Presentation

Town of Wickenburg — Regular Meeting (2025-10-08)

View PDF Meeting page

Extracted text (via pymupdf) 1524 characters
TOWN OF WICKENBURG
Parks and Trails Update
Todd Wallace, Manager, Parks & Facilities
October 8, 2025

• Working with CRAW to
build a new access road
and add 70,000+ sqft of
parking
• Planning for future barn
and stall area
• Reduce parking along
Constellation Road
2
Rodeo Grounds Parking & Road Upgrades

3
Rodeo Grounds Progress Pictures

• Replacing existing arena lights with LED stadium lights
o Photometrics used to produce and average of 50 foot-candles in arena
• Installing LED lights in main parking lot area.
4
Rodeo Grounds Lighting

5
Coffinger Park Improvements
Sidewalks, Benches and ADA Picnic Tables
Focusing
on the
Gophers

• Beginning Installation this Fall
• Planned Field Upgrades
o Add covered dugouts and expand backstop fencing
o Fix field lighting
o Irrigation updates and gopher mitigation
o Install scoreboard
o Add infield mix and new base pegs
o Add bleacher behind home plate
6
Coffinger Park – Ball Field Renovation

• Resurfaced Entire Pool
• Replaced Majority of Pool Equipment
o Acu Drive on filter and slide pumps
o High-capacity sand filters
o New 10hp and 5hp pumps
§ Slide and Raindrop mushroom
• Refurbished and polished pool slide
• Pool Heater & Pool Cover
• Enhance Pool Deck Area
7
Swimming Pool Improvements

• Alternative Scope
o Three multi-purpose fields
o Restrooms
o Food truck lot w/electrical
o Dog park
o One entrance from Hwy 60
o Ability for future expansion
8
New Park Design
Dog
Park

• Ball Field
• Ramada & Picnic Area
• Parking
9
Sunset Park Additions

Questions
10