2345 South Alma School Road | Suite 208 OFFICE 602.803.7079 • Mesa, AZ 85210 • hwlochner.com May 12, 2025 Mr. Herschel Workman Town of Wickenburg 155 North Tegner Street, Suite A Wickenburg, AZ 85390 RE: Award Recommendation Letter Schedule I – T-Hangar Taxilanes Reconstruction Bid Additive 1 – Additional Pavement Reconstruction Wickenburg Municipal Airport – Wickenburg, Arizona AIP No. 3-04-0048-030-2025 & 031-2025 | Lochner No. 24344 Dear Mr. Workman, Bids were received for the above noted project on May 8, 2025. Four (4) bids were received and are shown in the attached bid tabulation. The bids were reviewed for math errors, bid bonds, addenda acknowledgement and verification of federal disbarment. All four (4) bids appear to be responsive. A general review of each bid is summarized below: CONTRACTOR Schedule I Bid Additive 1 TOTAL Desert Services International, Inc. $832,215.00 $59,875.00 $883,090.00 Combs Construction Company, Inc. $877,420.80 $29,237.50 $906,658.30 Rummel Construction, Inc. $860,730.00 $30,675.00 $891,405.00 J. Banicki Construction, Inc. $943,265.00 $49,885.50 $993,147.50 A great deal of effort was put forth to attract bidders to this project. A total of 32 potential bidders were sent the Invitation for Bids. A total of eight (8) sets of plans and specifications were purchased by potential bidders, plan rooms, and suppliers. A 30-day bid period was established for this project. The advertisement for bids for the project was published for two (2) consecutive weeks as part of the bid period. A pre-bid conference was held onsite to answer questions and show the project to potential bidders. Based on conversations with FAA ADO staff, it is believed that sufficient funds are available for the budget listed below via an IIJA-AIG and a companion AIP grant. The grant applications are enclosed with this letter that incorporates the recommended bidders proposed cost at a 95% FAA share. The grant applications should be signed and forwarded to the FAA as soon as possible. Our recommendation is to award Schedule I and Bid Additive 1 to Desert Services International, Inc. for a total contract amount of $883,090.00 upon receiving concurrence from the FAA Program Manager and receipt of the FAA Grant Agreements. 2 The following budget needs to be developed for grant No. 3-04-0048-030-2025 & 031-2025. The Engineering Services and Construction Services items are per our executed scope of work. The Sponsor Administration item covers the cost for advertising the project to get bid proposals from the contractors and for the independent fee review of our fee. COST SUMMARY – AIP NO. 3-04-0048-030-2025 & 3-04-0048-031-2025 Engineering Services $86,930 Construction Administration $223,040 Sponsor Administration $5,000 Construction Cost $883,090 TOTAL PROJECT COST $1,198,060 FAA Share 95.00% $1,138,157 State Share 2.50% $29,951.50 Local Share 2.50% $29,951.50 FAA GRANT BREAKDOWN TOTAL FAA SHARE $1,138,157 IIJA-AIG Grant $444,000 AIP Grant $694,157 We will send the Notice of Award for signature once approval is received from the FAA Program Manager and a FAA Grant Agreements are executed. If you have any questions regarding this matter, please contact our office. We look forward to getting this project completed. Sincerely, LOCHNER Jason Musselman, P.E. Arizona Market Lead JM/cls Enclosures: Bid Tabulation Revised Grant Applications Item No. Spec No. Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 C-100-14.1 Contractor Quality Control Program 1 LS 50,000.00 $ $ 50,000.00 54,500.00 $ $ 54,500.00 124,000.00 $ $ 124,000.00 33,000.00 $ $ 33,000.00 57,500.00 $ $ 57,500.00 2 C-102-5.1 Compliance with Pollution, Erosion, and Siltation Control 1 LS 20,000.00 $ $ 20,000.00 30,000.00 $ $ 30,000.00 12,400.00 $ $ 12,400.00 10,000.00 $ $ 10,000.00 33,000.00 $ $ 33,000.00 3 C-105-6.1 Mobilization 1 LS 70,000.00 $ $ 70,000.00 98,500.00 $ $ 98,500.00 86,000.00 $ $ 86,000.00 15,000.00 $ $ 15,000.00 85,900.00 $ $ 85,900.00 4 C-106-3.1 Safety, Security and Maintenance of Traffic 1 LS 21,000.00 $ $ 21,000.00 45,000.00 $ $ 45,000.00 130,400.00 $ $ 130,400.00 36,500.00 $ $ 36,500.00 25,000.00 $ $ 25,000.00 5 P-101-5.1 Sawcut Existing AC Pavement 280 LF 15.00 $ $ 4,200.00 4.00 $ $ 1,120.00 1.25 $ $ 350.00 9.00 $ $ 2,520.00 9.00 $ $ 2,520.00 6 P-101-5.2 Milling 8300 SY 7.00 $ $ 58,100.00 2.85 $ $ 23,655.00 3.30 $ $ 27,390.00 3.50 $ $ 29,050.00 3.00 $ $ 24,900.00 7 P-101-5.3 Curb Removal 475 LF 7.00 $ $ 3,325.00 12.00 $ $ 5,700.00 11.00 $ $ 5,225.00 7.00 $ $ 3,325.00 30.00 $ $ 14,250.00 8 P-152-4.1 Unclassified Excavation 1,200 CY 15.00 $ $ 18,000.00 50.00 $ $ 60,000.00 32.00 $ $ 38,400.00 28.00 $ $ 33,600.00 11.00 $ $ 13,200.00 9 P-207-5.1 7" Thick In-Place FDR Recycled Asphalt Aggregate Base Course 7,900 SY 10.00 $ $ 79,000.00 12.00 $ $ 94,800.00 7.00 $ $ 55,300.00 4.20 $ $ 33,180.00 4.10 $ $ 32,390.00 10 P-207-5.2 7" Thick Re-Used FDR Recycled Asphalt Aggregate Base Course 410 SY 20.00 $ $ 8,200.00 22.00 $ $ 9,020.00 34.00 $ $ 13,940.00 45.00 $ $ 18,450.00 15.00 $ $ 6,150.00 11 P-207-5.3 Remove 7" Base Course and Place Salvaged Base Course 420 SY 20.00 $ $ 8,400.00 27.00 $ $ 11,340.00 20.49 $ $ 8,605.80 30.00 $ $ 12,600.00 32.00 $ $ 13,440.00 12 P-401-8.1 3" Thick Asphalt Surface Course 1,450 TON 240.00 $ $ 348,000.00 189.00 $ $ 274,050.00 142.00 $ $ 205,900.00 229.00 $ $ 332,050.00 285.00 $ $ 413,250.00 13 P-610-6.2 Concrete Spall Repair 15 SY 200.00 $ $ 3,000.00 250.00 $ $ 3,750.00 340.00 $ $ 5,100.00 870.00 $ $ 13,050.00 1,500.00 $ $ 22,500.00 14 P-620-5.1 Paint Striping 750 SF 6.00 $ $ 4,500.00 11.00 $ $ 8,250.00 2.00 $ $ 1,500.00 5.50 $ $ 4,125.00 3.10 $ $ 2,325.00 15 D-754-5.1 Ribbon Curb 1,100 LF 30.00 $ $ 33,000.00 30.00 $ $ 33,000.00 41.00 $ $ 45,100.00 90.00 $ $ 99,000.00 40.00 $ $ 44,000.00 16 D-754-5.2 6" Vertical Curb and Gutter 620 LF 35.00 $ $ 21,700.00 44.00 $ $ 27,280.00 39.00 $ $ 24,180.00 54.00 $ $ 33,480.00 52.00 $ $ 32,240.00 17 D-754-5.3 4' Wide Channel 30 CY 700.00 $ $ 21,000.00 425.00 $ $ 12,750.00 1,131.00 $ $ 33,930.00 1,860.00 $ $ 55,800.00 1,550.00 $ $ 46,500.00 18 D-754-5.4 6' Wide Channel 40 CY 700.00 $ $ 28,000.00 450.00 $ $ 18,000.00 1,230.00 $ $ 49,200.00 1,800.00 $ $ 72,000.00 1,500.00 $ $ 60,000.00 19 D-754-5.5 Outlet Structure 1 LS 10,000.00 $ $ 10,000.00 12,500.00 $ $ 12,500.00 10,500.00 $ $ 10,500.00 24,000.00 $ $ 24,000.00 14,200.00 $ $ 14,200.00 AIP No. 3-04-0048-030-2025 BID TABULATION Wickenburg Municipal Airport Wickenburg, Arizona T-Hangar Taxilanes Reconstruction TOTAL SCHEDULE I $ 809,425.00 $ 877,420.80 $ 860,730.00 Lochner No. 24344 Bid Opening: May 8, 2025 at 11:00 a.m. (MST) Engineer's Estimate Combs Construction Company, Inc. Rummel Construction, Inc. J. Banicki Construction, Inc. $ 943,265.00 Schedule I - T-Hangar Taxilanes Desert Services International, Inc. $ 823,215.00 Page 1 of 2 AIP No. 3-04-0048-030-2025 BID TABULATION Wickenburg Municipal Airport Wickenburg, Arizona T-Hangar Taxilanes Reconstruction Lochner No. 24344 Bid Opening: May 8, 2025 at 11:00 a.m. (MST) Item No. Spec No. Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 20 C-105-6.1 Mobilization 1 LS 3,500.00 $ $ 3,500.00 19,500.00 $ $ 19,500.00 1,700.00 $ $ 1,700.00 11,000.00 $ $ 11,000.00 3,500.00 $ $ 3,500.00 21 P-101-5.1 Sawcut Existing AC Pavement 50 LF 15.00 $ $ 750.00 4.00 $ $ 200.00 3.00 $ $ 150.00 28.00 $ $ 1,400.00 16.00 $ $ 800.00 22 P-101-5.2 Milling 500 SY 7.00 $ $ 3,500.00 11.00 $ $ 5,500.00 12.90 $ $ 6,450.00 2.85 $ $ 1,425.00 3.00 $ $ 1,500.00 23 P-207-5.1 7" Thick In-Place FDR Recycled Asphalt Aggregate Base Course 550 SY 10.00 $ $ 5,500.00 11.00 $ $ 6,050.00 12.90 $ $ 7,095.00 2.50 $ $ 1,375.00 7.00 $ $ 3,850.00 24 P-401-8.1 3" Thick Asphalt Surface Course 100 TON 240.00 $ $ 24,000.00 278.00 $ $ 27,800.00 137.00 $ $ 13,700.00 151.00 $ $ 15,100.00 400.00 $ $ 40,000.00 25 P-620-5.1 Paint Striping 75 SF 6.00 $ $ 450.00 11.00 $ $ 825.00 1.90 $ $ 142.50 5.00 $ $ 375.00 3.10 $ $ 232.50 TOTAL BID ADDITIVE 1 Engineer's Estimate mbs Construction Company, In Rummel Construction, Inc. J. Banicki Construction, Inc. Bid Additive 1 - Additional Pavement Reconstruction $ 37,700.00 $ 29,237.50 $ 30,675.00 $ 49,882.50 993,147.50 $ $ 59,875.00 Desert Services International, Inc. Desert Services International, Inc. 883,090.00 $ BID TOTAL - SCHEDULE I & BID ADDITIVE 1 Engineer's Estimate mbs Construction Company, Rummel Construction, Inc. J. Banicki Construction, Inc. 847,125.00 $ 906,658.30 $ 891,405.00 $ Page 2 of 2