10/20/25 Study Session Presentation
Extracted text (via pymupdf)
2561 characters
TOWN OF WICKENBURG Community Center Review Todd Wallace, Manager, Parks & Facilities October 20, 2025 • The Community Center was built in 1970 (55 years old) • 10,000 square feet under roof and situated on 4 acres • The building needs significant repairs o Equipment upgrades, HVAC, electrical and plumbing o Structural deficiencies, trusses and roof o Renovations to meet modern ADA and safety building codes § ADA access § ADA Restrooms § Fire sprinkler system and addressable fire alarm Overview 2 • Town resident were surveyed about the future of the Community Center in August 2024 • Approximately 60% of those surveyed preferred to renovate the existing building and 40% preferred to redesign and build a new building • 97% like the Community Center’s current location • Top requested ‘spaces’ for the Community Center were: o Large event and meeting area o Outdoor area for weddings and concerts o Small multipurpose meeting spaces Key Resident Survey Results 3 • Correct structural deficiencies o Roof and trusses • Replace aging equipment o HVAC, electrical, and plumbing systems • Remodeling will require compliance with current building and safety codes o ADA-compliant access and restrooms o New fire alarm and fire sprinkler systems • Reconfiguration interior • Exterior cosmetic and structural repairs • Current Projected Cost: $5 - $7 million • Current Budget: $1.8 million FY26 and $3.5 million in the CIP for FY27 4 Remodel Existing Facility 5 Existing vs Concept Floor Plan 6 Plan Evolution – Multipurpose Room 7 Plan Evolution – Stage vs Multipurpose 8 Plan Evolution – Office vs Conference 9 Plan Evolution – Restrooms 10 Existing vs Concept Floor Plan 11 Renderings – Great Hall 12 Concept Views – Great Hall 13 Renderings – Banquet Rooms 14 Concept Views – Banquet Rooms 15 Renderings – Conference Room 16 Concept Views – Entry Lobby 17 Concept Views – Enclosed Patio • We believe in the power of community involvement and value Resident’s input • Regularly update the Community Center page on Town’s website • Newspaper press releases • Open house at the Community Center o Present design options § Floor plans and renderings o Gather comments and concerns from resident’s 18 Community Engagement • 11/25 – 1/26 Phase 1 Design Development (60%) • 2/26 – 4/26 Phase 2 Construction Documents (100%) • 4/26 – 5/26 Prepare and Approve Construction Contract (GMP) • 6/26 – 7/26 Caliente Issue Subcontractor Contracts and Mobilize • 8/26 – 3/27 Demo/Construction • 4/27 Project Complete 19 Projected Timeline Questions? 20