Extracted text (via pymupdf)
3079 characters
4742 North 24th Street Suite 270 Phoenix, Arizona 85016 Main: 877 627 3772 Sewer Memorandum To: Town of Wickenburg From: Casey Whiteman, PE Date: December 10, 2025 Subject: Preliminary Sewer Memo Project No.: 2026.02 Terrible’s (the Project) is a gas station facility being developed north and east of SR-93, and east of Scenic Loop Road in Wickenburg, Arizona. The Project consists of approximately 5.75 acres in a portion of Section 21 in Township 1 South, Range 7 East of the Gila and Salt River Meridian. The Project will consist of a new convenience store, gas pumps, parking, and space for a future car wash. The Project is within the City of Wickenburg (City) in Yavapai County. However, the Project lies outside of any designated wastewater service provider’s service area. All onsite wastewater infrastructure required for serving the Project will be privately owned and operated by Terrible’s. The proposed wastewater system infrastructure for the Project was evaluated consistent with the design criteria provided in the Design Standards for Water and Wastewater Systems (City of Phoenix, 2021) and the 2017 Arizona Administrative Code (AAC, 2017). More specifically, the septic design follows guidelines set forth in the Arizona Administrative Code Title 18, Chapter 9 Department of Environmental Quality – Water Pollution Control (AAC Title 18-9). Anticipated wastewater demands for the Project are shown below in Table 1. More detailed calculations have been provided as an attachment. Table 1: Wastewater Demands Land Use Average Day Demand (gpm) (gpd) Commercial 0.3 375 Car Wash TBD TBD TOTAL: 0.3 375 The convenience store and site amenities will be constructed prior to the car wash facility to reduce initial sewer demands. There is no existing City sewer infrastructure near the Project vicinity. Therefore, the Project will be serviced by a private onsite wastewater treatment system. The onsite wastewater treatment system will be located at the southwest corner of the Site and will consist of a precast concrete septic Project No. 2026.02 December 10, 2025 Page 2 | 2 tank designed per section R18-9-A314A of the ACC. The effluent from the septic tank will flow to a distribution box and be evenly distributed to the disposal field. The final system sizing will be determined using data obtained in the field for the soil absorption rate (SAR). Detailed calculations for the sizing and disposal fields will be provided in the final wastewater report for the Project. Once City sewer is available adjacent to the Project site, the Project will connect to the City’s sewer system and will decommission the septic field. Sewer stubs are provided to the ROW to allow for future connection to the city-maintained sewer system. HC Sewer Flow Calculations - Preliminary Terrible's Wickenburg, AZ December-25 SF (gpd) (gpm) Building 1 5,000.0 375 0.3 GRAND TOTAL 5,000 375 0.3 Notes: Flow Factors: Average Day Flow for commerical buildings 75 gal/1000 SF Area Average Daily Flow