Town of Wickenburg — Regular Meeting (2026-02-24)

View PDF Meeting page

Extracted text (via pymupdf) 7257 characters
4742 North 24th Street Suite 270 
Phoenix, Arizona 85016 
Main: 877 627 3772 
 
 
Water Memorandum 
To: 
Town of Wickenburg 
From: 
Casey Whiteman, PE 
Date: 
December 10, 2025 
Subject: 
Preliminary Water Memo 
Project No.: 
2026.02 
 
 
Terrible’s (the Project) is a gas station facility being developed north and east of SR-93, and 
east of Scenic Loop Road in Wickenburg, Arizona. The Project consists of approximately 5.75 acres in 
a portion of Section 21 in Township 1 South, Range 7 East of the Gila and Salt River Meridian. The 
Project will consist of a new convenience store, gas pumps, parking, and space for a future car wash. 
The Project is within the City of Wickenburg (City) in Yavapai County.  However, the Project lies outside 
of any designated water service provider’s service area. All onsite water infrastructure required for 
serving the Project will be privately owned and operated by Terrible’s. 
 
The proposed water system infrastructure has been prepared and evaluated consistent with 
guidelines adopted from the Design Standards for Water and Wastewater Systems (City of Phoenix, 
2021), 2018 International Fire Code (ICC, 2018), and the Arizona Administrative Code (AAC, 2017). 
Anticipated water demands for the Project are shown below in Table 1. More detailed calculations 
have been provided as an attachment.  
Table 1: Water Demand Summary 
Land Use 
Average Day Demand 
Peak Demand 
(gpm) 
(gpd) 
(gpm) 
(gpd) 
Commercial 
0.4 
625 
0.7 
1,063 
Car Wash 
TBD 
TBD 
TBD 
TBD 
General Landscaping 
8.7 
12,552 
14.8 
21,338 
Public ROW 
0.6 
779 
0.9 
1,359 
TOTAL: 
9.7 
13,976 
16.5 
23,759 
 
The convenience store and site amenities will be constructed prior to the car wash facility to 
reduce initial water demands. 
 
There is no existing City water infrastructure near the Project vicinity. Therefore, the Project 
will be serviced by a private onsite water campus utilizing the existing well and storage tank located

Project No. 2026.02 
December 10, 2025 
Page 2 | 2 
just outside the southeast property corner. The existing water tank is 102,000 gallons. Information on 
this tank has been provided as an attachment. A new pump station and the necessary 
treatment/chlorination facilities will be installed as required. These new facilities will be located in the 
southeast corner of the Site. Additional information on these systems will be provided with the final 
water report for the Project.  
 
The required firm well capacity for the Project is calculated assuming that the well operates 
no more than 18 hours per day. Table 2 summarizes the required well capacity needs for the Project.  
Table 2: Well Capacity Requirements 
Well 
Peak Demand 
Required Well Capacity 
(Pumping 18 hrs/day) 
(gpm) 
(gpm) 
1 
16.5 
22.0 
 
The onsite booster pumps will have sufficient capacity to meet the peak hour demand plus 
the required fire flow. Table 3 below summarizes the booster pump capacity required for the Project. 
The firm pumping capacity will need to be met with the largest pump out of service. 
Table 3: Booster Pump Requirements 
Peak Demand 
Fire Flow 
Firm Pumping Capacity 
16.5 gpm 
750 gpm 
767 gpm 
 
HC

Water Demand Calculations - Preliminary 
Terrible's 
Wickenburg, Arizona
December 2025
(SF)
(acre)
(gpd)
(gpm)
(gpd)
(gpm)
Commerical
5,000
0.11
625
0.4
1,063
0.7
General Landscaping
125,000
2.87
12,552
8.7
21,338
14.8
Public ROW
26,000
0.60
799
0.6
1,359
0.9
Total
-
-
13,976
9.7
23,759
16.5
Notes: Demand Factors:
Commerical
125 gal/1000 SF
General Landscaping
4,374 gal/acre
Public ROW
1,339 gal/acre
Peaking Factors:
Peak Hour Demand:
2 x Average Day Demand
Fire Flow Demand:
Building Area
5,000 sq. ft
Building Construction Type
IIB
Fire Flow
1,500 gpm/2 hours
Automatic Sprinkler
Yes
Reduced Fire Flow
750 gpm/1 hours
Max Day Demand
16.5 gpm
Max Day Plus Fire Flow
766.5 gpm/1 hours
Area
Land Use
Average Day Demand
Peak Hour Demand
1Design criteria based on the City of Phoenix Water and Sewer Design Flows (2021).

Instructions 
The tank pad diameter must be at least six feet 
larger than the diameter of the tank for installation.  
1.
Remove all loam, vegetation and sharp 
objects from the tank pad location. 
2.
Wherever possible, the tank site should be 
excavated into natural ground. 
3.
When excavating a site, adequate drainage 
must be installed to allow water to be diverted 
around the tank. 
4.
When using fill to level a tank site, adequate 
retaining must be constructed to maintain pad 
integrity.  
5.
Tank base material must be crushed stone or 
similar, with a maximum particle size of 0.25” 
6.
The tank base must be at least 3” thick and 
level within 1/2” 
7.
Once the tank base is complete, ensure any 
damage by vehicles or livestock is adequately 
repaired. 
On the day of installation 
The customer is required to have available: 
Someone to advise the orientation of the 
fittings prior to installation starting  
Sufficient water to fill 10% of the tank volume 
while the installer is on site 
IMPORTANT 
Once the tank installation is complete, place a 
layer of free-draining aggregate around the 
perimeter of the tank to reduce base erosion. 
Site 
Preparation 
Aquamate Tanks Site Preparation 
(844) 320-TANK (8265) 
Model Code 
D205 
D307 
D409 
D512 
Tank Diameter 
17’1” 
25’7” 
34’2” 
42’8” 
Pad Diameter 
24’ 
32’ 
41’ 
49’

Prior to installation 
•
Excavate pipework trench in planned scour 
location. 
•
Lay scour pipework at least 12” below the  
planned base level on a suitably compacted 
base to minimise settlement. 
•
Finished the scour flange flush with the 
prepared tank base level. 
•
Studs must be at least 2’ long, threaded 
within 1/8” of flange. 
•
Backfill trench after pipework installation with 
suitable 
engineering 
fill 
and 
compact 
accordingly. 
Scour drain installation 
1.
Wrap exposed studs with geotextile offcuts 
or similar to protect liner during installation. 
2.
Install tank structure as normal. 
3.
Position the geotextile underlay as normal. 
After installation, find the studs, cut a hole 
around each one and push studs through 
the geotextile layer. Cut center hole last. 
4.
When installing the liner, lift the base 
section over the protruding studs as to not 
damage the liner. 
5.
After liner installation, find the studs, cut 
holes around each one and push studs 
through the tank liner. Do not cut the center 
hole at this stage. 
6.
Remove the geotextile offcuts from studs, 
place the rubber gasket and sealing flange 
over the studs. 
7.
Place a bead of Sika sealant about base of 
the exposed stud and tighten the washers & 
nuts onto each one. 
8.
Cut the center hole in the liner once the 
sealing flange is firm in place. 
Scour Drain 
Installation 
Site Preparation 
(844) 320-TANK (8265) 
finished studded flange prior to liner installation, 
flush with base level, studs 2” long minimum 
bolted scour order of assembly: geotextile underlay 
– tank liner – rubber gasket – sealing flange – 
sealant – washers & nuts   
IMPORTANT 
Compact the subgrade immediately next to flange 
to provide a firm, unyielding surface for liner to be 
placed on.  
Failure to compact area near flange may create 
differential settlement and lead to liner bridging 
and ultimately liner failure.