2024 Parks Master Plan

Town of Wickenburg — Regular Meeting (2026-04-08)

View PDF Meeting page

Extracted text (via pymupdf) 154303 characters
Parks and Recreation Master Plan
TOWN OF WICKENBURG
September 2024

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
2
Town Council
Rui Pereira, Mayor
Kristi Henson, Vice Mayor
Kristy Bedoian, Council Member
BG Bratcher, Council Member
Brian Jones, Council Member
Rebecca Rovey, Council Member
Art Rubash, Council Member
Town of Wickenburg Team
Stephen Erno, Town Manager
Kassandra T. Aleskova, Management Analyst Principal
Herschel Workman, Public Works Director
Sarah E. Brown, Community Services Manager
Consultant Team
Dig Studio  |  Lead Consultant
Jay Hicks, Senior Principal
Yuan Liu, Senior Planner
Matthew Lake, Landscape Designer
The Barnhart Company  |  Public Engagement
Brock Barnhart, CEO
Albert Granillo, Bi-lingual Sr. Project Manager
PROS Consulting  |  Park Management
Michael Svetz, Principal

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
3
CONTENTS
01    Looking Forward
About the Plan
Master Plan Process and Key Components
02    Wickenburg Parks & Recreation Today
Why Invest in Wickenburg’s Parks & Recreation Facilities?
Ecology and Environment
Local Culture and Character
Parks and Recreation System Inventory
03    Community Input
On-line and Paper Survey Summary
Stakeholder Interviews
In-person Public Workshops
Key Findings & Input
04    Parks & Recreation Needs Assessment
Program and Services Assessment
Park Maintenance Assessment
Park Maintenance Recommendations
05    Shared Vision for the Future
Gather Community
Connectivity and Accessibility
Economic Viability
Heritage Celebration
Protect Nature
06    Existing Park Opportunities
Coffinger Park
Rodeo Grounds & Constellation Park
Sunset Park
Wickenburg’s Trail Network
07    New Park Opportunities
Kerkes Sports Fields
Sunrise Park
Cassandro Wash Park
Upper Hassayampa Nature Preserve
08    Implementation Plan
Existing Parks Maintenance and Updates
New Park Amenities
6
8
12
13
14
16
20
21
22
24
28
32
34
38
40
42
44
46
50
56
62
66
77
78
79
80
86
96

01  Looking Forward
	»
About the Plan
	»
Master Plan Process and Key Components

Wickenburg’s trails meander through a landscape dotted with saguaro cacti, rugged mountains, and wide-open desert vistas, 
offering mountain bikers both challenging rides and leisurely paths. 
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
6
 LOOKING FORWARD
What is a Town-wide Parks and 
Recreation Master Plan?
This is a critical time for the Town of Wickenburg 
(“the Town”) to decide on a course for its parks and 
recreation system, to spark community spirit, and to 
include partner groups in the endeavor. Wickenburg’s 
parks, open space, and recreation resources have an 
aspirational future, as well as a practical approach, 
through the development of a Parks and Recreation 
Master Plan (“Master Plan”). The plan considers 
existing park amenities, the strong synergies between 
parks and natural open space, recreation goals, and the 
expanding needs of the local population. The Master 
Plan includes strategies for maintaining and improving 
current resources while gradually increasing capacity 
and extending opportunities and accessibility for 
the whole community. Through the integration of 
community health, equity, connection, and long-term 
economic sustainability, the plan aims to enhance 
the parks and recreation system’s significance in 
Wickenburg residents’ everyday lives in the years to 
come.
Moving Forward
The Town of Wickenburg is focused on the future 
growth and potential of its park and recreation system. 
The parks and recreation master plan capitalizes on the 
momentum generated by Town Council involvement, 
cross-departmental leadership, strategic investments, 
and alignment with the General Plan.
Presently, with a stable economy and a thriving 
community, Wickenburg is embarking on an exciting 
phase of rebuilding. This rebuilding phase involves 
active programming within existing facilities, increased 
funding resources, the restoration of a robust cultural 
identity, and the cultivation of an external community 
image. The current period of growth presents a pivotal 
opportunity for the Town to develop a new vision, 
establish goals, and prioritize initiatives through a 
master plan process.
About the Plan

Town of Wickenburg Limit
Wickenburg MPA Boundary
County Limit
Parks
Passive / Restricted Open Space
Golf Course
Public Land
Existing parks and open space in and near the vicinity of Wickenburg recorded in 2022
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
7
 LOOKING FORWARD
The Role of A Park and Recreation 
Master Plan
A Parks and Recreation Master Plan serves as a crucial 
tool for towns and cities planning for the future. The 
process begins with a comprehensive assessment 
of the current state of park and recreation facilities, 
identifying deficiencies, and understanding community 
needs. Through extensive community engagement, the 
plan collected valuable input to ensure that proposed 
projects align with the actual desires of residents and 
garner broad community support.
Strategic planning is a pivotal aspect of the master plan, 
outlining specific goals for park development. This 
strategic approach provides decision-makers with a 
clear road-map for utilizing available funds effectively. 
The plan prioritizes projects based on urgency, impact, 
and feasibility, enabling decision-makers to allocate 
funds to initiatives that address critical deficiencies and 
deliver maximum benefits.
Integral to the master plan is detailed needs assessment 
and level of service analysis, providing decision-makers 
with a comprehensive financial overview for each 
proposed improvement project. This financial clarity 
ensures that Capital Improvement Program (CIP) funds 
are allocated appropriately, minimizing unforeseen 
challenges during implementation.
Additionally, the master plan identifies potential 
grant opportunities, aligning proposed projects with 
the criteria of available grants to enhance the Town’s 
chances of securing additional funding sources.
Highlighting long-term sustainability is essential, as 
decision-makers often prioritize projects contributing 
to the enduring health of park facilities. The master 
plan can incorporate sustainable design principles, 
maintenance plans, and ongoing community 
engagement strategies, reinforcing the Town’s 
commitment to lasting improvements.
In essence, the Park and Recreation Master Plan 
combines community input, strategic planning, and 
financial clarity to present a compelling case for CIP 
funding. By addressing current needs, involving the 
community, and strategically planning for the future, 
the master plan enhances the Town’s ability to secure 
funding for park improvement projects.

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
8
 LOOKING FORWARD
The Parks and Recreation Master Plan takes a 
comprehensive approach, examining all aspects of 
the town, both internally and externally. This involves 
assessing the town’s physical assets, understanding 
the community’s needs, and evaluating the town and 
community’s vision, values, and culture concerning 
park and recreation resources. Elements of the physical 
system, town operations, and culture are carefully 
examined and evaluated throughout the following 
phases:
1. Park and Recreation Facility 
Inventory and Analysis
In this initial phase, a thorough analysis of the system’s 
existing conditions was conducted. This included 
updating the system-wide inventory, assessing the 
town’s physical assets, and establishing a strong 
understanding of the local context. The evaluation 
process sought to identify potential partnership 
opportunities, ensuring a strong foundation for future 
recommendations. Moreover, an assessment of the 
level of service and community needs was conducted to 
inform subsequent phases.
2. Public Engagement
To ensure the inclusivity of the master planning 
Master Plan Process and Key Components
process, a robust public engagement strategy was 
implemented. Online and paper surveys were 
distributed to the public, stakeholder meetings were 
held, and two public workshops were organized. These 
activities were essential in gathering valuable insights 
and perspectives from the community, fostering a 
collaborative approach to the planning process.
In total, 434 residents responded to the online survey 
and provided over 900 comments. 35 residents 
attended the first open house and 26 attended the 
second open house, providing valuable input. In 
addition, the team and Town staff met with multiple 
Wickenburg parks and recreation stakeholders, who 
provided valuable insights and input on improving the 
parks and recreation system to better serve residents 
participating in their organizations.
3. Future Needs, Opportunities, and 
Vision
Building upon the public engagement results, this 
phase aimed to identify future needs and opportunities 
for Wickenburg’s Parks and Recreation system. A 
collective goals and strategies were developed to guide 
both internal work culture and external performance. 
The process operationalized a shared identity and 
set of objectives for the town, ensuring an ongoing 
commitment to strategy execution.
4. Plan Development
The development phase focused on creating a new 
design process and evaluating the design to meet the 
established vision and community needs. Notably, four 
priority parks—Coffinger Park, Sunset Park, Rodeo 
Grounds, and Constellation Park Campground—were 
identified. A town-wide trail network was developed, 
along with conceptual site designs and programming 
baselines. These serve as a record of initial community 
needs and concerns, providing a foundation for future 
projects.
5. Report Finalization
The final phase involved refining recommendations 
and developing implementation strategies. The vision 
for implementation was shared with the public at an 
event to be determined. The final master plan was 
presented to the council in September 2024 marking 
the culmination of a thorough and inclusive planning 
process.
Throughout the entire Parks and Recreation 
Master Plan development, a commitment to clear 
communication, community engagement, and strategic 
visioning was evident. The result is a comprehensive 
document that not only addresses the town’s current 
needs but also provides a roadmap for its future 
recreational development.

Project Process
Oct
1
Park and Recreation Facility 
Inventory and Analysis
2
Public Engagement
3
Future Needs, Opportunities, 
and Vision
4
Priority Park Plan Development
5
Final Plan, Recommendations 
and Action Plan
Feb
Dec
Apr
Nov
Mar
Jan
May
Jun
Jul
Aug
Sept
Oct
Dec 2, Holiday 
Music Walk Station
Jan 30, Public 
Workshop #1
Stakeholder
Interviews
March 10
Online Survey Closed
May 2, Public 
Workshop #2
Public Review 
and Comment
September 3,
Council Presentation
Plan
Adoption
Program & Services 
Assessment
Oct 4, Project Overview with 
Parks & Trails Committee
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
9
 LOOKING FORWARD

02  Wickenburg Parks and 
Recreation System Today
	»
Why Invest in Wickenburg’s Parks & Recreation Facilities
	»
Context: Ecology and Environment
	»
Local Culture and Character
	»
Inventory of Today’s Parks and Recreation Facilities

Parks, open spaces and outdoor recreation are an important part of active lifestyles and the social lives of towns. Picture above: 
Bluegrass Festival at Everett Bowman Rodeo Arena (top), Horseback ride in the desert (bottom left), and Splash pad at Sunset Park 
(bottom right).
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
12
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
Why Invest in Wickenburg’s Park and 
Recreation Facilities?
For the past years, Wickenburg has seen substantial 
growth and a new period of new development, resulting 
in increased population, different kinds of development 
and mixed-income housing. The drivers for the changes 
are largely the result of several factors:
1.	 Economic Development and Job Growth: 
Wickenburg has seen a positive trend in job 
growth, with a predicted future job growth 
over the next ten years to be 45.1%, which is 
significantly higher than the US average. This is 
supported by a diverse economy that includes 
the rodeo industry, behavioral health services, 
and mining business. 
2.	 Tourism: The town is known as the “Team Roping 
Capital of the World” and hosts events that attract 
thousands of visitors. Additionally, Wickenburg’s 
designation as the “Dude Ranch Capital of the World” 
contributes to its tourist appeal, with its western-
style amenities and historical attractions like mines 
and dude ranches. Resort-style communities like 
Wickenburg Ranch also offer a blend of modern 
conveniences and western lifestyle, enhancing its 
attractiveness as a place to live and visit.
3.	 Community Planning and Development: 
The Wickenburg General Plan 2025 and ongoing 
updates to zoning codes reflect a comprehensive 
approach to future land use, economic 
diversification, livability, sustainability, and 
community excellence. These plans aim to guide 
the town’s development in a way that preserves 
its character while accommodating growth and 
enhancing quality of life. Plans for the Interstate 
11 corridor, which would connect Phoenix to Las 
Vegas and potentially run through Wickenburg, 
could open new commercial and industrial 
opportunities, further promoting growth.
As Wickenburg continues to see growth in the 
coming years – in residences, restaurants and shops, 
tourism attractions – the town’s success will need to 
be reinforced by investments that not only focus on 
healthy economic development, but also contribute 
to placemaking and public improvements. These 
types of improvements range from a town-wide trail 
system, which would establish a complete network 
for bicyclists and pedestrians throughout the town, 
to community parks that truly gather the community 
and improve the quality of life and open spaces that 
define a vision for the design and experiences that can  
inform future development.
Why Invest in Wickenburg’s Park & Recreation Facilities?

Wickenburg is a hotspot area for birding in Arizona with over 280 
species of bird confirmed. Picture above: Vermilion Flycatcher 
pictured at Hassayampa River Preserve.
A portion of the Hassayampa River that runs through the Preserve.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
13
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
The Hassayampa River and Dynamic 
Washes
Nestled within the arid landscapes of the Sonoran 
Desert, Wickenburg, Arizona, boasts a distinctive 
environmental context that profoundly influences its 
natural features. The Hassayampa River, a perennial 
watercourse, gracefully meanders through the region, 
contributing to the town’s hydrological dynamics. This 
river not only provides a habitat for a diverse array of 
wildlife but also exerts a significant influence on the 
surrounding vegetation and overall ecosystem.
In addition to the Hassayampa River, Wickenburg is 
characterized by dry washes—intermittent streambeds 
that come to life during sporadic rainfall events. 
Understanding the patterns and behavior of these 
washes is paramount for managing potential flood 
risks and preserving the delicate ecological balance of 
the area. Thoughtful park planning should carefully 
consider the impact of these washes and incorporate 
measures to mitigate potential flooding and erosion.
The town’s hydrology is intricately linked to its 
arid climate, featuring limited rainfall. This reality 
underscores the importance of implementing judicious 
water management strategies to sustain both natural 
habitats and human activities. Practices such as 
rainwater harvesting, the use of permeable surfaces, 
and the installation of efficient irrigation systems 
contribute to responsible water use within the town, 
aligning with broader water conservation goals in the 
desert environment.
Wildlife
Wickenburg’s wildlife population adds a dynamic 
element to its natural setting. From reptiles such as 
desert tortoises and Gila monsters to a variety of bird 
species adapted to arid conditions, the diverse fauna 
reflects the remarkable resilience of life in the desert 
environment. Larger mammals, including mule deer 
and bighorn sheep, may inhabit the more mountainous 
terrains adjacent to Wickenburg.
Vegetation
The town’s vegetation mirrors the hardiness 
characteristic of the Sonoran Desert. Employing 
xeriscaping techniques, which involve the use of native 
and drought-resistant plant species, plays a crucial role 
in sustainable landscaping practices. These approaches 
contribute to water conservation efforts and ensure that 
the local vegetation aligns seamlessly with the demands 
of the arid climate.
Environmental Stewardship
Preserving the environmental integrity of Wickenburg 
requires acknowledging and respecting the delicate 
balance between the natural surroundings and human 
activities. Future development of parks and recreation 
facilities should conscientiously consider these 
environmental factors, incorporating green spaces 
that seamlessly harmonize with the desert ecology 
while providing abundant recreational opportunities. 
The preservation of riparian areas along the 
Hassayampa River, responsible water management, and 
conservation efforts for local wildlife and vegetation 
collectively contribute to maintaining the unique 
environmental character of Wickenburg.
Ecology and Environment

Population by age range
Data resource: American Community Survey 5-Year Data (2009-2022)
As one of Wickenburg’s grandest celebrations, Gold Rush Days celebrated its 75th anniversary in 2024. This heritage event, featuring 
a blend of traditional festivities, draws thousands visitors to experience the town’s rich history and community spirit. Picture above: 
Gold Rush Days in 1949. 
Photo credit: The Wickenburg Chamber of Commerce
Population by age category
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
14
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
Historical Overview
Wickenburg’s journey began in the 1860s, founded 
on the heels of a significant gold discovery by Henry 
Wickenburg. Its early days were marked by the 
typical trials and triumphs of a mining boomtown. 
However, the town evolved over time into a hub for 
cattle ranching and agriculture. Key events like the 
establishment of the Vulture Mine brought prosperity 
and growth, setting the stage for the town’s enduring 
legacy as a cornerstone of the Western frontier.
Changing Population
Wickenburg is experiencing notable demographic 
shifts and population dynamics. As of recent estimates, 
Wickenburg’s population has shown a growth rate of 
13.09% since the 2020 census, with the population 
increasing from 7,500 to approximately 8,482. This 
growth trend underscores a steady increase in the 
number of residents, reflecting broader trends of 
migration and development within the area​ (US 
Census)​. The town’s population dynamics are 
influenced by various factors, including economic 
opportunities, the appeal of the town’s lifestyle, and its 
status as a desirable retirement destination.
A significant aspect of Wickenburg’s demographic 
profile is its median age, which stands at 64.4 years, 
indicating a predominantly senior population. This 
is notably higher than the median ages of both the 
Phoenix-Mesa-Chandler, AZ Metro Area (37.4) and 
the state of Arizona (38.4), suggesting Wickenburg is a 
favored retirement destination.
Wickenburg is also characterized by its seasonal 
population changes, often influenced by “snowbirds,” or 
part-time residents who migrate from colder climates 
to enjoy the warmer weather during winter months. 
This seasonal migration significantly impacts the local 
population, economy, and community life, contributing 
to fluctuations in business activities, healthcare 
services, and housing demands.
Ranching and Rodeo Heritage
Wickenburg, Arizona, is a town where the spirit of the 
American West thrives through its ranching and rodeo 
culture. The area’s ranches, from historic working cattle 
operations to guest ranches offering immersive cowboy 
experiences, form the backbone of its identity and 
economy. These ranches reflect a lifestyle that has been 
a pillar of the community since the late 19th century, 
blending tradition with modernity. Working ranches 
continue the age-old practices of cattle ranching and 
horse breeding, while guest ranches invite visitors 
Local Culture and Character

Old Town Wickenburg’s architectural character dates back to the town’s founding featuring Western facades and wooden accents 
that speak to its mining and ranching past.
Photo credit: Visit Arizona
The town’s early ranching and rodeo along with rugged desert landscape have shaped town’s character and identity.
Photo credit: The Wickenburg Chamber of Commerce
Photo credit: The Team Roping Journal
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
15
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
to step into the cowboy boots of the West, offering 
horseback riding, roping, and a taste of ranch life 
alongside contemporary comforts.
The cultural impact of these ranches extends beyond 
their fences, influencing Wickenburg’s celebrations, 
arts, and community ethos. Rodeo and roping events, 
notably the Gold Rush Days Rodeo, are central to 
the town’s social calendar, showcasing the skills 
and traditions that define cowboy heritage. These 
gatherings are not merely entertainment; they’re 
a tribute to the community’s resilience, skills, and 
collective spirit.
Moreover, ranchers in Wickenburg are custodians 
of the land, engaging in conservation efforts to 
preserve the desert’s natural beauty and biodiversity. 
This stewardship reflects a profound respect for the 
environment, integral to the cowboy ethos.
Wickenburg’s ranches and rodeos offer a living 
connection to the American West, embodying the 
town’s legacy and continuing allure. They represent not 
just a way of life but a vibrant community where history 
and tradition meet the present, making Wickenburg a 
unique testament to the enduring spirit of the West.
Festivals and Celebrations
Wickenburg’s calendar is marked by vibrant festivals 
and celebrations, chief among them the Gold Rush Days 
Rodeo and the Bluegrass Festival. Gold Rush Days, 
celebrated annually, honors the town’s mining heritage 
with a rodeo, parade, and various cultural activities, 
drawing visitors from across the nation. The Bluegrass 
Festival, another highlight, features performances 
by top bluegrass musicians and bands, offering 
workshops, impromptu jam sessions, and a family-
friendly atmosphere. These events not only celebrate 
Wickenburg’s rich history and cultural diversity but 
also serve as a testament to the community’s vibrant 
spirit and unity.
Architectural Charm
The architecture in Wickenburg reflects its Western 
heritage, with many buildings showcasing Territorial 
Adobe, Victorian, and Spanish Colonial styles. The 
town’s shops and boutiques maintain a rustic charm, 
offering Western wear, local art, and handmade crafts. 
Wandering through Wickenburg’s streets, one can feel 
the Old West ambiance, particularly in the historic 
downtown area where buildings have been preserved or 
restored to their original glory.

Regional Park / Special Use
Community Park
Neighborhood Park
Pocket / Linear Park
Non-parks (cemetery / golf)
Constellation Park
Coffinger Park
Boetto
Park
Stone
Park
Wishing 
Well Park
Kerkes
Trailhead
Maquire 
Park
Wickenburg 
Cemetery
Sunset 
Multi-use 
Path
Sunset Park
Barbara 
Brown Park
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
16
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
Parks and Recreation System Inventory
In the Town of Wickenburg, parks, open spaces, and 
facilities come in various shapes and sizes, ranging 
from community gathering spaces to desert RV 
camping grounds. Sunset Park offers a variety of sports 
fields for all ages, while the Everett Bowman Rodeo 
Grounds serve as a lively, programmed desert rodeo 
venue hosting destination events. Each facility plays 
a different role in the community. The master plan 
provides an understanding of the function of each space 
within the broader system, as well as its character and 
performance. It also looks at the system in aggregate to 
understand where there are surpluses and deficits of 
overall acreage and specific amenities compared to the 
town population.
Park and Recreation System 
Inventory
This inventory provides a foundational understanding 
of the number, type, location, and quality of all parks 
and recreation facilities in Wickenburg. Beginning 
with a list of facilities from the town, the project 
team assessed each site, documenting its amenities 
and condition. In total, 14 parks and open spaces, 
along with buildings serving recreational purposes, 
were surveyed. The Town of Wickenburg oversees 
approximately 67 acres of developed parks and 
14,716 square feet of recreational facilities. Parks 
and recreational spaces are categorized by size and 
general function. Typically, smaller open spaces address 
localized needs such as a small playground or trail 
access points, while larger parks and open spaces draw 
users from farther away from destination activities 
such as Everett Bowman Rodeo Grounds. The offerings 
at a park vary by its category:
•	Pocket Parks / Linear Parks are established in 
small, built-out areas to provide green space in 
neighborhoods where larger parks are not feasible.
Typical Park Size: 0.25 - 0.50 Acres
•	Neighborhood Parks are vital for offering 
accessible, local park access and supporting 
community health, providing various playground 
amenities and recreational opportunities for 
residents.	
	
	
	
	
Typical Park Size: 1.0 - 5.0 Acres
•	Community Parks are larger in size and often 
feature a greater concentration of sports fields 
and other recreation amenities to meet demands 
for a broader area.	
	
	
	
	
Typical Park Size: 5.0 - 25.0 Acres
•	Regional Parks / Special Use Parks offer the 
widest range of amenities and accommodate 
diverse programming and users. This type of 
park often plays a significant economic role by 
generating revenue to support the rest of the 
system.	 	
	
	
	
	
Typical Park Size: 25 - 100 Acres

1
2
3
5
6
9
10
11
13
14
12
4
7
8
Parks and Recreation Facilities
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
17
 WICKENBURG PARKS AND RECREATION SYSTEM TODAY
1. Constellation Park Campgrounds
2. Everett Bowman Rodeo Grounds
3. Coffinger Park
4. Coffinger Park Recreation Center
5. Stone Park
6. Wishing Well Park
7. Wickenburg Library
8. Wickenburg Community Center
9. Boetto Park
10. Maguire Park
11. Sunset Park
12. Dog Park
13. Sunset Multi-Use Path
14. Kerkes Trailhead

03  Community Input
	»
On-line and Paper Survey Summary
	»
Stakeholder Interviews
	»
Public Workshops
	»
Key Findings & Input

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
20
 COMMUNITY INPUT
Survey Operations and Methods
Receiving input from a wide range of Wickenburg 
residents was a top priority for this Parks and 
Recreation Master Plan. Online and hard copy surveys 
were implemented to receive comments from multiple 
different types of park users. 
The online survey was live from November 30, 2023 to 
March 10, 2024. The survey, both online and on paper, 
was offered in English and Spanish. Multiples methods 
were used to distribute the survey. Wickenburg’s Town 
website housed a “Parks and Rec Master Plan” web 
page displaying the information on the Master Plan, 
provided instructions on how to complete the paper 
survey and provided the link to the survey. 
The public workshops were advertised in the local 
newspaper displaying survey links for those who could 
not attend the event. The postcards and workshop 
advertisements were shared on local social media 
profiles and posted at key community locations 
including the library, town hall and the community 
center. 
Results Summary
The survey received a total of  434 responses (429 
in English and 5 in Spanish).  73% of respondents 
On-line and Paper Survey Summary
ranked in order of number of entries concerning the 
respective theme:
1.	 Maintenance and upgrades to existing facilities. 
2.	 Prioritizing programs and events for youth & children
3.	 Needs for indoor facility housing fitness/wellness 
programs or upgraded pool facilities
4.	 Trails, multi-use paths and accessibility (ADA 
included)
5.	 Communications about programs and events from 
The Town to the residents. 
completed the survey in full. The average time to 
complete the survey was six minutes. 
The survey was comprised of  ten questions. Nine 
questions were multiple choice and two questions had 
an open ended, typed response. Through resident input, 
the Master Plan team gained valuable insights into the 
needs of the Wickenburg Parks and Recreation system.
The survey reveals that playgrounds and picnic areas 
are the most popular park amenities, whereas the dog 
park and splash pad are the least utilized. Analysis of 
the open-ended responses suggest that issues such as 
maintenance, age of materials, and communication 
hinder the use of the dog park and splash pad. 
Improvements in these areas could potentially increase 
their usage.
The survey showed that the most used parks were 
clearly Coffinger and Sunset Parks. The largest item 
that prevents residents from using the parks was either 
being unfamiliar with the parks, poor maintenance, lack 
of equipment or lack of transportation. Town residents 
identified youth sports, after-school activities and 
facilities for outdoor sports as essential. Additionally, 
Town residents stated aquatics, indoor rec facilities, 
pickleball and tennis courts, wellness classes and golf 
courses and very important. 
Contrastingly, survey respondents were evenly 
distributed when ask about what new park initiative 
should be a priority. A new fitness facility was stated to 
be highest priority. However, expanded pool facilities, 
walking and biking trails, new athletic fields and 
fitness/wellness classes were also deemed be a high 
priority by town residents. 
As the open ended questions were reviewed, five major 
themes clearly began to form that residents expressed 
needs within. The following are the major themes, 
434 
Resident Responses
Playgrounds and 
picnic areas are the 
most popular park 
amenities.
After-school activities 
and facilities for 
outdoor sports are 
essential.
A new fitness facility 
was stated to be 
highest priority.
How important, if at all, is it that the Town provides the following 
amentities or activities for the community? 
Essential  
Very 
Important  
Somewhat 
Important  
Not at All  
Disc golf courses  
7% 
24% 
38% 
31% 
Golf courses 
19% 
31% 
29% 
21% 
Visual arts classes (e.g., pottery, painting, etc.) 
13% 
33% 
42% 
12% 
Performing arts classes (e.g., dance, drama, etc.) 
14% 
34% 
38% 
14% 
Fitness equipment (e.g., weight training, cardio) 
21% 
31% 
32% 
16% 
Gymnastic programs  
19% 
30% 
38% 
13% 
Tennis courts  
18% 
36% 
35% 
11% 
Wellness/fitness classes (e.g., aerobics, yoga, etc.) 
21% 
40% 
30% 
9% 
Pickleball courts 
26% 
37% 
26% 
11% 
Indoor sports leagues (e.g., basketball, volleyball) 
35% 
37% 
21% 
7% 
Aquatics  
(e.g., lap swimming, water exercise classes, lessons, etc.) 
37% 
40% 
19% 
4% 
Outdoor sports leagues  
(e.g., baseball, softball, soccer, lacrosse, etc.) 
42% 
38% 
15% 
5% 
Youth after-school programs  
53% 
31% 
10% 
6% 
Youth sports  
60% 
27% 
9% 
4%

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
21
 COMMUNITY INPUT
Overview & Purpose
Over the course of the information gathering phase 
of developing this parks and recreation master Plan, 
the master plan Team and members of the Town staff 
met with multiple Wickenburg parks and recreation 
stakeholders that oversee organizations that frequently 
use Wickenburg’s parks. These Stakeholders were 
able to offer knowledge and provide input on how the 
parks and rec system could better service the residents 
that participate in the organizations they help lead. 
The following information is organized by location or 
topic pertaining to the parks and rec system generally 
and consolidated from multiple stakeholders offering 
similar input. 
Coffinger Park
•	
Concerns over the dilapidated state of the main 
multi-purpose field. Should either re-grade, use 
parts of the field for more parking, dog park, t-ball, 
small youth soccer field, staging area or space to 
host food trucks.
•	
The pool facility was a large concern for many 
residents and stakeholders. Many expressed the 
desire for a year-round heated pool facility. Others 
suggested that the pool should have more hardscape 
to reduce the amount of mud produced by pool 
 Parks & Rec Stakeholders Engaged
Angela Egan - Wickenburg Christian Academy
Carlos Reyes - Baseball / Softball Little League
Sheri Fucili - AYSO Soccer
Sean Lowry - AYSO Soccer
Stephanie Napoles - Youth Football
Teresa Underdown - Community Rodeo Assoc. of Wickenburg
Julia Macias Brooks - Emeritus Chamber of Commerce
Parks and Trails Advisory Committee
Ed Temerowski - Fire Chief
Les Brown - Police Chief
Amy Brown - Town Clerk
Trails and Open Space
•	
Trails initiatives should capitalize on many grant 
programs.
•	
Major trails and open space areas should have 
updated trailhead amenities. 
•	
Areas within town should have connections to 
outdoor rec areas and trail open spaces. 
•	
A Hassayampa River trail and Downtown to Vulture 
Mountain trail would receive a lot of usage. 
•	
Trails should preserve natural desert.
•	
Easements to be established in wash areas for horse 
trails.
•	
Optimize trails for wide range of users, bike and 
pedestrian.
•	
Mountain trail opportunities at Sophie’s flat, West 
of Flying E Ranch, Within and around Constellation 
Park, South Mariposa and Hassayampa River.
Stakeholder Interviews
water. Shade around the pool should be a necessity.
•	
Most of picnic lawn does not receive irrigation but 
should. Park should have more rentable spaces.
•	
Park mostly services nearby residents but should be 
accessible and used by whole town.
•	
More amenities for youth like basketball courts
•	
Possible site for indoor rec center.
•	
Safety concerns include: lack of overall surveillance, 
lack of parking spaces and mobility during events.
•	
Safety suggestions include: redesign of mobility 
around the park, expanded parking, involving traffic 
control or police with event, improved lighting and 
more surveillance locations. Possible blue phones.
Sunset Park
•	
More fields, some offering artificial turf, some as one 
sport only. Field downtime is too short, warm up/ 
practice field would be nice.
•	
Spaces for youth sports and opportunities and adult 
leagues .
•	
One-way in and one-way out is major safety 
concern. Need to have loop or two entrances / exits.
•	
Irrigation system is outdated, maintenance heavy 
and needs updating. 
•	
Updated clay in baseball fields.
•	
Splash pad needs updates and more amenities 
around it to create sense of safety. No dogs at splash 
pad.
•	
Dog park is too dust/ muddy. Need to introduce 
grass.
•	
Public restroom needs sewer issue solved. 
Rodeo Grounds & Constellation Park
•	
One main challenge for evolving the space at Rodeo 
Grounds are the lease limitations the BLM have on 
property. No permanent structures can be allowed.
•	
At the Rodeo Grounds, trailhead amenities are 
needed (ie. wayfinding signage, shade, picnic area 
and benches, expanded or upgraded restrooms.)
•	
Use Rodeo as major place-making strategy for Town.
•	
A covered indoor facility at the penthouse (for 
auctions, fundraising, livestock pens, shows, 4H).
•	
Could a trailhead be accessible from watertank 
behind Cobblestone Hotel be added and trails up 
washes to other trailheads?
•	
Reservable RV hook ups installed at Constellation 
park to generate more revenue.
•	
Potential event opportunities include livestock 
display, circus, amphitheater, live concerts.
•	
Updated concessions stand.
•	
Temporary horse pens, preferably with covers.
•	
Constellation road should receive traffic calming 
improvements.

Public involvements at two public workshops
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
22
 COMMUNITY INPUT
In-Person Public Workshops
Overview & Purpose
The purpose of the Public Engagement Workshop 
was centered in information gathering. The workshop 
would allow residents of Wickenburg to express their 
desires for the parks and recreation system. Before the 
workshop the parks and recreation master plan Team 
evaluated existing parks and recreation facilities and 
created an inventory of the parks and recreation system. 
The Team then presented the inventory to the residents 
that participated in the public workshop. The workshop 
allowed resident participants to communicate how 
they would like to see the Town’s parks and recreation 
systems move forward within the next ten years. 
The master plan Team facilitated the gathering of 
information from residents that participated in the 
workshop, and quantified the information so this 
master plan report can accurately reflect the resident’s 
desires. 
The workshop facilitators  were Dig Studio and the 
Barnhart Company. The Dig Studio team presented the 
parks and recreation inventory and gathered resident 
opinions and input. The Barnhart Company oriented 
the residents to the workshop and guided participants 
through voting for what park programs and facilities 
they would like to see in the coming years. 
Operations and Methods
The workshop team presented residents with three 
main ways of providing their input on the parks and 
recreation system. The methods were;
•	
Park feedback notes 
Handwritten notes placed in park inventory 
boards respective to the park displayed on the 
board. Each note was documented afterwards.
•	
Amenity voting boards
Three boards displayed multiple precedent 
images of potential parks and recreation 
program options. Residents were asked to vote 
(using colored sticker dots) for which programs 
they would like to see within the parks and rec 
system. Votes were tallied and documented.
•	
Comment cards
Comment cards provided space for residents 
to write out thoughts in a more lengthy and 
confidential manner. Comments were also 
documented.
Each workshop facilitator that spoke with residents 
during the workshop wrote any feedback that was 
heard but not written down by residents. This ensured 
no verbal input was lost in conversion. The facilitator 
would then place the note on the respective board the 
input was about.
 JOIN US!
PUBLIC
WORKSHOP
PARKS & RECREATION
MASTER PLAN
WICKENBURG 
COMMUNITY CENTER
160 N VALENTINE ST 
WICKENBURG, AZ 85390
January
Tuesday
Doors open at 3:45, event begins at 4 PM
https://www.surveymonkey.com/r/WickenburgParks
30TH
SCAN TO COMPLETE THE ONLINE SURVEY, OR USE THE LINK BELOW

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
23
 COMMUNITY INPUT
B. What amenities and programs would serve the 
community best?
1.	 Indoor sports center = 31 points
2.	 Family Park = 30 Points
3.	 Fitness paths = 22 points
4.	 Event venue = 21 points
C. Think Big! What facilities and activities would 
you like to see in the future?
1. Pump track = 36 points
2. Regional trail network = 32 points
3. Play amenities & enhanced access to open space 
and trails = 22 points (tie)
4. Splash Pad = 19 points
Workshop Results
The input from the workshop was organized by park or 
open space type and location. The input in consolidated 
from providng direct feedback statements that 
represent major themes of residents. 
Wickenburg Trails and Open Space
•	Multi-use trails that accommodate walking, 
running, dog walking, equestrian, and OHV.
•	Trails that connect major points in Wickenburg 
to major trail areas (ie. downtown to Vulture 
Mountain).
•	Bike optimized trails in Twin Peaks, Black Hills, 
Sophie Flats, Constellation Park and Vulture 
Mountain.
Rodeo Grounds & Constellation Park
•	Potential entrance and trailhead near water tank 
behind Cobblestone Hotel.
•	Covered arena, 4H facility and livestock housing.
•	Multi-use paths but separate equine paths. 
•	Multi-use path from downtown to Rodeo Grounds.
Sunset park
•	Indoor sports/wellness/after-school program 
facility to escape heat.
•	Improved regular maintenance.
•	Improved dog park and added amenities.
•	More features for children including improved 
playgrounds, splash pad, added pump-track .
•	Additional fields, one as soccer only. Improved 
communication about programs & events.
Coffinger Park
•	Improved / year round pool facility.
•	Improved regular maintenance .
•	Improved communication about programs & 
events.
•	Upgrade and improve existing facilities (i.e. grass 
field, sidewalks, expanded pool hardscape, lighting, 
trashcans, shade).
•	Possible indoor recreation center.
•	More shade.
Neighborhood Parks (Stone, Wishing Well, 
Maguire, Boetto Parks)
•	Improved regular maintenance. 
•	Enclosed, turf dog area.
•	Upgrade existing features (basketball hoops, lights 
benches, restrooms).
•	Community board signage.
•	Shade.
•	Playgrounds, climbing features.
•	Better bike/walk-ability to smaller parks in town.
Voting board Results
Below  are quantified results of the voting. Each color 
was assigned a point value: Green (first choice) = 3 
points, Yellow (second choice) = 2 points, Blue (third 
choice) = 1 point. Points are added together for each of 
the potential park and rec program and ranked. The top 
four programs from each board are shown below. 
A. How can we best improve existing parks and 
facilities in Wickenburg? 
1.	 Year-round pool facility = 67 points
2.	 Stabilized trail to existing washes / paved trails = 
26 points (tie)
3.	 Restroom Upgrade = 25 points
4.	 Striped bike lanes = 22 points

Public Workshop #1: Team presenting display boards and gathering input from the community
Public Workshop #2: Jay Hicks, Senior Principal at Dig Studio, presenting project progress and park design plans to the community
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
24
 COMMUNITY INPUT
Overview & Purpose
Through the various methods of Town engagement, 
the parks and recreation master plan Team received 
over 900 comments. These comments offer diverse 
perspectives and input that can inform how the Town of 
Wickenburg can shape it’s park and rec system to better 
suite it’s residents over the next decade and beyond. 
Coffinger Park
•	
Main multi-purpose field in dilapidated state; 
suggestions include re-grading, utilizing parts for 
parking, dog park, t-ball, small youth soccer field, 
staging area, or space for food trucks.
•	
Concerns about pool facility; suggestions for year-
round heated pool, more hardscape, and shade.
•	
Most picnic lawn lacks irrigation; desire for more 
rentable spaces.
•	
Accessibility and usage by entire town desired, not 
just nearby residents.
•	
Need for more youth amenities like basketball courts 
and potential site for indoor rec center.
•	
Safety concerns: lack of surveillance, parking, 
and mobility during events; suggestions include 
redesigning park mobility, expanding parking, 
involving traffic control/police, improving lighting 
and surveillance, and adding blue phones.
•	
Other suggestions: improved communication about 
programs/events, regular maintenance, upgraded 
facilities (grass field, sidewalks, pool hardscape, 
lighting, trash cans, shade), and more shade.
Sunset Park
•	
Need for more fields, some with artificial turf and 
some dedicated to one sport.
•	
Desire for warm-up/practice field and spaces for 
youth/adult sports leagues.
•	
Safety concern over one-way in/out; desire for loop 
or two entrances/exits.
•	
Outdated irrigation system, need for maintenance.
•	
Updates needed for baseball fields and splash pad; 
desire for amenities around splash pad and exclusion 
of dogs.
•	
Dog park too dusty/muddy; need for grass.
•	
Sewer issue in public restroom needs solving.
•	
Desire for indoor sports/wellness/afterschool 
program facility.
•	
Suggestions for improved regular maintenance and 
dog park with added amenities.
900+ 
Total Resident comments
Key Findings & Input

Sunset Park Overlook (photo credit: Google Images - Ramon Leon)
Wickenburg: A premier destination for rodeo events (photo credit: Visit Wickenburg)
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
25
 COMMUNITY INPUT
establishment of easements in wash areas for horse 
trails.
•	
Optimization of trails for various users including 
biking, pedestrian, equestrian, and OHV.
•	
Opportunities for mountain trails at various 
locations around Wickenburg.
•	
Bike-optimized trails in specific areas.
Neighborhood Parks
•	
Need for improved regular maintenance, enclosed 
turf dog area, upgraded existing features, community 
board signage, shade, playgrounds, climbing features, 
•	
Better bike/walk-ability to smaller parks in town.
Rodeo Grounds & Constellation Park
•	
Challenges with lease limitations at Rodeo Grounds, 
no permanent structures allowed.
•	
Safety input: implement emergency ATV spine trail
•	
Need for trailhead amenities, shade, picnic areas, 
restrooms.
•	
Use of Rodeo Grounds for town place-making; 
suggestions include covered indoor facility, trailhead 
accessibility, RV hookups at Constellation Park for 
revenue generation, potential events.
•	
Desire for updated concessions stand, temporary 
horse pens, traffic calming improvements, entrance/
trailhead near water tank.
•	
Multi-use paths with separate equine paths, multi-
use path from downtown and the new hotel to Rodeo 
Grounds.
Trails and Open Space
•	
Capitalizing on grant programs for trails initiatives.
•	
Updated trailhead amenities for major trails/open 
space areas.
•	
Connectivity of areas within town to outdoor rec 
areas and trail open spaces.
•	
Potential for Hassayampa River trail and Downtown 
to Vulture Mountain trail.
•	
Preservation of natural desert on trails,

04  Parks & Recreation 
Needs Assessment
	»
Program and Services Assessment
	»
Park Maintenance Assessment
	»
Park Maintenance Recommendations

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
28
 PARK & RECREATION NEEDS ASSESSMENT
Program and Services Assessment
Overview of Priorities and Core 
Program Areas
The Wickenburg Parks and Recreation Department  
offers a wide range of programs and events managed 
by a professional staff. These include youth camps, 
aquatics, sports, health, fitness, and special events. 
Through formal and informal cooperative relationships, 
various nonprofit agencies and other community 
partners assist with delivering select programs and 
indoor space to provide access for programs.
Core Program Approach
The vision of the Town is to be a premier parks and 
recreation systems in the region, providing all residents 
access to high-quality programs and experiences. 
Identifying Core Program Areas creates a sense of focus 
around activities and outcomes of greatest importance 
to the current needs of the community. The philosophy 
of the Core Program Area assists staff, policy makers, 
and the public to focus on what is most important. 
Program areas are considered as Core if they meet many 
of the following categories:
•	The program area has been provided for longer 
than 5 years and/or is expected by the community.
•	The program area consumes a relatively large 
portion (5% or more) of the agency’s overall 
budget.
•	The program area is offered 3-4 seasons per year.
•	The program area has wide demographic appeal.
•	There is a tiered level of skill development 
available within the programs area’s offerings.
•	There is full-time staff responsible for program 
areas.
•	There are facilities designed for a  program area.
•	The agency controls a significant percentage (20% 
or more) of the local market.
Ensuring the Right Core Program Mix
The Core Program Areas provided by Wickenburg 
currently appear to meet some of the community’s 
major needs as identified in the survey results, but the 
program mix must be evaluated on a regular basis to 
ensure that the offerings within each Core Program 
Area – and the Core Program Areas themselves – align 
with changing leisure trends, demographics, and needs 
of residents. The following six determinants can be 
used to inform what services are provided by the Town.
•	Conceptual foundations of play, recreation, and 
leisure – Programs and services should encourage 
and promote a degree of freedom, choice, and 
voluntary engagement in their structure and 
design. 
•	Organizational philosophy, mission, and vision 
-  Programs and services should support the 
Town’s vision statements, values, goals, and 
objectives. These center on promoting personal 
health, community well-being, social equality, 
environmental awareness, and economic vitality.
•	Constituent interests and desired needs 
-  Towns should actively seek to understand 
the recreational needs and interests of their 
constituency. This not only ensures an effective 
(and ethical) use of taxpayer dollars, but also helps 
to make sure that programs perform well and are 
valued by residents.
•	Creation of a constituent - centered culture 
programs and services reflect a culture where 
constituents’ needs are the prime factor in 
creating and providing programs. This should be 
reflected in all parts of program design 
•	Experiences desirable for clientele - Programs 
and services should be designed to provide the 
experiences desirable to meet the needs of the 
participants/clients in a community and identified 
target markets. 
•	Community opportunities - When planning 
programs and services, The Town should consider 
the network of opportunities afforded by other 
organizations such as nonprofits, schools, other 
public agencies, and the private sector. Towns 
should also recognize where gaps in service 
provision occur and consider how unmet needs 
can be addressed. 
Age Segment Analysis – Current 
Segments Served
Findings from the analysis shows that the Town 
provides a strong balance of programs across all age 
segments. All segments are targeted as a primary 
market for at least three programs.
This balance should be maintained moving forward, 
and the Town should update this Age Segment Analysis 
every year to note changes or to refine age segment 
categories. Given the growing population trend for 
residents ages 55 and over and the growing demand for 
services in this age bracket, it is also recommended that 
the Town further segment this group into 65-74 and 
75+. These two sub-segments will have increasingly 
unique needs and expectations for programs and 
services in coming years, and program planning will be 
needed to provide differing requirements.
Age Segment Analyses should ideally be done for every 
program offered by the Town. Program coordinators/
managers should include this information when 
creating or updating program plans for individual 
programs. An Age Segment Analysis can also 
be incorporated into Mini Business Plans for 
comprehensive program planning.
Lifecycle Analysis
A lifecycle analysis involves reviewing every program 
identified by Town of Wickenburg staff to determine the 
stage of growth or decline for each as a way of informing 
strategic decisions about the overall recreation program 
portfolio. The various stages of program lifecycles are 
as follows:
•	Introduction - New program; modest 
participation.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
29
 PARK & RECREATION NEEDS ASSESSMENT
that are in the Mature stage. Currently, the Town 
only has 63.1% of their programs in this category. It 
is recommended that this be approximately 40% to 
provide stability to the overall program portfolio, 
but without dominating the portfolio with programs 
that are advancing to the later stages of the lifecycle. 
Programs in the Mature stage should be tracked for 
signs they are entering the Saturation or Decline stages. 
There should be an ongoing process to evaluate program 
participation and trends to ensure that program 
offerings continue to meet the community’s needs.
A total of 6.2% of programs are saturated or declining. 
It is recommended to keep as few programs as possible 
in these two stages, but it is understood that programs 
eventually evolve into saturation and decline. If 
programs never reach these stages, it is an indication 
that staff may be “over-tweaking” their offerings and 
abbreviating the natural evolution of programs. This 
prevents programs from reaching their maximum 
participation, efficiency, and effectiveness. For Towns 
challenged by doing the most they can with limited 
resources, this has the potential to be an area of 
concern.
•	Take-Off - Rapid participation growth.
•	Growth - Moderate, but consistent participation 
growth.
•	Mature - Slow participation growth.
•	Saturated - Minimal to no participation growth; 
extreme competition.
•	Decline - Declining participation.
Recreation Program Lifecycle 
Analysis - Current Distribution and 
Recommendations
Overall, the lifecycle analysis results indicate an 
unbalanced distribution of all programs across the 
lifecycle. A combined total of 30.8% of programs fall 
into the Introduction, Take-off, and Growth stages. 
It is recommended that this be 50-60% of the overall 
program portfolio to provide new programs to align 
with trends and help meet the evolving needs of the 
community.
In addition to the need to always introduce new 
programming to meet community needs, it is also 
important to have a stable core segment of programs

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
30
 PARK & RECREATION NEEDS ASSESSMENT
Other Key Recommendations
•	Participation Data Analysis:  Through ongoing 
participation data analysis, refine recreation and 
library program offerings to reduce low enrollment 
or canceled programs due to no enrollment. 
•	Staffing:  Consider the addition of programming 
staff to meet the unmet needs of the community.
•	Expand programs and services in the areas 
of greatest demand:  Ongoing analysis of the 
participation trends of programming and services 
in Wickenburg is significant when delivering high 
quality programs and services. By doing so, staff 
will be able to focus their efforts on the programs 
and services of the greatest need and reduce or 
eliminate programs and services where interest 
is declining. Specific efforts should be made to 
increase programming in the areas of greatest 
UNMET need as identified in the statistically 
valid survey.
As programs enter the Decline stage, they must be 
closely reviewed and evaluated for repositioning or 
elimination. When this occurs, it is recommended to 
modify these programs to begin a new lifecycle with the 
introductory stage or to add new programs based upon 
community needs and trends. 
Staff should complete a lifecycle review on an annual 
basis and ensure that the percentage distribution 
closely aligns with desired performance. 
This analysis is not based on strict quantitative data, 
but rather is based on an understanding of the Town’s 
program areas. The table below shows the percentage 
distribution of the various lifecycle categories of the 
Town’s unique program/service offerings.
Other Key Findings
•	Program Evaluation:  Assessment and evaluation 
tools to measure the success of programs and 
services are in place but should be reviewed and 
updated annually.
•	Customer Satisfaction and Retention:  The 
Town currently does track customer satisfaction 
ratings, but not customer retention percentages.
•	Staffing:  Staffing levels should be evaluated 
as current levels are not sufficient to expand 
recreation program offerings.
•	Public Input:  The Town does not utilize survey 
tools to continually gather feedback on needs and 
unmet needs for programming.
•	Marketing:  The Town utilizes several marketing 
strategies to inform Town residents of the 
offerings of the community; however, it lacks a 
formalized Marketing Plan which can be utilized 
to create target marketing strategies.
•	Volunteers:  The Town has a strong volunteer 
program.
•	Partnerships:  The Town utilizes several partner 
providers to deliver programs to Wickenburg 
residents but lacks a formal partnership policy.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
31
 PARK & RECREATION NEEDS ASSESSMENT
Program Plan Summary
The Town is delivering quality programs, services, 
and events to the community, however, does have 
opportunity for improvement. This chart provides a 
summary of the recommended actions that the Town 
should implement in developing a program plan to meet 
the needs of residents.

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
32
 PARK & RECREATION NEEDS ASSESSMENT
Maintenance Management Plan
Through the review of data and workshops with staff, 
the PROS Consulting team determined that the Parks 
Division does try to operate within the maintenance 
modes identified above. Parks maintenance also 
intuitively follows a set of routine parks and grounds 
maintenance standards with task, frequency, and 
season of year for each of the functional work 
areas, however, a formalized, documented, detailed 
maintenance management plan does not exist. A 
formalized maintenance management plan includes not 
only maintenance modes and standards for each park 
but also tracks the performance of the work against a 
set of defined outcomes as well as the costs expended 
to achieve each outcome. A maintenance management 
plan is typically memorialized within an asset-based 
work order management system.
Staffing Levels  
Parks and Recreation System:  The Parks Maintenance 
Division is comprised of 10 full-time equivalents 
(FTES) – 10 full-time employees as well as 1 Parks 
Manager - dedicated to maintaining the parks and 
recreation system as well as right of ways and medians. 
Park Maintenance Assessment
Parks and amenities that are clean and functioning 
efficiently are a critical element to delivering high 
quality programs and services. The Wickenburg Parks 
Division maintains:
•	82 acres of parks.
•	429,000 SF of landscaping within right-of-ways 
•	14,716 square feet of indoor facilities.
Below is a comprehensive list of the functions/lines of 
service performed by the Park Division.
Maintenance Modes & Standards
Regular maintenance requires unit-based 
quantification for most major resource requirements 
and provides methods for projecting future resource 
needs. The Town’s maintenance efforts as detailed are 
expansive and address diverse aspects of maintaining 
high-quality parks, amenities, and infrastructure 
to preserve the integrity of public assets and their 
meaningful use. The prevailing objectives of a 
standards-based park maintenance program are 
presented below but not in order of importance:
•	Maintain and improve the sites, grounds, facilities, 
and structures of the Town’s parks system to 
provide optimal and enjoyable use.
•	Provide landscaping and general maintenance for 
a multitude of Town amenities, including but not 
limited to, landscaped beds and turf, urban open 
spaces, urban forests, and selected park buildings 
and structures.
•	Be responsive to maintenance needs of the Town’s 
open-space tracts. Particular attention must be 
paid to access points, trail repair, erosion control, 
and trash removal. 
•	Protect and preserve the value of Town assets so 
that long-term maintenance costs are minimal due 
to extending the service life of those assets.
Many of the objectives assigned to the Park’s 
maintenance teams go beyond the traditional 
responsibilities of park maintenance employees. 
It is recommended that all park maintenance agencies 
adopt a system of grounds maintenance levels wherein 
functions are organized into a tiered structure with 
three different levels of service.  These levels are 
referred to as maintenance modes, and each has a 
unique standard that dictates routine maintenance 
tasks and their frequency. The appropriate 
maintenance mode is assigned to each park or site, 
which creates a framework for organizing and 
scheduling tasks and responsibilities at each location. 
A description of each of the maintenance modes is 
provided below:
Maintenance Mode/Level 1
 Applies to parks or sites that require the greatest level 
of maintenance standard in the system. These parks 
or sites are often revenue producing facilities, such 
as the athletic fields, where the quality and level of 
maintenance has a direct impact on the park facility’s 
ability to maximize revenue generation. 
Maintenance Mode/Level 2
Maintenance Mode/Level 2 (Mode/Level 2) applies to 
parks or sites that require a moderate level of effort and 
maintenance standards in the system. These include 
developed and undeveloped parks with amenities that 
are heavily used such as trails, community and pocket 
parks, and special-use facilities found in the Town’s 
parks system. 
Maintenance Mode/Level 3
Maintenance Mode/Level 3 (Mode/Level 3) applies to 
parks or sites that require a nominal level of effort and 
maintenance standards in the system. These include 
undeveloped parks with minimal amenities.
Park Maintenance Assessment

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
33
 PARK & RECREATION NEEDS ASSESSMENT
As shown in the table above, the parks maintenance division is slightly understaffed by 0.81 FTE based on the best practice 
maintenance standards and 1 FTE = 1,760 actual hours worked annually.
Best Practice Staffing Levels

Total Cost of Ownership Graphic
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
34
 PARK & RECREATION NEEDS ASSESSMENT
Park Maintenance Recommendations
Cost Avoidance
Maintenance operations are typically spent in divisions 
that do not have direct revenue sources that can offset 
expenditures. There are opportunities, however, to 
reduce expenditure through the following strategies.
•	Adopt-a-Trail Programs:  These are typically 
small-grant programs that fund new construction, 
repair or renovation, maps, trail brochures, 
and facilities (bike racks, picnic areas, birding 
equipment, etc.), as well as providing maintenance 
support. Adopt-a-Trail programs can also take the 
form of cash contributions in the range of $12,000 
to $16,000 per mile to cover operational costs.
•	Adopt-a-Park Programs:  Small-grant 
programs that fund new construction and provide 
maintenance support. Adopt-A-Park programs 
can also take the form of cash contributions in 
the range of $1,000 to $5,000 per acre to cover 
operational costs.
•	Operational Partnerships:  Partnerships 
are operational funding sources formed from 
two separate agencies, such as two government 
entities, a non-profit and a public agency, or 
a private business and a public agency. Two 
partners jointly share risk, operational costs, 
responsibilities, and asset management based on 
the strengths of each partner.
Recreation Program Lifecycle 
Analysis - Current Distribution and 
Recommendations
A work order system should be used to track lifecycle 
maintenance requirements that are tied to weekly 
and monthly work orders. This will help the staff to 
stay ahead of preventative maintenance and limit 
breakdowns. Further, utilizing the system will provide 
staff with the necessary “actual cost” data for work 
being performed. The typical components of a work 
order management system are as follows:
•	Schedule Work Activities: Detailed framework for 
asset management by incorporating GIS into the asset 
repository. Allows for grouping of assets by location, 
type, age, or other key parameters. These groupings 
can then be used to create maintenance activities 
such as preventive work, reactive work, tests, or 
inspections. 
•	Mapping Tools: This would allow for the 
creation of map visualizations of database queries 
including open work orders, service requests, or 
work orders of a specific type and assignment. 
•	Data Mobility: A variety of tools to help 
maintenance staff access and update valuable 
information while in the field.
•	 Asset Management: Track work performed on any 
asset at any given time throughout its lifecycle. 
•	Track Unproductive: Time Travel time on average 
should not exceed the maximum threshold of 2.2 
hours for every 8-hour day.
Cost Of Service/Systematic 
Approach to Contracting Services
Through the development of management processes, 
the Parks Division must begin to track cost of service 
at a unit activity level through the implementation 
of a work order management system.  This, in turn, 
would internally analyze the unit cost to perform work 
internally against the unit cost to perform work by a 
third-party vendor, in particular right-of-way, median 
and public facility grounds landscape maintenance.
Annual Park Maintenance Staffing
It is recommended that the Park Division be authorized 
for one additional FTE (0.81) for the maintenance of the 
parks and recreation system.
Annual Park Operation and 
Maintenance Funding
It is critically important to view the financial 
sustainability of the Parks and Recreation System 
through the concept of “Total Cost of Ownership” as 
shown in the graphic below.
The Parks Division will need to closely monitor 
resources to ensure that the assets of the parks system 
reach the anticipated lifecycles. It is recommended 
that the Parks Division maintenance funding grow to 
accommodate new park development in the future.
As the system grows, the following guidelines should be 
utilized to identify annual operational funding required 
to maintain additional park acreage:
•	Athletic Field Parks:  
$15,000 - $20,000 per natural turf rectangular field. 
$20,000 - $25,000 per diamond field. 
$5,000 general acreage
•	Community Parks: $5,000 - $7,500 per acre
•	Neighborhood Parks: $7,500 - $10,000 per acre
•	Open Space: $300 - $500 per actively managed acre
•	Pocket Parks: $15,000 - $20,000 per acre
•	Special Use Parks: Costs varies dependent on 
amenities.
•	Recreation Corridors/Trails: $1,000-$2,000 per 
mile
*Please note, maintenance costs typically increase 2-3% 
annually.

The table above details the current and recommended LOS for the Wickenburg Parks and Recreation System.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
35
 PARK & RECREATION NEEDS ASSESSMENT
residents based on the Town’s current population. 
The consulting team recommends 6.0 acres per 
1,000 population for the TOW.
•	To keep up with the projected population growth 
and to meet the recommended LOS standards, 
the Town will need to develop and add a total of 
twenty (20) acres of developed parks to the system 
by the year 2038. 
•	In addition to the core developed park acreage, 
the Town provides an additional 5.5 acres of linear 
parks. The consulting team does not provide a 
population based LOS recommendation for this 
park type.
•	The top two park classification needs in the Town 
are neighborhood parks and community parks. 
•	What is needed by 2038
	 	 2 - 4    	 Pocket Parks
	 	 2 - 3    	 Neighborhood Parks
	 	 1      	
Community Park
Level of Service Standards
Level of Service (LOS) standards are guidelines that 
define service areas based on population that support 
investment decisions related to parks, facilities, and 
amenities. LOS standards will change over time; as the 
population increases, the need to acquire additional 
land and develop parks also increases as will the costs 
to do so. 
The consultant team evaluated LOS standards using a 
combination of local, regional, and national resources, 
including: 
•	Demographic projections (including population, 
age, and diversity segmentation).
•	National Recreation and Park Association (NRPA) 
guidelines.
•	Recreation activity participation rates reported 
by the Sports & Fitness Industry Association’s 
(SFIA) 2023 Study of Sports.
•	Ability for the Town to acquire parkland for 
developed parks, trails, and open space.
•	Community and stakeholder input needs 
prioritization.
•	Planned yet not developed parks in the Town.
•	The ability for the Town to financially sustain a 
high-quality park, open space, and trail system.
•	These resources provide LOS guidelines based 
on population to inform and support investment 
decisions related to parks, facilities, and 
amenities. When coupled with local input on 
the needs of the Wickenburg community, these 
standards help to identify park and facility/
amenity gaps and surpluses. The findings of the 
LOS standards analysis are summarized below:
•	Wickenburg currently provides a LOS of 6.37 
acres of pocket, neighborhood, special use, and 
community parks (core developed parks) per 1,000

05  Shared Vision for 
the Future
	»
Gather Community
	»
Connectivity and Accessibility
	»
Economic Viability
	»
Heritage Celebration
	»
Protect Nature

Support Family-Oriented Events
Enhance community programs through multi-
generational festival experiences, meet diverse needs 
and foster inclusive, representative town events.
All-Weather Recreation Spaces
Address Wickenburg’s harsh weather by creating 
covered recreation spaces, year-round pool facilities, 
and indoor event spaces to meet community demand.
Recreation for All Ages and Abilities
Enhance facilities, assure inclusive services for 
individuals with disabilities, and expand adult and 
senior fitness programs.
Shape New Development
Work with developers to integrate public open spaces 
into new projects, fostering health, social cohesion, and 
recreational opportunities for all ages.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
38
 SHARED VISION FOR THE FUTURE
Goal: Create programs and projects 
that make people feel welcome, 
enable community members to 
gather, and encourage visitors to 
linger and frequent local business 
and events.
Wickenburg, renowned for its rich Western heritage 
and celebrated as the “Team Roping Capital of the 
World,” provides a unique setting for community 
engagement and recreational pursuits. The vision 
behind the Parks and Recreation Master Plan is not 
only to cultivate a welcoming atmosphere but also to 
capture the historic essence of the town. The plan sets 
its sights on leveraging the town’s heritage, such as the 
iconic rodeo grounds, to cater to activities and events. It 
also aims to further the enhancement and development 
of parks, trails, and recreational facilities, informed by 
a thorough assessment of current community needs. 
Through inclusive, multi-generational programming, 
this strategic approach aims to celebrate Wickenburg’s 
distinct identity and cater to the diverse requirements 
of its community. By addressing the challenges posed 
by the desert climate and integrating Wickenburg’s 
characteristic charm and natural beauty, the Master 
Plan aspires to initiate efforts to create vibrant public 
spaces that pay homage to the town’s legacy.
Gather Community

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
39
 SHARED VISION FOR THE FUTURE
Support Family-Oriented Events
Expand on the success of current community programs 
and events to develop more multi-generational 
festival experiences. Events can be with community 
organizations and local non-profits. Community 
feedback identified the need for adult-focused 
programs and classes, more special events, after-
class youth programs, and visual and performing arts. 
These activities present a wonderful opportunity to 
collaborate with vendors, nonprofits, and community-
based organizations to co-produce events, thereby 
transferring leadership responsibilities to community 
advocates. These partnerships have the potential to 
foster new relationships between local leaders and 
agencies, allowing for the collaboration of external 
groups to program town spaces with experiences that 
are inclusive and representative of all community 
members.
Shape New Development
As development continues, it will be critical to 
collaborate with developers to establish additional 
public open spaces, particularly in regions that 
lack adequate recreation facilities. It will be crucial 
to promote the integration of open space into 
new developments through developer education, 
conversation, and coordination. The rationale for 
investing in parks and open spaces is straightforward: 
they are essential for the promotion of physical 
health, mental well-being, and social cohesion among 
community members. Recent plans and market demand 
anticipate the development of numerous large parcels 
into homes and employment in the southern regions 
and areas near the I-11 alignment in the coming years. 
These expansive sites offer the potential to incorporate 
new parks and open spaces that can accommodate both 
current and future populations. It is recommended to 
implement a design guideline that delineates strategies 
to facilitate the development of more successful parks 
and open spaces.
All-Weather Recreation Spaces
Residents and visitors to Wickenburg, like many 
southern Arizona cities and towns, experience harsh 
weather during the summer and extreme sun exposure 
throughout the year. Covered or all-weather recreation 
spaces can extend the use of space to all weather and 
seasons, increasing comfort and safety. These types 
of spaces received a lot of positive feedback during 
community engagement, showing a high demand for 
a recreation center, a major renovation or new-build 
community center, a year-round pool facility, and more 
covered amenities in rodeo grounds to support hiking 
and mountain biking. In its current state, Wickenburg 
does not have sufficient multi-purpose indoor space for 
programming and indoor events.
Recreation for All Ages and Abilities
The online survey responses and public workshop 
feedback indicated a high demand for adult sports 
programs and fitness classes in Wickenburg. The 
Town should consider expanding adult fitness and 
wellness programs and enhancing facilities to better 
accommodate these interests. Given Wickenburg’s 
demographic profile, it is also essential to continue 
developing programs targeted at senior adults. At 
present, both the Town of Wickenburg and the 
Foundation for Senior Living (FSL) offer a range of 
services for senior residents. 
Moreover, addressing the needs of individuals with 
disabilities is of paramount importance. Therapeutic 
recreation services can cater to this demographic in 
multiple ways, either through programs specifically 
designed for individuals with disabilities or by 
offering inclusion support services that facilitate their 
participation in typical recreational programming. Both 
approaches are vital for catering to the diverse interests 
and requirements of individuals with disabilities in 
Wickenburg, ensuring that all community members 
have equal opportunities to engage in and benefit from 
the town’s recreational offerings.
Strategy 1
Strategy 2
Strategy 3
Strategy 4

Connected Trail System
To enhance community access, prioritize safe street 
connections linking parks for pedestrian and bike-
friendly routes. Establish a connected trail system for 
diverse recreational activities.
Crossing Treatment
Implement crossing treatment to cross barriers,  
providing a continuous and safe trail and biking 
experience.
Increasing Access
Formalize key access points with parking, signage, 
amenities, and emergency services to enhance user 
experience and safety in Wickenburg’s trail network.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
40
 SHARED VISION FOR THE FUTURE
Connectivity and Accessibility
Goal: Create a connected network 
of parks, pedestrian and bicycle 
paths, natural areas, and washes 
that is accessible to the Wickenburg 
community.
Imagine Wickenburg as the heart of a regional trail 
network of parks, recreation amenities, and natural 
open spaces.
Wickenburg has tremendous resources for recreation 
and parks in close proximity to the town center area. 
There is a significant opportunity to establish a 
connected network that allows walkers and bicyclists 
to access Wickenburg’s park and recreation resources 
by utilizing the current street network and natural open 
spaces. In order for the parks and recreation system in 
Wickenburg to fully realize its benefits, it needs to be 
accessible to all community members via pedestrian 
and biking routes.
There is existing momentum to build a trail network 
connecting all parks and recreation amenities. The 
trail system must be thoughtfully aligned with adjacent 
parkland, trailheads, existing multi-purpose paths, 
and active recreation uses in order to fully realize its 
potential as a public amenity. The Parks and Recreation 
Master Plan has the potential to become a truly 
integrated town parks system by coordinating its efforts 
with ongoing town initiatives, which could significantly 
increase the plan’s impact.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
41
 SHARED VISION FOR THE FUTURE
Connected Trail System
Safe street connections are essential for parks 
and recreation amenities to accommodate a larger 
number of community members. A network of critical 
streets has been identified for penitential streetscape 
improvements in order to enhance the connectivity of 
the town’s parks, thereby facilitating safer and more 
comfortable pedestrian and bicycle access. Wickenburg 
Way and Constellation Road serve as spine corridors 
and provide an east-west connection, while Kellis Rd., 
Ocotillo Road, Steinway Drive, Flying E Ranch Road, 
and Tegner Street provide secondary connections. The 
Town can seek cross-board collaboration with other 
streetscape projects in the town to ensure that people-
to-park connections are optimized.
Additional design suggestions for a connected trail 
system include paths in open land that are available. 
These paths are typically continuous non-motorized 
trails or paths that connect parks and facilitate a variety 
of recreational and transportation activities, such as 
walking, bicycling, running, horseback riding, and 
wildlife viewing.
Increasing Access
Provide additional access points in areas where trail 
start points are concentrated. The access point serves 
as an essential point of access for emergency services 
and affects the user experience. A formalized trailhead 
is recommended for major access points, which often 
provide parking spaces, clear signage and wayfinding, 
and amenities such as benches, trash receptacles, and 
restrooms, which contribute to a clean and comfortable 
trail experience.
Crossing Treatment
Crossing treatments improve the physical connectivity 
along the trail system and provide design solutions for 
challenging crossings. They often occur when the trail 
crosses a major roadway, a major wash, or a river.  It is 
essential to implement a consistent pavement marking 
system in order to guarantee a safe and uninterrupted 
trail experience. Additionally, signage that is both 
legible and prominent should be implemented to notify 
drivers of the presence of trail users and to identify at-
grade crossings. Whenever possible, grade-separated 
crossings should be considered to provide clearance for 
pedestrian underpasses.
Strategy 1
Strategy 2
Strategy 3

Special Events
Leverage Wickenburg’s heritage sites for events and 
festivals to create opportunity for revenue generation.
Sustainable Development 
Integration
Establish development standards to ensure parks 
and trails in new developments are financially self-
sustaining through partnerships.
User-Pays Principle for Major Sports 
Facilities
Implement a user-pays model for major sports facilities, 
setting reasonable usage fees to fund maintenance 
and upgrades. Ensure facilities remain financially 
sustainable and accessible to all users.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
42
 SHARED VISION FOR THE FUTURE
Economic Viability
Goal: Seek Innovative solutions to 
become more financially sustainable. 
Bolster Wickenburg’s economic 
success by enhancing and developing  
parks and recreation facilities.
Tourism and seasonal residents make up a significant 
economic area in Wickenburg, thanks to its rich 
Western heritage, annual cultural events, and outdoor 
recreational activities. Due to its proximity to the 
Phoenix metropolitan area, the town serves as a 
gateway for residents looking for a taste of the Old West, 
with attractions such as dude ranches, historic walking 
tours, and rodeo events. The sector likely continued to 
recover and possibly thrive following downturns caused 
by the COVID-19 pandemic, in line with broader trends 
seen in domestic travel and outdoor recreation.
In addition to the aforementioned economic drivers, 
placemaking and quality of life improvements support 
both businesses and residents. Cities and towns with 
accessible natural resources, parks, and cultural 
amenities attract residents. Businesses frequently 
thrive in markets that are attractive to employees to 
support workforce recruitment and retention. Retail 
businesses benefit from being located in safe and 
attractive destinations anchored by cultural venues 
and public spaces. By supporting the efforts of its local 
development, the Town can help make Wickenburg a 
destination for businesses, residents, and visitors.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
43
 SHARED VISION FOR THE FUTURE
Sustainable Development 
Integration
To ensure economic viability, parks and trails within 
or at the edge of new developments must be financially 
self-sustaining. Creating a development standard under 
this strategy would enable development, partnerships 
with private entities, and innovative funding 
mechanisms to cover the maintenance and operation 
of these recreational spaces, instead of relying on 
additional taxes from existing residents. This approach 
not only safeguards the fiscal health of the community 
but also encourages developers to integrate green 
spaces into new projects from the onset. By doing so, 
Wickenburg’s expansion will enhance the quality of life 
for all residents while maintaining fiscal responsibility. 
This plan will require careful coordination with 
developers and might include incentives for those who 
prioritize the inclusion of public recreational spaces in 
their projects.
Special Events
Wickenburg’s unique heritage amenities, such as 
the Constellation RV Camping Park and the Everett 
Bowman Rodeo Grounds, are significant potential 
revenue generators. This strategy focuses on actively 
promoting these sites through programmed events, 
festivals, and other community gatherings that 
attract visitors and generate income. Sponsorship 
opportunities can further offset costs and increase 
revenue without compromising the daily needs of local 
residents. The town should prioritize staff capacity 
and dedicate event spaces to ensure heritage sites 
contribute to Wickenburg’s economic sustainability 
and are aligned with the community’s values and 
heritage.
User-Pays Principle for Major Sports 
Facilities
Adoption of a user-pays approach for major sports 
facilities ensures that those who benefit most 
from these resources contribute to their upkeep 
and development. Reasonable usage fees will 
be implemented for facilities that demand high 
maintenance or offer specialized amenities, ensuring 
they do not become financial burdens on the broader 
community. Revenue generated from these fees 
can be reinvested into facility upgrades, expanded 
programming, and the development of new amenities, 
thereby enhancing the overall user experience. This 
model fosters the responsible use of resources, fosters 
a sense of ownership among users, and upholds the 
principle of balancing the enjoyment of specialized 
recreational facilities with financial sustainability. To 
ensure inclusivity, fees will be affordable while also 
covering operational costs.
Strategy 1
Strategy 2
Strategy 3

Well-Managed Success
Leverage Wickenburg’s unique heritage to enhance 
its status as a premier event destination, and engage 
professional event management to sustain growth.
Equestrian Heritage
Embrace and promote Wickenburg’s equestrian culture 
by enhancing trails, developing riding amenities, and 
integrating horseback units into emergency services, 
strengthening community ties and the local economy.
Expand Art in Public Spaces
Promote Wickenburg’s unique character through art 
and murals in public realm, enhancing its appeal as a 
destination and fostering community engagement with 
its cultural heritage.
Existing Facility Adaptation
Enhance and regulate Wickenburg’s event spaces to 
improve efficiency, ensure accessibility, and support 
growth.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
44
 SHARED VISION FOR THE FUTURE
Heritage Celebration
Goal: Enhance Wickenburg’s cultural 
appeal through collaborative events, 
public art, and equestrian traditions, 
simultaneously preserving and 
celebrating the town’s rich heritage 
and community pride.
Wickenburg’s enduring traditions and historical events 
illuminate its legacy, rooted in a Western way of life. 
Since the 1950s, the town has become known for its 
engaging rodeos and cultural festivals. These elements, 
combined with Wickenburg’s historical landmarks and 
scenic beauty, have solidified its position as a cherished 
destination.
The prioritization of heritage celebration within the 
Parks and Recreation Master Plan honors the town’s 
storied past while promoting its status as a vibrant hub 
of culture and recreation. This initiative seeks to weave 
the rich tapestry of history, art, and equestrian lifestyle 
into the fabric of daily life, strengthening community 
ties and the local economy.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
45
 SHARED VISION FOR THE FUTURE
Well-Managed Success
Since the 1950s, Wickenburg’s Rodeo Grounds 
have flourished through a synergistic collaboration 
between town leaders, local businesses, the Chamber 
of Commerce, and community advocates. This 
partnership has transformed Wickenburg into a 
prime venue for flagship events such as the Gold Rush 
Days, the Bluegrass Festival, and the Annual Fiesta de 
Septiembre. Historically, the community has hosted 
livestock displays and live concerts, contributing 
to its rich cultural tapestry. To further enhance 
Wickenburg’s status as a premier event destination, it 
is crucial to leverage the town’s unique characteristics 
and heritage. Moving forward, sustaining this growth 
trajectory will require maintaining and enhancing the 
competitiveness of Wickenburg’s existing assets and 
attractions. It is recommended to engage professional 
event management expertise to ensure continued 
success.
Existing Facility Adaptation
Today, Wickenburg uses flexible soft surfaces, 
roadside space, and parking lots far from the event 
venue to solve overflow parking during events like the 
Bluegrass Festival and Gold Rush Days. These spaces 
do double duty at different times of the day and week. 
As events and programming grow, the Town should 
seek to renovate certain spaces for more efficiency 
and to regulate the use of others, including ensuring 
event spaces are universally accessible, have access 
to sufficient public parking, maintain clearance of 
emergency routes, and have the ability to grow the 
capacity needed for events. Efficient space use will 
support operating staff and improve the event’s 
ability to generate revenue through vendors, greater 
attendance, or other measures. The Town should also 
identify opportunities for similar multi-use spaces 
across Wickenburg that can host additional pop-up 
events on occasion to relieve pressure from these main 
spaces.
Expand Art in Public Spaces
The Chamber of Commerce’s Wickenburg Walking 
Tour exemplifies this strategy by reinforcing the 
town’s distinct character and promoting it as a unique 
destination. These efforts, which highlight the historic 
architectural allure and the mural-rich Old Town 
Wickenburg, encapsulate the essence of the town’s 
historic core.
Moreover, the murals facilitate collaborations with 
multicultural organizations, showcasing Wickenburg’s 
commitment to diversity. Additionally, they play a 
crucial role in enlivening street life, injecting vibrancy, 
and fostering a sense of community in public spaces. 
This encourages both residents and visitors to engage 
more deeply with the town’s cultural and historical 
layers.
Equestrian Heritage
Wickenburg, with its deep-rooted history as a 
destination for equestrians and ranchers, presents a 
unique opportunity to further embrace and promote 
its equestrian culture. Enhancing the network of 
equestrian trails that connect historical, cultural, and 
natural landmarks encourages exploration of the town’s 
scenic beauty and rich heritage. The development of 
horseback riding amenities in open spaces allows for 
recreational riding and fosters a deeper connection 
with the area’s natural landscapes.
This approach also supports the growth of local 
equestrian businesses, which in turn bolsters the local 
economy and strengthens the community’s bond with 
equestrian activities. Additionally, the integration 
of horseback units for emergency services and the 
police force not only offers practical advantages for 
patrolling but also serves as a contemporary reflection 
of Wickenburg’s historic relationship with horses.
Strategy 1
Strategy 2
Strategy 3
Strategy 4

Celebrate and Protect Desert Character
Invest in Wickenburg’s trail and park development with a 
focus on sustainable design and environmental education to 
celebrate and preserve the town’s unique desert character.
Expand Shade
Expand Wickenburg’s tree canopy and implement 
shade and cooling solutions in parks and trails to 
enhance outdoor comfort, supporting year-round 
recreation and gatherings in the community.
Integrate Nature
 Integrate nature into Wickenburg’s parks and 
recreational spaces, developing destinations for 
educational and recreational engagement with the 
natural environment.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
46
 SHARED VISION FOR THE FUTURE
Protect Nature
Goal: Create programs and projects 
that amplify the natural qualities of 
Wickenburg in its parks and open 
spaces; conserve the desert character 
and improve both comfort and 
sustainability. 
In Wickenburg, efforts to enhance the town’s distinctive 
natural landscapes are focused on the preservation of 
its desert ambiance, the seamless integration of nature 
into public spaces, and the expansion of shaded areas 
to promote sustainability and comfort. Key strategies 
include enhancing trail systems to spotlight the desert’s 
beauty, promoting education about the environment, 
and fostering community engagement. By developing 
parks and recreational spaces with environmental 
education and sustainable designs, the master plan 
aims to deepen the appreciation for Wickenburg’s 
natural setting. Furthermore, integrating nature into 
development of parkland and recreational facilities, 
cultivates a deeper connection with the environment, 
enriching residents’ lifestyles. Expanding shade, 
through both vegetation and innovative engineering 
solutions, ensures outdoor activities remain pleasant, 
encouraging a year-round engagement with the 
outdoors. These efforts collectively strive to maintain 
the town’s ecological integrity while enhancing the 
quality of life for its community.

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
47
 SHARED VISION FOR THE FUTURE
Celebrate and Protect Desert 
Character
Wickenburg’s unique environment showcases 
the natural desert landscape. Investments in the 
expansion and enhancement of the town’s trail system 
spotlight these features and serve as a platform for 
community education and engagement with the desert 
environment.
The development of future trails and parks can 
incorporate environmental education initiatives and 
create opportunities for programming partnerships 
with organizations dedicated to conservation and 
stewardship. By integrating educational elements into 
the park and recreation infrastructure, Wickenburg can 
foster a deeper appreciation for its desert setting and 
biodiversity among residents and visitors.
Adoption of design guidelines for future park 
development is crucial to preserving the desert’s 
character. The guidelines should emphasize sustainable 
practices and design principles that highlight the 
natural beauty and ecological significance of the desert 
environment.
Integrate Nature
The integration of nature into parks and recreational 
spaces strengthens the relationship between 
Wickenburg’s residents and the natural environment. 
The development of nature-based destinations, such as 
Boetto Park with its native tree species and landscapes 
echoing the Hassayampa River corridor, provides a 
variety of experiences that connect the community to 
the environment. The Everett Bowman Rodeo Grounds 
is highlighted as a potential desert park, underscoring 
the celebration of the unique desert ecology. In these 
areas, the introduction of nature-related programming 
is critical, as it provides educational and recreational 
opportunities that highlight the importance of our 
natural surroundings.
As the town grows, it’s a priority to include elements 
in new developments that foster a closer relationship 
with nature, creating spaces for nature-based play and 
fitness that are accessible to all residents. 
Expand Shade
Expanding the tree canopy and implementing shade 
solutions are essential to enhance the comfort and 
usability of parks and trails in Wickenburg, especially 
considering the area’s hot summers and significant 
sun exposure. These efforts aim to create a more 
comfortable walking and biking experience throughout 
the town, making outdoor activities and recreation 
enjoyable year-round.
In addition to vegetated shade, the town can employ 
engineered solutions to cool public spaces. Options 
include integrating water play areas and spray grounds 
within community parks, as well as using mist tents at 
pop-up events, festivals, or during peak summer heat. 
Moreover, all-weather accommodations, such as shaded 
outdoor dining areas in Coffinger Park and Stone Park, 
ramadas with picnic benches at trailheads, and shaded 
seating for parents in Sunset Park, support year-round, 
all-season gathering and recreation.
Shade is a critical element for active and functional 
open spaces, and extends the usability of these areas 
throughout all seasons and times of the day. Shade 
solutions can vary from simple, umbrella-shaded 
seating areas to more extensive covered structures, 
adapting to more park and recreation spaces across 
Wickenburg. Through these initiatives, the Town aims 
to provide residents and visitors with cooler, more 
accessible outdoor environments.
Strategy 1
Strategy 2
Strategy 3

06  Existing Park 
Opportunities
	»
Coffinger Park
	»
Everett Bowman Rodeo Arena and Constellation Park Campground
	»
Sunset Park
	»
Trail Network

2
3
1
4
5
6
7
8
9
10
11
14
13
15
12
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
50
 EXISTING PARK OPPORTUNITIES
Coffinger Park:  Community Park
On-site Amenity
1.	 Off-street parking lot
2.	 Multi-purpose sport field
3.	 Wickenburg public pool
4.	 Playground
5.	 Ramada with lights
6.	 Recreation Building
7.	 BBQ grills, picnic tables and benches
8.	 Tennis courts with lights
9.	 Skate park
10.	 Softball / T-Ball 
Access Point
11.	 Public access point
12.	 Park edge bounded by private 
properties
Context
13.	 Tegner St
14.	 Sols Wash
15.	 U.S. Route 93
N
Tegner St
Swilling Ave
US  Highway 93

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
51
 EXISTING PARK OPPORTUNITIES
CHALLENGE AND OPPORTUNITY
Settled in the heart of Town, Coffinger Park stands 
as a canvas of possibilities. With strategic planning 
and a positive outlook, the park can be transformed 
into a vibrant and welcoming space for the entire 
community to enjoy.
The Field
Currently, the field is in a state of disrepair, 
underutilized and awaiting a vision for its full 
potential. Consideration of re-purposing options such 
as converting it into extra parking, a dynamic dog 
park, a versatile staging area, or a venue for lively 
food truck events opens up exciting possibilities.
Pool Facility
The pool facility faces challenges, including 
insufficient parking and overhanging tree canopies 
from neighboring properties. However, these 
challenges are viewed as catalysts for positive 
change. Addressing issues like limited operational 
months due to a lack of heating provides an 
opportunity to introduce new revenue-generating 
programs, overcoming the current limitations 
imposed by school use. The open structure of the 
storage/restroom building presents an opportunity 
for creative redesign, enhancing both functionality 
and aesthetics.
Picnic Lawn
The Picnic Lawn, designed for family-focused events, 
holds promise despite challenges like a lack of 
irrigation in certain areas. By addressing this issue 
and promoting inclusive among town residents, the 
Picnic Lawn can evolve into a thriving community 
space.
Recreation Center
The Recreation Center, currently offering fitness 
classes and hosting school camps, faces an identified 
issue of a lack of rental spaces. This challenge 
presents an opportunity for expansion and increased 
community engagement.
Overall Park
Examining the park as a whole, the presence of 
Mulberry trees has posed maintenance challenges. 
The potential removal of these trees becomes an 
opportunity to positively impact the park’s aesthetics 
and functionality, enhancing its overall beauty while 
addressing maintenance concerns. Utility concerns, 
including drainage and power, represent areas where 
proactive examination and improvements can make 
a significant impact. To further enhance the park’s 
appeal, there is a need for thoughtful consideration 
to improve its connection to the town center. The 
park space on the east end holds exciting potential 
for diverse programming, catering to various 
community needs.
Off-street parking lot
Ramada and Recreation Center
Picnic Lawn
Multi-purpose sport field
Tennis courts
Pool Facility

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
52
 EXISTING PARK OPPORTUNITIES
Coffinger Park Concept
Comfort seating and shade
Community engaging
Native planting material
Pool facility improvement
Light fixture improvement
Programming for all age groups
PARK CONCEPT  2
In response to public input as well as the results 
of the existing park assessment, there is a desire 
by the public for a recreation center and a year-
round pool facility. The needs assessment identified 
a requirement for a recreation center with an 
approximate size of 17,000 square feet (Section 
04: Needs Assessment). We anticipate that the 
recreation center will offer a wide range of fitness 
activities for youth and seniors. Similar-sized 
multigenerational facilities include a full-size 
basketball court, two-to-three multiuse rooms, 
restrooms with lockers, and a small administration 
office.  Additionally, high on the public input list 
was the desire to have a year-round heated pool. 
The current pool facility lacks heating capabilities, 
and the pool configuration, which combines the lap 
pool with the play pool makes heating the pool very 
expensive. A new pool could be an indoor pool or 
a size configuration that are more economical to 
operate year-round. Similar year-round pools are 
four to six lanes and six foot depths at each end with 
a four foot depth at the center for water aerobics 
and other shallow water activities. The six lane width 
permits the use of two lanes for a lap swimming and 
four lanes for water activities.
Design Recommendation
Parkland Improvements
Parking Expansion
Dog Park
Pool Facility Improvements
New Recreation Center Building
Picnic Lawn Improvements
Utility Update
Pedestrian Connection to Existing Community Center
PARK CONCEPT  1
In response to community feedback, we propose 
the introduction of a new multi-generational center 
at Coffinger Park. Taking advantage of its prime 
location in the town center, this facility will offer 
convenient access for both vehicles and pedestrians.
To enhance the experience of park users and 
support the new multi-generational center, we 
have re-configured the vehicular loop route to 
ensure continuous access for emergency services 
throughout the park and the adjacent residential 
areas. Additionally, the plan incorporates the addition 
of over 400 parking spaces, alongside overflow 
parking at the east end to accommodate large 
events.
Furthermore, the concept seeks to foster a 
stronger connection between the park and other 
town amenities. It includes the establishment of 
pedestrian pathway to the Wickenburg Community 
Center in addition to Tegner Street. The pathway 
will provide accessible routes to the trails along the 
Hassayampa River and Sols Wash, enriching the 
recreational landscape of Wickenburg town center 
and promoting a vibrant, interconnected community.
Design Recommendation
Ballfield Improvement
Parking Expansion
Dog Park
Picnic Lawn Improvements
Utility Update
Pedestrian Connection to Existing Community Center

EXISTING
A.   Community pool
B.   Picnic lawn
C.   Tennis courts
D.   Playground
E.   Ramada + Community center
F.   Skate park
PROPOSED
1.	 Expanded and updated parking
2.	 Improved existing ballfield
3.	 Improved walks
4.	 Dog park
5.	 Connection to community center
A
B
C
D
E
F
2
4
5
3
1
1
1
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
53
 EXISTING PARK OPPORTUNITIES
CONCEPT 1 - PRESERVE AND UPDATE, LIMITED AMENITY EXPANSION

EXISTING
A.   Community pool
B.   Picnic lawn
C.   Tennis courts
D.   Playground
E.   Ramada + Community center
F.   Skate park
PROPOSED
1.	 Expanded and updated parking
2.	 Water harvesting garden
3.	 Improved walks
4.	 Dog park
5.	 Connection to community center
6.	 New recreation center / 6-lane pool
A
B
C
D
E
F
2
4
5
6
3
1
1
1
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
54
 EXISTING PARK OPPORTUNITIES
CONCEPT 2 - AMENITY EXPANSION & NEW RECREATION CENTER

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
55
 EXISTING PARK OPPORTUNITIES
[This page is intentionally left blank]

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
56
 EXISTING PARK OPPORTUNITIES
Rodeo Grounds & Constellation Park:  Desert Park
4
6
5
1
4
On-site Amenity
1.	 Everett Bowman Rodeo Arena
2.	 Rodeo Grounds parking
3.	 Constellation Campground Parking
4.	 Campground access road & RV Stalls
5.	 Wickenburg Sportsman Club (non-profit 
social club)
6.	 Minor wash feeding Hassayampa River
Context
1.	 Calamity Wash (feeds Hassayampa River)
2.	 Wickenburg Way
3.	 Cobblestone Hotel
4.	 Wishing Well Park & Wickenburg 
Footbridge less than a half mile from 
property edge
5.	 Private road to property edge
Access Point
1.	 Constellation Rd (only accessible road to 
property)
2.	 Access to Rodeo Grounds Mine Trail
3.	 Private road to Wickenburg Sportsmen’s 
Club
4.	 Service road to water tank
2
3
1
2
1
3
4
1
3
2
5
N

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
57
 EXISTING PARK OPPORTUNITIES
CHALLENGE AND OPPORTUNITY
Major Events and Festivals
Wickenburg hosts several significant events each 
year. The Gold Rush Days & Senior Pro Rodeo 
in February is a major draw but faces funding 
challenges despite town support. The Bluegrass 
Festival, held in November, attracts thousands with 
its music competitions. The Fiesta de Septiembre 
celebrates Hispanic heritage every September.
Previously, the town held events like the Livestock 
Show and the Cowboy Christmas Poetry Gathering. 
Additionally, several guest ranches in the area 
offer private roping and viewing experiences, 
supplementing the town’s rodeo offerings.
Facilities at Rodeo Arena and Constellation 
Park Campground
The town has several guest ranches that offer private 
roping and viewing experiences, complementing 
the town’s rodeo arena. The Rodeo Arena and 
Constellation Park Campground currently have basic 
facilities but require several improvements, such as 
ADA-compliant restrooms, additional bleachers, and 
staff for maintenance. There are event opportunities 
utilizing current facilities and potential improvements, 
including livestock displays and live concerts.
Investment and Development Challenges
The community has made significant investments in 
the Rodeo Arena, and while progress has been made, 
land ownership and contract restrictions with the 
Bureau of Land Management limit the potential for 
further development. Despite these challenges, there 
are opportunities for improvement throughout the 
town. Additionally, there’s potential to enhance trail 
usage, improve programming, and possibly invest in 
town-owned rodeo facilities to bypass restrictions 
and capitalize on demand.
Restore Wickenburg’s Identity
These events and developments play a crucial role 
in maintaining Wickenburg’s identity and character, 
contributing significantly to the town’s recreational 
offerings and revenue generation. Wickenburg can 
capitalize on it’s identity within this park and create 
a true desert park using trails and natural desert 
features.
Warm up area
Parking lot / the ‘Penthouse’
Bleachers with canopy
Restroom building
RV Parking at Constellation Park
Existing ramada and seating

Formalized parking lot
Equestrian amenity
Shaded amphitheater
Restroom improvement
Event space
Enhanced RV camping ground
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
58
 EXISTING PARK OPPORTUNITIES
Rodeo Grounds Concept
PARK CONCEPT
Constellation RV Camping Park
Following community feedback and a thorough 
evaluation of existing assets, we propose a 
comprehensive upgrade to the Constellation RV 
Camping Ground. Key upgrades include formalizing 
the entrance trailer parking for improved 
organization, and increasing RV stall count to 46, 
alongside introducing six RV camping pads equipped 
with closed horse corrals. To enhance visitor 
comfort, we propose a new building with shower 
rooms and restrooms. Additionally, a new trailhead 
from the camping ground will offer direct access 
to surrounding hiking and mountain biking trails, 
enriching the outdoor experience.
Rodeo Ground Enhancements
The Rodeo Ground’s redevelopment is designed to 
augment the recreational amenities. Our proposal 
introduces a distinct recreation package separate 
from the existing rodeo facilities. This includes 
adding an outdoor event space, shaded picnic areas 
with tables and chairs, and establishing a new 
trailhead to encourage outdoor exploration.
To accommodate increased visitor traffic, the existing 
rodeo ground will undergo parking lot formalization 
and expansion, including designated trailer parking 
areas and additional spaces. These improvements 
aim to streamline access and enhance the overall 
visitor experience.
By implementing these upgrades, we intend to 
create a more organized, accessible, and enjoyable 
environment at Rodeo Ground and Constellation 
Park, catering to a wide range of outdoor enthusiasts 
and ensuring a memorable visit for all.
New Trailhead and Nature Amphitheater
Constellation Park is the desert jewel of the Town’s 
Park system. Encompassing over 272 acres the park 
provides the town with hiking and mountain bike 
trails within a natural Sonoran Desert environment. 
Providing a separate trailhead ensures that the 
public has access to the trail system concurrently 
with events at the rodeo grounds. The outdoor 
amphitheater provides a unique setting for outdoor 
programs, demonstration, and events. Through 
public and Town Staff input, there is a desire to add 
a connecting trail system between the hotel and the 
rodeo grounds. An additional trailhead is located 
at the end of Bass Road. Coordination with the 
Cobblestone Hotel may provide a beneficial hotel 
amenity while providing shared parking within the 
hotel parking lot. A conceptual trail layout identifies 
over 2.5 miles of hiking and mountain bike trails.
DESIGN RECOMMENDATION
Each project could be built as a stand alone project or 
combined with other site improvements for a larger 
package as funding becomes available:
RV Camping Ground Improvement
New Shower Room / Restroom Building
Rodeo Ground Parking Formalization
Restroom Improvement
Trailhead Amenities
Ramada

EXISTING
A. Shaded bleachers
B. Rodeo grounds
C. Restroom building
D. Ramada and picnic tables & chairs
E. Rodeo grounds overflow parking
F. Warm-up area
PROPOSED
1.	 Trailhead separated from rodeo amenities
2.	 Community Event Space
3.	 Formal parking lot with trailer parking
4.	 Enhanced RV park
5.	 Constellation Park trailhead
C
D
E
F
A
B
1
2
3
3
4
5
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
59
 EXISTING PARK OPPORTUNITIES
CONCEPT
N

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
60
 EXISTING PARK OPPORTUNITIES
CONCEPTUAL TRAILS AND ACCESS POINTS

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
61
 EXISTING PARK OPPORTUNITIES
[This page is intentionally left blank]

2
2
1
1
3
4
5
6
7
8
9
9
10
11
11
12
13
1
1
2
2
3
1
1
3
2
4
Wickenburg Way
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
62
 EXISTING PARK OPPORTUNITIES
Sunset Park:  Sports Park
On-site Amenity
1.	 Softball fields with lights
2.	 Baseball fields with lights
3.	 Basketball court
4.	 Sand volleyball 
5.	 Practice field
6.	 Concessions and restroom building
7.	 Dog park
8.	 Ten Pickle ball courts & one tennis court
9.	 Splash pad, playground & ramada
10.	 Perimeter walking path
11.	 Overflow parking
12.	 Batting cage
13.	 Maintenance facility 
Context
1.	 Wickenburg way
2.	 Sunset Multi-use Trail
3.	 Municipal Airport
4.	 Flood control system
Access Point
1.	 Public access point
2.	 Continuation of Pedestrian path on soil
3.	 Park bounded by private property fencing
N

Splash pad
Park overview
Tennis & pickle ball courts
Dog park
Playground & ramada
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
63
 EXISTING PARK OPPORTUNITIES
CHALLENGE AND OPPORTUNITY
As a key facility for sports and recreation in The 
Town of Wickenburg,  Sunset Park, offers broad 
community-centric amenities. With planning and 
phasing, this beloved park can meet all recreation 
demands and evolve it’s inviting park interior. 
Fields 
Housing the majority of Town sports fields for 
Baseball, softball, soccer and football, these four 
fields are in need of relief and care. Updates include 
irrigation systems, possible infield replacement 
with synthetic turf, clay updates. New multi-purpose 
fields are needed to give these heavily used fields 
adequate downtime. Additional warm-up fields are 
needed to assist the development of youth players 
and downtime of fields. 
Courts
Current sports courts include one tennis court, one 
full basketball court, ten pickle ball courts and one 
sand volleyball court. Many of these courts were 
added or improved on in 2020 and it is recommended 
that they stay ‘as is’ until either supply of courts or 
demand for courts shift.
Playgrounds
Three playgrounds and one splash-pad is located 
within Sunset Park. Safety, comfortability, and 
accessibility should be prioritized in updating and 
repairing play features as needed. Repairs to and 
additional shade structures should be prioritized. 
Parking
Four formal parking lots combine to offer 218 
parking stalls. Three un-paved parking lots offer an 
additional 90-110 parking stalls. Paved and un-paved 
parking lots are scattered throughout the park, which 
invites cars deeper into the park’s interior creating 
the need for a heightened sense of awareness within 
the park. Options to consolidate parking should be 
explored to create a safer park interior and open up 
additional field or amenity space. 
Dog Park
Multiple opportunities present itself for the dog park. 
The allocation of space between large and small dog 
could be balanced based on need. Due to the low 
height of the dog park, it could be relocated to town 
property across Wickenburg Way and make room for 
additional sports fields.  
Overall Park
Careful design should be dedicated to the park’s 
pedestrian and vehicular circulation to create a 
welcoming park interior. The park should capitalize 
on its unique desert landscape while prioritizing 
shade for the park patrons to create a comfortable 
sports and recreation hub in the park.

Multi-Sport Compatible Field
Comfort seating & shade for parents
Sufficient warm-up area
Integrate nature
Provide facility suitable for different age groups
Dog park improvement
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
64
 EXISTING PARK OPPORTUNITIES
PARK CONCEPT
Based on community feedback and discussions with 
sports group leaders, we propose enhancements to 
Sunset Park to better serve the community needs. 
Our plan introduces two major fields: a multi-
purpose field positioned on the east end for soccer 
and football, and a baseball field located on the west 
end. Additionally, we plan to upgrade one existing 
softball field into a multi-purpose field that can 
support both softball and soccer. This design allows 
the turf ample recovery time between games.
To optimize space and improve functionality, we 
propose relocating the dog park from the west 
to the east side of the park. This move not only 
facilitates the creation of additional parking for the 
new baseball field but also allows reconfiguration 
of the dog park into two separate areas, catering to 
both large dogs and puppies, enhancing safety and 
enjoyment dog park visitors.
In response to the need for more efficient use of the 
park’s facilities, we are increasing parking availability 
across Sunset Park. This expansion will facilitate 
better access and convenience for all users.
Moreover, we are introducing warming-up areas 
adjacent to each group of sports fields, providing 
athletes with dedicated spaces for preparation 
and practice before their games. This addition 
underscores our commitment to supporting active 
lifestyles and promoting the well-being of our 
community members through enhanced recreational 
infrastructure.
DESIGN RECOMMENDATION
Each project could be built as a stand alone project or 
combined with other site improvements for a larger 
package as funding becomes available:
East Parking Lot Expansion
Dog Park
Soccer / Football Field
Existing Fields Improvement
New Baseball Field
West Parking Lot
Restroom Improvements
General Park Native Seeding
Splash Park Restoration
Sunset Park Concept

D
E
C
A
B
F
6
7
8
4
5
1
3
2
3
3
3
EXISTING
A. Pickle ball courts & tennis court
B. Splash pad & playground
C. Multi-purpose field - baseball / soccer
D. Softball field
E. Baseball field
F. Maintenance facility
PROPOSED
1.	 Dog park
2.	 Tennis court
3.	 Parking lot
4.	 Warm-up area
5.	 Multi-purpose field - soccer
6.	 Multi-purpose field - softball / soccer
7.	 Baseball field
8.	 New restroom building
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
65
 EXISTING PARK OPPORTUNITIES
CONCEPT
N

Existing Trails 
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
66
 EXISTING PARK OPPORTUNITIES
WICKENBURG TRAILS TODAY
Wickenburg, Arizona, known for its rich history as a gold mining town and 
vibrant western culture, has in recent years also become a hotspot for outdoor 
enthusiasts, particularly hikers and bicyclists. The town’s surrounding desert 
landscapes and rugged mountains offer a picturesque backdrop for an 
extensive trail system that caters to various skill levels and interests. 
Along Wickenburg Way, a multi-use trail linking the historic downtown area 
to the east with Sunset Park to the west offers both detached and attached 
sidewalk segments. This trail acts as a gateway, enhancing connectivity 
between recreational areas and fostering outdoor activities within the town.
Major Hiking Areas
Wickenburg boasts several major hiking areas, including the Vulture Mountain, 
which offers breathtaking views from the summit, the Hassayampa River 
Preserve, known for its riparian beauty and bird watching opportunities, and 
Sophie’s Flat, an addition to Wickenburg’s trail network providing a wide 
range of trails that cater to hiking and ATV uses. The trails in these areas 
are well-maintained, thanks to the efforts of the authorities and community 
organizations. Usage varies by season, with peak times in the cooler months 
from October to April. Despite their popularity, these trails maintain a sense of 
tranquility, offering a refuge for both locals and tourists.
Public Recorded Trails vs. Social Trails
While Wickenburg has an array of publicly recorded trails mentioned above, a 
significant number of social trails have been identified by local hikers. These 
unofficial paths, created by repeated use rather than planned design, offer 
unique explorations but lack official maintenance or signage. The existence 
of social trails reflects the community’s enthusiasm for outdoor activities 
but also underscores the need for careful management to protect sensitive 
habitats.
Off-Road Vehicles
Off-road vehicles are a common mode of transportation and recreation 
within the Wickenburg area. Public streets, county roads, and wash corridors 
frequently host this type of transportation and recreational use. The parks and 
recreation master plan does not deal specifically with off-road vehicle routes, 
but it does acknowledge that there are certain access points to public lands 
that the park system can provide. Constellation Park provides access to the 
BLM and state land potentially permitting this type of recreation. Please note 
that the town does not designate specific routes beyond the legal use of public 
streets. 
Wickenburg Trails Network
N

Turtleback Mountain is a rugged area known for its distinctive 
turtleback shape. With its diverse terrain and scenic beauty, this 
area faces challenges in trail development due to complex land 
ownership, including private, state, and federal holdings.
Vulture Mountain is a prominent landmark near Wickenburg, offering more challenging hiking trails that lead to panoramic views of 
the desert landscape. The area is named after the nearby Vulture Mine, a historic gold mine, adding a touch of history to your hike. 
Twin Peak Wash is a natural drainage area that offers a unique 
hiking experience through the desert. The wash has trails 
allowing hikers to navigate through sandy terrain surrounded by 
the beauty of the Sonoran Desert while observing local flora and 
fauna.
The Hassayampa River Preserve is a lush oasis in the desert, 
featuring a rare riparian habitat along the Hassayampa River. 
This area is a haven for wildlife, including over 280 bird species, 
making it a prime location for birdwatching. The preserve offers 
several trails that allow visitors to explore its rich biodiversity, 
flowing river, and dense vegetation.
The Rodeo Ground Mine Trail offers a unique combination of 
natural beauty and historical significance. Starting near the 
town’s rodeo grounds, this trail takes hikers to abandoned mine 
sites, offering a glimpse into Wickenburg’s mining past. The 
trail offers opportunities to see old mine shafts and equipment, 
as well as stunning views of the desert.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
67
 EXISTING PARK OPPORTUNITIES
CHALLENGE AND OPPORTUNITY
Land Ownership and Challenges
Wickenburg’s trail system offers a diverse range of 
outdoor experiences across private, state, federal, 
and town-owned lands. Accessing these areas, 
including Constellation Park and Sophie Flat, can be 
challenging due to private land restrictions, which 
sometimes necessitate detours. Trails crossing 
private properties without formal easements can lead 
to conflicts. As hiking and ATV riding on private lands 
increase, the need to establish clear boundaries and 
secure access rights becomes crucial for sustainable 
outdoor activities and maintaining respect for private 
property.
Amenities and Safety Measures for Hikers 
and Bicyclists
Among the notable gaps in the current trail system is 
the significant lack of amenities that would not only 
enhance the hiking experience but also ensure the 
safety and well-being of trail users. This includes the 
absence of sufficient parking areas, clearly marked 
trailheads, updated maps, rest areas with benches 
and shade structures, and emergency 911 call station 
markings.

Existing Trailheads
Proposed Trailheads
Proposed Off-road Vehicle Parking
‘Spine Corridor’
Gateway Path
Proposed Road-side Trail
Hassayampa River Corridor
Potential Natural Surface Trail
Potential Bike Route
Town Parks
Town Recreation Areas
Existing Trails 
N
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
68
 EXISTING PARK OPPORTUNITIES
DESIGN RECOMMENDATION:
A CONNECTED TRAIL SYSTEM
As one of Maricopa County’s more rural towns, 
Wickenburg is uniquely situated to use its trail 
network to establish a sense of place and service 
Town residents by connecting the town’s parks and 
amenities via multi-use trails. 
To enhance town mobility and promote walkability 
and bikability, the implementation of two main spine 
corridors is proposed. One corridor along Vulture 
Mine Road, while the other is to be improved and 
added too along Wickenburg Way and Constellation 
Road. Continuing the multi-use path along Grand 
Ave, south of 296th Ave, and north on US 93 to 
Wickenburg Ranch could create a gateway entry 
to the town. These corridors will create improved 
movement within the town, providing safer pathways 
for pedestrians and cyclists to town parks and 
recreation amenities.
A network of side trails would branch off of main 
corridors including along Kellis Rd, Ocotillo Rd., 
Steinway Dr., Flying E Ranch Rd and Tegner St. 
These trails will offer convenient access to parks 
and recreational facilities, promoting an active 
lifestyle and capitalizing on Wickenburg’s identity by 
improving access to outdoor activities. 
To support the proposed trails, trailhead amenities 
will be strategically added. These trailheads will 
meet the following criteria:
    1. Accessible to multiple trails,
    2. Located on town-owned land. 
    3. Accessible from a Public Rights-Of-Way.  
Furthermore, a series off-road trails will be 
developed, including a Hassayampa River corridor, 
connecting to new trailheads. 
Wickenburg Trail Network

On-road bike path - ‘Sharrow’
On-road bike path - buffered bike lane
Universal trail design (AZ State Parks)
Paved and unpaved surfaces for multi-purpose paths
Equine designated & multi-purpose trails (Cave Creek Trail Rides)
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
69
 EXISTING PARK OPPORTUNITIES
IN-TOWN TRAIL DESIGN
Design Intent
The development of trails within the Town of 
Wickenburg is aimed at crafting continuous, 
non-motorized pathways that serve to enrich the 
community’s recreational opportunities and to 
provide alternative transportation routes. These 
trails, whether adjacent to or off of roadways, are 
designed to seamlessly connect trailheads and 
recreational destinations throughout the town. 
They cater to a diverse set of activities, including 
walking, bicycling, running, and horseback, ensuring 
accessibility and enjoyment for all users.
Design Principles
	– Create an environment where pedestrians, 
bicyclists, equestrians, and individuals with 
disabilities feel safe and welcome, fostering a 
sense of community inclusive.
	– Ensure path surfaces and materials reflect 
and reinforce Wickenburg’s unique character, 
blending seamlessly with the town’s aesthetic.
	– Adhere to national design and accessibility 
standards to provide consistency and 
accessibility, ensuring a smooth experience for 
all users.
	– Maintain an minimum 8-foot path width, whereas 
10-foot is recommended, to accommodate a 
variety of activities, ensuring sufficient space for 
diverse recreational uses.
	– Implement design and signage strategies to 
guide users’ speed and encourage appropriate 
behavior on the path, ensuring safety and 
respect among all users.

Existing Condition
Proposed Streetscape - Detached Multi-purpose Path
PAVED SURFACE
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
70
 EXISTING PARK OPPORTUNITIES
In-town Street Retrofit Option 1

Existing Condition
Proposed Streetscape - Buffered Bike Lanes and Detached Walk
PAVED SURFACE
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
71
 EXISTING PARK OPPORTUNITIES
In-town Street Retrofit Option 2

Example of at-grade crossing enhancement
Pedestrian bridge
Example of at-grade crossing enhancement
Multi-purpose underpass
Well-lit pedestrian tunnel
Lighting of short tunnel during daytime
Wayfinding signage when connecting along sidewalk
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
72
 EXISTING PARK OPPORTUNITIES
CROSSING TREATMENT
Design Intent
Crossing treatments enhance physical connectivity 
by providing design solutions for challenging 
intersections, such as roadways, washes, or 
railroads. These treatments are designed to mark 
and improve the path of travel, allowing trail users 
to safely and comfortably navigate designated 
trails. The aim is to ensure the continuation of the 
trail experience across barriers. Consistency in 
crossing designs throughout the trail network is 
essential, enabling users to easily recognize them as 
continuations of the trail experience.
Design Guideline
	– Any enhanced at-grade crossings should clearly 
identify the crossing and highlight the path of 
travel.
	– Incorporate prominent and legible signage to 
further identify crossings and alert drivers when 
crossing a major roadway.
	– Crossing enhancements or improvements should 
use markings, materials, and colors that are 
consistent with the character of Wickenburg.
	– Underpass should be well lit for both daytime 
and evening use and provide a safe route for 
users.
	– Underpass design must adhere to all local 
design criteria for minimum height and width 
clearances.
	– At-grade crossing, underpass, and overpass 
design should be ADA accessible.
	– Provide adequate signage for clear wayfinding.

Shaded picnic tables & benches
Trash receptacle
Information board
Bike rack
Way-finding signage with emergency marker
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
73
 EXISTING PARK OPPORTUNITIES
TRAILHEAD DESIGN
Design Intent
As one of Maricopa County’s more rural towns, 
Wickenburg is uniquely situated to use its trail 
network to establish a sense of place and service 
Town residents. The Town can do so by creating a 
system of outdoor recreation amenities that support 
and promote a wide range of usage. Trailheads can 
serve as a gateway to this system, creating the first 
impression on town outdoor recreation experiences.
The Town should consider the intent of trailhead 
design when preparing for implementation. This 
intent would include providing Town residents  
with clear and safe points of entry to major areas 
of outdoor recreation in and near the Town of 
Wickenburg. Trailheads should connect to spine 
corridors to make mobility to and from Town outdoor 
recreation simple and seamless. Trailhead should 
provide a wide range of amenities that encourage 
usage from a diverse set of users (walking, biking, 
equine, running etc.)
Design Guideline
	– Trailheads should be connected to one of the 
Town’s main spine corridors via a road-side trail. 
	– Wayfinding signage should be clearly visible from 
road. Trail markings should be visible from the 
parking lot to lead trail users to trail entrances. 
Trail information signage, including maps, 
should be considered to inform visitors on trails 
that can be accessed from trailhead. 
	– It is recommended to provide parking stalls 
depending on specific sites and anticipated 
demand. Consider demands for equine parking 
as well.
	– Layout of trailhead needs to accommodate 
routes for emergency services and markers for 
emergency clearances. 
	– Town of Wickenburg should issue ATV 
regulations, as needed, within town limits.
	– At a minimum, one trash receptacle should be 
located at trailheads.
	– Studies should be conducted to determine if a 
restroom building shall be provided.
	– Where trailheads expect a larger amount of 
regular use, other amenities that support 
additional comfort should be provide (i.e. shade, 
benches, ramadas, group gathering areas.)

07  New Park Opportunities
	»
Kerkes Sports Fields
	»
Sunrise Park
	»
Cassandro Wash Park
	»
Upper Hassayampa Nature Preserve

1
2
3
5
6
9
10
11
13
14
12
4
7
8
Existing Parks & Recreation Facilities
New Park Opportunities
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
76
 NEW PARK OPPORTUNITIES
1. Constellation Park Campgrounds
2. Everett Bowman Rodeo Grounds
3. Coffinger Park
4. Coffinger Park Recreation Center
5. Stone Park
6. Wishing Well Park
7. Wickenburg Library
8. Wickenburg Community Center
9. Boetto Park
10. Maguire Park
11. Sunset Park
12. Dog Park
13. Sunset Multi-Use Path
14. Kerkes Trailhead
15. Kerkes Sports Fields
16. Cassandro Wash Park
17. Sunrise Park
18. Upper Hassayampa Nature Preserve
15. Kerkes Sports Fields
17. Sunrise Park
16. Cassandro Wash Park
18. Upper Hassayampa Nature Preserve

WICKENBURG WAY
93
HASSAYAMPA RIVER
KERKES ST
TEGNER ST
TEGNER ST
HASSAYAMPA 
ELEMENTARY 
SCHOOL
MULTI-PURPOSE FIELD
ADULT SOCCER / FOOTBALL
MULTI-PURPOSE FIELD
LITTLE LEAGUE SOFTBALL / SOCCER
RESTROOM 
BUILDING
PARKING LOT
KERKES 
TRAILHEAD
N
HASSAYAMPA ELEMENTARY SCHOOL FIELD - 7.9 ACRES
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
77
 NEW PARK OPPORTUNITIES
Kerkes Sports Fields
Design Intent
Hassayampa Elementary School may provide a 
unique opportunity for the Town and the school 
district to partner in providing sports fields for both 
the elementary school and the public. Hassayampa 
Elementary School was the previous high school, 
providing open play fields as well as a regulation 
football field. The current condition of the football 
field would require a full renovation of the field. 
Used as a bus parking area, and storage, the field 
may require gravel placed for bus parking removed 
and possible placement of new topsoil and a new 
irrigation system to cultivate a new grass field.
The current playground maintained by the school is 
in poor condition, but could be renovated to create 
an additional multi-use field. It is anticipated that 
parking improvements would be required, along with 
a restroom building.

SHADE 
RAMADAS
60 - Wickenburg Way
MULTI-USE TRAIL
SMALL PUMP 
TRACK 
FCDMC PROPERTY
LARGE PUMP TRACK 
/ TRAIL
SWALE
SWALE
TRAIL 
BRIDGE
ACCESS ROAD
WICKENBURG WAY
MARIPOSA DR.
N
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
78
 NEW PARK OPPORTUNITIES
Cassandro Wash Park
Design Intent
The needs assessment identified a new community-
level park to meet the town’s recreation needs 
by 2038. The town has an opportunity to partner 
with the Flood Control District of Maricopa County 
(FCDMC) to utilize the stormwater storage area 
behind Cassandro Wash Dam. The FCDMC fequently 
collaborates with cities and towns to develop flood 
control properties for multi-use facilities. The town 
staff has had an initial meeting with FCDMC, and 
there is interest from both parties. The general 
public has envisioned the park as a wheeled 
park that promotes mountain biking, BMX, and 
recreational biking. The park’s features could include 
a competitive mountain bike track, a pump track 
and a BMX track. Additional amenities could include 
ramadas, parking, a restroom located above the 
water storage area, and a perimeter walking path. 
17.6 ACRES OF FLOOD CONTROL DISTRICT LAND

WICKENBURG WAY
N
MULTI-PURPOSE FIELD
LITTLE LEAGUE BASEBALL / 
SOCCER / FOOTBALL
BASEBALL FIELD
MULTI-PURPOSE 
FOOTBALL FIELD
BASKETBALL 
COURTS
WARM-UP
AREA
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
79
 NEW PARK OPPORTUNITIES
Sunrise Park
Design Intent
To meet the need for sport facilities, there 
is an opportunity to build a new sports park, 
complementing the existing park. The Town currently 
owns land immediately south of the existing Sunset 
Park. A portion of the land is within the Town’s 
municipal airline flight path, limiting the recreational 
use under the flight path. The focus on sports fields 
and sport court could provide the Town residents with 
expanded sports programs, including adult soccer, 
baseball and softball, soccer fields and sport courts. 
20.2 ACRES OF PARK AREA

WICKENBURG WAY
93
CONSTELLATION RD
N
Birding 
Overlooks
Natural Surface Path
Parking
Parking
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
80
 NEW PARK OPPORTUNITIES
Upper Hassayampa Nature Preserve
Design Intent
The Town owns property along the Hassayampa 
River, which was once a source of sand and 
gravel. During the prime bird migration 
season, the natural reclamation of the land 
has benefited the excavated areas from 
seasonal surface water. The area is a natural 
preserve, providing critical habitat for wildlife 
as well as an opportunity for residents and 
visitors to observe bird life. The opportunity to 
formalize the area’s use as a preserve provides 
protection for the area. Removing cattle 
grazing and defining the property boundary 
may help to improve and protect this natural 
environment. The proposed improvements to 
the area should be  light and minimal, providing 
parking, restrooms and controlled entry points. 
Birding and wildlife overlooks provide visitors 
with opportunities to observe wildlife, while 
interpretive signage informs visitors of the 
uniqueness fo the area and the wildlife that 
calls it home. Natural surface paths provide 
a comfortable way to enjoy the preserve 
while having minimal impact on vegetation 
and wildlife. This area complements the 
Hassayampa Preserve to the east, reinforcing 
the wildlife area’s value.
155 ACRES OF TOWN-OWNED LAND

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
81
 NEW PARK OPPORTUNITIES
[This page is intentionally left blank]

IMPLEMENTATION PLAN
08  Implementation Plan
	»
Existing Parks Maintenance & Upgrades
	»
New Park Amenities

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
84
 IMPLEMENTATION PLAN
Existing Parks
The following pages illustrate each of the existing parks maintenance needs and improvement to increase the quality of experience by the residents. Many of the recommended 
improvments relate to deferred maintenance, while others bring the parks into compliance with Americans with Disabilities Act. The recommendations also include minor 
upgrades to ensure the parks are fully utilized.
What is the Implementation Plan?
Where do we start? Compared to Wickenburg’s peers, 
the Town is right where it should be on parkland 
acres. Addtionally, with an additional 20-acres of 
parkland needed by 2038, the town has opportunities 
to partner for shared facilities, eliminating the need 
to acquire new land. The current town land assets 
and the potential for a partnership with FCDMC to 
develop Cassandro Wash Park, and with the school 
district renovating existing fields at Hassayampa 
Elemntary school enables the town put funds directly 
to Improvements versus land acquisition. Town owned 
land in the Hassayampa River provides a unique park 
preserve that is a new type of park that few towns or 
cities have within their park stystems. 
A theme that resonated by the public in surveys and 
public meetings was to reinvest and maintain the 
current parks. A thorough inventory of all the existing 
parks was conducted and a list of maintenance and 
amenities compiled to form a list of priorities for each 
of the parks. In addition, the new park amenities we 
identified to further develop existing parks. A separate 
report with approximate capital costs was prepared for 
the Parks Department for their use in planning their 
capital project budgets. 
Implementation Plan - Existing Parks
EXISTING PARKS
ESTIMATED TIMEFRAME
FISCAL YEARS
TOTAL BUDGET
2025
2026
2027
2028
2029
2030+
Barbara Brown Park
 $26,500 
 $3,500 
 $23,000 
Boetto Park
 $9,100 
 $4,000 
 $5,100 
Maguire Park
 $26,000 
 $5,000 
 $9,000 
 $12,000 
Coffinger Park
 $200,000 
 $25,000 
 $65,000 
 $80,000 
 $30,000 
Sunset Park
 $390,000 
 $30,000 
 $140,000 
 $60,000 
 $60,000 
 $100,000 
Estimated Budget
 $651,600 
 $67,500 
 $242,100 
 $152,000 
 $90,000 
 $- 
 $100,000

Existing Barbara Brown Park
Recommend adding additional planting to park
Barbara Brown Park – Recommended tree placement
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
85
 IMPLEMENTATION PLAN
Barbara Brown Park
Recommended Park Maintenance and Improvements
1.	 Add (4) 24”-box trees. Recommend (1) Blue Palo Verde, (2) Ironwoods, (1) Sweet Acacia
2.	 Add (20) 5-gallon shrubs. Recommend hummingbird/bird attracting plants (Fairy Duster, Aloe, Red Yucca, Jojoba)
3.  	 Shade structure with Picnic Ramada
Estimated Improvement Cost: $26,500
Estimated Improvement Timeframe:  FY2025 - 2026
* The estimated cost is based on 2023-24 pricing for similar projects and to be used for budgeting purposes.

Existing Playground – Recommend replacing sand with Fibar surface for ADA accessibility.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
86
 IMPLEMENTATION PLAN
Boetto Park
Recommended Park Maintenance and Improvements
1.	 Minor painting on restroom.
2.	 Minor path lighting repair.
3.	 Recommend replacement of sand with Fibar to make the entire playground accessible.  This conversion may coincide with the rubber play surface failure.
4.	 General- regular washing down of benches and fitness equipment. Recommended frequency – 2 times per month.
Estimated Improvement Cost: $9,100
Estimated Improvement Timeframe: FY2025 - 2026
* The estimated cost is based on 2023-24 pricing for similar projects and to be used for budgeting purposes.

ITEM 1 - Add sidewalks to basketball court and playground. Provide sidewalk ramp into playground fall surface.
ITEM 2 - Add ADA parallel parking space with signage and ADA ramp to existing sidewalk. 
ITEM 3 - Add concrete curb, Fibar fall surface to swings, and change one swing to ADA compliant swing. 
ITEM 4 - Add ADA compliant picnic tables to ramada and bolt down to existing concrete paving. 
ITEM 5 - Add 6’-8’ high chain link fencing the width of the basketball court. 
Recommend adding ADA parking space and accessible sidewalks to courts and 
playground.
Recommend adding concrete curb to swing area, changing fall surface to Fibar 
and replace on swing with ADA accessible swing
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
87
 IMPLEMENTATION PLAN
Maguire Park
Recommended Park Maintenance and Improvements
1.	 Add sidewalks to basketball court and playground.  Provide sidewalk ramp into playground fall surface.
2.	 Add ADA parallel parking space with signage and ADA ramp to existing sidewalk.
3.	 Add concrete curb, Fibar fall surface to swings and add concrete ramp into the Fibar, and change one swing to ADA compliant swing. 
Verify required clearances before installing the concrete curb.
4.	 Add two (2) ADA complaint picnic tables to ramada and bolt down to existing concrete paving.
5.	 Add 6’-8’ high chain link fencing the width of the basketball court.  Place between the court and wash to prevent balls from going into 
the wash. Black vinyl coated chain link fence with painted posts preferred finish.
Estimated Improvement Cost: $26,668
Estmated Improvement Timeframe: FY2025 - 2027
* The estimated cost is based on 2023-24 pricing for similar projects and to be used for budgeting purposes.

Recommend removal of picnic tables and concrete pads or bring up to ADA standards.
Recommend adding accessible sidewalk from pool house to playgrounds and large ramada.
ITEM 1 – Add (1) van ADA space and (2) standard ADA spaces closer to building and existing ramp.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
88
 IMPLEMENTATION PLAN
Recommended Park Maintenance and Improvements
1.	 Relocate (2 minimum) ADA spaces closer to existing ramp to pool facility.  Add new ADA striping and signage at the recommended 
plan location. Remove existing ADA spaces as the access through the pipe barrier does not meet code to pass a wheelchair.
2.	 Add new sidewalk, minimum 6’ wide, from pool house sidewalk to the large ramada.
3.	 Add sidewalk that transitions into a ramp at the three entries to the playground.  See item 2 for additional sidewalk recommendation.
4.	 Remove (2) old picnic tables and concrete pads along parking lot. Note: Future picnic replacements within the park should be ADA 
compliant.
5.	 Replace playground fall surface with Fibar brand (or equal) to provide compliant fall surface and ADA access throughout the 
playground.
6.	 Restripe ADA spaces at south parking lot leading to the community room. Provide (1) van ADA space and (2) standard ADA spaces.
7.	 Add (1) ADA parallel parking space southeast of skate park.
8.	 Replace heaved concrete panel near the southeast corner of the skate park. 
9.	 Remove gate at skate park and repaint fence.  Adjust irrigation not to spray fence.
10.	Add (2) benches in skate park area under the existing trees.
11.	 Tennis courts are generally in good shape, but minor repair work is needed along west net area.
12.	Tennis fencing is in poor condition. Recommend removing existing chain link fence, plum existing posts and install new chain link 
fence with 11 gauge (green or black vinyl coated) fencing for added strength.  Paint posts to match chain link fence color. We would 
not recommend windscreen as suspect the bent posts were caused by wind load on the fence.
13.	Recommend the open play field return to a condition for programmed football or soccer play. Adding this lighted field back into the 
park inventory as a programmed field will relieve a portion of programmed field sports at Sunset Park.
a.	 Continue to control rodent damage, with the goal of complete removal of rodents.
b.	 Once rodents are removed the field should be sand-leveled to fill and smooth out any holes or irregularities in the surface for 
safe play.
c.	 Adjust irrigation as necessary to ensure full irrigation coverage.
14.	Recommend improving the ballfield. The return of the field to the park inventory of playable fields will relieve a portion of 
programmed play at Sunset Park.  The field would be suitable for Tee-Ball or lower ages of Little League.
a.	 Remove sand infield surface and replace with 6” of infield mix.
b.	 Remove existing chain link on backstop.  Paint existing posts and replace backstop fencing with 9-gauge fencing.
c.	 Added improvement – add dugout benches behind existing fence or add new enclosed dugouts.
15.	 Add portable outfield fence to separate football/soccer from baseball field.
Estimated Improvement Cost: $200,000
Estmated Improvement Timeframe: FY2025 - 2030
* The estimated cost is based on 2023-24 pricing for similar projects and to be used for budgeting purposes.
Coffinger Park

Recommend moving ADA parking spaces to have direct access to pool house ramp and park sidewalks.
ITEM 2 – Add new sidewalk. ITEM 3 – Add concrete ADA ramps into play surface. ITEM 4 – Remove (2) 
picnic tables and concrete pads. ITEM 5 – Replace wood chips with Fibar play surface.
ITEM 6 – Restripe (1) van ADA and (2) standard ADA spaces. ITEM 7 – Stripe (1) parallel ADA space. 
ITEM 8 – Replace heaved concrete panel. ITEM 9 – Remove gate. ITEM 10 – Add (2) benches.
Add sidewalks and accessible ramps at three locations to provide ADA access. Remove old picnic table 
and concrete pads or replace with ADA accessible table and connecting sidewalks.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
89
 IMPLEMENTATION PLAN

ITEM 11 – Minor court repair at net and seal cracks in court. 
ITEM 12 – Replace chain link fence.
ITEM 13 – Repair field suitable for football and/or soccer program. 
ITEM 14a – Replace sand infield with regulation infield mix. ITEM 14b – Remove and replace 
chain link backstop fence. ITEM 14c – Add dugout fencing and benches. 
ITEM 15 – Provide temporary outfield fence for baseball.
Recommend minor court repair and replacement of court fencing and straightening of 
posts.
Recommend bringing fields up to programmed field play. 
Remove and replace infield soil with infield mix, and replace 
backstop fencing.
Restripe ADA spaces south of large ramada and add new parallel ADA space by skate park.
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
90
 IMPLEMENTATION PLAN

ITEM 1 - Paint buildings and selected facia replacement. ITEM 2 - Replace artificial turf. 
ITEM 3 – Add concrete curb to volleyball court. 
ITEM 4 (Alternate) Recommend adding one additional volleyball court.
Recommend painting concession building and adding concrete curb to volleyball courts.  Option to add 
an additional volleyball court with lighting.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
91
 IMPLEMENTATION PLAN
Recommended Park Maintenance and Improvements
Sports Field Area
1.	 Paint buildings and selected facia replacement.
2.	 Replace artificial turf. Recommend base material compacted before turf is placed.  Additionally, ensure that seams are correctly 
connected and turf is correctly attached to border to ensure turf remains taut.
3.	 Add concrete curb to volleyball court.
4.	 Recommend adding one additional volleyball court with curbing, sand, lighting and overhead irrigation to settle dust.
Playground Area
5.	 Ramada and restroom roofs are in poor condition. Recommend removal of asphalt shingles, repair damaged T-111 decking, and add 
metal roofing to match ballfield buildings.  Metal roofing has an extended lifecycle and modernize the ramadas.
6.	 Add ADA concrete ramps into the playground fall surface. 
7.	 Replace wood chips with Fibar play surface at playgrounds.
8.	 Add one playground canopy fabric.  Frame is in place.
9.	 Secure picnic tables to ramadas.  Tables are currently being moved around the site.
10.	Add concrete border and Fibar fall surface to swing area.  Replace one swing with (1) ADA compliant swing. Verify required 
clearances before installing the concrete curb.
11.	 Repair erosion and add rock mulch to immediate playground and ramada area.
12.	Replace heaved sidewalk panels. 
13.	Replace broken restroom vestibule light.
14.	Repaint parking lot light poles.
General Park Area
15.	 Seal and restripe parking lots, except for upper parking lot by pickleball court
16.	Add crosswalk striping and sidewalk from upper parking to steps to sports fields.
17.	 Paint fencing along internal drive.
18.	Refresh gravel or add millings to the unpaved parking lot.
Estimated Improvement Cost: $390,000
Estmated Improvement Timeframe: FY2025 - 2030
* The estimated cost is based on 2023-24 pricing for similar projects and to be used for budgeting purposes.
Sunset Park

ITEM 5 - Ramada and restroom roofs replacement. ITEM 6 – Add ADA ramps into playground fall surface. ITEM 7 – Replace with 
Fibar play surface. ITEM 8 – Add new fabric canopy. ITEM 9 – Secure picnic tables in ramadas. ITEM 10 – Add concrete border and 
Fibar to swings and replace one swing with ADA swing. ITEM 11 – Repair erosion and add rock mulch. ITEM 12 – Replace heaved 
concrete panel. ITEM 13 – Replace restroom light. ITEM 14 – Paint light poles.
Highly recommend repair and replacement of ramada and restroom roofs.  
Recommend repairing erosion and adding rock mulch in the ramada and playground area.  Add accessible ramps into Fibar play 
surface.
Recommend replacement of playground canopy. Add concrete curb and Fibar fall surface under swings. Replace one swing with ADA 
accessible swing.  
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
92
 IMPLEMENTATION PLAN

Recommend adding sidewalk to existing stairs. Seal roadways and parking lot throughout and paint light poles throughout.
ITEM 15 - Seal and restripe parking lots, except for upper parking lot by pickleball court. ITEM 16 - Add crosswalk striping and 
sidewalk from upper parking to steps to sports fields. ITEM 17 - Paint fencing along internal drive. ITEM 18 - Refresh gravel or add 
millings to the unpaved parking lot.
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
93
 IMPLEMENTATION PLAN

WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
94
 IMPLEMENTATION PLAN
New Park Opportunities
Mentioned previously, the opportunities for new parks and amenities are quite exciting for the town. The town truly has untapped potential for creating new recreational areas, 
new recreational types and parks built around preserving the natural environment. The park descriptions have been previously covered.
NEW PARKS
ESTIMATED TIMEFRAME
FISCAL YEARS
TOTAL BUDGET
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
Hassayampa Preserve (new park)
 $1,200,000 
 $400,000 
 $800,000 
Kerkes Park (Sports Fields)
 $2,500,000 
 $1,250,000 
 $1,250,000 
Constellation Park New Trailhead
 $1,300,000 
 $600,000 
 $200,000 
 $500,000 
Cassandro Wash Park (new park)
 $1,500,000 
 $750,000 
 $750,000 
Coffinger Recreation Center/Pool
 $14,500,000 
 $2,500,000 
 $12,000,000 
Sunset Park (New Amenities)
 $7,500,000 
 $2,500,000 
 $2,500,000 
 $2,500,000 
Constallation Park RV Park
 $1,000,000 
 $500,000 
 $500,000 
Sunset Park South (new park)
 $13,500,000 
 $4,500,000 
 $4,500,000 
 $4,500,000 
Estimated Budget
 $43,000,000 
 $- 
$1,650,000 
$1,850,000 
$1,550,000 
$3,250,000  $12,200,000 
$3,000,000 
$2,500,000 
$2,500,000 
 $500,000 
 $500,000 
$4,500,000 
$4,500,000 
$4,500,000 
Implementation Plan - New Park Opportunities

5
2
4
6
7
1
3
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
95
 IMPLEMENTATION PLAN
Coffinger Park - New Park Amenities
COST SUMMARY
1
DOG PARK                                  
$163,000
2
SOUTH PARKING LOT           
 $1,153,000
3
EAST PARKING LOT                   
$245,200
4
NORTHEAST PARKING LOT      
$178,500
5
NORTH HEAD-IN PARKING      
$195,000 
6
RECREATION CENTER            
$8,520,000
7
POOL (OUTDOOR 6 LANE)   
$3,124,000
TOTAL NEW AMENITIES      
$13,578,700

6
2
3
5
7
1
4
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
96
 IMPLEMENTATION PLAN
Sunset Park - New Park Amenities
COST SUMMARY
1
PRACTICE FIELD                                  
 $390,000
2
NORTHEAST FIELD EXPANSION     
$1,163,000
3
SOUTHWEST BALL FIELD                
 $1,947,000
4
NORTHEAST PARKING LOT            
$1,124,000
5
WEST PARKING LOT                      
   $1,192,000
6
DOG PARK                                             
$586,000 
7
RESTROOM / TENNIS COURT           
 $985,000
TOTAL NEW AMENITIES      
$7,287,000

2
3a
3b
5
1
4
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
97
 IMPLEMENTATION PLAN
Constellation Park - New Park Amenities
COST SUMMARY
1
MAIN TRAILHEAD (SOUTH)
$650,000
2
TRAILHEAD EVENT SPACE
$215,000
3a
ARENA PARKING LOT
 $282,000
3b
TRAILER PARKING LOT
$104,000
4
RV PARK IMPROVEMENTS
$1,000,000
5
TRAILHEAD (NORTH)
$39,000 
TOTAL NEW AMENITIES      
$3,680,000

HASSAYAMPA RIVER
KERKES ST
TEGNER ST
HASSAYAMPA 
ELEMENTARY 
SCHOOL
MULTI-PURPOSE FIELD
ADULT SOCCER / FOOTBALL
MULTI-PURPOSE FIELD
LITTLE LEAGUE SOFTBALL / SOCCER
RESTROOM 
BUILDING
PARKING LOT
KERKES 
TRAILHEAD
2
1
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
98
 IMPLEMENTATION PLAN
Kerkes Park - New Park Amenities
COST SUMMARY
1
NORTH FIELD RENOVATION
$ 163,404
2
SOUTH FOOTBALL FIELD RENOVATION
$ 2,345,889
TOTAL NEW AMENITIES      
$ 2,509,293
  7.9-Acre Sports Park

N
MULTI-PURPOSE FIELD
LITTLE LEAGUE BASEBALL / 
SOCCER / FOOTBALL
BASEBALL FIELD
MULTI-PURPOSE 
FOOTBALL FIELD
BASKETBALL 
COURTS
WARM-UP
AREA
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
99
 IMPLEMENTATION PLAN
Sunrise Park - New Park Amenities
COST SUMMARY
1
NEW PARK DEVELOPMENT
$ 13,763,000
  24-Acre Sports Park

SHADE 
RAMADAS
60 - Wickenburg Way
MULTI-USE TRAIL
SMALL PUMP 
TRACK 
FCDMC PROPERTY
LARGE PUMP TRACK 
/ TRAIL
SWALE
SWALE
TRAIL 
BRIDGE
ACCESS ROAD
N
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
100
 IMPLEMENTATION PLAN
Cassandro Park - New Park Amenities
COST SUMMARY
1
NEW PARK DEVELOPMENT
$ 1,495,763
  17.6-Acre Mountain Bike / Pump Track Park

N
Birding 
Overlooks
Natural Surface Path
Parking
Parking
TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
101
 IMPLEMENTATION PLAN
Upper Hassayampa Nature Preserve - New Park Amenities
COST SUMMARY
1
NEW PARK DEVELOPMENT
$ 1,268,000
155-Acre Nature Preserve

N
Existing Trailheads
Proposed Trailheads
Proposed Off-road Vehicle Parking
‘Spine Corridor’
Gateway Path
Proposed Road-side Trail
Hassayampa River Corridor
Potential Natural Surface Trail
Potential Bike Route
Town Parks
Town Recreation Areas
Existing Trails 
WICKENBURG PARKS & RECREATION MASTER PLAN  |  SEPTEMBER 2024 DRAFT
102
 IMPLEMENTATION PLAN
Maricopa Associate of Governments’ (MAG) Active Transportation program 
provides resources to member agencies for the improvement and 
construction of sidewalks, bikeways, off-street paths, and improved access 
to ransit, with the goal of making high-quality active transportation modes 
safe and accessible throughout our region. We present the implementation 
plan for new paths, enabling the Town of Wickenburg to apply for grant 
funding to build a town-wide path system.

The following cost summary is to construct eight (8’) foot-wide concrete 
paths with directional signage along the various roadways. The cost 
summary does not include land acquisition or path easement negotiation.
*Note: The cost summary is not included in the Capital Improvement 
Program (CIP) budget but is expected to be integrated with the road 
improvement projects.
New Path Opportunities
COST SUMMARY *
1
WICKENBURG WAY (LOS ALTOS - US 60)
$900,000
2
VULTURE MINE ROAD (WICKENBURG WAY - US 93)
$850,000
3
VULTURE MINE ROAD (WICKENBURG WAY - DUFFY RD)
 $420,000
4
US 60 / GRAND AVENUE (WICKENBURG WAY - 296TH AVE)
$1,800,000
5
US 93 (WICKENBURG WAY - WICKENBURG RANCH)
$3,850,000
TOTAL NEW PATHS   
$7,820,000

TOWN OF WICKENBURG  |  SEPTEMBER 2024 DRAFT
103
 IMPLEMENTATION PLAN
[This page is intentionally left blank]

September 2024