Extracted text (via ocr_local)
4006 characters
he PONS PROJECT SIGN OFF FORM SURPRISE PUBLIC WORKS - ENGINEERING SERVICES, INSPECTIONS ARIZONA Date Submitted: 1/7/21 Commercial Commercial w/Offsite X__ Residential x COMPLETION ACCEPTANCE (End of Construction) FINAL ACCEPTANCE (End of Warranty) 11-3-20 Date of Punch-List Walk 12-9-20 Date Punch-List Completed FS Number: FS17-450 Permit Number(s): E18P-0238,0248,0253,0256,0241,0243 Project Name: Zanjero Trails Phase 2 Parcel 11B Phase 1,2,3 Project Developer/Builder: (Name/Email, Address) Lennar Homes - 1665 W Alameda Dr Ste 130 Tempe AZ 85282 MAG TIP Reporting: Street Name Classification Begin Limits End Limits # Lanes Length to Features nearest % mi. SierraSt | Local | 190thIn | 189th ave 2 1/4 Cortezst | Local | 189thdr | 190th In 2 1/4 Cameron Dr | Local 190th In 189th In 2 1/4 Chollast | Local | 190thIn | 189th Dr 2 1/4 190thLn | Local Sierra st | Cholla st 2 1/4 MATERIALS: Asphalt: Solterra Materials Supplier 1-75 Total Lane Miles 18739 Total Square Yards Water: 8" Pvcc-900 cl 200 size/Type 5251 Total LF Size/Type Total LF 8" CL350 Size/Type 416 Total LF Size/Type Total LF Sewer; 8" PVC SDR-35 Size/Type 3963 Total LF 8" SDR-26 Size/Type 537 Total LF 4" PVC Size/Type 83 Total LF Size/Type Total LF Storm: _18" RGRCP Size/Type 88 Total LF 30" RGRCP Size/Type 139 Total LF 24" RGRCP Size/Type 74 Total LF Size/Type Total LF Fire Ln: Size/Type Total LF Size/Type Total LF Additional Comments: SUPPORTING DOCUMENTATION REQUIRED: X___ Copy of Punch List X ___ Final Certification Letter from Engineer of Record X_ aoc X__ Complete Geotechnical Testing Packet X___ Asphalt Concrete Ticket w/ Name of Contractor X__ Sewer Pressure Testing Results X___ Streetlight Energize Letter X__ Sewer Manhole Vacuum Testing Certification _X__ As built Documents (PDF copy on CD) X__ Sewer Manhole Insecticide Certification _— Updated asbuilt CAD base files (copy on CD) X__ Sewer Videos with Operators Notes (inc. re-videos) Other = (Specify) APPROVAL: Hoe VEZ4 Civil Inspector: 3 Date: Vi me -A / Civil Engineering Supervisor: iA OS Date: “| q L | AF PS ON PROJECT SIGN OFF FORM SURPRISE PUBLIC WORKS - ENGINEERING SERVICES, INSPECTIONS ARIZONA Date Submitted: 1/7/21 Commercial Commercial w/Offsite X Residential x COMPLETION ACCEPTANCE (End of Construction) FINAL ACCEPTANCE (End of Warranty) 11-3-20 Date of Punch-List Walk 12-9-20 Date Punch-List Completed FS Number: FS17-450 Permit Number(s); E18P-0238,0248,0253,0256,0241,0243 Project Name: Zanjero Trails Phase 2 Parcel 11B Phase 1,2,3 Project Developer/Builder: (Name/Email, Address) Lennar Homes - 1665 W Alameda Dr Ste 130 Tempe AZ 85282 MAG TIP Reporting: Street Name Classification Begin Limits End Limits # Lanes Length to Features nearest % mi. 189th In Local Cameron Dr | Future Tie in 2 1/4 189th dr | Local | Cholla St | Cortez st 2 1/4 MATERIALS: Asphalt: Solterra Materials Supplier 1-75 TotalLane Miles 18739 Total Square Yards Water: 8" Pvcc-900cl200_ size/Type 5251 Total LF Size/Type Total LF 8" CL350 Size/Type 416 Total LF Size/Type Total LF Sewer: 8" PVC SDR-35 Size/Type 3963 Total LF 8" SDR-26 Size/Type 537 Total LF 4" PVC Size/Type 83 Total LF Size/Type Total LF Storm: _18" RGRCP Size/Type 88 Total LF 30" RGRCP Size/Type 139 Total LF 24" RGRCP Size/Type 74 Total LF Size/Type Total LF Fire Ln: Size/Type Total LF Size/Type Total LF Additional Comments: SUPPORTING DOCUMENTATION REQUIRED: X__ Copy of Punch List X__ Final Certification Letter from Engineer of Record xX AOC X__ Complete Geotechnical Testing Packet X__ Asphalt Concrete Ticket w/ Name of Contractor X__ Sewer Pressure Testing Results X__ Streetlight Energize Letter X__ Sewer Manhole Vacuum Testing Certification X__ As built Documents (PDF copy on CD) X__ Sewer Manhole Insecticide Certification —— Updated asbuilt CAD base files (copy on CD) X__ Sewer Videos with Operators Notes (inc. re-videos) ____ Other (Specify) APPROVAL: ZL LL Civil Inspector: L Date: (= T-a / ma Civil Engineering Supervisor: OK Py ie =a Date: _} ee