Extracted text (via pymupdf)
1400 characters
Total Capital Cost: $100,000.00 Department: Water Type: Capital Improvement Request Groups: CIP Timeline: 07/01/2025 to 06/30/2026 Request description: Capital Costs FY2026 Total Planning $0.00 Design $0.00 Engineering $0.00 Land/Right-of-way $0.00 Construction/Maintenance $100,000.00 $100,000.00 Equipment/Vehicle/Furnishings $0.00 Other $0.00 Total $100,000.00 $100,000.00 Funding Source FY2026 Total 149 - Special Projects $0.00 511 - Water $100,000.00 $100,000.00 513 - Ranchettes $0.00 541 - Sewer $0.00 148 - CDBG $0.00 111 - General $0.00 Total $100,000.00 $100,000.00 Type of Project Strategic Priority Bond Eligible Grant Funding Project Status No No Unmodified Alto Well Site Discharge Pipe Replacement This request is to replace the discharge piping at the Alto well site. The discharge piping has never been replaced, and the site is over 40 years old. The discharge piping takes drinking water directly from the booster pump and into the public distribution system. The approximate useful life of this asset ranges from 30 to 50 years. The water division is recommending replacement because of the condition of the current pipe and leaking due to internal corrosion. The benefits of replacing this pipe are a higher quality product being discharged to the distribution system along with an improvement in water loss. Additional Information Improvement Superior Infrastructure 91