Project Number:
62079
Department:
Wastewater
Total Capital Cost:
$1,200,000.00
Type:
Capital Improvement
Request Groups:
CIP
Timeline:
07/01/2025
to
06/30/2030
Request description:
Capital Costs
Historical
FY2026
FY2027
FY2028
FY2029
FY2030
Total
Planning
$0.00
Design
$0.00
Engineering
$0.00
Land/Right-of-way
$0.00
Construction/Maintenance
$0.00
Equipment/Vehicle/Furnishings
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$1,200,000.00
Other
$0.00
Total
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$1,200,000.00
Funding Source
Historical
FY2026
FY2027
FY2028
FY2029
FY2030
Total
149 - Special Projects
$0.00
511 - Water
$0.00
513 - Ranchettes
$0.00
541 - Sewer
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$1,200,000.00
148 - CDBG
$0.00
111 - General
$0.00
Total
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$1,200,000.00
Account Codes (Capital Costs):
541-5-7581-657
$1,000,000.00
$1,000,000.00
Type of Project
Strategic Priority
Bond Eligible
Grant Funding
Project Status
Division
No
No
Modified
Utilities
Wastewater Process System Improvements
This project is a multi-year program to upgrade and/or replace critical wastewater process equipment which includes the following: pumps, motors, blowers, centrifuge, 
belt press, filters, decanters, aerators, disinfection systems, VFD's, and PLC's. Process equipment is essential to operating the wastewater reclamation facility.  The program 
has been in place since FY18.  The program is flexible and allows staff to plan for rebuilds and replacements of specific pumps and motors and other process equipment 
necessary for the wastewater plant to function.  Typically, staff will plan to replace between 3 to 4 system pumps.  Components of specialty equipment items such as the 
centrifuge or belt press replacements are eligible for this project.  Generally, a pump/motor/component's useful life is between 15 to 30 years.  Staff will program for 
rebuilding of the asset for two cycles followed by replacement at the end of the useful life of the asset.  This allows for the most efficient use of resources.  Assets are 
evaluated by systematic checks from staff on a routine basis and standards from the American Water Works Association (AWWA).This program benefits the community by 
ensuring that the City's wastewater system remains operational.  Keeping the WRF properly running with planned maintenance and replacement of critical assets will 
prolong the useful life of the plant while keeping the health, safety, and welfare of the community as a top priority.The 2021 National Community Survey found that 74% of 
El Mirage residents rate wastewater services favorably, and 91% of residents feel it is important to focus on utility infrastructure in the next two years. Modified: Added 
FY2030 amount.
Additional Information
Improvement
Superior Infrastructure
90