02/02/25
ELMIR26001
To:
Work Items
NO.
QTY
UNIT
TOTAL $
1.
1
LSUM
705.00
$
2.
134
SY
1,072.00
$
3.
1
LSUM
1,175.00
$
4.
1
LSUM
2,900.00
$
5.
1
LSUM
425.00
$
6.
1200
SF
960.00
$
7.
1
LSUM
705.00
$
8.
492
SF
7,380.00
$
9.
708
SF
9,912.00
$
10.
1
LSUM
705.00
$
11.
278
LF
139.00
$
12.
268
LF
187.60
$
13.
16
LF
15.20
$
14.
70
LF
98.00
$
15.
108
LF
302.40
$
16.
8
EA
1,880.00
$
17.
3
EA
465.00
$
18.
5
EA
125.00
$
19.
1
LSUM
2,000.00
$
20.
1065
LF
2,130.00
$
21.
268
LF
603.00
$
22.
52
LF
143.00
$
23.
142
LF
390.50
$
24.
70
LF
245.00
$
25.
296
LF
2,072.00
$
26.
3
EA
1,620.00
$
27.
8
EA
5,640.00
$
28.
3
EA
3,000.00
$
29.
18
EA
720.00
$
30.
127
LF
241.30
$
31.
72
EA
1,656.00
$
32.
7
EA
161.00
$
33.
30
EA
232.50
$
34.
488
LF
1,903.20
$
THERMOPLASTIC STRIPING - 8" WIDE, YELLOW
2.75
$
THERMOPLASTIC STRIPING - 12" WIDE, WHITE
3.50
$
THERMOPLASTIC STRIPING - 4" WIDE, YELLOW
2.00
$
THERMOPLASTIC STRIPING - 6" WIDE
2.25
$
THERMOPLASTIC STRIPING - 8" WIDE, WHITE
2.75
$
ACRYLIC STRIPING - YIELD SYMBOL PER MCDOT PAVEMENT MARKING
MANUAL DETAIL 5-39, WHITE
155.00
$
ACRYLIC STRIPING - YIELD LINE TRIANGLES PER DETAIL 1 ON SHEET 3,
WHITE
25.00
$
MOBILIZATION - THERMOPLASTIC STRIPING
2,000.00
$
ACRYLIC STRIPING - 12" WIDE, WHITE
1.40
$
ACRYLIC STRIPING - 24" WIDE, WHITE
2.80
$
ACRYLIC STRIPING - CHEVRON (SPEED CUSHION/TABLE) PER CITY DETAIL A-
3, WHITE
235.00
$
ACRYLIC STRIPING - 4" WIDE, YELLOW
0.50
$
ACRYLIC STRIPING - 6" WIDE, WHITE
0.70
$
ACRYLIC STRIPING - 8" WIDE, WHITE
0.95
$
SPEED HUMP - 12' WIDE AT 3" HEIGHT PER PLAN
15.00
$
SPEED TABLE - 24' WIDE AT 3" HEIGHT PER PLAN
14.00
$
MOBILIZATION - ACRYLIC STRIPING
705.00
$
SWEEPING
2,900.00
$
MOBILIZATION - TACK COAT
425.00
$
TACK COAT
0.80
$
MOBILIZATION - ASPHALT SPEED HUMPS & TABLES
705.00
$
TYPE 'G' RPMs
23.00
$
REMOVE EXISTING RPMs
7.75
$
OBLITERATE EXISTING STRIPING - 4" WIDE - PER CITY SIGNING & STRIPING
NOTE 3 (MICRO SEAL QUANTITY BELOW)
3.90
$
THERMOPLASTIC STRIPING - YIELD LINE TRIANGLES PER DETAIL 1 ON SHEET
3, WHITE
40.00
$
CURB (TOP AND FACE), PAINT YELLOW
1.90
$
TYPE 'D' RPMs
23.00
$
THERMOPLASTIC STRIPING - STRAIGHT ARROW PER MCDOT PAVEMENT
MARKING MANUAL DETAIL 5-36, WHITE
540.00
$
THERMOPLASTIC STRIPING - CHEVRON (SPEED CUSHION/TABLE) PER CITY
DETAIL A-3, WHITE
705.00
$
THERMOPLASTIC STRIPING - YIELD SYMBOL PER MCDOT PAVEMENT
MARKING MANUAL DETAIL 5-39, WHITE
1,000.00
$
ASPHALT MILLING
8.00
$
MOBILIZATION - DEMO/HAUL
1,175.00
$
THERMOPLASTIC STRIPING - 24" WIDE, WHITE
7.00
$
DBA Construction proposes (unless otherwise noted) to furnish all labor, equipment, material and incidentals necessary to successfully complete the items
listed below. We thank you for the opportunity to provide you with a comprehensive proposal for the above referenced project.
UNIT $
MOBILIZATION - ASPHALT MILLING
705.00
$
Date:
Bryce Christo, PE
City of El Mirage
Proposal No.
bchristo@elmirageaz.gov
DESCRIPTION
El Mirage Road Traffic Calming
623.980.9980
www.DBAConstruction.net Page 1 of 2
35.
200
LF
1,200.00
$
36.
22
LF
204.60
$
37.
3
EA
2,700.00
$
38.
6
EA
960.00
$
39.
1
LSUM
705.00
$
40.
42.75
SF
1,710.00
$
41.
3
EA
1,620.00
$
42.
1
EA
705.00
$
43.
1
EA
270.00
$
44.
2
EA
300.00
$
45.
2
EA
460.00
$
46.
2
EA
460.00
$
47.
1
EA
385.00
$
48.
5
EA
775.00
$
49.
3
EA
690.00
$
50.
1
EA
2,500.00
$
51.
2
EA
6,500.00
$
52.
2
EA
770.00
$
53.
1
LSUM
425.00
$
54.
261
LF
717.75
$
55.
1
LSUM
1,850.00
$
56.
182
SY
18,018.00
$
57.
1
LSUM
10,800.00
$
58.
1
LSUM
25,500.00
$
PROPOSAL TOTAL:
132,134.05
$
1.
2.
3.
1.
2.
1.
ESTIMATOR
602.885.6658
OBLITERATE EXISTING STRIPING - 6" WIDE - PER CITY SIGNING & STRIPING
NOTE 3 (MICRO SEAL QUANTITY BELOW)
6.00
$
REMOVE SIGN PANEL AND SALVAGE TO CITY
230.00
$
REMOVE AND DISPOSE OF EXISTING SIGN POST
230.00
$
SIGN POST, FOUNDATION & ANCHOR PER CITY DETAIL EM-132-1 & 2 IN
CONCRETE
705.00
$
SIGN POST ONLY PER CITY DETAIL EM-132-1 & 2
270.00
$
SIGN ATTACHMENT TO STREETLIGHT POLE - THIS IS ONLY FOR THE
EQUIPMENT NEEDED TO ATTACH A SIGN PANEL TO A STREETLIGHT POLE,
NOT THE SIGNS THEMSELVES
150.00
$
MOBILIZATION - SIGNAGE
705.00
$
SIGN PANEL
40.00
$
SIGN POST, FOUNDATION & ANCHOR PER CITY DETAIL EM-132-1 & 2 IN
DG/DIRT
540.00
$
HOT RUBBER CRACK SEAL
MOBILIZATION - MICRO SEAL TYPE II
1,850.00
$
MICRO SEAL TYPE II PER CITY OF PHOENIX APPROVED SUPPLIER
OBLITERATE EXISTING STRIPING - 8" WIDE - PER CITY SIGNING & STRIPING
NOTE 3 (MICRO SEAL QUANTITY BELOW)
9.30
$
OBLITERATE EXISTING STRIPING - YIELD SYMBOL - PER CITY SIGNING &
STRIPING NOTE 3 (MICRO SEAL QUANTITY BELOW)
900.00
$
OBLITERATE EXISTING STRIPING - YIELD LINE TRIANGLES - PER CITY SIGNING
& STRIPING NOTE 3 (MICRO SEAL QUANTITY BELOW)
160.00
$
Cost of Payment & Performance Bond and taxes is included.
Clarifications
Our proposal requires further clarification on these points in order to be considered:
385.00
$
MOBILIZATION - HOT RUBBER CRACK SEAL
425.00
$
Our proposal is based on the assumption that the following conditions exist on the project site:
Exclusions
Our proposal excludes the following items and were not considered during the preparation to this estimate:
2.75
$
F3W 360 DEGREE FLEXIBLE DELINEATOR WITH SURFACE MOUNTED
FOUNDATION PER ADOT DETAIL M-26
10,800.00
$
TRAFFIC CONTROL
25,500.00
$
Temporary striping of speed cushions is included. Permanent thermoplastic striping to be installed a minimum of 30 days after speed cushion installation.
DBA CONSTRUTION, INC.
Wyatt York
DBA Construction excludes the cost of any and all utility conflicts, including but not limited to bracing, shoring, relocating, etc.
REMOVE SIGN POST & FOUNDATION
385.00
$
REMOVE AND RELOCATE EXISTING SIGN PANEL
155.00
$
LOWER EXISTING SIGN & CUT POST
230.00
$
PATCH CONCRETE SIDEWALK WHERE SIGN POST & FOUNDATION WAS
REMOVED
2,500.00
$
REMOVE & REPLACE TRUNCATED DOME TILES (24"X30") - TEKWAY HIGH
PERFORMANCE ADA TILES (COLOR: TERRACOTTA)
3,250.00
$
All scheduling contingent upon mutual agreement of Owner and DBA Construction.
All work is to be performed utilizing a short term flagger set-up. No detour route signage is included in this proposal.
Assumptions
Access to site to be provided for crews and equipment.
99.00
$
CONSTRUCTION SURVEY
www.DBAConstruction.net Page 2 of 2