PLANNING AND ZONING 
Development Services Department 
10000 N. El Mirage Road, El Mirage, Arizona 85335 
623-876-2996; Fax 623-876-4605; TDD 623-933-3258 
www.elmirageaz.gov 
 
 
1  
 
 
Technical Advisory Committee 
Review Comment Memorandum  
To: 
 
David Klucznik, Pinnacle Consulting Inc 
From  
Jose A. Macias, Senior Planner 
 
 
Development Services Department, Planning & Zoning  
Re: 
 
CUP250005 AZ01-231 Heater / PHO Mirage Peoria
 
Date:  
September 23, 2025 
Mr. Klucznik,  
Please see the review comments from the El Mirage Technical Advisory Committee (TAC) for the 
conditional use permit and site plan approval zoning application.      
 
BUILDING & SAFETY – Brigham Bennett, Building Official  
1. No comment. 
ECONOMIC DEVELOPMENT – Tom Doyle, Economic Development  
2. No comment. 
ENGINEERING – Bryce Christo, Asst. City Engineer  
3. See the attached memorandum. 
FIRE DEPARTMENT – Jason Napier, Fire Marshall  
4. No comment. 
PLANNING & ZONING – Jose A. Macias, Senior Planner 
5. See the attached memorandum.   
POLICE DEPARTMENT – Chris Culp, Police Sergeant  
6. No comment.  
PUBLIC WORKS – Scott Ketchmark, Utilities Superintendent 
7. No comment. 
If you have any questions regarding these comments or would like to set up a follow-up meeting or call, 
please feel free to contact my office.

Engineering 
Development Services Department 
10000 N El Mirage Road, El Mirage 85335 
623-972-8116; Fax 623-876-4605; TDD 623-933-3258 
www.elmirageaz.gov 
 
 
MEMORANDUM  
 
TO: 
 
Jose Macias, Planner/GIS 
FROM: 
Bryce Christo, P.E., Assistant City Engineer 
SUBJECT: 
Sun State Towers – Conditional Use Permit Review  
DATE: 
09-08-25 
 
Below are the Engineering Division’s comments for the above referenced submittal prepared in 
August 2025. These items will have to be addressed prior to the Planning and Zoning 
Meeting. 
 
1. None. 
 
The below items will have to be addressed during the Construction Plan Submittal. 
 
Narrative 
2. Public Utilities & Services Section - All proposed utilities shall be placed underground. 
3. Section 154.091.D.4 Setbacks – Show property setbacks which are 20 feet for the front 
yard, 10 feet along Ramirez Road and 5 foot for the interior side yard and rear yard. 
4. Section 154.091.D.17 Fencing – This section states the fence will be 8 feet tall but the 
plans show it as 6 feet tall. Which is correct? 
 
Plans 
5. Site Survey 
a. Boundary Detail – The 30’ Roadway Easement along El Mirage Road should be 
33’.  Also, both document 1994-0697190 and Schedule ‘B’ Item 8 are not correct 
for this easement.  
b. Boundary Detail – The 30’ right of way along 121st Avenue is per Schedule ‘B’ 
Item 9. 
c. Utility Easement Legal Description – The 12 foot Access and Utility Easement 
referenced here is shown as 15 foot on the plans. 
6. The utility is typically placed in the center of the easement. 
7. Several items on the plans will require permits from the Building Safety Division 
including the wall, generator and the electrical work. 
8. Show the property setbacks per Comment 3 above.  
9. Future improvements to the El Mirr RV property may require a dedication of an 8 foot 
Public Utility Easement along 121st Avenue.  Relocate the monopalm further to the west 
to allow for the future 8 feet, the property wall and any clearance from the wall that 
Verizon would require. 
10. Add the City’s General Information (City Detail EM-101-1), General Notes (EM-101-2) 
and Dry Utility Notes (EM-101-11) to the plans. These notes can be found here.

2 
 
11. As built drawings shall be provided to the City upon project completion. 
 
The above comments are meant to be general in nature and are not considered to be all inclusive. 
Additional comments will arise during the formal permit submittal.

PLANNING AND ZONING 
Development Services Department 
10000 N. El Mirage Road, El Mirage, Arizona 85335 
623-876-2996; Fax 623-876-4605; TDD 623-933-3258 
www.elmirageaz.gov 
 
 
Planning and Zoning Division 
Zoning Application Review Memorandum 
To: 
 
David Klucznik, Pinnacle Consulting Inc 
From  
Jose A. Macias, Senior Planner 
 
 
Development Services Department, Planning & Zoning  
Re: 
 
CUP250005 AZ01-231 Heater / PHO Mirage Peoria
 
Date:  
September 23, 2025 
Mr. Klucznik,  
Please see the review comments from the Planning and Zoning Division for the proposed 
development project mentioned above.  
ZONING INFORMATION 
Property Ownership: ELMIRRV LLC 
Assigned Address: 10075 N El Mirage Road, El Mirage, AZ 85335 
El Mirage 2020 General Plan: Commerce/Industry Park 
Zoning: Employment / Industrial E/I 
Land Use: Outdoor Storage (RV Storage) 
Proposed Land Use: Wireless Communication Facility 
Zoning Application Requirement:  Conditional Use Permit 
 
CONDITIONAL USE PERMIT 
The Planning Commission and City Council shall, in addition to any other conditions, impose the 
following general conditions upon every conditional use permit granted.  
1. The right to a use and occupancy permit shall be contingent upon the fulfillment of all 
general and special conditions imposed by the conditional use permit procedure.  
2. All of the special conditions shall constitute restrictions running with the land and shall 
be binding upon the owner of the land, his or her successors, or assigns.  
3. All conditions specifically stated under any conditional use listed in this chapter shall 
apply and be adhered to by the owner of the land, his or her successors, or assigns.  
4. All of the special conditions shall be consented to in writing by the applicant.  
5. The proposed used wireless communication facility shall not create noise, vibrations, parking 
issues, or odors that may become a nuisance to the public. 
6. The operation shall be screened from public view at all times.  
7. No commercial advertising or signage shall be allowed on-site; however, each facility 
shall have an identification plaque no larger than 12 inches square permanently affixed 
that clearly identifies the provider's name, address, and emergency phone number.  
8.  A facility shall have at least one parking space designed to city standards. This requirement shall 
also include maneuvering areas and access drives. This requirement shall be waived when 
sufficient hard surface parking exists.

2 
 
9. The facility shall not be artificially lighted, unless required by the FAA or other applicable 
authority.  
10. Anti-climbing features shall be incorporated in the wireless communication facility, as needed, 
to reduce potential for trespass and injury.  
11. If the conditional use permit is granted, the permit shall be issued upon the signature of 
the Senior Planner / Zoning Administrator, and any conditions, automatic termination 
date, or review period shall be stated on the permit.  
 
 
SITE PLAN APPROVAL 
Site Plan 
12. No comment. 
 
Landscape 
13. No comment.  
 
ARS 28-8481 Military Land Use Compatibility 
14. The site is located inside the Luke Air Force Base (LAFB) Noise Contour Zone and the 
Military Airport Territory Area and is subject to review from LAFB for land use 
compatibility with ARS 28-8481. Since the proposed development will be located within 
the “territory in the vicinity of a military airport,” it will be subjected to approximately 
170 direct overflights daily. Once the LAFB review letter is available from the base, city 
staff will provide a copy to the applicant.  
 
 
If you have any questions regarding these comments, please contact my office at (623)876-2996 
or jmacias@elmirageaz.gov.