Total Capital Cost:
$175,000.00
Department:
Water
Type:
Capital Improvement
Request Groups:
CIP
Timeline:
07/01/2025
to
06/30/2026
Request description:
Capital Costs
FY2026
Total
Planning
$0.00
Design
$0.00
Engineering
$0.00
Land/Right-of-way
$0.00
Construction/Maintenance
$175,000.00
$175,000.00
Equipment/Vehicle/Furnishings
$0.00
Other
$0.00
Total
$175,000.00
$175,000.00
Funding Source
FY2026
Total
149 - Special Projects
$0.00
511 - Water
$175,000.00
$175,000.00
513 - Ranchettes
$0.00
541 - Sewer
$0.00
148 - CDBG
$0.00
111 - General
$0.00
Total
$175,000.00
$175,000.00
Account Codes (Capital Costs):
511-5-7115-657
$175,000.00
$175,000.00
Type of Project
Strategic Priority
Bond Eligible
Grant Funding
Project Status
No
No
Unmodified
Thompson Ranch Well Site Discharge Pipe Replacement
This request is to replace the discharge piping at the Thompson Ranch well site. The discharge piping takes drinking water directly from the well pump and into the public 
distribution system. The discharge piping is recommended for replacement at 20 plus years of age due to corrosion which can affect the quality of the water discharged to 
the distribution system.  Note: Project to include new valves, pump to waste controls, sand separator, discharge piping, sample ports, including pipe priming and paint. The 
Thompson Ranch well was constructed in 1959. The current piping system was installed in 2004. 