Extracted text (via pymupdf)
1467 characters
Total Capital Cost: $175,000.00 Department: Water Type: Capital Improvement Request Groups: CIP Timeline: 07/01/2025 to 06/30/2026 Request description: Capital Costs FY2026 Total Planning $0.00 Design $0.00 Engineering $0.00 Land/Right-of-way $0.00 Construction/Maintenance $175,000.00 $175,000.00 Equipment/Vehicle/Furnishings $0.00 Other $0.00 Total $175,000.00 $175,000.00 Funding Source FY2026 Total 149 - Special Projects $0.00 511 - Water $175,000.00 $175,000.00 513 - Ranchettes $0.00 541 - Sewer $0.00 148 - CDBG $0.00 111 - General $0.00 Total $175,000.00 $175,000.00 Account Codes (Capital Costs): 511-5-7115-657 $175,000.00 $175,000.00 Type of Project Strategic Priority Bond Eligible Grant Funding Project Status No No Unmodified Thompson Ranch Well Site Discharge Pipe Replacement This request is to replace the discharge piping at the Thompson Ranch well site. The discharge piping takes drinking water directly from the well pump and into the public distribution system. The discharge piping is recommended for replacement at 20 plus years of age due to corrosion which can affect the quality of the water discharged to the distribution system. Note: Project to include new valves, pump to waste controls, sand separator, discharge piping, sample ports, including pipe priming and paint. The Thompson Ranch well was constructed in 1959. The current piping system was installed in 2004. Additional Information Improvement Superior Infrastructure 94