Staff Report

City of El Mirage — Regular Meeting (2025-09-09)

View PDF Meeting page

Extracted text (via pymupdf) 2456 characters
DEVELOPMENT APPLICATION
STAFF REPORT
Case Number:
SP250002
Request:
Site Plan Approval
Project Name:
DT Industrial Park
Applicant/Owner:
KTM Design Studio / Desert Truss Inc.
Project Address:
10080 N Dysart Rd, El Mirage AZ 85335
Acres
+21.0 ac.
Considerations
The applicant is requesting approval for a site plan zoning application to develop a
vacant parcel of land into an industrial park within a PAD zoning area. The park
would feature four types of buildings for industrial, office, and commercial tenants,
ranging from over 9,000 SF to over 23,000 SF. The industrial park will consist of
fifteen buildings, with some outdoor storage available for businesses that need to
park company vehicles overnight. The project will be phased to stagger the
construction of the buildings. The applicant has provided elevation drawings for
the four building types with the submittal of the zoning application.
General Plan
Compliance
The El Mirage 2020 General Plan identifies the site as being in the
Commerce/Industry Park Planning Area and follows the plan.
Zoning & Land Use
The property is zoned PAD, Planned Area Development, PAD00-08-01, for
commercial, industrial, and manufacturing use, with a land use designation status
of a vacant industrial lot.
ARS 28-8481 Land Use
Compatibility
The site is located inside the Luke Air Force Base (LAFB) Noise Contour Zone
and the Military Airport Territory Area and is subject to ARS 28-8481, land use
compatibility regulations. Please read their comments in the attached email from
Mark James, Interim Director, dated January 20, 2025.
City Staff Review
The staff of the Technical Advisory Committee (TAC) has a thoroughly reviewed
the application and determined that it is appropriate to proceed with the public
hearings.
Stipulations:
The applicant shall consent and address the comments provided by the TAC
members mentioned in the August 21, 2025, with the permit review submittal.
Planning Commission
September 9, 2025. Staff is seeking a recommendation from the Planning and
Zoning Commission to the City Council for final action.
City Council
Staff will present the proposal to the City Council at the public meeting on
October 7, 2025, and seek a final action.
Attachments
Zoning Application, TAC Review Comments, and Luke Review.
Supportive Documents
Supportive documents are available for review at the El Mirage Development
Services Department, Planning & Zoning Division during the city’s work hours.