Summary Sheet- RFCA SUMMARY
Extracted text (via pymupdf)
2505 characters
CITY OF TEMPE Meeting Date: 3/5/2026 REQUEST FOR COUNCIL ACTION Agenda Item: 7B23 ACTION: Award a professional services contract to Dibble & Associates Consulting Engineers, Inc. for Project No. 3221025B – Joint Tempe – Mesa Sewer Rehabilitation – 2025 – GMP 1. FISCAL IMPACT: The contract amount is $599,885. Funds to cover this contract, related costs and any future addenda are appropriated in Fiscal Year 2025/26 and future years, contingent upon City Council approval of the City’s annual budget, in the Capital Improvement Project No. 3221099 (Wastewater Collection System Upgrades and Improvements). This infrastructure is jointly owned by the City of Tempe and the City of Mesa and cost share will be per the existing Intergovernmental Agreement. RECOMMENDATION: Award contract BACKGROUND INFORMATION: The Water Utility Division of the Public Works Department maintains a long-term asset management program that ensures the reliable operations of associated infrastructure. The program includes the wastewater collection system with approximately 500 miles of gravity sewer pipeline and roughly 10,000 manholes. Approximately 14 miles of the sewer pipelines within Tempe city limits are jointly owned with the City of Mesa. The City of Tempe contracts for yearly inspections and condition assessments of various sections of the jointly owned infrastructure, and based on these evaluations, capital improvement projects are identified to ensure continued reliable operation. This contract is to provide post design and construction management services for the project. Scope of Work: Conduct pre-construction conference, and facilitate weekly construction progress meetings Perform site visits, construction inspections, oversee construction progress and quality assurance services Coordinate with project stakeholders Review submittals, requests for information and project test results Review project schedule and updates Review pay requests and change orders Complete project document close out package and record drawing production ATTACHMENTS: 1. 3221025B-CON-DIBBLE-JOINT TEMPE MESA SEWER REHAB-2025 GMP1.PDF STAFF CONTACT(S): Jodie Inman, P.E., Deputy Public Works Director - Engineering, (480) 350- 2972; Craig Caggiano, Deputy Public Works Director - Water Utilities, (480) 858-2160 Department Director: Tara Ford, Public Works Director Legal review by: Dave Park, Sr. Assistant City Attorney Prepared by: Decima Sever, Administrative Manager