CITY OF TEMPE, ARIZONA 
PUBLIC WORKS DEPARTMENT 
ENGINEERING DIVISION 
 
CONTRACT DOCUMENTS 
 
FOR 
 
JOINT TEMPE-MESA SEWER REHABILITATION-2025, GMP 1 
 
PROJECT NO. 3221025B 
 
 
 
B&F Contracting, Inc. 
 
CONSTRUCTION MANAGER AT RISK 
CONSTRUCTION SERVICES 
 
APPROVED BY: 
 
 
 
 
_________________________ 
Jodie Inman, P.E. 
Deputy Public Works Director/ 
City Engineer 
 
CITY COUNCIL MEMBERS 
Mayor – Corey D. Woods 
Vice Mayor – Doreen Garlid 
 
 
Jennifer Adams 
  
Berdetta Hodge 
 
Nikki Amberg 
  
Randy Keating 
 
Arlene Chin 
  
 
 
CITY MANAGER 
Rosa Inchausti 
 
2026

i 
TABLE OF CONTENTS 
 
1. 
TERMS AND DEFINITIONS ............................................................................................. 1 
2. 
SERVICES OF CMAR ........................................................................................................ 6 
3. 
TERM .................................................................................................................................... 6 
4. 
CMAR’S COMPENSATION .............................................................................................. 6 
5. 
CITY’S RESPONSIBILITIES ............................................................................................ 7 
6. 
GENERAL SCOPE OF SERVICES ................................................................................... 8 
7. 
CONTROL OF WORK ...................................................................................................... 13 
8. 
CONTROL OF MATERIALS .......................................................................................... 16 
9. 
ENVIRONMENTAL REQUIREMENTS ........................................................................ 16 
10. SAFETY REQUIREMENTS ............................................................................................. 17 
11. HEAT SAFETY STANDARDS FOR OUTDOOR WORKERS .................................... 22 
12. COMMENCEMENT, PROSECUTION AND PROGRESS .......................................... 23 
13. SUBCONTRACTOR AND SUPPLIER SELECTIONS ................................................. 25 
14. WARRANTY ...................................................................................................................... 26 
15. INSURANCE ....................................................................................................................... 26 
16. BONDS ................................................................................................................................. 30 
17. MEASUREMENTS AND PAYMENTS ........................................................................... 30 
18. RECORD KEEPING AND FINANCE CONTROLS ..................................................... 31 
19. MISCELLANEOUS REMOVAL AND RELOCATIONS ............................................. 32 
20. APPROXIMATE QUANTITIES ...................................................................................... 32 
21. MISCELLANEOUS WORK AND ALLOWANCES ...................................................... 32 
22. SPECIAL TERMS AND CONDITIONS ......................................................................... 33 
23. CORRECTION OF DEFECTIVE WORK ...................................................................... 36 
24. WITHHOLDING PAYMENT ........................................................................................... 37 
25. TERMINATION ................................................................................................................. 38 
26. PROJECT DOCUMENTS AND COPYRIGHTS ........................................................... 38 
27. CONFLICT OF INTEREST .............................................................................................. 38 
28. COVENANT AGAINST CONTINGENT FEES ............................................................. 39 
29. INDEMNIFICATION ........................................................................................................ 40 
30. DISPUTE RESOLUTION ................................................................................................. 40 
31. ADDITIONAL SERVICES ............................................................................................... 40 
32. ALTERATION IN CHARACTER OF WORK ............................................................... 40

ii 
33. SUCCESSORS AND ASSIGNS ........................................................................................ 41 
34. COMPLETENESS AND ACCURACY OF CMAR’S WORK ...................................... 41 
35. DISSEMINATION OF DATA ........................................................................................... 41 
36. PROJECT STAFFING ....................................................................................................... 43 
37. INDEPENDENT CONTRACTOR ................................................................................... 43 
38. SUBCONTRACTORS ........................................................................................................ 43 
39. LABOR ................................................................................................................................ 43 
40. RECORDS/AUDIT ............................................................................................................. 43 
41. NOTICES ............................................................................................................................ 44 
42. COMPLIANCE WITH STATE AND FEDERAL LAWS .............................................. 44 
43. CONTRACTOR’S LICENSE AND FEDERAL EMPLOYER I.D. NUMBER ........... 46 
44. FORCE MAJEURE ............................................................................................................ 46 
45. NON-WAIVER PROVISION ............................................................................................ 46 
46. JURISDICTION ................................................................................................................. 47 
47. ATTORNEYS’ FEES AND COSTS ................................................................................. 47 
48. SURVIVAL .......................................................................................................................... 47 
49. MODIFICATION ............................................................................................................... 47 
50. SEVERABILITY ................................................................................................................ 47 
51. INTEGRATION .................................................................................................................. 47 
52. TIME IS OF THE ESSENCE ............................................................................................ 47 
53. THIRD PARTY BENEFICIARY ...................................................................................... 48 
54. COOPERATION AND FURTHER DOCUMENTATION ............................................ 48 
55. EXHIBITS ........................................................................................................................... 48 
56. CONFLICT IN LANGUAGE ............................................................................................ 48 
57. HEADINGS ......................................................................................................................... 48 
58. NON-APPROPRIATION .................................................................................................. 48 
59. ASSIGNMENT OF CLAIMS ............................................................................................ 49 
60. DISPUTES ........................................................................................................................... 49 
61. SEXUAL HARASSMENT ................................................................................................. 49 
62. AMENDMENTS ................................................................................................................. 49 
63. CMAR RECORDS ............................................................................................................. 49 
64. NO CONSTRUCTION AGAINST DRAFTING PARTY .............................................. 50 
65. INTERPRETATION OF CONTRACT DOCUMENTS ................................................. 50 
66. EXHIBITS ........................................................................................................................... 51

iii 
SIGNATURE PAGE ................................................................................................................... 52 
 
65.1. LIST OF SUBCONTRACTORS 
 
65.2. STATUTORY PERFORMANCE BOND 
 
65.3. STATUTORY PAYMENT BOND 
 
65.4. CERTIFICATION BY THE CONTRACTOR AUTHORIZING 
EMPLOYEES TO SIGN BINDING AGREEMENT 
 
65.5. CONDITIONAL WAIVER CONTRACTOR’S PAYMENT AND 
SETTLEMENT OF CLAIMS 
 
65.6. AFFIDAVIT OF GENERAL CONTRACTOR/PRIME CONSULTANT 
REGARDING HEALTH INSURANCE 
 
65.7. CITY OF TEMPE GUIDELINES FOR IMPLEMENTATION OF HEALTH 
INSURANCE  
 
65.8. AFFIDAVIT DEMONSTRATING LAWFUL PRESENCE IN THE UNITED 
STATES 
 
65.9. COMPLIANCE WITH TEMPE CITY CODE ON 
ANTIDISCRIMINATION 
 
65.10. ACKNOWLEDGEMENT REGARDING LETTER IN GOOD STANDING 
 
65.11. CITY ENGINEERING SECURE FACILITIES ACCESS GUIDELINES 
 
 
EXHIBIT A GUARANTEED MAXIMUM PRICE 
 
EXHIBIT B TECHNICAL SPECIFICATIONS

1 
CITY OF TEMPE, ARIZONA 
PUBLIC WORKS DEPARTMENT 
DIVISION OF ENGINEERING 
 
CONTRACT FOR CONSTRUCTION MANAGER AT RISK 
CONSTRUCTION MANAGEMENT 
 
 
This Contract is made and entered into this      5th      day of       March        2026, by and between 
the City of Tempe, an Arizona municipal corporation (“City” or “Owner”) and B&F Contracting, 
Inc., an Arizona corporation (“Construction Manager at Risk”, “CMAR” or “Contractor”). 
 
A. 
WHEREAS, City desires to construct Joint Tempe-Mesa Sewer Rehabilitation-2025, 
GMP 1, in Tempe, Arizona, Maricopa County, Arizona, more particularly described herein; 
 
B. 
WHEREAS, City and CMAR have reached an agreement, memorialized in this Contract, 
whereby CMAR will perform construction services for said improvements for payment by the City 
as set forth herein; 
 
C. 
WHEREAS, City engages CMAR to perform professional construction management 
services and construct the Project known and described as Joint Tempe-Mesa Sewer 
Rehabilitation-2025, GMP 1, Project No. 3221025B (“Project”). 
 
NOW, THEREFORE, City and CMAR, in consideration of the mutual representations and 
covenants set forth herein, and for other good and valuable consideration, do mutually agree as 
follows: 
 
1. 
TERMS AND DEFINITIONS 
 
 
For purposes of this Contract, the following definitions apply: 
 
1.1. 
“Addendum” means a document issued by City that modifies or supersedes 
portions of the Contract as to additional specifications, forms, or other information. 
 
1.2. 
“Allowances” means costs for additional quantities and or additional Work that 
City may require. 
 
1.3. 
“Alternate Systems Evaluations” means alternatives for design, means and 
methods or other scope considerations that are evaluated by City using value 
engineering principles for a potential reduction of construction costs of a quality 
and functional Project per City requirements. 
 
1.4. 
“Amendment” means a written modification of the terms and conditions of this 
Contract signed by the parties to the Contract.

2 
1.5. 
“Business Day” means any calendar day except Saturdays, Sundays and holidays 
observed by City. 
 
1.6. 
“Calendar Day” means every day shown on the calendar including Saturdays, 
Sundays, and holidays. 
 
1.7. 
“Change Order” means a written agreement entered into after the execution of the 
Contract signed by the City, CMAR, and other parties as may be required or 
appropriate, which makes changes to the scope of services or Deliverables and sets 
forth adjustment to the Contract amount and or adjustment to the CMAR time of 
completion. 
 
1.8. 
“CMAR” (“Construction Manager at Risk” or “Contractor”) means the 
person, firm, corporation, or other approved legal entity with whom City has 
contracted with to provide design services or construction services. 
 
1.9. 
“Construction Fee” means CMAR’s total administrative costs, including home 
office overhead if any, and profit, whether at CMAR’s principal or branch offices.   
 
1.10. “Construction Manager Professional” means the person, firm, or corporation 
having a separate contract with the City working as the Owner’s representative to 
provide construction program management services for the Project. 
 
1.11. “Contract” means this written document, including all addenda, amendments, 
exhibits, attachments, and schedules attached thereto, signed by City and CMAR 
covering the construction phase of the Project.  The Contract collectively represents 
the entire agreement between City and CMAR, and which supersedes any prior 
negotiations, representations, or agreements, either written or oral. 
 
1.12. “Cost Model” means a breakdown of the scope of the Project that is initially 
developed by CMAR during the conceptual design phase and based on information 
from the Project Team and CMAR’s records of similar Projects.  The model will 
evolve as the design progresses and be maintained by CMAR throughout the design 
phase and will include any assumptions and clarifications made by CMAR.  Cost 
Model will support any cost estimates, Alternate Systems Evaluations and 
eventually any GMP, when required by the Project Team.  Cost Model is subject to 
approval by City in its sole discretion.  
  
1.13. “Cost of the Work” means the direct costs necessarily incurred by CMAR in the 
proper performance of the Work.  Cost of the Work may include direct labor costs, 
subcontract costs, costs of materials and equipment incorporated in the completed 
Work, costs of other materials and equipment, temporary facilities, building permit 
fees, materials testing, and related items.  Cost of the Work shall not include 
CMAR’s Construction Fee, general conditions costs, taxes, bonds, or insurance 
costs.

3 
1.14. “Data” means all information, whether written, electronic, or verbal, including 
plans, photographs, studies, investigations, audits, analyses, samples, reports, 
calculations, internal memos, meeting minutes, field notes, work product, 
proposals, correspondence and any other similar documents or information 
prepared by or obtained by CMAR in the performance of this Contract. 
 
1.15. “Day(s)” means Calendar Day(s) unless otherwise expressly stated herein. 
 
1.16. “Deliverables” means the work products prepared by CMAR in performing the 
scope of Work described in the Contract. 
  
1.17. “Design Professional” means the qualified and licensed design person, firm, or 
corporation having a contract with City to furnish design services for this Project. 
 
1.18. “Drawings” means documents which visually represent the scope, extent, and 
character of the Work and which have been prepared or approved by Design 
Professional and City.  Drawings include such documents that have reached a 
sufficient stage of completion and are released by the Engineer solely for the 
purposes of review and/or use in performing constructability or biddability reviews 
and in preparing cost estimates.  (e.g., conceptual design Drawings, preliminary 
design Drawings, detailed design Drawings at 30%, 60%, 90% or 100%, but 
excluding Shop Drawings and those marked “NOT FOR CONSTRUCTION”). 
 
1.19. “Effective Date of this Contract” means the date specified in this Contract on 
which the Contract becomes effective, but if no such date is specified, the date on 
which the last of the parties signs this Contract. 
 
1.20. “Engineer” means City Engineer acting directly or through its duly authorized 
representative. 
 
1.21. “Final Acceptance” means a written final acceptance of the Work prepared by the 
Engineer, after all Work has been completed in accordance with the Contract and 
after inspection is completed by City.   
 
1.22. “General Conditions Costs” means, other than expressly limited or excluded 
herein, the costs of CMAR during the construction phase, including but not limited 
to:  payroll costs for the project manager or construction manager (but not both) for 
work conducted at the site; payroll costs for the superintendent and full-time 
general foremen; payroll costs for management personnel resident and working on 
or off the site; workers not included as direct labor costs engaged in support 
functions (e.g., loading, unloading, clean-up); costs of offices and temporary 
facilities including office materials, office supplies, office equipment, minor 
expenses, utilities, fuel, sanitary facilities, and telephone services at the site; costs 
of consultants not in the direct employ of CMAR or Subcontractors; and fees for 
licenses.

4 
1.23. “Guaranteed Maximum Price (GMP)” means the sum of the maximum Cost of 
the Work, the Construction Fee, General Conditions Costs, any Allowances, taxes, 
bonds, and insurance. 
 
1.24. “Guaranteed Maximum Price (GMP) Proposal” means the offer of a proposal 
detailing the qualifications, assumptions, exclusions, value engineering, and any 
and all other requirements set forth in the scope of work for the design phase. 
 
1.25. “Laws and Regulations; Laws or Regulations” means any and all applicable 
laws, rules, regulations, ordinances, codes and orders of any and all federal, state, 
and local governmental bodies, agencies, authorities and courts having jurisdiction 
over the subject Project, site and/or any Work for this Contract. 
 
1.26. “MAG Specifications” means the Maricopa Association of Governments Uniform 
Standard Specifications for Public Works Construction – latest edition, Maricopa 
Association of Governments Uniform Standard Details for Public Works 
Construction – latest edition, and City of Tempe Supplement to the MAG Uniform 
Standard Details and Specifications for Public Works Construction – 2014 thereto.  
The definitions set forth in MAG Specifications shall govern unless expressly 
defined herein. 
 
1.27. “Notice to Proceed” means written notification from City to CMAR establishing 
the date on which performance of CMAR’s obligations under this Contract shall 
begin.  Notice to Proceed will be issued after CMAR’s receipt of the fully executed 
contract and any applicable building permits are available. 
 
1.28. “Progress Payment” means the form accepted by City and used by CMAR in 
requesting progress payments or final payment for Work performed under this 
Contract, which includes supporting documentation as required by the Contract or 
City. 
 
1.29. “Project” means the total design and construction of improvements or services 
and/or Work to be performed by CMAR.  
 
1.30. “Project Contingency” means a fund to cover non-general condition and other 
cost growth during the Project used by the City or approved by the City for CMAR 
use, at City’s sole discretion.  The City will permit use of the Project Contingency, 
as the need may arise, and such Project Contingency monies may be utilized and 
are generally available for increased charges due to material costs and availability, 
production capacity, unforeseen Project circumstances or site conditions, City 
directed changes to the Work to be performed under the Contract including design 
revisions or additional scope requests made by the City or the Design Professional, 
or may be utilized to cover costs that have not been completely identified as trade 
specific scope on the GMP setting documents such as scope gap, coordination 
issues between trades, and missed scope during the bidding process, and may

5 
require further clarification or coordination.  The amount of Project Contingency 
will be set solely by City and will not be included in the GMP or GMP Proposal. 
 
1.31. Project Manager” means Engineer or Construction Manager Professional. 
 
1.32. “Project Team” means a construction services unit consisting of a Design 
Professional, CMAR, Engineer, Construction Manager Professional and other 
persons who are responsible for making decisions regarding the Project, as 
approved by Engineer.  Any other persons to be included in the Project Team shall 
be identified in the preconstruction conference and are subject to approval by the 
Engineer. 
 
1.33. “Samples” means physical examples of materials, equipment, or workmanship 
representative of a part of the construction phase establishing the standards by 
which that portion of the construction phase Work will be evaluated. 
 
1.34. “Shop Drawings” means all Drawings, diagrams, illustrations, schedules and other 
Data or information specifically prepared or assembled by or for CMAR and 
submitted by CMAR to illustrate some portion of the Work. 
 
1.35. “Specifications” means the technical specifications for the construction phase of 
this Project consisting of written technical descriptions of materials, equipment, 
construction systems, standards and workmanship as applied to the Work and 
administrative details applicable thereto.  
 
1.36. “Subcontractor” means an individual, firm, entity, or corporation other than 
CMAR’s employees, having a contract with CMAR to undertake to perform a part 
or portion of the design phase services or construction phase Work at the site for 
which CMAR is responsible.  Subcontractors shall be selected through the 
Subcontractor bid process described in Section 12 of this Contract. 
 
1.37. “Substantial Completion” means when the construction services for the Work (or 
a specified part thereof) has progressed to the point where, within the sole discretion 
of the City and as evidenced by a letter of Substantial Completion, such 
construction services are sufficiently complete in accordance with the Contract 
Documents so that City can occupy and use the Project or a portion thereof for its 
intended purposes. 
 
1.38. “Supplier” means a manufacturer, fabricator, supplier, distributor, materialman, or 
vendor having a direct contract with CMAR or with any Subcontractor to furnish 
materials or equipment. 
 
1.39. “Total Float” means number of Calendar Days by which the design phase services 
or construction phase Work or any part of the same may be delayed without 
necessarily extending a pertinent schedule milestone in the Project schedule, as 
mutually agreed to by City and CMAR.

6 
 
1.40. “Work” means any or all of the improvements as required by the Contract, and the 
construction, demolition, reconstruction, design, and/or repair of all or any portion 
of such improvements, and all labor, services, incidental expenses, and material 
necessary or incidental thereto.  
 
2. 
SERVICES OF CMAR 
 
2.1. 
CMAR shall perform in accordance with the degree of care, skill and judgment that 
a professional construction manager in Arizona would exercise under similar 
conditions.  CMAR will, at all times, perform the required services consistent with 
sound and generally accepted construction and construction management. 
 
2.2. 
CMAR has assigned Andrea Groak as its representative for this Contract.  Prior 
written approval by the City is required in the event CMAR requests a personnel 
substitution.  CMAR shall submit the qualifications of any proposed substituted 
personnel to City for approval.   
 
2.3. 
CMAR shall provide construction administration services for this Project as 
described in Exhibit “A”.  Where applicable, the services being provided under this 
Contract include the following: 
 
2.3.1. CMAR shall furnish any and all plant, materials, labor, construction 
equipment, services and transportation (all applicable taxes included) 
required for performing all Work for the installation of the Project. 
 
2.3.2. The full street or physical address of the construction work location is 
US-60 and Mill Avenue, in Tempe, Arizona.  CMAR Contractor shall list 
each Work location in any and all contracts with each Subcontractor at any 
level and each Subcontractor shall include each Work location in any and 
all contracts with its Subcontractors at any level. 
 
3. 
TERM 
 
 
CMAR shall complete all services per the terms of the Contract, free and clear from any 
and all claims, liens and changes whatsoever, within 318 calendar days of the Notice to 
Proceed date issued by the City.  In the event delays are experienced beyond the control of 
CMAR, the schedule may be revised as determined by City in its sole discretion. 
 
4. 
CMAR’S COMPENSATION 
 
4.1. 
Total compensation for the services performed shall be the sum of $4,943,673.81, 
which is the Guaranteed Maximum Price (GMP), as established in the attached 
Exhibit “A” attached hereto and incorporated herein by this reference.

7 
4.2. 
City will pay CMAR installments based on approval of monthly progress reports 
and detailed invoices submitted by CMAR.  Such payments will be made pursuant 
to A.R.S. § 34-609. 
 
Payment requests shall be submitted by CMAR through the City’s PMWeb 
Software System at https://tempe-az.pmweb.com/pmweb/ using a login provided 
to CMAR by City and shall include all supporting documentation for work 
performed during the payment period. 
 
5. 
CITY’S RESPONSIBILITIES 
 
5.1. 
City may designate a Construction Manager Professional for the term of this 
Contract.  When designated, the Construction Manager Professional has authority 
to administer this Contract and will monitor compliance with all terms and 
conditions stated herein.  All requests for information from or a decision by City 
on any aspect of the Work will be directed to the Construction Manager 
Professional. 
 
5.2. 
City will review Deliverables by CMAR, provide prompt responses to questions, 
and render decisions to minimize delay in the progress of CMAR Work.  City will 
keep CMAR advised concerning the progress of the City’s review of the Work.  
CMAR agrees that City’s inspection, review, acceptance and/or approval of 
CMAR’s Work shall not relieve CMAR’s responsibility for errors or omissions of 
CMAR or any of its Subcontractors. 
 
5.3. 
Unless included in CMAR’s services as identified herein, City may furnish with or 
without charge the following to the extent it is within City’s possession or control: 
 
5.3.1. One copy of its maps, records, laboratory tests, survey ties and benchmarks, 
or other Data in its possession pertinent to the services.  However, CMAR 
shall be solely responsible for researching the records, requesting specific 
Drawings or information, and independently verifying all Data. 
 
5.3.2. Available City Data on policies, regulations, standards, criteria and studies 
relevant to the Project. 
 
5.4. 
City additionally may: 
 
5.4.1. Contract separately with one or more Design Professionals to provide 
architectural and/or engineering design services for the Project.  The scope 
of the services for the Design Professional will be provided to CMAR.  
CMAR shall have no right to limit or restrict any changes of such services 
that are otherwise mutually acceptable to City. 
 
5.4.2. Supply all necessary copies of programs and reports reasonably required by 
CMAR.

8 
5.4.3. Provide CMAR with adequate information regarding the City’s 
requirements for the Project. 
 
5.4.4. Give prompt written notice to CMAR in the event City becomes aware of 
any default or defect in the Project or nonconformance with the Drawings 
and/or Specifications.  Such notices of nonconformance shall be provided 
to CMAR through the City’s PMWeb Software System. 
 
5.4.5. Notify CMAR of changes concerning or affecting budget allocations. 
 
5.4.6. Authorize the Project Manager to approve the Project budget and Project 
schedule, render decisions and furnish information to CMAR. 
 
6. 
GENERAL SCOPE OF SERVICES 
 
6.1. 
CMAR Requirements and Conditions. 
 
6.1.1. Licenses, Taxes and Permits.  Prior to the execution of this contract, the 
Contractor must carry the appropriate State of Arizona Contractor License.  
In addition, all Subcontractors must carry the appropriate State of Arizona 
Contractor’s license for the proposed Work. 
 
Prior to execution of this Contract, CMAR must ensure all applicable taxes 
due by Contractor are paid in full. At all times, the determination of 
applicable taxes and rates, and remitting taxes owed, shall be the sole 
responsibility of Contractor.  
 
It is the sole responsibility of the Contractor and any subcontractors to 
obtain a Letter of Good Standing from the Arizona Department of 
Revenue 
prior 
to 
Contract 
award. 
 
Go 
to 
https://azdor.gov/forms/collections-forms/tax-clearance-application 
and obtain directions regarding how to submit for the Letter of Good 
Standing.  The Letter of Good Standing must have been issued within 
the last 90 Calendar Days from the award date of the contract.  Submit 
a 
copy 
of 
the 
Letter 
of 
Good 
Standing 
to 
contractor_support@tempe.gov  In addition, Contractor must 
complete (Exhibit 65.10) prior to award. 
 
In the event a “denial” letter is received from the Arizona Department of 
Revenue, should any taxes owed by the Contractor not be remitted in full 
prior to award along with the receipt of a Letter of Good Standing from the 
Contractor, the award of the contract will not move forward. 
 
CMAR, at its sole cost, shall obtain all required governmental permits and 
approvals for all work and services performed hereunder unless otherwise 
specified.

9 
Licenses and Permits.  All Subcontractors must carry the appropriate State 
of Arizona Contractor’s license for the proposed Work.  Prior to execution 
of this Contract, CMAR must possess a valid State transaction privilege 
license and shall provide the permit number of such for validation and must 
carry the appropriate State of Arizona Contractor License. 
 
6.2. 
Uniform Standard Specifications 
 
6.2.1. Unless otherwise specified herein, all Work performed under this Contract 
shall be accomplished in accordance with the MAG Specifications as 
defined in Section 1.26. 
 
6.2.2. In the case of a discrepancy or conflict, the order in which the Contract 
sections govern is as follows from the highest to lowest: special terms and 
conditions, technical specifications, plans, general terms and conditions, 
City of Tempe Supplement, MAG Specifications, and MAG Details. 
 
6.2.3. All bids shall be made in accordance with the General Conditions of the 
MAG Specifications. 
 
6.3. 
Examination of Premises. 
 
6.3.1. CMAR shall visit the site of the Project and shall fully acquaint itself with 
the conditions as they exist, so that it may fully understand the facility, 
difficulties and restrictions attending the execution of the Work. 
 
6.3.2. Subcontractor bidders shall also thoroughly examine and be familiar with 
the Specifications and other Contract requirements.  The failure of CMAR 
to obtain, receive or examine any addenda to the proposed Contract, or to 
visit the site and acquaint itself with the conditions there existing, shall not 
relieve it from any obligation with respect to its proposal. 
 
6.3.3. By submitting a proposal, CMAR agrees that it has examined the site, 
Specifications and the Contract and accepts, without recourse, all site 
conditions and the proposed Contract, except for conditions that could not 
have been reasonably foreseen or discovered upon examination of the site, 
specifications and the Contract.  
 
6.4. 
Project Meetings.  CMAR shall attend Project Team meetings and all other 
meetings as directed by City. 
 
6.5. 
CMAR shall perform any and all services described herein, in a proactive manner 
and consistent with the intent of the most current Drawings and Specifications.  
CMAR will promptly notify City in writing in the event that CMAR determines 
that any Drawings or Specifications are inappropriate for the Project and/or cause 
changes in the scope of Work.

10 
6.6. 
Description of Work.  CMAR shall provide services for this Project as described in 
Section 7 through Section 13 herein. 
 
6.7. 
Traffic Control. 
 
6.7.1. All traffic shall be regulated in accordance with MAG Standard 
Specifications and MAG Standard Details; the City of Phoenix Barricade 
Manual, latest edition, with City of Tempe revisions, available through the 
City of Tempe Transportation Division (Transportation) at 480-350-8219; 
the Manual on Uniform Traffic Control Devices (MUTCD); and any special 
provisions included herein. 
 
6.7.2. At the time of the pre-construction conference, CMAR shall designate an 
American Traffic Safety Services Association (ATSSA) certified individual 
who is well qualified and experienced in construction traffic control and 
safety, to be responsible for implementing, monitoring, and altering traffic 
control measures as necessary to insure that traffic is carried through the 
work area in an effective manner and that motorists, pedestrians, bicyclists, 
and workers are protected from hazard and accidents.  At the same time, 
City shall designate a representative who will be responsible to see that all 
traffic control and traffic control alterations are implemented per these 
traffic control specifications. 
 
6.7.3. CMAR shall have the full responsibility and liability for traffic control for 
this Project.  CMAR shall submit a Traffic Control Plan to the 
Transportation Division for approval one week prior to beginning Work 
under this Contract.  It shall be noted that traffic under this Contract shall 
include all motor vehicles, bicyclists, and pedestrians. 
 
6.7.4. During construction it may be necessary to alter traffic control as approved 
by the Transportation Division.  Alterations to traffic control shall be in 
accordance with the latest edition of Part VI of the Manual on Uniform 
Traffic Control Devices: “Traffic Control for Streets and Highway 
Construction and Maintenance Operations”; the latest edition of the ADOT 
Traffic Control Manual; or the City of Phoenix Barricade Manual, latest 
edition, with City of Tempe revisions.  The most restrictive manual shall 
apply. 
 
6.7.5. No measurement or payment will be made for traffic control unless 
otherwise expressly set forth herein.  The cost thereof shall be included in 
the GMP Proposal for the construction or installation of the items to which 
such traffic control is incidental or appurtenant. 
 
6.7.6. In the event CMAR damages any traffic signal equipment, traffic signal 
conduit, and/or circuits, it shall have them repaired immediately at its 
expense by an electrical contractor that has had traffic signal experience

11 
which is pre-approved by the City.  Any damage repaired by the City will 
be billed to CMAR at twice the City’s cost. 
 
6.7.7. CMAR shall notify all adjacent or affected residents or businesses at least 
forty-eight (48) hours in advance of any street, alley, sidewalk, and 
driveway closures and make suitable arrangements to have all vehicles 
moved to a satisfactory location outside the closed area. 
 
6.7.8. Pedestrian access shall be maintained along the length of the Project at all 
times per the requirements of the Americans with Disabilities Act, and as 
approved by the City Transportation Division. 
 
6.7.9. Speed limits shall be strictly enforced. 
 
6.7.10. For more information, please contact the City Transportation Division at 
480-350-8219. 
 
6.8. 
Dust Prevention.  Contractor shall take all necessary steps to ensure dust-free 
conditions on property within the City to the satisfaction of the City Engineer, and 
fully comply with A.R.S. §49-474.06 and Maricopa County Air Pollution Control 
Rules and Regulations Rule 200 §305-306, concerning dust-generating operations 
as defined by Maricopa County Rule 310.  In any operation where more than one-
tenth of an acre of surface area is disturbed and/or when unpaved onsite haul roads 
are used, Contractor shall obtain a Maricopa County dust control permit.  
Contractor shall provide assurance that subcontractors used on the dust generating 
portion of the Project are registered with the Maricopa County Air Quality 
Department and that only certified PM-10 efficient street sweepers shall be used to 
sweep City streets as required by Tempe City Code Sec. 26A-25.  Contractor shall 
provide its subcontractor(s)’ registration number and dust control plan, if 
applicable, to the City Engineer prior to engaging in any dust-generating activities. 
Project related hauling activities to and/or from storage located on property owned 
by City shall be listed on the approved dust control permit and be subject to control 
measures in the approved dust control plan.  When hauling fill or excavation 
materials exceeding 5,000 cubic yards or when the duration of the haul is more than 
fourteen Calendar Days, Contractor shall obtain a City haul permit before the 
hauling operation begins.  Prior to receiving a haul permit, Contractor must submit 
the required certificate of insurance, a plan showing the proposed haul routes and a 
complete schedule of the hauling operation to the City Engineer.   
All costs associated with the submittal, approval and implementation of the permit 
and dust control plan as approved by Maricopa County Air Quality Department 
shall be borne solely by the Contractor.  Failure to fully comply with this provision 
shall be considered a material breach of the Contract, and subject the Contract to 
termination by the City, in addition to other legal remedies. 
 
6.9. 
Clean-Up.  Contractor agrees and covenants to adequately protect the work site, 
adjacent property, and the public in all phases of the work and/or services provided 
herein. Contractor shall be solely responsible for all damages or injuries due to

12 
action or neglect pursuant to this section.  Contractor shall maintain access to all 
phases of the project pending inspection by City.  Contractor hereby agrees to the 
following as to the job site:  The project limits shall be cleaned of all trash, debris, 
construction materials and equipment at the completion of each workday.  No 
equipment, vehicles or materials shall be stored on site during non-working hours, 
holidays or non-working days unless otherwise approved by the City Engineer or 
designee.  No payment shall be made for this work; the cost being considered 
included in other items of work.  All new construction shall be completed withing 
the right-of-way or temporary construction easement areas shown on the project 
plans.  Contractor agrees to continually keep the job site free from debris, waste, 
and accumulation of materials; immediately clean up any oil, fuel, or chemical 
spills and take any and all remediation necessary; keep machinery clean and free of 
weeds and debris; remove all construction stains, smears, and debris from finished 
surfaces; perform site preparation to limit the spread of weeds, debris, and other 
nuisances prior to submission of final invoice to City; and remove all equipment, 
materials, tools, and Contractor’s personal property prior to submission of final 
invoice to City. 
 
In accordance with MAG Specifications Section 105, Contractor shall respond 
within 24 hours after notice by City of any defects and/or maintenance requests to 
immediately remedy the condition of the job site.  Should Contractor fail to respond 
promptly as set forth herein, City shall correct the job site at the expense of 
Contractor and recover all attendant costs. 
 
6.10. Alteration of Work. 
 
6.10.1. In the event that significant changes in the scope of the Work, and/or 
changes in the quantities due to contingencies of construction become 
necessary, such changes shall be made in accordance with Section 104.2 of 
General Conditions in the MAG Specifications. 
 
6.10.2. The costs associated with any extra Work as authorized by the contracting 
agency must be approved prior to the start of Work.  Extra Work performed 
on an actual cost basis shall be submitted for approval within 21 Calendar 
Days after the completion of such Work.  The final costs for additional 
Work shall also include any and all charges associated with extended 
general conditions or Contract acceleration. 
 
6.11. Subsidiary Work.  All Work called for in the Plans and Specifications shall be 
performed by CMAR and unless a specific bid item is provided for the Work, then 
such portion of the Work will be considered subsidiary to other Work for which 
payment is provided.

13 
7. 
CONTROL OF WORK 
 
7.1. 
Interpretations of Drawing and Documents.  If any Subcontractor submitting a bid 
for the proposed Work or any part thereof is in doubt as to the true meaning of part 
of the Contract, or finds discrepancies in or omissions from the Contract, such 
Subcontractor may submit to the Engineer a written request for an interpretation or 
correction thereof.  Subcontractor submitting the request will be responsible for its 
prompt delivery.  Any interpretations or corrections of the proposed documents will 
be made by Addendum duly issued, and a copy of each addendum will be mailed 
or delivered to CMAR who shall distribute the addendum to the appropriate 
Subcontractor(s).  City will not be responsible for any other explanation or 
interpretations of the documents. 
 
7.2. 
CMAR’s Representative.  CMAR shall at all times be present at the Work in person 
or represented by a foreman or other properly designated agent.  Instructions and 
information given to CMAR’s foreman or agent on the Work shall be considered 
as having been given to CMAR. 
 
7.3. 
Relocation of Utilities.  All utilities in conflict with the new Work will be relocated 
by the utility company except as otherwise provided in the Plans and Specifications. 
 
7.4. 
Supervision by CMAR.  CMAR will supervise and direct the Work.  It will be 
solely responsible for the means, methods, techniques, sequences and procedures 
of construction.  CMAR will employ and maintain on the Work a qualified 
supervisor or superintendent who shall have been designated in writing by CMAR 
as CMAR’s representative at the site.  The supervisor shall have full authority to 
act on behalf of CMAR and all communications given to the supervisor shall be as 
binding as if given to CMAR.  The supervisor shall be present on the site at all 
times as required to perform adequate supervision and coordination of the Work. 
 
7.5. 
Construction Staking.  Construction staking shall be provided by CMAR.  Repair 
or replacement of construction stakes that have been knocked out due to CMAR’s 
Work or lack of Work, weather conditions, traffic or vandalism will be performed 
at CMAR’s sole expense. 
 
7.6. 
Survey Control Points.  Existing survey monuments shall be protected by CMAR 
or removed and replaced under the direct supervision of the Engineer.  Prior to 
construction, it is the responsibility of CMAR to notify the Engineer of any survey 
monuments which need to be referenced off of the monument.  Any monuments 
which are lost and have not been referenced off due to CMAR’s negligence and/or 
lack of notification to the Engineer shall be replaced at CMAR’s expense.  Lot 
corners shall not be disturbed without knowledge and consent of the property owner 
and only after such corner has been properly referenced for replacement. 
 
7.7. 
Authority of the Construction Manager Professional.  Construction Manager 
Professional shall act as the Engineer’s designated representative during the 
construction period.  Construction Manager Professional shall advise on questions

14 
concerning coordination with the City, public safety, and quality and acceptability 
of materials and Work performed.  Construction Manager Professional or 
Construction Manager Professional’s assigned inspector shall interpret the intent of 
the Contract in an unbiased manner.  
 
Construction Manager Professional or Construction Manager Professional’s 
assigned inspector shall be present on the site at times during construction to 
monitor the Work and to maintain records for Contract management.  Construction 
Manager Professional shall promptly make decisions relative to the interpretation 
of the Contract so as to minimize delays in construction.  Construction Manager 
Professional will not be responsible for directing construction, control, techniques, 
sequence, or procedures, or for directing job safety. 
 
7.8. 
Shop Drawings, Schedules & Samples. 
 
7.8.1. In time for each to serve its proper purpose and function, CMAR shall 
submit to Engineer such schedules, reports, drawings, lists, literature 
samples, instruction, directions, and guarantees as are specified or 
reasonably required for construction, operation, and maintenance of the 
facilities to be built and/or furnished under this Contract. 
 
7.8.2. Shop drawings and Data shall be submitted to the Engineer in such number 
of copies as will allow Engineer to retain four (4) copies of each submittal.  
The submittal shall clearly indicate the specific area of the Contract for 
which the submittal is made.  The additional copies received will be 
returned to CMAR’s representative at the job site.  Engineer’s notations of 
the action taken will be noted on one (1) of these returned copies. 
 
7.8.3. The above drawings, lists, prints, samples, and other Data shall become a 
part of the Contract and a copy of the same shall be kept with the jobsite 
Contract, and the fabrications furnished shall be in conformance with the 
same.  However, Engineer’s review of the above drawings, lists, prints, 
specifications, samples, or other Data shall not release CMAR from its 
responsibility for the proper fulfillment of the requirements of this Contract 
nor for fulfilling the purpose of the installation nor from its liability to 
replace the same, should it prove defective or fail to meet the specified 
requirements.   
 
7.9. 
As-Built Plans.  CMAR shall provide and maintain accurate field Data on a redlined 
set of Project plans, which are to be kept current and submitted as complete at the 
conclusion of the construction.  All redlined plans shall be subject to acceptance 
and approval by City.  Upon City’s approval, these redlined plans will be used as 
documentation for progress payments, and upon Project completion, for the 
preparation of as-built file plans by Design Professional.  CMAR shall have a 
Design Professional certify the as-built plans prior to submission to City.  Final 
payment will not be issued to CMAR until all record plans and as-builts are

15 
submitted by CMAR and certified to be complete and accurate by Design 
Professional of record. 
 
7.10. Underground Utilities.  Underground utilities indicated on the plans are in 
accordance with maps furnished by City and by each utility company.  The 
locations are only approximate and require verification prior to construction as 
mandated by City requirements for underground street crossings and potholing. 
 
7.11. Inspection.  CMAR is responsible for complying with the Specifications and is 
hereby forewarned that final approval of any Work will not be given until the entire 
Project is completed and accepted.  Prior to “final inspection” on any City facilities 
requiring a building permit, CMAR must call for final inspections from the 
Development Services and Public Works Departments of City.  The final inspection 
must be completed prior to final acceptance and payment by Engineer. 
 
7.12. Substantial Completion.  Upon Substantial Completion of the Work or, if 
applicable, any portion of the Work, City shall release to CMAR all retained 
amounts relating, as applicable, to the Work or completed portion of the Work, less 
an amount up to two and one half times (2.5) the reasonable value of all remaining 
or incomplete items of Work as noted in a certificate of Substantial Completion. 
 
7.13. Beneficial Occupancy.  “Beneficial occupancy” is use of a facility or Project, in 
whole or in part, by the owner for its intended purpose.  This may occur even though 
some Work of the Contract remains undone.  Prior to such use or occupancy, City 
will provide notice to the CMAR and complete a partial acceptance inspection.   
 
7.14. Completion of the Work.  Completion of the Work is full completion of all 
construction associated with this Contract, including, but not limited to punch list 
items, close out documentation, operation and maintenance manuals, warranties, 
and record plans as certified by Design Professional.   
 
7.15. Final Acceptance and Guarantee.  “Final Acceptance” shall mean a written final 
acceptance of the Work as defined in Section 1.23. 
 
7.16. Warranty.  CMAR acknowledges and agrees that CMAR’s Warranty as set forth in 
Section 13 shall begin at the time of beneficial occupancy by City of any portion of 
the Project, and shall continue for a period of one (1) year upon the Final 
Acceptance of the entire Work as expressly stated in Section 13 of the Contract.  
This provision shall in no way be construed to limit or restrict the Warranty period 
expressly stated in the Contract. 
 
7.17. Emergencies.  In any emergency affecting the safety of persons and/or property, 
CMAR shall act, at its discretion, to prevent threatened damage, injury or loss.   
MAG Specification 107.5 applies to this provision.

16 
8. 
CONTROL OF MATERIALS 
 
8.1. 
Excess Materials.  Excess or unsuitable material, broken asphaltic concrete and 
broken portland concrete shall be disposed of by CMAR.  CMAR shall, prior to 
commencement of the Work, submit a letter to the Engineer stating the location of 
disposal site(s) for all excess material and certifying that it has obtained the property 
owner’s permission for the disposal of all surplus material. 
 
8.2. 
Quality Control. 
 
8.2.1. All material shall be new and of the specified quality and equal to the 
accepted samples, if samples have been submitted.  All Work shall be done 
and completed in a thorough, workmanlike manner, notwithstanding any 
omission from this Contract; and it shall be the duty of CMAR to call the 
Engineer’s attention to apparent errors or omissions and request instruction 
before proceeding with the Work. 
 
8.2.2. Engineer may, through appropriate instruction, correct errors and supply 
omissions, which instructions shall be as binding upon CMAR as though 
contained in the original Contract. 
 
8.2.3. At the option of Engineer, materials to be supplied under this Contract will 
be tested and/or inspected either at its place of origin or at the site of the 
Work.  CMAR shall give Engineer written notification well in advance of 
actual readiness of materials to be tested and/or inspected at point of origin.  
Satisfactory tests and inspections at the point of origin shall not be construed 
as a final acceptance of the material nor shall it preclude retesting or 
reinspection at the site of the Work. 
 
9. 
ENVIRONMENTAL REQUIREMENTS 
 
9.1. 
CMAR shall comply with all federal, state, and municipal regulations, laws, and 
policies relating to air, ground water quality, and water conservation.  In addition, 
the following requirements are applicable for City construction projects. 
 
9.1.1. Non-pick up sweepers will not be allowed except as required to make joints 
during chip sealing operations. 
 
9.1.2. Water flooding of trenches with potable water will not be permitted. 
 
9.1.3. All paints applied by sprayers shall be of a water-based type. 
 
9.1.4. Provisions shall be made to prevent the discharge of construction silt, mud, 
and debris into City storm drains or streets.

17 
9.1.5. Spills of oil, gas, chemical, or any other hazardous materials must be 
reported and removed by approved procedures.  Mitigation measures shall 
be taken to prevent contamination of construction storage sites. 
 
9.1.6. Concrete waste must be disposed of in an approved location and at least 
twenty-five (25) feet from established landscaping. 
 
9.1.7. City refuse roll-off containers shall be used on City projects unless 
otherwise directed by the City of Tempe Solid Waste Supervisor.  If you 
should have any questions concerning any of the requirements or charges, 
please contact the Solid Waste Supervisor, at 480-350-8268. 
 
9.1.8. Hazardous waste shall not be discharged into the City’s sanitary sewers or 
storm drainage system.  All waste products shall be disposed of in 
accordance with applicable regulations. 
 
9.1.9. The discovery of archeological ruins or artifacts must be reported 
immediately, and excavation shall not resume in the identified area until 
approved by the Engineer. 
 
9.1.10. All materials supplied by CMAR shall be one hundred percent (100%) 
asbestos free unless otherwise approved by the City. 
 
9.2. 
No additional payment will be made for compliance with the above items. 
 
9.3. 
In addition to the above, the use of new products made with reclaimed material and 
meeting Project Specifications is encouraged. 
 
10. 
SAFETY REQUIREMENTS 
 
CMAR shall comply with all applicable federal, state, and local health and safety laws, 
regulations, ordinances, and requirements.  In addition, the following requirements are 
applicable for City construction projects. 
 
10.1. Pre-Contract Requirements. 
 
10.1.1. CMAR shall submit current loss history information from all its insurance 
carriers before this Contract is executed.  The information specific to 
workers’ compensation insurance carriers must include a three (3) year 
history of both its Experience Modification Factor (EMOD) and its loss 
ratio.    
 
10.1.2. CMAR shall provide upon request a copy of its written health and safety 
program and any required employee training records or certificates.

18 
10.1.3. CMAR shall provide certificates of insurance and meet indemnification 
criteria. 
 
10.2. Contract Requirements.  CMAR will be required to attend a City safety briefing.  
The safety briefing session shall address the following issues: 
 
10.2.1. City Safety Rules and Expectations. 
 
10.2.2. Contractor Tailgates.  CMAR shall conduct tailgate safety meetings 
regularly to ensure that safety on the job is given priority. 
 
10.2.3. Accident/Injury/Illness Procedures.  Engineer and the Risk Management 
Division shall be contacted any time an accident, injury or illness occurs on 
the Project. 
 
10.2.4. Unsafe Acts.  CMAR employees shall be empowered to stop an unsafe act 
or condition at City facilities. 
 
10.2.5. Safety Audits.  City reserves the right to conduct safety audits at the job site 
at any time.  In addition, City shall be notified should an OSHA inspection 
occur at a City job site. 
 
10.2.6. Job and Site Specific Requirements.  Site specific requirements such as 
lockout/tagout rules and evacuation plans shall be covered during the safety 
briefing as indicated by the Project exposures. 
 
10.2.7. CMAR may have the following additional safety requirements based on the 
exposures of the Project: 
 
a. CMAR shall implement a permit-required confined space program as 
required under federal and state statutes and/or regulations, and 
amendments thereto, for all Work that encompasses a space that (1) is 
large enough and so configured that an employee can bodily enter and 
perform assigned Work; (2) has limited or restricted means for entry or 
exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, 
and pits are spaces that may have limited means of entry); and (3) is 
not designed for continuous employee occupancy.   
 
b. As a part of CMAR implementing a confined space program, it is the 
responsibility of CMAR to provide trained attendant(s) and all 
intrinsically safe confined space entry related equipment (for example, 
ladders, gas detectors, safety harnesses, safety tripods, and electrical 
devices) as needed for safe entry of a confined space.

19 
c. When any City employee is required to enter a confined space during 
the construction phase of a Project, such as for the purpose of 
inspection, it is the responsibility of CMAR to provide a trained 
attendant and all necessary equipment required for safe entry of City 
employee. 
 
d. Safety will be a part of the agenda for the weekly construction 
meetings.  Items of discussion will be outstanding safety and health 
issues, current safety meeting topics, environmental issues and any 
accidents or injuries on the job.  City reserves the right to request the 
agendas, minutes of the meetings, and documentation of any safety 
tailgate meetings held on the job site. 
 
10.3. Temporary Barricades. 
 
10.3.1. Temporary barricades shall be regulated in accordance with the City of 
Phoenix Traffic Control and Barricade Manual, latest edition, with City of 
Tempe revisions available through the City of Tempe Transportation 
Division at 480-350-8219. 
 
10.3.2. No additional payment will be made for temporary barricades.  Temporary 
barricades will be considered subsidiary items to those items for which 
payment is made. 
 
10.4. Protection of Finished or Partially Finished Work. 
 
10.4.1. CMAR shall properly guard and protect all finished or partially finished 
Work and shall be responsible for the same until that phase is completed 
and accepted by the Engineer.   
 
10.4.2. Estimate or partial payment of Work so completed shall not release CMAR 
from such responsibility, but he shall turn over the entire Work in full 
accordance with these Specifications before final payment can be made.  
 
10.5. Arizona 811.  CMAR is required to notify Arizona 811 at 602-263-1100 prior to 
the excavation of any material in accordance with A.R.S. §§ 40-360.22-24, as 
amended from time to time.  CMAR shall directly contact City for the marking of 
electrical underground apparatus for traffic signals, sprinkler, and irrigation 
facilities. 
 
10.6. Salt River Project Construction Clearance Agreement.  Salt River Project requires 
all contractors who will be working on its facilities to sign a standard form 
“Construction Clearance Agreement” prior to issuance of a license.  This agreement 
sets forth the requirements to complete the proposed Work in an allotted time frame 
or to pay full costs for others to complete.  It also obligates the contractor to comply 
with all applicable federal, state, and local laws, rules, regulations, and ordinances

20 
including, but not limited to, the OSHA Permit Required Confined Space rules, as 
amended.  CMAR is responsible for executing a “Construction Clearance 
Agreement” with Salt River Project, if required, and furnishing a copy to City prior 
to proceeding with any construction on Salt River Project facilities. 
 
10.7. Notification of Property Owners.  All property owners that may be affected by the 
proposed construction activities shall be notified of scope and duration of the 
construction activities by CMAR prior to start of construction.  CMAR shall submit 
all notifications to City Engineer for approval prior to distributing such 
notifications to property owners. 
 
10.8. Access.  Access shall be maintained to adjacent businesses at all times during 
construction.  Where property has more than one point of access, no more than one 
access shall be restricted or closed at any one time.  If only one driveway exists, 
then access shall be maintained to at least one-half of the driveway at a time.  
Access to adjacent private driveways shall be maintained during all non-working 
hours. 
 
10.9. Protection of Existing Facilities.  CMAR is to protect all existing facilities during 
construction.  Utility poles that may be affected by the construction activities shall 
be protected and/or braced by CMAR.  CMAR shall notify the appropriate utility 
company or agency of any construction that may affect its facilities and state the 
course of action which will be taken to protect same. 
 
10.10. Storm Water Pollution Prevention Plan and AZPDES Permit. 
 
This Project is subject to Arizona Pollutant Discharge Elimination System 
(AZPDES) General Permit requirements for discharge from construction activities 
to waters of the United States.  Under provisions of that permit, CMAR shall be 
designated as permittee, and shall be responsible for providing necessary material 
and taking appropriate measures to assure that all discharges authorized by the 
General Permit shall be consistent with the terms and conditions of the General 
Permit.  The AZPDES Construction General Permit requirements for construction 
and Storm Water Pollution Prevention Plan can be viewed at the City of Tempe 
Engineering Division or downloaded from https://azdeq.gov/node/524 
 
10.10.1. CMAR shall complete and submit the following: 
 
a. Notice of Intent (NOI) for Coverage under AZPDES Permit No. 
AZG2003-001 for Construction Activity Discharges to Waters of 
the United States, including certification of the signature.   
 
b. Storm Water Pollution Prevention Plan (SWPPP) for the Project. 
 
c. Notice of Termination (NOT) of coverage under the AZPDES 
Construction General Permit.

21 
 
10.10.2. All Subcontractors shall comply with all requirements of the AZPDES 
Construction General Permit and the Project SWPPP.  The SWPPP shall 
be kept on the Project site at all times and shall be retained by the 
permittee for three (3) years following Project completion. 
 
10.10.3. CMAR shall submit completed and signed NOI forms PRIOR TO THE 
PROJECT PRECONSTRUCTION CONFERENCE to the following 
address:  Stormwater Program – Water Permits Section/NOI, Arizona 
Department of Environmental Quality, 1110 West Washington, Phoenix 
5415B-3, Arizona 85007.  Copies shall be transmitted to the Engineer at 
the time of the preconstruction meeting.  CMAR shall prepare a final 
SWPPP and submit it at the preconstruction meeting for discussion and 
approval. 
 
10.10.4. Failure by CMAR (or any of its appropriate Subcontractors) to submit the 
NOI forms within this time frame (or to promptly make revisions to those 
forms as requested by the City) which prevents submittal of the forms to 
the Arizona Department of Environmental Quality within the mandated 
deadline of forty-eight (48) hours prior to start of construction will result 
in delay of the start of construction.  CMAR will not be entitled to any 
claim for additional compensation for additional costs resulting from such 
a delay in the construction start date.  The NOI shall be posted on the 
construction site along with the SWPPP. 
 
10.10.5. It is CMAR’s responsibility to perform inspections of all storm water 
pollution prevention control devices on the Project on a monthly basis and 
following each significant rainfall (0.50 inches or more).  CMAR is 
responsible for maintaining those devices in proper working order, 
including cleaning and/ or repair. 
 
10.10.6. All SWPPP reports required under this Contract shall be available to the 
public in accordance with the requirements of the AZPDES Construction 
General Permit No. AZG2003-001.  CMAR, as the permittee of 
construction activities with storm water discharges covered by the 
AZPDES Construction General Permit, shall make plans available to the 
public upon request through the Arizona Department of Environmental 
Quality. 
 
10.10.7. No condition of the AZPDES Construction General Permit as well as the 
SWPPP shall release CMAR from any responsibilities or requirements 
under other environmental statutes or regulations. 
 
10.10.8. Upon total Project completion, acceptance, and de-mobilization, CMAR 
shall submit its completed, signed Notice of Termination (NOT) form to 
Stormwater Program – Water Permits Section/NOT, Arizona Department

22 
of Environmental Quality, 1110 West Washington 5415B-3, Phoenix, 
Arizona 85007 with a copy to the City’s construction Project manager 
thereby terminating all AZPDES Construction General Permit coverage 
for the Project. 
 
10.10.9. The unit prices for the proposal items shall include all material, labor, and 
other incidental costs relating to the preparation and submittal of all 
AZPDES Construction General Permit related forms to Arizona 
Department of Environmental Quality; preparation, revision, and 
maintenance of the SWPPP; and provision, installation, operation, and 
maintenance of all pollution control devices.  The cost of the activities 
and items within this provision as provided by CMAR is considered 
incidental to other items and no extra payment will be made for these 
incidental costs.  Such incidental costs shall include CMAR costs in order 
to assure proper operation of the pollution control devices installed, 
including all maintenance, cleaning, and disposal costs associated with 
clean-up and repair following storm events or other runoff or releases on 
the Project. 
 
11. 
HEAT SAFETY STANDARDS FOR OUTDOOR WORKERS 
 
If Contractor's employees or contract workers will perform work under this Contract in an 
outdoor environment for a substantial period of time, the Contractor must have and 
implement a written plan listing the preventative and proactive measures that Contractor 
will take to protect those employees and contract workers from heat hazards (the "heat 
safety plan") while performing that work.  The City may request a copy of this heat safety 
plan and documentation of all heat safety and mitigation efforts currently implemented by 
the Contractor to prevent heat-related illnesses and injuries for work done under this 
Contract.  The heat safety plan must also be posted where it is accessible to employees. 
 
At a minimum, the heat safety plan must include each of the following elements as it relates 
to heat safety: 
 
(1) 
The heat safety plan shall address the requirements of Section 13A-102. 
 
(2) 
Effective acclimatization practices to promote the physiological adaptation 
of employees or contract workers newly assigned or reassigned to work in 
an outside environment.  An employee who has been newly assigned to a 
high heat area shall be closely observed by a supervisor or designee for the 
first ten (10) days of the employee's employment. Employers may follow the 
Arizona Division of Occupational Safety and Health (ADOSH) 
acclimatization recommendations, which prescribe starting with twenty 
percent (20%) of a normal workload and progressively increasing it by 
twenty percent (20%) each subsequent day.

23 
(3) 
Close monitoring and observation of employees working in heat, potentially 
including a 'buddy system' where employees are partnered together. 
 
(4) 
Communication and emergency response protocols: specifically, a means of 
communication between supervisors and employees in the event of a heat-
related emergency. 
 
(5) 
Training of employees and contract workers, no later than one (1) week prior 
to being deployed to work in an outdoor environment, on heat illness and 
injury that focuses on environmental and personal risk factors, prevention, 
how to recognize and report signs and symptoms of heat illness and injury 
and how to report heat illness and injury to emergency medical personnel. 
Employees shall receive at least one (1) additional training session annually 
thereafter. 
 
(6) 
The posting of signage at the job site that contains information, in both 
English and Spanish, explaining how to (a) recognize and report signs and 
symptoms of heat illness and injury; (b) administer appropriate first aid 
measures, and (c) report heat-related illness and injury to emergency medical 
personnel.  The signage must also include a phone number for reporting heat 
violations to OSHA/ADOSH.  The signage must also include a phone 
number for reporting heat violations to Occupational Safety and Health 
Administration (OSHA), Arizona Division of Occupational Safety and 
Health (ADOSH).  The signage must indicate that reports may be made 
anonymously. 
 
(7) 
Providing written notification to all employees and contract workers 
regarding their new worker protections under this provision.  This 
notification shall be provided to existing employees and during the 
onboarding process for new employees.  The notification shall be provided 
to each worker in the language preferred by that worker and must be posted 
in the workplace.  Contractors will incorporate this section in all subcontracts 
with subcontractors or other entities or individuals who may perform work 
under this Contract, including the requirement that those subcontractors 
impose the same obligations under any sub- subcontractors.  It is the 
obligation of the Contractor to ensure compliance with this provision by its 
subcontractors. City may terminate this Contract for failure to comply with 
this provision. 
 
12. 
COMMENCEMENT, PROSECUTION AND PROGRESS 
 
12.1. Start of Work.  Work shall start as soon as practical, and in no case later than seven 
Calendar Days after the Notice to Proceed is issued by City.

24 
12.2. Contract Completion Date.  The date established in the Notice to Proceed is for 
completion of all or specified portions of the Work.  This includes items of Work 
to be completed under an owner allowance or as part of a contingency item.  The 
stated Contract completion date will include weather conditions that are not 
unusually severe for the area and time of year.  This date may be expressed as a 
calendar date or a number of Calendar Days after issuance of the Notice to Proceed. 
 
12.3. CMAR’s Construction Schedule.  Prior to the start of Work, a construction progress 
schedule shall be required and shall comply with the requirements of MAG 
Specification 108.4.  In addition, a schedule update comparing actual progress with 
scheduled progress will be required with the submission of each monthly pay 
request. 
 
12.4. Hindrances and Delays. 
 
12.4.1. Except as provided in Section 22, no charge shall be made by CMAR for 
hindrances or delays from any cause during the progress of any portion of 
the Work embraced in this Contract; but such delays, if due to no fault or 
neglect of CMAR, may entitle CMAR to a time extension sufficient to 
compensate for the delays.  The amount of the delay shall be determined by 
the Engineer provided CMAR gives Engineer immediate notice in writing 
of the cause of such delay. 
 
12.4.2. The parties agree to negotiate for the recovery of actual costs related to 
expenses incurred by CMAR for a delay under the following circumstance: 
 
a. If City is solely responsible for the delay which is unreasonable under 
the circumstances,  
 
b. Which delay was not within the contemplation of the parties to the 
Contract at the time the Contract was entered into, and; 
 
c. CMAR can show the impact of the delay on the critical path of the 
construction activity as indicated in an approved Construction Progress 
Management schedule.   
 
12.4.3. Unless specifically provided for or otherwise stated herein, the maximum 
compensation for delays, shall not exceed CMAR’s actual cost.   
 
12.4.4. This section shall not be construed to void any provisions of this Contract, 
which require notice of delays, which provide for alternative dispute 
resolution or other procedures for settlement, or which provide for 
liquidated damages.

25 
12.5. Liquidated Damages.  Unless otherwise specified, liquidated damages will be 
applied in accordance with MAG Specification 108.9.  Completion of the Work as 
stated in this Contract is the same as completion of the Work as stated in MAG 
Specification 108.9.  Damages will be applied at the amounts specified in Table 
108.1. 
 
13. 
SUBCONTRACTOR AND SUPPLIER SELECTIONS 
 
13.1. CMAR shall select Subcontractors as set forth in A.R.S. § 34-603.  CMAR hereby 
warrants that it has complied with the applicable provisions of A.R.S. § 34-603 in 
its selection of any Subcontractor and agrees to hold harmless and indemnify City 
for any statutory noncompliance. 
 
13.2. If City objects to any nominated Subcontractor or supplier or to any self-performed 
Work for good reason, CMAR will nominate a substitute Subcontractor or supplier.  
This provision shall in no way be deemed to diminish CMAR’s responsibility for 
Subcontractor or impose liability upon City for contracting with any Subcontractor. 
 
13.3. All Subcontractors doing Work in excess of Thirty Thousand Dollars ($100,000.00) 
shall maintain, during the course of the Contract, health insurance for all employees 
working on this Project and will offer health insurance coverage to eligible 
dependents of such employees as required by the City of Tempe Guidelines for 
Implementation of Health Insurance, and Resolution No. 2000.73. 
 
13.4. CMAR will distribute Drawings and Specifications, and when appropriate, conduct 
a pre-bid conference with prospective Subcontractors. 
 
13.5. City reserves the right to request a completed bid tabulation from CMAR within a 
reasonable time after the closing of the bid opening proceedings. 
 
13.6. If after award of Subcontractors or suppliers, City objects to any nominated 
Subcontractor or supplier, or to any self-performed Work for good cause, CMAR 
will nominate a substitute Subcontractor or supplier, preferably if such option is 
still available, from those who submitted bids for the Work identified.   
 
13.7. CMAR, upon opening of bids for Subcontractors will evaluate them including, but 
not limited to, the evaluation of lower tier Subcontractors, Subcontractor 
qualification submittals and prospective suppliers selected by each apparent low 
bidder.  CMAR will resolve any bid withdrawal, protest, or disqualification in 
connection with the award at no increase in the Cost of the Work.

26 
13.8. Within 15 Calendar Days after Subcontractor bid opening, CMAR will deliver to 
City a written notice of intent to award, itemizing the Subcontractors and suppliers 
selected by CMAR.  The notice of intent to award will detail: (a) for each 
Subcontractor agreement, the amount of the bid and the corresponding 
Subcontractor or supplier; (b) the sum of bids received for all intended 
Subcontractor agreements; and (c) trade work that CMAR intends to self-perform, 
if any. 
 
14. 
WARRANTY 
 
CMAR warrants to City that the construction, including all materials and equipment 
furnished as part of the construction, shall be new unless otherwise specified in the 
Specifications and Contract, of good quality, in conformance with the Specifications and 
the other CMAR Contract and free of defects in materials and workmanship.  CMAR’s 
warranty obligation excludes defects caused by abuse, alterations, or unreasonable failure 
to maintain the construction by persons other than CMAR, Subcontractors or others under 
CMAR control.  Nothing in this warranty shall limit any manufacturer’s warranty which 
provides City with greater warranty rights than set forth in herein or in the Contract.  
CMAR will provide City with all manufacturers’ warranties and operation and 
maintenance manuals upon substantial completion of the Work.  CMAR’s warranty shall 
be for one (1) year and will commence for all portions of the Work upon Final Acceptance 
of the entire Work as determined by City under the Contract.  All statutory or other 
warranties, express or implied, related to latent defects will remain in force and are not 
limited by this provision. 
 
15. 
INSURANCE 
 
15.1. Without limiting any of their obligations or liabilities, CMAR, at its own expense, 
shall purchase and maintain the minimum insurance specified below with 
companies duly licensed or otherwise approved by the State of Arizona, 
Department of Insurance, and with forms reasonably satisfactory to City.  Each 
insurer shall have a current A.M. Best Company, Inc. rating of not less than A-VII.  
Use of alternative insurers requires prior approval from City. 
 
15.2. General Clauses. 
 
15.2.1. Additional Insured.  This insurance coverage, except for workers 
compensation and professional liability coverage, required by this Contract, 
shall name the City, its agents, representatives, directors, officials, 
employees, and officers, as additional insureds, and shall specify that 
insurance afforded the Contractor shall be primary insurance.  This 
provision and the naming of the City as an additional insured shall in no 
way be construed as giving rise to responsibility or liability of the City for 
applicable deductible amounts under such policy(s).

27 
15.2.2. Coverage Term.  All insurance required herein shall be maintained in full 
force and effect until the services required to be performed under the terms 
of this Contract are satisfactorily completed and formally accepted; failure 
to do so may constitute a material breach of this Contract, at the sole 
discretion of City. 
 
15.2.3. Primary Coverage.  CMAR’s insurance shall be primary insurance as 
respects City and any insurance or self-insurance maintained by City shall 
be in excess of CMAR’s insurance and shall not contribute to it. 
 
15.2.4. Claim Reporting.  CMAR shall not fail to comply with the claim reporting 
provisions of the policies or cause any breach of a policy warranty that 
would affect coverage afforded under the policy to protect City. 
 
15.2.5. Waiver.  The policies for workers’ compensation and general liability shall 
contain a waiver of transfer rights of recovery (subrogation) against City, 
its agents, representatives, directors, officers, and employees for any claims 
arising out of the Work of CMAR. 
 
15.2.6. Deductible/Retention.  The policies may provide coverage which contain 
deductibles or self-insured retentions.  Such deductible or self-insured 
retentions shall not be applicable with respect to the coverage provided to 
City under such policies.  CMAR shall be solely responsible for deductible 
or self-insured retentions and City may require CMAR to secure the 
payment of such deductible or self-insured retentions by a surety bond or 
an irrevocable and unconditional letter of credit. 
 
15.2.7. Policies and Endorsements.  City reserves the right to request and to receive, 
within 14 Calendar Days, information on any or all of the above policies or 
endorsements. 
 
15.2.8. Certificates of Insurance.  Prior to commencing services under this 
Contract, CMAR shall furnish City with Certificates of Insurance or formal 
endorsements as required by the Contract issued by CMAR’s insurer(s), as 
evidence that policies providing the required coverages, conditions and 
limits required by this Contract are in full force and effect.  Such certificates 
shall identify this Contract number and shall provide for not less than 30 
Calendar Days advance written notice by certified mail of cancellation or 
termination. 
 
15.2.9. Subcontractors.  CMAR shall include all Subcontractors as insured 
under its policies or shall maintain separate certificates and 
endorsements from each Subcontractor.

28 
15.3. Workers’ Compensation. 
 
15.3.1. CMAR shall carry workers’ compensation insurance to cover obligations 
imposed by federal and state statutes having jurisdiction of CMAR 
employees engaged in the performance of the services and employer’s 
liability insurance of not less than $100,000 for each accident, $100,000 
disease coverage for each employee, and $500,000 disease policy limits.  
 
15.3.2. In case services are subcontracted, CMAR will require the Subcontractor to 
provide workers’ compensation and employer’s liability to at least the same 
extent as provided by CMAR. 
 
15.4. Automobile Liability. 
 
 
CMAR shall carry commercial/business automobile liability insurance with a 
combined single limit for bodily injury and property damages of not less than 
$1,000,000, each occurrence, regarding any owned, hired and non-owned vehicles 
assigned to or used in performance of CMAR’s services.  Coverage will be at least 
as broad as coverage Code 1 “any auto” (Insurance Service Office policy form 
CA 00 01 or any replacements thereof).  Such coverage shall include coverage for 
loading and unloading hazards. 
 
15.5. Commercial General Liability. 
 
15.5.1. CMAR shall carry commercial general liability insurance with unimpaired 
limit of not less than $1,000,000 for each claim with a $2,000,000 general 
aggregate limit.  The general aggregate limit shall apply separately to the 
Services under this Contract or the general aggregate shall be twice the 
required per claim limit.  The policy shall be primary and include coverage 
for bodily injury including death, property damage, personal injury, 
products, completed operations and blanket contractual covering, but not 
limited to, the liability assumed under the indemnification provisions of this 
Contract, which coverage shall be at least as broad as Insurance Service 
Office policy form CG 00 01 or any replacement thereof. 
 
15.5.2. In the event the general liability insurance policy is written on a claims made 
basis, coverage shall extend for two (2) years past Final Acceptance of the 
services as evidenced by annual certificates of insurance. 
 
15.5.3. Such policy shall contain a severability of interest provision (also known as 
cross-liability and separation of insured). 
 
15.6. Property Coverage.  CMAR shall purchase and maintain, in a company or 
companies lawfully authorized to do business in the jurisdiction in which the 
Project is located, property insurance written on a builders risk “all-risk” or 
equivalent policy form in the amount of the initial Contract sum, plus value of

29 
subsequent Contract modifications and cost of materials supplied or installed by 
others, comprising total value for the entire Project at the site on a replacement cost 
basis.  This insurance shall include interests of the City, the CMAR, Subcontractors 
and its subcontractors in the Project, and shall include insurance against the perils 
of fire and physical loss or damage including, without duplication of coverage, 
theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, 
falsework, testing and startup, temporary buildings and debris removal, including 
demolition occasioned by enforcement of any applicable legal requirements and 
coverage for valuable papers. 
 
City and CMAR waive all rights against each other and against all Subcontractors, 
sub-Subcontractors, material Suppliers, and the Design Professional, for damages 
caused by fire or other perils covered by Builder’s Risk or any other property 
insurance, except such rights as they may have to the proceeds of such insurance.  
Such insurance may be subject to an amount deductible from the sums otherwise 
payable thereunder and the burden of such deduction shall be borne by the CMAR.  
The Owner or CMAR, as appropriate, shall require of the Design Professional, 
Design Professional’s consultants, separate contractors, if any, and the 
Subcontractors, sub-Subcontractors, agents and employees of any of them, by 
appropriate agreements, written where legally required for validity, similar waivers 
each in favor of other parties enumerated herein. 
 
15.7. Health Insurance Requirements. 
 
All consultants and general contractors, who bid on projects or enter into public 
works contracts, in excess of $100,000 or the current Council approval contract limit 
in place at the time the contract is executed, with the City of Tempe, after January 
1, 2001, are required to sign an affidavit in the form attached hereto. The general 
contractor shall be responsible for ensuring that the subcontractors comply with the 
health insurance requirements. 
 
Health insurance is required for all employees, except for those employees who work 
less than one hundred and twenty (120) days in any calendar year. A “workday” 
consists of any time within a twenty-four-hour period, regardless of number of 
hours, that the individual is paid. 
 
The level of health insurance provided shall be determined by each employer but 
should be no less than that provided by the Arizona Cost Containment Health 
System. 
 
All complaints concerning violations of the health insurance requirements shall be 
filed, in writing, with the Public Work's Department, within five (5) days from 
discovery of the violation. An administrative hearing will be held before the Public 
Works Director, and a written decision of findings will be provided to the parties to 
the hearing within ten (10) days thereafter. Appeal from the decision of the Public 
Works Director may be made within ten (10) days of the date of the decision by filing

30 
a notice of appeal in writing with the Public Works Department. If an appeal is timely 
filed, an administrative hearing will be held before an administrative hearing officer 
appointed by the City Manager. The decision of the administrative hearing officer 
shall be final. 
 
In the event of a finding of violation of the insurance provisions, the company in 
violation of the provision shall be barred from bidding on, or entering into, any 
public works contract with the City for a period of three (3) years. 
 
All consultants and contractors subject to the health insurance requirements shall 
post, in English and Spanish, notice of the health insurance requirements at the job 
site. Signs for posting will be provided by the City. 
 
16. 
BONDS 
 
16.1. CMAR shall execute a bond for any and all Work or services performed hereto, in 
accordance with A.R.S. § 34-221.  Personal or individual bonds are not acceptable.  
Bonding companies and liability and excess insurance carriers shall be “Best Rated 
A-VII” or better as currently listed in the most recent “Best’s Key Rating Guide 
(Property/Casualty)” published by the A.M. Best Company. 
 
16.2. Each such bond shall be executed by a surety company, or companies duly licensed 
to do business in the State of Arizona.  The bonds shall be written or countersigned 
by an authorized representative of the surety who is either a resident of the State of 
Arizona or whose principal office is maintained in this State and the bonds shall 
have attached thereto a certified copy of power of attorney of the signing official. 
 
16.3. Prior to execution of the Contract, CMAR shall provide a performance bond and a 
payment bond, each in an amount equal to the full amount (100%) of the Contract 
amount.  Each bond shall meet the requirements of Arizona Revised Statutes. 
 
17. 
MEASUREMENTS AND PAYMENTS 
 
17.1. Contract Price Adjustments.  The increase or decrease in Contract price resulting 
from a change in City requested change in Work shall be determined by one or 
more of the following methods: 
 
17.1.1. Unit prices set forth in the Contract or as subsequently agreed to between 
the parties; 
 
17.1.2. A mutually accepted, lump sum, properly itemized and supported by 
sufficient substantiating Data to permit evaluation by City; and 
 
17.1.3. Costs, fees and any other markups.

31 
17.2. The markups that shall be allowed on such changes shall be no greater than the 
markups delineated in the approved GMP as shown on Exhibit “A”. 
 
17.3. If an increase or decrease cannot be agreed to as set forth in items 16.1.1 through 
16.1.3, above, and City issues a change order, the cost of the change of the Work 
shall be determined by the reasonable expense and savings in the performance of 
the Work resulting from the change, including a reasonable overhead and profit, as 
may be set forth in the Contract.  CMAR shall maintain a documented, itemized 
accounting evidencing the expenses and savings associated with such changes. 
 
17.4. If unit prices are set forth in the Contract or are subsequently agreed to by the 
parties, but application of such unit prices will cause substantial inequity to City or 
CMAR because of differences in the character or quantity of such unit items as 
originally contemplated, such unit prices shall be adjusted, in City’s discretion. 
 
17.5. If City and CMAR disagree upon whether CMAR is entitled to be paid for any 
services required by City, or if there are any other disagreements over the scope of 
Work or proposed changes to the Work, City and CMAR shall resolve the 
disagreement pursuant to MAG Specification 110. 
 
17.6. As part of the negotiation process, CMAR shall furnish City with a good faith 
estimate of the costs to perform the disputed services in accordance with City’s 
interpretations.   
 
17.7. If the parties are unable to agree and City expects CMAR to perform the services 
in accordance with City’s interpretations, CMAR shall proceed to perform the 
disputed services, conditioned upon City issuing a written order to CMAR (i) 
directing CMAR to proceed and (ii) specifying City’s interpretation of the services 
that are to be performed.  
 
18. 
RECORD KEEPING AND FINANCE CONTROLS 
 
18.1. Records of CMAR’s direct personnel payroll, reimbursable expenses pertaining to 
this Project and records of accounts between the City and CMAR shall be kept on 
a generally accepted accounting basis. 
 
18.2. City, its authorized representative, and/or the appropriate federal agency, reserve(s) 
the right to audit CMAR’s records to verify the accuracy and appropriateness of all 
pricing Data, including Data used to negotiate Contract and any change orders.   
 
18.3. City reserves the right to decrease Contract price and/or payments made on this 
Contract if, upon audit of CMAR’s records, the audit discloses CMAR has provided 
false, misleading, or inaccurate cost and pricing Data.   
 
18.4. CMAR shall include a similar provision in all of its contracts with sub-consultants 
and Subcontractors providing services under the Contract to ensure City, its

32 
authorized representative, and/or the appropriate federal agency, has/have access to 
the sub-consultants’ and Subcontractors’ records to verify the accuracy of cost and 
pricing Data.  
 
18.5. City reserves the right to decrease Contract Price and/or payments made on this 
Contract if the above provision is not included in sub-consultant’s and 
Subcontractor’s contracts, and one or more sub-consultants and/or Subcontractors 
do not allow City to audit its records to verify the accuracy and appropriateness of 
pricing Data. 
 
19. 
MISCELLANEOUS REMOVAL AND RELOCATIONS 
 
Miscellaneous removals and relocations shall be construed to mean the removal of all 
unsuitable materials whether designated or implied by the Plans and Specifications; and 
shall include but not be limited to the removal of such items as pipes, concrete, asphalt, 
block, brick, rock, metal, and other comparable items of every nature and description, 
unless such items are specifically designated in a separate bid item.  Also, certain items 
require temporary removal and reinstallation such as mailbox stands, signposts, survey 
monument frames and covers, and other comparable items, and are included in this 
category.  
 
20. 
APPROXIMATE QUANTITIES 
 
20.1. It is expressly understood and agreed by the parties hereto that the quantities of the 
various classes of Work to be done and material to be furnished under this Contract, 
which have been estimated, as stated in the Proposal, are only approximate and are 
to be used solely for the purpose of comparing, on a consistent basis, the proposals 
offered for the Work under this Contract.  CMAR further agrees that City will not 
be held responsible if any claim for damages or for loss of profits is made due to a 
difference between the quantities of the various classes of Work herein estimated 
and the Work actually performed.   
 
20.2. If any error, omission, or misstatement is found to occur in the estimated quantities, 
the same shall not invalidate this Contract or release CMAR from the execution and 
completion of the whole or any part of the Work in accordance with the Plans and 
Specifications herein mentioned, and for the prices herein agreed upon and fixed 
therefore, or excuse CMAR from any of the obligations or liabilities hereunder, or 
entitle CMAR to any damages or compensation except as may be provided for in 
this Contract. 
 
21. 
MISCELLANEOUS WORK AND ALLOWANCES 
 
21.1. Unless previously approved by the City in writing, the following items are 
considered to be included in the Work and CMAR’s Compensation as set forth 
herein, with no direct or additional payment allowed.  Payment for the following 
shall be included in the payment for other items for which direct payment is made.

33 
 
21.1.1. CMAR’s expenses for, but not limited to: mobilization, job site office, 
storage facilities, traffic control and public safety devices, sanitary 
facilities, utilities and telephone. 
 
21.1.2. Cleanup including day-to-day cleanup. 
 
21.1.3. Notification to residents adjacent to this Project prior to start of 
construction which would affect them. 
 
21.1.4. Water required for compaction or dust control. 
 
21.1.5. Miscellaneous removals and relocations not otherwise specified in the 
technical specifications. 
 
21.1.6. Power pole bracing. 
 
21.1.7. Removal of trees twelve inches (12”) or less in diameter. 
 
21.1.8. Removal, relocation and/or modification of existing walls and fences. 
 
21.1.9. Trimming of trees and bushes. 
 
21.1.10. Replacement of plant material and repair of irrigation equipment to meet 
or exceed conditions existing prior to CMAR beginning Work. 
 
22. 
SPECIAL TERMS AND CONDITIONS 
 
22.1. Permits. 
 
Except as otherwise provided in the Contract documents, it is the duty of CMAR to 
procure all its own permits and licenses necessary for the Project.  CMAR shall 
assist the City with obtaining any necessary permits.  Should the CMAR purchase 
the necessary permits, the reimbursement will be at cost with no mark-up.  There 
will be no charge to CMAR for any necessary City permits and inspections.  CMAR 
shall abide by all stipulations of all licenses and permits issued for this Project. 
 
22.2. Key Contacts. 
 
Arizona 811  
602-263-1100 
 
22.3. Uniformed Police Officers. 
 
During the course of construction, City may require a uniformed police officer 
present to facilitate traffic control per the Tempe Barricade Manual and the Traffic 
Engineer’s direction.

34 
 
22.4. Open Trenching and Steel Plates. 
 
 
The maximum amount of open trench in any state of trenching or backfilling shall 
be limited to five hundred feet (500’).  All trenches shall be completely backfilled 
or covered using steel plates at the end of each working day.  The use of steel plates 
shall not exceed seventy-two (72) hours between completion of Work in trench and 
final patch.  Steel plates are to be installed according to Detail T-450 of the Tempe 
Supplement to the MAG Details.  All steel plates installed will be recessed into the 
existing pavement by milling until the top of the plate is flush with the top of the 
pavement. 
 
22.5. Confidentiality of Plans and Specifications. 
 
22.5.1. Any Plans or Specifications CMAR receives regarding this Project are for 
official use only.  CMAR may not share them with others except as required 
to fulfill the obligations of its Contract with City. 
 
22.5.2. All record documents, Shop Drawings and other plans or drawings prepared 
or submitted by CMAR shall include the following language: “Per City of 
Tempe Guidelines, these Plans are official use only and may not be shared 
with others except as required to fulfill the obligations of CMAR’s Contract 
with the City of Tempe”. 
 
22.6. Irrigation and Landscape Repair. 
 
 
CMAR shall repair all sprinkler and irrigation systems that are disturbed in the 
course of the Work.  There will be no separate payment for irrigation and landscape 
repair, the cost of which will be incidental to other bid items.  It is highly 
recommended that CMAR meet with owner(s) of irrigation systems prior to 
construction and note existing operating systems to minimize impact and repair 
costs. 
 
22.7. Sequence of Construction. 
 
CMAR shall submit a Project sequencing schedule to the Engineer for review at 
the pre-construction conference.  CMAR is on notice that City will review the 
proposed schedule to insure limited community impact. 
 
22.8. Coordination with Other Contractors. 
 
22.8.1. Other projects located on or near the site of Work may be under construction 
during the Contract period.  Coordination between contractors may be 
required.

35 
22.8.2. Should CMAR cause damage to the Work or property of any separate 
contractor at the site, or should any claim arising out of or resulting from 
CMAR’s performance of the Work at the site be made by any separate 
contractor against CMAR, Design Professional, or Construction Manager 
Professional or any other person, CMAR shall promptly attempt to settle 
with such other contractor by agreement, or to otherwise resolve the dispute 
by mediation, arbitration, or at law. 
 
22.8.3. CMAR shall, to the fullest extent permitted by laws and regulations, 
indemnify and hold City, Design Professional and Construction Manager 
Professional and the officers, directors, employees, agents and other 
consultants of each and any of them harmless from and against all claims, 
costs, losses and damages, (including, but not limited to, all fees and charges 
of engineers, architects, attorneys and other professionals, and all court 
arbitration or other dispute resolution costs) arising directly, from any 
action, legal or equitable, brought by a separate contractor against City, 
Design Professional or Construction Manager Professional of the officers, 
directors, employees, agents or other consultants of each and any of them to 
the extent based on a claim to the extent caused by CMAR’s performance of 
the Work. 
 
22.8.4. Should a separate contractor cause damage to the Work or property of 
CMAR or should the performance of Work by any separate contractor at 
the site give rise to any other claim, CMAR shall not institute any action, 
legal or equitable against City, Design Professional, or Construction 
Manager Professional or the officers, directors, employees, agents, or other 
consultants of each and any of them or permit any action against any of 
them to be maintained and continued in its name or for its benefit in any 
court or before any mediator or arbitrator which seeks to impose liability on 
or to recover damages from City, Design Professional, or Construction 
Manager Professional or the officers, directors, employees, agents, or other 
consultants of each and any of them on account of such damage or claim. 
 
22.8.5. If CMAR is delayed at any time in performing or furnishing Work by any 
act or neglect of a separate contractor and City and CMAR are unable to 
agree as to the extent of any adjustment in completion time attributed 
thereto, CMAR may make a claim for an extension of time.  An extension 
of the completion time shall be CMAR’s exclusive remedy with respect to 
City, Design Professional, or Construction Manager Professional or the 
officers, directors, employees, agents, or other consultants of each and any 
of them for activities that are its respective responsibilities. 
 
22.8.6. Cooperation between contractors shall be in accordance with MAG 
Specification 105.7.

36 
22.9. Secure Facility Access:  Contracts that call for work to be done in any of the City’s 
secure facilities are subject to the City’s Engineering Secure Facilities Access 
Guidelines, which are incorporated herein by reference. 
 
 
23. 
CORRECTION OF DEFECTIVE WORK 
 
23.1. If any portion of the Work is covered over contrary to the request of City or as 
required by the Contract or the applicable building standards, it must be uncovered 
for observation at CMAR’s expense if requested by City in writing. 
 
23.2. If any portion of the Work, other than those portions required to be inspected or 
observed by City or others, prior to being covered, has been covered over, City may 
request that it be uncovered for inspection or observation, as applicable.  If such 
portion is found to be in accordance with the requirements of the Specifications and 
other Contract, the cost of uncovering it shall be charged to the City as a change 
order.  If such portion is found not to be in accordance with the requirements of the 
Specifications and other CMAR Contract, CMAR shall bear such costs. 
 
23.3. CMAR agrees to promptly correct any Work that is found not to be in conformance 
with the Specifications and other CMAR Contract, whether previously inspected or 
observed by City’s representatives or not unless a specific written waiver of such 
nonconformance has been provided to CMAR by City.  This obligation shall 
continue for a period of one (1) year from the date of Final Acceptance of the entire 
Work.  Nothing in this Section 22 shall waive any rights that City may have under 
Arizona law or under Section 13 herein. 
 
23.4. CMAR, upon receipt of notice from City delivered through the City’s PMWeb 
Software System that the Work is not in conformance with the Specifications or 
other Contract provisions, shall, within seven (7) Calendar Days (except in the case 
of an emergency or item on the schedule critical path, which will require immediate 
response) commence correction of such nonconforming Work, including, without 
limitation, the other parts of the Work affected by the nonconforming Work.  If 
CMAR fails to commence the necessary steps within seven Calendar Days, City, 
in addition to any other remedies provided under the Contract, may at the end of 
the seven Calendar Day period provide CMAR with notice that City will commence 
to correct such nonconforming Work with its own or other forces.  CMAR shall be 
responsible for all costs and expenses that City incurs in remedying any Work not 
in conformance with the Specifications or the other Contract, including, without 
limitation, at the City’s sole discretion any of City’s own staff time costs and all 
fees incurred by City.  City will notify CMAR of its intent to make such corrections 
at or before the commencement of the corrective Work.

37 
23.5. The one-year warranty period referenced in Section 13 applies only to CMAR’s 
obligation to correct Work not in conformance with the Contract and shall not 
constitute a period of limitations with respect to any other rights or remedies the 
City may have with respect to CMAR’s other obligations under the Contract or 
under applicable law.  
 
24. 
WITHHOLDING PAYMENT 
 
 
City may withhold payment from any Progress Payment Application to the extent 
necessary to protect City from loss because of: 
 
24.1. Unsatisfactory job progress as determined by City; 
 
24.2. Disputed Work or materials; 
 
24.3. Defective Work not remedied; 
 
24.4. Claims or other encumbrances filed or reasonable evidence indicating probable 
filing of claims or other encumbrances by Subcontractors; 
 
24.5. Failure of CMAR to make payment to any Subcontractors within seven Calendar 
Days after receipt of each progress payment; 
 
24.6. CMAR’s failure to perform any of its contractual obligations under the Contract or 
any other agreement with City; 
 
24.7. Deficiencies or claims asserted by City against CMAR arising from any other 
project; 
 
24.8. Damage to City or a separate CMAR caused by the fault or neglect of CMAR or 
any Subcontractor to the extent not covered by insurance; 
 
24.9. Reasonable evidence that the entire Work or portion of the Work that City has 
agreed to accept separately will not be substantially complete within the Contract 
time(s) due to delay for which CMAR is responsible, or that the unpaid balance of 
the Guaranteed Maximum Price will not be adequate to cover completion of the 
entire Work and liquidated damages for any anticipated unexcused delay for which 
CMAR is responsible; or 
 
24.10. Any other reason which in City’s reasonable judgment disqualified CMAR from 
receiving the full amount of the application for payment. 
 
24.11. City, pursuant to and in accordance with A.R.S. § 34-601 et seq., reserves the right 
to withhold funds from the CMAR’s progress payments up to the amount equal to 
resolve claims City may have against CMAR, until such time as the settlement on 
those claims is reached.

38 
If the above basis for withholding payment is remedied, payment shall be made within 
fourteen Calendar Days for amounts previously withheld.  Prior to any withholding 
pursuant to this section, City shall meet with CMAR to discuss potential withholding and 
attempt in good faith to resolve such issues without the need for withholding. 
 
25. 
TERMINATION 
 
25.1. In addition to MAG Specifications 108.11 and A.R.S. § 38-511, City, at its sole 
discretion, may terminate this Contract for convenience or abandon any portion of 
the Project for which services have not been performed by the CMAR. 
 
25.2. In the event of such termination or abandonment, City will so notify the CMAR in 
writing, and the CMAR will immediately after receiving such notice discontinue 
advancing the Work specified under this Contract and mitigate the expenditure, if 
any, of costs resulting from such abandonment or termination. The CMAR shall 
deliver to City all Drawings, special provisions, field survey notes, reports, 
estimates, and any and all other documents or Work product generated by the 
CMAR under the Contract, entirely or partially completed, together with all unused 
materials supplied by City. 
 
25.3. If City terminates or abandons the Contract due to no fault of the Contractor, the 
CMAR will receive compensation in full for services satisfactorily performed to 
the date of such termination.  The fee will be paid in accordance with Section 4 of 
this Contract.  However, in no event will the fee exceed that set forth in Section 4 
or as amended in accordance with Paragraph 31, “Alteration in Character of Work”.   
City shall make final payment within 60 Calendar Days after the CMAR has 
delivered the last of the completed items and City has approved and determined the 
final fee. 
 
26. 
PROJECT DOCUMENTS AND COPYRIGHTS 
 
26.1. City Ownership of Project Documents.  All Work products (electronically or 
manually generated) prepared in the performance of this Contract including but not 
limited to, plans, drawings, specifications, cost estimates, tracings, studies, design, 
analysis, CADD files and related products, are the property of City and are to be 
delivered to City before the final payment is made to CMAR.  Only if previously 
approved in writing by City, CMAR may retain originals and supply City with 
reproducible copies of the Work. 
 
26.2. Documents to Bear Seal.  When applicable and as required by law, CMAR and its 
Subcontractors will endorse by professional seal all plans, works, and Deliverables 
prepared by them for this Contract. 
 
27. 
CONFLICT OF INTEREST 
 
27.1. CMAR agrees to disclose any financial or economic interest in the Project property, 
or any property affected by the Project, existing prior to the execution of this

39 
Contract.  Further, CMAR agrees to disclose any financial or economic interest 
with the Project property, or any property affected by the Project, if CMAR gains 
such interest during the course of this Contract.  Only if previously approved in 
writing by City, CMAR may retain originals and supply City with reproducible 
mylar copies of the Work. 
 
27.2. If CMAR gains financial or economic interest in the Project during the course of 
this Contract, this may be grounds for terminating this Contract at the sole 
discretion of City. 
 
27.3. CMAR shall not engage the services on this Contract of any present or former City 
employee who was involved as a decision maker in the selection or approval 
processes, or who negotiated or approved billings or Contract modifications for this 
Contract.  
 
27.4. To evaluate and avoid potential conflicts of interest, CMAR will provide written 
notice to the City, as set forth in this section, of any Work or services performed by 
CMAR for third parties that may involve or be associated with any real property or 
personal property owned or leased by City. 
 
27.5. Actions considered to be adverse to City under this Contract include but are not 
limited to: 
 
27.5.1. Using Data as defined in the Contract, acquired in connection with this 
Contract, to assist a third party pursuing administrative or judicial action 
against City. 
 
27.5.2. Testifying or providing evidence on behalf of any person in connection with 
an administrative or judicial action against City. 
 
27.5.3. Using Data to produce income for CMAR or its employees independently 
of performing the services under this Contract, without the prior written 
consent of City. 
 
27.6. CMAR represents that except for those persons, entities and Projects previously 
identified in writing to City, the services to be performed by CMAR under this 
Contract are not expected to create an interest with any person, entity or third party 
Project that is or may be adverse to the interests of the City. 
 
27.7. CMAR’s failure to provide a written notice and disclosure of the information as set 
forth in this section will constitute a material breach of this Contract. 
 
28. 
COVENANT AGAINST CONTINGENT FEES 
 
 
CMAR affirms that it has not employed or retained any company or person, other than a 
bona fide employee working for CMAR, to solicit or secure this Contract, and that it has 
not paid or agreed to pay any company or person, other than a bona fide employee, any

40 
fee, commission, percentage, brokerage fee, gift or any other consideration contingent upon 
or resulting from the award or making of the Contract.  For breach or violation of this 
clause, City shall terminate this Contract or in its discretion may deduct from the Contract 
price or otherwise recover, the full amount of such fee, commission, percentage brokerage 
fee, gift or contingent fee from CMAR. 
 
29. 
INDEMNIFICATION 
 
 
To the fullest extent permitted by law, CMAR shall indemnify and hold harmless City, its 
officers, and its employees, from liabilities, damages, losses, and costs, including 
reasonable attorney fees and court costs, to the extent caused by the negligence, 
recklessness or intentional wrongful conduct of CMAR, its subcontractors, design 
professionals, or other persons employed or used by CMAR in the performance of the 
contract or subcontract. Nothing in this section shall prohibit the requirement of insurance 
coverage that complies with this section, including the designation of any person as an 
additional insured on a general liability insurance policy or as a designated insured on an 
automobile liability policy. The amount and type of insurance coverage requirement set 
forth herein will in no way be construed as limiting the scope of the indemnity in this 
paragraph. 
 
30. 
DISPUTE RESOLUTION 
 
 
In the event of a dispute between the parties to this Contract regarding any provision of 
this Contract, a party’s performance of its obligations as stated in this Contract or any other 
matter governed by the terms of this Contract, the parties will meet in good faith to attempt 
to resolve the dispute.  If the parties fail to resolve the dispute, then the City may pursue 
any and all remedies provided by law or in equity.  The exercise of any one of City’s 
remedies shall not preclude subsequent or concurrent exercise of further or additional 
remedies. 
 
31. 
ADDITIONAL SERVICES 
 
 
Additional services which are outside the scope of basic services contained in this Contract 
shall not be performed by CMAR without prior written authorization from City.  Additional 
services, when authorized by an agreement or an amendment to this Contract shall be 
compensated for by a fee mutually agreed upon between City and CMAR. 
 
32. 
ALTERATION IN CHARACTER OF WORK 
 
 
In the event an alteration or modification in the character of Work or Deliverable results in 
a substantial change in this Contract, thereby materially increasing or decreasing the scope 
of services, costs of performance or Project schedule, the Work or Deliverable will 
nonetheless be performed as directed by City.  However, before any altered or modified 
Work begins, a Change Order or Amendment must be approved and executed by the City 
and executed by CMAR.  Such Change Order or Amendment will not be effective unless 
approved by the City.  Additions to, modifications or deletions from the Project provided 
herein may be made, and the compensation to be paid to CMAR may be adjusted

41 
accordingly solely at the discretion of City.  No claim for extra Work done or materials 
furnished by CMAR will be allowed by City except as provided herein, nor will CMAR 
do any Work or furnish any material(s) not covered by this Contract unless such Work or 
material is previously authorized in writing by City.  Work or material(s) furnished by 
CMAR without such prior written authorization shall be at CMAR’s sole jeopardy, cost 
and expense, and CMAR hereby agrees that without prior written authorization no claim 
for compensation for such Work or materials furnished will be made. 
 
33. 
SUCCESSORS AND ASSIGNS 
 
 
This Contract shall not be assignable except by the prior written approval of City, and it 
shall extend to and be binding upon the heirs, executors, administrators, successors and 
assigns of the parties hereto. 
 
34. 
COMPLETENESS AND ACCURACY OF CMAR’S WORK 
 
 
CMAR is solely responsible for the completeness and accuracy of all reviews, reports, 
supporting Data and other design phase Deliverables prepared or compiled pursuant to its 
obligations under this Contract, and will at its sole expense correct its Work or 
Deliverables.  Acceptance or approval of CMAR’s Work or Deliverables by the City does 
not relieve or diminish CMAR’s responsibilities under the Contract nor does this 
requirement to correct the Work or Deliverable constitute a waiver of any claims or 
damages otherwise available by law or in equity to City. 
 
35. 
DISSEMINATION OF DATA  
 
35.1. The parties agree that all Data, including originals, images and reproductions 
prepared by, obtained by or transmitted to CMAR in connection with CMAR’s 
performance of this Contract is the sole property of City. 
 
35.2. CMAR shall not divulge Data to any third party without prior written consent of 
City.  CMAR will not use the Data for any purposes except to perform the services 
required under this Contract.  However, these prohibitions do not apply to the 
following Data, provided CMAR first provides the required notice to City: 
 
35.2.1. Data which was known to CMAR prior to its performance under this 
Contract unless such Data was acquired in connection with Work performed 
for City; 
 
35.2.2. Data which was acquired by CMAR in its performance under this Contract 
and which was disclosed to CMAR by a third party, who to the best of 
CMAR’s knowledge and belief had the legal right to make such disclosure 
and CMAR is not otherwise required to hold such Data in confidence; or 
 
35.2.3. Data which is required to be disclosed by CMAR by law, regulation, or 
court order.

42 
35.3. In the event a third party requires or requests CMAR to disclose Data or any other 
information to which CMAR became privy as a result of any other Contract with 
City, CMAR will first notify City as set forth in this section of the request or 
demand for such Data.  CMAR will timely give City sufficient facts such that City 
has a meaningful opportunity to either first give its consent or take such action that 
City may deem appropriate to protect such Data from disclosure. 
 
35.4. CMAR, unless prohibited by law, within 14 Calendar Days after completion of 
services for a third party on real or personal property owned or leased by City, will 
promptly deliver, as set forth in this section, a copy of all work products and Data 
to the City.  All Data will continue to be subject to the provisions of this section. 
 
35.5. CMAR assumes all liability for maintaining the Data in its possession and agrees 
to compensate and indemnify City if any of the provisions of this section are 
violated by CMAR, its employees, agents, authorized assigns, subconsultants or 
Subcontractors.  A breach of this section shall be deemed to cause irreparable harm 
to City that justifies injunctive relief. 
 
35.6. GIS Data Disclaimer.  CMAR UNDERSTANDS THE CITY OF TEMPE DOES 
NOT WARRANT THE ACCURACY, COMPLETENESS, CONDITION, 
SUITABILITY, PERFORMANCE, OR CURRENCY OF THE GIS DATA 
PROVIDED UNDER THIS CONTRACT.  AREAS DEPICTED BY GIS DATA 
ARE APPROXIMATE, AND NOT GUARANTEED TO BE ACCURATE TO 
STANDARDS FOR MAPPING, SURVEYING OR ENGINEERING.  THIS 
DATA IS FOR ILLUSTRATIVE PURPOSES ONLY AND SHOULD NOT BE 
RELIED UPON FOR SITE-SPECIFIC PURPOSES.  THE DATA HEREIN IS 
SUBJECT TO CONSTANT CHANGE AND MAY NOT BE COMPLETE, 
ACCURATE OR UP TO DATE.  THE CITY OF TEMPE IN NO WAY 
ASSUMES LIABILITY OR RESPONSIBILITY FOR ANY INCORRECT DATA 
OR 
ANY 
INFORMATION 
PROVIDED 
HEREIN. 
 
THE 
CMAR 
ACKNOWLEDGES AND AGREES THAT THE CITY OF TEMPE ASSUMES 
NO LIABILITY FOR DAMAGES INCURRED DIRECTLY OR INDIRECTLY 
RESULTING 
FROM 
INCOMPLETE, 
INCORRECT 
OR 
MISSING 
INFORMATION; INCLUDING ANY DIRECT, INDIRECT, SPECIAL OR 
CONSEQUENTIAL DAMAGES, HOWEVER CAUSED OR UNDER ANY 
THEORY OF LIABILITY, WHETHER IN TORT, CONTRACT, STRICT 
LIABILITY OR OTHERWISE.  BY WAY OF THE SIGNATURE ON THIS 
CONTRACT, THE CMAR ASSUMES ALL LIABILITY FOR ANY AND 
ALL DEPENDENCE AND/OR RELIANCE UPON THIS INFORMATION 
AND ASSUMES ALL RESPONSIBILITY RELATING THERETO.  ANY 
AND ALL EXPRESSED OR IMPLIED WARRANTIES, INCLUDING BUT 
NOT LIMITED TO, IMPLIED WARRANTIES OF MERCHANTABILITY 
AND FITNESS FOR A PURPOSE ARE SPECIFICALLY AND EXPRESSLY 
DISCLAIMED.  CMAR SHOULD NOT RELY UPON THE GIS DATA 
WITHOUT PROPER FIELD VERIFICATION FOR ANY PURPOSE.

43 
36. 
PROJECT STAFFING 
 
CMAR will maintain an adequate number of competent and qualified persons, to ensure 
acceptable and timely completion of the scope of Services described in this Contract 
throughout the period of those services.  If City objects, with reasonable cause, to any of 
CMAR’s staff, CMAR will take prompt corrective action and, if required, remove such 
personnel from the Project and replace with other personnel. 
 
37. 
INDEPENDENT CONTRACTOR 
 
 
CMAR is and shall be an independent contractor and whatever measure of control City 
exercises over the Work or Deliverable pursuant to the Contract will be as to the results of 
the Work only.  No provision in this Contract will give or be construed as establishing an 
employer/employee relationship, partnership, or joint venture, between City and CMAR, 
or cause City to be responsible in any way for the debts or obligations of CMAR.  CMAR 
is to comply with all applicable laws and ordinances pertaining thereto. 
 
38. 
SUBCONTRACTORS 
 
 
Prior to beginning any Work or Deliverables, CMAR will furnish to City the names of all 
Subcontractors to be used on this Project by completing (Exhibit 65.1).  This provision 
shall in no way be deemed to diminish CMAR’s responsibility for Subcontractor or impose 
liability upon City for the contracting with any Subcontractor.  
 
39. 
LABOR 
 
CMAR agrees and covenants to use only licensed Subcontractors in the making and/or 
installation of any and all repairs, alterations, improvements or other Work of CMAR on 
the Project.  CMAR shall be liable to City for any losses and liabilities associated with any 
violation of this provision, and the Contract shall immediately be terminated upon any 
violation hereof by CMAR. 
 
40. 
RECORDS/AUDIT 
 
39.1 
Records of CMAR’s direct personnel payroll and reimbursable expenses pertaining 
to this Project and records of accounts between City and CMAR will be kept 
following generally accepted accounting principles, for a period of five years after 
completion of the Contract.  City, its authorized representative and   or the 
appropriate federal agency, reserve the right to audit CMR’s records to verify the 
accuracy and appropriateness of all pricing Data, including Data used to negotiate 
this Contract and any attendant Change Orders, for a period of five years after 
completion of this Contract.  City reserves the right to decrease Contract amount 
and or payments made on this Contract if, inter alia, upon audit of CMAR’s 
records, the audit discloses that CMAR has provided false, misleading, or 
inaccurate cost and or pricing Data.

44 
39.2 
CMAR will include a provision in all of its agreements with sub-consultants, 
Subcontractors and Suppliers providing services under this Contract to ensure City, 
its authorized representative and/or the appropriate governmental agency, has 
access to the sub-consultants’, Subcontractors’ and Suppliers’ records.  City 
reserves the right to decrease Contract amount and/or payments made on this 
Contract if the above provision is not included in sub-consultant, Subcontractor and 
Supplier contracts and one or more of those parties do not allow City to audit their 
records to verify the accuracy and appropriateness of pricing Data. 
 
41. 
NOTICES 
 
 
Unless otherwise provided herein, notices and/or demands under this Contract shall be in 
writing and will be deemed to have been duly given and received either (a) on the date of 
service if personally served on the party to whom notice is to be given, or (b) on the third 
day after the date of the postmark of deposit by first class United States mail, registered or 
certified, postage prepaid, and properly addressed as follows: 
 
To City: 
 
Jodie Inman, P.E. 
Deputy Public Works Director/City Engineer 
Public Works Department 
Engineering Division 
31 E. 5th Street, Mail Stop 0108 
Tempe, Arizona 85281 
To CMAR: 
 
 
 
 
 
 
(Printed Name of Signatory) 
B&F Contracting, Inc. 
11011 N. 23rd Avenue 
Phoenix, Arizona 85029 
 
42. 
COMPLIANCE WITH STATE AND FEDERAL LAWS 
 
42.1. Lawful Presence in the United States.  Pursuant to A.R.S. §1-502, any 
individual/sole proprietor who applies for local public benefits by signing this 
Contract shall also sign a sworn affidavit (Exhibit 65.8) and present one of the 
documents listed on the affidavit to verify lawful presence in the United States.  
This Contract shall not be fully executed by the City if the individual/sole proprietor 
fails to sign the affidavit and present one of the listed documents. 
 
42.2. Specially Designated Nationals and Blocked Persons List.  CMAR represents and 
warrants to City that neither CMAR nor any affiliate or representative of CMAR 
(i) is listed on the Specially Designated Nationals and Blocked Persons List 
maintained by the Office of Foreign Asset Control, Department of the Treasury 
(OFAC) pursuant to Executive Order No. 13224, 66 Fed. Reg. 49079 (“Order”); 
(ii) is listed on any other list of terrorists or terrorist organizations maintained 
pursuant to the Order, the rules and regulations of OFAC or any other applicable

45 
requirements contained in any enabling legislation or other related Order(s); (iii) is 
engaged in activities prohibited in the Order; or (iv) has been convicted, pleaded 
nolo contendre, indicted, arraigned or custodially detained on charges involving 
money laundering or predicate crimes to money laundering. 
 
42.3. Antidiscrimination.  CMAR shall not refuse to hire or employ or bar or discharge 
from employment any person, or discriminate against such person in compensation, 
conditions, or privileges of employment because of race, color, gender, gender 
identity, sexual orientation, religion, national origin, familial status, age, disability, 
or United States military veteran status.  CMAR shall provide a copy of its anti-
discrimination policy to City to confirm compliance with this requirement or attest 
in writing to compliance based upon the criteria outlined in (Exhibit 65.9). 
 
42.4. Employment Laws.   CMAR agrees and covenants that it will comply with any and 
all applicable governmental restrictions, regulations and rules of duly constituted 
authorities having jurisdiction insofar as the performance of the Work and services 
pursuant to the Contract, and all applicable safety and employment laws, rules and 
regulations, including but not limited to, the Fair Labor Standards Act, the Walsh-
Healey Act, and the Arizona Fair and Legal Employment Act, and any amendments 
thereto, along with all attendant laws, rules and regulations.  CMAR acknowledges 
that a breach of this warranty is a material breach of this Contract and CMAR is 
subject to penalties for violation(s) of this provision, including termination of this 
Contract.  City retains the right to inspect the documents of any and all contractors, 
Subcontractors and sub-subcontractors performing work and/or services relating to 
the Contract to ensure compliance with this warranty.  Any and all costs associated 
with City inspection are the sole responsibility of CMAR.  CMAR hereby agrees 
to indemnify, defend and hold City harmless for, from and against all losses and 
liabilities arising from any and all violations thereof. 
 
42.5. Equal Opportunity.  City is an equal opportunity, affirmative action employer.  CMAR 
hereby covenants that it shall not discriminate unlawfully against any employee or 
applicant for employment, nor shall it deny the benefits of this Contract, to any person 
on the basis of race, color, national origin, physical or mental disability, age, gender 
or veteran status.  CMAR covenants and agrees that it will comply in all respects with 
the applicable provisions of the Executive Order 11246, Title VII of the Civil Rights 
Act of 1964, the Americans with Disabilities Act, the Age Discrimination in 
Employment Act, the Vietnam Era Veterans’ Readjustment Assistance Act, the 
Rehabilitation Act, and any other applicable state and federal statutes governing equal 
opportunity.  CMAR agrees to post hereinafter in conspicuous places, available for 
employees and applicants for employment, notices to be provided by the 
contracting officer setting for the provisions of this clause. 
 
42.6. Boycott.  CMAR certifies that it is not currently engaged in and agrees for the duration 
of this Contract/Agreement that it will not engage in, a boycott of Israel, as that term 
is defined in A.R.S. § 35-393.

46 
42.7. Compliance with Ariz. Rev. Stat. § 35-394.  Contractor hereby certifies that it does 
not currently, and agrees for the duration of this Agreement, that Contractor will 
not, use: 1.  The forced labor of ethnic Uyghurs in the People’s Republic of China; 
2. Any goods or services produced by the forced labor of ethnic Uyghurs in the 
People’s Republic of China; or 3.  Any contractors, subcontractors or suppliers that 
use the forced labor or any goods or services produced by the forced labor of ethnic 
Uyghurs in the People’s Republic of China.  Contractor hereby agrees to indemnify 
and hold harmless the City, its officials, employees, and agents from any claims or 
causes of action relating to the City’s action based upon reliance upon this 
representation, including the payment of all costs and attorney fees incurred by the 
City in defending such as action. 
 
CMAR further agrees to include the provisions of this section in any and all subcontracts 
hereunder.  Any violation of such provisions shall constitute a material breach of this 
Contract. 
 
42.8. Burial and Cultural Discoveries.  Personnel working on projects involving ground-
disturbing activity are required to comply with the Salt River Pima-Maricopa Indian 
Community (SRPMIC) Statement on Burials and Cultural Resource Discoveries 
(the “Statement”), a copy of which can be obtained from the City of Tempe 
Historical Preservation Office upon request at 480-350-8870.  To comply with the 
Statement, Contractor and its’ agents are prohibited from publicly releasing 
information about archeological findings or recording (through photos, video, or 
other imaging) archaeological resources, including human remains, funerary 
objects, or other discoveries. 
 
43. 
CONTRACTOR’S LICENSE AND FEDERAL EMPLOYER I.D. NUMBER 
 
 
Prior to award of the Contract, CMAR must provide to the City’s Public Works 
Department/Engineering Division, its Contractor’s license classification and number its 
Federal Employer I.D. number/ Tax Payer I.D. Number. 
 
44. 
FORCE MAJEURE 
 
 
If either party is delayed or prevented from the performance of any service, in whole or 
part, required under this Contract by reason of acts of God or other cause beyond the control 
and without fault of that party, financial inability excepted, performance of that act may be 
excused at City’s discretion, but only for the period of the delay.  The time for performance 
of the act will be extended for a period equivalent to the period of delay. 
 
45. 
NON-WAIVER PROVISION 
 
 
The failure of either party to enforce any of the provisions of this Contract or to require 
performance by the other party of any of the provisions of this Contract shall not be 
construed as a waiver of such provisions nor will it affect the validity of this Contract or 
any part thereof or the right of either party to thereafter enforce each and every provision.

47 
46. 
JURISDICTION 
 
 
This Contract is made under and will be construed in accordance with and governed by the 
laws of the State of Arizona, without regard to the conflicts or choice of law provisions 
thereof.  An action to enforce any provision of this Contract or to obtain any remedy with 
respect hereto will be brought in the Superior Court, Maricopa County, Arizona, and for 
this purpose, each party hereby expressly and irrevocably consents to the jurisdiction and 
venue of such court. 
 
47. 
ATTORNEYS’ FEES AND COSTS 
 
In the event of any legal action or proceeding arising out of this Contract, the prevailing 
party shall be entitled to recover its reasonable attorney’s fees and costs incurred in such 
legal action or proceeding, and such fees and costs shall be included in any judgment 
rendered as determined by the Court.  In addition, if any person should institute a claim or 
action against CMAR in which City is made a party defendant, CMAR shall indemnify, 
defend and hold City harmless for, from and against all liability by reason thereof, 
including reasonable attorney’s fees and all costs incurred by City in such action. 
 
48. 
SURVIVAL 
 
 
All warranties, representations and indemnifications by CMAR will survive the completion 
or termination of this Contract. 
 
49. 
MODIFICATION 
 
 
No supplement, modification or amendment of any term of this Contract will be deemed 
binding or effective unless in writing and signed by the parties hereto and in conformation 
with provisions of this Contract except as expressly provided herein to the contrary. 
 
50. 
SEVERABILITY 
 
 
If any provision of this Contract or the application thereof to any person or circumstance 
is held invalid, illegal or unenforceable to any extent, the remainder of this Contract and 
the application thereof will not be affected and will be enforceable to the fullest extent 
permitted by law. 
 
51. 
INTEGRATION 
 
 
This Contract contains the full agreement of the parties hereto.  Any prior or 
contemporaneous written or oral agreement between the parties regarding the subject 
matter hereof is merged and superseded hereby. 
 
52. 
TIME IS OF THE ESSENCE 
 
 
Time of each of the terms, covenants and conditions of this Contract is hereby expressly 
made of the essence.

48 
 
53. 
THIRD PARTY BENEFICIARY 
 
 
This Contract will not be construed to give any rights or benefits in the Contract to anyone 
other than City and CMAR.  All duties and responsibilities undertaken pursuant to this 
Contract will be for the sole and exclusive benefit of City and CMAR and not for the benefit 
of any other party. 
 
54. 
COOPERATION AND FURTHER DOCUMENTATION 
 
 
CMAR agrees to provide City such other duly executed documents as may be reasonably 
requested by City to implement the intent of this Contract. 
 
55. 
EXHIBITS 
 
The parties agree that all references to this Contract include all exhibits designated in and 
attached to this Contract, such exhibits being incorporated into and made an integral part 
of this Contract for all purposes. 
 
56. 
CONFLICT IN LANGUAGE 
 
 
All Work and Deliverables will conform to all applicable City codes, ordinances, and 
requirements.  If there is a conflict in interpretation between provisions in this Contract and 
any exhibits thereto, the provisions in this Contract will prevail. 
 
57. 
HEADINGS 
 
The headings used in the Contract are for ease of reference only and shall not in any way 
be construed to limit or alter the meaning of any provision. 
 
58. 
NON-APPROPRIATION 
 
City is a government agency that relies upon appropriation of funds by its governing 
body to satisfy its obligations. In the event that (1) funds are not appropriated by the City 
Council to perform the Work; or (2) funds appropriated or otherwise allocated to perform 
the Work become unavailable for payment by City under this Contract, City may either 
(a) cancel this Contract without further obligation of City; or (b) delay the Work for a 
period of six (6) months, In case of any such delay by City, Consultant/Contractor may 
suspend performance of work or services as applicable. The parties retain all rights 
available under this Contract to the extent permitted under Arizona law, in the event of 
termination or cancellation of this Contract due to lack of funding on the part of the City.

49 
59. 
ASSIGNMENT OF CLAIMS 
 
City and CMAR recognize that in actual economic practice overcharges resulting from 
antitrust violations are in fact borne by City.  Therefore, CMAR hereby assigns City any 
and all claims for such overcharges.  CMAR in all subcontracts shall require all 
Subcontractors to likewise assign all claims for overcharges to the City. 
 
60. 
DISPUTES 
 
Any failure of City to make a decision within the time limit set forth shall not be construed 
as acquiescence in all or any part of any CMAR claim for relief. 
 
61. 
SEXUAL HARASSMENT 
 
CMAR shall comply with the City’s current policy regarding sexual harassment.  City 
prohibits sexual harassment by any person on City’s premises or at any City affiliated 
functions. 
 
62. 
AMENDMENTS 
 
The Contract may not be changed, altered, or amended in any way except in writing signed 
by duly authorized representatives of CMAR and City. 
 
The Contract may not be changed, altered, or amended in any way except in writing signed 
by duly authorized representatives of CMAR and City.  Contractor shall maintain a 
Certification by the Contractor Authorizing Employees to Sign Binding Agreements on 
file with the City.  That Certification shall identify all individuals authorized by Contractor 
to execute documents necessary to carry out the terms of this Contract or to amend this 
Contract. 
 
If the Contractor already has a Certification on file with the City, that Certification, along 
with any future amendments, is incorporated herein by reference.  If the contractor does 
not already have a Certification on file with the City, it shall submit one with the City upon 
receipt of a Notice to Proceed, and that Certification, along with any future amendments, 
shall be incorporated herein by reference.  In either case, Contractor agrees that the 
individuals listed on its most recent Certification by the Contractor Authorizing Employees 
to Sign Binding Agreements shall have authority to execute documents necessary to carry 
out the terms of the Contract or to amend this Contract. 
 
63. 
CMAR RECORDS 
 
CMAR agrees to retain all records relating to the Contract pursuant to A.R.S. § 35-214, as 
amended from time to time.  CMAR agrees to make those records available at all 
reasonable times for inspection and audit by City during the term of the Contract and for a 
period of five (5) years after the completion of the Contract.  The records shall be provided

50 
at City Public Works Department, Engineering Division, Tempe, Arizona, or another 
location designated by City upon reasonable notice to CMAR. 
 
64. 
NO CONSTRUCTION AGAINST DRAFTING PARTY 
 
Each party acknowledges that it has had an opportunity to review the Contract with 
counsel, and such documents shall not be construed against any party that is determined to 
have been the drafter of the documents. 
 
65. 
INTERPRETATION OF CONTRACT DOCUMENTS 
 
65.1. In the event of omissions in the Contract documents, the following shall apply. 
 
65.1.1. If the Contract is not complete as to any minor detail of a required 
construction system or with regard to the manner of combining or installing 
of parts, materials, or equipment, but there exists an accepted trade standard 
for good and skillful construction, pursuant to MAG Specifications or 
otherwise, such detail shall be deemed to be an implied requirement of the 
Contract in accordance with such accepted trade standard.   
 
65.1.2. The quality and quantity of parts or materials supplied shall conform to 
trade standards and be compatible with the type, composition, strength, size 
and profile of the parts of materials otherwise specified in the Contract 
documents.

51 
66. 
EXHIBITS 
 
The parties agree that all references to this Contract include all exhibits designated in and 
attached to this Contract, such exhibits being incorporated into and made an integral part 
of this Contract for all purposes. 
 
65.1. LIST OF SUBCONTRACTORS 
 
65.2. STATUTORY PERFORMANCE BOND 
 
65.3. STATUTORY PAYMENT BOND 
 
65.4. CERTIFICATION BY THE CONTRACTOR AUTHORIZING  
EMPLOYEES TO SIGN BINDING AGREEMENT 
 
65.5. CONTRACTOR’S PAYMENT AND SETTLEMENT OF CLAIMS 
 
65.6. AFFIDAVIT OF GENERAL CONTRACTOR/PRIME CONSULTANT 
REGARDING HEALTH INSURANCE 
 
65.7. CITY OF TEMPE GUIDELINES FOR IMPLEMENTATION OF HEALTH 
INSURANCE 
 
65.8. AFFIDAVIT DEMONSTRATING LAWFUL PRESENCE IN THE UNITED 
STATES 
 
65.9. COMPLIANCE WITH TEMPE CITY CODE ON ANTIDISCRIMINATION 
 
65.10. ACKNOWLEDGEMENT REGARDING LETTER IN GOOD STANDING 
 
65.11. CITY OF ENGINEERING SECURE FACILITIES ACCESS GUIDELINES 
 
 
 
[SIGNATURE PAGE TO FOLLOW]

52 
SIGNATURE PAGE 
Joint Tempe-Mesa Sewer Rehabilitation-2025, GMP 1 
Project No. 3221025B 
 
DATED this        5th        day of            March 
              2026. 
 
 
 
 
 
 
 
 
CITY OF TEMPE, ARIZONA  
 
 
 
 
 
 
 
 
By:  
 
 
 
 
 
 
 
 
 
 
 
 
       Corey D. Woods, Mayor 
 
 
 
 
 
 
 
 
By:  
 
 
 
 
 
 
 
 
 
 
 
 
       Public Works Director 
 
 
ATTEST: 
 
 
 
 
 
Recommended By: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Kara A. DeArrastia, City Clerk  
 
 
Deputy Public Works Director/ 
 
 
 
 
 
 
 
City Engineer 
 
APPROVED AS TO FORM: 
 
 
 
 
 
 
Eric C. Anderson, City Attorney 
 
CMAR warrants that the person who is signing this Contract on behalf of CMAR is authorized to 
do so and to execute all other documents necessary to carry out the terms of this Contract. 
 
CMAR CONTRACTOR: 
B&F Contracting, Inc. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Signature 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Printed Name 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Title 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Email Address 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Federal I.D. No./Tax Payer I.D. No.

65.1 
 
LIST OF SUBCONTRACTORS 
 
In accordance with the provisions of Section 108.2 of the MAG Specifications, CMAR shall 
provide the information listed below regarding proposed Subcontractors which are subject to 
approval by the City. 
 
Joint Tempe-Mesa Sewer Rehabilitaion-2025, GMP 1 
Project No. 3221025B 
 
 
Name  
 
 
 
 
  Name 
 
 
 
 
 
 
Location 
 
 
 
 
  Location 
 
 
 
 
 
 
ROC No./Exp. 
 
 
 
  ROC No./Exp. 
 
 
 
 
 
ROC Classification 
 
 
 
  ROC Classification 
 
 
 
 
Federal ID No./Exp.  
 
 
  Federal ID No./Exp. 
 
 
 
 
Type of Work  
 
 
 
  Type of Work 
 
 
 
 
 
Amount $ 
 
 
 
 
  Amount $  
 
 
 
 
 
 
Name  
 
 
 
 
  Name 
 
 
 
 
 
 
Location 
 
 
 
 
  Location 
 
 
 
 
 
 
ROC No./Exp. 
 
 
 
  ROC No./Exp. 
 
 
 
 
 
ROC Classification 
 
 
 
  ROC Classification 
 
 
 
 
Federal ID No./Exp.  
 
 
  Federal ID No./Exp. 
 
 
 
 
Type of Work  
 
 
 
  Type of Work 
 
 
 
 
 
Amount $ 
 
 
 
 
  Amount $  
 
 
 
 
 
 
Name  
 
 
 
 
  Name 
 
 
 
 
 
 
Location 
 
 
 
 
  Location 
 
 
 
 
 
 
ROC No./Exp. 
 
 
 
  ROC No./Exp. 
 
 
 
 
 
ROC Classification 
 
 
 
  ROC Classification 
 
 
 
 
Federal ID No./Exp.  
 
 
  Federal ID No./Exp. 
 
 
 
 
Type of Work  
 
 
 
  Type of Work 
 
 
 
 
 
Amount $ 
 
 
 
 
  Amount $  
 
 
 
 
 
 
Name  
 
 
 
 
  Name 
 
 
 
 
 
 
Location 
 
 
 
 
  Location 
 
 
 
 
 
 
ROC No./Exp. 
 
 
 
  ROC No./Exp. 
 
 
 
 
 
ROC Classification 
 
 
 
  ROC Classification 
 
 
 
 
Federal ID No./Exp.  
 
 
  Federal ID No./Exp. 
 
 
 
 
Type of Work  
 
 
 
  Type of Work 
 
 
 
 
 
Amount $ 
 
 
 
 
  Amount $

65.2 
 
STATUTORY PERFORMANCE BOND 
PURSUANT TO TITLE 34, 
CHAPTER 6, OF THE ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Contract amount) 
 
 
KNOW ALL MEN BY THESE PRESENTS: 
 
That   
 
 
 
 (“Principal”) and  
 
 
 
 
 
, 
a corporation organized and existing under the laws of the State of   
 
 
, with its 
principal office in the City of  
 
 
(“Surety”), are held and firmly bound unto 
 
 
 
 
(“Obligee”) in the amount of   
 
 
 
 Dollars 
($ 
 
 
), for the payment whereof, the said Principal and Surety bind themselves, 
and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by 
these presents. 
 
WHEREAS, the Principal has entered into a certain written Contract with the 
Obligee, dated the    5th      day of   March   2026, to complete Project No. 3221025B, which 
Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied 
at length herein. 
 
NOW, THEREFORE, the condition of this obligation is such, that if the said 
Principal shall faithfully perform and fulfill all the undertakings, covenants, terms, conditions and 
agreements of said Contract during the original term of said Contract and any extension thereof, 
with or without notice to the Surety, and during the life of any guaranty required under the 
Contract, and shall also perform and fulfill all the undertakings, covenants, terms, conditions, and 
agreements of any and all duly authorized modifications of said Contract that may hereafter be 
made, notice of which modifications to the Surety being hereby waived; then the above obligation 
shall be void, otherwise to remain in full force and effect.

Provided, however, that this bond is executed pursuant to the provisions of Title 34, 
Chapter 6, of the Arizona Revised Statutes, and all liabilities on this bond shall be determined in 
accordance with the provisions of said Title and Chapter, to the extent as if it were copied at length 
herein. 
 
The prevailing party in a suit on this bond shall recover as part of the judgment 
reasonable attorney fees that may be fixed by the Court.  The performance under this bond is 
limited to the construction to be performed under this Contract and does not include any design 
services, preconstruction services, finance services, maintenance services, operations services or 
any other related services included in the Contract. 
 
DATED this               day of                                        2026. 
 
 
 
 
 
 
 
 
PRINCIPAL  
SEAL 
 
 
 
BY: 
 
 
 
 
 
** 
 
 
 
 
SURETY 
SEAL 
 
 
 
BY: 
 
 
 
 
 
 
 
 
 
 
AGENCY ADDRESS 
 
 
** Surety hereby acknowledges they are licensed to do business in the State of Arizona **

65.3 
 
STATUTORY PAYMENT BOND 
PURSUANT TO TITLE 34, 
CHAPTER 6, OF THE ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Contract amount) 
 
KNOW ALL MEN BY THESE PRESENTS: 
 
That   
 
 
 
 
 (“Principal”) and  
 
 
 
 
, 
a corporation organized and existing under the laws of the State of   
 
 
 
, 
with its principal office in the City of  
 
 
 
 (“Surety”), as held and firmly 
bound unto  
 
 
 
 (“Obligee”) in the amount of  
 
 
 
 
Dollars ($ 
 
 
), for the payment whereof, the said Principal and Surety bind 
themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, 
firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Contract with the 
Obligee, dated the    5th      day of   March   2026, to complete Project No. 3221025B, which 
Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied 
at length herein. 
 
NOW, THEREFORE, the condition of this obligation is such, that if the said 
Principal shall promptly pay all monies due to all persons supplying labor or materials to the 
Principal or the Principal’s Subcontractors in the prosecution of the construction provided for the 
Contract, then this obligation shall be void, otherwise to remain in full force and effect; 
 
Provided, however, that this bond is executed pursuant to Title 34, Chapter 6, 
Arizona Revised Statutes, and all liabilities on this bond shall be determined in accordance with 
the provisions, conditions and limitations of said Title and Chapter to the same extent as if it were 
copied at length in this Contract.

The prevailing party in a suit on this bond shall recover as a part of the judgment 
reasonable attorney fees that may be fixed by the Court. 
 
DATED this                    day of                                          2026. 
 
 
 
 
 
 
 
PRINCIPAL  
SEAL 
 
 
 
BY: 
 
 
 
 
 
** 
 
 
 
 
SURETY 
SEAL 
 
 
 
BY: 
 
 
 
 
 
 
 
 
 
 
AGENCY ADDRESS 
 
 
 
** Surety hereby acknowledges they are licensed to do business in the State of Arizona **

65.4 
 
CERTIFICATION BY THE CONTRACTOR AUTHORIZING 
EMPLOYEES TO SIGN BINDING AGREEMENTS 
 
Joint Tempe-Mesa Sewer Rehabilitation-2025, GMP 1 
Project No. 3221025B 
 
Contractor hereby certifies that the following employees in its organization are duly authorized to sign 
binding agreements necessary to carry out the terms of its contract(s) or amend the terms of its contract(s) 
on behalf of the Contractor, its owner(s), partner(s), and/or principal(s) of a corporation, or the manager(s) 
and/or member(s) of a limited liability company. Such agreements include, but are not limited to, pay 
requests, change orders, required certifications, etc. 
 
In submitting this Certification, Contractor acknowledges this Certification is incorporated by reference 
into any active contract(s) between Contractor and the City and will be incorporated by reference into any 
future contract(s) between Contractor and the City.  Contractor further acknowledges it understands the 
City will rely on the representations contained herein concerning authority to execute documents. 
 
Type or Print Name  
 
 
 
Signature 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Contractor Name: 
 
 
 
 
 
 
 
 
 
 
 
 
Signed By: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Printed Name:  
 
 
 
 
 
 
 
 
 
 
 
Title:  
 
 
 
 
 
 
 
 
 
Date:

65.5 
 
CITY OF TEMPE PUBLIC WORKS DEPARTMENT 
CONDITIONAL WAIVER AND RELEASE 
FOR CONTRACTOR’S FINAL PAYMENT 
AND SETTLEMENT OF CLAIMS 
 
 
The undersigned: 
 
Contractor’s Name:  ____________________________________ 
 
Contractor’s Address:  _______________________________________________ 
 
On receipt by the undersigned of a check from City of Tempe in the sum of $                           (dollar 
amount for final payment) and when the check has been properly endorsed and has been paid by 
the bank on which it is drawn, this document becomes effective to release any mechanic's lien, any 
state or federal statutory bond right, any private bond right, any claim for payment and any rights 
under any similar ordinance, rule or statute related to claim or payment rights for persons in the 
undersigned's position, the undersigned has on the job of the City of Tempe (Owner) for JOINT 
TEMPE-MESA SEWER REHABILITATION-2025, GMP 1 and PROJECT NO. 3221025B  
at the location of US-60 and Mill Avenue.  This release covers the final payment to the 
undersigned for all labor, services, equipment or materials furnished to the jobsite, except for 
disputed claims in the amount of $                         .  Before any recipient of this document relies 
on it, the person should verify evidence of payment to the undersigned. 
 
The undersigned, in consideration of the payment acknowledged, hereby warrants that he has 
already paid or will pay using the monies received from this final payment to promptly pay in full 
all his contractors, subcontractors, laborers, materialmen and suppliers for all work, materials, 
equipment or services provided to the above-referenced project. 
 
 
 
_________________________________________  
______________________ 
Contractor Signature  
 
 
 
 
Date 
 
_________________________________________ 
By (Print Name and Title)

65.6 
 
CITY OF TEMPE 
TEMPE, ARIZONA 
PUBLIC WORKS DEPARTMENT 
DIVISION OF ENGINEERING 
 
AFFIDAVIT OF GENERAL CONTRACTOR/PRIME CONSULTANT 
REGARDING HEALTH INSURANCE 
 
 
 
 
, Arizona 
 
Date 
 
 
 
JOINT TEMPE-MESA SEWER REHABILITATION-2025, GMP 1 
PROJECT NO. 3221025B 
 
I hereby certify that ______________________________________________ (name of company) currently has, and 
all of its major Subcontractors/subconsultants, defined as doing work in excess of $100,000 will have, during the 
course of this Contract, health insurance for all employees working on this Project and will offer health insurance 
coverage to eligible dependents of such employees, as defined in the accompanying Guidelines.  The company’s 
health insurance is as follows: 
 
Name of Insurance Company:_____________________________________________________ 
 
Type of Insurance (PPO, HMO, POS, INDEMNITY): __________________________________ 
 
Policy No.: ___________________________________________ 
 
Policy Effective Date (MM/DD/YY): ______________________________________ 
 
Policy Expiration Date (MM/DD/YY): _____________________________________ 
 
 
Signed and dated at  
 
 
, this  
 
 day of   
 
 
 2026. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
General Contractor/Prime Consultant 
 
 
 
 
 
 
 
 
 
 
By: 
 
 
STATE OF ARIZONA 
 
) 
 
 
 
 
 
)  ss 
COUNTY OF MARICOPA 
) 
 
SUBSCRIBED AND SWORN to before me this ___________ day of _____________________ 2026. 
 
 
 
 
 
 
 
 
 
 
Notary Public 
 
[Notary Seal]  
 
 
My commission expires: 
 
 
 
 
 
 
 
____________________________

65.7 
 
CITY OF TEMPE 
GUIDELINES FOR IMPLEMENTATION OF RESOLUTION NO. 2000.73 
 
These Guidelines are provided for purposes of implementing Resolution No. 2000.73 which 
requires that health insurance be provided by all consultants, general contractors and major 
subcontractors, as determined at the start of each project, for employees and dependents of 
employees. Questions regarding this procedure should be addressed to Tara Ford, Public Works 
Director for the City of Tempe. 
 
1. All consultants and general contractors, who bid on projects or enter into public works 
contracts, in excess of $100,000 or the current Council approval contract limit in place at the 
time the contract is executed, with the City of Tempe, after January 1, 2001, are required 
to sign an affidavit in the form attached hereto. The general contractor shall be responsible 
for ensuring that the subcontractors comply with the health insurance requirements. 
 
2. Health insurance is required for all employees, except for those employees who work less 
than one hundred and twenty (120) days in any calendar year. A “workday” consists of 
any time within a twenty-four-hour period, regardless of number of hours, that the 
individual is paid. 
 
3. The level of health insurance provided shall be determined by each employer but should 
be no less than that provided by the Arizona Cost Containment Health System. 
  
4. All complaints concerning violations of the health insurance requirements shall be filed, 
in writing, with the Public Work's Department, within five (5) days from discovery of the 
violation. An administrative hearing will be held before the Public Works Director, and 
a written decision of findings will be provided to the parties to the hearing within ten 
(10) days thereafter. Appeal from the decision of the Public Works Director may be 
made within ten (10) days of the date of the decision by filing a notice of appeal in writing 
with the Public Works Department. If an appeal is timely filed, an administrative hearing 
will be held before an administrative hearing officer appointed by the City Manager. 
The decision of the administrative hearing officer shall be final. 
 
5. In the event of a finding of violation of the insurance provisions, the company in violation 
of the provision shall be barred from bidding on, or entering into, any public works contract 
with the City for a period of three (3) years. 
 
6. All consultants and contractors subject to the health insurance requirements shall post, in 
English and Spanish, notice of the health insurance requirements at the job site. Signs for 
posting will be provided by the City. 
March 24, 2025  
 
Tara Ford, Public Works Director

65.8. 
AFFIDAVIT DEMONSTRATING LAWFUL 
PRESENCE IN THE UNITED STATES 
A.R.S. § 1-501 and § 1-502 require any individual person or sole proprietor who applies to the City for a local public benefit (including the award of a 
contract) to demonstrate his or her lawful presence in the United States. An individual person or sole proprietor who submits a bid for this contract 
must complete this Affidavit and submit it with the bid, along with a copy of one of the documents listed below.   
ALL VIOLATIONS OF FEDERAL IMMIGRATION LAW SHALL BE REPORTED TO 1-866-347-2423 
 
LAWFUL PRESENCE IN THE UNITED STATES CAN BE DEMONSTRATED BY 
PRESENTATION OF ONE (1) OF THE DOCUMENTS LISTED BELOW. 
Please present the document indicated below to the City.  If mailing the document, attach a copy of the document to this Affidavit. 
(If the document may not be copied, present the document in person to the City for review and signing of the affidavit.) 
 
 
1. 
An Arizona driver license issued after 1996.   
 
 
 
Print first 4 numbers/letters from license: 
 
___ ___ ___ ___ 
 
 
2. 
An Arizona non-operating identification License. 
 
 
 
Print first 4 numbers/letters: 
 
 
 
___ ___ ___ ___ 
_______  
3. 
A birth certificate or delayed birth certificate issued in any state, territory or possession of the United 
States. 
 
 
 
Year of birth:  
 
 
:   Place of birth:   
 
 
 
 
 
4. 
A United States Certificate of Birth abroad. 
 
 
 
Year of birth:  
 
 
:   Place of birth:  
 
 
 
 
 
 
5. 
A United States passport. 
 
 
 
Print first 4 numbers/letters on Passport: 
 
___ ___ ___ ___ 
 
 
6. 
A foreign passport with a United States Visa. 
 
 
 
Print first 4 numbers/letters on Passport 
 
___ ___ ___ ___ 
 
 
 
Print first 4 numbers/letters on Visa 
 
___ ___ ___ ___ 
 
 
7. 
An I-94 form with a photograph. 
 
 
 
Print first 4 numbers on I-94: 
 
 
 
___ ___ ___ ___ 
_______  
8. 
A United States Citizenship and Immigration Services Employment Authorization Document (EAD). 
 
 
 
Print first 4 numbers/letters on EAD: 
 
 
___ ___ ___ ___ 
 
 
9. 
Refugee travel document. 
 
 
 
Date of Issuance:  
 
 
Refugee Country:   
 
 
 
 
 
10. 
A United States Certificate of Naturalization. 
 
 
 
Print first 4 digits of CIS Reg. No.:   
 
 
___ ___ ___ ___  
 
 
 
11. 
A United States Certificate of Citizenship. 
 
 
 
Date of Issuance:  
 
   Place of Issuance:   
 
 
 
 
 
 
12. 
A tribal Certificate of Indian Blood. 
 
 
 
Date of Issuance:  
 
  Name of Tribe:   
 
 
 
 
 
 
13. 
A tribal or Bureau of Indian Affairs Affidavit of Birth. 
 
 
 
Year of Birth:   
 
 
  Place of Birth:   
 
 
 
 
I DO SWEAR OR AFFIRM UNDER PENALTY OF LAW THAT I AM LAWFULLY PRESENT IN THE UNITED STATES 
AND THAT THE DOCUMENT I PRESENTED ABOVE AS VERIFICATION IS TRUE. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Signature 
 
 
 
 
 
Business/Company (if applicable)  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Print Name  
 
 
 
 
 
Address 
Date:  
 
 
 
 
 
 
 
 
 
 
 
 
 
STATE OF ARIZONA 
 
 
 
 
City, State, Zip Code 
COUNTY OF MARICOPA 
 
SUBCRIBED AND SWORN to before me this ___________ day of _____________________ 2026. 
 
[Notary Seal]  
 
 
 
Notary Public ______________________________________

65.9. 
 
COMPLIANCE WITH TEMPE CITY CODE 
CHAPTER 2 ARTICLE VIII SECTION 2-603(5) 
_________________________________________________ 
 
Per Tempe City Code Chapter 2 Article VIII Section 2-603(5), it is unlawful for a city vendor or city contractor, 
because of race, color, gender, gender identify, sexual orientation, religion, national origin, familial status, age, 
disability, or United States military veteran status, to refuse to hire or employ or bar or discharge from 
employment any person, or to discriminate against such person in compensation, conditions, or privileges or 
employment.   
 
City vendors and contractors of fifteen (15) or more employees shall provide a copy of its antidiscrimination 
policy to the city’s procurement officer to confirm compliance with this article.  Employers having fourteen (14) 
or less employees may attest in writing to compliance with this article.   
 
 CONTRACTOR means any person who has a contract with the City. 
 
 VENDOR means a person or firm in the business of selling or otherwise providing products, materials, or 
services. 
 
 
CONTRACTOR/VENDOR, select one: 
 
           Current copy of antidiscrimination policy attached. 
 
OR 
 
_____ I hereby certify _________________________________ (contractor/vendor) to be in compliance 
with Tempe City Code Chapter 2 Article VIII Section 2-603(5). 
 
 
____________________________________ 
 
Date: _____________________ 
Signature 
 
____________________________________ 
 
__________________________ 
Print Name 
 
 
 
 
 
 
Title 
 
____________________________________ 
Company

65.10. 
 
ACKNOWLEDGEMENT REGARDING LETTER IN GOOD STANDING 
 
JOINT TEMPE-MESA SEWER REHABILITATION-2025, GMP 1 
PROJECT NO. 3221025B 
 
Signing 
this 
document 
acknowledges 
contractor’s 
understanding 
of 
the 
requirements 
outlined 
in 
the 
Contract 
(Section 6.1 referencing taxes) stating the following: 
 
6.1. 
CMAR Requirements and Conditions. 
 
6.1.1 Licenses, Taxes and Permits  
 
Prior to execution of this Contract, CMAR must ensure all applicable taxes due by Contractor are paid in 
full. At all times, the determination of applicable taxes and rates, and remitting taxes owed, shall be the 
sole responsibility of Contractor.  
 
It is the sole responsibility of the Contractor and any subcontractors to obtain a Letter of Good 
Standing from the Arizona Department of Revenue prior to Contract award.  Go to 
https://azdor.gov/forms/collections-forms/tax-clearance-application 
and 
obtain 
directions 
regarding how to submit for the Letter of Good Standing.  Submit a copy of the Letter of Good 
Standing to contractor_support@tempe.gov.  The Letter of Good Standing must have been issued 
within the last 90 Calendar Days from the award date of the contract. 
 
In the event a “denial” letter is received from the Arizona Department of Revenue, should any taxes owed 
by the Contractor not be remitted in full prior to award along with the receipt of a Letter of Good Standing 
from the Contractor, the award of the contract will not move forward. 
 
I hereby acknowledge _________________________________ (contractor/vendor) will be in 
compliance with section 6.1 at the time of a contract award. 
 
 
____________________________________ 
 
Date: _____________________ 
Signature 
 
____________________________________ 
 
__________________________ 
Print Name 
 
 
 
 
 
 
Title 
 
____________________________________ 
Company

65.11. 
 
CITY ENGINEERING SECURE FACILITIES ACCESS GUIDELINES 
 
These guidelines are applicable to all contracts that call for work to be done in any of the City’s secure facilities 
and are incorporated by reference into said contracts.  Contractors should be advised that there are separate 
requirements for General Secure Facilities and Water Utilities Department Secure Facilities. 
 
I. 
GENERAL SECURE FACILITIES ACCESS REQUIREMENTS 
 
The Contractor and Third-Party Construction Manager shall provide the City with a 10-year background check 
for all employees, including subcontractors, working in any of the City’s secure facilities which include, but are 
not limited to, the Tempe Transportation Center, East Valley Bus Operations and Maintenance Facility, Police 
Department/Courts Headquarters, and Police Department substations. Background checks shall be performed by 
an authorized company capable of conducting a nationwide search. Background checks shall include, at a 
minimum, information regarding state and national criminal and sexual offender information, and a 5-year driving 
record search. The Contractor and Third-Party Construction Manager shall be responsible for the cost of all their 
employee background checks. Below is a list of automatic and discretionary disqualifiers which may disqualify 
or make an individual ineligible to work at any of the City’s secure facilities. The Contractor and Third-Party 
Construction Manager shall submit all employee background checks to the City of Tempe for review and 
authorization before the contractor employees or subcontractors are issued a Contractor Identification Badge and 
before being allowed to work at any of the City’s secure facilities. All authorized contractor, subcontractor and 
third-party construction manager employees shall coordinate with the respective facility supervisor to obtain a 
contractor identification badge. Contractor and Third-Party Construction Manager employees must wear their 
contractor identification badge at-all-times while working at the City’s secure facility. 
 
AUTOMATIC DISQUALIFIERS 
The following will disqualify any individual who has, at any time: 
 
• 
Has known affiliations with gangs, gang members, terrorist groups and/or individuals,  
• 
Outstanding felony warrants, 
• 
Conviction for selling, producing, cultivating, or transporting marijuana for sale,  
• 
Conviction for producing, cultivating, or transporting any dangerous drugs or narcotics for sale. 
DISCRETIONARY DISQUALIFIERS 
The following may, upon review by the Tempe Police Department, make an individual ineligible to work in or 
around secure areas of City Facilities: 
 
• 
Unlawful sexual misconduct;  
• 
DUI conviction or suspension of your Arizona driver’s license due to a DUI; 
• 
Commission of a felony;  
• 
Conviction of a felony or any offense that would be a felony if committed in Arizona; 
• 
Outstanding misdemeanor warrants;  
• 
Any other conduct or offense that could jeopardize the safety of City employees or the public; or,  
• 
Insufficient information.

II. 
WATER UTILITIES DEPARTMENT SECURE FACILITIES ACCESS REQUIREMENTS 
 
The Contractor and Third-Party Construction Manager shall verify that a 10-year background check has been 
completed within the last 5 years for all employees, including subcontractors, working in any of the City’s Water 
Utilities Department secure facilities which include, but are not limited to, the Johnny G. Martinez Water 
Treatment Plant, South Tempe Water Treatment Plant, and Kyrene Water Reclamation Facility. The background 
check shall include state and national criminal and sexual offender information as well as driving record 
information outlined in Secure Facility Access Requirements. Background checks shall be performed by an 
authorized company capable of conducting a nationwide search. Background checks shall include, at a minimum, 
information regarding state and national criminal and sexual offender information, and a 5-year driving record 
search. The Contractor and Third-Party Construction Manager shall be responsible for the cost of all their 
employee background checks.  
 
Contractor and Third-Party Construction Manager shall disclose any knowledge of employee criminal history 
status involving the following: 
 
• 
Any felony offense; 
• 
Any offense involving assault or threats of violence; 
• 
Any theft, fraud or financial crimes offense; 
• 
Any arson offense; 
• 
Any sexual misconduct offense; 
• 
Any offense of misconduct involving a deadly weapon 
SECURE FACILITY VERIFICATION REQUIREMENTS 
 
The Contractor and Third-Party Construction Manager shall verify that all employee background checks have 
been completed before the contractor employees or subcontractors are issued a Contractor Identification Badge 
and before being allowed to work at any of the City’s Water Utilities Department secure facilities. All 
authorized contractor, subcontractor and third-party construction manager employees shall coordinate with the 
respective facility supervisor to obtain a contractor identification badge. Contractor and Third-Party 
Construction Manager employees must wear their contractor identification badge at-all-times while working at 
the City’s secure facility.

ROC-089744   |   BFCONTRACTING.COM   |   11011 N. 23rd Avenue|   Phoenix, AZ 85029 
P: 623.582.1170   |   F: 623.582.3761 
 
December 15, 2025 
 
 
Barrett Jurgemeyer, PE, Principal Civil Engineer 
City of Tempe – Engineering CIP Construction, Public Works Dept  
31 E Fifth Street, Garden Level 
Tempe, AZ 85281 
 
RE: Name:                          Joint Tempe-Mesa Sewer Rehabilitation 2025 
Project No.: 
3221025B 
 
SUBJECT:  Construction Manager at Risk – 100% Guaranteed Maximum Price (GMP) Rev 1 
 
Dear Mr. Jurgemeyer, 
 
B&F Contracting, Inc. respectfully submits, for your review and approval, our 100% Guaranteed Maximum 
Price Proposal, dated 12/15/2025 for the Joint Tempe-Mesa Sewer Rehabilitation 2025 Project No. 
3221025B. The following items in the below table will be completed under this 100% GMP to rehabilitate 7 
manholes, CIPP line 761 LF of existing 36” sewer, CIPP line 469 LF of existing 42” sewer, and provide three 
separate bypass systems to complete the work.  
 
Item 
Description 
Unit 
Total Quantity 
1 
Mobilization/Demobilization 
LS 
1 
2 
Potholing 
DY 
10 
3 
Priest & Southern Bypass System Installation And Removal 
LS 
1 
4 
College Ave Bypass System Installation And Removal 
LS 
1 
5 
Priest & 16th St. Bypass Installation And Removal 
LS 
1 
6 
Bypass Operation Priest & Southern 
DY 
34 
7 
Bypass Operation College Ave 
DY 
36 
8 
Bypass Operation Priest & 16th St. 
DY 
17 
9 
Bypass Piping Trenching & Removal 
LF 
973 
10 
Cleaning Of Existing 36" Pipe 
LF 
761 
11 
Cleaning Of Existing 42" Pipe 
LF 
469 
12 
Man Entry T-Lock Removal 42" Pipe 
LF 
469 
13 
Install 36" CIPP Lining 
LF 
761 
14 
Install 42" CIPP Lining 
LF 
469 
15 
Post-CIPP Pano Inspection 
LF 
1230 
16 
Modify & Repair Bench/Throat Interface For CIPP Installation Det 1 Sht 15 
EACH 
4 
17 
Modify & Repair Manhole Cone For CIPP Installation 
EACH 
1 
18 
Rehabilitate Manhole (Epoxy Coat) 
SF 
1747 
19 
Rehabilitate Manhole (PVC T-Lock NW31N5MH0079) 
EACH 
1 
20 
Rehab Bench & Channel Interface W/ FRP Det 2 Sht 15 
EACH 
2 
21 
Install 60-inch Diameter Polymer Concrete Insert 
EACH 
1 
22 
CCTV Manholes 
EACH 
7 
23 
Asphalt Replacement Priest (10" Thick) 
SY 
1245 
24 
Asphalt Replacement College Ave/Mill Ave (6" Thick) 
SY 
176 
25 
Replace Concrete Sidewalk 
SF 
75 
26 
Replace Concrete Scupper 
SF 
90 
27 
Replace Valley Gutter 
SF 
60 
28 
Replace Concrete Curb And Gutter 
LF 
30 
29 
General Conditions 
MO 
10 
 
 
 
EXHIBIT A

··· 
 
ROC089744   |   BFCONTRACTING.COM   |   11011 North 23rd Avenue   |   Phoenix, AZ 85029 
 
P: 623.582.1170   |   F: 623.582.3761 
 
 
 
 
 
2 
This 100% GMP proposal was developed based on the following Project documents: 
 
• 
Project Drawings: City of Tempe Public Works Department Engineering Division, Joint Tempe-Mesa 
Sewer Rehabilitation – 2025, Project No. 3221025B, Dated 10/27/25 
• 
Technical Specifications: Joint Tempe-Mesa Sewer Rehabilitation – 2025, Project No. 3221025B, 
Dated October 27, 2025 
• 
Rehabilitation Design Memorandum: Joint Tempe-Mesa Sewer Rehabilitation-2025, Project No. 
3221025B, Dated November 10, 2025 
 
Project construction duration for this 100% GMP is anticipated to take 318 calendar days from project NTP 
to final completion. 
 
B&F proposes to complete the work associated with this 100% GMP for a not-to-exceed amount of  
$4,943,673,81. Due to the estimating software not having rounding function, the Schedule of Values 
(SOV) will be the superseding document that has been adjusted to 2 decimals for simplicity during 
construction and limiting lengthy rounding errors. The cost/estimate detail included in this package is 
meant for back up and will vary slightly from the SOV because of the rounding adjustments made.   
 
Description 
Amount 
Contractor’s Cost 
$3,364,987.71 
Overhead & Profit 
$403,798.53 
Insurance, Bond, and Sales Tax 
$278,167.57 
Allowances 
$896,720.00 
GMP Grand Total 
$4,943,673.81 
 
B&F’s project personnel involved in the development of this 100% GMP and the proposed team for the 
construction phase consists of the following personnel: 
 
Description 
Name 
Email 
Phone 
Contract Signer 
Josh Onstott 
jonstott@bfcontracting.com 
623-238-3792 
Project Manager 
Andrea Groak 
Andrea.groak@bfcontracting.com 623-258-6051 
Project Engineer 
Mike Vicuna 
Mike.vicuna@bfcontracting.com 
480-528-0269 
Superintendent 
Oscar Chacon 
ochacon@bfcontracting.com 
623-687-4261 
Estimator 
Travis Monk 
tmonk@bfcontracting.com 
602-326-9282

··· 
 
ROC089744   |   BFCONTRACTING.COM   |   11011 North 23rd Avenue   |   Phoenix, AZ 85029 
 
P: 623.582.1170   |   F: 623.582.3761 
 
 
 
 
 
3 
 
Included in this 100% GMP package are the following documents: 
 
• 
Scope of Work, Clarifications, Assumptions, and Exclusions 
• 
City of Tempe GMP Proposal Form 
• 
Project Schedule of Values 
• 
Cost Detail 
• 
Project Schedule 
• 
Vendor Solicitation Summaries & Quotes 
• 
Project Drawings & Technical Specifications 
• 
Sewer Bypass Plans/Documents 
 
 
We are excited about the opportunity to work with the City of Tempe and look forward to a successful 
project. If you or your team have any questions or comments regarding the above items, please contact 
Travis Monk at (602) 326-9282. 
 
Sincerely, 
 
 
 
 
Travis Monk – Preconstruction Manager 
Tmonk@bfcontracting.com 
B&F Contracting, Inc. 
 
 
 
 
 
Travis Monk

SCOPE OF WORK 
 
PROJECT OVERVIEW 
 
The 100% GMP scope of work includes trenchless rehabilitation of approximately 469 linear feet of 42-inch 
sewer pipe and 761 linear feet of 36-inch sewer pipe using Cured-in-Place Pipe (CIPP) lining methods. 
Additionally, 7 existing manholes within the project area will be rehabilitated to restore structural integrity 
and extend service life. Temporary bypass pumping will be required to divert flow during construction to 
ensure uninterrupted sewer service.  
 
 
SCOPE OF WORK ITEMS: 
 
1. Mobilization / Demobilization 
1. Mobilization and demobilization of equipment.  
2. Setup/takedown yard, site control measures, and security fencing. 
3. Water meter purchase. 
4. Steel plate delivery and pickup.  
5. Temporary fence delivery, pickup, and associated fuel surcharge fees. 
6. Furnishing and installing 2 each project signs on spring stands to be relocated to different site 
locations as required. 
7. Delivery of CMP tanks for bypass suction pits. 
8. Dust Permit Fee 
 
2. Potholing 
1. Includes labor and equipment costs for hydro excavation crew to perform utility locating for the 
bypass trenching alignments, Priest and Southern subcut excavation, and any other 
excavations that require utility locating. 
 
3. Priest & Southern Bypass Installation and Removal 
1. Setup and teardown of a flow management system designed to bypass an existing 42-inch 
segment of pipe on Priest Drive south of Southern. 
2. Flow management system to be installed is based on flow data from previous Western Canal 
bypass system upstream. The bypass for this project is designed for a peak flow rate of 22.80 
MGD (design flow rate of 34.20 MGD).  
3. Existing rim to invert is approximately 25.5 feet. In order for the bypass pumps to prime and 
operate appropriately B&F will need to take measures to reduce the suction lift. The flow 
management system is designed and priced for B&F to surcharge flows 3.5 feet above the 
existing 42-inch pipe and perform a subcut excavation of 5 feet to lower pumps closer to flow 
line. 
4. This bid item includes costs for performing an excavation subcut of 5 feet deep for two suction 
pit setups. One subcut excavation will be approximately 80 feet long by 30 feet wide and 5 feet 
deep. The second subcut area will be approximately 40 feet long by 30 feet wide and 5 feet 
deep. If existing utility locations allow, suction pits will be combined into one large pit. 
5. Includes haul-off and dump fees for subcut excavation and suction pit installation. 
6. Includes backfilling and compacting MAG spec ABC in subcut excavation.

7. Pricing includes cutting coupons in existing 42-inch pipe for suction ports and performing 
coupon repairs upon bypass completion. 
8. Includes installing concrete cap over coupon repairs.  
9. Includes furnishing and installing 2 each CMP tanks for suction pits and removing and 
backfilling suction pits with ½ sack ABC slurry. 
10. Includes setting 6 each 14” pumps at the 2 each suction pits; fusing and installing 4 each 18” 
discharge pipes; all necessary manifolds, valves, appurtenances; hydro static testing of 
discharge lines; and flushing and disinfecting pipe upon completion. 
11. Removing and repairing discharge manhole cone. 
12. Milling and recessing plates at discharge manhole. 
13. Engineered stamped bypass calculations. 
14. Installation and removal of manhole plugs at suction and discharge manholes. 
 
4. College Avenue Bypass System Installation and Removal 
1. Setup and teardown of a flow management system designed to bypass existing 36-inch pipe 
segments along College Ave and under Highway 60. 
2. Flow management system is designed for a peak flow rate of 6.072 MGD (design flow rate of 
9.11 MGD) and includes bypassing the existing 36-inch sewer and existing 12-inch sewer 
lateral. 
3. Includes setting 3 each 12” pumps and 2 each 6” pumps; fusing and installing 1 each 18” 
discharge pipe; installing and removing all necessary manifolds, valves, appurtenances; hydro 
static testing of discharge lines; and flushing and disinfecting pipe upon completion. 
4. Removing and repairing 1 suction manhole cone and 1 discharge manhole  
5. Milling and recessing plates at discharge manhole. 
6. Engineered stamped bypass calculations. 
7. Installation and removal of manhole plugs at suction manholes. 
 
5. Priest & 16th Street Bypass Installation and Removal 
1. Setup and teardown of a flow management system designed to bypass an existing 48-inch 
segment of pipe on Priest Drive south of 14th Street in order rehabilitate existing manhole 
SW21N4MH0077. 
2. Flow management system to be installed is based on flow data provided by the City of Tempe, 
Preconstruction Discussions, and a Project Team agreement of designing and pricing the 
bypass for a design flow rate of 20 MGD. 
3. Includes haul-off and dump fees for 2 each suction pit excavations and CMP installations. 
4. Pricing includes cutting coupons in existing 48-inch pipe for suction ports and performing 
coupon repairs upon bypass completion. 
5. Includes installing concrete cap over coupon repairs.  
6. Includes furnishing and installing 2 each CMP tanks for suction pits and removing and 
backfilling suction pits with ½ sack ABC slurry. 
7. Includes setting 3 each 12” pumps and 3 each 8” pumps at the 2 each CMP suction pits and 
existing manhole SW21N4MH0035; fusing and installing 2 each 18” discharge pipes;  installing 
all necessary manifolds, valves, appurtenances; hydro static testing of discharge lines; and 
flushing and disinfecting pipe upon completion. 
8. Removing and repairing suction manhole SW21N4MH0035’s cone and discharge manhole 
SW21N4MH0001’s cone. 
9. Milling and recessing plates at discharge manhole.

10. Engineered stamped bypass calculations. 
11. Installation and removal of manhole plugs at suction and discharge manholes. 
 
6. Bypass Operation – Priest & Southern 
1. Includes all pump watch labor and equipment necessary to perform 24/7 bypass operations, 
monitoring, spill containment, basic odor control efforts (tarping pits), and maintenance of 
bypass for Priest and Southern bypass system during lining operations. 
 
7. Bypass Operation – College Avenue 
1. Includes all pump watch labor and equipment necessary to perform 24/7 bypass operations, 
monitoring, spill containment, basic odor control efforts (tarping pits), and maintenance of 
bypass at the College Avenue bypass system during lining operations. 
 
8. Bypass Operation – Priest & 16th Street 
1. Includes all pump watch labor and equipment necessary to perform 24/7 bypass operations, 
monitoring, spill containment, basic odor control efforts (tarping pits), and maintenance of 
bypass for Priest and 16th Street bypass system during lining operations. 
 
9. Bypass Piping Trenching & Removal 
1. Trenching for installation of temporary bypass discharge piping for crossings identified on 
supplemental bypass exhibits. 
2. Installation of traffic-rated plates for access and road crossings. 
3. Includes sawcutting, asphalt removal, milling and recessing steel plates, trucking and haul-off, 
and dump fees. 
4. Removal of discharge piping after bypass and backfill with ½ sack ABC slurry backfill prior to 
pavement restoration. 
5. Estimate units based on preliminary bypass routing. Will be validated in the field prior to billing. 
 
10. Cleaning of Existing 36” Pipe 
1. Vactor cleaning crew to complete three passes with large diameter pipe cleaner and vacuum 
of debris. 
2. Debris removal and disposal. 
 
11. Cleaning of Existing 42” Pipe 
1. Vactor cleaning crew to complete three passes with large diameter pipe cleaner and vacuum 
of debris. 
2. Debris removal and disposal. 
 
12. Man Entry T-Lock Removal 42” Pipe 
1. Confined-space manual entry to remove existing deteriorated PVC T-Lock liner in the 42-inch 
pipeline from MH NE32N4MH0019 to NE32N4MH0012. 
2. Includes certified confined space crew, atmospheric monitoring, and rescue plan. 
3. Surface prep for CIPP installation, ensuring complete removal of loose or delaminated liner. 
 
13. Install 36” CIPP Lining 
1. Installation of cured-in-place pipe (CIPP) UV liner for 36-inch sewer segments.

14. Install 42” CIPP Lining 
1. Installation of cured-in-place pipe (CIPP) UV liner for 42-inch sewer segment. 
 
15. Post CIPP Panoramic Inspection 
1. Conduct post-lining panoramic (Panoramo) CCTV inspection for 36-inch and 42-inch 
segments. 
2. Provide high-definition inspection deliverables with electronic submittals. 
 
16. Modify & Repair Bench/Throat Interface For CIPP Installation Det 1 Sht 15 
1. Demolition of manhole bench and throat sections as necessary to accommodate CIPP liner 
insertion and termination. 
2. Sawcut manhole flat tops to widen the channel and then rebuild them to their original 
dimensions with approved cementitious material. 
3. FRP wrap manholes per Project Documents. 
 
17. Modify & Repair Manhole Cone for CIPP Installation 
1. Includes removal and replacement of the manhole cone, frame, cover, grade rings, and 
reconstruction of the manhole cone. 
2. Reinstalling frame, cover, grade rings, and a new collar post-CIPP lining efforts. 
 
18. Rehabilitate Manhole (Epoxy Coat) 
1. Clean and prepare substrate for new epoxy. 
2. Bring manhole back to smooth profile. 
3. Epoxy coat with approved vendor. 
4. Qualified applicators. 
5. Testing of manhole. 
 
19. Rehabilitate Manhole (PVC T-Lock NW31N5MH0079) 
1. Cleaning of existing PVC T-Lock lined manhole and preparation of substrate. 
2. Preparing existing manhole by removing any loose/deteriorated material 
3. Repair of damaged liner sections or joint repairs using PVC patch strips and adhesive system. 
 
20. Rehab Bench & Channel Interface W/ FRP Det 2 Sht 15 
1. Prep substrate of bench and channel interface for FRP installation. 
2. FRP wrap manholes per Project Documents. 
 
21. Install 60-inch Diameter Polymer Concrete Insert 
1. Sawcutting asphalt for excavation  
2. Crew to excavate and remove cone, set trench box, and mill asphalt for asphalt restoration. 
3. Haul-off and dump fees. 
4. Crew to install manhole insert, grout annular space, pull manhole box, and backfill excavation 
with ½ sack ABC slurry.  
5. Manhole adjustment crew and concrete for collar (existing manhole frame and cover to reused) 
6. Composite Polymer Manhole insert material. 
 
22. CCTV Manholes 
1. CCTV inspection of 7 each manholes post rehabilitation.

23. Asphalt Replacement Priest (10" Thick) 
1. Asphalt replacement for the Priest and Southern bypass trenching, suction pit subcut 
excavations, discharge manhole pull location, and CIPP insertion cone pull location; and Priest 
and 16th Street bypass trenching, suction pit locations, suction manhole cone pull location, and 
discharge manhole pull location. 
2. Includes subcontractor costs for installing 1,245 square yards of 2” surface course asphalt and 
917 square yards of 8” base course asphalt to match existing asphalt thickness. 
 
24. Asphalt Replacement College Ave/Mill Ave (6" Thick) 
1. Asphalt replacement for the 36” College Ave bypass trenching for crossings, suction manhole 
pull location, discharge pull location, and replacement for the NW34N4MH0048 manhole 
insert installation location. 
2. Includes subcontractor costs for installing 176 square yards of 2” surface course asphalt and 
97 square yards of base course asphalt to match existing asphalt thickness. 
 
25. Replace Concrete Sidewalk 
1. Remove and replace existing concrete sidewalk in kind joint to joint for College Ave bypass 
installation. 
2. Includes costs for sawcutting, labor, equipment, forms, and concrete material. 
 
26. Replace Concrete Scupper 
1. Remove and replace existing concrete scupper in kind joint to joint for College Ave bypass 
installation. 
2. Includes costs for sawcutting, labor, equipment, forms, and concrete material. 
 
27. Replace Valley Gutter 
1. Remove and replace existing concrete valley gutter in kind joint to joint for College Ave bypass 
installation. 
2. Includes costs for sawcutting, labor, equipment, forms, and concrete material. 
 
28. Replace Concrete Curb and Gutter 
1. Remove and replace existing concrete curb and gutter in kind joint to joint for College Ave 
bypass installation. 
2. Includes costs for sawcutting, labor, equipment, forms, and concrete material. 
 
29. General Conditions 
1. Includes all indirect project costs to be billed monthly. 
2. Costs include onsite office, yard rental, temporary facilities, utilities, trash dumpster and dump 
fees, and portable toilets. 
3. Drinking water and ice for the crew. 
4. Field device communication (radios, phones, tablets, etc.) 
5. Small tools (batteries, hand tools, saw blades, etc.) 
6. Safety Supplies (hard hats, vests, glasses, gloves, masks, hearing protection, Fall protection, 
Anchor Points etc.) 
7. Covers project management, administration, software, permits.

8. Coordination with the City of Tempe and Mesa for site access, traffic control, and permit 
approvals. 
 
 
CLARIFICATIONS & ASSUMPTIONS 
 
1. The 3 each sewer bypass systems – Priest and Southern, College Ave, and Priest and 16th 
– all require 24 hours a day and 7 days week traffic control restrictions to remain in place 
for the duration required to complete said scope of work. 
2. Traffic control quantities and costs are based on recent comparable projects but may vary 
based on unknown or changing City or ADOT requirements. Excess costs beyond 
estimated value will be handled via allowance or contingency. 
3. Police support is assumed for all work within 300 feet of signalized intersections or when 
open trench activities impact arterial roads. Scheduling and coverage will be coordinated 
with the City of Tempe. Excess costs beyond estimated value will be handled via 
allowance or contingency. 
4. The project is bid assuming a 5-day work week. Any deviation from this (e.g., night or 
weekend work) not initiated by B&F will require compensation through allowance or 
change order. 
5. A dedicated team consisting of a half-time Project Manager, full-time Superintendent, and 
three-quarter time Project Engineer will be assigned to this GMP scope. 
6. Fuel costs are assumed at $4.00/gallon delivered. Any significant fluctuation above this 
amount will be compensated through allowance or contingency. 
7. All material and/or subcontractor price escalations shall be reimbursed via allowance or 
contingency budgets. 
8. Force majeure impacts due to economic conditions, supply chain interruptions, or inflation 
that are demonstratable and validated will be reviewed for additional cost/time 
compensation. 
9. There are no SBE/DBE requirements associated with this GMP. 
10. All indirect project costs (e.g., overhead, administrative costs, small tools, etc.) will be 
invoiced monthly as part of the progress payment application process. 
11. Bid pricing excludes additional traffic-rated protection measures such as K-rail, attenuator 
trucks, or crash barriers unless noted. If required by the City or ADOT, costs will be added 
through allowance. 
12. Three stamped engineer bypass plans are included. Modifications required by agencies 
after submittal may result in additional costs. 
13. Dust permit fee is included in the bid. All other permits required for the work will be cost-
reimbursable via the project contingency and are not included in the base bid. 
14. GMP pricing does not include 36-inch pipe man entry PVC T-Lock lining or man entry 
cleaning of the pipe since existing pipe from MH SW34N4MH0015 to SW34N4MH0006 and 
MH SW34N4MH0006 to NW34N4MH0055 are 36-inch VCP sewer lines. 
15. One mobilization and one demobilization are included in this GMP.

16. Water for construction, including but not limited to, dust control and bypass operations, 
will be reimbursed through “Construction Water” allowance appropriate backup and detail 
in payment request (e.g. volume of water used for specific items and tasks.) 
17. Asphalt replacement is limited to a maximum of 10” thickness on arterial streets and 6” 
thickness on collector streets, unless noted otherwise. Increases due to poor base 
conditions or agency request will be handled through change order or allowance. 
18. GMP pricing includes cost for asphalt replacement with conventional EVAC asphalt mixes 
and not rubberized asphalt mixes. 
19. Bypass systems will be pressure tested to the maximum anticipated operating pressure 
before live flow diversion. 
20. ADOT permits for traffic control within ADOT right-of-way are assumed to be provided at 
zero cost. 
21. Yard/staging area rental is included as part of the General Conditions/Indirect Costs. If 
additional laydown space is required due to city restriction, costs may increase. 
22. Final deliverables (as-builts, O&M documentation, test reports, etc.) will be submitted 
within 30 days of final acceptance by the Owner. 
23. All quantities and scope are assumed accurate per the bid documents and plans. Any 
quantity overages will be billed at approved unit rates via allowance or contingency. 
24. Additional flow management days beyond quantities outlined in schedule of values will be 
billed through allowances or change order. 
25. Allowance items (e.g., police, traffic control, construction water, etc.) will be tracked, 
documented, and billed only upon Owner or delegated representative’s written approval 
prior to execution of additional work. 
26. Bypass pipe alignment is based on preliminary field walk and best estimate, and price as 
depicted in conceptual bypass exhibits provided. Changes due to unknown buried utilities, 
site conditions, or other constraints will be handled via allowance, contingency, or change 
order. 
27. All unused portions of any project allowance will be credited back to the Owner at the end 
of the project. 
28. Traffic loops, if disturbed, will be reimbursed through allowance or contingency budgets. 
29. CIPP Lining 
1. For CIPP lining segments, no sewer laterals are identified on drawings, thus no lateral 
reinstatements or connections are anticipated or included in GMP. 
2. GMP does not include any point repairs to fix offset joints. If offset joints are incurred, 
such as the offset joint in segment SW34N4MH0006 to NW34N4MH0055, B&F intends 
on CIPP lining through offset joints. Note, slight wrinkle may occur at offset joints. 
30. GMP pricing is based on all work associated with manhole inserts and/or reconstruction 
will be given 24-hour traffic closures. Limited traffic control setups will increase schedule, 
reduce production, and increase traffic control costs not included in proposal. 
31. Unit Price Contract Administration:  This GMP will be administered as a Measured 
Quantity/Unit Price, Guaranteed Not‐to‐Exceed Contract. The Schedules of Values is 
defined by the individual work/pay items plus fee structure, and markups. Final contract 
price/payout will be based on field measured, final completed quantities at the approved

unit prices, approved allowance and/or contingency utilization, and approved change 
orders. It is understood that these City approved prices including mark‐ups are the “Cost 
of the Work”.  The mark‐up structure on the Schedule of Values will apply to Change 
Orders and/or Extra Work, allowances, and contingencies. Pay Item under‐runs and/or 
unused items shall fall to Project contingency for the duration of the project. Quantity 
over‐runs shall be paid at the unit price established in the Schedule of Values for the pay 
item and shall be paid from Contingency or Change Orders. 
32. Miscellaneous Allowance of $200,000.00 shall be utilized for, but not limited to: 
1. Bypass discharge piping alignment changes that differ from B&F’s conceptual bypass 
plans due to utility conflicts, traffic control/pedestrian access constraints, etc. 
2. If required, utility relocations required for construction of any of the three bypasses, 
and specifically for the 5’ deep subcut excavation for the Priest and Southern bypass 
suction pit locations. 
3. The Priest and 16th Street bypass, if flows are determined to be more than the agreed 
upon 20 MGD, additional efforts associated with bypass setup, suction pits, discharge 
piping installation, bypass pumping equipment, bypass teardown, etc. 
 
 
EXCLUSIONS 
 
1. Scope growth in manholes post cleaning. 
2. Multiple mobilization to and from the project 
3. Manhole ring and covers unless. 
4. Asphalt outside of the proposed quantities detailed on Schedule of Values, Project 
Drawings, and Bypass Plans. 
5. Lateral bypasses not identified on the plans. 
6. Flow Monitoring 
7. Public outreach 
8. Nightwork above beyond watching pumps. 
9. Railroad permits 
10. Pre video of manhole rehabilitation 
11. SRP permits 
12. Survey 
13. Engineering 
14. Temporary Construction Easements 
15. AOC or ATC acquisition 
16. Temporary traffic signals 
17. Replacement of Traffic loops 
18. Material testing is excluded per 90% GMP review meeting. Material testing to be performed 
by City of Tempe. 
19. Utility conflicts and changes to the design and direct impacts to schedule, direct costs, and 
overhead.  
20. SBE Requirements

21. Any costs associated with Permits, Paving Permit/Fees, Waterline and Trench 
Permit/Fees and Haul Permit/Fees are not included in the GMP, except for the dust 
control permit fee.

JOC/CMAR Proposal Calculations
ENTRY IN YELLOW FIELDS ONLY
Proposal/General Conditions
3,364,987.71
$                                 
(Cost of work, labor, material and equipment)
(1)
Subtotal
3,364,987.71
$                                 
(1)
Overhead & Profit *(Construction Fee) % 12.00%
403,798.53
$                                    
multiply with (1)
(2)
Add (2) +(1)
3,768,786.24
$                                 
Subtotal (3)
Insurance * %
1.00%
37,687.86
$                                      
multiply with (3)
(4)
add (3) + (4)
3,806,474.10
$                                 
Subtotal (5)
Pay and Performance Bond %
1.00%
38,064.74
$                                      
multiply with (5)
(6)
[Add (5) + (6)]
3,844,538.84
$                            
(7)
Taxes 5.265%
202,414.97
$                                    
(where applicable)
(8)
multiply or enter - tax on Mat and Eqp only
Add (7) + (8)
4,046,953.81
$                                 
Subtotal (9)
Traffic Control (Allowance)
336,000.00
$                                     
Off Duty Police (Allowance)
227,000.00
$                                     
Heavy Cleaning (Allowance)
13,720.00
$                                       
Construction Water (Allowance)
25,000.00
$                                       
Odor Control (Allowance)
75,000.00
$                                       
Striping (Allowance)
20,000.00
$                                       
Misc (Allowance)
200,000.00
$                                     
896,720.00
$                                    
Subtotal (10)
Project Total 
4,943,673.81
$             
[add 9+10]

Item
Description
Unit
Total Quantity
Unit Price
Total Price
1
Mobilization/Demobilization
LS
1
44,361.20
$          
44,361.20
$               
2
Potholing
DY
10
2,608.56
$            
26,085.60
$               
3
Priest & Southern Bypass System Installation And Removal
LS
1
500,364.12
$       
500,364.12
$            
4
College Ave Bypass System Installation And Removal
LS
1
179,575.48
$       
179,575.48
$            
5
Priest & 16th St. Bypass Installation And Removal
LS
1
240,923.43
$       
240,923.43
$            
6
Bypass Operation Priest & Southern
DY
34
12,030.59
$          
409,040.06
$            
7
Bypass Operation College Ave
DY
36
8,765.81
$            
315,569.16
$            
8
Bypass Operation Priest & 16th St.
DY
17
9,836.64
$            
167,222.88
$            
9
Bypass Piping Trenching & Removal
LF
973
200.88
$                
195,456.24
$            
10
Cleaning Of Existing 36" Pipe
LF
761
9.74
$                      
7,412.14
$                  
11
Cleaning Of Existing 42" Pipe
LF
469
10.84
$                   
5,083.96
$                  
12
Man Entry T-Lock Removal 42" Pipe
LF
469
12.13
$                   
5,688.97
$                  
13
Install 36" CIPP Lining
LF
761
211.33
$                
160,822.13
$            
14
Install 42" CIPP Lining
LF
469
262.25
$                
122,995.25
$            
15
Post-CIPP Pano Inspection
LF
1230
9.00
$                      
11,070.00
$               
16
Modify & Repair Bench/Throat Interface For CIPP Installation Det 1 Sht 15
EACH
4
33,579.60
$          
134,318.40
$            
17
Modify & Repair Manhole Cone For CIPP Installation
EACH
1
13,626.68
$          
13,626.68
$               
18
Rehabilitate Manhole (Epoxy Coat)
SF
1747
91.09
$                   
159,134.23
$            
19
Rehabilitate Manhole (PVC T-Lock NW31N5MH0079)
EACH
1
25,696.51
$          
25,696.51
$               
20
Rehab Bench & Channel Interface W/ FRP Det 2 Sht 15
EACH
2
32,736.05
$          
65,472.10
$               
21
Install 60-inch Diameter Polymer Concrete Insert
EACH
1
40,493.28
$          
40,493.28
$               
22
CCTV Manholes
EACH
7
385.00
$                
2,695.00
$                  
23
Asphalt Replacement Priest (10" Thick)
SY
1245
96.91
$                   
120,652.95
$            
24
Asphalt Replacement College Ave/Mill Ave (6" Thick)
SY
176
81.29
$                   
14,307.04
$               
25
Replace Concrete Sidewalk
SF
75
80.02
$                   
6,001.50
$                  
26
Replace Concrete Scupper
SF
90
69.93
$                   
6,293.70
$                  
27
Replace Valley Gutter
SF
60
68.68
$                   
4,120.80
$                  
28
Replace Concrete Curb And Gutter
LF
30
105.63
$                
3,168.90
$                  
29
General Conditions
MO
10
37,733.60
$          
377,336.00
$            
PROPOSAL/GENERAL CONDITIONS:
3,364,987.71
$          
30
Overhead & Profit @ 12%
LS
1
403,798.53
$       
403,798.53
$            
PROPOSAL/GENERAL CONDITIONS + OH&P:
3,768,786.240
$       
31
Insurance (1%)
LS
1
37,687.86
$          
37,687.86
$               
PROPOSAL/GENERAL CONDITIONS + OH&P + INSURANCE:
3,806,474.100
$       
32
Payment and Performance Bond (1%)
LS
1
38,064.74
$          
38,064.74
$               
PROPOSAL/GENERAL CONDITIONS + OH&P + INSURANCE + BOND:
3,844,538.84
$          
33
Sales Tax (5.265%)
LS
1
202,414.97
$       
202,414.97
$            
PROPOSAL/GENERAL CONDITIONS + OH&P + INSURANCE + BOND + TAX:
4,046,953.81
$         
34
Traffic Control (Allowance)
AL
1
336,000.00
$       
336,000.00
$            
35
Off Duty Police (Allowance)
AL
1
227,000.00
$       
227,000.00
$            
36
Heavy Cleaning (Allowance)
HR
20
686.00
$                
13,720.00
$               
37
Construction Water (Allowance)
AL
1
25,000.00
$          
25,000.00
$               
38
Odor Control (Allowance)
AL
1
75,000.00
$          
75,000.00
$               
39
Striping (Allowance)
AL
1
20,000.00
$          
20,000.00
$               
40
Misc (Allowance)
AL
1
200,000.00
$       
200,000.00
$            
PROJECT TOTAL:
4,943,673.81
$          
JOINT TEMPE MESA SEWER REHABILITATION - 2025
SCHEDULE OF VALUES
CITY OF TEMPE PROJECT NO - 3221025B

ID
Task Name
Duration
Start
Finish
1
3221025B JOINT TEMPE-MESA SEWER REHABILITATION - 2025
224 days
Mon 2/9/26
Wed 12/23/26
2
ADMINISTRATION & CLOSEOUT
224 days
Mon 2/9/26
Wed 12/23/26
3
NTP
0 days
Mon 2/9/26
Mon 2/9/26
4
SUBMITTALS
15 days
Mon 2/9/26
Fri 2/27/26
5
SUBSTANTIAL COMPLETION
0 days
Wed 12/9/26
Wed 12/9/26
6
STRIPING REPAIRS
3 days
Thu 12/10/26
Mon 12/14/26
7
PUNCHLIST
10 days
Thu 12/10/26
Wed 12/23/26
8
FINAL COMPLETION
0 days
Wed 12/23/26
Wed 12/23/26
9
MANHOLE REHAB SW21N4MH0077 - PRIEST DR & 16TH ST
61 days
Mon 3/2/26
Tue 5/26/26
10
MOBILIZE EQUIMENT & BYPASS
5 days
Mon 3/2/26
Fri 3/6/26
11
INSTALL SUCTION PITS
6 days
Wed 3/4/26
Wed 3/11/26
12
POTHOLE BYPASS TRENCHING ALIGNMENT
3 days
Fri 3/6/26
Tue 3/10/26
13
SAWCUT, MILL PLATES, & BYPASS TRENCHING
4 days
Thu 3/12/26
Tue 3/17/26
14
HDPE FUSION & INSTALLATION
16 days
Wed 3/4/26
Wed 3/25/26
15
DISHCHARGE MANHOLE PIPING SETUP
2 days
Thu 3/26/26
Fri 3/27/26
16
SET PUMPS & SUCTION STINGER ASSEMBLIES
8 days
Mon 3/30/26
Wed 4/8/26
17
TEST 18" HDPE DISCHARGE PIPING
2 days
Thu 4/9/26
Fri 4/10/26
18
SET PLUGS
1 day
Mon 4/13/26
Mon 4/13/26
19
REHABILITATE MH SW21N4MH0077
9 days
Tue 4/14/26
Fri 4/24/26
20
TEST MANHOLE
1 day
Mon 4/27/26
Mon 4/27/26
21
POST PANO MANHOLE FOR INSPECTION
1 day
Tue 4/28/26
Tue 4/28/26
22
REMOVE PLUGS & SHUT DOWN BYPASS
1 day
Wed 4/29/26
Wed 4/29/26
23
REMOVE BYPASS
10 days
Thu 4/30/26
Wed 5/13/26
24
BACKFILL BYPASS TRENCHES
2 days
Wed 5/6/26
Thu 5/7/26
25
RESTORE SUCTION MANHOLE CONE AND DISCHARGE MANHOLE 
CONE
2 days
Fri 5/8/26
Mon 5/11/26
26
REPAIR COUPONS
3 days
Tue 5/12/26
Thu 5/14/26
27
CONCRETE CAP COUPONS
2 days
Thu 5/14/26
Fri 5/15/26
28
REMOVE CMP & BACKFILL SUCTION PITS
4 days
Mon 5/18/26
Thu 5/21/26
29
ASPHALT PREP & PAVE
2 days
Fri 5/22/26
Tue 5/26/26
30
MANHOLE REHAB
31 days
Wed 5/27/26
Wed 7/8/26
31
SW21N4MH0091 (EPOXY COAT)
7 days
Wed 5/27/26
Thu 6/4/26
32
SW21N4MH0049 (EPOXY COAT)
7 days
Fri 6/5/26
Mon 6/15/26
33
NW16N4MH0006 (EPOXY COAT)
11 days
Tue 6/16/26
Tue 6/30/26
34
NW31N5MH0079 (PVC T-LOCK)
5 days
Wed 7/1/26
Tue 7/7/26
35
POST PANO MANHOLE INSPECTIONS
1 day
Wed 7/8/26
Wed 7/8/26
36
COLLEGE AVE CIPP LINING
63 days
Thu 5/14/26
Tue 8/11/26
37
MOBILIZE EQUIPMENT & BYPASS 
3 days
Thu 5/14/26
Mon 5/18/26
38
HDPE FUSION & INSTALLATION
13 days
Tue 5/19/26
Fri 6/5/26
39
POTHOLE BYPASS TRENCHING ALIGNMENT
4 days
Tue 5/19/26
Fri 5/22/26
40
SAWCUT, MILL PLATES, & BYPASS TRENCHING
4 days
Tue 5/26/26
Fri 5/29/26
41
REMOVE SUCTION MANHOLE CONE
2 days
Mon 6/1/26
Tue 6/2/26
42
REMOVE DISCHARGE MANHOLE
2 days
Wed 6/3/26
Thu 6/4/26
43
SET PUMPS & STINGER ASSEMBLIES
5 days
Fri 6/5/26
Thu 6/11/26
44
TEST BYPASS DISCHARGE PIPING
2 days
Fri 6/12/26
Mon 6/15/26
45
SET PLUGS
1 day
Tue 6/16/26
Tue 6/16/26
46
NW34N4MH0048 INSERT INSTALLATION
10 days
Wed 6/17/26
Tue 6/30/26
2/9
SUBMITTALS
12/9
STRIPING REPAIRS
PUNCHLIST
12/23
MOBILIZE EQUIMENT & BYPASS
INSTALL SUCTION PITS
POTHOLE BYPASS TRENCHING ALIGNMENT
SAWCUT, MILL PLATES, & BYPASS TRENCHING
HDPE FUSION & INSTALLATION
DISHCHARGE MANHOLE PIPING SETUP
SET PUMPS & SUCTION STINGER ASSEMBLIES
TEST 18" HDPE DISCHARGE PIPING
SET PLUGS
REHABILITATE MH SW21N4MH0077
TEST MANHOLE
POST PANO MANHOLE FOR INSPECTION
REMOVE PLUGS & SHUT DOWN BYPASS
REMOVE BYPASS
BACKFILL BYPASS TRENCHES
RESTORE SUCTION MANHOLE CONE AND DISCHARGE MANHOLE CONE
REPAIR COUPONS
CONCRETE CAP COUPONS
REMOVE CMP & BACKFILL SUCTION PITS
ASPHALT PREP & PAVE
SW21N4MH0091 (EPOXY COAT)
SW21N4MH0049 (EPOXY COAT)
NW16N4MH0006 (EPOXY COAT)
NW31N5MH0079 (PVC T-LOCK)
POST PANO MANHOLE INSPECTIONS
MOBILIZE EQUIPMENT & BYPASS 
HDPE FUSION & INSTALLATION
POTHOLE BYPASS TRENCHING ALIGNMENT
SAWCUT, MILL PLATES, & BYPASS TRENCHING
REMOVE SUCTION MANHOLE CONE
REMOVE DISCHARGE MANHOLE
SET PUMPS & STINGER ASSEMBLIES
TEST BYPASS DISCHARGE PIPING
SET PLUGS
NW34N4MH0048 INSERT INSTALLATION
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Qtr 1, 2026
Qtr 2, 2026
Qtr 3, 2026
Qtr 4, 2026
Qtr 1, 2027
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: 3221025B Joint Tempe
Date: Mon 12/15/25

ID
Task Name
Duration
Start
Finish
47
NW34N4MH0052 REHAB
8 days
Wed 7/1/26
Fri 7/10/26
48
CIPP CHANNEL & BENCH MODIFICATONS
5 days
Wed 6/17/26
Tue 6/23/26
49
CLEAN & CCTV TWO 36-INCH SEWER SEGMENTS
2 days
Wed 6/24/26
Thu 6/25/26
50
CCTV REVIEW & ACCEPTANCE OF SEWER SEGMENT TO CIPP
1 day
Fri 6/26/26
Fri 6/26/26
51
CIPP LINE 761 LF OF 36-INCH SEWER
4 days
Mon 6/29/26
Thu 7/2/26
52
REBUILD CHANNEL AND BENCHES FOR CIPP MANHOLES
5 days
Fri 7/3/26
Thu 7/9/26
53
BENCH/THROAT INTERFACE REPAIRS @ 2 CIPP MANHOLES
8 days
Tue 7/7/26
Thu 7/16/26
54
POST PANO CIPP & MANHOLES
1 day
Fri 7/17/26
Fri 7/17/26
55
CIPP PANO REVIEW AND ACCEPTANCE
1 day
Mon 7/20/26
Mon 7/20/26
56
REMOVE PLUGS AND SHUTDOWN BYPASS
1 day
Tue 7/21/26
Tue 7/21/26
57
REMOVE BYPASS
9 days
Wed 7/22/26
Mon 8/3/26
58
BACKFILL BYPASS TRENCHES
3 days
Fri 7/24/26
Tue 7/28/26
59
RESTORE SUCTION MANHOLE & DISCHARGE CONE
4 days
Wed 7/29/26
Mon 8/3/26
60
CONCRETE RESTORATION
4 days
Tue 8/4/26
Fri 8/7/26
61
ASPHALT PREP & PAVE
2 days
Mon 8/10/26
Tue 8/11/26
62
PRIEST & SOUTHERN CIPP LINING
89 days
Tue 8/4/26
Wed 12/9/26
63
MOBILIZE EQUIMENT & BYPASS
5 days
Tue 8/4/26
Mon 8/10/26
64
SUBCUT 5' DEEP FOR BYPASS SUCTION PITS
10 days
Thu 8/6/26
Wed 8/19/26
65
INSTALL SUCTION PITS & CMP
8 days
Thu 8/20/26
Mon 8/31/26
66
POTHOLE BYPASS TRENCHING ALIGNMENT
2 days
Thu 8/20/26
Fri 8/21/26
67
SAWCUT, MILL PLATES, & BYPASS TRENCHING
4 days
Mon 8/24/26
Thu 8/27/26
68
HDPE FUSION & INSTALLATION
16 days
Wed 8/12/26
Wed 9/2/26
69
DISHCHARGE MANHOLE & PIPING SETUP
2 days
Thu 9/3/26
Fri 9/4/26
70
SET PUMPS & SUCTION STINGER ASSEMBLIES
9 days
Tue 9/8/26
Fri 9/18/26
71
TEST 18" HDPE DISCHARGE PIPING
4 days
Mon 9/21/26
Thu 9/24/26
72
SET PLUGS
1 day
Fri 9/25/26
Fri 9/25/26
73
CIPP MH CHANNEL & BENCH MODIFICATONS
4 days
Mon 9/28/26
Thu 10/1/26
74
CLEAN 42-INCH SEWER SEGMENT
1 day
Fri 10/2/26
Fri 10/2/26
75
MAN ENTRY T-LOCK CLEANING & REMOVAL
2 days
Mon 10/5/26
Tue 10/6/26
76
POST-CLEANING CCTV
1 day
Wed 10/7/26
Wed 10/7/26
77
CCTV REVIEW & ACCEPTANCE OF PIPE CLEANING/PREP
1 day
Thu 10/8/26
Thu 10/8/26
78
CIPP LINE 469 LF OF 36-INCH SEWER
2 days
Fri 10/9/26
Mon 10/12/26
79
REBUILD CHANNEL AND BENCHES AT CIPP MANHOLE
4 days
Tue 10/13/26
Fri 10/16/26
80
BENCH/THROAT INTERFACE REPAIRS
7 days
Thu 10/15/26
Fri 10/23/26
81
RESTORE CIPP INSERTION MANHOLE CONE
1 day
Mon 10/26/26
Mon 10/26/26
82
POST PANO CIPP & MANHOLES
1 day
Tue 10/27/26
Tue 10/27/26
83
CIPP PANO REVIEW & ACCEPTANCE
1 day
Wed 10/28/26
Wed 10/28/26
84
REMOVE PLUGS & SHUT DOWN BYPASS
1 day
Thu 10/29/26
Thu 10/29/26
85
REMOVE BYPASS
16 days
Fri 10/30/26
Fri 11/20/26
86
BACKFILL BYPASS TRENCHES
3 days
Wed 11/4/26
Fri 11/6/26
87
REPAIR COUPONS
4 days
Mon 11/9/26
Thu 11/12/26
88
CONCRETE CAP COUPONS
4 days
Wed 11/11/26
Mon 11/16/26
89
REMOVE CMP & BACKFILL SUCTION PITS
6 days
Fri 11/13/26
Fri 11/20/26
90
BACKFILL BYPASS SUCTION PIT SUBCUT AREAS
8 days
Mon 11/23/26
Fri 12/4/26
91
ASPHALT PREP & PAVE
3 days
Mon 12/7/26
Wed 12/9/26
NW34N4MH0052 REHAB
CIPP CHANNEL & BENCH MODIFICATONS
CLEAN & CCTV TWO 36-INCH SEWER SEGMENTS
CCTV REVIEW & ACCEPTANCE OF SEWER SEGMENT TO CIPP
CIPP LINE 761 LF OF 36-INCH SEWER
REBUILD CHANNEL AND BENCHES FOR CIPP MANHOLES
BENCH/THROAT INTERFACE REPAIRS @ 2 CIPP MANHOLES
POST PANO CIPP & MANHOLES
CIPP PANO REVIEW AND ACCEPTANCE
REMOVE PLUGS AND SHUTDOWN BYPASS
REMOVE BYPASS
BACKFILL BYPASS TRENCHES
RESTORE SUCTION MANHOLE & DISCHARGE CONE
CONCRETE RESTORATION
ASPHALT PREP & PAVE
MOBILIZE EQUIMENT & BYPASS
SUBCUT 5' DEEP FOR BYPASS SUCTION PITS
INSTALL SUCTION PITS & CMP
POTHOLE BYPASS TRENCHING ALIGNMENT
SAWCUT, MILL PLATES, & BYPASS TRENCHING
HDPE FUSION & INSTALLATION
DISHCHARGE MANHOLE & PIPING SETUP
SET PUMPS & SUCTION STINGER ASSEMBLIES
TEST 18" HDPE DISCHARGE PIPING
SET PLUGS
CIPP MH CHANNEL & BENCH MODIFICATONS
CLEAN 42-INCH SEWER SEGMENT
MAN ENTRY T-LOCK CLEANING & REMOVAL
POST-CLEANING CCTV
CCTV REVIEW & ACCEPTANCE OF PIPE CLEANING/PREP
CIPP LINE 469 LF OF 36-INCH SEWER
REBUILD CHANNEL AND BENCHES AT CIPP MANHOLE
BENCH/THROAT INTERFACE REPAIRS
RESTORE CIPP INSERTION MANHOLE CONE
POST PANO CIPP & MANHOLES
CIPP PANO REVIEW & ACCEPTANCE
REMOVE PLUGS & SHUT DOWN BYPASS
REMOVE BYPASS
BACKFILL BYPASS TRENCHES
REPAIR COUPONS
CONCRETE CAP COUPONS
REMOVE CMP & BACKFILL SUCTION PIT
BACKFILL BYPASS SUCTION PIT SU
ASPHALT PREP & PAVE
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Qtr 1, 2026
Qtr 2, 2026
Qtr 3, 2026
Qtr 4, 2026
Qtr 1, 2027
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 2
Project: 3221025B Joint Tempe
Date: Mon 12/15/25

TRADE/ MATERIAL
COMPANY
PRICE
SELECTED
CIPP LINING
B&F (Self-Perform)
$            269,889.27 
Selected as Lowest Bidder
Insituform
$            482,968.00 
SAK
$            693,760.00 
EPOXY COATING
B&F (Self-Perform)
$            159,138.42 
Selected as Lowest Bidder
JPCI
$            176,000.00 
FRP REHAB
B&F (Self-Perform)
$            162,873.54 
Selected as Lowest Bidder
JPCI
$            169,500.00 
PVC T-LOCK MANHOLE REHAB
Sonco
$              23,250.00 
Only qualified bidder
ASPHALT REPLACEMENT
P1 Paving
$            148,678.00 
Selected as lowest bidder
YSC
$            177,840.65 
Vortex
$            177,941.04 
COMPOSITE MANHOLE INSERT
Armorock
$              16,070.00 
Only Bidder
Rock Hard by P3 Polymers
No Bid 
READY-MIX
AZ Materials
$            120,468.91 
Selected
Martin Marietta
$            127,424.00 
Desert Ready Mix
$            127,361.75 
Selected 
MAG SPEC ABC
Desert Ready Mix
$22.50/Ton 
Selected as Lowest Bidder
Insearch
$22.95/Ton 
Cemex
$23.65/Ton 
VENDOR SOLICITATION & SELECTION SUMMARY

Bid Item
Description
Quantity
Unit
Total Price
Total Price
Total Price
Priest & Southern Scope of Work
882
SY
83.00
$         
73,206.00
$         
102.36
$       
90,280.81
$       
-
$             
-
$                  
2" AC Surface Course
882
SY
-
$             
-
$                    
-
$             
-
$                  
23.76
$         
20,956.32
$       
8" AC Base Course
713
SY
-
$             
-
$                    
-
$             
-
$                  
78.56
$         
56,013.28
$       
Finegrading/Prep
713
SY
-
$             
-
$                    
-
$             
-
$                  
6.94
$           
4,948.22
$         
College Ave Scope of Work
169
SY
73.00
$         
12,337.00
$         
100.19
$       
16,932.00
$       
-
$             
-
$                  
2" AC Surface Course
169
SY
-
$             
-
$                    
-
$             
-
$                  
40.86
$         
6,905.34
$         
4" AC Base Course
86
SY
-
$             
-
$                    
-
$             
-
$                  
72.12
$         
6,202.32
$         
Finegrading/Prep
86
SY
-
$             
-
$                    
-
$             
-
$                  
33.36
$         
2,868.96
$         
Priest & 16th St Scope of Work
690
SY
91.50
$         
63,135.00
$         
102.36
$       
70,627.84
$       
-
$             
-
$                  
2" AC Surface Course
690
SY
-
$                    
-
$                  
23.56
$         
16,256.40
$       
8" AC Base Course
523
SY
-
$                    
-
$                  
86.97
$         
45,485.31
$       
Finegrading/Prep
523
SY
-
$                    
-
$                  
12.15
$         
6,354.45
$         
Mobilizations
3
EA
-
$             
-
$                    
-
$             
-
$                  
2,997.00
$    
8,991.00
$         
Crack Seal
2508
LF
-
$             
-
$                    
-
$             
-
$                  
1.18
$           
2,959.44
$         
148,678.00
$        
177,840.65
$      
177,941.04
$      
TOTAL PRICE
BID RESULTS: ASPHALT REPLACEMENT
P1 Paving
YSC
Vortex
Unit Price
Unit Price
Unit Price

ACCEPTED: 
 
The above prices and scope of work are accepted 
Buyer:  
Signature:  
Date: 
CONFIRMED: 
 
P1 PAVING AND CONSTRUCTION, LLC. 
Matt Tormey 
Signature:  
 
Date: 
10/16/2025 
 
P1 Paving and Construction LLC. 
8550 n 91st ave, Suite 65 
Peoria AZ, 85345 
P1Paving.com 
To: TRAVIS MONK 
Company: B&F CONTRACTING 
Address: TEMPE CMAR 
Project: TEMPE CMAR 
Matt Tormey 
602-359-1393 
Matt@p1paving.com 
Item Description 
Quantity 
Unit 
Total price 
1 Priest and Southern - May 2026 
Furnish, place and compact 10" depth AC 
720 SY at 8" depth and 878 SY at 2" depth 
878 
SY 
$83.00 
$72,874.00 
 
2 College Ave & Baseline - July 2026 - Asphalt price good till end of July 
Furnish, place and compact 6" depth AC 
78 SY at 4" depth and 159 SY at 2" depth 
159 
SY 
$73.00 
$11,607.00 
 
3 Priest and Southern - November 2026 - Asphalt price good till end of Nov. 
Furnish, place and compact 10" depth AC 
512 SY at 8" depth and 656 SY at 2" depth 
656 
SY 
$91.50 
$60,024.00 
Total Bid Price: 
$144,505.00 
• Final invoice will be for the above quantity, if quantity is reduced P1 Paving must be notified and will need to re-bid 
• Should the actual asphalt thickness exceed the asphalt thickness included in this proposal, the owner will be responsible for additional 
costs 
• Final quantitys greater than the above proposal will be billed at the same unit price 
• Saw cutting is NOT included unless specifically stated in the above proposal 
• Price is based on water being available on-site 
• Any pre-existing ADA compliance issues are excluded 
• Work performed on weekends WILL incur additional costs unless specifically stated in proposal 
• P1 Paving is not responsible for ponding water where the grade is less than 2% 
• P1 Paving is not responsible for pedestrian / bicycle / any traffic that travels through fresh concrete 
• P1 Paving is not responsible for any utility lines that could be damaged through normal work 
• Overlay projects are subject to reflective cracking and are not warrantied 
• This proposal is valid for 30 days from submittal. After 30 days all proposals must be reviewed by P1 Paving and Construction

Young, Swenson Cross Paving, Inc.
1329 E. Gibson Lane, Phoenix, AZ 85034
Phone: 602-254-7474, Fax 602-254-7476
License #: ROC299308
Bid To:
B&F Contracting, Inc.
Date:
Travis Monk
Estimate #:
11011 N. 23rd Ave.
Phoenix, AZ. 85029
Project Name:
Tempe/Mesa Sewer Rehab CMAR
Phone:
Project Address:
Various Locations
e-mail: tmonk@bfcontracting.com
Tempe/Mesa, AZ.
Bid Detail
Assuming 10" Thick
A.
Install 10" of Asphalt to (12) areas that total approximately 1,534 SY.
$157,019
1. Apply tack to existing saw cut edges.
2. Install new 3/4" EVAC Gyratory hot mix asphalt to a depth of 3", and compact to proper density.
3. Install new 3/4" EVAC Gyratory hot mix asphalt to a depth of 2.5", and compact to proper density.
4. Install new 3/4" EVAC Gyratory hot mix asphalt to a depth of 2.5", and compact to proper density.
5. Saw cut asphalt in prepartation for removal.
6. Demo, remove, and haul away exisiting asphalt for T-top.
7. Apply tack to existing asphalt surface .
8. Install new 1/2" EVAC Gyratory hot mix asphalt to a depth of 2", and compact to proper density.
9. Use hot rubber sealant to seal all joints of the newly installed asphalt.
NOTE:
Includes (2) weekday mobilizations.
NOTE:
Asphalt to be installed in (4) lifts.
NOTE:
Area is to be at proper grade (+/- 0.25") and base compacted to proper density by others.
NOTE:
Additional paving mobilization charges will be at $3,800 each.
Assuming 6" Thick
B.
Install 6" of Asphalt to (5) areas that total approximately 159 SY.
$16,932
1. Apply tack to existing saw cut edges.
2. Install new 3/4" EVAC Gyratory hot mix asphalt to a depth of 3.5", and compact to proper density.
3. Saw cut asphalt in prepartation for removal.
4. Demo, remove, and haul away exisiting asphalt for T-top.
5. Apply tack to existing asphalt surface .
6. Install new 1/2" EVAC Gyratory hot mix asphalt to a depth of 2.5", and compact to proper density.
7. Use hot rubber sealant to seal all joints of the newly installed asphalt.
NOTE:
Includes (1) weekday mobilization.
NOTE:
Asphalt to be installed in (2) lifts.
NOTE:
Area is to be at proper grade (+/- 0.25") and base compacted to proper density by others.
NOTE:
Additional paving mobilization charges will be at $3,800 each.
NOTE:
YSC Paving, Inc. will not be held responsible for any settling of asphalt due to
subgrade/ABC preparation by OTHERS.
NOTE:
Includes demo and removal of existing materials for T-top.
NOTE:
Any additional square yards patched back will be billed via change order.
NOTE:
Excludes traffic control / barricades, Slurry Seal, Fog Seal, Engineering, Survey, Testing, Permits, or any
other items not specified above.
NOTE:
Changes in the asphalt thickness will require a signed change order prior to paving.
Total: $173,951
ESTIMATE
10/28/2025
CC25112
623-582-1170
WHERE SUCCESSFUL PROJECTS BEGIN.
Pricing is valid until 3/30/2026, if we receive a subcontract by 11/28/2025.
Page 1 of 2

Young, Swenson Cross Paving, Inc.
1329 E. Gibson Lane, Phoenix, AZ 85034
Phone: 602-254-7474, Fax 602-254-7476
License #: ROC299308
TERMS AND CONDITIONS:
Price includes (unless otherwise stated) 1 weekday mobilization, equipment, labor, license, and materials. Weekend work is extra.
Sprinkler and irrigation water to be turned off for the duration of projects by owner.
A two(2) year warranty on all workmanship, labor, and materials (except ordinary wear/abuse, failure due to work placed by Others)
is standard.
Price EXCLUDES engineering, testing, inspection, permits, bonds, utility adjustments, utility asphalt repairs, stripes, sawcut, 
prime coat, soil sterilant, colored concrete, Rip Rap, spillways, extruded curb, parking blocks, encasements, drywells, trenches, 
demolition, environmental controls, ABC, private utility locators, traffic control plans, or any other items unless specifically noted.
Seal Coat and Slurry Seal adhesion cannot be guaranteed on heavily oil contaminated areas.
Tire marks due to hard steering, hot weather, abuse are normal and unavoidable and should not be concern.
YSC is not responsible for drainage on projects with less than 1% fall, subgrade deficiencies, damage to underground utilities
or survey monuments not located by Blue Stake "811" or for private lines by owner prior to start of work.
Material prices are good for 30 days from the date on the estimate unless otherwise stated. ****See Market Volatility note above.
Unless stated specifically in the above scope YSC Paving, Inc. is not responsible for making any site conditions or improvements
ADA compliant. It is recommended that the client use a certified ADA consultant for site evaluations and recommendations as
required by applicable Federal and State laws. YSC Paving will then make the recommended changes and additional charges will
apply. 
PRELIMINARY / LIEN PROCEDURES:  A preliminary notice will be mailed within 20 days, from the start of the project.  This is
NOT A LIEN and is NOT RECORDED AGAINST YOUR PROPERTY.
This notice will be mailed to the owner, construction lender, general contractor, and/or owner/owner's agent in order to preserve the 
claimant's right to later file a mechanic's lien or make claim against a payment bond if he or she is not paid.  This Pre-lien is also
for your protection.  It informs you, at the outset of the claimant's work, of the type and dollar range of the materials or services 
to be provided to your project.  This allows you to track payments downstream to the claimant, and in return, collect partial and  
final lien waivers throughout the project.  The Pre-lien enables you to make sure the appropriate parties are paid, and to minimize 
the chance of a mechanic's lien or a bond claim at the conclusion of the project.  NOTE: You may also receive other Pre-liens 
from other subcontractors, suppliers, or similar entities involved in you project.
Any deviations from the specifications involving extra costs will become an extra charge above the estimate.
The above proposal is not intended to be used as specifications for other vendors or contractors.
All sales tax included in total.
Payment terms to be - 50% Down and Balance due upon completion of project.
Payment can be made by Check, ACH transfer, or Credit Card (Visa, Mastercard). A processing fee of 3% will be applied to 
all credit card payments.
Total: $173,951
The above prices, specifications, and conditions
are satisfactory and are hereby accepted. You
Date:
Print Name & Title:
are authorized to do the work as specified.
Signature:
CC25112
Acceptance of Estimate #
Submitted By:
Chris Cathcart
602-254-7474
chris@yscpaving.com
Page 2 of 2

Date: 
Bid #:
Item #
Description
Quantity
Unit
Unit Price
Total
1
Priest and Southern - Arterial Street (Finegrade ABC)
720
             
SY
6.94
$                    
4,996.80
$          
2
Priest and Southern - Arterial Street (Base Course 8")
720
             
SY
78.56
$                  
56,563.20
$        
3
Priest and Southern - Arterial Street (Surface Course 2")
878
             
SY
23.76
$                  
20,861.28
$        
4
College Ave  n/o Baseline – Collector Street (Finegrade ABC)
78
                
SY
33.36
$                  
2,602.08
$          
5
College Ave  n/o Baseline – Collector Street (4" Base Course)
78
                
SY
72.12
$                  
5,625.36
$          
6
College Ave  n/o Baseline – Collector Street (2" Surface Course)
159
             
SY
40.86
$                  
6,496.74
$          
7
Priest and Southern – Arterial Street (Finegrade ABC)
512
             
SY
12.15
$                  
6,220.80
$          
8
Priest and Southern – Arterial Street (8" Base Course)
512
             
SY
86.97
$                  
44,528.64
$        
9
Priest and Southern – Arterial Street (2" Surface Course)
656
             
SY
23.56
$                  
15,455.36
$        
10
Crack Seal Joints using Crafco Poly III
2,508
          
LF
1.18
$                    
2,959.44
$          
11
Mobilization 
3
                  
EA
2,997.00
$            
8,991.00
$          
Total:
$175,300.70
Notes:
1
2
Accepted By:______________________________________________Date:_______________
BID PROPOSAL
10/16/2025
AZ ROC # 346003
Client:
Job:
Excludes: Bonds, Permits, Sales Tax, Quality Control Testing, Survey, Water Buy (Hydrants to be Provided by Owner), Inspection 
Fees, Unsuitable Subgrade, Removals from other trades, Temp. Fencing, Pedestrian Access,  Portable Toilets, Private Locating, 
Potholing, Layout, AC Material Escalations after 12/31/26, Slurry Seal, Asphalt and ABC Escalations after 12/31/26, Special 
Inspections and Insurance, Certified Payroll or Prevailing wages, SWPPP, Dust Permit, Hazardous Materials, Landscaping or 
Decorative Rock, Sawcutting or Removal of Sawcuts
Asphalt Priced to Utilize EVAC PG 70-10 Conventional Mix. ABC to be turned over to Vortex within .1'. Each Site to be completed in 
1 Mobilization for Consecutive Finegrading and Paving Operation. Vortex to mobilize to site when entire area is within .1' per 
email from Travis Monk. Unit Pricing Based on 3 Mobilizations. 
B&F Contracting 
COT - COM Joint Sewer MH Rehab
Joint Tempe - Mesa Sewer Rehab CMAR

Bid Item
Description
Quantity
Unit
Total Price
Total Price
Total Price
36" Mobilization
1
LS
30,000.00
$  
30,000.00
$         
13,000.00
$  
13,000.00
$       
12,466.87
$  
12,466.87
$       
Furinsh & Install 36" CIPP Liner
761
LF
500.00
$       
380,500.00
$       
325.00
$       
247,325.00
$     
183.06
$       
139,308.66
$     
42" Mobilization
1
LS
30,000.00
$  
30,000.00
$         
13,000.00
$  
13,000.00
$       
9,666.87
$    
9,666.87
$         
Furinsh & Install 42" CIPP Liner
469
LF
540.00
$       
253,260.00
$       
447.00
$       
209,643.00
$     
231.23
$       
108,446.87
$     
693,760.00
$        
482,968.00
$      
269,889.27
$      
TOTAL PRICE
BID RESULTS: CIPP LINING
SAK Construction
Insituform
B&F Contracting
Unit Price
Unit Price
Unit Price

CONTRACTOR LICENSE & REGISTRATION NUMBERS:  AZ – 277787    UT – 6981198-5501    NM – 374011 
 
CA – 758411    OR – 133115    WA – INSITTL883CW    NV – 0048110    HI – 21894    AK – 25830 
 
 
9/25/2025                                                                                                            
 
Project Proposal 
 
Re: 
Joint Tempe – Mesa Sewer Rehabilitation Project – 2025 – CIPP Lining 
Project No. 3221025B 
 
Tempe, AZ 
 
 
 
 
  
Attn: 
Travis Monk 
 
B&F Contracting, Inc. 
 
 
 
 
INSITUFORM TECHNOLOGIES, LLC herein proposes to furnish a Proposal for the labor, materials, equipment, and 
services set forth below to reconstruct the referenced project. The following prices should be considered 
confidential. 
 
PROPOSAL PRICING 
 
Bid 
Item 
Description 
Quantity Unit 
Unit Cost 
Amount 
1 
Mobilization 36” CIPP Liner 
1 
LS 
 $      13,000.00  
$        13,000.00 
2 
Furnish & Install 36” CIPP Liner 
761 
LF 
 $      325.00  
$        247,325.00 
3 
Mobilization 42” CIPP Liner 
1 
LS 
 $      13,000.00  
$        13,000.00 
4 
Furnish & Install 42” CIPP Liner 
469 
LF 
 $      447.00  
$        209,643.00 
 
TOTAL 
 
 
  
$      482,968.00 
 
Lining only (See full list of Inclusions & 
Exclusions below) 
 
 
 
 
 
ASSUMPTIONS AND QUALIFICATIONS 
 
Insituform Technologies, LLC (Insituform) have based this proposal on a nominal wall thickness for the Insitutube 
as shown in the specifications or derived from general, industry accepted specifications and design criteria.  This is 
based on the best available information at the time of this proposal. Existing pipe deterioration in excess of the 
conditions assumed, ground water loads in excess of those assumed, or other loads or conditions may increase 
the recommended thickness for all or portions of the work.  Final recommendations may be submitted to you 
following the completion of the preliminary TV phase of the project.  Stated prices are subject to adjustment if 
design changes are agreed upon. 
 
Insituform is a NON-union shop, is considered a specialty contractor, and shall not be subject to any union 
requirements or project labor agreements. 
 
Water shall be provided at no cost to Insituform for all construction phases of this project.  Insituform will follow all 
required deposit, backflow prevention, and metering procedures. We estimate that 135,000 gallons of water will be 
required for the 36” CIPP installation, and 110,000 gallons of water will be required for the 42” CIPP installation. 
 
Access requirements for existing pipeline to be rehabilitated shall be provided by Owner and/or Prime Contractor – 
includes entry and exit access approved from Insituform Project Manager and/or Field Engineer. This includes 
manhole cone removal and bench opening at manholes MH 0012 and MH 0015, which will be our two installation 
locations.

Insituform Proposal 
 
Page 2 of 3 
We anticipate 4 days for installation of the 36” CIPP liner and 3 days for installation of the 42” liner. We anticipate a 
lead time of 4 to 6 weeks for procurement of the CIPP liner after the pre-installation CCTV inspection and pipe 
diameter measurements are completed.  We have crews and resources available, and will coordinate with B&F to 
meet the project schedule. 
 
Specific service connections, if encountered, will not be reconnected only when written directions are received 
from the Owner.  The Owner will indemnify and hold Insituform harmless from all claims arising from backups and 
other effects of such actions or inactions from services not opened at the Owner’s request.  In the event that 
Insituform is unable to locate or reconnect a service lateral internally, the Prime Contractor will externally 
reconnect the service and repair any damages to the CIPP at no cost to Insituform.   
 
PROPOSAL INCLUSIONS 
 
Insituform proposal pricing includes only the items listed below; other items, scope of work, and/or project 
requirements are not part of the Insituform proposal pricing:  
 
1. Two mobilizations and demobilizations - based on a mutually agreeable schedule between Insituform 
and the Owner and/or Prime Contractor. The Owner and/or Prime Contractor needs to give Insituform 
at least one-week advance notice of any changes to the mutually agreed upon schedule. If through no 
fault of Insituform the mutually agreed upon schedule changes with less than one-week notice, then 
Insituform may charge the Owner and/or Prime Contractor an additional mobilization charge and any 
potential lost materials including but not limited to tube already “wetout”.   
2. Installation of Cured-In-Place Pipe (CIPP) lining per ASTM F1216 Cured-In-Place Pipe Lining including 
inversion, curing, and finishing. Insituform will utilize a polyester resin system.  
3. CCTV, post-installation. 
4. Confined space safe entry practices. 
5. As specified standard construction warranty. 
6. Certificate of insurance with a standard coverage. 
 
PROPOSAL EXCLUSIONS 
 
Insituform proposal pricing excludes all items and scope of work listed below.  These items, if needed or found to 
be applicable, would be provided by Insituform at your additional cost; or would be furnished by others, at your 
direction, at no cost to Insituform: 
 
1. Bypass Pumping 
2. Traffic Control 
3. Cleaning and CCTV, pre-installation. 
4. Heavy cleaning, mechanical cleaning. 
5. T-Lock PVC Liner Repair 
6. Removal/installation of fittings or valves 
7. Internal lateral reinstatement. 
8. Lateral Sealing – Top Hats by others 
9. Manhole installation, rehabilitation, and/or replacement 
10. Manhole cone removal and bench widening. 
11. FRP sealing at manholes per Detail 1 on Sheet 14 of the project drawings. 
12. Point repairs, if required, prior to lining 
13. Excavation of any kind 
14. Filling of annular space between casing and host pipe 
15. Water for curing of CIPP installation 
16. Trenchless point repairs or sectional liners 
17. Removal of manhole cones for access to sewer pipe – none are expected 
18. Restorations, finished surface repairs (e.g. landscaping, sidewalk, road repairs), or any finished surface 
repairs required by the owner. 
19. Archaeological Monitoring 
20. Owner or General Contractor to provide access to water from fire hydrants within a convenient distance 
from each cleaning and inversion site location 
21. If any hazardous or toxic materials are encountered during the project, the Owner will be responsible for 
the removal and disposal of the materials. 
22. Any special permits or licenses 
23. State and local sales and/or use taxes are excluded, including gross receipts. If the project is exempt, 
please submit the appropriate documentation.

Insituform Proposal 
 
Page 3 of 3 
24. Additional premiums for special insurance coverage(s) required by you or other parties particular to this 
project. 
25. Performance and payment bond not included but is available upon request. If required, please add 2.5% 
to the total project cost. 
26. Stamped Designs. 
 
PROPOSAL TERMS AND CONDITIONS 
 
a) When CIPP is required to negotiate bends or defects in the host pipe, there is a tendency to experience 
wrinkling in the installed CIPP around the inside radius of the bend or in the area where the host pipe defect is 
located.  This is normal and should be expected.  It will not affect the structural integrity of the finished product.  
Insituform Technologies, LLC will not be liable for repairs or penalties due to wrinkles in the CIPP at the 
locations of bends or defects in the host pipe. 
b) Limits of Liability.  In consideration of INSITUFORM TECHNOLOGIES, LLC agreement to maintain no less than 
$5,000,000 of comprehensive general liability insurance in the form required by the Contract, INSITUFORM 
TECHNOLOGIES, LLC liability to the Owner for any matter covered by such insurance will be limited to the extent 
of such insurance and the Owner will indemnify and hold INSITUFORM TECHNOLOGIES, LLC harmless from any 
third party claims covered by such insurance to the extent such claims exceed the limits of such insurance.  
Neither party shall be liable to the other for consequential damages relating to the contract.  In case of conflict 
between this provision and any other provision in the Contract as ultimately executed, this provision shall 
govern and prevail. 
c) LIMITED WARRANTY.  IN LIEU OF ALL OTHER EXPRESSED, IMPLIED AND/OR STATUTORY.  
WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR 
PURPOSE, INSITUFORM AGREES TO CORRECT ANY DEFECTS IN THE MATERIALS OR SERVICES 
PROVIDED BY INSITUFORM WHICH ARE BROUGHT TO THE ATTENTION OF INSITUFORM WITHIN 
ONE YEAR FOLLOWING COMPLETION OF INSITUFORM'S WORK, PROVIDED OWNER AFFORDS 
INSITUFORM SUITABLE ACCESS AND WORKING CONDITIONS TO ACCOMPLISH SUCH CORRECTION. 
d) MUTUAL RELEASE OF CONSEQUENTIAL DAMAGES.  Neither party shall be liable to the other for 
consequential damages relating to or arising out of the Contract. 
e) PROPOSAL SUBJECT TO NEGOTIATION OF OTHER STANDARD TERMS OF AGREEMENT.  This 
proposal is subject to agreement of the parties on other terms and conditions as are customary in contracts of 
this nature. 
f) 
If actual quantities differ significantly from those stated in the proposal, then work will be renegotiated. 
g) Payments are due at net within thirty days of invoice.  Final payment is due within thirty days of completion of 
project. 
h) Monthly progress partial payments may be requested for the value of work in progress or completed, including 
materials secured and on site. 
i) 
Prices stated are in effect for thirty days from the date of this proposal.  The acceptance period may be 
extended at the sole option of INSITUFORM TECHNOLOGIES, LLC. 
j) 
Conflicts.  In case of conflict between the provision of the aforesaid paragraphs and any other provision in the 
Contract as ultimately executed the provisions as set forth above shall govern and prevail. 
 
OFFERED BY: 
 
 
 
 
 
ACCEPTED BY:  
 
INSITUFORM TECHNOLOGIES, LLC  
 
 
 
 
 
 
 
 
 
 
BRAD CONDER 
COMMERCIAL MANAGER 
(801) 472-8472 
bconder@azuria.com 
 
 
 
 
 
 
 
ARIZONA OFFICE: 
 
645 SOUTH 24TH STREET 
TEMPE, AZ 85282 
(480) 446-0620 
 
 
 
__________________________________________
CONTRACTOR NAME OR ORGANIZATION 
 
 
__________________________________________
SIGNATURE 
 
 
__________________________________________
AUTHORIZED REPRESENTATIVE 
 
 
__________________________________________
TITLE 
 
 
__________________________________________
DATE

636.385.1000 tel  
 
222 Seale Road 
San Antonio, TX 78219 
 
www.sakcon.com 
 
 
 
PROPOSAL 
FROM: Patrick Hale 
COMPANY: SAK Construction, LLC 
 
DATE: 09/24/25 
 
RE: 
Tempe/Mesa, AZ – Sewer Rehab 2025 Project # 3221025B 
 
 
 
The following is our unit price quotation for the CIPP portion of the above referenced project: 
 
 
 
*** SAK CONSTRUCTION IS A UNION CONTRACTOR *** 
 
PROPOSAL INCLUSIONS: 
1. One mobilization / demobilization to the project site for the CIPP lining crew.  Any additional mobilizations 
will be negotiated as extra work. 
2. Provide installation of approximately 1,230 LF of cured-in-place pipe (CIPP) in the designated 42”, and 36” 
sewer pipelines.  The CIPP will utilize a polyester resin system and be installed per the project specification.   
3. Provide 2-year construction warranty on CIPP materials and workmanship. 
4. Provide certificate of insurance and endorsements evidencing typical coverage and limits for General 
Liability ($1 million / $2 million), Automobile Liability ($1 million), Workers’ Compensation & Employer’s 
Liability ($1 million), and if required, Excess Liability ($5 million).  If insurance coverage above and beyond 
this is required, the General Contractor will be responsible for securing any additional insurance coverage or 
reimbursing SAK for the costs associated with obtaining the additional insurance. 
5. When payment of prevailing wages is applicable, provide the required documentation showing workers on 
this project have been paid in accordance with the relevant prevailing wage determination for the 
appropriate laborer classification. 
 
PROPOSAL EXCLUSIONS: 
The following items are not included in this proposal, and when required, will be provided by the General 
Contractor at no cost to SAK.  If SAK is required to provide any of these items, the costs will be charged to the 
General Contractor as extra work. 
1. Provide any point repairs or other repairs necessary or required to repair or prepare the existing pipeline for 
CIPP lining.  This also includes any offset joint repairs that may need to be done internally. 
2. Provide initial Cleaning and TV inspection of the CIPP-lined mainline pipe and provide videos to the 
subcontractor at least 3 weeks prior to CIPP lining and provide required documentation of the inspection to 
the Owner.  
ITEM NO.
ITEM DESCRIPTION
QTY
U/M
UNIT PRICE
TOTAL PRICE
BASE BID
1
Mobe/Demobe - 36" Scope
1
LS
30,000.00
$             
30,000.00
$             
2
Furnish & Install 36" CIPP Liner
761
LF
500.00
$                  
380,500.00
$           
3
Mobe/Demobe - 42" Scope
1
LS
30,000.00
$             
30,000.00
$             
4
Furnish & Install 42" CIPP Liner
469
LF
540.00
$                  
253,260.00
$           
TOTAL BASE BID:
693,760.00
$

3. Provide any necessary traffic, parking, &/or pedestrian control.  Traffic, parking, &/or pedestrian control 
systems shall be coordinated to accommodate SAK’s operations and placed in a timely manner such that 
SAK’s operations are not impeded or delayed.  The General Contractor shall also be responsible for all 
required traffic control plans. 
4. Provide any necessary plugging, damming, diversion, shutdown, and/or bypass pumping of existing pipeline 
flows, including providing any necessary dewatering of the pipelines, structures, access points, and liner 
termination points once the plugs, dams, diversion, shutdown, &/or bypass systems are in place and 
operating.  Bypass or diversions systems shall be coordinated to accommodate SAK’s operations and 
placed in a timely manner such that SAK’s equipment and personnel are not obstructed by suction & 
discharge locations, or other components of the diversion or bypass system, and SAK’s operations are not 
impeded or delayed.  This shall also include providing any necessary odor control &/or monitoring work. 
5. Provide any required installation of top hat type service connection seals at reinstated lateral connections, 
when applicable. 
6. Provide legal and physical access to the pipeline, manholes, structures, and other access points sufficient to 
allow SAK’s operations to be conducted, and to allow large trucks and equipment to access the structures 
and manholes directly when in streets, or as near as possible for easement locations.  When applicable, this 
shall include locating, exposing, and making accessible any manholes, structures, or other access points, 
associated with SAK’s work, including any necessary alterations to fencing, trees and vegetation, and 
providing any final restoration once SAK’s operations are complete.  When necessary, this shall also include 
providing expanded access by either staging construction of new structures or temporarily altering existing 
structures where the existing or new structure configuration will impede SAK’s operations. 
7. Provide any final repair, testing &/or inspection of CIPP-lined pipes when additional work has been 
performed in or on those pipes by others subsequent to the completion of SAK’s work. 
8. Provide access to a high-volume water supply at the project site either from the nearest fire hydrants, or 
other high-volume on-demand sources, as designated by and coordinated with SAK.  Access to the water 
source must either be directly at each installation site or be within 500 feet of each installation site and able 
to be piped directly to the installation site. 
9. When needed, secure permissions and provide access to appropriate dump/discharge sites at the project 
site for disposal of liquids and material collected from the pipelines during pipeline lining operations and 
other waste materials from the project. 
10. Any Styrene mitigation or odor control. 
11. Provide access to a secure yard at or near site for staging and storage of equipment and materials, when 
available. 
12. Any and all required SWPPP and implements. 
13. Provide all required notifications of agencies and other parties affected by the work.  This shall include 
providing any necessary community relations or public relations work. 
14. Obtain and pay for all special licenses, permits, variances, or other fees required to perform the work.   
 
OTHER CONDITIONS: 
1. Work covered by this proposal will be performed under a mutually agreed upon subcontract agreement 
which incorporates the terms and conditions contained in this proposal either by direct attachment, by 
insertion, or by reference.  In case of conflict, the terms and conditions of this proposal shall prevail.  The 
subcontract agreement shall not require either party to be liable to the other for consequential damages 
arising out of or relating to the subcontract or contract. 
2. Work covered by this proposal will be performed under a mutually agreed upon project schedule.  No 
material acquisition or mobilization will commence prior to the execution of a mutually agreed upon 
subcontract agreement.  Once crews have been mobilized to site, work covered under this proposal must be 
able to proceed at an unrestricted pace without impediment or delay.  If SAK’s operations are delayed by 
the General Contractor or others, then standby costs &/or additional mobilization costs will be charged to the 
General Contractor accordingly. 
3. Normal working hours for installing CIPP are 24-hours a day due to the nature of the product, which requires 
that once an install is started, it cannot be suspended until it is completed.  To the extent that SAK will incur 
overtime expenses due to this schedule, those costs have been anticipated and are covered in this

proposal.  However, SAK will not be liable for any penalties, liquidated damages, overtime inspection costs, 
or other fees that may result from these required working hours. 
4. Progress and final payments are due within 30 days of invoice, or when applicable regulations require, 
whichever is soonest.  Release of any withheld retention shall be no later than 30 days from the completion 
and acceptance of the work covered under this proposal, excluding any subsequent work required in the 
warranty period, and regardless of whether the General Contractor’s retention has been released by the 
Owner.  If retention is not withheld from the General Contractor’s payments, then retention shall not be 
withheld from SAK’s payments.  Overdue amounts will be subject to interest at a rate of 1.5% monthly, 18% 
annually. 
5. This proposal covers only the scope of work specifically included above.  It does not cover performing any  
cleaning or inspection of pipe or structures not specifically included above; warranty inspections or testing; 
verification of active/inactive status of laterals; alteration, repair, installation, or rehabilitation of manholes or 
other structures; abandonment of any pipe or structures; bypassing, plugging, shutdown, damming, 
diversion, or dewatering of existing pipe flows or structures; odor control &/or odor monitoring work or plans; 
pedestrian control, parking control, or traffic control; sampling or testing of the installed CIPP liner not 
specifically included above; sampling or testing of any substances or materials on the project not specifically 
included above; alteration, testing, sealing, repair, replacement, or rehabilitation of any lateral pipes or 
lateral connections, aside from any internal reinstatement specifically included above; grouting or repair of 
obstructions, voids, or defects in the host pipe prior to or after lining; top hat type lateral service connection 
seals; mandrel testing or other similar testing of the pipe; or any work requiring excavation. This proposal 
also does not cover providing any field yards, meeting facilities, or office facilities for the project; phones, 
cameras, computer software, or computer equipment for the use of the General Contractor or Owner; 
photos or other documentation for record of pre- or post-construction site conditions; tree or vegetation 
clearing, trimming, removal, protection or restoration; site grading; snow &/or ice removal; handling, 
transportation, or disposal of hazardous materials; surveying or staking; engineered plans, designs, or 
drawings, with the only exception being if the CIPP specification specifically requires engineered CIPP 
thickness designs, then those designs will be provided; preparation or implementation of any pollution 
control or environmental protection programs or plans; environmental stewardship; street sweeping; 
security; fire control truck and operator; fencing of any kind; erosion or sedimentation control; community 
relations or public relations work; project signs or advance notification signs; submission of information 
beyond this proposal for escrow bid documentation; and any necessary archaeological, biological, or ground 
settlement / movement monitoring and mitigation.  If any of this type of work is required to be performed by 
SAK, it will be considered to be extra work and charged accordingly. 
6. For the purposes of this proposal, the General Contractor shall be defined to be the entity contracting with 
SAK to perform the work covered under this proposal. 
7. This proposal is valid for 120 days from the date of submission as indicated above. 
 
SAK acknowledges receipt of Zero (0) addenda for this project

Bid Item
Description
Quantity
Unit
Total Price
Total Price
Modify & Repair Bench/Throat Interface For CIPP 
Installation Det 1 Sht 15 
4
EA
26,475.36
$   
105,901.44
$        
27,500.00
$   
110,000.00
$      
Rehab Bench & Channel Interface W/ FRP Det 2 Sht 15
2
EA
28,486.05
$  
56,972.10
$         
29,750.00
$  
59,500.00
$       
162,873.54
$        
169,500.00
$      
TOTAL PRICE
BID RESULTS: FRP REHAB
B&F Contracting
JPCI
Unit Price
Unit Price

Joseph Painting Company, Inc.
4702 E. Virginia Street • Mesa, Arizona 85215-9101
(480) 986-1212 • Fax (480) 380-4461
License No.  ROC197873 KE AZ • ROC199485 KE AZ • ROC242450 KE AZ • ROC218119 A AZ
ROC107144 CR34 AZ • CA Lic 280286 C-33 & A • NV Lic N0. 0058702-A15, No.0058579-C-4
TO:
PHONE:
623-582-1170
FAX:
623-582-3761
DATE:
CELL:
602-326-9282
RE:
ITEM #
1 :
Item #
1 Amount
ITEM #
2 :
Item #
2 Amount
ITEM #
3 :
Item #
3 Amount
ITEM #
4 :
Item #
4 Amount
ITEM #
5 :
Item #
5 Amount
ITEM #
6 :
Item #
6 Amount
ITEM #
7 :
Item #
7 Amount
TOTAL PROPOSAL AMOUNT:
*TPT TAX Paid on Materials at point of Purchase.
..........................................
$34,500.00
Manhole: NW34N4MH0052 - Rehab per spec 02760 and 09710 while under 
bypass (Bench and Channel not included in item 3, refer to item 2)
..........................................
$26,750.00
We propose to complete the following work as described below;
..........................................
$59,500.00
Repair bench throat interface per detail 1 - sheet 15, quantity 4, $27,500.00 
each
Rehabilitate bench and channel interface w/ FRP per Det 2 - sheet 15, 
quantity 2, $29,750 each
$110,000.00
.......................................................................
$345,500.00
The above proposal amount is based on a standard wages, 40 hours per week work schedule. Extended hours, 
weekend holiday work and Davis bacon wages will be an add to the contract amount. All work orders need to give 
JPCI Services a minimum of two weeks notice before the start of the project. Price valid for 90 days from date of 
proposal.
J P C I  SERVICES
Manhole: SW21N14MH0077 - Remove existing coating and Rehab per spec 
02760 and 09710 while under bypass
..........................................
$32,750.00
Manhole: MW16N4MH0006 - Remove existing coating and Rehab per spec 
02760 and 09710 ( no bypass, supplied air required)
..........................................
Manhole: SW21N4MH0091 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
PROPOSAL
Travis Monk
B&F Contracting
November 13, 2025
Manhole: SW21N4MH0049 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
..........................................
$34,500.00
City of Tempe 3221025B Joint Tempe Mesa Sewer Rehab
..........................................
$47,500.00
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

Sincerely,
Superintendent
Accepted by:
Phone:
Job Superintendent:
Phone:
Estimated Start Date:
PO/Contract #:
Please notify Beckey Durfee at (480)986-1212 if there is a change in the start date.
If you accept this proposal, please complete the information requested below and fax to (480)380-4461, along with a 
site map.
The cost of bonds, traffic control, bypass, permit fees, removal/relocation of existing utility lines/pipes, removal or 
replacement of walls/interfering structures, third party inspections, concrete repairs where loss is > 3" and 
dehumidification are excluded from the above proposal.  Please do not hesitate to call should you need more 
information.
NACE CIP Level 2 No. 72522
Damyon Carr
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

DESERT READY MIX 
                                                                                                           READY MIX CONCRETE SALES AND SERVICE 
 
                                                                                                       4011 PRESIDO STREET 
 
                                                                                                    MESA, AZ  85215 
                                                                                                            OFFICE: 480-428-2280  FAX: 480-985-4248 
* E – Environmental | S – Saturday Fee | F – Fuel Surcharge  
 
Begin Date: 
October 1, 2025 
Quote # : 
29498 
Expiration Date: 
June 30, 2026 
MAP/GRID 
 
 
 
 
 
Item Code 
Item Description 
Est. Qty 
Price 
S500501      
PHCLSM.5 (1/2 SK SLURRY COP)             
1225 
$105.00 
A203051      
MAG A 3000 NAT POZZ                      
30 
$137.00 
A204051      
MAG AA 4000 NAT POZZ                     
10 
$135.00 
AG010003     
MAG SPEC ABC (NON-LIME)                  
1200 
$22.50 
TC           
TEMPERATURE CONTROL                      
 
$1.00 
              Ready Mix Fees                                                                                 Minimum Load Fee 
Quoted By: 
JUSTIN DAWSON                            
 
Customer: 
B & F CONTRACTING INC                    
Customer Code: 
BFCO001    
Address: 
11011 N 23RD AVE                         
 
PHOENIX, AZ  85029 
Contact: 
NANCY A/P                                
Phone: 
623-582-1170 O 
Fax: 
 
Project: 
JOINT TEMPE-MESA SEWER REHAB CMAR        
Job Address: 
SOUTHERN & PRIEST                        
Terms Description: 
2% 10TH NET 30                            
Fee ID * 
UOM 
Price 
ENV 
PER YARD  
$3.25 
FSC 
PER LOAD  
TBD 
Less than or equal to 
UOM 
Price 
2 
Load 
0 
3.5 
Load 
0 
5.5 
Load 
0 
• 
Normal operating hours are Mon-Fri, Sat, Sun or Holidays are subject to surcharges. 
• 
Color added at no expressed guarantee. 
• 
Drivers do not accept cash or make change. 
• 
Desert Ready Mix reserves the right to increase prices due to RAW Material cost increases 
such as Cement, Fly Ash, Aggregates or unexpected Fuel increases. 
• 
All specialized aggregate sales are based on availability. 
• 
Deliveries less than 6 Cubic yards are subject to our minimum load charges. 
• 
This quote does not guarantee product or service availability 
• 
All Aggregates and Concrete deliveries include a per load fuel surcharge.

QUOTE
QUOTE
Project Name
Project Location
Map ID
Quote Date :
11/13/2025
Joint Tempe-Mesa Sewer Rehab CMAR
Southern and Priest, Tempe
149
Submitted
To
"Simply Better Than the Best"
8845 S Hardy Dr. Tempe, AZ 85284
Phone (480)-940-0100 Fax (480)-940-3338
Travis Monk
B and F Contracting Inc.
P.O. Box 54785
Phoenix ,   AZ   85078-4785
Quote Expiration Date:
12/13/2025
Quote No. :
78466
Conditions:
1. B and F Contracting Inc. will assure accessibility (ingress/egress) to the job site without hindrance or delay.
3. B and F Contracting Inc. will place all orders for material at least five (5) business days before 
2. Insearch Corporation will not be responsible for any dust control, track out, street sweeping on the job site.
4. Payment invoices will be due within 30 days of delivery date.
Exclusions :
1. Quoted prices DO NOT include Saturdays, Sundays, legal holidays, or nights. Additional charges MAY apply if
any of these conditions become prevelant.
2. Insearch Corporation will not be held responsible for traffic control, taxes, bonds, fees, flag personnel,
material testing, environmental analysis, erosion control, engineering and staking.
delivery is required.
Insearch Corporation :
B and F Contracting Inc.  : 
$26,340.00
Total  :
5. Upon the issuance of your Purchase  Order prior to the Quote Expiration Date, Insearch Corporation will guarantee 
pricing not to increase as indicated in the Pricing Good Through Date column above. If the Purchase Order is not 
issued to Insearch Corporation prior to the Quote Expiration Date, this Quote will be considered void. 
5. Upon the issuance of your Purchase  Order prior to the Quote Expiration Date, Insearch Corporation will guarantee 
pricing not to increase as indicated in the Pricing Good Through Date column above. If the Purchase Order is not 
issued to Insearch Corporation prior to the Quote Expiration Date, this Quote will be considered void. 
5. Upon the issuance of your Purchase  Order prior to the Quote Expiration Date, Insearch Corporation will guarantee 
pricing not to increase as indicated in the Pricing Good Through Date column above. If the Purchase Order is not 
issued to Insearch Corporation prior to the Quote Expiration Date, this Quote will be considered void. 
5. Upon the issuance of your Purchase  Order prior to the Quote Expiration Date, Insearch Corporation will guarantee 
pricing not to increase as indicated in the Pricing Good Through Date column above. If the Purchase Order is not 
issued to Insearch Corporation prior to the Quote Expiration Date, this Quote will be considered void. 
5. Upon the issuance of your Purchase  Order prior to the Quote Expiration Date, Insearch Corporation will guarantee 
pricing not to increase as indicated in the Pricing Good Through Date column above. If the Purchase Order is not 
issued to Insearch Corporation prior to the Quote Expiration Date, this Quote will be considered void. 
3. B and F Contracting Inc. will place all orders for material at least five (5) business days before 
6. B and F Contracting Inc. understands that quantities above are approximate and have been provided by B and F 
Contracting Inc.. Actual quanties to be shipped will be determined in the field by a representative of B and F 
Contracting Inc.. If actual ordered and delivered quantity exceeds the quantity on this quote, Insearch Corp. will 
consider the act of ordering the material by B and F Contracting Inc. a Change Order and authorization for payment 
from B and F Contracting Inc..
7. Unless otherwise specified: quoted price(s) are contingent on a 8 hour day in bottom dump trucks. Should the hours 
of delivery be reduced or a change in equipment become neccesary a rate increase may apply.
MAG 702 Spec ABC
Purchase & deliver approx. 1200 Tons of 
MAG Spec ABC to the jobsite in bottom 
dump trucks.  Add $1.00/ton for Supers.
$21.95
$26,340.00
Approximate 
Quanti ty
Material Type
Scop e of Work
Pricin g Good 
Through Date
Unit Price
Estimated   
Total
1200 Tons
3/31/2026
Tax will NOT be char ged unless B  and 
F Contra cting Inc. requ ests Insearch 
Corp to do so.

QUOTE
QUOTE
Project Name
Project Location
Map ID
Quote Date :
11/13/2025
Joint Tempe-Mesa Sewer Rehab CMAR
Southern and Priest, Tempe
149
Submitted
To
"Simply Better Than the Best"
8845 S Hardy Dr. Tempe, AZ 85284
Phone (480)-940-0100 Fax (480)-940-3338
Travis Monk
B and F Contracting Inc.
P.O. Box 54785
Phoenix ,   AZ   85078-4785
Quote Expiration Date:
12/13/2025
Quote No. :
78466

QUO-1471770-G5L8L7 0
1
8888 E. Raintree, Suite 205 Scottsdale, AZ 85260
GENERAL INFORMATION
MATERIAL PRICING
Material 
Number
Description
Plant
Quantity
UoM
Delivered 
Price
Truck Type
Notes
1307799
3/4"-0,BASE COARSE
8984 - Trad - Maricopa
1,200.00
TON
$23.65
16 WHEELER
CLAUSES
Category
Item
Value
UoM
Comments
Pricing Escalation
The prices are subject to an escalation of
x.xx
USD/ton
Effective , and each  months thereafter
Surcharges and Fees
Variable Fuel surcharge
xx.xx
USD/Load
Environmental compliance fee
$0.00
USD/Load
Charged on all loads
Full freight recovery
xx.xx
USD/ton
Based on full freight for a load of 22 Tons
Plant Operning fee for non business hours on weekdays, 
weekends
$1,000.00
USD per Each
Subject to notification
Saturday haul premium
Bid upon request
USD/ton
Aggregates account manager for pricing
Standby charge
xx.xx
USD/min
Subject to notification
Re-handling fee
$40.00
USD/Load
Unsuitable material dumped at landfill, to be reloaded
Pricing Conditions
All Sales are subject to CEMEX Standard terms and conditions. Pricing quoted is per short ton and does not include sales tax.  Applicable Sales Tax will apply unless Sales Tax exemption certificate is 
on file at CEMEX prior to pick up or delivery.
Delivered Pricing: Pricing is based on delivery during regular aggregate plant hours.
FOB Pricing:  Material prices are FOB CEMEX facility at the designated location loaded onto buyer’s trucks. Ownership of materials transfers from CEMEX to customer at gate.
Payment terms
Payment Terms are standard as follows: Net 10th Prox. (10th of the month following delivery or pick up)
Delayed portion of payment will attract a Finance charge of the lessor of 1.5% per month, 18% per annum or maximum permitted under applicable laws
Material Availability
All Materials are subject to availability by plant inventory, production schedules, shipping schedules, plant failure and / or equipment breakdown. CEMEX is not liable for lack of material, equipment, 
drivers, disruptions in transportation, and any other shortage.
Delivery Availability
All shipments are subject to truck availability.
Product Performance
All material is per engineer approval and is considered acceptable when tested and sampled per acceptable sampling standards at our plant.
CEMEX Con Mat South,LLC
B&F CONTRACTING INC
Quoted By:
Accepted By:
Jared K Matkin 
________________________________
TRAVIS MONK 
________________________________
Date
11/13/2025 7:09 AM
Account:
B&F CONTRACTING INC
Account Manager:
Jared K Matkin
Account number:
3029758
E-mail:
jared.matkin@cemex.com
Contact:
TRAVIS MONK
Phone Number:
+16024162677
E-mail:
TMONK@BFCONTRACTING.COM
Phone:
6235821170
Customer Service:
602-416-2658
Project:
D-JOINT TEMPE-MESA SEWER REHAB
Quote Expiration:
12/13/2025
Project Address:
- Southern Av & Priest Dr, Tempe Arizona 85282
Price Valid
From 11/13/2025 To 3/31/2026

Page
 1
of
2
11/12/2025
Notes:
1. Quote is subject to our standard terms, conditions, and shipping policies.
2. Payment is due at Net 30. Late Payment service charge for over 30 days will be charged at 18% APR
3. Quote is valid for 30 days from issue date to receipt of PO after 30 days quote is subject to change based off
market value of materials.
4. Sales tax not included. All applicable taxes are to be paid by purchaser
5. If owner requires items to be grouted in field contractor is responsible for materials and labor costs incurred.
6. All loads will be billed at $1,100 for each legal load out of BC. Total of 1 legal load(s) needed for job. Customer
will only be billed for trucks used. Additional trucks will be billed at market rate.
7. Freight requested under 3 days notice may be subject to increased freight rates
8. Products will be billed at unit pricing per quotation
9. Rush orders will be priced accordingly.
10. Contractor shall be responsible for joint sealing and performance.
11. Miscellaneous items such as grout, epoxy, and hardware are not included with the structures unless a specific
line item is shown on this quote. Additional charges will apply for any extra items that are not shown on this quote.
12. Final lead time is determined at date of approved submittal.
13. Project retention is not allowed.
14. Summation of structure price is for convenience of bidding only. Structures will be billed by
components.Customer purchase order needs to match up to component pricing.
Q  U  O  T  A  T  I  O  N
Quotation 7.5.78.00
Quote Date:
11/12/2025
To:
Reference:
Joint Tempe-Mesa Sewer Rehab ‘25
Tempe, Arizona
Maricopa County
Sales Manager: Austin Black
From: Finn Tystad

_Lifting Equipment
0.00'
0
$1,580
1 RMH60SPREA
DER
60" REHAB SPREADER BAR
SSMH-001 STA 10+00
60" Polymer Rehab
18.30'
6,440
$13,390
1 MHGR30X3
30 IN X 3 IN POLYMER GRADE RING
1 RMHL5330
60 IN ECC POLYMER LID FLAT - REHAB W/
30" ACCESS
1 RMH6024
60 IN X 2 FT POLYMER MH SECTION -
REHAB
3 RMH6048
60 IN X 4 FT POLYMER MH SECTION -
REHAB
8 MASJ
1.25 IN X 14 FT JOINT MASTIC ROLL
1 PGROUT
POLYMER GROUT KIT
Sub-Total
$14,970
Freight/Delivery
$1,100
$16,070
Total Price for
Joint Tempe-Mesa Sewer Rehab ‘25
Structure
Description
Height
Weight
Price
For:
Ref: Joint Tempe-Mesa Sewer Rehab ‘25
Tempe, Arizona
Maricopa County
Quote Date: 11/12/2025
Page
2
of
2
11/12/2025
Quotation 7.5.78.00

1
Travis Monk
From:
Travis Monk
Sent:
Wednesday, November 12, 2025 12:19 PM
To:
'Info@p3polymersllc.com'
Cc:
Saakshi Amrale
Subject:
City of Tempe 3221025B Joint Tempe-Mesa Sewer Rehab - Request for Quote - 
Manhole Insert
Attachments:
Sheet 8.pdf; 2025-1027_3221025_Final_Specifications.pdf
Good Afternoon, 
 
City of Tempe has selected B&F as the Construction Manager at Risk for the 3221025B Joint Tempe-Mesa 
Sewer Rehab project. We are requesting quotes for 1 each composite manhole insert. Attached is 
relevant Project Drawing and Technical Specifications. At the below link available for download are all of 
the Project Documents: 
 
 100% Drawings and Specs 
 
Can you please provide a price for the below by end of day Thursday, November 13th? Insert will need 
to be shipped to Tempe, AZ. 
 
 Composite Manhole Insert Into Existing 60” Diameter Manhole per Tech Spec 13130: 18 VF 
 
Thanks, 
 
 
Travis Monk 
Project Manager  
Mobile: 602-326-9282 | tmonk@bfcontracting.com  
——————————————————————  
B&F Contracting, Inc. | 11011 N 23rd Ave, Phoenix, AZ 85029  
Office: 623-582-1170 | Fax: 623-582-3761 | www.bfcontracting.com 
ROC08974 A | ROC111282 B-4

Bid Item
Description
Quantity
Unit
Total Price
Total Price
Prep & Epoxy Coat NW34N4MH0052
350
SF
91.09
$          
31,882.34
$          
76.43
$          
26,750.00
$        
Prep & Epoxy Coat SW21N4MH0091
289
SF
91.09
$          
26,325.70
$          
119.38
$        
34,500.00
$        
Prep & Epoxy Coat SW21N4MH0049
289
SF
91.09
$          
26,325.70
$          
119.38
$        
34,500.00
$        
Prep & Epoxy Coat SW21N14MH0077
341
SF
91.09
$          
31,062.51
$          
96.04
$          
32,750.00
$        
Prep & Epoxy Coat NW16N4MH0006
478
SF
91.09
$          
43,542.17
$          
99.37
$          
47,500.00
$        
159,138.42
$        
176,000.00
$      
TOTAL PRICE
BID RESULTS: MANHOLE EPOXY COATING
B&F Contracting
JPCI
Unit Price
Unit Price

Joseph Painting Company, Inc.
4702 E. Virginia Street • Mesa, Arizona 85215-9101
(480) 986-1212 • Fax (480) 380-4461
License No.  ROC197873 KE AZ • ROC199485 KE AZ • ROC242450 KE AZ • ROC218119 A AZ
ROC107144 CR34 AZ • CA Lic 280286 C-33 & A • NV Lic N0. 0058702-A15, No.0058579-C-4
TO:
PHONE:
623-582-1170
FAX:
623-582-3761
DATE:
CELL:
602-326-9282
RE:
ITEM #
1 :
Item #
1 Amount
ITEM #
2 :
Item #
2 Amount
ITEM #
3 :
Item #
3 Amount
ITEM #
4 :
Item #
4 Amount
ITEM #
5 :
Item #
5 Amount
ITEM #
6 :
Item #
6 Amount
ITEM #
7 :
Item #
7 Amount
TOTAL PROPOSAL AMOUNT:
*TPT TAX Paid on Materials at point of Purchase.
..........................................
$34,500.00
Manhole: NW34N4MH0052 - Rehab per spec 02760 and 09710 while under 
bypass (Bench and Channel not included in item 3, refer to item 2)
..........................................
$26,750.00
We propose to complete the following work as described below;
..........................................
$59,500.00
Repair bench throat interface per detail 1 - sheet 15, quantity 4, $27,500.00 
each
Rehabilitate bench and channel interface w/ FRP per Det 2 - sheet 15, 
quantity 2, $29,750 each
$110,000.00
.......................................................................
$345,500.00
The above proposal amount is based on a standard wages, 40 hours per week work schedule. Extended hours, 
weekend holiday work and Davis bacon wages will be an add to the contract amount. All work orders need to give 
JPCI Services a minimum of two weeks notice before the start of the project. Price valid for 90 days from date of 
proposal.
J P C I  SERVICES
Manhole: SW21N14MH0077 - Remove existing coating and Rehab per spec 
02760 and 09710 while under bypass
..........................................
$32,750.00
Manhole: MW16N4MH0006 - Remove existing coating and Rehab per spec 
02760 and 09710 ( no bypass, supplied air required)
..........................................
Manhole: SW21N4MH0091 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
PROPOSAL
Travis Monk
B&F Contracting
November 13, 2025
Manhole: SW21N4MH0049 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
..........................................
$34,500.00
City of Tempe 3221025B Joint Tempe Mesa Sewer Rehab
..........................................
$47,500.00
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

Sincerely,
Superintendent
Accepted by:
Phone:
Job Superintendent:
Phone:
Estimated Start Date:
PO/Contract #:
Please notify Beckey Durfee at (480)986-1212 if there is a change in the start date.
If you accept this proposal, please complete the information requested below and fax to (480)380-4461, along with a 
site map.
The cost of bonds, traffic control, bypass, permit fees, removal/relocation of existing utility lines/pipes, removal or 
replacement of walls/interfering structures, third party inspections, concrete repairs where loss is > 3" and 
dehumidification are excluded from the above proposal.  Please do not hesitate to call should you need more 
information.
NACE CIP Level 2 No. 72522
Damyon Carr
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

Joseph Painting Company, Inc.
4702 E. Virginia Street • Mesa, Arizona 85215-9101
(480) 986-1212 • Fax (480) 380-4461
License No.  ROC197873 KE AZ • ROC199485 KE AZ • ROC242450 KE AZ • ROC218119 A AZ
ROC107144 CR34 AZ • CA Lic 280286 C-33 & A • NV Lic N0. 0058702-A15, No.0058579-C-4
TO:
PHONE:
623-582-1170
FAX:
623-582-3761
DATE:
CELL:
602-326-9282
RE:
ITEM #
1 :
Item #
1 Amount
ITEM #
2 :
Item #
2 Amount
ITEM #
3 :
Item #
3 Amount
ITEM #
4 :
Item #
4 Amount
ITEM #
5 :
Item #
5 Amount
ITEM #
6 :
Item #
6 Amount
ITEM #
7 :
Item #
7 Amount
TOTAL PROPOSAL AMOUNT:
*TPT TAX Paid on Materials at point of Purchase.
..........................................
$34,500.00
Manhole: NW34N4MH0052 - Rehab per spec 02760 and 09710 while under 
bypass (Bench and Channel not included in item 3, refer to item 2)
..........................................
$26,750.00
We propose to complete the following work as described below;
..........................................
$59,500.00
Repair bench throat interface per detail 1 - sheet 15, quantity 4, $27,500.00 
each
Rehabilitate bench and channel interface w/ FRP per Det 2 - sheet 15, 
quantity 2, $29,750 each
$110,000.00
.......................................................................
$345,500.00
The above proposal amount is based on a standard wages, 40 hours per week work schedule. Extended hours, 
weekend holiday work and Davis bacon wages will be an add to the contract amount. All work orders need to give 
JPCI Services a minimum of two weeks notice before the start of the project. Price valid for 90 days from date of 
proposal.
J P C I  SERVICES
Manhole: SW21N14MH0077 - Remove existing coating and Rehab per spec 
02760 and 09710 while under bypass
..........................................
$32,750.00
Manhole: MW16N4MH0006 - Remove existing coating and Rehab per spec 
02760 and 09710 ( no bypass, supplied air required)
..........................................
Manhole: SW21N4MH0091 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
PROPOSAL
Travis Monk
B&F Contracting
November 13, 2025
Manhole: SW21N4MH0049 - Remove existing coating and Rehab per spec 
02760 and 09710 (no bypass, supplied air required)
..........................................
$34,500.00
City of Tempe 3221025B Joint Tempe Mesa Sewer Rehab
..........................................
$47,500.00
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

Sincerely,
Superintendent
Accepted by:
Phone:
Job Superintendent:
Phone:
Estimated Start Date:
PO/Contract #:
Please notify Beckey Durfee at (480)986-1212 if there is a change in the start date.
If you accept this proposal, please complete the information requested below and fax to (480)380-4461, along with a 
site map.
The cost of bonds, traffic control, bypass, permit fees, removal/relocation of existing utility lines/pipes, removal or 
replacement of walls/interfering structures, third party inspections, concrete repairs where loss is > 3" and 
dehumidification are excluded from the above proposal.  Please do not hesitate to call should you need more 
information.
NACE CIP Level 2 No. 72522
Damyon Carr
Z:\JPCI SERVICES\D & M Project Notes\Bids\B&F\Tempe 3221025B Joint Tempe-Mesa Sewer Rehab\B&F - Tempe 3221025B Joint Tempe - Mesa Sewer 
Rehab

To:
Travis Monk
Proposal #
1800-49
Company:
B&F Contracting
Proposal Date:
09/24/25
Project Name
City Of Tempe 3221025B
Phone:
602-326-9282
Project Address:
City of Tempe  
Email
Tmonk@bfcontracting.com
UNITS
LABOR and MATERIAL
5
4,500.00
$                            
150
18,750.00
$                          
TBD
TBD
*Included in this Proposal 
(1) All labor and equipment necessary. (2) ArmorLok Certified PVC welding Technicians.
(3) Unlimited access to work area. (4) Typical ventilation (5) Top man and confined space restrictions
(6) must be clean and dry
* Excluded from this Proposal
(1)Traffic control. (2) Inspection (3) Exterior water proofing. (4) Sewer bypass and/or plugs.
(5) Damage caused to liner due to operations of other trades. (6) Spray coatings.
(7) Permits, Bonds, Liquidated Damages. (8) Dewatering 
Sonco Construction, Inc.
Prime Contractor
By:
Richard Chico
By:
Date:
Date:
PROPOSAL
        Furnish and install ArmorLok PVC Liner,
to rehabilitate manhole liner and weld 
DESCRIPTION
UNIT PRICE
4927 Toronto Ave
Fontana CA 92336
 (909) 223-1280 /  (909) 260-4749 
license #911666 / dir #1000024656
60" joint welds Det 1 Sheet 13
150 sf PVC Liner repair Det 2 sheet 13
MH NW31N5MH0079
manhole joints.
900.00
$                               
125.00
$                               
8,000.00
$                            
42" Coupon
48" Coupon
8,500.00
$                            
PAYMENT CONDITIONS
BILLING TURNED IN BY THE 25th OF EACH MONTH WILL BE PAID BY THE 10th DAY OF THE FOLLOWING MONTH
SIGNATURE OF THIS DOCUMENT IS TO BE CONSIDERED ACCEPTANCE OF THESE TERMS AND AN AUTHORIZATION TO PROCEED.
THIS PROPOSAL MAY BE SUBJECT TO CHANGE OR CANCELLATION IF NOT ACCEPTED WITHIN 30 DAYS.

Bid Item
Description
Quantity
Unit
Total Price
Total Price
Total Price
1/2 Sack ABC Slurry
1037
CY
100.00 
$        
103,700.00 
$        
107.00 
$        
110,959.00 
$      
105.00 
$        
108,885.00 
$      
Transportation Charge/Fuel Charge
130
Load
35.00 
$          
134.91 
$               
10.00 
$          
1,300.00 
$          
20.00 
$          
2,600.00 
$          
Environmental Fee/CY
1037
CY
- 
$                  
1.00 
$            
1,037.00 
$          
3.25 
$            
3,370.25 
$          
Environmental Fee/Load
130
Load
25.00 
$          
3,250.00 
$            
- 
$                  
- 
$                       
- 
$                  
- 
$                       
SUBTOTAL: 
107,084.91 
 $         
SUBTOTAL: 
113,296.00 
 $       
SUBTOTAL: 
114,855.25 
 $       
MAG 'A' Concrete
68
CY
140.00 
$        
9,520.00 
$            
140.00 
$        
9,520.00 
$          
144.00 
$        
9,792.00 
$          
Transportation Charge/Fuel Charge
12
Load
35.00 
$          
420.00 
$               
10.00 
$          
10.00 
$               
20.00 
$          
240.00 
$             
Environmental Fee/CY
68
CY
- 
$                  
- 
$                         
- 
$                  
- 
$                       
3.25 
$            
221.00 
$             
Environmental Fee
12
25.00 
$          
300.00 
$               
- 
$                  
- 
$                       
- 
$                  
- 
$                       
Shortloads
4
EA
200.00 
$        
250.00 
$               
250.00 
$        
1,000.00 
$          
- 
$                  
- 
$                       
SUBTOTAL: 
10,490.00 
 $           
SUBTOTAL: 
10,530.00 
 $         
SUBTOTAL: 
10,253.00 
 $         
MAG 'AA' Concrete
14
CY
146.00 
$        
2,044.00 
$            
146.00 
$        
2,044.00 
$          
152.00 
$        
2,128.00 
$          
Transportation Charge/Fuel Charge
4
Load
35.00 
$          
350.00 
$               
10.00 
$          
40.00 
$               
20.00 
$          
80.00 
$               
Environmental Fee/CY
14
CY
1.00 
$            
14.00 
$               
3.25 
$            
45.50 
$               
Environmental Fee/Load
4
Load
25.00 
$          
250.00 
$               
- 
$                  
- 
$                       
- 
$                  
- 
$                       
Shortloads
6
EA
200.00 
$        
250.00 
$               
250.00 
$        
1,500.00 
$          
- 
$                  
- 
$                       
SUBTOTAL: 
2,894.00 
 $             
SUBTOTAL: 
3,598.00 
 $           
SUBTOTAL: 
2,253.50 
 $           
120,468.91 
 $         
127,424.00 
 $       
127,361.75 
 $       
Total Ready-Mix:
BID RESULTS: READY-MIX MATERIALS
AZ Materials
Martin Marietta
Desert Ready Mix
Unit Price
Unit Price
Unit Price

Quote Number: 
Q10035016-0
Created On: 
10/2/2025
Quote Expires On:
11/1/2025
Project:
Joint Tempe-Mesa Sewer Rehab
Account:
B & F Contracting Inc
Project Address:  
Account Number:
40032
Southern & Priest
Tempe, AZ 85282
Contact:       
Travis Monk
Estimated Start Date:
2/2/2026
E-mail:
tmonk@bfcontracting.com
Project End Date:
6/30/2026
Phone:
Customer Service: 
Sales Office Address: PO Box 741805 Kilgore Companies
Los Angeles, CA  90074-1805
MATERIAL PRICING
Item Code
Description
Quantity
Unit Price
PHCLSM
1/2 SACK ABC SLURRY (COP)
1,300 CY
$100.00
-Escalator of $2.00 effective 4/1/2026 recurring every 12 months
--
14004
MAG-AA 4000 PSI, 1" ROCK
10 CY
$142.00
-Escalator of $4.00 effective 4/1/2026 recurring every 12 months
--
13004
MAG-A 3000 PSI
30 CY
$136.00
-Escalator of $4.00 effective 4/1/2026 recurring every 12 months
--
SUNDRIES AND SURCHARGES
Item
Comments
Price
Unit
Fuel Surcharge RMX
$35.00
EA
WEEKEND TRUCK TIME
$50.00
EA
ENVIRONMENTAL CHARGE
$25.00
EA
Load Size: 6 yds & less
$200.00
CY
Additional Products & Services
Hot Water
$2.50
PCY
Recover per 1/2 hour
$4.00
OZ
Micro Fiber
$7.50
PCY
Color Wash Out
$25.00
EA
Nitrogen Cooling
$12.50
GAL
Non-Chloride Accerator (per 1%)
$4.00
GAL
Macro Fiber (Structural)
$7.50
PCY
Color Seal
$0.00
PCY
Chilled Water
$2.50
PCY
Respectfully,
Arizona Materials
Sales Rep: Randy Schmolke
Phone: 602-342-6595
Email: rschmolk@summit-materials.com
Customer Acceptance
Signed by:
Date:
__Taxable     __Tax Exempt (Attach Certificate)

DESERT READY MIX 
                                                                                                           READY MIX CONCRETE SALES AND SERVICE 
 
                                                                                                       4011 PRESIDO STREET 
 
                                                                                                    MESA, AZ  85215 
                                                                                                            OFFICE: 480-428-2280  FAX: 480-985-4248 
* E – Environmental | S – Saturday Fee | F – Fuel Surcharge  
 
Begin Date: 
October 1, 2025 
Quote # : 
29498 
Expiration Date: 
June 30, 2026 
MAP/GRID 
 
 
 
 
 
Item Code 
Item Description 
Est. Qty 
Price 
S500501      
PHCLSM.5 (1/2 SK SLURRY COP)             
1225 
$105.00 
A203051      
MAG A 3000 NAT POZZ                      
30 
$137.00 
A204051      
MAG AA 4000 NAT POZZ                     
10 
$135.00 
AG010003     
MAG SPEC ABC (NON-LIME)                  
1200 
$22.50 
TC           
TEMPERATURE CONTROL                      
 
$1.00 
              Ready Mix Fees                                                                                 Minimum Load Fee 
Quoted By: 
JUSTIN DAWSON                            
 
Customer: 
B & F CONTRACTING INC                    
Customer Code: 
BFCO001    
Address: 
11011 N 23RD AVE                         
 
PHOENIX, AZ  85029 
Contact: 
NANCY A/P                                
Phone: 
623-582-1170 O 
Fax: 
 
Project: 
JOINT TEMPE-MESA SEWER REHAB CMAR        
Job Address: 
SOUTHERN & PRIEST                        
Terms Description: 
2% 10TH NET 30                            
Fee ID * 
UOM 
Price 
ENV 
PER YARD  
$3.25 
FSC 
PER LOAD  
TBD 
Less than or equal to 
UOM 
Price 
2 
Load 
0 
3.5 
Load 
0 
5.5 
Load 
0 
• 
Normal operating hours are Mon-Fri, Sat, Sun or Holidays are subject to surcharges. 
• 
Color added at no expressed guarantee. 
• 
Drivers do not accept cash or make change. 
• 
Desert Ready Mix reserves the right to increase prices due to RAW Material cost increases 
such as Cement, Fly Ash, Aggregates or unexpected Fuel increases. 
• 
All specialized aggregate sales are based on availability. 
• 
Deliveries less than 6 Cubic yards are subject to our minimum load charges. 
• 
This quote does not guarantee product or service availability 
• 
All Aggregates and Concrete deliveries include a per load fuel surcharge.

PROJECT NAME
JOB / P. O. NUMBER
QUOTE DATE
TEMPE-MESA SEWER REHAB CMAR
84982 /
10/1/2025 11:12:42 AM
PROJECT LOCATION
BID DATE
SOUTHERN AVE & PRIEST DR  ,  AZ
October 1, 2025
PROJECT START DATE
CUSTOMER
B & F CONTRACTING INC
February 16, 2026
CONTACT
TRAVIS MONK
QUOTE EXPIRATION DATE
TMONK@BFCONTRACTING.COM
September 30, 2026
**See Price Escalators**
STREET ADDRESS
11011 N 23RD AVE
CITY, STATE, ZIP
PHOENIX, AZ  85029-4828
CUSTOMER NO.
992678
4129 E Van Buren St, Suite 200
Phoenix, AZ 85008
(602) 685-3400
QUOTE NUMBER: 157490
SALES REP: Villegas, Raul
(480) 298-0157
Raul.Villegas@MartinMarietta.com
PRODUCT CODE
MATERIAL DESCRIPTION
UOM
USAGE
SLUMP
QTY
PRICE
PHCLSM
1/2 SACK ABC SLURRY (PHCLSM1/2)
CY
SLURRY
8
1225
$107.00
2303141
MAG A, 1"
CY
ENCASEMENT
3-5
30
$144.00
2403141
MAG AA, 1"
CY
ENCASEMENT
3-5
30
$150.00
ADDITIONAL COMMENTS
PRICES DO NOT INCLUDE TAX
ESCALATION NOTES:
CUBIC YARD PRICE INCREASE: 4/1/2026 INCLUDED
CUBIC YARD PRICE INCREASE: 10/1/2026 $8.00
Add:
Add Miscellaneous Extra Charges:
$10.00 Per Load Transportation Surcharge - Add to Above Pricing
$8.00
Per Cubic Yard per each 1% Non Chloride Accelerator (available in 0.25% increments)
$1.00 Per Cubic Yard Environmental Fee - Add to Above Pricing
$3.00
Per Cubic Yard per Each 30 Minute Increment of Hydration Stabilizer (Retarder)
$1.00 Per Cubic Yard Tempered Water Service Fee
$7.00
Per Cubic Yard Mono/Micro Fiber (1LB per Cubic Yard)
$10.00 Per Cubic Yard Saturday Premium Charge
$4.00
Per Pound of Color per Sack of Cement per Cubic Yard
$50.00
Color Washout Fee per Load
$250.00
Per Load Short Load Delivery Fee (Orders of 6 CYs or Less)
$2.00
Per Minute of Wait Time per Load After 45 Minutes (on job standby)
$5.00
Per Gallon Nitro (3 gallons is equivalent to 20 LBs. of ice) Call for Availability
$0.75
Per Pound Ice
$8.00
Per Cubic Yard Cancellation Fee within 24 Hours of Scheduled Start Time ($200 minimum fee)
$100.00
Per Load Multi-Stop Delivery Fee (per stop)
Above pricing is valid for 30 days from quote date, written quote acceptance is required to hold pricing beyond 30 days.
Prices are FOB job site unless noted otherwise and do not include taxes. Sales Tax owed unless exempt documentation is received before the first pour.
See item 7. TERMS: NET 30 DAYS. If not paid when due, Applicant agrees to pay interest charges at the rate of 1.5% per month or the maximum lawful rate, whichever is lower,
and Seller's reasonable costs of collection, including reasonable attorneys’ fees.
Signature:_______________________________________________________
Quote Date: 10/1/2025
Accepted by: __________________________________________
Please Note
All concrete as bid is per 90 minute max delivery and 95 degree max concrete temperature unless noted otherwise. All Concrete as Bid contains Type F Ash and normal weight aggregate unless specifically
 
noted. All concrete pricing above is valid from Monday thru Friday during normal business hours unless noted otherwise. Aggregates are a naturally occurring material which can contain particles that
 
degrade or stain concrete. It is not possible to completely remove all such particles; however, the occurrence is infrequent, and the bulk aggregate meets the Limits for Deleterious Substances and Physical
 
Property Requirements of Coarse Aggregate for Concrete as outlined in ASTM C 33. Martin Marietta does not warranty against these infrequent occurrences.
Minimum amount of standard concrete for deliveries is 2 cubic yards, specialty concrete is 4 cubic yards. Buyer is responsible for safe access to work area and wash out containment area for all deliveries.

PROJECT AREAS
SEE KEYMAP
SHT 04
3221025B
SHT.       OF
01
20
AREA OF DISTURBANCE
NET AREA OF DISTURBANCE 
TOTAL AREA OF DISTURBANCE
33 SY
33 SY
UTILITY CONFLICT CONTACT INFORMATION
ESTIMATED MANHOLE QUANTITIES
MODIFY & REPAIR MANHOLE CONE
2 EA
JOINT TEMPE - MESA SEWER REHABILITATION - 2025
ESTIMATED PIPE QUANTITIES
42" CIPP LINER
36" CIPP LINER
761 LF
469 LF
AC PAVEMENT
33 SY
PROJECT # ___________   DS # __________  EN # ____________  TITLE: ______________________________________
REVISIONS
NO.         DESCRIPTION                         DATE
SOUTHERN AVE.
BROADWAY RD
APACHE BLVD
UNIVERSITY DR.
202 FREEWAY
RIO SALADO PARKWAY
101 FREEWAY
SALT RIVER
McCLINTOCK DR.
SCOTTSDALE RD.
COLLEGE AVE.
PRIEST DR.
McKELLIPS RD.
CURRY RD.
BASELINE RD.
GUADALUPE RD.
ELLIOT RD.
WARNER RD.
KNOX RD.
WESTERN CANAL
RAY RD.
RURAL RD.
I-10 FREEWAY
KYRENE CANAL
KYRENE RD.
HIGHLINE CANAL
MILL AVE.
HARDY DR.
U.P.R.R.
U.P.R.R.
PRICE RD.
52nd. ST.
48TH ST.
CANAL
WASHINGTON ST.
VAN BUREN ST.
GRAND
SALT
RIVER
LAKE
24
23
22
21
20
17
16
15
14
13
12
11
10
9
8
1
2
3
4
5
31
18
11
6
31
30
19
36
18
35
34
33
32
29
28
27
26
25
24
23
22
21
20
17
16
15
14
13
13
11
10
3
9
ONE MILE
EPOXY COAT MANHOLE
1747 SF
60" COMPOSITE INSERT
17 VF
COX COMMUNICATIONS
                                                           DATE
CENTURYLINK 
                                                           DATE
SRP
                                                           DATE
SOUTHWEST GAS
                                                           DATE
ZAYO
                                                           DATE
USIC DISPATCH CENTER - (800) 778-9140                                   05/15/2025
USIC DISPATCH CENTER - (800) 778-9140                                   05/15/2025
ELM LOCATING DISPATCH - (623) 780-3350                                05/15/2025
SRP BLUESTAKE - (602) 236-8026                                                 05/15/2025
ZAYO LOCATE DESK - (800) 364-1063                                           05/15/2025
PROJECT NO.  3221025B
CITY OF TEMPE
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
AS-BUILT INFORMATION IS INCLUDED IN THESE AREAS
ON THIS SET OF DRAWINGS
[TO BE COMPLETED BY CITY INSPECTOR]
COMMUNITY DEVELOPMENT
PERMITS REQUIRED FOR
THIS SET OF DRAWINGS
SEWER (SW)
WATER (WA)
WATER-RECLAIMED (WA)
STORM DRYWELL (DR)
PAVING (PV)
OFFSITE (C, G, SW, DW)
GRADING/DRAINAGE (DR)
FIRE LINE (UF)
CITY IRRIGATION
SHARED USE PATH
LANDSCAPE/SPRINKLER
STREET LIGHTS (ST)
BUILDINGS
BUILDING (BP)
WATER/SEWER (WS)
FIRE (FR)
DEFERRED SUBMIT (DEF)
OTHER
AS-BUILT PLANS CHECKED FOR FIELD CHANGES
CITY INSPECTOR:                                                  DATE:
PARCEL #:
REFERENCE
1/4 SECTION
LOCATION
SW21N4
NW16N4
NW31N4
NW32N4
NE32N4
SW34N4
NW34N4
APPROVED
DEPUTY PUBLIC WORKS DIRECTOR / 
                                        DATE
CITY ENGINEER
CONTACTS:
CITY OF TEMPE
31 EAST FIFTH STREET
GARDEN LEVEL, WEST WING
TEMPE, AZ 85281
(480) 350-8200
ENGINEER/ARCHITECT:
ARNO I. LESKINEN, PE
DIBBLE
3020 E CAMELBACK RD, SUITE 201
PHOENIX, AZ 85016
(602) 957-1155
DESCRIPTION
COVER SHEET
02
01
SHEET NO.
KEYMAP
04
GENERAL NOTES
ABBREVIATIONS & LEGEND
03
CONCEPTUAL BYPASS PLAN
18-20
PIPE & MANHOLE REHABILITATION 
05-13
DETAILS
14-17
MAYOR
COREY D. WOODS
VICE MAYOR
DOREEN GARLID
CITY COUNCIL
JENNIFER ADAMS
NIKKI AMBERG
ARLENE CHIN
BERDETTA HODGE
RANDY KEATING
CITY MANAGER
ROSA INCHAUSTI
CITY ENGINEER
MARK A. WEBER, PE
12-01-2025

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
02
“
”
¾”
”
”
“
”
“
”
”
”
“
”
“
”
GENERAL NOTES
NO OVERLAY
INCLUDED
NO PAVEMENT
SEAL INCLUDED

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
03
ABBREVIATIONS &  LEGEND
STANDARD ABBREVIATIONS & LEGEND
NEW
EXISTING

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
04
KEYMAP

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONSTRUCTION NOTES
REMOVAL NOTES
05
PIPE & MANHOLE REHABILITATION
REFERENCE NOTES
PRIEST DR
2
2
3

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONSTRUCTION NOTES
REMOVAL NOTES
06
PIPE & MANHOLE REHABILITATION
REFERENCE NOTES
COLLEGE AVE
3

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONSTRUCTION NOTES
REMOVAL NOTES
07
PIPE & MANHOLE REHABILITATION
REFERENCE NOTES
COLLEGE AVE
TYPICAL END
SEAL PER CIPP
LINING
SPECIFICATION
SECTION 02148

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
CONSTRUCTION NOTES
REMOVAL NOTES
08
PIPE & MANHOLE REHABILITATION
US 60 AT MILL AVE
REFERENCE NOTES

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
CONSTRUCTION NOTES
REMOVAL NOTES
09
PIPE & MANHOLE REHABILITATION
PRIEST DR

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
10
PIPE & MANHOLE REHABILITATION
PRIEST DR
CONSTRUCTION NOTES
REMOVAL NOTES

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
11
PIPE & MANHOLE REHABILITATION
PRIEST DR
CONSTRUCTION NOTES
REMOVAL NOTES
REFERENCE NOTES

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
12
PIPE & MANHOLE REHABILITATION
PRIEST DR
CONSTRUCTION NOTES
REMOVAL NOTES

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
N/A
13
PIPE & MANHOLE REHABILITATION
SOUTHERN AVE
CONSTRUCTION NOTES
REMOVAL NOTES

DETAILS
PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
14

DETAILS
PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
B
B
A
A
15

16
PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
DETAILS
16

NA
NA
PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
DETAILS
17

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONCEPTUAL BYPASS PLAN
N/A
REFERENCE NOTES
18

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONCEPTUAL BYPASS PLAN
N/A
REFERENCE NOTES
19

PUBLIC WORKS DEPARTMENT
DESIGNED: AF
DRAWN: SKF
DATE
PROJECT NO.
CHECKED: AIL
P.O. BOX 5002, TEMPE, AZ  85280
SCALE:
SURVEYED: N/A
DESCRIPTION
SHT      
C I T Y   O F   T E M P E
ENGINEERING DIVISION
Tempe, Arizona
OF
MARK
DATE
DESCRIPTION
BY
10/2025
3221025B
20
CONSTRUCTION NOTES
NOTE:
ELEVATIONS & DIAMETERS OBTAINED FROM CITY
PROVIDED GIS GEODATABASE & DIGITAL CCTV.
CONTRACTOR SHALL FIELD VERIFIY ALL DIMENSIONS
PRIOR TO ORDERING MATERIALS.
1"=20'
HORIZ:
VERT:
Tempe, Arizona
JOINT TEMPE - MESA SEWER
REHABILITATION - 2025
CONCEPTUAL BYPASS PLAN
N/A
REFERENCE NOTES
20

Joint Tempe-Mesa Sewer Rehabilitation - 2025
Project No.: 3221025B
TECHNICAL SPECIFICATIONS
Submitted To:
CITY OF TEMPE
October 27, 2025
Mayor
Corey D. Woods
Vice Mayor
Doreen Garlid
City Council
Submitted by:
Jennifer Adams
Nikki Amberg
Arlene Chin
Berdetta Hodge
Randy Keating
www.dibblecorp.com
EXHIBIT B

[This page intentionally left blank for double sided printing]

_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
TOC - 1
October 27, 2025
JOINT TEMPE-MESA SEWER REHABILITATION – 2025
TECHNICAL SPECIFICATIONS
 
TABLE OF CONTENTS
Section
Subject
             Pages
DIVISION 1 – GENERAL REQUIREMENTS
01010
Summary of Work
01010-2
01014
Work Sequence
01014-4
01015
Contractor’s Use of Premises
01015-2
01060
Health and Safety
01060-4
01062
Permits and Easements
01062-2
01064
Inspection and Testing
01064-2
01071
Standard References
01071-4
01102
Contractor’s Hazardous Materials Management Program
01102-4
01300
Submittals
01300-6
01310
Progress Schedule
01310-2
01380
Photographs and Video Recordings
01380-2
01550
Contractor’s Utilities
01550-2
01560
Environmental Controls
01560-10
01700
Restoration of Improvements
01700-2
01999
Reference Forms
01999-12
DIVISION 2 – SITE WORK
02100
Traffic Control
02100-2
02145
Diversion of Sewage Flow and Dewatering
02145-6
02148
CIPP Lining of Existing Sewers
02148-18
02760
Sewer Pipe and Sewer Structure Cleaning
02760-4
02761
Remote CCTV Inspection of Existing and Rehabilitated Sewers
02761-6
DIVISION 9 - FINISHES
09710
Concrete and Masonry Coating
09710-28
09720
Fiber Reinforced Polymer (FRP)
09720-24

_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
TOC - 2
October 27, 2025
DIVISION 13 – MISCELLANEOUS
13000
Special Protective Materials Installation
13000-8
13130
Polymer Concrete Manhole Insert
13130-14
13133
Polypropylene Grade Adjusting Rings
13133-4

SECTION 01010
SUMMARY OF WORK
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01010 - 1
 October 27, 2025
PART 1 - GENERAL 
 
1.01
SCOPE 
 
A. All construction shall be provided in accordance with the requirements of the 2025 
Revision to the 2020 Maricopa Association of Government (MAG) and the 2014 City 
of Tempe Supplement to MAG Uniform Standard Specifications and Details for Public 
Works Construction.
B. The Contractor shall provide all materials, equipment, and labor necessary to 
rehabilitate / replace sanitary sewer access manholes utilizing epoxy coating 
technologies, composite inserts, and/or open cut replacement/installation methods 
according to project design drawings and/or technical specifications.
C. Major work to be performed under this contract includes, but is not limited to the 
following: 
1. Provide all traffic control on streets, alleys and driveways during construction as 
necessary for sanitary sewer access manhole rehabilitation and bypass operations. 
Traffic control plans shall be submitted to the City for approval prior to construction 
activities.
2. Restore area disturbed by construction activities back to pre-construction 
conditions.
3. Provide coordination with the City for public notification of construction activities 
to the general public.
4. Provide all bypass pumping, piping, power, noise control, and odor control 
including materials, labor and equipment necessary to divert sanitary sewage flows 
around the rehabilitation construction area as necessary to complete the work.
5. Provide all equipment, labor, and materials required to modify and repair PVC T-
Lock lined RCP for bypass suction ports.
6. Coordinate work activities with adjacent businesses, public events and special 
needs i.e. medical and emergency response.
7. Maintain access to private properties including sidewalks and driveways as 
necessary during the course of the work. Maintain sanitary sewer service to 
properties as necessary to prevent sewage backups into homes and businesses.
8. Provide all necessary equipment to prevent construction debris from entering 
sanitary sewer system.
9. Perform initial cleaning of sanitary sewer pipe to remove all grease, scale, roots, 
debris, and foreign protrusions prior to pipe rehabilitation.
10. Perform “pre” pipe rehabilitation analog CCTV and “post” pipe rehabilitation 
digital panorama CCTV condition documentation.

SECTION 01010
SUMMARY OF WORK
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01010 - 2
October 27, 2025
11. Provide all equipment, labor, and materials required to install CIPP liner sanitary 
sewer pipes as indicated in the design drawings and technical specifications.
12. Provide all equipment, labor, and materials to remove cone and modify 
bench/throat interface as required for CIPP liner installation.
13. Provide all equipment, labor, and materials required to re-install manhole cone and 
apply Fiber Reinforced Polymer wrap onto bench/throat interface, as required post 
CIPP liner installation.
14. Provide all equipment, labor, and materials required to grit and hydro blast clean 
and epoxy coat access manholes as indicated in the Design Drawings and Technical 
Specifications.
15. Provide all equipment, labor, and materials to install polymer concrete manhole 
insert as indicated in the Design Drawings.
16. Provide “post” rehabilitation panorama digital scan of manholes to document as-
built conditions.
1.02
UTILITIES 
A. The Contractor shall field locate and verify the horizontal and vertical location of all 
access manholes along with wet and dry utilities prior to conducting any excavation 
work. 
B. The Contractor is required to contact Arizona 811, formerly Blue Stake, at (602) 263-
1100 at least two (2) working days prior to start of any excavation. 
C. Quarter Section maps of the City’s sanitary sewer collection system are available upon 
request from the City. It shall be the responsibility of the Contractor to coordinate, 
obtain and pay all fees associated with obtaining copies of these maps. The Contractor 
shall not solely rely upon the information contained in the mapping and shall field 
verify for accuracy.
1.03
FLOW CHARACTERISTICS
A. The project sanitary sewer collection system receives wastewater from residential, 
commercial, and industrial facilities within the City. The Contractor shall bypass flows 
around the work area described in the project as necessary to complete the work 
specified.   
B. The collection system may receive nuisance runoff water during storm events.  
Volumes of nuisance water are unpredictable. Contractor shall be responsible to take 
appropriate precaution when rain events are pending.
PART 2 - PRODUCTS 
(NOT USED) 
PART 3 - EXECUTION
(NOT USED)
** END OF SECTION **

SECTION 01014
WORK SEQUENCE
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01014 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
CONTINUITY OF FACILITY OPERATIONS 
 
Work under this Contract shall be planned, scheduled and performed so as to minimize 
disruption to the operation of existing business, facilities, surrounding residents and the 
traveling public.  The Contractor shall provide all equipment and facilities (including 
piping, pumps, odor mitigation, and noise control along with standby power, pumps, 
equipment and appurtenances) necessary to maintain flow through and/or around existing 
facilities.  Contractor shall be responsible for traffic control to redirect the flow of traffic 
through and/or around the work area. 
 
1.02
PROJECT COMPLETION 
 
The project shall be completed within the contract time as outlined in the Agreement. 
1.03
PUBLIC INFORMATION  
 
A. Refer to Technical Specification Section 01310 - Progress Schedule
1.04
PROJECT CONSTRUCTION COORDINATION
 
A. At the Preconstruction Meeting, the Contractor shall designate a Representative who 
will be on the job and available for communication at all times for the duration of the 
construction contract. The Contractor’s Representative shall be available 24 hours a 
day by mobile telephone, home telephone, or other means acceptable to the City or 
City’s Representative. The representative shall be the contact person representing the 
Contractor, and shall be capable of giving direct field orders as the need arises. Official 
job communication shall be conducted between Contractor’s Representative and the 
City or City’s Representative. 
 
B. The Contractor shall obtain written approval from the City or City’s Representative 72 
hours in advance of any change in the Contractor’s daily work schedule. Work 
performed at times other than the approved schedule must first be approved by the City 
or City’s Representative. 
 
C. The Contractor’s Representative shall attend a weekly construction progress meeting.  
Location of the meeting shall be determined by the City or City’s Representative. The 
Contractor shall present and distribute copies of the two week look-ahead schedule, 
report on status of resident concerns reported, any Traffic Control Plan updates, and 
upcoming construction activity coordination.

SECTION 01014
WORK SEQUENCE
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01014 - 2
October 27, 2025
D. Field Superintendent shall be responsible for coordination of the work schedule.  It 
shall be the responsibility of the Contractor to sequence work to resolve conflicts with 
adjacent construction and schedule work accordingly to minimize disruption. The City 
will not entertain Contractor claims for additional compensation arising out of 
construction delays caused by adjacent construction work. City may at its sole 
discretion grant an extension of contract time due to unforeseen delays caused by 
adjacent construction activity conflicts.
1.05
SCHEDULING AND SEQUENCING CONSTRAINTS 
 
A. The Contractor shall rehabilitate sanitary sewer access manholes identified in the 
Design Drawings. Once construction activities commence, the Contractor shall 
continue uninterrupted until all sanitary sewer access manholes identified are 
completed unless variance is obtained in writing from the City.  
 
B. No construction activities shall begin on-site until all required submittals are 
transmitted to the City or City’s Representative and returned with a signed and dated 
approved stamp attached. 
C. Traffic control shall remain in effect as dictated by the approved Traffic Control Plan 
and Permit until all work is completed and inspected. Contractor shall maintain access 
to all private properties within the project area on a 24-hour basis unless written 
approval is otherwise obtained from property(s) owners for reduced access. Copies of 
all written approvals shall be provided to the City or City’s Representative prior to 
work commencing.  Refer to Technical Specification Section 02100 – Traffic Control. 
 
D. Bypassing sewage flow as required for rehabilitation of sanitary sewer access manholes 
is part of this contract. Refer to Technical Specification Section 02145 – Diversion of 
Sewage Flow and Dewatering for the bypass pumping requirements and restrictions. 
  
E. The Contractor shall perform a detailed inspection of the work to confirm completion 
of all work items and conformance to the project Technical Specifications. Final 
inspection of the work will be carried out by the City or City’s Representative after 
receipt of the Contractor’s written request for final inspection. 
 
F. After receipt of the Contractor’s written notice of work completion, the City or City’s 
Representative will perform a detailed inspection and will create a punch list of 
omissions and defects observed. Punch list items shall be promptly corrected by the 
Contractor. The Contractor shall then schedule a time for re-inspection by the City or 
City’s Representative upon satisfactory completion of the punch list items. All costs 
associated with re-inspection, including the City’s Representative’s time and re-
inspection costs, shall be the responsibility of the Contractor.

SECTION 01014
WORK SEQUENCE
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01014 - 3
October 27, 2025
1.06
CONTRACTOR WORK HOURS 
 
A. The Contractor shall ensure adequate resources are available to complete all work 
within regular business hours per City of Tempe-Code of the City Chapter 20 Section 
20-8 – Construction of buildings and projects.  
B. Contractor may be required to operate bypass pumping systems 24-hous per day or 
work at night to minimize disruption to area residents or businesses. It shall be the 
responsibility of the Contractor to ensure City of Tempe work permit allows for 
extended work hours.
PART 2 - PRODUCTS 
(NOT USED)
 
PART 3 - EXECUTION 
(NOT USED)
 
** END OF SECTION **

SECTION 01014
WORK SEQUENCE
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01014 - 4
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01015 
CONTRACTOR’S USE OF PREMISES
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01015 - 1
October 27, 2025
PART 1- GENERAL 
 
1.01
OWNER’S RESPONSIBILITIES 
 
A. The City of Tempe staff is responsible for operating the existing sewers and facilities 
throughout the execution of this Project.  
1.02
CONTRACTOR’S RESPONSIBILITIES 
 
A. Except where the Contractor is bypassing flows, sewer and force main (if present) pipes 
shall remain in operation throughout the performance of this Project. All coordination 
between the City of Tempe’s operations personnel and the Contractor on all matters 
shall be through the City’s appointed Project Manager unless otherwise approved in 
writing by the City. 
1.03
USE AND OPERATION OF EXISTING FACILITIES
A. The Contractor shall not interfere with the operation of existing sewers and sanitary 
sewer pipes, except to bypass flows as necessary to perform the work. The Contractor 
shall exercise every precaution to ensure that debris and material from its operation 
does not enter the sewer.  Any debris or blockage entering into the sewer as a result of 
the Contractor’s work shall be immediately removed at the Contractor’s expense. Any 
damages caused by or as a result of the debris entering the sewer shall be the 
responsibility of the Contractor.   
B. All costs, coordination, permits, and fees associated with the location of staging areas, 
material, equipment storage, and site trailer location (if applicable) shall be the 
responsibility of the Contractor. The Contractor shall submit copies of individual 
landowner agreements (if present) to the City. All disturbed areas shall comply with 
the dust control plan required by Maricopa County Environmental Services Department 
as specified in Technical Specification Section 01062 – Permits and Easements. 
1.04
TRAFFIC: 
 
A. The Contractor shall comply with Technical Specification Section 02100 – Traffic 
Control. 
 
1.05
DAMAGE TO EXISTING PROPERTY 
 
A. Contractor shall be responsible for any damage to existing structures, piping, work, 
materials, or equipment because of its operations, and shall repair or replace any 
damaged structures, piping, work, materials or equipment to the satisfaction of, and at 
no additional cost to the City.

SECTION 01015
CONTRACTOR’S USE OF PREMISES
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01015 - 2
October 27, 2025
B. Contractor shall protect all existing structures and property from damage. 
 
C. Contractor shall be responsible for all damage to streets, roads, curbs, sidewalks, 
walking trails, driveways, ditches, embankments, drainages, floodways, landscaping, 
or other public or private property, which may be caused by the work including 
transporting equipment, materials, or workers to or from the work. Contractor shall 
make satisfactory and acceptable arrangements with the agency having jurisdiction 
over the damaged property concerning its repair or replacement and/or as specified in 
these Technical Specifications. 
 
D. Contractor shall be responsible for any and all damage to private property as caused by 
the Contractor’s operations including but not limited to sewage spills/backups. 
PART 2 - PRODUCTS 
(NOT USED)
PART 3 - EXECUTION 
(NOT USED) 
** END OF SECTION **

SECTION 01060
HEALTH AND SAFETY
__________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01060 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
HEALTH AND SAFETY REGULATIONS 
 
A. The Contractor shall exercise precaution at all times for the protection of persons 
(including employees) and property. The Contractor shall comply with the provisions 
of all applicable laws, pertaining to such protection including all Federal, State and 
Local occupational safety and health acts, codes, standards and regulations 
promulgated thereunder. Contractor shall have copies of, but not limited to, confined 
space entry permit on-site and available for review any time work activities are 
commencing. 
 
B. Contractor shall comply with the provisions of the Federal Occupational Safety and 
Health Act, as amended. 
C. Contractor shall comply with the provisions of the Maricopa County Air Quality 
Department. 
D. The Contractor shall provide and maintain in a neat, sanitary condition such 
accommodations for the use of the employees as may be necessary to comply with the 
requirements and regulations of the Arizona State Department of Health and/or as 
specified by the Maricopa County Health Department, Sanitary Code. 
 
E. The Contractor shall provide all safeguards, safety devices and protective equipment 
and take any other needed actions, on his own responsibility reasonably necessary to 
protect the life and the health of employees on the job, the safety of the public, and to 
protect property in connection with the performance of the work covered by this 
contract. 
 
1.02
SPECIAL CONSIDERATIONS 
 
A. GENERAL
This Technical Specification Section describes certain minimum precautions the 
Contractor shall consider in developing its health and safety program. It supplements 
the regulatory requirements of Paragraph 1.01 and the requirements of the General 
Conditions. Sewers and appurtenant structures are considered confined spaces and are 
subject to federal, state and local regulations governing confined space entry and safety 
procedures.

SECTION 01060
HEALTH AND SAFETY
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01060 - 2
October 27, 2025
B. INFECTIOUS DISEASES: 
 
Contractor should anticipate that a wide spectrum of disease-producing organisms will 
be present in the sewer. In addition to the requirements set forth in the regulations 
described in Paragraph 1.01 above, the Contractor shall provide the following as a 
minimum: 
1. Instruction in appropriate disease-prevention mechanisms and personal sanitation 
practices for all workers and supervisors. 
 
2. A preventative inoculation program (tetanus/diphtheria, hepatitis, etc.) to all 
workers and supervisors. 
 
3. Clothing to protect against infection, including rubber boots with full sole and heel 
steel insert-liners, safety glasses or goggles, and gloves to all workers and 
supervisors. 
 
C. DANGEROUS GASES AND OXYGEN DEFICIENCY: 
 
 
The sewer access manholes and junction structures are confined spaces, which mean 
they have a limited means of egress and are subject to the accumulation of dangerous 
gases or oxygen deficiency. Volatile petroleum products and common household 
hazardous materials may be present within the sewer. Explosive gases, such as methane 
generated from decomposing organic material, may be accumulated. Toxic gases, such 
as hydrogen sulfide, may be present in life-threatening concentrations.  Significant 
oxygen depletion may occur. In addition, construction procedures may require 
combustion engine machinery to be located in or near the work site. Therefore, gaseous 
combustion by-products, such as carbon monoxide, may be present.   
 
In addition to the requirements set forth in the regulations described in Paragraph 1.01 
above, the Contractor shall provide the following: 
 
1. Portable atmospheric monitors that measure levels of oxygen, explosive gas 
(methane), carbon monoxide, and toxic gas (hydrogen sulfide). Monitors shall be 
properly calibrated and carefully maintained throughout the construction period.  
Monitors shall be used continuously while personnel are in the sewer. 
 
D. TOXIC CHEMICALS: 
 
Toxic chemicals may be part of the construction process. The Contractor shall abide by 
all handling procedures recommended by the manufacturer when dealing with toxic 
chemicals.

SECTION 01060
HEALTH AND SAFETY
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01060 - 3
October 27, 2025
E. ASBESTOS-CEMENT PIPE: 
 
The Contractor shall abide by all asbestos-cement handling procedures as required by 
all local, state and federal regulatory agencies. 
1.03
SUBMITTALS 
 
Contractor shall submit Health and Safety Plan according to Technical Specification 
Section 01300 – Submittals. 
 
PART 2 - PRODUCTS 
 
2.01
HEALTH AND SAFETY PLAN 
 
A. GENERAL 
 
The Contractor shall develop and maintain for the duration of the Contract three copies 
of a Health and Safety Plan that will effectively incorporate and implement all required 
health and safety precautions. At least one copy shall be located on the Contractor's 
work site. 
 
B. COMPLIANCE
 
The Contractor shall appoint an on-site employee who is qualified, trained and 
authorized to supervise and enforce compliance with the Health and Safety Plan. The 
Contractor is responsible for ensuring that necessary gas monitoring, protective 
clothing, and other supplies and equipment as specified are available to implement this 
plan. 
 
C. REVISIONS
 
In the event that regulatory agencies or jurisdictions determine the Health and Safety 
Plan to be inadequate to protect employees and the public: 
 
1. The Contractor shall stop the work in progress until adequate safety measures are 
implemented. 
 
2. The Contractor shall modify the plan to meet the requirements of said regulatory 
agencies, jurisdictions, and the City. 
 
3. The Contractor shall provide the City and City’s Representative with the revisions 
to the plan within two (2) days of the notice of deficiency.

SECTION 01060
HEALTH AND SAFETY
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01060 - 4
October 27, 2025
D. MINIMUM CONSIDERATIONS 
 
The Health and Safety Plan shall, as a minimum, include the following considerations: 
 
1. Objective. 
 
2. Key personnel and responsibilities. 
 
3. Hazard analysis of the work activities and environment. 
 
4. Training requirements, including authorized personnel and qualifications for work 
in confined spaces. 
 
5. Personal protective equipment. 
 
6. Confined Space Entry Plan.
 
7. Site control measures. 
 
8. Work practices, decontamination procedures, and work limitations. 
 
9. Emergency procedures, including sewer evacuation plan, location of first aid, fire 
extinguishers, eyewash, drinking water, map showing route to nearest medical 
facility, list of key personnel who are currently certified in first aid/CPR. 
 
10. Job site cleanup, and spill containment and cleanup procedures. 
 
11. Telephone numbers: 
a.
24-hour number to contact Contractor's Representative. 
b. Emergency services.
c.
City
d. City’s Representative. 
 
12. Documentation (training, injury or illness, respirator-fit tests, hazards notification 
log, etc.). 
PART 3 - EXECUTION 
(NOT USED)
 
** END OF SECTION **

SECTION 01062
PERMITS AND EASEMENTS 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01062 - 1
October 27, 2025
PART 1 - GENERAL
 
1.01
EASEMENTS 
 
All sewers and access manholes are assumed to be located in the City of Tempe right-of-
way or utility easements. Contractor shall be responsible to limit construction activities to 
within these areas.
 
1.02
PERMITS TO BE OBTAINED BY THE CONTRACTOR 
 
Contractor shall obtain any additional permits and access agreements required by the work 
and shall pay all costs thereof, including agency inspections. The Contractor shall comply 
with all applicable terms and conditions therein and provide copies to the City’s 
Representative before working in areas covered by those permits. The following permits, 
but not necessarily limited to the following, shall be obtained by the Contractor if 
applicable to the work: 
 
1)
Occupational Safety and Health Association (OSHA) – Confined Space Entry 
Permit
2)
Arizona Department of Environmental Quality (ADEQ) – Air Quality Division
3)
Arizona Department of Transportation (ADOT) – Encroachment Permit
4)
City of Tempe - Construction Permit
5)
Others as applicable
1.03
POSTING 
 
Permits shall be posted (or available for review) at the site of the work at all times work 
is commencing. All permits shall be submitted to the City in accordance with Technical 
Specification Section 01300 – Submittals.
PART 2 – PRODUCTS
(NOT USED)
PART 3 - EXECUTION
(NOT USED)
** END OF SECTION **

SECTION 01062
PERMITS AND EASEMENTS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01062 - 2
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01064
INSPECTION AND TESTING 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01064 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01 
INSPECTION AND TESTING OF MATERIALS 
 
All workmanship and materials shall be subject to inspection by the City or City’s 
Representative, who may select samples of materials in such a quantity as the City or City’s 
Representative may deem necessary to determine their qualities, as herein specified. Any 
samples taken shall be at the discretion of the City and shall be in addition to those required 
to be taken by the Contractor as specified in these Technical Specifications, manufacturer’s 
recommendations, and permits requiring test results. The City or City’s Representative will 
accept or reject the materials in accordance with the results of such trials or from test results 
submitted from an independent testing laboratory. All rejected materials shall be promptly 
replaced to the satisfaction of the City or City’s Representative. The Contractor shall assist 
the City or City’s Representative by providing access to the location where the work is in 
progress. The Contractor shall replace rejected work and materials and bear all costs for 
doing so. 
Non-rejection or non-inspection of materials does not constitute acceptance by the City or 
the City’s Representative. 
 
The City’s or City’s Representative’s inspection will be provided on an 8-hour per day, 5-
day per week basis, excluding weekends and holidays. The Contractor shall not schedule 
any overtime work which requires inspection, survey or material testing without written 
permission from the City’s Representative two (2) working days before the proposed 
overtime work. The City reserves the right to deny the requested overtime. If an overtime 
request is denied, the City may extend the contract time at no additional cost to the City. 
 
1.02 
REFERENCES 
Refer to Technical Specification Section 02148 – CIPP lining of Existing Sewers
Refer to Technical Specification Section 09710 – Concrete and Masonry Coating.
PART 2 - PRODUCTS 
(NOT USED)
 
PART 3 - EXECUTION 
(NOT USED)
 
** END OF SECTION **

SECTION 01064
INSPECTION AND TESTING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01064 - 2
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01071 
STANDARD REFERENCES
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01071 - 1
October 27, 2025
 PART 1 - GENERAL 
 
1.01 
ABBREVIATIONS 
 
Wherever used in the Contract Documents, the following abbreviations will have the 
meanings listed: 
 
AAC 
Arizona Administrative Code 
1700 West Washington, 7th Floor 
Phoenix, AZ  85007-2808 
 
AASHTO 
American Association of State Highway and Transportation 
Officials 
444 North Capitol Street, N.W., Suite 249 
Washington, D.C. 20001 
 
ACI   
American Concrete Institute 
38800 Country Club Drive 
Farmington Hills, MI 48331-3439
 
ADEQ 
Arizona Department of Environmental Quality 
1110 West Washington Street 
Phoenix, AZ 85007
 
ADOT 
Arizona Department of Transportation 
206 South 17th Avenue 
Phoenix, AZ 85004 
 
ADWR 
Arizona Department of Water Resources 
3550 North Central Avenue, Suite 200 
Phoenix, AZ 85012
 
AEIC 
Association of Edison Illuminating Companies 
600 North 18th Street 
Birmingham, AL 35203 
 
AISC
American Institute of Steel Construction, Inc. 
130 East Randolph, Suite 2000
Chicago, IL 60601
AISI   
American Iron and Steel Institute 
25 Massachusetts Avenue, N.W., Suite 800 
Washington, D.C. 20001

SECTION 01071
STANDARD REFERENCES
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01071 - 2
October 27, 2025
ANSI 
American National Standards Institute, Inc. 
1899 L Street, N.W., 11th Floor 
Washington, D.C. 20036 
 
API   
American Petroleum Institute 
1220 L Street, N.W. 
Washington, D.C. 20005 
 
ASCE 
American Society of Civil Engineers 
1801 Alexander Bell Drive 
Reston, Virginia 20191 
 
ASCII 
American Standard Code for Information Interchange 
United States of America Standards Institute  
10 East 40th Street 
New York, NY 10016 
 
ASTM 
American Society for Testing and Materials 
100 Barr Harbor Drive
P.O. Box C700
West Conshohocken, PA 19428-2959
AT & SFRR
Atchison, Topeka and Santa Fe Railroad
 
AWS 
American Welding Society 
8669 N.W. 36th Street, Suite 130 
Miami, FL 33166-6672
 
AWWA 
American Water Works Association 
6666 West Quincy Avenue 
Denver, CO 80235 
 
BOCA   
Building Officials and Code Administrators 
7926 Halstead 
Homewood, IL 60430 
CFR 
Code of Federal Regulations 
Superintendent of Documents 
Government Printing Office 
Washington, D.C. 20402 
 
CMAA
Crane Manufacturers Association of America, Inc. 
(Formerly called: Overhead Electrical Crane Institute) (OECI) 
8720 Red Oak Boulevard, Suite 201
Charlotte, NC 28217-3992

SECTION 01071 
STANDARD REFERENCES
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01071 - 3
October 27, 2025
 
CRSI 
Concrete Reinforcing Steel Institute 
933 North Plum Grove Road 
Schaumburg, IL  60173-4758
COT
City of Tempe
Engineering Division
31 East 5th Street
Tempe, AZ   85281
 
EEI 
Edison Electric Institute 
701 Pennsylvania Avenue, N.W. 
Washington, D.C. 10016 
 
FEDSPEC 
Federal Specifications 
General Services Administration 
Specification and Consumer Information  
Distribution Branch 
Washington Navy Yard, Building 197  
Washington, DC 20407 
 
FEDSTDS 
Federal Standards 
(see FEDSPECS) 
FCDMC
Flood Control District Maricopa County
2801 West Durango Street
Phoenix, AZ 85009
 
IES   
Illuminating Engineering Society 
120 Wall Street, Floor 17 
New York, NY 10005-4001 
 
MAG 
Maricopa Association of Governments 
302 North 1st Avenue, Suite 300 
Phoenix, AZ 85003
MCESD
Maricopa County of Environmental Services Department
1001 North Central Avenue, Suite 200
Phoenix, AZ 85004
NACE 
National Association of Corrosion Engineers 
15835 Park Ten Place 
Houston, TX 77084

SECTION 01071
STANDARD REFERENCES
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01071 - 4
October 27, 2025
NASSCO 
National Association of Sewer Service Companies 
2470 Longstone Lane, Suite M
Marriottsville, MD 21104 
 
NFPA 
National Fire Protection Association 
1 Batterymarch Park
Quincy, MA 02169-7471
NPDES 
National Pollutant Discharge Elimination System 
U.S. Environmental Protection Agency
National Pollutant Discharge Elimination System Program 
Office of Water, Office of Wastewater Management
1200 Pennsylvania Avenue, N.W. (Mail code 4203M) 
Washington, D.C. 20460 
 
OSHA 
Occupational Safety and Health Act
U.S. Department of Labor
Occupational Safety and Health Administration 
200 Constitution Avenue, N.W. 
Washington, D.C. 20210 
SWPPP 
Storm water Pollution Prevention Plan
Environmental Protection Agency, Region 9 
75 Hawthorne Street, 
San Francisco, CA 
 
UBC 
Uniform Building Code
Published by ICBO 
 
UL 
Underwriters Laboratories Inc.
207 East Ohio Street 
Chicago, IL 60611 
 
WABO 
Washington Association of Building Officers 
Post Office Box 7310 
Olympia, WA 98507 
PART 2 - PRODUCTS 
(NOT USED) 
 
PART 3 - EXECUTION 
(NOT USED)
** END OF SECTION **

SECTION 01102
CONTRACTOR’S HAZARDOUS MATERIALS 
MANAGEMENT PROGRAM 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01102 - 1
October 27, 2025
PART 1 - GENERAL 
1.01
DESCRIPTION
A. The Contractor shall comply with all Federal, State, and local rules and regulations 
related to environmental protection and environmental safety including, but not limited 
to, the following:
1. Title 29 Code of Federal Regulations Part 1910, Occupational Safety and Health
2. Title 40 Code of Federal Regulations, Protection of Environment
3. Title 49 Code of Federal Regulations, Transportation
4. State Occupational Safety and Health Administration (OSHA)
5. Arizona Department of Environmental Quality (ADEQ)
6. Arizona Department of Water Resources (ADWR)
7. Maricopa County Air Pollution Control Regulations
8. Maricopa County Air Quality Department Regulations
B. In order to ensure the City that the Contractor is complying with the intent of the 
regulations stated in Paragraph 1.01.A above, as they relate to the on-site use of 
hazardous materials, hazardous wastes and other substances similarly defined in those 
regulations, develop and maintain a Contractor’s Hazardous Materials Management 
Program that includes as a minimum, but is not limited to the requirements specified 
herein. The interests of the City are that accidental spills, site contamination, and injury 
of personnel on the site are avoided. The City will not enforce suspected violations of 
the rules and regulations referenced in Paragraph 1.01.A above, however the City will 
notify the Contractor of suspected violations. If in the opinion of the City, the 
Contractor fails to address the suspected violations in a timely and appropriate manner, 
the City will notify Federal, State, or local regulatory agencies, report the suspected 
violations to them, and request that they inspect the Contractor’s operations. Any fines 
that may be levied against the City for violations committed on the site by the 
Contractor, as well as any costs to the City associated with cleanup of materials, shall 
be reimbursed immediately by the Contractor. All documents required by the program 
shall be made available to the City’s Environmental Representative immediately, upon 
request.
C. Responsibility for any hazardous waste, as defined in any of the above-listed 
regulations, and those generated by the Contractor, belongs to the Contractor. If the 
Contractor is going to generate, or has generated, a substance that qualifies as a 
hazardous waste, the Contractor must obtain an EPA identification number, listing the 
Contractor’s name and construction site address as the generator of the hazardous 
waste. Responsibility for the identification, analysis, profiling, transport and disposal 
of hazardous wastes generated, belongs to the Contractor. The identification number 
can be obtained from the Arizona Department of Environmental Quality (ADEQ). This

SECTION 01102
CONTRACTOR’S HAZARDOUS MATERIALS 
MANAGEMENT PROGRAM
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01102 - 2
October 27, 2025
number shall be provided to the City’s Representative within five (5) days after the 
Notice to Proceed, or before any hazardous materials are brought onto the site.
1.02
HAZARDOUS MATERIALS PROGRAM REQUIREMENTS
A. Within the regulations listed in Paragraph 1.01.A, above, terms such as hazardous 
material, hazardous wastes, and similar terms have varying definitions. To dispel 
confusion regarding what materials fall under the Program Requirements and for the 
purposes of this Technical Specification Section, Hazardous Material is defined as “any 
material, whether solid, semi-solid, liquid, or gas, which, if not stored or used properly, 
may cause harm or injury to persons through inhalation, ingestion, absorption or 
injection, or which may negatively impact the environment through the use or discharge 
of the material on the ground, in the water (including groundwater), or to the air.”
B. All chemicals brought onto the site must be approved by the City. Prior to bringing any 
chemical on site, request approval from the City’s Environmental Representative for 
each chemical the Contractor proposes to bring on site. At the time of request, the City’s 
Environmental Representative may request and receive from the Contractor, specific 
information associated with each chemical. The specific information may include, but 
is not limited to, MSDS, manufacture, vendor, container size(s), number of containers, 
minimum and maximum volume of material intended to be stored on site, as well a 
description to the process or procedures in which any requested chemical is to be used. 
The City, within five (5) working day from receipt of the specific chemical information, 
will inform the Contractor as to whether the chemical has been approved for use on 
site.
C. Maintain on site two notebooks containing (1) a chemical inventory, and (2) current 
(dated within the past two years) Safety Data Sheets for all materials being used on site, 
whether or not they are defined as a Hazardous Material in Paragraph 1.2.A, above. 
One notebook shall be kept in the Contractor’s on-site office and the other shall be kept 
in a location specified by the City’s Environmental Representative. These notebooks 
must be kept up-to-date as materials are brought onto and removed from the site. Copies 
of SDS sheets for chemicals removed from the site shall be provided to the City’s 
Environmental Representative. 
D. Develop an emergency/spill response plan, for each hazardous material or class/group 
of materials. As a minimum, the response plan must address the following:
1. Provide a description of equipment on site available to contain or respond to an 
emergency/spill of the material.
2. Notification procedures.
3. Response coordination procedures between the Contractor, the City, and the City’s 
Representative.
4. Provide a Site Plan showing the location of stored hazardous materials and location 
of spill containment/response equipment. 
5. Provide a description of the hazardous material handling and spill response training 
provided to the Contractor’s employees.

SECTION 01102
CONTRACTOR’S HAZARDOUS MATERIALS 
MANAGEMENT PROGRAM
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01102 - 3
October 27, 2025
E. In accordance with applicable Laws and Regulations, properly and safely store all 
hazardous materials, which shall include as a minimum, the following:
1. Have a designated storage site for hazardous materials that includes secondary 
containment. The site must include barriers to prevent vehicles from colliding with 
the storage containers and offer protection from environmental factors such as 
weather.
2. Provide signage in accordance with applicable Laws and Regulations, clearly 
identifying the hazardous materials storage site.
3. All hazardous materials containers must bear the applicable Hazard Diamonds.
F. Properly label all containers of consumable materials, whether or not they are classified 
as Hazardous Materials under this Section. The name of the Contractor or subcontractor 
shall be stenciled on any container containing a hazardous material and on any 
container over five-gallon capacity containing a non-hazardous material. Any container 
must have a label clearly identifying the contents. If any such unlabeled containers are 
discovered on the site, the City’s Environmental Representative will notify the 
Contractor.  Responsibility to remove such containers belongs to the Contractor.  
Containers will be properly labeled or removed from the site within one (1) hour.  Any 
containers that are filled from larger containers must also be properly labeled.
G. The City encourages storage of hazardous materials off site until the materials are 
needed on site.
H. Provide all documentation required herein available immediately upon request of the 
City’s Environmental Representative. The Contractor’s Safety Representative shall 
meet at least monthly with the City’s Environmental Representative to review the 
Contractor’s Hazardous Materials Management Program documents, procedures, and 
inspect the storage site and job site to ensure the requirements specified herein are being 
complied with. Also, provide the City’s Environmental Representative and the City’s 
Representative with copies of all permits obtained from environmental regulatory 
agencies.
I.
Provide documentation to the City’s Representative and the City’s Environmental 
Representative that the Contractor, subcontractors, or others hired by the Contractor 
making deliveries of hazardous Materials (as defined in Title 49 CFR) to the site are in 
compliance with Title 49 CFR 172.800 – 172.804, which requires each person who 
offers for transportation in commerce or transports in commerce one or more of the 
following hazardous materials, as defined by Title 49 CFR, must develop and adhere 
to a security plan for hazardous materials that conforms to the requirements of this 
subpart.

SECTION 01102
CONTRACTOR’S HAZARDOUS MATERIALS 
MANAGEMENT PROGRAM
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01102 - 4
October 27, 2025
PART 2 – PRODUCTS
(NOT USED)
PART 3 – EXECUTION 
(NOT USED)
** END OF SECTION **

SECTION 01300
SUBMITTALS
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 1
October 27, 2025
PART 1 - GENERAL 
1.01
GENERAL 
 
Submittals covered by these requirements include manufacturers' information, shop 
drawings, test procedures, test results, samples, requests for substitutions, and 
miscellaneous work-related submittals. The Contractor shall furnish all specifications, 
descriptive data, certificates, samples, tests, methods, schedules, and manufacturer's 
installation and other instructions as specifically required in the contract documents to 
demonstrate fully that the materials to be furnished and the methods of work comply with 
the provisions and intent of the contract documents. 
 
1.02
CONTRACTOR'S RESPONSIBILITIES 
 
The Contractor shall be responsible for the accuracy and completeness of the information 
contained in each submittal and shall assure that the material, equipment or method of work 
shall be as described in the submittal. The Contractor shall verify that all features of all 
products conform to the specified requirements. Submittal documents shall be clearly 
edited to indicate only those items which are being submitted for review. All extraneous 
materials shall be crossed out or otherwise obliterated. The Contractor shall ensure that 
there is no conflict with other submittals and notify the City or City’s Representative in 
each case where his submittal may affect the work of another Contractor or the City. The 
Contractor shall coordinate submittals among his subcontractors and suppliers. 
 
The Contractor shall coordinate submittals so that work will not be delayed. The Contractor 
shall coordinate and schedule different categories of submittals, so that one will not be 
delayed for lack of coordination with another. No extension of time will be allowed because 
of failure to properly schedule submittals. The Contractor shall not proceed with work 
relating to a submittal until the submittal process is complete. This requires that submittals 
for review and comment shall be returned to the Contractor stamped "No Exceptions 
Taken" or "Make Corrections Noted." 
 
The Contractor shall certify on each submittal document by signing Transmittal Form 
01999-A specified in Technical Specification Section 01999 – Reference Forms they have 
reviewed the submittal, verified field conditions, and complied with the contract 
documents. 
 
The Contractor may authorize in writing a material or equipment supplier to deal directly 
with the City’s Representative or with the City with regard to a submittal. These dealings 
shall be limited to contract interpretations to clarify and expedite the work.

SECTION 01300
SUBMITTALS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 2
October 27, 2025
1.03
CATEGORIES OF SUBMITTALS 
 
A. GENERAL 
 
Submittals fall into two general categories; submittals for review and comment, and 
submittals, which are primarily for information only. Submittals, which are for 
information only, are typically specified in the Part 2 - PRODUCTS of the individual 
Technical Specification section. 
 
a.
SUBMITTALS FOR REVIEW AND COMMENT:
 
All submittals except where specified to be submitted as product data for 
information only shall be submitted by the Contractor to the City or City’s 
Representative for review and comment. 
 
b. SUBMITTALS (PRODUCT DATA) FOR INFORMATION ONLY 
 
Where specified, the Contractor shall furnish submittals (product data) to the City 
or City’s Representative for Information only. 
1.04
TRANSMITTAL PROCEDURE 
 
A. GENERAL
 
The City or City’s Representative will furnish the Contractor a list of numbers for 
anticipated submittals as specified in the Construction Documents. The list of 
submittals will be marked for review and comment and product data (submittals) for 
information only. The list is not intended to be an all-inclusive list of submittals 
required. Contractor shall coordinate additional submittals and corresponding submittal 
numbers with the City or City’s Representative.
Unless otherwise specified, all submittals shall be accompanied by Transmittal Form 
01999-A specified in Technical Specification Section 01999 – Reference Forms. A 
separate Transmittal Form shall be used for each specific item, class of material, and 
items specified in separate, discrete sections, for which the submittal is required.  
Submittals for various items shall be made with a single form when the items taken 
together constitute a manufacturer's package or are so functionally related that 
expediency indicates checking or review of the group or package as a whole. 
 
A unique number, sequentially assigned, shall be noted on the transmittal form 
accompanying each item submitted. Original submittal numbers shall have the 
following format:  "XXX"; where "XXX" is the sequential number assigned by the City 
or City’s Representative. Re-submittals shall have the following format:  "XXX-Y"; 
where "XXX" is the originally assigned submittal number and "Y" is a sequential letter 
assigned for re-submittals, i.e., A, B, or C being the 1st, 2nd, and 3rd re-submittals,

SECTION 01300
SUBMITTALS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 3
October 27, 2025
respectively. Submittal 25B, for example, is the second re-submittal of submittal 25. 
Re-submittals shall include original information with all revisions.
B. DEVIATION FROM CONTRACT 
 
1. The Contractor shall submit a copy of the specification section, with addendum 
updates included, and all referenced and applicable sections with addendum 
updates included, with each paragraph check-marked as follows:
a.
Marked to indicate specification compliance. Check marks (√) shall denote full 
compliance with a paragraph as a whole.  
b. Marked to indicate requested deviations from specification requirements. If 
deviations from the specifications are indicated, and therefore requested by the 
Contractor, each deviation shall be underlined and denoted by a number in the 
margin to the right of the identified paragraph, referenced to a detailed written 
explanation of the reasons for requesting the deviation. The City shall be the 
final authority for determining acceptability of requested deviations. The 
remaining portions of the paragraph not underlined will signify compliance on 
the part of the Contractor with the specifications. Failure to include a copy of 
the marked-up specification sections, along with justification(s) for any 
requested deviations to the specification requirements, with the submittal shall 
be sufficient cause for rejection of the entire submittal with no further 
consideration.
2. If the Contractor proposes to provide material, equipment, or method of work, 
which deviates from the Construction Documents, he shall indicate so under 
"deviations" on the transmittal form accompanying the submittal copies.
 
C. SUBMITTAL COMPLETENESS 
 
Submittals which do not have all the information required to be submitted, including 
deviations, and Contractor signature are not acceptable and will be returned without 
review. The Contractor will be charged an additional cost if a submittal requires three 
or more reviews. (See Sub-section: 1.07 THIRD AND SUBSEQUENT 
SUBMITTALS)
1.05
REVIEW PROCEDURE 
 
A. GENERAL
 
Submittals are specified for those features and characteristics of materials, and methods 
of operation, which can be selected, based on the Contractor's judgment of their 
conformance to the specified requirements. Other features and characteristics are 
specified in a manner, which enables the Contractor to determine acceptable options

SECTION 01300
SUBMITTALS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 4
October 27, 2025
without submittals. The review procedure is based on the Contractor's guarantee that 
all features and characteristics not requiring submittals conform as specified. Review 
shall not extend to means, methods, techniques, sequences or procedures of 
construction, or to verifying quantities, dimensions, weights or gages, or fabrication 
processes (except where specifically indicated or required by the contract documents) 
or to safety precautions or programs incident thereto. Review of a separate item, as 
such, will not indicate approval of the assembly in which the item functions. 
 
When the contract documents require a submittal, the Contractor shall submit the 
specified information as follows: 
 
1. Unless otherwise specified, one (1) electronic Copy (.pdf format) of all submitted 
information shall be transmitted with submittals for review and comment. 
2. Unless otherwise specified, one (1) electronic Copy (.pdf format) of all submitted 
information shall be transmitted with submittals (Product Data) for information 
only. 
 
B. SUBMITTALS FOR REVIEW AND COMMENT
 
Unless otherwise specified, within ten (10) calendar days after receipt of a submittal 
for review and comment, the City or City’s Representative shall review the submittal 
and return one copy of the electronically marked-up original in PDF format. Shop 
drawing submittals that require markups shall be marked up in red by the City or City’s 
Representative. The City or City’s Representative will retain the original.  
The returned submittal shall indicate one of the following actions: 
 
1. If the review indicates that the material, equipment or work method complies with 
the contract documents, submittal copies will be marked "NO EXCEPTIONS 
TAKEN." In this event, the Contractor may begin to implement the work method 
or incorporate the material or equipment covered by the submittal. 
2. If the review indicates limited corrections are required, copies will be marked 
"MAKE CORRECTIONS NOTED." The Contractor may begin implementing the 
work method or incorporating the material and equipment covered by the submittal 
in accordance with the noted corrections. A corrected copy shall be resubmitted. 
3. If the review reveals that the submittal is insufficient or contains incorrect data, 
copies will be marked "AMEND AND RESUBMIT." Except at his own risk, the 
Contractor shall not undertake work covered by this submittal until it has been 
revised, resubmitted and returned marked either "NO EXCEPTIONS TAKEN" or 
"MAKE CORRECTIONS NOTED."

SECTION 01300
SUBMITTALS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 5
October 27, 2025
4. If the review indicates that the material or work method does not comply with the 
contract documents, copies of the submittal will be marked "REJECTED - SEE 
REMARKS." Submittals with deviations, which have not been clearly identified, 
may be rejected. Except at his own risk, the Contractor shall not undertake the work 
covered by such submittals until a new submittal is made and returned marked 
either "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED." 
 
C. SUBMITTALS (PRODUCT DATA) FOR INFORMATION ONLY: 
 
Such information is not subject to submittal review procedures and shall be provided 
as part of the work under this contract and its acceptability determined under normal 
inspection procedures. 
 
1.06
EFFECT OF REVIEW OF CONTRACTOR'S SUBMITTALS 
 
Review methods of work or information regarding materials the Contractor proposes to 
provide, shall not relieve the Contractor of his responsibility for errors therein and shall not 
be regarded as an assumption of risks or liability by the City’s Representative or the City, 
or by any officer or employee thereof, and the Contractor shall have no claim under the 
contract on account of the failure, or partial failure, of the method of work, material, or 
equipment so reviewed. A mark of "NO EXCEPTIONS TAKEN" or "MAKE 
CORRECTIONS NOTED" shall mean that the City has no objection to the Contractor, 
upon his own responsibility, using the plan or method of work proposed, or providing the 
materials proposed. 
1.07
THIRD AND SUBSEQUENT SUBMITTALS 
 
The cost for third and subsequent submittals shall be borne by the Contractor. The cost of 
reviews for third and subsequent reviews shall be at a rate of $300 per review and shall be 
charged to the Contractor as a reduction in Contractor’s pay request. 
 
PART 2 - PRODUCTS 
(NOT USED)
 
PART 3 - EXECUTION 
(NOT USED)
** END OF SECTION **

SECTION 01300
SUBMITTALS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01300 - 6
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01310
PROGRESS SCHEDULE 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01310 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
This Technical Specification section specifies requirements and procedures for the 
Contractor in preparing schedules. The purpose of the schedule shall be to ensure adequate 
planning and execution of the work by the Contractor, notification and coordination of 
construction activities with the general public, to establish the standard against which 
satisfactory completion of the project shall be judged, to assist the City or City’s 
Representative in monitoring progress and for the assessment of the impact of change 
orders on the Schedule. 
 
1.02
SUBMITTAL
 
The Contractor shall submit a schedule to the City or City’s Representative within five (5) 
working days of receiving Notice to Proceed and prior to pre-construction conference (if 
scheduled) with work identifying the duration of mobilization, anticipated time when work 
is to be performed, cleaning, pre-video, rehabilitation duration and date of project 
completion. Schedule shall be transmitted to the City or City’s Representative per 
Technical Specification Section 01300 – Submittals.  
 
PART 2 - PRODUCTS 
 
2.01
PROGRESS SCHEDULES 
 
A. Contractor shall provide a Schedule to the City and/or City’s Representative. Schedule 
shall be updated weekly with anticipated sanitary sewer access manholes to be 
rehabilitated. Schedule shall also list pipe and access manholes rehabilitated to date. 
B. Schedule shall be prepared on computer software (MS Project) that facilitates schedule 
updates and e-mailing. 
C. Special considerations, coordination requirements, etc., as encountered for certain 
sanitary sewer pipe and access manholes shall be noted on schedule. 
D. Time for completion for each separate sanitary sewer pipe and access manhole shall be 
shown on the schedule. 
E. The schedule duration of each activity shall be based on the work being performed 
during the normal work week with allowances made for legal holidays. The schedule 
shall include a critical path for each separate sanitary sewer access manhole.
F. Dates imposed on the schedule by the Contractor shall not be binding on the City or 
City’s Representative.

SECTION 01320
PROGRESS SCHEDULE
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01310 - 2
October 27, 2025
G. Failure to include elements of work required for the performance of this Project shall 
not excuse the Contractor from completing the work as described in the Construction 
Documents. 
H. Provide a list of the holidays and non-work days applicable to the schedule. 
I.
Provide a schedule and narrative summary stating project status so the City or City’s 
Representative may use them as a basis for determining the Contractor’s compliance 
with the Technical Specification requirements regarding progress payments, contract 
time extensions, change order prices and impacts, and the overall progress of the work.  
Failure of the Contractor to comply with the requirements of this Technical 
Specification Section may delay the review and acceptance of the progress payment 
requests. 
PART 3 - EXECUTION 
 
3.01
GENERAL 
The Contractor and the Contractor’s Field Superintendent shall attend regularly scheduled 
project meetings with the City or City’s Representative and others invited by the City or 
City’s Representative. 
 
3.02
UPDATES 
 
A. Requests for extensions in time resulting from changes issued by the City shall be 
accompanied by a Time Extension Request - Narrative Report explaining the impacts 
and costs associated with the extension if it were to be granted. 
B. If actual progress on the critical path items is observed to deviate from the schedule 
by one (1) week behind, the Contractor shall update and submit a revised (updated) 
schedule. In the case of the work being behind schedule, the Contractor shall submit, 
along with the revised schedule, a written plan for completing the work within the 
milestone and contract times. 
** END OF SECTION **

SECTION 01380 
PHOTOGRAPHS AND VIDEO RECORDINGS
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01380 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
A. This section specifies digital color photographs and digital video recordings to be taken 
at the ground surface level by the Contractor before and after construction commences 
for the rehabilitation of sanitary sewer access manholes located in City Right-of-Way 
or Utility Easements. These recordings shall clearly document site conditions prior to 
construction activities commencing and again following the completion of construction 
activities. 
 
1.02 
PAYMENT 
 
A. Contractor shall pay costs for photography, video recording and prints. Parties 
requiring additional photography, video recordings or prints shall invoice and pay 
photographer directly.
 
1.03
SUBMITTAL 
 
A. Contractor shall submit the following for information only per Technical Specification 
Section 01300 – Submittals at the Preconstruction Conference: 
 
1. Site condition color photographs and video with audio commentary taken prior to 
construction.
PART 2 - PRODUCTS 
 
2.01 
GENERAL 
 
A. The color photographs and audio-video recordings are intended for use as indisputable 
evidence in ascertaining the extent of any damage which may have occurred as a result 
of the Contractor's operations and are for the protection of the Contractor and the City, 
and may, at the City’s discretion, be a means of determining whether and to what extent 
damage, resulting from the Contractor's operations, occurred during the Contract work. 
B. PHOTOGRAPHS: 
 
Photographs shall be color digital (high resolution) .jpeg format stored on DVD or USB 
media. Submitted DVD media shall indicate on the front of each jewel protection case 
the date, name of Project, and City where the photographs were taken. Submitted USB 
media shall contain a Readme Notepad file that contains the date, name of Project, and 
City where the photographs were taken. One copy of each DVD or USB shall be 
delivered to the City.

SECTION 01380 
PHOTOGRAPHS AND VIDEO RECORDINGS
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01380 - 2
October 27, 2025
C. VIDEO RECORDINGS 
Video recordings shall be .mpeg format stored on DVD or USB media. Submitted DVD 
media shall indicate on the front of each jewel protection case the date, name of Project, 
and City where the videos were taken.  Submitted USB media shall contain an 
identification tag along with a Readme Notepad file that contains the date, name of 
Project, and City where the videos were taken. The video recordings should contain an 
audio track, which narrates the progression of the video recording through the site. One 
copy of each DVD or USB shall be delivered to the City.
PART 3 - EXECUTION 
 
3.01 
VIDEO / DVD 
 
A. Contractor shall perform video recordings of all areas where the Contractor anticipates 
construction activities to occur, including all staging, storing, working, parking and 
excavation areas. Easements and areas outside of paved roadways are of particular 
interest. 
 
B. After completion of construction and restoration, video recordings shall be taken from 
the same points, in the same direction as the preconstruction examination recording. 
 
3.02 
CONSTRUCTION PHOTOGRAPHY 
 
A. Photographs shall be provided of items of special interest and/or special conditions 
during construction. 
 
**END OF SECTION**

SECTION 01550 
CONTRACTOR’S UTILITIES
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01550 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
A. This section specifies the facilities, utilities, and security the Contractor is required to 
furnish and maintain during construction. 
B. Copies of any Design Drawing and Technical Specifications shall be kept at the work 
site and available for use at all times. 
 
PART 2 - PRODUCTS 
 
2.01 
POWER 
 
A. Contractor shall use battery, pneumatic, or hydraulic power for all interior sanitary 
sewer access manhole work. This limitation is not necessary for work on the surface. 
 
2.02
LIGHTING AND ILLUMINATION 
 
A. As necessary, the Contractor shall provide low voltage lighting and illumination in the 
access manhole interior, in accordance with the guidelines published in Practice for 
Industrial Lighting, ANSI/IES RP7-1983. Lighting used by the Contractor on the 
surface shall be placed and directed to avoid nuisance to traffic or local residences. 
Light shields may be required to limit light pollution into adjacent residences or 
businesses.
 
2.03 
TELEPHONE 
 
A. Contractor shall provide and maintain telephone service at the construction site and the 
telephone shall be manned by the Contractor or Contractor’s Representative 24 hours 
per day. Contractor or Contractor’s Representative manning the telephone service shall 
be fluent in written and verbal English as well as Spanish languages. Cellular telephone 
service is acceptable as a substitute for telephone service. These telephone and labor 
costs shall be paid by the Contractor. 
 
2.04 
WATER 
 
A. All water for testing, flushing, cleaning and construction activities shall be furnished 
and paid for by the Contractor. Water may be available upon request to the City for 
connecting to the City’s water distribution system. Connection may be approved by the 
City with appropriate backflow prevention and metering devices installed by the 
Contractor according to City requirements. Authorization to receive water may be 
rescinded by the City upon written notice to the Contractor at any time and for any

SECTION 01550 
CONTRACTOR’S UTILITIES
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01550 - 2
October 27, 2025
reason.  
The City shall charge the Contractor for water used in performing the above functions 
in accordance with the City’s established rate schedule. An approved backflow 
prevention device, meeting the requirements of ANSI A40.6, latest revision, shall be 
installed in each and every connection to the City’s water supply. The Contractor shall 
be required to meter all water used. 
 
2.05 
DEBRIS DISPOSAL 
 
A. Contractor shall make provisions for legal, off-site debris disposal. Contractor shall be 
responsible to obtain and submit to the City a written letter of acceptance, signed by an 
authorized representative of the agency and/or authorized party accepting debris.  
Disposal of debris shall not occur until City has reviewed and accepted the disposal 
site. Contractor shall pay all fees and charges for debris disposal. Contractor shall be 
responsible for all permits and fees according to Technical Specification Section 01062 
– Permits and Easements, subsection 1.02 Permits to be obtained by the Contractor for 
transport to the disposal site.
 
2.06 
BYPASS PUMPS
A. Contractor shall provide and maintain a sanitary sewer by-pass pumping system to 
divert flow around the work area according to Technical Specification Section 02145 
– Diversion of Sewage Sewer Flow and Dewatering. Contractor shall be responsible 
for all operation, maintenance and monitoring of bypass pumping and discharge piping 
system.
PART 3 - EXECUTION 
(NOT USED) 
  
 
**END OF SECTION**

SECTION 01560 
ENVIRONMENTAL CONTROLS
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
A. Provide and maintain methods, equipment, and temporary construction, as necessary 
to provide controls over environmental conditions at the construction site and adjacent 
areas.  Remove physical evidence of temporary facilities at completion of work. 
 
1.02
TRANSPORTATION ROUTES 
 
A. The Contractor shall select its transportation routes for hauling materials, equipment, 
or imported products based on the existing condition of the sanitary sewer access 
manholes and impacts on local traffic. Transportation routes shall be documented in a 
traffic control plan on a case by case basis. 
 
1.03
TRAFFIC CONTROL 
 
A. All streets, traffic ways, and sidewalks shall be kept open in a safe manner for the 
passage of traffic and pedestrians during the construction period unless otherwise 
approved by the City. 
B. When required to cross, obstruct or close a street, traffic way, or sidewalk for a short 
duration that is approved by the City, the Contractor shall provide and maintain suitable 
bridges, detours or other approved temporary means for the accommodation of 
vehicular and pedestrian traffic. Closings shall be for the shortest time practical, and 
passage shall be restored immediately after completion of construction. 
C. Contractor shall give the City 24 hours advance notice of their proposed operations 
within any public rights-of-way and temporary roadway closings. All proposed 
roadway closings shall be submitted in Traffic Control Plan and approved prior to 
commencement of operations.  
D. Contractor shall provide signs, signals, barricades, flares, lights and all other 
equipment, service and personnel required to regulate and protect all traffic, and warn 
of hazards in accordance with MAG specifications. All such work shall conform to 
requirements of the City or authority having jurisdiction. Remove temporary 
equipment and facilities when no longer required and restore grounds to original 
condition. 
E. As specified in Technical Specification Section 02100 – Traffic Control, the Contractor 
shall provide a Traffic Control Plan and implement traffic control around all work as 
part of the contract. 
F. Qualified and suitably equipped flaggers shall be used to assist all construction 
equipment and vehicles access to and from the construction site.

SECTION 01560
ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 2
October 27, 2025
1.04
RELEASE OF HOT WATER
A. Contractor shall not release heated water into the sanitary sewer system directly 
upstream of any wastewater reclamation facility. Contractor shall be responsible to 
obtain written authorization from the facility operator receiving the sanitary sewer 
flow when discharging within one (1) mile of the facility. Authorization, if given, shall 
state the maximum discharge temperature of the water. Contractor shall submit 
Authorization to Release letter to the City according to Technical Specification 
Section 01300 – Submittals.
B. Contractor shall be responsible to cool process water to a temperature below levels 
required by the facility operator or find alternative hot water disposal methods and/or 
location at no additional cost to the City.
C. Contractor shall be responsible for and pay all damages caused by an unauthorized 
release of heated water into the headworks of the treatment facility.
1.05
SEWAGE SPILL CONTROL 
 
A. A spill is defined as any uncontrolled release of raw sewage outside of the intended 
sanitary sewer collection system. Raw sewage releases shall not be allowed to occur 
and are not permitted. The Contractor shall be responsible for all consequences and 
damages caused by the overflow, backup, or spill due to the Contractor's work 
activities. 
B. Contractor shall give both verbal and written notification to the City immediately in 
the event of any sewage release, overflow, backup, or spill. 
C. Contractor shall complete and submit to the City Form 01999-C Confidential Spill 
Reporting form found in Technical Specification Section 01999 – Reference Forms 
within 2 hours of any spill.
1.06
EMERGENCY SPILL RESPONSE PLAN 
A. The Contractor shall be responsible to develop and follow an emergency spill response 
plan. Plan shall be well communicated to all personnel in the event an emergency 
should occur, it can be handled in the safest and most efficient manner possible. 
B. The primary responsibility for all Contractor personnel is to respond to sewer spills as 
quickly as possible. 
C. Emergency telephone list is part of this procedure and will be kept up-to-date at all 
times. 
D. Follow Standard Procedure List.

SECTION 01560
         ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 3
October 27, 2025
E. Complete Form 01999-C Confidential Spill Reporting Form, see Technical 
Specification Section 01999 – Reference Forms. 
F. Contractor shall develop an Emergency Spill Response Phone List containing, but not 
limited to the following:
Submit list to City according to Technical Specification Section 01300 – Submittal. 
(Name) ____  (Contractors Field Superintendent) 
(___) __ - ____
(Name) ____  (Engineer’s Field Representative)  
(___) __ - ____
(Name) ____  (City’s Construction Project Manager)
(___) __ - ____
(Name) ____  (Engineer's Project Manager)
(___) __ - ____
 
1.07
STANDARD REPORTING PROCEDURES 
 
A. HANDLING EMERGENCIES 
1. Medical emergency, fire or explosion, call 911 immediately.  Do not call 911 to 
report a wastewater spill.
B. OBSERVATION
1. Contractor shall without endangering himself, obtain enough information to make 
an initial assessment of the situation. 
C. PROTOCOL FOR NOTIFICATION OF SPILL 
1. Contractor’s Field Superintendent: 
Contractor’s field personnel shall verbally notify the Contractor’s Field 
Superintendent. Field Superintendent shall promptly notify Engineer’s Field 
Representative and City’s Construction Manager immediately, always less than 
one (1) hour from the time of being made aware of the spill.  Document all calls 
and conversations. 
2. Engineer’s Field Representative: 
Engineer’s Field Representative shall verbally notify City’s Construction 
Project Manager, Contractor and Engineer’s Project Manager in less than one 
(1) hour from the time of being made aware of the spill. Document all calls and 
conversations. 
3. City’s Construction Project Manager: 
City’s Construction Project Manager shall verbally notify Engineer’s Project 
Manager, and City’s Project Manager within one (1) hour from the time of 
being made aware of the spill. Document all calls and conversations.

SECTION 01560
ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 4
October 27, 2025
4. Engineer’s Project Manager: 
Engineer’s Project Manager shall confirm notification has occurred with City’s 
Construction Project Manager, confirm Contractor’s awareness of incident, and 
verifies that Engineer’s Field Representative is monitoring events. Document 
all calls and conversations. 
D. REPORT
As soon as possible, but no later than 24 hours following discovery of the spill, the 
Contractor shall complete Form 01999-C Confidential Spill Reporting Form, reference 
Technical Specification Section 01999 – Reference Forms. The Contractor shall take 
photographs at all stages of the incident to include in the report. Submit copies of all 
documentation to City per Technical Specification Section 01300 – Submittals except 
as herein modified. Spill reports shall be hand carried to City’s Construction Project 
Manager as soon as complete. 
 
E. SUBMITTAL
The Contractor shall verify that City has received a copy of the spill report and 
supporting documentation and submitted copy of said report to the City’s Construction 
Project Manager in a timely manner. Compare all reports and report discrepancies to 
the City’s Construction Project Manager and retain one (1) copy in the Project File 
located at Contractor’s office. 
1.08
SANITARY SEWAGE SPILL/BACKUP 
 
A. If a sanitary sewage spill/backup occurs into a lateral and a citizen or business sustains 
property damage, the following procedure is to be adhered to: 
 
1. The initial responsibility of the Contractor is to locate and eliminate the cause of 
the backup as soon as possible. As part of cleaning the backup, Contractor crews 
are to determine the cause and source (if possible) of the backup. Contractor will 
obtain an emergency clean-up service and relocate the residents, if necessary, to 
minimize health risks. Contractor shall be responsible for all costs and coordination 
efforts associated with the sewer backup and cleanup including but not limited to: 
a.
Relocation of residents
b. Temporary housing of displaced residents
c.
Clean-up and sanitizing costs
d. Replacement of damaged personal items
e.
Relocation of residents back into the residence

SECTION 01560
         ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 5
October 27, 2025
2. Determine the extent of the property damage (photographs are recommended).  A 
report (Incident Report), with the photos must be provided to the Contractor’s or 
Contractor’s designated Safety Officer. The Safety Officer will forward the 
information to the Contractor’s corporate liability insurance carrier.  Information 
compiled should include: 
a.
Time call was received 
b. Time the crew arrived at the site 
c.
Time work was completed
d. Cause of stoppage/source of backup sewage (if possible) and location of 
stoppage causing the backup
e.
Name of property owner/tenant and address of affected property 
f.
Extent of damage 
g. Action taken 
 
3. Contractor-authorized personnel will also assist and pay all costs for obtaining and 
coordinating a sub-contractor to perform restoration work and will work with the 
selected sub-contractor to equitably restore the premises to its pre-loss condition.   
 
4. The Contractor’s Superintendent shall notify the City of the stoppage in the sanitary 
sewer pipe. 
 
5. Notify City in the event of any spills.
6. The City of Tempe shall notify Arizona Department of Environmental Quality 
(ADEQ) only as it pertains to Arizona State Law Requirements. 
1.09
SURCHARGING 
 
A. Upon notification or discovery that a surcharge condition exists, crews shall respond 
immediately to the area with proper equipment and manpower to reduce the surcharge.  
If, due to limited capacity of the sewers, the surcharge cannot be reduced, any spill 
which occurs shall be properly cleaned. Waste products are to be disposed of in 
accordance with state and federal laws. 
Contractor shall be responsible for obtaining City’s known areas or sections of sanitary 
sewer pipes that are subject to surcharging capacity situations. These instructions will 
remain in effect until the problem is resolved. These areas or sections of concern will 
be monitored throughout the bypass operations, and in the event of an emergency, City 
shall be notified by the Contractor immediately for response. Response of City crews 
shall not relieve the Contractor for project responsibilities or liabilities. 
A Confidential Spill Reporting Form must be completed by the Contractor and 
distributed to the required parties according to Section 1.05. Distribution of said 
Confidential Spill Reporting Form must take place, preferably by fax or electronic mail, 
within one (1) day of the occurrence.

SECTION 01560
ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 6
October 27, 2025
PART 2 - PRODUCTS 
(NOT USED) 
PART 3 - EXECUTION 
 
3.01 
SITE MAINTENANCE 
 
A. Contractor shall keep the work site, staging areas, storage and parking area, 
Contractor's facilities clean and free from rubbish and debris. Materials and equipment 
shall be promptly removed from the site when they are no longer necessary. Upon 
completion of the work and before final acceptance, the work site shall be cleared of 
equipment, unused materials, and rubbish to present a clean and neat appearance in 
conformance with the preconstruction condition of the site.   
B. Contractor shall not store equipment or materials anywhere other than locations 
approved by the City. Property surrounding the work site shall be completely free of 
all debris and rubbish at all times. 
 
3.02 
CLEAN-UP: 
 
A. Waste material of any kind will not be permitted to remain on the site of the work or 
on adjacent streets. Immediately, upon such materials becoming unfit for use in the 
work, they shall be collected, carried off the site and legally disposed of by the 
Contractor. The Contractor shall be responsible for obtaining necessary permits or 
approval for the Contractor's disposal site.
B. The Contractor shall keep all buildings and areas occupied by the Contractor clear of 
all refuse, rubbish and debris that may accumulate from any source and shall keep them 
in a neat condition to the satisfaction of the City. 
C. In the event that waste material, refuse, debris and/or rubbish are not so removed from 
the work area by the Contractor, the City reserves the right to have the waste material, 
refuse, debris and/or rubbish removed and the expense of the removal and disposal 
charged to the Contractor.
D. Paints, solvents, and other construction materials shall be handled with care to prevent 
entry of contaminants into storm drains, surface waters, or soils. 
 
3.03. BARRIERS: 
 
A. A barrier shall be provided around all unattended excavations and open structures.  The 
barrier shall enclose the area and prevent unauthorized access.

SECTION 01560
         ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 7
October 27, 2025
3.04 
STREET CLEANING: 
 
A. Contractor shall be responsible for preventing dirt, dust, and sediments from escaping 
from trucks departing the project site, by covering dusty loads, washing truck tires 
before leaving the site, or other reasonable methods.
B. When working trucks and/or other equipment on paved streets and roadways, the 
Contractor will be required to clean said streets as soon as possible, but no later than at 
the conclusion of each day's operations or 24-hour period and at such interim periods 
as required by the City.
C. All streets in the construction area used by Contractor's trucks or any other equipment 
hauling material to and from the area, whether within the Contract limits or adjacent 
thereto, shall be kept clean by the Contractor and shall be continuously serviced by the 
Contractor's use of water trucks to control dust.
D. Cleaning and dust control shall be as specified in MAG Section 104.1.4 “Cleanup and 
Dust Control” and shall be at the Contractor's expense. 
E. Any violation of the requirements shall be sufficient grounds for the City to order the 
streets in question cleaned by others and the cost to be paid by the Contractor. 
F. No solid materials or soils may be flushed into storm drains or in the sanitary sewers 
or wastewater facilities. 
G. Contractor shall use a power pick-up broom as part of the dust control effort. 
 
3.05 
AIR POLLUTION CONTROL 
 
A. GENERAL: 
 
The Contractor shall not discharge smoke, dust, and other contaminants into the 
atmosphere that violate the regulations of any legally constituted authority. The 
Contractor shall maintain construction vehicles and equipment in good repair.  
Equipment exhaust emissions that are determined to be excessive by the City shall 
cause the equipment to be repaired or replaced. 
 
B. Contractor shall also minimize dust nuisance by cleaning, sweeping, and sprinkling 
with water, or other means. The use of water, in amounts, which result in mud on public 
streets, is not acceptable as a substitute for sweeping or other methods.  Equipment for 
this operation shall be on the job site or available at all times.

SECTION 01560
ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 8
October 27, 2025
3.06 
ODOR: 
 
A. The Contractor shall employ methods and procedures that mitigate the generation and 
discharge of objectionable odors to the surface environment at all times. 
 
3.07   ODOR CONTROL: 
 
A. Contractor shall be prepared to add approved chemicals to the wastewater flow 
upstream of bypass pumping operations to reduce odor. Costs for chemical odor 
control dosing shall be as negotiated and approved by the City prior to use. The 
Contractor shall make his own determination of flow characteristic for required 
dosing.  
 
The Contractor shall add the chemicals from a location upstream that will allow 10 to 
15 minutes reaction time before the flow enters the work area. The chemical dosing 
shall reduce odors generated from the wastewater stream to a level acceptable to the 
City. If this is not accomplished by adding chemicals only, an additional control may 
be required.
 
3.08 
NOISE CONTROL 
 
A. Contractor shall perform all work in compliance with OSHA standards and in no case 
will noise levels be permitted which would interfere with the work of the City or others.  
Noise levels shall be in accordance with City noise ordinance. 
B. If pumping operations and/or power generation occur after normal work hours as stated 
in the Technical Specification Section 02145 – Diversion of Sewage Flow and 
Dewatering, subsection 2.01A. Contractor shall utilize sound attenuated bypass pumps 
with a maximum decibel rating of 70 db @ 50 feet.
C. Each internal combustion engine, used for any purpose on the job or related to the job, 
shall be equipped with a muffler of a type recommended by the manufacturer for 
residential use. No internal combustion engine shall be operated on the project without 
said muffler. 
D. Noisy portable equipment, such as generators, pumps or compressors, shall be located 
as far away from sensitive noise receptor areas as practical. Sensitive noise receptors 
are defined as occupied buildings with windows or doors facing the site. Noise barriers 
shall be constructed around noisy stationary construction equipment such as 
compressors, pumps or generators that have to be utilized at locations near (within 100 
feet of) sensitive noise receptors as defined above. 
E. Idling equipment not actively utilized for extended periods of time shall be shut off.

SECTION 01560
         ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 9
October 27, 2025
 3.09 TREE AND PLANT PROTECTION 
 
A. If a tree or any landscaped vegetation is damaged or destroyed by construction, or any 
action of the Contractor, the Contractor shall replace the damaged tree or plant with a 
healthy one of the same species. The replacement tree or plant shall be of the same size 
as the damaged tree or plant and will be placed at the existing grade. The Contractor 
shall bear all expenses required to establish the replacement tree or plant. The 
replacement tree or plant shall be guaranteed healthy for 1 year after the end of 
construction date. The Contractor shall be responsible for any tree or plant that the 
Contractor had replaced that is deemed unhealthy during that year. 
B. All landscaped areas and other surface improvements which are damaged by actions of 
the Contractor shall be restored to their original condition at the Contractor's expense. 
 
3.10 
SURFACE WATER CONTROL 
 
A. Contractor shall conform to the regulations and requirements of legally authorized 
surface water management agencies. The Contractor is responsible to provide and 
maintain any temporary pumping, drainage structures, or other means to manage or 
control nuisance surface water.
B. The Contractor shall be responsible for keeping any open excavations and other areas 
free from water as required to permit continuous progress of, or to prevent damage to, 
its own work or work of others. The Contractor shall cover exposed excavated areas 
and spoil piles when runoff from rain is or would be likely to cause turbid waters to 
enter local waterways. The Contractor shall suspend work in the rain if such work 
cannot be performed without causing turbid runoff. 
 
3.11 
STORM DRAIN 
 
A. Contractor shall not discharge any wastewater, potable water used for testing, or 
cleaning, or any chemical or waste materials from the construction operation into the 
storm drain system. 
 
3.12
SANITARY SEWER 
 
A. Contractor shall not dispose of chemical or any waste materials from the construction 
operations into the sanitary sewer system. 
  
 
** END OF SECTION **

SECTION 01560
ENVIRONMENTAL CONTROLS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01560 - 10
October 27, 2025
[This page left intentionally blank for double sided printing]

SECTION 01700
RESTORATION OF IMPROVEMENTS
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01700 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01 
GENERAL 
 
This section specifies restoration of improvements of the Contractor's work area, staging 
area, storage area, and parking area. 
 
1.02 
STRUCTURES 
 
Contractor shall remove such existing structures as may be necessary for the performance 
of the work and shall rebuild the structures thus removed, with the specified requirements, 
in as good a condition as found. The Contractor shall also repair existing structures that 
workers damage as a result of the work under this Project at no additional cost to the City.
 
1.03
ROADS AND STREETS 
 
Unless otherwise specified, roads and streets in which the surface is removed, broken, or 
damaged, or in which the ground has caved or settled during or as a result of the work 
under this Project, shall be resurfaced and brought back to the original grade and section at 
the Contractor’s expense. The Contractor shall document in video the entire road or street 
area to be used for the work and parking area as specified in Technical Specification 
Section 01380 – Photography and Video Recordings. Copies of the Digital Video Disk 
(DVD) or Universal Serial Bus (USB) shall be submitted to the City prior to starting the 
work. Once construction starts, Contractor assumes responsibility for road condition and 
repair.  
Roadways used by the Contractor shall be cleaned and repaired if damaged. Before 
resurfacing material is placed, edges of pavements shall be trimmed back far enough to 
provide clean, solid, vertical faces, and shall be free of loose material. Streets, sidewalks, 
and other City, County or State-owned facilities impacted by construction activities shall 
be replaced or repaired in accordance with current City and MAG requirements. 
 
1.04 
CULTIVATED AREAS AND OTHER SURFACE IMPROVEMENTS 
 
A. Cultivated or planted areas, other unpaved areas, and other surface improvements 
which are damaged by actions of the Contractor shall be restored to their original 
condition. The Contractor shall document in video the entire area to be used as the work 
area, staging area, storage area, and parking area as specified in Technical Specification 
Section 01380 – Photographs and Video Recordings. Copies of the DVD or USB shall 
be submitted to the City prior to starting the work. Once construction starts, Contractor 
assumes responsibility for road condition and repair.  
B. Existing guard posts, barricades, and fences shall be protected and replaced if damaged.

SECTION 01700 
RESTORATION OF IMPROVEMENTS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01700 - 2
October 27, 2025
1.05 
PROTECTION OF EXISTING INSTALLATIONS 
 
A. Contractor shall protect all existing operating facilities and structures from damage.  
However, if damage occurs, the Contractor shall immediately correct or replace 
existing equipment, materials, or systems that are damaged as a result of its operations 
to the satisfaction of the City. 
 
 
PART 2 - PRODUCTS 
(NOT USED)
 
PART 3 - EXECUTION 
 
3.01 
RESTORATION ACCEPTANCE 
 
A. The Contractor shall restore the area to existing condition of the Contractor’s work 
area, staging area, storage area, and parking area as documented in the photographs and 
video recordings. 
B. The City shall determine if and when restoration of the site is acceptable following 
review of the pre-construction and post-construction recordings as specified in 
Technical Specification Section 01380 – Photographs and Video Recordings.   
 
 
 
 
 
** END OF SECTION **

SECTION 01999
REFERENCE FORMS 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 1
October 27, 2025
PART 1 - GENERAL 
1.01
REQUIRED FORMS 
 
The forms listed below and included in this section are referenced from other Technical 
Specification sections of the contract documents: 
 
Form No. 
Title
 
01999- A 
Submittal Transmittal 
 
01999- B 
Request for Information 
 
01999- C 
Confidential Spill Reporting 
01999- D
Chain of Custody
1.02
SCOPE 
 
The Contractor shall be responsible for the documentation forms for tests and evaluations 
required of the contract that do not have specific forms identified. Contractor generated 
forms shall follow the format established on Form 01999-A Submittal Transmittal 
contained herein. 
 
 
PART 2 - PRODUCTS 
(NOT USED)
 
 
PART 3 - EXECUTION 
(NOT USED)

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 2
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 3
October 27, 2025
FORM 01999-A         SUBMITTAL TRANSMITTAL 
Submittal Description:   
               Submittal No:   
      
 
 Spec Section:   
 
Routing 
Sent 
Received 
OWNER:              
Contractor 
 
 
PROJECT: 
Engineer 
 
 
 
Contractor 
 
 
CONTRACTOR: 
 
 
 
 
 
We are sending you  
Attached   
Under separate cover via        
 ˜ Submittals for review and comment 
 ˜ Product data for information only 
Remarks:    
 
Item 
Copies 
Date 
Section 
No. 
Description 
Review 
action
a
Reviewer 
initials 
Review comments 
attached 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note:  NET = No exceptions taken; MCN = Make corrections noted; A&R = Amend and resubmit; R = Rejected 
Attach additional sheets if necessary. 
 
Contractor:  Certify either A or B: 
 
 A. We have verified that the material or equipment contained in this submittal meets all the requirements, including 
coordination with all related work specified (no exceptions). 
 
 B. We have verified that the material or equipment contained in this submittal meets all the requirements specified 
except for the attached deviations. 
No.
 
Deviation
 
 
               
 
 
               
 
 
              
 
 
 
 
Certified by:  ______________________________________________________________ 
 Contractor's Signature

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 4
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 5
October 27, 2025
FORM 01999-B       REQUEST FOR INFORMATION 
 
RFI NO.    
OWNER: 
___________________  
ROUTING 
 
SENT 
 
RECEIVED 
PROJECT: 
 
 
Contractor 
 
 
 
 
CONTRACTOR
 
City 
Representative
 
 
 
 
 
 
 
 
 
 
 
 
RFI TITLE: 
 
 
 
 
 
 
 
 
 
 
 
 
 
REFERENCES: 
DRAWING NO: 
 
LOCATION: 
 
 
SPEC. SECTION: 
 
 
 
PAGE: 
 
 
OTHERS: 
 
 
 
 
 
 
 
 
 
 
 
The following information is requested as described below or in the attachments: 
 
 
 
 
 
 
 
 
By: 
 
 
 
 
 
Date: 
 
 
The following information is provided as described below or in the attachments: 
 
 
 
 
 
 
 
 
By: 
 
Date:

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 6
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 7
October 27, 2025
FORM 01999-C   CONFIDENTIAL SPILL REPORTING 
 
 
INSTRUCTIONS:  The Contractor shall ensure that appropriate on-site personnel complete 
this form.  The form shall be completed immediately upon discovery of a sanitary sewer spill 
or release by the individual who first made the discovery. 
 
 
First at the Scene (name): 
 
1. Facility name and address/location/intersection (or major cross streets): 
  
2. Is/was there a fire or explosion or other release (except for sewage release) outside the facility?   
      Yes           No  
If yes, immediately contact the Fire Department (911) for assistance, initiate appropriate 
facility response procedures, and then continue with this form. 
 
3. Personal injuries and extent, if any: 
 
4. Date and time of initial call or complaint:____________________________________ 
 
5. Date and time of spill found or confirmed:____________________________________ 
 
6. Date spill reporting completed:_____________________________________________ 
 
7. Date and time spill occurred or started, if known:______________________________ 
 
8. What was spilled?  Describe completely.  List chemical names/wastewater if known. 
 
 9. How much was spilled?  Use units such as gallons or pounds, etc._________________
 
10. Where and how did the spill occur?  Include a description of the container or vessel from which 
the spill occurred.  Attach diagram or map, if available.

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 8
October 27, 2025
11. Where did the spilled material go?  Check all that apply. 
 
 drywell 
 dry wash 
 canal 
 riverbed 
 private property 
retention basin 
 sanitary sewer 
secondary 
containment 
 storm  drain 
city street 
Air (vapors or 
odors) 
other (specify 
below) 
________________________________________________________________ 
________________________________________________________________ 
________________________________________________________________ 
________________________________________________________________ 
________________________________________________________________ 
 
12. How far did the spill travel?  Describe the path the spill took to its final destination.  
 
13. Was the spill stopped or contained?  Describe how and by whom. 
 
14. How long did the spill last? ______________________________________________ 
 
15. Who found the spill?  Use the back of this form if necessary. 
 
Name_________________ Title_____________________ Phone________________ 
 
a. 
 
b.

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 9
October 27, 2025
16. Who was notified of the spill?  List names and identify how notification was made (phone call, 
fax, etc.  Use the back of this form if necessary). 
Name Department/Division/Agency       Date/Time Notified   Method of Notification 
a. 
 
b. 
 
Printed name and signature of person who completed this form: 
 
Printed Name_______________________Title___________________Phone__________
Signature_____________________________                      Date____________________

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 10
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 11
October 27, 2025
FORM 01999-D      CHAIN OF CUSTODY
PROJECT:
CITY:
CITY CONTRACT NUMBER:
PROJECT NUMBER:
OWNERS REPRESENTATIVE:
COMPANY NAME:
ADDRESS
CONTACT PHONE NUMBER:
CONTACT NAME:
CONTRACTOR:
COMPANY NAME:
ADDRESS
CONTACT PHONE NUMBER:
CONTACT NAME:
TESTING LABORATORY:
LAB  NAME:
ADDRESS
CONTACT PHONE NUMBER:
FAX NUMBER
CONTACT NAME:
Pipe Segment No.
Date Sample Taken:
Pipe Diameter
Sample Number:
Liner Design Thickness:
Quarter Section No.
Resign Type:
Upstream Manhole No.
Downstream Manhole No.
SAMPLE TAKEN BY:
SIGNATURE:
DATE
PRINT NAME:
ENGINEER, RECEIVED BY:
SIGNATURE:
DATE
PRINT NAME:
LABORATORY RECIEVED BY:
SIGNATURE:
DATE
PRINT NAME:
TEST RESULTS, RECEIVED BY:
SIGNATURE:
DATE
PRINT NAME:

SECTION 01999
REFERENCE FORMS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
01999 - 12
October 27, 2025
** END OF SECTION **

SECTION 02100 
TRAFFIC CONTROL
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02100 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01 
DESCRIPTION 
 
Traffic control during construction shall be provided in accordance with the requirements 
of the 2016 City of Tempe Traffic Barricade Manual. 
 
1.02 
TRAFFIC REGULATIONS 
 
A.
Traffic Control Plan must be submitted for review and approval by the City of Tempe 
(City) for arterial, collector, and local streets impacted by construction operations.  
B.
All traffic and/or traffic control devices on this project shall be provided, maintained 
and/or controlled as specified in the City of Tempe Traffic Barricade Manual, 
MUTCD, ADOT Supplement to MUTCD, and City of Phoenix Traffic Barricade 
Manual, except as modified per the City of Tempe Traffic Barricade Manual. 
C.
Pedestrian control shall comply with the City of Tempe Barricade Manual Section 4.6, 
City of Phoenix Traffic Barricade Manual, or any special condition required by the 
City.
D.
The submitter/designer of the Traffic Control Plan (TCP) shall be IMSA or ATSSA 
certified.
E.
The Barricade Company used by the Contractor shall have a current barricade 
certification permit as required by the City of Tempe Traffic Barricade Manual Section 
2.
F.
Law enforcement officers may be required within 300 feet of a signalized intersection.  
Officers may be required for non-signalized construction areas at the discretion of the 
City.
G.
Traffic restrictions on arterial and collector streets are not permitted during peak traffic 
hours (7:00 am to 8:30 am and 3:30 p.m. to 6:30 p.m.) as per City of Tempe Traffic 
Barricade Manual Section 4.2.
H.
24-hour TCP setup on arterial streets is not permitted without prior written approval 
from City of Tempe Transportation Department.
I.
A minimum of five (5) working days, is required for TCP review prior to construction 
starting. Re-submitted redline corrected TCP requires additional five (5) working days 
for review.

SECTION 02100 
TRAFFIC CONTROL
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02100 - 2
October 27, 2025
1.03 
TRAFFIC CONTROL / ACCESS  
A.
Contractor shall be responsible to present traffic control plans at the regularly 
scheduled project progress meeting for review as outlined in Technical Specification 
Section 01014 – Work Sequence, subsection 1.04C. Uninterrupted access to 
commercial businesses and residences shall be maintained at all times. Contractor 
shall be responsible to adjust work schedule to minimize disruption to normal 
operation of businesses. 
B.
Contractor shall be responsible to coordinate traffic control plans and inform the 
project’s public relations sub-consultant of any potential impacts to commercial 
businesses or residents. Contractor shall adjust work activities and schedules to 
minimize disruptions to the City, residents and traveling public. The City reserves the 
right to request the Contractor move his operations or modify work plans and 
schedules to minimize disruptions to commercial business or residents at no cost to 
the City. 
1.04 
TRAFFIC CONTROL PLAN DISTRIBUTION 
A.
Copy of approved Traffic Control Plan (TCP) shall be submitted to the City’s 
representative prior to start of work. 
B.
Copy of approved traffic control plan shall be on-site and available for review at all 
times work activities are commencing. Failure to have approved TPC on-site while 
work is commencing will be grounds for rejection and non-payment of work being 
performed.
PART 2 - PRODUCTS 
(NOT USED)
PART 3 - EXECUTION 
(NOT USED) 
** END OF SECTION **

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 1
October 27, 2025
PART 1 – GENERAL
1.01
DESCRIPTION
A. SCOPE:
This Technical Specification Section describes requirements for temporary bypassing 
and dewatering of sewers during sanitary sewer access manhole rehabilitation, if 
required. 
B. REQUIREMENTS:
1. Contractor shall provide all coordination, labor, materials, equipment and 
supervision to temporarily bypass flow around the Contractor’s work in accordance 
with the Contractor’s specific needs of the rehabilitation method being utilized and 
dewater the pipelines and/or manholes in preparation for cleaning and 
rehabilitation.  
2. The actual design of the bypass arrangement shall be the responsibility of the 
Contractor, and shall be submitted to the City to review for general conformance to 
project objectives. Means and methods of accomplishing the bypassing shall be the 
responsibility of the Contractor.
3. The Contractor shall have the entire bypassing system in place and successfully 
pressure tested with potable water at a minimum of 1.5 times the maximum 
operating pressure of the system before bypassing any sewage.
4. The Contractor shall notify the City 48 hours prior to shutting down or bypassing 
any pipeline. The bypass system equipment and existing flows shall be 
continuously monitored.
5. It is the Contractor’s responsibility to arrange all necessary access and temporary 
construction agreements with all affected parties for the Contractor’s proposed 
location of the bypass pumping system.
6. Contractor is responsible for immediate and proper cleanup as per Technical 
Specification Section 01560 – Environmental Controls should any sewage spill 
occur. Regardless of amount, the Contractor shall pay for all damages and fines 
incurred as a result of a spill.

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 2
October 27, 2025
C. EXPERIENCE:
Contractor shall utilize staff and/or a subcontractor that has been directly responsible 
for completion of a rehabilitation project that required the bypass pumping of sewage 
flows in excess of 1.0 mgd.
1.02
SUBMITTALS
A. At the preconstruction conference the Contractor shall submit, in accordance with 
Technical Specification Section 01300 - Submittals, drawings and complete design 
data showing methods and equipment the Contractor proposes to utilize in sewer 
bypassing for review by the City. The submittal shall include the following 
information:
1. Drawings indicating the scheme and location of temporary sewer plugs and bypass 
discharge pipes. The drawings shall also show the method and location for 
discharging the bypass pipes.
2. Capacities of pumps, prime movers, and standby equipment.
3. Bypass plan shall include odor control plan.
4. Design calculations verifying adequacy of the capacity of the pumping system and 
selected equipment, The Contractor shall have a professional civil engineer, 
registered in the State of Arizona, design and professionally seal bypassing 
pumping plan and calculations.
5. Standby power source.
6. Staffing plan.
1.03
EMERGENCY PLAN
A. Diversion of sewage into adjacent sewers (if applicable or proposed)
1. Drawings and/or design calculations verifying available flow capacity of sewer 
receiving the bypassed sewage. 
2. CCTV showing the structural and internal condition of the sewer receiving the 
bypassed sewage.

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 3
October 27, 2025
1.04
JOB CONDITIONS
A. AVAILABLE FLOW DATA:
The Contractor shall be responsible for measuring flow to size the bypass pumping 
system to accommodate existing flow present at the time construction occurs.
B. PROTECTION:
No bypassing to the ground surface, receiving waters, storm drains, or bypassing which 
results in soil or groundwater contamination or any potential health hazards shall be 
permitted.
C. SCHEDULING:
The bypassing system shall operate continuously and shall not be shut down between 
shifts, on holidays or weekends, or during work stoppages without written permission 
from the City. The bypass system shall have attendants monitoring 24 hours a day 
whose only duty is to maintain the bypass pumping system until the bypassing of that 
specific pipeline is no longer required.
D. SERVICE LATERALS:
Sanitary sewers to be bypassed may have service laterals connected to adjacent users.   
The Contractor shall verify the locations of these laterals and any other service laterals 
not shown on the Design Drawings. 
PART 2 – PRODUCTS
2.01
MATERIALS
A. Contractor shall provide temporary pumps, conduits, and other equipment to bypass 
sewer flow around the Contractor’s work area as required during CCTV inspection, 
cleaning and rehabilitation activities. Contractor shall furnish all necessary labor and 
supervision to set up, operate and remove the pumping and bypass piping system.  
Sound attenuated pumps shall be provided for the bypass pumping. The sound 
attenuated pumps and/or power generators shall be capable of achieving an operating 
noise level of 70 decibels or less, measured at a distance of 50 feet. Contractor shall be 
responsible to provide and install sound attenuation devices, methods, and/or systems 
to maintain noise levels below stated decibels. Sound measurements shall be made and 
recorded by the Contractor in accordance with American National Standard S. 13-1971.

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 4
October 27, 2025
Pumps and bypass pipes shall be of adequate capacity and size to handle the required 
capacity. 
1. Pumping:  Contractor shall provide adequate size pump(s) to accommodate 150 
percent of the maximum instantaneous flow. The Contractor shall determine the 
required flow capacity. The City may provide flow information (if available) to the 
Contractor but shall provide no guarantees regarding the accuracy of such data.
2. Contractor shall provide 100 percent redundant bypass pumping capability when 
only one pump is required to accommodate the flow. When multiple pumps are 
required to accommodate the bypass flows, the Contractor shall provide a 
minimum of 50 percent additional number of equal capacity pumps.
3. Contractor shall provide a full time operator/inspector with full responsibility for 
the bypass pumping operation.
4. In no case shall the Contractor allow any sewage to surcharge and backup into 
homes or businesses, or in any way overflow into the environment. If the bypass 
pumping capacity is insufficient to prevent surcharge and/or overflow at any time, 
the Contractor shall clear any blockages and pull the line plugs irrespective of the 
status of the application or rehabilitation process.
B. Contractor shall maintain on site, sufficient equipment and materials to ensure 
continuous and successful operation of the bypass and dewatering systems. The 
standby equipment shall be installed, fueled/powered and fully operational at all times 
including all pumps, support equipment being in-place. The Contractor shall maintain 
on site a sufficient number of valves, tees, elbows, connections, tools, sewer plugs, 
piping, and other parts or system hardware to ensure immediate repair or modification 
of any part of the system as necessary.
C. All pumps, generators and other fueled equipment shall be placed in a containment 
barrier to protect against gasoline, oil, and hydraulic fluid spills.
PART 3 - EXECUTION 
 
3.01 
ESTIMATED FLOWS AND SEWER CAPACITY 
 
A. Reference Technical Specification Section 01010 – Summary of Work, paragraph 1.03.

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 5
October 27, 2025
3.02
PROTECTION 
 
In areas where flows are bypassed, all bypass flow shall be discharged as described above 
or approved by the City’s Representative. No bypassing to the ground surface, receiving 
waters, storm drains, or bypassing which results in groundwater contamination or potential 
health hazards shall be permitted. 
Prior to bypass operations, the contractor shall assess bypass suction and discharge 
manholes to verify condition of manhole prior to bypass system setup. City and City’s 
Representative shall be notified of the condition of the manholes to determine if 
rehabilitation may be required prior to bypass operations. 
3.03 
DAMAGES 
 
The Contractor shall repair, without cost to the City, any damage that result from the 
Contractof’s negligence, inadequate or improper installation, maintenance and operation 
of bypassing system, including debris clogging, mechanical, or electrical failures. 
** END OF SECTION **

SECTION 02145
DIVERSION OF SEWAGE FLOW 
AND DEWATERING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02145 - 6
October 27, 2025
[This page intentionally left blank for double sided printing]

SECTION 02148
CIPP LINING OF EXISTING SEWERS 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
A. SCOPE
 
This Technical Specification Section specifies the Cured-In-Place-Pipe (CIPP) 
rehabilitation lining, sets acceptable material and experience parameters, defines 
minimum performance requirements for the finished, installed product and details 
testing requirements for the completed product.
B. REQUIREMENTS
 
The Contractor shall provide and install a resin impregnated flexible tube (liner) with 
an interior plastic coating wearing surface into pipes identified for CIPP lining in 
accordance with American Society for Testing and Materials ASTM F1216 for the 
inversion installation method or ASTM F1743 for the pulled-in-place installation 
method, or ASTM F2019 for pulled-in-place (Glass Reinforced Plastic – liner) with 
resin cured by exposure to heated water, steam or UV light. When cured, the CIPP 
lining shall be continuous and tight fitting.
1.02
CLIMATIC CONDITIONS
The Contractor is made aware that the Work may occur during the summer months with 
temperatures exceeding 115 degrees F. The Contractor shall be prepared for these 
conditions and alter installation procedures or provide protection from detrimental 
exposure to adverse temperature or sunlight consistent with the materials proposed for use. 
Severe thunderstorms could occur that may increase volume of flow present within the 
sewer system. The Contractor shall be prepared for these conditions and alter his 
installation procedures and/or provide bypass pumping capabilities accordingly. 
Contractor shall be responsible for review of the weather forecast prior to commencement 
of liner installation that restricts or impedes the flow capacity of sewer pipe being 
rehabilitated. When the anticipated weather conditions are such that the resulting sewer 
flow may exceed upstream sanitary system storage volume or the capacity of the bypass 
pumping system or otherwise adversely affect the liner installation then the City’s 
Representative shall be informed and the installation shall be delayed until favorable 
weather is forecast.
1.03
EXPERIENCE RECORD OF THE CONTRACTOR
The Contractor shall provide to the satisfaction of the City, written documentation from 
the CIPP lining manufacturer that the Contractor’s personnel have been adequately 
informed and trained in the installation procedures of CIPP liner process proposed. Such

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 2
October 27, 2025
written documentation shall describe manufacturer’s procedures for installers, training 
program and, if applicable, licensing policies. 
The Contractor shall have an experienced representative on-site that has been responsible 
for the successful installation of a minimum of 5,000 linear feet of CIPP liner installation 
of similar diameter in the United States utilizing the installation materials and techniques 
proposed.
1.04
REFERENCES 
 
This Technical Specification Section contains references to the following documents.  
They are a part of this section as specified and modified. In case of conflict between the 
requirements of this section and those of the listed documents, the requirements of this 
section shall prevail. 
AASHTO Loading 
American Association of State Highway and 
Transportation Officials - Anticipated external 
load to be placed on the pipe.
ASTM F412
Definitions of Terms Relating to Plastic Piping 
Systems.
ASTM F1216
(including Appendix 
XI)
Standard practice for rehabilitation of existing 
pipelines and conduits by the inversion and 
curing of a resin-impregnated tube.
ASTM F1743
ASTM F2019
Standard Practice for Rehabilitation of Existing 
Pipelines and Conduits by Pulled-in-Place 
Installation of Cured-in-Place Thermosetting 
Resin Pipe (CIPP).
Standard Practice for Rehabilitation of Existing 
Pipelines and Conduits by the Pulled in Place 
Installation of Glass Reinforced Plastic (GRP) 
Cured-in-Place 
Thermosetting 
Resin 
Pipe 
(CIPP)
ASTM C581
Standard Practice for Determining Chemical 
Resistance of thermosetting resins used in glass 
fiber reinforced structures, intended for liquid 
service.
ASTM D543
Test Method for resistance of plastics to 
chemical reagents.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 3
October 27, 2025
ASTM D638
Standard Test Method for Tensile Properties of 
Plastics.
ASTM D790
Test Method(s) for flexural properties of 
unreinforced 
and 
reinforced 
plastics 
and 
electrical insulating materials.
ASTM D883
Definitions and Terms Relating to Plastics.
ASTM D1600
Abbreviations, Acronyms, and Codes for Terms 
Relating to Plastics.
ASTM D2990
Standard 
Test 
Methods 
for 
Tensile, 
Compressive, and Flexural Creep and Creep-
Rupture of Plastics.
ASTM D 1682
Test Method for Breaking Load and Elongation 
of Textile Fabrics.
ASTM D 5813
Specification for Cured-in-Place Thermosetting 
Resin Sewer Pipe APS Standard – Water 
tightness standard for cured-in-place thermo-
setting resin pipe Porosity Test protocol.
ASTM  D3039 /
D3039M
Test Method for Tensile Properties of Polymer 
Matrix Composite Material
ASTM D 3567
Practice for Determining Dimensions of 
Reinforced Thermosetting Resin Pipe (RTRP) 
and Fittings
ASTM E797
Practice for Measuring Thickness by Manual 
Ultrasonic Pulse-Echo Contact Method.
NASSCO Standard
Recommended 
Specifications 
for 
Sewer 
Collection System Rehabilitation.
1.05
SUBMITTALS 
 
The following submittals shall be provided in accordance with Technical Specification 
Section 01300 – Submittals: 
 
1. Shop drawings which detail short and long term properties (providing all supporting 
test data) of all component materials, construction and recommendations for material 
storage, sunlight control (if applicable), temperature control (if applicable), and CIPP 
liner handling constraints.
2. Representative cured liner sample (1-foot in length) for each diameter size of the same 
resin and felt/fiberglass liner proposed for the project depicting all material 
components, depicting the final quality of workmanship that can be expected on this 
project.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 4
October 27, 2025
3. Structural calculations of each CIPP diameter size that is proposed for use in sanitary 
sewer pipes as identified in the design drawings using parameters stated in paragraph 
2.04. CIPP liner calculations shall be stamped by a Professional Engineer in the State 
of Arizona.
4. 10,000-hour third party, 50-year Flexural Creep Modulus test data. Test shall be in 
accordance with ASTM D-2990 at 10,000 hours. If approved 10,000 hour tests are not 
available, Contractor shall use a minimum 50% reduction (50% retention) of Flexural 
Modulus of Elasticity (per ASTM F-1216) for all formula calculations. 
5. Independent laboratory test reports of CIPP sample(s) and tests as specified in 
Technical Specification Section 02148 , paragraph 1.06 (A).
6. Remote visual inspection video and reports as specified in Technical Specification 
Section 02148 , paragraph 3.01 (C),
 
7. Liner manufacturer’s recommended installation procedures per ASTM F1216 or 
ASTM F1743, Recommendations for material storage, temperature and sunlight 
control, CIPP liner handling, insertion, curing, trimming and finishing.  
8. Liner manufacturer’s recommended maximum pulling force that can be applied to the 
liner (if winched-in method employed).
9. Resin manufacturer’s proposed rate of cure temperature change (heating and cooling) 
and the target temperature and duration for cure of resin along with the maximum rate 
and target temperature for cool down prior to the termination of the cure process.
 
10. Certification showing the Contractor is currently licensed by the appropriate licensor 
to perform CIPP installation. Certification shall be given to the City’s Representative 
before any materials are delivered to the job site. 
11. A certified affidavit, signed by an officer of the installation Company, shall be provided 
stating that the on-site superintendent has received proper training in the 
manufacturer’s recommendations for CIPP liner installation methods and procedures.
 
12. Certification stating CIPP tube has been manufactured in accordance with ASTM 
F1216 and resin ASTM D5813 is suitable for its intended use. 
13. Test results for chemical resistance performed on a previously prepared sample of the 
finished product proposed for this project. Contractor shall submit a certified affidavit, 
signed by an officer of the company, stating that the resin the tests apply to and the 
resin submitted for this project are the same.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 5
October 27, 2025
14. Contractor shall submit method of measuring defects and an outline of specific repair 
or replacement procedures as recommended by the tube manufacturer for potential 
defects removal that may occur in the installed CIPP. Potential defects within the CIPP 
that cannot be repaired shall be clearly defined by the Contractor based on the 
manufacture’s recommendations, accompanied by a proposal for compensation to the 
City. 
 
15. Manhole connection (liner termination) detail and material proposed to seal any annular 
space between the liner and host pipe.
16. Warranty information and certificates.
17. Material safety data sheets for all hazardous chemicals used or expected to be on-site.  
At a minimum, sheets for the resin, catalyst, cleaners and repair agents should be 
submitted. 
18. Proposed equipment and fiber optic cable for monitoring the CIPP liner wall 
temperature during cure along the entire length being installed.
19. Contractor shall submit Lateral Seal connection material shop drawings and 
installation procedures.  
20. Contractor shall submit UV cured CIPP patch shop drawings and installation 
procedures. 
1.06
CIPP LINER QUALITY ASSURANCE 
 
A. LABORATORY TEST SAMPLE:
 
1. Sample should be cut from a section of cured CIPP at an intermediate manhole or 
at the termination point that has been inverted through a similar diameter pipe or 
other restraining system which will be held in place by a suitable heat sink, such as 
sandbags per ASTM F1216 or ASTM F1743 or ASTM F2019.
2. CIPP liner samples taken shall be sent to an independent laboratory within three (3) 
days of collection for quality control testing. Samples are to be signed by the City’s 
Representative and accompanied by a completed Chain of Custody form, included 
in Technical Specification Section 01999 -Reference Forms – FORM 01331-D.  
Results of laboratory testing shall be submitted directly to the City’s Representative 
within three (3) working days of receipt by the Contractor.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 6
October 27, 2025
3. Samples taken for testing shall be individually labeled and logged to record the 
following:
a.
City name.
b. City’s project number and project title.
c.
Unique sample number.
d. Pipe segment number as noted on Design Drawings or Pipe Rehabilitation List.
e.
Date and time sample was taken.
f.
Name of Contractor.
g. Date, location and name of person by whom the sample was taken.
Updated copies of the test log shall be submitted to the City Representative at the 
regularly scheduled coordination meeting. 
4. SAMPLE TESTING.  The cured sample shall be tested by an independent testing 
laboratory approved by the City’s Representative. Final payment will not be made 
until acceptable test results are received by the City’s Representative. The 
Contractor shall be responsible for any deviation from the specified physical 
properties and those evaluated through testing. Failure to meet the specified 
physical properties will result in the CIPP liner being considered defective work 
which will be handled in accordance with MAG Section 106. The Contractor shall 
be responsible for all costs associated with the testing of the liner physical 
properties and repair of any defective work. 
5. SAMPLING FREQUENCY: The above-stated sampling shall be performed for 
each manufacturing lot of CIPP liner materials (per diameter size). A sample shall 
be taken every 3,000 lineal feet or one semi-trailer load of liner whichever is less. 
City’s Representative reserves the right to request the Contractor to perform one 
(1) additional test for every 3,000 lineal feet or one semi-trailer load of liner 
whichever is less. 
6. Grounds for rejection of installed CIPP liner include, but not limited to the 
following:
a.
CIPP sample sent to laboratory that is missing City’s Representative signature.
b. CIPP samples missing the Chain of Custody form.
c.
Chain of Custody form missing information or signatures of all those who 
handled or processed the sample, including the signature of the City’s 
Representative and the laboratory Manager responsible for performing the 
quality control testing.
d. Laboratory test results not meeting minimum Technical Specification 
requirements.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 7
October 27, 2025
B. LABELING 
 
Each liner tube shall be labeled by the liner manufacturer with a permanent unique 
identification number that is referenced in accompanying documentation.  
Documentation shall include the following:
1. Liner manufacturer’s name,
2. Location of the liner manufacturer, 
3. Felt supplier,
4. Resin supplier,
5. Date of resin impregnation into felt liner,
6. Unique identification number of liner,
7. Resin identification number, 
8. Resin weight – lbs/ft, 
9. Manufactured liner length both resin impregnated felt “wet” and dry felt “dry”
10. Liner thickness, 
11. Liner diameter. 
 
1.07
WARRANTY 
 
The work performed under this Project shall be warranted to be free from defects in 
material and workmanship for a period of two (2) years from the date of Final Acceptance.  
The City’s Representative, while not acting as quality control agent for the Contractor, 
shall be allowed to view and document any portion of this contract, including but not 
limited to verifying type and quantities of resin used at any point during this work. If the 
City’s Representative determines that the process/material/installation has failed during the 
warranty period, the Contractor shall perform any and all repairs, including ancillary costs 
associated with repair at no additional cost to the City.
The warranty period of any part of the Work repaired or replaced under the provisions of 
the warranty will be extended for one (1) additional year.
 
PART 2 - PRODUCTS 
 
2.01
GENERAL 
 
A. All materials and installation procedures provided by the Contractor for use in the CIPP 
installation process shall be equal to or exceed the requirements of ASTM F1216, 
ASTM F1743 and ASTM F2019 and ASTM D2990.
 
B. Contractor shall be responsible for control of all material and process variables to 
provide a finished CIPP possessing the minimum properties specified in ASTM F1216 
and ASTM 5813 and/or supplemented herein.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 8
October 27, 2025
2.02
COMPONENT PROPERTIES 
A.  MATERIAL
a.
FELT LINER 
The liner tube shall consist of one or more layers of flexible needled felt or an 
equivalent non-woven and/or woven material meeting ASTM 1216 Section 5 or 
ASTM F1743 Section 5.2.1 and capable of carrying resin, withstanding installation 
pressures and curing temperatures, and is compatible with the resin system used.  
a.
FIBERGLASS LINER 
The liner tube shall consist of one or more layers of flexible fiberglass or an 
equivalent woven material meeting ASTM D2990 and ASTM D5813 and capable 
of carrying resin, withstanding installation pressures and curing temperatures and 
is compatible with the resin system used.  
The fiberglass liner shall include an exterior and interior film that protects and 
contains the resin used in the liner.  The exterior film shall be provided with an 
ultraviolet (UV) light blocker foil.
B. RESIN 
The resin system to be used shall be manufactured by an approved company selected 
by the CIPP process manufacturer. Only corrosion resistant polyester or vinyl ester 
resins shall be used.
The resin used shall produce a properly cured-in-place pipe system, which will be 
resistant to abrasion caused by solids, grit, and/or sand. The cured-in-place pipe system 
shall also be resistant to corrosion due to acids and gases such as sulfuric acid, carbonic 
acid, hydrogen sulfide, methane, and carbon monoxide. The cured-in-place pipe system 
utilized shall withstand the corrosive effect of the existing residential, commercial, and 
industrial effluents, liquids and/or gases.
The chemical corrosion resistance of the actual resin system used by the Contractor 
shall be tested by the resin manufacturer in accordance with ASTM F1216, D543, or 
C581 as applicable. Exposure to the chemical solutions listed below shall result in a 
loss of not more than twenty percent (20%) of the initial physical properties when tested 
in accordance with ASTM C581:
C. CHEMICAL RESISTANCE 
The chemical resistance tests should be completed in accordance with Test Method 
ASTM D 543. Exposure should be for a minimum of one month at 73.4 degrees F.  
During this period, the CIPP test specimens should lose no more than 20 percent of 
their initial flexural strength and flexural modulus when tested in accordance with 
Section 8 of ASTM F1216 when subjected to the following solutions:

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 9
October 27, 2025
Chemical 
Solution
Concentration (%)
Tap Water (pH 6-9)
100
Nitric Acid
5
Phosphoric Acid
10
Sulfuric Acid
10
Gasoline
100
Vegetable Oil
100
Detergent
0.1
Soap
0.1
The Contractor shall be responsible for all costs associated with the chemical resistance 
tests.  Proof of meeting these requirements shall be provided to the City’s 
Representative for approval at least seven (7) days prior to commencement of work. 
D. LINER TUBE
 
1. The liner tube shall be fabricated to a size that, when installed, will fit the internal 
circumference of the existing sanitary sewer main without any annular space 
between liner and walls of host pipe. Allowances shall be made for circumferential 
stretching due to insertion of liner and deterioration of host pipe walls.
2. The minimum liner tube length shall be that deemed necessary by the Contractor to 
effectively and continuously span the distance from the inlet to the outlet of the 
respective manholes, unless otherwise specified. The Contractor shall verify the 
lengths in the field before impregnation and installation of the tube. Individual 
insertion runs may be made over one or more manhole sections as determined in 
the field by the Contractor. 
3. Measure the overall elongation of the fabric tube after pull-in completion and report 
to the City’s Representative. 
4. Contractor shall utilize a dynamometer or load cell per ASTM F1743 Section 6.4.1 
or other approved method to monitor winch or cable pulling force.  
5. Prior to insertion, the liner tube shall be free of all visible tears, holes, cuts, foreign 
materials, and other defects. 
6. The physical properties quoted in Technical Specification 02148 – paragraph 2.03 
applies to CIPP manufactured polyester, vinyl-ester, or epoxy resin. Resins shall be

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 10
October 27, 2025
tinted for visibility and provide positive indication of adequate liner wet-out.  
Resins should be appropriate for conditions encountered. 
E. DIMENSIONS 
 
1. The Contractor shall make allowances in determining the felt tube length and 
circumference for stretch during installation and shrinkage during curing. The 
Contractor shall verify the lengths in the field before the felt tube is cut and 
impregnated. Individual installation runs may include one or more manhole-to-
manhole sections as approved by the City’s Representative. 
2. The diameter of the host pipe may be larger than the nominal inside diameter due 
to corrosion of the existing host pipe.  It is the Contractor’s responsibility to 
determine the required diameter of the liner. 
3. “Minimum Design” thickness is defined as the CIPP calculated thickness according 
to ASTM F1216 or ASTM F1743 or ASTM D2990 as applicable, using design 
criteria then rounded up to next manufactured increment. Calculations of liner 
thickness shall be submitted to the City or City’s Representative according to 
Technical Specification Technical Specification Section 01300 – Submittals prior 
to installation. 
Unless otherwise specified to provide for excess resin migration, the gap thickness 
of the wetting out equipment shall be sized to allow an excess of 5 to 10 percent 
resin to pass during impregnation. The measurement of installed dry cured liner 
thickness shall be determined at a minimum of three locations cut from a CIPP 
restrained liner sample, minus the thickness of any plastic coatings or CIPP layers 
not included in the structural design of the CIPP, using a method of measurement 
accurate to the nearest 0.005-mm.
2.03
FINISHED AND CURED CIPP LINER PROPERTIES
The physical properties of the cured CIPP shall have minimum initial test values as given 
in Table 1 of ASTM F1216 for resin impregnated felt tube and Table 1 of ASTM F2019 
for resin impregnated Glass Reinforced Plastic tube and supplemented below in Table 1. 
Properties for these or any other enhanced resins shall be substantiated with test data.
Table 1:  CIPP Liner Properties
Resin Impregnated Felt Tube
Test Property
Test Value
Test Method
Flexural strength
5,000 psi
ASTM D790
Flexural modulus
300,000 psi
ASTM D790
50-year flexural creep modulus
150,000 psi
ASTM D2990

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 11
October 27, 2025
Resin Impregnated GRP Tube
Test Property
Test Value
Test Method
Flexural strength
7,000 psi
ASTM D790
Flexural modulus
750,000 psi
ASTM D790
50-year flexural creep modulus
375,000 psi
ASTM D2990
2.04
DESIGN CRITERIA
A. The liner thickness shall be designed in accordance with the procedures of ASTM F 
1216, Appendix XI, ASTM D2990 and these Technical Specifications. All material 
properties used in design calculations shall be long-term (time-corrected) values.  
Contractor shall familiarize himself with site conditions when preparing liner design.
B. The following parameters shall be assumed for the liner design:
1. Modulus of soil reaction, E's = 1,000 psi (fully deteriorated)
2. Unit weight of soil = 140 pcf
3. The minimum ovality shall be 2.0 percent
4. Groundwater to ground surface elevation
5. AASHTO H20 Traffic loads
6. Safety Factor = 2.0
2.05
PAYMENT PENALTY / REDUCTION
A penalty will be assessed by the City to the Contractor for payment on all installed CIPP 
liners that do not meet or exceed the minimum CIPP wall thickness requirements as stated 
in Technical Specification Section 02148 - paragraph 2.02.E.3. Payment to the Contractor 
will be reduced on Contractor’s unit price per foot payment for the total length of CIPP 
liner installed as measured between center of upstream manhole to center of downstream 
manhole. Payment/reduction shall be based on the following Table 2 – Payment Penalty / 
Reduction:
TABLE 2 - PAYMENT PENALTY / REDUCTION
Payment Penalty 
(see note 1)
Installed Dry Cured Liner Thickness Below             
Minimum Design (mm)
0%
0% up to and including 5%
10%
Greater than 5% up to and including10%
20%
Greater than 10% up to and including 20%
Rejected
Greater than 20%
Note 1 – Reduction in payment assessed in Contractor’s pay request to City

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 12
October 27, 2025
2.06
CIPP TERMINATION POINTS 
 
The Contractor shall provide CIPP liner terminations. If the CIPP fails to make a tight seal 
at the manhole walls, the Contractor shall seal the liner/manhole interface with material 
consisting of a resin mixture compatible with the liner/resin system or approved equivalent.  
The sealing system shall be applied in accordance with manufacturer specifications and 
approved by the City’s Representative. 
2.07
CURE TEMPERATURE MONITORING
For CIPP 15-inches and larger, the Contractor shall provide equipment and fiber optic cable 
for monitoring the CIPP liner wall temperature during cure along the entire length being 
installed. Sensor technology shall be as manufactured by Zia Systems LLC., of Galloway, 
Ohio 43119-8137 or approved equal.
PART 3 - EXECUTION 
 
3.01
PREPARATORY PROCEDURES 
A. SET-UP
Prior to CIPP installation all necessary traffic control measures shall be put into place 
per Technical Specification Section 02100 – Traffic Control, and the bypass diversion 
pumping system, including back-up pumps, shall be tested and running per Technical 
Specification Section 02145 – Diversion of Sewage Flow and Dewatering.  
Every effort should be made to protect the environment from any contamination from 
sanitary sewer. 
B. SEWER CLEANING
 
Prior to CIPP tube installation, the Contractor shall clean the existing sewer in 
accordance with Technical Specification Section 02760 – Sewer Pipe and Sewer 
Structure Cleaning.  The Contractor shall clear the existing sewer of obstructions such 
as solids that will prevent or hinder CIPP liner installation.   The Contractor shall utilize 
a spinning nozzle as to ensure that the host pipe is free from any residual sediment prior 
to lining.  A time lapse no greater than 30 calendar days shall be allowed between initial 
host pipe cleaning and liner installation.
C. CCTV INSPECTION
 
The interior of the sewer shall be inspected in accordance with Technical Specification 
Section 02761 – Remote CCTV Inspection of Existing and Rehabilitated Sewers to 
determine the location of conditions, which may prevent proper installation of CIPP.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 13
October 27, 2025
The Contractor shall furnish the cleaning CCTV and report to the City’s Representative 
for host pipe segments that the Contractor determines existing conditions may impact 
the final operation of the lined pipe, either grade or condition. If existing host pipe 
defects or voids exist, the Contractor shall repair or replace that section of the host pipe. 
The Contractor shall not line over any offset that is greater than 5% of the lined pipe 
internal diameter without first notifying the City’s Representative.  
D. CIPP LINER DIAMETER VERIFICATION
 
The internal diameter of the existing host pipe may be larger (or smaller) than their 
nominal size. It is the Contractor's responsibility to measure the actual inside diameter 
of the sewer to determine the appropriate size of CIPP liner to use. 
 
3.02
INSTALLATION METHODS
A. GENERAL
 
The Contractor shall designate the location where the CIPP felt tube would be 
impregnated with resin ("wet-out"). Locations shall be subject to approval by the City’s 
Representative and applicable local agencies. The Contractor shall allow the City 
and/or City’s Representative to inspect the materials and "wet-out" procedure. 
If the “wet-out” location is not at the project site, the impregnated CIPP tube shall be 
transported to the site under controlled environmental conditions. Transport vehicles 
shall include a tamper resistant, sealed temperature-recording device which records the 
temperature of the liner at all time after leaving the wet-out site. The Contractor shall 
decide when to transport the impregnated CIPP tube to the site and when to commence 
insertion with respect to weather conditions. 
The Contractor is responsible for obtaining construction/ fire hydrant meters from City 
of Tempe and for paying all applicable deposit, fees and water usage fees according to 
revised City Code Section 49. 
B. PRE-INSTALLATION
Prior to installation of the liner, the following activities are required to be completed:
1. Receipt and approval of pre-installation submittals by the City’s Representative.
2. Verification of pipe condition and any obstructions by video inspection.
3. Verification of existing laterals and location of services by flowing water, dye test, 
or visually with a pan and tilt head camera or other means.

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 14
October 27, 2025
4. Cleaning of sewer main (recorded on video).
5. Perform required point repairs at pipe locations that would prevent or hinder proper 
CIPP liner. The Contractor shall obtain the approval of the point repairs from the 
City’s Representative prior to proceeding with the liner installation. The Contractor 
assumes all responsibility of liner quality once installation begins if prior written 
notification is not received and acknowledged by the City’s Representative.
6. The Contractor is to ensure liner tube is free of all visible tears, holes, cuts, foreign 
materials, and other defects.
C. HANDLING
 
The Contractor shall exercise adequate care during transportation, handling and 
installation to ensure the CIPP material is not torn, cut, or otherwise damaged. If any 
part or parts of the CIPP material becomes torn, cut or otherwise damaged before or 
during insertion, it shall be repaired or replaced in accordance with the manufacturer’s 
recommendations and approval by the City’s Representative before proceeding further; 
and at the Contractor's expense. 
 
D. INSTALLATION PROCESS
 
No CIPP installations will be undertaken in weather conditions that could jeopardize 
the installation of the CIPP, or be detrimental to the long-term performance of the CIPP.  
The liner will be installed by the inversion tube method or winching method as follows.  
1. INVERSION METHOD: The tube shall be impregnated with a liquid thermosetting 
resin and lowered into the insertion pit through an inversion tube. The inversion 
tube will then be inverted into the existing sewer by air pressure which will push 
the tube through the host pipe inside out, while pressing the resin impregnated side 
firmly against the inside walls of the host pipe. The smooth coated side of the liner 
shall become the new interior surface of the host pipe. After the tube is inverted 
through the host pipe section, the Contractor shall cure the liner by introducing 
steam or a combination of compressed air and steam to initiate the curing process. 
 
2. WINCHING METHOD: The wet out liner shall be inserted through the upstream 
manhole and pulled through the section through the use of a power winch attached 
to the end of the liner with an appropriate pulling head.  
A monitoring device shall be provided to measure the pulling force. Should the 
pulling force exceed the manufacture recommendations, the tube shall be rejected, 
removed and replaced. Maximum manufacturer’s pulling force shall be submitted 
according to Technical Specification Section 01300 – Submittals.
 
Rollers shall be installed in the upstream and downstream manholes to guide the

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 15
October 27, 2025
liner into and out of the host pipe and to guard against chafing of the crowns at the 
entry and exit. 
 
The sewer invert throughout the section to be lined shall be covered with a 
polyethylene foil or other suitable material to facilitate threading of the liner and 
reduce the risk of damage to the liner material. The CIPP shall be formed with a 
polyurethane, polyethylene, or polypropylene coating on its interior surface. 
 
During insertion of the resin impregnated tube into the host pipe, the maximum 
allowable longitudinal elongation, or stretch, of the liner tube shall be 5% per 
ASTM F1743 Section 6.4.2.  The longitudinal stretch of the tube shall be gauged 
by comparing the fully inserted tube to the actual length of host pipe being 
rehabilitated. Contractor shall field measure within the interior of the pipe the actual 
host pipe length and submit to the City’s Representative. 
 
The Contractor shall use a flexible and impermeable calibration hose to inflate the 
tube.  The calibration hose may or may not remain in the complete installation. Any 
dry tube or inflation hose material that enters the existing pipe that has not been 
previously impregnated with resin under controlled conditions cannot be included 
in the structural wall of the CIPP. The nominal thickness of this material shall be 
deducted from the field sample thickness measured in order to verify that the 
minimum specified wall thickness is achieved. Hose material remaining in the 
installation shall be compatible with the resin system used, shall bond permanently 
with the tube, and shall be translucent to facilitate post installation inspection. Hose 
materials which are to be removed after curing shall be of non-bondable material. 
 
The Contractor shall introduce air and/or steam into the liner and expand with 
pressure inflating and pressing the liner material in a tight fit against the inner walls 
of the host pipe producing dimples at lateral and side connections and flared ends 
at manholes. All hoses/pipes used for introducing water, air, and/or steam shall be 
ramped during the inversion and curing process to allow for the ease of vehicular 
and pedestrian traffic. All hoses/pipes shall be color-coded for identification to 
prevent the use of hoses/pipes used for water conveyance are not used for 
wastewater conveyance or vice versa. 
 
E. CURING
 
The curing process shall be per ASTM F1216 or ASTM F1743 or similar approach 
recommended by the manufacturer and approved by the City’s Representative, to 
ensure that the liner design physical properties are attained. Circulation water shall be 
cool down to at least 100 degrees F before releasing the hydrostatic head.
 
The rate of temperature rise and fall during heating and cooling shall not exceed 2 
degrees F per minute or manufacturer’s recommendation. Contractor shall submit per 
Technical Specification Section 01300 – Submittals the manufacturer recommendation

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 16
October 27, 2025
for temperature control requirements during heat–up, cure, recommended cure 
temperature, and length of time at recommended cure temperature, and maximum rate 
of cool down of temperature. 
 
F. CURE TEMPERATURE MONITORING
The Contractor shall monitor the temperature of the CIPP liner wall to verify and 
document manufacturer recommended curing temperature has been achieved. 
Temperature monitoring system shall be placed between the host pipe and the liner in 
the bottom of the host pipe (invert) to record the heating and cooling that takes place 
on the outside of the liner. The Contractor shall install and monitor temperature during 
the curing process with system/equipment as follows:
1. CIPP Liner in Pipe Less than 15-inch Diameter: Temperature sensors shall be 
placed between the host pipe and the liner at the invert of the host pipe. The sensors 
shall be placed at the upstream and downstream ends of the reach being lined to 
monitor the temperature during the curing process.
2. CIPP Liner in Pipe 15-inch Diameter and Larger: Fiber optic cable along the entire 
length of CIPP liner in addition to point temperature sensors installed at the 
upstream, downstream, and intermediate (if present) access manholes. The 
monitoring shall be by a computer which can record the temperatures at this 
interface throughout the processing of the CIPP utilizing a tamper-proof database. 
Prior to installing the CIPP liner in the host pipe, the temperature monitoring 
system’s function shall be confirmed by hooking it up to the computer and seeing 
that the sensors are reporting ambient temperatures. No more than two sensors in 
sequence can be found faulty during this test. If three or more sensors in sequence 
are discovered faulty, a new sensor array shall be pulled into the host pipe replacing 
the previously installed array; and the new array shall be again tested for its proper 
function.
G. REINSTATEMENT OF LATERAL CONNECTIONS
It is the intent of this project that all service lateral connections be reopened.
Service laterals shall be reopened to 100% of original lateral pipe diameter without 
excavation, utilizing a remotely controlled cutting device, monitored by CCTV. The 
cut liner shall have no jagged edges and shall be brushed smooth with a wire brush. 
Contractor shall reinstate laterals back to a smooth finish with the lateral opening free 
of debris or obstruction to flow. Contractor shall remove any “coupons” that fall within 
laterals prior to performing a post-installation CIPP CCTV. The Contractor shall certify 
he has a minimum of two (2) complete working cutter units plus spare key components 
on the site before the insertion of the liner. No additional payment shall be made for 
excavations for the purpose of reopening connections unless previously approved by

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 17
October 27, 2025
the City’s Representative prior to the start of work. The Contractor is responsible for 
all costs and liability associated with such excavations and restoration work. 
Where identified in the design drawings, the Contractor shall install lateral seal 
connections within five (5) working days of CIPP liner installation. Surface preparation 
of installed liner and/or existing lateral shall be per lateral seal manufacturer 
recommendations. Surface preparation costs, including additional cleaning, shall be at 
no additional cost the City.  
H. REINSTATEMENT OF DROP SEWER CONNECTIONS
The Contractor shall reinstate the opening of all vertical drop sewer connections to 
100% of original drop pipe diameter without excavation, utilizing a remotely controlled 
cutting device, monitored by CCTV. The cut liner opening shall have no jagged edges 
and shall be brushed smooth with a wire brush. Contractor shall reinstate drop back to 
a smooth finish with the drop opening free of debris or obstruction to flow. 
The existing host pipe drop connection may be constructed of PVC material that is 
easily damaged by robotic cutting equipment. The Contractor shall be responsible for 
all costs associated with repair of damaged host pipe, including installation of a UV 
cured seal and/or open cut excavation to repair damage to the existing host pipe and or 
vertical drop pipe due to overcut of drop sewer connection.  
Contractor shall remove any liner “coupons” or shavings that fall within the drop pipe 
segment prior to performing a post-installation CIPP CCTV documentation.
3.03
FINISHED PRODUCT 
 
A. FINISH
 
The finished CIPP shall be continuous over the entire length of an installation run. 
 
B. MANHOLE CONNECTION 
 
The contractor shall provide a watertight seal between the host pipe and liner pipe at 
the manhole connection. 
 
C. INSPECTION
 
The Contractor shall inspect the CIPP after installation. The inspection will be 
performed and recorded using remote visual television inspection equipment in 
accordance with Technical Specification Section 02761 – Remote CCTV Inspection of 
Existing and Rehabilitated Sewers. If defects exist within the liner, the Contractor shall 
repair or replace that section of liner at no additional cost to the City.  Methods of repair 
shall be proposed by the Contractor and submitted to the City’s Representative for

SECTION 02148
CIPP LINING OF EXISTING SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02148 - 18
October 27, 2025
review and approval prior to initiating repair work. City Representative shall be notified 
a minimum of 24 hours prior to performing repair work.
The Contractor shall resubmit a final video showing a post inspection after the liner 
issues have been addressed and approved. 
D. REPAIR OF DEFECTS
Defects such as foreign inclusions, dry spots, pinholes, delamination, seam separation 
and wrinkling beyond the specification allowances or as determined by the City’s 
Representative as affecting the integrity or structural stability of the CIPP pipe, or as 
adversely affecting the hydraulic capacity of the CIPP lined pipe are unacceptable and 
shall be repaired or replaced at the Contractor's expense.
1. Wrinkles in the finished lined pipe which cause a backwater of one (1) inch or more 
or reduce the hydraulic capacity of the lined pipe (wrinkle height that exceed 5 
percent of the lined pipe internal diameter) are unacceptable and shall be removed 
and/or repaired by the Contractor at no additional cost to the City.  
2. Voids or annular space that exists between a wrinkle and the host pipe shall be 
repaired or pipe section replaced and relined by the Contractor at no additional cost 
to the City. Methods of repair shall be proposed by the Contractor and submitted to 
the City’s Representative for review and approval prior to initiating work. 
3. Separations of CIPP liner seam in the finish lined pipe are unacceptable and shall 
be removed or repaired by the Contractor at no additional cost to the City. If a 
separation of a liner seam exists, the Contractor shall remove the CIPP liner or 
replace that section of pipe. Methods of repair shall be proposed by the Contractor 
and submitted to the City’s Representative for approval. 
3.04
CLEANUP 
 
Following inspection, the Contractor shall clean up the entire project area. The Contractor 
shall dispose of all excess material and debris not incorporated into the permanent 
installation off site. 
** END OF SECTION **

SECTION 02760
SEWER PIPE AND SEWER STRUCTURE CLEANING
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02760 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01 
DESCRIPTION 
 
A. SCOPE: 
This Technical Specification section specifies the requirements for cleaning of the 
sewer structures prior to remote visual inspection, City or City’s Representative 
inspection, and manhole rehabilitation. The work to be done under this Contract 
consists of furnishing all labor, materials, and equipment to remove the accumulated 
sediments and clean the sanitary sewers and sewer structures.
 
B. REQUIREMENTS: 
The work to be done consists of furnishing all labor, materials, and equipment to 
remove accumulated sediments and debris down to sound, solid structural material of 
the sanitary sewer access manhole. The Contractor shall hydro blast with a minimum 
1000 PSI water pressure for duration sufficient to clean the sanitary sewer access 
manhole per coating manufacturer’s recommendations.
Where composite manhole inserts are to be installed, the access manhole shall be 
cleaned using low pressure water to remove debris that may hinder the installation of 
the composite manhole insert. Removed debris shall not be allowed to enter the 
wastewater collection system. 
The Contractor shall remove existing sediment, debris, roots, scale, encrustations, and 
grease accumulations from the sanitary sewer access manholes to be inspected and/or 
rehabilitated and adequately prepare the surfaces for composite manhole insert 
installation, epoxy coating, and/or bench repair.  
All materials dislodged during cleaning shall not be allowed to enter the wastewater 
collection system, and shall be removed from the sanitary sewer pipe, and/or access 
manhole, and work area and delivered to an approved disposal site. 
 
1.02 
SUBMITTALS  
A. The following submittal shall be provided in accordance with Technical Specification 
Section 01300 - Submittals: 
1. A letter report identifying the methods the Contractor anticipates employing to 
remove sediment, debris, grease, scale, encrustations, and deteriorated concrete and 
or PVC T-Lock liner sanitary sewer access manhole to be rehabilitated. The letter 
report shall also include methods for removal manhole PVC T-Lock liner. The letter 
report shall include a detailed explanation of the surface preparation process and a 
schedule of activities and references where the Contractor has used the identified 
cleaning method successfully in the past.

SECTION 02760 
SEWER PIPE AND SEWER STRUCTURE CLEANING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02760 - 2
October 27, 2025
PART 2 - MATERIALS 
2.01 
CHEMICAL ADDITIVES 
 
No chemicals shall be used without written approval of the City. In no case shall any 
chemical additive be used which might be considered hazardous or might be considered 
detrimental to organisms or equipment of a wastewater treatment plant, or detrimental to 
old or new pipe materials.   
 
A Safety Data Sheet (SDS) shall be posted onsite with a copy supplied to the City for all 
chemicals used in the project or brought on-site as approved by the City. 
2.02
HYDRO BLAST CLEANING 
A. The Contractor shall use a nozzle to ensure the interior 360 degree circumference of 
the pipe interior is clean and free from any residual sediment prior to lining. 
B. It shall be the Contractor’s responsibility to determine whether structural condition of 
the existing pipe or access manhole will not be detrimentally damaged by use of 
spinning nozzle and water pressure utilized. The Contractor shall notify The City’s 
Representative of pipe condition that would be impacted through the proposed cleaning 
process and equipment. Once the Contractor initiates the cleaning operation, he accepts 
the responsibility of reinstating normal operation of the sewer.
2.03 
MECHANCAL CLEANING 
A. The Contractor shall use a mechanical cleaning method to ensure the interior 360 
degree circumference of the pipe interior is clean of tuberculation, corrosion and/or 
encrustations prior to lining. 
B. It shall be the Contractor’s responsibility to determine whether structural condition of 
the existing pipe and will not be detrimentally damaged by use of spinning mechanical 
device proposed. The Contractor shall notify The Owner’s Representative of pipe 
condition that would be impacted through the proposed cleaning process and 
equipment. Once the Contractor initiates the cleaning operation, he accepts the 
responsibility of reinstating normal operation of the sewer.
PART 3 - EXECUTION 
3.01 
GENERAL  
The Contractor shall at all times conduct work so as to prevent any detrimental sewage 
blockage and minimize surcharging in the sewer manholes or connecting sanitary sewer 
system. Damage to existing facilities as a result of the Contractor's work shall be promptly 
repaired in kind at the Contractor's expense.

SECTION 02760
                                        SEWER PIPE AND SEWER STRUCTURE CLEANING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02760 - 3
October 27, 2025
3.02 
SEWER BYPASSING AND DEWATERING 
 
Sewer flow shall be bypassed during the cleaning of the sewers as specified in Technical 
Specification Section 02145 – Diversion of Sewage Flow and Dewatering.
3.03 
HYDRO BLAST CLEANING 
 
The Contractor shall clean existing sediment, debris, roots, scale, encrustations, grout, and 
grease accumulations from the sanitary sewer pipes and access manholes to be inspected 
or scheduled to be rehabilitated and adequately prepare the surfaces for installation of liner 
and coating. Initial cleaning may not be performed more than thirty (30) days prior to start 
of lining installation. 
Pipe discovered by the Contractor or his Subcontractor to be physically deteriorated to the 
extent where cleaning may detrimentally impact the structural integrity of the existing pipe 
shall be brought to the attention of the City’s Representative prior to conducting cleaning 
operations. 
Cleaning shall remove all sediment, rocks, debris, roots, grease accumulations and 
obstructions from the sewer to be lined and from the structures to be coated. Cleaning of 
the sewer and structure interior surfaces shall remove all grease, scale, encrustation, and 
any other foreign material from the surface. Multiple passes with cleaning equipment may 
be required at no additional cost to the City. 
 
Sediment or debris from cleaning operations larger than U.S. #8 sieve shall not be 
deposited downstream in the sewer. Sedimentation deposited downstream shall be 
removed at no cost to the City.  All materials dislodged during cleaning shall be removed 
from the pipe and delivered to an approved disposal site.
The Contractor shall be thoroughly familiar with all phases of sewer and structure cleaning 
to ensure the completion of this Contract without causing a health hazard or damage to the 
sewage system, public and private property. 
 
The Contractor shall clean the sewer and structures so that there are no visible rocks, debris, 
roots, grease accumulation and obstructions. The Contractor shall clean the access to 
ensure proper installation of the structural insert or epoxy coating.

SECTION 02760 
SEWER PIPE AND SEWER STRUCTURE CLEANING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02760 - 4
October 27, 2025
3.05
MECHANICAL CLEANING
The Contractor shall clean existing interior pipe of tuberculation, scale, encrustations, and 
grout accumulations from the sanitary sewer pipes to be inspected or scheduled to be 
rehabilitated and adequately prepare the surfaces for installation of liner. Initial cleaning 
may not be performed more than thirty (30) days prior to start of lining installation. 
Pipe discovered by the Contractor or his Subcontractor to be physically deteriorated to the 
extent where cleaning may detrimentally impact the structural integrity of the existing pipe 
shall be brought to the attention of the City’s Representative prior to conducting cleaning 
operations. 
Cleaning shall remove all mineral accumulations and/or attachments from corrosion of 
metallic surfaces from the sewer to be lined and from the structures to be coated. Cleaning 
of the sewer and structure interior surfaces shall remove all scale, encrustation, and any 
other foreign material from the surface.  
 
It shall be the responsibility of the Contractor to repeat the mechanical cleaning process if 
tuberculation or detrimental corrosion buildup occurs prior to CIPP lining operation at no 
additional cost to the City.
3.05 
DISPOSAL OF SEDIMENTS 
 
The Contractor shall be responsible for transporting and disposing, including all disposal 
fees, of any sediments and material removed from the sewer or structures per Technical 
Specification Section 01560 – Environmental Controls. 
 
All sediment and debris removed from the sewer shall be disposed off-site in a lawful 
manner. Hauling containers shall be watertight. On-site stockpiling of removed material 
shall not be allowed. 
The Contractor is responsible for obtaining all necessary permits, fees, and approval from 
all regulatory agencies required to perform the work, including transport of sediments.  
Off-site disposal of all material removed from the sewer shall be the Contractor's 
responsibility. 
 
Copies of all disposal receipts shall be submitted to the City.  
 
** END OF SECTION **

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS 
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION 
 
This specification defines the requirements for internal Closed Circuit Television (CCTV) 
inspection after rehabilitation according to the National Association of Sanitary Service 
Company (NASSCO) standards. 
 
1.02
SUBMITTALS 
 
A. PRELIMINARY  
At the preconstruction conference the Contractor shall submit the following 
information for review per Technical Specification Section 01300 – Submittals 
following notification of award of the Contract: 
 
1. The Contractor shall submit operator name and National Association of Sanitary 
Service Companies (NASSCO) – Manhole Assessment and Certification Program 
(MACP) of CCTV operator for approval.  
2. The Contractor shall submit an example of work of the analog and/or digital camera 
equipment to demonstrate proposed quality and clarity of video along with 
proposed methods of documentation. Example shall consist of one remote visual 
inspection record, in digital and/or analog format, of previous sewer inspection 
work complete with audio commentary and inspection log(s). The submitted record 
shall show operational and structural defects in sewers that are of the same diameter 
as the sewers in this project.  
The information will be reviewed to determine if the quality of the images, 
technique, and inspection procedures are acceptable and if defects were properly 
identified and documented. Samples shall be with the same camera, lighting 
equipment, and data handling procedures proposed for this work.   
The City’s Representative will review the records, not for accuracy of content, but 
to make sure that the required information is provided and the recording is of 
acceptable quality. If the City’s Representative determines that the records are 
defective or not of adequate quality, the Contractor shall repeat the inspection 
documentation at the Contractor's expense. 
The Contractor shall be responsible for modifications to his equipment and/or 
inspection procedures to achieve report material of acceptable quality. No work shall 
commence prior to approval of the material by the City’s Representative. Once 
accepted, the report material shall serve as a standard for the remaining work. 
The Contractor shall resubmit a final video showing a post inspection after the liner

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 2
October 27, 2025
issue(s) have been addressed and approved. Contractor shall correct all title information 
on the video and labels prior to final submittal.
 
Digital Video Disk (DVD) or Universal Serial Bus (USB) records shall include labels 
containing project titles, dates, including City and Contractor company names. The 
Contractor shall maintain a copy of all inspection documentation (disks, tapes, 
databases, and logs) for the duration of the work and warranty period. 
 
B. OTHER SUBMITTALS 
1. One (1) copy of the sanitary sewer access manhole CCTV inspection stored on 
DVD, USB media, or external hard drive showing the existing access manhole after 
rehabilitation as noted in the Design Drawings shall be submitted to the City’s 
Representative within ten (10) days from the final inspection video date. The City’s 
Representative will track and compile a final record of access manhole 
rehabilitation and if necessary secondary access manhole CCTV after coating or 
structural insert issues have been addressed and submitted to the City’s 
Representative by the Contractor.
Final CCTV inspection shall be completed utilizing digital Panoramo 360 or 
approved equal format.
The Contractor shall submit written inspection logs and CCTV procedures 
according to NASSCO MACP for the sanitary sewer access manholes inspected 
and/or rehabilitated.
Final payment to the Contractor shall not be made until Final CCTV inspection for all 
rehabilitated sanitary sewer pipe and access manholes have been received by the City. 
PART 2 - PRODUCTS 
 
2.01
MATERIALS 
A. TELEVISION INSPECTION CAMERA(S)
 
Camera(s) shall be intrinsically safe and shall be operative in 100 percent humidity 
conditions. Lighting intensity shall be remote controlled and shall be adjusted to 
minimize reflective glare. Lighting and camera quality shall provide a clear, focused 
picture of the entire inside periphery of the sewer. Analog type camera shall have tilt 
and zoom capabilities to view 90 degrees to the pipe centerline for the entire 360 
degrees of the pipe circumference.

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 3
October 27, 2025
The Contractor shall utilize equipment that allows for CCTV to be performed within 
conditions noted in the specification. Contractor’s equipment shall be sized to fit within 
lined segments. Any scrapes or damages to the liner resulting from equipment use shall 
be addressed and corrected based on City of Tempe inspection. 
The Contractor shall utilize a digital, Panaramo 360 or approved equal for Post CCTV 
inspection of rehabilitated pipes and access manholes. 
 
B. DVD/USB
 
Video recordings of all sewer line inspections shall be made on DVD disks or USB 
drives. The audio portion of the video shall be sufficiently free from electrical 
interference and background noise to provide complete intelligibility of the oral report.  
A copy of the video recordings shall be consolidated on DVD or USB media identified 
by City of Tempe quarter section number of lined sewer segments so to minimize the 
number of disks provided at end of project. 
 
C. FOOTAGE COUNTER 
 
A footage counter device, which measures the distance traveled by the camera in the 
sewer, shall be accurate to plus or minus 2 feet in 1,000 feet. 
 
D. VIDEO TITLING
 
Video equipment shall include genlocking capabilities to the extent that computer 
generated data, (i.e., footage, date, size, address and location, etc.) as determined by 
the City can be overlaid onto video, and both indicated on the television monitor and 
permanently recorded on the inspection video. 
E. SEWAGE FLOWS IN SEWERS:
 
During remote visual inspections, and continuously until completion of liner 
installation and final documentation inspection, the Contractor shall provide temporary 
dry conditions in the sewer pipes. The bypassing requirements are provided in 
Technical Specification Section 02145 – Diversion of Sewage Flow and Dewatering. 
 
PART 3 - EXECUTION 
 
3.01
CLEANING
The remote visual inspection shall be performed after cleaning the sewer as specified in 
Technical Specification Section 02760 – Sewer and Sewer Structure Cleaning, and prior to 
lining the pipe. The Contractor shall be responsible for properly inspecting and 
documenting the final condition of the rehabilitated pipe.

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 4
October 27, 2025
3.02
SCHEDULE
The Contractor shall submit post CCTV of segments within ten (10) working days from 
the date of installation. The Contractor shall also be responsible to produce and submit hard 
copy inspection logs of the inspection process.  
3.03
SEQUENCE OF INSPECTION
The sewer pipe shall be remote visually inspected, in the same direction, prior to and 
following the lining of the sewer. Final CCTV inspection shall be performed after lateral 
reinstatement has been completed.  
3.04
INSPECTION METHODS 
The Contractor shall inspect the sewer interior using a camera or process capable of 
producing a color image for permanent record and documentation of inspection in digital 
format (mpeg or jpeg) with audio location and date information, data title information.  
A. VERBAL COMMENTARY
 
The Contractor shall audio record narrative on the remote visual inspection the location, 
upstream and downstream control points, date, and time of the inspection. 
B. ACCESS
The City’s Representative shall have full access to observe the monitor and all other 
operations at all times. The system of cabling employed to transport the camera and 
transmit its signal shall not obstruct the camera's view. 
C. INSPECTION RATE
 
The camera shall be pulled through the sewer in either direction, but all inspections at 
each location shall be in the same direction. Maximum rate of travel shall be 30 feet 
per minute when recording with analog camera systems. 
 
D. IMAGE PERSPECTIVE
 
The camera image shall be down the center axis of the pipe when the camera is in 
motion. The Contractor is required to provide a 360-degree view of the pipe interior.  
Points of interest shall also be documented and shall include, but not be limited to, 
defects, encrustations, mineral deposits, debris, sediment, any location determined not 
to be clean or part of a proper liner installation, or defects in the liner (including, but 
not limited to, bumps, folds, tears, dimples, etc.).

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 5
October 27, 2025
Each individual sanitary sewer lateral opening to the sewer main shall be remote 
visually inspected. Camera shall first pan and tilt to the lateral opening prior to zoom 
for analog camera systems. Full 360 degrees of the lateral opening shall be documented 
without zoom. Contractor shall not utilize pan, tilt and/or zoom simultaneously. 
 
E. SEWER IDENTIFICATION
 
All inspection documentation shall include the sewer location identified by City of 
Tempe quarter section manhole numbers as indicated on the Design Drawings.
F. VIDEO NAMING CONVENTION
All CCTV inspection videos and reports shall be named based on the following 
convention: quarter section (XXXXXX), upstream manhole (MHXXX) or cleanout 
(COXXX) – quarter section (XXXXXX), downstream manhole (MHXXX) – Initial 
cleaning (Cleaning Pre-Video) or Pre-lining of CIPP (Pre-Video) or Post-lining of 
CIPP (Post-Video).
G. QUALITY CONTROL
 
The City’s Representative will review DVDs or USBs to ensure compliance with the 
requirements listed in this specification and contract documents. If the sewer line is 
determined not to be adequately cleaned, as required in this Technical Specification 
Section, it shall be re-cleaned and remote visual inspection repeated by the Contractor 
at no additional cost to the City. If any portion of the liner is determined not acceptable, 
the liner shall be repaired or replaced, whichever the City’s Representative deems 
appropriate, and re-inspected and documented. 
** END OF SECTION **

SECTION 02761
REMOTE CCTV INSPECTION OF EXISTING 
AND REHABILITATED SEWERS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
02761 - 6
October 27, 2025
[ This page intentionally left blank for double sided printing ]

SECTION 09710
CONCRETE AND MASONRY COATING
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 1
October 27, 2025
PART 1 - GENERAL
1.01
DESCRIPTION
A. SCOPE
When specified in the Design Drawings or as directed by the City, this Technical 
Specification section specifies the coating system used for the rehabilitation of municipal 
sanitary sewer structures to provide protection against chemical or gas corrosion of the 
interior of sewer structures. The coating shall yield a hard, durable chemical resistant 
coating and provide a water and gas tight seal to concrete and other components within 
existing sanitary sewer collection system infrastructure.
B. DEFINITIONS
1) In this Technical Specification, the words “coating” (or “coatings”) and “lining” (or 
“linings” or “liner”) are used interchangeably. Similarly, “to coat” is used 
interchangeably with “to line” (or other variations of these words). 
2) In this Technical Specification, unless otherwise specifically noted, the word 
“manhole” shall mean “sewer structure” and shall encompass sewer manholes, sewer 
junction structures, sewer vaults, and other structures contained within the sanitary 
sewer system. It also encompasses sewer pipes (or portions thereof) that are located 
within the sewer structure, but does not include sewer pipes (or portions thereof) that 
are located outside of the limits of the structure. 
3) In this Technical Specification, “existing manholes” shall mean those manholes that 
are (or were) not constructed as part of this project work. “Rehabilitating” existing 
manholes and "applying corrosion protective coating" to those manholes shall include 
the following activities: 
a.
Cleaning and preparation of the surface to coating manufacture’s recommended 
standards and removing corroded/deteriorated materials from the manhole, and 
otherwise preparing the manhole for one of the approved coating systems.
 
b. Testing of the prepared surface to coating manufacturer’s standards prior to 
applying an approved coating system.
c.
Applying one of the approved coating systems, as specified herein. 
d. Testing the finished surface coating, as required herein. 
e.
Other related activities, as noted herein.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 2
October 27, 2025
Where required by the approved Design Drawings or as directed by the City, existing 
manholes shall be rehabilitated and an approved, or equal, corrosion protective coating 
applied to their interior surfaces, as specified herein. 
The approved coating system (as specified herein) shall be applied to all exposed brick, 
concrete, grout, mortar, and cementitious surfaces or portions thereof that are not PVC 
lined within the manhole including pipe-to-throat transitions, throat, bench, risers, cones, 
chimney, adjusting rings, etc.
1.02
QUALITY ASSURANCE
A. REFERENCES
This Technical Specification section contains references to the following documents. They 
are a part of this section as specified and modified. In case of conflict between the 
requirements of this section and those of the listed documents, the requirements of this 
section shall prevail.
Reference
Title
ASTM C109
Standard Test Method for Compressive Strength of 
Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube 
Specimens) 
ASTM D4258
Standard Practice for Surface Cleaning Concrete for 
Coating
ASTM D4262
Standard Test Method for pH of Chemically Cleaned or 
Etched Concrete Surfaces
ASTM D4414
Standard Practice for Measurement of Wet Film Thickness
ASTM D4541
Standard Test Method for Pull-off Strength of Coatings 
using Portable Adhesion Testers
ASTM D4787
Standard Practice for Continuity Verification of Liquid or 
Sheet Linings Applied to Concrete Substrates
ASTM D5162
Standard Practice for Discontinuity (Holiday) Testing of 
Nonconductive Protective Coating on Metallic Substrates
ASTM D7234
Standard Test Method for Pull-off Adhesion Strength of 
coatings on Concrete Using Portable Pull-Off Adhesion 
Testers

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 3
October 27, 2025
OSHA – ADOSH
Occupational Safety and Health Association - Arizona 
Division of Occupational Safety and Health (ADOSH)
NACE
National Association of Corrosion Engineers Published 
Standards
B. STANDARDIZATION
Materials and supplies provided shall be the standard products of manufacturers. Materials 
in each coating system shall be the products of a single manufacturer or proven to be 
compatible. 
C. INSPECTION
All work and testing shall be performed in presence of the City, unless City has granted 
prior approval to perform work in their absence. The Contractor shall provide testing as 
approved by the City. Cost of this inspection and testing shall be the responsibility of the 
Contractor. Inspection by the City or waiver of inspection in any particular portion of work 
shall not relieve the Contractor of responsibility to perform work in accordance with this 
Technical Specification. 
a) Safety Equipment: Scaffolding and/or tri-pod safety equipment shall be erected and 
moved by the Contractor to locations to facilitate inspection by the City. The Contractor 
shall be responsible to provide equipment and conditions according to OSHA safety 
standards for the City or City’s Representative to enter into confined space for 
inspection purposes. The Contractor shall provide additional illumination or fresh air 
upon request. 
b) Surface pH Testing: The Contractor shall furnish services of a trained operator in 
surface pH testing, equipment and chemicals until acceptance of prepared surface. 
Surface pH testing shall be performed in the presence of the City or his on-site 
Representative. The Contractor shall perform pH testing on all surfaces prior to 
application of coating. The Contractor shall be responsible to perform additional 
surface cleaning as necessary to obtain pH readings acceptable to coating 
manufacturer’s requirements.
c) Adhesion “Pull” Testing: The Contractor shall furnish (until final acceptance of 
coatings) inspection devices in good working condition for the verification of adhesion 
of any substrate repair material to the existing concrete. The Contractor shall furnish 
services of trained operator in pull test devices until final acceptance of coatings. Pull 
test devices shall be tested and operated in the presence of the City. The Contractor 
shall perform pull test in the presence of the City on all coated surfaces for each layer 
of material applied.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 4
October 27, 2025
The Contractor shall perform pull test in the presence of the City on all coated surfaces 
for each layer of material applied. The Contractor shall be responsible to repair test 
areas and retest coating as necessary at no additional cost to the City. The Contractor 
shall furnish services of trained operator in pull test devices until final acceptance of 
coatings. Pull test devices shall be tested and operated in the presence of the City. Pull 
testing and repair of the coating test areas shall be performed prior to spark testing. 
The Contractor shall conduct thickness measurements of coating retained on the 
destructive pull strength dolly. Measurements of thickness of applied protective 
coatings in the presence of the City.  
d) Holiday “Spark” Testing: The Contractor shall furnish services of a trained operator in 
holiday detection devices until final acceptance of coatings. Devices shall be tested and 
operated in the presence of the City. The Contractor shall perform holiday test on all 
coated surfaces in the presence of the City or his on-site Representative. The Contractor 
shall be responsible to repair defective areas and retest coating as necessary at no 
additional cost to the City.
D. SUMMARY REPORT
Surface pH, pull strength, and coating thickness measurements shall be documented 
and reported in a Summary Report produced by the Contractor and submitted to the 
City. The report shall be presented after completion of underlayment, top coating 
operations, and shall state number of manufacturer’s product units used and total square 
footage of surface area covered. City shall have option of requiring the Contractor to 
document number of units (coating materials) on hand before and after coating of each 
structure operations to verify actual minimum coating thickness applied. All coating 
thicknesses not meeting required minimums shall be removed and/or re-coated per 
manufacturer’s recommendations. 
E. INSPECTION MILESTONES
The Contractor shall keep City informed of his progress on rehabilitation of each 
structure. At each manhole, the City may inspect the work at the completion of each of 
the milestones listed below before the Contractor shall commerce work on the next 
milestone:
1. Completion of the cleaning and surface preparation activities required by these 
Technical Specifications.
2. Completion of all void-filling activities and underlayment application, prior to 
surface coating application, with the associated adhesion testing of the 
underlayment layer.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 5
October 27, 2025
3. pH of surface following cleaning and void filling underlayment activities, prior to 
coating application.
4. Completion of the surface coating installation prior to testing.
5. Adhesion/bond testing of the finished coating system as required by these Technical 
Specifications.
6. Spark testing of the final surface coating as required by these Technical 
Specifications.
7. Following final clean-up and inspection, the Contractor shall prepare a table in 
Microsoft Excel format and summit digitally the results of testing that include at a 
minimum the manhole number, pull test locations with corresponding test results, 
and spark test pass/fail results.
F. QUALITY CONTROL TESTING
The Contractor shall submit the following test results to the City:
1. pH Testing:  pH of surface shall be tested and reported. Surfaces with a pH below 
7 shall not be coated and further surface preparation shall be performed until a 
neutral or basic pH reading is obtained prior to coating.
2. Adhesion Testing:  Adhesion of the coating to the substrate shall be tested per 
ASTM D4541, and the mode of failure shall be such that the substrate fails before 
the coating separates from the substrate.
3. Holiday Testing: Holiday “spark” testing shall be employed to identify holidays, 
defects, and substandard coating thickness.
4. Coating Thickness Test:  Coating thickness testing shall be performed by pull test 
destructive testing methods and direct measurement of coating thickness to verify 
cured coating meets the minimum dry mil thickness.
1.03
CERTIFIED APPLICATOR
The Contractor applying coating shall be an Arizona Licensed Contractor. The coating 
system shall be applied by an Applicator certified within the prior two (2) years by the 
coating and underlayment material system manufacturer as properly trained for applying 
the manufacturer’s coating and underlayment products. Underlayment products include 
repair materials, grouts, fillers, primers, etc. A training outline for the certification program 
undergone by the applicators shall be submitted to the City, for review. The Contractor 
shall provide evidence that the personnel performing the product application received the 
manufacturer's training for certification.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 6
October 27, 2025
The Contractor shall appoint a Quality Assurance Manager who shall take full 
responsibility for the oversight of the quality of the work. The Quality Assurance Manager 
shall be fully certified and have a minimum of five (5) years of application experience with 
the particular coating system.
Applicator(s) shall be fully certified by the product manufacturer and have a minimum of 
two (2) years of application experience with the particular coating system.
1.04
DELIVERY AND STORAGE
Materials shall be delivered to the job site in their original, unopened containers. Each 
container shall bear the manufacturer's name, coating type, batch number, date of 
manufacture, storage life, and special directions.
Materials shall be stored in enclosed structures and shall be protected from weather and 
excessive heat or cold. Flammable materials shall be stored in accordance with state and 
local codes. Materials exceeding storage life recommended by the manufacturer or visibly 
deviate from normal appearance or texture shall not be used, physically marked in Orange 
paint on the container as being REJECTED and physically removed from the project site 
so as not to be inadvertently incorporated into future work.
1.05
WARRANTY
A. A non-prorated written (but not bonded) warranty to cover workmanship and materials 
against coating failure shall be provided for the entire coating system, including all 
repair material, defect fillers, primers, intermediate (if applicable), and finish coats. 
The minimum duration of the warranty shall be five (5) years following final 
acceptance of project. The product and the installation shall both be covered by the 
Contractor’s warranty. The Contractor shall be responsible for administration, 
performance and all ancillary costs associated with implementation of the warranty. 
The warranty shall be delivered to the City prior to and as a condition of final 
acceptance and final payment for this project.
B. Inspection shall be conducted during the eleventh/fifty ninth months (FOR 12/60 
MONTH WARRANTY ITEMS) following completion of all coating work. The 
Contractor and representative of coating manufacturer shall attend inspection. 
Defective work shall be repaired in accordance with specifications and satisfaction of 
the City within one (1) month of written notification. The City may, by written notice 
to the Contractor, reschedule warranty inspection to another date within one-year 
correction period, or may cancel warranty inspection altogether. If warranty inspection 
is not held, the Contractor is not relieved of the responsibilities stated under Contract 
Documents.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 7
October 27, 2025
C. This warranty shall state that the coating(s) will not fail for a minimum period of five 
(5) years. Coating failure is defined as blistering, cracking, embrittlement, or softening, 
or failure to adhere to the substrate. The warranty shall also apply to any repair 
materials, primers, or other products used in the application. If any repair or 
replacement is necessary within the warranty period, a new five (5) year warranty 
period shall start at the date that the manhole is placed back into service following 
repairs.
D. By executing this contract, the Contractor certifies and agrees that any testing 
performed during construction (e.g., spark testing, adhesion testing and/or other 
testing) shall not in any way modify the warranty, nor relieve the Contractor for 
responding to defects during the warranty period.
E. The Contractors responsibility to provide the warranty is considered incidental to the 
work and is, therefore, a non-pay item.
F. The Contractor and coating system Manufacturer shall within one (1) month of written 
notice thereof, repair defects in materials or workmanship that may develop during said 
warranty period(s).
G. The costs for ancillary items associated with coating repair includes, but limited to, 
permitting costs, by-pass pumping, traffic control and third party quality control 
inspection shall be the Contractor’s responsibility and are to be included in and 
incidental to the cost(s) of warranty repairs.
1.06
SUBMITTALS
A. Before materials are delivered to the job site, the Contractor shall provide the following 
information in accordance with Technical Specification Section 01300 - Submittals:
1. Name(s) and qualifications of all proposed applicator(s) per paragraph 1.03, along 
with Certification of Applicator(s) and outline of training undertaken for the 
certification program.
2. Schedule identifying sequence and dates the Contractor will be working on each 
structure. When The Contractor is prepared to start work at a structure he shall 
inform the City of his schedule of milestone inspection points for that structure.  
Failure to provide notification of any milestone inspection point is grounds for 
rejection and non-payment of all work performed within the structure. 
3. Current Arizona Contractor's license or equivalent (specifically for the 
rehabilitation of concrete manholes). If the manhole(s) to be rehabilitated is (are)

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 8
October 27, 2025
brick, then the license or equivalent shall state for the rehabilitation of concrete and 
brick manholes.
4. Material Safety Data Sheet (MSDS) for the grout, filler, primer and finish coating, 
the Contractor proposes to use.
5. For the filler and finish coating, the Contractor shall provide the manufacturer's 
technical literature and application instructions, which shall include the following:
a.
Surface preparation recommendations and limitation(s) of any existing 
subsurface materials for adherence bonding concerns.
b. Primer type, where required.
c.
Maximum mil thickness per coat.
d. Mixing and proportioning requirements (as applicable).
e.
Minimum and maximum curing time between coats (if applicable), including 
atmospheric temperature and humidity conditions for each.
f.
Curing time before submergence in liquid.
g. Thinners (if allowed) that are acceptable with coating material.
h. Environmental requirements for application and worker safety, including 
ventilation, humidity, and temperature ranges.
i.
Allowable application methods.
j.
Maximum allowable surface moisture content.
k. Allowable surface pH range.
l.
Required storage conditions and maximum storage life.
m. Sample of finished product showing final color.
6. List of materials proposed to be used under this section and manufacturer's 
technical literature and data for each material.
7. A letter or manufacturer’s technical literature and product data identifying the 
procedures recommended for repair of defect of each proposed material.
8. Written certification from the materials manufacturer that the surface material is 
compatible with proposed material, the surface has been prepared to acceptable 
standards, and the applied coating has been installed according to material 
manufacturer’s recommendations. 
9. Minimum pull force reading that is anticipated for proposed pull test equipment 
and size of dolly for passing test.
10. Testing Summary Report per paragraph 1.02 D. 
11. Written warranty per paragraph 1.05.
12. The Contractor shall provide procedures and products proposed for use to repair 
deteriorated steel reinforcement bars (if present).

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 9
October 27, 2025
13. The Contractor shall provide procedures and products proposed for use around 
utility penetrations (if present).
PART 2 – PRODUCTS
2.01
MANHOLE COATINGS
Materials shall be delivered to the site in factory sealed and labeled containers. Date of 
manufacture shall be labeled on each container. Materials shall be handled and stored 
according to the strictest requirements of the manufacturer and in accordance with all local, 
state, and federal laws and regulations.  
1. Coating systems shall be compatible with the preparation methods as specified 
herein. Any limitations or deviations requested by the manufacturer shall be 
approved in writing by the City, prior to surface preparation. The Contractor shall 
provide all labor, materials and equipment as necessary at no additional cost to the 
City for any deviations of surface preparation required by the coating materials 
manufacturer.
2. Epoxy based coatings shall be applied within two months of their date of 
manufacture (unless the manufacturer’s requirements are more stringent), or 
otherwise approved in writing by the City.  
3. Thicknesses specified herein is the minimum dry thickness required and do not 
include the primer or underlayment thickness, unless otherwise noted. Provide 
greater thickness where recommended by the manufacturer.
4. Sealant or Primer, if required, shall be as recommended by the manufacturer for 
each installation.
5. Defect filler and repair materials shall be as recommended by the manufacturer for 
each installation. All materials shall be identified.
6. Manhole infiltration control material shall be as recommended by the 
manufacturer for each installation, and shall be covered under the same warranty 
as the rest of the coating system.
2.02
CORROSION PROTECTIVE COATING SYSTEMS FOR EXISTING MANHOLES
Manhole coating materials shall be one of the products listed in this paragraph, or approved 
equal. Manhole coating system proposed shall be compatible with any existing manhole 
coating present or removed down to coating manufacturer acceptable substrate at no 
additional cost to the City. The approved corrosion protective coating systems shall be as 
listed below.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 10
October 27, 2025
•
Sauereisen Sewergard Lining No. 210 with Sauereisen Underlayment No. F-120, as 
manufactured by Sauereisen Cements, Pittsburgh, PA. The underlayment shall be used 
to repair and re-profile corroded areas of manhole surfaces. Manhole surfaces shall be 
cleaned and prepared in accordance with the manufacturer’s recommendations and 
coating system specification sheets (COATSPEC) in paragraph 3.19 prior to 
application.
•
Sewer Shield 150 Epoxy Lining as manufactured by Environmental Coatings, Mesa, 
Arizona. The underlayment shall be used to repair and re-profile corroded areas of 
manhole surfaces. Manhole surfaces shall be cleaned and prepared in accordance with 
the manufacturer’s recommendations and coating system specification sheets 
(COATSPEC) in Technical Specification Section 3.19 prior to application.
•
Raven 405 Epoxy Lining with calcium aluminate cement underlayment, as 
manufactured by Raven Lining Systems, Tulsa, Oklahoma. The underlayment shall be 
used to repair and re-profile corroded areas of manhole surfaces. Manhole surfaces 
shall be cleaned and prepared in accordance with the manufacturer’s recommendations 
and coating system specification sheets (COATSPEC) in Technical Specification 
Section 3.19 prior to application.
The underlayment material and the surface coating material installed in any one manhole 
shall be from the same coating system.
2.03
CORROSION INHIBITOR FOR REINFORCING STEEL
Reinforcing steel, exposed by corrosion or during surface preparation operations, shall be 
treated with a water-based epoxy resin, anti-corrosion coating and bonding agent such as 
Armatec 110 EpoCem, manufactured by the Sika Corporation, or approved equal. The 
Contractor shall be responsible to verify that the corrosion inhibitor product is compatible 
with proposed coating system materials.
2.04
BONDING COMPOUNDS
All surfaces where new concrete contacts existing concrete shall be coated with a bonding 
compound as recommended by the manufacturer of the concrete repair material.
2.05
BENCH REPAIR
Acid-resistant non-shrink grout mortar shall be used for bench restoration. The grout 
mortar shall be applied to a depth of at least ¾-inches on the bench. The finish surface shall 
be hand-troweled smooth to finish the bench and channel.
2.06
UNDERLAYMENT FOR STRUCTURE WALL REPAIR

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 11
October 27, 2025
Manhole wall repair (if necessary) shall be provided for manhole walls for re-profiling 
back to original manhole dimensions with a product as recommended by underlayment and 
coating manufacturer. Voids that extend beyond the exterior manhole wall shall be brought 
to the attention of the City for approved repair procedures. Costs for exterior manhole wall 
repair shall be considered a changed condition with costs for repairs negotiated and agreed 
upon prior to proceeding with the work. Failure to obtain prior approval of repair costs 
eliminates any claims by the Contractor for additional compensation for added work to 
repair the manhole.
PART 3 - EXECUTION
3.01
HAZARDOUS LOCATIONS
The City may wish to enter the manhole under the Contractor’s safety program to perform 
observations and/or perform additional testing. The Contractor shall provide the necessary 
safety equipment, monitoring, and safe working atmosphere to allow the City or City’s 
Representative to safely enter the manhole, at no additional cost to the City.
The Contractor is responsible for safety of the job site, including the responsibility to 
enforce and enact the provisions of the Contractor’s Confined Space Entry program and 
the responsibilities to monitor the atmosphere within the structures and provide a safe 
working atmosphere and environment. These safety measures shall be at no additional cost 
to the City. The City shall not be responsible for safety or for safety monitoring of the job 
site.
3.02
SEWAGE FLOW AND DIVERSION
The Contractor shall be aware that the existing manholes included in this project are active, 
functioning manholes. The Contractor shall be required to coordinate the minimization of 
existing sewer flow and corresponding water level within the manhole through upstream 
diversion as much as possible per Technical Specification Section 02145 – Diversion of 
Sewage Flow and Dewatering when rehabilitating the lower sections of the manhole.
Manholes scheduled for rehabilitation that are contiguous to pipe rehabilitation activities 
shall be performed while flow is diverted and manhole is dewatered.  
3.03
MANHOLE PREPARATION AND CLEANING
Surface preparations for each type of surface shall be in accordance with manufacturer’s 
recommendations or the specific requirements of the coating specification sheet 
(COATSPEC).

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 12
October 27, 2025
The Contractor shall inspect all surfaces specified to receive a coating system prior to 
surface preparation. The Contractor shall notify City, of any noticeable disparity in the 
surfaces, which may interfere with the proper preparation, or application of the coating 
system.
The entire manhole interior including frame, chimney, walls, bench and throat shall be 
cleaned prior to rehabilitation using abrasive blasting and/or high-pressure water blast. 
Cleaning shall remove deteriorated concrete down to sound solid substrate. The Contractor 
shall remove all manhole steps present within the interior or as directed and any voids 
repaired. 
The Contractor shall use manhole debris shields or other approved method to prevent debris 
from entering the live sewers. Discharge of removed sediment and debris into the 
interceptor pipe is prohibited. The Contractor shall remove and legally dispose of dislodged 
debris offsite.  All hauling equipment shall be water tight to prevent spillage during 
transport. The Contractor will be responsible for interceptor pipe cleaning and removal of 
all sediments, at no cost to the City, if construction debris is observed being discharged 
into the interceptor sewer.
3.04
DEFECT REPAIR
A. All surface defects including tie holes, any honeycombing or otherwise defective 
concrete or brick shall be repaired. All voids, holes, and rough or irregular surfaces 
shall be filled/repaired.
B. The Contractor shall use the fill/repair material recommended by the coating 
manufacturer, to repair or fill all defects. Areas to be patched shall be cleaned. Minor 
honeycombed or otherwise defective areas shall be removed to solid concrete. The 
edges of the cut shall be perpendicular to the surface of the concrete. Patches on 
exposed surfaces shall be finished to match the adjoining surfaces after they have set. 
Finishes shall be equal in workmanship, texture and general appearance to that of the 
adjacent material. 
C. Deteriorated or honeycombed concrete which exposes the reinforcing steel or with 
defects that affect the structural strength shall be repaired. Any exposed reinforcing 
steel shall be mechanically cleaned and coated in accordance with paragraph 3.06. The 
proposed repair method shall be approved by the City.
D. Extend all existing control and expansion joints through any patch or repair area.
3.05
STRUCTURAL REINFORCING REPAIR
Structural repairs shall include splicing new reinforcing steel to existing reinforcing steel 
and providing additional reinforcing steel to reestablish the original structural integrity and 
existing loading capacity. Provide 3/8-inch diameter anchor bolts as needed to support 
reinforcing steel.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 13
October 27, 2025
3.06
REINFORCING STEEL TREATMENT
Where corrosion or surface preparation activities have exposed reinforcing steel the 
following procedure shall be used:
1. If half the diameter of the reinforcing steel, or more, is exposed, chip out behind the 
reinforcing steel a minimum of 1-inch for placement of grout or polymer concrete.
2. Determine cross sectional area loss of reinforcing steel.
3. Where reinforcing steel cross sectional area loss exceeds 15% of the original 
reinforcing steel, perform structural repair as directed by the City.
4. Abrasive blast all exposed reinforcing steel surfaces to remove all contaminants and 
corrosion products.
5. Clean exposed reinforcing steel with stiff brush or grit blast equipment per Technical 
Specification Section 02760 – Sewer Pipe and Sewer Structure Cleaning.
6. Apply a 20 mil (wet) coat of corrosion inhibitor to all surfaces of the clean, exposed 
reinforcing steel with a stiff brush or spray equipment.  Allow 2 to 3 hours for coating 
to cure or until surface is tack-free.
7. Apply a second 20 mil (wet) coat of corrosion inhibitor and allow for 2-hour to 3-hour 
cure prior to placement of polymer mortar, cementitious mortar, or grout.
3.07
REPAIR MANHOLE BENCH AND NON-MAIN CHANNEL(S)
The Contractor shall repair manhole bench and non-main channel(s) with acid-resistant 
mortar. Manhole bench shall be sloped a minimum ½-inch per foot to the edge of the throat.  
Minimum mortar thickness shall be ¾-inch.
3.08
CHIMNEY REPAIR
Brick chimneys shall he repaired through re-pointing or replacement as necessary to ensure 
structural integrity.
3.09
MANHOLE FRAME AND COVER AND ADJUSTING RINGS REPLACEMENT
Manhole frames and covers shall be replaced as indicated in the Design Drawings or as 
directed by the City. Contractor shall notify the City or City’s representative if access 
manhole frame and covers previously not identified are damaged. The Contractor shall 
perform work in accordance with City of Tempe Standard Detail T-446. The covers shall

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 14
October 27, 2025
contain the City of Tempe official logo and the words “City of Tempe Sanitary Sewer”. 
The frames and covers shall have a nominal opening diameter of 24-inches for 48-inch 
diameter access manholes and 30-inches for 60-inch and larger diameter access manholes. 
Adjusting rings on these manholes shall be replaced as necessary to raise the lid to surface 
grade and slope. Concrete adjusting rings shall receive the same corrosion protective 
coating system as all other concrete surfaces within the manhole. 
3.10
PREPARATION
A. GENERAL
Surfaces to be coated shall be clean and dry according to Technical Specification 
Section 02760 – Sewer Pipe and Sewer Structure Cleaning.
B. DETAILED SURFACE PREPARATION
Surface preparations for each type of surface shall be in accordance with the specific 
requirements of the coating specification sheet (COATSPEC).
3.11
COATINGS 
A. GENERAL
Coating products shall not be used until the City has inspected the materials and the 
coating manufacturer's technical representative has instructed the Contractor and City 
in the recommended procedures for surface preparation, mixing and application of the 
coating.
B. COATING SYSTEMS
Field coats shall consist of one or more finish coats to build up the coating to the 
specified mil thickness. Unless otherwise specified, finish coats shall not be applied 
until other work in the area is complete and until all previous coats have been inspected.
The Contractor shall employ whatever means necessary (e.g., humidity control, 
temperature control, additional blasting, mechanical surface preparation, etc.) to ensure 
strong adhesion of the surface coating layer(s), to any underlying and overlying layers 
and proper curing of the surface coating layer(s). If the surface coating is applied in 
two or more layers, the time between applications of the various layers shall be 
controlled to ensure proper bond between layers.
C. COATING REQUIREMENTS
The approved surface coating shall be mixed in a clean, dry mixing container.  
Compound that has begun to set shall not be recovered by adding additional liquid but 
shall be discarded.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 15
October 27, 2025
All items of equipment, or parts and surfaces of equipment, which are immersed when 
in service, with the exception of pumps shall have all surface preparation and coating 
work performed in the field.
3.12
APPLICATION
A. WORKMANSHIP
Coated surfaces shall be free from runs, drops, ridges, waves, laps, and trowel marks.  
Coats shall be applied so as to produce an even film of uniform thickness completely 
coating corners and crevices.
The Contractor's equipment shall be designed for application of the materials specified.  
The coating shall be applied using a trowel suitable for obtaining the proper thickness 
and surface characteristics as recommended by the coating manufacturer.  
Each coat shall be applied evenly and sharply cut to line. Care shall be exercised to 
avoid over-coating or spattering on surfaces not to be coated. All over-coating or 
spattering shall be removed.
For all coatings, trowel marks and other surface irregularities shall be removed by using 
a short nap mohair paint roller. The short nap mohair shall be dampened with water. 
Excess water shall be shaken off prior to use.
B. ATMOSPHERIC CONDITIONS
Coatings shall be applied only to surfaces that are dry, and only under conditions of 
evaporation rather than condensation. Coatings shall not be applied during rainy, misty 
weather, or to surfaces upon which there is frost or moisture condensation. During 
damp weather, when the temperature of the surface to be coated is within 10 degrees 
Fahrenheit (F) of the dew point, the surfaces shall be heated to prevent moisture 
condensation thereon. During coating, and for a period of at least 8 hours after the 
coating has been applied, the temperature of the surfaces to be coated, the coated 
surfaces, and the atmosphere in contact shall be maintained at or above 40 degrees F 
and 10 degrees F above the dew point. When applied, coating shall be approximately 
the same temperature as that of the surface on which it is applied. Fans or heaters shall 
be used inside enclosed areas where conditions causing condensation are present.  
Structures shall be continuously ventilated to prevent condensation. The Contractor 
shall be responsible for providing, installing, maintaining and removal of all safety 
apparatus safeguarding open structure being ventilated. 
Contractor shall confirm ambient temperature and humidity of the manhole interior and 
the surface temperature and moisture content of the surface, and the temperature of

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 16
October 27, 2025
coating materials that is to be applied are within the manufacture’s recommended 
ranges.
C. SURFACE CONDITIONS
The Contractor shall remove excess water from the surface using compressed air 
equipment with oil-trapping filters or other means to produce surface-dry conditions.  
Suitable heaters shall also be used as needed to produce the surface-dry condition. The 
surface shall be vacuumed to ensure that loose particle are not present.  
D. PROTECTION OF COATED SURFACES
Items which have been coated shall not be handled, worked on, or otherwise disturbed, 
until the coating is completely dry and hard. Do not allow flowing water, chemicals or 
other liquids on the approved, applied coating for a minimum of 4 hours after 
installation or longer as recommended by the coating manufacturer.
E. THICKNESS AND CONTINUITY
Coating system thickness is the total thickness of protective coats.
The surface area covered for various types of surfaces and thickness per coat shall not 
exceed those recommended by the manufacturer. Coatings shall be applied as a 
minimum to the mil thickness specified, in layers if necessary, as recommended by the 
coating manufacturer and in accordance with these Technical Specifications.
In testing for continuity of coating about welds, projections (such as bolts and nuts,) 
and crevices, the City will determine the minimum conductivity for smooth areas of 
like coating where the mil thickness has been accepted. This conductivity shall then be 
taken as the minimum required for these rough or irregular areas. Pinholes and holidays 
shall be repaired and recoated to the required coverage.
F. SAFETY AND VENTILATION REQUIREMENTS
Requirements for safety and ventilation shall be in accordance with manufacturer’s 
recommendations.
3.13
ADHESION / BOND TESTING
A. GENERAL
1. The Contractor shall perform an adhesion test in accordance with ASTM D7234 
after proper cure in accordance with manufacturer’s recommended procedures to

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 17
October 27, 2025
demonstrate that the specified field coatings adhere to the substrate. Costs 
associated with adhesion testing are considered to be incidental to the unit price 
cost of coating.
2. Where unacceptable test results are obtained, the Contractor shall be responsible 
for removing and reapplying the specified coatings at no additional expense to the 
City.
B. FREQUENCY OF TESTING
After the approved coating has been applied to all specified surfaces and has adequately 
cured (as determined by the manufacturer, but no more than 4 days), the Contractor 
shall test the finished coating system for adequate adhesion between the underlying 
substrate and the coating system and between the various layers of the coating system. 
Said test shall be performed in-place and in accordance with ASTM Standard D-7234 
and the requirements as dictated in the remainder of this Technical Specification 
section.
1. Adhesion testing shall be performed at two different stages of the work:
a.
Underlayment Adhesion Testing: Underlying substrate shall be tested before 
the surface coating layer(s) are applied;
b. Finish Coating System Adhesion Testing: After the surface coating layer(s) 
have been applied, the adhesion of all applied layers in the coating system to 
one another and to the underlying substrate shall be tested. The Contractor shall 
perform adhesion tests on 30% of the manholes coated, or at least one manhole 
if 30% of the manholes coated is equal to less than one.
2. Adhesion tests shall be required at a minimum of one (1) underlayment adhesion 
test and three (3) tests per manhole of the finished coating system. Adhesion test 
shall be conducted on the bench, wall, and cone 
3. Specific manholes and test location within each manhole shall be selected by the 
City. The City shall be present to observe all adhesion testing. 
4. The need to repeat an adhesion test due to an error in the performance of the 
adhesion testing (e.g., a dolly coming off prematurely) or due to a failure in the 
coating system before the required full test pressure is applied (i.e., a "not pass" test 
result) shall not count as an additional test for the purposes of determining 
compliance with the minimum number of tests required per Item No. 1, but shall 
rather be denominated a "repeat test". 
5. Adhesion testing of the underlayment layer shall conform to the following: 
a.
After the underlayment layer has cured for a minimum of 4 hours but before the 
surface coating has been applied over the underlayment layer, the Contractor

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 18
October 27, 2025
shall test the underlayment layer for proper adhesion to the underlying 
substrate. 
b. The Contractor shall perform the adhesion testing in-place and in accordance 
with ASTM Standard D-7234 and the requirements as dictated in the remainder 
of this section. 
6. The adhesion/bond testing is in addition to the spark testing discussed in paragraph 
3.14.
C. ADHESION TEST EQUIPMENT
The remaining paragraphs of this Technical Specification section apply to both the 
adhesion testing of the underlayment layer and the adhesion testing of the finished 
coating system: 
The Contractor shall perform the adhesion testing discussed in this Technical 
Specification section using a DeFelsko Positest Pull-off Adhesion Tester Model AT-A 
or AT-M with 50mm dolly accessory kit or City Approved Equal, to be provided by 
the Contractor. The Contractor shall be responsible to purchase and provide enough 50 
mm diameter dollies (as sold by DeFelsko, one dolly for each adhesion test, not re-
usable) and adhesive for the dollies to perform all of the required tests. The Contractor 
shall also provide the equipment and tools to core drill around the test location, as 
discussed later in this Technical Specification section. The Contractor shall provide 
proof that the adhesion tester has been calibrated within the last six (6) months. 
Calibration test shall be submitted in accordance with Technical Specification Section 
13000 – Submittal.
D. ADHESION TEST PROCEDURES
Adhesion testing shall be conducted after the coating system has cured per 
manufacturer instruction and in accordance with ASTM D-7234 (for concrete).  
Adhesion shall be completed per ASTM or as described as follows:
1. The Contractor shall first glue the test dolly to the surface of the manhole at the test 
location selected by the City. The Contractor may lightly sand the coating surface 
with sandpaper at the test location to improve dolly adhesion. After the adhesive 
has set, the Contractor shall test the dolly for adhesion to the surface of the manhole 
by pulling on it by hand. If the dolly comes off, the Contractor shall re-adhere the 
dolly, using different glue if necessary. The coated surface shall be scored prior to 
conducting the adhesion test. 
2. The adhesion testing machine shall then be attached to the dolly and each test 
location shall be tested to a minimum pulling strength of 200 psi (defined herein as

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 19
October 27, 2025
the pulling force divided by the test sample cross-sectional area perpendicular to 
the applied force).  
3. If delamination or any other failure occurs between or within any of the coating 
system layers and/or the underlying concrete substrate prior to the application of 
the full, sustained (for 30 seconds minimum) test pulling pressure of 200 psi, the 
test shall be classified as “not pass”. However, if the dolly comes off the surface of 
the coating and no other delamination or failure occurs between or within any of 
the coating system layers and/or the underlying concrete substrate, the test will not 
be classified as a "failure" or "not pass", but the test shall be repeated at no 
additional cost to the City. 
The test can be discontinued if the testing pressure reaches a sustained (for 30 
seconds minimum) at 200 psi and no delamination or other failure has occurred 
within or between any of the coating system layers and/or the underlying concrete 
substrate, which test would be judged a “pass”. If delamination or other failure 
occurs but only when the sustained, applied pulling pressure is in excess of 200 psi, 
the test shall also be judged to be a “pass”. To avoid damaging the test equipment, 
do not continue the test beyond 500 psi. 
4. For tests that are classified as “not pass”, the City will require additional testing.  In 
the event of a “not pass”, three (3) additional tests shall be performed. Location of 
tests shall be at the discretion of the City.  If any one (1) of the three (3) additional 
tests is found to be “not pass”, the coating shall be determined as defective and 
remedial action required. 
Remedial action will include removal of the entire coating system (or whatever 
components of it that have been installed in the manhole to that point) from the 
entire manhole, re-cleaning of the manhole, re-application of the coating system to 
all required surfaces and re-testing. Said retesting and remedial action shall be at 
no additional cost to the City. 
5. After the adhesion tests have been performed, the Contractor shall mechanically 
grind down the test locations to the underlying substrate and re-apply the 
underlayment and/or coating system (whatever has been installed up to that point 
in the manhole) in accordance with these provisions to patch the area. Said repair 
work shall be at no additional cost to the City. The Contractor shall not use acetone, 
MEK or other chemicals to dissolve the underlayment or coating system as a 
substitute for mechanical grinding down of the test area. 
3.14
HIGH VOLTAGE SPARK TEST
A. DEFINITION – HOLIDAY:  Holidays are defined as pinholes and voids in non-
conductive coating that allow electrical current to pass through the protective coating 
to the base material.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 20
October 27, 2025
B. After the protective coating has set hard to the touch it shall be inspected with high-
voltage holiday detection wire brush wand style equipment.  Surface shall first be dried, 
an induced holiday shall then be made on to the coated concrete surface and shall serve 
to determine the minimum/maximum voltage to be used to test the coating for holidays 
at that particular area.  The spark tester shall be initially set at 100 volts per 1 mil (25 
microns) of film thickness applied but may be adjusted as necessary to detect the 
induced holiday (refer to NACE RPO188-99 or ASTM D5162).  
In testing for continuity of coating about welds, projections (such as bolts and nuts), 
and crevices, the City will determine the minimum conductivity for smooth areas of 
like coating where the mil thickness has been accepted.  This conductivity shall then 
be taken as the minimum required for these rough or irregular areas.  Pinholes and 
holidays shall be repaired and recoated to the required coverage.
Whereas adhesion testing is required at two stages of the project work in each manhole, 
spark testing is required only on the fully installed coating system.
1. After the approved coating has been applied to all specified surfaces, the Contractor 
shall spark test the coated surfaces in accordance with ASTM D-4787. The 
Contractor shall provide all equipment and materials necessary to perform said 
testing, which equipment and materials shall remain the property of the Contractor. 
2. Testing shall be performed with a wire brush-type test wand (the squeegee-type is 
not acceptable) with a minimum test voltage of 100 volts per mil (where 1 mil = 
1/1000-inch) of finished surface coat thickness. For example, a minimum of 12,500 
volts shall be used for a surface coat thickness of 1/8-inch (125 mils). The 
Contractor shall use a grounding rod, or other means to establish ground for the 
spark testing equipment. 
3. As a test of the proper functioning of the spark testing equipment, the City may 
require the Contractor to drill a hole through the coating system into the underlying 
concrete substrate and to demonstrate to the City that the spark testing equipment 
can "find" the hole. The Contractor shall then patch and repair the hole at no 
additional cost to the City. At the City’s discretion, one such quality control test 
may be required for each manhole. Unless otherwise determined by the City, any 
adjustments to the spark testing methodology (e.g., adjusting the grounding 
method, increasing the test voltage, etc.) required to "find" the known holiday 
(hole) shall remain in effect for the remainder of the spark testing of that manhole. 
4. The entire surface of the manhole shall then be spark tested. Any imperfections 
found in the coating system shall be ground down and refilled. Use of a chemical 
solvent such as acetone or MEK in lieu of mechanical grinding down the area shall 
not be permitted. Repaired areas shall be re-tested. Said testing, repairs and re-

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 21
October 27, 2025
testing shall continue until all portions of the manhole pass the spark test as 
specified herein. 
5. The Contractor shall perform repairs and re-testing at no additional cost to the City. 
All detected holidays shall be marked and repaired by abrading the coating surface.  
After abrading and cleaning, additional protective coating material shall be hand 
applied to the repair area. All touch-up/repair procedures shall follow the protective 
coating manufacturer's recommendations.
6. The City shall be notified and present to observe testing and retesting. In addition, 
the Contractor shall provide certification for each manhole stating that the coating 
is free of holes or other imperfections. 
3.15
UNDERLAYMENT DEFECT REPAIR
A. All surface defects in the underlayment including cracks, tie holds, minor honeycombing 
or otherwise defective concrete, shall be repaired. All voids, holes, rough or irregular 
concrete shall be cleaned with grit blasting and high pressure water cleaning to sound 
material and filled.
B. The Contractor shall use the repair and fill material recommended by the coating 
manufacturer to repair or fill all defects. Areas to be patched shall be cleaned. Minor honey-
combed or otherwise defective areas shall be cut out to solid concrete to a depth of at least 
1-inch. The edges of the cut shall be perpendicular to the surface of the concrete. Patches 
on exposed surfaces shall be finished to match the adjoining surfaces after they have set.  
Finishes shall be equal in workmanship, texture and general appearance to that of the 
adjacent concrete. Concrete with honeycombing which exposes the reinforcing steel or 
with defects, which affect the structural strength, shall be corrected.
3.16
REPAIRS OF COATING SYSTEMS
All pinholes, uncured coating, blisters, surface imperfections and damage to the coating 
resulting from the adhesion test shall be prepared to a point 1-inch minimum beyond the 
limits of the damaged area. Pinhole defects shall be primed and recoated with the same 
coating system to a minimum additional thickness of 30 mils unless otherwise specified by 
the coating manufacturer and/or City.  
Blisters, uncured coating and surface imperfections shall be completely removed and the 
areas recoated with appropriate coating material to 1-inch minimum beyond the repair area 
at a minimum dry film thickness of 125 mils or design coating thickness whichever is 
greater. The damage resulting from the adhesion test shall be repaired by recoating with 
appropriate lining material to 1-inch beyond the repair area at 150 mils or design coating 
thickness whichever is greater. Additional spark testing shall be completed after repairs are 
completed.
3.17
INSPECTIONS
A. The Contractor shall notify City of impending completion of surface repairs, re-profiling, 
and prior to application of epoxy coating, or PVC lining repair.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 22
October 27, 2025
B. The notifications shall be given a minimum 24-hours in advance of completion of the 
surface repairs and re-profiling, and 24-hours in advance of application of the epoxy 
coating and any testing; including spark testing, adhesion testing, and dry film thickness 
testing.
C. Failure to provide notification at these designated times/work stages may prevent the 
acceptance of the work by the City.
3.18
CLEANUP
Upon completion of coating, the Contractor shall remove surplus materials, protective 
coverings, and accumulated rubbish, and thoroughly clean all surfaces and repair any 
overspray or other coating-related damage.
Any spilled or over sprayed material must be cleaned-up prior to curing. After curing has 
occurred, clean-up may be accomplished by chipping or blasting. All discarded materials 
shall be disposed of properly. Clean-up and disposal of discarded material shall be at no 
additional cost to the City. Surfaces damaged by clean-up procedures shall be cleaned, 
repaired and refurbished to required condition.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 23
October 27, 2025
3.19 A. COATING SYSTEM SPECIFICATION SHEETS (COATSPEC)
Surfaces shall be coated in accordance with the COATSPEC to the system thickness 
specified.
Coating System
Identification:
Sauereisen Sewergard Lining No. 210
Surface:
Concrete/Masonry
Minimum Surface 
Preparation:
Abrasive Blasting and Hydro Blasting
Concrete:
Except as otherwise specified, loose concrete, form oils, 
surface hardeners, curing compounds, and laitance shall be 
removed from surfaces by abrasive and hydro blasting. 
Voids and cracks shall be repaired as specified in Technical 
Specification Section 09710 paragraphs 3.04 and as 
indicated by the underlayment defect repair paragraph. After 
grit abrasion blasting, the concrete should be high pressure 
washed to remove oil, grease, and other contaminants. All 
active hydrostatic leaks must be stopped by use of a water 
stop, waterproofing, or urethane grout.
Epoxy Coating
Compatibility:
Except as otherwise specified, any existing coating that is 
incompatible with proposed epoxy coating as recommended 
by the proposed coating manufacturer’s recommendation for 
proper bonding purposes, shall be removed from surfaces by 
abrasive and hydro blasting and chipping if required.  
Underlayment:
Sauereisen Restokrete Substrate Resurfacer No. F-120 shall 
be used to fill holes and undulations in concrete surface 
found or created during the cleaning process. Sufficient 
material shall be used to build the concrete surface back to 
original dimensions prior to protective coating or lining 
installation. Holes and any defects up to 2-inches deep shall 
be filled with as manufactured by Sauereisen Cements, 
Pittsburgh, PA or approved equal to restore structural 
integrity. If the defects are larger than 2-inches deep a high 
early cement fill shall be used. Loose or splattered 
underlayment shall be removed by scraping and chipping.  
The Sauereisen No. F-120 and high early cement fill shall be 
applied as recommended by the manufacturer.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 24
October 27, 2025
Application:
Underlayment shall dry a minimum of 5 hours at 70 degree 
F in an atmospheric environment with humidity below 
manufacturer’s recommended levels prior to application of 
the protective coating Sewergard No. 210 or as 
recommended by the manufacturer. Underlayment must be 
cured by means of fog spray, wet burlap, or appropriate 
Sauereisen curing compound. The Contractor shall follow 
coating manufacturer’s requirements for bonding the coating 
systems to the installed sewer liner.
Coating shall be applied as recommended by the 
manufacturer, provided the coating as applied complies with 
prevailing air pollution control regulations. Only one coat 
should be applied to obtain the system thickness. The 
Contractor shall follow costing manufacturer’s requirements 
for bonding the coating system to the installed liner.
Drying time between coats shall be as recommended by 
coating manufacturer.
Design Coating 
Thickness:
125 mils dry thickness.
Coatings:
Coats at manufacturer's recommended dry thickness per coat 
to the specified total system thickness.
Color
Ivory white – or approved color

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 25
October 27, 2025
3.19 B. COATING SYSTEM SPECIFICATION SHEETS (COATSPEC)
Surfaces shall be coated in accordance with the COATSPEC to the system thickness 
specified.
Coating System
Identification:
Raven 405 Epoxy Lining
Surface:
Concrete/Masonry
Minimum Surface 
Preparation:
Abrasive Blasting and Hydro Blasting
Concrete:
Except as otherwise specified, loose concrete, form oils, 
surface hardeners, curing compounds, and laitance shall be 
removed from surfaces by abrasive and hydro blasting. 
Voids and cracks shall be repaired as specified in Technical 
Specification Section 09710 paragraph 3.04 and as indicated 
by the underlayment defect repair paragraph. After grit 
abrasion blasting, the concrete should be high pressure 
washed to remove oil, grease, and other contaminants. All 
active hydrostatic leaks must be stopped by use of a water 
stop, waterproofing, or urethane grout.
Epoxy Coating
Compatibility:
Except as otherwise specified, any existing coating that is 
incompatible with proposed epoxy coating as recommended 
by the proposed coating manufacturer’s recommendation for 
proper bonding purposes, shall be removed from surfaces by 
abrasive and hydro blasting and chipping if required.  
Underlayment:
Underlayment 
with 
calcium 
aluminate 
cement 
as 
recommended by Raven 405 manufacturer shall be used to 
fill holes and undulations in concrete surface found or 
created during the cleaning process. Sufficient material shall 
be used to build the concrete surface back to original 
dimensions prior to protective coating or lining installation.  
Holes and any other defects up to 2-inches deep shall be 
filled with calcium aluminate cement (as manufactured by 
Raven Lining Systems, Tulsa, Oklahoma) or approved equal 
to restore structural integrity. If the defects are larger than 2-
inches deep a high early cement fill shall be used. Loose or 
splattered underlayment shall be removed by scraping and 
chipping. The calcium aluminate cement and high early 
cement fill shall be applied as recommended by the 
manufacturer.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 26
October 27, 2025
Application:
Underlayment shall dry a minimum of 5 hours at 70 degree 
Fahrenheit in an atmospheric environment with humidity 
below manufacturer’s recommended levels prior to 
application of the protective coating Raven 405 or as 
recommended by the manufacturer.
Coating shall be applied as recommended by the 
manufacturer, provided the coating as applied complies with 
prevailing air pollution control regulations. Only one coat 
should be applied to obtain the system thickness. The 
Contractor shall follow coating manufacturer’s requirements 
for bonding the coating system to the installed liner.
Design Coating 
Thickness:
125 mils dry thickness.
Coatings:
Coats at manufacturer's recommended dry thickness per coat 
to the specified total system thickness.
Color
Ivory white – or approved color

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 27
October 27, 2025
3.19 C. COATING SYSTEM SPECIFICATION SHEETS (COATSPEC)
Surfaces shall be coated in accordance with the COATSPEC to the system thickness 
specified.
Coating System
Identification:
Sewer Shield 150
Surface:
Concrete/Masonry
Minimum Surface 
Preparation:
Abrasive Blasting and Hydro Blasting
Concrete:
Except as otherwise specified, loose concrete, form oils, 
surface hardeners, curing compounds, and laitance shall be 
removed from surfaces by abrasive and hydro blasting. 
Voids and cracks shall be repaired as specified in Technical 
Specification Section 09710, paragraph 3.04 and as 
indicated by the underlayment defect repair paragraph. After 
grit abrasion blasting, the concrete should be high pressure 
washed to remove oil, grease, and other contaminants. All 
active hydrostatic leaks must be stopped by use of a water 
stop, waterproofing, or urethane grout.
Epoxy Coating
Compatibility:
Except as otherwise specified, any existing coating that is 
incompatible with proposed epoxy coating as recommended 
by the proposed coating manufacturer’s recommendation for 
proper bonding purposes, shall be removed from surfaces by 
abrasive and hydro blasting and chipping if required.  
Underlayment:
Use epoxy mortar or cemntitous materials that compatible 
with Sewer Shield 150 to fill holes and undulations in 
concrete surface found or created during the cleaning 
process. Sufficient material shall be used to build the 
concrete surface back to original dimensions prior to 
protective coating or lining installation. Loose or splattered 
underlayment shall be removed by scraping and chipping.
New Concrete:
Allow to cure for a minimum of 28 days. Remove any 
surface hardener or curing compounds by using the 
recommended mechanical methods for surface preparation.

SECTION 09710
CONCRETE AND MASONRY COATING
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09710 - 28
October 27, 2025
Application:
Coating shall be applied as recommended by the 
manufacturer, provided the coating as applied complies with 
prevailing air pollution control regulations.
Drying time between coats shall be as recommended by 
coating manufacturer.
Design Coating 
Thickness:
30 mils dry thickness.
Coatings:
Coats at manufacturer's recommended dry thickness per coat 
to the specified total system thickness.
Color
Ivory
** END OF SECTION **

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
09720 - 1
October 27, 2025
PART 1 – GENERAL
1.01
DESCRIPTION
This Technical Specification is intended to provide guidelines and performance requirements for 
the rehabilitation of structures and gravity sewers using internally bonded fiber reinforced polymer 
(FRP) composite systems. The rehabilitation system described herein shall include a carbon fiber 
reinforced polymer (CFRP) and/or glass fiber reinforced polymer (GFRP) as the main reinforcement 
system. The FRP can also include layers of other materials to increase stiffness of the FRP 
composite system in a cost-effective manner. The latter may be proprietary to the FRP Material 
Supplier. Any materials used for the FRP system shall be subject to the approval of the Engineer.
A. SCOPE:
The work includes furnishing of all materials, labor, equipment and services for the supply, 
installation and finish of structural strengthening using a FRP system.
The Contractor shall be licensed in the State of Arizona and  shall include all engineering, labor, 
materials, tools, equipment, appliances and services required to design, deliver, furnish all items 
necessary for the proper execution and completion of the work as shown in the Contract 
Documents, as specified herein and/or as required by job conditions. A detailed design of the 
FRP system for the specific site conditions shall be included with the installation of the FRP 
system by the FRP installer selected by the City or General Contractor. All items not shown or 
specified, but which are necessary for the proper execution and completion of the Work, shall 
be provided by the Contractor.
The extent of the FRP composite system covered shall be as defined herein and as shown on the 
plans.
The Contractor shall cooperate and coordinate with all other trades in executing the work 
described in the contract documents.
The Contractor shall deliver finished product(s) including all materials, labor, equipment, and 
services necessary for product installation, all quality controls and material samples required 
for performance tests, final inspection, and warranty work, all as specified in these Contract 
Documents and at the quantities of each component to complete the work. 
The prices submitted by the Contractor shall include all costs of permits, labor, equipment and 
materials for the various bid items necessary for rehabilitation materials and processes in 
accordance 
with 
these 
Technical 
Specifications 
complete 
and 
in 
place,

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 2
October 27, 2025
including all items of work not specifically mentioned herein which are required to make the 
product perform as intended. All Contractor costs to deliver the final product shall be included 
in the respective lump sum and/or unit price bid items depicted in the Bid Proposal.
1.02
SAFETY REQUIREMENTS:  
The Contractor shall conform to all work safety and health requirements of pertinent regulatory 
agencies and/or shown in Technical Specification Section 01060 – Health and Safety and shall 
secure the site for working conditions in compliance with the same. The Contractor shall perform 
existing 
material 
testing 
as 
required 
by 
regulatory 
regulation 
requirements 
and 
provide/install/maintain and be responsible such signs and/or other devices as are necessary for 
safety at the work site.
1.03
NOTIFICATION:  
It shall be the Contractor's responsibility to notify all utility companies involved whenever a utility 
is to be cut, tapped, moved, or in any way disturbed from its original placement. Sufficient notice 
shall be given to the utility company so that its users can be informed of any disruption of service. 
Such notice shall be given no less than 48 hours in advance.
It is the Contractor's responsibility to inform the City of construction activities which may lead to 
interruption in pedestrian or vehicular traffic or sewer service. The Contractor shall provide 72-hour 
notice prior to construction to verify all applicable residents have been alerted.
1.04
QUALITY CONTROL
A. REFERENCES:
Reference
Title
ACI—American Concrete Institute
117-90
Specifications for Tolerances for Concrete Construction and 
Materials, and Commentary. 
224.1R-07
Causes, Evaluation, and Repair of Cracks in Concrete Structures. 
224R-01
Control of Cracking in Concrete Structures. 
440R-07
State-of-the-Art 
Report 
on 
Fiber 
Reinforced 
Plastic 
Reinforcement for Concrete Structures.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 3
October 27, 2025
503R-93
Use of Epoxy Compounds with Concrete. 
503.4-R92
Standard Specifications for Repairing Concrete with Epoxy 
Mortars. 
503.6R-97
Guide for the Application of Epoxy and Latex Adhesives for 
Bonding Freshly Mixed and Hardened Concretes.
546R-04
Concrete Repair Guide.
ASTM- American Society for Testing and Materials 
D3039
Test Method for Tensile Properties of Polymer Matrix Composite 
Materials 
D3418
Test Method for Transition Temperatures of Polymers by 
Differential Scanning Calorimetry. 
D5687
Guide for Preparation of Flat Composite Panels with Processing 
Guidelines for Specimen Preparation. 
D7565
Standard Test Method for Determining Tensile Properties of Fiber 
Reinforced Polymer Matrix Composites Used for Strengthening of 
Civil Structures. 
D7290
Standard Practice for Evaluating Material Property Characteristic 
Values for Polymeric Composites for Civil Engineering Structural 
Applications. 
D638
Standard Test Method for Tensile Properties of Plastics. 
D695
Standard Test Method for Compressive Properties of Rigid 
Plastics. 
D790
Standard Test Methods for Flexural Properties of Unreinforced 
and Reinforced Plastics and Electrical Insulating Materials. 
D543
Standard Practices for Evaluating the Resistance of Plastics to 
Chemical Reagents. 
NACE International 
SSPC-SP12 / NACE 5 
Surface Preparation and Cleaning of Steel and Other Hard 
Materials by High- and Ultra High- Pressure Water Jetting Prior to 
Recoating.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 4
October 27, 2025
SSPC-SP13 / NACE 6 
Surface Preparation of Concrete. 
ICRI- International Concrete Repair Institute 
No. 03732
Selecting and Specifying Concrete Surface Preparation for 
Sealers, Coatings, and Polymer Overlays. 
No. 03733
Guide for Selecting and Specifying Materials for Repairs of 
Concrete Surfaces.
1.05
CERTIFIED INSTALLER
The Contractor must be trained and certified by the FRP Material Supplier and approved by the 
City and City’s Representative for installation of the FRP system.  A training outline for the 
certification program shall be submitted to the City or City’s Representative for review. The 
Contractor shall provide evidence that the on-site Superintendent responsible for supervision of 
the FRP installation crew has received the FRP Material Supplier's training.
The Contractor shall appoint a Quality Assurance Manager who will be on-site full-time during 
FRP installation to take full responsibility for the quality of the work. The Quality Assurance 
Manager shall be fully certified.
1.06
SUBMITTALS:
A performance work statement (PWS) shall be submitted by the Contractor for the approval of City 
and City’s Representative.  The PWS shall include submittals consisting of drawings, sketches, FRP 
Material Supplier's literature, catalog descriptions, or other descriptions in sufficient detail to allow 
a decision for submittal acceptance. 
One (1) electronic copy of submittal(s) shall be provided to the City and City’s Representative at 
least two (2) weeks before a determination is required.  
Contractor shall submit the following information to the City or City’s Representative in accordance 
with Technical Specification Section 01300 - SUBMITTALS.
A. Certifications of applicator with written consent from the FRP Material Supplier that the 
Contractor has been trained in proper application of FRP Material Supplier’s systems. 
B. Physical and mechanical properties shall be provided of each proposed FRP system and 
other components, including test results conducted per the ASTM standards as applicable 
to the project. Physical properties shall, at the minimum include: Laminate density, 
Laminate 
Shore 
D 
hardness 
(ASTM 
D2240), 
corrosion 
resistance

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 5
October 27, 2025
(ASTM D543), fully cured resin water absorption (ASTM D570), glass transition 
temperature (ASTM E1640), fabric ply thickness, resin cure times, Volatile organic 
compound (VOC) of laminate materials (ASTM D2369), and FRP fabric roll dimensions 
range. Mechanical properties shall, at the minimum include: Minimum Ultimate and 
characteristic design tensile strength, elongation percent, and tensile modulus of the 
laminate in fiber direction (per ASTM D3039and D7290, respectively), and minimum 
design laminate thickness per layer.
C. FRP Material Supplier’s Safety Data Sheets (SDS) for all materials to be used.
D. Product data sheets (PDS) for the components of the FRP system. 
E. Safety plan in compliance with local, state, and federal requirements. 
F.
Detailed installation plan describing all work items. 
G. FRP Material Supplier’s qualifications and pertinent test data. 
H. FRP system designer’s qualifications and the criteria used for the design. 
I.
Installer’s qualifications including their experience in similar projects. 
J.
Product installation procedure.
K. QA/QC plan including field sampling and testing. 
L. Design Drawings and Technical Specifications.
M. Documentation of Contractor’s Experience: Contractor shall provide references for all jobs 
within the last two (2) years that were either completed or under construction using the 
proposed rehabilitation method.  
N. Installer’s Qualifications: The installer of the FRP system shall show experience in the 
installation of the proposed rehabilitation method for all jobs within the last five (5) years. 
References shall be provided for a minimum of five (5) jobs. Information provided shall 
include a description of the job, the location of the job, the value of the job, the City name, 
and the City contact person for the job including name, title, address, and phone number.   
The total jobs submitted shall show that at least 500 linear feet of the product installed by 
the installation Contractor. 
O. Submit FRP Material Supplier’s published product and installation literature and published 
quality control testing criteria data for the proposed FRP system.
P.
Submit independent test report showing that the physical properties of the proposed materials 
meet the requirements of these Technical Specifications and will meet or

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 6
October 27, 2025
exceed the physical properties given in the FRP Material Supplier’s published literature 
submitted as required by Part 2 – PRODUCTS.
Q. Submit a report of the proposed installation process and procedures as directed by the FRP 
system to be used. The report shall include information specific to the installation instructions 
and any unique site condition(s) that must be taken into consideration including grout curing 
operations and procedures, annular space grout type requirements and lift limitations, access 
coordination, installation timing and identification and any coordination requirements/requests 
from the City or City’s Representative.
R. Shop Drawings: Contractor shall provide shop drawings of proposed materials for approval 
prior to ordering.  Shop drawings shall depict:
1.
All measurements made by the Contractor to verify critical dimensions. 
2.
Material(s) proposed for construction.
3.
Critical dimensions, jointing and connections, fasteners, and anchors with sizes, spacing, 
and location, connections, attachments, and openings.
4.
Color(s).
S.
Documentation of the control checks for materials used in the fabrications and each part of 
the fabrication including resin. 
T. Warranty:  Contractor shall submit warranty documents signed by an officer of the company 
and notarized stating the terms and conditions of the warranty identified in Paragraph 1.10 – 
WARRANTY.
U. Any item the Contractor proposes to utilize as an "or equal" to that proposed in the Contract 
Documents.
1.07
SUBSTITUTIONS
Any item the Contractor proposes to substitute for a specified item as an "or equal" must be made 
in writing, received, and approved by the City or City’s Representative prior to the start of 
construction activities. Substitutions or deviations not approved by the City or City’s Representative 
shall risk rejection and replacement at no additional cost to the City.
1.
For any proposed design change or deviation from these Technical Specifications.
2.
For anything in these Technical Specifications found to conflict with applicable codes and 
ordinances.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 7
October 27, 2025
3.
For anything not understood by the Contractor.
1.08
QUALITY ASSURANCE/QUALITY CONTROL
A. EXAMINATION: Each component part shall be examined by the Contractor for dimensional 
requirements, soundness, and workmanship in accordance with ASTM C478.
B. COMPOSITION CONTROL: FRP installer shall control and document the fiber to resin ratio 
content for each part of the installation. Documentation of the control checks shall be 
maintained by the Contractor and FRP installer. Proper content may be shown by fiber to resin 
ratio usage rate checks, in accordance with the FRP Material Supplier’s recommended material 
composition.
C. TESTING RECORDS: Records of all testing shall be kept, and copies of test results shall be 
submitted in accordance with Paragraph 1.06 - SUBMITTALS.
1.09
INSPECTION POINTS
Contractor shall keep the City or City’s Representative informed of milestone progress for 
the following items:
1.
Completion of removal of unsound material and pressure wash cleaning.
2.
Completion of leveling/seal material placement and surface preparation prior to FRP 
placement.
3.
Completion of FRP placement.
4.
Complete of FRP protective coating.
1.10
WARRANTY
The Contractor shall replace promptly and at no expense to the City, any materials which fails during 
the warranty period. Warranty work shall include all ancillary items including, but not limited to 
permits, traffic control, exposure, and flow control and all other work required to compete the 
repair/replacement work. Warranty and durations are described below:
A. Project Warranty: The Contractor shall warrant all materials and workmanship performed under 
this contract for a period of one (1) year from the date of formal acceptance or as stated in the 
project Contract Documents whichever is longer.
B. Materials Warranty: The FRP system installed shall be free of defects that will affect the long-
term life and operation of the system. The Contractor shall warrant in writing all materials 
provided under this contract for a period of five (5) years from the date of formal acceptance.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 8
October 27, 2025
C. Design Life: Material(s) shall provide a design life of a minimum of fifty (50) years against 
deterioration from H2S corrosion and typical chemicals found in municipal sanitary sewage.
PART 2 – PRODUCTS
2.01
ACCEPTABLE FRP MATERIAL SUPPLIERS & COMPOSITE STRENGTHENING SYSTEM
A. General
Materials for the FRP system must be suitably qualified, compliant with industry standards and 
properties provided herein, and supplied by a reputable FRP Material Supplier approved by the City 
or City’s Represeantative. Before the materials are ordered or work is performed, Contractor must 
identify which materials are proposed to be utilized and from which FRP Material Supplier(s) 
Contractor proposes to obtain the materials. 
Quality Control Testing and Certification: FRP Material Supplier shall certify that every material 
conforms to the project specification and shall submit test results for every material. 
Labeling, packaging, and storage shall include any health hazard warnings, precautions for handling 
and recommended first aid procedures in case of contact. 
All materials used shall conform to the project specification and other specifications referenced within 
and subject to the approval of the ENGINEER.
B. Design Loads
The FRP system shall be designed for the following loads as they apply for the specific site conditions:
1.
Earth load (a long-term loading)
2.
External pressure from ground water calculated at pipe invert (a long-term loading)
3.
Live load (a short-term loading, usually will not occur simultaneously with other 
4.
short-term loads)
5.
Internal working pressure (a long-term loading, where applicable)
6.
Water weight (a long-term loading)
7.
Host pipe weight (a long-term loading)
8.
Wind loads (if applicable)
9.
Seismic (if applicable)
2.02
GLASS FABRIC 
A. Glass fabric layers may be used with or without carbon fiber, where loading conditions allow.
B. A glass fabric layer shall be used to create a dielectric barrier if the host pipe is conducive to electricity 
(steel, iron, etc.). The minimum dielectric constant (κ) shall be 4 (ASTM D150)

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 9
October 27, 2025
for the dielectric barrier. Glass fabric shall have the minimum physical and mechanical properties as 
agreed upon by the Engineer and FRP Material Supplier. A sample material properties table is provided 
below. 
Longitudinal (0°) Direction:
Weight (Fabric Only)
20 oz/yd2
(670 g/m2)
27 oz/yd2             (904 
g/m2)
26 oz/yd2              (871 
g/m2)
Fiber Orientation
Uniaxial
Uniaxial
Biaxial
Tensile Strength
63.7 ksi
(439 MPa)
85.2 ksi        
(587 MPa)
54.2 ksi     
(374 MPa)
Tensile Modulus
2,940 ksi
(20,270 MPa)
3,980 ksi 
(27,440 MPa)
3,217 ksi 
(22,180 MPa)
Ultimate Elongation
2.20%
2.30%
2.10%
Breaking Force
2,365 lb./in.
(4,140 N/cm)
3,490 lb./in. 
(6,110 N/cm)
2,170 lb./in. 
(3,800 N/cm)
Transverse (90°) Direction:
Tensile Strength
N/A
N/A
52.0 ksi    
(358 MPa)
Tensile Modulus
N/A
N/A
2,700 ksi 
(18,615 MPa)
Ultimate Elongation
N/A
N/A
1.90%
Breaking Force
N/A
N/A
1,560 lb./in. 
(138 N/cm)
Ply Thickness
.037 in
N/A
0.040 in.    
(1.0 mm)
2.03
CARBON FABRIC
A. The carbon fabric shall be composed of high strength, high modulus carbon fibers. The fabric shall be 
black in color and impregnated using two component high strength epoxy or other approved resin.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 10
October 27, 2025
B. Fiber sizing and coupling agent shall be compatible with the resin system used to impregnate the fibers. 
To avoid galvanic corrosion of steel in proximity to carbon fibers, a dielectric barrier such as glass fiber 
fabric may be used to isolate the steel from the FRP laminate.
C. Carbon fabric shall conform to the minimum physical and mechanical properties as agreed upon by 
the ENGINEER and FRP Material Supplier. A sample material properties table is provided below.
2.04
ALTERNATIVE FABRICS
Alternative fabrics can be used for improved ring stiffness at reduced costs. Such materials can be 
proprietary and are subject to the approval of the Engineer. Although revealing the chemical composition 
of alternative systems is at the discretion of the FRP Material Supplier, the physical and mechanical 
properties of such materials and the overall system are subject to the review of the Engineer.
Carbon Fabric and Laminate Properties
Dry Fiber Properties 
Tensile Strength
400 ksi (2,760 MPa)
Tensile Modulus
25,000 ksi (172,400 MPa)
Ultimate Elongation
1.5%
Density
0.065 lb./in3 (1.8 g/cm3)
Aerial Weight
27.8 oz/yd2 (931 kg/m2)
Laminate Properties
Tensile Strength
135 ksi (930 MPa)
Tensile Modulus
9,000 ksi (62,000 MPa)
Ultimate 
Elongation
0.98%
Breaking Force
2,500 lb./in (4,380 N/cm)
Ply Thickness
0.047 in (1.2 mm)

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 11
October 27, 2025
2.05
SATURATING RESIN – POLYMER 
A. Fabrics shall be impregnated with a two component, high strength, and low viscosity structural 
epoxy or other resin system as listed in Section 2.05 paragraph D. The resin shall have low 
viscosity and long pot life, with a fast cure time designed for high volume saturation of heavy 
reinforcement fabrics using an impregnator machine or hand tools as per project requirements 
to saturate the fabric thoroughly and uniformly. 
1.
The resin system shall be resistant to service environment conditions, including but not 
limited to moisture, elevated temperature, and chemicals in the fluid flowing inside host 
pipe. 
2.
The resin system shall not be diluted with any organic solvents such as a thinner.
3.
The resin system shall not be used outside of the FRP Material Supplier's specified pot life. 
4.
The resin system shall not be applied on cold or frozen surfaces. 
5.
Only moisture tolerant resins shall be allowed to be applied on wet surfaces.
 
6.
Temperature and moisture range for application shall be within the FRP Material Supplier's 
specified values. 
B. Primer: For systems requiring a primer, the primer shall have sufficiently low viscosity to 
penetrate the concrete substrate and provide an adhesive bond for the thickened resin applied. 
C. Thickened Resin: A thickened resin system, which consists of the saturating resin and fumed 
silica (or similar) supplied by the FRP Material Supplier as premixed or mixed at the site 
according to the FRP Material Supplier's recommended procedure, shall be used to provide a 
smooth surface for the application of the FRP laminate. The thickened resin system shall be 
used to fill in surface voids and even out the concrete substrate. It is permissible to use a thin 
coat of thickened epoxy between laminae to enhance adhesion. 
D. Saturating Resins:  Saturating Resins shall be 100% solids formulation with low odor 
conforming to the minimum physical and mechanical properties as approved by the Engineer. 
A sample epoxy resin properties table is provided below.
Epoxy Resin Properties
Color – Part “A” is pigmented syrup, Part “B” is amber liquid
Viscosity Mixed at 770 F (250 C)
1,500 – 1,600 cps
Pot Life at 770 F (250 C)
3 – 4 h (thin film set time)

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 12
October 27, 2025
2.06
OTHER MATERIALS 
Contractor to provide compatible primer, filler and other materials recommended by the FRP 
Material Supplier as needed for the proper installation of the complete surface bonded FRP system. 
Vinyl ester resins can be used to saturate the FRP fabrics as an alternative to epoxy. The vinyl ester 
(or epoxy vinyl ester) resins shall have the minimum physical and mechanical properties as 
approved by the Engineer. A sample epoxy vinyl ester resin properties table is provided below. It 
should be noted that use of vinyl ester resins will require additional safety measures when applied 
in confined space due to styrene or other monomer emissions. Cure times of vinyl ester resins vary 
in a wide range, and if the project requires faster cure times than those provided by the FRP Material 
Supplier in ambient temperature, then heating of resin during application should be considered 
commensurate with the FRP Material Supplier’s curing schedule.
Sample Epoxy Vinyl Ester Resin Properties Table
Viscosity (ISO 2555)
200 – 250 cps
Gel Time
30 min
Density
62.4 lb./ ft3 (1.00 kg/L)
Cure time (>55 °F)
24 h
Density at 392 ⁰F (200 ⁰C)
Part A: 70.5 lb./ft3 (1.13 kg/L) 
Part B: 62.4 lb./ ft3 (1.00 kg/L)
Tensile Strength (ASTM D638) 
Tensile Modulus (ASTM D638)
7,150 psi (49 MPa)
289,000 psi (1,992 MPa)
Flexural Strength (ASTM D790)
Flexural Modulus (ASTM D790)
11,140 psi (77 MPa)
252,400 psi (1,740 MPa)
Compressive Strength (ASTM D695) Compressive 
Modulus (ASTM D695)
13,000 psi (90 MPa)
350,000 psi (240 MPa)
Water Absorption (% gain) in 24 hours
< 1%
Expansion Coefficient [-37.40 – 40.10 ⁰C] 
Expansion Coefficient [1,200 – 2,220 ⁰C]
78 ×10-6 m/m ⁰C
151.8 ×10-6 m/m ⁰C

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 13
October 27, 2025
Tensile Strength (ASTM D638) 
Tensile Modulus (ASTM D638)
12,800 psi (88 MPa)
460,000 psi (3.2 GPa)
Flexural Strength (ASTM D790) 
Flexural Modulus (ASTM D790)
22,000 psi (153 MPa)
500,000 psi (3.5 GPa)
Compressive Strength (ASTM D695)
17,600 psi (121 MPa)
Water Absorption (% gain) in 24 hours
< 1%
Expansion Coefficient [-37.40 – 40.10 ⁰C] 
Expansion Coefficient [1,200 – 2,220 ⁰C]
78 ×10-6 m/m ⁰C
151.8 ×10-6 m/m ⁰C
PART 3 – EXECUTION
3.01
GENERAL PROCEDURES 
The design of the FRP reinforcement shall conform to the design provisions given for the particular 
project and applicable standards.
3.02
INSTALLATION BY THE WET LAYUP METHOD 
Contractor can propose alternative installation techniques and design improvements to meet the 
project goals and design requirements outlined in the drawings and technical specifications. Such 
proposed changes will be submitted as a part of the Performance Work Statement (PWS) 30 days 
before the start of construction and is subject to the approval of the City and City’s Representative.
A. Surface Preparation
1.
The Contractor shall expose and inspect the interior of the pipe to be rehabilitated with the 
FRP system. Inspection shall check the location and inspect cracks and existing conditions 
of the concrete. 
All necessary repair and restoration of a concrete section shall be approved by the 
ENGINEER prior to surface preparation. 
The Contractor shall examine the existing conditions to identify potential obstructions and 
constraints; shall verify dimensions, geometry, and access locations; and shall map all 
visible voids and cracks in the host pipe.
An adhesive bond with adequate strength shall always be provided between the first layer 
of the FRP system and substrate. Surface preparation shall also promote continuous intimate 
contact between the FRP system and substrate by providing a clean, and smooth surface.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 14
October 27, 2025
2.
Surface Grinding/Blasting:  All irregularities, unevenness, and sharp protrusions in the 
surface profile shall be ground away to a smooth surface with CSP 3/CSP 2 surface profile 
for concrete substrate. Disk grinders or other similar devices shall be used to remove stain, 
paint, or any other surface substance that may affect the bond. Voids or depressions with 
diameters larger than 1 ½ in. or depths greater than 1/8 in., when measured from a 12-in. 
straight edge placed on the surface, shall be filled according to Section 3.02 paragraphs A.4.
3.
Crack Injection: In case of host pipe having deep cracks and fractures to an extent that it 
imposes a risk of failure of the substrate during FRP application, these cracks and fractures 
will be filled, and the host pipe shall be pre-strengthened by crack injection. Where crack 
injection is necessary, internal, or external cracks at a width specified by the Engineer shall 
be filled using pressure injection of epoxy. The FRP system shall be installed no earlier than 
12 hours after crack injection. Any surface roughness caused by injection shall be removed 
as per Section 3.02 paragraph A.2. The limit of crack injection shall be as indicated on the 
plans. 
4.
Surface Profiling: After surface grinding, any remaining unevenness in the surface greater 
than that specified in Section 3.02 paragraph A.2, fins, protrusions, bug holes, eroded 
surfaces shall be filled and smoothened over by using putty made of epoxy resin mortar or 
polymer cement mortar. 
5.
Surface Cleaning: Substrate concrete and finished surface of concrete shall be cleaned prior 
to application of the FRP system. Cleaning shall remove any dust, laitance, grease, oil, 
curing compounds, wax, stains, coatings (as necessary), surface lubricants, foreign 
particles, weathered layers, or any other bond-inhibiting material. If power wash is used, 
the surface shall be allowed to dry thoroughly before installing the FRP system. The cleaned 
surface shall be protected against redeposit of any bond-inhibiting materials. 
6.
Surface Preparation for Metal Pipes: Surface of steel and any other metallic pipes or pipe 
joint rings shall be prepared to achieve adequate bond strength between the FRP system and 
the metal substrate. The surface preparation procedure for the steel substrate shall be a 
minimum of SSPC SP-10/ NACE No. 2 near white metal surface. Sand blasting or another 
suitable method shall be used to ensure the required surface profile is achieved. The 
prepared steel surface shall be free of materials including epoxy mortar, concrete, dust, dirt, 
and oil at the time of the FRP system installation. The cleaned metal substrate shall be 
primed with epoxy prior to the installation of the initial layer of glass fiber lamina for the 
system's dielectric barrier.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 15
October 27, 2025
B. Installation
This section specifies general installation procedures for the wet lay-up of the FRP system 
composed of FRP laminae. Contractor shall submit a site-specific installation procedure in the 
PWS, which shall, at the minimum include the following measures.
1.
Environmental Conditions:  Environmental conditions for installation shall be examined 
before and during installation of the FRP system to ensure conformity to the contract 
documents and FRP Material Supplier’s recommendations. Primers, putty, saturating 
resins, or adhesives shall not be applied on cold, frozen, damp, or wet surfaces, unless the 
resin is moisture tolerant. Ambient and concrete surface temperatures shall be within 45-95 
°F (7-35 °C). Moisture level on all contact surfaces shall be less than 10 percent at the time 
of installation of the FRP system, as evaluated according to ACI 503R-93. Moisture 
restrictions may be waived for resins that have been formulated for wet applications. Work 
areas identified as a confined space will require an entry permit in accordance with OSHA 
regulations. The Contractor is responsible for the training of all personnel, air testing, safety 
equipment and complying with the requirements of OSHA. A detailed safety plan shall be 
submitted by the Contractor as part of the Technical Specification Section 01300 – 
SUBMITTALS. 
2.
Moisture Vapor Transmission: Application of bonded FRP systems shall not proceed if any 
moisture vapor transmission is present. Concrete dryness is necessary when using elevated 
temperature cure. Any bubble that develops from moisture vapor transmission can 
effectively be injected with the same adhesive material used for the FRP system following 
the procedure specified in Section 3.02 paragraph A.3. 
3.
Applications in Inclement Weather: When inclement weather does not allow installation of 
the FRP system, as specified in Section 3.02 paragraph B.1, auxiliary measures may be 
employed to correct the conditions. An auxiliary heat source may be used in cold weather 
to raise the ambient and concrete surface temperatures to acceptable levels, as 
recommended by the FRP Material Supplier, but not higher than the glass transition 
temperature (Tg) of the primer or saturating resin. Pressurized air may be used to dry the 
surface dampness. 
4.
Equipment: The Contractor shall provide all necessary equipment in sufficient quantities 
and clean operating conditions for continuous uninterrupted FRP system installation. 
5.
Mixing of Resin Components:  All resin components, including the main agent and 
hardener, shall be mixed at the proper temperature using the appropriate weight ratio and 
for a duration specified by the FRP Material Supplier until thorough mixing with uniform 
color 
and 
consistency 
is 
achieved. 
Resins 
shall 
not 
be 
diluted

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 16
October 27, 2025
with any organic solvents such as a thinner. Electrically powered mixing blades shall be 
used for mixing. Resin shall be mixed in quantities sufficiently small to ensure that it can 
be used within its pot life. Any mixed resin that exceeds its pot life or begins to generate 
heat or shows signs of increased viscosity shall not be used and shall be disposed of 
according to the SDS. Mixing of some resins may be accompanied by noxious fumes. 
Precautions must be taken regarding the resin’s impact on the environment, including 
emission of volatile organic compounds. If flammable resins are used, explosion proof 
electrical motors or air driven motors should be used for mixing.
6.
Primer and Putty: When necessary, apply one or two coats of primer on the substrate surface 
to penetrate its open pores. The putty shall be applied as soon as the primer becomes tack 
free or is not sticky to the fingers. The putty shall be applied within 7 days after primer 
application; otherwise, the primer- coated surface shall be roughened with sandpaper or a 
similar tool. The resulting surface shall be cleaned according to Section 3.02 paragraph A.5 
before applying the putty. Apply 40-mil (1 mm) thick coat of putty in one layer, and smooth 
over the surface to fill in any small voids, cracks, or uneven areas. Any swelling on the 
surface after applying the putty shall be corrected to meet surface profile as specified in 
Section 3.02 paragraph A.4. The surfaces of primer and putty shall be protected from dust, 
moisture, and any other contaminants before applying the FRP system.
7.
Saturant:  Saturant is the term for the engineered resin used to impregnate FRP fabrics and 
turn them into laminae upon cure. The saturant used in a FRP system shall have sufficiently 
low viscosity to ensure full impregnation of the fiber sheets prior to curing. To maintain 
proper viscosity of the saturant, the ambient and substrate surface temperatures must be 
within the range specified in Section 3.02 paragraph B.1. Any mixed saturant that exceeds 
its pot life shall be disposed of according to Section 3.05. 
8.
Applying Fiber Sheet and Saturant:  The fabric will be uniformly saturated with the saturant 
using the saturating machine or hand saturated, where site conditions are not favorable for 
using the machine. The fabric will be cut to the length specified in the contract documents 
and shall be installed in place and gently pressed onto the wet putty. Any entrapped air 
between the fiber sheet and the concrete surface shall be released or rolled across the sheet 
in the direction parallel to the fibers while allowing the resin to impregnate the fibers and 
achieve intimate contact with the substrate. Rolling perpendicular to the fiber direction is 
not allowed. In bi-directional fabrics, rolling shall be initially in the fill (transverse) 
direction end to end and then in the warp (longitudinal) direction. Subsequent layers of 
fabric (if called for in the design) shall be properly saturated with saturant and applied on 
top of the first sheet of fabric with no interruption.
9.
Multiple-Fiber Plies: Subsequent layers of fabric (if called for in the design), shall be 
properly saturated with saturant and applied on top of the first sheet of fabric

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 17
October 27, 2025
with no interruption. The amount of resin overcoat for intermediate plies shall factor in 
overcoat for the applied ply and undercoat for the next ply. Follow the PWS and approved 
shop and contract drawings for the fiber orientation and ply stacking sequence. Each ply 
and core fabric shall be applied before the onset of complete gelation of the previous layer. 
The number of plies that can be applied in a single day shall be based on the FRP Material 
Supplier’s recommendation and the approval of the Engineer. When previous layers are 
cured, interlayer surface preparation, such as light sanding and filling with putty, may be 
required, as specified in Section 3.02 paragraph B.6. 
10. Overlapping:  Lap joints shall be constructed over a minimum of one CFRP or GFRP 
laminate. The lap joint layer shall not be the top laminate. The length of the lap splice shall 
be as specified by the contract documents but must be at least 6 in. (152 mm) long. 
Staggering of lap splices on multiple plies and adjacent strips shall be required unless 
permitted by contract documents. 
11. Alignment of FRP Materials:  The fiber plies shall be aligned on the host pipe according to 
the contract documents. Any deviation in the alignment more than 5 degrees (approximately 
1 in./ft) is not acceptable. Once installed, the fibers shall be free of kinks, folds, and 
waviness. 
12. Termination Points:  The termination points of the FRP system shall be designed such that 
water is not allowed to seep in between the host pipe and the FRP system. The FRP system 
shall be sealed properly at the termination points by applying epoxy sealant. Where flow 
velocities are high or in pressurized conduits, elastomeric internal joint seals with 
compressed steel bands shall be used at the termination points, at the discretion of the 
Engineer, with the appropriate approved details included in the drawing set.
13. Curing: The FRP system shall be allowed to cure for the minimum amount of time specified 
per the FRP Material Supplier’s recommendations. Field modification of resin chemistry 
for rapid curing shall not be allowed. Elevated cure temperature may be used if rapid curing 
is necessary. Cure of installed plies shall be monitored before placing subsequent plies. In 
case of any curing irregularity, installation of subsequent plies shall be halted. Protect the 
FRP system while curing.
14. Protective Coating and Finishing:  It is permissible to use a topcoat for abrasion resistance 
and improved flow conditions. The topcoat shall be either thickened epoxy, with or without 
a pigment added to facilitate inspection, or another resin as agreed between the City or 
City’s Representative and Contractor. The topcoat shall be compatible with exposure 
conditions including moisture, abrasive chemicals in sewage, salt water, and physical 
abrasion due to debris and silt in sewers. Applicability of the topcoat to the FRP system in 
abrasive environments shall be verified by testing (ASTM D4060) as required by the 
Engineer.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 18
October 27, 2025
15. Protective Coating Field Application:  Surface preparation shall be as recommended by the 
FRP Material Supplier. Solvent wipes shall not be used to clean the FRP surface unless 
approved by the FRP Material Supplier. If abrasive cleaning is necessary, air pressure shall 
be limited to avoid any damage to fibers. Ambient and surface temperatures shall be within 
the range specified in Section 3.02 paragraph B.1, prior to applying the protective coating. 
3.03
INSPECTION & QUALITY ASSURANCE 
A specific quality assurance (QA) plan shall be developed from the tests identified in this section. 
All inspections and tests in this section will be performed by a trained inspector acting on behalf of 
the City for QA of the project in the presence of the Contractor and Engineer. The Contractor may 
have its own inspector for Quality Control (QC). The project specific QA/QC plan shall be included 
in the PWS submittal. 
A. Inspection of Materials:  The FRP Material Supplier’s certifications for all delivered and stored 
FRP components will be inspected for conformity to the contract documents before starting the 
project. Materials testing will be conducted on samples as detailed in the PWS. Any material 
that does not meet the requirements of the contract documents or PWS will be rejected. 
Additional inspection measures may be taken during the installation process if specified in the 
contract documents or PWS.
B. Daily Inspection: Daily inspection will include date and time of repair; relative humidity; 
general weather conditions; surface dryness per ACI 503.4-92; surface preparation and surface 
profile using ICRI surface profile chips; qualitative description of surface cleanliness; type of 
auxiliary heat source, if any; widths of cracks not injected with epoxy; fiber or procured 
laminate batch numbers and their locations in the structure; batch numbers, mixture ratios, 
mixing times, and qualitative descriptions of the appearance of all mixed resins, primers, putties, 
saturants, adhesives, and coatings; observations of the progress of the cure of resins; 
conformance with installation procedures; adhesion test results of bond strength, failure mode, 
and location; FRP properties from tests of field sample panels or witness panels, if required; 
location and size of any delamination’s or air voids; and the general progress of work. 
C. Inspection for Fiber Orientation:  Fiber or ply orientation, fiber kinks, and waviness will be 
examined by visual inspection for conformity to the contract documents. Tolerances will follow 
Sections 3.02 and 3.03. Any nonconforming FRP repair area will be removed and required as 
per Section 3.04 - Repair of Defective Work. 
D. Inspection for Debonding:  After at least 24 hours from initial installation of the resin, a visual 
inspection of the surface will be performed for any swelling, bubbles, voids, or delamination. If 
an air pocket is suspected, an acoustic tap test will be carried out with a hard object to identify 
delaminated areas by sound, with at least one strike per one ft2 (0.1 m2). Defects smaller than 
0.5 in. (12 mm) in diameter will require no corrective action, unless as specified in Section 3.04 
paragraph 
A. 
Defects 
larger 
than

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 19
October 27, 2025
0.5 in. (12 mm) but smaller than 2 in. (50 mm) in diameter will be repaired as per Section 3.04 
paragraph B. Defects larger than 2 in. (50 mm) but smaller than 6 in. (150 mm) in diameter, and 
with a frequency of less than 5 per 10 ft2 (1 m2) of surface area, will be repaired as per Section 
3.04 paragraph C. Larger defects will be repaired as per Section 3.04 paragraph D.
E. Inspection for Cure of Resin:  If specified in the contract documents, the relative cure of resin 
in FRP systems will be examined by visual inspection or by third party laboratory testing of 
resin-cup samples using ASTM D3418. Follow recommendations of the resin FRP Material 
Supplier for acceptance criteria. If the cure of resin is found unacceptable, the entire area will 
be marked and repaired as per Section 3.04. 
F.
Tests:  Specimens from the installed FRP system or samples representative thereof, shall be 
tested for tensile, compressive, and adhesive strengths. 
Adhesion test: Refer to ASTM D7234 for adhesion to concrete and ASTM D4541 for adhesion 
to metal (e.g., steel). To validate the adequacy of the surface preparation and the adhesion 
strength of the FRP system, the Contractor shall perform random adhesion tests on the prepared 
concrete and steel substrate of pipe segments adjacent to repair pipes as directed by the Engineer 
and witnessed by the City's Representative. The City's Representative should designate the areas 
for trial adhesion tests prior to the surface preparation activities. These areas shall be cleaned, 
prepared, and covered with two-ply FRP system test patches with minimum dimensions of 2 ft 
x 2 ft (60 cm x 60 cm) for adhesion test to concrete substrate and minimum dimensions of 4 in. 
x 4 in. (10 cm x 10 cm) for adhesion to steel substrate. The patch shall consist of two orthogonal 
plies of FRP laminae, with a layer of GFRP first applied on any steel substrate. Three adhesion 
tests shall be performed on each test patch. The remaining adhesion test patches shall be finish 
coated and remain in place for future testing purposes as needed. The Contractor shall log the 
location of the adhesion test and report the test results to the City or City’s Representative.  
Tensile strength test (ASTMD3039): Depending on the composition of the FRP system used 
for a particular application, test panels shall be field fabricated using the (2) FRP system layers 
of carbon/glass fiber fabric, any core (3D) fabric, resins and saturation equipment used in the 
application. Tensile test panels shall be approximately 12 in. by 12 in. The test panel shall be 
prepared on a smooth flat surface overlaid with plastic (polyethylene or vinyl) sheeting. 
Saturating resin shall be used to prime the surface, followed by the saturated system, and finally 
topped with more saturating resin. A cover of plastic sheeting shall be placed over the panel and 
the panel squeegeed to remove any bubbles and other surface irregularities to ensure a smooth 
flat surface. The panel shall be labeled with time, date, and sample panel number, fabric lot 
numbers, and resin batch numbers, and stored in an environment representative of the pipeline 
inside condition to cure until collected for lab testing.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 20
October 27, 2025
The test lab will perform a minimum of ten tensile tests with the fibers oriented in the strong 
direction for each tensile test panel in accordance with ASTM D3039, and report certified tests 
results for tensile strength, tensile modulus, related specimen dimensions, and percent 
elongation. For projects where multiple test panels with the same fabric batch are prepared, it 
is permissible to perform 5 tension tests per panel instead of 10 tests per panel, subject to review 
and approval by the Engineer.
The FRP system will be unacceptable if the average tensile strength is below that specified in 
the contract documents. Compressive strength test (ASTM D695).  The resin used for the FRP 
system shall have the minimum compressive strength as required by the ENGINEER. This shall 
be verified by taking resin samples from the job site. A minimum of five samples shall be 
prepared for compressive strength testing per ASTM D695. 
The standard test specimen, except as indicated shall be in the form of a right cylinder or prism 
whose length is twice its principal width or diameter. Preferred specimen sizes are 12.7 by 12.7 
by 25.4 mm (0.50 by 0.50 by 1 in.) (prism), or 12.7 mm in diameter by 25.4 mm (cylinder). 
Results of the compressive strength test shall be reviewed and approved by the Engineer. If the 
average compressive (yield) strength of the samples is less than the value as indicated in the 
design, then that resin batch shall be rejected. Two or more individual samples having a yield 
strength less than the value indicated in the design shall also result in rejection of the resin batch 
regardless of the average value. 
3.04
REPAIR OF DEFECTS
This section specifies the conditions and types of defects that require repair and the acceptable 
methods of repair. Defects are of different types and may be generally classified as aesthetic, short-
term critical, or long-term critical. Repair procedure depends on the type, size, and extent of defects. 
Repair procedures indicated below are exemplary, and the actual procedure specific to each project 
shall be submitted as a part of the PWS.
D. Repair of Protective Coating:
Defects in protective coating can be of three types: small hairline cracks, blistering, and peeling. 
In all cases, moisture content of the substrate should be below 0.05% before applying a new 
coating. Prior to any repair of protective coating, the FRP system shall be examined visually or 
otherwise to ensure that no defect exists within or on the surface. 
Defects in FRP, if found, shall be repaired as described below. If protective coating appears to 
show small areas with cracks, the local surface shall be lightly sanded. Then a new coating with 
appropriate primer shall be applied according to the FRP Material Supplier’s recommendations. 
At the minimum, the coating shall be applied over an area extending 1 in. (25 mm) on either 
side of the defect. If the protective coating shows signs of blistering, the entire area of blisters 
as 
well 
as 
the 
surrounding 
area 
to 
a 
distance

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 21
October 27, 2025
of at least 12 in. (30 cm) shall be carefully scraped clean. In no case should a blistered surface 
be recoated without complete removal of the existing coating. The area shall be wiped clean 
and dried thoroughly. Once dry, the area can be recoated after application of the primer coat if 
required by the FRP Material Supplier. If the surface shows signs of excessive peeling, the 
entire coating shall be scraped off and the surface lightly sanded, wiped clean, and thoroughly 
dried before applying a new coat according to the FRP Material Supplier’s recommendations. 
E. Epoxy Injection of Small Defects:  Small entrapped voids or surface discontinuities no larger 
than 0.5 in. (12 mm) in diameter shall not be considered defects and require no corrective action 
unless they occur next to edges or when there are more than five such defects in an area of 10 
ft2 (1 m2). Small defects of size between 0.5 and 2 in. (12 and 50 mm) in diameter shall be 
repaired using low-pressure epoxy injection as long as the defect is local and does not extend 
through the complete thickness of the FRP system. 
F.
Patching of Minor Damage:   Minor defects are those with diameters between 2 and 6 in. (50 
and 150 mm) and a frequency of less than five per any unit surface area of 10 ft2 (1 m2) length 
or width. The area surrounding the defects to an extent of at least 1 in. (25 mm) on all sides 
shall be carefully removed. The area shall be wiped clean and thoroughly dried. The area shall 
then be patched by adding an FRP patch extending at least 1 in. (25 mm) on all sides of the 
removed area. 
G. Replacement of Large Defects:  Defects larger than 6 in. (150 mm) in diameter shall be carefully 
marked and scarfed out extending to a minimum of 1 in. (25 mm) on all sides. Scarfing shall be 
progressing through the layers of the FRP system until past the defective area. The substrate 
shall be appropriately prepared and primer reapplied after ensuring that the surface is clean and 
dry. Application of an FRP patch system shall extend a minimum of 6 in. (150 mm) on all sides 
of the scarfed area. Once cured, the protective coating shall be applied over the entire area.
3.05
STORAGE, HANDLING, AND DISPOSAL 
A. Storage Requirements:  All components of the FRP system must be delivered and stored in the 
original factory-sealed, unopened packaging or in containers with proper labels identifying the 
FRP Material Supplier, brand name, system identification number, and date. Catalysts and 
initiators should be stored separately. All components must be protected from dust, moisture, 
chemicals, direct sunlight, physical damage, fire, and temperatures outside the range specified 
in the system data sheets. Any component that has been stored in a condition different from that 
stated above must be disposed of, as specified in Section 3.05 paragraph G. 
B. Shelf Life:  All components of the FRP system, especially resins and adhesives, that have been 
stored longer than the shelf life specified on the system data sheet shall not be used and must be 
disposed of, as specified in Section 3.05 paragraph G.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 22
October 27, 2025
C. Handling: All components of the FRP system, especially fiber sheets, must be handled with care 
according to the FRP Material Supplier recommendations to protect them from damage and to 
avoid misalignment or breakage of the fibers by pulling, separating, or wrinkling them or by 
folding the sheets. After cutting, sheets shall be either stacked dry with separators or at a radius 
no tighter than 12 in. (30 cm) or as recommended by the FRP Material Supplier. 
D. Safety Hazards: All components of the CFRP system, especially resins and adhesives, must be 
handled with care to avoid safety hazards, including but not limited to skin irritation and 
sensitization and breathing vapors and dusts. Mixing resins shall be monitored to avoid fuming 
and inflammable vapors, fire hazards, or violent boiling. The Contractor is responsible for 
ensuring that all components of the FRP system at all stages of work conform to the local, state, 
and federal environmental and worker’s safety laws and regulations. The Contractor is advised 
that a forced ventilator system may be required inside enclosed sections and that provision for 
ventilation, if any, shall be included in the cost of the work. Refer to the Safety Plan for details.
E. Safety Data Sheets:  The SDS for all components of the FRP system shall be accessible to all at 
the project site. Specific handling hazards and disposal instructions shall be specified in the SDS 
section entitled Personnel and Workplace Protection. The Contractor is responsible for 
providing the proper means of protection for safety of the personnel and the workplace. 
The Contractor shall inform the personnel of the dangers of inhaling fumes of primer, putty, or 
resin and shall take all necessary precautions against injury to personnel. The resin mixing area 
shall be well vented to the outside. Refer to the Safety Plan for details.
F.
Clean-Up: The Contractor is responsible for the cleanup of the equipment and the project site 
from hazardous and aesthetically undesirable FRP components using appropriate solvents, as 
recommended in the system data sheet. 
G. Disposal: Any component of the FRP system that has exceeded its shelf life or pot life or has 
not been properly stored, and any unused or excess material that is deemed waste shall be 
disposed of in a manner amiable to the protection of the environment and consistent with the 
SDS.
3.06
PROJECT CLOSE-OUT AND MAINTENANCE
Documentation of the work:  The City requires documentation of the work be prepared and 
submitted to the City or City’s Representative by the Contractor on completion of the work 
according to Technical Specification Section 01300 - SUBMITTALS. The documentation shall 
include the following:
1.
Information on the products and installation method used.

SECTION 09720
FIBER REINFORCED POLYMER (FRP)
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 23
October 27, 2025
2.
Pre- and post-inspection results.
3.
Test results.
4.
Any changes or deviations from the contract documents and possible corrective work.
A. Verification/Basis for Rejection:  Materials not complying with the requirements of this 
Technical Specification shall be rejected at the discretion of the City or City’s Representative. 
Repairs, replacements, and retesting shall be accomplished in accordance with the contract 
documents at no additional cost to the City.
B.
Affidavit of Compliance:  The City requires an affidavit from the FRP Material Supplier or 
Contractor, as applicable, that the material provided, or the installation performed complies with 
the applicable requirements of the Technical Specifications provided herein and delivered to the 
City or City’s Representative according to Technical Specification Section 01300 - 
SUBMITTALS.
3.07
PROTECTION OF SITE: 
Except as otherwise provided herein, the Contractor shall protect from damage all fences, structures, 
sidewalks, utilities, trees, shrubbery, lawns, etc., during the progress of this work. All debris and 
unused materials shall be removed immediately upon completion of the work. The site shall be 
restored as nearly as possible to its original condition, including the replacement, at the Contractor's 
sole expense, of any facility or landscaping which has been destroyed or damaged beyond 
restoration.
3.01
UTILITIES:  
 
Unless otherwise indicated in Technical Specification Section 01550 – CONTRACTOR’S 
UTILITIES, the Contractor shall arrange for and provide any required utilities at the Contractor’s 
sole cost and expense. This includes but is not limited to water, power for operating any equipment 
along with personnel sanitation facilities.
3.02
CLEANING AND PREPARATION
A. The Contractor shall be responsible for all cleaning and surface preparation according to 
Technical Specification Section 02760 – SEWERS AND SEWER STRUCTURE CLEANING. 
The Contractor shall notify the City’s Representative of any irregularity, which may interfere 
with the proper installation
3.03
ACCEPTANCE
As a condition precedent to Final Acceptance of the work, Contractor shall certify the proper 
installation and testing of material provided under this section. Certification shall

SECTION 09720
FIBER REINFORCED POLYMER (FRP)       
 
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38 
Project No.: 3221025B
09720 - 24
October 27, 2025
warrant that materials and installation are free of defects and/or workmanship and suitable for 
trouble-free operation under the conditions set forth in these Technical Specifications.
3.04
RECORD DRAWINGS: 
Prior to final payment, the Contractor shall provide a complete set of redlined Design Drawings 
showing the project as constructed including manhole insert depth, diameter, along with location 
and diameter of any insert penetrations and interior piping configurations. A spreadsheet and/or 
Design Drawings shall include all information required elsewhere in these Technical Specifications 
as well as any changes.
** END OF SECTION **

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 1
October 27, 2025
PART 1 - GENERAL 
 
1.01
DESCRIPTION
A. SCOPE
This section specifies the PVC lining system used for the rehabilitation of municipal 
sanitary sewer manholes and structures to provide protection against chemical or gas 
corrosion. The lining shall yield a durable, chemical resistant lining and provide a water 
and gas tight seal to concrete components within existing sanitary sewer collection 
system infrastructure.
B. DEFINITIONS
1. In this Technical Specification, the word “lining” (or “linings” or “liner”) is used 
interchangeably. Similarly, “line” is used interchangeably with “to line” (or other 
variations of these words). 
2. In this Technical Specification, unless otherwise specifically noted, the word 
“manhole” shall mean “sewer structure” and shall encompass sewer manholes, 
sewer structures, sewer vaults, and other structures contained within the sanitary 
sewer system. It also encompasses sewer pipes (or portions thereof) that are located 
within the sewer structure including sewer pipes (or portions thereof) that are 
located outside of the limits of the structure. 
3. In this Technical Specification, “existing manholes” shall mean those manholes 
that are (or were) not constructed as part of this project work. “Rehabilitating” 
existing manholes and "applying corrosion protective coating" to those manholes 
shall include the following activities: 
a.
Cleaning and preparation of the surface to PVC lining manufacture’s 
recommended standards and removing loose, corroded, deteriorated, hanging 
materials from the manhole or pipe per Technical Specification Section 02146 
- SEWER PIPE AND SEWER STRUCTURE CLEANING and otherwise 
preparing the manhole or pipe for liner installation/repair.
 
b. Testing of the prepared surface to lining manufacturer’s standards prior to 
applying an approved lining system.
c.
Testing the finished surface coating, as required herein. 
Where required by the Contract Documents, existing manholes and pipes shall be 
rehabilitated and an approved corrosion protective PVC lining installed to their interior 
surfaces, as specified herein.

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 2
October 27, 2025
The approved lining system (as specified herein) shall be installed to all exposed 
concrete, grout, mortar, and cementitious surfaces or portions thereof within the 
manhole including pipe-to-throat transitions (or pipe-to-bench transitions), throat, 
bench, and channel. 
1.02
CITY OF TEMPE SUPPLEMENT TO MAG SPECIFICATIONS
A. All materials, work and methods relating to the special protective materials installation 
shall conform to the applicable provisions of the City of Tempe Supplement to MAG 
Uniform Standard Specifications and Details for Public Works Construction, latest 
edition.
B. Acceptance of the completed work is subject to inspection by the City or City’s 
Representative. If the overall quality of the materials and installations is found to be 
unacceptable in the opinion of the City or City’s Representative, repair and retesting 
will be required.
1.03
INSTALLER QUALIFICATIONS
Applicator of specialized linings shall be certified by the lining material manufacturer.
1.04
SUBMITTALS 
 
The following submittals shall be provided in accordance with Technical Specification 
Section 01300 – SUBMITTALS. 
1. Complete shop drawings including description of installation.
a.
PVC liner spot repair detail.
b. PVC weld joint installation detail.
c.
Large PVC lining patch with mechanical anchors repair detail.
d. Filling of voids behind pipe wall and pipe repair detail, (as necessary).
e.
Epoxy coated manhole/PVC lined pipe interface connection detail.
f.
PVC lined manhole/PVC lined pipe interface connection detail.
g. Repair detail for bypass pump suction and discharge port(s) cut into an existing 
PVC lined pipe.
2. Complete material lists.
3. PVC welder/installer certifications from lining material manufacturer.
4. Contractor’s quality control test procedures and test results.

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 3
October 27, 2025
PART 2 - PRODUCTS 
 
2.01
PVC LINING REPAIR – PLAIN SHEET
A. “Small” and “medium” sized defects that are present within the existing PVC protective 
lining, as detailed in the Contract Documents, shall be repaired using Armorlok 
Incorporated, 1420 Richardson Street, San Bernadino, CA or approved equivalent, and 
Sikaflex 1A or approved equivalent. The lining material shall be PVC, white in color, 
compounded of inert synthetic resins, pigments and plasticizers to make it permanently 
flexible sheets. Liner sheets shall be a nominal 0.065-inch in thickness. Submittal 
required per Technical Specification Section 01300 – SUBMITTALS
B. Joint strips and welding strips shall have the same corrosion resistance as the sheet 
lining material but shall not have locking extensions. Liner sheets joint, corner, and 
welding strips shall be free of cracks, cleavages, or other defects adversely affecting 
the protective characteristics of the material. All lining shall have good impact 
resistance and shall have an elongation sufficient to bridge up to 1/4-inch crack without 
damage to the lining sheets.
C. Mechanical anchors shall be 1/4–inch diameter Zamac nail with mushroom head or 
approved equivalent. Minimum anchor length shall be 1¼-inch. Submittal required per 
Technical Specification Section 01300 – SUBMITTALS.
D. Installation of “Large Patch” repairs shall be reviewed by the City or City’s 
Representative for approval prior to installation.
2.02
PVC PROTECTIVE LINING – NEW SURFACES
A. Concrete surface/repair shall include a protective lining as detailed in the project 
Contract Documents. Surfaces shall be protected using Armorlok PVC Shieldlok Mini 
D-Key liner material as manufactured by Armorlok Incorporated, 1420 Richardson 
Street, San Bernadino, CA or approved equivalent. The lining material shall be PVC, 
white in color, compounded of inert synthetic resins, pigments and plasticizers to make 
it permanently flexible sheets. Liner sheets shall be a nominal 0.065-inch in thickness. 
Submittal required per Technical Specification Section 01300 – SUBMITTALS.
B. Shieldlok Mini D-Key PVC protective lining material that is to be placed over new 
concrete shall be embedded into Shieldlok two-part mastic (Part A / Part B), Mixed 
according to manufacturer recommendations.  Concrete shall be coated with Shieldlok 
primer prior to application of two-part mastic.  Mini D-Key extensions of the same 
material as to the liner shall be integrally extrude with the sheet.  Locking extensions 
shall be approximately 2.5 inches apart and shall be at least 0.375 inch high. 
C. Joint strips and welding strips shall have the same corrosion resistance as the sheet 
lining material. Liner sheets, including locking extensions shall be free of cracks, 
cleavages, or other defects adversely affecting the protective characteristics of the

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 4
October 27, 2025
material. Liner joints, corner, and welding strips shall be free of cracks, cleavages, or 
other defects adversely affecting the protective characteristics of the material.
 
PART 3 - EXECUTION 
3.01
HAZARDOUS LOCATIONS
The City or City’s Representative may wish to enter the manhole under the Contractor’s 
safety program to perform observations and/or perform additional testing. The Contractor 
shall provide the necessary safety plan, safety equipment, monitoring, and safe working 
atmosphere that allow the City or City’s Representative to safely enter the manhole, at no 
additional cost to the City.
The Contractor is responsible for safety of the job site, including the responsibility to 
enforce and enact the provisions of the Contractor’s Confined Space Entry program and 
the responsibilities to monitor the atmosphere within the structures and provide a safe 
working atmosphere and environment. These safety measures shall be at no additional cost 
to the City. The City shall not be responsible for safety or for safety monitoring of the job 
site.
3.02
SEWAGE FLOW AND DIVERSION
The Contractor shall be aware that the existing manholes included in this project are active, 
functioning manholes. The Contractor shall be required to coordinate the minimization of 
existing sewer flow and corresponding water level within the manhole through upstream 
diversion as much as possible per Technical Specification Section 02145 – DIVERSION 
OF SEWAGE FLOW AND DEWATERING when rehabilitating the lower sections of the 
manhole.
Manholes designated for rehabilitation that are contiguous to pipe rehabilitation activities 
shall be performed while flow is diverted, and manhole is dewatered.
3.03
MANHOLE PREPARATION AND CLEANING
Deteriorated or soft substrate concrete shall be removed down to sound concrete with 
surface profile equivalent to ICRI SCP 3-4, using abrasive blasting or hydro-jet cleaned 
per Technical Specification Section 02146 - SEWER PIPE AND SEWER STRUCTURE 
CLEANING. Substrate shall be repaired back to original pipe dimensions per Technical 
Specification Section 09710 - CONCRETE AND MASONRY COATING. 
Existing PVC surface preparation shall include a high-pressure wash with a minimum 
water pressure of 1,000 psi to remove all grease, oils, or foreign material in accordance 
with PVC liner material manufacturer’s recommendations. 
The Contractor shall inspect all surfaces specified to receive the PVC lining system prior 
to surface preparation. The Contractor shall notify City of any noticeable disparity in the

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 5
October 27, 2025
surfaces which may interfere with the proper preparation or lining system. Remove all 
loose PVC material back to sound material. Any part of the existing field joint that cannot 
be caused to lie flat shall be trimmed away and discarded.
The entire manhole interior including frame, chimney, walls, bench, channel, and throat 
shall be cleaned prior to rehabilitation using high-pressure water blast per Technical 
Specification Section 02146 – SEWER PIPE AND SEWER STRUCTURE CLEANING.
The Contractor shall use manhole debris shields or other approved method to prevent debris 
from entering the live sewers. The Contractor shall remove and legally dispose of dislodged 
debris offsite. Discharge of removed sediment and debris into the interceptor pipe is 
prohibited. If sediments are inadvertently or intentionally released into the interceptor 
sewer, the Contractor will be responsible for interceptor pipe cleaning and removal of all 
sediments from the location of observed release for a distance one (1) mile downstream 
along the length of pipe, regardless of diameter(s) as directed by the City.
Contractor shall notify the City or City’s Representative in the event significant structural 
degradation of existing concrete has occurred, and sound concrete is not encountered 
during the cleaning process. 
 
3.04
UNDERLAYMENT DEFECT REPAIR
A. All defects in the underlayment including deteriorated concrete, cracks, honeycombing 
or otherwise defective concrete, shall be repaired. All deteriorated concrete, voids, 
holes, rough or irregular concrete shall be cleaned with abrasive blasting and high-
pressure water cleaning to sound material and filled.
B. The Contractor shall use the repair and fill material to repair or fill all defects. 
Deteriorated concrete or otherwise defective areas shall be cut out to solid concrete to 
a depth of at least 1-inch. The edges of the cut shall be perpendicular to the surface of 
the concrete. Patches shall be finished to match the adjoining surfaces profile. Concrete 
with honeycombing which exposes the reinforcing steel or with defects, which affect 
the structural strength, shall be corrected.
3.05
STRUCTURAL REINFORCING REPAIR
Structural repairs shall include splicing new reinforcing steel to existing reinforcing steel 
and providing additional reinforcing steel to reestablish the original structural integrity and 
existing loading capacity. Provide 3/8-inch diameter anchor bolts as needed to support 
reinforcing steel.
3.06
REINFORCING STEEL TREATMENT
Where corrosion or surface preparation activities have exposed reinforcing steel, the 
following procedure shall be used:

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 6
October 27, 2025
1. If half the diameter of the reinforcing steel, or more, is exposed, chip out behind 
the reinforcing steel a minimum of 1-inch for placement of grout or polymer 
concrete.
2. Determine cross sectional area loss of reinforcing steel.
3. Where reinforcing steel cross sectional area loss exceeds 15% of the original 
reinforcing steel, perform structural repair as directed by the City.
4. Abrasive blast all exposed reinforcing steel surfaces to remove all contaminants 
and corrosion products.
5. Clean exposed reinforcing steel with stiff brush or grit blast equipment. 
6. Apply a second 20 mil (wet) coat of corrosion inhibitor and allow for 2-hour to 3-
hour cure prior to placement of polymer mortar, cementitious mortar, or grout.
3.07
NEW PVC JOINTS OVER EXISTING FIELD JOINTS
A. Field joints at the pipe or manhole joints shall be Armorlok – Detail J-1 with 6-inch-
wide joint strip and 1-inch-wide weld strips as depicted in the Contract Documents. 
Detail J-1 joint shall be centered over the existing pipe joint.
B. Edge of new 6-inch-wide joint strip shall be heat fuse welded to the existing PVC lining 
along the circumference of the pipe or manhole on both edges of the new joint along 
with 1-inch weld strips at the edges per Contract Documents and Armorlok – Detail J-
1 or approved equivalent.
3.08
TERMINATION OF PVC-LINER TO CONCRETE OR EPOXY COATED SURFACE 
Where PVC-liner is to be attached to an existing epoxy coated surface, Armor liner plain 
sheet PVC lining or approved equivalent shall be terminated with a PVC turn-back that is 
mechanically anchored to the existing concrete substrate. The installation of epoxy coating 
to the manhole shall be performed prior to installation of the PVC lining turn-back. The 
turn-back shall be sealed to the epoxy surface with Sikaflex 1A sealant, or approved 
equivalent, such that the connection of the turn-back to the manhole wall, bench, throat, 
pipe connection or chimney is gas tight.
3.09
REPAIR MANHOLE BENCH AND NON-MAIN CHANNEL(S)
The Contractor shall repair manhole bench and non-main channel(s) with acid-resistant 
mortar per Technical Specification Section 09710 – CONCRETE AND MASONRY 
COATING. Manhole bench shall be sloped a minimum ½-inch per foot to the edge of the 
throat. Minimum mortar thickness shall be ¾-inch.

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 7
October 27, 2025
3.10
ADHESION/BOND TESTING
A. GENERAL
1. The Contractor shall perform an adhesion test with a thin bladed chisel after proper 
heat fuse welding of the PVC material in accordance with manufacturer’s 
recommended procedures. Costs associated with weld testing are incidental to the 
unit price cost of lining.
2. Where unacceptable test results are obtained, the Contractor shall be responsible 
for re-welding at no additional expense to the City.
B. FREQUENCY OF TESTING
The Contractor shall test all finished PVC heat fuse welded joints for adequate 
adhesion.
3.11
HIGH VOLTAGE SPARK TEST
A. DEFINITION – HOLIDAY: Holidays are defined as pinholes and voids in non-
conductive lining that allow electrical current to pass through the protective lining to 
the base material.
B. After the protective lining is installed it shall be inspected with high-voltage holiday 
detection wire brush/squeegee wand style equipment, Tinker and Rasor Model AP-W, 
maximum 35,000 Volts or approved equivalent. Surface shall first be dried, an induced 
holiday shall then be made on to the PVC lined surface and shall serve to determine the 
minimum/maximum voltage to be used to test the lining for holidays at that particular 
area. 
1. The entire surface of the manhole, whether PVC lined, or epoxy coated, shall then 
be spark tested. Any imperfections found in the lining/epoxy coating system shall 
be re-welded or ground down and refilled. The Contractor shall perform repairs and 
re-testing at no additional cost to the City. 
2. The City shall be notified and present to observe testing and retesting. In addition, 
the Contractor shall provide certification for each manhole stating that the lining 
and epoxy coating is free of holidays, holes, or other imperfections. 
3.12
REPAIRS OF PVC LINING SYSTEM
1. Pinhole defects shall be cleaned and sealed with a 1-inch-wide heat fused weld strip. 
2. All blisters, splits and damage to the existing PVC lining shall be prepared to a point 
1-inch beyond the limits of the damaged lining area.

SECTION 13000
SPECIAL PROTECTIVE MATERIALS INSTALLATION 
 
_____________________________________________________________________________________________
City of Tempe
Dibble 
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13000 - 8
October 27, 2025
3. Blisters splits and damage to the existing PVC lining shall be completely removed to a 
1-inch minimum beyond the repair area. 
4. Repairs large than 18-inches in any direction shall be brought to the attention of the 
City or City’s Representative for review and approval of proposed repair procedure.
3.13
INSPECTIONS
A. The Contractor shall notify City of impending completion of surface cleaning, re-
profiling, and prior to PVC lining repair or application of the epoxy coating per 
Technical Specification Section 09710 – CONCRETE AND MASONRY COATING.
B. The notifications shall be given a minimum 24-hours in advance of completion of the 
surface repairs and re-profiling, and 24-hours in advance of PVC lining repairs or 
application of the epoxy coating and any testing, including spark testing, and adhesion 
testing and dry film thickness testing of the epoxy lined areas.
C. Failure to provide notification at these designated times/work stages may prevent the 
acceptance of the work by the City.
3.14
CLEANUP
Upon completion of PVC lining, the Contractor shall remove surplus materials, protective 
coverings, and accumulated rubbish.
** END OF SECTION **

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT
______________________________________________________
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 1
October 27, 2025
PART 1 – GENERAL
1.01
DESCRIPTION
The purpose for this Technical Specification is to provide guidance for the rehabilitation 
of sanitary sewer access manholes using a fully structural insert capable of supporting loads 
without the addition of internal or external stiffeners and manufactured out of materials 
that are chemically inert from chemicals and corrosive gasses typically found in a 
municipal sanitary sewer system. The insert shall be comprised of barrel and cone segments 
as a single or multi piece monolithic designed unit constructed and installed in a manner 
consistent with acceptable manufacturing and construction techniques and practices.
A. SCOPE:
This Technical Specification covers all work necessary to furnish and install a 
structural manhole insert. The Contractor shall be licensed in the State of Arizona. The 
Contractor shall deliver finished insert product(s) including all materials, labor, 
equipment, and services necessary for product installation, all quality controls and 
material samples required for performance tests, final inspection and warranty work, 
all as specified in these Contract Documents and at the quantities of each component 
contained in the Bid Proposal. Anticipated work to be provided also includes all traffic 
control, bypass pumping diversion and/or temporary restriction of sewage flows (as 
necessary) for durations to complete the work, removal and reinstallation of any grade 
rings along with ring and cover, excavation of existing manhole cone including 
removal, transport and offsite disposal of materials, manhole interior cleaning, any 
manhole bench modifications and placement of  insert base support/seal grout along 
with grouting of insert exterior annular space. Work also included removal and 
replacement of any interior piping and equipment and reconnection of any lateral pipe 
connections as necessary to reinstate normal sewer service.
The work shall be for the renewal of sanitary sewer manholes that shall be 
accomplished by the installation of a number of components either individually or 
together with other components. These may include acid resistant non-shrink grout to 
structurally rebuild the manhole bench and throat section (if present) back to original 
dimensions and the application of a protective polymer coating at a minimum thickness 
to all exposed concrete/grout to establish chemical resistance. 
Any steps present within the manhole shall be removed flush with the manhole interior 
wall. The Contractor is responsible for extension and proper reconnection of any sewer 
and/or utility piping present within the manhole including all seals and/or mechanical 
hangers and devices to properly restore original service and capabilities.
Contractor is responsible for accurate and complete manhole rehabilitation as specified.  
The prices submitted by the Contractor shall include all costs of permits, labor,

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 2
October 27, 2025
equipment and materials for the various bid items necessary for furnishing and 
installing the manhole rehabilitation materials and processes in accordance with these 
Technical Specifications complete and in place, including all items of work not 
specifically mentioned herein which are required to make the product perform as 
intended. All Contractor costs to deliver the final product shall be included in the 
respective lump sum and/or unit price bid items depicted in the Bid Proposal.
1.02
SAFETY REQUIREMENTS:  
The Contractor shall conform to all work safety and health requirements of pertinent 
regulatory agencies and/or shown in Technical Specification Section 01060 – Health and 
Safety and shall secure the site for working conditions in compliance with the same. The 
Contractor shall perform existing material testing as required by regulatory regulation 
requirements, and provide/install/maintain and be responsible such signs and/or other 
devices as are necessary for safety at the work site.
1.03
NOTIFICATION:  
It shall be the Contractor's responsibility to notify all utility companies involved whenever 
a utility is to be cut, tapped, moved, or in any way disturbed from its original placement. 
Sufficient notice shall be given to the utility company so that its users can be informed of 
any disruption of service. Such notice shall be given no less than 48 hours in advance.
It is the Contractor's responsibility to inform the City of construction activities which may 
lead to interruption in sewer service. The Contractor shall provide 72 hour notice prior to 
construction in order for the City to alert all applicable residents.
1.04
QUALITY CONTROL
A. REFERENCES:
Reference
Title
ASTM C478 
Standard Specification for Precast Reinforced Concrete 
Manholes Sections (Structural intent only)
ASTM C478
Standard Specification for Circular Precast Reinforced 
Concrete Manhole Sections
ASTM C497
Test Methods for Concrete Pipe, Manhole Sections, or Tile
ASTM C579 
Standard Test Methods for Compressive Strength of 
Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, 
and Polymer Concretes

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 3
October 27, 2025
ASTM C587
Standard Practice for Minimum Structural Design Loading 
for Underground Utility Structure
ASTM C923
Standard Specification for Resilient Connectors between 
Reinforced Concrete Manhole Structures, Pipes, and 
Laterals
ASTM C990 
Standard Specification for Joints for Concrete Pipe, 
Manholes, and Precast Box Sections Using Preformed 
Flexible Joint Sealants
ASTM D1244
Standard Test Method for Concrete Sewer Manholes by the 
Negative Air Pressure (Vacuum) Test Prior to Backfill 
ASTM D2584
Test Method for Ignition Loss of Cured Reinforced Resins
ASTM D6783 
Standard Specification for Polymer Concrete Pipe (material 
mix design)
ASTM G20
Standard Test Method for Chemical Resistance of Pipeline 
Coatings
AASHTO HS-20
Standard Specification for Highway Bridges Codes - Axle 
Loading
AASHTO HL 93 
(LRFD) Bridge Design and Axial Load Specifications
1.05
CERTIFIED INSTALLER
The insert shall be installed by a Contractor certified by the insert manufacturer. A 
training outline for the certification program shall be submitted to the City for review. 
The Contractor shall provide evidence that the on-site Superintendent responsible for 
supervision of the insert installation crew has received the manufacturer's training.
The Contractor shall appoint a Quality Assurance Manager who will be on-site full 
time during manhole bench preparation, insert installation, annular space grouting, 
and backfill to take full responsibility for the quality of the work. The Quality 
Assurance Manager shall be fully certified.
1.06
SUBMITTALS:
Contractor shall submit information to the City or City’s Representative in accordance with 
Technical Specification Section 01300 - Submittals.
A. Insert Manufacturer’s Qualifications: The manufacturer of the manhole insert shall 
show experience in the manufacture of proposed insert for more than five (5) years.

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 4
October 27, 2025
B. Documentation of Contractor’s Experience: Contractor shall provide references for all 
jobs within the last two (2) years that were either completed or under construction using 
the proposed rehabilitation method.  
C. Installer’s Qualifications: The installer of the manhole insert shall show experience in 
the installation of the proposed inserts for more than five (5) years. References shall be 
provided for a minimum of five (5) jobs. Information provided shall include a 
description of the job, the location of the job, the value of the job, the Owner name, and 
the Owner contact person for the job including name, title, address, and phone number.   
The total jobs submitted shall show that at least 1,000 vertical feet of the product 
installed by the installation Contractor. 
D. Submit Manufacturer’s published product and installation literature and published 
quality control testing criteria data for the proposed manhole insert system.
E. Submit Test Reports: The manufacturer shall design, fabricate and certify that the 
manhole insert conforms to ASTM C478 - Standard Specification for Precast 
Reinforced Concrete Manholes Sections and the requirements of this Technical 
Specification.
F. Submit independent test report showing that the physical properties of the proposed 
insert meet the requirements of these Technical Specifications and will meet or exceed 
the physical properties given in the manufacturer’s published literature submitted as 
required by Part 2 – PRODUCTS.
G. Submit a report outlining the proposed installation process and procedures as directed 
by the insert manufacturer to be used. The report shall include information specific to 
the installation instructions and any unique site condition(s) that must be taken into 
consideration including grout curing operations and procedures, annular space grout 
type requirements and lift limitations, access coordination, installation timing and 
identification and any coordination requirements/requests from the City or others.
H. Shop Drawings: Contractor shall provide shop drawings of proposed materials for 
approval prior to ordering.  Shop drawings shall depict:
1. All measurements made by the Contractor to verify manhole critical dimensions 
including but not limited to depth and diameter along with any pipe penetrations or 
equipment hanger requirements.  
2. Material(s) proposed for construction.
3. Critical dimensions, jointing and connections, fasteners and anchors with sizes, 
spacing, and location, connections, attachments, and openings.
4. Anticipated grade adjustment ring(s) and height.
5. Color(s).

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 5
October 27, 2025
I.
Contractor to provide design detail for manhole bench conditions with insufficient 
circumferential bearing area to support the manhole insert. Modifications shall be per 
manufacturer’s recommendations. 
J.
Documentation of the control checks for materials used in the fabrications each part 
of insert fabrication including resin and aggregate content.
K. Approved maximum depth of annular space grout per lift as calculated by the insert 
manufacturer structural engineer.
L. Warranty:  Contractor shall submit warranty documents signed by an officer of the 
company and notarized stating the terms and conditions of the warranty identified in 
Paragraph 1.10 – WARRANTY.
M. Any item the Contractor proposes to utilize as an "or equal" to that proposed in the 
Contract Documents.
1.07
SUBSTITUTIONS
Any item the Contractor proposes to substitute for a specified item as an "or equal" must 
be made in writing, received and approved by the City or City’s Representative prior to the 
start of construction activities. Substitutions or deviations not approved by the City shall 
risk rejection and replacement at no additional cost to the City.
1. For any proposed design change or deviation from these Technical Specifications,
2. For anything in these Technical Specifications found to conflict with applicable codes 
and ordinances,
3. For anything not understood by the Contractor.
4. One (1) electronic copy of submittal(s) shall be provided to the City at least two (2) 
weeks before a determination is required.  
5. Submittals may be drawings, sketches, manufacturer's literature, catalog descriptions, 
or other descriptions in sufficient detail to allow a decision. The submittal shall indicate 
the amount to be added to or deducted from the bid price should the submittal be 
accepted.
1.08
QUALITY ASSURANCE/QUALITY CONTROL
A. EXAMINATION: Each insert component part shall be examined by the Contractor for 
dimensional requirements, soundness, and workmanship in accordance with ASTM 
C478.
B. COMPOSITION CONTROL: Manufacturer shall control and document the resin and 
aggregate content for each part of manhole fabrication. Documentation of the control 
checks shall be maintained by the manufacturer. Proper content may be shown by resin 
and aggregate usage rate checks, in accordance with the manufacturer’s recommended 
material composition.

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 6
October 27, 2025
C. TESTING RECORDS: Records of all testing shall be kept and copies of test results 
shall be submitted in accordance with Paragraph 1.06 - SUBMITTALS.
1.09
INSPECTION POINTS
Contractor shall keep the City or City’s Representative informed of milestone 
progress on each insert location for the following items:
1. Start of excavation to remove the cone, chimney, frame and cover.
2. Completion of removal of unsound material and manhole pressure wash cleaning.
3. Completion of bench cleaning and preparation (if any).
4. Completion of leveling/seal grout placement prior to insert placement.
5. Prior to annular space grouting.
6. Completion of bench protective coating.
7. Completion of backfill placement.
1.10
WARRANTY
The Contractor shall replace promptly and at no expense to the City, any materials which 
fails during the warranty period. Warranty work shall include all ancillary items including, 
but not limited to permits, traffic control, and flow control required to compete the 
repair/replacement work. Warranty and durations are described below:
A. Project Warranty: The Contractor shall warrant all materials and workmanship 
performed under this contract for a period of one (1) year from the date of formal 
acceptance or as stated in the project Contract Documents whichever is longer.
B. Materials Warranty: The manhole insert shall be free of defects that will affect the long 
term life and operation of the manhole. The Contractor shall warrant in writing all 
materials provided under this contract for a period of five (5) years from the date of 
formal acceptance.  
C. Insert: Insert material(s) shall be tested for a design life of a minimum of fifty (50) 
years against deterioration from H2S corrosion and typical chemicals found in 
municipal sanitary sewage.

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 7
October 27, 2025
PART 2 – PRODUCTS
2.01
POLYMER CONCRETE INSERT
A structural insert shall be installed into the interior of existing deteriorated sanitary sewer 
manhole that meet or exceed the structural requirements as stated in ASTM C478 Standard 
Specification for Circular Precast Reinforced Concrete Manhole Sections.  Approved insert 
manufacturers:
1) Armorock™: Manufactured by Armorock, 3555 21st Street, Boulder City, NV 89005  
(702) 479-1772
2) Rock HardTMscp Manufactured by P3 Polymers, 885 S. State Rd 57, P.O. Box 494, 
Washington, IN 47501 (812) 674-2051
3) Approved Equal.
2.02
MATERIAL and DESIGN
This section is to provide minimum design calculations and testing requirements for a 
barrel section and cone together. There are some Technical Specifications that shall differ 
between the cone and the barrel that shall be described in separate sections.
A. The design of the insert shall be prepared and professionally sealed by an Engineer 
licensed in the State of Arizona. The insert shall meet or exceed the requirements of 
buried manholes up to 40 feet deep without the use or reliance upon external or internal 
structural stiffeners. The design shall not allow infiltration of ground water.
B. Insert shall be designed and tested to withstand AASHTO HS-20 loading with no 
structural strength derived from the existing manhole structure or installation of 
external or internal structural stiffeners.
C. Material of the insert shall be consistent throughout the structure consisting of resin 
and aggregate material, including reinforcement that is inert to corrosion from sewer 
gasses per ASTM D6783 - Standard Specification for Polymer Concrete Pipe (material 
mix design). Epoxy shall be 100% solids, solvent free, low odor emitting, 
environmentally friendly, and impervious to chemicals. Manufacture shall determine 
the need for and type of reinforcement including that for safety and lifting 
requirements. Reinforcement, if determined necessary, shall be made of non-ferrous 
material.
D. The resins used shall be unsaturated, supplier certified commercial grade resins.  
Mixing lots of resin from different manufacturers or “odd-lotting” of resins shall not 
be permitted. Quality-assurance records on the resin shall be maintained. Interior 
surface shall be light in color in order to facilitate ease of inspection from ground 
surface.

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 8
October 27, 2025
E. Load Rating: The complete manhole shall have a minimum dynamic load rating of 
16,000 pounds. To establish this rating the complete manhole shall not leak, crack, or 
suffer other damage when load tested to 40,000 pounds.
F. The use of a multi-piece insert must be approved by the City prior to ordering.  If 
allowed, joints shall be of bell and spigot configuration. Joints every 5 feet shall be 
sealed with a material consistent with the chemical resistance of the manhole sections 
per ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and 
Precast Box Sections Using Preformed Flexible Joint Sealants and shall not affect the 
warranty.  All joints shall be water proofed and shall not allow infiltration.
2.03
THIRD PARTY TESTING
The Manufacturer shall have testing of the manhole insert materials performed by an 
independent test laboratory. Where there are conflicts between the requirements of the 
ASTM and this Technical Specification, this Technical Specification shall supersede. The 
Manufacturer shall submit the results of third-party testing, as specified below, and in 
accordance with Technical Specification Section 01300 - Submittals.
1. LOAD RATING: The insert shall have an AASHTO HS-20 load rating.
2. CHEMICAL RESISTANCE TESTING: The following chemical resistance tests 
shall be performed in accordance with ASTM G20 - Standard Test Method for 
Chemical Resistance of Pipeline Coatings. After exposure to the solutions, 
specimens shall exhibit zero (0) weight loss, spalling, cracking or blistering. Any 
changes to appearance such as color and texture shall be noted.
2.04
BARREL DESIGN SPECIFICATIONS:
The barrel section of the polymer concrete insert shall meet general design specifications 
as noted in Paragraph 2.02 - Material and Design.
Dimensions: Barrel sections of the manhole insert shall be designed to maximize the 
diameter of the existing manhole interior.
2.05
CONE DESIGN SPECIFICATIONS:
The cone section of the insert shall meet general design specifications as noted in Paragraph 
2.02 - Material and Design. Cones shall be concentric for all manhole diameters. The cone 
section must provide a bearing flat shoulder surface on which a chimney consisting of 
adjustment grade rings may be supported.
Dimensions: Cone sections of the manhole insert shall be a designed according to MAG 
Standard Detail 520.

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 9
October 27, 2025
2.06
CHIMNEY CONSTRUCTION:  
The chimney shall be constructed on the flat shoulder bearing surface of the cone using 
grade adjustment rings. The chimney shall be built to support the cast iron frame and 
cover adjusted to final surrounding grade.  Height of the chimney shall be according to 
MAG Standard Detail 420-1.  
2.07
STANDARD CITY CAST IRON FRAME AND COVER:
The cast iron frame and cover shall be supported by the chimney and shall not be installed 
directly on the cone. Contractor shall inform City if existing frame and/or cover is worn or 
damaged and shall obtain approval prior to replacing frame and cover.
2.08
GROUTS: 
All grout or concrete applied to the manhole interior shall be acid resistant quick-setting 
non-shrink epoxy grouts, approved by the insert manufacturer and compatible with the 
polymer protective coating material and tested in accordance with ASTM C579 - Standard 
Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, 
Monolithic Surfacings, and Polymer Concretes.
2.09
MARKING AND IDENTIFICATION:
A. Manhole insert shall be marked on both the interior and exterior with the following 
information:
1. Manufacturer’s Company Name identification. 
2. Date of Manufacture.              
3. Manhole wall thickness.
4. Installation assist marks.
2.10
DELIVERY, STORAGE AND HANDLING
Contractor shall be responsible for any damage resulting from improper storage and/or 
handing. Damaged materials shall be replaced at no additional cost to the City.
A. Materials shall be handled in accordance with MAG 106.
B. Store all products according to manufacturer’s recommendations until installation. Protect 
from construction traffic and damage.
C. During the loading, unloading, and storage, care should be taken to ensure that the manhole 
insert is not dropped or otherwise damaged.
D. The manhole insert should be stored on a smooth surface free of sharp objects.

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 10
October 27, 2025
E. Nylon or fabric slings should be used in conjunction with a spreader bar to lift or move the 
manhole. 
F.  UNDER NO CIRCUMSTANCES SHOULD CABLES OR CHAINS BE USED.
G. If the manhole insert is stored horizontally, the manhole insert should be placed in such 
a way as to avoid damage and braced.
PART 3 – EXECUTION
3.01
PROTECTION OF SITE: 
Except as otherwise provided herein, the Contractor shall protect from damage all fences, 
structures, sidewalks, utilities, trees, shrubbery, lawns, etc., during the progress of this 
work. All debris and unused materials shall be removed immediately upon completion of 
the work. The site shall be restored as nearly as possible to its original condition, including 
the replacement, at the Contractor's sole expense, of any facility or landscaping which has 
been destroyed or damaged beyond restoration.
3.02
UTILITIES:  
 
Unless otherwise indicated in Technical Specification Section 01550 – Contractor’s 
Utilities, the Contractor shall arrange for and provide any required utilities at his sole cost 
and expense. This includes but is not limited to water for compaction or testing, power for 
operating any equipment along with personnel sanitation facilities.
3.03
CLEANING AND PREPARATION
A. The Contractor shall be responsible for all existing manhole cleaning and surface 
preparation according to Technical Specification Section 02760 – Sewer and Sewer 
Structure Cleaning. The Contractor shall notify the City of any irregularity, which 
may interfere with the proper installation of the manhole insert.  
3.04
COMPOSITE INSERT
A. The manhole insert installed shall bond to or fit sufficiently tight to the existing 
manhole so as to eliminate water leakage into the manhole or allow water or vapors to 
leak out of the manhole through pin-holes or other defects. If infiltration or exfiltration 
leakage occurs, the Contractor shall seal these areas to stop all leakage using a material 
compatible with the insert material installed and as specified by the manufacturer. If 
leakage continues to occur, the Contractor shall remove and replace the insert at no 
additional cost to the City. All repair materials shall have the same estimated life 
expectancy as the insert installed. Final approval of the installation will be based on 
meeting the acceptance test requirements for each insert installed.

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 11
October 27, 2025
B. All existing manhole interior piping shall be removed prior to insert installation and 
bench protective coating application.  Interior piping shall be reinstalled per project 
Design Drawings or as required by these contract Technical Specifications.
C. Flow from existing active service connections entering the manhole shall be plugged 
or diverted through by-passed pumping operation, if the flow affects proper installation.
D. Testing and warranty inspections shall be witnessed by the City or the City’s 
Representative. Any defects found shall be repaired by the Contractor.
E. Compensation for all work required for providing test samples and independent 
laboratory testing shall be included in the in the Bid Proposal cost of the item contained.
3.05
INSTALLATION:
A. The Contractor shall install the manhole insert in accordance to approved 
manufacturer’s techniques.
B. The insert shall be centered inside the existing manhole or as otherwise approved.
C. Contractor shall use an acid resistant polymer grout around circumference of the bench 
prior to lowering insert into position. The insert base section shall be installed into 
fresh grout to evenly support the weight of the insert and establish a gas 
tight seal. The polymer grout shall be compatible with insert material and approved 
for use by the insert manufacturer and compatible with the bench protective coating 
material. The bottom seal shall also prevent loss of annular space grout material 
installed between the outside of the insert and the interior wall of the existing 
manhole.
D. After placement of insert, Contractor shall complete installation of the 
protective coating of the manhole bench. As a minimum, Contractor shall raise 
manhole bench to the same elevation as the crown of the pipe as directed or shown in 
project Design Drawings. Manhole bench shall be sloped a minimum ¼-inch per foot 
to the channel. Minimum repair grout thickness shall be ¾-inch.  
E. Where insert is installed using multiple barrel sections in lieu of a single piece barrel, 
apply a non-shrink epoxy putty or butyl mastic sealant approved by the manufacturer, 
to the joint of each barrel or cone section. Wipe excess material from the inside seam 
to provide a smooth finish.
F. Replace all existing manhole connections with the same inside diameter pipe. Sewer 
main and lateral connections in the existing manholes shall be extended through the 
insert with sealed watertight connections. Seal all penetrations through the insert with 
an acid resistant non-shrink polymer grout. Installation shall be in accordance with

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 12
October 27, 2025
Manufacturer's written instructions utilizing installation equipment approved for use 
by the Manufacturer.
G. Fill the annular space between the insert and the existing manhole wall with a Portland 
cement and sand grout mixture or a hydrophilic grout. The grout backfill shall be 
placed in a maximum 12-inch lifts or as approved by the insert manufacturer 
structural engineer. Manufacturer’s approved maximum lift shall be submitted to 
the City per Technical Specification Section 01300 – Submittals. Grout shall 
cure to provide a minimum compressive strength of 100 psi. The grout shall be 
consolidated without damage to the insert or connecting pipes.
H. Install the cone section (if applicable). after grouting the top bell section 
3.06
CONE BACKFILL MATERIAL
Contractor shall backfill around the manhole cone and chimney with sand, crushed stone, 
pea gravel or aggregate base course (ABC) per MAG Section 701, unless directed 
otherwise and approved by the Engineer. The material chosen shall be free of large lumps 
or clods, which shall not readily break down under compaction.
Backfill shall be placed in layers of not more than twelve (12) loose measure inches and 
mechanically tamped to 95 percent Standard Proctor Density, unless otherwise approved 
by the City or City’s Representative. Flooding or water jet compaction shall not be 
permitted. Backfill shall be placed in such a manner as to prevent any wedging action 
against the manhole structure.
Contractor shall install grade rings and adjust height to surrounding elevation and slope.  
Pour a concrete collar around the manhole ring and cover after setting the proper height.
All damaged pavement shall be removed and replaced in kind with new pavement. In 
landscaped areas the surface shall be restored in kind. Any damaged irrigation facilities 
shall be repaired.
3.07
GROUTING:
Annular space grouting shall be done in accordance with manufacturer's requirements and 
as described in "Installation" procedures, and should meet the following minimum 
requirements:
Test Type
Results
Test Method
Density
4 lbs.
ASTM D-1622
Water Absorption
(volume confined)
<1%
ASTM D-2842

SECTION 13130
_
POLYMER CONCRETE MANHOLE INSERT
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 13
October 27, 2025
Shear Strength
17.10 PSI
ASTM C-273
Tensile Strength
29.30 PSI
ASTM D-1623
Elongation
44%
ASTM D-1623
Viscosity
@ 500 CPS
Chemical Emersion 
Testing
Excellent results
ASTM G20-88
The system should also use an accelerator to quicken the reaction time (30 minutes) where 
needed. All physical properties shall be expected to be detailed in submittals showing that 
they meet these Technical Specifications.
3.08
MANHOLE BENCH and CHANNEL RESTORATION
Manhole bench and channel shall be cleaned and coated as follows:
A. The manhole bench shall be grit blasted down to solid/sound substrate, followed by 
high pressure water blasting to remove any lose debris and adjust pH acidity to Neutral. 
Debris shields shall be used to prevent any dislodged material from entering the sewer 
system as per Technical Specification Section 02760 – Sewer Pipe and Sewer Structure 
Cleaning.
B. Manhole bench shall be rebuilt with non-shrink acid resistant grout as necessary to 
restore original dimensions in preparation for structural foundation of insert.
C. A polymer grout should then be applied to the circumference of the bench as necessary 
to manhole insert manufacturer’s recommended dimensions for structural foundation 
of insert to create a level bearing area and seal of the first insert barrel section 
installation.
D. Manhole channel shall be rebuilt with acid resistant polymer coating, as necessary, to 
dimensions consistent with existing incoming and outgoing pipe grades
E. After the manhole insert has been installed and base rebuilt, the entire bench and 
channel shall be coated with a protective polymer concrete coating to ensure the 
exposed manhole base/throat/channel have the similar acid resistance as the remainder 
of the rehabilitated manhole.
3.09
LATERALS AND CONNECTIONS:
Sewer main and lateral connections present in the existing manholes shall be extended 
through the insert wall with sealed watertight connections. Existing pipe diameters shall be 
maintained. Penetration installation shall be in accordance with insert manufacturer's 
written instructions utilizing installation equipment approved for use by the manufacturer.

SECTION 13130
POLYMER CONCRETE MANHOLE INSERT____
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13130 - 14
October 27, 2025
Penetrations cut through the insert wall shall be made with tools capable of cutting circular 
shapes. Use of a carbide blade chop saw or other tools that cut a straight edge shaped is 
strictly prohibited. Penetrations through the insert shall be sealed with an approved non 
shrink, acid resistant polymer grout material approved by the insert manufacture. 
3.10
PROTECTIVE BENCH COATING TESTING
Contractor shall perform spark test and pull test on applied coatings per Technical 
Specification Section 09710 – Concrete and Masonry Coatings.  
3.11
ACCEPTANCE
As a condition precedent to Final Acceptance of the work, Contractor shall certify the 
proper installation and testing of material provided under this section. Certification shall 
warrant that materials and installation are free of defects and/or workmanship and suitable 
for trouble-free operation under the conditions set forth in these Technical Specifications.
3.12
RECORD DRAWINGS: 
Prior to final payment, the Contractor shall provide a complete set of redlined Design 
Drawings showing the project as constructed including manhole insert depth, diameter, 
along with location and diameter of any insert penetrations and interior piping 
configurations. A spreadsheet and/or Design Drawings shall include all information 
required elsewhere in these Technical Specifications as well as any changes.
** END OF SECTION **

SECTION 13133
POLYPROPYLENE 
GRADE ADJUSTING RINGS
_
_
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13133 - 1
October 27, 2025
PART 1 - GENERAL
1.01
SCOPE
This Technical Specification defines the materials required for the adjustment of grade of 
manhole structures to surrounding area finish final grade elevation or as shown on the 
project Design Drawings.
1.02
WORK REQUIRED
In areas approved by the City, grade adjustment rings meeting the requirements of this 
section shall be used to adjust and support the frame and cover to the final elevation on all 
project manholes.
1.03
SYSTEM DESCRIPTION
A. Design Requirements – The grade adjustment rings shall be designed to allow final 
adjustment of the frame and cover to the surrounding grade. The rings shall also be 
designed to accommodate flat or sloping surfaces to within ¼-inch (one quarter inch) 
of the final elevation. The grade adjustment system shall have a minimum 50 (fifty) 
year design life.
B. Performance Requirements – The grade adjustment rings shall be capable of supporting 
the minimum requirements of AASHTO H-20 and HS-20, be UV stable and be resistant 
to chemicals and corrosion commonly associated with the sanitary sewer environments.
1.04
SUBMITTALS
The following submittal shall be provided in accordance with Technical Specification 
Section 01300 – SUBMITTALS:
1. Test Report: A test report from an approved third party testing agency showing the 
grade adjustment rings meets the minimum requirements of ASSHTO H-20 and HS-
20.
2. Certification: The manufacturer of the grade adjustment rings shall provide 
certification to the City stating that the product meets the design life and material 
requirements of this specification.
1.05
REFERENCES 
 
This Technical Specification Section contains references to the following documents.  
They are a part of this section as specified and modified.  In case of conflict between the

SECTION 13133
POLYPROPYLENE 
GRADE ADJUSTING RINGS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13133 - 2
October 27, 2025
requirements of this section and those of the listed documents, the requirements of this 
section shall prevail. 
AASHTO Loading 
American Association of State Highway and 
Transportation Officials - Anticipated external 
load to be placed on the pipe.
ASTM D3575
Standard Test Methods for Flexible Cellular 
Materials Made From Olefin Polymers.
ASTM C920
Standard Specification for Elastomeric Joint 
Sealants
PART 2 - PRODUCTS
2.01
MANHOLE GRADE ADJUSTMENT RING
Manhole grade adjustment rings shall consist of a variety of heights (thicknesses), 
diameters and shapes all conforming to the following requirements:
A. The grade adjustment rings shall be manufactured from expanded polypropylene 
(EPP), black, meeting ASTM D3575. The rings shall be manufactured using a high 
compression molding process to produce a finished density of 120 g/l ((7.5 pcf).
B. “Grade” adjustment rings may contain either an upper and lower keyway (tongue and 
groove) for vertical alignment and/or an adhesive trench on the underside with a flat 
top.
C. “Finish” or “Flat” rings may either have a keyway (groove) on the underside for vertical 
alignment and/or an adhesive trench with a flat upper surface. These rings shall be 
available in heights (thicknesses) which will allow final adjustment of the frame and 
cover or grate to within ¼” (one quarter inch) of the specified final elevation.
“Finish” rings may also have a keyway on the upper surface of the inner diameter to 
facilitate installation of an “Angle” ring.
D. “Angle” rings may either have an upper and lower keyway (tongue and groove) for 
vertical alignment and/or an adhesive trench on the underside. When required, the 
“Angle” ring or rings shall allow final adjustment of the frame and cover or grate to 
within ¼” (one quarter inch) of the specified final elevation.

SECTION 13133
POLYPROPYLENE 
GRADE ADJUSTING RINGS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13133 - 3
October 27, 2025
2.02
APPROVED MANUFACTURER 
1) Cretex Specialty Products Inc., N16 W23390 Stone Ridge Dr A, Waukesha, WI 53186 
PRO-RING™ 
2) Approved Equal
2.03
EQUIPMENT
The contractor shall have the required tools and equipment necessary to facilitate proper 
installation of the grade adjustment rings.
2.04
ADHESIVE/SEALANT
A. Any adhesive or sealant used for watertight installation of the manhole grade 
adjustment rings shall be M-1 Structural Adhesive/Sealant or equal meeting ASTM C-
920, Type S, Grade NS, Class 25, Uses NT, T, M, G, A and O.
B. Other adhesives or sealants may only be used with City’s written authorization.
2.05
REPAIR MORTAR
Repair mortar shall be a one component, quick set, high strength, non-shrink; polymer 
modified cementitious patching mortar, which has been formulated for vertical or overhead 
use meeting the requirements of ASTM C-109 for Compressive Strength, C-348 and C-78 
for Flexural Strength and C-882 for Slant Shear Bond Strength. Repair mortar shall not 
contain any chlorides, gypsums, plasters, iron particles, aluminum powder or gas-forming 
agents nor shall it promote the corrosion of any steel that it may come in contact with. 
Octocrete or approved equal.
Any repair mortar exposed to the environmentally corrosive environment of the manhole 
interior shall be coated with a vinyl ester polymer coating.
2.06
CEMENTITIOUS GROUT
Cementitious grout shall be a premixed, non-metallic, high strength, non-shrink grout 
which meets the requirements of ASTM C-191 and C-827 as well as CRD-C-588 and C-
621. When mixed to a mortar or "plastic" consistency, it shall have minimum one day and 
28 day compressive strength of 6,000 and 9,000 psi, respectively. Commercial Grade 
Quikrete Non-Shrink General Purpose Grout, Penn Grout, or approved equal.
Any cementitious grout exposed to the environmentally corrosive environment of the 
manhole interior shall be coated with a vinyl ester polymer coating per Technical 
Specification Section 09710 – Concrete and Masonry Coating.

SECTION 13133
POLYPROPYLENE 
GRADE ADJUSTING RINGS
_____________________________________________________________________________________________
City of Tempe
Dibble
Joint Tempe-Mesa Sewer Rehabilitation-2025
Project No.: 1016084.38
Project No.: 3221025B
13133 - 4
October 27, 2025
PART 3 - EXECUTION
3.01
INSTALLATION
A. Installation and surface preparation shall be in accordance with the grade ring 
manufacturer’s instructions.
B. The joint between the first grade ring and top of the manhole shall be sealed using an 
adhesive/sealant meeting the requirements of paragraph 2.03.
C. If the top of the manhole structure is not level or is irregular, then a non-shrink repair 
mortar meeting the requirements of Section 2.04 or non-shrink cementitious grout 
meeting the requirements of Section 2.05 shall be used. A bed of the specified mortar 
or grout shall be placed on the top surface of the utility structure and then the first 
grade ring shall be embedded and leveled into the bed of material.
D. The remaining joints between all manhole adjustment rings and the frame and cover 
or grate shall be sealed using an adhesive/sealant meeting the requirements of Section 
2.03.
E. No other materials shall be used in the construction of the grade adjustment area 
beyond those specified above. Prohibited materials include, but are not limited to 
wood or wood shims of any kind, concrete, brick, block, stones, etc.
** END OF SECTION **

JOINT TEMPE MESA SEWER REHABILITATION-2025 
BYPASS DRAWING 1 - PRIEST DR AND SOUTHERN AVE
SUCTION PIT
-EXCAVATION 30X40
SUBCUT 5' DEEP
-INSTALL 96' CMP TANK
-2 EA PUMPS
DISCHARGE MH0052
-CONE REMOVAL
-MILLED AND RECESSED PLATES
MH0021
SUCTION PIT
-EXCAVATION 30X80
SUBCUT 5' DEEP
-INSTALL 96' CMP TANK
-4 EA PUMPS
PRIEST DR
W MANHATTON DR
LA JOLLA DR
SOUTHERN AVE
TRENCHED BYPASS PIPING W/ STEEL PLATES
EXISTING 42" SEWER
TRENCHED BYPASS PIPING W/ STEEL PLATES

Pipe:
Pumps:
Peak Flow in GPM:
Metered Peak Flow Sewer Line:
Flow Rate Safety Factor:
Design Flow Rate (MGD):
Design Flow Rate (GPM):
15,833
22.800
150%
34.20
23,750
Bypass Pumping Writeup:
1,172.00
1,146.50
3.50
3.50
5.00
13.50
1165.10
-6.90
18"
4.00
0.00
1,200.00
12"
4.00
2.00
Extra pipe, gaskets, O-rings will be readily available to perform repair line. A Vac truck (if necessary), will be used to handle repair. 
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
42" Sewer Bypass Insituform 
Priest & Southern
Design Flow Rate Calculations:
Project Specification Requirements for Pipe and Pump Redundancy:
Bypass Setup Description:
Discharge Pipe:
Number of Discharge Lines with Sufficient Capacity for the Design Flow Rate:
150% Max Flow Rate
100% Additional, Fully Operable, Standby Pumps - unless multiple pumps required, then 50%
Suction Manhole:
Pump Containment:
HDPE Spill Berms will be Installed Under Each Pump in the Event of Any Spills and / or Leaks of Hazardous Materials such as Fuel, Oil, or Grease. 
Each (EA)
Pumping Equipment Information:
Pump Model:
Each (EA) 
Length of Each Discharge Line:
Linear Feet (LF)
Number of Redundant Discharge Lines:
Number of Pumps with Sufficient Capacity for the Design Flow Rate:
Silent Pump
Each Pump is Equipped with it's Own Fuel Storage Tank (Please See Pump Cutsheets for Respective Capacities).
1.) Design Hydraulic Calculations 
Additional Notes:
1.) All work will be Performed by B&F Technicians.
Attachments:
All Tools Required to Support Pump Mechanical and Pipe Integrity will be Available Onsite 24-Hours per Day. 
2.) Pump Performance Curves
3.) Design Flow Rate Data
Each Pump and will be Replenished a Minimum of One (1) Time per Day.
Each (EA) 
Number of Redundant Pumps:
Standby Power or Fuel Source:
Bypass Staffing Plan:
B&F will have one (1) employee on site during operations manning the pumps & inspecting the discharge pipe.
Not Applicable, No Laterials Pump Stations are part of this Bypass.
Lateral Flow Diversion Setups:
The temporary bypass will be HDPE. Adequate pumps placed to cover flow design.
Feet (Ft)
Feet (Ft)
MH0021 Rim Elevation:
Diameter of Pipe:
Manhole Surcharge
Subcut Excavation:
Feet (Ft)
Feet (Ft)
Feet (Ft)
Invert Elevation:
Each (EA)
Vertical Feet (VF)
Feet (Ft)
Vertical Feet (VF)
MH0052 Rim Elevation:
Suction & Discharge Rim Elevation Difference:
Discharge Manhole:
Discharge Piping Information:
Suction Lift:
HDPE DR26

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR17
15.755
25.50
3.50
3.50
5.00
13.50
23,750.00
4.00
5,937.50
13.50
5,937.50
40.00
15.00
18"
45.00
18"
45.00
18"
5.00
18"
Ls+Lred +Lentrance+L90+Lss
150.00
   GPM1.85 X L 
  C1.85 X D4.8655 
5,937.50
150.00
140.00
15.76
Q1 
2.45*D2 
13.50
32.54
18"
Pioneer Pump Suction Elevation
3.00
19.49
2.40
13.05
60'
(Hvp ) Vapor Pressure of Water at Sea Level
0.59
Silent Pump
------------>NPHSR:
13.00
19.49
YES
Lss =
LSS= Equivalent Length of Pipe for Suction Screen
Pipe Inside Diameter:
Inches (In)
Velocity (V) =
EQUALS (=)
9.76
Suction Velocity in Feet per Second (ft/s)
Total Flow Rate
Gallons Per Minute (GPM)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
(Hf )  HEAD LOSS = 10.44 X
EQUALS (=)
L90 =
L90= Equivalent Length of Pipe for 90° Elbow
Ls  =
Ls= Length of Suction Pipe / Hose (In Feet)
SUCTION PIPE EQUIVALENT LENGTHS FOR PIPE:
LReducer = 
LReducer = Equivalent Length of Reducer 
Feet (Ft)
 Suction Pit Subcut Depth:
Feet (Ft)
Hss =
Hss = Static Suction Lift (In Feet)
Q1   =
Q1= Rate of Flow (In Gallons Per Minute)
LEntrance = 
LEntrance = Equivalent Length For Pipe / Hose Entrance  
LSuction Equivalent =
LSuction Equivalent = TOTAL Equivalent length of Suction Piping (In Feet)
LSuction Equivalent =
SUCTION HAZEN-WILLIAMS EQUATION FOR PIPE:
Feet (Ft)
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
42" Sewer Bypass Insituform 
SUCTION PIPE CALCULATIONS FOR PIPE:
Rim to Invert Elevation:
Feet (Ft)
Total Flow Rate Per Pump:
Gallons Per Minute (GPM)
Total Suction Lift:
Vertical Feet (VF)
 Total Flow Rate:
Gallons Per Minute (GPM)
 Total Number of Pumps
Each (EA)
Inside Diameter of Pipe Under Bypass:
Feet (Ft)
Surcharge of Flow of Pipe Under Bypass:
(Hf) Head Loss (In Feet):
NPSH Available: 
SUCTION PIPE TOTAL DYNAMIC SUCTION HEAD (Hs):
Hss = Static Suction Lift (In Feet):
Project Elevation Atmospheric Pressure:
(Hs) TOTAL Dynamic Suction Head (In 
2.40
(Hf) Head Loss in Feet (Ft)
(Hs) TOTAL Dynamic Suction Head (In Feet):
NPSHA > NPSHR:

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR26
16.532
40.00
157.84
Ld+Lreducer+L90+Lcv +Lman +
197.84
   GPM1.85 X L 
  C1.85 X D4.8655 
5,937.50
1.00
5,937.50
197.84
140.00
16.53
Q1
2.45*D2 
Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR26
16.532
1,200.00
517.32
Ld+Lreducer+L90+Lcv +Lman +
1717.32
   GPM1.85 X L 
  C1.85 X D4.8655 
23,750.00
4.00
5,937.50
1,717.32
140.00
16.53
Q1
2.45*D2 
19.49
24.21
Potential Main Bypass Backpressure Head
0.00 Feet (Ft)
-6.90
36.80
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge Pipe from Manifold to Discharge Manhole
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge from Pumps to Manifold
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings = 
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
2.50
(Hfd) Head Loss in Feet (Ft)
 Pipe Length:
Feet (Ft)
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Lfittings = 
 Pipe Inside Diameter:
Inches (In)
Velocity (V) = 
EQUALS (=)
8.87
Discharge Velocity in Feet per Second (ft/s)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
Pipe Roughness:
Coefficient (C )
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
21.71
(Hfd) Head Loss in Feet (Ft)
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
 Pipe Inside Diameter:
Inches (In)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
TOTAL DYNAMIC HEAD (TDH):
(Hs) TOTAL Dynamic Suction Head:
Feet (Ft)
(Hd) TOTAL Dynamic Discharge Head:
Feet (Ft)
Velocity (V) = 
EQUALS (=)
8.87
Discharge Velocity in Feet per Second (ft/s)
HsD =
See Attached Performance Curve.
BACKUP PUMP SUMMARY:
B&F will provide (2) Each 6" Silent Diesel PUMP
HYDRAULIC PUMP CURVE SUMMARY:
 Pipe Inside Diameter:
TDH for 18-inch Suction & 18-inch to manifold - 18-inch Discharge MH Pipe System
PRIMARY PUMP FLOW RATE SUMMARY:
B&F will provide (4) Each 12" Silent Diesel PUMP

JOINT TEMPE MESA SEWER REHABILITATION-2025 
BYPASS DRAWING 2 - COLLEGE AVENUE
SUCTION MH0038
-REMOVE CONE
-3 EA PUMPS
SUCTION MH0005
- 2 EA PUMPS W/MANIFOLD
TRENCHED BYPASS PIPING IN
ASPHALT W/ STEEL PLATES
COLLEGE AVE
CARTER DR
MILL AVE
US 60
DISCHARGE MH0035
-REMOVE CONE
-PLATE DISCHARGE
-CURB & GUTTER R&R - 10 LF
1 EA 18" BYPASS
DISCHARGE PIPE
COLLEGE AVE
VALLEY GUTTER R&R - 60 LF
CURB & GUTTER R&R - 10 LF
SIDEWALK R&R - 25 SF
CONCRETE SCUPPER R&R TO 90 BEND AND DIP
PIPE UNDER DRIVEWAY - 90 SF
TRENCH & PLATE PIPINP - 29 LF
TRENCH IN GRASS, R&R SIDEWALK, AND PLATE
-CONCRETE R&R 25 SF
CLOSE DRIVEWAY
CLOSE SIDEWALK
TRENCH AND BURY PIPING
SIDEWALK - 25 SF 
 CURB & GUTTER R&R - 10 LF
PLATE BYPASS PIPING
AC REPLACEMENT

Pipe:
Pumps:
Peak Flow in GPM:
Metered Peak Flow Sewer Line:
Flow Rate Safety Factor:
Design Flow Rate (MGD):
Design Flow Rate (GPM):
4,217
6.072
150%
9.11
6,325
Bypass Pumping Writeup:
1,173.40
1,157.60
4.00
0.00
0.00
11.80
1170.60
-2.80
18"
1.00
0.00
3,700.00
12"
2.00
1.00
Extra pipe, gaskets, O-rings will be readily available to perform repair line. A Vac truck (if necessary), will be used to handle repair. 
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
36" Sewer Bypass Insituform 
College & US 60
Design Flow Rate Calculations:
Project Specification Requirements for Pipe and Pump Redundancy:
Bypass Setup Description:
Discharge Pipe:
Number of Discharge Lines with Sufficient Capacity for the Design Flow Rate:
150% Max Flow Rate
100% Additional, Fully Operable, Standby Pumps - unless multiple pumps required, then 50%
Suction Manhole:
Pump Containment:
HDPE Spill Berms will be Installed Under Each Pump in the Event of Any Spills and / or Leaks of Hazardous Materials such as Fuel, Oil, or Grease. 
Each (EA)
Pumping Equipment Information:
Pump Model:
Each (EA) 
Length of Each Discharge Line:
Linear Feet (LF)
Number of Redundant Discharge Lines:
Number of Pumps with Sufficient Capacity for the Design Flow Rate:
Silent Pump
Each Pump is Equipped with it's Own Fuel Storage Tank (Please See Pump Cutsheets for Respective Capacities).
1.) Design Hydraulic Calculations 
Additional Notes:
1.) All work will be Performed by B&F Technicians.
Attachments:
All Tools Required to Support Pump Mechanical and Pipe Integrity will be Available Onsite 24-Hours per Day. 
2.) Pump Performance Curves
3.) Design Flow Rate Data
Each Pump and will be Replenished a Minimum of One (1) Time per Day.
Each (EA) 
Number of Redundant Pumps:
Standby Power or Fuel Source:
Bypass Staffing Plan:
B&F will have one (1) employee on site during operations manning the pumps & inspecting the discharge pipe.
Not Applicable, No Laterials Pump Stations are part of this Bypass.
Lateral Flow Diversion Setups:
The temporary bypass will be HDPE. Adequate pumps placed to cover flow design.
Feet (Ft)
Feet (Ft)
MH0038 Rim Elevation:
Diameter of Pipe:
Manhole Surcharge
Subcut Excavation:
Feet (Ft)
Feet (Ft)
Feet (Ft)
Invert Elevation:
Each (EA)
Vertical Feet (VF)
Feet (Ft)
Vertical Feet (VF)
MH0035 Rim Elevation:
Suction & Discharge Rim Elevation Difference:
Discharge Manhole:
Discharge Piping Information:
Suction Lift:
HDPE DR26

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
12"
HDPE DR17
11.16
15.80
4.00
0.00
0.00
11.80
6,325.00
2.00
3,162.50
11.80
3,162.50
30.00
12.00
12"
29.00
12"
30.00
12"
5.00
12"
Ls+Lred +Lentrance+L90+Lss
106.00
   GPM1.85 X L 
  C1.85 X D4.8655 
3,162.50
106.00
140.00
11.16
Q1 
2.45*D2 
11.80
32.54
12"
Atlas Copco Suction Elevation
3.00
18.44
2.83
14.10
70'
(Hvp ) Vapor Pressure of Water at Sea Level
0.82
Silent Pump
------------>NPHSR:
8.00
18.44
YES
Lss =
LSS= Equivalent Length of Pipe for Suction Screen
Pipe Inside Diameter:
Inches (In)
Velocity (V) =
EQUALS (=)
10.36
Suction Velocity in Feet per Second (ft/s)
Total Flow Rate
Gallons Per Minute (GPM)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
(Hf )  HEAD LOSS = 10.44 X
EQUALS (=)
L90 =
L90= Equivalent Length of Pipe for 90° Elbow
Ls  =
Ls= Length of Suction Pipe / Hose (In Feet)
SUCTION PIPE EQUIVALENT LENGTHS FOR PIPE:
LReducer = 
LReducer = Equivalent Length of Reducer 
Feet (Ft)
 Suction Pit Subcut Depth:
Feet (Ft)
Hss =
Hss = Static Suction Lift (In Feet)
Q1   =
Q1= Rate of Flow (In Gallons Per Minute)
LEntrance = 
LEntrance = Equivalent Length For Pipe / Hose Entrance  
LSuction Equivalent =
LSuction Equivalent = TOTAL Equivalent length of Suction Piping (In Feet)
LSuction Equivalent =
SUCTION HAZEN-WILLIAMS EQUATION FOR PIPE:
Feet (Ft)
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
36" Sewer Bypass Insituform 
SUCTION PIPE CALCULATIONS FOR PIPE:
Rim to Invert Elevation:
Feet (Ft)
Total Flow Rate Per Pump:
Gallons Per Minute (GPM)
Total Suction Lift:
Vertical Feet (VF)
 Total Flow Rate:
Gallons Per Minute (GPM)
 Total Number of Pumps
Each (EA)
Inside Diameter of Pipe Under Bypass:
Feet (Ft)
Surcharge of Flow of Pipe Under Bypass:
(Hf) Head Loss (In Feet):
NPSH Available: 
SUCTION PIPE TOTAL DYNAMIC SUCTION HEAD (Hs):
Hss = Static Suction Lift (In Feet):
Project Elevation Atmospheric Pressure:
(Hs) TOTAL Dynamic Suction Head (In 
2.83
(Hf) Head Loss in Feet (Ft)
(Hs) TOTAL Dynamic Suction Head (In Feet):
NPSHA > NPSHR:

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
12"
HDPE DR26
11.71
30.00
106.60
Ld+Lreducer+L90+Lcv +Lman +
136.60
   GPM1.85 X L 
  C1.85 X D4.8655 
3,162.50
1.00
3,162.50
136.60
140.00
11.71
Q1
2.45*D2 
Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR26
16.532
3,700.00
517.32
Ld+Lreducer+L90+Lcv +Lman +
4217.32
   GPM1.85 X L 
  C1.85 X D4.8655 
6,325.00
1.00
6,325.00
4,217.32
140.00
16.53
Q1
2.45*D2 
18.44
62.81
Potential Main Bypass Backpressure Head
0.00 Feet (Ft)
-2.80
78.45
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge Pipe from Manifold to Discharge Manhole
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge from Pumps to Manifold
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings = 
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
2.88
(Hfd) Head Loss in Feet (Ft)
 Pipe Length:
Feet (Ft)
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Lfittings = 
 Pipe Inside Diameter:
Inches (In)
Velocity (V) = 
EQUALS (=)
9.41
Discharge Velocity in Feet per Second (ft/s)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
Pipe Roughness:
Coefficient (C )
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
59.92
(Hfd) Head Loss in Feet (Ft)
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
 Pipe Inside Diameter:
Inches (In)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
TOTAL DYNAMIC HEAD (TDH):
(Hs) TOTAL Dynamic Suction Head:
Feet (Ft)
(Hd) TOTAL Dynamic Discharge Head:
Feet (Ft)
Velocity (V) = 
EQUALS (=)
9.45
Discharge Velocity in Feet per Second (ft/s)
HsD =
See Attached Performance Curve.
BACKUP PUMP SUMMARY:
B&F will provide (1) Each 12" Silent Diesel PUMP
HYDRAULIC PUMP CURVE SUMMARY:
 Pipe Inside Diameter:
TDH for 12-inch Suction & 12-inch to manifold - 18-inch Discharge MH Pipe System
PRIMARY PUMP FLOW RATE SUMMARY:
B&F will provide (2) Each 12" Silent Diesel PUMP

JOINT TEMPE MESA SEWER REHABILITATION-2025 
BYPASS DRAWING 3 - PRIEST AND 16TH ST
16TH ST
15TH ST
14TH ST
13TH ST
TRENCHED BYPASS
PIPING W/ STEEL PLATES
DISCHARGE MH0001
-CONE REMOVAL
-MILLED AND RECESSED PLATES
14TH ST
PRIEST DR
MH TO BE REHABILITATED
2 EA 18" DISCHARGE PIPES
-1 EA CONE PULL
-3 EA 8" PUMP
-1 EA CMP SUCTION PITS
-3 EA 12" PUMP

Pipe:
Pumps:
Peak Flow in GPM:
Metered Peak Flow Sewer Line:
Flow Rate Safety Factor:
Design Flow Rate (MGD):
Design Flow Rate (GPM):
6,250
9.000
150%
13.50
9,375
Bypass Pumping Writeup:
1,147.10
1,129.70
4.00
0.00
0.00
13.40
1147.60
0.50
18"
2.00
0.00
1,200.00
12"
2.00
1.00
Extra pipe, gaskets, O-rings will be readily available to perform repair line. A Vac truck (if necessary), will be used to handle repair. 
Each (EA)
Vertical Feet (VF)
Feet (Ft)
Vertical Feet (VF)
MH0001 Rim Elevation:
Suction & Discharge Rim Elevation Difference:
Discharge Manhole:
Discharge Piping Information:
Suction Lift:
HDPE DR26
The temporary bypass will be HDPE. Adequate pumps placed to cover flow design.
Feet (Ft)
Feet (Ft)
MH0035 Rim Elevation:
Diameter of Pipe:
Manhole Surcharge
Subcut Excavation:
Feet (Ft)
Feet (Ft)
Feet (Ft)
Invert Elevation:
All Tools Required to Support Pump Mechanical and Pipe Integrity will be Available Onsite 24-Hours per Day. 
2.) Pump Performance Curves
3.) Design Flow Rate Data
Each Pump and will be Replenished a Minimum of One (1) Time per Day.
Each (EA) (1) 8" & (1) 12" back-up pumps
Number of Redundant Pumps:
Standby Power or Fuel Source:
Bypass Staffing Plan:
B&F will have one (1) employee on site during operations manning the pumps & inspecting the discharge pipe.
Not Applicable, No Laterials Pump Stations are part of this Bypass.
Lateral Flow Diversion Setups:
Each Pump is Equipped with it's Own Fuel Storage Tank (Please See Pump Cutsheets for Respective Capacities).
1.) Design Hydraulic Calculations 
Additional Notes:
1.) All work will be Performed by B&F Technicians.
Attachments:
Pump Containment:
HDPE Spill Berms will be Installed Under Each Pump in the Event of Any Spills and / or Leaks of Hazardous Materials such as Fuel, Oil, or Grease. 
Each (EA)
Pumping Equipment Information:
Pump Model:
Each (EA) 
Length of Each Discharge Line:
Linear Feet (LF)
Number of Redundant Discharge Lines:
Number of Pumps with Sufficient Capacity for the Design Flow Rate:
Silent Pump (2) 8" & (2) 12" Primary Pumps
Design Flow Rate Calculations:
Project Specification Requirements for Pipe and Pump Redundancy:
Bypass Setup Description:
Discharge Pipe:
Number of Discharge Lines with Sufficient Capacity for the Design Flow Rate:
150% Max Flow Rate
100% Additional, Fully Operable, Standby Pumps - unless multiple pumps required, then 50%
Suction Manhole:
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
48" Sewer Bypass Insituform 
Priest & 16th St. 12" Pumps
2 -12" pumps & 1 back-up

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR17
15.755
17.40
4.00
0.00
0.00
13.40
9,375.00
2.00
4,687.50
13.40
4,687.50
30.00
15.00
18"
45.00
18"
45.00
18"
5.00
18"
Ls+Lred +Lentrance+L90+Lss
140.00
   GPM1.85 X L 
  C1.85 X D4.8655 
4,687.50
140.00
140.00
15.76
Q1 
2.45*D2 
13.40
32.57
8"
Atlas Copco Suction Elevation
2.77
18.20
1.44
14.37
60'
(Hvp ) Vapor Pressure of Water at Sea Level
0.59) 12" Primary Pumps
------------>NPHSR:
10.00
18.20
YES
(Hs) TOTAL Dynamic Suction Head (In Feet):
NPSHA > NPSHR:
(Hf) Head Loss (In Feet):
NPSH Available: 
SUCTION PIPE TOTAL DYNAMIC SUCTION HEAD (Hs):
Hss = Static Suction Lift (In Feet):
Project Elevation Atmospheric Pressure:
(Hs) TOTAL Dynamic Suction Head (In 
1.44
(Hf) Head Loss in Feet (Ft)
LSuction Equivalent =
LSuction Equivalent = TOTAL Equivalent length of Suction Piping (In Feet)
LSuction Equivalent =
SUCTION HAZEN-WILLIAMS EQUATION FOR PIPE:
Feet (Ft)
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
48" Sewer Bypass Insituform 
SUCTION PIPE CALCULATIONS FOR PIPE:
Rim to Invert Elevation:
Feet (Ft)
Total Flow Rate Per Pump:
Gallons Per Minute (GPM)
Total Suction Lift:
Vertical Feet (VF)
 Total Flow Rate:
Gallons Per Minute (GPM)
 Total Number of Pumps
Each (EA)
Inside Diameter of Pipe Under Bypass:
Feet (Ft)
Surcharge of Flow of Pipe Under Bypass:
Feet (Ft)
 Suction Pit Subcut Depth:
Feet (Ft)
Hss =
Hss = Static Suction Lift (In Feet)
Q1   =
Q1= Rate of Flow (In Gallons Per Minute)
LEntrance = 
LEntrance = Equivalent Length For Pipe / Hose Entrance  
L90 =
L90= Equivalent Length of Pipe for 90° Elbow
Ls  =
Ls= Length of Suction Pipe / Hose (In Feet)
SUCTION PIPE EQUIVALENT LENGTHS FOR PIPE:
LReducer = 
LReducer = Equivalent Length of Reducer 
Lss =
LSS= Equivalent Length of Pipe for Suction Screen
Pipe Inside Diameter:
Inches (In)
Velocity (V) =
EQUALS (=)
7.71
Suction Velocity in Feet per Second (ft/s)
Total Flow Rate
Gallons Per Minute (GPM)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
(Hf )  HEAD LOSS = 10.44 X
EQUALS (=)

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
12"
HDPE DR26
11.71
40.00
106.60
Ld+Lreducer+L90+Lcv +Lman +
146.60
   GPM1.85 X L 
  C1.85 X D4.8655 
4,687.50
1.00
4,687.50
146.60
140.00
11.71
Q1
2.45*D2 
Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR26
16.532
1,200.00
517.32
Ld+Lreducer+L90+Lcv +Lman +
1717.32
   GPM1.85 X L 
  C1.85 X D4.8655 
9,375.00
2.00
4,687.50
1,717.32
140.00
16.53
Q1
2.45*D2 
18.20
20.43
Potential Main Bypass Backpressure Head
0.00 Feet (Ft)
0.50
39.13
HsD =
See Attached Performance Curve.
BACKUP PUMP SUMMARY:
B&F will provide (2) Each 8" & 12" Silent Diesel PUMP(S)
HYDRAULIC PUMP CURVE SUMMARY:
 Pipe Inside Diameter:
TDH for 18-inch Suction & 12-inch to manifold - 18-inch Discharge MH Pipe System
PRIMARY PUMP FLOW RATE SUMMARY:
B&F will provide (4) Each 8" & 12" Silent Diesel PUMP(S)
TOTAL DYNAMIC HEAD (TDH):
(Hs) TOTAL Dynamic Suction Head:
Feet (Ft)
(Hd) TOTAL Dynamic Discharge Head:
Feet (Ft)
Velocity (V) = 
EQUALS (=)
7.00
Discharge Velocity in Feet per Second (ft/s)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
 Pipe Inside Diameter:
Inches (In)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
14.02
(Hfd) Head Loss in Feet (Ft)
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Lfittings = 
 Pipe Inside Diameter:
Inches (In)
Velocity (V) = 
EQUALS (=)
13.95
Discharge Velocity in Feet per Second (ft/s)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
Pipe Roughness:
Coefficient (C )
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge Pipe from Manifold to Discharge Manhole
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge from Pumps to Manifold
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings = 
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
6.41
(Hfd) Head Loss in Feet (Ft)
 Pipe Length:
Feet (Ft)
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)

Pipe:
Pumps:
Peak Flow in GPM:
Metered Peak Flow Sewer Line:
Flow Rate Safety Factor:
Design Flow Rate (MGD):
Design Flow Rate (GPM):
3,009
4.333
150%
6.50
4,514
Bypass Pumping Writeup:
1,147.10
1,129.70
4.00
0.00
0.00
13.40
1147.60
0.50
18"
2.00
0.00
1,200.00
8"
2.00
1.00
Extra pipe, gaskets, O-rings will be readily available to perform repair line. A Vac truck (if necessary), will be used to handle repair. 
Each (EA)
Vertical Feet (VF)
Feet (Ft)
Vertical Feet (VF)
MH0001 Rim Elevation:
Suction & Discharge Rim Elevation Difference:
Discharge Manhole:
Discharge Piping Information:
Suction Lift:
HDPE DR26
The temporary bypass will be HDPE. Adequate pumps placed to cover flow design.
Feet (Ft)
Feet (Ft)
MH0035 Rim Elevation:
Diameter of Pipe:
Manhole Surcharge
Subcut Excavation:
Feet (Ft)
Feet (Ft)
Feet (Ft)
Invert Elevation:
All Tools Required to Support Pump Mechanical and Pipe Integrity will be Available Onsite 24-Hours per Day. 
2.) Pump Performance Curves
3.) Design Flow Rate Data
Each Pump and will be Replenished a Minimum of One (1) Time per Day.
Each (EA) (1) 8" & (1) 12" back-up pumps
Number of Redundant Pumps:
Standby Power or Fuel Source:
Bypass Staffing Plan:
B&F will have one (1) employee on site during operations manning the pumps & inspecting the discharge pipe.
Not Applicable, No Laterials Pump Stations are part of this Bypass.
Lateral Flow Diversion Setups:
Each Pump is Equipped with it's Own Fuel Storage Tank (Please See Pump Cutsheets for Respective Capacities).
1.) Design Hydraulic Calculations 
Additional Notes:
1.) All work will be Performed by B&F Technicians.
Attachments:
Pump Containment:
HDPE Spill Berms will be Installed Under Each Pump in the Event of Any Spills and / or Leaks of Hazardous Materials such as Fuel, Oil, or Grease. 
Each (EA)
Pumping Equipment Information:
Pump Model:
Each (EA) 
Length of Each Discharge Line:
Linear Feet (LF)
Number of Redundant Discharge Lines:
Number of Pumps with Sufficient Capacity for the Design Flow Rate:
Silent Pump (2) 8" & (2) 12" Primary Pumps
Design Flow Rate Calculations:
Project Specification Requirements for Pipe and Pump Redundancy:
Bypass Setup Description:
Discharge Pipe:
Number of Discharge Lines with Sufficient Capacity for the Design Flow Rate:
150% Max Flow Rate
100% Additional, Fully Operable, Standby Pumps - unless multiple pumps required, then 50%
Suction Manhole:
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
48" Sewer Bypass Insituform 
Priest & 16th St. 8" Pumps
2 -8" pumps & 1 back-up

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
12"
HDPE DR17
11.16
17.40
4.00
0.00
0.00
13.40
4,513.85
2.00
2,256.93
13.40
2,256.93
25.00
12.00
12"
29.00
12"
30.00
12"
5.00
12"
Ls+Lred +Lentrance+L90+Lss
101.00
   GPM1.85 X L 
  C1.85 X D4.8655 
2,256.93
101.00
140.00
11.16
Q1 
2.45*D2 
13.40
32.57
8"
Atlas Copco Suction Elevation
2.77
18.20
1.44
14.37
60'
(Hvp ) Vapor Pressure of Water at Sea Level
0.59) 12" Primary Pumps
------------>NPHSR:
10.00
18.20
YES
(Hs) TOTAL Dynamic Suction Head (In Feet):
NPSHA > NPSHR:
(Hf) Head Loss (In Feet):
NPSH Available: 
SUCTION PIPE TOTAL DYNAMIC SUCTION HEAD (Hs):
Hss = Static Suction Lift (In Feet):
Project Elevation Atmospheric Pressure:
(Hs) TOTAL Dynamic Suction Head (In 
1.44
(Hf) Head Loss in Feet (Ft)
LSuction Equivalent =
LSuction Equivalent = TOTAL Equivalent length of Suction Piping (In Feet)
LSuction Equivalent =
SUCTION HAZEN-WILLIAMS EQUATION FOR PIPE:
Feet (Ft)
City of Tempe
Joint Tempe - Mesa Sewer Rehab 2025
48" Sewer Bypass Insituform 
SUCTION PIPE CALCULATIONS FOR PIPE:
Rim to Invert Elevation:
Feet (Ft)
Total Flow Rate Per Pump:
Gallons Per Minute (GPM)
Total Suction Lift:
Vertical Feet (VF)
 Total Flow Rate:
Gallons Per Minute (GPM)
 Total Number of Pumps
Each (EA)
Inside Diameter of Pipe Under Bypass:
Feet (Ft)
Surcharge of Flow of Pipe Under Bypass:
Feet (Ft)
 Suction Pit Subcut Depth:
Feet (Ft)
Hss =
Hss = Static Suction Lift (In Feet)
Q1   =
Q1= Rate of Flow (In Gallons Per Minute)
LEntrance = 
LEntrance = Equivalent Length For Pipe / Hose Entrance  
L90 =
L90= Equivalent Length of Pipe for 90° Elbow
Ls  =
Ls= Length of Suction Pipe / Hose (In Feet)
SUCTION PIPE EQUIVALENT LENGTHS FOR PIPE:
LReducer = 
LReducer = Equivalent Length of Reducer 
Lss =
LSS= Equivalent Length of Pipe for Suction Screen
Pipe Inside Diameter:
Inches (In)
Velocity (V) =
EQUALS (=)
7.40
Suction Velocity in Feet per Second (ft/s)
Total Flow Rate
Gallons Per Minute (GPM)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
(Hf )  HEAD LOSS = 10.44 X
EQUALS (=)

Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
8"
BRS HOSE
8
20.00
71.50
Ld+Lreducer+L90+Lcv +Lman +
91.50
   GPM1.85 X L 
  C1.85 X D4.8655 
2,256.93
1.00
2,256.93
91.50
140.00
8.00
Q1
2.45*D2 
Pipe / Hose Size
Pipe / Hose material
Pipe / Hose ID (inches)
18"
HDPE DR26
16.532
1,200.00
517.32
Ld+Lreducer+L90+Lcv +Lman +
1717.32
   GPM1.85 X L 
  C1.85 X D4.8655 
4,513.85
2.00
2,256.93
1,717.32
140.00
16.53
Q1
2.45*D2 
18.20
10.23
Potential Main Bypass Backpressure Head
0.00 Feet (Ft)
0.50
28.93
HsD =
See Attached Performance Curve.
BACKUP PUMP SUMMARY:
B&F will provide (2) Each 8" & 12" Silent Diesel PUMP(S)
HYDRAULIC PUMP CURVE SUMMARY:
 Pipe Inside Diameter:
TDH for 12-inch Suction & 8-inch to manifold - 18-inch Discharge MH Pipe System
PRIMARY PUMP FLOW RATE SUMMARY:
B&F will provide (4) Each 8" & 12" Silent Diesel PUMP(S)
TOTAL DYNAMIC HEAD (TDH):
(Hs) TOTAL Dynamic Suction Head:
Feet (Ft)
(Hd) TOTAL Dynamic Discharge Head:
Feet (Ft)
Velocity (V) = 
EQUALS (=)
3.37
Discharge Velocity in Feet per Second (ft/s)
 Pipe Length:
Feet (Ft)
Pipe Roughness:
Coefficient (C )
 Pipe Inside Diameter:
Inches (In)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)
3.63
(Hfd) Head Loss in Feet (Ft)
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Lfittings = 
 Pipe Inside Diameter:
Inches (In)
Velocity (V) = 
EQUALS (=)
14.39
Discharge Velocity in Feet per Second (ft/s)
 Total Flow Rate:
Gallons Per Minute (GPM)
Number of Pipes:
Each (EA)
Flow Rate Per Pipe
Gallons Per Minute (GPM)
Pipe Roughness:
Coefficient (C )
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge Pipe from Manifold to Discharge Manhole
DISCHARGE PIPE CALCULATIONS FOR PIPE:
Discharge from Pumps to Manifold
Ld  =
Ld= Length of Discharge Pipe / Hose (In Feet)
Lfittings = 
Lfittings - The Length of the Miscellaneous Fittings, Valves and Manifolds of the System.
Ldischarge Equiv =
Ldischarge Equiv  = Total Equivalent Length of Discharge Piping (In Feet)
Ldischarge Equiv =
6.60
(Hfd) Head Loss in Feet (Ft)
 Pipe Length:
Feet (Ft)
Feet (Ft)
DISCHARGE HAZEN-WILLIAMS EQUATION FOR PIPE:
(Hfd )  HEAD LOSS = 10.44 X
EQUALS (=)