Summary Sheet- RFCA SUMMARY
Extracted text (via pymupdf)
2269 characters
CITY OF TEMPE Meeting Date: 3/26/2026 REQUEST FOR COUNCIL ACTION Agenda Item: 8A7 ACTION: Award a construction contract to Achen-Gardner, L.L.C., for Project No. 3221025 – Wastewater Collection System Rehabilitation. FISCAL IMPACT: The contract amount is $1,501,367.51 and the contingency is $225,000. Funds to cover this contract and related expenses are appropriated in Fiscal Year 2025/26 and future years, contingent upon City Council approval of the City’s annual budget, from the Capital Improvement Project No 3221099 (Wastewater Collection System Upgrades and Improvements.) RECOMMENDATION: Award contract BACKGROUND INFORMATION: The City of Tempe Wastewater Collection system includes approximately 500 miles of gravity sewer mains and more than 10,000 manholes. The Public Works Department - Water Utilities Division’s asset management program involves inspections and assessments of 60 miles of pipeline and 1,000 manholes each year. Maintaining the structural and operational condition of this system is critical to public health. As part of this effort, a consultant supplements in-house inspection capabilities and generates an annual summary report that prioritizes needed pipeline and manhole rehabilitation projects. This contract is to award the construction contract to the lowest approved bidder selected through the Invitation to Bid process. Scope of Work: Rehabilitation of 26 sewer pipe segments: Install cured-in-place-pipe Open cut sanitary sewer pipe replacement Relocate cross bore utility Rehabilitation of 8 manholes: Repair existing manhole liners Apply epoxy coating to the manhole interior Install corrosion-resistant structural manhole inserts Remove and replace frame and covers, chimneys, and cones. Divert sewer flow as required ATTACHMENTS: 1. 3221025-CON-ACHEN-GARDNER CONSTRUCTION-WASTEWATER COLLECTION SYSTEM REHABILITATION 2025.PDF STAFF CONTACT(S): Jodie Inman, P.E., Deputy Public Works Director - Engineering, (480) 350- 2972; Craig Caggiano, Deputy Public Works Director - Water Utilities, (480) 858-2160 Department Director: Tara Ford, Public Works Director Legal review by: Dave Park, Sr. Assistant City Attorney Prepared by: Decima Sever, Administrative Manager