Summary Sheet- RFCA SUMMARY
Extracted text (via pymupdf)
2354 characters
CITY OF TEMPE Meeting Date: 4/16/2026 REQUEST FOR COUNCIL ACTION Agenda Item: 7B11 ACTION: Award a professional services contract to T.Y. Lin International, Inc., for Project No. 6011191 - Rio Salado Upstream Pedestrian Bridge. FISCAL IMPACT: The professional services contract amount is $142,634.13. Funds to cover this contract, related costs and any future addenda are appropriated in fiscal year 2025/26 in the Capital Improvement Project No. 6011191 (Rio Salado Upstream Pedestrian Bridge). RECOMMENDATION: Award contract BACKGROUND INFORMATION: First identified in Tempe’s General Plan and Transportation Master Plan, this project has received a notice of award for $25,000,000 from the Federal Highway Administration RAISE program for the construction of a 1.25-mile multi-use path and pedestrian bridge on the east side of Rio Salado within Tempe. This project will refresh Tempe’s segment of the existing Indian Bend Wash path, provide a new multi-use path along the missing gap of the Rio Salado North Bank, and provide a new pedestrian bridge utilizing the existing upstream dam pier caps to connect the Rio Salado North and South Banks. Once complete, the project will allow for a complete off-street path loop of the Rio Salado Path system in Tempe and allow for direct off-street path connections to the cities of Mesa, Scottsdale and Phoenix. The following scope of work is the first step required to progress the project into the final design phase. Scope of Work: Provide the following pre-design permitting services to prepare the necessary documentation to obtain a US Army Corps of Engineers (USACE) Section 408 Permit: Utility and Right-of-Way mapping Preliminary civil/structural design and specifications Grading, Layout, Profiles and Cross-Section Plans Cultural Resources Report Section 408 Permit Application Package ATTACHMENTS: 1. 6011191-CON-T.Y. LIN INTERNATION-RIO SALADO UPSTREAM PEDESTRIAN BRIDGE - PRE- DESIGN PERMITTING AND RESEARCH.PDF STAFF CONTACT(S): Jodie Inman, P.E., Deputy Public Works Director - Engineering, (480) 350- 2972; Shelly Seyler P.E, Deputy Transportation & Sustainability Director, (480) 350-8854 Department Director: Tara Ford, Public Works Director Legal review by: Dave Park, Sr. Assistant City Attorney Prepared by: Decima Sever, Administrative Manager