1.
Zoning Map
2.
Aerial Map
3-16.
Letter of Explanation
17-18.
General Plan Designation (Existing and Proposed)
19-20.
Zoning Designation (Existing and Proposed)
21-23.
Planned Area Development (Proposed)
24.
Conceptual Site Plan
25-28.
Conceptual Building Elevations
29-49.
Neighborhood Meeting Summary and Public Input, received as of
December 30, 2025
50-55.
Context Photos
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! !
! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Enterprise GIS and Data Analytics Group; City of Tempe
, Vantor
General Industrial District (GID)
! ! ! ! ! !
! ! ! ! ! !
! ! ! ! ! ! Mixed Use High (MU-4)
Agricultural (AG)
.
LEGEND CITY DISTRICT AT PAPAGO
PL250252
EXHIBIT 1
SITE
GID
Enterprise GIS and Data Analytics Group; City of Tempe
, Vantor
²
Aerial Map
LEGEND CITY DISTRICT AT PAPAGO
PL250252
EXHIBIT 2
Date: December 19, 2025
To:
City of Tempe Community Development Department
Planning Division
Re: Submittal of the General Plan Amendment Application from Commercial
to Mixed-Use High at 1600 North Priest Drive, Tempe, AZ
Subject: Letter of Explanation
Dear Staff Members,
Thank you again for taking the time to review and understand the submittal of our
General Plan Amendment application for 1600 North Priest Drive
This letter provides a detailed response to the Criteria for Considering a General
Plan Amendment as identified in the Land Use and Development Chapter of the
City of Tempe’s General Plan. The request seeks to amend the General Plan
land use designation for the approximately 19.17-acre site at 1600 North Priest
Drive from Commercial to Mixed Use-High Density, in order to facilitate a
comprehensive multi-family residential development with supporting amenities
and Live/Work units.
The subject property is located within the 300-acre Papago Park Center mixed-use
development. Surrounding area uses include several office buildings and
complexes within the larger Papago Park Center development, including the
corporate headquarters for SRP and First Solar, regional offices for Towers Watson,
Wells Fargo, and Sonora Quest Labs, The Lofts at Rio Salado apartment
community, as well as limited restaurant and retail space. Tempe Town Lake is
approximately 1/2 mile to the southeast, and the Marquee Theatre is at the
southwest corner of Mill Avenue and Washington Street. Papago Park is
approximately 1 mile to the north. Existing buildings within the larger Papago Park
Center development typically range from one to six stories in height. Washington
Street and the METRO Light Rail is a short walk to the south.
EXHIBIT 3
1. Quantitative Impacts of the Proposed Amendment
The existing Commercial designation anticipates employment-oriented uses
such as warehousing, manufacturing, and logistics, which typically generate high
volumes of truck traffic, limited pedestrian activity, and single-use development
patterns. In contrast, the proposed Mixed Use-High Density designation supports
residential, Live/Work, and supporting amenity uses within a compact urban
form.
Quantitatively, the proposed amendment shifts the site from a predominantly
employment-industrial land use to a residential-focused mixed-use development
with four five-story residential buildings and structured parking. This change
increases residential density while significantly reducing heavy industrial traffic,
noise, and the negative environmental impacts typically associated with industrial
uses. The proposed development introduces structured parking, integrated open
space, and internal pedestrian circulation, resulting in more efficient land
utilization and improved compatibility with surrounding office, residential, and
mixed-use development within Papago Park Center.
2. Justification for the Amendment and Public Benefit
The proposed amendment provides both short-term and long-term public benefits
consistent with the Land Use Principles and objectives of the General Plan 2050.
In the short term, the project represents a substantial private investment that will
generate construction employment and immediate economic activity. In the long
term, it adds needed housing supply in proximity to employment centers, transit,
and amenities, helping the City meet housing demand while reducing regional
commuting pressures.
The amendment supports General Plan objectives by promoting infill
development, encouraging redevelopment of underutilized land, and
implementing higher-density mixed-use development in areas served by existing
infrastructure. The inclusion of Live/Work units further supports economic
diversification and small business opportunities, reinforcing Tempe’s role as a
center for innovation and employment.
3. Long-Term and Short-Term Public Benefit and Citywide Objectives
From a citywide perspective, the amendment advances General Plan 2050 goals
by aligning land use with Tempe’s long-term vision for compact, transit-
EXHIBIT 4
supportive, and mixed-use development. Short-term benefits include increased
investment, activation of the site, and improved site aesthetics. Long-term
benefits include expanded housing choice, enhanced economic resilience,
reduced vehicle miles traveled due to proximity to employment and transit, and
efficient use of public infrastructure.
The amendment directly supports the General Plan’s emphasis on livability,
sustainability, and economic competitiveness by enabling development that
integrates living, working, and recreational opportunities within a walkable and
transit-accessible environment.
4. Impact on Projected Land Use Within One-Half Mile
Within a one-half-mile radius, the area is characterized by a mix of office
campuses, existing multi-family residential communities, limited retail uses, and
major regional amenities such as Papago Park, Tempe Town Lake and the
METRO Light Rail. The proposed Mixed Use-High Density designation is
compatible with this evolving context and supports the transition of the area
toward a more balanced mix of employment and residential uses.
Rather than introducing conflicting land uses, the amendment complements
surrounding development by providing employees for nearby businesses,
housing near major employment centers and transit, reducing commuting
distances and reinforcing the mixed-use character envisioned for North Tempe.
5. Response to Land Use Principles
a. Public Benefit of Increased Intensity
The increased intensity associated with Mixed Use-High Density provides a
public benefit by replacing potential industrial impacts with residential and
Live/Work uses that are more compatible with surrounding office and residential
developments. The amendment reduces industrial-related nuisances while
enhancing neighborhood compatibility and site activation at an underutilized
property.
b. Impact on City Infrastructure
The proposed development leverages existing infrastructure, including water,
sewer, streets, and transit services. Residential and mixed-use development
generates fewer peak-hour and heavy vehicle trips than industrial uses and is
well supported by nearby METRO Light Rail and bus service. Emergency access
EXHIBIT 5
and public safety services are accommodated through coordinated site planning
and existing service capacity.
c. Quality of Life and Design
The project incorporates high-quality site and building design, integrated
landscaping, structured parking, and pedestrian-oriented circulation. The
development provides access between residential, Live/Work, and amenity
spaces, supports multimodal transportation, and reduces physical barriers
through thoughtful site planning. The project contributes to a complete
neighborhood environment that supports daily living needs.
d. Open Space and Recreation
The development includes landscaped open spaces, outdoor terraces, swimming
pools, and recreational amenities that serve residents while contributing visually
to the broader area. These spaces link residential uses internally and do not
negatively impact existing public parks, while benefiting from proximity to Tempe
Town Lake, The Desert Botanical Garden, The Phoenix Zoo, and Papago Park.
e. Transit and Circulation Objectives
The project supports regional and local transit objectives by locating higher-
density residential development within walking distance of METRO Light Rail and
arterial streets. The internal circulation system prioritizes pedestrian connectivity
and integrates with the surrounding street network, supporting multimodal
mobility consistent with City transportation goals.
f. Impact on School Districts
The mix of unit types and urban location near employment centers and transit is
anticipated to generate a moderate school-age population relative to traditional
suburban residential development. Existing school facilities are expected to
accommodate the projected enrollment, and the project does not impose a
disproportionate burden on school district resources.
g. Additional Quality of Life Components
Additional quality-of-life benefits include proximity to employment centers, access
to transit, on-site fitness and community amenities, Live/Work opportunities, and
integration with the existing Papago Park Center development. These features
contribute to Tempe’s vision of a livable, connected, and sustainable urban
community.
EXHIBIT 6
Summary
The proposed General Plan Amendment from Commercial to Mixed Use- High
Density is consistent with the City of Tempe’s General Plan 2050 and advances
its long-term objectives related to land use efficiency, economic development,
housing diversity, transportation choice, and sustainability. The amendment
provides clear public benefits, is compatible with surrounding land uses and
supports the continued evolution of North Tempe as a vibrant, mixed-use area.
The proposed amendment will substantially conform to the following
standards of Zoning & Development Code Criteria Section 6-302(D):
The requested amendment to allow Mixed Use-High Density development
substantially conforms to the approval criteria outlined in Section 6-302(D) of the
City of Tempe Zoning and Development Code, as described below.
1. Appropriate Short- and Long-Term Public Benefits
The proposed amendment provides both immediate and lasting public benefits.
In the short term, the redevelopment represents significant private investment in
an underutilized site, generating construction employment and economic activity.
In the long term, the project introduces high-quality residential development
within a major employment center and transit-served corridor, supporting housing
availability, economic vitality, and efficient land use. The inclusion of Live/Work
units further enhances long-term economic resilience by supporting small
business activity and flexible work arrangements.
2. Mitigation of Impacts on Land Use, Water Infrastructure, and
Transportation
The proposed Mixed Use-High Density designation replaces a Commercial
designation that could generate greater land use conflicts, heavier vehicle traffic,
and increased infrastructure demands. Residential and mixed-use development
generates fewer peak-hour and heavy truck trips and is better suited to the
surrounding office, residential, and mixed-use context of Papago Park Center.
The project leverages existing water, sewer, and utility infrastructure and
incorporates modern, water-efficient landscaping and building systems to
minimize long-term resource consumption. Transportation impacts are mitigated
EXHIBIT 7
through proximity to METRO Light Rail, Valley Metro bus routes, pedestrian
connections, and bicycle facilities, reducing reliance on single-occupancy vehicle
trips.
3. Advancement of General Plan Objectives
The amendment directly supports multiple objectives of the City of Tempe
General Plan 2050, including infill development, transit-oriented land use,
housing diversity, and economic development. By concentrating higher-density
residential uses near employment centers and transit infrastructure, the project
advances the City’s goals for compact development, multimodal mobility, and
sustainable growth patterns.
4. Provision of Public Amenities and Community Benefits
The project provides meaningful on-site amenities that contribute to the public
realm, including landscaped open spaces, outdoor terraces, swimming pools,
and pedestrian-oriented circulation. These amenities enhance visual quality and
livability while complementing nearby regional amenities such as Tempe Town
Lake and Papago Park. The site’s location and design further support transit
access and walkability, reinforcing broader public transportation and connectivity
objectives.
5. Mitigation of Potentially Negative Influences
Potential impacts related to building height, density, traffic, and compatibility have
been carefully evaluated and mitigated through thoughtful site planning, building
placement, and design standards. Building heights and massing are consistent
with previously approved entitlements within Papago Park Center, and the
proposed uses are compatible with surrounding development. Any remaining
impacts are limited, manageable, and deemed acceptable within the context of
the area’s planned evolution as a mixed-use, transit-supportive environment.
EXHIBIT 8
6. Appropriateness of the Amendment Relative to Market Demand and Area
Impacts
The proposed amendment is appropriate given demonstrated market demand for
housing near major employment centers and transit corridors. The project
addresses housing needs without adversely impacting surrounding land uses,
public services, utilities, or historic resources. Fiscal impacts are positive due to
increased property values and tax revenue, while traffic impacts are moderated
by transit accessibility and multimodal design. Public facilities and services are
already in place to support the proposed development, allowing for efficient and
responsible growth.
Summary
The proposed General Plan Amendment substantially conforms to the criteria set
forth in Section 6-302(D) of the Zoning and Development Code. It provides clear
public benefits, mitigates potential impacts, advances General Plan objectives,
and represents an appropriate and well-considered response to market
conditions and the evolving land use context of North Tempe.
Sincerely,
Brent Kendle, AIA, LEED AP
EXHIBIT 9
Date: December 19, 2025
To:
City of Tempe Community Development Department
Planning Division
Re: 1st Submittal of the Zoning Amendment Application
ISB Site, 1600 North Priest Drive, Tempe, AZ
Subject: Letter of Explanation
Dear Staff Members,
Thank you again for taking the time to review and understand the submittal of our
General Plan Amendment application for 1600 North Priest Drive
1600 North Priest Drive is located within the Papago Park Center Planned Area
Development. When created, the property was zoned General Industrial District
(GID) zoning category. This application seeks to rezone the property to the MU-4
district and bring it into alignment with other similar parcels in the Papago Park
Center Planned Area Development.
The applicant is proposing to redevelop the approximately 19.17-acre site at 1600
North Priest Drive. The project will consist of four 5-story residential structures and
associated 4 and 5-story parking structures. The buildings are composed of a mix of
unit types, (Studio, 1-Bedroom, 2-Bedrooms, and 3-Bedrooms), indoor fitness
amenities, leasing offices, swimming pools and outdoor terraces. Two of the
buildings will contain Live/Work units. These units provide flexibility for
entrepreneurs, freelancers, and creative professionals, fostering a mixed-use
environment that encourages pedestrian activity, local economic vitality, and a
sense of community, while maintaining compatibility with the surrounding
neighborhood.
EXHIBIT 10
The subject property is located within the 300-acre Papago Park Center mixed-use
development. Surrounding area uses include several office buildings and
complexes within the larger Papago Park Center development, including the
corporate headquarters for SRP and First Solar, regional offices for Towers Watson,
Wells Fargo, and Sonora Quest Labs, The Lofts at Rio Salado apartment
community, as well as limited restaurant and retail space. Tempe Town Lake is
approximately 1/2 mile to the southeast, and the Marquee Theatre is at the
southwest corner of Mill Avenue and Washington Street. Papago Park is
approximately 1 mile to the north. Existing buildings within the larger Papago Park
Center development typically range from one to six stories in height. Washington
Street and the METRO Light Rail is a short walk to the south.
General Plan 2050 Conformance and Public Interest Statement
The proposed redevelopment of the 19.17-acre site at 1600 North Priest Drive
advances the public interest by transforming an underutilized property into a
modern, high-quality residential community that provides needed housing
options, supports local businesses and employment areas, and contributes to the
long-term vitality of the North Tempe corridor. The project consists of four 5-story
residential buildings, associated parking structures, a mix of unit types, indoor
and outdoor amenities, and Live/Work units that support small business activity.
The project’s goal is to create a vibrant and aesthetically pleasing multi-family
development that complements the existing collection of office, residential and retail
uses within Papago Park Center and further stimulates economic activity in north
Tempe. The purpose of this Project is to bring additional residential opportunities to
the City of Tempe, while promoting a sustainable environment of living, staying,
working, and playing in one location within walking distance of the METRO light rail.
The City of Tempe’s 2050 General Plan articulates the City’s economic vision as
one that will “ensure new developments within hubs at sufficient densities to support
the desired new neighborhood-oriented goods and services and provide an
economic magnet for neighborhoods and ensure growth areas reach their full
potential economic development”. It also anticipated a Mixed Use and High Density
to accommodate a mixture of residential and commercial uses creating a
sustainable development with a “village” concept where residents live and work
within the development area. The proposed development is the type of project
envisioned by the 2050 General Plan.
The intent of the development is that these buildings will complement the existing
structures within Papago Park Center and will be representative of the ongoing
private and public investment near the METRO Light Rail line and around nearby
EXHIBIT 11
Tempe Town Lake. This development directly implements and supports the
multiple goals and objectives of the City of Tempe’s General Plan 2050.
1. Land Use & Development
The project aligns with General Plan policies encouraging reinvestment, infill, and
the redevelopment of large parcels in established urban areas. The proposed
density and building form are appropriate for a major corridor and employment-
center context, supporting compact development patterns and efficient land use.
The inclusion of multiple unit types—including family-oriented 2- and 3-bedroom
units and flexible Live/Work residences—responds to the City’s goal of providing
diverse housing opportunities for a range of households. The site plan integrates
pedestrian connections, amenities, and activated building edges that improve the
area's urban fabric.
2. Economic Development
The redevelopment supports economic development goals by introducing new
residents who will patronize surrounding businesses, strengthening the local
customer base, and contributing to the vitality of the area’s major employment
corridors. The Live/Work units directly support entrepreneurship and small
business activity, providing opportunities for home-based or early-stage
businesses to operate in a compatible mixed-use environment. Construction and
long-term operations contribute to the City’s economic health through investment,
job creation, and increased tax revenue.
3. Circulation
The proposal incorporates a circulation system that aligns with General Plan
mobility goals by emphasizing pedestrian connectivity, multimodal accessibility,
and safe internal circulation. Parking structures are designed to manage
vehicular demand efficiently while minimizing surface parking. The project
improves walkability within the site and ties into the surrounding street network,
supporting transit use and alternative modes of transportation consistent with
Tempe’s multimodal mobility objectives.
4. Conservation
The redevelopment replaces outdated site infrastructure with modern, energy-
efficient building systems, water-efficient landscaping, and contemporary
materials that reduce long-term resource consumption. The project supports
General Plan conservation goals by enhancing stormwater management,
incorporating sustainable site design strategies, and promoting efficient building
performance. Redeveloping and repurposing a previously developed site reduces
pressure on undeveloped land and furthers sustainability objectives.
EXHIBIT 12
5. Open Space, Recreation, and Cultural Amenities
The proposed buildings incorporate outdoor terraces, swimming pools, and
landscaped open spaces that enhance resident well-being and support General
Plan goals for accessible recreational amenities. These spaces improve the
character of the development, contribute visually to the surrounding area, and
create a high-quality living environment. Indoor fitness and community spaces
further strengthen the project’s alignment with policies encouraging healthy
lifestyles and social connectivity.
6. Public Facilities and Services
The project leverages existing public infrastructure and services and supports
their efficient use by concentrating new residential development in an area
already served by utilities, transportation networks, and city services.
Coordination with City departments ensures appropriate utilities, emergency
access, and service capacity, meeting General Plan objectives for responsible
and infrastructure-efficient growth.
Additionally, the site’s proximity to METRO Light Rail, the Valley Metro bus line, and
the increase in alternate modes of transportation such as bicycling and ride-sharing
will further reduce parking demand. These diverse options fulfill the goals outlined in
the Tempe General Plan 2050 where “Tempe’s vision for itself in the year 2050 is
one of livability: a city with a diverse, active and engaged community; a city that is
visually attractive and accessible by multiple modes of transportation.” Tempe
should consist of “revitalized neighborhoods that are walkable, pleasant, safe and
connected within a 20-minute walk, bike or transit ride”. We believe this project
achieves Tempe’s goal of connecting neighborhoods within 20-minutes via multiple
modes of transportation.
Sincerely,
Brent Kendle, AIA, LEED AP
EXHIBIT 13
Date: December 19, 2025
To:
City of Tempe Community Development Department
Planning Division
Re: 1st Submittal of the Planned Area Development Application,
ISB Site, 1600 North Priest Drive, Tempe, AZ
Subject: Letter of Explanation
Dear Staff Members,
Thank you again for taking the time to review and understand the submittal of our
General Plan Amendment application for 1600 North Priest Drive
1600 North Priest Drive is located within the Papago Park Center Planned Area
Development. When created, the property was zoned General Industrial District
(GID) zoning category. This application seeks to rezone the property to the MU-4
district and bring it into alignment with other similar parcels in the Papago Park
Center Planned Area Development.
The applicant is proposing to redevelop the approximately 19.17-acre site at 1600
North Priest Drive. The project will consist of four 5-story residential structures and
associated 4 and 5-story parking structures. The buildings are composed of a mix of
unit types, (Studio, 1-Bedroom, 2-Bedrooms, and 3-Bedrooms), indoor fitness
amenities, leasing offices, swimming pools and outdoor terraces.
The subject property is located within the 300-acre Papago Park Center mixed-use
development. Surrounding area uses include several office buildings and
complexes within the larger Papago Park Center development, including the
corporate headquarters for SRP and First Solar, regional offices for Towers Watson,
Wells Fargo, and Sonora Quest Labs, The Lofts at Rio Salado apartment
community, as well as limited restaurant and retail space. Tempe Town Lake is
EXHIBIT 14
approximately 1/2 mile to the southeast, and the Marquee Theatre is at the
southwest corner of Mill Avenue and Washington Street. Papago Park is
approximately 1 mile to the north. Existing buildings within the larger Papago Park
Center development typically range from one to six stories in height. Washington
Street and the METRO Light Rail is a short walk to the south.
The development fulfills goals and objectives in the General Plan.
The project’s goal is to create a vibrant and aesthetically pleasing multi-family
development that complements the existing collection of office, residential and retail
uses within Papago Park Center and further stimulates economic activity in north
Tempe. The purpose of this Project is to bring additional residential opportunities to
the City of Tempe, while promoting a sustainable environment of living, staying,
working, and playing in one location within walking distance of the METRO light rail.
The City of Tempe’s 2050 General Plan articulates the City’s economic vision as
one that will “ensure new developments within hubs at sufficient densities to support
the desired new neighborhood-oriented goods and services and provide an
economic magnet for neighborhoods and ensure growth areas reach their full
potential economic development”. It also anticipated a Mixed Use and High Density
to accommodate a mixture of residential and commercial uses creating a
sustainable development with a “village” concept where residents live and work
within the development area. The proposed development is the type of project
envisioned by the 2050 General Plan.
The intent of the development is that these buildings will complement the existing
structures within Papago Park Center and will be representative of the ongoing
private and public investment near the METRO Light Rail line and around nearby
Tempe Town Lake.
Standards requested through the PAD Overlay District shall take into
consideration the locations and context for the site for which the project is
proposed.
The Project’s buildings, site circulation, landscape elements and associated design
standards, have taken into consideration the context of the area. Given the existing
mixed-use setting of office and retail developments immediately to the east, west
and south of the site, the Project’s proposed building heights, setbacks and
EXHIBIT 15
landscape are of an appropriate scale for the area. Structures on the site have been
thoughtfully located so that the proposed buildings will compliment those already
found within Papago Park Center.
The development appropriately moderated transitional impacts on the
immediate surroundings.
All proposed uses suitably moderate the influences on adjacent properties. As
previously mentioned, buildings on the site have been thoughtfully located so that
the height, scale and use of the proposed structures will mirror those existing on
nearby properties. The building height will comply with those in the previously
approved 24th Amended PAD for Papago Park Center.
Additionally, the site’s proximity to METRO Light Rail, the Valley Metro bus line, and
the increase in alternate modes of transportation such as bicycling and ride-sharing
will further reduce parking demand. These diverse options fulfill the goals outlined in
the Tempe General Plan 2050 where “Tempe’s vision for itself in the year 2050 is
one of livability: a city with a diverse, active and engaged community; a city that is
visually attractive and accessible by multiple modes of transportation.” Tempe
should consist of “revitalized neighborhoods that are walkable, pleasant, safe and
connected within a 20-minute walk, bike or transit ride”. We believe this project
achieves Tempe’s goal of connecting neighborhoods within 20-minutes via multiple
modes of transportation.
Sincerely,
Brent Kendle, AIA, LEED AP
EXHIBIT 16
¹
0
0.4
0.2
Miles
Proposed Lan d U se
Ch an gesfrom Gen eral
Pl an 2040
Proposed D en si ty
Ch an gesfrom Gen eral
Pl an 2040
Proposed Lan d U sean d
D en si tyCh an gesfrom
Gen eral Pl an 2040
Cu l tu ral Resou rceArea,
Refertoexi sti n g Zon i n g
D i stri ct
Si n gl e-Fam i l yLargeLot,
u p to3du /a/ c
Si n gl e-Fam i l y
Tradi ti on al ,u p to9du /
ac
M u l ti -Fam i l yLow-
M oderate,u p to25du /
ac
M u l ti -Fam i l yM oderate,
u p to45du /a/ c
Com m erci al ,Referto
exi sti n g Zon i n g D i stri ct
M i xed-U seM oderate,u p
to45du /a/ c
M i xed-U seH i gh ,u p to
65du /a/ c
M i xed-U seU rban ,m ore
th an 65du /a/ c
M i xed-U seI n du stri al
M oderate,u p to45du /
ac
I n du stri al
Ci vi c
Edu cati on
Pu bl i cOpen Space
Pu bl i cRecreati on /
Cu l tu ral
Col l egeAve.
Con ti n en tal D r.
.r
D
t
s
eir
P
M i l l Ave.
Current Land Use and
Density, General Plan 2050
.
d
R
el
a
d
s
tt
o
c
S
.r
D
k
c
o
t
n
il
C
c
M
d
R
.el
a
d
stt
o
c
S
Van B u ren St.
M cKel l i psRd.
.
d
R
r
elli
M
CURRENT LAND
USE MAP
PROJECT SITE
EXHIBIT 17
¹
0
0.4
0.2
Miles
Proposed Lan d U se
Ch an gesfrom Gen eral
Pl an 2040
Proposed D en si ty
Ch an gesfrom Gen eral
Pl an 2040
Proposed Lan d U sean d
D en si tyCh an gesfrom
Gen eral Pl an 2040
Cu l tu ral Resou rceArea,
Refertoexi sti n g Zon i n g
D i stri ct
Si n gl e-Fam i l yLargeLot,
u p to3du /a/ c
Si n gl e-Fam i l y
Tradi ti on al ,u p to9du /
ac
M u l ti -Fam i l yLow-
M oderate,u p to25du /
ac
M u l ti -Fam i l yM oderate,
u p to45du /a/ c
Com m erci al ,Referto
exi sti n g Zon i n g D i stri ct
M i xed-U seM oderate,u p
to45du /a/ c
M i xed-U seH i gh ,u p to
65du /a/ c
M i xed-U seU rban ,m ore
th an 65du /a/ c
M i xed-U seI n du stri al
M oderate,u p to45du /
ac
I n du stri al
Ci vi c
Edu cati on
Pu bl i cOpen Space
Pu bl i cRecreati on /
Cu l tu ral
Col l egeAve.
Con ti n en tal D r.
.r
D
t
s
eir
P
M i l l Ave.
Proposed Land Use and
Density, General Plan 2050
.
d
R
el
a
d
s
tt
o
c
S
.r
D
k
c
o
t
n
il
C
c
M
d
R
.el
a
d
stt
o
c
S
Van B u ren St.
M cKel l i psRd.
.
d
R
r
elli
M
PROPOSED LAND
USE MAP
PROJECT SITE
EXHIBIT 18
ZONING MAP: CURRENT ZONING
PROJECT SITE
EXHIBIT 19
ZONING MAP: PROPOSED ZONING
PROJECT SITE
EXHIBIT 20
EXHIBIT 21
EXHIBIT 22
EXHIBIT 23
Ground Obscured
S
S
S
S
S
S
S
30'-0"
EASEMENT
24'-0"
24'-0"
24'-0"
24'-0"
20'-0"
R20'-0"
R44'-0"
24'-0"
25'-0"
SETBACK
R12'-0"
R12'-0"
R49'-0"
R19'-0"
R49'-0"
R19'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R48'-0"
24'-0" SHARED
FIRE LANE
R24'-0"
24'-0"
20'-0" 20'-0" 20'-0"
60'-0"
30'-0"
EASEMENT
25'-0"
SETBACK
30'-0"
EASEMENT
25'-0"
SETBACK
EASEMENT
20'-0" 20'-0" 20'-0"
60'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
20'-0"
20'-0"
50'-0"
20'-7"
20'-7"
10'-0"
20'-0"
20'-0"
50'-0"
20'-7"
20'-7"
10'-0"
R15'-0"
R15'-0"
2'-0"
NO FOOTING
ENCROACHMENT
31'-9"
38'-8"
35'-4"
42'-9"
38'-1"
26'-5"
30'-11"
19'-9"
45'-1"
48'-10"
42'-3"
27'-2"
24'-0"
R24'-0"
R24'-0"
R24'-0"
CLUB
HOUSE
FITNESS
LOBBY
POOL
LANDSCAPED
PUBLIC
COURTYARD
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
AMENITY
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
BIKE
STORAGE
2
FITNESS
LOBBY
POOL
LIVE
WORK
LIVE
WORK
LIVE
WORK
CLUB
HOUSE
AMENITY
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
BIKE
STORAGE
2
2
1
1
PRIVATE
COURTYARD
LOBBY
POOL
FITNESS
AMENITY
CLUB
HOUSE
PRIVATE
COURTYARD
BIKE
STORAGE
1
1
2
FITNESS
LOBBY
AMENITY
POOL
PRIVATE
PARK
PRIVATE
COURTYARD
CLUBHOUSE
PRIVATE
PARK
BIKE
STORAGE
1
1
2
2
39'-6 1/4"
R24'-0"
R24'-0"
R24'-0"
BK 593, PG 40
MCR
BK 593, PG 40
MCR
24'-0"
T
T
T
T
R15'-0"
R15'-0"
15'-0"
20'-0"
R5'-0"
R20'-0"
R20'-0"
R10'-0"
39'-0"
60°
60°
60°
60°
10'-4 11/16"
10'-4 11/16"
10'-4 11/16"
10'-4 11/16"
T
T
SERVICE
DRIVE
T
T
93'-10"
87'-11"
96'-8 1/8"
96'-8"
10'-10"
8'-1"
NORTHEAST
PHASE 1
SOUTHEAST
PHASE 2
NORTHWEST
PHASE 3
SOUTHWEST
PHASE 4
1195.0' DATUM ELEVATION AT
PROPERTY MID-POINT ALONG
SALT RIVER DRIVE IS BASIS
TO ESTABLISH BUILDING HEIGHT.
.
SALT RIVER DRIVE
DESERT COVE DRIVE
PRIEST DRIVE
EXIST'G
FIRE
HYDRANT
.
EXIST'G
FIRE
HYDRANT
.
EXIST'G
FIRE
HYDRANT
.
EXIST'G
FIRE
HYDRANT
.
EXIST'G
FIRE
HYDRANT
.
8' CMU WALL ALONG
SOUTH PERIMETER OF
SITE
.
.
.
ACCESS
GATE
.
30'-0"
EASEMENT
24'-0"
24'-0"
24'-0"
24'-0"
20'-0"
R20'-0"
R44'-0"
24'-0"
25'-0"
SETBACK
R12'-0"
R12'-0"
R49'-0"
R19'-0"
R49'-0"
R19'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R48'-0"
24'-0" SHARED
FIRE LANE
R24'-0"
24'-0"
20'-0" 20'-0" 20'-0"
60'-0"
30'-0"
EASEMENT
25'-0"
SETBACK
30'-0"
EASEMENT
25'-0"
SETBACK
EASEMENT
20'-0" 20'-0" 20'-0"
60'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
R24'-0"
20'-0"
20'-0"
50'-0"
20'-7"
20'-7"
10'-0"
20'-0"
20'-0"
50'-0"
20'-7"
20'-7"
10'-0"
R15'-0"
R15'-0"
2'-0"
NO FOOTING
ENCROACHMENT
31'-9"
38'-8"
35'-4"
42'-9"
38'-1"
26'-5"
30'-11"
19'-9"
45'-1"
48'-10"
42'-3"
27'-2"
24'-0"
R24'-0"
R24'-0"
R24'-0"
CLUB
HOUSE
FITNESS
LOBBY
POOL
LANDSCAPED
PUBLIC
COURTYARD
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
AMENITY
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
BIKE
STORAGE
2
FITNESS
LOBBY
POOL
LIVE
WORK
LIVE
WORK
LIVE
WORK
CLUB
HOUSE
AMENITY
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
LIVE
WORK
BIKE
STORAGE
2
2
1
1
PRIVATE
COURTYARD
LOBBY
POOL
FITNESS
AMENITY
CLUB
HOUSE
PRIVATE
COURTYARD
BIKE
STORAGE
1
1
2
FITNESS
LOBBY
AMENITY
POOL
PRIVATE
PARK
PRIVATE
COURTYARD
CLUBHOUSE
PRIVATE
PARK
BIKE
STORAGE
1
1
2
2
39'-6 1/4"
R24'-0"
R24'-0"
R24'-0"
BK 593, PG 40
MCR
BK 593, PG 40
MCR
24'-0"
T
T
T
T
R15'-0"
R15'-0"
15'-0"
20'-0"
R5'-0"
R20'-0"
R20'-0"
R10'-0"
39'-0"
60°
60°
60°
60°
10'-4 11/16"
10'-4 11/16"
10'-4 11/16"
10'-4 11/16"
T
T
SERVICE
DRIVE
T
T
93'-10"
87'-11"
96'-8 1/8"
96'-8"
10'-10"
8'-1"
Ground Obscured
S
S
S
S
S
S
S
98.5
EXIST'G
WATER METER
.
EXIST'G
WATER METER
.
EXIST'G
WATER
METER
EXIST'G
FIRE
HYDRANT
.
EXIST'G
WATER METER
.
EXIST'G
FIRE
HYDRANT
.
EXISTING BIKE
LANE TO REMAIN
.
30'-0"
R/W
30'-0"
R/W
55'-0" R/W
55'-0" R/W
1
1
1
1
2
2
2
2
2
2
2
2
3
3
3
3
3
4
3
4
4
4
4
4
4
5
5
5
5
5
28
28
28
28
28
28
6
6
6
6
6
6
28
6
6
28
28
6
6
6
28
28
6
6
6
6
6
6
28
29
29
29
7
7
8
8
8
8
29
7
9
9
9
9
9
9
9
9
9
9
9
9
10
10
10
10
11
11
11
11
11
11
11
11
11
11
12
12
12
12
12
12
12
12
12
12
12
12
12
8'-0" EXIST'G
SIDEWALK
8'-0" EXIST'G
SIDEWALK
8'-4" EXIST'G
SIDEWALK
8'-4"
SIDEWALK
8'-0" EXIST'G
SIDEWALK
8' UTILITY
EASEMENT
8'-0" EXIST'G
SIDEWALK
14
14
.
14
14
14
14
14
14
14
EXIST'G
FIRE
HYDRANT
.
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
13
13
13
13
3
6
7
7
23
23
24
24
24
24
25
3
316.37'
S89°41'36"E
N55°13'49"E
S61°05'30"E
N79°37'00"E
S16°00'17"E
N24°47'15"W
N29°01'30"E
245.14'
585.94'
132.41'
360.02'
393.84'
S60°58'30"E
427.90'
NOT A PART
LOT 1A - TOSCO OFFICE COMPLEX
BK 593, PG 4, MCR
1520 N PRIEST DR
TEMPE, AZ 85288
APN 124-19-018A
NOT A PART
LOT 1B - TOSCO OFFICE COMPLEX
BK 593, PG 4, MCR
1500 N PRIEST DR
TEMPE, AZ 85288
APN 124-19-019
NOT A PART
LOT 2B - TOSCO OFFICE COMPLEX
BK 593, PG 4, MCR
1500 N PRIEST DR
TEMPE, AZ 85288
APN 124-19-021
NOT A PART
LOT 3B - TOSCO OFFICE COMPLEX
BK 593, PG 4, MCR
1500 N PRIEST DR
TEMPE, AZ 85288
APN 124-19-023
16
16
16
16
11
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
26
26
26
26
26
26
26
26
26
26
26
27
27
27
27
10'-10"
8'-1"
28
28
28
7
1.
9' x 23'-9" ANGLED PARKING SPACE, TYPICAL
2.
11'+ 5' AISLE x 23'-9" ACCESSIBLE PARKING SPACE
3.
ELECTRONIC VEHICULAR GATE TO BE EQUIPPED FOR FIRE
DEPARTMENT ACCESS.
4.
PEDESTRIAN ENTRY GATE W/ PAINTED FINISH.
5.
PEDESTRIAN CROSSWALK WITH CONCRETE PAVERS
6.
MASONRY SITE WALL. HEIGHT VARIES SEE CIVIL DWG.
7.
8' TUBULAR STEEL PERIMETER FENCE W/ PAINTED FINISH
8.
6' POOL GATE W/ PAINTED FINISH
9.
ACCESSIBLE CURB RAMP. MAG DETAIL 237-3 EXCEPT AT DESERT
DRIVE & SALT RIVER DRIVE WHERE TEMPE DETAIL T-326 IS TO
BE USED.
10. DECORATIVE CONCRETE POOL TERRACE
11.
ACCESSIBLE RAMP.
12. PLANTER
13.
WATER METER, EXISTING
14. EXISTING FIRE HYDRANT
15.
SEATING AREA W/ DECORATIVE CONCRETE SLAB
16.
CONCRETE SIDEWALK & STEPS
17. LANDSCAPE MEDIAN
18.
COMBO WALL, 3' CMU & 3' TUBE STEEL FENCE W/ PAINTED FINISH
19. BBQ
20. SEATING AREA
21. DOG PARK
22. NEW FIRE HYDRANT
23. EXISTING BIKE LANE TO REMAIN
24. REFUSE PER CITY OF TEMPE DETAIL DS-118
25. 8' CMU WALL ALONG SOUTH PERIMETER OF SITE
26. ASPHALT DRIVE
27. DEVELOPMENT SIGNAGE
28. COMBO WALL, CMU RETAIN'G WALL & 8' TUBE STEEL FENCE W/
PTD FINISH. RETAIN'G WALL HEIGHT VARIES, SEE CIVIL DWG
29. 6' TALL POOL FENCE
28
29
29
29
29
6
6
29
7
6
6
6
ADDRESS:
SUBDIVISION
EXISTING ZONING:
GENERAL INDUSTRIAL
1600 NORTH PRIEST DRIVE
TEMPE, ARIZONA 85288
PAPAGO PARK CENTER, PHASE 1
LOT 1, TRACTS A-F
PROJECT DATA
SITE AREA, GROSS:
19.17 AC (834,838 SF)
EXISTING GENERAL
PLAN USE:
COMMERCIAL
PROPOSED ZONING:
MIXED USE HIGH, MU-4, PAD
LOT NUMBER: TRACT B
PARCEL NO:
124-19-011A
CONSTRUCTION TYPE: V-B SPRINKLERED
PAD BUILDING
SETBACKS:
FRONT (DESERT COVE DR.) - NONE
SIDE - 19'-0"
REAR (PRIEST DR.) - 10'-10"
STREET SIDE (SALT RIVER DR.) - NONE
PROPOSED GENERAL
PLAN USE:
MIXED USE, HIGH
DISTRICT, GID
CONTACT
PAPAGO PARK CENTER, INC
1521 N. PROJECT CENTER DR
TEMPE, AZ 85281
602-236-2592
SITE AREA, NET:
17.34 AC (755,507 SF)
Remain
Concrete Sidewalk
Private Courtyards
A-0.1
SITE PLAN & COVER SHEET
A-0.2
AERIAL MAP & SITE PLAN OVERLAY
A-0.3
CONTEXT PHOTOS
C-1
GRADING & DRAINAGE
SA-1
ALTA SURVEY
SA-2
AERIAL SURVEY
A-1.1
SITE PLAN - PHASE 1
A-1.2
SITE PLAN - PHASE 2
A-1.3
SITE PLAN - PHASE 3
A-1.4
SITE PLAN - PHASE 4
A-1.5
FLOOR PLAN - PHASE 1, LEVELS 1 - 3
SHEET INDEX
A-2.2
ELEVATIONS - PHASE 2
A-2.3
ELEVATIONS - PHASE 3
A-2.4
ELEVATIONS - PHASE 4
A-2.5
STREET ELEVATIONS
A-3.1
ELEVATIONS, COLOR - PHASE 1
A-3.2
ELEVATIONS, COLOR - PHASE 2
A-3.3
ELEVATIONS, COLOR - PHASE 3
A-3.4
ELEVATIONS, COLOR - PHASE 4
A-4.1
BUILDING SECTIONS - PHASE 1
A-4.2
BUILDING SECTIONS - PHASE 2
A-4.3
BUILDING SECTIONS - PHASE 3
A-1.6
FLOOR PLAN - PHASE 1, LEVELS 4 - 5
A-1.7
FLOOR PLAN - PHASE 2, LEVELS 1 - 3
A-1.8
FLOOR PLAN - PHASE 2, LEVELS 4 - 5
A-1.9
FLOOR PLAN - PHASE 3, LEVELS 1 - 5
A-1.10
FLOOR PLAN - PHASE 4, LEVEL 1
A-1.11
FLOOR PLAN - PHASE 4, LEVELS 2 - 3
A-1.12
FLOOR PLAN - PHASE 4, LEVEL 4
A-1.13
FLOOR PLAN - PHASE 4, LEVEL 5
A-1.14
ENLARGED UNIT PLANS
A-1.15
ENLARGED UNIT PLANS
A-2.1
ELEVATIONS - PHASE 1
A-4.4
BUILDING SECTIONS - PHASE 4
L101
PLANTING LEGEND & PLAN
L102
PLANTING PLAN
L103
PLANTING PLAN
L104
PLANTING PLAN
L105
PLANTING PLAN
L106
PLANTING PLAN
L107
PLANTING PLAN
L108
PLANTING PLAN
L109
PLANTING PLAN
PROPERTY LINE
EASEMENT
ACCESSIBLE PARKING
FIRE TRUCK TURNING LANE
12
WM
25'-0"
45'-0"
LEGEND
FIRE HYDRANT
WATER METER
LIGHT POLE
NO. OF PARKING
SPACES
ELECTRICAL
TRANSFORMER
T
1.
9' x 23'-9" ANGLED PARKING SPACE, TYPICAL
2.
11'+ 5' AISLE x 23'-9" ACCESSIBLE PARKING SPACE
3.
ELECTRONIC VEHICULAR GATE TO BE EQUIPPED FOR FIRE
DEPARTMENT ACCESS.
4.
PEDESTRIAN ENTRY GATE W/ PAINTED FINISH.
5.
PEDESTRIAN CROSSWALK WITH CONCRETE PAVERS
6.
MASONRY SITE WALL. HEIGHT VARIES SEE CIVIL DWG.
7.
8' TUBULAR STEEL POOL FENCE W/ PAINTED FINISH
8.
POOL GATE W/ PAINTED FINISH
9.
ACCESSIBLE CURB RAMP. MAG DETAIL 237-3 EXCEPT AT DESERT
DRIVE & SALT RIVER DRIVE WHERE TEMPE DETAIL T-326 IS TO
BE USED.
10. DECORATIVE CONCRETE POOL TERRACE
11.
ACCESSIBLE RAMP.
12. PLANTER
13.
WATER METER, EXISTING
14. EXISTING FIRE HYDRANT
15.
SEATING AREA W/ DECORATIVE CONCRETE SLAB
16.
CONCRETE SIDEWALK & STEPS
17. LANDSCAPE MEDIAN
18.
COMBO WALL, 3' CMU & 3' TUBE STEEL FENCE W/ PAINTED FINISH
19. BBQ
20. SEATING AREA
21. DOG PARK
22. NEW FIRE HYDRANT
23. EXISTING BIKE LANE TO REMAIN
24. REFUSE PER CITY OF TEMPE DETAIL DS-118
25. 8' CMU WALL ALONG SOUTH PERIMETER OF SITE
26. ASPHALT DRIVE
27. DEVELOPMENT SIGNAGE
28. COMBO WALL, CMU RETAIN'G WALL & 8' TUBE STEEL FENCE W/
PTD FINISH. RETAIN'G WALL HEIGHT VARIES, SEE CIVIL DWG
29. 6' TALL POOL FENCE
KEYNOTES
SHEET TITLE:
CHECKED BY:
DRAWN BY:
CAD DWG FILE:
PROJECT NO:
ISSUE: 2ND SUBMITTAL 4-6-26
K E N D L E D E S I G N
C O L L A B O R A T I V E
6 1 1 5 N O R T H C A T T L E T R A C K
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
P H 4 8 0 . 9 5 1 . 8 5 5 8
BRENT@KENDLEDESIGN.COM
KENDLEDESIGN.COM
MARK
DATE
DESCRIPTION
1
2
3
4
5
-
All drawings and written material appearing
herein constitute the original and unpublished
work of Kendle Design Collaborative. Any
duplication or reproduction of these documents
or any portion herein without the expressed
written permission from Kendle Design
Collaborative is prohibited by law.
LEGEND CITY
DISTRICT AT
PAPAGO PARK
CENTER
1600 North Priest Drive
Tempe AZ 85288
3-27-26 1ST SUBMITTAL
A-0.1
SITE PLAN
SITE PLAN
1:50
50
100
200
N
E. VAN BUREN ST
202 FREEWAY
WASHINGTON ST
202 FREEWAY
N. PRIEST DR
SITE
VICINITY MAP
NORTH
EXHIBIT 24
SOUTH ELEVATION - NORTHEAST - PHASE 1
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
343'-3 13/16"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
1
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
3
1
3
1
3
1
3
1
3
1
3
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
WEST ELEVATION - NORTHEAST - PHASE 1
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
406'-9"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
3
1
3
1
3
1
3
1
3
1
3
1
2
2
2
2
2
2
2
2
2
2
2
2
2
GARAGE ENTRANCE
8'-0"
24'-0"
NORTH ELEVATION - NORTHEAST - PHASE 1
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
337'-0"
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
3
1
3
1
3
1
3
1
3
1
2
2
2
2
2
2
2
2
2
2
2
EAST ELEVATION - NORTHEAST - PHASE 1
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
303'-9"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
3
3
1
1
3
1
3
1
3
1
2
2
2
2
2
STUCCO 1. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9550
MERCURIAL
42" HIGH, 5/8" CLEAR
TEMPERED GLASS
GUARDRAIL
1" LOW-E INSULATED
DOOR & WINDOW
GLAZING, TEMPERED
1
STUCCO 2. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
BENJAMIN MOORE CW-80
CARTER GRAY
2
3
STUCCO 3. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9555
STORM WARNING
4
5
LEGEND: EXTERIOR MATERIALS
8x8x16 MASONRY IN A
RUNNING BOND PATTERN
"BLOCK-LITE" COLOR:
KONA
6
1
BALCONY PROJECTS 6'-8" BEYOND FACE OF BUILDING
2
LINE INDICATES 4" REVEAL
3
CANOPY PROJECTS 6'-8" BEYOND FACE OF BUILDING
SHEET TITLE:
CHECKED BY:
DRAWN BY:
CAD DWG FILE:
PROJECT NO:
ISSUE: 2ND SUBMITTAL 4-6-26
K E N D L E D E S I G N
C O L L A B O R A T I V E
6 1 1 5 N O R T H C A T T L E T R A C K
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
P H 4 8 0 . 9 5 1 . 8 5 5 8
BRENT@KENDLEDESIGN.COM
KENDLEDESIGN.COM
MARK
DATE
DESCRIPTION
1
2
3
4
5
-
All drawings and written material appearing
herein constitute the original and unpublished
work of Kendle Design Collaborative. Any
duplication or reproduction of these documents
or any portion herein without the expressed
written permission from Kendle Design
Collaborative is prohibited by law.
LEGEND CITY
DISTRICT AT
PAPAGO PARK
CENTER
1600 North Priest Drive
Tempe AZ 85288
3-27-26 1ST SUBMITTAL
A-2.1
ELEVATIONS
NORTHEAST
PHASE 1
EXTERIOR ELEVATIONS
1/16
16
32
64
KEY PLAN - SITE
NORTH
KEY PLAN - ELEVATION
N
E
W
S
1
1
2
3
4
KEYNOTES
EXHIBIT 25
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
SOUTH ELEVATION SOUTHEAST - PHASE 2
SCALE 1/16"
426'-9 7/16"
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
2
WEST ELEVATION SOUTHEAST - PHASE 2
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
474'-9 9/16"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
2
2
GARAGE ENTRANCE
8'-0"
24'-0"
2
NORTH ELEVATION SOUTHEAST - PHASE 2
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
429'-9 7/8"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
EAST ELEVATION SOUTHEAST - PHASE 2
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
474'-1 1/2"
12345
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
2
2
2
2
2
2
2
2
2
SES
5'-4"
8'-8"
ENLAR
SCALE: 1/8" = 1'-0"
VENT
5'-4"
8'-8"
ENLAR
SCALE: 1/8" = 1'-0"
STUCCO 1. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9550
MERCURIAL
42" HIGH, 5/8" CLEAR
TEMPERED GLASS
GUARDRAIL
1" LOW-E INSULATED
DOOR & WINDOW
GLAZING, TEMPERED
1
STUCCO 2. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
BENJAMIN MOORE CW-80
CARTER GRAY
2
3
STUCCO 3. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9555
STORM WARNING
4
5
LEGEND: EXTERIOR MATERIALS
8x8x16 MASONRY IN A
RUNNING BOND PATTERN
"BLOCK-LITE" COLOR:
KONA
6
1
BALCONY PROJECTS 6'-8" BEYOND FACE OF BUILDING
2
LINE INDICATES 4" REVEAL
3
CANOPY PROJECTS 6'-8" BEYOND FACE OF BUILDING
SHEET TITLE:
CHECKED BY:
DRAWN BY:
CAD DWG FILE:
PROJECT NO:
ISSUE: 2ND SUBMITTAL 4-6-26
K E N D L E D E S I G N
C O L L A B O R A T I V E
6 1 1 5 N O R T H C A T T L E T R A C K
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
P H 4 8 0 . 9 5 1 . 8 5 5 8
BRENT@KENDLEDESIGN.COM
KENDLEDESIGN.COM
MARK
DATE
DESCRIPTION
1
2
3
4
5
-
All drawings and written material appearing
herein constitute the original and unpublished
work of Kendle Design Collaborative. Any
duplication or reproduction of these documents
or any portion herein without the expressed
written permission from Kendle Design
Collaborative is prohibited by law.
LEGEND CITY
DISTRICT AT
PAPAGO PARK
CENTER
1600 North Priest Drive
Tempe AZ 85288
3-27-26 1ST SUBMITTAL
A-2.2
ELEVATIONS
SOUTHEAST
PHASE 2
EXTERIOR ELEVATIONS
1/16
16
32
64
KEY PLAN
NORTH
KEY PLAN - ELEVATION
N
E
W
S
2
1
2
3
4
KEYNOTES
EXHIBIT 26
SOUTH ELEVATION NORTHWEST - PHASE 3
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
469'-0 7/8"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
WEST ELEVATION NORTHWEST - PHASE 3
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
243'-0 1/2"
2
3
5
4
1
2
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
2
2
2
NORTH ELEVATION NORTHWEST - PHASE 3
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
473'-6"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
EAST ELEVATION NORTHWEST - PHASE 3
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
238'-2"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
8'-0"
GARAGE ENTRANCE
24'-0"
8'-0"
STUCCO 1. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9550
MERCURIAL
42" HIGH, 5/8" CLEAR
TEMPERED GLASS
GUARDRAIL
1" LOW-E INSULATED
DOOR & WINDOW
GLAZING, TEMPERED
1
STUCCO 2. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
BENJAMIN MOORE CW-80
CARTER GRAY
2
3
STUCCO 3. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9555
STORM WARNING
4
5
LEGEND: EXTERIOR MATERIALS
8x8x16 MASONRY IN A
RUNNING BOND PATTERN
"BLOCK-LITE" COLOR:
KONA
6
1
BALCONY PROJECTS 6'-8" BEYOND FACE OF BUILDING
2
LINE INDICATES 4" REVEAL
3
CANOPY PROJECTS 6'-8" BEYOND FACE OF BUILDING
SHEET TITLE:
CHECKED BY:
DRAWN BY:
CAD DWG FILE:
PROJECT NO:
ISSUE: 2ND SUBMITTAL 4-6-26
K E N D L E D E S I G N
C O L L A B O R A T I V E
6 1 1 5 N O R T H C A T T L E T R A C K
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
P H 4 8 0 . 9 5 1 . 8 5 5 8
BRENT@KENDLEDESIGN.COM
KENDLEDESIGN.COM
MARK
DATE
DESCRIPTION
1
2
3
4
5
-
All drawings and written material appearing
herein constitute the original and unpublished
work of Kendle Design Collaborative. Any
duplication or reproduction of these documents
or any portion herein without the expressed
written permission from Kendle Design
Collaborative is prohibited by law.
LEGEND CITY
DISTRICT AT
PAPAGO PARK
CENTER
1600 North Priest Drive
Tempe AZ 85288
3-27-26 1ST SUBMITTAL
A-2.3
ELEVATIONS
NORTHWEST
PHASE 3
EXTERIOR ELEVATIONS
1/16
16
32
64
KEY PLAN
NORTH
KEY PLAN - ELEVATION
N
E
W
S
3
1
2
3
4
KEYNOTES
EXHIBIT 27
SOUTH ELEVATION SOUTHWEST - PHASE 4
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
CH SCREEN WALL
506'-11 1/2"
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
WEST ELEVATION SOUTHWEST - PHASE 4
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
386'-10 3/8"
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
NORTH ELEVATION SOUTHWEST - PHASE 4
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
469'-8 7/8"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
EAST ELEVATION SOUTHWEST - PHASE 4
SCALE 1/16"
0'-0"
GRADE
+11'-0"
LEVEL 2
+22'-0"
LEVEL 3
+33'-0"
LEVEL 4
+44'-0"
LEVEL 5
+55'-0"
ROOF
+63'-0"
MECH SCREEN WALL
393'-4 7/8"
12345
ADDRESS NUMBERS. 12"
HIGH, INDIVIDUAL MOUNT,
METAL REVERSE PAN
CHANNEL CHARACTERS
2
3
5
4
1
2
+58'-0"
ROOF
+58'-0"
ROOF
+58'-0"
ROOF
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
DASHED LINE INDICATES
MECHANICAL EQUIPMENT
BEHIND SCREEN ALL
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
3
1
1
24'-0"
8'-0"
GARAGE ENTRANCE
STUCCO 1. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9550
MERCURIAL
42" HIGH, 5/8" CLEAR
TEMPERED GLASS
GUARDRAIL
1" LOW-E INSULATED
DOOR & WINDOW
GLAZING, TEMPERED
1
STUCCO 2. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
BENJAMIN MOORE CW-80
CARTER GRAY
2
3
STUCCO 3. INTEGRAL COLOR
SYNTHETIC STUCCO SYSTEM.
SMOOTH SAND FINISH. COLOR:
SHERWIN WILLIAMS SW-9555
STORM WARNING
4
5
LEGEND: EXTERIOR MATERIALS
8x8x16 MASONRY IN A
RUNNING BOND PATTERN
"BLOCK-LITE" COLOR:
KONA
6
1
BALCONY PROJECTS 6'-8" BEYOND FACE OF BUILDING
2
LINE INDICATES 4" REVEAL
3
CANOPY PROJECTS 6'-8" BEYOND FACE OF BUILDING
SHEET TITLE:
CHECKED BY:
DRAWN BY:
CAD DWG FILE:
PROJECT NO:
ISSUE: 2ND SUBMITTAL 4-6-26
K E N D L E D E S I G N
C O L L A B O R A T I V E
6 1 1 5 N O R T H C A T T L E T R A C K
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
P H 4 8 0 . 9 5 1 . 8 5 5 8
BRENT@KENDLEDESIGN.COM
KENDLEDESIGN.COM
MARK
DATE
DESCRIPTION
1
2
3
4
5
-
All drawings and written material appearing
herein constitute the original and unpublished
work of Kendle Design Collaborative. Any
duplication or reproduction of these documents
or any portion herein without the expressed
written permission from Kendle Design
Collaborative is prohibited by law.
LEGEND CITY
DISTRICT AT
PAPAGO PARK
CENTER
1600 North Priest Drive
Tempe AZ 85288
3-27-26 1ST SUBMITTAL
A-2.4
ELEVATIONS
SOUTHWEST
PHASE 4
EXTERIOR ELEVATIONS
1/16
16
32
64
KEY PLAN
NORTH
KEY PLAN - ELEVATION
N
E
W
S
4
1
2
3
4
KEYNOTES
EXHIBIT 28
TO:
Robert Mansolillo, Senior Planner
City of Tempe Community Development Department,
Planning Division
FROM:
Jeffrey Martin
Kendle Design Collaborative
Date:
Wednesday, March 5, 2026
RE:
Public Involvement Final Report for The Legend City District at
Papago Park Center located at 1600 North Priest Drive, Tempe,
Arizona 85281
Robert,
Included, please find the Public Involvement Final Report for The Legend City
District at Papago Park Center.
If you have any questions, please call me at 480.951.8558
Sincerely,
Jeffrey Martin
EXHIBIT 29
Public Involvement Final Report
LEGEND CITY DISRTICT AT PAPAGO PARK CENTER
Project Name
The Legend City District at Papago Park Center
Project Address
1600 North Priest Drive, Tempe, Arizona 85281
Cross Streets
North Priest Drive and East Salt River Drive
Case Number
Preliminary Site Plan Review SPR24014
Formal application PL250252
EXHIBIT 30
Date: Wednesday, March 4, 2026
To:
Robert Mansolillo, Senior Planner
City of Tempe Community Development Department, Planning Division
Case No. PL 250252
From:
Jeffrey Martin
Kendle Design Collaborative
RE: Public Involvement Final Report.
Amended Planned Area Development for The Legend City District at Papago
Park Center: approximately 19.17 acres located at 1600 North Priest Drive,
Tempe, Arizona 85281
The project team has made a concentrated effort to reach out to the
community. The project team has and will continue to address any questions and
comments that may arise throughout the application process.
Posting and Notification
Pursuant to City of Tempe Zoning and Development Code and applicable City
requirements, on Thursday, February 5th, 2026, the applicant sent first class
letters to all property owners within 600 feet of the project site and all tenants
within the property’s boundaries, notifying interested parties of the proposed
development and the neighborhood meeting scheduled for Friday, February 20th,
2026. (Note: There are no registered neighborhood associations or homeowner’s
associations within the 1,320 Ft boundary identified in the Planned Area
EXHIBIT 31
Development Application. This information provided by the City of Tempe
Neighborhood Services Division website). The respective date, locations and
times for the neighborhood meeting and scheduled public hearings, as well as
the applicant’s contact information, were posted on the site on Thursday,
February 5th, 2026. Copies of the mailing notice and notification list, as well as
photos of the public hearing notice sign posted on the site, are enclosed with
this summary.
Phone Calls, Letters, Email and Faxes
The applicant and the applicant’s representatives did not receive any phone calls
with questions or comments about the project
Total number of individuals noticed: 20
Total number of individuals that participated: 0
These figures include the individuals who attended the meeting(s), provided
written comments, exchanged email messages, and made phone calls.
Neighborhood Meeting of Friday, February 20th, 2026
The neighborhood meeting was held 2.1 miles from the project site in the
meeting room of the Lou’s Bar and Grill at the Papago Golf Course located at
5595 East Karsten Way in Phoenix on Friday, February 20th, 2026. The meeting
began at approximately 6:00 pm. Representatives from the Salt River Project
(SRP), Kendle Design Collaborative, Gammage & Burham, and The City of Tempe
Community Development Department were present. No members of the public
attended the meeting.
The meeting format was set up as a group presentation with citizen question and
response. The intent of the meeting was to solicit input and have an open
exchange of information about the proposed development resulting in an
application that is responsive to the attendees’ concerns. There were no
EXHIBIT 32
questions, concerns or issues expressed as no one from the public was in
attendance.
Mailings will be used to provide notification of changes and amendments to the
development after the neighborhood meeting.
The meeting adjourned shortly after 6:30 pm. Contact information for persons in
attendance at the meeting is provided on the enclosed sign-in sheet
Enclosed:
1. Notification Area Map of properties located within 600 feet of the project
site.
2. Mailing Notice of Neighborhood Meeting.
a. Notification Letters were mailed on Thursday, February 5th, 2026.
b. The Neighborhood Meeting was held on Friday, February 20th, 2026.
3. List of owners of record within 600 feet of the subject property.
4. List of tenants within the subject property.
5. Photos and Affidavit of Hearing Sign posting and photo of posted Hearing
Sign, Thursday, February 5th, 2026.
6. Neighborhood Meeting sign-in sheet, Friday, February 20th, 2026.
7. Affidavit of Public Hearing Notification.
EXHIBIT 33
Notification Area Map
A notification area map indicating property owners with 600 feet of the subject
property has been provided and is included on the following page.
Note: there are no registered neighborhood associations or homeowners’
associations within the 1,320 Ft boundary required by the City of Tempe.
Information provided by the City of Tempe Neighborhood Services Division
website.
EXHIBIT 34
EXHIBIT 35
Mailing Notice of Neighborhood
Meeting
Mailing Notice of Neighborhood Meeting.
Notification Letters were mailed on Thursday, February 5th, 2026.
The Neighborhood Meeting was held on Friday, February 20th, 2026.
EXHIBIT 36
EXHIBIT 37
Property Owners Within 600 Feet of Site
EXHIBIT 38
EXHIBIT 39
Tenants Within the Property
There are no tenants within the subject property.
EXHIBIT 40
Photo & Affidavit of Hearing Sign
Affidavit of Hearing Sign posting and photo of the three posted Hearing Signs,
Thursday, February 5th, 2026
EXHIBIT 41
EXHIBIT 42
EXHIBIT 43
EXHIBIT 44
EXHIBIT 45
Neighborhood Meeting Sign-In Sheet
Neighborhood Meeting sign-in sheet for meeting on Friday, February 20th, 2026.
EXHIBIT 46
EXHIBIT 47
Affidavit of Public Hearing Notification
Mailing of Neighbor Notification Letters on Thursday, February 5th, 2026.
EXHIBIT 48
EXHIBIT 49
Ground Obscured
DESERT COVE DRIVE
PRIEST DRIVE
SALT RIVER DRIVE
3
4
2
1
7
8
6
5
11
12
10
9
15
16
14
13
17
18
19
20
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-1
12-1-25
CONTEXT PHOTO LOCATION MAP
NTS
-
SITE PLAN
N
EXHIBIT 50
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-2
12-1-25
CONTEXT PHOTOS
NTS
-
IMAGE 1
IMAGE 2
IMAGE 4
IMAGE 3
EXHIBIT 51
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-3
12-1-25
CONTEXT PHOTOS
NTS
-
IMAGE 5
IMAGE 6
IMAGE 7
IMAGE 8
EXHIBIT 52
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-4
12-1-25
CONTEXT PHOTOS
NTS
-
IMAGE 9
IMAGE 10
IMAGE 11
IMAGE 12
EXHIBIT 53
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-5
12-1-25
CONTEXT PHOTOS
NTS
-
IMAGE 15
IMAGE 16
IMAGE 13
IMAGE 14
EXHIBIT 54
ISB SITE: 1600 NORTH PRIEST DRIVE
Sheet:
Scale:
Drawing Name:
Project Number:
Date:
P - 4 8 0 - 9 5 1 - 8 5 5 8
K E N D L E D E S I G N C O L L A B O R A T I V E
B RENT@KENDLEDESIGN.COM
S C O T T S D A L E , A R I Z O N A 8 5 2 5 0
6 1 1 5 N O R T H C A T T L E T R A C K
KENDLEDESIGN.COM
A-6
12-1-25
CONTEXT PHOTOS
NTS
-
IMAGE 19
IMAGE 20
IMAGE 17
IMAGE 18
EXHIBIT 55