WATER RESOURCES MEMO.PDF

City of Tempe — Work Study Session (2026-05-18)

View PDF Meeting page

Extracted text (via pymupdf) 8586 characters
Mayor and Council 
May 18, 2026 
1
MEMORANDUM 
TO: Mayor and Council 
THROUGH: Lisette Camacho, Deputy City Manager, (480) 350-8505 
FROM: Tara Ford, Public Works Director, (480) 350-2855 
DATE: May 18, 2026 
SUBJECT: Tempe Water Resources 
Tempe has a robust and diverse water resources portfolio. In a typical year, the majority of Tempe’s 
water supply comes from renewable surface water provided by the Salt River Project (SRP). Water 
previously stored in the aquifer and recovered by Groundwater wells makes up about seven percent of 
Tempe’s supply, and the remaining six percent is supplied by the Colorado River, which is delivered 
through the Central Arizona Project (CAP) canal.  
For the past two decades, the amount of 
water available from the Colorado River has 
been steadily declining and at the end of 
2026, the collection of agreements and 
management documents that govern the 
operation of the Colorado River will expire.  
These factors create uncertainty regarding 
how much of Tempe’s CAP supplies will be 
available in the future. However, Tempe has 
a culture of conservation, a history of 
growing sustainably and a robust water 
resources portfolio that contains sufficient 
supplies to allow the community to have 
confidence that Tempe has sufficient 
supplies to meet all demands, regardless of 
shortages on the Colorado River.  
Water Conservation and Efficiency 4.03 
Achieve or exceed water conservation targets for Single Family, Multifamily and Landscape customer 
class water use as measured by gallons per capita per day  
Groundwater Supply 4.16 
Achieve groundwater production capacity to meet the projected average for future daily demand 
Water Efficiency 4.22 
Achieve efficiency gains from 80% of residential and commercial customers participating in Tempe 
water conservation programs 
Salt River 
Project
87%
Central 
Arizona 
Project
6%
Groundwater 
Wells
7%
Tempe water supplies
Salt River Project
Central Arizona Project
Groundwater Wells

2
Mayor and Council 
May 18, 2026 
Since 2015, Tempe’s population has increased by approximately 12%, and during that same period, 
water demand has decreased by 20%. These reductions in water use over time are due to changes in 
land use and the collective actions of the community to increase efficiency.  
To understand how Tempe utilizes available 
water supplies to meet water demands, it is 
important to understand the history of Salt 
River Project.  
In the late 1800s, local farmers in the valley 
pledged their land as collateral to build the 
federally water storage and delivery system 
that became the Salt River Project. The 
agricultural lands of these farmers, now 
largely urbanized, make up the SRP 
“member lands” in the valley. Due to the 
structure of the federal project, the water 
collected and stored behind SRP dams is 
only available for use on these specific 
lands.  
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0
10,000
20,000
30,000
40,000
50,000
60,000
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Population 
Acre feet
Year
Tempe total water use and population
Water use
Population

Mayor and Council 
May 18, 2026 
3
In Tempe, these SRP member lands are 
indicated by the blue areas of the Tempe Water 
Service Area map. The non-SRP member lands, 
those that rely on water from sources other than 
the SRP project member supplies, are indicated 
by the pink areas of the map.  
Fortunately, despite a dry winter, the SRP 
system is not forecasting shortage to future 
supplies. This is due to the fact that the SRP 
watershed is not equivalent to the Colorado 
River Basin. Here in the desert of Arizona, the 
SRP watershed has become more drought 
resistant, and SRP’s system has a different 
allocation system that does not create structural 
deficits that the system cannot support; and is 
supported by a robust aquifer and wells to 
sustain demands in times of drought on the 
watershed.  
Historically, Tempe has used supplies from the 
Colorado River, provided by the Central Arizona 
Project (CAP) to meet the water demands on 
Non-SRP member lands.  
However, in addition to CAP, Tempe has access 
to additional surface water provided by SRP to 
meet non-SRP member demands. In the 1990s, Tempe participated in the effort to modify SRP’s 
Roosevelt Dam. The water stored in the space created behind the dam by these efforts is known as 
Roosevelt New Conservation Space (NCS) water. 
In addition to CAP and NCS, Tempe has 
access to surface water and reclaimed water 
that was previously stored in the aquifer. 
Storing water in the aquifer through efforts like 
this creates Long-term Storage Credits (LTSC). 
Each of these sources: CAP, NCS and LTSC 
are renewable supplies that Tempe can use to 
meet non-SRP member demands within 
Tempe’s Water Service Area. 
In addition to Tempe’s CAP supplies, these 
non-SRP member supplies include 4,200 acre-
feet of NCS and the ability to recovery 3,000 
acre-feet of LTSC in an average year.  
As illustrated previously with Tempe’s overall 
population and water demands, Tempe’s non-
SRP member water demands have been 
decreasing while the population in these areas 
has been increasing.  
NCS, 9,000
CAP, 4,493
LTSCs, 
3,000
Non-SRP member supplies (acre-feet)

Mayor and Council 
May 18, 2026 
4
In addition to reduced water 
availability from the Colorado River, 
the seven states that share the 
Colorado River Basin states and the 
federal government have yet to 
reach a consensus on how to 
manage the river after 2026.  
With 2027 approaching rapidly, there 
is significant uncertainty about the 
amount of CAP water Tempe can 
expect in both the near and long 
term. Even basic questions, such as 
how much of Tempe’s CAP 
allocation will be available in 2027 
remain unanswered.  
To plan for this extreme uncertainty, Tempe has evaluated a range of possible cuts, or hypothetical 
shortages to Tempe’s CAP allocations in 2027.  
The next chart illustrates three planning scenarios and non-SRP member supplies that Tempe is 
evaluating for 2027. These scenarios range from status quo on the left, which is unlikely given the poor 
hydrology on the Colorado River Basin this past winter, to no CAP allocation at all on the right. 
Importantly, note that through all scenarios, there are sufficient supplies available to meet the non-SRP 
member demands, as indicated by the purple line to the chart.  
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
DCP 1 (2025)
CAP 85% cut
CAP Deadpool
Acre-feet
Planning assumptions for 2027 
2027 Non-SRP member planning scenarios
CAP
LTSC
NCS
Projected demand
3,112
2,873
2,917
2,876
2,781
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
0
1,000
2,000
3,000
4,000
2021
2022
2023
2024
2025
Non-SRP member population
Acre-feet
Year
Non-SRP member potable demands and 
population
Water demand
Population

Mayor and Council 
May 18, 2026 
5
Looking ahead to 2028, there is the possibility that the federal government will provide clearer guidance 
regarding availability of Tempe’s CAP supplies into the future years. However, it remains highly likely 
that Tempe’s CAP allocation will be reduced compared to pre-2027 amounts. The chart below reflects 
Tempe’s current planning assumptions of non-SRP member supplies and demands. Note that this chart 
includes a new supply: reclaimed water. Following the rehabilitation of Tempe’s Kyrene Water 
Reclamation Facility in late 2027, Tempe will have access to local reclaimed water, which can be used 
to generate Long-term Storage Credits or provide access to new supplies through an exchange with 
SRP.  
Although there is considerable 
uncertainty surrounding the 
Colorado River, one thing is clear: 
Tempe is fully prepared to continue 
supplying the water our community 
needs to thrive and grow 
sustainably. To ensure readiness, 
Tempe actively plans and shares 
these plans with customers through 
tools such as concise “one-page” 
fact sheets and by maintaining an 
updated Drought Resiliency and 
Preparedness Plan, most recently 
revised in 2025. At present, Tempe’s 
demand management stage within 
this plan remains at “0, Watch,” 
reflecting the limited impact that 
Colorado River shortages currently 
have on the City’s ability to meet 
water demands. 
ATTACHMENT: 2026 Tempe Water Resources Presentation 
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2028
(CAP 85% cut)
2030
2035
2040
Acre-feet
Planning year
Long-term Non-SRP member planning scenarios
CAP
Non-Member Groundwater Wells
Reclaimed Water
Projected Demand