Summary Sheet- RFCA SUMMARY
Extracted text (via pymupdf)
2683 characters
CITY OF TEMPE Meeting Date: 6/25/2026 REQUEST FOR COUNCIL ACTION Agenda Item: 7C13 ACTION: Adopt a resolution authorizing the Mayor to sign an Intergovernmental Agreement with Maricopa County for the Loop 101 Integrated Corridor Management Readiness Project. (Resolution No. R2026.82) FISCAL IMPACT: Total cost of Tempe’s 5.7% local match required contribution for the project shall not exceed $4,045 which includes $2,000 in design costs. Sufficient funds have been appropriated in the Capital Improvement Program Fund, Cost Center 6911699 (Traffic Signal CCTV Updates), for the anticipated expenditures in the current fiscal year. RECOMMENDATION: Adopt Resolution No. R2026.82. BACKGROUND INFORMATION: The purpose of this Intergovernmental Agreement (IGA) is to identify the roles and responsibilities for the parties with respect to the project and define the cost sharing of the local match. In association with the Maricopa Association of Governments (MAG) System Management and Operations (SM&O) Plan, the project consists of procuring equipment to support Integrated Corridor Management (ICM) along Loop 101 within the City of Tempe. The project also includes enhancements to the AZTech Regional Information System (ARIS) to support the Loop 101 ICM. The goal of this project is to provide improved reliability, connectivity, safety and regional operations while enhancing coordination amongst the local agencies included in the AZTech Regional Partnership. The project will enhance the capabilities of providing real-time management for Integrated Corridor Management detour routing along the Loop 101 corridor by addressing existing deficiencies in infrastructure and data, thus improving corridor data availability and connectivity while supporting real- time corridor operations and coordination. Closed-circuit television cameras (CCTV) devices, detection devices, network communication devices, and/or traffic signal controllers, which are inclusive of necessary hardware and software, will be procured. The City is responsible for all field infrastructure upgrades required to support the project and will complete the installation of the procured devices. This Agreement shall commence June 25, 2026 and shall terminate on June 24, 2036 or until all responsibilities in this IGA have been completed. ATTACHMENTS: 1. RESOLUTION 2. INTERGOVERNMENTAL AGREEMENT STAFF CONTACT(S): Shelly Seyler, Deputy Transportation and Sustainability Director, (480) 3650- 8854 Department Director: Eric Iwersen, Transportation and Sustainability Director Legal review by: Eric Anderson, City Attorney Prepared by: Sue Taaffe, Administrative Supervisor