January 25, 2023 
Z2022133 & Z2022134 
Page 1 of 6 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Board Hearing Date: 
January 25, 2023 
 
Case #/Title:   
 
 
Z2022133 and Z2022134 – Lake Pleasant Storage      
 
Supervisor District: 
4 
 
Applicant/Owners:  
Richard Starr / Branden Orr and Savannah Orr  
 
Request: 
1) Zone Change with Overlay from Rural-43 to C-2 CUPD 
 
 
 
2) Special Use Permit (SUP) for RV/Boat Parking 
 
Site Location: 
Generally located 2,100’ north of the NEC of W. Pinnacle 
Peak Road & N. Lake Pleasant Parkway in the Peoria area 
 
Site Size: 
Approximately 4.4 acres 
 
County Island Status: 
Yes (City of Peoria) 
Additional 
Comments: 
There are no outstanding concerns from reviewing agencies. 
The applicant, Richard Starr of Garrett Development 
Corporation, on behalf of the property owners, Branden and 
Savannah Orr, is requesting a Zone Change from Rural-43 to 
C-2 CUPD, as well as a Special Use Permit (SUP) for RV and 
boat storage, on APN 201-16-019C. 
 
 
Following publication of the Report to the Planning & Zoning 
Commission (but prior to the Commission hearing on 
December 8, 2022), staff received public comments from the 
City of Peoria. The City noted that the project is located within 
its Municipal Planning Area, and likewise, their General Plan 
2040 designates the land use onsite as Rural Residential (0-1 
units per acre). The City expressed concerns regarding the 
fact that the proposed self-storage facility is not consistent 
with this land use designation or the immediately surrounding 
land use patterns. However, since the site is located on a 
County Island, the City requested additional conditions of 
approval regarding maximum building height, signage, and 
development character. The applicant confirmed his support 
for these conditions. Therefore, staff agreed to a revised set 
of conditions of approval for Case Z2022133. Conditions ‘d.1.’, 
‘e’, and ‘f’ were incorporated with the Commission’s 
recommendation (listed below) to address the City of

January 25, 2023 
Z2022133 & Z2022134 
Page 2 of 6 
Peoria’s comments/concerns. The City’s comments memo is 
included within the 12/8/22 PZ Handout. 
 
Staff also received 22 signatures from area residents 
petitioning for opposition to both cases. Each petition 
includes a signature from the property owner and the parcel 
number at which they reside. Each petition was also 
submitted with a map from the Maricopa County Assessor’s 
Office confirming the owner information and corresponding 
parcel. Ten (10) of the signatures were received from parcels 
wholly or partially within a 300’ radius of the subject site. The 
remaining 12 signatures were received from parcels wholly 
beyond the 300’ radius. The petitions state general opposition 
to the project, with no specific reasoning provided. The 
petitions were received by staff following publication of the 
Report to the Planning & Zoning Commission (but prior to the 
Commission hearing on December 8, 2022). As such, they are 
included within the 12/8/22 PZ Handout. One of these 
property owners within 300’ of the project spoke in opposition 
at the Commission hearing, where he expressed concerns 
regarding the traffic impact on Lake Pleasant Parkway. Both 
staff and the applicant responded to the opposition, 
confirming that the project would be a low trip generator, 
with driveway access at Lake Pleasant Parkway facilitating 
right-in/right-out turning movements only. 
 
Staff has calculated the opposition received, and notes that 
a Super Majority Vote has been triggered. The trigger occurs 
when 20% or more of property owners within a 300’ radius of 
the subject site, by number and area, register opposition to 
the case. The opposition received accounts for 10 property 
owners across 8 parcels, with an area of 274,642 square feet 
within the 300’ buffer. An Opposition Map is attached. 
 
 
The calculations for Lake Pleasant Storage are as follows:  
 
22.2% opposed parcel acreage within 300’ buffer 
 
47.1% opposed parcel numbers within 300’ buffer  
 
Commission  
 
Recommendations: 
On 12/8/22, the Commission voted 9-0 to recommend 
approval of Z2022133 subject to conditions ‘a’ – ‘j’, with staff-
recommended modified conditions ‘d.1’, ‘e’, and ‘f’:  
 
a. 
A Plan of Development is approved subject to the Site Plan entitled “Lake Pleasant 
Parkway Storage”, consisting of 1 full-size sheet, dated October 31, 2022, and 
stamped received November 2, 2022, except as modified by the following 
conditions. The Plan of Development may be amended administratively under a 
separate application as long as the amendment complies with the established 
CUPD development standards as approved by the Board of Supervisors. Staff may 
determine slight refinements to remain in substantial conformance with the 
approved site plan.  Minor and major amendments to the site plan will be

January 25, 2023 
Z2022133 & Z2022134 
Page 3 of 6 
determined in accordance with Chapter 3 of the Maricopa County Zoning 
Ordinance.  
 
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “Lake Pleasant Parkway Storage”, consisting of 7 pages, dated 
October 2022, and stamped received November 2, 2022, except as modified by 
the following conditions.  
 
c. 
The following Planning Engineering conditions shall apply: 
 
1. Patent easements must be abandoned prior to issuance of any building 
permits. 
 
2. Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The 
applicant will be responsible for coordinating with the City to review any traffic 
impact, right-of-way dedication, permitting or roadway improvement 
requirements. 
 
3. Mariposa Grande has not been accepted by the county; and therefore not 
maintained by the County. This alignment is classified as “Other R/W” 
 
4. Based on the TIS submitted to the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities surrounding 
the project Site. County has no further comments. 
 
5. Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. Maintain a minimum 25 foot separation between septic facilities and the 
retention basins. 
 
7. Detailed Grading and Drainage (Site Infrastructure) Plans must be submitted 
with the application for Building Permits. All onsite flows must be routed to the 
underground retention storage. 
 
8. Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit. 
 
9. The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of any 
building 
permits 
required 
for 
site 
development. 
See: 
https://www.maricopa.gov/DocumentCenter/View/6577 
 
10. Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction. 
 
d. 
The following C-2 CUPD standards shall apply:

January 25, 2023 
Z2022133 & Z2022134 
Page 4 of 6 
 
1. Buildings shall be limited to one story with a maximum height of 20’. 
 
2. There shall be a minimum of 26 parking spaces provided. 
 
3. There shall be a minimum of 1 loading space provided. 
 
4. The use of the site shall be limited to indoor self-storage. 
 
e. 
Signage along Lake Pleasant Parkway shall be limited to static elements. Digital 
signage or message centers are prohibited. 
 
f. 
To the extent practical, the building façade along Lake Pleasant Parkway shall be 
designed in such a manner as to mimic the appearance of a professional office 
building, which is compatible with the scale and character of the area. This may 
be achieved through façade alteration, building fenestration, and the 
application of colors and materials. 
 
g. 
Prior to issuance of a building permit, written confirmation will be required from the 
emergency fire protection jurisdiction having authority that the facility has been 
designed in accordance with their regulations and requirements, and that 
emergency fire protection service will be provided to the facility. Prior to issuance 
of the certificate of occupancy, local fire protection jurisdiction review and 
approval will be required. 
 
h. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Zone Change as set forth in the Maricopa County 
Zoning Ordinance. 
 
i. 
The property owners and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions. 
 
j. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions. In the event of the failure to comply 
with any condition, the property shall revert to the zoning that existed on the date 
of application.  It is, therefore, stipulated and agreed that revocation due to the 
failure to comply with any conditions does not reduce any rights that existed on 
the date of application to use, divide, sell, or possess the property and that there 
would be no diminution in value of the property from the value it held on the date 
of application due to such revocation of the Zone Change.  The Zone Change 
enhances the value of the property above its value as of the date the Zone 
Change is granted and reverting to the prior zoning results in the same value of 
the property as if the Zone Change had never been granted. 
 
On 12/8/22, the Commission voted 9-0 to recommend 
approval of Z2022134 subject to conditions ‘a’ – ‘f’: 
 
a. 
Development of the site shall be in substantial conformance with the Site Plan 
entitled “Lake Pleasant Parkway Storage”, consisting of 1 full-size sheet, dated

January 25, 2023 
Z2022133 & Z2022134 
Page 5 of 6 
October 31, 2022, and stamped received November 2, 2022, except as modified 
by the following conditions. Staff may determine slight refinements to remain in 
substantial conformance with the approved site plan.  Minor and major 
amendments to the site plan will be determined in accordance with Chapter 3 of 
the Maricopa County Zoning Ordinance. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “Lake Pleasant Parkway Storage”, consisting of 7 pages, dated 
October 2022, and stamped received November 2, 2022, except as modified by 
the following conditions. 
 
c. 
The following Planning Engineering conditions shall apply: 
 
1. 
Patent easements must be abandoned prior to issuance of any building 
permits. 
 
2. 
Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The 
applicant will be responsible for coordinating with the City to review any 
traffic 
impact, 
right-of-way 
dedication, 
permitting 
or 
roadway 
improvement requirements. 
 
3. 
Mariposa Grande has not been accepted by the county; and therefore 
not maintained by the County. This alignment is classified as “Other R/W” 
 
4. 
Based on the TIS submitted to the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities 
surrounding the project Site. County has no further comments. 
 
5. 
Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. 
Detailed Grading and Drainage (Site Infrastructure) Plans must be 
submitted with the application for Building Permits. All onsite flows must be 
routed to the underground retention storage. 
 
7. 
Detailed Grading and Drainage (Site Infrastructure) Plans must be 
submitted with the application for Building Permits. All onsite flows must be 
routed to the underground retention storage. 
 
8. 
Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit. 
 
9. 
The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of 
any 
building 
permits 
required 
for 
site 
development. 
See: 
https://www.maricopa.gov/DocumentCenter/View/6577 
 
10. 
Engineering review of planning and/or zoning cases is for conceptual 
design only. All development and engineering design shall be in 
conformance with Section 1205 of the Maricopa County Zoning 
Ordinance; Drainage Policies and Standards; Floodplain Regulations for

January 25, 2023 
Z2022133 & Z2022134 
Page 6 of 6 
Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of 
application for construction. 
 
d. 
This Special Use Permit is valid for a period of 20 years and shall expire on January 
25, 2043, or upon termination of the use for a period of 90 or more days, whichever 
occurs first. All site improvements associated with the Special Use Permit shall be 
removed within 90 days of such expiration or termination of use. 
 
e. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Special Use Permit as set forth in the Maricopa County 
Zoning Ordinance. 
 
f. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions.  In the event of the failure to comply 
with any condition, or at the time of expiration of the Special Use Permit, the 
property shall revert to the zoning that existed on the date of application. It is, 
therefore, stipulated and agreed that either revocation due to the failure to 
comply with any conditions, or the expiration of the Special Use Permit, does not 
reduce any rights that existed on the date of application to use, divide, sell, or 
possess the property and that there would be no diminution in value of the 
property from the value it held on the date of application due to such revocation 
or expiration of the Special Use Permit.  The Special Use Permit enhances the value 
of the property above its value as of the date the Special Use Permit is granted 
and reverting to the prior zoning results in the same value of the property as if the 
Special Use Permit had never been granted. 
 
Presented by: 
 
Nick Schlimm, Planner 
Reviewed by: 
 
Darren Gérard, AICP, Planning Manager   
 
Attachments: 
 
12/8/22 P&Z Packet (51 pages)  
 
 
12/8/22 P&Z Handout (42 pages) 
 
 
12/15/22 Opposition Map (1 page) 
 
 
Note: 
12/8/22 Draft P&Z Minutes are not available as of the writing of this report, but can 
be provided upon request later when available.

Z2022133 & Z2022134 
Page 1 of 13 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Cases: 
Z2022133 and Z2022134 – Lake Pleasant Storage 
 
 
Hearing Date: 
December 8, 2022 
 
Supervisor District: 
4 
 
 
 
  
 
Applicant: 
Richard Starr, Garrett Development Corporation  
 
Owners: 
Branden Orr and Savannah Orr  
   
Requests: 
1) Zone Change with Overlay from Rural-43 to C-2 CUPD 
 
 
2) Special Use Permit (SUP) for RV/Boat Parking  
 
  
 
Site Location: 
Generally located 2,100’ north of the NEC of W. Pinnacle Peak Road 
& N. Lake Pleasant Parkway in the Peoria area 
 
  
Site Size: 
Approx. 4.4 acres 
 
Density: 
N/A 
 
County Island:  
Yes (City of Peoria) 
 
 
County Plan: 
White Tank / Grand Ave – Small Lot Residential (2-5 d.u./ac.) 
 
Municipal Plan: 
City of Peoria – Rural Residential 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z2022133 & Z2022134 
Page 2 of 13 
Project Summary: 
 
1. 
The applicant, Richard Starr of Garrett Development Corporation, on behalf of the 
property owners, Branden and Savannah Orr, is requesting a Zone Change from Rural-43 
to C-2 CUPD, as well as a Special Use Permit (SUP) for RV and boat storage, on APN 201-
16-019C (subject property). The subject property is vacant, comprises approximately 4.4 
acres, and is located on the east side of Lake Pleasant Parkway, approximately ½ mile 
north of Pinnacle Peak Road and ½ mile south of Happy Valley Road. The subject 
property is also located on a county island in the City of Peoria Municipal Planning Area. 
 
2. 
The request for a Zone Change with Overlay is to accommodate a proposed indoor, 
climate-controlled self-storage facility. The narrative report states that the self-storage 
facility would provide an important low-intensity use to customers with personal, business, 
or other temporary storage needs. Climate control is cited as an especially valuable asset 
in the hot Arizona climate. The self-storage use would be contained within a single-story 
building with a 55,900-square-foot footprint, plus an additional 55,900 square feet of 
basement storage. A total of 109,250 square feet would be dedicated to self-storage, 
plus 900 square feet of office space and a 1,650-square-foot loading area, for a total 
building area of 111,800 square feet. The proposed roofline is 18’-8”, with parapets raising 
the total building height to 20’. 
 
3. 
The request for an SUP is to accommodate up to 71 covered spaces for RV and boat 
storage, with a total canopy area of 29,280 square feet. These storage spaces would be 
12’ wide and range from 25’ – 50’ in length, would measure up to 19’-3” in height, and 
would be located to the east and south of the self-storage building. Per the narrative 
report, covered RV and boat parking is valuable for customers who face restrictions 
parking large vehicles on their own properties, and in turn seek secure storage of these 
vehicles with protection from the sun. 
 
4. 
Public access, as well as primary emergency access, would be provided to and from the 
site by way of a new driveway and deceleration lane at Lake Pleasant Parkway. The 
driveway would be 40’ wide and located along the west property line, with the centerline 
located 70’ south of the north property line. Due to the existing median, the new driveway 
would only accommodate right-in/right-out turns. As Lake Pleasant Parkway is within the 
City of Peoria’s jurisdiction, driveway access and related traffic impact analyses will be 
further evaluated by the City following final determination of these cases by the County, 
but prior to the issuance of building permits. Secondary emergency access, if requested 
by fire authorities, would be provided at the southeast corner of the property by way of 
an emergency gate at Mariposa Grande. On-site, two-way traffic will be permissible on 
all sides of the indoor storage building. Two gates (one each on the north and south side 
of the building) would allow customers to access via keypad their storage units and 
RV/boat storage spaces, as well as the loading area of the self-storage building. 
 
5. 
Two employees would be onsite during office hours from 9:00 a.m. – 6:00 p.m., Monday 
through Saturday. The two access gates would be accessible 7 days a week from 6:00 
a.m. – 10:00 p.m. The property would be screened by an 8’ (h) CMU wall and a 25’ 
landscape buffer along the north, east, and south property lines. 
 
6. 
The Maricopa County Planning & Development Department (PND) held a Pre-
Application meeting with the applicant on June 14, 2022 (per Case PA2022095) to discuss

Z2022133 & Z2022134 
Page 3 of 13 
the proposed uses and zoning entitlements. Staff recommended that the applicant 
inquire with the City of Peoria regarding annexation of the subject property, as Lake 
Pleasant Parkway is within the City’s jurisdiction. Otherwise, a Zone Change to C-2 CUPD 
and an SUP would both be required. The applications for the Zone Change and SUP (per 
Cases Z2022133 and Z2022134, respectively) were received on July 12, 2022. The 
applicant’s narrative report confirms that the City of Peoria had expressed no intention 
of annexing the subject parcel, and likewise had expressed no objection to the proposed 
uses and zoning entitlements to be requested from the County. A Technical Advisory 
Committee (TAC) meeting was held on August 16, 2022. Final revisions to the site plan 
and narrative report were received on November 2, 2022, and the cases were placed 
on the December 8, 2022 Planning & Zoning Commission agenda. 
 
7. 
The requested CUPD Overlay includes three variations to the base C-2 zoning district 
regulations. The first request is to reduce the required number of parking spaces from 126 
to 26. The second request is to reduce the required number of loading areas from five to 
one (the one loading area proposed will accommodate three drive-in bays). The 
applicant justifies these requests in stating that the storage use is a low-intensity trip 
generator, with customers only visiting their rented units once every several months on 
average. The applicant also references the far less restrictive parking requirements of 
other jurisdictions, namely the City of Phoenix, which only requires 1 parking space per 35 
storage units and one parking space per 300 square feet of office space (The County’s 
zoning ordinance requires 1 space per 900 square feet of building used for “warehouse” 
use and 1 space per 250 square feet of building used for “office” use). Per the applicant, 
if this project were within the City of Phoenix’s jurisdiction, the minimum parking 
requirement would be for 26 spaces, hence the requested variation. 
 
8. 
The third request is to restrict the allowed use on the site to self-storage only, with the 
associated RV and boat parking to be allowed with the SUP. Per the narrative report, 
allowing only these uses guarantees minimal commercial impact on the neighboring 
community, giving residents the comfort of knowing that a more intense commercial use 
(if one were to be proposed in the future) would be required to undergo an additional 
entitlement process. The following development standards are proposed with the 
CUPD/SUP table below, with changes to base development standards shown in bold. 
 
Regulation 
Base Zoning District 
Regulations (C-2) 
Proposed Zoning 
District Regulations 
(C-2 CUPD) 
Proposed Zoning 
District Regulations 
(C-2 CUPD SUP) 
Maximum Height 
40’ 
40’ 
40’ 
Minimum Front Yard 
10’ 
10’ 
10’ 
Minimum Side Yard 
10’ 
10’ 
10’ 
Minimum 
Street-side 
Yard 
10’ 
10’ 
10’ 
Minimum Rear Yard 
25’ 
25’ 
25’ 
Minimum Lot Area 
6,000 sq. ft. 
6,000 sq. ft. 
6,000 sq. ft. 
Minimum Lot Width 
60’ 
60’ 
60’ 
Maximum Lot Coverage 
60% 
60% 
60% 
Parking Spaces 
126 
26 (C-2 CUPD & SUP combined) 
26 (C-2 CUPD & SUP combined) 
Loading Spaces 
5 
1 
1 
Screening 
6’ solid wall 
6’ solid wall 
6’ solid wall 
Uses 
See Ordinance for C-2 
Commercial Uses 
Self-Storage Only 
Self-Storage 
and 
Associated 
RV/Boat 
Parking Only

Z2022133 & Z2022134 
Page 4 of 13 
Subject site and surrounding zoning districts. 
 
 
 
2022 aerial image of the subject site.

Z2022133 & Z2022134 
Page 5 of 13 
Site Plan 
 
 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
9. 
On-site: 
 
Rural-43 / Vacant 
North: 
Rural-43 / Single-Family Residences  
South: 
Rural-43 / Islamic Center of Peoria 
East: 
Rural-43 / Single-Family Residences 
West: 
Lake Pleasant Parkway, then City of Peoria SR-43 / Candeo School 
 
 
Utilities and Services: 
 
10. 
Water: 
 
Sunrise Water Company 
Wastewater: 
Private Septic 
School District: 
Peoria Unified School District 
Fire: 
Rural/Metro Fire Department 
Police:  
Maricopa County Sherriff’s Office  
 
Right-of-Way: 
 
11. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) 
Major Streets and Routes Plan.

Z2022133 & Z2022134 
Page 6 of 13 
Street Name 
Half-width Existing R/W 
Half-width Proposed R/W 
Future Classification 
Lake Pleasant 
Parkway 
75’ 
(City 
of Peoria 
jurisdiction) 
N/A 
Principal Arterial 
 
Adopted Plans: 
 
12. 
White Tank / Grand Ave Area Plan (adopted December 6, 2000): The White Tank / Grand 
Avenue Area Plan designates the site as Small Lot Residential (greater than 2.0 but less 
than 5.0 dwelling units per Acre). This category “identifies areas where increased 
residential density development is appropriate and urban services such as sewer, water, 
schools, parks, and fire and police protection are available. Single family development 
may be permitted, provided that overall development densities do not exceed 5.0 
dwelling units per acre. Densities greater than 5.0 dwelling units per acre may be 
permitted in new development, but only if areas of lower density offset the increase such 
that an average of no more than 5.0 dwelling units per acre is maintained. A community 
sewer and water system will be required for development at these densities.” 
 
13. 
City of Peoria General Plan (adopted December 2020): The City of Peoria General Plan 
designates the site as Rural Residential. This category “identifies areas of large-lot 
residential development in areas with a semi-rural or agricultural character.” Densities 
range from 0 to 1.0 dwelling unit per acre. Lots are typically over 1 acre in size, with 
substantial setbacks from streets and between homes to emphasize the semi-rural 
character of the area. 
 
Public Participation Summary: 
 
14. 
The applicant complied with the Maricopa County Citizen Review Process with the 
required posting of the site and notification by first-class mail to adjacent property owners 
within 300’ of the subject parcel and to interested parties. In the Citizen Participation 
Results report, the applicant acknowledges the concerns that neighboring property 
owners did express during the Review Process, including concerns regarding building 
height, traffic and access, screening, utility access at Mariposa Grande, the need and 
desirability for self-storage in the area, and onsite safety and security. The Results report 
addresses all of these concerns and confirms that the applicant has maintained contact 
with concerned neighbors. According to the report, there are no outstanding issues. As 
of the date of this report, staff has not been notified of any objections from the general 
public. The City of Peoria was also notified of the requests; however, as of the date of this 
report, staff has not received any response from the City. 
 
Outstanding Concerns from Reviewing Agencies: 
 
15. 
N/A. 
 
Staff Analysis: 
 
16. 
The proposed use is appropriate for a site located adjacent to a principal arterial. 
However, as the property owner will not be seeking annexation for sewer service, staff 
concurs with the applicant’s request to limit commercial use of the site to the proposed 
self-storage facility and RV/boat storage. These uses can be accommodated via an 
onsite septic system. Generally, self-storage and RV/boat storage facilities generate very

Z2022133 & Z2022134 
Page 7 of 13 
small numbers of visitors and very little traffic at any given time. For this reason, the 
proposed uses are compatible with the surrounding residential uses. For similar reasons, 
the request to lower the required number of parking spaces and loading spaces is also 
reasonable. The 126 parking spaces and five loading spaces required under base C-2 
zoning district regulations far exceed the number of spaces that would be in demand for 
a use that generates very few trips. Additionally, the applicant has demonstrated 
cooperation with neighboring property owners as part of the required Citizen Review 
Process and has gone so far as to tailor the site plan to accommodate their concerns. 
Therefore, staff supports the request for a Zone Change to C-2 CUPD and the associated 
proposal to develop the site as a self-storage facility. Staff also supports the request for a 
Special Use Permit for RV and boat storage. Staff recommends that the SUP be valid for 
a period of 20 years. Limiting the SUP to 20 years will allow for reevaluation of the project 
at that time to determine whether the use of the site for RV and boat storage remains 
appropriate, pending growth patterns, zoning, and annexations within the City of 
Peoria’s Municipal Planning Area. 
 
17. 
Staff notes that there are 33’ federal patent easements along the east and south 
property lines. Staff advised the applicant during the TAC meeting that these patent 
easements would need to be abandoned prior to issuance of building permits. The 
applicant and property owners are coordinating with the Maricopa County Department 
of Transportation (MCDOT) to abandon these patent easements, per Case PAB-0206. The 
first of two hearings scheduled with the Board of Supervisors (BOS) was held on September 
28, 2022. The second and final BOS hearing is scheduled for December 7, 2022. Following 
abandonment, only a 55’ x 33’ portion will remain as a road and utility easement in the 
southeast corner of the parcel, connecting to the Mariposa Grande right-of-way. A 30’ x 
65’ fire access easement will extend north from the road and utility easement, as 
illustrated in the excerpt from the site plan provided below. As confirmed in the narrative 
report, there will be no public access to/from Mariposa Grande, which will only be used 
for secondary emergency access if requested by fire authorities.

Z2022133 & Z2022134 
Page 8 of 13 
 
If the patent easements were not abandoned, as many as 50 (out of 71) of the proposed 
RV/boat storage spaces would encroach onto these easements, and hence would not 
be permissible. Therefore, the project benefits significantly from the abandonment of the 
patent easements. The preservation of a small segment of the southern patent 
easement, which will feed into a proposed fire access easement, is also beneficial as it 
will provide secondary emergency access if the need arises. 
 
18. 
A temporary address (9828 W. Mariposa Grande) has been assigned to the subject 
parcel. Mariposa Grande is classified as “Other R/W” (as it is not maintained by MCDOT) 
and follows the east-west patent easement up to the southernmost 25’ of the subject 
parcel’s east property line. Although public access to the site will be provided via Lake 
Pleasant Parkway (hence the project name), the subject parcel does not border the Lake 
Pleasant Parkway R/W. The two are separated by another parcel, APN 201-16-019B, 
which is adjacent to the west of the subject parcel (APN 201-16-019C). This adjacent 
parcel shares the same ownership with the subject parcel. Unlike the subject parcel, 
however, this adjacent parcel is within the City of Peoria’s jurisdiction, as is the Lake 
Pleasant Parkway R/W. 
 
 
 
This separation notwithstanding, staff has determined that the subject parcel qualifies as 
a through lot. Therefore, both the east and west property lines are considered front yards 
for setback purposes. Furthermore, the applicant has expressed interest in having the 
parcel reassigned a Lake Pleasant Parkway address. Since the main access driveway will 
connect to this arterial, staff concurs that a Lake Pleasant Parkway address is desirable.

Z2022133 & Z2022134 
Page 9 of 13 
Therefore, when the applicant applies for building permits, he is welcome to request a 
Lake Pleasant Parkway address from the PND Addressing Division. 
 
19. 
The applicant will be responsible for coordinating with the City of Peoria to review any 
traffic impact, right-of-way dedication, permitting, or roadway improvement 
requirements. The applicant has provided documentation of a Preliminary Application 
meeting held between himself and the City on June 8, 2022. This Pre-Application was a 
request for a driveway and ROW permit along Lake Pleasant Parkway. The City advised 
the applicant to obtain the necessary entitlements from Maricopa County first, and then 
to apply for Landscape and Site Improvement (Civil) Permits from the City. 
Documentation of this Pre-Application is included with the staff report. This 
documentation illustrates that the City of Peoria is aware of the project and the zoning 
entitlements being requested from the County. Furthermore, it suggests that the City is 
willing to support the project (to the extent it impacts municipal jurisdiction) once the 
County issues the zoning entitlements for that portion of the project within County 
jurisdiction. 
 
Recommendation: 
 
17. 
Staff recommends the Commission adopt a motion recommending that the Board of 
Supervisors approve Z2022133 subject to the following conditions ‘a’ – ‘h’. 
 
a. 
A Plan of Development is approved subject to the Site Plan entitled “Lake Pleasant 
Parkway Storage”, consisting of 1 full-size sheet, dated October 31, 2022, and 
stamped received November 2, 2022, except as modified by the following 
conditions. The Plan of Development may be amended administratively under a 
separate application as long as the amendment complies with the established 
CUPD development standards as approved by the Board of Supervisors. Staff may 
determine slight refinements to remain in substantial conformance with the 
approved site plan.  Minor and major amendments to the site plan will be 
determined in accordance with Chapter 3 of the Maricopa County Zoning 
Ordinance.   
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “Lake Pleasant Parkway Storage”, consisting of 7 pages, dated 
October 2022, and stamped received November 2, 2022, except as modified by 
the following conditions. 
 
c. 
The following Planning Engineering conditions shall apply: 
 
1. Patent easements must be abandoned prior to issuance of any building 
permits. 
 
2. Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The 
applicant will be responsible for coordinating with the City to review any 
traffic 
impact, 
right-of-way 
dedication, 
permitting 
or 
roadway 
improvement requirements. 
 
3. Mariposa Grande has not been accepted by the county; and therefore 
not maintained by the County. This alignment is classified as “Other R/W”

Z2022133 & Z2022134 
Page 10 of 13 
 
4. Based on the TIS submitted to the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities 
surrounding the project Site. County has no further comments. 
 
5. Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. Maintain a minimum 25 foot separation between septic facilities and the 
retention basins. 
 
7. Detailed Grading and Drainage (Site Infrastructure) Plans must be 
submitted with the application for Building Permits. All onsite flows must be 
routed to the underground retention storage. 
 
8. Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit. 
 
9. The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of 
any 
building 
permits 
required 
for 
site 
development. 
See: 
https://www.maricopa.gov/DocumentCenter/View/6577 
 
10. Engineering review of planning and/or zoning cases is for conceptual 
design only. All development and engineering design shall be in 
conformance with Section 1205 of the Maricopa County Zoning 
Ordinance; Drainage Policies and Standards; Floodplain Regulations for 
Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of 
application for construction. 
 
d. 
The following C-2 CUPD standards shall apply: 
 
1. There shall be a minimum of 26 parking spaces provided. 
 
2. There shall be a minimum of 1 loading space provided. 
 
3. The use of the site shall be limited to indoor self-storage. 
 
e. 
Prior to issuance of a building permit, written confirmation will be required from the 
emergency fire protection jurisdiction having authority that the facility has been 
designed in accordance with their regulations and requirements, and that 
emergency fire protection service will be provided to the facility. Prior to issuance 
of the certificate of occupancy, local fire protection jurisdiction review and 
approval will be required. 
 
f. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Zone Change as set forth in the Maricopa County 
Zoning Ordinance.

Z2022133 & Z2022134 
Page 11 of 13 
g. 
The property owners and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions. 
 
h. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions. In the event of the failure to comply 
with any condition, the property shall revert to the zoning that existed on the date 
of application.  It is, therefore, stipulated and agreed that revocation due to the 
failure to comply with any conditions does not reduce any rights that existed on 
the date of application to use, divide, sell, or possess the property and that there 
would be no diminution in value of the property from the value it held on the date 
of application due to such revocation of the Zone Change.  The Zone Change 
enhances the value of the property above its value as of the date the Zone 
Change is granted and reverting to the prior zoning results in the same value of 
the property as if the Zone Change had never been granted. 
 
18. 
Staff recommends the Commission adopt a motion recommending that the Board of 
Supervisors approve Z2022134 subject to the following conditions ‘a’ – ‘f’. 
 
a. 
Development of the site shall be in substantial conformance with the Site Plan 
entitled “Lake Pleasant Parkway Storage”, consisting of 1 full-size sheet, dated 
October 31, 2022, and stamped received November 2, 2022, except as modified 
by the following conditions. Staff may determine slight refinements to remain in 
substantial conformance with the approved site plan.  Minor and major 
amendments to the site plan will be determined in accordance with Chapter 3 of 
the Maricopa County Zoning Ordinance. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “Lake Pleasant Parkway Storage”, consisting of 7 pages, dated 
October 2022, and stamped received November 2, 2022, except as modified by 
the following conditions. 
 
c. 
The following Planning Engineering conditions shall apply: 
 
1. Patent easements must be abandoned prior to issuance of any building 
permits. 
 
2. Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The 
applicant will be responsible for coordinating with the City to review any 
traffic 
impact, 
right-of-way 
dedication, 
permitting 
or 
roadway 
improvement requirements. 
 
3. Mariposa Grande has not been accepted by the county; and therefore 
not maintained by the County. This alignment is classified as “Other R/W” 
 
4. Based on the TIS submitted to the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities 
surrounding the project Site. County has no further comments.

Z2022133 & Z2022134 
Page 12 of 13 
5. Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. Detailed Grading and Drainage (Site Infrastructure) Plans must be 
submitted with the application for Building Permits. All onsite flows must be 
routed to the underground retention storage. 
 
7. Detailed Grading and Drainage (Site Infrastructure) Plans must be 
submitted with the application for Building Permits. All onsite flows must be 
routed to the underground retention storage. 
 
8. Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit. 
 
9. The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of 
any 
building 
permits 
required 
for 
site 
development. 
See: 
https://www.maricopa.gov/DocumentCenter/View/6577 
 
10. Engineering review of planning and/or zoning cases is for conceptual 
design only. All development and engineering design shall be in 
conformance with Section 1205 of the Maricopa County Zoning 
Ordinance; Drainage Policies and Standards; Floodplain Regulations for 
Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of 
application for construction. 
 
d. 
This Special Use Permit is valid for a period of 20 years and shall expire on January 
25, 2043, or upon termination of the use for a period of 90 or more days, whichever 
occurs first. All site improvements associated with the Special Use Permit shall be 
removed within 90 days of such expiration or termination of use. 
 
e. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Special Use Permit as set forth in the Maricopa County 
Zoning Ordinance. 
 
f. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions.  In the event of the failure to comply 
with any condition, or at the time of expiration of the Special Use Permit, the 
property shall revert to the zoning that existed on the date of application. It is, 
therefore, stipulated and agreed that either revocation due to the failure to 
comply with any conditions, or the expiration of the Special Use Permit, does not 
reduce any rights that existed on the date of application to use, divide, sell, or 
possess the property and that there would be no diminution in value of the 
property from the value it held on the date of application due to such revocation 
or expiration of the Special Use Permit.  The Special Use Permit enhances the value 
of the property above its value as of the date the Special Use Permit is granted

Z2022133 & Z2022134 
Page 13 of 13 
and reverting to the prior zoning results in the same value of the property as if the 
Special Use Permit had never been granted. 
 
Presented by: 
Nick Schlimm, Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Maps (2 pages) 
 
Site Plan (1 page) 
 
Narrative Report (7 pages) 
 
MCDOT comments (1 page) 
 
MCESD comments (1 page) 
 
DPR comments (4 pages) 
 
Citizen Participation Plan (5 pages) 
 
Citizen Participation Results Report (4 pages) 
 
PND Pre-Application comments (10 pages) 
 
City of Peoria Preliminary Application comments (3 pages)

MARICOPA COUNTY
/
Maricopa County Planning & Development - Phoenix, AZ
4
Gross Acres: 4.36 approx.
Generated November 9, 2022 14:58 PM
Z2022133
Application Name:
Legal Description
Lake Pleasant Storage EDR
Applicant
Case Address
T04N R01E 9,
Richard Starr for Garrett Development Corp
9828 W MARIPOSA GRANDE
Applicant Phone/Email
Parcel Primary:201-16-019C
480.970.4003
richard@gdc-az.com
PEORIA AZ 85383
Map scale 1:1,433
Supervisor District No.
REZONE TO C-2 CUPD OVERLAY (SELF STORAGE USE ONLY), PLUS ASSOCIATED VEHICLE PARKING
(RV/BOAT) PER SUP
5.3585 in

MARICOPA COUNTY
/
Maricopa County Planning & Development - Phoenix, AZ
4
Gross Acres: 4.36 approx.
Generated November 9, 2022 15:02 PM
Z2022134
Application Name:
Legal Description
Lake Pleasant Storage EDR
Applicant
Case Address
T04N R01E 9,
Richard Starr for Garrett Development Corp
9828 W MARIPOSA GRANDE
Applicant Phone/Email
Parcel Primary:201-16-019C
480.970.4003
richard@gdc-az.com
PEORIA AZ 85383
Map scale 1:1,433
Supervisor District No.
SUP FOR VEHICLE PARKING (RV & BOAT) AS AN ACCESSORY USE TO SELF STORAGE BUILDING.
SELF STORAGE BUILDING IS PER SEPARATE REZONE TO C-2 CUPD
5.3585 in

(28) 12' X 25' COVERED SPACES
(6) 12' X 40'
COVERED SPACES
(6) 12' X 50
COVERED SPACES
(9) 12' X 40'
COVERED SPACES
(9) 12' X 50'
COVERED SPACES
6
12
1 STORY + BASEMENT
1ST FLOOR OFFICE -            900 S.F.
1ST FLOOR LOADING -     1,650 S.F.
1ST FLOOR STORAGE -   53,350 S.F.
BASEMENT STORAGE -   55,900 S.F.
TOTAL 111,800 S.F.
( STORAGE = 109,250 S.F.)
OFFICE
900 S.F.
TOTAL (71)
COVERED SPACES
10'-0"
18'-0"
26'-0"
(13) 12' X 30
COVERED SPACES
32'-4"
25'-0"
25'-0"
KEY PAD
75'-0"
ROW
75'-0"
ROW
8'-0" HIGH BLOCK
WALL
8'-0" HIGH BLOCK
WALL
8'-0" HIGH BLOCK
WALL
8'-0" HIGH BLOCK
WALL
8'-0" HIGH BLOCK
WALL
3'-4" PARKING
SCREEN
WALL
25'-0"
MARIPOSA
GRANDE
(OTHER ROW)
20'-0"
DE
25'-0"
L/S
25'-0"
L/S
25'-0"
L/S
25'-0"
L/S
25'-0"
L/S
20'-0"
DE
PROPERTY LINE
LAKE PLEASANT
PARKWAY
8'-0"
LANDSCAPE
9'-0"
18'-0"
10'-0"
MIN.
C-2
10'-0"
MIN.
C-2
10'-0"
MIN.
C-2
10'-0"
MIN.
C-2
55' x 33' ROAD & UTILITY
EASEMENT
55'-0"
GATE
20' ACCESS
GATE
20'-0"
30'-0"
30'x65'
FIRE
ACCESS
EASEMENT
25'-0"
L/S
25'-0"
MIN.
C-2
4" x 4'
 BOLLARD
8
18'-0"
8'-0"
5'-0"
LOADING
1,650 S.F.
14' CLEAR
30'-0"
63'-0"
72'-0"
30'-0"
50'-0"
55'-0"
50'-0"
40'-0"
45'-0"
40'-0"
25'-0"
32'-4"
191'-4"
31'-4"
25'-0"
25'-3"
22'-0"
20'-0"
16'-0"
20'-0"
22'-0"
20'-0"
KEY PAD
KEY PAD
24'-0"
27'-0"
296'-4"
316'-4"
166'-4"
ASPHALT
ASPHALT
ASPHALT
ASPHALT
211'-4"
25'-0"
85'-0"
GATE
GATE
25'-0"
100'-0"
66'-4"
20'-0"
20'-0"
DE
20'-11"
L/S
20'-11"
L/S
65'-0"
EXIST,
LIGHT
POLE TO
REMAIN
 MONUMENT SIGN
LOCATION
TO BE OUT SIDE OF
EASEMENT
(UNDER SEPARATE
APPROVAL)
EXISTING
MEDIAN
25' x 25'
S.V.T.
LANDSCAPE
40'-0"
50'
25'
0'
A
R
C
H
I
T
E
C
T
S
,
 
I
N
C
9828 W MARIPOSA GRANDE PEORIA AZ 85383
N OF NEC OF LAKE PLEASANT PKWY AND PINNACLE PEAK RD
LAKE PLEASANT PARKWAY STORAGE
DATE: 10-31-22
09-12-22 (REVISED)
07-01-22 (PRELIMINARY)
04-25-22 (PRE-APP)
RKAA# 22114.00
SP-1
  2 0 2 2  R K A A
ARCHITECTS, INC.  ALL
RIGHTS RESERVED.
THIS DRAWING IS AN
I N S T R U M E N T  O F
SERVICE. IT IS THE
PROPERTY OF RKAA
ARCHITECTS, INC. AND
M A Y  N O T  B E
DUPLICATED, USED OR
DISCLOSED WITHOUT
WRITTEN PERMISSION
OF THE ARCHITECT.
©
126 SPACES
26 SPACES
08 SPACES
08 SPACES
PARKING REQUIRED:
TOTAL PARKING REQUIRED: 1 PER 250 SF
TOTAL PARKING PROVIDED:
ACCESSIBLE SPACES REQUIRED:
ACCESSIBLE SPACES PROVIDED:
site
MARIPOSA GRANDE
NORTH
SCALE:
VICINITY MAP
N.T.S.
97TH AVENUE
55,900 S.F.
55,900 S.F.
111,800 S.F.
29,280 S.F.
141,080 S.F.
BUILDING AREA:
1ST FLOOR
BASEMENT
TOTAL BUILDING AREA:
TOTAL CANOPY AREA
TOTAL AREA
AVENDIA DEL SOL
PINNACLE PEAK ROAD
HAPPY VALLEY ROAD
99TH AVENUE
107TH AVENUE
LAKE PLEASANT PKWY
LAKE PLEASANT PKWY
PROJECT DIRECTORY
201-16-019C
RU-43(COUNTY)
C-2 CUPD WITH SUP(COUNTY)
4.356 ACRES (189,747 S.F.)
4.356 ACRES (189,747 SF)
60% (113,848 S.F.)
44.89% (85,180 S.F.)
STORAGE + RV PARKING
20'-0" MAX
PARCEL NUMBER:
EXISTING ZONING:
PROPOSED ZONING:
GROSS SITE AREA:
NET SITE AREA
MAX. LOT COVERAGE:
PROPOSED LOT COVERAGE:
PROPOSED USE:
PROPOSED BUILDING HEIGHT
SITE DATA
ARCHITECT:  RKAA ARCHITECTS, INC.
OWNER:  BRANDEN & SAVANNAH ORR
DEVELOPER:  GARRETT DEVELOPMENT CORP
ENGINEER:  OLSSON
AUTHORIZED AGENT:  GARRETT DEVELOPMENT CORP
NORTH
SCALE:
SITE PLAN
1" = 25'-0"
CASE # PA2022095
PEORIA UNIFIED SCHOOL DISTRICT
(ZONE CHANGE FROM RURAL-43 TO C-2 CUPD FOR
LAKE PLEASANT PARKWAY SELF-STORAGE, WITH
SUP FOR RV & BOAT STORAGE)
CASE # Z2022133
CASE # Z2022134
CUPD COMPARISON CHART
C-2 CUPD
40'
10'
10'
10'
25'
6,000 SF
60'
60%
26
1
6' SOLID WALL
SELF-STORAGE
ONLY
REGULATION
MAX. HEIGHT
MIN. FRONT YARD
MIN. SIDE YARD
MIN. STREET-SIDE YARD
MIN. REAR YARD
MIN. LOT AREA
MIN. LOT WIDTH
MAX. LOT COVERAGE
TOTAL PARKING SPACES
LOADING SPACES
SCREENING
USES
C-2
40'
10'
10'
10'
25'
6,000 SF
60'
60%
126
5
6' SOLID WALL
SEE ORDINANCE
FOR C-2
COMMERCIAL USES
PATENT EASEMENTS ARE IN PROCESS OF BEING
ABANDONED PER PAB-0206
PUBLIC UTILITY/SERVICES:
WATER: SUNRISE WATER
WASTEWATER: PRIVATE SEPTIC
FIRE PROTECTION: RURAL/METRO
POLICE PROTECTION: COUNTY SHERIFF
ELECTRIC: APS
NATURAL GAS: SW GAS
PHONE/INTERNET: COX
REFUSE: WASTE MANAGEMENT
C-2 CUPD SUP
40'
10'
10'
10'
25'
6,000 SF
60'
60%
26
1
6' SOLID WALL
SELF-STORAGE AN
ASSOCIATED
RV/BOAT
PARKING ONLY

1 
 
LAKE PLEASANT PARKWAY  
SELF STORAGE & RV/BOAT STORAGE 
 
 
 
 
 
Lake Pleasant Parkway and Mariposa Grande 
9828 W Mariposa Grande, Peoria, AZ 
APN:  201‐16‐019C 
Case No: Z2022133 and Z2022134 
October 2022 
SUBJECT

2 
 
Location:  Lake Pleasant Pkwy & Mariposa Grande 
APN:  201‐16‐019C (County) + 201‐16‐019B (City of Peoria). 
 
Purpose: 
Entitlements to be requested from County: 
a. Rezone to C‐2 CUPD for self storage use only. 
b. Special Use Permit for covered boat/RV parking. 
c. No land use entitlements from City.  Property within City limits (only 
6000 SF) will be used only for drainage and ROW landscaping.  Project 
will require access/ROW permit from City to access Lake Pleasant Pkwy. 
 
Description of Proposal: 
Requested Use:  Indoor, climate controlled Self Storage with covered Boat/RV 
parking. 
Business Operations (hours):   
 Office ‐ Monday through Saturday 9am‐6pm. 
 Gate – Monday through Sunday 6am‐10pm. 
# of Employees/Customers:  2 staff members + customers (often less than 2‐3 
customers onsite at a time). 
 
Description of Building:   
a. Single‐story self‐storage building located in the center of the site.  
Approximately 55,900 SF footprint plus basement = 111,800 gross SF.  
Loading area (east elevation):  1,650 SF.  Office (Northwest corner of 
building):  900 SF.   
b. Self‐storage building height ‐ 18’‐8” (except 20’ at sign parapet).   
c. RV canopies (steel) will be 14’‐8” high to 19’‐3”. 
 
Colors & Materials:  See elevations. 
a.  Building:  Stucco and stone veneer.  Sonoran Desert tones including 
Sherwin Williams “Sandbar” (tan) and “Tiki Hut” (dark brown). 
b.  RV canopies:  Steel. Sherwin Williams “Urbane Bronze”. 
 
Screening:  8’ block wall along North, East and South property lines. 
Landscape: 25’ landscaped buffer with trees along North, East and South property 
lines.

3 
 
Signage:   
a. 
Building signage to be located on the west elevation along Lake 
Pleasant Pkwy and on the north elevation closest to Lake Pleasant Pkwy as 
shown in the elevations.  Additional details to be provided via separate sign 
permit.  
b. 
Monument signage to be located within County property along Lake 
Pleasant Pkwy as shown on the site plan. Additional details to be provided 
via separate sign permit.  
 
Lighting:   
a. Parking lot lighting to be provided on all sides of the building.  Lighting 
will adhere to County’s zoning ordinance for height and screening 
requirements. 
 
Relationship to Surrounding Properties: 
Overview:  Property is located along major arterial (Lake Pleasant Parkway) in NW 
Peoria near regional commercial hub at LPP and Happy Valley.  Proposed project 
is single‐story only and a quiet use which helps it blend in with the adjacent 
residential uses.   
a. Existing Use/Zoning:  Residential / RU‐43. 
b. Surrounding Uses/Zoning: Residential (North and east), Islamic Center 
(South), Candeo Schools (West) 
c. Benefit to Community:  Self storage provides an important low‐intensity 
use to customers.  Self storage with climate control in hot AZ climate is 
valued by many residents to meet personal or business storage, moving 
or other temporary needs.  Covered RV/boat parking is vital for many 
residents that require secure storage of large vehicles with protection 
from AZ sun.  Also, some neighborhoods have HOA restrictions and/or 
smaller lots which prevent storage of RV/boats on residents’ property. 
d. Recent changes that support entitlement request:  Lake Pleasant 
Parkway (both in County and City) has developed with many non‐
residential uses including schools and commercial uses.  City of Peoria 
approved a similar self storage along Lake Pleasant Parkway in 2018.  
While this project will have similar upgraded elevations and landscaping,

4 
 
our project will be superior to City’s project because it will be fully 
climate controlled and offer RV parking. 
 
Location & Accessibility: 
Location is on the east side of Lake Pleasant Parkway, approx. 1/2 mile north of 
Pinnacle Peak Rd. and south of Happy Valley Rd.  Lake Pleasant Parkway is a major 
arterial with many similar commercial uses.   
 
Parking Required:   
Office:  1 per 250 sq. ft. = 4 spaces (including 1 ADA‐accessible space).   
Indoor Storage:  1 per 900 sq. ft. = 122 spaces (including 7 ADA‐accessible 
spaces). 
Loading:  1 per 25,000 sq. ft. = 5 loading spaces. 
Total Required:  126 spaces (including 8 ADA‐accessible spaces) and 5 
loading spaces. 
 
Parking Provided:  26 total spaces including 8 ADA‐accessible parking spaces and 1 
internal loading area with 3 drive‐in bays.   
 
Given that self storage use is a low‐intensity trip generator, the County’s standard 
parking requirement for 126 spaces is not necessary.  Frequently, customers only 
visit their rented units once every 3‐6 months.  Additionally, the County’s parking 
requirement exceeds the required parking in adjacent municipalities.  For 
example, the City of Phoenix requires only 1 stall / 35 storage units and 1 stall / 
300 sq. ft. office.  If this project were located in Phoenix, 26 parking spaces would 
be required (23 for storage units and 3 for office or 26 in total). 
 
Community Facilities & Services (within vicinity): 
 
Parks:  Liberty Park (9700 W Williams Road) – 1.5 miles away. 
Schools:  Candeo Peoria (9965 W Calle Lejos) ‐ .1 miles away, BASIS Peoria 
(25950 N Lake Pleasant Parkway) – 1.2 miles away, and Liberty High School 
(9621 W Speckled Gecko Drive) – 2.1 miles away. 
Other:  City of Peoria Police (23100 N Lake Pleasant Parkway) ‐.9 miles away 
and City of Peoria Fire (23210 N Lake Pleasant Parkway) ‐ .8 miles away. 
 
Circulation:

5 
 
Circulation Onsite:  Two‐way traffic permissible on all sides of building.  Boat/RV 
parking is in rear behind gates.  Customer access to gated area is via keypad.  Fire 
access to Mariposa Grande ROW will be provided via emergency gate (see 
Easement discussion) if requested by fire authorities. 
 
Circulation Offsite:  New driveway with deceleration lane on Lake Pleasant Pkwy 
(City ROW).  Right‐in, right‐out turning movements only.  There will be no 
customer traffic to/from Mariposa Grande (County ROW) and surrounding 
neighborhood.  A Traffic Impact Statement has been prepared with this submittal.  
Self storage generates less traffic than many commercial uses or schools.  The 
traffic engineer concludes that the deceleration lane and driveway on Lake 
Pleasant Parkway are appropriate for this development.  Further, the driveway 
will be evaluated by City of Peoria engineering in conjunction with its review of 
the required right‐of‐way permit.   
 
Describe Onsite Paving:  All vehicle areas will be paved. 
 
Development Schedule:   
Timeframe for Construction:  Approximately 11 months in a single phase. 
 
Public Utility/Services: 
 
Water:  Sunrise Water. 
 
Wastewater:  private septic. 
 
Fire Protection:  Rural/Metro. 
 
Police Protection:  County Sheriff. 
 
Electric:  APS. 
 
Natural Gas:  SW Gas. 
 
Phone/Internet: Cox. 
 
Refuse:  Waste Management.

6 
 
CUPD & SUP COMPARISON CHART: 
 
REGULATION 
BASE ZONING 
DISTRICT 
REGULATIONS (C‐2) 
PROPOSED ZONING 
DISTRICT 
REGULATIONS (C‐2 
CUPD) 
PROPOSED ZONING 
DISTRICT 
REGULATIONS (C‐2 
CUPD SUP) 
MAX. HEIGHT 
40’ 
40’ 
40’ 
MIN. FRONT YARD 
10’ 
10’ 
10’ 
MIN. SIDE YARD 
10’ 
10’ 
10’ 
MIN. STREET‐SIDE YARD 
10’ 
10’ 
10’ 
MIN. REAR YARD 
25’ 
25’ 
25’ 
MIN. LOT AREA 
6,000 sq. ft. 
6,000 sq. ft. 
6,000 sq. ft. 
MIN. LOT WIDTH 
60’ 
60’ 
60’ 
MAX. LOT COVERAGE 
60% 
60% 
60% 
PARKING SPACES 
126 
26 
26 
LOADING SPACES 
5 
1 
1 
SCREENING 
6’ solid wall 
6’ solid wall 
6’ solid wall 
USES* 
See Ordinance for C‐2 
Commercial Uses 
Self‐Storage Only 
Self‐Storage and 
associated RV/Boat 
Parking only 
 
 
 
 
 
 
*This rezone request is for the self storage use and the special use permit is for the associated 
RV/BOAT parking only.  Allowing only a single use provides the lowest commercial impact on 
the neighboring community.  It gives community members the comfort of knowing any other 
commercial use in the future would be required to go back through this zoning process.  
 
 
 
 
 
 
 
 
 
 
 
 
33’ Patent Easements: 
Existing Patent Easements along property lines: 
 
 
 
North:  none. 
 
East:  33’ Road and Utility. 
 
South:  33’ Road and Utility. 
 
West:  n/a (within City ROW) 
 
Revised Patent Easement (per pending Application with County PAB‐0206): 
 
 
North:  None. 
East:  55’ x 33’ Road and Utility in SE corner only to provide access to 
property to the south similar to existing conditions. 
 
South: SE corner only (see above).

7 
 
 
West:  N/A (within City ROW) 
 
Stormwater Drainage: 
A preliminary stormwater plan has been prepared by our civil engineer, 
Olsson.  See attached pdf.  All stormwater will be retained onsite and 
stored in underground tanks near the southwest corner of the property.  
There is an existing 20’ drainage easement, for flows running from north to 
south, which benefits the City of Peoria (easement holder).  The new site 
improvements within the City property affected by drainage easement will 
be reviewed by City of Peoria engineering staff. 
 
Citizen Participation Plan: 
As outlined in more detail in the Citizen Participation Plan, this application 
and its details will be shared with adjacent residents at each milestone.  
The applicant has reached out to adjacent owners already, before Pre‐
application meeting, and made three changes per those requests:  1) raise 
perimeter wall to 8’, 2) move RV parking from north property line to south 
property line and 3) provide more RV view‐screening along east property 
line.  Additionally, the site plan includes landscaped setbacks along north, 
east and south property lines in excess of typical C‐2 zoning. 
 
City of Peoria Coordination:  
The Applicant held a pre‐app meeting with City of Peoria on June 8, 2022 as 
a portion of the overall project, APN 201‐16‐019B with Lake Pleasant 
Parkway frontage, is located within the City of Peoria’s limits whereas APN 
201‐16‐019C is within Maricopa County. The notes from City of Peoria pre‐
app meeting are included with this application. The focus of the pre‐app 
was the required driveway and related deceleration lane along Lake 
Pleasant Parkway. Further discussion involved the existing 20' drainage 
easement (north/south) across the City portion of project. Lastly, City 
explained need to include elements of its "Lake Pleasant Parkway Design 
Theme" along project's arterial frontage. The City did not express any 
intention to annex the County property nor object to this Rezone 
application requested from Maricopa County.

I:\TSM Traffic Development\1. Projects\North_West_Valley(North of I10_West of I17)\LPP Storage_Z2022133 and 
Z2022134_LakePleasant Pkwy\1. Traffic Impact Studies\LPP Storage_Z2022133&Z2022134_1st Review Approved.docx 
MCDOT -- TRAFFIC ENGINEERING 
REVIEW COMMENT SHEET 
1 of 1 
Project Name: LPP Storage (APN # 201-16-19 C) 
Location: NEC of Lake Pleasant Parkway and Maripose Grand Lane 
MCDOT File No.: Z2022133 and Z2022134 
Date: August 03, 2022 
Reviewer: Laxmikanth Narwa, P.E. 
Phone No.: 602-506-8677 
Consultant: CivTech, Inc. 
Project No.:   
Plans Sealed By:  Joseph F. Spadafino, P.E., PTOE, PTP 
Consultant Code: 
A = Will Comply        B = Deleted 
C = Consultant to Evaluate 
Item 
Number 
Page 
Number 
Comments 
Consultant 
Reply 
=  =  = 
1 
2 
. 
=  =  = 
General 
General 
1st REVIEW (TS) 
Consultant:  Please use the code and respond to each comment in the 
Consultant Reply Column.  This sheet is for our record, please answer every 
question and sign and date your acknowledgement or the plans will be 
sent back to complete the process.  Send back the marked-up plans and a 
new set of plans along with this comment sheet.  Thank you for your 
cooperation. 
=  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  =  = 
General Project Summary: 
The proposed LPP Storage development is located on the northeast corner of 
Lake Pleasant Parkway and Mariposa Grande lane in the City of Peoria.  The 
development is planned to a self-storage mini-warehouse and RV Storage 
facility within parcel APN # 201-16-019B which is in Unincorporated Maricopa 
County .  The Site will be accessed by one RI/RO access driveways only due 
to existing median on Lake Pleasant Parkway.  The site is estimated to 
generate a maximum of 166 total daily trips with maximum 24 AM peak hour 
trips and maximum 19 PM peak hour trips. 
General Comments: 
The project site is entirely within the Unincorporated Maricopa County. The 
adjacent roadway covering the site is completely within the City of Peoria 
jurisdiction. Therefore, the proposed access point and related traffic impact 
analysis elements shall be reviewed and approved by the City of Peoria. The 
below comments are limited to Maricopa County facilities in the project 
vicinity. 
Review Comments: 
Based on the estimated low trip generation for the proposed warehouse 
development, County estimates that there will be no significant traffic impacts 
on the County facilities surrounding the project Site.  Therefore, County has 
no further comments on this Traffic Impact Statement presented for review. 
The Traffic Impact Statement is Approved. 
Signature: _____________________________________ Date: ___________ 
Use CODE 
"A", "B","C" 
in this column 
next to every 
comment. 
=  =  =  = 
8/22/22
Thank you!

Subdivision, Infrastructure & 
Planning Program 
1001 N. Central Avenue #150 
Phoenix, Arizona 85004 
Phone: (602) 506-1058 
Fax: (602) 506-5813  
TDD 602 506 6704 
Maricopa County 
Environmental Services Department 
Water and Waste Management Division  
DATE: July 14, 2022  
 
TO : 
Nicholas Schlimm, Planning & Development Dept. 
 
 
Planner 
 
 
 
 
 
 
 
FROM: Souren Naradikian, P.E. 
 
 
Senior Civil Engineer 
 
SUBJECT: Rezone to C-2 CUPD overlay. Z2022133 
 
The Maricopa County Environmental Services Department (MCESD) has reviewed 
documents received from the Maricopa County Planning and Development 
Department for the above referenced project. This project is a request Rezone to C-
2 CUPD overlay at APN # 201-16-019C. According to the submitted documents, 
water will be served by Sunrise Water and sewer services is septic, MCESD has 
concerns. ATC/NOID permit applications are required prior to construction permit 
approval. 
 
Based on the above, MCESD raised no objection to this project to the Planning & 
Development Department in Accela Automation on July 14, 2022 and the project 
may proceed at this time subject to the following stipulations: 
 
Condition: None. 
 
It should be noted that this document does not approve the referenced project.  
Comments are provided only as advisory to Maricopa County Planning and 
Development Department to assist staff to prepare a staff report.  Other Maricopa 
County agencies may have additional requirements. Final review and approval will be 
made through Planning and Development Department procedures. Applicant may 
need to submit separate applications to the Maricopa County Environmental Services 
Department for approval of proposed facilities regulated by the Department.  Review 
of any such application will be based on regulations in force at the time of 
application.

James Philbin, P.E. 
Planning & Development 
301 W Jefferson St, Suite 170 
Phoenix, Arizona 85003 
Phone: (602) 372-4362 
www.maricopa.gov/planning 
Email address: 
James.philbin@maricopa.gov 
  
Maricopa County 
Planning & Development Department 
 
 
 
Date:    
October 04, 2022 
 
Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development 
 
Attn: 
Nicholas Schlimm, Planner, Planning & Development Services 
 
cc: 
Michael Norris P.E., Engineering Manager, Planning and Development 
 
Bob Fedorka, PE, Engineering Supervisor, Planning & Development 
 
From: 
James Philbin, PE Plans Examiner Engineer, Planning & Development 
 
Subject:   
Z2020133_Z2020134: SUP for vehicle parking (RV & boat) as an 
accessory use to self storage building. Self Storage building is per 
separate Rezone to C-2 CUPD     
APN(s): 
201-16-019C 
Engineering Review has reviewed the first plan and report routed for review on 
09/15/2022, for the subject application and has no further objections with the following 
stipulations: 
 
1. Patent easements must be abandoned prior to issuance of any building 
permits.   
 
2. Lake Pleasant Parkway is within the jurisdiction  of the City of Peoria. The 
applicant will be responsible for coordinating with the City of review any traffic 
impact, right-of-way dedication, permitting or roadway improvement 
requirements.  
 
3. Mariposa Grande has not been accepted by the County; and therefore not 
maintained  by the County. This alignment is classified as “Other R/W” 
 
4. Based on the TIS submitted the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities surrounding 
the project Site. County has no further comments. 
 
5. Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. Maintain a minimum 25 foot separation between septic facilities and the 
retention basins.   
 
7. Detailed Grading and Drainage (Site Infrastructure) Plans must be submitted 
with the application for Building Permits.  All onsite flows must be routed to the 
underground retention storage.    
 
8. Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit.

Page 2 of 4 
 
 
 
9. The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of 
any building permits required for site development.  
See: https://www.maricopa.gov/DocumentCenter/View/6577  
 
10. Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction. 
 
 
Please contact me with any questions.

Page 3 of 4 
 
 
 
DRAINAGE PLAN REVIEW REFERENCES:   
 
The Drainage Regulations are listed in Section 1205 of the MCZO: 
https://www.maricopa.gov/documentcenter/view/272  
Maricopa County Drainage Policies and Standards Manual: 
https://www.maricopa.gov/DocumentCenter/Home/View/2369  
For Additional Information See: 
https://www.maricopa.gov/1635/Drainage-Review 
 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY REFERENCES:   
 
Floodplain Regulations for Maricopa County: 
https://www.maricopa.gov/DocumentCenter/View/630  
For Additional Information See: 
https://www.maricopa.gov/3847/Flood-Control-District  
 
PND TRANSPORTATION REFERENCES: 
 
Residential Driveway Guidelines 
https://www.maricopa.gov/documentcenter/view/362  
Roadway Design Manual 
http://www.mcdot.maricopa.gov/DocumentCenter/View/24883 
Maricopa County Resolution for ROW Permits 
https://www.maricopa.gov/documentcenter/view/364  
For Additional Information See: 
https://www.maricopa.gov/156/MCDOT  
 
PND STORMWATER QUALITY (SWPPP) REFERENCES: 
 
Storm Water Quality Management and Discharge Control Regulation 
https://www.maricopa.gov/DocumentCenter/View/6577 
Air Pollution Control Regulations Rule 310 
https://www.maricopa.gov/DocumentCenter/View/5354  
For Additional Information See: 
https://www.maricopa.gov/3980/Water-Sewage-Stormwater-Waste

Page 4 of 4 
 
 
 
Abbreviations Key: 
 
Drainage: 
 
DD =   
Department Directive (See: http://www.maricopa.gov/1911/Department-
Directives) 
MCZO = 
Maricopa County Zoning Ordinance 
DPSM =  Maricopa County Drainage Policies and Standards 
SSA =   
State Standard Attachment 
DDMV1=  Maricopa County Drainage Design Manual – Hydrology 
DDMV2 =  Maricopa County Drainage Design Manual – Hydraulics 
 
Flood Control: 
 
FRMC = 
Floodplain Regulations for Maricopa County 
 
PND Transportation: 
 
RDM =  
MCDOT Roadway Design Manual 
RDG =  
MCDOT Residential Design Guidelines 
MSRP =  MCDOT Major Streets and Routes Plan 
 
PND Storm Water: 
SWMDCR= 
Maricopa County Storm Water Quality Management and Discharge 
Control Regulation 
DDMV3=  Maricopa County Drainage Design Manual – Erosion Control 
APCR= 
Maricopa County Air Pollution Control Regulations – Rule 310

www.gdc-az.com  
GARRETT DEVELOPMENT CORPORATION 
6900 E CAMELBACK ROAD, SUITE 607, SCOTTSDALE, AZ 85251 
Citizen Participation Plan 
 
Lake Pleasant Parkway Self Storage 
9828 W Mariposa Grande, Peoria, AZ 
APN:  201-16-019C 
 
 
 
 
 
 
 
July 6, 2022

Parties Affected by Application  
1. 
The parties affected by this application include all property owners located within 
300’ of the proposed development and the City of Peoria.  There are 14 property 
owners identified within 300’ radius plus City of Peoria.  A list and map have been 
included. 
Notification and Information Procedures  
1. 
Applicant has already begun the citizen participation process and notified the 
immediately adjacent property owners about the applicant’s project including 
preliminary site plan and elevations prior to the pre-application meeting via mail.  
Applicant was able to engage in additional conversations (via in person meeting, 
phone or email) with 6 adjacent property owners to hear their comments and 
concerns.  Modifications including raising perimeter walls to 8’, moving the RV 
parking along northern property line to southern property line, and additional RV 
screening on east side were made per adjacent owners’ requests.   
2. 
All interested parties will be notified by mail (and/or via email if that information 
has been provided) for the following events: 
3. 
When an application has been made which will include a description of the 
overall application process and timeline.  A sample letter is included with this 
report.  
4. 
If/or when there are any major changes to the application 
5. 
At least 15 days prior to the Planning & Zoning Commission Hearing and the Board 
of Supervisors Hearing. 
 
Immediately adjacent property owners will also be noticed shortly after Board of 
Supervisors approval with an estimated development schedule and two weeks prior to 
the start of construction. 
Response Procedures

1. 
All parties affected by the application will be invited to discuss their questions and 
concerns with the Applicant via a scheduled in-person meeting, phone call, or via 
email.   
 
Status Procedure  
1. 
Applicant will provide staff a Citizen Participation Report prior to the scheduled 
Planning and Zoning hearing.   
 
 
Schedule for Completion  
1. 
Applicant has already started the citizen participation process and anticipates a 
completion of the Citizen Participation Plan prior to the Planning and Zoning 
hearing.  Our estimated schedule is below.  
 
Application Submittal – July 6 
Notice to Interested Parties of Application – July 20 
Submittal of Citizen Participation Report – August 5 
Technical Advisory Committee (TAC) – August 16 
Post TAC resubmittal – August 30 
TAC Signoff – September 13 
Notice to Interested Parties of P&Z Hearing Date (15 days before hearing) – October 5 
Planning and Zoning Board Hearing – October 20 
Notice to Interested Parties of BOS Hearing Date (15 days before hearing) – November 1 
Board of Supervisors Hearing – November 16 
Notice to adjacent property owners of BOS approval – November 30

SAMPLE LETTER 
 
July 6, 2022 
 
RE:  Rezoning and SUP of 4.36 acres at 9828 W Mariposa Grande, Peoria, AZ 
 
Dear Neighbor, 
 
 
We have submitted a request for a rezone and a special use permit to Maricopa County 
on 4.36 acres along Lake Pleasant Parkway at Mariposa Grande alignment (9828 W 
Mariposa Grande, Peoria, AZ).  This letter is being sent to all property owners within 300 
feet of the proposed development site as required by the County of Maricopa and our 
Citizen Participation Plan.   
 
The applicant, Garrett Real Estate Development LLC, is in escrow to purchase the subject 
property and is proposing the development of an enclosed, single story with basement, 
self-storage facility with additional covered RV/boat storage.  The current site is zoned 
RU-43.  Applicant is requesting a rezone to C-2 CUPD with overlay and Special Use Permit.  
The rezone request is to allow the self-storage use only, no other commercial uses will be 
permitted. The overlay will allow for reduced parking requirements (30 customer parking 
spaces) and the Special Use Permit is required for the covered RV/boat storage.  
Enclosed with this letter you will find a copy of the proposed site plan, landscape plan, 
sample elevations and some faq’s about the self-storage operations and management. 
 
Should you have any questions or comments regarding this development please feel free 
to contact us.  We are available to discuss via in person meeting, by phone, or email.   
480-970-4005 or tina@gdc-az.com.   
 
 
Sincerely, 
 
Garrett Real Estate Development, LLC 
 
Tina Kelty 
480-970-4005 
tina@gdc-az.com 
 
Richard Starr 
480-970-4003 
richard@gdc-az.com

Property owners to be notified: 
 
 
 
Parcel Number 
Owner 
Mailing Address 
201-08-047K 
PEORIA VALLEY LLC 
115 W CALIFORNIA BLVD SUITE 162 PASADENA CA USA 91105 
201-08-200 
CANDEO SCHOOLS INC 
9965 W CALLE LEJOS PEORIA AZ USA 85383 
201-16-016C 
SMITH FAMILY TRUST 
24654 N LAKE PLEASANT PKWY STE 103-329 PEORIA AZ USA 85383 
201-16-016F 
RAVENNA PAUL J/LOIS J TR 
23842 N 97TH AVE PEORIA AZ USA 85382 
201-16-025D 
NOLEN RICHARD K/SNEZANA 
9829 W CALLE LEJOS PEORIA AZ USA 85383 
201-16-025E / 
201-16-025G 
LOZEVSKI VICTOR/VASA 
9819 W CALLE LEJOS PEORIA AZ USA 85383 
201-16-025H 
LOZEVSKI JOVAN/NIKOLA 
521 COCHRAN DR CROWN POINT IN USA 46307 
201-16-038D / 
201-16-038L 
ISLAMIC CENTER OF PEORIA 
6635 W HAPPY VALLEY RD SUITE 249 PHOENIX AZ USA 85310 
201-16-039A 
MICHAEL GORDON COX AND 
DEBORAH ANN COX LIV TR 
9746 W MARIPOSA GRANDE PEORIA AZ USA 85383 
201-16-039B 
BATTIN RYAN N/AMY L 
9734 W MARIPOSA GRANDE PEORIA AZ USA 85383 
201-16-039C 
GREENE BRYAN J/NADINE TR 
PO BOX 2102 SUN CITY AZ USA 85351 
201-16-039D 
GARCIA CESAR JR 
24012 N 97TH AVE PEORIA AZ USA 85383 
201-16-040D 
WILSON JAMES P/ MARGIE 
9723 W CALLE LEJOS PEORIA AZ USA 85383 
201-16-040E 
TERRILL MARLON D/POLLY L 
9451 W ELECTRA LN PEORIA AZ USA 85383

www.gdc-az.com  
GARRETT DEVELOPMENT CORPORATION 
6900 E CAMELBACK ROAD, SUITE 607, SCOTTSDALE, AZ 85251 
Citizen Participation Results 
 
Lake Pleasant Parkway Self Storage & RV/Boat 
9828 W Mariposa Grande, Peoria, AZ 
APN:  201-16-019C 
Case Numbers:  Z2022133 and Z2022134 
 
 
 
 
 
November 7, 2022

Details and Techniques Used to Involve the Public in advance of the Planning & Zoning 
hearing. 
1. The Applicant mailed an information letter on May 10 with site plan, elevations 
and landscape plan to 6 adjacent property owners before the Pre-App meeting. 
2. A Pre-App Meeting with the City of Peoria was on held on June 8, primarily to 
discuss access from the self-storage property (located within the County) to Lake 
Pleasant Parkway. 
3. A Pre-App Meeting with County was held on June 14 to discuss Rezone (self-
storage facility) and Special Use Permit (RV). 
4. Rezone and SUP applications were submitted to County Planning portal on July 
13. 
5. A notice letter was sent via mail to all 14 property owners within 300’ and the City 
of Peoria on July 26 with site plan, elevations and landscape plan. 
6. Signs for Public Hearings for Rezone and SUP were posted at property on August 
10. 
7. Notices will be sent by County regarding the P&Z and Board of Supervisors hearing 
dates. 
8. The applicant has discussed the project with a total of 8 of the 14 property owners 
within 300’ and the City of Peoria via phone or email.  All 6 of the immediately 
adjacent neighbors (4 north, 1 east and 1 south) have been in contact with 
Applicant and there are zero outstanding issues. 
 
Summary of Concerns, Issues and Problems 
Below is a summary of the concerns outlined by adjacent property owners beginning in 
May 2022 to present.   
• 
Height of Self-Storage Building. 
• 
Traffic and Access from Lake Pleasant Parkway to Mariposa Grande and 
neighborhood beyond. 
• 
RV Parking and Screening. 
• 
Utility Access in developed condition at southeast corner (Mariposa Grande). 
• 
Self-Storage is not needed in area. 
• 
Self-Storage as a use is undesirable, attracts illegal activities and will be too close 
to adjacent homes. 
 
• 
Height of Self-Storage Building:  The Applicant’s design as submitted to County for 
Rezone and SUP is for a single-story building (with a basement) with a maximum 
height of 20’, very similar in size/scale to many adjacent buildings along the 
adjacent arterial road, Lake Pleasant Parkway.  Buildings of similar height and 
scale along Lake Pleasant Parkway include two schools, office buildings, retail

buildings, and a police station.  Further, the Applicant’s design includes 
enhanced elevations and significant landscaping along all four property lines.   
 
• 
Traffic and Access:  The Applicant’s Rezone and SUP site plan does not include 
any access to/from Mariposa Grande and the surrounding neighborhood.  
Several neighbors noted the existing traffic issues generated by the adjacent 
school and were pleased with the self-storage access only from the arterial, Lake 
Pleasant Parkway.  Also, self-storage is a low traffic generator because customers 
do not visit the facility often, sometimes no more than once every 3 or even 6 
months. 
 
• 
RV Parking and Screening:  Several adjacent neighbors requested modifications 
to address their concerns and the Applicant made the following changes:  
 
o Raised the perimeter wall along north, east and south property lines to 8’ 
(from 6’). 
o Moved the RV parking from north property line to south property line. 
o Added screening to RV canopies along east property line. 
 
• 
Utility Access in developed condition at southeast corner of property (Mariposa 
Grande):  The applicant coordinated with water provider, electrical provider and 
adjacent neighbors to ensure that existing water and power facilities will have 
continued access across the southeast corner of the property in the developed 
condition.  Applicant modified the site plan to accommodate these existing 
conditions. 
 
• 
Self-Storage is not needed in area:  A property owner left a voice mail stating that 
self storage is not necessary in this trade area but another use such as light 
industrial might be better.  The Applicant has studied the greater Phoenix metro 
area and believes that this is an excellent location for new climate controlled self 
storage.  In fact, this site is within a larger trade area that is below the metro area’s 
averages for self-storage saturation and more specifically, indoor storage.  
Climate controlled storage meets the needs of both residential and business 
customers in the hot Arizona climate.  RV parking is desired by consumers with RV, 
boat or other vehicles such as trailers that often do not fit in garages or are 
prohibited by many HOA’s.  The applicant tried four times to reach this property 
owner but was unsuccessful. 
 
• 
Self-Storage as a use is undesirable, attracts illegal activities and will be too close 
to adjacent homes:  One property owner had these concerns.  This project will be 
a modern, climate controlled self storage facility that is managed by a national 
self-storage operator and meets the needs of the surrounding community by 
providing a secure way to store goods for short or long term.  This facility will utilize 
gates, 8’ walls, keypads, video equipment and other measures to ensure the

safety of the customers and goods.  No storage units or RV stalls are accessible 
without keypad credentials.  Regarding the distance to homes, the self-storage 
facility is screened by an 8’ tall wall, landscaping on the three sides facing 
adjacent neighbors and is located a significant distance to the adjacent homes 
(about 210’ to the north, 320’ to the northeast, 250’ to the east and over 400’ to 
the southeast).  Applicant believes that self-storage professionally managed will 
be a good, quiet neighbor and that the single-story design, 8’ wall and 
landscaping will be an excellent buffer to any adjacent use.

Maricopa County Planning & Development Department 
PRE-APPLICATION MEETING FORM 
 
 
 
301 W. Jefferson Street, 1st Floor, Suite 170 ▪ Phoenix, AZ  85003 ▪ (602) 506-3301 
➢Internet:  www.maricopa.gov/planning 
PA2022095 Pre-Application Meeting Date & Time: Tuesday, 6/14/22 at 2:30 p.m. 
Planner:    Joseph Mueller 
Applicant Contacted: 5/6/22 11:00 a.m. 
Verified on: 5/6/22 at 1:24 p.m. 
Applicant or Property Owner:  Richard Starr – Garrett Real Estate Development LLC 
Phone: 480-970-4003 
Fax:  
E-Mail: richard@gdc-az.com; Tina@gdc-az.com 
Request, proposal and description:  
Rezone to C-2 for Self-Storage and SUP for Vehicle Parking 
APN #/s: 201-16-019C 
Acre(s): 4.36  
General Property Location (and/or address): 9828 W. Mariposa Grande, Peoria  
Planning Research 
Zoning District:  Rural - 43 
Supervisor District: 4   
County Area Plan / Land Use: White Tank / Grand Ave – Small Lot 
Residential (2-5) 
Municipality General Plan / Land Use:  City of 
Peoria 
Existing/Related Case Number(s):  
County Island Status: N/A 
Interested Parties for application(s) for routing and Citizen Participation Process (if applicable):   
Mining District, Lafarge North America, Philip Spiller, Ed Grant, Maricopa Association of Governments, City of Glendale, 
City of Peoria, The Senseman Family, Maricopa County Parks and Recreation, Insight Land, Arizona State Land 
Development, AZDOT 
 
It is the responsibility of the applicant to contact all Area of Interest groups for your site as shown on PlanNet, and to 
identify and contact any HOA within 300’ of your site as required per MCZO, Ch. 3. 
Pre-Application Meeting Attendees 
Maricopa County Agencies and Representatives 
Planning Staff 
  Darren Gerard 
  Matt Holm  
  Rachel Applegate  
  Ray Banker 
  Martin Martell 
   
  Adam Cannon 
   
  Daniel Johnson  
  Joseph Mueller   
Engineering  
  Michael Norris  
  Bob Fedorka  
  Larry Morden 
  Stacey Lapp   
  Jerri Loucks 
  Kevin Bischel 
  Doug Jones 
   
 
 
Environmental 
Services 
(MCESD) 
  Souren 
Naradikian   
 
Other County Agencies:  
_____________________________ 
_____________________________ 
_____________________________ 
_____________________________ 
_____________________________ 
_____________________________ 
_______________________________
____________________________ 
 Applicant Attendees: 
___________________________________________________________________________________________ 
___________________________________________________________________________________________ 
___________________________________________________________________________________________ 
___________________________________________________________________________________________ 
____________________________________________________________________________________________ 
➢ Note:  You must submit a photocopy of this completed form with your application materials.  
In addition, if an application is not filed within twelve (12) months from the date of this pre-
application meeting, or as otherwise noted, a new pre-application meeting may be required 
under separate fee.

Review Comments 
Current Planning: Applicant is recommended talking to the City of Peoria to annex into the city as there is an existing 
right of way within the City of Peoria.  If development within the County is still preferred after discussions with Peoria, 
C-2 CUPD will be the recommended zoning for the self storage component of the project.  An SUP will be required for 
the outdoor RV storage.   Staff will be looking for a good public participation plan as there is a lot of established 
residential properties in the general vicinity.  The recommended overlay will be to limit site uses other than storage. 
 
 
 
Comprehensive Planning: - [this section applies to sites within a Municipal planning areas as applicable] If the applicant 
applies with the County, the applicant is strongly encouraged to provide written confirmation from, and/or provide a 
summary of discussions with, the City of Peoria that indicates how this proposal meets their general plan and furthers 
the City’s Planning goals and policies.  This documentation should also confirm whether  the City will provide water and 
sewer services for this project and whether the City intends to annex the site. Although not a requirement, the applicant 
is strongly encouraged to discuss this development and these expectations with the City of Peoria prior to application. 
This documentation in conjunction with other case aspects such as public outreach, may help you present a stronger 
application and argument for case approval. 
 
Planning Engineering (includes Drainage, Transportation and Flood Control): 
 Engineering Memo provided dated _________.  
 
Environmental Services and Storm Water Quality Program: 
 
Code Enforcement/Other (if applicable): 
 
Applicant Advised to submit the following Planning Application(s): 
Comprehensive Planning 
 
 Development Master Plan 
 DMP Amendment 
 DMP Minor Amendment  
 DMP Modification of Condition(s) 
 
 Comprehensive Plan Amendment Major  
 General CPA 
 CPA Modification of Condition(s)  
 
 Use Compatibility & Consistency 
Determination (UCCD) 
 Military Compatibility Permit with POD 
 Military Compatibility Permit without 
POD 
 
See application packet for fee schedule. 
 
Current Planning & Board of Adjustment 
 
 Plan of Development  
 Plan of Development – Major Amendment 
 Plan of Development – Minor Amendment  
 Plan of Development – Modification of Condition(s) 
 
 Zone Change (ZC) with Overlay  
 Zone Change without Overlay 
 Zone Change Major Amendment 
 Zone Change Minor Amendment 
 Zone Change Modification of Condition(s) 
 
 Special Use Permit (SU) 
 Special Use - Major Amendment  
 Special Use - Minor Amendment  
 Special Use - Modification of Condition(s) 
 
 Preliminary Plat  
 Preliminary Plat Time Extension  
 Preliminary Plat Modification of Condition(s) 
 
 Final Plat with Infrastructure 
 Replat  
 
 BA - Residential Variance 
 BA- Non-Residential Variance 
 BA - Appeal  
 BA - Interpretation  
 BA- Blanket Variance  
 
 Temporary Use Permit  
 Status Report  
 Text Amendment  
 Legal Non-Conforming  
 As-Built POD  
 Government Action  
 Agricultural Exemption 
 Mining Exemption  
 Group Home 
 
See application packet for fee schedule. 
 
 No Planning application(s) required proceed 
with filing for Building Permit(s). 
 
Fees:  
Please see Planning application packet for fee schedule.  
Planning Representative Signature 
Applicant Signature 
Name  
 
Name (print): 
Signature: 
Date: 
Signature: 
                                            Date: 
➢ 
Applicant was advised to file for the planning application(s) as checked above. When filing the application 
materials please show the Maricopa County One Stop Shop staff a copy of the pre-application meeting form 
in order to initialize the correct Planning Application.

PA2022095: This project is a request for Rezone to C-2 (self-storage) and SUP (vehicle parking) 
at APN # 201-16-019C. Water and sewer providers are Sunrise Water and private septic, 
MCESD has no concerns, ATC/NOID for water and sewer utilities must be submitted and 
approve prior to any construction permit approval. 
 
Souren Naradikian, P. E. 
Senior Engineer 
Maricopa County Environmental Services Department 
Desk: 602.372-2907 
Cell.   480-356-1558 
Souren.Naradikian@maricopa.gov 
 
May 06, 2022.

- 1 - 
Maricopa County 
ENGINEERING PLAN REVIEW  
PRE-APPLICATION MEETING SUMMARY 
Planning & Development Department 
 
 
Primary Contact Name: 
Richard Starr 
Project Name: 
Storage Facility 
Description of Work: 
Re-Zone/POD 
Job Site Address: 
N. Lake Pleasant Pkwy. and W. Mariposa Grande 
APN(s): 
201-16-019C  
 
PRE-APP No. PA2022095 
Reviewer: Bob Fedorka, PE 
Phone: 602-506-7151 
Date: 6/08/2022 
No. of Pages Transmitted:  5 
+Attachments 
 
E-mail address: 
Bob.Fedorka@maricopa.gov 
 
 
 
   
Form 703 – Drainage Review Requirements for Precise Plans including Special Use Plans 
 
Form 705 – Drainage Review Requirements for Final Plats 
 
Form 706 – Drainage Review Requirements for Preliminary Plats 
 
Aerial Map 
 
ADOT Red Letter Process 
 
Effective requirements and guidelines: Maricopa County Zoning Ordinance (Section 1205), 
Maricopa County Drainage Design Manuals vol. 1-3, Drainage Policies and Standards for 
Maricopa County, Arizona Department of Water Resources- State Standards, Maricopa 
Association of Governments- Specifications and Details. 
 
The information presented and discussed in the pre-application meeting, including fees, is 
preliminary only and provided for general guidance. All projects must be demonstrated to meet 
the requirements of the Drainage Regulations of Maricopa County and adopted County design 
methods and standards. Additional data may be required based upon complexity of the design 
and location.  
 
I acknowledge that I have incorporated these general pre-application review comments into 
the plans and reports for this project.  
 
Signature: _____________________________________________ Date: ___________________

- 2 - 
RE-ZONE/SUP 
 
1. Engineering Plan Review (Drainage, FCD & MCDOT) has no comment on the re-
zoning/SUP proposal. 
 
PLAN OF DEVELOPMENT 
 
Drainage Plan Review Comments 
 
1. A Grading and Drainage Plan is required.  The Maricopa County Zoning Ordinance (MCZO) 
requires that all commercial submittals be prepared by a Civil Engineer registered in the 
State of Arizona. (MCZO 1205.7.2) 
 
2. Provide the required retention volume for the 100 year, 2 hour storm event with one (1) 
foot of freeboard for the site. Basins one (1) foot or less in depth need not provide 
freeboard. Provide documentation that the retention basin(s) will drain within 36 hours.  
(MCZO 1205.7.6-2.a & c) 
 
3. Provide a runoff coefficient based on Table 6.3 of the Maricopa County Drainage Policies 
and Standards.  Use 0.95 for commercial/industrial areas and 0.5 for retention basin 
areas. 
 
4. Maintain a minimum 25 foot separation between septic facilities and the retention 
basin(s). 
 
5. Plans/Drainage Report must address offsite flows that may impact the subject premises 
and how they will be routed through or around the development site.  
 
6. See https://apps.pnd.maricopa.gov/plansubmittalchecklist for the most up to date 
interactive Engineering Plan Review checklist. (Please be sure to check commercial and 
all related grading related matters so the checklist expands properly). 
 
Flood Control District Comments 
 
1. The site is not located in a Special Flood Hazard Area.  The Flood Control District has no 
comments on this application. 
 
PND Transportation Comments 
 
1. Mariposa Grande has not been accepted by the County; and is therefore not maintained 
by the County. This alignment is classified as “Other R/W”. 
 
2. A Traffic Study/Statement must be submitted with the Re-Zone/SUP/POD application. See 
following link to MCDOT Traffic Impact Manual. (RDM 7.1.4) 
 http://www.maricopa.gov/DocumentCenter/View/303.

- 3 - 
3. Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The applicant will be 
responsible for coordinating with the City to review any traffic impact, right-of-way 
dedication, permitting or roadway improvement requirements. 
 
4. The site is encumbered by Federal Patent easements (east and south). Unless abandoned, 
these easements must remain intact for their intended use. See link below for 
abandonment 
process. 
 
https://www.maricopa.gov/775/Abandonment-of-Patent-
Easements  
 
Storm Water Quality (SWPPP) – Pre-Construction 
 
1. The subject premises is located within the County’s Urbanized Area. If the project will 
disturb one (1) acre or more, a Storm Water Pollution Prevention Permit (SWPPP), issued 
by the County (PND), will be required prior to issuance of any building permits required 
for site development.  
 
 
All plans and reports should be developed and formatted to document that the project is 
designed to meet all County regulations, ordinances and design standards. 
   
It is incumbent upon the engineer to demonstrate compliance with all regulatory requirements 
and County design standards. 
 
Additional meetings or consultations may be assessed additional fees.

- 4 - 
DRAINAGE PLAN REVIEW REFERENCES:   
 
The Drainage Regulations are listed in Section 1205 of the MCZO: 
https://www.maricopa.gov/documentcenter/view/272  
Maricopa County Drainage Policies and Standards Manual: 
https://www.maricopa.gov/DocumentCenter/Home/View/2369  
For Additional Information See: 
https://www.maricopa.gov/1635/Drainage-Review 
 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY REFERENCES:   
 
Floodplain Regulations for Maricopa County: 
https://www.maricopa.gov/DocumentCenter/View/630  
For Additional Information See: 
https://www.maricopa.gov/3847/Flood-Control-District  
 
PND TRANSPORTATION REFERENCES: 
 
Residential Driveway Guidelines 
https://www.maricopa.gov/documentcenter/view/362  
Roadway Design Manual 
http://www.mcdot.maricopa.gov/DocumentCenter/View/24883 
Maricopa County Resolution for ROW Permits 
https://www.maricopa.gov/documentcenter/view/364  
For Additional Information See: 
https://www.maricopa.gov/156/MCDOT  
 
PND STORMWATER QUALITY (SWPPP) REFERENCES: 
 
Storm Water Quality Management and Discharge Control Regulation 
https://www.maricopa.gov/DocumentCenter/View/6577 
Air Pollution Control Regulations Rule 310 
https://www.maricopa.gov/DocumentCenter/View/5354  
For Additional Information See: 
https://www.maricopa.gov/3980/Water-Sewage-Stormwater-Waste

- 5 - 
Abbreviations Key: 
 
Drainage: 
 
DD =   
Department Directive (See: http://www.maricopa.gov/1911/Department-Directives) 
MCZO = 
Maricopa County Zoning Ordinance 
DPSM =  
Maricopa County Drainage Policies and Standards 
SSA =   
State Standard Attachment 
DDMV1=  
Maricopa County Drainage Design Manual – Hydrology 
DDMV2 =  
Maricopa County Drainage Design Manual – Hydraulics 
 
Flood Control: 
 
FRMC = 
Floodplain Regulations for Maricopa County 
 
PND Transportation: 
 
RDM =  
MCDOT Roadway Design Manual 
RDG =  
MCDOT Residential Design Guidelines 
MSRP =  
MCDOT Major Streets and Routes Plan 
 
PND Storm Water: 
SWMDCR= 
Maricopa County Storm Water Quality Management and Discharge Control 
Regulation 
DDMV3=  
Maricopa County Drainage Design Manual – Erosion Control 
APCR= 
Maricopa County Air Pollution Control Regulations – Rule 310

501 North 44th St, Suite 200  Phoenix AZ  85008  (602) 506-3301  (602) 506-3601 fax 
                703                                                                           Planning and Development                                                                  06/19 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A detailed drainage report with respect to hydrology and hydraulics in conjunction with grading, drainage and paving 
plans may need to be submitted. The final drainage plan must be signed and sealed by an Arizona Registered 
Professional Civil Engineer and address the following: 
 
1. Offsite Hydrology – Need to determine the quantity, the entrance and exit points, and how the flow is to be 
routed around or through the site. 
 
2. Onsite Hydrology – Need to show how the flows are to be routed to retention basins. 
 
3. Onsite Retention – Need to retain water for the 100-year, 2-hour storm for the site, including adjacent right 
of way, plus one (1) foot of freeboard. Determine volume needed and the size and location of basins. 
 
4. Retention Disposal – Provide notes indicating basin(s) will drain within 36 hours in conformance with Drainage 
Policies and Standard 6.10.  
 
5. Cross Sections – Provide typical sections for edge conditions indicating tie-in to existing surrounding grades 
and interior design features such as retaining walls and drainage channels. 
 
6. Finished Pad Elevations and Certification – Provide finished pad elevations in areas of the project site with 
unique drainage features (adjacent to basins, channels and/or in areas of significant grading) to demonstrate 
that the pads will be safe from inundation during the 100-year peak runoff event. 
 
7. Topography – Need to show natural and proposed contour elevations and/or spot elevations. All contour lines 
must be annotated. 
 
8. Floodplains – Need to show the regulatory floodplain boundaries if the site is within a Federal Emergency 
Management Agency’s (FEMA) special flood hazard area. 
 
9. Erosion Setbacks – For washes and other watercourses flowing at 50 cfs or more, an erosion setback will need 
to be determined, which meets Arizona State Standard 5-96. 
 
Since complex drainage systems may require more detailed information, a meeting should be arranged with personnel 
from Drainage Review. 
 
FEE INFORMATION*:   
Planning Cases:  
Plan of Development including SUP (except SFR-SUP 
 
$ 1,000 + $ 500/Acre  $11,000 Maximum 
SUP or Plan of Development with disturbance of less than 1,500 sq. ft.   
 
$    650 
Minor Amendment to a Plan of Development 
 
 
 
 
 
$    650 
Zone Change (no site plan, without precise plan entitlements) 
 
 
 
$      60 
Special Use plan for SFR uses 
 
 
 
 
 
 
 
$    210 
Modification of Stipulation/s 
 
 
 
 
 
 
 
$      60 
 
Construction Permits 
$ 2,000 + $ 250/Acre  $ 42,000 Maximum 
Minor Accessory structure on previously developed site (see Regulation for restrictions) - $   650 
Major Accessory structure on previously developed site (see Regulation for restrictions) - $ 5,000 
(Or as noted above if lower). 
* See the Drainage Regulation for current fee schedule (#710) 
Planning & Development  
Department 
 
DRAINAGE REVIEW REQUIREMENTS FOR 
PRECISE PLANS INCLUDING SPECIAL USE PERMITS

201-16-016G
201-16-040D
201-16-308
201-16-343
201-16-027K
201-16-019C
201-16-027E
201-08-092
201-16-016F
201-16-037R
201-16-312
201-16-038L
201-08-091
201-16-041D
201-16-016E
201-16-039C
201-16-027H
201-16-037E
201-16-040C
201-16-039D
201-16-040F
201-16-341
201-08-200
201-16-623
201-16-622
201-16-016C
201-16-311
201-08-047K
201-16-040E
201-16-015D
1330
133
2
1
3
2
8
13
26
1328
1
3
28
1328
1
3
2
4
1324
1326
1330
1
326
1328
1322
1322
1332
1322
1324
1318
1328
1330
1324
13
3
0
132
2
1328
1328
1324
1326
1
322
1
3
2
6
1332
133
2
1
3
32
133
0
1
33
0
13
2
6
1316
1
330
1322
1
328
1
3
2
2
1
324
13
2
8
1
32
4
132
2
1324
13
2
8
13
2
6
1316
13
2
6
1330
13
2
8
13
2
2
1328
1322
1
3
22
1318
132
0
1
324
1320
1
32
6
133
0
PEORIA
PEORIA
UNINCORPORATED
UNINCORPORATED
MARICOPA
MARICOPA
COUNTY
COUNTY
N 98th Ln
N 99th Ln
W Calle Lejos
W Villa
Lindo Dr
W Mariposa Grande
W Mariposa Grande
W Villa Lindo Dr
W Avenida Del Sol
N LAKE PLEASANT PKWY
FEMA X
(Shaded)
´
1 inch = 200 feet
0
200
400
100
Feet
The Flood Control District of Maricopa County (FCDMC) - Unofficial Document
This document cannot be used for floodplain determinations. Current studies, erosion setbacks and other factors may also affect the floodplain status of the property. 
The information shown for pending floodplains are the best technical information available at this time to determine the one percent chance flood and are subject to change.
Date: 06/08/2022
Time: 7:17:12 AM
User: bob.fedorka
Floodplain Management & Services
2801 West Durango Street
Phoenix, Arizona 85009
Phone:  (602) 506-2419
Fax:  (602) 372-6232
http://www.fcd.maricopa.gov/Floodplain/floodplain.aspx
Current Pending Flood Zones
   FW   
AEFW
  AFW  
   AE  
  AH  
  AO  
         A  
A (CIC)  
AAFF  
AFHH  
AFZA   
AFUFD   
X (Shaded) 
Current FEMA Flood Zones
   FW
AEFW
AFW
AE
AH
AO
     A
A (CIC)
AAFF
AFHH
AFZA
AFUFD

City of Peoria 
PLANNING AND COMMUNITY 
DEVELOPMENT 
 
9875 North 85th Avenue 
Peoria, Arizona 85345 
T 623.773.7200   F 623.773.7233 
E planning@peoriaaz.gov 
 
Preliminary Application Information 
Meeting Date/Time 
June 8, 2022 at 11:00 am 
Pre-App Number 
PA22-0057 
Project Name 
Driveway/ROW permit along Lake Pleasant Parkway 
Location 
Northeast corner of the Mariposa Grande Lane alignment and Lake Pleasant Parkway 
Proposal Description  Request for a driveway and ROW permit along Lake Pleasant Parkway 
 
 
Staff Contact Information 
 
 
Intent of the Pre-App 
The purpose of the pre-application meeting is for the applicant and City Staff to discuss the proposed project. 
This does not constitute a formal development application to the city.  
 
Comments generated during this process represent only a cursory look at the proposal given the 
information provided, and in no way constitutes a comprehensive evaluation of the project. Additionally, 
city comments may be refined or modified during the formal application process as additional information is 
provided subsequent to the pre-application meeting. 
 
Should modifications to the land use(s) or site layout occur subsequent to the pre-application meeting, or 
considerable time has lapsed, the applicant is encouraged to contact the planner to discuss the changes 
and/or consider submitting for another pre-application meeting. 
 
Should you have any questions please reach out to the representative listed above. 
 
 
 
Planning & Zoning 
Sarah Dircks 
Sarah.Dircks@peoriaaz.gov 
623-773-7514 
Site Development 
Gary Lopez Sr.  
Gary.Lopez@peoriaaz.gov 
623-773-7236 
Fire Prevention 
Ron Beene 
Ron.Beene@peoriaaz.gov 
623-773-7217 
Building Development 
Tom Fierros 
Tom.Fierros@peoriaaz.gov 
623-773-7590 
Traffic Division 
Austin Kennedy 
Austin.Kennedy@peoriaaz.gov 
623-773-7598

PA22-0057 
June 8, 2022 
Preliminary Application Comments 
 
 
Page 2 of 3 
 
The comments are organized into the following areas: 
1. Existing Entitlement, Development Standards, and Related Cases 
2. Land Use and Zoning Appropriateness  
3. Required Process 
4. Specific Comments 
5. Submittal Materials and Noticing Fees 
 
1. EXISTING ENTITLEMENT, DEVELOPMENT STANDARDS, AND RELATED CASES 
 
The subject site is located along Lake Pleasant Parkway (City of Peoria jurisdiction) on a parcel located in 
Maricopa County. The applicant has submitted the following pre-application with the City of Peoria to 
request work within the Lake Pleasant Parkway right-of-way including a driveway access. 
 
2. LAND USE AND ZONING APPROPRIATENESS 
  
The subject site is located within the future growth limits of Peoria and as such, the site is included in the 
Future Land Use Map of Peoria. The future land use map, established within the Peoria 2040 General Plan, 
was created using significant input from residents, businesses and property owners, and stakeholders 
regarding the desired character of the neighborhoods within Peoria. 
The City of Peoria’s Future Land Use Designation of the site is Rural Residential. Rural Residential is generally 
consistent with the City of Peoria AG, SR‐43, and SR‐35 intended for large lot residential properties. The 
proposed Mini-storage, Boat and RV storage development is not consistent with the Future Land Use 
Designation of the site.  
 
3. REQUIRED PROCESSES 
 
Construction Documents: 
 
A. Landscape and Civil Permits. Administrative (staff-level) Action  
After County approval(s) are received, the applicant may file for any required landscape permits, site 
improvement (civil) permits, and building permits. Contact the Planning Division at 623-773-7200, Site 
Development Division at 623-773-7210, and Building Development Division at 623-773-7225 for specific 
review times and application procedures. 
 
4. SPECIFIC COMMENTS 
 
Planning – Sarah Dircks 
A. Lake Pleasant Parkway Scenic Roadway Corridor. The subject site is located along Lake Pleasant 
Parkway, which is a unique roadway corridor within the City of Peoria that has an established specialty 
landscape setback intended to preserve open views of the corridor. Properties along Lake Pleasant 
Parkway located south of Happy Valley Road and north of Rose Garden maintain a minimum landscape 
setback of 30 feet. Work along Lake Pleasant Parkway should include landscape provisions to maintain 
the Scenic Roadway Corridor along Lake Pleasant Parkway. 
 
Building Development – Tom Fierros  
No comments. The proposed development is located in Maricopa County.

PA22-0057 
June 8, 2022 
Preliminary Application Comments 
 
 
Page 3 of 3 
 
Fire Prevention – Ron Beene 
The proposed development is located in Maricopa County. Fire will have no comments on this site unless there 
is an agreement that Peoria Fire-Medical will service the project. 
Traffic Division – Austin Kennedy 
1. The Traffic Impact Statement (TIS) must be submitted with the Construction documents. Pre-application 
review does not constitute approval of the TIS.  
2. A right turn lane is required for any access off Lake Pleasant Parkway, as depicted, with a minimum 150’ 
taper and 100’ storage. 
3. The parcel immediately south of this site is currently under construction. The adjacent site is required to 
have their legal access from Lake Pleasant Parkway. However, during the construction phase, the site is 
logistically using the easement to Mariposa Grande. Legal access to Mariposa Grande must be 
maintained for this site during the construction process until legal access for both the applicant’s site 
and the adjacent site can be provided from Lake Pleasant Parkway.  
4. Gates are shown at the northwest and southwest corners of the storage facility. A turnaround per PE-
100 must be provided at all ingress gates so that vehicles unable to enter the facility can readily 
turnaround and exit. These turnarounds are key to ensure good site circulation and reduce the 
likelihood of backups onto adjacent roads.   
  
 
Site Development - Gary Lopez  
 
1. Development will be required to comply with the latest Peoria Engineering Standards Manual at time of 
development.  Check City website for latest standards:  
https://www.peoriaaz.gov/government/departments/development-and-engineering-department 
2. Offside flows along the east r/w line in Lake Pleasant Parkway must not be disturbed. Any driveways 
proposed over the existing swale will need to provide adequate storm drain pipes and headwalls for the 
existing flows. 
3. Offsite and onsite flows must be separated. 
4. Water and sewer will be form private purveyors, as this site is within the county. 
 
5. SUBMITTAL PROCESS 
 
 
After the required County approval(s) are received, the applicant may file for any required permits. Reach out to 
the following departments for specific review times and application procedures. 
 
1. Landscape Permits –  Contact the Planning Division at 623-773-7200 
2. Site improvement (civil) Permits – Contact the Site Development Division at 623-773-7210

Planning and Development Department  
 
 
 
 
 
DATE: 
December 8, 2022 
 
TO: 
Planning & Zoning Commission  
 
FROM: 
Nick Schlimm, Planner  
 
SUBJECT: 
Z2022133 and Z2022134 – Lake Pleasant Storage  
 
Agenda Items: 5 and 6 
 
 
 
Since the publishing of the staff report for the above cases, staff received a comments 
memo from the City of Peoria. The City notes that the project is located within its 
Municipal Planning Area, and likewise, their General Plan 2040 designates the land use 
onsite as Rural Residential (0-1 units per acre). The memo goes on to note that self-storage 
facilities may be considered within the City’s commercial zoning districts (C-2 and 
above), which align with the General Plan’s Commercial land use designation. As such, 
the proposed self-storage facility is not consistent with the General Plan or the 
immediately surrounding land use patterns. 
 
Nonetheless, the City understands that the subject site is located within unincorporated 
Maricopa County. As such, they are requesting additional conditions of approval 
regarding maximum building height, signage, and development character. The 
applicant has confirmed his support for these conditions. Therefore, staff has agreed to 
a revised set of conditions for approval for Case Z2022133. See revised conditions ‘a’ – ‘j’ 
(with deleted language struck-through and added language underlined): 
 
a. A Plan of Development is approved subject to the Site Plan entitled “Lake Pleasant 
Parkway Storage”, consisting of 1 full-size sheet, dated October 31, 2022, and 
stamped received November 2, 2022, except as modified by the following 
conditions. The Plan of Development may be amended administratively under a 
separate application as long as the amendment complies with the established 
CUPD development standards as approved by the Board of Supervisors. Staff may 
determine slight refinements to remain in substantial conformance with the 
approved site plan.  Minor and major amendments to the site plan will be 
determined in accordance with Chapter 3 of the Maricopa County Zoning 
Ordinance. 
 
b. Development of the site shall be in substantial conformance with the Narrative 
Report entitled “Lake Pleasant Parkway Storage”, consisting of 7 pages, dated 
October 2022, and stamped received November 2, 2022, except as modified by 
the following conditions. 
 
c. The following Planning Engineering conditions shall apply:

1. Patent easements must be abandoned prior to issuance of any building 
permits. 
 
2. Lake Pleasant Parkway is within the jurisdiction of the City of Peoria. The 
applicant will be responsible for coordinating with the City to review any traffic 
impact, right-of-way dedication, permitting or roadway improvement 
requirements. 
 
3. Mariposa Grande has not been accepted by the county; and therefore not 
maintained by the County. This alignment is classified as “Other R/W” 
 
4. Based on the TIS submitted to the County for review, County estimates that 
there will be no significant traffic impacts on the County facilities surrounding 
the project Site. County has no further comments. 
 
5. Retention basin(s)\ Underground storage must drain within 36 hours. 
 
6. Maintain a minimum 25 foot separation between septic facilities and the 
retention basins. 
 
7. Detailed Grading and Drainage (Site Infrastructure) Plans must be submitted 
with the application for Building Permits. All onsite flows must be routed to the 
underground retention storage. 
 
8. Offsite flows contributing to the 2-18” pipe culverts must be provided in the 
building permit. 
 
9. The subject premises is located within the County’s Urbanized Area and will 
disturb more than one (1) acre. A Storm Water Pollution Prevention Permit 
(SWPPP), issued by the County (PND), will be required prior to issuance of any 
building 
permits 
required 
for 
site 
development. 
See: 
https://www.maricopa.gov/DocumentCenter/View/6577 
 
10. Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction. 
 
d. The following C-2 CUPD standards shall apply: 
 
1. Buildings shall be limited to one story with a maximum height of 20’. 
 
2. There shall be a minimum of 26 parking spaces provided. 
 
3. There shall be a minimum of 1 loading space provided.

4. The use of the site shall be limited to indoor self-storage. 
 
e. Signage along Lake Pleasant Parkway shall be limited to static elements. Digital 
signage or message centers are prohibited. 
 
f. To the extent practical, the building façade along Lake Pleasant Parkway shall be 
designed in such a manner as to mimic the appearance of a professional office 
building, which is compatible with the scale and character of the area. This may 
be achieved through façade alteration, building fenestration, and the 
application of colors and materials. 
 
g. Prior to issuance of a building permit, written confirmation will be required from the 
emergency fire protection jurisdiction having authority that the facility has been 
designed in accordance with their regulations and requirements, and that 
emergency fire protection service will be provided to the facility. Prior to issuance 
of the certificate of occupancy, local fire protection jurisdiction review and 
approval will be required. 
 
h. Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Zone Change as set forth in the Maricopa County 
Zoning Ordinance. 
 
i. 
The property owners and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions. 
 
j. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions. In the event of the failure to comply 
with any condition, the property shall revert to the zoning that existed on the date 
of application.  It is, therefore, stipulated and agreed that revocation due to the 
failure to comply with any conditions does not reduce any rights that existed on 
the date of application to use, divide, sell, or possess the property and that there 
would be no diminution in value of the property from the value it held on the date 
of application due to such revocation of the Zone Change.  The Zone Change 
enhances the value of the property above its value as of the date the Zone 
Change is granted and reverting to the prior zoning results in the same value of 
the property as if the Zone Change had never been granted. 
 
Since the publishing of the staff report for the above cases, staff has also received 22 
signatures from area residents petitioning for opposition to the cases. Each petition 
includes a signature from the property owner and the parcel number at which they 
reside. Each petition was also submitted with a map from the Maricopa County Assessor’s 
Office confirming the owner information of the corresponding parcel. The petitions state 
general opposition to the cases, with no specific reasoning provided. The petitions are 
dated November 28, 2022, and were received by staff on December 1, 2022.