Planning and Zoning Report 
Date 
June 24, 2026 
Case No.  
ZON26-00155 
Project Name 
DU 5/6 South Plan Amendment 
Request 
• 
Major Amendment to the Development Unit 5/6 South Development 
Unit Plan (DUP) 
Project Location 
Located between East Elliot Road and East Point Twenty-Two 
Boulevard, and west of South Signal Butte Road 
Parcel No(s) 
Multiple (see Exhibit 8) 
 
Project Area 
750± acres 
Council District 
District 6 
Existing Zoning 
Planned Community (PC) 
General Plan 
Designation 
Regional Employment 
Center, and Mixed 
Residential 
Applicant 
Christian Orr, Brookfield Properties  
Owner 
Multiple 
Staff Planner 
Jennifer Merrill, Senior Planner 
 
Recommendation 
Staff finds that the Proposed Major Amendment is consistent with the Mesa 2050 General Plan, 
and with the requirements for Development Unit Plans per Section 5 of the Eastmark Community 
Plan (CP). 
Staff recommends approval with conditions.

[2] 
Project Overview 
Request: 
The applicant is requesting a Major Amendment to the Development Unit 5/6 South Development 
Unit Plan (DUP) (Proposed Major Amendment). This request will modify the boundary of the DUP 
to align with East Rubidium Avenue and establish new boundaries for the District Land Use Group 
(LUG).  
The Proposed Major Amendment will directly affect approximately 11.7± acres of the 750± acre 
area covered by the DU 5/6 South DUP. Specifically, the request relates to the area located at the 
southwest corner of South Signal Butte Road and East Rubidium Avenue. The specific changes 
requested include: 
1. Shifting the boundary of the southeastern portion of the DUP north, to align with East 
Rubidium Avenue; and 
2. Establishing new boundaries for the District Land Use Group, to expand it west. 
In addition, this amendment will provide updated details for the area shown as “transition area”, 
located between the existing single-family residential neighborhoods and the area to the north 
that is developing with industrial uses. 
These changes constitute a Major Amendment to the DUP as defined by Section 5.4(A) of the 
CP.  
Concurrent Applications: 
• 
Site Plan Review for 11.7± acres to allow for a 261-unit Multiple Residence development and 
approximately 10,840± square feet of commercial development (ZON25-00693). 
Site Context 
General Plan:  
• 
The Development Unit 5/6 South Development Unit Plan (DUP) area has two Placetypes 
and Growth Strategy designations. The Placetype for the northern 334± acres is Regional 
Employment Center with an Evolve Growth Strategy; the northern portion is developing with 
industrial and data center / warehouse uses.  
• 
The Placetype for the southern 415± acres is Mixed Residential. Within the Mixed Residential 
Placetype area, the 28± acres located at the southwest corner of South Signal Butte Road 
and East Rubidium Avenue has an Evolve Growth Strategy, and the remaining 387± acres 
of the Mixed Residential Placetype has a Sustain Growth Strategy. The 387± acres with a 
Sustain Growth Strategy have been developed with single family residential neighborhoods. 
• 
The area most impacted by the Proposed Major Amendment (all 11.7± acres that are part of 
the Site Plan Review case) is designated as a Mixed Residential Placetype, with an Evolve 
Growth Strategy. Multi-family residential and eating and drinking establishments are principal

[3] 
land uses, and retail is a supporting land use in the Mixed Residential Placetype. When 
integrated with high-quality open space and amenities, and located with convenient access 
to additional services, a complete community is created. 
• 
The Proposed Major Amendment is consistent with the Mixed Residential Placetype and 
furthers the implementation of, and is not contrary to, the Vision, Guiding Principles, 
Strategies, and applicable elements of the Mesa 2050 General Plan. 
• 
Supporting General Plan Strategies: 
o N1. Promote complete communities in both existing and new neighborhoods. 
o N5. Improve street and open space network connectivity within neighborhoods and to 
local serving amenities. 
o H1. Create more opportunities for housing options. 
o PO2. Integrate bicycle and pedestrian pathways into the City’s parks and open space 
system. 
o LU1. Promote a balance of land uses to enhance the quality of life for current and 
future generations. 
Sub-Area Plan: 
The Proposed Major Amendment is located within the Mixed Use Community District of the Mesa 
Gateway Strategic Plan. This District should contain the widest variety of land uses within the 
planning area, with ultimate development including low- to high-density residential, commercial, 
employment, civic, and recreational uses to provide a complete community experience. 
Residential use provides a balance within the Mesa Gateway area amidst the employment, 
education, commercial and industrial uses surrounding the Gateway Airport. This request meets 
the intent of the Mesa Gateway Strategic Plan. 
Zoning:  
• 
The project site is zoned Planned Community (PC), and the requested Land Use Group 
(LUG) is District. 
• 
Typical uses in the District LUG include residentially scaled multi-family, with neighborhood 
commercial uses along district or arterial streets. 
Site History: 
• 
September 22, 2008: City Council approved a Major General Plan Amendment from Medium 
Density Residential, Community and Regional Commercial, Mixed Use Residential, Mixed 
Use Employment, Business Park and Office to Mixed Use Community (MUC) for 3,611.1+ 
acres, including the project site (Case No. GPMajor08-001; Resolution No. 9353). 
• 
November 3, 2008: City Council voted to annex 3,136.6+ acres into the City of Mesa, 
including the project site (Case No. A08-008; Ordinance No. 4891).

[4] 
• 
November 3, 2008: City Council established municipal zoning of Single Residence-43 (RS-
43) for 3,136.4+ acres, including the project site (Case No. Z08-055; Ordinance No. 4892). 
• 
November 3, 2008: City Council approved a rezoning from RS-43 to PCD for 3,136.4+ acres, 
including the project site (Case No. Z08-056; Ordinance No. 4893).  
• 
April 28, 2011: Planning and Zoning Board approved an amendment of exhibit 4.5 of the 
Mesa Proving Grounds Community Plan (3,200+ acres), to include a budget transfer of non-
residential gross floor area from Development Units 1 and 9 to Development Unit 6 (Case 
No. Z11-010). 
• 
April 28, 2011: Planning and Zoning Board recommended approval of Development Unit 6 
North for 280+ acres, which overlapped project site at East Rubidium Avenue (Case No. Z11-
011).  
• 
May 5, 2014: City Council approved a Major Amendment to the Eastmark (Mesa Proving 
Grounds) Community Plan for 3,200+ acres, including the project site, to modify the character 
theme and the addition of the Campus/Regional Center Land Use Group to DU5 (472+ acres) 
(Case No. Z14-014; Ordinance No. 5214). 
• 
May 17, 2017: Planning and Zoning Board approved a Development Unit Plan for DU 5/6 
South (750+ acres)(Case No. Z17-019). 
• 
August 20, 2018: City Council approved a Major Amendment to the Eastmark Community 
Plan (3,200+ acres) to make changes that impact Development Units 1, 2, 3, and 4 related 
to Land Use Groups, the Land Use Budget, refinements to the DU character descriptions, 
and corresponding modifications to various sections of the Community Plan including the 
removal of the requirement for a non-potable water master plan (Case No. ZON18-00121; 
Ordinance No. 5464). 
Requested Amendments 
The applicant is requesting changes to the DU 5/6 S DUP which primarily affect 11.7± acres of 
undeveloped land located at the southwest corner of South Signal Butte Road and East Rubidium 
Avenue and north of the Safeway/”The Point” shopping center. The original DU 5/6 S DUP was 
approved on May 17, 2017, and the requested changes reflect the current conditions of the Great 
Park, streets and neighborhood developments. The review below is a summary and analysis of 
the modifications within each Section of the DUP that are affected by the Proposed Major 
Amendment: 
Section 1.1 Site and Context 
This section is updated to include information about the data centers and residential 
neighborhoods that have been approved since 2017. 
Section 1.2 DU Development Character 
Updates to this section include removal of references to the formerly anticipated resort uses, and 
to describe the northern portion as planned entirely for employment use. The proposed changes

[5] 
in this section relate to the addition of greater density residential, which includes multi-family 
residential, as an appropriate transition, with a minimum 50-foot-wide landscaped buffer.  
This 
section 
also 
includes 
information 
about 
a 
transition 
area 
located 
between 
employment/manufacturing uses and residential use, and states that this transition is likely to be 
in the form of a usable open space area that connects with and provides extensions of the 
Eastmark Great Park, which remain unchanged. 
Section 1.3(E) DU Vision – DU6n/DU5/6s Interface 
Approved DUP 
Currently, this section includes information about the interface between DU5/6s and Development 
Unit 6 North (DU6n). The original DU 5/6 S DUP document described a 275-foot-wide Transition 
Area straddling the boundary between the DU 5/6 S DUP and DU6n. That Transition Area was to 
be held for future study depending on how the potential employment uses in DU6n would develop.  
Proposed DUP Amendment 
The Proposed Major Amendment describes the Eastmark Great Park, which is currently in 
construction, a minimum 50-foot-wide linear open space buffer and higher density residential 
development, as a smooth and appropriate transition between the employment area, commercial 
area and single-family residential. 
In the images below, the areas in green represent park or open space corridors / pedestrian paths 
as originally planned, and as currently proposed. 
             
 
Original DU 5/6 S DUP 
 
 
       Proposed DU 5/6 S DUP 
Section 3 DU Land Use Plan 
Updates to this section include the addition of multi-family residential uses and open space areas 
adjacent to the employment uses that are developing in DU6n.  
Section 3.1 Street Types

[6] 
This section has been updated to include the new Rubidium Avenue alignment. 
Section 3.2(G) LUG D – District Location 
Approved DUP 
The approved DUP includes the following LUGs: Regional Center/Campus (LUG C), Retreat LUG 
(LUG R), General Urban LUG (LUG GU), Urban Core (UC), Estate (E), Village (V), District (D), 
Civic Space (CS), and Open Space (OS).  
Proposed DUP Amendment 
The proposed DUP amendment maintains the same LUGs; however, the area shown for LUG D 
has expanded. As shown in Exhibit 3.15, LUG D is updated to show the District LUG extending 
north and west of its original boundaries. This expansion of LUG D will allow for development of 
the area previously held for future study. Multi-family residential and retail uses are permitted in 
LUG D. The images below also show the proposed shift of the boundary of DU 5/6 S DUP to align 
with Rubidium Avenue. Rubidium Avenue did not exist when the original DUP was approved in 
2017. 
   
 
Original DU 5/6 S DUP 
 
 
   Proposed DU 5/6 S DUP 
Section 3.3 Transition Areas 
This section describes the buffer between the employment/industrial uses in DU6n north of 
Rubidium and the single-family residential uses located west of the Safeway/”The Point” shopping 
center at the southwest corner of South Signal Butte Road and East Rubidium Avenue in DU 5/6 
S DUP. The proposed amendments include this additional statement: “Use of linear open space 
corridors that also function as usable open space amenities and as part of the Eastmark Great 
Park, higher density residential, roadways and other such transitions will occur.”  
Section 4.1(B)(1) Standard Neighborhood Streets 
A description of Rubidium Avenue is added. 
Section 5 DU Design Guidelines (“DUDG”)

[7] 
Updates to this section include more detail about the last phase of the Eastmark Great Park, 
including its termination point in DU 5/6s and the anticipated completion of construction in 2026, 
as well as updated exhibits showing the Great Park and the 50-foot-wide open space connection 
with the existing park located west of the Safeway/’The Point” shopping center. 
Staff Analysis 
Pursuant to  Sections 4.1(B), 5.1, and 5.2(B) of the CP, DUP amendments shall be approved by 
the Board if the application and supporting materials are consistent with the CP, which requires 
DUPs to include sufficient detail to ensure the compatibility of future development in the DU, to 
ensure appropriate transitions between different developments, to ensure that development will 
not overburden the transportation system, utility infrastructure or community facilities, and to 
facilitate the implementation of the CP. 
1. Shifting the boundary of the southeastern portion of the DUP north, to align with East 
Rubidium Avenue: 
This request to allow a minor shift in the boundary between DU 5/6 S and DU6n to adjust 
to the current configuration of the streets system as it has developed over time with 
development. Staff is supportive of this requested modification and finds it meets the 
requirements for a DUP amendment. 
2. Establishing new boundaries for the District Land Use Group, to expand it west: 
The applicant is requesting an expansion of the “District” LUG in an area originally to 
the east of the Great Park. The LUGs originally shown in this area were limited to LUG 
CS – Civic Space, and LUG OS – Open Space. Multi-family residential and retail uses 
are not permitted in the CS and OS LUGs. This request would allow for the multi-family 
residential and commercial uses proposed in the concurrent application: ZON25-00693. 
Staff is supportive of the requested modification and finds it meets the requirements 
for a DUP amendment. 
3. Updated details for the area shown as “transition area”, located between the existing single-
family residential neighborhoods and the area to the north that is developing with industrial 
uses: 
This ‘transition area’ was originally limited to the CS and OS LUGs; other types of 
development were on hold until the development pattern was established for the 
employment/industrial area anticipated for DU6n. Since the original DUP was approved 
in 2017, Rubidium Avenue has been constructed north of the original boundary of the 
DUP, and Site Plans for industrial uses have been approved north of Rubidium Avenue. 
Also, a Site Plan for the last phase of the Eastmark Great Park has been approved, and 
this new park will stretch between the single-family residential neighborhood and a 
portion of Rubidium Avenue. The remaining vacant piece is currently proposed for 
multi-family residential and commercial uses, and incorporates a minimum 50-foot-
wide landscaped open space as a buffer between the adjacent five single-family 
residential lots and the proposed multi-family development. This 50-foot-wide 
landscaped open space will include a pedestrian connection between the Great Park

[8] 
and an existing open space area. Staff is supportive of the proposed modification and 
finds it meets the requirements for a DUP amendment. 
Citizen Participation 
The applicant conducted a Citizen Participation process, notifying surrounding property owners, 
HOAs, public schools and registered neighbors, in accordance with Section 5.3(B) of the CP.  
Neighborhood Meetings: 
 Thursday, April 16th, 2026, from 3:00 p.m. to 7:00 p.m.   
The Classroom at the ‘Mark Resident Community Center of Eastmark 
10100 East Ray Road, Mesa AZ 85212 
• 
25 individuals attended 
• 
7 comment cards were completed  
o Two of those comment cards expressed opposition to the apartments proposed 
north of the existing single-family homes, where a transition area had previously 
been shown. One comment card indicated support, and the remaining comment 
cards did not express support or opposition.  
• 
Discussion at this meeting included the following questions/concerns:  
o Residential density 
o Traffic 
o Concern over the loss of the open space buffer that had previously been shown 
along the north side of the single-family residential neighborhood that is located 
west of the Safeway shopping center.  
o Appreciation for the greater open space buffer abutting the existing five residential 
lots 
 
Wednesday, May 13, 2026, from 5:30 - 6:30 PM  
The Classroom at the ‘Mark Resident Community Center of Eastmark   
10100 East Ray Road, Mesa AZ  85212 
• 
8 individuals attended 
• 
3 comment cards were completed 
• 
Discussion at this meeting included the following questions/concerns: 
o Concerns regarding the proposed use/layout of the apartments with some 
preferring no development 
o Support for the electric vehicle (EV) charging stations 
o Appreciation for the greater open space buffer abutting the existing five residential 
lots 
o Support for the amenities onsite for the future renters 
Required Notification:

[9] 
• 
Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods within 
one mile of the subject site were notified by mail of the public hearing.  
• 
Staff received one phone call from a neighbor who expressed opposition to the Proposed 
Major Amendment.  
Conditions of Approval 
Staff recommends approval of the Major Amendment to DU 5/6 S DUP, subject to the following 
conditions: 
1. Compliance with the Proposed DU 5/6 S DUP as submitted. 
2. Compliance with all applicable development agreements. 
3. Compliance with all applicable City development codes and regulations. 
Exhibits 
Exhibit 1 – Vicinity Map 
Exhibit 2 – Project Narrative 
Exhibit 3 – Proposed DU 5/6 S DUP 
Exhibit 4 – Proposed DU 5/6 S DUP with tracked changes 
Exhibit 5 – Citizen Participation Plan 
Exhibit 6 – Citizen Participation Report 
Exhibit 7 – Citizen Comment (emails) 
Exhibit 8 – Power Point Presentation