TAB Meeting Minutes March 17, 2026

City of Mesa — City Council Study Session (2026-06-08)

View PDF Meeting page

Extracted text (via pymupdf) 13341 characters
1 
 
TRANSPORTATION ADVISORY BOARD MINUTES 
APPROVED 
HELD ON March 17, 2026 
The Transportation Advisory Board of the City of Mesa met at City Hall (20 East Main Street, 1st Floor) on 
March 17, 2026, at 5:30 p.m. 
 
TAB Members Present 
TAB Members Absent 
Others Present 
Daniel Hartig (Chairperson)  
Dana Alvidrez 
Sabine King 
Mike James (Vice Chairperson) * 
Lea Bertoni 
Anna Janusz 
Tara Bingdazzo 
Daniel Laufer 
 
Justin Bond 
 
 
Rob Crist 
 
 
Melissa Leon 
 
 
Michelle McCroskey 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
*arrived at 5:53 pm 
 
 
 
 
 
Chairperson Hartig called the March 17, 2026, Transportation Advisory Board meeting to order at 5:35 
pm. 
 
Item 1. Approval of the minutes of the Transportation Advisory Board meeting held on January 20, 2026. 
 
It was moved by Board Member Bond, seconded by Board Member Leon, that receipt of the 
above-listed minutes be approved.      
Upon tabulation of votes, it showed: 
AYES – Hartig – Bingdazzo – Bond – Crist – Leon – McCroskey  
NAYS – None 
 
Item 2. Items from citizens present. 
None 
 
Item 3.  Hear and discuss a presentation on the Downtown Mesa Resurfacing and Restriping Project.

2 
 
Sabine King, Supervising Engineer, introduced herself and indicated that she would giving a presentation 
on the Downtown Mesa Resurfacing and Restriping Project. Ms. King presented the details of the 
upcoming project, which originated from the downtown Mesa micro-mobility and parking plan. The goal 
of the plan is to enhance transportation options for all users, including drivers, cyclists, pedestrians, and 
scooter riders, while maximizing and clarifying downtown parking. Ms. King outlined Downtown Mesa’s 
Mill & Overlay program, new striping configuration and wayfinding signage to public parking. By 
coordinating these changes with the city's scheduled pavement maintenance, the transportation 
department can use the newly resurfaced roads as a "blank slate" for the new striping. Ms. King showed 
a map of Downtown Mesa’s Proposed Bike Network and a couple proposed street cross section 
examples. She noted that many of the City of Mesa's wide downtown streets are currently underutilized. 
The project will incorporate a mix of parallel and angled parking, utilizing physical barriers like 
delineators and curb stops to keep cars out of the bike lanes. Next, Ms. King outlined the four-year 
current pavement maintenance plan that includes the ADA updates and targeted concrete curb repairs 
followed by the mill and overlay project that will provide the opportunity for the new striping 
configuration. The project will tackle one downtown quadrant per year. It will start in the northwest 
quadrant and move counterclockwise, finishing by 2029. The project is budgeted at an average of $5 
million per quadrant, totaling just over $20 million. 
Ms. King presented a few examples of design concepts and explained key elements of each of them. She 
added that the City of Mesa will remove center turn lanes (except at major intersections) to create the 
necessary space for the new bike lanes and parking configurations. The City of Mesa’s plans is to add 
green-striped bike lanes to provide a safe alternative to Main Street, which cannot accommodate bike 
lanes due to the light rail. To maximize safety, the design aims to place bike lanes behind parked cars, 
using the parked vehicles as a physical buffer from moving traffic. 
Ms. King added that the plan includes removal of some downtown traffic signals. Traffic lights at five 
low-volume intersections—specifically at Robson and 1st Street, Macdonald and 1st Street, Macdonald 
and 1st Avenue, Sirrine and 1st Avenue, and Hibbert and 1st Avenue—will be converted to all-way stops. 
This change is designed to reduce unnecessary wait times and improve the pedestrian experience. 
Signals on higher-volume roads like Center Street will remain.  
Additionally, the city has already removed the confusing color-coded parking lot system in favor of clear, 
standardized blue public parking signage. 
Board Member McCroskey inquired about the visibility of stop signs at wide intersections, specifically on 
Macdonald, following the proposed removal of traffic signals. She asked how the stop signs would be 
placed to ensure they are noticeable to drivers. 
Ms. King responded by using the 1st Street and Robson intersection as an example of a location where a 
traffic signal will be removed. She explained that due to the wide median on Robson, there is not much 
that can be changed, so the current layout will remain. On 1st Street, unused hatched areas on the right-
hand side provide an opportunity to place stop signs closer to the travel lane, preventing them from 
being blocked by parked vehicles. She added that reflective sleeves can be installed on the signposts to 
further enhance visibility.

3 
 
Board Member McCroskey inquired whether there had been any discussion regarding scheduling major 
road construction at night to avoid daytime traffic impacts and the extreme summer heat.  
Ms. King responded that because the project is in a residential area, the impacts of nighttime noise must 
be weighed against daytime traffic disruptions. The work will be strategically phased to ensure alternate 
routes remain open. The project does not involve moving any curbs. It primarily involves concrete work 
for ramps and sidewalks, followed by a relatively quick mill and overlay resurfacing, rather than a 
lengthy roadway reconstruction involving curb relocation. Due to the residential impacts and the speed 
of the resurfacing and striping processes, night work is not prioritized, and daytime impacts are not 
anticipated to be a significant issue. 
Board Member McCroskey inquired if physical barriers or vertical elements would be installed along the 
bike lanes to alert drivers if their vehicles drift into the designated cycling area. 
Ms. King stated that vertical delineators equipped with reflectors will be installed in certain sections, 
particularly adjacent to parallel parking stalls. Furthermore, she noted that the bike lanes will generally 
be physically separated from moving traffic by a buffer of parked cars, significantly reducing the 
likelihood of vehicles entering the bike lanes. 
Board Member McCroskey expressed support for the separation of bike lanes from vehicle traffic. She 
then commented on the proposed changes to parking zone colors, emphasizing the need for clear, 
quickly identifiable signage with time limits in the City of Mesa downtown area. Additionally, she 
emphasized the need for clear wayfinding and safe bicycle parking for cyclists navigating the downtown 
area. 
Ms. King assured the board that visible and secure bicycle parking is a priority. She stated that the City of 
Mesa actively collaborates with local businesses on bicycle parking options in visible locations, allowing 
cyclists to comfortably monitor their bicycles. 
Board Member McCroskey inquired about the specific destination, the 1st Avenue and 1st Street bike 
corridors, are intendent to connect. 
Ms. King stated that the corridors are designed to connect to the broader downtown network. This 
includes future connections to Center Street, which is being addressed as a separate capital 
improvement project. The overall goal over the next four years is to establish a comprehensive network 
of north-south and east-west connections, primarily using protected or striped bike lanes. However, 
some streets such as Macdonald and Robson that have wide median will not have dedicated bike lane 
due to space constraints. They are low-volume streets that will still serve as connections within the 
wider network. 
Board Member Bond noted that Robson is the only corridor providing a designated crosswalk 
connection across University Drive 
Ms. King clarified that the designated crossing is located on Grand, just east of Robson.

4 
 
Board Member Bond suggested utilizing stop signs with LED outer borders, in addition to reflective 
posts, to better capture drivers' attention. 
Ms. King acknowledged the suggestion. 
Chairperson Hartig inquired how the downtown bicycle network is planned to connect to areas outside 
of the immediate downtown square mile. 
Ms. King responded that establishing broader connectivity is an ongoing effort. For example, Center 
Street contains striped bike lanes north of University Drive, connecting to the canal paths. Additionally, 
future capital improvement projects, such as the planned extension of Mesa Drive north of Main Street 
utilizing Proposition 479 funds, will include bike lanes to further expand the network beyond the 
downtown core.  She further acknowledged that, while the current focus is on connecting the 
downtown area, it is essential to ensure connectivity to various destinations beyond downtown. 
Chairperson Hartig inquired about the definition of "micro-mobility parking" as referenced in the 
presentation materials. 
Ms. King stated that the micro-mobility concept originated from the Downtown Transformation Office. 
She explained that it primarily refers to providing infrastructure for parking, including bicycle parking 
and anticipating future needs for shared electric scooters. While scooter usage is currently low in the 
City of Mesa compared to other Valley cities, the plan aims to accommodate a potential future increase 
in micro-mobility options in the downtown area.  
Chairperson Hartig then inquired whether there were any safety concerns regarding vehicles backing 
out of the proposed angled parking spaces. 
Ms. King advised that the angled parking is situated on a low-volume, low-speed street. While 
acknowledging that drivers must look over their shoulders when backing out, she emphasized that 
angled parking is common in urban areas and functions as an effective traffic-calming measure. The 
tighter street design introduces "side friction," which naturally encourages drivers to reduce their speed 
and pay closer attention to their surroundings as they adapt to the pedestrian-friendly environment. 
Chairperson Harting commented that drivers might veer into the opposing lane to navigate around 
vehicles backing out of angled stalls but agreed that the low vehicle speeds should mitigate potential 
safety issues. 
Vice Chairperson James noted the upcoming Cul-de-sac development at Site 17 and its function as a 
mobility hub. He expressed that this development increases the importance of enhancing the bike lanes 
on, and connections from, University Drive, and described the current striping on University Drive as in 
need of improvement.  
Ms. King agreed with this assessment.  
Vice Chairperson James commented that a large tree was previously lost to a storm on the northeast 
corner of Mesa Drive and University Drive, suggesting that the resulting available right-of-way could be 
utilized for infrastructure improvements.

Downtown Mesa 
Resurfacing & Restriping Project
Transportation Advisory Board
March 2026

Agenda
2
• Downtown Mesa Micromobility & Parking Plan
• Downtown Mesa Mill & Overlay
o Four-year program
• New Striping Configurations
o Update street characteristics
o Add bike lanes
o Add parking
o Remove Signals
• Wayfinding to Public Parking

Micromobility & Parking Plan
3
Goals
• Enhance transportation options as the downtown area 
grows
• Focus on creating a sustainable, multimodal 
transportation network
• Explore options for improved connectivity between 
surrounding neighborhoods & downtown businesses
• Create dense, urban environment that incorporates 
walkability & shared parking solutions
• Maximize utilization of existing parking resources & 
anticipate future parking needs

Micromobility & Parking Plan
4
Downtown Mesa Proposed Bike Network

Micromobility & Parking Plan
5
Proposed Street Cross Sections
*concept-level 
cross sections

Pavement Maintenance
6
Downtown Mill & Overlay Project
• Four-year program (4 sq. mi.)
• ADA updates & targeted concrete curb 
repairs where needed
• Opportunity for new striping configurations
Legend
FY 25/26
FY 26/27
FY 27/28
FY 28/29
FY 25/26 = $6,000,000
FY 26/27 = $5,925,000
FY 27/28 = $4,950,000
FY 28/29 = $5,250,000

Pavement Marking Updates
7
Restriping Project
• Part of mill & overlay project with newly 
paved roadways
• Update street cross-sections with new 
striping configurations to meet the following 
goals: 
o add new and enhanced bike lanes to 
targeted corridors
o add downtown, on-street parking options
o promote slow-speed, multi-modal, 
downtown street characteristics

Pavement Marking Updates
8
1st Street Design Concepts

Pavement Marking Updates
9
1st Street Design Concepts

Pavement Marking Updates
10
1st Street Design Concepts

Pavement Marking Updates
11
1st Street Design Concepts

Proposed Traffic Signal Removals
12
1st Street
• Robson
• Macdonald
1st Avenue
• Macdonald
• Sirrine
• Hibbert
Intersections will be converted 
to all-way stops.

Public Parking Signage
13
Wayfinding to public parking areas
• Parking garages
• Surface parking lots

Why We Are Here Today
14
Overall Schedule
•
Provided to TAB:
Background, goals & resurfacing project
Current design concepts for striping
How to provide suggestions
•
Comment during today’s meeting
•
Submit written feedback to sabine.king@mesaaz.gov
by March 31, 2026

Questions/Discussion
15
15