Staff Report

City of Mesa — Board of Adjustment Public Hearing (2026-06-03)

View PDF Meeting page

Extracted text (via pymupdf) 10999 characters
Board of Adjustment Report 
Date 
June 3, 2026 
Case No.  
BOA26-00157 
Project Name 
Living Word Church 
Request 
• Special Use Permit (SUP) for a Comprehensive Sign Plan (CSP) 
Project Location 
Located at 3520 East Brown Road 
Parcel No(s) 
141-13-006J  
 
Project Area 
15.7± acres 
Council District 
District 1 
Existing Zoning 
Agricultural (AG) 
General Plan 
Designation 
Rural Residential 
Applicant 
Summit West Signs 
Owner 
The Living Word Bible Church 
Staff Planner 
Emily Johnson, Planner II 
Recommendation 
Staff finds that the requested Special Use Permit (SUP) for a Comprehensive Sign Plan (CSP) 
meets the criteria outlined in MZO Section 11-46-3 and the required findings outlined in MZO 
Section 11-70-5. 
Staff recommends approval with conditions. 
Project Overview

[2] 
Request: 
The applicant is requesting a Special Use Permit (SUP) for a Comprehensive Sign Plan (CSP) 
for a place of worship located in the Agricultural (AG) zoning district. Overall, the proposed CSP 
will allow for deviations to detached signage allowances.  
Site Context 
General Plan:  
• 
The Placetype for the project site is Rural Residential and the Growth Strategy is Sustain. 
• 
The Public/Semi-Public land use, which includes Places of Worship, is a supporting land 
use. 
Zoning:  
• 
The project site is zoned Agricultural (AG). 
• 
Places of Worship are permitted within the AG District. 
Surrounding Zoning & Use Activity: 
Northwest 
(Across Miramar) 
AG (Proposed RS-15-PAD) 
Vacant (Proposed Single 
Residence) 
North 
RS-35-PAD 
Single Residence 
Northeast 
(Across Val Vista Dr.) 
RS-35 
Single Residence  
West 
(Across Miramar) 
AG (Proposed RS-15-PAD) 
Vacant (Proposed Single 
Residence) 
Project Site 
AG 
Places of Worship 
East 
(Across Val Vista Dr.) 
RS-35-PAD 
Vacant 
Southwest 
(Across Brown Rd.) 
RS-15 
Single Residence 
South 
(Across Brown Rd.) 
RS-9 & OC 
Single Residence & Office 
Southeast 
(Across Brown Rd.) 
OC 
Office 
Site History: 
• 
August 25, 1979: City Council annexed 2,225± acres, including the project site, into the 
City of Mesa (Ordinance No. 1277). 
• 
February 18, 1980: City Council approved a rezoning for 821± acres, including the project 
site, from Maricopa County Rural-43, R1-35, and R1-35-SU to City of Mesa AG, SR 
(equivalent to current RS-43), and R1-35 (Case No. Z80-018; Ordinance No. 1313).  
• 
April 24, 1989: City Council approved a Site Plan for 4.6± acres, and a rezoning from R-
4 to C-2 for the northern 3.3+ acres, for development of a 32,440 square foot bowling alley 
and a 5,500 square foot free-standing pad building (Case No. Z89-009; Ordinance No. 
2427).  
• 
December 3, 1997: The Design Review Board reviewed the building elevations and 
landscape plan for The Living Word Bible Church (Case No. DR97-060).

[3] 
• 
December 14, 2010: The Board of Adjustment approved a Special Use Permit to allow a 
Commercial Communication Tower in the AG zoning district (Case No. BA10-065). 
• 
July 11, 2018: The Board of Adjustment approved a Special Use Permit to allow for a 
stealth wireless communication facility in the AG zoning district and a special Use Permit 
for a wireless communication facility to exceed the maximum height allowed in the AG 
zoning district (Case No. BOA18-00380). 
Project/Request Details 
Site Plan: 
• 
Access: The Project Site’s main entry is located on Brown Road with four additional 
ingress/egress drive aisles including, one on Brown Road, one on Miramar, and two on 
Val Vista Drive. 
• 
Street Frontage: The Project Site has three street frontages including approximately 
1,024-linear feet along Brown Road, 594-linear feet along Miramar, and 419-linear feet 
along Val Vista Drive. 
• 
Existing Signage: The Project Site currently has two monument signs identified by the 
applicant as Monument A and Monument B.  Monument A is a 32-square-foot, illuminated 
monument sign located along Brown Road that is proposed to remain unchanged, and 
Monument B is a non-illuminated monument sign located within the median of the main 
entrance along Brown Road which will be removed. There is no attached signage. 
Comprehensive Sign Plan (CSP): 
The applicant is requesting a CSP to allow for modifications from the Sign Ordinance for signage 
at The Living Word Bible Church. The requested modifications include an increase to the 
maximum number of attached or detached signs permitted per street front, an increase to the 
maximum area per sign, and for the allowance of illumination. 
The CSP proposes two detached signs, identified by the applicant as Monument A and 
Monument C, located along Brown Road. Monument A exists and will remain at the same 
location, approximately 115 feet from the western property line, and Monument C will replace 
Monument B within the main entry median, but it is proposed to be further south, closer to Brown 
Road. There will be approximately 787 feet between the two monument signs.  
Monument C is proposed to be approximately 44 square feet, which exceeds the maximum sign 
area allowance of 32 square feet per sign (Monument A is 32 square feet).  
Additionally, the CSP would allow for both the signs to be illuminated. Both signs are required to 
be in compliance with Section 11-41-3(B) of the Mesa Zoning Ordinance (MZO) for illumination, 
which includes conforming to the requirements of the Mesa Lighting and Electrical Code, Title 4, 
Chapter 4 of the Mesa City Code. Monument A is proposed to be illuminated on the western 
elevation and Monument C is proposed to be illuminated on both the west and east elevations. 
Monument C is proposed to include an electronic message panel which will be required to be in 
compliance with Section 11-43-5 of the MZO regarding the standards for message display and 
lighting controls. This includes the standard that electronic message panels located within 150 
feet of single residences shall not be illuminated between 11:00 p.m. and sunrise.

[4] 
Table 1 compares the Mesa Zoning Ordinance (MZO) standards for attached and detached 
permanent sign allowances in the AG district for a lot allowed to operate a non-residential land 
use with the proposed CSP modifications: 
Development Standards  
MZO Allowance 
CSP Proposed 
Maximum Number of Permitted 
Signs –  
MZO Table 11-43-3-A  
1 sign per street front, 
attached or detached 
2 signs on one street front 
(Brown Road) 
Maximum Area Per Sign – 
MZO Table 11-43-3-A 
32 square feet per sign 
44 square feet (Monument 
C) 
Additional Requirements –  
MZO Table 11-43-3-A 
Non-illuminated 
Illumination (Monument A 
and Monument C) 
Approval Criteria – Section 11-46-3(D): 
Per Section 11-46-3(D) of the MZO, the Board of Adjustment must find at least one of the 
following criteria are met in order to approve a CSP: 
1. Unique or Unusual Physical Conditions: The Project Site is large with three street 
frontages including approximately 1,024-linear feet along Brown Road. The sign code 
would allow up to one sign per street frontage; therefore, the Project Site is permitted three 
signs, one on each frontage. However, the applicant is requesting only two signs, both on 
Brown Road, as it is the most visible street frontage. The property’s scale combined with 
a larger setback requires enhanced signage to effectively identify the property. 
2. Unique Characteristics of Land Use, Architectural Style, Site Location or other 
Distinguishing Features: The Project Site consists of a place of worship serving the 
broader community and requires clear identification for visitors, special events, and 
community services that are provided on the campus. 
3. Incorporation of Special Design Features: The proposed signage is designed to 
improve communication for services, events, and community information while 
maintaining aesthetic compatibility with the surrounding area. 
Special Use Permit: 
Per Section 11-46-3(A), a CSP must be approved in conjunction with a SUP. Per Section 11-70-
5(E) of the City of Mesa Zoning Ordinance, the Board of Adjustment shall also find the following 
criteria are met for approval of a SUP: 
1. Advance the Goals and Objectives of and Consistency with the General Plan and 
other Plan/Policies: The proposed CSP is consistent with the Rural Residential 
Placetype, and furthers the implementation of, and is not contrary to, the Vision, Guiding 
Principles, Strategies, and applicable elements of the Mesa 2050 General Plan. The 
proposed CSP will provide greater visibility for the place of worship and help to promote 
complete communities in this existing neighborhood (Strategy N1). It will also help create 
opportunities for placemaking in neighborhoods in a strategic manner (Strategy LU2). 
2. Consistency with the Zoning District Purposes: The proposed CSP is consistent with 
the location, design and operating characteristics and conforms to the goals and purposes 
of the AG zoning designation on the project site. Places of Worship are permitted as a

[5] 
land use in the district and the site has developed with suitable infrastructure to support 
the use in the district. 
3. Project Impact: There will be no injurious or detrimental impact to surrounding properties 
with the proposed signage and will only encourage harmonic growth for the surrounding 
area. The proposed signs will not be overbearing in size, and will not flash, blink, animate 
or emit any noise. 
4. Adequate Public Facilities: The City of Mesa utilities and public infrastructure are 
available to serve the proposed project. 
Required Notification 
The applicant provided letters to surrounding property owners within 500 feet of the project site, 
notifying them of the public hearing.  
As of writing this report, staff has not been contacted regarding the Proposed Project. 
Conditions of Approval 
Staff recommends approval of the Special Use Permit for the Comprehensive Sign Plan, subject 
to the following conditions: 
1. Compliance with the final sign plan as submitted. 
2. Compliance with the Mesa Zoning Ordinance, including all applicable City Development 
codes and regulations. 
3. Compliance with all requirements of the Development Services Department regarding the 
issuance of building permits. 
4. Any sign components that become deteriorated, damaged, or weakened shall be 
promptly repaired or replaced. 
5. All signage be reviewed and approved through a separate sign permit application. 
Section 11-70-5 of the MZO allows for a revocation process if any condition, stipulation, or term 
of the approval of the SUP has been violated.  In addition to the conditions of approval above, 
approval of the SUP is conditioned on the information provided by the applicant at the public 
hearing and in the application (including any accompanying narrative and other supplemental 
materials) not being false or materially misleading at the time of approval. 
Exhibits 
Exhibit 1 – Vicinity Map 
Exhibit 2 – Project Narrative 
Exhibit 3 – Sign Plan 
Exhibit 4 – Power Point Presentation