April 6, 2026 Study Session

City of Mesa — City Council (2026-06-01)

View PDF Meeting page

Extracted text (via pymupdf) 18329 characters
OFFICE OF THE CITY CLERK             
 
 
COUNCIL MINUTES 
 
April 6, 2026 
 
The City Council of the City of Mesa met in the Study Session room at City Hall, 20 East Main Street, on 
April 6, 2026, at 4:45 p.m. 
 
COUNCIL PRESENT 
 
COUNCIL ABSENT 
OFFICERS PRESENT 
Mark Freeman 
Scott Somers 
Rich Adams 
Jennifer Duff  
Francisco Heredia* 
Dorean Taylor 
 
  Alicia Goforth 
 
Scott Butler 
Holly Moseley 
Jim Smith 
 
 
 
(*Participated in the meeting through the use of video conference equipment.) 
 
Mayor Freeman conducted a roll call. 
 
1. 
Review and discuss items on the agenda for the April 6, 2026, regular Council meeting. 
 
All of the items on the agenda were reviewed among Council and staff and the following was 
noted: 
 
Conflict of interest: None 
 
Items removed from the consent agenda: None 
 
2-a. 
Hear a presentation, discuss, and provide direction on the Transportation Department budget. 
 
Transportation Director Erik Guderian introduced Deputy Director Andrew Calhoun and displayed 
a PowerPoint Presentation. (See Attachment 1) 
 
Mr. Guderian shared the Transportation Department’s new public purpose statement, which 
closely aligns with their mission statement. He identified two key focus areas for the 
Transportation Department based on a 2022 proclamation by the Mayor and Council aimed at 
reducing fatal and serious injury crashes by 30% by 2030. (See Pages 2 and 3 of Attachment 1) 
 
Mr. Guderian reported that the City’s pavement condition index (PCI) is performing well above 
the target level, due to the significant investment Council and Management have made to the 
Transportation Department to preserve asphalt. (See Page 4 of Attachment 1)

Study Session 
April 6, 2026 
Page 2 
 
 
Mr. Guderian provided an update on the Streetlight LED Conversion project, stating approximately 
400 fixtures are remaining in downtown with completion expected in June 2026. He stated that 
the City saved money by having the work performed by in-house staff. He explained that the City 
re-established an in-house concrete crew three years ago to improve response times for repairs, 
especially buckled sidewalks. He noted that repair times have improved from over 30 days to 
about 10 days, while also allowing staff to handle smaller projects and gain experience. (See 
Pages 5 and 6 of Attachment 1) 
 
City Manager Scott Butler shared his appreciation for the Department’s continued efforts to 
determine the most timely and cost-effective service, whether that be in-house or through 
contractors, noting that the best option can change depending on economic conditions. 
 
Mr. Guderian added that while the City moved heavily toward contracted services about 20 years 
ago, recent contract trends have led them to reconsider whether in-house operations may now 
be more efficient. 
 
Mr. Guderian highlighted the City’s continued turf conversion efforts, especially along Dobson 
Road, replacing grass with low-water landscaping and improving irrigation systems. He 
commented that these projects have reduced water use and costs by about 80%, with only two 
turf locations remaining. (See Page 7 of Attachment 1) 
 
Mr. Guderian described how the City receives $800,000 to $1 million annually from the Photo 
Safety program to fund traffic safety improvements near schools, parks, and pedestrian areas. 
He added, since 2020, the fund has supported smaller-scale safety projects that otherwise may 
not have been possible. He presented a list of projects that the City recently completed and 
projects that are in progress. (See Page 8 of Attachment 1) 
 
Mayor Freeman emphasized that 100% of photo radar fine revenue is dedicated to safety-related 
projects throughout the city.  
 
Mr. Butler clarified that these funds are not used to supplement the General or Transportation 
Fund, or operations budget, and are strictly reserved for transportation safety improvements that 
are identified by the Transportation Department as areas of high critical need.  
 
Responding to a question from Mayor Freeman, Mr. Guderian explained that the City receives an 
annual allotment that is placed into a dedicated fund and later transferred into approved safety 
projects. He advised that the department meets quarterly to prioritize projects and currently has 
about a two-year backlog. 
 
Mr. Guderian discussed the updates for the mill and re-pavement project for the entire downtown 
square mile over the next four years. He noted that the work begins in the northwest quadrant 
and will move counterclockwise, including not only new pavement but new striping plans to 
improve parking, bike lanes, and vehicle lane use. (See Page 9 of Attachment 1) 
 
Mr. Guderian reviewed the funding sources for the Transportation Department, which operates 
largely through restricted funding sources that must be used for transportation purposes. He 
indicated that approximately 94% of funding comes from Mesa’s Local Street Sales Tax (LSST) 
and Highway User Revenue Funds (HURF), both dedicated to street maintenance and 
construction. He noted 2% is derived from the Environmental Compliance Fee (EFC) that is

Study Session 
April 6, 2026 
Page 3 
 
 
included on Mesa’s utility bills used for some storm drain maintenance, with additional funds from 
photo safety revenue. He emphasized that there are limited General Funds and Utility Funds that 
flow through the Transportation Department for other departments. (See Page 10 of Attachment 
1) 
 
Mr. Calhoun discussed the expenditures for Fiscal Year (FY) 26/27, noting that Transportation 
has 184 authorized positions, but approximately 170 employees. He commented that most 
expenditures are for personnel and contracted services, with future analysis planned to compare 
in-house versus contract work. He noted that $11.9 million is largely fleet-related costs and $5 
million is for utilities such as electricity and water for the City’s assets. (See Page 11 of Attachment 
1) 
 
Mr. Calhoun provided an overview of Transportation’s financial summary, stating that the 
department is not requesting any new employees or programs and will maintain current service 
levels. He reported that the proposed budget for FY 26/27 is $58.9 million, which has increased 
from the FY 25/26 revised budget driven by contract costs, personnel step increases, operational 
costs for new projects, and $650,000 transferred from lifecycle funds to cover landscape and tree 
maintenance. He emphasized that revenue is expected to remain stable, and the majority of 
transportation revenues come from temporary traffic control permit fees, and that revenues may 
taper off as fiber work declines. (See Page 12 of Attachment 1) 
 
Mr. Calhoun explained that the Transportation Department was instructed to take its 2% reduction 
from the ECF funding source, amounting to $25,000. He stated that savings from HURF funds 
will cover the reduction so that storm channel maintenance services are not impacted. (See Page 
13 of Attachment 1) 
 
Mr. Guderian provided an overview of the department’s $35 million annual lifecycle budget, and 
the majority of the funds go to the Street Overlay program. He commented that the City uses the 
budget to replace equipment and infrastructure that have reached the end of their useful life 
across various programs. (See Page 14 of Attachment 1) 
 
Mr. Guderian introduced a proposed $3 million annual Capital Improvement Program (CIP) for 
smaller active transportation projects, noting that Council had requested this type of program over 
the years. He mentioned that the fund would allow the City to address smaller community-
requested projects more quickly rather than waiting several years for grants or bond funding. He 
added that the program is proposed as a three-year pilot funded through Maricopa Association of 
Governments (MAG) reimbursements. (See Page 15 of Attachment 1) 
 
In response to a question posed by Councilmember Taylor, Mr. Guderian confirmed that active 
transportation refers to walking, biking, pathways, and any form of self-propelled travel.  
 
Mr. Guderian reviewed the various stages of projects and associated costs, noting that one mile 
of canal path now costs approximately $3 million, while pedestrian crossings can range from 
$750,000 to $1 million. He shared that the proposed funding could support several smaller 
projects annually and sought Council feedback before finalizing the CIP. (See Page 16 of 
Attachment 1)

Study Session 
April 6, 2026 
Page 4 
 
 
City Manager Scott Butler clarified that the goal is to fund smaller-scale community projects that 
close a gap or fill a different need in the community without requiring a need for transportation 
bond funding which is needed for larger projects.  
 
Responding to a question from Councilmember Adams, Mr. Guderian replied that most of the 
active transportation projects come directly from Councilmembers and residents, often through 
district concerns such as shared-use path connections or new crossings, making the process 
largely community-driven rather than staff-driven. 
 
In response to multiple questions from Councilmember Taylor, Mr. Guderian explained that the 
consolidated canal is owned and maintained by Salt River Project (SRP), and the City enters into 
a license agreement with SRP to use one side of the canal for recreational purposes. He 
confirmed that any new amenities on the City’s side, including lighting, would be provided and 
maintained by the City. He defined a traffic calming project ais a project that involves 
improvements to street designs that reduces speed, such as speed humps, raised crosswalks or 
building medians in the roadway to slow traffic down.  
 
Responding to an inquiry from Mayor Freeman, Mr. Guderian said the Transportation Department 
has a lot of turnover and plans to fill its vacancies. He advised that the specific reduction is 
$25,000 from storm drain maintenance, which will be offset by savings from other areas within 
the department. 
 
Discussion ensued regarding the base budget reduction of $25,000.  
 
Mayor Freeman thanked staff for the presentation.  
 
3. 
Acknowledge receipt of minutes of various boards and committees.  
 
3-a. 
Education and Workforce Development Roundtable meeting held on December 3, 2025. 
 
3-b. 
Planning and Zoning Board Meeting held on January 28, 2026.  
 
3-c. 
Housing and Community Development Advisory Board meeting held on February 5, 2026. 
 
3-d. 
Planning and Zoning Board Meeting held on February 25, 2026.  
 
It was moved by Councilmember Adams, seconded by Councilmember Duff, that receipt of the 
above-listed minutes be acknowledged. 
 
Upon tabulation of votes, it showed:  
 
AYES – Freeman–Somers–Adams–Duff–Heredia–Taylor 
NAYS – None 
ABSENT – Goforth 
 
Mayor Freeman declared the motion carried unanimously by those present.

Study Session 
April 6, 2026 
Page 5 
 
 
4. 
Current events summary including meetings and conferences attended. 
 
Mayor Freeman and Councilmembers highlighted the events, meetings, and conferences recently 
attended. 
 
5. 
Scheduling of meetings. 
 
City Manager Scott Butler stated that the schedule of meetings is as follows: 
 
Thursday, April 9, 2026, 7:30 a.m. – Study Session 
 
Thursday, April 16, 2026, 7:30 a.m. – Study Session 
 
Thursday, April 23, 2026, 8:00 a.m. – State of the City 
 
6. 
Adjournment. 
 
Without objection, the Study Session adjourned at 5:22 p.m. 
 
 
 
    ____________________________________ 
MARK FREEMAN, MAYOR 
 
ATTEST: 
 
 
 
_______________________________ 
HOLLY MOSELEY, CITY CLERK 
 
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the Study Session 
of the City Council of Mesa, Arizona, held on the 6th day of April 2026. I further certify that the meeting 
was duly called and held and that a quorum was present. 
 
 
 
 
 
 
 
_______________________________ 
    HOLLY MOSELEY, CITY CLERK 
 
lr 
(Attachments – 1)

Fiscal Year 2026/27
Transportation Department
April 6, 2026
Erik Guderian, Transportation Director
Andrew Calhoun, Deputy Director
Study Session 
April 6, 2026 
Attachment 1 
Page 1 of 16

PERFORMANCEPLUS
E N V I S I O N .  E L E V A T E .  I M P A C T .
OUTCOMES-base of kpis
HOW WE ALIGN TO THE PRIORITIES
WHY WE EXIST
The Transportation Department exists to plan, operate, 
and maintain Mesa’s transportation network to enhance 
its efficiency, reduce its safety risk, and promote its 
longevity to support quality development in Mesa.
Study Session 
April 6, 2026 
Attachment 1 
Page 2 of 16

Outcome Areas
3
3
• Reduce safety risk
• Promote longevity and 
enhance efficiency
Study Session 
April 6, 2026 
Attachment 1 
Page 3 of 16

4
4
4
Pavement Preservation
81.2
78.8
79.2
80.1
81.7
81.7
60
65
70
75
80
85
90
95
100
2020
2021
2022
2023
2024
2025
PCI Score 
All Streets Pavement Condition Index (PCI)
PCI
Target
Performance Measure/KPI
Study Session 
April 6, 2026 
Attachment 1 
Page 4 of 16

Performance Measure/KPI
5
5
Streetlight LED Conversion
45,445 converted, 427 remaining to convert
Expected date of completion: June 2026
LED
99%
HPS
0%
Other
1%
Study Session 
April 6, 2026 
Attachment 1 
Page 5 of 16

6
6
6
In-House Concrete Crew
Accomplishment
10
Days
•
Average Response Time: 10 Days (In-House) vs. 30 Days (Contractor)
•
Improved schedule control and resident response
•
Direct oversight during placement and finishing
Study Session 
April 6, 2026 
Attachment 1 
Page 6 of 16

Accomplishment
7
7
Landscape Refurbishment
Dobson Road: US60 and Guadalupe Rd – Completed December 2025
  Low-water landscaping
  Preserved healthy mature trees
  Stormwater catchment swales
  Upgraded irrigation system
  Smart controllers
  Decreased maintenance 
Highlights
Before
After
79% reduction in water costs (Dobson Rd Project)
Study Session 
April 6, 2026 
Attachment 1 
Page 7 of 16

Accomplishment
8
8
Recently Completed
  Gateway Library Pedestrian Hybrid Beacon    
      (Nov 2025)
  Extension Bike Lanes
      Baseline Rd → Main St (Dec 2025)
  Hampton Bike Lanes & Pedestrian Crossing
      96th St → Signal Butte Rd (Dec 2025)
  ITS Green Arrow Installations
       Phase 1 complete
       Phase 2 begins March 2026
  Westwood Raised Crosswalks
      University Dr & Rio Salado Pkwy (Dec 2025)
Funded – In Progress / Upcoming
Dobson Rd Pedestrian Hybrid Beacon
South of Broadway Rd (Est. June 2026)
Stapley Dr Sidewalks
South of Main St, west side (Summer 2026)
May & Ella ADA Improvements
Est. Summer 2026
Beverly & 2nd St Enhanced Crosswalk
Design starts Spring 2026
Horne RRFB @ Consolidated Canal
Est. March 2026
Safety Projects – Photo Safety Reinvestment
Gateway Library 
Pedestrian Hybrid 
Beacon    
Study Session 
April 6, 2026 
Attachment 1 
Page 8 of 16

Upcoming
9
9
FY 25/26 = $6,000,000
FY 26/27 = $5,925,000
FY 27/28 = $4,950,000
FY 28/29 = $5,250,000
Downtown Mesa Mill and Overlay Project
•
Four-year program to mill and pave all City streets within 
the downtown Mesa area (1 sq. mi.) 
•
Includes targeted concrete curb repairs and ADA upgrades 
where needed 
•
Coordinated with improvements identified in the 
Downtown Micromobility and Parking Study
Legend
FY 25/26
FY 26/27
FY 27/28
FY 28/29
Study Session 
April 6, 2026 
Attachment 1 
Page 9 of 16

48%
46%
2%
4%
Highway User Revenue Fund (HURF)
Local Streets Sales Tax (LSST)
Environmental Compliance Fee (ECF)
Other
FY 26/27 Operational Funding Sources
10
10
Restricted Fund
Restricted Fund
Study Session 
April 6, 2026 
Attachment 1 
Page 10 of 16

FY 26/27 Operating Expenditures
11
11
Personal Services
Contractual Services
Utilities
Commodities
Other Services
$20.8M
35%
$14.4M
24%
$5M
9%
$6.8M
12%
$11.9M
20%
Study Session 
April 6, 2026 
Attachment 1 
Page 11 of 16

Department Financial Summary
12
12
Core Business Process
FY 24/25
Year End
Actuals
FY 25/26
Revised 
Budget
FY 25/26
Year End
Estimate
FY 26/27
Proposed 
Budget
Expenditures
Field Operations
$41.9
$46.9
$45.7
$48.8
Traffic Engineering
$9.0
$9.7
$9.5
$10.1
Total
$50.9
$56.6
$55.2
$58.9
Revenues
Field Operations
$0.2
$0.6
$0.3
$0.2
Traffic Engineering
$5.9
$5.5
$5.5
$5.6
Total
$6.1
$6.1
$5.8
$5.8
Figures in millions, rounded
Study Session 
April 6, 2026 
Attachment 1 
Page 12 of 16

Base Budget Reduction(s)
13
13
Ranking
Adjustment
FTE
Ongoing
Fund
1
Personal Services and 
Contracted Services
0
-$25,426
Environmental 
Compliance Fee
Base Budget Reduction
Study Session 
April 6, 2026 
Attachment 1 
Page 13 of 16

Lifecycle Programs
• Street Overlay Program
• Storm Channels Maintenance and Repair
• Streetlight LED Conversion Project
• Transportation Landscape Improvements
• Rusted Streetlight Pole Replacements 
• ADA Improvements 
• Citywide Sidewalk Improvements
• CCTV Replacements
• Irrigation System upgrades
• ITS Field Equipment Upgrade
• Signalized Intersection ADA Improvement
• Traffic Signal Controller Cabinet Replacement
• Streetlight Spot Improvement 
• Traffic Signals – New and Upgrade
• Traffic Calming Projects
$35M Annually
14
Study Session 
April 6, 2026 
Attachment 1 
Page 14 of 16

Annual Active Transportation Projects
Description: Annual program that identifies, plans, designs and 
constructs new active transportation facilities, focusing on closing 
critical gaps in the regional active transportation network.
Council District: Citywide
Council Priority: Community Health & Safety
Lifecycle Program Description
Funding Sources
Transportation Fund - $3,000,000 Annually 
FY 26/27
FY 27/28
FY 28/29
FY 29/30
FY 30/31
$3.0M
$3.0M
$3.0M
TBD
TBD
Project Start Dates
Projected O&M Cost
One-Time: TBD
Ongoing: TBD
Design: On-Going
Construction: On-Going
15
Study Session 
April 6, 2026 
Attachment 1 
Page 15 of 16

Annual Active Transportation Projects
Recent Projects Completed
•
Hampton Ave Bike Lanes - $300K
•
Westwood Raised Crosswalks - $600K
•
Mesa Dr & Consolidated Canal Signal - $400K
Other Projects Under Design
•
Dobson Rd Pedestrian Hybrid Beacon - $750K
•
Beverly & 2nd St Enhanced Crosswalks - $300K
•
Las Sendas Pedestrian Crossings - $1.5M
Examples of Future Projects 
Under $3.0 M 
•
1 Mile of Shared Use Path
•
Eastern Canal  Shared Use Path – Lindsay to McKellips
•
Thomas Road Bike Lanes – Higley to Power Rd
•
Eastmark Pkwy Pedestrian Hybrid Beacon @ Paladium
16
Study Session 
April 6, 2026 
Attachment 1 
Page 16 of 16