E1. THE_POINTE_AT_TAPATIO_WALL_EASEMENT_11-18-2022_INT_SIGNED (1).PDF
Extracted text (via pymupdf)
9010 characters
When recorded, return to:
Flood Control District of Maricopa County
2801 West Durango Street
Phoenix, AZ 85009 (DMB)
EXEMPT ARS § 11-1134, A2
FCD 1999R016
NON-EXCLUSIVE EASEMENT
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
APN: 159-28-003R ptn.
FCD Permit No.: 2021P266
This Non-Exclusive wall Easement is entered into by and between the following parties and
becomes effective as of the date of recordation with the Maricopa County Recorder.
GRANTOR:
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY, a
political subdivision of the State of Arizona
GRANTEE:
THE
POINTE
AT
TAPATIO
CLIFFS
CONDOMINIUMS
ASSOCIATION, an Arizona non-profit corporation, and/or its successors
and assigns
In accordance with GRANTOR’S Board of Directors Resolution 2018R013 dated October
24, 2018, for the sum of SIX HUNDRED DOLLARS ($600.00), and other valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, GRANTOR does hereby grant and
convey to GRANTEE a non-exclusive easement in, upon, over, under, across, through and along
a portion of the premises set forth in instrument number 1995-049989 in the official records of
Maricopa County (“Burdened Property”). The granted easement, described on the attached
Exhibit “A” (“Easement”), is for the purpose of repairing and maintaining a pre-existing
subdivision wall, and appurtenances thereto (collectively, the “Facility”), in accordance with FCD
Right-of-Way Use Permit No. 2021P266 (“FCD Permit”).
Said Easement is SUBJECT TO all governmental restrictions which include, but are not
limited to, environmental, archaeological, and cultural resource regulations, and all land use
regulations, covenants, conditions, restrictions, easements, rights-of-way, and other matters of
record, or not of record, that could be disclosed by a visual inspection or accurate survey of the
real property.
Page of
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 2 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266
This Easement is, at all times, subject to and subordinate to the rights of GRANTOR to
have unrestricted access to and use of the Easement for the purpose of operation and maintenance
of the flood control project known as the 10th Street Drain and Basins (Project). GRANTOR shall
endeavor to use its best efforts to operate and maintain the Project in a manner which will not
unreasonably interfere with the GRANTEE’S rights granted by this Easement. GRANTEE
assumes all risk of damage to its Facility resulting from the Burdened Property functioning as a
flood control project.
In the event any use or activity conducted pursuant to the rights granted in this easement
by the GRANTEE interferes with GRANTOR’S use of the Burdened Property or the Burdened
Property is needed to construct, maintain, or relocate any portion of GRANTOR’S Project
(collectively “Interference”), GRANTEE shall, at GRANTOR’S request and GRANTEE’S sole
expense, eliminate the Interference upon notice from the GRANTOR. If elimination of
Interference, including but not limited to the relocation of the Facility, or any part thereof, requires
a right of way use permit, actual construction shall begin within thirty (30) days following
GRANTOR’S issuance of a right-of-way use permit. Upon mutual agreement, the time frame
for the start and completion of said work may be extended based on the requirements of
GRANTOR. If GRANTEE’S effort to eliminate Interference delays construction by
GRANTOR, and causes GRANTOR to be liable for damages, GRANTEE shall reimburse
GRANTOR for those damages attributable to the delay created by GRANTEE within thirty (30)
days after GRANTEE’S receipt of the GRANTOR’S invoice for said delay.
The GRANTEE shall, at its sole cost and expense, maintain the Easement, and
GRANTEE’S Facility located within the Easement, in a state of good repair and in a safe
condition, including without limitation the removal of trash and debris from the Easement. The
rights granted to GRANTEE herein include the right to cut back, trim and remove vegetation now
growing, or that may hereafter grow, within the Easement, or that may extend over the Easement,
so as to protect the same from interfering with the maintenance and operation of GRANTEE’S
Facility.
After the installation of GRANTEE’S Facility in accordance with said FCD Permit, any
modification whatsoever to the Easement, the Facility, or any appurtenance of GRANTEE located
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 3 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266
therein, that is not in compliance with said FCD Permit, will require GRANTEE to apply for and
obtain a new right-of-way use permit from GRANTOR. GRANTOR will process any such
application in accordance with GRANTOR’S right-of-way use permit approval process.
GRANTEE shall indemnify GRANTOR for any and all damages and costs, including
without limitation, reasonable attorney's fees, court costs, and all other expenses relating to the
defense of claims or litigation, caused by or arising from the exercise of GRANTEE’S rights
pursuant to the terms of this Easement, excepting therefrom any such injury, damage or costs
caused by or arising solely from the gross negligence, or actions that are purposeful or undertaken
without regard to the consequences, by the GRANTOR, its officers, employees, agents or
contractors.
In the event GRANTEE removes the Facility, or in the event the Facility ceases to
function, or in the event of any other event giving evidence to GRANTOR that the GRANTEE
has abandoned the use of this Easement, then and in such event, GRANTOR shall notify
GRANTEE, in writing, that GRANTOR considers that the Easement has been abandoned. In
such event, GRANTEE shall provide confirmation to GRANTOR that the Easement has been
abandoned, or in the event GRANTEE shall fail to reply that there has been no intent to abandon
the Easement within thirty (30) days of receipt of the aforesaid notice from the GRANTOR, this
Easement shall be deemed to be abandoned and GRANTOR shall be permitted to record a
termination of this Easement in the public records of Maricopa County. Unless and until such
termination is recorded by GRANTOR, this Easement shall remain in full force and effect.
The rights and privileges granted in this Easement are solely for the benefit of GRANTEE
to use the Easement for the purpose stated herein, and do not include the right to permit and/or grant
any other use of the Easement to another party.
This Easement shall run with the land and is binding on all parties.
FCD Project:WK6WUHHW'UDLQDQG%DVLQV
FCD Parcel No.: 7%
Page of
APN: 53WQ
FCD Permit No.:3
GRANTOR: FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
RECOMMENDED FOR APPROVAL:
Michael A. Fulton
Date
Director
REAL ESTATE DEPARTMENT APPROVAL:
Alex Smith, Director
Date
Maricopa County Real Estate Department
APPROVED AS TO FORM and within the powers and authority granted under the laws of the
State of Arizona.
District General Counsel
Date
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 5 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266
APPROVED:
BOARD OF DIRECTORS OF FLOOD CONTROL DISTRICT OF MARICOPA
COUNTY
Date
Chairman of the Board
ATTEST:
Clerk of the Board
Date
STATE OF ARIZONA
)
)ss
COUNTY OF MARICOPA )
Before me,
, Notary Public in and for said County, State
of Arizona, on this day personally appeared Bill Gates, known to me to be the person whose name
is subscribed to the forgoing instrument as Chairman of the Board of the Political Subdivision in
the foregoing instrument.
Given under my hand and seal of the office this
day of
, 202 .
______________________________
Notary Public (signature)
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 6 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266
GRANTEE ACCEPTANCE AND APPROVAL:
THE POINTE AT TAPATIO CLIFFS CONDOMINIUM ASSOCIATION, an Arizona
non-profit corporation
By
Charles (Bill) McFarlane, Board President
STATE OF ARIZONA
)
)ss
COUNTY OF MARICOPA
)
The foregoing instrument was acknowledged before me this _______ day of ____________,
20__, by Charles (Bill) McFarlane, its Board President of The Pointe at Tapatio Cliffs
Condominium Association, an Arizona non-profit corporation, and/or its successors and assigns.
and/or its successors and assigns.
My Commission Expires_______________ ______________________________
Notary Public (signature)
6th
December
22
03/28/2025
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 7 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266
FCD Project: 10th Street Drain and Basins
FCD Parcel No.: TB1-03
Page 8 of 8
APN: 159-28-003R
FCD Permit No.: 2021P266