Extracted text (via pymupdf)
8332 characters
Capital Improvement PROGRAM FY 2027 – 2031 Presented By: Date: Brian A. Ritschel – Office of Management and Budget Director Chris Lynch – Office of Management and Budget CIP Coordinator April 16, 2026 Introduction to the CIP Funding Plan This is a funding plan Allows for the scheduling and allocation of financial resources to address infrastructure needs 8-year plan developed Aligns infrastructure projects with the City’s goals Unfunded projects remain part of the plan and considered each year in the prioritization of infrastructure needs and resource availability 5-year plan approved by Council per Charter Exclusively includes projects with identified funding sources First year funding is appropriated as part of the annual budget adoption 2 Local Revenues Regional Awards/Grants General Obligation (GO) Bonds Excise Tax Obligation Utility Utility Revenues Utility Revenue Obligations Capacity Fee Utility Taxable Obligations CMC Steel CIP Funding Sources 3 Non-Utility One-time start up purchases and ongoing costs are reviewed and included in the financial forecast with the completion of a project to ensure the City can meet the operational requirements. Examples of ongoing: Staffing a new fire station, library, or utility plant expansion Landscape maintenance at City parks Examples of one-time: Furniture, fixtures, and equipment Vehicles 4 Operations and Maintenance Rising labor costs and continued cost pressures across commodities, services, and contracts Inflation is moderating, but prices remain elevated and have not declined from prior increases Keeping up with growth while maintaining current infrastructure 5 Current Challenges in CIP Broadway Road 6 Utility Capital Improvement Program Signal Butte Water Treatment Plant Water Resources Energy Resources LG Gas Line 7 Central Mesa Reuse Pipeline Harris Drive Water Main Improvements Sewer Diversion Structure Rehabs: Sites 6, 14, 15, 19, 21, 28, 39, 41, 42, 43 McDowell Rd. Water Transmission Main McKellips Rd. Water Transmission Main Falcon Field & Desert Sage Water Transmission Main Hohokam Irrigation Service & Waterline Gas Quarter Sections (44B & 44D – Phase 1) LG Gas Line Construction Westwood Street Gas Main New Services: CPLC Residences on Main Completed Utility Projects FY 25/26 Energy Resources Water Resources Energy and Water Resources Joint Projects Gantzel Road High Pressure Gas Main (Gas) Clausen Gate Station (Gas) Val Vista Pueblo to US 60 (Gas) AZ Farms Gas Line Replacement (Gas) New Services (GRID, Cabana Mesa) Transform 17 (Design) Signal Butte Water Treatment Plant Phase 2 New Groundwater Wells (DW24, DW25, DW26, DW30, DW33) GWRP Consolidated Reliability Improvements Smart Metering Broadway Road Signal Butte Water Treatment Plant 8 Current Utility CIP Projects Water Resources Greenfield Aeration Basin Concrete Rehabilitation NWWRP Programmable Logic Controller Upgrade NWWRP Solids Stream Equipment Replacement Broadway Rd. Sewer Relocation - UPRR Tracks Baseline Rd. Interceptor Sewer Rehabilitation Sewer Improvements – Various Locations (Phase 1A, 2, 3) Noche de Paz Lift Station (LS6) & SCS (SS3) Rehabilitation Energy Resources 69kV Looping (Electric) Country Club & Southern (Gas) New Services (Club & Main, AC Hotel) 9 Utility Projects to Begin Construction FY 26/27 Capacity Fee Projects in FY 26/27 Water Resources Signal Butte Water Treatment Plant Expansion East Mesa Water Interconnect Pipes New Groundwater Wells and Collection Lines New Lift Stations New Pump Station New Sewer Lines New Groundwater Well 10 Water Resources Brown Road Water Treatment Plant (BRWTP) Main Switchgear and Transformers Replacement (Construction) SRP\CAP Interconnect Facility Advanced Water Purification Bartlett Dam and Reservoir Expansion Energy Resources Transwestern Gate Station (Construction) Bella Vista Road High Pressure Upgrade (Gas) Clausen Gate Station Phase 2 (Gas) Transform 17 (Construction) Solid Waste East & West Mesa Service Centers Transfer Station Material Recovery Facility 11 Future Utility Projects Needed Vehicle Replacements Pumps and Motors Utility Valves Fire Hydrants Compliance Lab Equipment Plant Equipment 12 Utility Lifecycle Purchases Gateway Library NE Public Safety Facility 13 Non-Utility Capital Improvement Program 14 General Obligation (G.O.) Bonds Issued Authorized Issued thru 2026 CY % Issued Parks & Culture 2018 91,200,000 $ 91,200,000 $ 100% 2024 170,000,000 $ 18,000,000 $ 11% Library 2018 19,800,000 $ 19,800,000 $ 100% Public Safety 2013 51,700,000 $ 51,700,000 $ 100% 2018 85,000,000 $ 85,000,000 $ 100% 2022 157,000,000 $ 94,000,000 $ 60% 2024 90,000,000 $ - $ 0% Streets 2013 79,100,000 $ 79,100,000 $ 100% 2020 100,000,000 $ 75,090,000 $ 75% Public Safety: Northeast Public Safety Facility Library: Gateway Library PRCF: Reed Park Playground Improvements PRCF: Non-Playable Turf Conversions Reed Park Playground Gateway Library Pedestrian Hybrid Beacon 15 Non-Utility Projects Completed in FY 25/26 Transportation: Gateway Library Pedestrian Hybrid Beacon Transportation: Sossaman Road: Ray Rd to Warner Rd Transportation: Eastern Canal SUP & Signals - Brown to Broadway Transportation: L202 Red Mountain SUP - Power Rd. past Thomas Rd. Arts & Culture: idea Museum Renovation Phase 2 DoIT: Citywide Fiber Phase 2 Fire: Fire Station 224 Fire: Fire Station 205 (Rebuild) Fire: Fire Fuel Station Tanks Police: PD Headquarters Falcon Field: Design RWY 22L Holding Bay and Future Taxiway Falcon Field: Design Reconstruct West Airport Perimeter Road Falcon Field: Design Eastside Dual Taxi Lane Phase 2 PRCF: Signal Butte Park Phase 2 PRCF: The Courts at Eastmark PRCF: Cemetery SRP Canal Relocation PRCF: Eastmark Aquatic Complex (Design) PRCF: Red Mountain Aquatic Complex (Design) Transportation: Broadway Road - Mesa Dr to Stapley Transportation: Val Vista Dr - Pueblo to US 60 Transportation: Ellsworth Road Widening Transportation: Ray Road Connection at Ellsworth Fire Station 224 PD Headquarters 16 Current Non-Utility CIP Projects Arts & Culture: MAC Lighting System Replacement Phase 1 Fire: Fire Station 223 Fire: Fire Station Restroom Remodel s Falcon Field: Construct: Future Taxiway H (Anzio) (Phase 1 of 2) Falcon Field: Design & Construct: Anzio Ramp Reconstruction Phase 2 Falcon Field: Construct: Reconstruct Portions of West Airport Perimeter Road Transportation: Southern Avenue & Country Club Drive Roadway Improvements Transportation: Eastern Canal - Brown to Broadway – Pathways Transportation: Warner Rd Widening - Mountain to Meridian (S Side) Transportation: Elliot Road – East Maricopa Floodway to Ellsworth PRCF: Multiple Dog Park Renovations PRCF: Multiple Park Playground Improvements PRCF: Water Conservation Projects Fire Station 223 17 Non-Utility Projects To Begin Construction in FY 26/27 Arts & Culture: MAC Lighting Replacement Future Phases Arts & Culture: Arizona Natural History Museum Renovations Facilities Management: City Owned Parking Lots Fire: Fire Administration Building Library: Dobson Ranch Renovations Library: Book Locker Expansions Library: Main Library North Lawn Redevelopment Police: Substation Remodels PRCF: Cemetery Operations Building PRCF: Cemetery SW Expansion PRCF: New Park at Mountain & Adobe PRCF: Mesa Convention Center Upgrades PRCF: Amphitheater Upgrades PRCF: Dobson Ranch Lake 6 Rehab PRCF & Facilities Management: Deferred Maintenance Convention Center Lobby (concept) 18 Future Non-Utility Projects Needed Computer Cycle Replacement Software Maintenance and IT Infrastructure Vehicle Replacements Police & Fire Radio Upgrade & Replacement s Police Technical Services Replacements Police Equipment Replacements Police Bomb Robot Fire Apparatus Replacements Fire Equipment Replacements Pavement Maintenance MAC Equipment Replacement s Aging City Facilities Infrastructure Transportation End-of-Life Infrastructure Replacements 19 Non-Utility Lifecycle Projects