Design Review Board  
 
 
 
 
 
 Meeting Minutes 
 
Mesa City Council Chambers - Lower Level, 20 East Main Street 
Date: March 10, 2026 Time: 4:30 p.m.  
 
A meeting of the Design Review Board was held at 4:30 p.m. 
 
MEMBERS PRESENT: 
 
 
 
MEMBERS ABSENT: 
 
 
Chair Dane Astle  
 
 
 
 
Boardmember Denise Dunlop 
 
Vice Chair Ryan Circello 
 
 
Boardmember Shelly Udall 
 
Boardmember David Winstanley 
 
 
Boardmember Megan Neal 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
STAFF PRESENT:                            
 OTHERS PRESENT: 
Cassidy Welch 
            Chloe Durfee Daniel 
            Kwasi Abebrese 
            Sergio Solis 
Vanessa Felix  
 
 
 
 
 
(*indicates Boardmember or staff participated in the meeting using audio conference 
equipment)     
 
1 
Call meeting to order. 
 
Chair Astle excused Boardmember Dunlop and welcomed everyone to the meeting at 
4:30PM. 
 
2 
Consider the Minutes from February 10, 2026, Design Review Board Meeting. 
 
A motion to approve the Minutes from the February 10, 2026, Design Review Board 
Meeting was made by Boardmember Neal and seconded by Vice Chair Circello. 
 
Vote: 6 – 0 
Upon tabulation of votes, it showed: 
AYES – Astle – Circello – Udall – Winstanley – Neal  
NAYS – None 
ABSENT – Dunlop  
ABSTAINED – None 
 
3 
Discuss and take action on the following Design Review cases:

City of Mesa – Design Review Board – March 10, 2026 – Meeting Minutes 
2 
 
3a 
DRB25-00916. "Longbow Mixed-Use," 3.4± acres located approximately 1,700 feet 
west of the southwest corner of North Recker Road and East Longbow Parkway. Design 
review to allow for a 56,360± square foot Hotel and future commercial development. 
(District 5) 
 
Staff Planner: Cassidy Welch 
Recommendation: Approval with Conditions 
 
See attached presentation. 
 
 
The Board approved DRB25-00916 with the following conditions: 
1. Compliance with the building elevations and landscape plans submitted 
2. Design Review required for future commercial building pad site. 
3. Compliance with all conditions of approval of Ordinance No. 4897 Case No. 
ZON25-00917. 
4. Compliance with all City development codes and regulations, except as modified 
by Case No. ZON25-00917. 
5. All signage requires separate review and approval. 
 
Vote: 6 – 0 
Upon tabulation of votes, it showed: 
AYES – Astle – Circello – Udall – Winstanley – Neal  
NAYS – None 
ABSENT – Dunlop  
ABSTAINED – None 
 
 
3b 
DRB26-00001. "Lot 19 - Gateway Airport Commerce Park,” 1± acres located 
approximately 400 feet from the southeast corner of East Pecos Road and South 89th 
Place. Site Plan Modification and Design Review to allow for a 13,673± square foot 
Industrial development. (District 6) 
 
Staff Planner: Sergio Solis 
Recommendation: Approval with Conditions 
 
See attached presentation. 
 
 
The Board approved DRB26-00001 with the following conditions: 
1. Compliance with the site plan, landscape plan, and elevations submitted with this 
request. 
2. Compliance with all requirements of Case No. Z05-090 and DR07-057. 
3. Compliance with all applicable City of Mesa Development Codes and 
Regulations. 
4. The addition of any signage on the site will require review and approval of a 
separate permit per Section 11-47-3 of the MZO. 
 
Vote: 6 – 0 
Upon tabulation of votes, it showed: 
AYES – Astle – Circello – Udall – Winstanley – Neal  
NAYS – None 
ABSENT – Dunlop  
ABSTAINED – None

City of Mesa – Design Review Board – March 10, 2026 – Meeting Minutes 
3 
 
4 
Discuss and provide direction on the following Preliminary Design Review 
cases: * 
 
4a 
DRB21-00065. "Greenfield Multifamily," 1.9± acres located approximately 2,000 feet 
north of the northwest corner of East Brown Road and North Greenfield Road. Design 
Review to allow for a 30-unit Multiple Residence development. (District 2) 
 
Continued to April 14, 2026, Design Review Board Meeting 
 
 
 
4b 
DRB25-00828. "Mesa Store Front," 3.9± acres located at 2849 East Main Street. 
Design Review to allow for a 2,093± square foot Automobile/Vehicle Sales development. 
(District 2) 
 
Staff planner Kwasi Abebrese presented the case.   
 
See attached presentation. 
 
 
 
Staff planner Kwasi Abebrese summarized the case: 
• 
Change the century stone to a different material that provides a modern look. 
• 
Change the color of the proposed clear anodized metal framing to dark bronze. 
• 
Incorporate some form of wall articulation in the proposed building design where 
there is a change in material. 
 
4c 
DRB25-00969 "Power Village," 10± acres located at the northwest corner of East 
Broadway Road and South Power Road. Design Review to allow for modification to an 
existing Group Commercial development. (District 2) 
 
Staff planner Chloe Durfee Daniel presented the case.   
 
See attached presentation. 
 
 
Staff planner Chloe Durfee Daniel summarized the case: 
• 
No comments 
 
5        Staff Update:  
• 
No update 
 
6 
Adjournment: Boardmember Udall moved to adjourn the meeting and was seconded by 
Vice Chair Circello.  
 
Vote: 6 – 0 
Upon tabulation of votes, it showed: 
AYES – Astle – Circello – Udall – Winstanley – Neal  
NAYS – None 
ABSENT – Dunlop  
ABSTAINED – None 
 
The meeting was adjourned at 5:21 p.m.

City of Mesa – Design Review Board – March 10, 2026 – Meeting Minutes 
4 
 
Respectfully submitted,  
 
 
________________________ 
 
 
Chair Dane Astle

DRB25-00916
Longbow Mixed-Use
March 11, 2026
Mallory Ress, Senior Planner

Request
• Design Review
• To allow for a 56,360 sq. 
ft. Hotel and future 
commercial development

Location
• South of Loop 202 
Freeway
• West of Recker Road
• South of Longbow 
Parkway

Zoning
• Existing: Light Industrial with a 
Planned Area Development 
Overlay (LI-PAD)
• Proposed: Light Industrial with a 
Planned Area Development 
Overlay and a Bonus Intensity 
Zone Overlay (LI-PAD-BIZ)

Site Photos
Looking south towards the site

Site Plan
• 56,360 sq. ft. 4-story Hotel
• Future commercial pad
• Existing shared access from 
Longbow Parkway
• 183 parking spaces required; 131 
spaces proposed with AUP

Landscape Plan

Colors and Materials

Elevations

Elevations

Renderings

Renderings

Findings
Staff is seeking your review and decision on the following:
Proposed building elevations and landscape plan
Staff recommends Approval with Conditions

DRB26-00001
Lot 19 - Gateway Airport 
Commerce Park
March 10, 2026
Sergio Solis, Planner I

Request
• Design Review 
• Major Site Plan 
Modification
• To allow for a 13,673± 
square foot Industrial 
development

Location
• East side of 89th Place
• West of Ellsworth Road
• South of Pecos Road

Zoning
• Light Industrial with a 
Planned Area Development 
Overlay (LI-PAD)
• Indoor Warehousing and 
Storage and Light-Industrial 
uses are permitted within 
the LI District.

Site Photo
Looking east towards the vacant site

Proposed Site Plan
•
13,673± sq. ft. office/warehouse, 
industrial building
•
Access provided from 89th Place via 
one ingress/egress drive aisle along 
the north side of the site
•
Parking: 28 spaces required; 30 
spaces provided

Previously Approved 
Site Plan
Case No. DR07-057
1. The south drive aisle will be 
modified to be at the north 
portion of the lot.
2. The location of the office will 
be modified to face north.

Landscape Plan

Colors & Materials

North Elevation

South Elevation

East Elevation

West Elevation

Renderings

Renderings

Findings
Complies with the 2050 Mesa General Plan 
Complies with the Mesa Gateway Strategic Development Plan
Meets the review criteria for Site Plan Review outlined in 
Section 11-69-5 of the MZO
Staff recommends Approval with Conditions

Enlarged Site Plan

DRB25-00828
Mesa Store Front
March 10, 2026
Kwasi Abebrese, Planner II

Request
• Design Review 
• To allow for a 2,093± 
square foot 
Automobile/Vehicle 
Sales development

Location
• South side of Main Street
• East side of Lindsay Road

Site Photo
Looking south towards the site from Main Street

Site Plan
• Approx. 2,093 square foot 
office building
• Access from Main Street
• 6 parking spaces required; 8 
spaces provided

Landscape Plan

Color & Material Board

Elevations
North Elevation
West Elevation

Elevations
East Elevation
South Elevation

Renderings

Renderings

Alternative Compliance 
Roof Articulation.  Minimum vertical modulation is 2 feet or 1/10 
multiplied by the wall height, not to exceed 1/3 the height of the 
supporting wall

Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape design
Alternative compliance request
Staff welcomes any feedback

DRB25-00969
Power Village
March 10, 2026
Chloe Durfee Daniel, Planner II

Request
• Design Review
• To allow for modification 
to an existing Group 
Commercial 
development

Location
• North side of Broadway 
Road
• West of South Power Road

Site Photo
Looking northwest on the site

Site Plan
• Shared access points on the 
north, east, and south sides
• Providing new landscape 
diamonds 
• Parking:
• Provided: 596 spaces
• Required: 480 spaces

Landscape Plan

Building Elevations

Building Elevations

Building Elevations

Building Elevations

Renderings

Renderings

Renderings

Renderings

Colors and Materials

Alternative Compliance 
Materials. No more than 50% of the total façade may be covered with one (1) single 
material.
This is a request for all elevations.
Wall Articulation. Publicly visible facades may not have uninterrupted wall lengths 
exceeding 50 feet This is a request for the existing north and west elevations.
This is a request for the existing north and west elevations.
Roof Articulation. Flat roofs or facades with a horizontal eave, fascia, or parapet, in excess 
of one hundred feet in length, must provide vertical modulation. 
This is a request for the existing north and west elevations.

Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape plan
Proposed alternative compliance
Staff welcomes any feedback