City Council Staff Report 
 
Date 
March 23, 2026 
Case No. 
ZON25-00774 
Project Name 
Blue Sky Pest Control 
Request 
 Major Site Plan Modification to allow for the development of a 26,000 
square foot industrial building 
 Amending conditions of approval No. 1 and No. 2 of Ordinance No. 
5699 
Project Location 
Northwest corner of East Ray Road and South 71st Street 
Parcel No(s) 
304-30-052 
 
Project Area 
2.4± acres 
Council District 
District 6 
Existing Zoning 
Light Industrial with Planned 
Area 
Development 
and 
Bonus 
Intensity 
Zone 
Overlays (LI-PAD-BIZ) 
General Plan 
Designation 
Industrial 
Applicant 
Vince Dalke, Dalke Design Group 
Owner 
Ensign93 LLC 
Staff Planner 
Kwasi Abebrese, Planner II 
Proposition 207 
Waiver Signed 
Yes

[2] 
 
Recommendation 
 
Staff Recommendation: 
Staff finds that the Proposed Project is consistent with the Mesa 2050 General Plan and the review 
criteria for Site Plan Review outlined in Section 11-69-5 of the MZO.   
Staff recommends approval with conditions. 
Planning & Zoning Board Recommendation: 
On February 25, 2026, the Planning and Zoning Board voted (6-0) to recommend that City Council 
approve the proposed project. 
 
 Project Overview 
 
Request: 
The applicant is requesting approval for a Major Site Plan Modification to allow for the 
development of an approximately 26,000 square foot industrial building comprised of 
warehousing and industrial offices (Proposed Project). Also, this request includes the 
modification of conditions of approval No. 1 and No. 2 from Case No. ZON21-00356 (Ordinance 
No. 5699), which are no longer applicable to the proposed project if this request is approved. 
Condition No.1 requires compliance with the originally approved site plan, and condition of 
approval No. 2 requires compliance with all requirements of the previously approved design 
review case (Case No. DRB21-00316) for an industrial development on the project site. 
Concurrent Applications: 
 
Design Review: The Design Review Board reviewed the proposed request (DRB25-
00765) at their February 10, 2026, work session. Staff is working with the applicant to 
address minor aesthetic comments and recommendations from the Design Review Board 
that do not impact the site plan. 
 
 Site Context 
 
General Plan: 
 
The Placetype for the project site is Industrial and the Growth Strategy is Evolve. 
 
Per Chapter 3 of the 2050 General Plan, the Industrial Placetype is intended for high-
intensity industrial activities such as manufacturing, warehousing and storage, data 
storage, freight and distribution. Properties located within the Industrial Placetype should 
have excellent access to arterial roadways, freeways, and rail that can accommodate 
heavy truck traffic and distribution needs. Additionally, these areas should include design 
elements that buffer and mitigate negative impacts from surrounding areas. Warehousing 
and storage facilities are principal land uses in the Industrial Placetype. 
 
The Proposed Project is consistent with the Industrial Placetype and furthers the 
implementation of, and is not contrary to, the Vision, Guiding Principles, Strategies, and 
applicable elements of the Mesa 2050 General Plan.

[3] 
 
 
Supporting General Plan Strategies: 
o LU1. Promote a balance of land uses to enhance the quality of life for current and 
future generations. 
o ED3. Sustain a business climate that fosters entrepreneurs and small businesses. 
Sub-Area Plan: 
 
The project site is located within the Inner Loop District of the Mesa Gateway Strategic 
Development Plan. 
 
The Inner Loop District is intended to provide a high-quality, mixed use environment that 
is compatible with increasing over-flight activities associated with the Mesa Gateway 
Airport. Some of the proposed uses in this district include light industrial, office, and retail. 
 
The Proposed Project is consistent with the intent of the Mesa Gateway Strategic 
Development Plan and will strengthen the Inner Loop District by providing uses that are 
consistent with the air traffic existing in the area; which in turn furthers the implementation 
of the Vision, Guiding Principles, and Strategies of the Mesa 2050 General Plan. 
Zoning: 
 
The project site is zoned Light Industrial with Planned Area Development and Bonus 
Intensity Zone Overlays (LI-PAD-BIZ). 
 
Per Table 11-7-2 of the MZO, indoor warehousing facilities as well as business offices are 
permitted in the Light Industrial (LI) zoning district. 
Surrounding Zoning & Use Activity: 
The proposed industrial development is compatible with surrounding land uses, which include 
industrial offices, warehousing and storage facilities, mixed use and commercial developments, 
a Golf Course, and vacant land. 
 
Northwest 
(Across RWCD canal) 
LC-PAD 
Mixed Use Development 
North 
LI-PAD 
Industrial Office and 
Warehouse Facility 
Northeast 
(Across 71st Street) 
LI-PAD 
Industrial Development 
West 
(Across RWCD canal) 
AG 
Vacant 
Project Site 
LI-PAD-BIZ 
Vacant 
East 
(Across 71st Street) 
LI-PAD 
Vacant 
Southwest 
(Across Ray Road and 
Flood Control canal) 
LC-BIZ 
Commercial Development 
South 
(Across Ray Road and 
Flood Control canal) 
PS & LI 
Golf Course 
Southeast 
(Across Ray Road) 
LI-PAD 
Vacant 
Site History: 
 
May 20, 1996: The City Council approved the Williams Gateway Industrial Development 
Master Plan for 3,167± acres, including the project site (Case No. Z96-023; Ordinance 
No. 3181). 
 
November 16, 2000: The City Council annexed 1,571± acres, including the project site, 
into the City of Mesa (Case No. A99-004; Ordinance No. 3815).

[4] 
 
 
May 7, 2001: The City Council approved a rezone of 1,562± acres, including the project 
site, from Maricopa County ADII, ADIII, and Rural 43 to City of Mesa M-1 AF (equivalent 
to current Light Industrial with an Airfield Overlay [LI-AF]) and Agricultural with an Airfield 
Overlay (AG-AF) (Case No. Z00-087; Ordinance No. 3885). 
 
February 5, 2018: The City Council approved a rezone of 48± acres, including the project 
site, from LI-AF to LI-AF with a Planned Area Development Overlay (LI-AF-PAD) to allow 
for the development of an industrial subdivision (Case No. ZON17-00283; Ordinance No. 
5420). 
 
April 18, 2022: The City Council approved a rezone of the project site from Light 
Industrial with a Planned Area Development Overlay (LI-PAD) to LI-PAD with a Bonus 
Intensity Zone Overlay (LI-PAD-BIZ) to allow for the development of an industrial office 
and warehouse development (Case No. ZON21-00356; Ordinance No. 5699). 
 
 Site Context 
 
The applicant is requesting approval for a Major Site Plan Modification to allow for an industrial 
development in a Light Industrial District with Planned Area Development and Bonus Intensity 
Zone Overlays (LI-PAD-BIZ). 
The project site is approximately 2.4 acres in size and is currently vacant. In 2018, City Council 
approved a rezone of approximately 48 acres of land, including the project site from LI to LI-PAD 
to allow for the development of the Ray Road Commerce Center North to accommodate a private 
street within the industrial subdivision (Case No. ZON17-00283; Ordinance No. 5420). No other 
deviations from the development standards in the MZO were requested with the PAD overlay. 
Moreover, in 2022, the City Council approved a rezone of the project site from LI-PAD to LI-PAD 
with a BIZ Overlay and site plan review to allow modifications to certain development standards 
in the LI District. Specifically, the modification entailed a reduction to the required 15-foot-wide 
landscape setback on the south side of the project site to allow for the development of an 
approximately 28,178 square foot industrial building (Case No. ZON21-00356; Ordinance No. 
5699). The site plan was not executed within two years of approval and has therefore expired. 
Conditions of approval Nos. 1 and 2 of Ordinance 5699 required compliance with the approved 
site plan and all requirements of the approved design review case (Case No. DRB21-00316). 
The applicant is therefore requesting a Major Site Plan Modification and a modification of the 
conditions of approval to allow for the development of a new industrial office and warehouse 
building on the project site. 
Site Plan: 
 
Building Design: The Proposed Project entails the development of a single-story 
warehouse and industrial office building totaling approximately 26,000 square feet. Along 
the east side of the building is the main entrance and a 900 square foot entry plaza. 
Onsite walkways will connect the primary entrance of the building to the public sidewalk 
on East Ray Road. A truck loading area is proposed at the west side of the building and 
will be screened with an eight-foot-tall masonry wall at the north and west property lines 
in accordance with Section 11-30-13(C) of the MZO. 
 
Access: The site will be accessed via two (2) driveways from South 71st Street, 
specifically at the east side of the project site.

[5] 
 
 
Parking: Per Table 11-32-3.A of the MZO, a total of 57 parking spaces are required. The 
submitted site plan shows a total of 57 parking spaces proposed at the north, east and 
south sides of the proposed building. 
 
Landscaping: The Proposed Project features landscaped foundation base and parking 
areas that include several tree species and a multitude of shrubs. This meets the 
landscaping requirements outlined in Section 11-33-5 of the MZO. In addition, a 
landscaped yard is provided along South 71st Street, which includes a variety of trees and 
shrubs as well as a 3.5-foot-high masonry wall to screen the adjacent parking areas in 
accordance with Sections 11-33-3 and 11-30-9(H) of the MZO. 
 
 Citizen Participation 
 
The applicant conducted a Citizen Participation process, notifying surrounding property owners, 
HOAs, and registered neighbors. 
Neighborhood Meeting: 
A neighborhood meeting was held on November 13, 2025. There were no attendees. 
Required Notification: 
 
Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods 
within one mile of the subject site were notified of the public hearing. 
 
Staff has not received any phone calls or emails with questions on the Proposed Project. 
 
 Conditions of Approval 
 
Staff recommends approval of the Major Site Plan Modification and amendment to conditions of 
approval No. 1 and No. 2 for Case No. ZON21-00356 (Ordinance No. 5699), subject to the 
following conditions: 
1. 
Compliance with the final site plan as submitted. 
2. 
Compliance with all requirements of Design Review Case No. DRB25-00765. 
3. 
Compliance with all conditions of approval of Ordinance No. 5699 except for conditions of 
approval No. 1 and No. 2 (Case No. ZON21-00356). 
4. 
Compliance with all applicable City development codes and regulations. 
5. 
Installation of all off-site improvements and street frontage landscaping during the first 
phase of construction. 
6. 
Compliance with all requirements of Chapter 19 of the Zoning Ordinance including: 
a. Owner must execute the City’s standard Avigation Easement and Release for 
Mesa Gateway Airport prior to or concurrently with the recordation of the final 
subdivision map or the issuance of a building permit, whichever occurs first.

[6] 
 
b. Due to the proximity to Mesa Gateway Airport, any proposed permanent or 
temporary structure, as required by the FAA, is subject to an FAA filing for review 
in conformance with CFR Title 14 Part 77 (Form 7460) to determine any effect to 
navigable airspace and air navigation facilities. A completed form with a response 
by the FAA must accompany any building permit application for structure(s) on 
the property. 
 
c. Prior to the issuance of any building permit, provide documentation by a registered 
professional engineer or registered professional architect demonstrating 
compliance with the noise level reductions required in Section 11-19-5 of the Mesa 
Zoning Ordinance. 
 
d. Provide written notice to future property owners that the project is within 1 mile of 
Mesa Gateway Airport. 
 
e. All Final Plats must include a disclosure notice in accordance with Section 11-19-
5(C) of the Zoning Ordinance which must state in part: “This property, due to its 
proximity to the Mesa Gateway Airport, will experience aircraft overflights, which 
are expected to generate noise levels that may be of concern to some individuals.” 