Presentation

City of Mesa — Board of Adjustment Public Hearing (2026-04-01)

View PDF Meeting page

Extracted text (via pymupdf) 2330 characters
Board of Adjustment

BOA26-00082
April 1, 2026
Charlotte Bridges, Planner II

Request
• Special Use Permit to allow for a 
Transitional Community 
Residence
Hassett

Location
• 5848 S Hassett
• East of Signal Butte Road
• North of Williams Field Road
• Located on the west side of 
Hassett

General Plan
Mixed Residential Placetype 
with a Sustain Growth 
Strategy
• Single-family residential is a 
principal land use
Mixed Residential
Mixed Residential

Zoning
• Single Residence-6 with a 
Planned Area Development 
Overlay 
• Single residence use permitted
• Transitional Community 
Residences require approval of 
a SUP
RS-6

Site Photos
Looking west from Hassett

Citizen Participation
• Notified property owners within 
150 feet
• Spreadsheet from neighbor

Approval Criteria
Per Section 11-31-14(B):
The proposed use will be compatible with the residential uses allowed as of right in the zoning 
district; and
The proposed use in combination with any existing community residences, assisted living homes, 
and assisted living centers will not result in a clustering of such uses or alter the residential 
character of the surrounding neighborhood by creating or intensifying an institutional atmosphere; 
and
The proposed use will not interfere with normalization and community integration of the residents 
of any existing community residences, assisted living homes, or assisted living centers, and that 
the presence of other existing community residences, assisted living homes, or assisted living 
centers will not interfere with normalization and community integration of the residents of the 
proposed use;

Approval Criteria
Per Section 11-31-14(B):
The applicant has submitted a "good neighbor policy" in narrative form that includes:
(a)A description of acceptable measures to ensure ongoing compatibility with 
adjacent uses;
(b)The name and telephone number of the manager or person responsible for the 
operation of the facility;
(c) Complaint response procedures including investigation, remedial action, and 
follow-up procedures; and
(d)The proposed use complies with all other development standards in this 
Chapter.

Findings
Complies with the 2050 Mesa General Plan 
Meets required findings for a SUP in Section 11-31-14(B) of the 
MZO
Staff recommends Approval with Conditions

Board of Adjustment