SERIAL 13129-1-RFP
CONTRACT
SERIAL 13129-1-RFP
Contract Synopsis:
Approval Date: 
December 7, 2016
Contract Start Date: 
December 7, 2016
Contract End Date: 
December 31, 2026
Contract Term: 
10 years, plus option for additional 10 years
Contracted Parties: 
Maricopa County (County, Owner)
Esri Canada Limited (Contractor)
Scope Brief:
Contractor shall provide all products and services as defined in Exhibit A, Scope of Work to provide County with a 
Computer Aided Mass Appraisal (CAMA) system for the use of the Maricopa County Assessor’s Office. 
Table of Contents:
Master Agreement
Exhibit A, Scope of Work
Part One – Special Terms and Conditions
Part Two – Statement of Requirements
Part Three – Statement of Work
Part Four- Implementation Schedule
Exhibit B, Price Agreement 
Exhibit C, Software Subscription Agreement 
Appendix 1 – Functional and Technical Feature Requirements 
Appendix 2 – Contractor Travel and Per Diem Policy 
Appendix 3 – Scope of Work Support Documents
Part A – Data Migration Assumptions and Acceptance Criteria
Part B – Report Assumption
Part C – Integration Assumptions
Part D – Milestone/Deliverable Acceptance Form
Part E – Change Order Request Form

SERIAL 13129-1-RFP
MASTER AGREEMENT
SERIAL 13129-1-RFP
This Master Agreement (this “Contract”) is entered into as of the 7th day of December, 2016 (the “Effective Date”) 
by and between Maricopa County (“County”), a political subdivision of the State of Arizona, and Esri Canada 
Limited, an Ontario corporation (“Contractor”) for the purchase of Computer Aided Mass Appraisal Software 
System Implementation and maintenance services.  
1.0
CONTRACT TERM:
1.1
The term of this Contract shall commence as of the Effective Date and continue for a period of ten 
(10) years thereafter, until the 31st day of December, 2026 (the “Initial Term”).
1.2
The County may, at its option and with the agreement of the Contractor, renew the term of this 
Contract for additional terms up to a maximum of ten (10) additional years, (or at the County’s sole 
discretion, extend the contract on a month-to-month basis for a maximum of six (6) months after 
expiration).  The County shall notify the Contractor in writing of its intent to extend the Contract 
term at least thirty (30) calendar days prior to the expiration of the original contract term, or any 
additional term thereafter. The Initial Term and any renewal term thereafter shall be collectively 
known as the “Term.”
2.0
FEE ADJUSTMENTS:
After the completion of implementation as described in Exhibit A, Scope of Work of this Agreement, 
Contractor may request increases in rates for non-scope services (as described in Exhibit B) on the Contract 
anniversary date after Final Acceptance of Implementation Services. All requests for increases shall be 
accompanied by detailed supporting documents that explain the necessity of the increase. County shall 
independently verify each request and make a determination on the allowance of the increase(s). Requested 
increases to the Rate Card shall be limited to the lesser of three (3) percent or the Consumer Price Index for 
All Urban Consumers (CPI-U) as reported semiannually for the Phoenix-Mesa local area across the previous 
twelve months of published data prior to the adjustment effective date. 
3.0
PAYMENTS:
3.1
As consideration for performance of the duties described herein, County shall pay Contractor the 
charges or fees stated in Exhibit B.  All amounts are in US Dollars (USD).
3.2
Payment shall be made upon the County’s receipt of an acceptable invoice (in accordance with 
Section 3.4.1) for services rendered, subject to Part One to Exhibit A attached hereto (the “Special 
Terms and Conditions”).
3.3
In the event that an acceptable invoice is over sixty (60) days past due, Contractor may suspend the 
Services, in whole or in part, until County has cured such failure to pay.

SERIAL 13129-1-RFP
3.4
INVOICES:
3.4.1
Contractor shall submit one (1) legible copy of their detailed invoice before payment(s) 
can be made.  The invoice must provide the following information (if applicable):

Company name, address and contact

County bill-to name and contact information

Contract serial number

County purchase order number

Invoice number and date

Payment terms

Dates of service or delivery

Milestone Description 

Signed Acceptance Form

Milestone Extended Price

Retention Amount

Total Amount Due

If Applying travel and per diem expenses, copies of all receipts shall be 
provided for audit in accordance with the Contractor Travel and Per Diem 
Policy (Appendix 2)
3.4.2
Problems regarding billing or invoicing shall be directed to the County as listed on the 
applicable Purchase Order.
3.4.3
Payment shall be made to the Contractor within thirty (30) days of the date of an acceptable 
invoice by Accounts Payable through the Maricopa County Vendor Express Payment 
Program.  This is an Electronic Funds Transfer (EFT) process.  County shall make available 
the Maricopa County Vendor Express Payment Program upon Contractor’s completion of 
the Vendor Registration Form located on the County Department of Finance Vendor 
Registration Web Site (http://www.maricopa.gov/Finance/Vendors.aspx).
3.4.4
EFT payments to the routing and account numbers designated by the Contractor will 
include the details on the specific invoices that the payment covers.  The Contractor is 
required to discuss remittance delivery capabilities with their designated financial 
institution for access to those details.
3.4.5
APPLICABLE TAXES:
1.
Payment of Taxes: The Contractor shall pay all applicable taxes. With respect to 
any installation labor on items that are not attached to real property performed by 
Contractor under the terms of this Contract, the installation labor cost and the 
gross receipts for materials provided shall be listed separately on the Contractor’s 
invoices.
2.
State and Local Transaction Privilege Taxes: Maricopa County is subject to all 
applicable state and local transaction privilege taxes. To the extent any state and 
local transaction privilege taxes apply to sales made under the terms of this 
contract it is the responsibility of the seller to collect and remit all applicable taxes 
to the proper taxing jurisdiction of authority.
3.
Tax Indemnification: Contractor and all subcontractors shall pay all Federal, state, 
and local taxes applicable to its operation and any persons employed by the 
Contractor. Contractor shall, and require all subcontractors to hold Maricopa 
County harmless from any responsibility for taxes, damages and interest, if 
applicable, contributions required under Federal, and/or state and local laws and 
regulations and any other costs including transaction privilege taxes, 
unemployment compensation insurance, Social Security and Worker’s 
Compensation.

SERIAL 13129-1-RFP
4.0
AVAILABILITY OF FUNDS:
4.1
The provisions of this Contract relating to payment for services shall become effective when funds 
assigned for the purpose of compensating the Contractor as herein provided are actually available 
to County for disbursement.  The County shall be the sole judge and authority in determining the 
availability of funds under this Contract.  County shall keep the Contractor fully informed as to the 
availability of funds.
4.2
If any action is taken by any State agency, Federal department or any other agency to instrumentally 
suspend, decrease, or terminate its fiscal obligations under, or in connection with, this Contract, 
County may amend, suspend, decrease, or terminate its obligations under, or in connection with, 
this Contract.  In the event of termination, County shall be liable for payment only for services 
rendered prior to the effective date of the termination, provided that such services are performed in 
accordance with the provisions of this Contract.  County shall give written notice of the effective 
date of any suspension, amendment, or termination under this Section, at least ten (10) days in 
advance.
5.0
DUTIES AND WARRANTIES:
5.1
The Contractor shall perform all duties stated in Exhibit A, or as otherwise directed in writing by 
the Procurement Officer or County Designated Representative.
5.2
Contractor represents and warrants to, and covenants with, County that  during the performance of 
the Services, all Services will be performed in a professional and workmanlike manner and 
Contractor and its employees and subcontractors (i) will abide by all laws, rules and regulations that 
apply to the performance of the Services and (ii) will not willfully or knowingly violate or in any 
way infringe any patent, trademark, copyright or other proprietary interest of any third party in its 
performance of the Services.  EXCEPT AS EXPRESSLY PROVIDED HEREIN, CONTRACTOR 
MAKES AND COUNTY RECEIVES ABSOLUTELY NO WARRANTIES, EXPRESS OR 
IMPLIED.  CONTRACTOR DISCLAIMS ANY IMPLIED WARRANTIES OF FITNESS FOR A 
PARTICULAR PURPOSE, MERCHANTABILITY AND TITLE.
5.3
Contractor will during the Services Warranty Period (as defined under Section 3.2 of Exhibit C, 
Software Subscription Agreement) promptly re-perform the Services deemed by County not in 
accordance with this Contract or any Statement of Work at no additional expense to County, 
provided that Contractor receives notice from County within thirty (30) days after such Services 
were delivered to County.  
5.4
During the Term, County shall provide Contractor’s personnel with adequate workspace for 
consultants and such other related facilities as may be required by Contractor to carry out its 
obligations under this Contract.
6.0
TERMS and CONDITIONS:
6.1
INDEMNIFICATION:
6.1.1
Contractor shall defend, indemnify, and hold harmless County, its agents, representatives, 
officers, directors, officials, and employees from and against all damages, losses and 
expenses, including, but not limited to, attorney fees, court costs, expert witness fees, and 
the cost of appellate proceedings, relating to, arising out of third party claims arising from 
(a) the death of or personal injury to any person to the extent caused by the negligent acts, 
errors, omissions, mistakes or malfeasance of Contractor, its employees or subcontractors, 
or (b) the loss of or damage to the real or tangible personal property (whether owned or 
leased) to the extent caused by the negligent acts, errors, omissions, mistakes or 
malfeasance of Contractor , its employees or subcontractors.  
6.1.2
The amount and type of insurance coverage requirements set forth herein will in no way 
be construed as limiting the scope of the indemnity in this paragraph.

SERIAL 13129-1-RFP
The scope of this indemnification does not extend to the sole negligence of County.
6.2
INFRINGEMENT DEFENSE INDEMNIFICATION
6.2.1
Defense and Indemnity: Contractor shall defend, indemnify and hold harmless County 
against any Claim, as defined below as provided for in this Section for any judgments, 
settlements and court awarded attorney’s fees resulting from a Claim where the claimant 
is adjudged the successful party in the Claim. Contractor’s obligations under this Section 
are conditioned on the following: (i) County promptly notifies Contractor of the Claim in 
writing upon  County being made aware of the Claim; (ii) County gives  Contractor sole 
authority and control of the defense and (if applicable) settlement of the Claim, provided 
that County’s legal counsel may participate in such defense and settlement, at  County’s 
expense, and (iii) County provides all information and assistance reasonably requested by  
Contractor to handle the defense or settlement of the Claim. For purposes of this Section, 
“Claim” means any cause of action in a third party action, suit or proceeding against County 
alleging that Contractor software, or its upgrades, modifications, or revisions, as of its 
delivery date under this Agreement, infringes a valid U.S. patent, copyright or trademark.  
6.2.1.1 Remedial Measures: If software becomes the subject of a legal injunction pursuant 
to a Claim, Contractor may, at its own expense and option: (i) procure for County the right 
to continue use of the product; or (ii) replace or modify the software.
6.2.1.2 Exceptions: Contractor will have no defense or indemnity obligation for any Claim 
based on: (i) modifications by someone other than Contractor; (ii) software has been 
modified by Contractor in accordance with County-provided specifications or instructions; 
(iii) use or combination by the County of software with Third Party Products, open source 
or freeware technology; (iv) Third Party Products, open source or freeware technology; (v) 
a product that is used or located by County in a country other than the country in which or 
for which it was supplied by  Contractor; (vi) possession or use of a product after  
Contractor has informed  County of modifications or changes required to avoid such Claim 
and offered to implement those modifications or changes, if such Claim would have been 
avoided by implementation of Contractor's suggestions and to the extent County did not 
provide Contractor with a reasonable opportunity to implement Contractor's suggestions; 
or (vii) the amount of revenue or profits earned or other value obtained by the use of 
Contractor’s products, or the amount of use of Contractor’s products. “Third Party 
Products” means any products made by a party other than Contractor, and may include, 
without limitation, products ordered by County from third parties. However, components 
of Contractor-branded products are not Third Party Products if they are both: (i) embedded 
in Third Party Products (i.e., not recognizable as standalone items); and (ii) not identified 
as separate items on Contractor’s price list, quotes, order specifications forms or 
Documentation.
6.2.1.3 The foregoing states Contractor’s entire liability, and County’s sole and exclusive 
remedy except as provided at law or equity, with respect to any infringement or 
misappropriate of any intellectual property rights of another party.
6.3
INSURANCE:
6.3.1
Contractor, at Contractor’s own expense, shall purchase and maintain the herein stipulated 
minimum insurance from a company or companies duly licensed by the State of Arizona 
and possessing a current A.M. Best, Inc. rating of B++. In lieu of State of Arizona licensing, 
the stipulated insurance may be purchased from a company or companies, which are 
authorized to do business in the State of Arizona, provided that said insurance companies 
meet the approval of County.  
6.3.2
All insurance required herein shall be maintained in full force and effect during the Term.  
Failure to do so may, at the sole discretion of County, constitute a material breach of this 
Contract.

SERIAL 13129-1-RFP
6.3.3
Contractor’s insurance shall be primary insurance as respects County, and any insurance 
or self-insurance maintained by County shall not contribute to it.
6.3.4
Any failure to comply with the claim reporting provisions of the insurance policies or any 
breach of an insurance policy warranty shall not affect the County’s right to coverage 
afforded under the insurance policies.
6.3.5
The insurance policies may provide coverage that contains deductibles or self-insured 
retentions. Such deductible and/or self-insured retentions shall not be applicable with 
respect to the coverage provided to County under such policies.  Contractor shall be solely 
responsible for the deductible and/or self-insured retention and County, at its option, may 
require Contractor to secure payment of such deductibles or self-insured retentions by a 
surety bond or an irrevocable and unconditional letter of credit.
6.3.6
County reserves the right to request and to receive, within ten (10) working days, certified 
copies of any or all of the herein required insurance certificates. County shall not be 
obligated to review policies and/or endorsements or to advise Contractor of any 
deficiencies in such policies and endorsements, and such receipt shall not relieve 
Contractor from, or be deemed a waiver of County’s right to insist on strict fulfillment of 
Contractor’s obligations under this Contract.
6.3.7
The insurance policies required by this Contract, except Workers’ Compensation, and 
Errors and Omissions, shall name County, its agents, representatives, officers, directors, 
officials and employees as Additional Insureds.
6.3.8
The policies required hereunder, except Workers’ Compensation, and Errors and 
Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against 
County, its agents, representatives, officers, directors, officials and employees for any 
claims arising out of Contractor’s work or service.
6.3.9
Commercial General Liability:
Commercial General Liability (“CGL”) insurance and, if necessary, Commercial Umbrella 
insurance with a limit of not less than $2,000,000 for each occurrence, $2,000,000 
Products/Completed Operations Aggregate, and $4,000,000 General Aggregate Limit. The 
policy shall include coverage for bodily injury, broad form property damage, personal 
injury, products and completed operations and blanket contractual coverage, and shall not 
contain any provision which would serve to limit third party action over claims. There shall 
be no endorsement or modification of the CGL limiting the scope of coverage for liability 
arising from explosion, collapse, or underground property damage.
6.3.10
Automobile Liability:
Commercial/Business Automobile Liability insurance and, if necessary, Commercial 
Umbrella insurance with a combined single limit for bodily injury and property damage of 
not less than $2,000,000 each occurrence with respect to any of the Contractor’s owned, 
hired, and non-owned vehicles assigned to or used in performance of the Contractor’s work 
or services under this Contract.
6.3.11
Workers’ Compensation:
6.3.11.1Workers’ Compensation insurance to cover obligations imposed by federal and state 
statutes having jurisdiction of Contractor’s employees engaged in the performance of the work 
or services under this Contract; and Employer’s Liability insurance of not less than $1,000,000 
for each accident, $1,000,000 disease for each employee, and $1,000,000 disease policy limit.
6.3.11.2 Contractor waives all rights against County and its agents, officers, directors and 
employees for recovery of damages to the extent these damages are covered by the Workers’ 
Compensation and Employer’s Liability or commercial umbrella liability insurance obtained 
by Contractor pursuant to this Contract.

SERIAL 13129-1-RFP
6.3.12
Errors and Omissions Insurance:
Errors and Omissions insurance and, if necessary, Commercial Umbrella insurance, which 
will insure and provide coverage for errors or omissions of the Contractor, with limits of 
no less than $5,000,000 for each claim.
6.3.13
Certificates of Insurance.
6.3.13.1 Prior to commencing work or services under this Contract, Contractor 
shall furnish the County with valid and complete certificates of insurance, or 
formal endorsements as required by the Contract in the form provided by the 
County, issued by Contractor’s insurer(s), as evidence that policies providing the 
required coverage, conditions and limits required by this Contract are in full force 
and effect.  Such certificates shall identify this contract number and title.
6.3.13.1.1 In the event any insurance policy(ies) required by this 
Contract is (are) written on a “claims made” basis, coverage shall 
extend for two (2) years past completion and acceptance of 
Contractor’s work or services and as evidenced by annual Certificates 
of Insurance.
6.3.13.1.2 If a policy does expire during the Term, a renewal certificate 
must be sent to County fifteen (15) days prior to the expiration date.
6.3.14
Cancellation and Expiration Notice.
Insurance required herein shall not be permitted to expire, be canceled, or materially 
changed without thirty (30) days prior written notice to County.
6.4
NOTICES:
All notices given pursuant to the terms of this Contract shall be addressed to:
For County:
Maricopa County
Office of Procurement Services
ATTN: Contract Administration
301 West Jefferson Street, Suite 700
Phoenix, Arizona 85003
For Contractor:
Esri Canada Limited
ATTN: Lois Boynton, Vice-President, Operations
12 Concorde Place, Suite 900
Toronto, Ontario, Canada M3C 3R8
6.5
REQUIREMENTS CONTRACT:
6.5.1
Contractor signifies its understanding and agreement by signing this document that this 
Contract is a requirements contract.  This Contract does not guarantee any purchases will 
be made (minimum or maximum). Orders will only be placed when County identifies a 
need and issues a purchase order or a written notice to proceed.
6.6
TERMINATION FOR CONVENIENCE:
The County reserves the right upon sixty (60) days’ prior written notice, or forty-five (45) days’ 
prior written notice in the event of an assignment of this Contract by Contractor that does not require

SERIAL 13129-1-RFP
the County’s prior written approval, to terminate the Contract, in whole or in part at any time, when 
in the best interests of the County without penalty or recourse.  Upon receipt of the written notice, 
the Contractor shall immediately stop all work, as directed in the notice, notify all subcontractors of 
the effective date of the termination and minimize all further costs to the County.  In the event of 
termination under this paragraph, all documents, data and reports prepared by the Contractor under 
the Contract shall become the property of and be delivered to the County upon demand and 
settlement pursuant to part (a) and (b) below.  In the event of a termination or expiration of this 
Contract, the Contractor shall be entitled to receive just and equitable compensation for work 
completed and materials accepted before the effective date of the termination and pro-rated 
compensation for works in progress and such pro-ration will be based on the time and materials 
expended by Contractor; provided, that, for work in progress (a) County shall promptly pay 
Contractor the full payment amount, if any, retained by County (i.e., holdback amount) in 
connection with the applicable completed Milestone, and (b) shall thereafter continue to negotiate 
in good faith any additional amounts payable to Contractor by County. Notwithstanding anything 
to the contrary herein, any dispute, difference or question relating to or arising among the parties 
concerning the amount to be paid pursuant to part (a) or (b) will be submitted and settled by 
arbitration by a single arbitrator chosen by the corresponding Regional Office of the American 
Arbitration Association in accordance with the Commercial Rules of the American Arbitration 
Association.  The parties shall submit briefs of no more than ten (10) pages and the arbitration 
hearing shall be limited to two (2) days maximum.  The parties shall complete such arbitration within 
90 days of the Contractor’s receipt of the notice of cancellation and payments due to the Contractor 
shall be paid within ten (10) days of the determination of the arbitrator. The arbitrator shall apply 
Arizona law.  
6.7
TERMINATION FOR DEFAULT:
6.7.1
In addition to the rights reserved in the Contract, County may terminate the Contract in 
whole or in part due to the failure of the Contractor to comply with any material term or 
condition of the Contract if such failure is not cured within forty-five (45) days of the 
County’s notice of such failure to Contractor.  The County’s Procurement Officer shall 
provide written notice of the termination and the reasons for it to the Contractor.
6.7.2
Upon termination under this paragraph, all goods, materials, documents, data and reports 
prepared by the Contractor under the Contract shall become the property of and be 
delivered to the County on demand.
6.7.3
The County may, upon termination of this Contract, procure, on terms and in the manner 
that it deems appropriate, materials or services to replace those under this Contract.  The 
Contractor shall be liable to the County for any excess costs incurred by the County in 
procuring materials or services in substitution for those due from the Contractor.
6.7.4
The Contractor shall continue to perform, in accordance with the requirements of the 
Contract, up to the date of termination, as directed in the termination notice.
6.8
TERMINATION BY COUNTY:
If the Contractor should be adjudged bankrupt, or should make a general assignment for the benefit 
of its creditors, or if a receiver should be appointed on account of its insolvency, the County may 
terminate the Contract.  If the Contractor should persistently or repeatedly refuse or should fail, 
except in cases for which extension of time is provided, to provide enough properly skilled workers 
or proper materials, or persistently disregard laws and ordinances, or not proceed with work or 
otherwise be guilty of a substantial violation of any provision of this Contract, then the County may 
terminate the Contract.  Prior to termination of the Contract, the County shall give the Contractor 
fifteen- (15) calendar day’s written notice.  Upon receipt of such termination notice, the Contractor 
shall be allowed fifteen (15) calendar days to cure such deficiencies.
6.9
STATUTORY RIGHT OF CANCELLATION FOR CONFLICT OF INTEREST:
Notice is given that pursuant to A.R.S. §38-511 the County may cancel this Contract without penalty 
or further obligation within three years after execution of the contract, if any person significantly

SERIAL 13129-1-RFP
involved in initiating, negotiating, securing, drafting or creating the contract on behalf of the County 
is at any time while the Contract or any extension of the Contract is in effect, an employee or agent 
of any other party to the Contract in any capacity or consultant to any other party of the Contract 
with respect to the subject matter of the Contract.  Additionally, pursuant to A.R.S §38-511 the 
County may recoup any fee or commission paid or due to any person significantly involved in 
initiating, negotiating, securing, drafting or creating the contract on behalf of the County from any 
other party to the contract arising as the result of the Contract.
6.10
LIMITATION OF LIABILITY.
6.10.1
IN NO EVENT SHALL CONTRACTOR BE LIABLE UNDER THIS AGREEMENT 
FOR PUNITIVE, INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL 
DAMAGES OR EXPENSES ARISING OUT OF THIS AGREEMENT EVEN IF IT HAS 
BEEN ADVISED OF THE POSSIBLE EXISTENCE OF SUCH LIABILITY.  
6.10.2
IF FOR ANY REASON, CONTRACTOR BECOMES LIABLE TO COUNTY OR ANY 
OTHER PERSON FOR LIABILITY ARISING PRIOR TO COUNTY’S FINAL 
ACCEPTANCE, FOR DIRECT OR ANY OTHER DAMAGES, LOSSES OR 
EXPENSES FOR ANY CAUSE WHATSOEVER, AND REGARDLESS OF THE FORM 
OF ACTION (IN CONTRACT, TORT, STRICT LIABILITY, OR OTHER THEORY OF 
LIABILITY), INCURRED  IN  CONNECTION WITH THIS CONTRACT OR THE 
PROJECT 
DELIVERABLES, 
THEN 
THE 
AGGREGATE 
LIABILITY 
OF 
CONTRACTOR FOR ALL DAMAGES, INJURY, AND LIABILITY INCURRED BY 
COUNTY AND ALL OTHER PARTIES IN CONNECTION WITH THE SERVICES OR 
THIS AGREEMENT SHALL NOT EXCEED THE AGGREGATE VALUE OF 
IMPLEMENTATION AS DESCRIBED IN EXHIBIT B. 
IF FOR ANY REASON, CONTRACTOR BECOMES LIABLE TO COUNTY OR ANY 
OTHER PERSON FOR LIABILITY ARISING ON OR AFTER THE DATE OF 
COUNTY’S FINAL ACCEPTANCE, FOR DIRECT OR ANY OTHER DAMAGES, 
LOSSES OR EXPENSES FOR ANY CAUSE WHATSOEVER, AND REGARDLESS 
OF THE FORM OF ACTION (IN CONTRACT, TORT, STRICT LIABILITY, OR 
OTHER THEORY OF LIABILITY), INCURRED  IN  CONNECTION WITH THIS 
CONTRACT OR THE PROJECT DELIVERABLES, THEN THE AGGREGATE 
LIABILITY OF CONTRACTOR FOR ALL DAMAGES, INJURY, AND LIABILITY 
INCURRED BY COUNTY AND ALL OTHER PARTIES IN CONNECTION WITH 
THE SERVICES OR THIS AGREEMENT SHALL NOT EXCEED THE AMOUNT 
PAID TO CONTRACTOR DURING THE TWELVE (12) MONTHS IMMEDIATELY 
PRECEDING THE EVENT GIVING RISE TO THOSE DAMAGES CLAIMED.
6.11
FORCE MAJEURE
6.11.1
Neither party shall be liable for failure of performance, nor incur any liability to the other 
party on account of any loss or damage resulting from any delay or failure to perform all 
or any part of this Contract if such delay or failure is caused by events, occurrences, or 
causes beyond the reasonable control and without negligence of the parties (“Force 
Majeure Events”).  Such events, occurrences, or causes will include acts of God/nature 
(including fire, flood, earthquake, storm, hurricane or other natural disaster), war, invasion, 
act of foreign enemies, hostilities (whether war is declared or not), civil war, riots, 
rebellion, revolution, insurrection, military or usurped power or confiscation, terrorist 
activities, nationalization, government sanction, lockout, blockage, embargo, labor dispute, 
strike, interruption or failure of electricity or telecommunication service.
6.11.2
Each party, as applicable, shall give the other party notice of its inability to perform and 
particulars in reasonable detail of the cause of the inability.  Each party must use 
commercially reasonable efforts to remedy the situation and remove, as soon as practicable, 
the cause of its inability to perform or comply.
6.11.3
The party asserting Force Majeure as a cause for non-performance shall have the burden 
of proving that reasonable steps were taken to minimize delay or damages caused by 
foreseeable events, that all non-excused obligations were substantially fulfilled, and that

SERIAL 13129-1-RFP
the other party was timely notified of the likelihood or actual occurrence which would 
justify such an assertion, so that other prudent precautions could be contemplated.
6.11.4
The County shall reserve the right to terminate this Contract and/or any applicable order or 
contract release purchase order upon non-performance by Contractor.  The County shall 
reserve the right to extend the Contract and time for performance at its discretion.
6.12
OFFSET FOR DAMAGES;
In addition to all other remedies at law or equity, the County may, in good faith, offset from any 
money due to the Contractor any amounts Contractor owes to the County for damages resulting 
from breach or deficiencies in performance under this Contract.
6.13
ADDITIONS/DELETIONS OF SERVICE AND CONTRACTOR EMPLOYEE 
MANAGEMENT:
6.13.1
The County reserves the right to add and/or delete materials or services to the Contract 
through the Change Order process described in Section 1.3 of Exhibit A, Part One.  If a 
priced service requirement is deleted, payment to the Contractor will be reduced 
proportionately, to the amount of service reduced in accordance with the pricing in Exhibit 
B.  If additional materials are required, prices for such additions will be negotiated between 
the Contractor and the County.
 Delivery of Features will not exceed the entire effort estimate plus 25 percent for 
contingency.
6.13.2
The County reserves the right of final approval on proposed staff for all Tasks.  Also, upon 
request by the County, the Contractor will be required to remove any employees working 
on County projects and substitute personnel based on the discretion of the County within 
two weeks, unless previously approved by the County. In no event shall County be liable 
for any costs related to delays arising from this Section 6.13, except for circumstances 
arising under Section 6.13.1 above as expressed in the applicable Change Order. 
6.13.3
Contractor shall endeavor to maintain the provided personnel throughout the 
implementation of the Solution. In the event that Contractor personnel’s employment status 
changes, Contractor shall provide County a list of proposed candidates with equivalent 
experience with the Solution. County reserves the right to assist in the selection of the 
replacement candidate. 
6.13.4
Contractor shall not reassign any key personnel without the express consent of the County 
(which shall not be unreasonably withheld, delayed or conditioned). Key personnel shall 
be defined as the following roles:
A. Project Manager
B. Senior Business Analyst
C. Development Lead 
D. Data Conversion Lead
E. Executive Sponsor
F. Management Level Technical Sponsor
6.13.5
County reserves the right to immediately remove from its premises any Contractor 
personnel it deems to be causing any risk or disruption to County functions. 
6.13.6
Contractor acknowledges that its personnel shall be subject to background inspections of 
various levels of severity depending on level of secured access for the assigned tasks. 
Contractor further agrees to replace any personnel who fail to pass the required background 
check at the discretion of the County.

SERIAL 13129-1-RFP
6.14
RELATIONSHIPS:
In the performance of the services described herein, the Contractor shall act solely as an independent 
contractor, and nothing herein or implied herein shall at any time be construed as to create the 
relationship of employer and employee, partnership, principal and agent, or joint venture between 
County and Contractor.
6.15
ASSIGNMENT:
No assignment of this Contract or of any rights or obligations hereunder may be made by either 
party without the prior written consent of the other party and any attempted assignment without the 
required consent shall be void; provided, however, that notwithstanding the foregoing, and without 
prior written consent of County, (i) Contractor shall have the right to pledge, assign or otherwise 
transfer this Contract and its rights hereunder, in whole or in part, as collateral security to any lender, 
and (ii) Contractor shall have the right to assign or transfer this Contract and its rights hereunder, in 
whole or in part, to any direct or indirect wholly-owned subsidiary of Contractor (“Contractor 
Subsidiary”) or to any entity into which a Contractor Subsidiary may be merged or consolidated or 
any entity which purchases all or substantially all of the assets or capital stock of Contractor; 
provided, further, however, that (a) such subsidiary or entity agrees to be bound by the terms of this 
Contract and (b) any such assignment or transfer shall not relieve that party from any liability or 
obligation under this Contract.
6.16
SUBCONTRACTING:
Upon prior written approval by County, Contractor may subcontract work under this Contract; 
provided, however, that subcontracting shall not relieve Contractor of its responsibility and liability 
for any work performed by its subcontractor.
6.17
AMENDMENTS:
All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa 
County Office of Procurement Services shall be responsible for approving all amendments for 
County.
6.18
ACCESS TO AND RETENTION OF RECORDS FOR THE PURPOSE OF AUDIT AND/OR 
OTHER REVIEW:
6.18.1
In accordance with section MCI 372 of the Maricopa County Procurement Code the 
Contractor agrees to retain all books, records, accounts, statements, reports, files, and other 
records and back-up documentation relevant to this Contract for six (6) years after final 
payment or until after the resolution of any audit questions which could be more than six 
(6) years, whichever is latest.  County, Federal or State auditors and any other persons duly 
authorized by the Office of Procurement Services shall have full access to, and the right to 
examine, copy and make use of, any and all said materials.
6.18.2
If the Contractor’s books, records, accounts, statements, reports, files, and other records 
and back-up documentation relevant to this Contract are not sufficient to support and 
document that requested services were provided, the Contractor shall reimburse County for 
the services not so adequately supported and documented.
6.18.3
If at any time it is determined by the County that a cost for which payment has been made 
is a disallowed cost, the County shall notify the Contractor in writing of the 
disallowance.  The course of action to address the disallowance shall be at sole discretion 
of the County, and may include either an adjustment to future claim submitted by the 
Contractor by the amount of the disallowance, or to require reimbursement forthwith of the 
disallowed amount by the Contractor by issuing a check payable to Maricopa County.

SERIAL 13129-1-RFP
6.19
AUDIT DISALLOWANCES:
If at any time, County determines that a cost for which payment has been made is a disallowed cost, 
such as overpayment, County shall notify the Contractor in writing of the disallowance.  County 
shall also state the means of correction, which may be but shall not be limited to adjustment of any 
future claim submitted by the Contractor by the amount of the disallowance, or to require repayment 
of the disallowed amount by the Contractor.
6.20
SEVERABILITY:
The invalidity, in whole or in part, of any provision of this Contract shall not void or affect the 
validity of any other provision of this Contract.
6.21
PROPRIETARY RIGHTS IN DATA:
County shall own and have the use of all County Data and reports resulting from this Contract 
without additional cost or other restriction except as provided by law.  Each party shall supply to 
the other party, upon request, any available information that is relevant to this Contract and to the 
performance hereunder.  Notwithstanding the foregoing, all intellectual property rights (including, 
without limitation, copyrights and trade secrets) to deliverables, documentation and Software 
(including customized Software) developed by Contractor, whether developed by Contractor prior 
to or in the course of providing the Services, shall belong exclusively to Contractor.  “County Data” 
shall mean any data provided by County or entered into the Software.
The County agrees to allow the Contractor to use the County Data within the System for research 
and development (R&D) and/or demonstration purposes during the life of the Contract.  The 
Contractor agrees not to release any actual data related to parcels, accounts, or appeals without 
express approval of the County or any redacted information within the System. Contractor will work 
with the County to determine a demonstration data set for demonstration purposes to prospective 
customers of Contractor and any such data set shall be approved by County. 
6.22
NON-DISCRIMINATION:
Contractor agrees to comply with all provisions and requirements of Arizona Executive Order 2009-
09 including flow down of all provisions and requirements to any subcontractors. Executive Order 
2009-09 supersedes Executive order 99-4 and amends Executive order 75-5 and may be viewed and 
downloaded 
at 
the 
Governor 
of 
the 
State 
of 
Arizona’s 
website 
http://azmemory.azlibrary.gov/cdm/singleitem/collection/execorders/id/680/rec/1 which is hereby 
incorporated into this contract as if set forth in full herein. During the performance of this contract, 
Contractor shall not discriminate against any employee, client or any other individual in any way 
because of that person’s age, race, creed, color, religion, sex, disability or national origin.
6.23
WRITTEN CERTIFICATION PURSUANT TO A.R.S. § 35-393.01:
If Contractor engages in for-profit activity and has 10 or more employees, and if this Contract has a 
value of $100,000 or more, Contractor certifies it is not currently engaged in, and agrees for the 
duration of this Contract to not engage in, a boycott of goods or services from Israel. This 
certification does not apply to a boycott prohibited by 50 U.S.C. § 4842 or a regulation issued 
pursuant to 50 U.S.C. § 4842.
Unless and until the District Court's injunction in Jordahl is stayed or lifted, the Anti-Israel Boycott 
Provision (A.R.S. §35-393.01 (A)) is unenforceable and the County will take no action to enforce 
it.
6.24
INTEGRATION:
This Contract represents the entire and integrated agreement between the parties and supersedes all 
prior negotiations, proposals, communications, understandings, representations, or agreements, 
whether oral or written, express or implied.

SERIAL 13129-1-RFP
6.25
ORDER OF PRECEDENCE:
In the event of a conflict in the provisions of this Contract and its Exhibits, Appendices, or County 
issued Purchase Orders, the following order of precedence shall prevail:
1.
Contract
2.
Change Order Documents 
3.
Exhibit C, Software Subscription Agreement
4.
Exhibit A, Scope of Work
5.
Exhibit B, Price Agreement
6.
Appendix 1, Functional and Technical Feature Requirements
7.
Appendix 2, Contractor Travel and Per Diem Policy
8.
Appendix 3, Statement of Work Support Documents
9.
County issued Purchase Order or Work Release
10.
Acceptance Documents
6.26
VERIFICATION REGARDING COMPLIANCE WITH ARIZONA REVISED STATUTES §41-
4401 AND FEDERAL IMMIGRATION LAWS AND REGULATIONS:
6.26.1
By entering into the Contract, the Contractor warrants compliance with the Immigration and 
Nationality Act (INA using E-verify) and all other federal immigration laws and regulations 
related to the immigration status of its employees and A.R.S. §23-214(A).  The Contractor 
shall obtain statements from its subcontractors certifying compliance and shall furnish the 
statements to the Procurement Officer upon request.  These warranties shall remain in effect 
through the term of the Contract.  The Contractor and its subcontractors shall also maintain 
Employment Eligibility Verification forms (I-9) as required by the Immigration Reform and 
Control Act of 1986, as amended from time to time, for all employees performing work under 
the Contract and verify employee compliance using the E-verify system and shall keep a 
record of the verification for the duration of the employee’s employment or at least three 
years, whichever is longer.  I-9 forms are available for download at USCIS.GOV.
6.26.2
The County retains the legal right to inspect contractor and subcontractor employee 
documents performing work under this Contract to verify compliance with paragraph 6.26.1 
of this Section.  Contractor and subcontractor shall be given reasonable notice of the County’s 
intent to inspect and shall make the documents available at the time and date specified.  
Should the County suspect or find that the Contractor or any of its subcontractors are not in 
compliance, the County will consider this a material breach of the Contract and may pursue 
any and all remedies allowed by law, including, but not limited to:  suspension of work, 
termination of the Contract for default, and suspension and/or debarment of the Contractor.  
All costs necessary to verify compliance are the responsibility of the Contractor.
6.27
CONTRACTOR LICENSE REQUIREMENT:
6.27.1
Contractor shall procure all permits, insurance, licenses and pay the charges and fees 
necessary and incidental to the lawful conduct of the Services, and as necessary complete 
any required certification requirements, required by any and all governmental or non-
governmental entities as mandated to maintain compliance with and in good standing for 
all permits and/or licenses.  Contractor shall endeavor to keep fully informed of existing 
and future trade or industry requirements, Federal, State and Local laws, ordinances, and 
regulations which in any manner affect the fulfillment of a Contract and shall comply with 
the same. Contractor shall immediately notify both Office of Procurement Services and the 
using agency of any and all changes it has knowledge of concerning permits, insurance or 
licenses.
6.28
CERTIFICATION REGARDING DEBARMENT AND SUSPENSION
6.28.1
The undersigned (authorized official signing for Contractor) certifies to the best of his or 
her knowledge and belief as of the Effective Date or Renewal Date, that Contractor, and 
its principals:

SERIAL 13129-1-RFP
(1) are not presently debarred, suspended, proposed for debarment, declared 
ineligible, or voluntarily excluded from covered transactions by any Federal 
Department or agency;
(2) have not within the 3-year period preceding this Contract been convicted of or 
had a civil judgment rendered against them for commission of fraud or a criminal 
offense in connection with obtaining, attempting to obtain, or performing a public 
(Federal, State or local) transaction or contract under a public transaction; 
violation of Federal or State antitrust statues or commission of embezzlement, 
theft, forgery, bribery, falsification or destruction of records, making false 
statements, or receiving stolen property; 
(3) are not presently indicted or otherwise criminally or civilly charged by a 
government entity (Federal, State or local) with commission of any of the offenses 
enumerated in paragraph (2) of this certification; and
(4) have not within the 3-year period preceding this Contract had one or more public 
transaction (Federal, State or local) terminated for cause of default.
6.28.2
Should the Contractor not be able to provide this certification, an explanation as to why 
should be attached to the Contact.
The Contractor agrees to include, without modification, this clause in all lower tier covered 
transactions (i.e. transactions with subcontractors) and in all solicitations for lower tier covered 
transactions related to this Contract.
6.29
GOVERNING LAW:
This Contract shall be governed by the laws of the State of Arizona.  Venue for any actions or 
lawsuits involving this Contract will be in Maricopa County Superior Court, Phoenix, Arizona.
6.30
INFLUENCE
As prescribed in MC1-1203 of the Maricopa County Procurement Code, any effort to influence an 
employee or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct, 
may be grounds for Disbarment or Suspension under MC1-902.  
An attempt to influence includes, but is not limited to:
6.30.1
A Person, as defined in MC1-101, offering or providing a gratuity, gift, tip, present, 
donation, money, entertainment or educational passes or tickets, or any type valuable 
contribution or subsidy,
6.30.2
That is offered or given with the intent to influence a decision, obtain a contract, garner 
favorable treatment, or gain favorable consideration of any kind.
If a Person attempts to influence any employee or agent of County, the Chief Procurement Officer, 
or his designee, reserves the right to seek any remedy provided by the Maricopa County 
Procurement Code, any remedy in equity or in the law, or any remedy provided by this Contract.
6.31
PUBLIC RECORDS:
Under Arizona law, all Contracts are public records and must be retained by the Records Manager 
at the Office of Procurement Services. Contracts shall be open to public inspection and copying after 
Contract award and execution, except for such Contracts or sections thereof determined to contain 
proprietary or confidential information by the Office of Procurement Services.
6.32
INCORPORATION OF DOCUMENTS:
The following are to be attached to and made part of this Contract:

SERIAL 13129-1-RFP
6.32.1
Exhibit A, Scope of Work;
6.32.2
Exhibit B, Price Agreement;
6.32.3
Exhibit C, Software Subscription Agreement; 
6.32.4
Appendix 1, Functional and Technical Feature Requirements; and
6.32.5
Appendix 2, Office of Procurement Services Contractor Travel and Per Diem Policy; and
6.32.6
Appendix 3, Statement of Work Support Documents
6.33
FORCED LABOR
6.33.1
By entering into a Contract, Contractor agrees to comply with all applicable portions of 
Arizona Revised Statutes Section 35-394. Contracting; procurement; prohibition; written 
certification; remedy; termination; exception; definitions.
6.33.2
Contractor certifies that it does not currently, and agrees for the duration of the contract, 
that it will not use: 
6.33.2.1 The forced labor of ethnic Uyghurs in the People’s Republic of China.
6.33.2.2 Any goods or services produced by the forced labor of ethnic Uyghurs in the 
People’s Republic of China. 
6.33.2.3 Any contractors, subcontractors or suppliers that use the forced labor or any good 
or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China.
6.33.3
If Contractor becomes aware during the term of the Contract that Contractor is not in 
compliance with this section, the Contractor shall notify the County within five business 
days after becoming aware of the noncompliance. If the Contractor fails to provide a 
written certification to the County that the Contractor has remedied the noncompliance 
within 180 days after notifying the County of its noncompliance, then the Contract 
terminates, except that if the Contract termination date occurs before the end of the 180 
day period, the Contract terminates on the Contract termination date.

13129-1-RFP

13129-1-RFP
EXHIBIT A, SCOPE OF WORK
SERIAL 13129 –RFP
TABLE OF CONTENTS:
Part One – Special Terms and Conditions
Part Two – Statement of Requirements
Part Three – Statement of Work
Part Four – Implementation Schedule

13129-1-RFP
1.
PART ONE – SPECIAL TERMS AND CONDITIONS
1.1
DEFINITIONS
1.
“Acceptance” shall mean that a signed Deliverable Acceptance Form from the County has been sent 
to Contractor indicating that a Deliverable has met the acceptance criteria set forth hereinafter.
2.
“Artifacts” are items/activities that are required for project success but are not subject to 
Acceptance.  
3.
“BA” shall mean business analyst.
4.
“Business Day” shall mean one regular eight-hour workday (Monday through Friday) as defined by 
the County’s business calendar.
5.
“Business Hours” shall mean 8:00AM to 5:00PM Mountain Standard Time, Monday through 
Friday excluding County holidays.
6.
“Cloud” – The use and instance of Microsoft Azure for deployment of the System to the County.
7.
“Computer Based Training” shall mean training content hosted on a learning management system 
by County (or by Contractor upon mutual agreement of the parties).
8.
“Day/Days” shall mean, unless noted otherwise, one calendar day.
9.
“Defect” shall represent a condition in the software product which produces unexpected or incorrect 
results, does not meet the expected software requirement, or does not meet reasonable end-user 
expectations. 
10. “Deliverable” shall mean any product, service, document, software, data, or other item produced by 
Contractor and provided to the County for Acceptance.
11. “Designated Hardware” shall mean the servers designated by the County and in compliance with 
any known required specifications.
12. “Documentation” shall mean the user documentation describing the Software and providing 
guidelines for its use, and any and all additions and updates thereto provided to County by 
Contractor, and any portion of the foregoing.
13. “Enhancement” shall mean collectively any modification, addition, or change to the software that 
provides error corrections or efficiency alterations to the software, designated as such in 
Contractor’s sole discretion.
14. “Feature” shall mean a collection of functions that provide discrete business value.  Features 
contain User Stories.
15.  “Final Acceptance” shall mean the point at which Contractor has substantially met all of the 
material requirements and conditions of the SOW, contingent upon Treasurer acceptance of tax roll 
produced by the System.
16.  “Final UAT” shall mean Final User Acceptance Testing. This is the phase of software testing 
completed with End Users after delivery of the final Release Package to verify the system performs 
as expected. 
17. “Fix” shall mean the Contractor’s response with corresponding solution to a reported Defect.
18. “Flaw” shall represent a Defect that can be (but is not limited to) a typographical error, or an error in 
the aesthaetic of the user interface not impairing the software’s reasonable use.
19.  “Go-Live Date” shall be the date that County and Contractor establish as the date Contractor’s 
System will be used as the day-to-day operational system of record.
20. “Integration” shall mean provision of custom interfaces and code to allow data exchange between 
distinct software applications or databases.

13129-1-RFP
21. “Interface” shall mean programmed languages, codes and messages that programs use to 
communicate with each other and to make information available.
22. “Issue” shall mean any condition which does or may adversely affect the ability of the project to 
produce the required Deliverables, or which requires intervention in order to correct the condition.
23. “ITD” shall mean the Assessor’s Information Technology Division.
24. “Milestones” shall mean those milestones that Contractor shall meet, including the milestones for 
the Implementation Services, for which County shall pay Contractor an agreed amount upon 
completion of the applicable milestone.
25. “Onsite” shall mean the activity shall be conducted at County facilities.
26. “PM” shall mean project manager.
27. “Release” shall mean software package of expected functionality that is the culmination of one or 
more sprints.
28. “Release Package” shall mean a set of deliverables with each Release including Software & 
Technical documentation, analysis documentation, End-user documentation and Project Team 
release training.
29. “Resolution” shall mean that an acceptable plan to address a Defect has been agreed upon by both 
parties.
30. “Service Release” shall mean an unscheduled Release to address Defects and is delivered without a 
full Release Package.
31. “Services” shall mean all the conversion, support, update, modification, installation, 
implementation, maintenance, consulting, training or other services provided.
32.  “SME” shall mean subject matter expert.
33. “Software” shall mean the subscribed software provided by Contractor to County under the 
Software Subscription Agreement attached as Exhibit C that conforms to the requirements set forth 
in this Agreement.
34. “Software Subscription” shall mean the electronic method by which Contractor provides County 
access to the Software.
35. “SOW” shall mean the Statement of Work, Exhibit A, Part Three.
36. “Sprint” shall mean a set period of time during which specific work has to be completed and made 
ready for review.
37. “Story Point(s)” shall mean a unit of complexity and not be confused with effort. Story Points are 
abstract numbers used to estimate the relative complexity involved in implementing each User Story 
in Target Process.
38.  “System” or “Solution” shall mean the final configuration and setup of the Contractor software 
product, including migrated or converted County data, installation, configuration, database design, 
and integrations, so that all elements perform as a single unit in the manner intended.
39. “System Acceptance” shall mean the System is fully operational in the production environment and 
performing in conformity with Acceptance criteria described herein.
40. “System Readiness” shall mean the System is fully operational in a non-production environment 
and performing in conformity with the standard required to deploy the System to the production 
environment.
41. “Target Process” shall mean the Software-as-a-service (cloud-hosted) project management tool 
used by both Contractor and Maricopa County to manage software product requirements and testing.
42.  “Task” shall mean a set of activities in the SOW with a common purpose.

13129-1-RFP
43. “Test Script” shall mean a series of actions, functions or commands documented for the purpose of 
execution during quality assurance testing. To be consistent with the entity terms in Target Process, 
references to Test Scripts (“Test Script[s],” “Testing Scripts,” and “UAT Scripts”) are equivalent to 
and synonymous with “Test Case(s).”
44. “Third-party Statistical Software Application” shall mean analytics software for statistical and 
econometric analysis, visualization, regression, and forecasting made by a party other than the 
Contractor. 
45.  “UAT” shall mean User Acceptance Testing. This is the phase of software testing completed after 
delivery of ECD-25 to verify the system performs as expected.
46. “Upgrade” shall mean collectively any significant modifications or changes to the software which 
provide new functionality and/or interoperability, designated as such in Contractor’s sole discretion.
47. “User Story” or “User Stories” shall mean a tool(s) used in Agile software development to capture a 
description of a software feature from an end-user perspective. The user story(ies) describes the type 
of user, what they want and why. A user story helps to create a simplified description of a requirement.  
A user story is an entity in Target Process that is linked directly to a Feature.
 
1.2
   PAYMENT RETENTION:
1.2.1 Twenty percent (20%) of monies payable for Implementation Services in accordance with Exhibit 
B (provided, that the applicable Milestone is designated as eligible for payment retention) earned by 
Contractor related to work under this agreement shall be retained by County until Final Acceptance 
of the services herein described in accordance with this Exhibit. County may elect to release specific 
retention payments based on mutually agreed milestones, but in no case shall retention be fully 
released prior to Final Acceptance of the services.  All other payment terms and conditions shall not 
be affected by the retention. In the event of termination or cancellation of this contract by County 
through no fault of Contractor, Contractor shall be entitled to the refund of any funds in the retention 
account. Any interest earned on retainage shall accrue solely to the benefit of County.
1.2.2 The Contractor shall have the right, pursuant to Arizona Revised Statutes, to submit securities in 
lieu of retention for all work completed.  The Contractor is required to request this option at least 
ten (10) business days prior to submission of first Application for Payment to allow time for 
preparation of forms.  The Contractor shall request and obtain securities forms through County.  The 
County must identify either securities option or retention option prior to first Application for 
Payment.
1.2.3 For Deliverables ECD-14 to ECD 25 as identified in Appendix B, retainage for each identified 
Release Package may be withheld for such Deliverables that do not meet the 100% threshold for the 
agreed-upon effort for the cumulative total with respect to Story Points metric targets as described 
below.  
1.2.3.1 Once a Release plan has been accepted, the Release Package delivered under such plan 
must include at least 100% of the stated Story Points that were accepted in that plan by the 
County.  
1.2.3.2 As the intent of the additional withholding terms is to maintain a viable pace of 
development, a Release Package delivering over such 100% minimum requirement will 
provide Contractor with a “banked” Story Points entitlement to use as credits to mitigate 
against future low delivery Release Packages.  
1.2.3.3 If Contractor delivers below 100% on Story Points, County will withhold the at-risk 
retainage for the deficient Release Package as identified under Exhibit B.

13129-1-RFP
1.2.3.4 Any shortfall from a Release Package under 100% of its accepted plan will be added to the 
target effort for the subsequent Release Package, and the required minimum cumulative 
Story Points for the subsequent Release Package set out under Appendix 1 will not change.  
If this deficit is made up by the end of the next identified Release Package, thus achieving 
the required minimum cumulative Story Points, the applicable at-risk retainage shall be 
restored.
1.2.3.5 If Contractor delivers any complete Feature in the Release Package plan efficiently at less 
than the estimated Story Points as agreed upon in the plan, then the original Release 
Package plan will be adjusted accordingly so that Contractor will not be subject to 
additional withholding.
1.3    CHANGE ORDER PROCEDURE:
In the event that either party determines that product or services are required to be added to or deleted from 
the Contract, the following procedure shall be followed:
1.3.1The identifying party shall draw up a formal document (the “Change Order”) that shall include, but 
not be limited to;
(i)
A description of the item to be added/deleted
(ii)
Rationale for the change
(iii)
Specific cross reference (document/section) to where the change is proposed
(iv)
Detailed adjustment to project schedule
(v)
Proposed adjustment to impacted price/milestone
1.3.2 The proposed change shall be presented to the other party’s Project Manager (or duly authorized 
representative) for review. Said review shall not take longer than 10 business days.
1.3.3 The affected party may provide specific written commentary to the proposing party.
1.3.4 Once agreed as to form by the parties, the following shall be the sole executors of the Change Order 
for inclusion into the Contract:
For the County:
Chief Procurement Officer or the Maricopa County Board of 
Supervisors as determined by the County
For Esri Canada Limited:
Managing Director, Assessment (Michael Lomax as of the 
Effective Date) 
Cc: Vice President, Operations (Lois Boynton as of the 
Effective Date)
1.3.5 In no event shall either party act upon a proposed Change Order until fully executed by the parties. 
The acting party may be liable for all associated costs for products or services rendered under an 
un-authorized Change Order. 
1.3.6 Verbal agreements or directions given by either party that may have an effect on the Contract are 
not binding.
1.3.7 The Change Order Request Form is contained in Appendix 3, Part E.

13129-1-RFP
1.4
 HARDWARE
No hardware is included in this Contract unless mutually agreed to by the parties.  If necessary, any server 
upgrades or purchases will be performed under a separate procurement process.  However, County 
acknowledges that Contractor has already and will continue to provide recommended hardware 
requirements.
1.5
ACCEPTANCE:
Contractor shall provide an implementation testing and acceptance plan that shall clearly delineate any and 
all tasks that it expects County personnel to perform, including a clear time-line with milestones and 
estimated effort for said tasks.  Acceptance criteria for the implementation and subsequent upgrade and 
maintenance updates throughout the life of this Contract shall conform to those listed in the Statement of 
Work, Exhibit A, Part Three, §8.3.2.3.  Total Software Score (TSS) will be calculated by County in 
accordance with Requirements and Use Cases previously accepted.  More detail on the TSS approach is 
available in the Statement of Work, Exhibit A, Part Three, §1.1.5.5.
The County Project Manager or designee must approve all test plans and associated evaluation criteria 
prior to the initiation of the testing process.  All project milestones shall be subject to a formal acceptance 
process approved by the County Project Manager.  Only acceptance forms signed by designated County 
employees and counter signed by the County Project Manager will constitute formal acceptance of 
deliverables.
Defect Classification during Release Testing Periods:
CLASSIFICATION
SYSTEM DEFINITION
MITIGATION/RESPONSE
SEV1
Defect would prevent critical business 
process from functioning or cause data 
corruption post go-live. No workaround 
exists. 
or
Release testing is stalled and is dependent 
on effective resolution.
Resolution or acceptable workaround 
expected within current Release 
Testing Period.
SEV2
Defect would prevent or impedes non-
critical business process from functioning. 
An acceptable short-term work around 
exists.
Resolution in form of a Service 
Release is expected prior to next 
Release
SEV3
Defect would prevent or impedes lower 
impact non-critical business processes. 
Resolution expected in mutually 
agreed upon future Release.
SEV4
Flaws. Usability, training/how-to, or 
documentation issues.  Any issue that has a 
non-intrusive long-term work around.
Fix may or may not be needed in a 
future Release.
Defect Classification during UAT and Final UAT:

13129-1-RFP
CLASSIFICATION
SYSTEM DEFINITION
MITIGATION/RESPONSE
SEV1
Defect would prevent critical 
business process from functioning 
or cause data corruption post go-
live. No workaround exists. 
UAT is stalled and is dependent on 
effective resolution.
Resolution or acceptable workaround needed 
≤ 3 business days.
SEV2
Defect would prevent or impedes 
non-critical business process from 
functioning. An acceptable short-
term work around exists. 
UAT is (or is about to be) stalled 
and is dependent on effective 
resolution.
Resolution or acceptable workaround needed 
≤ 5 business days.
SEV3
Defect would prevent or impedes 
lower impact non-critical business 
processes.  
Resolution or acceptable workaround needed 
≤ 15 business days.
SEV4
Flaws. Usability, training/how-to, 
or documentation issues.  Any issue 
that has a non-intrusive long-term 
work around.
Fix may or may not be needed in a future 
Service Release
The Defect Classifications described above employed during UAT will be refined by the parties in a separate 
decision tree document mutually agreed between the parties that will aid in clarifying the UAT Defect 
classifications listed above.  If there is a conflict between the decision tree and the Defect Classification 
table above, the Defect Classification table above will supersede the decision tree.  
Defect Classification after Final Acceptance:
After Final Acceptance, all defects relating to the Software licensed under the Software Subscription 
Agreement (“Software Defects”) assigned a severity level in accordance with the Software Subscription 
Agreement attached as Exhibit C and shall be governed by the Software Subscription Agreement. 
Contractor shall provide ongoing administration, support, and maintenance of the System and Software 
based on service requests submitted by the County.  Service requests may be submitted by telephone, 
email, or Target Process depending on the service level of the issue or Defect.  All Level 3 requests must 
be submitted by the County through Target Process. 
  
1.6      SERVICE LEVEL AGREEMENT:
1.6.1
Escalation Schedule
(i)
User Support
All user support response times assume County business hours are 8:00AM to 5:00PM 
Mountain Standard Time, Monday through Friday excluding County holidays.
1.6.1.i.1  Upon receipt of service request from County, Contractor shall 
determine the appropriate service level (as set forth below).  Software Defects, 
if any, shall be assigned a level of severity in accordance with the severity levels 
provided under the Software Subscription Agreement.   
1.6.1.i.2 Level 1:  Synchronous, real-time assistance by telephone or quick 
response to emailed inquiries.  Initial diagnostics & reference to support

13129-1-RFP
knowledge base.  May include remote control of the user’s desktop.  County 
will provide this level for application, systems administration, database 
administration, and business process issues.
1.6.1.i.3 Level 2:  Asynchronous, scheduled service calls for desk-side 
assistance or remote control of the user’s desktop.  Includes reconfiguration or 
re-installation of software components.  May be provided by Contractor or 
County based on the source of the issue.  Those issues wholly within the 
Solution shall be Contractor’s responsibility, though Contractor may request 
County resources to perform local services at desktops or server.  Contractor 
shall acknowledge all Level 2 issues within one business hour and provide an 
estimate for resolution within eight business hours.
Level 2 issues escalated to Contractor will come through a designated contact 
within the County Assessor’s Office Technology Division.
1.6.1.i.4  Level 3:  Support is provided solely by Contractor and escalated 
internally for critical software failures, code debugging, etc.  
1.6.1.i.5 For Level 3 user support issues, resolutions shall be delivered within 
the guidelines and timelines as provided for Software Defects in the Software 
Subscription Agreement.  
1.6.2
Remedy for Breach of Service Levels
(i)
Root Cause
County and Contractor recognize that multitier solutions have many possible points of 
failure and that any service level breach or remedy contemplated in this Contract applies 
only to failure of Contractor’s software to provide agreed-upon functions.  Faults whose 
root causes lie with County or third-party resources (eg, telecommunications) are outside 
the scope of this Service Level Agreement.  The time to resolution shall not commence 
until both County and Contractor have isolated and duly attributed the fault to a Defect in 
Contractor’s software.
(ii)
Remedy
For faults in the Contractor’s software (other than Software Defects remedied pursuant to 
Section 3 of the Software Subscription Agreement) duly attributed as a Severity 1 or 
Severity 2 Defect, for each day beyond the Service Level Agreement that such Severity 1 
or Severity 2 Defect remains unresolved after acceptance and agreement on the applicable 
severity level, County shall receive a credit towards the next Software Subscription invoice 
of one day’s value of that year’s subscription cost.   
(iii)
Remedy Examples
1.6.2.iii.1 Severity 1 Example.  First thing the morning it is discovered that no employees 
can access the system.  Contractor investigates and determines that the 
Contractor hosted web service that provides access to the system has failed.  
Contractor re-cycles the web services at noon, and the system is now available 
to all authorized users.  Service level is met, and there is no breach and no need 
for remedy.
1.6.2.iii.2 Severity 2 Example.  It is discovered that the Market Bulk Validation job errors 
out every time it runs.  As it is still several months before the valuation process 
must be completed it does not fall into the timing situation for a severity 1 bug, 
but because 1.4 million parcels are valued annually via the market bulk

13129-1-RFP
valuation job it qualifies as a severity 2 bug due to the large number of parcels 
being effected.  Contractor provides a patch seven business days later, two days 
over the agreed service level. The service level breach is remedied in the next 
Software Subscription billing cycle with a credit of 2 business days of the 
annual fee, thus representing the two-day lag in service level.
1.6.2.iii.3  Severity 3 Example.  The contact search tab does not allow for scrolling or 
pagination of search results meaning any search is effectively limited to 50 
results.  Contractor provides new patch within seven business days, and County 
is able search for contacts and see results beyond the first 50 results.  As the 
service level for Severity 3 is twenty business days, there is no breach and no 
need for remedy.
1.6.2.iii.4  Out of Scope Example.  County staff cannot login to the solution from within 
one location but can remotely and from a second downtown location.  County 
technical staff identifies a network failure, so the fault is not within scope of 
Contractor’s services and is therefore not escalated to Contractor.
1.7 SOURCE CODE ESCROW REQUIREMENT:
1.7.1 Contractor shall provide all source and compiled code and any updates or fixes for the Contractor 
software work product as defined in Exhibit A, Part Three for safekeeping with a mutually 
acceptable escrow agent within ten (10) business days of release acceptance. Software described in 
contract 13068-SS Assessor Desktop Review SW Pilot Project executed by the County and Esri 
Canada on August 31, 2013 and contract ADSPO15-097108 executed by the State of Arizona and 
Esri on June 26, 2015 (adopted by the County on July 30, 2015 under contract number 15081-IGA) 
shall be excluded from this section 1.8. The software source code and compiled code deposited with 
the escrow agent will be a snapshot of all source and executable code maintained by Contractor in 
the form of an archive in a recognized version control system (e.g. Vault or Visual SourceSafe). In 
this way, as beneficiary of the escrow agreement between Contractor and escrow agent, County will 
have access to all source code of the products that they license for all versions of the software that 
they have licensed. Furthermore, the escrowed code shall include all code specifically developed 
for County including, but not limited to: interfaces, Extraction-Transformation-Loading (ETL) 
routines for data conversion, and all custom code. Upon taking possession of the source code, 
County will have the right to use the source for products that they license in the versions currently 
installed on the System or any subsequent versions in the archive., Contractor will make a deposit 
of the archive with the escrow agent in line with the Contractor’s software release schedule, but not 
less often than once every three (3) months throughout the life of the Implementation and then upon 
each maintenance release for the term of this Agreement. Each deposit may be verified by County 
through installation of the compiled code, at County’s option and expense.
1.7.2 County hereby agrees to pay all subscription and service fees to the Escrow Agent.
1.7.3 County shall have access to the escrowed code in the event of any of the following circumstances:
(i)          the sale, assignment, or transfer to any third party of any of Contractor’s rights in the 
licensed product (or any portion thereof) if such sale, assignment, or transfer may prevent 
Contractor from fully performing any of its obligations under this Contract;
(ii)
Contractor becomes insolvent or commits any affirmative act of insolvency, or generally 
fails to pay, or admits in writing its inability to pay, debts as they become due, makes a 
general assignment for the benefit of creditors, files a voluntary petition of bankruptcy,  
suffers or permits the appointment of a receiver for its business or assets, becomes subject 
to any proceeding under, or case in, any bankruptcy or insolvency law, or Contractor takes 
any action to authorize, or in the furtherance of, any of the foregoing;

13129-1-RFP
(iii)
Contractor discontinues providing full support and maintenance services for the licensed 
product in accordance with its obligations pursuant to any agreement with Maricopa 
County;
(iv)
Contractor has ceased to do business or intentionally refuses to provide any services 
pursuant to any agreement with Maricopa County;
(v)
Contractor has breached (and if subject to a cure period, has not cured such breach within 
such period) any material term or condition of any agreement with Maricopa County;
(vi)
Any change of control of Contractor or Contractor’s parent company, where such party is 
acquired, directly or indirectly, in a single transaction or series of related transactions, or 
all or substantially all of the assets of such party are acquired by any entity, or such party 
is merged with or into another entity to form a new entity; or
(vii)
Any other circumstance in which County is entitled to access or use the applicable deposit 
materials (including, but not limited to, the source code) under the express terms of any 
agreement between Contractor and County.
1.7.4
Upon Maricopa County taking possession of the source code, Maricopa County hereby agrees as 
follows:
(i)        County accepts full and total responsibility for the safekeeping of the source code. County 
agrees that such source code shall be subject to the restrictions of transfer, sale, and 
reproduction placed on the software itself as stated in the software license signed by all 
parties.
(ii)          County agrees to only use source code related to applications for which they own a license. 
There will be source from other applications in the archive.
(iii)        County agrees that any unauthorized release of the source code will cause irreparable harm 
to Contractor. Therefore, County agrees to compensate Contractor for any and all damages 
Contractor suffers, to include reasonable attorney’s fees, resulting directly or indirectly 
from, but not limited to, the mishandling, misuse, or theft of the source code, regardless of 
intent, or the absence thereof, by County, its employees, former employees, agents and 
third-party associates if so ordered by the court.  Notwithstanding the foregoing, County 
agrees that Contractor is entitled to an immediate injunction to stop any further alleged or 
actual disclosure.
(iv)
No license under any trademark, patent, copyright, or any other intellectual property right, 
is either granted or implied by the disclosure of the source code to County.   Contractor’s 
disclosure of the source code to County shall not constitute any representation, warranty, 
assurance, guarantee or inducement by Contractor to County of any kind, and, in particular, 
with respect to the non-infringement of trademarks, patents, copyrights, or any other 
intellectual property rights, or other rights of third persons or of Contractor.
(v)
Contractor will not be responsible for maintaining the source code.  Furthermore, 
Contractor will not be liable for any consequences related to the use of source code 
modified by County.
1.8 REMEDY FOR CONTRACTUAL DELAY
1.8.1 The parties acknowledge and agree in the event that Contractor fails to deliver a production ready 
System to include all technical documentation required by Exhibit A, Part 3, Section 1.2.1(8) by August 1,

13129-1-RFP
2022 (“Production Ready System Date”), the County shall be entitled to deduct as liquidated damages, 
either:
(i)     the sum of Two Thousand and Thirty-Two US dollars (US $2,032.00) per day from the 
Software Subscription annual fee payments due to the Contractor between August 1, 2022 
and September 30, 2022 (Option 1); or 
(ii)       the sum of One-Thousand and Eighty-Five US dollars (US $1,085.00) per day from the 
Software Subscription annual fee payments due to the Contractor between October 1, 2022 
and June 30, 2023 (Option 2), 
for each day of delay commencing on August 1, 2022 until a production ready System is delivered by the 
Contractor.
1.8.2   In the event that the County elects to pursue its liquidated damages entitlement for either Option 1 or 
Option 2 as described in Section 1.8.1 above, the parties agree that such applicable liquidated damages 
amount shall not be construed as a contractual penalty, but rather as the mutually agreed upon capped 
genuine and reasonable pre-estimated assessment of the monetary damages remedy available to the 
County under this Contract as a result of Contractor’s uncured failure to meet the agreed Production 
Ready System Date of August 1, 2022.
 
      1.8.3  Notwithstanding the foregoing, the parties acknowledge and agree that the County’s liquidated 
damages entitlement as provided under this Section 1.8 shall not apply in the event that the delay or 
failure to meet the Production Ready System Date: (i) is caused or occasioned by the County or any 
County representative; (ii) is excused by the County through an approved Change Order; or (iii) arises 
from an event of force majeure; or (iv) is otherwise excused under the Contract.
2.  PART TWO, STATEMENT OF REQUIREMENTS:
2.1
COUNTY REQUIREMENTS:
2.1.1 MUTUAL UNDERSTANDING OF REVISION
The parties agree that the requirements herein listed are subject to change and/or modification based 
on the following criteria:

unilateral business decision of the County to not pursue a particular functionality;

mutual decision of the parties to not pursue a particular functionality; 

unilateral business decision of the County to delay the development or deployment of a 
particular functionality until a later date; or

the findings of the development process that substantially modify either the requirements or 
Scope of Work.
In any of the above instances, any change/modification/deletion/addition/replacement of any portion 
of the requirements or Scope of Services shall solely be documented and agreed to by a bi-laterally 
executed Contract Amendment as described in Exhibit A, Part 1, Section 1.3.
2.1.2 GENERAL FUNCTIONAL REQUIREMENTS
The Solution shall have all of the following general functional capabilities.  These capabilities 
should be available to fully perform across all application functional areas of the Solution; be 
configurable; and be operable by trained County employees.

13129-1-RFP
The Solution shall comply with all applicable State of Arizona and Maricopa County Laws, and all 
applicable International Association of Assessing Officers (IAAO) standards, but specifically those 
listed below:

Standard on Automated Valuation Models

Standard on the Mass Appraisal of Real Property

Standard on the Valuation of Personal Property
2.1.2.1
Configurable Workflow
The System shall include the ability to configure workflows to support unique, high-use, 
repeatable activities such as are found with the appeals, permit intake, or notice-of-claim 
processes.  The workflow should aid in tasks such as: navigate the user through the proper 
screens; move the work-step to supervisory users for approval; and aid in the completion 
of queued work items (e.g., an appeal). A task in a given workflow can have a duration set 
such that a secondary action (e.g., notify the supervisor) is taken after the set duration is 
exceeded.
The CAMA software application should include a workflow process management and 
configuration toolset. The solution should include transparent application integration 
having simple and flexible configuration which will be able to handle multilevel workflow 
processes. Security should be flexible enough to manage and authorize hierarchical 
application users as well as mapping to external authentication systems such as Active 
Directory. As business processes are managed through workflow, reporting and queues 
will enable system users (management and individuals) to have a clear view of what is 
needed and what is in action. 
The design of workflow will include the ability to automate steps which get performed in 
the application as well as build complex business processes which may have external 
integration steps. This should all be facilitated through the CAMA software application in 
a flexible, repeatable, user friendly manner.  Items such as case management, building 
permits and appeals are examples of processes that should be configurable through 
workflow and may have configurable dependencies. Workflow should be flexible enough 
to handle other processes which are required. The intention is that the administrator users 
will be able to create and configure workflow processes without intervention. These 
configurations can be unique to the County’s business processes.
2.1.2.2
Notifications
The System shall include a specific system notification that an action is pending or that an 
action should be taken.  The System may have a “notification area” or feature where 
specific notifications occur.  These should be configurable and may work in conjunction 
with Workflow.
Example: An appeal recommendation requires approval by the Chief Appraiser, and since 
he is an occasional user of the system, an email is sent notifying him of the task.
2.1.2.3   Alerts
The System shall include the ability to set a feature to “watch” for a given data 
characteristic to change and then notify the user that such a condition exists.  Alerts may 
work in a manner similar to, or in conjunction with, Notifications.
Example: A given property has a violent dog, and that information needs to be alerted to 
an appraiser who is preparing to make a field visit.

13129-1-RFP
2.1.2.4   Security
The System shall have completely configurable role-based security that operates at the 
database level and controls user access to all data across all interfaces and output:  screens, 
fields, reports, dashboards, simple query tools, menus, administrative tools, etc.
The System shall have the ability to restrict access to sensitive data such as address 
information for law enforcement personnel or elected officials.
Security Incident Notification.  If Contractor becomes aware of a Security Incident, 
Contractor will (1) notify County of the Security Incident within twenty four (24) hours of 
becoming aware of the Security Incident and provide the County a summary of the  
Security Incident that is reasonably known at that time such as: components of the 
Contractor System affected, County data affected, County users affected and County 
data/information affected; (2) investigate the Security Incident and provide County with 
detailed information about the Security Incident; and (3) take reasonable steps to mitigate 
the effects and to minimize any damage resulting from the Security Incident. 
Notification(s) of Security Incidents will be delivered to one or more of County’s 
administrators by any means Contractor selects, including via email. Contractor shall pay 
for notification of all affected individuals as required by applicable law. Contractor shall 
further pay for credit monitoring for all affected individuals requesting such credit 
monitoring, for not less than one full calendar year after any Security Incident. It is 
County’s sole responsibility to provide Contractor with up-to-date contact information for 
notification purposes. Contractor’s fulfillment of its obligation to report or respond to a 
Security Incident under this section is not an acknowledgement by Contractor of any fault 
or liability with respect to the Security Incident. County must notify Contractor promptly 
about any possible misuse of its accounts or authentication credentials or any security 
incident related to the Services.
2.1.2.5   Simple Query Capability
The System shall include the ability for the user to define un-joined data selection criteria 
and return results to an online interface or export the data to a delimited file or Microsoft 
Excel.
2.1.2.6   Dashboard
The System shall include the ability to create graphical and tabular reports and make them 
available for interaction with authorized users.  
2.1.2.7  Complex Reporting
The System shall include the ability to create new reports using a report construction tool 
that allows for the creation and execution of complex queries, output formatting, and 
application of security.  The new reports can be made available to specified user groups or 
be kept available to a single user.
2.1.2.8    Letter Generation
The System shall include the ability to merge selected data into a predefined report (defined 
letter) for the purposes of email or paper letter distribution to County taxpayers.  The letter 
may be easily modified by persons with appropriate authorization.  This functionality will 
interact with the configurable workflow function.
2.1.2.9   Import/Export Tool

13129-1-RFP
The System shall include the ability to configure and re-use data import and export 
“routines.” The format for import or export can be one of several standards (e.g., CSV, 
delimited, fixed-width, xml).
2.1.2.10  Online Personal Property Inventory
The System shall include the ability to support the importing of personal property inventory 
and related ownership and location information submitted via the Maricopa County 
Assessor Web Portal.  
2.1.2.11  Web Portal Customer
The System shall provide an interface that allows the Maricopa County Assessor Web 
Portal to interface with the System and return tabular data.
2.1.2.12  API
A fully documented Application Programming Interface (API) or similar shall be available 
for use by other organizations that may be required to interface with the System.  Full 
publication of the API is preferred.
The API will support full featured use of objects, routines, language libraries, etc., as 
dictated by the technology inherent in the System, and shall be architected using a standard, 
industry-accepted Service Oriented Architecture (SOA) technology that is easily consumed 
by other organizations.
2.1.2.13  Audit Trail
The System shall include a feature that allows the County to track changes to individual 
data elements.  Based on configuration and activation, the feature will show the data value 
before and after the change; when the change occurred; and which user made the change. 
The changes shall be available online and in paper report form.
2.1.2.14  Desktop Appraisal
The System shall include the ability to use County-purchased and -provided oblique 
imagery (currently Pictometry Connect V1) to perform follow-up appraisals to all real 
property.  Primarily, this requires total integration with GIS and Pictometry in all System 
areas where imagery inspection could a) prompt a change/potential change in the real 
property characteristics or b) initiate an action for the appraiser (e.g., field visit or Notice 
of Change processes, etc.).
2.1.2.15  Reminders
The System shall include the ability for an individual user to set a reminder to perform a 
workflow action at some future date/time.  Reminders may record the context in which 
they are created (e.g., when the business context is a parcel, the parcel number and owner’s 
name is stored with the reminder.).
2.1.2.16  Work Management
The ability to assign work to a workgroup, specific individual, or to a queue is needed to 
support high-use, repeatable activities such as are found with the appeals, permit intake, or 
notice-of-claim processes.  This requirement extends workflow functionality to include the 
ability to schedule work, monitor progress, look up status of a given work item, utilize

13129-1-RFP
work templates, and manage work queues.  Scheduling work to groups or individuals is 
needed by geographic area, work type, and as restricted by employee skill set.
2.1.2.17   Case Management
The System shall include a configurable feature that supports the management of an issue 
(case) interactively over an indefinite period of time.  Data on the case is stored as a 
“header,” and time/date stamped notes and data changes are stored as child records to the 
case.  Cases shall interact with the workflow tool.  Cases may be opened against any of the 
following: appeal, litigation, Notice of Claim/Change/Error (or similar), any parcel, any 
owner, or split.  Cases for each of the types listed here may contain different data elements 
and use different work flows.
The County is looking for functionality that can handle tasks ranging from small to very 
large appeals that may flow through different hearing venues.  The module requires 
extensive mailing capabilities and interfaces to other systems such as GIS, email, document 
management, the County Treasurer’s system and other State agencies.  The module will 
also need to interact with the CAMA software market comparables functionality.  The 
requirements defined by the County will result in significant custom programming 
development.
2.1.2.18  Modeling
The System will use a Third-party Statistical Software Application (TSSA) to support all 
mathematical/regression analysis needed to support all automated valuation models 
(AVM).  The AVMs will be used by the CAMA software to produce the values for each 
parcel in the model.
Model methods shall include the following:

 Cost approach, specifically the calibration of location modifiers and depreciation 
tables

 Comparable sales approach

 Direct market approach using any formula structure deemed necessary by the 
jurisdiction

 Income approach, which may include vacancy, expense, direct capitalization, gross 
rent or net rent models, or any combination of these models
Each model will be completely configurable by designated employees using: property 
types/classifications, specified property characteristics & condition(s), selected sales data, 
and valuation approach (cost, income, sales).
Models will support stratification based on any data characteristic or combination of data 
relationships as deemed necessary by the jurisdiction.  This stratification may include but 
is not limited to:

Property type

Physical characteristics

Geographic location

Broad value ranges
The System shall have the capability to use regression model syntax to conduct the 
following:

13129-1-RFP

Change a given property characteristic (physical, type, or even location) and calculate 
a new value based on new characteristics. 

Conduct “what if” analysis on a given property or group of properties to determine 
how characteristic changes may impact the value—results are not used to change 
noticed value
The chosen method for managing the model syntax is included in Appendix 3.C.2.1.
2.1.2.19  Remote Operations
The System shall provide the capability to access functionality from remote locations that 
are physically separated from the primary County office Remote system functionality 
shall include all data maintenance, reporting, computation, and administration 
capabilities.
2.1.2.20  Assessed Value Calculation
A myriad of business rules will need to be created that rely on the property use and 
legislation classification of the property to come up with a final assessed value.  Some 
contain a percentage which needs to be applied to the final assessed valuation.  The 
associated parcel functionality is also part of determining the final assessed value as the 
County calculates a total value and will allocate to parcels contained in the economic unit.  
In the Marshall and Swift engine, the County has statutory appraised data for both Golf 
and AG properties which need to be contained in the system to conform to business 
practices.  Also the County requires valuation as subdivisions are being created and the 
new System must conform to the business rules, i.e. the county has an initial, interim and 
final land full cash value for new subdivisions which changes as the infrastructure is 
developed.  Custom development related to assessed value calculation impacts the 
following:
1.
Legal classes and assessments
2.
Economic units
3.
Parcel Class valuations
4.
Mixed use properties
5.
Statutory appraised properties
2.1.3 MAJOR BUSINESS AREAS
The following list shows the Assessor department major business and functional areas and specific 
processes in scope for the System.  Some of the areas listed include multiple processes and some 
areas support both real and personal property.
1
Residential appraisal-CAMA, various models 
using sales comparison approach
2
Residential appraisal-CAMA, various models 
using sub-division model variants
3
Commercial appraisal-CAMA, various models 
or manual analysis, using all three approaches
4
Industrial appraisal-manual analysis using all 
three approaches
5
Land appraisal-manual analysis using 
applicable approaches
21
Manage valuation appeals, real and 
personal, State Board Level
22
Manage litigation 
23
Create/maintain property sketches
24
Desktop appraisal, real property only—all 
types 
25
Conduct field inspections/re-visits, real and 
personal property
26
Valuation change process (taxpayer or 
Assessor initiated)

13129-1-RFP
6
Rule A, limited property value, valuation 
method 
7
Rule B, limited property value, valuation 
method
8
Audit process for any appraised real or personal 
property
9
Personal property, business self-reporting, 
electronic submission and paper form
10
Personal property, audit process per Arizona 
Revised Statutes
11
Maintain real property characteristics—all 
types & variants
12
Maintain ownership characteristics—all real 
and personal property
13
Maintain market areas
14
Update regression models created in Third-
party Statistical Software Applications
15
Maintain affidavit of affixture
16
Manage resolutions
17
Maintain sales data, all real property
18
Maintain Property Use Codes (PUC)
19
Conduct real property canvassing
20
Manage valuation appeals, real and personal, 
County Assessor Level
27
Manage the exemption process
28
Conduct real property parcel 
splits/combines
29
Maintain deeds
30
Verify/maintain legal classes
31
Import & manage new construction permits, 
all jurisdictions
32
Manage notice of claims/proposed 
corrections
33
Project assessable values and tax levy limits 
based on current and projected values and 
growth
34
Legislative Mandated Processes 
35
Annexations/Tax Area Code Maintenance 
36
Notice of Change
37
Notice of Valuation
38
State-mandated Reports 
39
Tax Roll Processing 
40
State Assessed Properties (CVP)
2.1.4 ARIZONA REVISED STATUTES
The System shall comply with all Arizona laws addressing real and personal property valuation and 
taxation.  The Arizona law can be found in mainly Arizona Revised Statute (ARS) Title 42, with 
specific law applicable to the System found in Chapters 11 through 19.  Links to the law are provided 
below, and specific interpretation to key elements of the law (Limited Property Valuation (LPV); 
and Full Cash Valuation (FCV) are shown below, as well.
ARS Title 42:
http://www.azleg.gov/ArizonaRevisedStatutes.asp?Title=42
LPV: 
http://www.azleg.gov/FormatDocument.asp?inDoc=/ars/42/13301.htm&Title=42&DocType=ARS
Property Tax:
http://www.azdor.gov/PropertyTax.aspx
2.1.4.1
Definitions:
2.1.4.1.1
Full Cash Value (FCV) for property tax purposes means the value determined 
as prescribed by statute. If no statutory method is prescribed, FCV is 
synonymous with market value, which means the estimate of value that is 
derived annually by using standard appraisal methods and techniques. FCV is 
the basis for assessing, fixing, determining and levying secondary property 
taxes. FCV shall not be greater than market value regardless of the method 
prescribed to determine value for property tax purposes.
2.1.4.1.2
Limited Property Value (LPV) means the value determined pursuant to 
section 42-13301. LPV is the basis for:

13129-1-RFP
2.1.4.1.2.1 Computing levy limitations for counties, cities, towns and 
community college districts
2.1.4.1.2.2 Assessing, fixing, determining and levying primary property taxes
2.1.4.1.3
LPV—Use and Interpretation at Maricopa County
2.1.4.1.3.1 LPV—Application of Concept
The purpose of the LPV is to create a hedge against inflationary 
increases in the market value of the property.  The calculations, by 
law, limit the amount of increase that can occur from one year to the 
next.  LPV is the value used against the Primary Tax Rate, which is 
the larger of the two tax rates (Primary Tax rate and Secondary Tax 
Rate).
The LPV is determined by law.  Arizona State Statutes provide the 
formulas to be used in calculating the LPV (see Arizona Revised 
Statutes §§ 42-13301 through 13304), which are referred to as Rule 
A or Rule B calculations.
Rule A:
Beginning in Tax Year 2015, the calculation of the LPV was 
changed to the following: The LPV for the current year is equal to 
the LPV of the prior year plus 5% of that prior LPV, not to exceed 
the Full Cash Value.
Rule B:
One exception to the calculation of the LPV is if there has been a 
major change (new improvements, demolition, change in land size, 
new parcel number) or a change in use of the property.  In these 
instances, the LPV is established by the relationship (percentage) of 
FCV to LPV of all other existing properties within the same legal 
classification.  The Rule B Calculation for legal class 3 property for 
tax year 2012 is 100% of the FCV in Maricopa County.  This 
percentage can change from year to year (many years it is below 
100%).  It is set annually by determining what the average 
percentage difference is between the FCV and LPV of all existing 
property in Maricopa County.  This is done separately for each legal 
classification.  Therefore, there can be a difference in the Rule B 
percentage between different legal classifications.
2.1.5 DATA MIGRATION
Contractor shall migrate data in accordance with the Data Migration Plan. The baseline data is 
described in Appendix 3, Part A.
Contractor also expressly agrees to complete 1 additional Full Data Migration without charge to the 
County – in addition to any previously set forth in the Data Migration Plan – using data slices to be 
provided by the County on August 1, 2022 (for tax years 2021 and prior) and September 1, 2022 
(for tax years 2022, 2023 and 2024) to facilitate the October 2022 Go Live Date.  Contractor 
understands that: (1) the County will continue to use its existing Oracle 6i system for all purposes 
from May 2022 through September 1, 2022; and (2) the County cannot Go-Live without this 
additional migration of data.

13129-1-RFP
2.1.6 REPORTING
2.1.6.1
Mandated Requirements
2.1.6.1.1
The System shall provide all required read-only database objects to produce the 
Annual State Abstract report in Excel format as described by the State of 
Arizona. At a high level, said data shall include:
2.1.6.1.1.1 List taxing authorities, along with valuation information, exempt 
amounts, and parcel counts,
2.1.6.1.1.2 List current tax areas, along with valuation information, exempt 
amounts, and parcel counts,
2.1.6.1.1.3 List legal classifications, along with valuation information, exempt 
amounts, and parcel counts,
2.1.6.1.1.4 List taxing authorities within legal classifications, along with 
valuation information, exempt amounts, and parcel counts, and
2.1.6.1.1.5 List of CVP/Local Assessed Properties taxing authorities with 
legal classifications, along with valuation information, exempt 
amounts and parcel counts.
2.1.6.1.2
A listing of reports is contained within Appendix 3, Part B.
2.1.6.1.3
Read-Only Database Access
The Contractor shall provide read-only access to database objects, including the 
Assessment Rolls, to facilitate the County’s development of all required reports 
through the reporting framework.
2.1.7 INTEGRATION
2.1.7.1
The following software products shall be integrated into the System with the requirement 
that said integrations shall function as a single unit to the end user and not require periodic 
data transfers or transformations. A further listing of all integrations is contained in 
Appendix 3, Part C.
2.1.7.1.1
GIS/Pictometry
The ability to view all geospatial data, as contained in the Assessor’s enterprise 
ESRI GIS and Pictometry imagery, using the parcel or improvement context 
provided by the CAMA software application. No additional querying of the GIS 
or Pictometry is required.  Basic geospatial viewing functionality shall be 
available to the user: pan, zoom, use of identify feature, full use of oblique 
imagery for Pictometry, etc.
No data exchange will take place, only utilization of GIS & Pictometry 
functionality as part of the System will occur.
2.1.7.1.2
GeoSketch
GeoSketch is a building sketch (polygon geometry) editor for creating and 
editing parcel improvement features in a georeferenced environment.  
GeoSketch facilitates the maintenance of accurate building sketches by 
presenting the data in a spatial context. The editing and visualization of 
improvement feature geometries within the context of a map environment 
greatly enhances the accuracy and utility of the data. Improvement feature areas

13129-1-RFP
are obtained directly from the sketch feature polygons for reporting and 
analysis.
Improvement feature sketches will be tightly integrated with the CAMA data 
and benefit from the built-in historical versioning mechanism. The changes to 
feature geometries over time may be visualized and analyzed within the system 
in the same way as other property characteristics.
2.1.7.1.3
Marshall & Swift Cost Tables
The System shall utilize the commercial cost tables and updates provided by 
Marshall & Swift to complete any valuation where the cost method is used.  No 
additional action by the user shall be required to cause the System to function 
properly and complete the valuation.
Marshall & Swift Valuation Platform web service will be adopted by the 
County as the primary cost valuation engine. The Marshall & Swift Square Foot 
Cost engine utilized by the Assessor’s Office is specific to Maricopa County.  
2.1.7.1.4
Assessment Analyst
The functionality for Esri Canada’s Assessment Analyst shall be incorporated 
into the CAMA product as a part of the overall solution, including integration 
with external data sources required for Assessment Analyst. This functionality 
will be accessible through a license manager, requiring both the CAMA license 
and AA DTR license to be fully operational.
2.1.7.2
External Data Integrations
The following software products shall be integrated with the System, but are not required 
to behave as a single unit within the System.
2.1.7.2.1
Third-party Statistical Software Application (TSSA)
The System shall provide the ability to use a TSSA to perform all statistical 
calculation and regression analysis in support of the creation of all valuation 
models. 
Sales and property characteristics will flow to a TSSA, and the model syntax, 
parameters, coefficients, and any additional related data (as jointly determined 
between Contractor and County) will be made available in the System through 
the method indicated in Appendix 3.C.2.1
2.1.7.2.2
OnBase: Electronic Document Management Solution
The ability to operate the Assessor’s current document management software 
from the System is needed with the ability to set indices and classifications per 
the OnBase configuration.  OnBase integration points are undetermined at this 
point and the scope of this integration is greatly dependent upon future business 
decisions and System capabilities. It is expected that context data will flow to 
OnBase for use in obtaining or storing the associated document.
Current Version:  OnBase 10.0.1.109
2.1.7.3
Routine Imports and Exports

13129-1-RFP
2.1.7.3.1
Treasurer Data Exchange
The System shall allow for file exchanges between the Assessor and Treasurer 
offices for the following transfer situations:
2.1.7.3.1.1
Resolutions: Assessor enters resolutions in their system and 
prepares the files.  These are picked up by the Treasurer.  They 
then process the resolutions through their system.  Treasurer then 
provides result files for the Assessor to pick up.
2.1.7.3.1.2
Address changes.  Each week the Assessor creates a file of all 
address changes from our system and makes that file available to 
the Treasurer to update their system.
2.1.7.3.1.3
Tax Roll.  Each year in August the Assessor make the tax roll 
available to the Treasurer.  This file contains the data for all 
parcels and personal property accounts and is the basis for the 
Treasurer to calculate and generate the tax bills.
2.1.7.3.1.4
Senior Value Protection.  Each year the Assessor provides the 
Treasurer a file of all parcels whose owner has qualified for 
valuation protection according to statute.  The Treasurer uses this 
information to apply an elderly assistance credit to that 
homeowner.
2.1.7.3.2
Recorder Import
Import data as provided by the County Recorder’s Office representing parcel 
and record maintenance recordings.  Volume is 1500 – 2000 records received 
on a daily basis.  Data elements received include, but are not limited to, the 
following:
1.
Recording Number
2.
File date
3.
Date Transferred
4.
Parcel Number
5.
File Type (Splits/Combines, Deeds, Affidavits, Judgments, Plat Maps, 
etc.)
2.1.7.3.3
Permits
Import permit data as submitted by external agencies. Volume varies based on 
agencies.  Process is performed in batch on a weekly basis and includes, but is 
not limited to, the following data elements:
6.
Parcel
7.
Owner
8.
Situs
9.
Builder
10.
Permit Status
11.
Type (new construction, additions, demos, etc.)
12.
Issue Date
13.
Job Descriptions
14.
Census Code

13129-1-RFP
2.1.8 TRAINING
2.1.8.1
User Groups:
User Group to be Trained
# of Users
Administration
25
Valuation Modeling Unit
12
Mapping & Ownership
40
Information Services
24
Personal Property
21
Appraisal
179
Litigation 
18
GIS Development
6
Outside Users
60
APPROXIMATE USERS TO TRAIN
385
2.1.8.2
Facilities: The County shall provide an equipped training facility that is sufficient to train 
in person up to 20 individuals simultaneously with larger audiences available for live 
webinars or computer based training.
2.1.8.3
County shall have the right to reproduce, edit, and distribute the training materials without 
limitation for internal training sessions involving internal or external end users.  The 
County shall also have the right to record any classroom training.
2.1.8.4
Training shall be provided for all user applications, system management tools and technical 
areas, and shall be conducted to allow the business and technical users to become 
completely familiar with the System capabilities.  During the project, the County may 
identify additional areas for which training may be required.
2.1.8.5
The County shall be responsible for developing separate training plans for each major 
functional area.
The following outlines the general responsibilities of the Contractor for training:

The Contractor must assign a Training Specialist to the project.  The Training 
Specialist shall review strategic and tactical training plans developed by the County.  

The Contractor must recommend the user-training environment including server 
specifications, 
operating 
system, 
workstation 
specifications, 
application 
requirements, etc.

The System must include context-sensitive help in the user interface.  The help files 
must accurately describe custom functionality developed for the County and link to 
online tutorials where appropriate.

The Contractor shall be responsible to provide staged training databases to ensure a 
consistent user training experience across sessions.

13129-1-RFP
ART THREE – STATEMENT OF WORK
STATEMENT OF WORK
EXHIBIT A, PART THREE TO THE
CONTRACT BETWEEN
ESRI CANADA LIMITED
AND
MARICOPA COUNTY, ARIZONA
Maricopa County
301 West Jefferson Street, Suite 700
Phoenix, AZ 85003
Esri Canada Limited
12 Concorde Place, Suite 900
Toronto, Ontario, Canada M3C 3R8

13129-1-RFP
Introduction to Statement of Work (SOW)
This document contains the overall Maricopa Assessment Replacement System (MARS) approach and 
Statement of Work (SOW) for the planning, design, data migration, development, testing, training, and Go-
Live project activities.  
Appendix 1 – Functional and Technical Feature Requirements is herein incorporated into this section. 
Contractor shall be responsible for the provision of the requirements as described within the appendix.
Project requirements or services not explicitly included in the Contract and SOW, or included in documents 
not specifically referenced in the Contract or SOW, will be considered out-of-scope, and will be handled 
through the change control process. The general goals and objectives of the SOW are:
1.
Improve appraisal services to the people of Maricopa County through the following:
a.
Accurate and justifiable property values
b.
Superior customer service and accountability 
2.
Improve exchange of data with other government entities
3.
Improve office productivity
4.
Stabilize workforce culture and improve institutional knowledge
a.
Implement standard policies and procedures
b.
Knowledge and skills
c.
Workforce integration/communication
5.
Respond to changes in laws, regulations, and policy in a complete, accurate, and timely manner
6.
Reduce risk associated with custom and/or unsupported technology
Software Description
The Software is the Contractor’s computer-aided mass appraisal (CAMA) software, (Contractor’s 
Assessment Analyst® GAMA software) with the functionality to meet the requirements described in the 
SOW.  The software elements included are designed for real estate valuation including, cost and comparison 
sales, data maintenance, sales analysis, reporting and query, image display, personal property valuation, and 
income capitalization. This software will be implemented to support the maintenance and enhancement of 
real and personal property records to effectively administer all laws and regulations for Maricopa County 
property owners so that all ad valorem property is fairly and equitably valued. 
Scope of Work Support Documents (Appendix 3)
Part A – Data Migration Assumption and Acceptance Criteria: This document states the beginning data 
migration assumption in terms of quantity and source, and lists the acceptance criteria for the migration effort.  
This document will be replaced by the Data Migration Plan produced as part of the Data Migration efforts.
Part B – Report Assumptions: the County expects that certain read-only data will be provided for County 
use in reporting as part of this SOW, with a defined set to be available at the Go-Live Date.  This work may 
be accomplished as part of the project tasking.  County and Contractor will review and refine the list provided 
in the attachment and will determine respective responsibilities for any effort that is needed.
Part C – Integration Assumptions:  The County expects that a number of third-party software applications 
will be integrated with the System.  This attachment lists the initial integration assumptions, and provides an 
initial, limited definition of the integration.
Part D – Milestone/Deliverable Acceptance Form: This template functions as the formal sign-off 
mechanism for individual Deliverables as identified in this SOW.  
Part E – Change Order Request Form: This template documents any measurable change in scope which 
results in a change in to the Contract.   This documentation process ensures complete communication 
between the County and Contractor and may be used to reduce or increase the scope of a given Deliverable, 
Task, or System component.

13129-1-RFP
1.
Project Management and Deliverables
This section outlines project roles, general responsibilities and deliverables for both Contractor and County. 
1.1. Project Roles
1.1.1. Primary Contractor Stakeholders and Project Resources
Contractor will appoint a team of staff members for the duration of the project.  At a minimum, the 
Contractor project team is composed of the following positions and responsibilities:
Role
Responsibilities
Contractor Project 
Sponsor

Support Contractor financial and resource commitments

Included on the Contractor change board for all cost and scope changes
Contractor PM

Coordinates all project activities for all Contractor project staff

Works in close collaboration with County project management and 
County staff

Has overall responsibility for the execution of all Contractor tasking

Has primary responsibility for project management activities as defined 
in the Project Management section of this document
Contractor Technical 
Services

Makes recommendations on system architecture – servers and 
subsystems

Assists in the resolution of technical networking and infrastructure 
system issues

Responsible for developing architecture items

Responsible for application development

Determines any needed 3rd party tools

Responsible for application integration

Programs the migration scripts and code to transfer all pertinent 
information from legacy systems to the System’s database

Leads/assists in all data migration tasking

Verifies converted data and prepares database for data validation
Business Analyst

Conducts Contractor tasking related to requirements and System Use 
Cases (SUCs)

Assists with data migration tasks

Assists with all testing tasks

Supports all training and implementation support tasks
Other Contractor 
Resources

Resources from other areas, including software engineering and product 
management, will be allocated to this project; however, they will not be 
visible participants on the project team.
1.1.2. If the parties agree to share the cost of additional resources for temporary tasks, then County shall be the 
contracting party to acquire the resource. Contractor shall reduce total contract value by the agreed 
proportional share of the cost for said resources.
1.1.3. Primary County Stakeholders and Project Resources
The County will appoint a team of staff members for the duration of the project.  The project team is 
composed of the following positions and responsibilities:

13129-1-RFP
Role
Responsibilities
County Project 
Sponsor

Overall project owner and champion
Executive Steering 
Committee

Advisory group comprising the major customers of the Office of the 
Assessor plus the County Office of Enterprise Technology
Policy Team

Primary decision making body

Approves any changes to plan, scope, or timeline 

Works with project manager to resolve project issues

Evaluate project and System-related alternatives which have potential 
impact on County and business operations.  

Empowered to make policy decisions on behalf of Assessor’s Office

Escalates issues to other County departments as appropriate (eg. 
interface definition or alignment of business rules)
County Project 
Manager

Review and approve all project deliverables

Provide overall project oversight and coordinate with business offices

Expedite business and functional decision-making to ensure technical 
development progress and completion

Escalate issues to Steering Committee when necessary

Report on project status to key groups and individuals (Sponsor, 
Steering Committee, etc.)

Measure the performance of the project
Project Team

Complete individual tasks required to deliver the project

Participate in analysis, requirement gathering, & preparation of 
specifications

Provide business expertise regarding processes and system design

Identify reporting requirements

Identify security/ access requirements

Identify and define improvement opportunities

Facilitate data cleansing and migration to the System load tables

Identify department-specific requirements 

Provide testing support
1.1.4. Assumptions
It is assumed that:
1.
County and Contractor will reasonably make resources available to assist with all project 
activities. The County will make County project team members available for meetings, 
discussions and conference calls upon request by Contractor.  Contractor will identify when 
information is needed and the County’s PM will confirm the availability of County resources to 
meet that timeframe or negotiate an alternative timeframe, to minimize delays in the project.
2.
All Onsite visits will be coordinated between the County and Contractor PMs.
3.
County and Contractor, when appropriate, shall consider alternative meeting options to Onsite 
visits, subject to approval, such as web meetings, remote desktop and conference calls.  Making 
use of this technology will help in reducing travel costs.

13129-1-RFP
4.
An adequate number of qualified staff with the appropriate skills and experience will be 
furnished by Contractor and the County for each meeting, analytical session, or other review 
activity, whether Onsite or Remote.
5.
The County will provide an adequate workspace for each Onsite Contractor consultant, with 
access to a desktop workstation, network, telephone and close proximity to the County project 
team.  Adequate breakout and conference space will also be provided.
6.
All software, data, and other project Issues or Defects found—whether by Contractor or the 
County—will be logged into a shared collaboration tool.  Tracking reports will be made available 
to the County and will record the Defect or Issue, resolution (and proposed resolutions, if 
desired), and acceptance by County staff.  
1.1.5. General Management
1.1.5.1. Collaboration Tool
A shared collaboration tool shall be provided by Contractor for the purposes of staging all project 
documents, posting project plans, managing issues, tracking changes, and to be used as needed to 
communicate and manage all tasking within this SOW.  Large Deliverables, such as migrated data, 
software, and the like, will be delivered using other mutually acceptable means.  The web site shall be 
secured and accessible by anyone with proper security credentials.
1.1.5.2. Issue Management
The Issue Management process ensures that each Issue identified within the project environment is 
documented, prioritized and resolved within an appropriate timeframe.
-
Issue Identification: Once the Contractor PM or the County PM identifies an Issue, according to 
the description above, the Issue will be tracked in the shared collaboration tool.
-
Issue Review: Issues will be reviewed by the PMs and project staff in status meetings and a 
course of action and an owner will be determined for each Issue.  
-
Implement Issue actions through completion: The Issue is tracked through resolution and closed 
when complete.
1.1.5.3. Communication Management Plan
The following strategies have been established to promote effective communication within and about this 
project.  
-
Project Management Meetings
Ad-hoc or regularly scheduled meetings will be hosted by Contractor via web conferencing, 
Onsite, or as a teleconference, as shown below.  In general, Contractor will be responsible for 
producing agendas and documenting the results of the meetings shown below.  Both PMs shall 
have the responsibility to schedule and communicate with their respective teams, and provide the 
necessary support materials.
Meeting Type
Purpose
Attendees
Frequency
Results
Weekly 
Planning & 
Status
Communicate project status, 
resolve issues, assign 
resources, and plan project 
activities.
PMs and others as 
needed
Weekly-web
Minutes will be recorded 
and posted to the shared 
collaboration tool

13129-1-RFP
Meeting Type
Purpose
Attendees
Frequency
Results
Quarterly 
Meeting on 
Enhancements 
– Post 
implementation
Contractor must share 
outline of any proposed 
Enhancements or other 
functionality changes prior 
to meeting, explaining 
impacts to County and 
timeline.  Meeting is to 
discuss details of proposed 
change, deployment 
windows, any issues, and 
testing.  
PMs and others as 
needed
Quarterly – 
web
Minutes will be recorded 
and posted to the shared 
collaboration tool.
Executive
Steering 
Committee 
Provide high level project 
tasking status; budget status; 
and communicate the six-
month tasking plan.
Executive Steering 
Committee, 
Contractor Sponsor, 
PMs, County 
Procurement Officer
Quarterly-
Onsite
Minutes will be recorded 
and posted to the shared 
collaboration tool 
Sponsors
Confidential meeting to 
address major project 
threats; personnel issues, 
budget status, and other 
senior management level 
discussions as needed.
Contractor & 
County Sponsors, 
PMs, County 
Procurement 
Officer, Policy 
Team as needed 
Ad hoc (as 
required)
Minutes will be recorded by 
the County PM, and 
retained for exclusive use 
by the Sponsors
Policy Team
Resolve business policy 
issues; communicate status; 
provide business guidance 
on near term project tasking 
County Policy Team
Monthly-
Onsite.  More 
frequently as 
needed.
Minutes will be recorded by 
the County PM and posted 
to the shared collaboration 
tool 
Ad hoc Issue
Resolve detailed issues, 
provide updates on Defects, 
notify County of any 
outages and System restoral 
times, produce Deliverables, 
and communicate as needed 
to support project tasking
Team leads, PMs, 
SMEs, and others as 
needed
Ad hoc
Results shall be 
communicated to the PMs 
by a designated participant.  
If a PM is present, the PM 
shall prepare the results.
-
Status reports
The Contractor PM will provide a written detailed status report at the end of every second Sprint 
through ECD-13 and at the
 midpoint and delivery dates for each Deliverable thereafter 
including at a minimum:

Tasks worked on during this period indicating status against latest approved schedule

Tasks planned to be worked on during upcoming sprints

Open issue and risk summary

Change orders

Project Metrics (as agreed upon by both parties)

Other comments
A single electronic copy of each status report will be made available in the shared collaboration 
tool. 
1.1.5.4. In addition to the above, during the Contract Term, Contractor shall provide status reports  
quarterly and more frequently if needed, to notify the County of all planned System outages, 
estimated System restoration times, deployment windows for Defect Fixes, and the scope and 
planned deployment dates of Enhancements, Features, and Upgrades as initiated by or on behalf

13129-1-RFP
of Contractor.  County must receive adequate notice of any new functionality or changes in 
functionality with adequate time for appropriate testing and training. 
1.1.5.5.  Risk Management
Contractor and the County acknowledge that risks exist and may impose a negative impact on the project 
in scope, cost or time.  We agree as a team to address each risk in advance if we are able, or otherwise to 
come together in mutual agreement and collaboration to deal with each situation as it arises.  The Risk 
Register will be posted on the shared collaboration tool with updates provided to County at status 
meetings.  At a minimum, the Risk Register will capture the following:

Date identified

Internal vs. External Risk

Author (person reporting risk)

Description of risk and its potential impact upon the project

Likelihood (high, medium, low)

Severity (high, medium, low)

Description of mitigation approach

Status (open, closed)
1.1.5.6. Defect Tracking
Defect identification, documentation, and resolution is an inherent component of solution testing. The 
following represents the approach for managing, evaluating, and prioritizing these Defects.  
Defects will be tracked using a shared collaboration tool.  At a minimum the following parameters will 
be captured for each Defect logged.

Defect ID

Severity (see levels below)

Author (person reporting the Defect)

Date Identified

Owner

Resolution Date

Resolved By

Status (open, closed)
Severity Levels: Severity represents the impact of the Defect on the system and associated business 
processes.  The definitions for each severity level are described in either section  1.5 ACCEPTANCE or 
the Software Subscription Agreement set forth at Exhibit C as applicable.
1.1.5.7. Project Closure
1.
Administrative closure procedure
This process includes updating Contract records to reflect final results, and archiving that information 
for future use.  
Contractor PM

Gather documentation (both paper and electronic) including, but not limited to, change orders, 
sign-off documents, meeting notes, timelines and lessons learned.

Organize and store documentation according to internal processes.

13129-1-RFP

Supply any necessary copies of documentation to customer.

Support customer’s administrative closure procedures.
County PM

Perform administrative closure procedures as dictated by their office.

Support Contractor’s administrative closure procedures.
2.
Contract closure procedure
This process includes activities needed to settle and close any Contract agreements as well as ensure 
all work is completed correctly and satisfactorily as per the Contract.
Contractor PM

Send documentation to customer outlining completion of contracted products and services 
including related change orders.

Notify customer of outstanding payments.

Notify Contractor Accounting department to invoice for final payment.

Hold internal hand-off meeting with Contractor Customer Service department.

Hold meeting to introduce Contractor Account Manager to customer team.

Hold lessons learned meeting with customer.
County PM

Perform Contract closure procedures as dictated by their office.

Support Contractor’s Contract closure procedures.

Support prompt payment of outstanding and final invoices.
1.1.5.8. Fixing Defects
Upon receiving notice of a Defect, the Contractor shall to the extent applicable based on the nature of the 
Defect follow the procedure in either 1.5 ACCEPTANCE or the Software Subscription Agreement set 
forth at Exhibit C and provide a response to the County within a reasonable amount of time regarding the 
Contractor’s plan of how to resolve the Defect.  Then the Contractor will provide to the County a Fix in 
accordance with that plan at which time the County will verify whether that the Fix has been made.  
Upon such verification the Defect will be considered resolved. 
1.2. General Responsibilities, Contractor and County
1.2.1. Contractor Responsibilities
The list below describes Contractor’s responsibilities that may not be listed elsewhere in this SOW, 
during the implementation of this project.  
(1) The Contractor PM will be the primary point of contact for Contractor staff, as specified in this 
SOW.
(2) Contractor will have responsibility for Contractor’s project tasks outlined in this SOW.  
Contractual and administrative communications will flow through the County PM and the 
Contractor PM.  The Contractor PM will coordinate Contractor’s software configuration, software 
and integration development, testing and integration tasks, and will manage Contractor’s day-to-
day technical activities related to implementation of the System.
(3) The County calendar shall dictate the observed holidays. All direct communication between 
Contractor and the County personnel will be copied to the Contractor PM and the County PM and 
staff, as agreed upon.
(4) Identify logistics needs for Onsite meetings to the County (conference room, projector, access to 
System, etc.).

13129-1-RFP
(5) Ensure Contractor communicates the desired County attendees for invitation in advance, and that 
Contractor is present, for all applicable meetings.
(6) Provide an adequate number of copies of agendas, handouts and presentation handouts for any 
meeting that Contractor is leading (Onsite or Remote).   If the meeting is to be conducted 
remotely, then only one electronic copy of any materials needs to be delivered, and copies will be 
made at County facilities as needed.  Electronic files may be used in lieu of printed material.  
(7) Create, review, and update all documents within the timeframe specified in the review process for 
all draft documents.
(8) Contractor will provide to the County, thirty (30) days in advance of desired production 
deployment date (no later than July 1, 2022), all updated technical specifications and requirements 
related to infrastructure and cloud subscription parameters and the Database Management 
Software (DBMS), and communication line requirements as mutually agreed by the parties. 
Mutually agreeable notice will be provided for all other deployment dates.
1.2.2. County Responsibilities
The list below describes County’s responsibilities that may not be listed elsewhere in this SOW, during 
the implementation of this project.   
1.
Make arrangements to satisfy Contractor’s requested logistics of all the Onsite meetings 
(conference room, projector, access to System, etc.).
2.
Ensure browser and internet access specifications match the service release version, per 
Contractor’s requirement, and are installed properly and configured prior to production 
deployment of any Contractor software Deliverables.
3.
Provide Remote access to the approved Contractor team members, consistent with County policy 
and where County agrees in advance to provide such connectivity.
4.
Review and provide feedback on all draft documents; in general, the County should attempt to 
provide feedback within five (5) Business Days of receiving the documents.
5.
Provide office space and an internet connection for Contractor team members.
6.
Provide County Business Calendar to Contractor.
7.
Ensure County attendees are invited in advance and are present, or accounted for via a suitable 
replacement if necessary, for all applicable meetings.
8.
Provide resources at the start of an Onsite visit by Contractor team for the installation of software 
needed for the visit.   Contractor will identify resources needed and schedule all Onsite visits in 
advance.
9.
Provide adequate departmental resources to support the project timeline while taking into 
consideration daily and periodic departmental work requirements.
10. Provide adequate facilities and equipment for training. 
11. The County shall have responsibility for overall County project management and will direct all 
County resources.  
12. All direct communication between the County and Contractor personnel will be copied to the 
Contractor PM and the County PM and staff, as agreed upon.
1.3. Review of Contractor Deliverables
In general, all Contractor Deliverables shall be made ready after all related tasking is completed, and Contractor 
has communicated to the County, via email or paper correspondence, that the Deliverable is ready for review and 
Acceptance.  Once notified, the County shall take all reasonable means to review the Deliverable in accordance 
with the criteria listed and timeframes in this SOW.  
1.3.1. Review Periods (unless otherwise noted):

13129-1-RFP
Standard: For Deliverables designated as “Standard”, the default review period will be five (5) County 
Business Days.
Release Package: For Deliverables designated as “Release Package”, the default Release Testing Period 
will be ten (10) County Business Days. The parties will jointly determine the appropriate duration.
Exceptions: If a review period has not been identified for a Deliverable, the parties will jointly determine 
the appropriate duration at the time of delivery to the County.  
1.3.2. Deliverable Review Process:
Both parties will adhere to the following steps for Deliverable review and Acceptance:
1.
Contractor completes the Deliverable and provides it, in the specified format, to the County PM 
with the Deliverable ID and description in the email subject line.  If the Deliverable is such that it 
cannot be delivered via email, an email will be sent as described, indicating the mode of delivery.
2.
Unless otherwise specified and agreed upon by both parties, the review period for all Deliverables 
is indicated in the Deliverable List.  The review period begins the next Business Day following 
receipt of the Deliverable.
3.
For certain activity-based Deliverables (testing, training, analysis workshops), the Deliverable 
cannot be considered submitted by Contractor until all related activities have concluded.  The 
parties may decide to split these activities by subject area (or other segment) in order to submit the 
Deliverable for review
4.
The County will use all reasonable efforts to review the Deliverables within the default review 
period, and assess the Deliverables to determine whether they conform in all material respects to 
the specifications (a walk-through can be requested to facilitate this).  The County will inform 
Contractor in writing if this deadline will not be met and provide a new date.
5.
In the event that the Deliverables are incomplete, unclear or deficient, the County will provide a 
detailed list in writing of the deficiencies and concerns.
6.
Contractor will use all its reasonable efforts to provide a response resolving the deficiencies and/ 
or concerns within the default review period, starting with receipt of County’s written response.  
Contractor will inform the County in writing if this deadline will not be met and provide a new 
date.
7.
County and Contractor may, by mutual written agreement, extend the review periods.  However, 
all attempts should be made to adhere to the default review duration so that the overall project can 
remain on schedule.  Failure to do this could result in a change order affecting schedule, cost and 
scope. 
8.
Contractor will provide Deliverables to County in accordance with the Contractor Deliverables 
List.
9.
In the event that the County does not provide written notification of its rejection or acceptance of a 
Deliverable within the agreed-upon review period, such Deliverable shall be deemed to be 
accepted by the County unless an extension is requested of, and accepted by, Contractor.
10. The County shall not unreasonably withhold its acceptance of Deliverables and will respect 
Contractor’s expectation to be compensated as defined in the Price Agreement (Exhibit B) for the 
satisfactory completion of Deliverables. 
11. Contractor’s performance of certain Deliverables under the SOW may be dependent in part on 
County’s actions. Any dates or time periods relevant to the performance of such dependent 
Deliverables by Contractor shall be appropriately extended to account for any delays caused or 
occasioned by County.
1.3.3. Contractor Deliverables List

13129-1-RFP
ID
Description
Type
ECD-01
R-00: Cloud service & Test Data migration
Standard
ECD-02
Architectural Review & Design Workshop
Standard
ECD-02
Project Planning, Functional Requirement & Use Case 
Workshop
Standard
ECD-02
R-01 Release Package
Release Package
ECD-03
Project Charter
Standard
ECD-03
Project Schedule (Initial Plan)
Standard
ECD-03
R-02 Release Package
Release Package
ECD-04
System Use Cases for Backlog
Standard
ECD-04
Data Migration Plan (Initial Plan)
Standard
ECD-04
Development Plan (Initial Plan)
Standard
ECD-04
Testing Plan (Initial Plan)
Standard 
ECD-04
R-03 Release Package
Release Package
ECD-05
Project Schedule (Baseline Plan)
Standard
ECD-05
Training Plan (Initial Plan)
Standard
ECD-05
Data Migration Plan (Living Plan)
Standard
ECD-05
Development Plan (Living Plan)
Standard
ECD-05
Testing Plan (Living Plan)
Standard
ECD-05
R-04 Release Package
Release Package
ECD-06
R-05 Release Package
Release Package
ECD-07
R-06 Release Package
Release Package
ECD-08
R-07 Release Package
Release Package
ECD-09
R-08 Release Package
Release Package
ECD-10
R-09 Release Package
Release Package
ECD-11
R-10 Release Package
Release Package
ECD-12
R-11 Release Package
Release Package
ECD-13
R-12 Release Package
Release Package
ECD-14
R-13 Release Package
Release Package
ECD-15
First Full Set Data Migration
Standard
ECD-15
R-14 Release Package
Release Package
ECD-16
Go-live Plan (Complete first draft)
Standard
ECD-16
Training Database Staging and Restoration Plan
Standard
ECD-16
R-15 Release Package
Release Package

13129-1-RFP
ECD-17
R-16 Release Package
Release Package
ECD-18
R-17 Release Package
Release Package
ECD-19
R-19 Release Package
Release Package
ECD-20
R-20 Release Package
Release Package
ECD-20
Training database set-up (based on Staging and 
Restoration Plan)
Standard
ECD-21
R-21 Release Package
Release Package
ECD-22
R-22 Release Package
Release Package
ECD-23
R-23 Release Package
Release Package
ECD-24
R-24 Release Package
Release Package
ECD-24
Go-Live Plan (Final)
Standard
ECD-25
R-25 Release Package
Release Package
ECD-26
UAT Scripts loaded into Target Process
Standard
ECD-26
User Acceptance Testing Complete
Standard
ECD-26
Full Set Data Migration with delivery of Production Ready 
System (All Data, All Years, as specified)
Standard
ECD-26
Production Ready System
Exceptions; parties agree to 21-
day Final UAT period
Retainage Payout 1 (50%) – Delivery of Production Ready 
System and Deployment to Production Environment (on or 
about August 1, 2022)
Exceptions
ECD-26
Full Set Data Migration before Go-Live Date (All Data, 
All Years, as specified)
Standard
  
Retainage Payout 2 (25%) – Go-Live Date (October 3, 
2022)**
Exceptions
ECD-26
Final Project Services Audit Report
Standard
ECD-26
Remediation of Defects according to Transition Plan
Standard
Retainage Payout 3 (10%) – County Generates 2022 Tax 
Bill Assessment Roll Report from System; Report 
Approved by Treasurer (October 2022)**
Exceptions
Retainage Payout 4 (15%) – Validation of 2023 Values 
(November 2022)**
Exceptions
ECD-27
R-26 Release Package 
Release Package
ECD-28
R-27 Release Package (First Post Go-Live Release)
Release Package
ECD-29*
R-28 Release Package (Second Post Go-Live Release)
Release Package
*Note: ECD-29 may be delivered by Contractor over multiple deployment dates no earlier than January 1, 2023 and 
no later than December 31, 2023.
**Note: The month indicated as the target date for each retainage payout identified in the table above reflects County 
planned dates for completion of the NOV or report.  The date is included here to reflect the anticipated retainage 
payout timing to Contractor, for planning purposes.

13129-1-RFP
2.
Project Planning
This section describes activities to initiate, plan and manage the project.
2.1. Project Preparation
2.1.1. Contractor Activities
2.1.1.1. Upon execution of the Contract between the County and Contractor, the Contractor team will 
initiate the project and start preparation and mobilization of its resources in accordance with the 
requirements defined in this SOW.  
2.1.1.2. Conduct onsite project design and planning workshops with County project resources.
2.1.2. County Activities
2.1.2.1. Support planning and meeting preparation activities.
2.1.2.2. Provide meeting room facilities and appropriate resources to ensure participation.
2.1.3. Contractor Deliverables
2.1.3.1. ECD-02 Architectural Review & Design Workshop
2.1.3.2. ECD-02 Project Planning, Functional Requirement & Use Case Workshop
2.1.4. Acceptance Criteria for Contractor Deliverables
2.1.4.1. Meeting materials conform to reasonable business standards and include the topics agreed upon 
by the County and Contractor.
2.1.4.2. Schedules accommodate County priorities and needs.
2.1.4.3. Workshops are conducted onsite during specified days.
2.2. Review/Revise Project Schedule  
This Task describes the effort needed to conduct the first detailed planning session post Contract signing.  All 
Tasks, resource needs, facilities and logistics, etc., should be addressed.
2.2.1. Contractor Activities
2.2.1.1. Prepare a detailed project timeline that will identify each specific Deliverable, as well as 
supporting Tasks, as necessary for effective project scheduling and control.  The timeline will 
provide the estimated duration of each Task, dependencies, and the type and level of 
participation of Contractor and County staff necessary to achieve the plan objectives.
2.2.1.2. Perform the following:
2.2.1.1.1. Conduct project planning session(s) with County project management, as needed, to 
reach agreement.
2.2.1.1.2. Develop the project timeline, as described above.  
2.2.1.1.3. Compile the Project Charter from the agreed-upon detailed project timeline, governance 
roles and protocols, and project goals.  The Charter is a summary suitable for a lay 
audience.
2.2.2. County Activities
2.2.2.1. Participate in project planning meetings.
2.2.2.2. Review and assist with development of documentation.  All changes to the approved Project 
Charter and timeline will be handled through a formal change management process.
2.2.2.3. Inform Contractor of applicable County technical standards and preferred practices.

13129-1-RFP
2.2.3. Contractor Deliverables
2.2.3.1. ECD-03 Project Charter
2.2.3.2. ECD-03 Project Schedule (Initial Plan)
2.2.3.3. ECD-05 Project Schedule (Baseline Plan)
2.2.4. Acceptance Criteria for Contractor Deliverables
2.2.4.1. Project Charter provides detailed project timeline, governance roles and protocols, and project 
goals.
2.2.4.2. Initial Project timeline is consistent with Price Agreement (Exhibit B).

13129-1-RFP
3.
Cloud Specifications & Software Deployment 
Activities in this section represent architecture and software deployment tasks that are performed during the project, 
subject to project planning.
3.1. Confirm the Recommended Browser Specifications
3.1.1. Contractor Activities
3.1.1.1. Work with ITD to confirm the browser requirements needed to support the County’s 
development, training, projected operational activity and projected growth plans.
3.1.2. County Activities
3.1.2.1. Collaborate with Contractor and exchange information to assist in arriving at an agreed browser 
specification. 
3.1.2.2. Ensure Contractor browser recommendations are in compliance with published County 
standards.
3.2. Test and Validate Server, OS, Database and Software
Cloud services are used for application servers, operating system software, database management software, and 
all related components to prepare for development, testing, training and an eventual production environment.
3.2.1. Contractor Activities
3.2.1.1. Configure servers, operating systems, and database management software.
3.2.1.2. Provide and verify multiple environments to support development, testing and training, such as:

Development Future State Testing Environment

Current State Testing Environment

Training Environment(s)

Staging Environment
3.2.2. Production Environment County Activities
3.2.2.1. Answer questions and assist in solving access issues which may arise.
3.3. Cloud Hosting Costs
On November 18, 2020 or on the execution of Project Change Request 05, whichever is earlier, the Cloud 
hosting costs will be transferred to the County and billed quarterly by Contractor as pass-through costs without 
markup.  Beginning January 1, 2024, Contractor will be responsible for Cloud hosting and providing all support 
related to Azure infrastructure. Contractor will invoice County for Cloud hosting costs at annual fixed price, as 
set forth in the Price Agreement and Rate Card in Exhibit B.   This cost includes all of Contractor’s 
administrative costs and hosting of three System environments (Production, Testing, and Train) as well as the 
reporting database for reporting and website. County will be given the option to request Premium Azure level at 
an additional cost as identified in Exhibit B.  Contractor will provide County with all information regarding 
performance minimums available at Premium level, upon request.  
Contractor will ensure Azure hosting utilizes geo-redundant backup storage with point-in-time data restoration 
for at least three weeks, and long-term retention of at least one year.  All software updates and Enhancements 
must be tested by Contractor prior to release and deployed to testing environment for County to test, validate, and 
elect whether to deploy to System. Contractor will continue to use IP whitelisting and Azure-based 
security/monitoring to secure System from external hacks or attempts at same.  Contractor will implement Azure 
front door with web application firewall and private endpoints to further secure multi-tenant environments on 
going-forward basis, or other Microsoft approved Azure security measures.

13129-1-RFP
4.
Design
Design involves the identification and analysis of development necessary to meet the County requirements.  The 
design analysis and associated documents will be completed for each of the Functional Areas, including Integration 
and reporting requirements described within this SOW.
System Use Cases will be developed in for a given topical area. It is expected that some System Use Cases will 
require more effort than others, and several System Use Cases may be in development at any given point in time. 
The process of developing the System Use Cases follows an iterative, draft/review cycle with multiple reviews of 
each document possible by the County. 
Contractor is responsible for writing System Use Cases for each functional area.  The final set of approved System 
Use Cases will represent the approved requirements and design for the System to be developed by Contractor.
4.1. Create System Use Cases
This Task addresses the need to identify exact requirements for ultimate use in creating a development 
specification.
System Use Cases are required for development planning, specifically for Release planning. The System Use 
Cases are comprised of:
-
Swimlane Workflow Diagrams
-
Business Rules
-
Data Dictionary
The approach for completing the System Use Cases is to: start with current state Business Use Cases; transcribe 
into Swimlane Workflow Diagrams; and review iteratively with the County to capture future state workflow, 
business rules and data dictionary within the scope of the project requirements.
4.1.1. Contractor Activities
4.1.1.1. Schedule and prepare for a series of workshops to completely analyze all potential development 
activity, and design specific System requirements.
4.1.1.2. Conduct workshops necessary to analyze and produce System Use Cases that address all 
functional areas, integrations, and reports.
4.1.1.3. Maintain listing of all System Use Cases and their status on the shared collaboration tool.
4.1.1.4. Include in each System Use Case the topical areas shown below (note that each area below may 
not be applicable in every System Use Case):

Business or task description

Business Rules

Scenarios (specific variations of the process or task that the System Use Case must 
consider)

User roles involved (Actors)

Triggers

Preconditions

Process statement or process flow

Post conditions

Data, user-interface, security, and business layer elements needed to include any 
workflow, validation, audit, and domain values

Data or other system integration requirements

Data migration impacts, if known

For Integrations, include frequency, and the direction of data flow and transformation

For reports, include a layout diagram

13129-1-RFP
4.1.1.5. Present draft System Use Cases to County for review
4.1.1.6. Update System Use Cases as required during the review process.
4.2. Create a Development Plan  
4.2.1.1. The purpose of the Development Plan is to show how all development work will be 
accomplished. A project schedule with sequence, dependencies, and approximate durations to 
be included in the Development Plan. 
4.2.1.2. Note that some details in this plan may change as the project progresses, and that additional facts 
may become evident.  
4.2.1.3. If during the course of Development, the changes to the Development Plan appear to be too great 
(as mutually agreed upon by Contractor and the County), then Contractor shall revise the 
Development Plan and redeliver it for Acceptance by the County.
4.2.2
County Activities
4.2.2.1
Prepare and provide sample data and documents which will add value to the analysis workshops 
regarding County requirements.
4.2.2.2
Participate in all workshops sessions as needed.
4.2.2.3
Provide County policy and procedures as requested by Contractor.
4.2.2.4
Conduct reviews and provide feedback on each System Use Case.
4.2.2.5
Provide additional information and detail as requested and available.
4.2.2.6
Conduct final approval review.
4.2.3 Contractor Deliverables
4.2.3.1
ECD-04 System Use Cases for Backlog
4.2.3.2
ECD-04 Development Plan (Initial Plan)
4.2.3.3
ECD-05 Development Plan (Living Plan)
4.2.4 Acceptance Criteria for Contractor Deliverable
4.2.4.1
System Use Cases comply with the requirements of this SOW.
4.2.4.2
Initial Development Plan details functionality planned in each Release with backlog covering 
requirements in prioritized System Use Cases.
4.2.4.3
Living Development Plan details functionality planned in each Release with backlog covering 
requirements in all signed-off System Use Cases for backlog.

13129-1-RFP
5.0 Data Migration
Data migration describes activities performed to migrate/convert data from the County’s legacy applications to the 
System.  
The data migration will be performed iteratively throughout each release, with a data migration summary provided 
in each release package, as specified in section 6.1 below. It is expected that Contractor and the County will 
collaboratively perform visual and programmatic inspections of the data as appropriate for each release.
Testing shall be conducted per the Data Migration Plan.  Testing concepts will include balance totals, visual 
sampling, and both manual and programmatic inspection of data.  
Acceptance of the final migration iteration will be contingent upon balancing.  The County describes its balancing 
expectations in Appendix 3, Part A: Data Migration Assumption and Acceptance Criteria.  Contractor and the 
County will collaborate to identify the instruments required to test balances.  Roles for the balancing activities will 
be fully described in the Data Migration Plan; however, it is assumed that the County will perform the data 
validation, with appropriate support and expertise provided by Contractor.  
As with other project deliverables, review and Acceptance are expected to be completed within a timeframe agreed 
upon by both parties.  There will be sufficient time allotted to ensure that the County can perform data validation, 
and that the results are adequate to proceed.
5.1 Create Data Migration Plan
Contractor, in a collaborative effort with the County, will facilitate the analysis necessary to develop a Data 
Migration Plan.  The Data Migration Plan will be version controlled and updated whenever significant changes 
have been made.
5.1.1 Contractor Activities
5.1.1.1
Conduct an initial data migration planning Workshop between the Contractor conversion 
specialists and the County’s staff.
5.1.1.2
Create the draft Data Migration Plan; the plan includes the management of the following:
-
Request inventory of data sources, including domain tables
-
Confirmation and review of historical data scope
-
Data mapping from all authoritative sources
-
Data conversion coding requirements
-
Table loading sequence
-
Data migration testing (balancing, sampling, etc.)
-
County and Contractor data migration roles and responsibilities
-
Iteration process per this SOW
-
Sign-offs at pre-defined steps  
5.1.1.3
Collaborate with the County to create tests/validations that can be used to manually inspect the 
data, or can be implemented as code or scripts.  Tests/validations should support balancing 
activities necessary to validate the standards described in Appendix 3, Part A: Data Migration 
Assumption and Acceptance Criteria.  
5.1.1.4
Deliver a draft Data Migration Plan.
5.1.1.5
Conduct a Data Migration Plan review meeting with the County to receive feedback.
5.1.1.6
Make edits to the Data Migration Plan.
5.1.1.7
Deliver the final Data Migration Plan.
5.1.2 County Activities
5.1.2.1
Attend data migration planning sessions.

13129-1-RFP
5.1.2.2
Collaborate with Contractor to create tests/validations that can be used to manually inspect the 
data,or can be implemented as code or scripts.  Tests/validations should support balancing 
activities necessary to validate the standards described in Appendix 3, Part A: Data Migration 
Assumption and Acceptance Criteria.
5.1.2.3
Review and provide feedback on the draft Data Migration Plan.
5.1.2.4
Approve the final Data Migration Plan.
5.1.3 Contractor Deliverables
5.1.3.1
ECD-04 Data Migration Plan (Initial Plan)
5.1.3.2
ECD-05 Data Migration Plan (Living Plan)
5.1.4 Acceptance Criteria for Contractor Deliverables
5.1.4.1
The initial Data Migration Plan includes a preliminary outline of the tasks to be performed and 
how they will be performed.  
5.1.4.2
The final Data Migration Plan meets the requirements of the County, supports the accurate 
migration of all in-scope data, fully documents the data migration process, and is ready for 
signature by the County. 
5.1.4.3
Tests/Validations described in the Data Migration Plan promote balancing to the standards 
described in Appendix 3, Part A: Data Migration Assumptions and Acceptance Criteria.
5.2 Data Migration Preparation and Data Mapping
This Task describes the activities necessary to begin executing the Data Migration Plan, including the 
inventory/acquisition of data, preparation of the test environment, and mapping of source data to appropriate 
locations in the System.  
5.2.1 Contractor Activities
5.2.1.1
Create a data migration meeting schedule that supports the timeline.
5.2.1.2
Assist the County in identification of data sources to include in data migration.
5.2.1.3
Lead data mapping meetings and document mapping decisions.
5.2.1.4
Establish a test environment for review and approval of sample and final data migrations.
5.2.1.5
Produce data maps for each identified data source.
5.2.1.6
Update the Data Migration Plan per migration and data mapping meetings.
5.2.1.7
Ensure data maps have been produced for all data sources determined to be in scope. 
5.2.2 County Activities
5.2.2.1
Attend data migration and data mapping meetings.
5.2.2.2
Procure, receive authority for, and/or obtain data as required to support data migration analysis.
5.2.2.3
Verify access to test environment for review and approval of sample and final data migrations.
5.2.2.4
Review and approve the updated Data Migration Plan, including data maps.
5.2.2.5
Ensure data maps address migration or creation of all data required for full production 
functionality required by the County
5.3 Data Migration Approach
Contractor and the County will focus on the iterative migration of sample data sets representing major account/ 
property ownership and exemption relationships, including, but not limited to, the following:
-
Active/Inactive (retired) properties

13129-1-RFP
-
Redacted owners
-
Partially and totally exempted properties
-
Properties with varied ownerships such as Sole Owner, Tenants in Common, Tenants by Entirety, 
Conto
-
Properties owned by entities such as Corporations, Trusts, Individuals, Public Agencies
-
Properties from each tax authority
-
Properties that have been split/combined/platted
-
Business Personal Property Accounts
-
Mobile Homes (Unsecured)
In order to ensure that an adequate sample is tested, about 5% of the total count of a given property type must 
be included in each release.
During each Release Test Period, validation routines will be used to determine the integrity of the data 
migration.  Contractor and the County will collaborate to identify factors to assess the “cleanliness” of the data 
(e.g., the impact of incorrect data to application functionality, number of accounts affected, etc.).  As issues with 
the migration of the subset are identified, Contractor and the County will determine whether the data should be 
cleansed by the County, or whether it can be addressed via Contractor’s data migration routines.
There will be multiple cycles of extracts, validations, and conversions into the Contractor data models.  Once an 
acceptable level of cleanliness is attained, the County will sign off to indicate that the account type is eligible 
for the full migration routine.  Once sign-offs are collected for all account types, the County will sign off to 
indicate that full migration can commence.
5.3.1 Contractor Activities
5.3.1.1
Assist the County in identifying property types and sample data to be included in prototyping.
5.3.1.2
Receive and inventory the data sent.
5.3.1.3
Populate translation tables.
5.3.1.4
Move data from the load tables to the Contractor application tables.
5.3.1.5
Stage data in the test environment of the System.  Produce data validation reports from the test 
environment correlating with balance reports produced from the legacy system.
5.3.1.6
Submit a detailed request to the County for data clean-up.  The request shall include the following, 
at a minimum:
-
Description of error
-
Data source, field/record name
-
Desired outcome of clean-up
5.3.1.7
Conduct iterative data validations, as required, to accomplish a reliable, repeatable data migration.
5.3.1.8
Document tests/validations in the Data Migration Plan.
5.3.2 County Activities
5.3.2.1
Identify property types and select sample data for prototyping to ensure about 5% of records for 
identified major property types have been processed. 
5.3.2.2
Extract data to the intermediate file format as provided by Contractor (multiple cycles as defined 
by the Data Migration Plan and project timeline). 
5.3.2.3
Correct (if needed) all data clean-up requests submitted by Contractor.  This may require manual 
or programmatic efforts, or may also be collaboratively determined to be more advantageous for 
Contractor to perform.
5.3.2.4
Conduct iterative data validations, as required, to accomplish a reliable, repeatable data migration 
to ensure the quality of the resulting data is sufficient to proceed with full data migration.

13129-1-RFP
5.4 Data Clean-Up
This Task describes the activities needed to clean source data in preparation for insertion into the System.  The 
County will perform the majority of data clean-up with guidance from Contractor.  Contractor and the County 
may collectively determine that select data cleansing would best be performed by Contractor.  If so, a change 
request will be required.  
5.4.1 Contractor Activities
5.4.1.1
Provide guidance to the County during clean-up activities as required to ensure timely and 
accurate results.
5.4.1.2
Conduct programmatic data cleansing (if indicated as being appropriate)
5.4.2 County Activities
5.4.2.1
Scrub the legacy data set subject to migration.
5.4.2.2
Inspect scrubbed data to ensure that cleanliness meets standards defined in the data migration 
plan.
5.5 Data Migration: Iterative with Each Release
Contractor will deliver partial data set migration iterations with each release.  Contractor and the County will 
perform visual and programmatic inspection of the data.
Issues will be identified, documented, and resolved.  For each issue, Contractor and the County will 
collaboratively determine the source and address the problem in a timely manner.  The full migration of all 
accounts should demonstrate that the migration process is adequate for all data subject areas well in advance of 
the date it is required.  
5.5.1 Contractor Activities
5.5.1.1
Receive and inventory data sent by the County.
5.5.1.2
Populate translation tables or Extraction Transformation and Loading process.
5.5.1.3
Move data from the load tables to the Contractor application tables.
5.5.1.4
Stage data in the test environment of the System.  
5.5.1.5
Collaborate with the County to document and resolve programmatic and data cleanliness issues.
5.5.1.6
Conduct iterative data validations, as required, to accomplish a reliable, repeatable data migration.
5.5.1.7
Document tests/validations in the Data Migration Plan.
5.5.1.8
Resolve all identified migration issues.
5.5.2 County Activities
5.5.2.1
Extract data to the intermediate file format as provided by Contractor (multiple cycles as defined 
by the Data Migration Plan and project timeline). 
5.5.2.2
Collaborate with Contractor to document and resolve programmatic and data cleanliness issues.
5.5.2.3
Conduct iterative data validations, as required, to accomplish a reliable, repeatable data migration.
5.6 Data Migration: Full Data Set to support UAT
Contractor will deliver a full migration of data to be used in User Acceptance Testing and for end-user training.  
This iteration must completely represent the anticipated production migration and result in data suitable for 
production as defined in Appendix 3, Part A: Data Migration Assumptions and Acceptance Criteria.

13129-1-RFP
In the event that it is determined that the data is not adequate for User Acceptance Testing (as determined by the 
County), additional cycles may be required.  Note that if the issues are determined to be with the data delivered 
by the County, the County may be responsible for compensating Contractor for additional cycles. 
5.6.1 Contractor Activities
5.6.1.1
Receive and inventory data received from the County.  Sign off to indicate acceptance of pre-
migration balances.
5.6.1.2
Migrate data from the load tables to the Contractor application tables.
5.6.1.3
Conduct data tests/validations to support deliverable acceptance.
5.6.1.4
Collaborate with the County to document and resolve programmatic and data cleanliness issues.
5.6.1.5
Document tests/validations in the Data Migration Plan
5.6.2 County Activities
5.6.2.1
Perform pre-migration balancing.
5.6.2.2
Extract data to the intermediate file format as provided by Contractor (multiple cycles as defined 
by the Data Migration Plan and project timeline). 
5.6.2.3
Conduct data tests/validations to support deliverable acceptance.
5.6.2.4
Collaborate with Contractor to document and resolve programmatic and data cleanliness issues.
5.6.3 Contractor Deliverables
5.6.3.1
ECD-15 First Full Set Data Migration (All Data, All Years as specified)
5.6.4 Acceptance Criteria for Contractor Deliverables
5.6.4.1
Successful migration of full County data set.
5.6.4.2
All identified migration issues have been resolved.
5.6.4.3
Data is suitable for production as defined in Appendix 3, Part A: Data Migration Assumption and 
Acceptance Criteria. 
5.7 Data Migration: Full Data Set to support Go-Live Data Migration Planning
This Task describes the data migration planning required to support Go-Live planning.  This Task may be 
performed in conjunction with or as part of the task to Develop Go-Live Plan.
5.7.1 Contractor Activities
5.7.1.1
Update the Data Migration Plan with Go-Live elements to include failover and recovery testing 
elements at least one (1) month in advance of Final Full Data Set Migration.  
5.7.1.1.1The plan should include all required duties by both Contractor and County resources and 
include step-by-step procedures with estimated durations where appropriate.
5.7.1.1.2Activities should be reasonable and achievable.
5.7.2 County Activities
5.7.2.1
Collaborate with Contractor in Go-Live migration planning.
5.7.2.2
Review and acceptance of updated Data Migration Plan.
5.8 Data Migration: Final Full Data Set Migration
This Task describes the final steps and preparations needed for Go-Live, including any final data clean-up 
activities and incorporation of changes in legacy data, up until the production cutover.  This Final Full Data 
Set Migration shall be completed by Contractor upon the County providing a final data set to Contractor.  If 
the County fails to provide the final data or there are data cleansing errors that need to be fixed by the

13129-1-RFP
County, any delay in delivery of the data to the Contractor by September 1, 2022 will adjust subsequent 
deliverable dates accordingly. 
5.8.1 Contractor Activities
5.8.1.1
Download final data extraction.
5.8.1.2
Inventory final data extraction against agreed-to structure and sign off to indicate acceptance of 
pre-migration balances.
5.8.1.3
Run data through data migration program.
5.8.1.4
Conduct data tests/validations to support Final Acceptance.
5.8.1.5
Transfer final migration database.
5.8.1.6
Provide an exceptions log.
5.8.2 County Activities
5.8.2.1
Perform pre-migration balancing.
5.8.2.2
Provide final data migration extraction for tax years 2021 and prior no later than August 1, 2022; 
provide final data migration extraction for tax years 2022, 2023, and 2024 no later than September 
1, 2022.
5.8.2.3
Set legacy system in view-only mode for data verification purposes.
5.8.2.4
Conduct data tests/validations to support Final Acceptance including balancing activities to 
demonstrate that the data meets the standards established in Appendix 3, Part A: Data Migration 
Assumptions and Acceptance Criteria.
5.8.2.5
Review the exceptions log.
5.8.3 Contractor Deliverables
5.8.3.1
ECD-26 Final Full Set Data Migration (All Data, All Years as specified) to be started by 
Contractor on or before September 1, 2022 and completed no later than September 23, 2022.
5.8.4 Acceptance Criteria for Contractor Deliverables
5.8.4.1
Contractor has completed the migration of the data provided in the final data extract according to 
the Data Migration Plan (including the designated sign-off documents), and Appendix 3, Part A: 
Data Migration Assumptions and Acceptance Criteria.

13129-1-RFP
6.0 Development
Project approach utilizes elements of Agile methodology to deliver scope within the defined project timeline. 
Functionality within scope, supporting documentation, data migration, scripts for testing by the project team, and 
training for the project team will be delivered with each Release throughout the project.
Each Release culminates in the delivery of a Release Package including applicable Software & Technical 
documentation, System Use Case documentation, End-user documentation and Project team release training.
6.1 Release Package
Deliverable: Release Package
Updated Software
1)
Compiled Application (available in the testing environment)
2)
Code Escrow Deposit
3)
Build Scripts/Build Definition (JSON)
Updated Technical Documentation
1)
Release Notes
2)
Defect List/Known Issues
3)
Data Migration Summary
4)
Data Model
5)
Data Dictionary
Updated System Use Case Documentation
1)
Swim-lane Workflow Diagrams (release-specific; only applicable through R-02) 
2)
Business Rules (release-specific; only applicable through R-02)
3)
Contract Requirements Traceability (only applicable R-02 through R-11)
Updated Testing Summary & Testing Scripts
1)
Unit and Integration Test Summary (release-specific)
2)
Load Test Results (release-specific) (only applicable R-05 and beyond)
3)
Functional Testing Plan and Scripts (release-specific)
4)
UAT Scripts loaded into Target Process (only applicable R-10 and beyond)
Updated Change Management Documentation
1)
User Documentation (only applicable R-10 and beyond) as Test Cases and online 
help
Release Metrics
1)
Planned Development vs Actual
2)
Story Points (Complexity) (only applicable R-03 and beyond)
3)
Feature vs Fixes (only applicable R-03 and beyond)
4)
Team Member Load & Capacity
6.1.1 Updated Software for each release.
6.1.1.1
Installed, functioning, fully accessible, and fully compiled software.  In addition to the release 
being delivered, each release shall include all previously delivered software unless movement of 
previous functionality to a future release has been agreed to by County and Contractor.  Software 
shall be available in the cloud unless County determines that an on-premise (or contracted data 
center) instance is required due to performance issues or other mission-critical reason.
6.1.1.2
Source code update that supports the deliverable described above.  Complete instructions for 
compiling the source code is required by the Escrow vendor (Iron Mountain).
6.1.1.3
Installation scripts, instructions, technical release notes, and other instructions as required for 
independent installation of the software product on County servers.

13129-1-RFP
6.1.2 Updated Technical documentation for each release.
6.1.2.1
Documentation accompanying each software release shall be delivered in a format that allows the 
update and ultimate completion of a master reference set that addresses all technical reference 
domains.  The following should be included at a minimum:
1.
Release notes
2.
Defect list/known issues
3.
Data migration summary
4.
Data model
5.
Data dictionary 
Containing the following at a minimum:
(i)
Table names and descriptions.
(ii) Field name, description, optionality, data type, and length.
(iii) Domain and default values as applicable.
(iv) Table/entity relationship model.
6.1.3 Updated System Use Case documentation for each release.
6.1.3.1
Documentation describing the functionality contained in each release shall be delivered in a 
format that allows the update and ultimate completion of a master document that supports the 
listing of all business analysis.  The following should be included at a minimum:
1.
System Use Cases supported in the release. If the released software supports only a portion 
of a given use case, then an accurate and complete description of the supported 
functionality shall be delivered in a manner that allows the County an understanding of all 
requirements currently available in the release.
2.
Updated traceability matrix showing how BUC, SUC, requirements, and other as-yet-to-be 
elaborated business requirements are related to the released functionality.
3.
A description of business rules, validations, and any other system-generated or configurable 
behavior contained in the release that impacts functional operation.  Documentation should 
be clear enough to support release testing and UAT, and to allow the end-user to determine 
if the system is behaving as required.
6.1.4 Updated Release testing documentation shall include the following Contractor deliverables at a minimum.
6.1.4.1
A Testing Plan that supports the testing of all SUCs related to the release.  The Testing Plan shall 
include a listing of the scripts and other tests to be conducted, as well as regression areas (previous 
scripts) to test.
6.1.4.2
Sample or converted data shall be delivered and installed with the release as needed to run all 
scripts or other tests. 
6.1.4.3
Test scripts required by the Testing Plan that included the following at a minimum:
1.
Test procedure (either written in the script, or referenced in completed documentation)
2.
Pre-requisites, data requirements, system condition
3.
Expected results
4.
Results

13129-1-RFP
6.1.4.4
A repository for logging issues, bugs, and resolution
6.1.4.5
One or more triage sessions where the bug log is reviewed, classified, and properly assigned for 
resolution.
6.1.4.6
Support during testing period of any release.  This should occur immediately following the release 
training event.  Support shall provide immediate issue triage, training, and facilitation to allow for 
a more rapid test of the release.
6.1.5 End-user documentation. (R-10 and beyond)
6.1.5.1
Procedural end-user documentation, describing how the functionality contained in each release 
should be operated to achieve the results of the System Use Cases contained in the release, shall 
be delivered in a format that allows the update and ultimate completion of a master document that 
ultimately forms the User Manual.  The following should be included at a minimum:
-
Written procedure documentation that would allow a trained end-user the ability to operate 
the screen, function, report, menu, search, or other system function in a successful manner.  
Test Cases provided with each Release will satisfy this requirement.
-
Online, context-sensitive field help that operates in a consistent manner through end-user 
initiation (e.g., presses F1).
6.1.6 Release metrics
6.1.6.1
Planned Development vs Actual
-
Unit of Measure: # of Features per Release, Grouped by priority, Planned & Actual
-
Purpose: Measure of Scope & Stability
6.1.6.2
Story Points (Complexity)
-
Unit of Measure: Story Points (Complexity) of Features per Release, Grouped by priority, 
Planned & Actual
-
Purpose: Measure of Scope & Schedule
6.1.6.3
Feature vs Fixes
-
Unit of Measure: Story Points (Complexity) of Features vs Story Points (Complexity) of 
defects, New development compared to fixes per Release
-
Purpose: Measure of Quality
6.1.6.4
Team Member Load & Capacity
-
Unit of Measure: FTEs per Release, Resource allocation, Planned & Actual
-
Purpose: Measure of Schedule 
6.1.6.5
Backlog Summary/Burn-down Summary
-
Unit of Measure: Number of Features completed / (number of Features completed  + 
number of Features remaining); number of story points completed / (number of story points 
completed + number of story points remaining)
-
Purpose: Measure of Scope & Schedule
6.2 Create New Applications & Software Configuration
This Task addresses the work that Contractor must perform to create the application as defined by the System 
Use Cases.  As an integral part of software development, Contractor will provide solution demonstrations of 
work in progress with each Release Package to the County.
6.2.1 Contractor Activities
6.2.1.1
Software development of in scope functionality. 
6.2.1.2
Design meetings and scrums between Contractor resources and County resources.

13129-1-RFP
6.2.1.3
Re-work and re-test.
6.2.1.4
Provide interim functionality demonstrations to County to review work in progress and solicit 
interim feedback.
6.2.1.5
Prepare Release Packages.
6.2.2 County Activities
6.2.2.1
Attend In Process Review sessions and other agile project activities as requested and provide 
feedback to ensure an accurate understanding of the functionality.
6.2.2.2
Support daily Business Analyst scrums as needed
6.2.2.3
Provide additional information as requested.
6.2.3 Contractor Deliverables
6.2.3.1
ECD-02 Release Package R-01
6.2.3.2
ECD-03 Release Package R-02
6.2.3.3
ECD-04 Release Package R-03
6.2.3.4
ECD-05 Release Package R-04
6.2.3.5
ECD-06 Release Package R-05
6.2.3.6
ECD-07 Release Package R-06
6.2.3.7
ECD-08 Release Package R-07
6.2.3.8
ECD-09 Release Package R-08
6.2.3.9
ECD-10 Release Package R-09
6.2.3.10 ECD-11 Release Package R-10
6.2.3.11 ECD-12 Release Package R-11
6.2.3.12 ECD-13 Release Package R-12
6.2.3.13 ECD-14 Release Package R-13
6.2.3.14 ECD-15 Release Package R-14
6.2.3.15 ECD-16 Release Package R-15
6.2.3.16 ECD-17 Release Package R-16
6.2.3.17 ECD-18 Release Package R-17
6.2.3.18 ECD-19 Release Package R-19
6.2.3.19 ECD-20 Release Package R-20
6.2.3.20 ECD-21 Release Package R-21
6.2.3.21 ECD-22 Release Package R-22
6.2.3.22 ECD-23 Release Package R-23
6.2.3.23 ECD-24 Release Package R-24
6.2.3.24 ECD-25 Release Package R-25
6.2.3.25 ECD-27 Release Package R-26 
6.2.3.26 ECD-28 Release Package R-27 (Post Go-Live, may be delivered by Contractor over multiple 
deployment dates)

13129-1-RFP
6.2.3.27 ECD-29 Release Package R-28 (Post Go-Live, may be delivered by Contractor over multiple 
deployment dates, but delivery of ECD-29 shall occur no earlier than January 1, 2023 and no later 
than December 31, 2023)
6.2.4 Acceptance Criteria for Contractor Deliverables
6.2.4.1
Release Package contents are as described in section 6.1.
6.2.4.2
Total Software Score (TSS), is at or below a mutually agreed upon score in accordance with the 
process defined in Section 8.0.
6.3 In-Process Review Sessions (ad hoc)
In-process review sessions (IPR) are held to review larger groups of new functionality, reports, or Integrations.  
These reviews shall be led by Contractor for the purpose of reviewing all major groups of functionality as 
documented by the Development Plan.  
The primary purpose is to provide a more comprehensive view of logical groups of functionality—to review 
new code, reports or Integration in the context of the larger System--and offer an early opportunity to direct 
development efforts and assess progress.  
6.3.1 Contractor Activities
6.3.1.1
Schedule and conduct IPRs.
6.3.1.2
Ensure that all relevant functionality is presented in at least one IPR.
6.3.2 County Activities
6.3.2.1
Participate in IPRs.

13129-1-RFP
7.0 Training
This section addresses the analysis, development and delivery of training to end-users.  These requirements are 
supplemental to Exhibit A, Part 2, Section 2.1.8. The detailed lists below (7.1-7.3) relate only to the “end user” 
training, not to the release training. 
Release-specific training will be provided for County project team members to support Release-specific testing, and 
will be delivered as solution demonstrations at the start of the Release Testing Period. The Release-specific training 
format is a walk through of Release-specific test scripts in the test environment.  
7.1 Training Analysis & Planning
This Task addresses whom to train, how training will be conducted, logistics, and training topics.  Training shall 
be instructed by County staff.  
The Training Plan should address:
-
Course syllabus/outlines
-
Student materials
-
Instructor materials
-
Course schedules
-
Rosters – by name, or by position, as applicable to each training class
-
Separate training database with data and properly configured user accounts, where the source of the data 
will be agreed upon by the County and Contractor
7.1.1 Contractor Activities
7.1.1.1
Collaborate with the County to plan for separate system training databases and strategy for the 
County or Contractor to refresh the data, as needed, to support training for specific class sessions.
7.1.2 County Activities
7.1.2.1
Determine topics for training by group, and determine the number and types of courses needed.  
7.1.2.2
Create training syllabus (course outline, instructor guide, student materials as needed for each 
proposed course).  The syllabus will list the course objectives, describe each functionality point 
that will be covered with the students, and outline the examples to be used as instructional aides.
7.1.2.3
Determine instructor resource needs to include classroom materials, System data for student 
exercises, learning aids (e.g., charts), tests or exercises to demonstrate mastery, etc.
7.1.2.4
Determine number of training classrooms and course schedules.
7.1.2.5
Collaborate with Contractor to confirm training needs for County personnel.
7.1.2.6
Prepare training classrooms, provide training equipment.
7.1.2.7
Schedule County staff as needed.
7.1.2.8
Review and edit preliminary training plan.
7.1.3 Contractor Deliverables
7.1.3.1
ECD-05 Training Plan (Initial Plan)
7.1.3.2
ECD-16 Training Database Staging and Restoration Plan.
7.1.3.3
ECD-20 – Training database set-up
7.1.4 Acceptance Criteria for Contractor Deliverables
7.1.4.1
Initial Training Plan

13129-1-RFP
7.1.4.2
Separate training database refreshment plan, where the source of the data will be agreed upon by 
the County and Contractor is available
7.2 Develop Training Materials
This Task describes the activities that will be performed to develop materials needed for various training classes 
once the training needs have been determined.  
Training materials from the Contractor will include:
-
Separate training databases with data and properly configured user accounts, where the source of the 
data is agreed upon by the County and Contractor.  For each database or dataset within a database, 
expected states include
o
Start State
o
Input files (eg, deeds, permits, &c)
o
Expected creates, replacements, updates and deletes
o
Supervisory tasks (eg, an approval in a workflow)
o
Restoration process to achieve the Start State.
7.2.1 Contractor Activities
7.2.1.1
Establish databases specific to certain classes with instructions to reset each database to its 
original state after the class has concluded.
7.2.2 County Activities
7.2.2.1
Support Contractor training development activities as needed, particularly in the area of County 
policy and procedure changes.
7.2.2.2
Prepare the training materials indicated in the Training Plan.
7.3 Support Training Sessions
7.3.1 Contractor Activities
7.3.1.1
Restore training databases as necessary to support class sessions.
7.3.2 County Activities
7.3.2.1
Provide students and facility resources, as agreed upon, to include adequate training facilities to 
accommodate attendees, and a lab environment to allow for computer accessibility.
7.3.2.2
Provide management of implementation of the training plan, schedule, etc.
7.3.2.3
Conduct training sessions per training plan.
7.3.2.4
Monitor student progress on subject matter.

13129-1-RFP
8.0 Testing
Testing is conducted during each Release. Contractor is responsible for Unit and Integration Testing, and Load 
Testing, which are performed as part of development and data migration activities.
County is responsible for Functional Testing, User Acceptance Testing and Final User Acceptance Testing, with 
guidance from the Contractor.
Testing includes: 
-
Unit and Integration Testing
-
Load Testing
-
Functional Testing
-
User Acceptance Testing
-
Final User Acceptance Testing 
The purpose of testing is to verify that all components of the System are functioning properly and ready for use in 
the production environment, and for the conduct of normal business as the System of record.  The following pre-
requisites shall be completed prior to the start of each Release Testing Period:
-
Migrated data will be provided for use in testing per the Data Migration Plan.
-
All related development work planned in the Release (integrations, reports, new functionality) shall be 
completed, operational, and included with the System installation to be used for testing the specific 
Release.
-
All related configurations, domain values, security, workflows, and other System administration 
requirements should be completed prior to testing the specific Release.
-
The network environment used for testing should be established so as to be as close to the production 
environment as possible.  Any variations in network environment should be taken into consideration when 
evaluating System performance. 
-
Data shall be staged as needed to support scripted testing.  Certain record conditions may not exist in 
System containing only newly converted data.  Record or other data creation, or other manipulations, may 
be needed to establish the proper condition for testing.  Consideration should be given, to the extent 
practical, to the System condition expected at various times of the tax year.
For County’s initial acceptance of each software Release, Contractor shall provide an acceptance test period (the 
“Release Testing Period”) that is defined in the applicable Testing Plan and System Use Cases. 
For each Release, Contractor shall ensure: 
-
The software is available on the test server.
-
Software is configured to support testing.
-
Testing team training, if any, is complete. 
8.1 Create Testing Plan
Contractor and the County shall collaborate to produce a comprehensive Testing Plan, which may reference 
sub-plans.  The Testing Plan or sub-plans shall address the following topics:
-
A listing of all scripts to be created along with permutations for each script.
-
Data preparation or staging approach, including any need to configure or “spoof” the System so that 
test conditions representing those found throughout the tax calendar year can be produced.  Include the 
process for refreshing data between testing cycles.
-
General method of script execution, to include any sequence dependencies.

13129-1-RFP
-
Network and System configuration requirements.
-
Numbers of end-users required to complete the testing.
-
A general timeline to guide script execution.
-
Any instructions, logistics, or other guidance needed beyond that provided in this SOW for the 
logging, triage, and resolution of Defects.
-
Identification of any automated testing to occur—as might be needed to prove System performance 
standards.
The plan shall encompass the following testing approaches:
-
Functionality user acceptance testing—tests to ensure the System supports relevant business process 
areas.  These tests shall encompass “negative testing” where appropriate (e.g., the System stops 
improper performance, or properly presents error messages, etc.).
-
Reports/outputs user acceptance testing—tests to ensure that all reports, queries, letters, receipts, etc., 
perform as needed in relevant business process areas.
-
Data migration testing—testing beyond that performed in the Data Migration activities, and conducted 
to ensure that migrated data appears in the correct fields, and is usable to conduct normal business 
operations.
-
Integration testing—testing to ensure that each integration point performs in accordance with its 
respective System Use Case.
-
Performance testing—testing to ensure that the system responds reasonably well when a normal and 
expected number of users are simultaneously logged on and conducting normal operations; and when 
batch routines are being performed against a database containing a simulated record set to be expected 
after five (5) years of operation. The performance criteria listed in the “Acceptance Criteria for 
Contractor Deliverables” of the Conduct Testing section shall apply.
8.1.1 Contractor Activities
8.1.1.1
Conduct planning workshop and lead development of the Testing Plan.
8.1.1.2
Provide System technical architecture and behavior knowledge, as required, to ensure that the 
Testing Plan is as comprehensive and exhaustive as is reasonable, and mutually agreed to by 
Contractor and the County.
8.1.1.3
Author/revise the Testing Plan in preparation for testing.
8.1.2 County Activities
8.1.2.1
Collaborate with Contractor to produce the Testing Plan.
8.1.2.2
Provide business domain and technical performance knowledge, as required, to ensure that the 
Testing Plan is as comprehensive and exhaustive as is reasonable, and mutually agreed to by 
Contractor and the County.
8.1.3 Contractor Deliverables
8.1.3.1
ECD-04 Testing Plan (Initial Plan)
8.1.3.2
ECD-05 Testing Plan (Living Plan)
8.1.4 Acceptance Criteria for Contractor Deliverables
8.1.4.1
Testing Plan is comprehensive and complete in accordance with Section 8.0.

13129-1-RFP
8.2 Create Test Scripts
Test Scripts shall be created for every testable feature delivered in a Release. Each Test Script shall address the 
following areas:
-
Test description/process statement
-
Permutations in terms of data, domain values, record types, etc.
-
Test steps, system instructions, or process steps
-
Pre-conditions, including data, security, workflow, or other System operations that must be completed 
prior to execution
-
Expected results
8.2.1 Contractor Activities
8.2.1.1
Conduct Test Script authoring training for County testers.
8.2.1.2
Support Test Script creation by County personnel, and ensure that Scripts are created in 
accordance with the Testing Plan.
8.2.1.3
Write all unit, integration, performance, batch, security, and administrative related Test Scripts.
8.2.2 County Activities
8.2.2.1
Participate in Test Script training class instructed by Contractor.
8.2.2.2
Assist with developing all Test Scripts, other than those identified above to be written by 
Contractor.
8.2.2.3
Sign off on contractor-delivered Test Plans and Cases.
8.2.3 Contractor Deliverables
8.2.3.1
ECD-26 UAT Scripts loaded into Target Process
8.2.4 Acceptance Criteria for Contractor Deliverables
8.2.4.1
Training for testing activities is conducted by knowledgeable Contractor employees and 
accomplishes the learning-objectives as evidenced by student testing or student performance 
observation.
8.2.4.2
Scripts written or uploaded by Contractor are in full compliance with the Testing Plan 
8.3 Conduct Testing
Testing shall be conducted in accordance with the Testing Plan. Testing shall be repeated (cycles) until the 
acceptance criteria are met.  The first Testing cycle shall be comprehensive and 100% of the Testing Plan (all 
scripts and permutations) shall be executed to test functionality specific to the Release.  Subsequent Testing 
cycles may be conducted after an agreed upon number of Defects have been corrected and System updated with 
the corrections.
If Contractor pre-delivery testing is performed, County may ask to see the results, but only for comparison to 
the County test results.  County maintains sole authority to certify the successful completion of any and all tests 
performed by the Contractor on the System.
8.3.1 Contractor Activities
8.3.1.1
Ensure all testing environment conditions are met prior to execution of any test cycle.
8.3.1.2
Support the execution of all Test Scripts 
8.3.1.3
For the UAT test periods, proctor test execution for the first week of the test cycles.

13129-1-RFP
8.3.2 County Activities
8.3.2.1
Execute all Test Scripts.
8.3.2.2
Record Defects, and participate in Defect triage in accordance with the Project Management 
section of this SOW.
8.3.2.3
Schedule resources to complete testing within the timeframe dictated by the project timeline.
8.3.3 Contractor Deliverables
8.3.3.1
Release Testing (R-01 through R-26)
8.3.3.2
ECD-26 User Acceptance Testing environments and support
8.3.4 Acceptance Criteria for Contractor Deliverables
8.3.4.1
Total Software Score (TSS)
Total Software Score (TSS) is a formula that considers both number and severity of Defects.  It will be 
used at various points during the project as an evaluation criterion, specifically for acceptance of 
software deliveries and final project acceptance.  A TSS value will be identified for acceptance of 
specific Releases User Acceptance Testing, and Final User Acceptance Testing.
TSS is calculated by multiplying the severity count by the corresponding point value for the associated 
severity level.  The point value for each level is indicated below:
-
SEV1: 3 points
-
SEV2: 2 points
-
SEV3: 1 points
-
SEV4: 0 points (largely cosmetic or desired future enhancements to functionality)
Example: If four (4) SEV3 and two SEV1 Defects are identified and unresolved, the TSS = 10 
[(4x1)+(2x3)].  
Severity levels are defined in Section 1.5 ACCEPTANCE. The general approach will be to tie Story 
Points (complexity) of functionality planned in each Release to allowable TSS as follows:
-
Pre-requisite for Story Point assignments is the development of System Use Cases to be 
completed by R-03 (Release 3).
-
Story Points will use Fibonacci series for setting relative complexity. 
-
Releases with more complexity will be allowed greater TSS for Acceptance, subject to a 
relatively more rigorous TSS acceptance cap over time. 
-
TSS calculated at the end of each Release Testing Period will be reviewed for Acceptance. TSS 
for a Release may be re-calculated as defects are remediated. 
-
Defects may continue to be logged outside of a Release Testing Period, but might not count 
toward the release TSS. In that scenario, the defect would fall into next release TSS if still open 
at that time
-
The allowable TSS in UAT periods will be lower than in the development stage.
8.3.4.2
System Performance Testing
System performance shall be in accordance with the following, or as otherwise established in Testing 
Plan or applicable Test Script within a system that meets minimum computing and operating 
environment specifications:
-
The System shall not “crash, stall, or freeze-up” at any time.

13129-1-RFP
-
A simple query, such as searching for a single owner or parcel, shall take no longer than three 
seconds to return the result, including parcel sketch and photo, with at least 150 users logged on 
and using the System.
-
A moderately complex query, such as searching for all appeals associated with a given property, 
shall take no longer than eight seconds to produce all results, with at least 150 users logged on and 
using the System.
-
No operational report (an output with relatively small amounts of data needed to support a routine 
daily process) shall take longer than 5 seconds to be sent to the printer dialog.
-
No comparable query for a single property shall take longer than 20 seconds to return five 
comparable properties.
-
Very complex or inclusive queries or processes shall be tested and are able to complete in a 
mutually agreeable time frame.
8.4 Revise/Correct Defects
This Task will be performed concurrently with conducting testing.
8.4.1 Contractor Activities
8.4.1.1
Facilitate Defect triage meetings at least once per week, or as needed to address all Defects logged 
as part of Testing.  This shall include the prioritization and classification of each Defect, and 
documentation of the fix for each Defect. 
8.4.1.2
Log results in shared collaboration tool.  Defects are tracked using the process provided in the 
Project Management section of this SOW.
8.4.1.3
Correct System Defects and provide software updates or other solutions according to the agreed-
upon resolution.
8.4.2 County Activities
8.4.2.1
Participate in the Defect triage meetings.
8.4.2.2
Support correction of Defects.

13129-1-RFP
9.0 Go-Live
Go-Live activities are outlined in this section, including transition planning. 
9.1 Develop Go-Live Plan
9.1.1 Contractor Activities
9.1.1.1
Schedule and facilitate a meeting with the County to create and deliver the Go-Live Plan.  The 
following topics or sections shall be addressed:
9.1.1.2
Provide real time Defect and Issue triage and correction approach, to support personnel as they 
first encounter the System for their routine tasking.
9.1.1.3
Work and support schedules shall be created and maintained for the duration of the Go-Live 
support period.
9.1.1.4
Contractor technical staff will be available for 3 extended hours for 10 Business Days after Go-
Live Date.
9.1.1.5
Support roles for County and Contractor personnel involved in the plan.
9.1.1.6
Support assignments and schedule for County and Contractor personnel for the first 30 Business 
Days after Go-Live Date.
9.1.1.7
Provide Go-live specific communication plan and other plans as identified.
9.1.2 County Activities
9.1.2.1
Collaborate with Contractor to produce the Go-Live Plan.
9.1.3 Contractor Deliverables
9.1.3.1
ECD-16 Go-Live Plan (Complete first draft)
9.1.3.2
ECD- 24 Go-Live Plan (Final)
9.1.4 Acceptance Criteria for Contractor Deliverables
9.1.4.1
Go-Live Plan appears to meet and support needs of the County for the first 30 Business Days after 
Go-Live.
9.1.4.2
Go-Live Plan includes detailed transition plans.
9.2 Go-Live Event  
9.2.1 Contractor Activities
9.2.1.1
Except for delays excused under this Contract or by the County in writing, to facilitate the Go-
Live event the Contractor will deliver a production ready System on or before August 1, 2022 for 
Final UAT Testing by the County.
9.2.2 County Activities
9.2.2.1
Perform Go-Live: activate the System and perform user activity such that the System is in daily 
regular production use and reliance section-wide by County employees.
9.2.2.2
Assist Contractor in performing Go-Live support.
9.2.2.3
The target Go-Live Date for the System is October 3, 2022.  Contractor understands that, due to 
the County’s statutory requirements, even if Contractor delivers a production-ready System in 
August or September 2022, the County does not intend to use GAMA as its system of record until 
October 2022.  The parties expressly agree to this proposed timeline and further agree that the 
County will have no contractual obligation to begin using GAMA as its system of record prior to 
October 2022. Notwithstanding the forementioned, County agrees to begin software subscription 
payments upon Contractor’s delivery of a production-ready System, as set forth in Exhibit B.

13129-1-RFP
9.2.3 Contractor Deliverables
9.2.3.1
ECD-26 Production-ready System
9.2.4 Acceptance Criteria for Contractor Deliverables
9.2.4.1
Contractor System is used as the system of record.

13129-1-RFP
10.0 Transition
Transition refers to post-Go-Live activities intended to facilitate the transition of the System to sustainment, to 
recognize Final Acceptance, and to deliver retained funds to Contractor.  
10.1 Remedy Defects
10.1.1 Contractor Activities
10.1.1.1 Conduct regular Defect triage meetings to prioritize and agree upon the resolution for all Defects 
logged to date until System Acceptance criteria have been met.  
10.1.1.2 Document resolution plan for each Defect in shared collaboration tool.
10.1.2 County Activities
10.1.2.1 Attend Defect triage meetings and collaborate on resolution plan for all Defects.
10.1.2.2 Support Contractor in the remediation of Defects until System Acceptance criteria have been met.
10.1.3 Contractor Deliverables
10.1.3.1 ECD-26 Remediation of Defects According to Transition Plans
10.1.4 Acceptance Criteria for Contractor Deliverables
10.1.4.1 Defects have been remedied according to transition plans.
10.2 System Acceptance / Transition to Support
This Task describes activities associated with formal System Acceptance and the transition of the County to the 
Contractor Customer Support team.
10.2.1 Contractor Activities
10.2.1.1 Remedy Defects according to transition plans.
10.2.1.2 Schedule and conduct structured meeting to transfer County to Contractor Customer Support for 
post-Go-Live support.
10.2.2 County Activities
10.2.2.1 Attend transfer-to-support meeting.  
10.3 Retained Funds Release Milestones
The activities described in this Task shall be repeated for each of the milestones for retained funds release 
associated with Final Acceptance set forth in the Price Agreement (Exhibit B) less any withholding per section 
1.2.1 (Exhibit A).  
For the purpose of Retained Funds Release Milestones, the scope of the Total Software Score (TSS) includes 
only the current and prior Activities listed in this table.  TSS for the entire System must remain below a 
mutually agreed upon amount, as described in section 8.0.
The following is the acceptance criteria to be applied to each respective milestone:

13129-1-RFP
Milestone
Activities*
Payout %
Acceptance Criteria
Payout 1
Production-Ready System is 
Delivered, Accepted, and 
Deployed to Production 
Environment. 
(June-August 2022) 
50%
1. Contractor delivered production-ready 
System, including delivery of technical 
specifications as required by Exhibit A, 
Part 3, Section 1.2.1(8).
2. County completed testing of 
production-ready System, Contractor 
remedied any defects as outlined in 
Exhibit A, Part 1, section 1.5 unless 
mutually agreed, and System code 
deployed to Production environment.
3. All pre-go live Story Points delivered. 
Payout 2
Go-Live Date (October 2022)
25%
1. Contractor completed Final Data 
Migration in September 2022 into 
production ready System.
2. County began using AA-GAMA as 
system of record. 
Payout 3 
Tax Bill Assessment Roll 
Report (Final 2022 Tax Bill 
SAR) (October 2022)
10%
County can generate a Tax Bill 
Assessment Roll Report (Final 2022 Tax 
Bill SAR) from System.
Payout 4
Validation of 2023 Values 
(November 2022)
15%
County re-valued 25% residential/condo 
properties and 100% of remaining 
properties using the 2023 models in the 
MARS system; values matched to values 
calculated by the CAMA group (for 
market properties) and the 6i system (for 
cost). Any value discrepancies must be as 
a result of action taken by the County 
(e.g. late model overrides within 6i that 
were not part of the final data migration).  
*Note: The month indicated as the target date for each activity identified in the table above reflects County 
planned dates for completion of the activity.  The date is included here to reflect the anticipated retainage payout 
timing to Contractor, for planning purposes. Both parties acknowledge that retainage will be paid upon completion 
of acceptance criteria noted in the table above.
10.3.1 Contractor Activities
10.3.1.1 Prepare a Project Services Audit report to outline outstanding Issues, Defects, operational Risks, 
and relevant action items.  Revise according to County feedback.
10.3.2 County Activities
10.3.2.1 Review draft Project Services Audit report and provide feedback to Contractor.
10.3.3 Contractor Deliverables
10.3.3.1 ECD-26 Final Project Services Audit Report
10.3.4 Acceptance Criteria for Contractor Deliverables
10.3.4.1 Project Services Audit report describes all outstanding Issues, Defects, operational Risks, and 
action items.

13129-1-RFP
 
2.
PART FOUR: IMPLEMENTATION PLAN/SCHEDULE
The Implementation Plan/Schedule will be included in the Living Development Plan, which will be updated every 
quarter.

13129-1-RFP
EXHIBIT B, PRICE AGREEMENT
SERIAL 13129-1-RFP
NIGP CODE: 208-82
CONTRACTOR'S NAME:
Esri Canada Limited
COUNTY VENDOR NUMBER:
VC0000001004
 
 
ADDRESS:
12 Concorde Place, Suite 900
 Toronto, ON, M3C 3R8
 
P.O. ADDRESS:
 
 
 
TELEPHONE NUMBER:
416-441-6035
 
FACSIMILE NUMBER:
 
WEB SITE:
www.esri.ca
 
CONTACT (REPRESENTATIVE):
Michael Lomax
 
REPRESENTATIVE'S E-MAIL ADDRESS:
mlomax@esri.ca
 
CONTRACTOR WILL ALLOW OTHER GOVERNMENTAL ENTITIES TO PURCHASE FROM THIS 
AGREEMENT.
1.
TOTAL NOT TO EXCEED FOR INITIAL TEN (10) YEAR TERM: $20,159,399.80
1.1. PROJECT MANAGEMENT
$845,124.00
1.2. DELIVERABLES (ECD-01 Through ECD-29)
$10,683,574.85
a)
With Project Change Request #4 in late 2019, portions of future payments from Annual Software 
Subscription Post Implementation (§1.5 below) have been shifted on a net-present-value basis to 
Deliverables for calendar year 2020.  The net nominal dollar savings to the County from this shift is 
$76,563.
b)
With Project Change Request #7 in 2022, portions of planned payments for Annual Software 
Subscription Post Implementation have been shifted to Deliverables for calendar year 2022.  The net 
nominal dollar savings to the County from this shift is $58,126.43. 
c)
These nominal savings must be added to the line items described in §§1.1-1.5 here to reach the not-to-
exceed value for the initial ten-year term of this contract.
1.3. TRAVEL ALLOWANCE
$276,834.00
1.4. SOFTWARE SUBSCRIPTION FOR IMPLEMENTATION
$834,870.00
1.5. ANNUAL SOFTWARE SUBSCRIPTION POST IMPLEMENTATION (including Azure Maintenance) 
through PCR08

13129-1-RFP
$1,834,996.95
Annual Software Subscription - Post Development
Subscription Period
Software Subscription Costs
Azure Maintenance Costs
Aug. 1, 2022 to Sept. 30, 2022
Parties agree that no 
subscription fees will be 
charged or payable until 
Contractor delivers a 
production-ready System.  
In the event the System is not 
production ready on August 1, 
2022, Software Subscription 
payments due to Contractor 
for the period Aug. 1, 2022 to 
Sept. 30, 2022 will be reduced 
in accordance with Option 1 
of Section 1.8.1 (i) of Exhibit 
A, Part One -Special Terms 
and Conditions. 
$124,006.90
$9,427.55
October 1, 2022 to June 30, 
2023 (Includes Production 
Deployment / Go Live)
$295,312.50 
$30,000.00 
July 1, 2023 to June 30, 2024
$393,750.00 
20,0000*
July 1, 2024 to June 30, 2025
$393,750.00 
$0 
July 1, 2025 to June 30, 2026
$393,750.00 
$0 
July 1, 2026 to Dec. 31, 2026
$175,000.00 
$0 
Total
$1,775,569.40
$59,427.55
*Azure maintenance is prorated during this period due to Azure fixed priced implementation as part of 
PCR09 commencing January 1, 2024.
Estimated Cloud Hosting Costs 2021 through December 31, 2023 
Fiscal Year
*Azure Subscription Cost
Estimated 
2021
As invoiced by Microsoft
$300,000.00
2022
As invoiced by Microsoft
$600,000.00
2023
As invoiced by Microsoft
$600,000.00
Total 
$1,500,000.00
*  Through PCR08, Cloud Microsoft Azure subscription costs are passed through to County as billed to 
Contractor and will not include mark-ups.  The above figures are purely estimates.  Microsoft Azure 
invoices will be provided by Contractor to County upon request.  Contractor is entitled to charge for 
“maintenance” of this pass-through billing as set forth above

13129-1-RFP
Upon implementation of PCR09, Azure Maintenance will be included in fixed price Cloud hosting cost set 
forth below at terms set forth in Section 3.3, Statement of Work, Exhibit A.
Cloud Hosting Costs starting with PCR09 (Fixed Price includes all Azure Maintenance)
Fiscal Year
Price
January 1, 2024 – June 30, 2024
$604,000
July 1, 2024 – June 30, 2025
$1,208,000
July 1, 2025 – June 30, 2026
$1,208000
July 1, 2026 – December 31, 2026
$604,000
Total
$3,624,000
1.6. PROJECTED ANNUAL SOFTWARE SUBSCRIPTION AND CLOUD HOSTING COSTS FOR 
RENEWAL TERM
  $24,450,240.13
Projected Annual Software Subscription and Cloud Hosting for Renewal Term
Subscription Period
Subscription 
Costs
Azure Maintenance Costs
Cloud Hosting Costs
Jan 1, 2027 to Jun 30, 
2027
$407,750.00 
$0 
$634,200
Jul 1, 2027 to Jun 30, 
2028
$835,900.00 
$0 
$1,268,400
Jul 1, 2028 to Jun 30, 
2029
$877,700.00 
$0 
$1,331,820
Jul 1, 2029 to Jun 30, 
2030
$921,600.00 
$0 
$1,331,820
Jul 1, 2030 to Jun 30, 
2031
$967,700.00 
$0 
$1,398,411
Jul 1, 2031 to Jun 30, 
2032
$1,016,100.00 
$0 
$1,398,411
Jul 1, 2032 to Jun 30, 
2033
$1,066,900.00 
$0 
$1,468,331.55
Jul 1, 2033 to Jun 30, 
2034
$1,120,200.00 
$0 
$1,468,331.55
Jul 1, 2034 to Jun 30, 
2035
$1,176,200.00 
$0 
$1,541,748.13
Jul 1, 2035 to Jun 30, 
2036
$1,235,000.00 
$0 
$1,541,748.13
Jul 1, 2036 to Dec 31, 
2036
$632,550.00 
$0 
$809,418.77
Total
$10,257,600.00 
$0 
$14,192,640.13
Optional Future Development – This is a county reserve fund that must be authorized by the County prior to 
execution of billing.
Jan 1, 2024 to Dec 31, 2026
Per rate card
$560,000
2.
SCHEDULE OF DELIVERABLES

13129-1-RFP
2.1. The parties acknowledge that payment for Deliverables will be directly tied to those specific Deliverables 
that have been accepted by County. Payment for travel will be on strict cost reimbursement for actual and 
approved travel expenses without markup. Copies of invoices for travel may be requested by County. 
Payment for Project Management fees shall be on a quarterly basis. Contractor shall prepare quarterly 
invoices that at a minimum reflect a line item level detail for the categories listed within this section. County 
reserves the right to modify the content and format of invoicing with the concurrence of Contractor.
2.2. The Sequence of Deliverables and Payments is noted below.
2.3. Contractor shall prepare invoices at the end of each Quarter for all Deliverables accepted or fees due in that 
quarter.  
3.
RATE CARD
The following labor rates shall apply for all services rendered additionally to this Agreement via a Change 
Order or Amendment.
Project management
 $  175.00 
Product consulting
 $  175.00 
Programming & product customization
 $  175.00 
General configuration support
 $  150.00 
Data conversion
 $  150.00 
Interface development
 $  175.00 
Training development (curriculum developer or technical writer)
 $  175.00 
Training (trainer)
 $  150.00 
Help desk support (regular business hours)
 $  100.00 
Help desk support (after business hours)
 $  150.00 
Cost per Story Point (up to ECD 28)
$1,600.00
           Cost per Story Point (ECD 29 only)                                                                          $1,800.00
           Cost per Story Point (New Functionality/Professional Services after ECD 29)                             $1,800.00 
           Azure Premium Level Service (Daily Rate)                                                              $1,000.00
Deliverable or Fee
Total 
Total Value
Retainage
Payment
Project Management
$845,124.00
$169,024.80
$676,099.20
Deliverables (ECD-01 to ECD-29)*
$10,683,574.85
$1,719,125.78
$8,964,449.07
Software Subscription (Implementation)
$834,870.00
$834,870.00
Travel (maximum possible 
reimbursement)
$276,834.00
$276,834.00
Retainage
$(1,888,150.58)
$1,888,150.58
Sub-total
$12,640,402.85
-
$12,640,402.85
NPV Allowance – not paid
$76,563.00
$76,563.00
Microsoft Azure Subscription Costs 
(Fiscal Years 2021-2023)**
$1,500,000.00
$1,500,000.00
Software Subscription, years 4-10***
   
$1,834,996.95
$1,834,996.95

13129-1-RFP
Microsoft Azure Fixed Price (Jan 1,        
2024 to Dec 31, 2026
Option for Future Development
   
$3,624,000.00
$560,000.00
-
$3,624,000.00
$560,000.00
Software Subscription, years 11-20
Microsoft Azure Fixed Price (Jan 1, 2027 
to Dec 31, 2036                                              
$10,257,600.00
$14,192,640.13
$10,257,600.00
$14,192,640.13
$44,609,639.93
-
$44,609,639.93
* The parties agree that ECD-29 shall be no fewer than 320 Story Points and no greater than 500 Story Points, at the 
cost per Story Point set forth in the Rate Card. Any increase in Story Points above 500 Story Points would need to 
be mutually agreed, at the same cost per Story Point. This Release Package may be delivered by Contractor over 
multiple deployment dates, but delivery of ECD-29 shall occur no earlier than January 1, 2023 and no later than 
December 31, 2023.
** The Microsoft Azure Subscription Costs for Fiscal Years 2021-2023 are forecasted and provided as an estimate 
for the County’s planning purposes. Contractor reserves the right to adjust these costs to reflect the actual annual 
fees invoiced by Microsoft to Contractor for the Azure annual subscription. 
*** In the event the System is not production ready on August 1, 2022, Software Subscription payments due to 
Contractor will be reduced in accordance with Section 1.8.1 of Exhibit A, Part One - Special Terms and Conditions .
Sequence of Deliverables and Payments
During the initial development phase, there are 3 regular payment streams (not including travel expenses).  
Specifically;
3.
Project Management (Quarterly) through December 2019
4.
Software Subscription (Quarterly) through December 2019
5.
Deliverables (On Acceptance) through completion of Features  (Release dates may be revised where 
mutually agreed by County and Contractor)
Total Value
Retainage
Payment
Date 
(if applicable)
1. Project Management
1 month Dec 2016
$22,841.00 
$4,568.20 
$18,272.80 
2017 Q1
$68,523.58 
$13,704.72 
$54,818.86 
2017 Q2
$68,523.58 
$13,704.72 
$54,818.86 
2017 Q3
$68,523.58 
$13,704.72 
$54,818.86 
2017 Q4
$68,523.58 
$13,704.72 
$54,818.86 
2018 Q1
$68,523.58 
$13,704.72 
$54,818.86 
2018 Q2
$68,523.58 
$13,704.72 
$54,818.86 
2018 Q3
$68,523.58 
$13,704.72 
$54,818.86 
2018 Q4
$68,523.58 
$13,704.72 
$54,818.86 
2019 Q1
$68,523.58 
$13,704.72 
$54,818.86 
2019 Q2
$68,523.58 
$13,704.72 
$54,818.86 
2019 Q3
$68,523.58 
$13,704.72 
$54,818.86 
2019 Q4
$68,523.62 
$13,704.72 
$54,818.90 
Total
$845,124.00 
$169,024.80 
$676,099.20 
2. Software Subscription

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
1 month Dec 2016
$22,564.05 
$22,564.05 
2017 Q1
$67,692.16 
$67,692.16 
2017 Q2
$67,692.16 
$67,692.16 
2017 Q3
$67,692.16 
$67,692.16 
2017 Q4
$67,692.16 
$67,692.16 
2018 Q1
$67,692.16 
$67,692.16 
2018 Q2
$67,692.16 
$67,692.16 
2018 Q3
$67,692.16 
$67,692.16 
2018 Q4
$67,692.16 
$67,692.16 
2019 Q1
$67,692.16 
$67,692.16 
2019 Q2
$67,692.16 
$67,692.16 
2019 Q3
$67,692.16 
$67,692.16 
2019 Q4
$67,692.19 
$67,692.19 
Total
$834,870.00 
$0.00 
$834,870.00 
3. Deliverables
ECD-01
Release R-00
Set up Cloud Service in Azure, Database, 
Data transfer, File conversions
$250,900.00 
$50,180.00 
$200,720.00 
ECD-02
Release Package R-01
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
Architectural Review & Design Workshop
Project Planning, Functional Requirement & 
Use Case Workshop
$414,507.16 
$82,901.43 
$331,605.73 
March 31, 2017
ECD-03
Release Package R-02
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
Project Charter
Project Schedule (Initial Plan)
$414,507.16 
$82,901.43 
$331,605.73 
June 30, 2017
ECD-04

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
Release Package R-03
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
System Use Cases for Backlog
Data Migration Plan (Initial Plan)
Development Plan (Initial Plan)
Testing Plan (Initial Plan)
$414,507.16 
$82,901.43 
$331,605.73 
September 29, 2017
ECD-05
Release Package R-04
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
Project Schedule (Baseline Plan)
Training Plan (Initial Plan)
Data Migration Plan (Living Plan)
Development Plan (Living Plan)
Testing Plan (Living Plan)
$414,507.16 
$82,901.43 
$331,605.73 
December 20, 2017
ECD-06
Release Package R-05
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
March 29, 2018
ECD-07
Release Package R-06
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 •  Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
June 29, 2018
ECD-08

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
Release Package R-07
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
• Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
September 28, 2018
ECD-09
Release Package R-08
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
• Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
December 21, 2018
ECD-10
Release Package R-09
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
• Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
March 29, 2019
ECD-11
Release Package R-10
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
June 28, 2019
ECD-12
Release Package R-11
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
  • Release Metrics
$414,507.16 
$82,901.43 
$331,605.73 
September 27, 2019

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
ECD-13
Release Package R-12
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts 
 • Release Metrics
$414,507.20 
$82,901.44 
$331,605.76 
December 29, 2019
ECD-14
Release Package R-13
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$120,000.57
*$24,000.11
$96,000.45
February 27, 2020
ECD-15
Release Package R-14
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
First Full Set Data Migration (All Data, All 
Years as specified)
$120,000.57
*$24,000.11
$96,000.45
April 15, 2020
ECD-16
Release Package R-15
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
Go-Live Plan (Complete first draft)
Training Database Staging and Restoration Plan
$120,000.57
*$24,000.11
$96,000.45
June 2, 2020
ECD-17
Release Package R-16
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$120,000.57
*$24,000.11
$96,000.45
July 20, 2020

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
ECD-18
Release Package R-17
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$120,000.57
*$24,000.11
$96,000.45
September 3, 2020
ECD-19
Release Package R-19**
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$376,440.07
*$75,288.01
$301,152.06
December 11, 2020
ECD-20
Release Package R-20
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release MetricsTraining database set-up
$376,440.07
*$75,288.01
$301,152.06
February 10, 2021
ECD-21
Release Package R-21
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$376,440.07
*$75,288.01
$301,152.06
April 6, 2021
ECD-22
Release Package R-22
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$376,440.07
*$75,288.01,
$301,152.06,
May 27, 2021
ECD-23
Release Package R-23
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$376,440.07
*$75,288.01
$301,152.06,
July 19, 2021

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
ECD-24
Release Package R-24
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
Go-Live Plan (Final)
$376,440.07
*$75,288.01
$301,152.06
September 9, 2021
ECD-25
Release Package R-25
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$512,000.00
*$102,400.00
$409,600.00
November 2, 2021
ECD-26
UAT Scripts Loaded into Target Process
Full Set Data Migration (All Data, All Years as 
specified)
Production-Ready System 
Remediation of Defects According to Transition 
Plans
Final Project Services Audit Report
50% Retainage Payout (System is Production 
Ready and Deployed to Production) 
25% Retainage Payout (Go-Live)
10% Retainage Payout (2022 Tax Bill 
Assessment Report; Approved by Treasurer)
15% Retainage Payout (Validation of 2023 
Values)                                              
($944,075.29)
   ($472,037.65)
($188,815.06)      
($283,222.59)    
August 2022
October 2022
October 2022
November 2022

13129-1-RFP
Total Value
Retainage
Payment
Date 
(if applicable)
ECD-27
Release Package R-26 
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$711,945.62
$711,945.62
June 2022
ECD-28
Release Package R-27 (First Post Go-Live 
Release)
 • Updated Software
 • Updated Technical Documentation
 • Updated System Use Case Documentation
 • Updated Testing Summary & Testing Scripts
 • Release Metrics
$476,000.00
$476,000.00
Minimum of 75% of 
Story Points 
Delivered by 
November 30, 2022; 
Full Delivery by 
December 16, 2022 
***
ECD-29 ****
Release Package R-28 (Second Post Go-Live 
Release)
Total Project Management
$900,000.00
$845,124.00 
$169,024.80 
$900,000.00
$676,099.20 
No earlier than Jan. 
1, 2023 and no later 
than Dec. 31, 2023
Total Software Subscription (Implementation)
$834,870.00 
$834,870.00 
Total Deliverables (ECD-01 to ECD-27)
$9,307,574.85
$1,719,125.78
$7,588,449.07
ECD-28
$476,000.00
$476,000.00
ECD-29
Retainage Payments
$900,000.00
$900,000.00
$1,888,150.58
Travel as incurred, estimate
$276,834.00 
$276,834.00 
Total
$12,640,402.85 
 
$12,640,402.85
NOTE: “*” indicates the “at risk” retainage that is subject to the calculations in Exhibit A – Section 1.2.3.
NOTE: “**” indicates that Release Package 18 was purposefully not used to align ECD numbering.
NOTE : “***” indicates that the prioritization of the Story Points to be delivered by November 30, 2022 deadline will be 
mutually agreed by the parties.
NOTE: “****” indicates that ECD-29 shall be no fewer than 320 Story Points and no greater than 500 Story Points, at 
the cost per Story Point set forth in the Rate Card. Any increase in Story Points above 500 Story Points would need 
to be mutually agreed, at the same cost per Story Point. This Release Package may be delivered by Contractor over 
multiple deployment dates, but delivery of ECD-29 shall occur no earlier than January 1, 2023 and no later than 
December 31, 2023.

13129-1-RFP
EXHIBIT C, SOFTWARE SUBSCRIPTION AGREEMENT
1.
Subscription Uses and Restrictions
1.1. General.  The Contractor represents that it has the right to grant the Software Subscription hereunder.  The 
Software and its related Documentation are subscribed, not sold, to County for use only under the terms of 
this Software Subscription Agreement.
1.2. Subscription Grant.  Upon and subject to the terms and conditions of this Software Subscription Agreement, 
Contractor grants to County, and County accepts, a non-transferable, limited and non-exclusive Software 
Subscription to: (i) use the Software only for County’s internal business needs; (ii) use the Documentation 
to support the use of the Software and/or Service(s). All rights not expressly granted hereunder shall be 
reserved to Contractor.  Additionally, County shall not sell, rent, transfer, distribute or otherwise 
commercially exploit or make the Software or Documentation available to any third-party for any purpose 
beyond the administration of the Maricopa County Assessor’s Office under the laws of the State of Arizona.   
County and all of its users who have the right to use the Software on behalf of County under this Software 
Subscription Agreement, will be bound and comply with this Software Subscription Agreement.  
1.3. Restrictions.  County shall not, directly or indirectly (i) reverse engineer, decompile or disassemble the 
Software, or otherwise attempt to derive the source code of the Software, or any portion thereof; (ii) make 
more copies of the Software and the Documentation than is specified in this Software Subscription 
Agreement or allowed by applicable law, despite this limitation;  (iii) modify or create a derivative work of 
any part of the Software or Documentation; (iv) use the Software other than as, or for any purpose other 
than that, set forth in the Documentation or in any application that may involve risks of death, personal 
injury, severe property damage, or environmental damage; or (v) file copyright or patent applications that 
include the Software or Documentation or take any other action that may transfer any intellectual property 
rights in the Software or the Documentation to any Person other than Contractor.  The County recognizes 
that the Software and/or Documentation is itself proprietary information and shall use at least the same 
degree of care as it uses to protect its own proprietary information of similar kind, but in no event shall such 
care be less than commercially reasonable, so as to protect the Software and Documentation without limiting 
the generality of the foregoing.  For avoidance of doubt, the archival copy of the Software and 
Documentation County is permitted to keep hereunder may be used only to comply with County’s record 
keeping obligations under applicable law and for no other purpose.
1.4. Provision of Subscribed Software.  Contractor shall provide to County (i)(a) the object code for the Software 
or (b) remote access to the Software and (ii) Documentation for the Software.  
1.5. Locations.  In the event County receives the object code for the Installed Software (rather than remote access 
thereto) County shall use the Software only on the Designated Hardware and at the Designated Location(s). 
County shall have the right to change the Location of the Designated Hardware and to upgrade the 
Designated Hardware to use the Software on servers that replace the Designated Hardware.
2.
Protection of Proprietary Rights
2.1. Proprietary Rights.  County acknowledges that the Software and Documentation have been and shall be 
developed by Contractor at great expense to Contractor, that the Software and Documentation are 
proprietary to Contractor and that Contractor has, and shall have and retain, full title, ownership, proprietary 
and other intellectual property rights in the Software and Documentation, including without limitation,

13129-1-RFP
copyright, trademark, service mark, trade secret, trade name and other intellectual property rights 
(collectively the “Proprietary Rights”).  
2.2. County’s Rights.  County acknowledges and agrees that: (i) no title or ownership of the Software or 
Documentation is transferred to County hereby; (ii) the Software and Documentation and all Proprietary 
Rights are, and shall remain, the exclusive property of Contractor; and (iii) except for the Subscription and 
perpetual license upon Termination granted in Section 1 above, County shall not have any right, title or 
interest in the Software or Documentation.  County shall not make any claim or representation of ownership, 
or act as the owner, of any of the Software or Documentation. County agrees not to remove, change or 
deface, and shall include, Contractor’s copyright notice and notice of its Proprietary Rights on each and 
every item of Software copied or reproduced.
2.3. Contractor’s Rights.  Contractor acknowledges that it has no right to or interest in the data processed by 
County using the Software, except that of limited use of the Software. Contractor will work with the County 
to determine a demonstration data set for demonstration purposes to prospective customers of Contractor 
and any such data set shall be approved by County. 
2.4. Confidentiality.  County shall keep confidential the Software and other information of Contractor which is 
confidential, proprietary or nonpublic (“Confidential Information”) and shall not disclose the Confidential 
Information to any Person, except to employee(s) of County with a need to know the Confidential 
Information in order for County to perform its obligations under this Software Subscription Agreement. 
Confidential Information shall not include information which  (i) is in the public domain at the time of 
disclosure or enters the public domain through no act or omission of County, (ii) County’s written records 
in existence at the time of disclosure show was known to County at the time of disclosure, (iii) is freely 
disclosed to County, without restriction, by a third party without a duty of confidentiality to Contractor, and 
(iv) County’s written records show to have been developed independently by County by personnel without 
access to the Confidential Information.  
2.5. Notification of Unauthorized Use.  County shall promptly notify Contractor upon becoming aware of the 
possession, use, or knowledge of any Confidential Information by a Person not authorized by this Software 
Subscription Agreement to have such possession, use or knowledge.  County shall promptly furnish to 
Contractor full details of such possession, use or knowledge and shall use reasonable efforts to cooperate 
with Contractor, at Contractor’s expense, in any action taken or deemed necessary by Contractor to protect 
the Confidential Information or Proprietary Rights.
3.
Warranties
3.1. Software Warranty.  Contractor warrants to the County that the Software shall operate substantially in 
accordance with its Documentation for duration of the Contract Period (“Software Warranty”).  The 
Software Warranty shall commence 30 consecutive days after the Go Live Date, provided that there has 
been no significant failure, outage or event in Software during that 30-day period.  If a significant System 
failure/outage/event occurs, the 30-day period will reset and begin again.  The Software Warranty shall last 
for 60 days after the first 30-consecutive-day period after the Go Live Date without a significant Software 
failure, outage, or event (the “Software Warranty Period”). County’s exclusive remedy and Contractor’s 
exclusive obligation for any breach of this Software Warranty shall be the correction of Defects or 
replacement by Contractor of the nonconforming portion of such Software, at Contractor’s sole election and 
expense.  County’s notice shall disclose the items within the Documentation to which such Software fails to 
conform and the manner in which the Software fails to conform, with sufficient specificity to permit 
Contractor to reproduce and correct such nonconformity.  In the event Contractor determines, in its sole 
discretion, that it cannot, using commercially reasonable efforts, correct a Defect or replace such 
nonconforming portion of the Software, Contractor shall refund the Subscription fee paid hereunder for the 
affected period of the Defect.  This Software Warranty shall be null and void upon, and shall not apply to 
any Defect or nonconformity caused by (i) any modification or alteration of the Software other than by or 
with prior approval of Contractor, (ii) misuse or abuse of the Software or Documentation, (iii) negligence 
or wrongdoing of County in connection with the Software or Documentation, (iv) force majeure events as 
set forth in the Master Agreement, (v) malfunction of any of County’s equipment, or (vi) use of the Software 
or Documentation in any manner inconsistent with this Software Subscription Agreement or the 
Documentation therefor.  County shall pay Contractor at Contractor’s then-current time and materials rates

13129-1-RFP
for its Services in the event County makes a Software Warranty claim that is null and void or inapplicable 
hereunder.  
3.2. Services Warranty.  Contractor warrants that all Services will be performed in a professional and 
workmanlike manner, consistent with then-current industry standards (“Services Warranty”).  County’s 
remedy for a breach of the Services Warranty will be, at Contractor’s option, either to (i) re-perform such 
Service(s); or (ii) to provide County a refund for the allegedly defective Service(s).  Such remedy will only 
be available if County notifies Contractor in writing within thirty (30) calendar days of the completion of 
such Service(s). The Services Warranty shall commence with Contractor’s delivery of a production-ready 
System and shall continue until 30 days after Contractor’s contractual service obligations cease (the 
“Services Warranty Period”). 
3.3. Warranty Exclusions; Exclusive Remedy.  Contractor does not make any, and expressly disclaims, all 
representations and warranties, whether oral or written, express or implied, or arising by usage of trade or 
course of dealing, other than the warranties expressly made in this Software Subscription Agreement, 
including, without limitation, the warranties of merchantability, fitness for a particular purpose and non-
infringement.  Contractor does not warrant that the Software will satisfy, or may be customized to satisfy, 
all of County’s requirements or that the use of the Software will be uninterrupted or error-free.  The remedies 
set forth herein shall be the sole and exclusive remedies of County.
4.
Software Subscription, Services, and Enhancements
4.1. Commencement of Software Subscription Service.  The commencement date of the Software Subscription 
shall be August 1, 2022; however, the parties agree that no Software Subscription fees are payable to 
Contractor unless and until Contractor delivers a production-ready System.
4.2. Enhancements During Warranty.  Contractor shall provide to County during the Software Warranty Period, 
at no additional expense to County, any correction or Enhancement provided by Contractor, as determined 
by Contractor in its sole discretion.  After the expiration of the Software Warranty Period, Enhancements 
and Upgrades shall be available to County through the Software Subscription as described in Exhibit C.8.
4.3. Data Access Support. Contractor shall provide to County reasonable support to add, delete and modify 
database objects necessary to access data in the System for purposes external to the System such as website 
and extracts for other agencies. The access to such data shall be provided in a manner that supports the 
County’s existing business processes under the County’s current 6i system. Contractor will provide a 
database with elevated privileges to test and develop data access activities. This will be an interim solution 
until an alternative solution is developed using a maximum of 125 Story Points from a Post Go Live Release.
5.
Limitation of Liability; Indemnification 
5.1. Limitation of Liability.  Contractor shall not be liable for any loss or damage that County suffers or claims 
to have suffered other than, subject to the limitations set forth below, a loss or damage directly caused by 
Contractor’s negligence or willful misconduct.  Both Parties agree that Contractor has no liability 
whatsoever for County’s data or equipment.
5.2. Exclusion of Consequential Damages.  In no event will either Party be liable to the other for (i) incidental, 
consequential, indirect, special, punitive or exemplary damages, whether claimed under contract, tort or any 
other legal theory, including but not limited to loss of use, revenue or profit, or (ii) loss of or damage to 
County data or programming, in either event whether or not such Party had notice of the possibility of such 
damages occurring or should have known of such possibility. Notwithstanding anything to the contrary set 
forth in this Software Subscription Agreement, County and Contractor expressly agree that the maximum 
aggregate liability of Contractor for all claims under this Software Subscription Agreement or otherwise 
shall be the amount paid by County to Contractor hereunder during the twelve months immediately 
preceding the event causing the loss or damage to County.  The representations and warranties made in this 
Software Subscription Agreement extend only to County and its permitted successors and assigns.  Any 
action against Contractor not brought within six (6) months after the cause of action accrues or arises shall 
be deemed barred.

13129-1-RFP
5.3. Indemnification.  County shall, to the fullest extent permitted by applicable law, indemnify and hold 
harmless Contractor, its agents, employees, officers, directors, stockholders, successors and assigns from 
and against any and all liabilities, losses, damages, claims, suits and expenses, including, without limitation, 
reasonable attorneys’ fees, of whatsoever kind and nature imposed on, incurred by, or asserted against 
Contractor, its agents, employees, officers, directors, stockholders, successors and assigns relating to or 
arising out of any failure on the part of County to perform or comply with the terms of this Software 
Subscription Agreement.
6.
Intellectual Property Indemnification
6.1. Defense and Cooperation.  Contractor shall, at its own expense with counsel of its own choosing, defend 
any claim made against County asserting that the Software infringes upon the United States patent or 
copyright rights of a third party, provided that County provides immediate notice of such claim and 
Contractor has full control of such defense, the right to settle or compromise such claim and the incurring 
of any expense related thereto. County shall fully cooperate with Contractor in any such defense.
6.2. Infringing Software.  In the event of any claim described in Section 6.1 “Defense and Cooperation” above, 
or upon Contractor’s determination that such a claim may occur, Contractor shall have the right, at its option, 
to (i) procure for County the right to continue using that portion of the Software claimed to be infringing, or 
(ii) require County to cease using that portion of the Software claimed to be infringing and replace at no cost 
to the County such portion with other, equally capable or better software to make the Software non-
infringing.
6.3. Failure of Notification.  The failure of County to notify Contractor of such claim shall relieve Contractor of 
its obligations and liabilities under this Section 6 “Intellectual Property Indemnification.”  Contractor shall 
have no liability or obligation to County under this Section 6 if any such claim is made by an affiliate of 
County or is based upon, arises out of or results from (i) any product or information or data not provided by 
Contractor, (ii) the failure of County to use Enhancements or Upgrades to the Software, (iii) modification 
or alteration of the Software by a Person other than Contractor, (iv) misuse or abuse of the Software, (v) 
negligence or wrongdoing of County or any malfunction, modification or alteration of County’s equipment, 
(vi) force majeure events set forth in the Master Agreement, or (vii) use of the Software in any manner 
inconsistent with this Software Subscription Agreement or the Documentation.
6.4. Exclusive Remedy.  Section 6 “Intellectual Property Indemnification” specifies the entire liability of 
Contractor and the exclusive remedy of County with respect to any claim that the Software infringes the 
intellectual property rights of any third party or a breach of Section 1.1 “General” of this Software 
Subscription Agreement.
7.
Term and Termination of Software Subscription Agreement
7.1. Term.  This Software Subscription Agreement shall have the same Effective Date and Expiration Date as 
the Master Agreement.
7.2. Termination for Material Breach.  Contractor shall have the right, upon thirty (30) business days’ notice to 
County, to terminate this Software Subscription Agreement upon County’s breach of any of the terms and 
conditions of this Software Subscription Agreement and shall have the right to cease performance of its 
obligations hereunder, without notice, in the event County breaches any of the terms and conditions of this 
Software Subscription Agreement.  This Software Subscription Agreement shall automatically terminate in 
the event County is unable to pay debts as they come due, enters into suspension of payments, moratorium, 
reorganization or bankruptcy, admits in writing its inability to pay debts as they mature, suffers or permits 
the appointment of a receiver for its business or assets, or avails itself of or becomes subject to any other 
judicial or administrative proceeding related to insolvency or protection of creditors’ rights (and, if such 
action or proceeding is involuntary on the part of County, such action or proceeding is not dismissed within 
sixty (60) days).
7.3. Termination of Software Subscription Agreement.  If the County terminates this Software Subscription 
Agreement, the Contractor hereby grants to County a nonexclusive, royalty-free, perpetual license to use 
any Software and Documentation that were accessible to and provided the County during the term of this 
Software Subscription Agreement.  The grant foregoing subscription shall be subject to the County’s full

13129-1-RFP
payment of any amounts owed for the Software and Documentation and shall be revocable if the County is 
in material breach of this Software Subscription Agreement.  The County and Contractor agree that upon 
such termination the County retains the obligation to protect the confidential nature of the software and that 
Contractor has no further obligation to provide maintenance, updates, or any service to ensure the 
performance of the Licensed Materials after the termination date.
7.4. Obligations after Termination.  The termination of this Software Subscription Agreement shall be without 
prejudice to any rights of either Party against the other and such termination shall not relieve either Party of 
any of its obligations to the other existing at the time of termination.
7.5. Additional Remedies Due to Breach.  County acknowledges that, because of the confidential and proprietary 
nature of the Software, neither termination of this Software Subscription Agreement, nor arbitration, nor 
would an action at law be an adequate remedy for a breach by County of Section 1, “Subscription Grant and 
Restrictions” of this Software Subscription Agreement.  Accordingly, County agrees and consents that in 
the event of such a breach, in addition to all other remedies which the injured Party may have, the injured 
Party shall be entitled to relief in equity, including a temporary restraining order, temporary or preliminary 
injunction and permanent injunction to restrain the continuation of any such breach or to compel compliance 
with the provisions of this Software Subscription Agreement.
8.
Software Subscription Services Provided
8.1. During the Software Subscription Term, and upon and subject to the terms and conditions of the Software 
Subscription Agreement, Contractor will provide to County during Business Hours reasonable operational 
support and assistance as described below in connection with the use of the Software:
a)
Corrections to the Software and Documentation of Defects reported by County to Contractor, which 
Defects are caused by errors in the currently available Software, provided that such Defects are reported 
to Contractor no later than two (2) business days after the Defect is first recognized.
b)
Enhancements to accommodate changes in Arizona statute.
c)
Upgrades that County is entitled to receive pursuant to Section 9.
d)
Telephone and email support with respect to the Services delineated in Sections 8.1(a) hereof.
e)
Contractor’s obligation to provide a response pursuant to this Section 8.1 is void if the County does not 
allow reasonable access to the Installed Software for diagnostics and examination, or in the event of 
causes beyond the control of Contractor, including but not limited to acts of God, fire, flood, strike, 
national emergency or failures of communications facilities or lines.
8.2. This Schedule further shall not apply to, and the Services shall not be deemed to include:
a)
Development or engineering of the Software, unless Contractor shall deem such development or 
engineering necessary in its providing services under section 8.1 above;
b)
Any services related to work external to the Software. 
8.3. Any corrections, updates, enhancements, or upgrades shall meet or exceed the same acceptance and system 
performance standards established in Exhibit A, Scope of Work.
8.4. Service Level Agreement definitions and Defect classification post Go-Live are listed in the table below.  
County and Contractor will collaborate and build a decision tree which will aid in refining the system 
definitions in the table below.  If there is a conflict between the decision tree and the Classification table 
below, the Classification table below will supersede the decision tree.  
8.5. The Service Level Agreement shall include support for the integrations identified in Appendix 3 Section C.
8.6. Maintenance windows shall be outside County Business Hours, unless mutually agreed.
8.7. Contractor agrees to provide professional services to County to upgrade to a new version of the Software to 
support functionality delivered as of the final project Release (ECD-28 or ECD-29, as applicable). 
8.8. Contractor will provide County the opportunity to test new versions of the Software in a test environment. 
The County is responsible for all testing activities.

13129-1-RFP
8.9. Defect evaluation and classification
CLASSIFICATION
SYSTEM DEFINITION
MITIGATION/RESPONSE
SEV1
Defect prevents critical deadline-oriented 
business process from functioning.  No 
workaround exists.
Resolution, or an immediate fix must be 
delivered within  two (2)business days.
SEV2
Prevents or impedes business process 
from functioning or causes data 
corruption involving large amounts of 
folios.  This may include deadline-
oriented issues. 
Resolution, or a fix must be delivered within 
five (5) business days.
SEV3
Prevents or impedes lower business 
processes. 
Resolution, acceptable workaround, or a fix 
must be delivered within twenty (20) business 
days.
SEV4
 Usability issues has a non-intrusive 
long-term work around.
Fix may be included in a future Service 
Release.
8.9.1
  Root Cause
County and Contractor recognize that multitier solutions have many possible points of 
failure and that any severity level breach or remedy contemplated in this Contract applies 
only to failure of Contractor’s software to provide agreed-upon functions.  Faults whose 
root causes lie with County or third-party resources (eg, telecommunications) are outside 
the scope of this Service Level Agreement.  The time to resolution shall not commence 
until both County and Contractor have isolated and duly attributed the fault to a Defect in 
Contractor’s software.  The Contractor and the County should agree on the acceptance of 
the defect and associated severity level within 1 to 2 business days of the Defect being 
logged. 
8.9.2
Remedy
For faults in the Contractor’s software (other than Software Defects remedied pursuant to 
Section 3 of the Software Subscription Agreement) duly attributed as a Severity 1 or 
Severity 2 Defect, for each day beyond the Service Level Agreement that such Severity 1 
or Severity 2 Defect remains unresolved after acceptance and agreement on the applicable 
severity level, County shall receive a credit towards the next Software Subscription invoice 
of one day’s value of that year’s subscription cost.   
8.9.3
Remedy Examples
8.9.3.i.1
Severity 1 Example.  First thing the morning it is discovered that no employees 
can access the system.  Contractor investigates and determines that the 
Contractor hosted web service that provides access to the system has failed.  
Contractor re-cycles the web services at noon, and the system is now available 
to all authorized users.  Service level is met, and there is no breach and no need 
for remedy.
8.9.3.i.2
Severity 2 Example.  It is discovered that the Market Bulk Validation job errors 
out every time it runs.  As it is still several months before the valuation process 
must be completed it does not fall into the timing situation for a severity 1 bug, 
but because 1.4 million parcels are valued annually via the market bulk 
valuation job it qualifies as a severity 2 bug due to the large number of parcels

13129-1-RFP
being effected.  Contractor provides a patch seven business days later, two days 
over the agreed service level. The service level breach is remedied in the next 
Software Subscription billing cycle with a credit of 2 business days of the 
annual fee, thus representing the two-day lag in service level.
8.9.3.i.3
Severity 3 Example.  The contact search tab does not allow for scrolling or 
pagination of search results meaning any search is effectively limited to 50 
results.  Contractor provides new patch within seven business days, and County 
is able search for contacts and see results beyond the first 50 results.  As the 
service level for Severity 3 is twenty business days, there is no breach and no 
need for remedy.
8.9.3.i.4
Out of Scope Example.  County staff cannot login to the solution from within 
one location but can remotely and from a second downtown location.  County 
technical staff identifies a network failure, so the fault is not within scope of 
Contractor’s services and is therefore not escalated to Contractor.
9.
Software upgrades, warranty, & roadmap/enhancements:
9.1. The Contractor shall make available to the County, at no additional charge, all Enhancements and Upgrades 
to the proposed software as they are released so long as the County is currently under the Contractor’s 
Software Subscription Agreement.  Contractor shall provide information regarding all Enhancements and 
Upgrades in quarterly meetings, as set forth in Statement of Work, Section 1.1.5, and provide adequate time 
for County to analyze desirability of Enhancement and test/validate Enhancement prior to deployment date. 
The County shall decide at its discretion whether or not to take advantage of the updated version and support 
it under the Software Subscription Agreement. The County understands that not accepting certain Upgrades 
or Enhancements may result in outdated versions of the Software and the possibility of not being able to 
accept certain Upgrades or Enhancements in the future. Contractor will provide updates to County on the 
status of this development and the County’s remaining story points.
9.2. Beginning January 1, 2024, the cost for requested new functionality and/or professional services is the cost 
per story point set out in the rate card. These story points may be used by the County to request future 
development.  Contractor agrees to exercise good faith in complying with these requests.
All requests for new functionality or professional services should be requested at a minimum of one month 
prior to commencement of development.  Beginning January 1, 2024 the Contractor will be moving to a 
semi-annual release cycle. The sizes of each release must be mutually agreed. 
All requests for new functionality should be requested at a minimum of one month prior to commencement 
of development. 
9.3. To ensure that documentation is consistent with the operating environment, updated documentation shall be 
delivered concurrently with every software fix-pack or software update.
10.
Surviving Sections 
Notwithstanding anything to the contrary in this Software Subscription Agreement, sections 1.0, 2.0, 5.0, and 
6.0 shall survive expiration or earlier termination of this Software Subscription Agreement.

13129-1-RFP
APPENDIX 1, FUNCTIONAL AND TECHNICAL FEATURE REQUIREMENTS
Contractor will meet (or has met) County’s requirements in three categories

GO-LIVE PRODUCT – Features required for development and testing prior to the Go-Live Date.

POST GO-LIVE PRODUCT – Features required for development by ECD-28 (or ECD-29, as applicable*).

DELIVERED – Features accepted in a Release Package prior to the effective date of Project Change 
Request 05.
Each identified Release Package shall include Features encompassing a minimum singular and cumulative effort in 
Story Points in accordance with the following table.  These minimums and the calculation of total Story Point effort 
for the Go-Live and Post Go-Live Products include the 25% contingency from Master Agreement §6.13.1.
Category
Deliverable
Release
Minimum 
Release Story 
Points
Minimum 
Cumulative Story 
Points
Delivered
Go-Live Product
ECD-14
R-13
320
320
Yes
Go-Live Product
ECD-15
R-14
320
640
Yes
Go-Live Product
ECD-16
R-15
320
960
Yes
Go-Live Product
ECD-17
R-16
320
1280
Yes
Go-Live Product
ECD-18
R-17
320
1600
Yes
Go-Live Product
ECD-19
R-19
320
1920
Yes
Go-Live Product
ECD-20
R-20
320
2240
Yes
Go-Live Product
ECD-21
R-21
320
2560
Yes
Go-Live Product
ECD-22
R-22
320
2880
Yes
Go-Live Product
ECD-23
R-23
320
3200
Yes
Go-Live Product
ECD-24
R-24
320
3520
Yes
Go-Live Product
ECD-25
R-25
320
3840
Yes
Go-Live Product
ECD-27
R-26
481
4321
Yes
Post Go-Live 
Product
ECD-28
R-27
320
4641
Yes
Post Go-Live 
Product
ECD-29
R-28
320
4961
Yes
*Note: The parties agree that ECD-29 will be no fewer than 320 Story Points and no greater than 500 Story Points, 
at the cost per Story Point set forth in the Rate Card. Any increase in Story Points would need to be mutually agreed, 
at the same cost per Story Point. This Release Package may be delivered by Contractor over multiple deployment 
dates, but delivery of ECD-29 shall occur no earlier than January 1, 2023 and no later than December 31, 2023.
Assignment of specific Features to Deliverables is accomplished through an accepted Release Package including the 
Release Plan for the subsequent Release, at the direction of County.

13129-1-RFP
APPENDIX 2, CONTRACTOR TRAVEL AND PER DIEM POLICY
SERIAL 13129-RFP
1.0 All contract-related travel plans and arrangements shall be prior-approved by the County Contract Administrator. 
2.0 Lodging, per diem and incidental expenses incurred in performance of Maricopa County/Special District (County) 
contracts shall be reimbursed based on current U.S. General Services Administration (GSA) domestic per diem 
rates for Phoenix, Arizona.  Contractors must access the following internet site to determine rates (no exceptions): 
www.gsa.gov
2.1 Additional incidental expenses (i.e., telephone, fax, internet and copying charges) shall not be reimbursed. 
They should be included in the contractor’s hourly rate as an overhead charge.
2.2 The County will not (under no circumstances) reimburse for Contractor guest lodging, per diem or 
incidentals.
3.0 Commercial air travel shall be reimbursed as follows:
3.1 Coach airfare will be reimbursed by the County.  Business class airfare may be allowed only when 
preapproved in writing by the County Contract Administrator as a result of the business need of the County 
when there is no lower fare available. 
3.2 The lowest direct flight airfare rate from the Contractors assigned duty post (pre-defined at the time of 
contract signing) will be reimbursed.  Under no circumstances will the County reimburse for airfares related 
to transportation to or from an alternate site. 
3.3 The County will not (under no circumstances) reimburse for Contractor guest commercial air travel.
4.0 Rental vehicles may only be used if such use would result in an overall reduction in the total cost of the trip, not 
for the personal convenience of the traveler.  Multiple vehicles for the same set of travelers for the same travel 
period will not be permitted without prior written approval by the County Contract Administrator.
4.1. Purchase of comprehensive and collision liability insurance shall be at the expense of the contractor.  The 
County will not reimburse contractor if the contractor chooses to purchase these coverage.
4.2. Rental vehicles are restricted to sub-compact, compact or mid-size sedans unless a larger vehicle is necessary 
for cost efficiency due to the number of travelers.  (NOTE:  contractors shall obtain pre-approval in writing 
from the County Contract Administrator prior to rental of a larger vehicle.)

13129-1-RFP
4.3. County will reimburse for parking expenses if free, public parking is not available within a reasonable 
distance of the place of County business.  All opportunities must be exhausted prior to securing parking that 
incurs costs for the County.  Opportunities to be reviewed are the DASH; shuttles, etc. that can transport the 
contractor to and from County buildings with minimal costs.
4.4. County will reimburse for the lowest rate, long-term uncovered (e.g. covered or enclosed parking will not 
be reimbursed) airport parking only if it is less expensive than shuttle service to and from the airport.
4.5. The County will not (under no circumstances) reimburse the Contractor for guest vehicle rental(s) or other 
any transportation costs.
5.0 Contractor is responsible for all costs not directly related to the travel except those that have been pre-approved 
by the County Contract Administrator.  These costs include (but not limited to) the following: in-room movies, 
valet service, valet parking, laundry service, costs associated with storing luggage at a hotel, fuel costs associated 
with non-County activities, tips that exceed the per diem allowance, health club fees, and entertainment costs.  
Claims for unauthorized travel expenses will not be honored and are not reimbursable. 
6.0 Travel and per diem expenses shall be capped at $276,834.00 for the duration for the implementation period.

13129-1-RFP
APPENDIX 3, SCOPE OF WORK SUPPORT DOCUMENTS
SERIAL 13129 –RFP
A.
Data Migration Assumptions and Acceptance Criteria
B.
Report Assumptions
C.
Integration Assumptions
D.
Milestone/Deliverable Acceptance Form
E.
Change Order Request Form

13129-1-RFP
A: DATA MIGRATION ASSUMPTION & ACCEPTANCE CRITERIA
This attachment addresses two topics as starting points for the Data Migration activities.
1.
Known sources of data to be migrated to the System.
2.
Initial criteria for the acceptance of migrated data.
KNOWN DATA SOURCES:
The following sources of production data shall be considered the starting assumption for the Data Migration 
activities.  As the planning task progresses, additional data sources may become evident.
PAIS
Production Assessor Information, also referred to as “Oracle”, “6i” and Secured or Unsecured
Purpose: Production data for the management of real and business personal property appraisal.  
Migration assumption: The amount of data to migrate (# of Years), and the estimated number of records for each 
subject is provided for each subject area.  Not all tables within PAIS are subject to migration.
DATA (SUBJECT AREAS)
DATA OWNER(S)
# OF 
YEARS
ESTIMATED # 
OF RECORDS
Residential Property Characteristics
Real Property
7
1.6M/Yr.
Land Characteristics
Real Property
7
1.7M/Yr.
Commercial Characteristics 
Real Property
7
2.4M/Yr.
Commercial Cost Components
Real Property
Valuation 
Year 2018 
forward
2.4M/Yr 
(included with 
above)
Personal Property Account 
Characteristics
Real Property
7
150K/Yr.
Apartment Characteristics
Real Property
7
12K/Yr.
Centrally Valued Property 
Characteristics
Real Property; Admin
7
1K/Yr.
Unsecured Mobile Home Characteristics
Real Property
7
56K/Yr.
Agriculture Characteristics
Real Property
7
17K/Yr.
Golf Characteristics
Real Property
10
15K/Yr.
Common Area Characteristics
Real Property
7
47K/Yr.
Valuation Information
Admin
7
1.6M/Yr.
Ownership Information
Ownership/Mapping
All History
4.2M (Total)
Situs Address Information
Real Property
All History
1.5M (Total)
Sales Information
Real Property
7
3M/Yr.
Parcel History 
All
All History
14.4M (Total)
Personal Property Account History
Real Property
All History
320K (Total)
Appeals Information
Real Property; Litigation
7
15K/Yr.
Resolution Information
All
7
310K (Total)
Legal Class Information
Real Property
7
2.3M/Yr.
Subdivision Information
Real Property
7
30K/Yr.
Litigation Information
Litigation
7
25K (Total)
Exemptions (both Personal and 
Organizational)
Real Property
7
234K (Total)
Association Parcel Information
Real Property
7
114K/Yr.

13129-1-RFP
DATA (SUBJECT AREAS)
DATA OWNER(S)
# OF 
YEARS
ESTIMATED # 
OF RECORDS
Deed Information (including Title Chain 
Information)
Ownership/Mapping
All History
33M (Total)
Business Equipment Information
Real Property
7
625K/Yr.
Splits Information
Real Property; 
Ownership/Mapping
7
75K/Yr.
Special District Information
Admin
7
2.3M/Yr.
Notice of Proposed Correction/Claim 
Information
All
7
20K (Total)
Rental Registration Information
Real Property
All History
360K (Total)
Senior Valuation Protection Information
Real Property
All History
40K (Total)
First and Final Re-class Information
Real Property
7
360K (Total)
Tax Information
Admin
7
12M/Yr.
Tax Roll Information
Admin
7
1.6M/Yr.
OnBase 
Commercial off the Shelf application for use in content management, document management, etc.  
www.onbase.com
Purpose: Currently being used as a workflow tool for the management of all appeals; and to store all appeals-related 
documentation.
Migration assumption: All documents that reside with any migrated appeal record should be related to the correct 
record in the System.
APEX 
Commercial off the Shelf application for use in recording property sketches.
Purpose: Currently being used to capture property sketches.
Migration Assumption: All sketches related to a parcel will remain related to the correct parcel.
DATA MIGRATION BALANCING TOLERANCES:
During each data migration iteration, the following criteria shall be used as acceptance criteria.  This may be over-
ridden or appended as agreed to in the Data Migration Plan.  Each balance tolerance shall be treated as a maximum 
variance, or the additional variance must be explained and accepted by the County.
From the RFP:
Record Balancing

Migrated records, by record type and subtype, shall balance to zero unexplainable 
discrepancies by count.

Migrated records, by record type and subtype, shall balance to within $500 in 
unexplainable discrepancies by dollar value.

Migrated records, by record type and subtype, shall balance to within 0.25% in 
unexplainable discrepancies for any value where a sum total (other than dollars) can 
be used (e.g., square feet, linear feet, volume, etc.)

13129-1-RFP
Category
Criteria
Examples
Real Property
1) Total parcel count broken 
down by ‘active’ and ‘deleted’ 
parcels certified tax year
Parcel count pre-conversion must 
equal parcel count post- conversion 
(active and deleted)
150,000  before = 
150,000 after
2) Parcel counts by city by 
property class certified tax year
Parcel counts for each property class 
within a city or outside city 
boundaries.
101’s in  Phoenix  before = 1,200  
101’s in  Phoenix  after   = 1,200 
3) Total full cash  value (FCV) 
for certified tax year
Values must be an exact match
FCV prior = $ 34,000,000,000 FCV 
after = $ 34,000,000,000
5) Total assessed value (AV) for 
certified tax year
Values must be within 0.006% of 
one another
AV prior = $19,000,000,000
AV after = $19,000,000,000
8) Total real market value 
(RMV) for certified tax year by 
tax code area. 
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$1,000,000 
Tax Code area 015067 after = 
$1,000,000
9) Total assessed value (AV) for 
certified tax year by tax code 
area. 
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$680,000 
Tax Code area 015067 after = 
$680,000
9.1) Total net assessed value 
(NAV) for certified tax by code 
area
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$740,000 
Tax Code area 015067 after = 
$740,000
11) Total  assessed value (AV) 
for certified tax year by tax code 
area. 
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$240,000 
Tax Code area 015067 after = 
$240,000
12) Total exception NAV for 
certified tax year
Values must be an exact match
Exception NAV prior = $80,000,000
Exception NAV  after = $80,000,000  
13) Total parcel count broken 
down by ‘active’ and ‘inactive’ 
parcels current tax year
Parcel count pre-conversion must 
equal parcel count post- conversion 
(active and deleted)
150,000  before = 
150,000 after
14) Parcel counts by city by 
property class current tax year
Parcel counts for each property class 
with a city or outside city boundaries 
must be an exact match.
101’s in  Phoenix  before = 1,200  
101’s in  Phoenix  after   = 1,220 
15) Total real market value 
(RMV) for current tax year
Values must be an exact match
FCV prior = $ 34,000,000,000 FCV 
after = $ 34,000,000,000
17) Total assessed value (AV) 
for current tax year
Values must be within 0.006% of 
one another
AV prior = $19,000,000,000
AV after = $19,000,000,000
18) Total maximum assessed  
value (SAV)for current tax year
Values must be within 0.006% of 
one another
SAV prior = $9,000,000,000
SAV after = $9,000,000,000
19) Total full cash value (FCV) 
for current tax year by tax code 
area. 
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$1,000,000 
Tax Code area 015067 after = 
$1,000,000

13129-1-RFP
Category
Criteria
Examples
20) Total assessed value (AV) 
for current tax year by tax code 
area. 
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$680,000 
Tax Code area 015067 after = 
$680,000
20.1) Total maximum full cash 
value (FCV) for current tax by 
code area
Values must be within 0.006% of 
one another
Tax Code area 015067 before  = 
$740,000 
Tax Code area 015067 after = 
$740,000
21) Total full cash value (FCV) 
exception value for current tax 
year
Values must be within 0.006% of 
one another
FCV prior = $100,000,000
FCV after = $100,000,000  
22) Historical full cash  values 
(FCV)  county wide by year
Values must be an exact match back 
to 2010-2011
23) Historical maximum assessed 
(NAV)  county wide by year
Values must be an exact match back 
to 2010-2011
24) Historical assessed values 
(AV)  county wide by year
Values must be an exact match back 
to 2010-2011
25) Historical secondary assessed 
values (SAV)  county wide by 
year
Values must be an exact match back 
to 2010-2011
26) Historical maximum 
secondary assessed values 
(MSAV)  county wide by year
Values must be an exact match back 
to 2010-2011
27) Total acres for certified tax  
year
Total summarized acre count should 
match before and after conversion.
Acre count prior = 322,017
Acre count after  = 322,017
28) Total acres for current tax 
year
Total summarized acre count should 
match before and after conversion.
Acre count prior = 322,017
Acre count after  = 322,017
29 ) Primary Residence Count 
Total # of Primary Residences 
should match before and after 
conversion.
Primary Residence count prior = 
121,676
Primary Residence count after  = 
121,676
30) Personal Exemption or 
Senior Counts
Run inventory of manual flags for 
Senior or Disabled counts
Senior or Disabled prior =  640
Senior or Disabled prior =  640
31) Commercial building 
sections
Commercial building sections’ 
Marshall and Swift “occupancy 
code” must be maintained
Maricopa County uses the Marshall 
and Swift occupancy code.
31.2) Property Exemptions 
certified year
Calculate exemptions correctly to 
match within reasonable tolerances. 
Exemptions Before= 10,000,0000
Exemption After 10,002,500

13129-1-RFP
Category
Criteria
Examples
32) Parcel level accuracy 
requirements
It is the County’s intent that all valid 
legacy data at the parcel detail level 
be converted into the System.  Parcel 
data prior to conversion should be an 
exact match to parcel data after 
conversion.  Examples of the type of 
data to be converted include but are 
not limited to those items shown at 
the right.
Valid legacy data is defined as those 
items identified in the data migration 
plan to be converted.

Adjustments to land

Building Class, and Sq.Ft.

Actual Year Built

Effective Year Built

Indexes ( quality, 
depreciation, neighborhood)

Bldg counts on a parcel 
must be equal

Land table

Land Classes

Multi-family unit counts

Legal Class
33) Valuation methods
Valuation methodologies must be 
maintained.
If a parcel is valued on the Income 
Approach in 6i, then that parcel 
should still be valued on income 
approach in the System post 
conversion.
Appeals
34) General scope
(Need to be tested on prior year)
Must maintain historical record of 
data associated  SBOE appeals (six 
years)
Examples of the type of data to be 
converted include but are not limited 
to those items shown at the right.
There is also a number of scanned 
documents that include petitions and 
evidence.

Petition number

Parcel number

status

Owner information 
including representative

Date petition received

Tax payer comments

SBOE dates, outcomes

Assessor Recommendation

Board Decision

Final Comments

Noticed value

Assessor’s recommended 
values

Decision Values

13129-1-RFP
Category
Criteria
Examples
Sales/Deed History
35) General scope
Must maintain historical record of 
sales and data associated with sales. 
Examples of the type of data to be 
converted include but are not limited 
to those items shown at the right.

Seller of record

Owner of record

Sale/Deed date

Sale price

Deed type

Deed number

Recording number

Parcel acres

Property use codes

Sale validation codes

Full cash values at time of 
sale

Ratios
Personal Property
36) Total value for certified tax 
year  (FCV and AV)
Value must be within 0.006% of one 
another
Prior FCV = $1,110,000,000
After FCV= $1,110,000,000
Prior AV = $1,110,000,000
After AV= $1,110,000,000
37) Total value for certified tax 
year by tax Code area
Value must be within 0.006% of one 
another
Prior FCV 924010 = $247,000,000
After FCV 924010 = $247,000,000
38) Total value for current tax 
year
Value must be within 0.006% of one 
another
Prior FCV = $1,110,000,000
After FCV = $1,110,001,000
39) Total value for current tax 
year by tax code area
Value must be within 0.006% of one 
another
Prior FCV 924010= $247,000,000
After FCV 924010= $247,000,000
40) Total number of accounts for 
current tax year, broken down by 
active and deleted
Count must be within 0.006% of one 
another
Prior active = 9,000
Prior deleted = 4,500
After active = 9,000
After deleted = 4,500
41) Total Number of accounts for 
the current tax year that have a 
late filing penalty
Count must be an exact match of 
accounts with a late filing penalty 
Prior accounts with penalty After 
accounts with penalty

13129-1-RFP
Category
Criteria
Examples
42) Account level accuracy 
requirements  (current year)
It is the County’s intent that all valid 
legacy data at the account detail 
level be converted into the System.  
Account data prior to conversion 
should be an exact match to account 
data after conversion.  Examples of 
the type of data to be converted 
include but are not limited to those 
items shown at the right.
Valid legacy data is defined as those 
items identified in the data migration 
plan to be converted.

Total number of detail lines

Detail lines by year 
acquired

Total cost per line item and 
by account

Calculated value per detail 
line

Maintain to link leaser to 
lessee 

Depreciation type

Business type code
Special Assessments
43) Total number of parcels 
under   Statutory Classification 
by type 
Count must be an exact match by 
type
Prior CU = 6,100
After CU = 6,100
44) Total acres of land under  
Statutory Classification by acres
Acres must be an exact match by 
type
Prior = 250 ac
After = 250 ac
45) Certified year total value by 
value type (FCV, NAV of land 
under  Statutory Classification
Value must be an exact match by 
type and value type
Prior FCV STF = 80,000,000
After FCV STF = 80,000,000
46) Total number of Special 
assessment districts
Count must be an exact match of 
both districts and parcel counts
Prior = 3,500
After = 3,500
47) Total number of Special 
assessment district acres
Acres must be an exact match
Prior = 3,500
After = 3,500
48) Parcel level accuracy 
requirements
It is the County’s intent that all valid 
legacy data at the parcel detail level 
be converted into the System.  Parcel 
data prior to conversion should be an 
exact match to parcel data after 
conversion.  Examples of the type of 
data to be converted include but are 
not limited to those items shown at 
the right.
Valid legacy data is defined as those 
items identified in the data migration 
plan to be converted.

Soil type per Acre

Total FCV by Soil/Site type

Special Use  value by 
Soil/Site Type 

Effective Size

Description of Soil/Site 
type
Tax Roll 
49) District certifications Counts, 
rates, values, and taxes 
The values for roll extension and 
certification will match the 
“Certified Tax Roll” once converted 
into the System. 
50) Code Districts
All
51) Tax Roll Data 
Within 1 dollar by district
51.2) Special Assessment codes
Count of Special Assessment codes 
matches.
350 before = 350 after

13129-1-RFP
Category
Criteria
Examples
51.3) Total Special Assessment 
Imposed assessments
Total value of Special Assessment 
matches.
$490,481.54 before = $490,481.54 
after
51.4) District level accuracy
Detail of District codes matches.
Description, contact information, 
DOR code, tax rate, distribution %, 
code areas, etc.
51.5) Code Areas
Total count of code area 
combination matches.
015060 = 20 parcels before equals 
015060 =20 parcels after
51.6) Code Area level accuracy
Detail of Code Area matches.
Description, DOR code, tax rates, 
distribution %, code areas, etc.
51.7) SVP frozen and Market 
Values
Total values by SVP agencies 
matches.
SVP Phoenix = $350,000 before 
equals Market Phoenix = $350,000 
after
51.8) Joint County value by 
Districts
Total value by Districts matches.
Phoenix =$25,000 before equals 
Phoenix =$25,000 after
51.9) Total Assessed Value 
(AV), exemptions and Net 
Assessed Value (NAV)
Grand total of AV, exemptions and 
NAV
NAV before = $2,890,008              
NAV after = $2,890,008
51.10) Total NAV for Real 
properties, Personal Properties, 
and Utility accounts.
Total assessed value for Real 
properties, Personal Properties, and 
Utility accounts.
NAV Real properties before =$1,000 
NAV Real properties after = $1,000

13129-1-RFP
B: REPORT ASSUMPTION
The reports listed below represent the major reports required by Statute in Arizona and shall be operational, 
producing complete and accurate results, at Go-Live, as well as a sampling of reports currently used by the County.  
Many other reports will be required and evaluated for action as part of the development activities.  The Reporting 
Framework provided by Contractor shall support all reports listed here. County is responsible for development and 
validation of reports from that provided Framework.
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
Remote Municipal 
Property
Annual
42-15252
Contains a listing of exempt municipal properties located 
within Maricopa County.  Used to report the properties 
owned by municipalities outside the county per ARS 42-
15252.  The county assessor shall determine the full cash 
value and primary and secondary assessed valuation of 
remote municipal property at the same amount and using the 
same method of assessment as applied to private property 
that is used for the same purpose in the county.
Levy Limit Report
Annual
42-17052
Contains the Current Net Assessed Value and Property 
Subject to Taxation in the Prior Year used to calculate the 
amount of new construction by taxing jurisdiction. 
Determine the assessed value for the current tax year of all 
property in the political subdivision that was subject to tax in 
the preceding tax year.
State Abstract
Multiple
42-15155
Contains an aggregate summation of valuations by taxing 
jurisdictions.  It contains all property and must create a Net 
Assessed Value but subtracting properties which are 
determined to be exempt per ARS 42-15155 and must be in a 
format determined by the Department of Revenue.
GPLET Report
Annual
42-13051
(Government Property Lease Excise Tax) – Contains the 
properties reported to the Assessor which are determined to 
be subject to an excise tax and leased to a private entity per 
ARS 42-13051 & 46-6406.  List the property with the 
determined valuation for use on the tax roll and report to the 
department of education the determined valuations of 
properties that are subject to the government property lease 
excise
Annexation Reports
On-Demand
48-261
Contains a list of parcels within a proposed annexation area 
based on a supplied boundary per ARS 48-261.  The detailed 
list of taxed properties provided by the assessor.
Exception List
Annual
42-13053
Contains a list of parcels which the value has changed more 
than 15% from the preceding year per ARS 42-15053.  If the 
county assessor initially determines the valuation of property 
under this article by using a computerized data processing or 
valuation program, and if the valuation found by that method 
constitutes a change in the valuation methodology and the 
resulting change in valuation in any year is more than fifteen 
per cent above or below the valuation found for the same 
parcel of property in the preceding year, the assessor shall 
place the parcel on an exception list.
Non-Appraised List
Annual
42-13003
Contains a listing of parcels in which the value has not 
changed in the previous 3 years per ARS 42-13003.  The 
county assessor shall report to the department each parcel of 
property that has not been appraised during the preceding 
three years.
Split Control File
 
 
SP11045.RDF

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
AZ Residential Rental 
Property Information
 
 
SP28010.RDF
Organizational 
Exemption Report
 
 
SP32025.RDF
Common Area Parcel 
Maintenance Screen 
Print
 
 
SP33005.RDF
DIMS Parcel History 
Report
 
 
SP50010.RDF 
Residential 
Subdivision 
Information Report
 
 
SP50025A.RDF
Residential 
Subdivision Activity 
Report
 
 
SP50025B.RDF
Residential 
Subdivision Models 
Report
 
 
SP50025C.RDF
STAR Center Report
 
 
SP99020.RDF
Update Property 
Legal Description 
Report
 
 
SP99035.RDF
Prior Years Value 
Information Screen 
Print
 
 
SP99070.RDF
Value History Report
 
 
SP99071.RDF
Exemption 
Remainder/Qualifying
SB32005
Tax Exemption 
Notification
SB32070
Open non-subdivision 
Splits by dept
Monthly
 
SR11010
Split apportionment 
report
Weekly
 
SR11013
Prop 104 Granted 
Letter
Weekly
 
SR12070
Prop 104 Renewal  
Granted Letter
On-Demand
 
SR12071
Permit issuing agency 
last received
Weekly
 
SR21090
AG acreage  
discrepancy
Monthly
 
SR21250
Pending AG 
Applications
Monthly
 
SR21285
Sales involving AG 
parcels
Monthly
 
SR21295
Marker file report
Feb, Aug, Sep
 
SR23070
Permanent Override 
(Assessor)
Annual
 
SR23135
Residential Master
Annual
 
SR23170
Assessor - Level 
Notice of Mtg
Daily during 
appeals
 
SR24036

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
List of attendees for 
Santa Fe (RD)
 
 
SR24038
Appeals by Dept/Area
Weekly
 
SR24040
Assessor Notice of 
Decision
Daily during 
appeals
 
SR24120
Reso Maint Change 
report
Weekly
 
SR25006
Print reso's for phase
Weekly
 
SR25010
Finalized resos by 
department
Monthly
 
SR25011
DOR960 
Bi-weekly
 
SR25015
Open Resolution 
Splits 
Monthly
 
SR25030
Pending resolutions - 
NOPC (RP)
Bi-weekly
 
SR25040
Litigation case 
Daily
 
SR27005
Management  Case 
Monthly
 
SR27007
Lit Cases 
w/judgments due
Monthly
 
SR27010
Rental Property 
Summary 
 
 
SR28005
Non Registered 
Rental Res Prop
Monthly
 
SR31015
Organizational 
Exemption Response
User
 
SR32085
Percent exempt non-
filers
Monthly
 
SR32150
Personal exemption 
cross over
User
 
SR41325
Subdivision Index 
Report
At Notice time
 
SR42020
Notice of Claim - 
Real Property
Monthly
 
SRBS015
Prop 104 Granted 
Letter
User
 
UR12070
Renewal Granted 
Letter
User
 
UR12071
Ownership & Situs 
Address Changes
Monthly
 
UR12075
UPPS Senior 
Protection Variance 
Monthly
 
UR30011
Unprocessed 
Received 520 Accts
User
 
UR50010
UPPS Multi Co 
Listing
User
 
UR50023
UPPS Lease Co 
Listing
User
 
UR50024
Mobile Home by 
Situs address
User
 
UR50050a
UPPS Mobile Home 
dup indent number
User
 
UR50065
UPPS Canvass Book
User
 
UR50130

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
UPPS Stratification
User
 
UR50310
UPPS accounts w/ 
Multiple cls codes
User
 
UR50600
UPPS accounts w/ 
Multiple cls codes 
calc
User
 
UR50610
Parcels w/ Assoc 
PUC & no Econ unit
Periodic
 
assoc_no_econ_cm_
Parcels w/ $1 land 
values
Periodic
 
dollar_land_all
Parcels w/Assoc PUC 
& an IMP FCV
Periodic
 
impr_assoc
Parcels w/ IMP cls 
and no components
Periodic
 
impr_no_comps
Parcels w/ no Land 
components
Periodic
 
missing_land_comps
Single Parcel 
Economic Units
Periodic
 
single_assoc
Property legal class 
ratio verification
Periodic
 
SR99013
Property legal class 
ratio verification 
w/modeled values
Periodic
 
SR99013_mvl
Parcels w/vacant PUC 
& IMP or components
Periodic
 
vacant_puc_imps
Lead Parcels w/Assoc 
PUC
Periodic
 
vfy_lead_parcels
Parcels in Common 
Area table not exempt
Periodic
 
check-ca-exempt.sql
Parcels with exempt 
status not in Common 
Area table
Periodic
 
check_exmpt_not_ca.sql
Parcels with 12 legal 
class
Periodic
 
class12.sql
Unsecured All 
Property Types 
Variance Report
Annual
 
UB30134.spr
504 Tax Clearance 
Permit
Daily
 
Excel 
Preliminary Top 100 
Property Owners in 
Value Gain
Bi-Annual
 
ST23005.sqr
Preliminary Top 100 
Property Owners in 
Value High
Bi-Annual
 
ST23007.sqr
Preliminary Top 100 
Property Owners in 
Value Loss
Bi-Annual
 
ST23008.sqr
Preliminary 
Comparison Land- by 
City
Annual

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
Preliminary 
Comparison 
Commercial- by City
Annual
 
 
Preliminary 
Comparison Full 
Cash Value Analysis  
Annual
 
 
Preliminary Median 
Value by Property 
Type
Annual
 
 
Preliminary 
Comparison Single 
Family Residential- 
By City (includes 
Condos)
Annual
 
 
Preliminary 
Comparison Single 
Family Residential- 
By Zip (includes 
Condos)
Annual
 
 
Preliminary 
Secondary Abstract 
Secondary and 
Primary Valuation
On-Demand
 
 
Preliminary Top 100 
Business Personal 
Property Owners in 
High Value
Annual
 
 
DOR Sales File
Monthly
 
ST42095
Data File for CAGRD 
Parcels
Quarterly
 
ST12100
Export permits to 
send DOR
Monthly
 
ST21005
Export of Economic 
Units
Monthly
 
ST21300
Notice of Value Files
Annually
 
ST23070
File of Registered 
Rentals by City
Weekly
 
ST42005
Creates DOR "Parcel 
File"
For NOV, 
NOC
 
ST42015
Creates DOR "MAS 
File"
For NOV, 
NOC
 
ST42016
Creates Subdivision 
Index File
Monthly
 
ST42020
Subdivision File by 
City
Monthly
 
ST42021
Sales Affidavit File
Monthly
 
ST42025
Sales Affidavit's by 
City
Aug, Feb
 
ST42026
RD Master File by 
City
Monthly
 
ST42032
RD Master File 
w/Ownership and 
Situs
Monthly
 
ST42033

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
Personal Exemption 
File
Aug, Feb
 
ST42045
Secured Master in 
140,000 row pieces
Quarterly
 
ST42060
Secured Master by 
City in 140,000 row 
pieces
Quarterly
 
ST42061
File of all parcels for 
a city based on input
Monthly
 
ST42062
Notice of County 
Island and Island Fire 
Dist.
Monthly
 
ST42063
Notice of Error 
Listing
Annually
 
ST42066
Land Component 
Master
Aug, Feb
 
ST42067
Enhanced Secured 
Master by Book
Monthly
 
ST42073
Secured Master plus 
Sec. Net Assessed 
Values
Monthly
 
ST42075
Premium Secured 
Master by Book
Monthly
 
ST42076
Top 25 Taxpayers by 
Net Sec. Assessed 
Value by City or Dist
Weekly
 
ST42080
Cost_impr_base file
Monthly
 
ST42082
Commercial Master 
by City
Monthly
 
ST42083
Top 25 Taxpayers by 
Net Sec. Assessed 
Value
Monthlyish
 
ST42085
DOR full cost file
Bi-Weekly
 
ST42090
Notice of Change 
Files without 
redaction
Annually
 
ST23072
Apartment Master 
File
Quarterly
 
ST42100
Secured Extract File
Weekly
 
ST99050
Secured Property 
Information
Daily
 
SP99005
Account Maintenance
Daily
 
UP20130
Creates UPPS 520 
Low-Value PDF file
Annually 
December
 
UB30020
Creates UPPS 520 
Non-Filer Forms
Annually 
December
 
UB30021
Creates UPPS 520 
Non-Filer Reprint 
Forms
Annually 
December
 
UB30021B
Upps 520 Exemption 
Report
December and 
July
 
UB30022
UPPS Tax Roll Files
Anually 
 
UB30031

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
UPPS Notice of 
Value Printer Files
Anually 
 
UB30050
UPPS Notice of 
Value Microfiche
Anually 
 
UB30055
UPPS Notice of 
Value Data Files
Anually 
 
UB30056
UPPS preliminary 
secured mismatch 
report
Weekly
 
UB50180
Preliminary parcel 
numbering report
Daily
SR11020
Senior Protected 
parcel in split process
Quarterly
SR11065
Senior protected 
parcels not LC 2 or 3
Quarterly
SR12015
Permits errors for Phx 
from SB21006
Weekly
SR21014
open permits greater 
than 90 days old
Monthly
SR21070
Open permits on 
historic properties
Monthly
SR21085
Rejected permits by 
city
Weekly
SR21116
Report of A6 parcels
Anually in Oct
SR23165
Assessor level appeal 
meeting notices
daily during 
appeals
SR24035
Address changes and 
PHF by Pub Asst
Monthly
SR31011
New recordings on 
historical properties
Monthly
SR31012
New changes in LC to 
RR and old 
registration
Monthly
SR31014
Weekly deed transfer 
report
Monthly
SR31017
redacted parcel listing
quarterly
SR31065
Exemptions Report
User requested
SR32010
PE exemption 
summary
User requested
SR32020
Tax Exemption File 
Print (Limited)
User requested
SR32030
Tax Exemption File 
Print (Full Cash)
User requested
SR32040
Redemption of 
Waiver for Org 
Exmpt.
User requested
SR32092
Creates redemption of 
waiver report for pers 
exmpt
User requested
SR32097
FCV/LPV Alpha 
Listing
User requested
SR32100

13129-1-RFP
REPORT TITLE
FREQUENCY
STATUTE
DESCRIPTION
Prints claim for tx 
exmpt.for ORG 
Exmpt
Anually
SR32140
cancelled parcel in 
Common Area
Monthly
SR33015
Common Area 
Exception Report
Monthly
SR33020
Create a list of 
'special handling' 
parcels from 
affidavidts
Daily
SR99095
Parcels with sec PP 
before and after reso 
change
Monthly
SR99130
Preliminary tracking 
report
Monthly
SR99215
Land size change 
report
Monthly
SR99225

13129-1-RFP
C: INTEGRATION ASSUMPTIONS
The following integration points shall be considered the starting assumption for the data integrations.  The method 
of integration, frequency, data types, etc., may change as analysis progresses and the final Development Plan is 
approved.
1. 
COMPLETE INTEGRATION
The following software products require complete, “seamless” integration—i.e., the integration should function 
as a single unit and part of the System, and not require periodic (even frequent) data transfers or 
transformations.  The end-user should experience the use of the integrated component as if he/she were in the 
primary software application.
Use Cases and specifications shall be developed during system development.
1.1. 
GIS/Pictometry Aerial and Streetfront Imagery
The System shall have ability to view all geospatial data, as contained in the County Assessor’s enterprise 
Esri GIS and Pictometry imagery, using the parcel or improvement context provided by the system. No 
additional querying of the GIS or imagery is required.  Basic geospatial viewing functionality shall be 
available to the user: pan, zoom, use of identify feature, full use of various oblique imagery, angles, etc.
No data exchange will take place, only utilization of GIS & image functionality as part of the System will 
occur.
Example:  When the user is viewing property components of a given improvement, the user can cause the 
parcel (GIS) to be visible on demand or the GIS/image is queried and presented automatically when context is 
achieved in the system. 
1.2. 
GeoSketch
GeoSketch is a building sketch (polygon geometry) editor for creating and editing parcel improvement features 
in a georeferenced environment. The current implementation of GeoSketch in Assessment Analyst Desktop 
Review will be enhanced to better integrate with the browser-based solution for remote and desktop users, and 
to offer the required mobile field application functionality without the need to transfer data between systems, 
subsystems or viewers.  The County will ensure all original sketch source data will be made available for 
conversion. 
1.3. 
Marshall & Swift Cost Tables
The System shall utilize the commercial cost tables and updates provided by Marshall & Swift to complete 
any valuation where the cost method is used.  No additional action by the user shall be required to cause the 
Solution to function properly and complete the valuation.
Marshall & Swift Valuation Platform web service will be adopted by the County as the primary cost valuation 
engine. The Marshall & Swift Square Foot Cost engine utilized by the Assessor’s Office is specific to the 
County.  
1.4. 
Assessment Analyst Desktop Review (AA DTR)
The System shall utilize an updated version of Esri Canada’s Assessment Analyst Desktop Review product to 
integrate building sketches, imagery, data and analytics without the need to transfer data between systems,
subsystems or viewers.
2. 
EXTERNAL DATA INTEGRATIONS
The following software products require integration, but they do not need to behave as if the software and the 
System are a single unit.  Operation may occur to allow interactivity.
2.1. 
Third-party Statistical Software Application (TSSA)

13129-1-RFP
The System shall allow the TSSA to perform all statistical calculation and regression analysis of the creation 
of all valuation models.
Data will flow both directions: sales and property characteristics will flow to the TSSA, and the model 
syntax, parameters, coefficients, and any additional related data (as jointly determined and documented 
between Contractor and County) will be made available in the System utilizing a method jointly agreed upon 
by the Contractor and County.  The models will continue to be developed in the TSSA.  The developed 
models will be serialized and translated such that they can be executed directly from the Software along with 
the property characteristics from a single parcel or many parcels stored in the system to provide real time 
valuations.
2.2. 
OnBase: Electronic Document Management Solution
The System shall have the ability to operate the Assessor’s current document management software from the 
Solution, with the ability to set indices and classifications per the OnBase configuration.  OnBase integration 
points are undetermined at this point and the scope of this integration is greatly dependent upon future 
business decisions. It is expected that context data will flow to OnBase for use in obtaining or storing the 
associated document.
3. 
ROUTINE IMPORTS & EXPORTS
The following software products require integration, but they do not need to behave as if the software and the 
System are a single unit.  Operation may occur to allow interactivity.
3.1. 
Treasurer Data Exchange
Almost exclusively, the transfer of data between the Assessor and the County Treasurer is file-based.  This 
means either the Assessor or the Treasurer extracts data from the appropriate system and makes that file 
available to the other for consumption. The following represent the main transfers, but additional transfers 
may be identified during development.
1.
Resolutions.  Assessor enters resolutions in their system and prepares the files.  These are picked up 
by the Treasurer.  They then process the resolutions through their system.  Treasurer then provides 
result files for the Assessor to pick up. 
2.
Address changes.  Each week the Assessor creates a file of all address changes from our system and 
makes that file available to the Treasurer to update their system. 
3.
Tax Roll.  Each year in August the Assessor makes the tax roll available to the Treasurer.  This file 
contains the data for all parcels and personal property accounts and is the basis for the Treasurer to 
calculate and generate tax bills. 
4.
Senior Value Protection.  Each year the Assessor provides the Treasurer a file of all parcels whose 
owner has qualified for valuation protection according to statute.  The Treasurer uses this information 
to apply an elderly assistance credit to each homeowner.
3.2. 
Recorder Import
The System shall be able to import County Recorder’s Office data representing parcel and record 
maintenance recordings.  Volume is 1500 – 2000 records received on a daily basis.  Data elements received 
include, but are not limited to, the following:

Recording Number

File date

Date Transferred

Parcel Number

File Type (Splits/Combines, Deeds, Affidavits, Judgments, Plat Maps, etc.)
3.3. 
Building Permits

13129-1-RFP
The System shall be able to import permit data as submitted by external agencies.  Volume varies based on 
agencies.  The process is performed in batch on a weekly basis and includes, but is not limited to, the 
following data elements:

Parcel

Owner (import for permit reconciliation)

Situs (import for permit reconciliation)

Builder (import for permit reconciliation) Permit Status

Permit Status

Type (new construction, additions, demos, etc.)

Issue Date

Job Descriptions

Census Code
3.4. 
FTP Exports 
With varying frequency, the Assessor’s Office makes available to other jurisdictions a series of datasets 
residing on an FTP server.
3.5. 
Website Database 
Currently, on a nightly basis the County’s website database, hosted in MySQL, loads an update from a 
separate instance of our core system.  The dataset is indexed for the use of our custom search engine.  The 
website’s MySQL database also contains registries for Rental Registration, Personal Property renditions, and 
the like.  These registries are reviewed periodically and then imported into PAIS
Whether through a similar data extract into a separate database or the use of APIs, the website requires 
reasonably current data including sketches and the ability to accept data and files from the public.

13129-1-RFP
D: MILESTONE/DELIVERABLE ACCEPTANCE FORM
This form shall serve as a guideline and may be modified to suit the needs of the project. The information for 
Deliverable Acceptance shall be filled out and signed by Contractor and presented to the County for approval after 
all deliverables for a given milestone have been completed.  Alternately, this form can be used to document the 
acceptance of one or more deliverables that may not result in immediate payment.  Upon acceptance, the County 
will then counter sign the form and return one copy to the Contractor.
DELIVERABLE ACCEPTANCE FORM
Purchase Order Number:
Milestone/Deliverable Name & Number:
 (If only a milestone is listed, it is assumed all deliverables within the milestone are accepted)
Date Completed: 
Total Value: $
Retainage: $
Payment: $
Description:
Notes/Exceptions/Variations:
Contractor Attest:
Signature
Name (Print)
Title
Date
Maricopa County Acceptance:
Signature
Name (Print)
Title
Date
Signature
Name (Print)
Title
Date
Signature
Name (Print)
Title
Date

13129-1-RFP
E: CHANGE ORDER REQUEST FORM
This form shall be used to document any material change to the SOW that results in a measurable change in scope 
from that defined in the Contract. It shall serve as a guideline and may be modified to suit the needs of the project.
This form shall be filled out and signed by Contractor and presented to the County for approval.  Upon approval, the 
County will then counter sign the form and return one copy to the Contractor.
Project Change Request (PCR) Number
Effective Date
Effect of Change:
Esri Canada Activities
County Activities
Esri Canada Deliverables
County Deliverables
Acceptance Criteria for Deliverables
Reason for Change/Notes:
Associated Cost
Contract Price Adjustments
Note: Original Value is the amount listed as 
the “TOTAL NOT TO EXCEED FOR 
INITIAL TEN (10) YEAR TERM” 
(Ref: SERIAL 13129-1-RFP, EXHIBIT B, 
PRICE AGREEMENT, Section 1)
Original Value
Amounts for previous PCRs
Amount for this PCR
 
New Value
Esri Canada, LLC. Agreement – Signature/Title/Date:
___________________________   __________________________   _______________________   ____________
Signature                                          Name (Print)
           Title
                 Date
Maricopa County Agreement – Signature/Title/Date:
___________________________   __________________________   _______________________   ____________
Signature                                          Name (Print)
           Title
                 Date
___________________________   __________________________   _______________________   ____________
Signature                                          Name (Print)
           Title
                 Date
___________________________   __________________________   _______________________   ____________
Signature                                          Name (Print)
           Title
                 Date

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP

13129-1-RFP