Narrative

City of Mesa — Design Review Board (2026-02-10)

View PDF Meeting page

Extracted text (via pymupdf) 20508 characters
SITE ADDRESS 
PROJECT NO. 
DATE 
JURISDICTION 
SEC. of South Power 
Road & East Elliot Road, 
Mesa, Arizona 85212 
23749  
08/18/2025 
City of Mesa 
Project Narrative 
Major Site Plan Modification Review 
 
 
 
 
PREPARED BY 
Dutch Bros Coffee (AZ1618) 
 
 
Barghausen Consulting 
Engineers, LLC 
PREPARED FOR 
 
CLIENT ADDRESS 
Dutch Bros, LLC 
 
1930 Rio Salado Parkway, Tempe, AZ 85281

1 
23749.007-Narrative 
Project Overview 
The project proposes to develop a 0.77-acre parcel for construction of a 1,025-square-foot Dutch Bros 
Coffee with double drive-through lanes to accommodate up to 22 vehicles in the queue. A separate covered 
service window will be offered for walk-up customers on the southern side of the building opposite the drive-
through service window. Surface parking for 11 vehicles, including one (1) ADA spot and two (2) cross-
access parking spots, is provided. The ADA spot is located directly in front of the Dutch Bros Coffee building 
with an ADA-accessible ramp leading to the customer walk up window. 
The property is zoned Limited Commercial (LC). The lot previously received Site Plan approval and Dutch 
Bros is proposing modifications to the plan to adapt to Dutch Bros standards. The City determined the 
changes proposed qualify as major; therefore, a Major Site Plan Modification is required for entitlement 
approval. The Dutch Bros Coffee site is proposing changes to the parking arrangement, landscape features, 
and pedestrian and vehicle connections, which are reviewed as a Major Modification to the previously 
approved site plan. This submittal requests approval of the modifications because the changes proposed 
still maintain the intent of the original site plan and are compliant with the City’s Code.  
Site Amenities 
A separate covered service window will be offered for walk-up customers on the southern side of the 
building opposite the drive-through service window. A walkway connection east of the walk-up service 
window leads to the overall development sidewalk, which allows customers to travel safely between sites 
by foot. The ADA path is clearly marked and crosses the drive-through lanes to lead pedestrian customers 
up to the walk-up customers’ window. In addition, well-designed site landscaping and a landscaped screen 
wall will minimize the visibility of vehicles in the drive-through queue.  
Queuing and Stacking 
Approximately 448 feet of stacking space is available behind the drive-through window to provide queuing 
for up to twenty-two (22) vehicles. Dutch Bros Coffee will implement a runner system at the proposed facility 
that is designed to increase speed and efficiency in serving drive-through customers. Dutch Bros Coffee 
employees travel from vehicle to vehicle to greet customers and take orders. These "runners" utilize a 
handheld device to transmit customers’ orders to the multiple drink stations inside the building. Additionally, 
runners will charge individuals while in line, so by the time they arrive at the service window, they may pick 
up their order and be on their way. This system decreases wait times, while allowing the runners to have a 
more personal face-to-face interaction with customers. 
The drive-through lanes are located on the opposite side of the site as to not interfere with onsite parking 
and to promote efficient site circulation. A secondary exit is located on the southwestern edge of the site to 
allow customers access to the adjacent site. The additional egress is located near the entrance of the drive-
through queuing lanes that allow customers to exit before approaching the service window, therefore 
effusing site circulation. Allowing the additional egress to the southwest of the site ensures that circulation 
on the site is effective and mitigates against any potential congestion that may occur on site and off site. 
The drive-through will not include any speaker boxes. All customer orders are taken in person either at the 
window or with a runner that carries a handheld device to transmit orders to the kitchen. This ordering 
process minimizes noise impacts and decreases the amount of vehicle idling at menu boards that are 
common at traditional drive-through facilities.  
Operational Measures 
The Dutch Bros Coffee site is proposing an extensive directional sign package that will direct customers 
throughout the site. In addition, the layout of the site was designed to create the best possible flow and the 
maximum queuing possible to reduce spillover onto neighboring properties or the public roads. In addition, 
there is an escape lane proposed near the entrance of the drive-through entrance that leads to the overall 
development internal road, which allows customers to exit to the east. The additional egress allows 
customers to exit the Dutch Bros Coffee site so they can avoid vehicle turnaround to exit at the dual access 
at the northwest corner of the project site.

2 
23749.007-Narrative 
All staff are required to attend a monthly shop meeting to discuss traffic plans in detail. In addition, the staff 
will gather before each shift to ensure the traffic strategy is set.  
Approximately three (3) or four (4) staff members will be dedicated to the parking area throughout the day 
to take orders and receive payments. In addition, one (1) person's sole responsibility will be traffic control. 
Tactics will include instructing all vehicles to pull forward as close as possible to utilize the maximum 
queuing available, directing cars into the waiting area or the escape lane if needed, and ensuring no cars 
are blocking the road or areas they are not allowed to block.  
These measures, in addition to implementing the runner system described above, will reduce customers’ 
time at the window to 30 to 45 seconds. If customers are taking longer than that timeframe, the drink runners 
will bring drinks to the customers in line behind the window to allow those customers to exit via the bypass 
lane. This means customers are not required to reach the drive-through window to receive their order and 
exit the site. Installation of a exit only escape lane near the entrance of the drive-through lane allows 
customers to exit earlier and avoid turning around to exit at the northwest corner access. These measures 
significantly minimize the potential for queuing spillover outside the dedicated drive-through lanes.  
The typical hours of operation are 5am to 11pm each day of the week. Please note the proposed facility 
may extend business hours of operation to 24 hours on a seasonal or permanent basis in the future.  
Site Design and Orientation 
The proposed Dutch Bros Coffee will be constructed as a part of a larger commercial development. Access 
will be from the west from South Power Road to the shared drive aisle of the overall development shared 
the adjacent sites. The access will lead vehicles to the south where they will enter the drive-through lane, 
wrapping around counterclockwise east then west to the service window where customers will exit on the 
through the same internal access point. The project will include a separate customer window that is oriented 
to the south of the site to serve pedestrian walk-up traffic only.   
Architecture 
The proposed building is visually interesting and will be constructed with a variety of high-quality building 
materials and painted with simple, bold colors. The design as proposed aligns with the style architecture of 
neighboring businesses which includes stonework columns. Vertical and horizontal façade breaks, building 
massing, and modulation have all been incorporated into the design of the building. Canopy awnings are 
provided over all entrances and service doors. The building features modulation with a tower element, 
building wall articulation, and building materials that are aesthetic and compatible with other newer 
developments in the community. Colorful and visually interesting wall signs depicting the Dutch Bros Coffee 
logos will be installed on all sides of the building. 
Signs and Lighting 
Signs proposed for use at the project site will conform to the City of Mesa Development Code. Signs 
proposed to be installed at the project site include wall signs, menu signs, drive-through, parking lot, and 
directional signs. Signs will be constructed with high-quality materials and properly installed under separate 
permits. 
Site lighting will be provided at the project site for the safety and security of all customers, pedestrians, and 
employees. Outdoor lighting and illumination at the site will include parking lot security lighting and 
pedestrian scale lighting within the patio space and along the pedestrian pathway. Exterior building lighting 
will be installed on the building façade. The drive-through area will be provided with security lighting. All 
lights will include shields to direct light toward the project site and keep glare away from the adjacent land 
uses and rights-of-way.

3 
23749.007-Narrative 
Site Plan Modification Review Findings 
1. The project is consistent with and conforms to the adopted General Plan and any applicable sub-
area or neighborhood area plans (except no analysis of the use if it is permitted in the zoning district 
on the property), is consistent with the development standards of this Ordinance, and is consistent 
with and meets the intent of any applicable design guidelines. 
Response: The proposed development is consistent with the standards of Quality Development 
Design Guidelines that are intended to create commercial spaces with an attractive, engaging, and 
distinctive streetscape. The proposed building is visually interesting and will be constructed with a 
variety of high-quality building materials and painted with simple, bold colors. Vertical and horizontal 
façade breaks, building massing, and modulation have all been incorporated into the design of the 
building along with visually pleasing landscaping. Additionally, the building features a customer 
walk-up window and large patio area with canopy coverage that connects to the overall 
development’s pedestrian path, allowing customers to travel between sites safely. The project is 
designed to satisfy all development standards of the applicable ordinances and Goals and Policies 
detailed in the Mesa General Plan. Below are policies and strategies from the Mesa General Plan 
that demonstrate compatibility with the City’s vision. 
Neighborhood P1: Encourage the appropriate mix of uses that will bring life and energy to 
neighborhoods while protecting them from encroachment by incompatible development. 
Neighborhoods S4: Establish and maintain ongoing process for improving connections and 
walkability in existing neighborhoods by installing sidewalks where needed and improving the 
amount of shade and other amenities along sidewalks. 
Redevelopment P2: Encourage and facilitate infill development that improves the quality of the 
neighborhood. 
Economic Development S1: Uphold a business service approach that facilitates the successful 
attraction, expansion, and retention of businesses in Mesa 
Character Areas P2: In areas with the Neighborhood Village Center character, development will be 
reviewed for the opportunity to: (i) provide needed services to the surrounding neighborhoods, (ii) 
increase connections with the surrounding neighborhoods, (iii) maintain the health and viability of 
the surrounding neighborhood, provide a greater sense of place and identity to the center and 
surrounding neighborhood, and (iv) improve the viability of businesses within the center, and will 
also be reviewed for compliance with any approved sub-area or neighborhood plan for the specific 
area. 
2. The project is consistent with all conditions of approval imposed on the property whether by 
ordinance, resolution or otherwise. 
Response: The overall design of the project will enhance the appearance of the vacant site and 
surrounding commercial environment by providing visually pleasing landscaping, adequate site 
lighting and a visually interesting building façade. The 1,025-square-foot building will be human 
scaled to demonstrate compatibility with commercial area while also demonstrating distinct design 
features to appeal to the broader community. Screen and landscape walls will be installed on the 
western side of the property along South Power Road and along the northern edge of the drive-
through to minimize the visual presence of vehicles from the right-of-way and the neighboring sites. 
The proposed sidewalk location is positioned to facilitate a safe clear path of travel that serves as 
a connection to the overall development, to the public transit stop, and trash enclosure. Safety and 
efficiency are determining factors for the location.

4 
23749.007-Narrative 
3. The overall design of the project, including but not limited to the site layout, architecture of the 
buildings or structures, scale, massing, exterior design, landscaping, lighting, and signage, will 
enhance the appearance and features of the site and surrounding natural and built environment. 
Response: The Dutch Bros Coffee building will be constructed with a variety of high-quality building 
materials and painted with simple, bold colors, vertical and horizontal façade breaks, building wall 
articulation, and aesthetically pleasing materials that will be visible from all streets and public areas. 
The signature Dutch Bros Coffee tower is oriented to face the right-of-way to provide visual appeal 
to patrons traveling on South Power Road along with enhanced landscaping on the property 
frontage. 
4. The site plan is appropriate to the function of the project and will provide a suitable environment for 
occupants, visitors, and the general community. 
Response: The project design incorporates sufficient parking, landscaping, pedestrian 
connections, and a trash and recycling enclosure to accommodate the function of the use and 
provide a suitable environment for all customers. Designated employee parking is shown on the 
site plan along with a bicycle rack to accommodate a variety of travel methods and Dutch Bros 
Coffee staff. A designated pedestrian path leads to the overall development’s sidewalk as well as 
the trash enclosure to ensure safe travel throughout the site which is situated to provide an safe 
path of travel away from the convergence point in the queuing lanes. 
5. Project details, colors, materials, and landscaping are internally consistent, fully integrated with one 
another, and used in a manner that is visually consistent with the proposed architectural design. 
Response: The building will be constructed with high-quality materials and the project will optimize 
landscaping to create a safe, attractive, and inviting environment. Landscaped screening provides 
a buffer between the overall development’s sidewalk and the drive-through vehicle queue creating 
a distinct visual area for cars and pedestrians on foot. The attractive landscaping and clearly 
defined path invite customers and create an easily understood delineation between vehicle and 
pedestrian areas. 
6. The project is compatible with neighboring development by avoiding big differences in building 
scale and character between developments on adjoining lots in the same zoning district and 
providing a harmonious transition in scale and character between different districts. 
Response: The proposed Dutch Bros Coffee will have a harmonious relationship with its 
surrounding properties by using compatible building materials and upholding similar building scale 
with other uses in the surrounding zoning districts. Drive-through restaurants are permitted in the 
Limited Commercial zone, and this proposal demonstrates that Dutch Bros Coffee is a compatible 
addition to the zoning district and commercial area. 
7. The project contributes to the creation of a visually interesting built environment that includes a 
variety of building styles and designs with well-articulated structures that present well designed 
building facades, rooflines, and building heights within a unifying context that encourages increased 
pedestrian activity and promotes compatibility among neighboring land uses within the same or 
different districts. 
Response: The proposed Dutch Bros Coffee will have a pedestrian pathway on the site leading to 
the development’s public walkway and a separate covered service window will be offered for walk-
up customers, which is effectively isolated from vehicle areas and oriented towards the parking 
area, where customers may choose to park their vehicle and purchase drinks through the walk-up 
window, which will alleviate the amount of cars stacking in the queuing lanes. This design provides 
a safe and inviting space for customers and promotes compatibility with the surrounding 
community.

5 
23749.007-Narrative 
8. The project creates visual variety and relief in buildings and avoids a large-scale, bulky, or box-like 
appearance. 
Response: The proposed Dutch Bros Coffee building is 1,025 square feet in area and includes a 
tower element along with a variation of colors and materials that provide variety and relief across 
all façades. In combination with the range of materials on the structure, the Dutch Bros Coffee 
building will be a dynamic but compatible design addition to the commercial development. 
9. The streetscapes, including street trees, lighting, and pedestrian furniture, are consistent with the 
character of activity centers, commercial districts, and nearby residential neighborhoods. 
Response: The proposed landscaping, street trees, and site lighting are designed to satisfy the 
City of Mesa standards for commercial uses in the Limited Commercial Zoning district. The 
development is designed to be compatible with the overall commercial development as well as the 
existing sites in the vicinity to ensure a harmonious addition of the Dutch Bros Coffee. 
10. Street frontages are attractive and interesting for pedestrians and provide for greater safety by 
allowing for surveillance of the street by people inside buildings and elsewhere. 
Response: The project design implements building features, lighting, and pedestrian spaces that 
create an attractive and inviting space for employees and customers during all operational hours. 
The building is constructed to invite pedestrians, bicyclists, and automobile in a legible way to 
ensure that visitors understand where to go to maximize site efficiency. The street frontage will be 
landscaped to invite customers to the new commercial space with a clearly marked pedestrian 
walkway leading to all sites in the development. The street frontage is screened to minimize the 
presence of vehicles from the right-of-way. 
11. The proposed landscaping plan is suitable for the type of project and site conditions and will 
improve the appearance of the community by enhancing the building and site design; and the 
landscape plan incorporates plant materials that are drought-tolerant, will minimize water usage, 
and are compatible with Mesa's climate. 
Response: The proposed project landscaping will improve the appearance of the community by 
providing beautiful scenery from public view while utilizing plant materials that are drought-tolerant, 
minimize water usage, and are compatible with Mesa’s climate. Landscape screening is provided 
on the northern edge of the drive-through aisles to mitigate the view of vehicle queuing from the 
internal shared road for the overall development. 
Conclusion 
The proposed 1,025-square-foot Dutch Bros Coffee will enhance and complement the City of Mesa’s design 
principles. Dutch Bros Coffee is a successful business that will promote improvement of the existing 
commercial area. Dutch Bros Coffee locations are known to be clean and well maintained, providing quick 
service from friendly staff. The proposed coffee shop will provide excellent products and service, along with 
enhanced landscaping areas, lighting, and pedestrian open space at the project site that will benefit all 
customers and users in the immediate vicinity and the surrounding areas. The above narrative 
demonstrates how the proposal meets the City’s standards and complies with the intended measures of 
the previously approved site plan, which will increase the overall quality of the project site and positively 
impact the citizens and businesses of the surrounding community and the City of Mesa.