Supporting Document (9477bf55...)

City of Scottsdale — Regular Meeting and Work Study Session (2026-07-01)

View PDF Meeting page

Extracted text (via pymupdf) 136723 characters
CITY COUNCII
REPORT
Item 10
•¥
*
&
Meeting Date:
General Plan Element: 
General Plan Goal:
ACTION
July 1,2026 
Land Use
Create a sense of community through land uses
Rivian Service and Delivery Center 
ZN-0001-2026
Request to consider the following:
1. Adopt Ordinance No. 4716 a zoning district map amendment from Industrial Park, Planned 
Community District (1-1 PCD) to General Commercial, Planned Community District (C-4 PCD) 
and a request to amend development standards including Floor Area Ratio, Open Space, 
Building Height, and Setbacks, on a +/-5.4 acre portion of a+/- 57.5 acre site located at 17771 
N. Pima Road and APNs 215-04-471 and 215-04-470.
Goal/Purpose of Request
The applicant’s request isto amend the previously approved development plan (case 10-Z-1988) 
including amended development standards to allow for different land uses, including a new 
tenant user to utilize an existing building for a new vehicle service and delivery facility.
Key Items for Consideration
• 
Associated previous zoning case 10-ZN-1988
• 
Conformance with Scottsdale General Plan 2035, as amended
• 
Conformancewith the Greater Airpark Character Area Plan, as amended
• 
Consistency with the previously approved MEDCP(case 1-MP-2008)
• 
Amended Development Standards
• 
Planned Community District Findings
• 
To date, one public comment has been received
• 
Planning Commission heard this case 6/10/2026 and recommended approval with a vote of 
6-0
OWNER_____________________ ______________________________________
101 Bell PI North LLC 
Mack Real Estate Group
APPLICANT CONTACT_______________________________________________
George Pasquel III
Action Taken.

Planning Gomitiission Report | ZN-0001-2026: Rivian Rezone
Withey Morris Baugh, PLC 
602-230-0600
LOCATION
AT
S
\
sin-iE
■» W-i.
/
17771 N Pima Rd., APNs 215-04-471 and 215-04-470
BACKGROUND ______________________________
General Plan
City of Scottsdale General Plan 2035 designates the property as Employment: Light 
Industrial/Office. The Employment: Light Industrial/Office land use category provides a variety of 
employitient opportunities, business enterprises, aviation uses, light manufacturing, 
warehousing, and other light industrial and heavy commercial type activities.
The subject site is located within the General Plan designated Greater Airpark Growth Area - an 
identified location within the community that is most a ppropriate for development focus, a nd will 
best accommodate future growth, new development, revitalization, and redevelopment. 
Scottsdale's Growth Areas focus on higher intensity development, a planned concentration of 
land uses, and enhanced transportation and infrastructure in designated areas.
Character Area Plan
The Greater Airpark Character Area Plan (GACAP) designates the property as Employment (EMP) 
land use within the Type C Development Type. This land use category includes an array of office, 
commercial, warehousing, and light industrial land uses that provide opportunities for business 
enterprises, as well as regional and local jobs. Within the Greater Airpark, Development Types 
help define the size and scale of development. Type C development represents medium to higher 
scale development, which supports pedestrian activity in the Greater Airpark.
Zoning
The site is currently zoned Industrial Park, Planned Community District (1-1 PCD). The 1-1 zoning 
district allows for light manufacturing, light industrial, and other supportive uses but prohibits 
vehicle sales, rental, or repair uses within this zoning district.
The proposed General Commercial (C-4) zoning district allows for high intensity uses similar to 
those of the 1-1 zoning district and allows for vehicle sales, rental, or repair. As a part of this 
fezoning , the applicant is requesting that the C-4 property development standards be amended 
to the current 1-1 Zoning Ordinance development standards.
Context
The subject property is located within the Mack 101 development along the east side of the loop 
101 Freeway, and west of the DC Ranch neighborhood park, with E. Bell Road to the south, and N. 
Pima Road to the north. The Rivian tenant suite is proposed to be located within a portion of one 
of the two existing buildings on stie and comprises +/- 65,000 square feet of the overall total +/- 
185,000 building square footage. The applicant is also requesting additional parking adjacent to 
this site to assist Rivian operations. Please refer to context graphics attached.
Adjacent Uses and Zoning
Page 2 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
• 
North: Vacant Light industrial pad within Mack 101 development, zoned Industrial Park
Planned Community District (1-1 PCD).
• 
South: Vacant Light industrial pad within Mack 101 development, zoned Industrial Park
Planned Community District (1-1 PCD).
• 
East: Existing internalized community storage facility within DC Ranch Corporate Center,
zoned Industrial Park, Planned Community District (1-1 PCD).
• 
West: Loop 101 Freeway, further west isthe Perimeter Center development, zoned Industrial
Park Planned Community District (1-1 PCD).
Other Related Policies, References:
Scottsdale General Plan 2035, as amended 
The Greater Airpark Character Area Plan 
Zoning Ordinance
11 -ZN-1986: Rezoned the subject site from R1 -35 to 1-1 PCD
Case 49-DR-2022#2: design review approval Mack 101 industrial development buildings C & D 
Case 1 -MP-2008: established design standards for Mack development
APPLICANT’S PROPOSAL
Development Information
The applicant is requesting to amend the previously approved development plan to allow C-4 
land uses and amend the C-4 property development standards to align with the current 1-1 
property development standards. The rezone request primarily serves to allow for a vehicle 
service, delivery and repair facility to be located within a constructed building at the Mack 
Innovation Park.
• 
Existing Use: 
Light Industrial and Office development
• 
Proposed Use: 
Vehicle leasing, rental or sales with indoor or outdoor vehicle
display, storage, and vehicle repair
• 
Buildings/Description: 
Existing 1-story light industrial building
+/-57.49 Acres 
+/-5.4 Acres
• 
Parcel Size:
• 
Rezone Area Size:
Page 3 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
IMPACT ANALYSIS
Land Use
Below is a summary table that compares the existing 1-1 development standards and the 
proposed amended C-4 development standards.
Development
Standard
Current C-4 Standards
Current 1-1 
Standards
Proposed Amended C-4 
standards
(Request)
Floor Area 
Ratio
Maximum: 0.80 multiplied by 
the net lot area
Maximum: 0.80 
multiplied by the net 
lot area
Maximum: 0.80 
multiplied by the net 
lot area
Open Space
Minimum: 0.05 multiplied by 
the net lot area.
For building heights over 
twelve (12) feet: the minimum 
required open space plus 
0.004 multiplied bythenetlot 
area, for each foot of building 
height over twelve (12) feet.
Minimum: 0.10 
multiplied by the net 
lot area.
For building heights 
over twelve (12) feet: 
the minimum 
required open space 
plus 0.003 
multiplied by the net 
lot area, for each 
foot of building 
height over twelve 
(12) feet.
Minimum: 0.10 
multiplied by the net 
lot area.
For building heights 
over twelve (12) feet: 
the minimum required 
open space plus 0.003 
multiplied by the net 
lot area, for each foot 
of building height over 
twelve (12) feet.
Building
Height
Maximum: thirty-six (36) feet
Maximum: Fifty-two 
(52) feet
Maximum: Fifty-two 
(52) feet
Yards: Front
Front minimum: Twenty (20) 
feet.
Front minimum: 
Twenty (20) feet.
Front minimum: 
Twenty (20) feet.
Airport Vicinity
As part of the development process within proximity to the airport, the applicant is required to submitfor 
an FAA Determination (Form 7460-1) on any proposed structures to make sure the buildings will not be a 
hazardfor aircraft. Before final plan approval, the owner shall submitthe FAA response to FAA Form 7460- 
1. Airport staff reviewed the application and indicated support of the proposal subject to the review and 
approval of the FAA.
Page 4 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
PCD Findings/Criteria
A. That the development proposed isin substantial harmony with the General Plan oftheCityof 
Scottsdale and can be coordinated with existing and planned development of surrounding 
areas.
• 
The proposed development plan amendment is in substantial harmony with the 
General Plan ‘Employment: Light tndustrial/Office land use designation. The proposal 
intends to utilize existing buildings fora new user.
B. That the streets and thoroughfares proposed are suitable and adequate to serve the 
proposed uses and the anticipated traffic which will be generated thereby.
• 
The existing established street system is not impacted with this request. Internal 
streets have been constructed to provide access to N. Pima Road to the north, newly 
constructed N. 91^ Street to the east, E. Bell Road to the south, and the Loop 101 
frontage to the west.
C. The Planning Commission and City Council shall further find that the facts submitted with 
the application and presented at the hearing will establish beyond reasonable doubt that:
1. In the case of proposed development, that such development will constitute a residential 
environment of sustained desirability and stability; that it will be in harmony with the 
character ofthe surrounding area; andthatthesites proposed for public facilities, such 
as schools, playgrounds and parks, are adequate to serve the anticipated population. The 
Planning Commission and City Council shall be presented written acknowledgment of 
this from the appropriate school district, the Scottsdale Parks and Recreation 
Commission and any other responsible agency.
The proposed development plan does not include residential uses.
2.
3.
In the case of proposed industrial or research uses, that such development will be 
appropriate in area, location and overall planning to the purpose intended; and thatthe 
design and development standards are such as to create an industrial environment of 
sustained desirability and stability.
• Although the request is to implement new land uses within an existing industrial park, 
those additional uses do not fundamentally cause concern forthe surroundings as the 
additional uses ^vehicle sales, rental, or repair) are similar uses to those ofthe 1-1 
zoning district and commonly found in the Greater Airpark Character Area. This 
request does seek amended development standards, but no major modifications to 
the existing building would need to be made.
In the case of proposed commercial, educational, cultural, recreational and other 
nonresidential uses, that such development will be appropriate in area, location and 
overall planning to the purpose intended; and that such development will be in harmony 
with the character of the surrounding areas.
Page 5 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
• The proposed development plan amendment will be in full conformance with the 
amended C-4 property development standards. The scale and intensity of the 
development proposed is congruent with surrounding sites. The proposed 
development plan will be in harmony with the character of the surrounding area, 
which shares the same property development standards.
Transportation
The proposed rezoning associated with the Rivian development is anticipated to generate an 
additional 1,714 daily trips, 99 AM peak hour trips and 116 PM peak hour trips compared to 
previous land use assumptions. The results of the queueing analysis indicate that queues at the 
dedicated left-turn and right-turn lanes are anticipated to remain similarto queues under previous 
land use assumptions. Therefore, the left-turn and right-turn lane lengths previously 
recommended atthe study intersections in the approved TIMAs forthe overall Mack development 
are recommended to be maintained.
Water/Sewer
The applicant provided Basis of Design reports for water and sewer have been accepted by the 
Water Resources Division. The City of Scottsdale is an Arizona Department of Water Resources 
designated provider with a 100 years Assured Water Supply and will supply water in accordance 
with City codes, ordinances, and the City’s Drought Management Plan. All infrastructure 
upgrades necessary to serve this project will be completed by the applicant.
Fire/Police
The nearest fire station is within 1 mile of the site and is located at 18455 N Hayden Rd. The subject 
site is sen/ed by Police District Foothills, Beat 18. As with any project that contributes to growth, 
the fire department and police department continually anticipate and evaluate resource needs 
forthe city’s budget process.
Open Space
The development conforms with the overall open space requirement with a minimum requirement 
of 216,670 square feet and a provided amount of 265,306 square feet. This request will have no 
effect on the established desert arroyos or landscaping .
Housing Cost
The approval of the zoning district map amendment proposed by the applicant provides an 
opportunityforadditionalcommercialusesfortheexistingproperty. In conjunction with state law, 
staff has considered the scope of the zoning district map amendment, as well as aspects which 
would affect the cost of construction of housingforsaleor rent. Staff has notidentified anyfactors 
that would substantially impact the cost to construct housing for sale or rent.
Community Involvement
The City of Scottsdale promotes public participation in the development of the built environment. 
The applicant complied with the city’s suggested best practices for public outreach. Atthe time 
of writingthis report, staff only received one public comment requesting additional information 
from the applicant about potential noise, pollution, and water usage.
Page 6 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
Significant Updates to Development Proposal Since Initial Submittal
• 
Added on-site amenities for customers and employees
• 
Added masonry screen walls and mature landscaping along N. Pima Road frontage
Community Impact
The proposed development will not create any significant adverse effects on the surrounding 
development or the community at large.
Other Boards and Commissions
Planning Commission:
Planning Commission heard this case on June 10,2026 arid recommended approval with a 6-0 
vote.
Recommended Approach:
Staff recommended that the Planning Commission find that the Planned Community District 
criteria have been met, and determine that the proposed zoning district map amendment, 
development plan, and amended development standards are consistent and conform with the 
adopted General Plan, and makea recommendation to City Councilfor approval, per the attached 
stipulations.
(RECOMMENDATION
Recommended Approach:
Adopt Ordinance No. 4716 a zoning district map amendment from Industrial Park, Planned 
CommunityDistrict (1-1 PCD)to General Commercial, Planned Community District (C-4 PCD) and 
a request to amend development standards including Floor Area Ratio, Open Space, Building 
Height, and Setbacks, on a +/- 5.4 acre portion of a +/- 57.5 acre site located at 17771 N. Pima 
Road and APNs 215-04-471 and 215-04-470.
RESPONSIBLE DEPARTMENT/STAFF CONTACTS
Planning and Development 
Services
Current Planning Services
Chris Zimmer 
Senior Planner 
480-312-2347
Email: czimmer@scottsdaleaz.gov
PublicWorks
Traffic Engineering
John Hoang
Senior Manager - Traffic Engineering 
480-312-7645
Email: jhoang@scottsdaleaz.gov
Community & Economic 
Development
Stormwater Management
Ghassan Aouad 
Stormwater Engineer Senior 
480-312-7055
Email: gaouad@scottsdaleaz.gov
Engineering Services
Water Resources
Rezaur Rahman
Water Resources Engineer Principal 
480-312-5636
Email: rrahman@scottsdaleaz.gov
Page 7 of 9

Planning Commission Report | ZN-0001-2026: Rivian Rezone
Urmas Grossthal
Water Resources Engineer Principal 
480-312-2831
Email: ugrossthal@scottsdaleaz.gov
Community & Economic 
Development
Plan Review
Eliana Hayes
Development Engineering Manager 
480-312-2757
Email: ehayes@scottsdaleaz.gov
Public Safety-Fire
Fire & Life Safety Services
Linda Wilson
Senior Plans Examiner
480-312-2372
Email: lwilson@scottsdaleaz.gov
Page 8 of 9

Planning Commission Report | ZN-0001-202e: Rivian Rezone
APPROVED BY
6/15/2026
Chris Zimmer, Senior Planner
Date
6/14/2026
Tim Curtis, AlCP, Current Planning Director 
Planning Commission Liaison
Phone: 480-312-4210 Email: tcurtis@scottsdaleaz.gov
Date
'TJ!.
06/11/2026
Erin Perreault, AlCP, Executive Director 
Planning and Development Services
Phone: 480-312-7093 Email: eperreault@scottsdaleaz.gov
Date
ATTACHMENTS
1. Context Aerial
2. Aerial Close-Up
3. Ordinance No. 4716 
Exhibit 1: Zoning Map 
Exhibit 2: Stipulations
Exhibit A to Exhibit 2: Rivian Development plan
4. Existing General Plan Land Use Map
5. Greater Airpark Character Area Land Use Plan
6. ExistingZoningMap
7. Zoning Land Use Comparison Summary
8. Traffic Impact Summary
9. Community Involvement
10. Correspondence
11 .City Notification Map
12. Planning Commission Draft Meeting Minutes June 10, 2026
Page 9 of 9

Ml
v/',,^2S223i£2^
''#avs
mmm
■ i__jt^.—"ac^g*.
1
tnifnni
UlnUJM
,.i-
^!P'
fclH^^pa
W, :
J_
^SteS^*^hvieiiwtili^D,^ll^L^ \
^—f-ttVesfworMDrS— %
' 
- : p ;* ^;: >;>#1 
:' '.life; J
Context Aerial
|ZN-0001-2026|
ATTACHMENT #1

yi.
y
5^
4
A
.>
Stale'ii
Law Firm
A-
■Si?
-jf
Jr
2
DC;fi
rt'O’'
y
m
» •.
.r'.
‘■ie.
%
Jy
v:
101
^ *“.Sitel
’♦
Se
'a
j.f'
,5
i/R-
s
’yi
5'
?
1»
rev
irU
is*
1
1
*
»
■• ir^iM
wr.
»**
T>.
•SI..
'jf
■?r^ .*=«‘
fa
Q.s. _______
37-49
''^^^^iGoogleEarthProlmage^
^ i
E.'.BellRd *^i..-r%wieir>g^-
Close-up Aerial
ATTACHMENT #2
i
i-
:,'j
5
J-v
•'
m
l&i:
ir-A
•'»-
^ vii
•1
i.
■>■
‘sA
Vi
'r
.i
V' ^:^> •
V .
?t:>
■r:
k-: -••: •».
•i.
1*
t
C* ».:-«
lij
:<
rsm^/„>r^
|ZN-0001-20^

ORDINANCE NO. 4716
AN ORDINANCE OF THE COUNCIL OF THE CITY OF SCOTTSDALE. 
MARICOPA COUNTY, ARIZONA. AMENDING ORDINANCE NO. 455. THE 
ZONING ORDINANCE OF THE CITY OF SCOTTSDALE. BY AND FOR THE 
PURPOSE OF CHANGING THE ZONING ON THE “DISTRICT MAP" TO 
ZONING APPROVED IN CASE NO. ZN-0001-2026 FROM INDUSTRIAL 
PARK PLANNED COMMUNITY DISTRICT (I-1 PCD) TO GENERAL 
COMMERCIAL PLANNED COMMUNITY DISTRICT (C-4 PCD), AND A 
REQUEST TO AMEND DEVELOPMENT STANDARDS INCLUDING FLOOR 
AREA RATIO, OPEN SPACE, BUILDING HEIGHT. AND SETBACKS. ON A 
+/-5.4 ACRE PORTION OF A +/-57.5 ACRE SITE LOCATED AT 17771 N.
PIMA ROAD AND APNs 215-04-471 AND 215-04-470.
WHEREAS, the Planning Commission held a hearing on June 10, 2026; and
WHEREAS, the City Council has considered the probable impact of Zoning Ordinance 
No. 4716 on the cost to construct housing for sale or rent; and
WHEREAS, The Planning Commission has made findings in conformance with the 
requirements of the PCD district and the City Councii also finds:
A. That the deveiopment proposed is in substantial harmony with the General Plan, and 
can be coordinated with existing and planned development of surrounding areas.
B. That the streets and thoroughfares proposed are suitable and adequate to serve the 
proposed uses and the anticipated traffic which will be generated thereby.
C. The Planning Commission and City Council shall find that the facts submitted with 
the application and presented at the hearing establish beyond reasonable doubt that:
1. In the case of proposed industrial or research uses, that such development will be 
appropriate in area, location and overall planning to the purpose intended; and that the design 
and development standards are such as to create an industrial environment of sustained 
desirability and stability.
2. In the case of proposed commercial, educational, cultural, recreational and other 
nonresidential uses, that such development will be appropriate in area, location and 
overall planning to the purpose intended; and that such development will be in harmony with the 
character of the surrounding areas.
WHEREAS, the City Council finds that the proposed development is in substantial 
harmony with the General Plan of the City of Scottsdale and will be coordinated with existing 
and planned development; and
WHEREAS, it is now necessary that the comprehensive zoning map of the City of 
Scottsdale (“District Map”) be amended to conform with the decision of the Scottsdale City 
Council in Case No. ZN-0001-2026.
follows:
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Scottsdale, as
19262341
Ordinance No. 4716 
Page 1 of 2
ATTACHMENT #3

Section 1. That the “District Map” adopted as a part of the Zoning Ordinance of the City 
of Scottsdale, showing the zoning district boundaries, is amended by rezoning a +/- 5.4 acre site 
located at the 17771 N. Pima Road and APNs 215-04-471 and 215-04-470 and marked as “Site” 
(the Property) on the map attached as Exhibit 1, incorporated herein by reference, from 
Industrial Park, Planned Community District (1-1 PCD) to General Commercial, Planned 
Community District (C-4 PCD).
Section 2. That the above rezoning approval is conditioned upon compliance with all 
stipulations attached hereto as Exhibit 2 incorporated herein by reference.
PASSED AND ADOPTED by the Council of the City of Scottsdale, Maricopa County, 
Arizona this______ day of______________, 2026.
ATTEST;
CITY OF SCOTTSDALE, an Arizona 
municipal corporation
By:.
Ben Lane 
City Clerk
By:.
Lisa Borowsky 
Mayor
APPROVED AS TO
.7
By:
LuisE>6antaella, City Attorney 
By; Joe Padilla, Deputy City Attorney
Ordinance No. 4716 
Page 2 of 2

1
j: h-
eo
0)
»»• ^'hj;
-O
3(0
(0
o
G-2 PCD,
o
O'
c.
0€ PCD,
\
s Si 
2i
■(eslYhd)
✓
\
«s>. 
'
^ \
(M
NORTH
<S3 I
Rr7iPCD,
0)
3MD
P.CD,
(U*
fwl
«<»
<x
Br
BenS
00 P.GD.
R-:5.P.GD.
oo
PCD
t
I
t
E. Hartford Drive
Q.S.
37-49
t
t
I
Zoning Graphic
,ao»|PrftnW,
ggBB I
ir^
R1-7iPCD
ESL^HD)
to
£
<s
Z
PRQP.CD
CIS'PJ^Dj PCD >CD ll-lllP.CPl ■gI3>.CD:
R-AESL^
Zoning
Ordinance No. 4716 
Exhibit 1 
Page 1 of 1
ZN-0001-2026

Stipulations for the Zoning Application: 
Rivian Rezone
Application Number: ZN-0001-2026
These stipulations are in order to protect the public health, safety, welfare, and the City of Scottsdale.
SITE DESIGN
1. CONFORMANCE TO DEVELOPMENT PLAN. Development shall conform with the “Rivian 
Development Plan” attached as Exhibit A to Exhibit 2 incorporated into these stipulations and 
ordinance by reference as if fully set forth herein. Any proposed significant change to the 
Development Plan, as determined by the Zoning Administrator, shall be subject to additional action 
and public hearings before the Planning Commission and City Council. Where there is a conflict 
between the Development Plan and these stipulations, these stipulations shall prevail.
2. CONFORMANCE TO AMENDED DEVELOPMENT STANDARDS. Development shall conform 
with the amended development standards, as shown in the development plan. Any change to the 
development standards shall be subject to additional public hearings before the Planning Commission 
and City Council.
INFRASTRUCTURE
3. WASTEWATER LINE. The Developer shall design and construct an eight (8) inch, dry, sewer main 
from N Pima Road, at the existing, dry, sewer crossing, within existing water and sewer facilities 
easement and right-of-way to the existing eighteen (18) inch sewer main crossing of the ADOT 101, 
connecting into same; an approximately twelve hundred (1200) lineal foot Dry Sewer Extension. The 
design of the Dry Sewer Extension shall occur such that within six (6) months of zoning adoption, the 
Developer shall complete the design of the Dry Sewer Extension and submit to the City for approval. 
The completion of the Dry Sewer Extension shall occur such that within twenty-four (24) months of 
zoning adoption, the Developer shall have constructed and caused the city to accept the Dry Sewer 
Extension.
4. WATER AND WASTEWATER IMPROVEMENTS. The property owner shall provide all water and 
■ wastewater infrastructure improvements, including any new service lines, connection, fire-hydrants,
and man-holes, necessary to serve the development.
5. WATER DEMAND. Water usage within the zoning boundary, as verified through water billing, 
shall not exceed an average daily demand of one hundred ninety-eight (198) gallons per minute, a 
max daily demand of three hundred ninety-five gallons per minute (395 gpm), or a peak daily demand 
of eight hundred sixty-three gallons per minute (863 gpm), any underage's remain the property of the 
city.
Ordinance No. 4716 
Exhibit 2 
Page 1 of2

EXTERIOR LIGHTING:
6.
7.
All exterior luminaires shall have integral lighting shield and be directed downward, including 
landscape lighting.
All exterior luminaires mounted eight (8) feet or higher above finished grade, shall be directed 
downward and have an integral lighting shield.
8. Any exterior luminaire with a total initial lumen output of greater than 1600 lumens shall have an 
integral lighting shield.
9. Any exterior luminaire with a total initial lumen output of greater than 30S0 lumens shall be directed 
downward and comply with the Illuminating Engineering Society of North America (IBS) 
requirements for full cutoff.
10. The initial vertical luminance at 6-foot above grade, along the north, south, east, west, property line 
shall not exceed 0.3 foot-candles. All exterior luminaires shall be included in this calculation.
11. All exterior luminaires shall meet all lES requirements for full cutoff and shall be aimed downward 
and away from property line except for sign and landscape lighting.
12. Incorporate the following parking lot and site lighting into the project’s design:
a. The maintained average horizontal luminance level, at grade on the site, shall not exceed 2.0 foot- 
candles. All exterior luminaires shall be included in this calculation.
b. The maintained maximum horizontal luminance level, at grade on the site, shall not exceed 8.0 
foot-candles. All exterior luminaires shall be included in this calculation.
c. The initial vertical luminance at 6-foot above grade, along the entire property line shall not 
exceed 0.8 foot-candles. All exterior luminaires shall be included in this calculation.
d. AH exterior lighting shall have a color temperature of 3,000 Kelvin or less.
e. The total lumen per luminaire shall not exceed 24,000 lumens.
REPORTS AND STUDIES
13. DRAINAGE REPORT. The development shall conform with submitted drainage report submitted 
with this review, in accordance with the Design Standards and Policies Manual to the 
satisfaction of stormwater staff.
Ordinance No. 4716 
Exhibit 2 
Page 2 of2

\
Rivian Development plan
Ordinance No. 4716 
Exhibit A to Exhibit 2 
Page 1 of 4

I
iiSi
/
III
f :
V
\
\
53 V
— [i 1!
ZONWCrW ^ \lW
ZOMNO OS
I
oi
-'j
\
►
o
CO
B
9-
<j
a
9
/■,
I
£
iiV
»7
SF
\
V>
t
\
\
H
I
m
m
±u;
im
\
\
}
LUIJ m
V
\
\
\
\
r:
(
0
I;
1J
\
\
FUirURE
ta t
f
PHASE'
\
\
\
t
\
I
\
\
mfflosF
S!S
\
N
jso-n
\
\
£
\
1
I
I
\
\
:rv-ijC5
\
V\
©
\
184^ SF
i«—iFioii«iawt.i
\
TO
\\
mm
>
m
w
/
\
A
\
ZONMG:M
7
/
m
:
Ftf
33
///
/ //
> /
/
'/
®
i
i2o,4irsr
s.
M
1^
ZOMNO: (•1
"1
V
s
k
tniAMAC
igfi 
I 
>jaTi 
1
Tid “d rd “d
-ss-
TWMt| 
^AMONd. 
wiT
ifiv ii-y n^mmM
mn-e M»e
.-r: i.'.r 4’, mh^e:
dgSB
TOTM.
TOTAL
FS£::r •
«i
SITE PLAN KEYNOTES
I. UBTKFIKHrDMMT 
I 
toiaewmwc
1 «v.TiuiHcoi».w»o«ioe»Tie»>
4. aniwcnmuM 
L tMDMMtfDCUMMOMei 
ATfMUWM
A WCWCM PMCQiMMTZiM
EASEMENT LEGEND
(M«Mn04Da«*W
0ra>MfEA9e«HT
@DA««eW«»T
(2)«T«B«*MT
, nvTTPCMN
L ritmcMevciMM 
U. UTtmtMMMTW.eMeNM 
tv VMUrrtMMMVfLM
«. MttUMmTUM
a. rtowMwuav.MTTBVuuMlT
H fHTMrUMOMtTMkLTVP. 
m. CtMWetSBfWrtfMMCMCWF.
0 moRMB) nj«£ uTurr e 
0 BOSTMOKWaieMCMENr
®
®
0 Bomo W COUNTY MOMWY 
t>«tgMtMTTOMAe«ICI0»*0 
0 l«OU«S V iAWCMTs: 0
ENLARGED SITE PLAN - NORTH
itWF.eeiMKfM
BCMXr-tTO
atM«ni.Ci4>fM WM*l_D3»2t
K >1 A 
I / INNOVATION
MACK PARK
e. t>t *» IW»B«Cioaoxt ti»twM 
M «MMTVMei.MIBMt.eeiMCD
1 rtA
MACK
REAL
ESTATE
GROUP
NEC Loop 101 & Bell Road
SCOTTSDALE, AZ
Ordinance No. 4716 
Exhibit A to Exhibit 2 
Page 2 of 4
RZ21-Cm
I--
Butler Design Group. ir»c
DfcMtuos & ptoPfW

;
I .
: i .
\ .. .■ •
Legislative Draft of C-4 Development Standards 
CHANGES MADE ARE SHOWN IN STRIKE-THROUGH AND BOLD AND UPPERCASE 
Sec. 5.1600. - General Commercial (C-4).
Sec. 5.1601. - Purpose.
The C-4 District is intended to provide space for the heaviest type of commercial activities 
found in the city, including iight manufacturing, warehousing, whoiesaling and vehicle leasing, 
rental, sales and repair. This district provides opportunities for light industrial uses in order to 
sustain and enhance the community's economic viability and employment opportunities. The 
development standards are intended to provide development flexibility consistent with the 
community's sensitive design principles, and appropriate transition in areas adjacent to 
residential districts.
Sec. 5.1602. - Reserved.
Sec. 5.1603. - Use regulations.
A. 
Permitted uses. Buildings, structures, or premises shali be used and buildings and structures 
shali hereafter be erected, altered, or enlarged only for the following uses:
1. Any use shown as permitted in Tabie 11.201.A., subject to the limitations as listed.
B. 
Uses permitted by conditional use permit.
1. Any use shown as permitted by conditional use permit in Table 11.201 .A., subject to the 
limitations as iisted, and any additionai conditional use permit criteria.
Sec. 5.1604. - Property deveiopment standards.
The foliowing property development standards shall apply to all land and buildings in the C- 
4 District.
A. 
Floor area ratio.
1. 
Maximum: 0.80 muitiplied by net lot area.
B. 
Required open space.
1. 
MINIMUM: 0.10 MULTIPLIED BY THE NET LOT AREA. Total open space. 
a—Minimum: 0.05 multiplied by the net lot area.
2. b;—For building heights over twelve (12) feet: the minimum open space requirement 
plus 0.0043 multiplied by the net lot area for each additional foot of building height 
over twelve (12) feet.
2^—Total open space is distributed as follows:
€h—Frontage open spaee-minimum: 0.50 multiplied by the required total open 
spacer
br—The remainder of the total open space, less the frontage open space, shall be 
common open space.
3. 
Parking areas and parking lot landscaping are not inciuded in the required open
space.
Ordinance No. 4716 
Exhibit A to Exhibit 2 
Page 3 of 4

4. NAOS may be included in the required open space.
C. 
Building height.
1. Maximum: Thirty-six (36) FIFTY-TWO (62) feet, except as otherwise provided in 
Article VII.
D. 
Yards.
1. Front MINlMUM:Yard-TWENTY (20) FEET.
%—No front yard is required except as required in Article VII and this subsection
br- -if a bloek-is partly in a residential-distriGt shown on Table <1.100.-A., or the 
residential portion of a Planned Community P-C or any portion of a Planned 
Residential-Development PRD with-an underlying zoning district comparable to
the front yard-regulations of
B
2.
Refer-4o-B:2.a: above, Frontage open space-minimum.
Side and rear minimum: THIRTY (30)F-ifly (50) feet from a single-family residential 
district SHOWN ON TABLE 4.100.A, OR THE RESIDENTIAL PORTION OF A P- 
C, OR ANY PORTION OF A PRD WITH AN UNDERLYING ZONING DISTRICT 
COMPARABLE TO THE RESIDENTIAL DISTRICTS SHOWN ON TABLE 
4.100.A.and-twenty-five (25) feet--from a - multiple-family residential district.
E.
3. All outdoor activities, including storage, minimum: Fifty (50) feet from a residential 
district as shown on Table 4.100.A., or the residential portion of a Planned 
Community P-C or any portion of a Planned Residential Development PRD with an 
underlying zoning district comparable to the residential districts shown on Table 
4.100. A.
Screening.
1. 
All activities, mechanical equipment, outdoor storage, and refuse areas shall be 
within an enclosed building, or screened by a solid wall at least six (6) feet in height 
or as otherwise approved by the Development Review Board.
2. 
No outdoor storage shall be visible from off-site.
3. 
Other requirements and exceptions are as specified in Article VII and Article X. 
Sec. 5.1605. - General provisions.
Unless otherwise provided in this district, the provisions of Article VII shall apply.
Sec. 5.1606. - Signs.
The provisions of Article VIII shall apply.
Sec. 5.1607. - Off-street parking.
The provisions of Article IX shall apply.
Sec. 5.1608. - Landscaping.
Unless otherwise provided, the provisions of Article X. apply.
Ordinance No. 4716 
Exhibit A to Exhibit 2 
Page 4 of 4

imm
Emp/oymSif: Light 
Industrial/Office
\
£, Princess
E. Bell Road
Q.S.
37-49
Deve/opedl
Open5pac3
Cultural/lnstifutional
or Public Use
I
-K
M
z
"i:il
i^ 3t-
if'
Employment: Light 
Industrial/Office I
Urbam - 
Neighborhoods
Employment: Light
Industrial/OfficeCommercial
Existing General Plan 2035 Future Land Use Map 
+/- 5.4-acres of Employment: Light Industrial / Office
|ZN-0001-202^
ATTACHMENT #4

Legend
Land Use Plan:
Aapark Mixed Use- 
Residential (AMU-R)
Airpartc Mixed Use (AMU)
Regional Tourism |RT) 
Employment (EMP)
Aviation (AV) 
open Space (OS]
iiiZLJ AVotAMU
Greater Airpork Boundory 
: >>>>>>> Signature Corridor
Powerfne Corridor 
Central Arizono Proiect
Rointree, between Hoyden 
and Scottsdale Roods, is 
subject to change os a port 
of engineering associated 
with street improvements
/
EMP
i
So
I \'
RT
- *
Site
' mu vi>'>>>H>a«>>>>>>>>»^
A .
0
0
i
m
AMU
RT
U
EMP
?»>
»»»
■<
Jf
A-*'
»»»>■»'
cO
^,6
>AMU
'IJK'U-) 1>K
AV
J-
1“ 
; Emp
V
o.
IMUNUKUIK[iKT.I
OctetHrM.MtO
Octotwrlt.SOIt MP-mi 
Octab«2S,20)1 
AprilS.}«U I0^2tll 
OK«nb« 12014 S^»I4
Noir«rte 14.7016 J-GP-7016 
Oclotw 1.7019 7-O> 7019 
Am Kl 2020 7-<V^»t9
N
1
1 Mile
Greater Airpark 
Land Use Plan
ZN-0001-2026
ATTACHMENT #5
/

t4. ^Sfh
■c ^ 
00 ^ 
S S!
z ^
■Z.
V
<9
O
G?2 PGD
(0
, p,ince
j>p
00 PGD
<8
e»
.n Dr/V^
%
,I0?PGD
\
(M
\
I
\
\
I
n
■EsJmDy
(SS I
Rl-7iRGD
o
SHE)
1331
P.GD
a>
v»
V
<0
z*
LRo/o
Br
BenB
OQ P.GD
R:5,PGD,
PGD
(U
45
to
O*
E. Hartford Drive
Q.S.
37-49
Zoning Graphic
t
I
I
P'/GJ2 rsB
E.,Bell,RdadI fela'PGD
Rl-TiPGD.
ESL'(HD)
z
PRG P.GD
lEonr
iM»j
R-AESL^
Existing Zoning
ZN-0001-2026
ATTACHMENT #6

SUMMARY OF C-4 AND 1-1 LAND USES
UNO USES
zoNiNCriaifmicTs-
PenTittted(P)ar
CohdltiWUse^
•'■^rC-4:
Aeronautical use, except off-airport heliport or helipad
P
Amusement and theme parks
CU
Appliance sales
P
Arts and craft production
P
Auction sales
CU
Big box
P/CU
Building material and garden sales
P
Carwash
CU
Courier and messenger
P
Data processing, hosting and related service
P
Day care center with drop off or outdoor play area farther than 100 feet from a residential district
P
P
Day care center with drop off or outdoor play area within 100 feet of a residential district
CU
Educational service, elementary and secondary school
P
CU
Educational service, other than elementary and secondary school
P
P
Electronic shopping and mail-order sen/ice
P
Equipment storage
P
Equipment sales, rental, and storage
P
Farm supply sales
P
Financial institution
P/CU
Funeral home and funeral services
Furniture and home furnishing sales
P
P
Gas station
CU
General and specialty trade contractors
P
Health and fitness studio
P
industrial launderer
P
Internalized community storage
P
P
Light manufacturing
P
P
Medical and diagnostics laboratory
P
Medical marijuana caregiver cultivation
CU
Medical marijuana use
CU
Multifamily Conversion
P
Multimedia production with communication tower equal to or less than 100 feet in height
P
P
Multimedia production with communication tower over 100 feet in height
CU
CU
Multimedia production without communication tower
P
P
Municipal use
p
P
Off*alrport heliport or helipad
CU
Office
P
Outdoor sales display area
CU
Personal care service
P
Place of worship
P
Recyclable material collection center
P
Repair and maintenance
P
Restaurant, excluding drive-through restaurant and excluding drive-ln restaurant
P
Restaurant, including drive-through restaurant but excluding drive-ln restaurant
Restaurant, including drive-through restaurant and including drtve-in restaurant
CU
Restoration service
P
Scenic and sightseeing transportation
P
Scientific research and development
P
P
Seasonal art festival
CU
Swimming pool sales, including display pools only and including construction equipment storage yard
P
Swimming pool sales. Including display pools only, but excluding construction equipment storage yard
P
Taxi and limousine service
P
Towing service
CU
Travel accommodation
Utility service yard
P
CU
Vehicle emissions testing facility
P
P
Vehicle leasing, rental or sales with indoor or outdoor vehicle display and storage
P
Vehicle leasing, rental or sales with indoor vehicle display and storage located in an enclosed building
P
Vehicle repair
P
Vehicle storage adjacent to residential districts
P
CU
Vehicle storage not adjacent to residential districts
P
P
Veterinary and pet care service
P
Wholesale, warehouse and distribution
P
P
Wireless communications facility. Type 1,2, and 3
P
P
Wireless communications facility, Type 4
CU
CU
ATTACHMENT#?

Kimley»>Horn
January 9, 2026
APPROVED
Brad Kanwischer, VP, Development Equity Investment
Mack Real Estate Group
2415 E Camelback Rd, Suite 920
Phoenix, AZ 85016
RE: Rivian Traffic Impact Statement - Scottsdale, Arizona
Dear Mr. Kanwischer:
This statement documents the trip generation of the proposed automobile sales and service 
center, identified as Rivian, that is proposed to be located within the Mack Innovation Park on the 
southeast corner of the intersection of State Route 101 (SRI 01) & Pima Road in Scottsdale, 
Arizona. A portion of the warehousing land use that was previously planned within the Mack 
Innovation Park development, the first two buildings are nearing completion of construction, is 
proposed to be rezoned from 1-1 (PCD) to C-2 prior to development of the Rivian site. 
Approximately 65,566 square feet (SF) of warehousing land use and a portion of the parking is 
proposed to be rezoned for use by the Rivian site. A copy of the project site plan is provided in 
Attachment 1.
Kimley-Horn previously analyzed the trip generation of the overall site in two traffic impact and 
mitigation analyses (TIMAs), SEC SR101 and Pima Road Traffic impact and Mitigation Anaiysis, 
and NEC SR101 and Beii Road Traffic impact and Mitigation Analysis, in September 2023. Both 
TIMAs have since been approved by the City of Scottsdale and the Arizona Department of 
Transportation (ADOT). Relevant excerpts from the approved TIMAs are included in 
Attachment 2.
SITE ACCESS
No new site access points are proposed with the Rivian site. Access to the site will be provided 
by the site driveways described in the approved TIMAs, which have been constructed at the time 
of this statement as part of the Mack Innovation Park’s offsite improvements. All offsite roadway 
and intersection improvements have also been constructed at the time of this statement.
TRIP GENERATION
The trip generation of the currently proposed Rivian site was compared to that of the previously 
proposed warehousing land use. Trip generation projections for the currently proposed site were 
estimated using the weekday trip generation rates published by the Institute of Transportation 
Engineers’ (ITE) Trip Generation Manual, 12"’ Edition. Trip generation projections for the 
previously proposed warehousing land use were estimated using the weekday trip generation 
rates published by the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 11'" 
Edition to maintain consistency with the methodology of the previously approved TIMAs. Table 1 
summarizes the trip generation comparison. Trip generation calculations are provided in 
Attachment 3.
kimley-horn.com
ATTACHMENT #8
1661 East Camelback Road, Suite 400, Phoenix, AZ 85016
602 944 5500

KimIey»>Horn
Page 2
Table 1: Trip Generation Comparison
Land Use
Land
Use
Code
Size/
Quantity
Units
Daily
Total Weekday Trips 
AM Peak Hour PM Peak Hour
In
Out Total
In
Out Total
Current Land Use Assumptions (ITE 12*^ Edition)
Automobile 
Sales (New)
840
65,566
SF
1,826
80
30
110
51
77
128
Previous Land Use Assumptions (iTE Edition)
Warehousing
150
65,566
SF
112
8
3
11
3
9
12
Difference 1,714
72
27
99
48
68
116
Compared to previous land use assumptions, the proposed land use is expected to generate 
1,714 additional daily trips, with 99 additional trips during the AM peak hour and 116 additional 
trips during the PM peak hour. The additional peak hour trips generated by the proposed site 
exceed the threshold of 100 peak hour trips that would generally require additional traffic analysis. 
Therefore, additional analysis was performed to determine if the previous turn lane storage length 
recommendations would accommodate the additional traffic.
REVISED 2028 TOTAL TRAFFIC VOLUME PROJECTIONS
Revised 2028 total traffic volumes for the overall Mack Innovation Park under current land use 
assumptions were estimated using the 2028 total traffic volumes previously developed in the 
approved TIMAs and the traffic assignment of the additional trips generated by the proposed land 
use change. The additional trips, shown as the difference between the previous and current land 
uses’ trip generation in Table 1, were distributed and assigned to the surrounding roadway 
network based on the methodology described in the approved TIMAs. The additional site traffic 
assignment was added to the 2028 total traffic under previous land use assumptions to obtain 
revised 2028 total traffic volume projections. The study area intersections from the approved 
TIMAs were maintained. Relevant excerpts from the approved TIMAs are included in 
Attachment 2.
Figure 1 shows the additional site traffic assignment associated with proposed change in land 
use. Figure 2 shows the revised 2028 total traffic volumes.
kimley-horn.com I 1661 East Camelback Road, Suite 400, Phoenix, AZ 85016 
1602 944 5500

J
I
I
-itr
r
t
T
§
III
a
/
..T
s
Trails de View
1(1
ii
oS>
1(1)
-»
C##
•s
M
8>
a
i»w
Pnposed
D
r
a.
O'
=•
-ll
•it?
\-
'4
tr
-=■«—T 'n'-
;Tfn ^1j
1(1)
mm M
S g-^Kil
53
1^ i
4a
I
«(t)
i
«(i»
Ip)
Bell Rd
-I
4a
i §
4«
Frank Uoyd Wright Blvd
J \
T
4«
4a
m
I
AM(PM) PEAK HOUR 
TRAFFIC VOLUMES
Kimley>^Horn
Figure 1
Additional Site Traffic Assignrrent
January 2026
SECSR101 and Pima Rd | Traffic Impact Statement

fin
I7D(47I]
if
Ji
r
Tr
“=:u
90am
mum
IfTWTH)
M(7t)
mA
§
iM(?q
I
II
Trailskie View
4n»»
1t4(417)
S
'S
CO
ts
a
Dnakoncnt
tr
5
O'
'V
8>
•^JITOW)
»a»
•\rriiy
:
>1
ll
'.T,
M
im
ji\.
.E
:~.-
11
P!
./ll.
i2<:^
BeiIRd
I
«-i«
«»
1(7t(l»1l
Frank Uoyd Wright Btvd
♦-taTtiaq
nMii)
;il,
I
itr
«o«ai
sy
•mtrm
w/vv^ 
PEAR hour
TRWWV0UJM6S
Kimiey>^Horn
Figure 2
2028 Total Traffic and Recommended Geometry
January 2026
SEC SRI 01 and Pima Rd | TrafRc impact Statement

Kimley»>Horn
Page 5
TURN LANE STORAGE LENGTH ANALYSIS
After reviewing the results of the additional site traffic assignment shown in Figure 1, any 
intersections with a negligible increase in turning movement volumes were excluded from the 
storage length calculations since the added volumes would not be expected to significantly 
change the results. The following intersections were considered in the storage analysis (further 
referred to as the “study intersections”):
SRI 01 SB Frontage Road & Pima Road/Princess Drive 
SRI 01 NB Frontage Road & Pima Road/Princess Drive
SRI 01 NB Frontage Road & Bell Road
• 
SRI 01 SB Frontage Road & Bell Road
• 
SRI 01 NB Frontage Road & Frank Lloyd Wright Boulevard
SRI 01 SB Frontage Road & Frank Lloyd Wright Boulevard
Driveway D1 & Pima Road 
• SRI 01 SB Frontage Road & Driveway D2
Queueing was analyzed at the dedicated left-turn and right-turn lanes at the study intersections 
to confirm that the storage length recommendations from the approved TIMAs can accommodate 
the revised 2028 total traffic volumes. The left-turn and right-turn storage calculations at the traffic 
interchanges utilized the ADOT turn lane storage length methodology described in ADOT Traffic 
Guidelines and Processes, Section 430 (TGP 430). ADOT calculates storage length by summing 
queue length multiplied by a factor of 1.5 to 2 times plus braking distance. Additionally, 95*'^ 
percentile queues were analyzed using Synchro 12 analysis software. The Synchro queueing 
methodology was analyzed at the traffic interchanges, and the Highway Capacity Manual, 7*^ 
Edition (HCM 7) methodology was analyzed at all other intersections.
Table 2 provides the storage length calculations for the dedicated left-turn lanes at the study area 
intersections. The calculations associated with these conclusions are included in Attachment 4.
kimley-horn.com
1661 East Camelback Road, Suite 400, Phoenix, AZ 85016
602 944 5500

Kimley»>Horn
Page 6
Table 2. Left-Turn Storage
Intersection 
and Approach
Previously 
Recommended 
Storage Length
Desired
Calculated Base (Minimum) 
Queue Length Braking 
Distance
95"' Percentile 
Storage Length
Recommended
Storage
SRIOI SB Frontage Road & Pima Road/Princess Drive
Southbound
Approach
355 feet (LT) 
355 feet (Th/LT)
490 feet (LT) 
490 feet (Th/LT)
200 feet 
(85 feet)
821 feet (LT) 
821 feet (Th/LT)
355 feet (LT)
355 feet (Th/LT)
Westbound
Approach
1,215 feet 
(Triple)
450 feet (Triple)
200 feet 
(85 feet)
472 feet (Triple)
1,215 feet 
(Triple)
SRlOl NB Frontage Road & Pima Road/Princess Drive
Northbound
Approach
275 feet (LT) 
275 feet (Th/LT)
270 feet (LT) 
270 feet (Th/LT)
200 feet 
(85 feet)
426 feet (LT) 
426 feet (Th/LT)
275 feet (LT)
275 feet (Th/LT)
Eastbound
Approach
400 feet
240 feet
200 feet 
(85 feet)
330 feet
400 feet
SRIOI SB Frontage Road & Beil Road
Southbound
Approach
385 feet (LT) 
385 feet (Th/LT)
530 feet (LT) 
530 feet (Th/LT)
200 feet 
(85 feet)
931 feet (LT) 
931 feet (Th/LT)
385 feet (LT)
385 feet (Th/LT)
Westbound
Approach
625 feet (Dual)
445 feet 
(Dual)
200 feet 
(85 feet)
1028 feet 
(Dual)
625 feet (Dual) (1)
SRIOI NB Frontage Road & Bell Road
Northbound
Approach
310 feet(LT) 
310 feet (Th/LT)
270 feet (LT) 
270 feet (Th/LT)
200 feet 
(85 feet)
702 feet (LT) 
702 feet (Th/LT)
310 feet (LT) 
310 feet (Th/LT)
Eastbound
Approach
450 feet
85 feet
200 feet 
(85 feet)
115 feet
450 feet
SRIOI SB Frontage Road & Frank Lloyd Wright Boulevard
Southbound
Approach
250 feet (Dual) (5)
435 feet (Dual)
200 feet 
(85 feet)
583 feet (Dual)
250 feet (Dual) (')(=)
Westbound
Approach
580 feet (Dual)
190 feet (Dual)
200 feet 
(85 feet)
254 feet (Dual)
580 feet (Dual)
SRIOI NB Frontage Road & Frank Lloyd Wright Boulevard
Northbound
Approach
285 feet (Dual) <®)
395 feet (Dual)
200 feet 
(85 feet)
449 feet (Dual)
285 feet (Dual) <’)<=)
Eastbound
Approach
450 feet (Dual) (5)
350 feet (Dual)
200 feet 
(85 feet)
400 feet (Dual)
450 feet (Dual)
TWLT = Two-way left-turn lane.
LT and Th/LT = Exclusive left-turn lane and through/left-turn lane.
Dual = Two left-turn lanes.
Triple = three left-turn lanes.
(’) Recommendation is consistent with previously recommended storage length.
(2) Additional storage available beyond striped turn lane.
(s)Value represents proposed improvements per Pima Freeway DCR. Interchange Is currently under construction.
The results of the analysis show that left-turn queue lengths are generally expected to remain 
similar to previous projections with the revised site land use. Therefore, the left-turn lane storage 
lengths previously recommended at the study intersections in the approved TIMAs are 
recommended to be maintained.
kimley-horn.com
1661 East Camelback Road, Suite 400, Phoenix, AZ 85016
602 944 5500

Kimley»>Horn
Page 7
Table 3 provides the storage length calculations for the dedicated right-turn lanes at the study 
area Intersections. The calculations associated with these conclusions are included in
Attachment 4.
Table 3. Right-Turn Storage
Intersection 
and Approach
Previously 
Recommended 
Storage Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95*'' Percentile 
Storage Length
Recommended
Storage
SRIOI SB Frontage Road & Pima Road/Princess Drive
Southbound
Approach
355 feet (RT) 
355 feet(Th/RT)
140 feet (RT) 
140 feet (Th/RT)
200 feet 
(85 feet)
63 feet (RT) 
63 feet (Th/RT)
355 feet (RT)
355 feet(Th/RT)
Eastbound
Approach
245 feet (Dual)
150 feet (Dual)
200 feet 
(85 feet)
162 feet (Dual)
245 feet (Dual)
5R101 NB Frontage Road & Pima Road/Princess Drive
Northbound
Approach
275 feet 
(Dual, Drop, 
Channelized, 
Free-Flow)
.(6)
200 feet 
(85 feet)
.0)
275 feet 
(Dual, Drop, 
Channelized, 
Free-Flow)
Westbound
Approach
285 feet
350 feet
200 feet 
(85 feet)
236 feet
285 feet
SRlOl SB Frontage Road & Bell Road
Southbound
Approach
385 feet (RT) 
385 feet (Th/RT)
120 feet (RT) 
120 feet (Th/RT)
200 feet 
(85 feet)
Ofeet(RT)
0 feet (Th/RT)
385 feet (RT) 
385 feet (Th/RT)
Eastbound
Approach
315 feet
175 feet
200 feet 
(85 feet)
83 feet
315 feet
SRIOI NB Frontage Road & Bell Road
Northbound
Approach
310 feet (RT) 
310 feet(Th/RT)
265 feet (RT) 
265 feet (Th/RT)
200 feet 
(85 feet)
102 feet (RT) 
102 feet(Th/RT)
310 feet (RT) <*> 
310 feet(Th/RT)
Westbound
Approach
350 feet
335 feet
200 feet 
(85 feet)
464 feet
350 feet
SRIOI SB Frontage Road & Frank Lloyd Wright Boulevard
Southbound
Approach
225 feet
270 feet
200 feet 
(85 feet)
704 feet
225 feet
Eastbound
Approach
175 feet 
(Channelized)'^'
435 feet
200 feet 
(85 feet)
(Channelized)
175 feet 
(Channelized)
RT and Th/RT = Exclusive right-turn lane and through/right-turn lane.
Dual = Two right-turn lanes.
Drop = Through lane that transitions to right-turn oniy lane.
Channelized = Channei-separated right-turn iane.
Free Fiow = Operates without traffic conflicts.
<’) Recommendation is consistent with previousiy recommended storage length.
Additional storage available beyond striped turn iane.
(siVaiue represents proposed improvements per Pima Freeway DCR. interchange is currentiy under construction. 
(6)Caiculated value not available for this movement.
<*) Storage iength does not account for free-flowing right-turn.
P) Free-flowing right-turn. Significant queueing not anticipated.
kimley-horn.com I 1661 East Camelback Road, Suite 400, Phoenix, AZ 85016 I 602 944 5500

Kimley»>Horn
Page 8
(Table 3 continued)
Intersection 
and Approach
Previously 
Recommended 
Storage Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95**' Percentile 
Storage Length
Recommended
Storage
SR 101 NB Frontage Road & Frank Lloyd Wright Boulevard
Northbound
Approach
285 feet
120 feet
200 feet 
(85 feet)
51 feet
285 feet
Westbound
Approach
225 feet (Dual) 
(Channelized)*®’
275 feet (Dual)
200 feet 
(85 feet)
(Channelized)
225 feet (Dual) 
(Channelized)
Driveway D1 & Pima Road
Eastbound
Approach
150 feet(Drop)
.(6)
.(9)
150 feet(Drop)
SRIOI NB Frontage Road & Driveway D2
Northbound
Approach
300 feet
130 feet <®>
200 feet 
(85 feet)
.(9)
300 feet
RT and Th/RT = Exclusive right-turn lane and through/right-turn lane.
Dual = Two right-turn lanes.
Drop = Through lane that transitions to right-turn only lane.
Channelized = Channel-separated right-turn lane.
Free Flow = Operates without traffic conflicts.
hi Recommendation is consistent with previously recommended storage length.
F) Additional storage available beyond striped turn lane.
® Value represents proposed improvements per Pima Freeway DCR. Interchange is currently under construction.
<^> Calculated value not available for this movement.
(8) Storage length does not account for free-flowing right-turn.
(81 Free-flowing right-turn. Significant queueing not anticipated.
The results of the analysis show that right-turn queue lengths are generally expected to remain 
similar to previous projections with the revised site land use. Therefore, the right-turn lane storage 
lengths previously recommended at the study intersections in the approved TIMAs are 
recommended to be maintained.
CONCLUSION
The proposed rezoning associated with the proposed Rivian development is anticipated to 
generate an additional 1,714 daily trips, 99 AM peak hour trips and 116 PM peak hour trips 
compared to previous land use assumptions. The results of the queueing analysis indicate that 
queues at the dedicated left-turn and right-turn lanes are anticipated to remain similar to queues 
under previous land use assumptions. Therefore, the left-turn and right-turn lane lengths 
previously recommended at the study intersections in the approved TIMAs for the overall 
development are recommended to be maintained.
kimley-horn.com
1661 East Camelback Road, Suite 400, Phoenix, AZ 85016
602 944 5500

Kimley»>Horn
Page 9
If you have any further questions, please feel free to contact me at (602) 944-5500. 
Sincerely,
6
<<;
4’ o
77122
■s
□>
ALEXANDER
Si:
O(t o WEBER
Alexander Weber, P.E.
KIMLEY-HORN AND ASSOCIATES. INC.
Attachments:
• 
Attachment 1: Site Plan
• 
Attachment 2: Relevant TIMA Excerpts
• 
Attachment 3: Trip Generation Calculations
Attachment 4: Storage Length Calculations
kimley-horn.com
1661 East Camelback Road, Suite 400, Phoenix, AZ 85016
602 944 5500

1FfiPKD
PROJECT AOOWU 
I77T1 K P«ilA BOAO scorraodii «
OOSTnCZOMMO 
MJMCMEA 
TENANT MEA 
PARKWO LOT 1 SITE AREA 
OfnCE PMKMO STA1X6 (T,712 S.F. /») 
: » SPACES
STAU9 (STEW 8.P. J S») 
: 73 SPACES
.'ESK
EMSTM WORK PER PE RMTT «113Md
WAREHOUSE PARKNO STAU31
EWmo PARKMO AUOCATED TO TENANT 
NFAtPARKWOlOTl
t» SPACES 
:R) SPACES
EWSTWO EV STMX8 PNOVOe> 
icw Ev sTAos mmucD
REOUMEO ADA PAMwa 
ntOTIXD AOA PARKMO
EJUSTM3 MCTCU PARNNG
:SSPACSS
@@@@@(10)
1
@C^Cp(»)@@®®@
*
rT
s \
in
' \
AOMDONM. TENANT 
PARmO (70 SPACES)
\
\
r IMSOMCr SCREEN WAAl.
I 
VAHOUS EASEMENTS
\\
\\
t
\
J
9^
\ '/
i--------- WATER MAM ESWT.
w-tr^ WFS DCDCATEO »«RON
■\ i ■ 
WPS ESSfT.
r>
j BLDG C «WORTH ELEVATION
• , SCMS:
C-v 
NEW TENANT PARNNG
^ 
(laospACEi
K
TTP AtlA »-0S .i^-y OmWifK-i
SPACE AM) RA*» r~T1 
EV CHARBCR. TYP WWE-MDOOR-.____________ j
AOOfTIONAi. ADA STAU»—
n
: \z.i
V
:_:iL;_iL :iii!
j ^ 
PAWPASHWAT.TYP. U
STAUW rOKTTP.7
t
ICWEVPMKHO-'
y-y 
w-c wo*
R '
CWST SEWER Eswr
PRCPO8E0 P-<r SOeWAiK —
. % ^
\ 
V-.' JS
\ .:P-'
' V'
\
\ \ 
\
i -
■ \-
NEW TENANT SPACE 
65,566 S.F.
E30ETMGr-(r
ancMAuc
p.
\ \:
1
I
Vaccess
STAwriP.
\
EXISTING BUILDING PER PERMIT #1120-24
7
c.
'o-i
I-
I
V CONCRETE DOW 
APRON. TVP.
! b
L,
-i
-„l
□
I__
:=
□
1
I-,,
V,
MACK
REAL
ESTATE
GROUP
K A /\ 
I / INNOVATION
MAUK PARK
NEC Loop 101 &Bell Road 
SCOTTSDALE, AZ
1
07-02-25
22(as-ST17_NWC
SCALE. 1* > 46'
Butler Design Group. Inc
Sfcnilecis 4 puinners

Traffic Impact and Mitigation Analysis
SEC SR101 and Pima Road 
Scottsdale, Arizona
Prepared for:
Mack Real Estate Development
Kimley»>Horn

VNORTHJ
Trailside View
■X %
•£5-
*,
I
4
'<>
oi>
V'
03
V-
fagl
(>S^
9
.. -£- :
03
V'
III ^ Lu . lii. 
;
ri— - ir O rrni ':1''V-^
i!
i
O'
■ ip ■ ---^
..«0«
—:
i\
:i"iiV':^' ;':ni '■
‘ ;r
si..
yira'
I
E
- .#: T'l
U; Jijif Sl*
'K;.
*
101
■??' ■ ;'i i ■ /-si?-' ;■
\
jySSs. \S, • >
► ,
V 
_-==
i.
\
I
Bell Rd
55
x:o
03
Frank Lloyd Wright Blvd
DRIVEWAYS 
SITE (PARCEL 1) 
PARCEL 5 
PARCEL 6
Kiniley»>Horn
Figure 2 
Site Plan
September 2023
SEC SR101 and Pima Rd | Traffic Impact and Mitigation Analysis

Traffic Impact and Mitigation Analysis
NEC SR101 and Bell Road 
Scottsdale, Arizona
Prepared for:
Mack Real Estate Development
Kimley»>Horn

V NORTHJ
Trailside View
6
»■
<?
x>
%
S
\\
O'
/O
CO
m
CO
O'
0>
n
m
I
m
IT
n
m
ft
-S.
O'
fl
6^
..^00
ll"
o<\<'
i
lL
Til
rI
rn
i
}
iex'f
kr
Q iTgfw^»>0 GtWfc' m.
■t
'f
E
5
X-
LJ
n;
111
11/
101
X'SN
6
'X
i. i
VS
I
Bel Rd
Frank Lloyd Wright Blvd
LEGEND
driveways
SITE
Kimley»>Horn
Figure 2 
Site Plan
September 2023
NEC SRI 01 and Bell Rd | Traffic Impact Analysis

5.0 PROJECTED TRAFFIC
5.1 SITE TRAFFIC FORECASTS
5.1.1 TRIP GENERATION
The Institute of Transportation Engineers’ (ITE) Trip Generation, H**' Edition was used to obtain daily and 
peak hour trip generation rates and inbound-outbound percentages, which were then used to estimate the 
number of daily and peak hour trips that can be attributed to the proposed development. The site trip 
generation was further divided into car and truck trips based on the truck trip percentages for 
Warehousing land uses presented in Appendix I of the ITE Trip Generation Handbook, 3^ Edition. The 
trip generation characteristics of the site are summarized in Table 6. Trip generation calculations can be 
found in the Appendix.
Table 6. Project Trip Generation
Land Use
ITE 
Daily 
AM Peak 
PM Peak
code 
Total 
out Total In Out Total
Parcel 2A
Warehousing
150
404,075
SF
692
53
16
69
20
53
73
Parcel 2B*
Warehousing
I 150 I 105,915
SF
182
14
4
18
5
14
19
Total Trips 874
67
20
87
25
67
92
Car Trips 700
53
16
69
20
53
73
Truck Trips
174
14
4
18
5
14
19
*Future phase development. Site traffic assignment volumes to be realized in the ultimate buildout of Parcel 2.
The proposed development is expected to generate 874 daily trips, with 87 trips occurring in the AM peak 
hour and 92 trips occurring in the PM peak hour.
5.1.2 TRIP DISTRIBUTION
Daily passenger car trips were distributed over the cardinal directions based on the Maricopa Association 
of Governments' (MAG) estimate of total households within an 11.5-mile radius of the site. This radius is 
based on the average employment-based trip length as reported in the 2017 National Household Travel 
Survey.
Percent to and from: 
2020 
2040
North 
11 % 
13 %
East 
9 % 
8 %
South 
32 % 
29 %
West 
49 % 
50 %
The results of this distribution were used as a basis for determining the ultimate passenger car trip 
distribution for the site. In addition to the MAG land use database for current and future land use 
projections, the ultimate surrounding roadway system was also taken into consideration when trip 
distribution was determined; therefore, the distribution shown above was further refined by considering
NEC SR101 and Bell Road | Traffic Impact and Mitigation Analysis 
September 2023

the future roadway network near the site. Figure 4 illustrates the passenger car trip distribution for the 
study area.
Truck traffic utilized a different trip distribution that was oriented predominantly to the freeway to account 
for differences in truck travel patterns. Figure 4 illustrates the truck trip distribution for the study area.
5.1.4 SITE TRAFFIC ASSIGNMENT
Trips generated by the proposed development were assigned to the roadway network based on the trip 
distribution and the likely travel patterns to and from the site. Figure 5 shows the results of the site traffic 
assignment. Additional figures showing the routes into and out of the site from SRI 01 and the site traffic 
assignment broken out into car and truck traffic are included in the Appendix.
5.2 FUTURE TRAFFIC FORECASTING
The background traffic volumes for the buildout year 2025 were calculated based on 2022 traffic counts 
and the annual traffic growth rate. Based on historical trends in the COS average daily traffic volume data 
from 2014, 2016, and 2018 and development potential in the area, an annual growth rate of 1.0 percent 
per year was applied to the existing turning movements to obtain background traffic volumes for the year 
2025. The resulting 2025 background traffic volumes are shown in Figure 6. The relevant COS average 
daily segment traffic volume maps are included in the Appendix.
In addition to applying the annual traffic growth rate to the existing 2022 traffic counts, traffic from the 
adjacent developments discussed in Section 3.2 of this report was included in the background traffic 
volumes for the horizon year 2028. To account for the impacts of the adjacent developments on the 
surrounding roadway network, trip generation rates from the Institute of Transportation Engineers’ (ITE) 
Trip Generation, 11*'' Edition were used to estimate the development’s peak hour trip generation, shown 
below in Table 7.
Table 7. Adjacent Development Trip Generation
Land Use
ITE
Code
Quantity Units
Daily
Total
AM Peak 
Out Total
Parcel 1
PM Peak
Out Total
Warehousing
ISO 572,170
SF
980
75
22
97
29
74
103
Parcel 3
General Office Building 710 
300,000
SF
3,252 
401
55
456
73
359 
432
Parcel 4
General Office Building 710 
49,200
SF
534
66
9
75
12
59
71
Parcel 5
General Office Building 710 
54,000
SF
586
72
10
82
13
65
78
High-Turnover (Sit- 
Down) Restaurant
932
6,000
SF
644
31
26
57
33
21
54
Parcel 6
General Office Building | 710 | 40,000 | SF
434
54
7
61
10
48
58
Total Trips
6,430
699
129
828
195
626
796
NEC SR101 and Bell Road | Traffic Impact and Mitigation Analysis
September 2023

A
r
rm
SI
i
Ji
0(«
I
es
*?«««
itM
If
0W-*
4«K1M
timiTW
«—«ni)
•POi)
'flff
r
r
^T
MOM
WiJ—»
leem
J*74(1»
III
9
P
?
Traiiside View
<f>
:
. V
ill
^*(171)
s®
^T^
«P)
a
II
©
4(M»
t
I
1
r
rr
a.
O'
4
C
I
4, 
;
Si
M
Jl
5
\r
:
WTOM
s
m-l,
E
s
"rtr A .,s
■^TT
j J I ■ '+
III
/liu
*w,a
ra
4—tnwa \
■m
ur
Mr
III
4n<K}—" 
»t*(1HD—* 
114^1)-^ if
T. 1
iA
lilM
aM<Mdi
lam
Bell Rd
2o
,A/®^
s’"'V J /- >
I
§
J
II
41(11)-^
r
r
^11
8/
Frank Lloyd Wright Blvd
; A
■Tiuai
Jl'.
*
=f Mtiir,
•sir
*ti{i«i)
wttm-*
TWLT - IWCmAY LBT-T\JRN LANE
LEGEND
-XXDOQ 
PEAK HOUR
TfWTtCVOLUMES
LASCUSC
■ ANTOPATH) BACKGROUtsD 
LANEUS£NPROVEMENTS 
___ FUTURELAftLat
EXmMQ INTERSECTION 
CONTROL
ANnOPATHI BACKGROUND 
NTERSECnON CONTROL 
■uPfloveers
PROPOSED NTERSeCnON 
CONTROL
Kimley>^Horn
Figure 9
2028 Total Traffic and Recommended Geometry
September 2023
NEC SR101 and Bell Rd | Traffic Impact Anatysis

Intersection
NB
SB
52 
43 
7
55
EB
43
WB
19
15
Intersection
LOS
31
5R101 SB Frontage Road & Frank Lloyd Wright Boulevard
AM Peak
C
28
C
28
D
46
D
43
A
1
D
54
C
29
C
32
PM Peak
D
38
D
50
D
37
D
51
A
2
D
54
C
22
D
36
SRIOI NB Frontage Road & Frank Lloyd Wright Boulevard
AM Peak
C
29
C
27
A
5
D
55
C
23
D
47
A
1
C
27
PM Peak
D
45
C
34
B
12
D
54
B
19
D
35
A
1
C
27
As shown in Table 16, the alternative scenario review indicated that the LOS of each movement at the 
TIs can be improved to LOS E or better with the implementation of the previously mentioned 
improvements.
There are constraints that would need review if geometric improvements were to be considered at these 
Tl locations. These constraints include but are not limited to right-of-way acquisition, underpass bridge 
modifications, and utility and traffic signal equipment relocations.
6.2 LEFT-TURN LANES
The City of Scottsdale requires left-turn lanes at all street intersections on major collector and arterial 
roadways. Turn lane lengths are to be determined based on the anticipated turning volume and the traffic 
control type. The City of Scottsdale requires left-turn lanes to be constructed with a standard storage 
length of 150 feet and minimum storage length of 100 feet. Left-turn lanes should be constructed with a 
reverse curve length per COS Standard Detail 2225.
The signalized and unsignalized intersections and site driveways in the study area were analyzed to 
determine the left-turn storage needed to accommodate the expected traffic volumes in the horizon year 
2028. The left-turn storage calculations at the traffic interchanges utilized ADOT turn lane criteria. Per 
ADOT TCP 430, ADOT calculates storage length by summing queue length multiplied by a factor of 1.5 
to 2 times plus braking distance. The left-turn storage calculations at the remaining intersections utilized 
AASHTO turn lane criteria. Additionally, Synchro 95*^ percentile queues were analyzed at the traffic 
interchanges, and HCM 95‘'' percentile queues were analyzed at all other intersections. Table 17 provides 
the recommended left-turn storage at the study area intersections. The recommended storage lengths are 
based on total traffic volumes shown in Figure 9. The calculations associated with these conclusions and 
the relevant COS and ADOT standards are included in the Appendix.
NEC SRIOI and Bell Road | Traffic Impact and Mitigation Analysis 
September 2023
40

Table 17. Left-Turn Storage
Intersection
and
Approach
Existing Storage 
Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95'*' Percentile 
Storage Length
5R101 SB Frontage Road & Pima Road/Princess Drive
Recommended
Storage
Southbound
Approach
355 feet (LT) 
355 feet (Th/LT)
470 feet (LT) 
470 feet (Th/LT)
200 feet 
(85 feet)
781 feet (LT) 
781 feet (Th/LT)
355 feet (LT) <2) 
355 feet (Th/LT)
Westbound
Approach
765 feet (Dual)
450 feet (Triple)
200 feet 
(85 feet)
462 feet (Triple)
1,215 feet d)(5)
(Triple)
5R101NB Frontage Road & Pima Road/Princess Drive
Northbound
Approach
275 feet (LT) 
275 feet (Th/LT)
265 feet (LT) 
265 feet (Th/LT)
200 feet 
(85 feet)
397 feet (LT) 
397 feet (Th/LT)
275 feet (LT) <2) 
275 feet (Th/LT)
Eastbound
Approach
400 feet
240 feet
200 feet 
(85 feet)
326 feet
400 feet dlH)
Pima RoadSt Traiiside View
Southbound
Approach
140 feet
150 feet
N/A
25 feet
115 feet (’X-ixe)
Westbound
Approach
195 feet
225 feet
N/A
175 feet
190 feet (9(4)(6)
91" Street« Traiiside View
Northbound
Approach
150 feet
100 feet
N/A
25 feet
150 feet d)
91" Street & Driveway D3
Northbound
Approach
100 feet
N/A
25 feet
150 feet
Southbound
Approach
N/A
TWLT
91" Street & Driveway D4
Northbound
Approach
100 feet
N/A
25 feet
150 feet
SRIOI SB Frontage Road & Beii Road
Southbound
Approach
385 feet (LT) 
385 feet (Th/LT)
530 feet (LT) 
530 feet (Th/LT)
200 feet 
(85 feet)
916 feet (LT) 
916 feet (Th/LT)
385 feet (LT) (2) 
385 feet (Th/LT)
Westbound
Approach
625 feet 
(Dual)
440 feet 
(Dual)
200 feet 
(85 feet)
992 feet 
(Dual)
625 feet (Dual) d)
SRlOl NB Frontage Road & Beii Road
Northbound
Approach
310 feet (LT) 
310 feet (Th/LT)
270 feet (LT) 
270 feet (Th/LT)
200 feet 
(85 feet)
683 feet (LT) 
683 feet (Th/LT)
310 feet (LT) d) 
310 feet (ThAT)
Eastbound
Approach
450 feet
85 feet
200 feet 
(85 feet)
113 feet
450 feet d)(4)
90* Street & Beii Road
Eastbound
Approach
100 feet
N/A
25 feet
250 feet
Westbound
Approach
55 feet
100 feet
N/A
25 feet
55feetd)H)
4
NEC SR101 and Bell Road | Traffic Impact and Mitigation Analysis
September 2023

Intersection
and
Approach
Existing Storage 
Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95'^ Percentile 
Storage Length
91" Street & Bell Road
Recommended
Storage
Northbound
Approach
120 feet (Dual)
275 feet
N/A
300 feet
120 feet (“)
Southbound
Approach
100 feet
N/A
25 feet
150 feet
Eastbound
Approach
550 feet
N/A
525 feet
400 feet
Westbound
Approach
245 feet
125 feet
N/A
50 feet
245 feet d)W
SRIOI SB Frontage Road & Frank Lloyd Wright Boulevard
Southbound
Approach
250 feet (Dual)
(5)
435 feet (Dual)
200 feet 
(85 feet)
534 feet (Dual)
250 feet (Dual)
(2)(S)
Westbound
Approach
580 feet (Dual)
(5)
190 feet (Dual)
200 feet 
(85 feet)
224 feet (Dual)
580 feet (Dual)
(1)(4)(5)
SRlOl NB Frontage Road & Frank Lloyd Wright Boulevard
Northbound
Approach
285 feet (Dual)
(5)
395 feet (Dual)
200 feet 
(85 feet)
442 feet (Dual)
285 feet (Dual)
(4)(5)
Eastbound
Approach
450 feet (Dual) 
(5)
350 feet (Dual)
200 feet 
(85 feet)
371 feet (Dual)
450 feet (Dual)
(2)(5)
TWLT = Twt>-way left-turn lane.
LT and Th/LT = Exclusive left-turn lane and through/left-tum lane.
Dual = Two left-turn lanes.
Triple = three left-turn lanes.
(') Calculated or 95% Percentile Storage Length value less than or equal to existing.
(2) Additional storage available beyond striped turn lane.
P) Turn lane Is geometrically constrained. Maximize turn storage.
P) Site does not contribute or minimally contributes traffic to movement.
PIValue represents proposed improvements per Pima Freeway DCR.
PlValue represents proposed Improvements per Pima Rd and Trailside View Intersection Improvement Plans.
The left-turn lanes should provide the storage recommended in Table 17 and an appropriate reverse 
curve length per COS Standard Detail 2225.
The northbound approaches to Driveway D3 and Driveway D4 are recommended to be constructed with 
150 feet of northbound left-turn lane storage.
The proposed eastbound left-turn lane at the intersection of 91®* Street & Bell Road is geometrically 
constrained by the existing westbound left-turn lane at the intersection of 90**' Street & Bell Road. The 
eastbound left turn lane storage is recommended to be maximized. Approximately 400 feet of eastbound 
left-turn storage is anticipated to be provided.
The westbound dual left-turn lanes at the intersection of SR101 NB Frontage Road & Bell Road are 
geometrically constrained by the existing median width east of the Tl. Since these turn lanes are unlikely 
to be extended in the future, the proposed eastbound left-turn lane storage at the intersection of OO*” 
Street & Bell Road is recommended to be maximized to provide approximately 250 feet of storage.
The existing outer northbound left-turn lane at the intersection of 91®* Street & Bell Road is recommended 
to be restriped as a dedicated through lane to accommodate northbound through traffic on 91®* Street. It is
NEC SR101 and Beli Road | Traffic Impact and Mitigation Analysis 
September 2023
42

anticipated that the existing two-way left-turn iane on 91®* Street south of Bell Road will accommodate 
expected left-turn queues.
6.3 RIGHT-TURN LANES
Right-turn lanes are often recommended on roadways where right-turning vehicles create delays or safety 
concerns for other traffic movements. The need for a right-turn lane depends on the speed of traffic on 
the road, the volume of traffic turning right, and the through traffic volume in the same lane as the right- 
turning traffic.
6.3.1 INTERSECTIONS
The City of Scottsdale recommends a right-turn lane at all street intersections on major arteriai roadways 
and on other roadways based on anticipated turning volumes and traffic control.
Based on a review of roadway classifications and the 2028 total traffic volumes, a right-turn lane is 
recommended at the southbound approach to the intersection of 91®* Street & Bell Road. The City of 
Scottsdale requires right-turn lanes to be constructed with a standard storage length of 150 feet and 
minimum storage length of 100 feet. Right-turn lanes should be constructed with a reverse curve length 
per COS Standard Detail 2225.
The signalized and unsignalized intersections and site driveways in the study area were analyzed to 
determine the right-turn storage needed to accommodate the expected traffic volumes in the horizon year 
2028. The right-turn storage calculations at the traffic interchanges utilized ADOT turn lane criteria. Per 
ADOT TCP 430, ADOT calculates storage length by summing queue length multiplied by a factor of 1.5 
to 2 times plus braking distance. The right-turn storage calculations at the remaining intersections utilized 
AASHTO turn lane criteria. Additionally, Synchro 95*** percentile queues were analyzed at the traffic 
interchanges, and HCM 95*** percentile queues were analyzed at all other intersections. Table 18 provides 
the recommended right-turn storage at the study area intersections. The recommended storage lengths 
are based on total traffic volumes shown in Figure 9. The calculations associated with these conclusions 
and the reievant COS and ADOT standards are included in the Appendix.
NEC SR101 and Beli Road | Traffic Impact and Mitigation Analysis
September 2023

Table 18. Right-Turn Storage
Intersection
and
Approach
Existing Storage 
Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95“'' Percentile 
Storage Length
Recommended Storage
5R101 SB Frontage Road & Pima Road/Princess Drive
Southbound
Approach
355 feet (RT) 
355 feet (Th/RT)
140 feet (RT) 
140 feet (Th/RT)
200 feet 
(85 feet)
62 feet (RT) 
62 feet (Th/RT)
355 feet (RT)<i>l‘'> 
355 feet (Th/RT)
Eastbound
Approach
245 feet (Dual)
150 feet (Dual)
200 feet 
(85 feet)
159 feet (Dual)
245 feet (Dual)
5R101NB Frontage Road & Pima Road/Princess Drive
Northbound
Approach
275 feet
(Trap, Free Flow)
.(6)
200 feet 
(85 feet)
275 feet (Dual, Trap) 
(Channelized, Free Flow)
Westbound
Approach
285 feet
350 feet
200 feet 
(85 feet)
233 feet
285 feet'iX'"
Pima Road & Trailside View
Northbound
Approach
100 feet
300 feet
N/A
225 feet
300 feet
Westbound
Approach
200 feet
175 feet
N/A
200 feet
200 feet ^
91^ Street & Traiiside View
Eastbound
Approach
125 feet
150 feet
N/A
25 feet
125 feet W
SRIOI SB Frontage Road & Beii Road
Southbound
Approach
385 feet (RT) 
385 feet (Th/RT)
120 feet (RT) 
120 feet (Th/RT)
200 feet 
(85 feet)
0 feet (RT) 
Ofeet (Th/RT)
385 feet (RT) •i"'" 
385 feet (Th/RT)
Eastbound
Approach
315 feet
175 feet
200 feet 
(85 feet)
82 feet
315 feet
SRlOl NB Frontage Road & Beii Road
Northbound
Approach
310 feet (RT) 
310 feet (Th/RT)
260 feet (RT) 
260 feet (Th/RT)
200 feet 
(85 feet)
97 feet (RT) 
97 feet (Th/RT)
310 feet (RT) 
310 feet (Th/RT)
Westbound
Approach
175 feet
335 feet
200 feet 
(85 feet)
441 feet
350 feet
90* Street & Beii Road
Eastbound
Approach
150 feet
100 feet
N/A
150 feet
91^ streets, Beil Road
Northbound
Approach
120 feet
150 feet
N/A
75 feet
120 feet
Southbound
Approach
250 feet
N/A
175 feet
250 feet (Trap)
Eastbound
Approach
205 feet
200 feet
N/A
75 feet
205 feet'i’l'"
SRIOI SB Frontage Road S, Frank Lloyd Wright Boulevard
Southbound
Approach
225 feet'=>
270 feet
200 feet 
(85 feet)
672 feet
225 feet
Eastbound
Approach
175 feet 
(Channelized)
435 feet
200 feet 
(85 feet)
(Channelized)
175 feet
(Channelized)*^’*^’
NEC SR101 and Bell Road | Traffic Impact and Mitigation Analysis 
September 2023
44

Intersection
and
Approach
Existing Storage 
Length
Calculated 
Queue Length
Desired
(Minimum)
Braking
Distance
95"’ Percentile 
Storage Length
Recommended Storage
5R101NB Frontage Road & Frank Lloyd Wright Boulevard
Northbound
Approach
285 feet <=>
120 feet
200 feet 
(85 feet)
50 feet
285 feet
Westbound
Approach
225 feet (Dual) 
(Channelized)
270 feet (Dual)
200 feet 
(85 feet)
(Channelized)
225 feet (Dual) 
(Channelized)
RT and Th/RT = Exclusive righl-tum lane and thraugh/righl-turn lane.
Dual = Two right-turn lanes.
Trap = Through lane that transitions to right-turn only lane.
Channelized = Channei-separated right-turn lane.
Free Flow = Operates without traffic conflicts.
I') Caiculated or 95% Percentiie Storage Length vaiue less than or equal to existing.
P) Additional storage available beyond striped turn iane.
P) Turn lane Is geometrically constrained.
(<) Site does not contribute or minimally contributes traffic to movement.
(5) Value represents proposed improvements per Pima Freeway DCR.
(°)Calcuiated value not available for this movement.
<°> Storage length does not account for free-flowing right-turn.
(S) Free-flowing right-turn. Significant queueing not anticipated.
The right-turn lanes should provide the storage recommended in Table 18 and an appropriate reverse 
curve iength per COS Standard Detail 2225.
Per coordination with ADOT and the City of Scottsdale, dual channelized free-flow right-turn lanes are 
anticipated to be instalied on the northbound approach to the intersection of the SRI 01 NB Frontage 
Road & Pima Road/Princess Drive with construction of Parcel 1 north of the site to improve traffic 
operations at the Tl. Both turn lanes are anticipated to be trap lanes. The turn lanes are recommended to 
be striped with 275 feet of storage.
An additional eastbound receiving lane is anticipated to be constructed at the intersection of SRI 01 NB 
Frontage Road & Pima Road/Princess Drive to accommodate the additional free-flowing northbound 
right-turn lane. The additional lane is anticipated to transition to a right-turn trap lane at Driveway D1.
The westbound right-turn lane at the intersection of SRI 01 NB Frontage Road & Bell Road is 
recommended to be extended to provide 350 feet of westbound right turn storage and an appropriate 
taper length per ADOT TCP 430.
The northbound right-turn lane at the intersection of Pima Road and Trailside View is recommended to be 
extended to provide 300 feet of northbound right-turn storage and an appropriate reverse curve length per 
COS Standard Detail 2225.
The outer southbound through lane at the intersection of 91®' Street and Bell Road is recommended to 
transition to a right-turn trap lane with 250 feet of storage.
6.3.2 DRIVEWAY
The City of Scottsdale recommends a right-turn lane at site driveways on major arterial roadways and 
when the criteria specified in the COS Design Standards & Policies Manual (DSPM) are met. These
NEC SR101 and Bell Road | Traffic Impact and Mitigation Analysis
September 2023

criteria consider the daily traffic volumes on the street, the 85'^ percentile traffic speed on the street, and 
the turning volume into the driveway.
Based on a review of the 2028 total traffic volumes and roadway conditions, a righMurn lane is warranted 
at the eastbound approach of Driveway D1 on Pima Road. An additional eastbound through lane is also 
anticipated to be installed along Pinna Road from SR101 NB Frontage Road and will transition to a right- 
turn lane at Driveway D1. Therefore, a right-turn trap lane is recommended to be striped at this location 
with 150 feet of storage.
A northbound right-turn trap lane is recommended to be striped at the intersection of 91st Street & 
Driveway D3 to transition the 91®' Street cross-section to a single northbound through lane north of 
Driveway D3. The trap lane is recommended to be striped with 150 feet of storage.
ADOT recommends a right-turn lane when the criteria in ADOT TGP 245 are met. These criteria consider 
the peak hour volume on the adjacent street, the posted speed on the roadway, and the right-turn 
volume.
Based on a review of the 2028 total traffic volumes and roadway conditions, a right-turn lane is warranted 
at the northbound approach to Driveway D2 on SRI 01 NB Frontage Road. Therefore, a righWurn lane is 
recommended to be constructed at this location with 300 feet of storage and an appropriate taper length 
per ADOT TGP 430.
The relevant COS and ADOT right-turn lane standards are included in the Appendix.
6:4^ DRIVEWAY Cf^tERIA " 
;
The City of Scottsdale requires driveways to be spaced from each other and street intersections as 
defined in the COS DSPM Section 5-3.2000. Standard driveway spacing is 500 feet along a major arterial 
roadway, 330 feet along a minor arterial roadway, and 250 feet along a major collector roadway, 
measured between centerlines of driveways or roadways. Site driveways are also recommended to align 
with driveways on the opposite side of the street;
Based on the site plan and coordination with the City of Scottsdale, the proposed driveway locations are 
anticipated to satisfy these driveway spacing requirements.
6.5 CROSS-SEGtlONS
The 91®' Street alignment is identified as a major collector roadway by the 2016 COS Transportation 
Master Plan. 91®' Street appears to be constructed to a three-lane urban minor collector cross-section 
north of the site and a five-lane urban rriajor collector cross-section south of the site. Based on the 
recommended storage lengths along 91®' Street, it is recommended that 91®' Street be constructed to a 
suburban major collector cross-section from Driveway D3 to Bell Road to match the street section on the 
south side of Bell Road. The cross-section should maintain a raised median and two travel lanes in each 
direction. The outer northbound through lane is recommended to transition to a right-turn trap lane at 
Driveway D3 to transition from a major collector to a minor collector cross-section north of the driveway.
NEC SR101 and Bell Road | Traffic lmpactand Mitigation Analysis 
September 2023

ITE Trip Generation Summary
WeoMay Trip Generator)
Trips Based on Average Rates/Equations
Kimley»>Horn
Project Name 
Project Number
Current Land Use
rTE Version
Trip Genoration Characteriatica
ITE 12th Ed
Land Us« * Coda
(840) Automobile Sales (Now)
Suboafesgory
All Sites
No. Units
65.566
bid^ndsirf
KSF
MIy
SEC SRIO-I & Pima Road 
291335001
Avarag* Rata/Equation
AM
Total Trips
T = 27.84{X)
mm = 0.81 LnfX)-»-1.31
PM
Lnm = 0.84 Ln(X)-*-1.34
Daly
1.826
AM
In
60
Out
30
Total
110
In
51
Out
77
Total
128
Previous Land Use
rrEVsnkm
Trip Gonaration Characteriatica
Land UaaeCoda
Subcataoory
No.Unlta
Vai
DMIy
Avaraga Rata/Equatlon
AM
Total Trips
PM
Daly
AM
In
Out
TetM
In
Out
Total
ITE 11th Ed
(150) Warehousing
All Sites
65.566
KSF
T s 1.71(X)
T = 0.17(X}
T = 0.18(X)
112
3
11
3
9
12
Difference (Current Land Use - Previous Land Use)
I 1,714 I 72 I 27 I 99 I 46 I 68 I 116 I

ADOT Left-Turn Storage Analysis
IntorsMtien
PMk
volunw
(vph)
SignallXMl?
(Ptaca in "X")
fftigAiIind
Yet
SR1Q1 SB Frontage Rd & Pima Rd/Prtncess Df
SB
WB
719
1351
X
Cycis Lingth • of Turn 
No (soeoiMli) UiMS
Oip(fMt)
Braking Oistanci
Dislrabl* Mlnimufii
fT6P430)
Stti HV
Existing
VolufiM
(vph)
Qtioui Lmth W)
Estknatod 
Existing HV 
Volume (vph)
Average CalouMedHV 
HV% Vekime (veh)
HV Storage 
M)ustiiient(ft)
Adjusted
Base
Queue (ft)
1.Sx
Queue
2x
Queue
ADOT Required Turn Lane (ft)
M3NAUZEO
Con
Minimum Consei 
(Mln.*1.5) (Das. + rS] (Dei.4^2)
X
120
120
1.5
3
90
90
200
200
85
85
400
380
9
1
569
1253
57
125
9%
9%
2
2
70
70
470 
70S
450
675
940
900
SOQ
925
1150
775
875
1100
SR101 NB Frontage Rd & Pima Rd/Prlncess Dr
NB
EB
243
X
X
120
1
90
90
200
85
85
205
1
0
229
37
23
9%
1
1
35
35
240
360
480
450
575
700
SR101 SB Frontage Rd & Bel Rd
SB
WB
823
861
X
X
120
120
1.5
2
90
90
200
65
85
460
370
6
11
583
578
58
58
8%
8%
2
70
70
530
440
795
660
1060
680
900
750
1000
875
1275
1100
SR101 NB Frontage Rd & Bel Rd
NB
EB
47
X
X
120
1,5
1
90
90
200
85
235
40
0
0
44
39
9%
1
1
35
as
405
130
540
170
500
225
625
350
750
375
5R101 SB Fitmtage Rd & Frartk Uo>d Wright B>»d
SB
WB
867
X
X
120
120
2
90
90
200
65
85
365
155
0
0
807
342
81
9%
2
1
70
35
435
190
655
285
670
360
750
375
675
500
1075
600
SR101 NB Frontage Rd & Frank Lloyd Wright Blvd
NB
EB
772
663
Estimated Existing HV%
HV Storags Adjustment (ft|
101^
X
X
120
120
2
90
90
200
200
85
65
325
260
0
0
727
615
73
62
9%
9%
2
2
70
70
395
350
595
525
790
700
700
625
800
725
1000
900
Tniek Length (ft) 60 
Car Length (ft) 25
K:V>HX_CMIi2»1335001 Mack RE Plma.101\T>dneiAi
ge_291335001_ADOTj«

ADOT RIght-Tum Storage Analysis
pMk
vohan*
l*ph>
RTOR
RMueaen?
SlgnaUzMl?
Wght-Tum (p|,ic» «n 'X*)
No
trot
:ycteLan9lh •BfTurn 
(MCOrM*) LaiM*
OWtfMt)
OMiraMo iWilmuni
Bho
(TOP430J
8MKV
VotutM(vph)
Existing
Vobrns
(vph)
ExMingHV
VolumsCvph)
KV%
CsIcuMkIKV
VofanM(vsh)
HVStmgs
m
Adjustsd
Bms
OMusm
ADOT RooutrsdTwn tons cni
UNI
{MbL*1.S) tDts.*1J) (D«.*2)
Cor
SR101 SB Fronlaes Rd E Pima RdlPflncess Dr
120
1,5
105
0
2*7
25
9%
14C
N/A
N/A
WA^
SR101 NB Froniags Rd & Pima Rd/Prncae
SR101 NB Trontags Rd ft Onvwsy 02
SR101 SB Fiontua Rd & B
213
17C 
255
N/A^
»10l NB Frontags Rd S
N/A*75
120
200
85
317
N/A
SR101 SB Pwttao* Rd A Frwik LkMj wnght BM
0
SR101 NB f rontaoe Rd A FranK Lloyfl Wnghl Blva 
NB
76
120
as
85
0
1*2
35
2*0
N/A
27S
N/A 
500
750
ExMtm KV%
Truck Length (ft) 
60
Car Unglh <fl) 
25
K.mX_CMUS133MI01 HmM RE Ams.lO-
3M0D1 jOOTjO

SAMPLE CALCULATIONS (ADOT TOP 430)
QUEUE LENGTH
SIGNALIZED INTERSECTIONS
Queue Length = N x Q / L x Average Vehicle Length
’POISSON METHOD’
Queue Length = 
—— , Average Vehicle Length
L
Where: 
N = veh/interval = V x C / 3600
V=peak hourly volume (vph) 
Where :
C = cycle length (sec)
Q = queue factor = 1.5 to 2 
L = number of left turn lanes 
25 ft/veh = Average Length of Passenger Cars 
60 fl/veh = Average Length of Trucks
UNSIGNALIZED INTERSECTIONS
Queue Length = V x 2 min/interval / 60 min/hr x Average Vehicle Length
N = vehicles/interval;
V*C
3600
V = peak turning volume (vehicles per hour)
C = cycle length (seconds)
L = number of left turn lanes 
z = 1.282 for 90% confidence level 
z = 1.645 for 95% confidence level (Typically used) 
25 ftA/eh = Average Length of Passenger Cars 
60 ft/veh = Average Length of Trucks
Where: 
V = peak turning volume (vehicles per hour)
25 ftA/eh = Average Length of Passenger Cars 
60 ft/veh = Average Length of Trucks
BRAKING DISTANCE
Table 430^. Braking DIsUnce
POSTED
or
DESIGN SPEED 
(moh)
30
IS
40
4S
50
$5
60
65
70
75
braking
SPEED
DE3 RABLE
20
34
38
43
47
52
56
60
64
70
DISTANCE
(foot)
BO
115
ISO
200
245
300
380
415
490
S8S
ENTERING
SPEED
(mph)
MINIMUM
20
35
30
35
40
45
50
65
60
65
20
25
26 
34 
38 
43 
47 
S3 
56 
61
BRANNO BRAKING
SPEED DISTANCE 
(mrfi)(foot)
20
40
60
85
120
145
200
265
315
400
GAP LENGTH
Table 430-1. Left Turn Lane Gap Lengths
POSTED or 
DESIGN SPEED 
(mph)
<40
GAP
(feet)
40-50
>50
60
90
140

Mack Innovation Park - Riyian Rezoning
CITIZEN INVOLVEMENT REPORT 
ZN-0001 -2026 - Updated March, 2026
I. Introduction
This Citizen Involvement Report is being provided in association with a rezoning 
application for the Mack Innovation Park located immediately east of fhe Loop 
101 freeway between Bell Road and Pima Road. See aerial at TAB A. The 
application proposes to rezone a small, roughly 5-acre portion of fhe site from 1-1, 
PCD to C-4, PCD while also modifying fhe PCD overlay fhaf exists upon the full +/- 
100-acre site. The purpose of fhe application is to enable Rivian Automotive to 
occupy an existing building within the Park.
The Property has a General Plan designation of "Employment Light Industrial / 
Office" and is also locafed within a "Regional Use Overlay" ond within the Greater 
Airpark Character Area Plan. No change to the existing General Plan, Overlay or 
Character Area Plan designations are required or proposed for this application.
II. Overall Outreach Summary
This site has q long record of putreach dating back to the Development Review 
applications that were submitted in 2022 and eventually approved in 2024 under 
Case No. 49-DR-2022#2. Numerous open house meetings, small group meetings 
and notifications occurred during that process and the overall goal of the Park 
was discussed and conveyed in those meetings. That goal - to create something 
different from tradifional industrial parks and to avoid an abundance of intense 
industrial operations and semi-truck traffic - is furfhered by this application. 
Rivian's facilities are clean, technologically advanced, and aligned with 
Scottsdale’s focus on innovafion and economic growth. They also have a 
substantial customer base in Scottsdale that will be better served with the build­
out of this new facility.
As with the prior application, before fhe formal open house was conducfed or fhe 
rezonihg applicafion is even filed, pur pffice cpnducfed spme preliminary 
putreach tc gauge receptance tc the fcrthccming request - including with 
members ef the DC Ranch ccmmunity. Members of the development team also 
have ongoing call with Director of Public Affairs for DC Ranch Community Council.
ATTACHMENT #9

III. Formal Outreach Milestones
September 4, 2025:
• First-class letters were mailed out to property owners within the vicinity of 
the Property including property owners within 1,250 feet of the overall site 
(not just the smaller area subject to the C-4 zoning request) and registered 
HOA's and interested parties os provided by the City. The letter included 
exhibits, described the application and invited the recipient to attend on 
open house meeting. The recipient was also encouraged to contact the 
applicant or City with any questions or comments and appropriate contact 
information was provided. See notification letter, exhibits and mailing list 
attached at TAB B.
September 5, 2025:
In addition to the letters, five (5) Project Under Consideration signs were 
posted along the perimeter of the site. The sign provided application 
information as well as contact information as required by the City. See 
affidavit of posting attached at TAB C. Open house information was also 
provided to City Staff for disbursement as needed.
September 17, 2025:
An open house meeting was conducted in proximity to the site at the 
Scottsdale Marriot at McDowell Mountain. A presentation was made with 
exhibits and a Q&A session occurred. An estimated 25 people attended 
the meeting, though not all elected to sign in. See sign in sheet attached
at TAB D.
January 20, 2026:
• Formal application submitted to the City. (Application No. ZN-0001-2026)
February, 2026:
• City sent out Notice of Zoning District Map Amendment Request postcard 
regarding submitted application and appropriate contact information.
Ongoing:
• Regular status update calls have been ongoing with the Director of Public 
Affairs for DC Ranch Community Council.
2
CITIZEN REVIEW REPORT
Rivian Rezoning - Mack Innovation Park

IV. Summary of Comments, Concerns, Issues
The overall response to the proposed use has been extremely positive. Attendees 
at the open house were happy to see a higher-end user and a less industrial type 
of use. The fact that the building was already constructed and a known entity 
also provided relief to some attendees.
There were questions about battery storage and safety. It was noted that Rivian 
utilizes a just-in-time delivery protocol for batteries. The vehicle batteries are not 
stored on-site and the old batteries leave the facility on the same palette the new 
one arrives on. It was also noted that no disassembly or repair of batteries occurs 
at this location.
Questions regarding the sale of vehicles at this location were asked. It was noted 
that the car buying process has drastically changed in recent years and a lot of 
car buying occurs online nowadays. Such online purchases might be delivered to 
this facility for customer pick-up. While some custorners might purchase an onsite 
vehicle, that is not the typical experience. Most purchasing customers will view 
display models, ask questions and potentially pick out options with a Rivian 
associate at this location. They may even purchase the car at the facility, but 
typically the car would be delivered at d later date.
Questions regarding the PCD modification were also asked. It was also noted that, 
through the PCD amendment, the C-4 area will be required to conform to the 
existing 1-1 development standards like the vast majority of the rest of the Park. It 
was also noted that C-4 has a lower building height than 1-1, but that the building 
Rivian will be occupying was already constructed at the higher, 1-1 district height.
The majority of questions dealt with what else may or may not be planned on the 
remainder of the Park. Residents are concerned about traffic and in particular 
the existing conditions along the Loop TOl ingress and egress roadways. The 
Applicant noted that they had worked extensively with ADOT and the City to try 
and make a better condition. This included the installation of an additional lane 
on the 101-frontage road, the addition of a second. Tree-flow right turn lane onto 
northbound Pima, and a new dedicated turn lane into the project along Pima. It 
was also conveyed that the new, 91st Street extension running north of Bell Road 
will be 4-lanes to start but then taper to only 2 lanes north of this site and that the 
northern 2-lane segment is not a truck route
The Applicant will continue to be available to answer questions from any 
interested parties regarding this exciting project and will continue to keep the City 
informed.
3
CITIZEN REVIEW REPORT
Rivian Rezoning - Mack Innovation Park

Tab A
!

Bpi
m
t
■%
w
'/■
i
i
/.
I
k'M
s
'■?
%
fi
i’-
tJ
;S
*
a
L<
4
r.
m
•jr-
I
m
-1
...i
«
M-y
m
• •::
<■1^
>
I'
'3
t
•’!,
rii
i’
?
>4i.W
1
«
♦if
1
fr '>-4^
f
r<
;l*l ■ ^...i V - ■.•. .Mimm
>
Ml
x
1 ^
z.
m
- '!> 
.. :l'
HS
!■: 5
p
s
nu
«
V;
«1 •
0
m
I
N
0*^
4
•>
;•
V.
i
• !
V %
m
m
;,i
6
V
F
\
S
iiiaedaf
iM.ooa
\
;''i
Y.
a
<: V 1*1" I'
fTl
*
.T
--*■
I
a
I
rj
%
«•
1'.
G
h
V
•ft,™
iGscisar
1
»
:v
\
t
■.>i
$
.V;
*
1
'i
J»t
V
t^.
to
fi
I
tc
-r>?t
»
^■B
t
^5^
■3
lip
%•
a
AM.
iiS
>•>
ia
- -.-.m
BELL ROAtr
COLOR MASTER SITE PLAN 
B
MACK
REAL
ESTATE
GROUP
N yl A /—^ I / INNOVATION
MAOK PARK
NEC Loop 101 &Bell Road
r^istf 
MM. IOJO 2029
oozi.2on
22024^T19_MSP Cotarad
1
Scottsdale, AZ
DR24-2
Butler Design Group, Inc
architects & ptannefs

TabB

MREG 101 BELL LLC
2415 East Camelback Road, Suite 920
Phoenix, AZ 85016 
480.712-9427
September 4, 2025
Re: 
Open House Invitation - Rezoning for Rivian Automotive and a Planned Shared
Development (PSD) Overlay to share development standards and modifications to existing 
Planned Community District (PCD) - Mack Innovation Park - Southeast Corner of the Loop 
101 Fwy & Pima Road (APN # 215-07-470, -471, and -022P) - Project No. 546-PA-2025
Dear Neighbor or Interested Citizen:
We are excited to invite you to an upcoming open house regarding an application 
within the Mack Innovation Park. As you likely know, the Park is adjacent to the Loop 101 
Freeway between Pima and Bell Roads. The majority of the Property (+/-95-acres) is zoned 
Industrial Park, Planned Community District (1-1, PCD), a small portion of which also has an 
Environmentally Sensitive Lands overlay (1-1, PCD, ESL). The entire Property has a General 
Plan designation of “Employment: Light Industrial / Office.”
We are thrilled to announce that Rivian Automotive has elected to locate a new Service 
& Delivery facility within the Mack Innovation Park! Rivian is a pioneering, American electric 
vehicle manufacturer and technology company. With this investment, they will occupy 65,000 
square feet of Building C, which is already under construction on the campus. See enclosed 
exhibit for reference. While this is a significant investment that will produce substantial sales 
tax for the City, Rivian has elected to locate here without receiving sales tax incentives or any 
kickbacks from the City.
At Mack Innovation Park, our vision has always been to create something different 
from traditional industrial parks found elsewhere in the Valley - avoiding the abundance of 
intense industrial operations, nuisances, and heavy semi-truck traffic. Rivian exemplifies this 
vision. Their facilities are clean, technologically advanced, and aligned with Scottsdale’s 
focus on innovation and economic growth. They also have a substantial customer base in 
Scottsdale.
It is important to note, no significant changes are occurring to the previously approved 
buildings or site approvals that have been extensively discussed and reviewed for this 
campus. Rivian is simply moving into one of the already approved buildings (Building C), 
which is nearing completion of construction. To allow for Rivian’s use, a portion of that 
building and site (approximately 5.5-acres) will be rezoned from Industrial Park (1-1) to 
General Commercial (C-4). While technically a rezoning, this application is actually a down­
zoning from the current Industrial (1-1) designation, which allows for more intensive industrial 
and manufacturing uses.
Concurrently with this C-4 application, we will also be processing an amendment to 
the existing PCD overlay and will add a PSD overlay over the full 95-acre campus. These 
applications are more technical in nature. The PCD amendment will enable the existing 
building height in the new, C-4 zoned area. (The C-4 district limits building height to 36 feet.
Notice of Open House - Rivian Automotive

MREG 101 BELL LLC
2415 East Camelback Road, Suite 920
Phoenix, AZ 85016 
480.712-9427
but again, Building C has aiready been approved and constructed at the permissibie 1-1 
buiiding heights (up to 52 feet max.). The PSD overlay allows individual parcels within a 
campus setting to share deveiopment standards, thus enabiing the campus to function more 
as one cohesive development, instead of a collection of individual parcels.
Again, no significant changes are occurring to the existing building or site approvals. 
Rivian is moving into a building which is already approved and nearing completion of 
construction. No modifications are proposed to the previously approved building heights, 
sizes, or other major site elements. This is simply a downzoning from Industrial to 
Commercial zoning to allow for this exciting new use, while also processing the PCD 
amendment and overlay to enable shared development standards.
To review this exciting project and meet the development team, we have scheduled 
an open house for September 17, 2025, from 6pm - 7pm at the Scottsdale Marriott at 
McDoweii Mountains, 16770 N. Perimeter Drive in Scottsdaie, 85260. We hope you can 
attend, but if this date and time are not convenient, we would, as always, be happy to speak 
with you by phone or in person at your convenience. Please contact George Pasquel III at 
Withey Morris Baugh, PLC, at 602.230.0600 or George@wmbattorneys.com. You can also 
reach the City’s Project Coordinator, Meredith Tessier at 480.312.4211 or at 
MTessier@Scottsdaleaz.gov. Information can also be found on the City’s website at: 
https://www.scottsdaieaz.gov/pianning-development/proJects-in-process.
Again, feel free to contact George Pasquel III at 602.230.0600 or 
George@wmbattomeys.com. We look forward to seeing you and thank you for your courtesy 
and consideration.
Sincerely,
MREG 101 BELL, LLC
By
Craig S. Henig 
Authorized Signatory
Notice of Open House - Rivian Automotive

i
I
I
t
'■■
r‘
i
S
1
;i-r
s
k-3
a.
<v
.-Im
I
•A?
rfis
'^j
i
4
5«
>•
i
-1
'•>.»■ t
i:a
Y.
If
•f'
!«>
♦
*■*1
k *
v» #
S*
A
;.i‘
,5 A
■f
<P I-
T
tv.
■u^P
M
.V-:
«
t?
i.-»
8^1''
iv^
TvfV-^'v
lipii'm?
v«
Krr
m
I
■sy
/'a
A-
F-f-
i^
A
m
*<<.j
m
B
-!<
2»^
-1
K
-AV
1—.
I IB
li't /<• £‘ jii^ r- k- i« z-r^ t-1-
r-:
►<■ »r r
c
so,
1M,M0tF
« ■aa-';.
\
S!
I
1*1
I
'«
.'v
V
lOl
•v^
m
W-.
.•
»
m
s
*■
0
H
rv.n*
?•
1
120.41$ tf
s
/
V*
•S 'V
ft’
;• ^ii
k'K 'K'K K'KlS^'m K-^ X l
m:
y
r 
m a K i
M
-i
-<-
V
>
•-t
i: *52
!.
»
.V
\
1
I
*
i-
A-
gf
fe
I
k
S
t0..
m
!!
i?-
••
\
m
\
%
5-
»'i
V
■«i
«J|^
IH
V
A
t
% v.»
:r
••
'Q
« %
0
*
ftm
IP
•3='
I
.«
I
Ik
£
mm
s.
m
Pis
Wmrnmr^"
COLOR MASTER SITE PLAN 
^
MACK
INNOVATION
PARK
•CM.£: r- IW
Itov. 0906.2$ 
o$i9.«n$ 
22Q244Tt$_USPCakx«d
MACK
REAL 
ESTATE 
'GROUP
NEC Loop 101 &Bell Road
Scottsdale, AZ
DR24-2
1
S'o
Butler Design Group, Inc
architects & planners

TOO JECT DATA:
PROJECT ADDRESS:
17771 N P(MA ROAD SCOnSOALE.AZ
EXI8TN0Z0MNG
BLOGCAREA
T&4ANTAREA
PARKING LOT 1 SITE AREA
“■i
?>
(2)m^NORTH ELEVATION
:: 
■ 
70 SPACES
BUILDINGS
m
'ir—
I ,e> I, .:| ii ,v
«I“|PJLI!.| 
..91»}»»r il IPBaFpi., % 
t ft-■
i
L; ■ ^
I
%'
169.590 SI. 
(DR APPROVED)
m
i
m
M
t:
m
x-
m
'•
^4.
Jil
LOTI
I
t r-.T
. „ 
130 SPACES
riaiiitii:-" ,,,
f
■111
c
TENANT SPACE 
6S.S66SF
■•«•. %h\
m
184,960 SF
+9,000 SF (Optional Mezz.)
(UNDER CONSTRUCTION)
„ -r-----—
r
mi
•.
%
flJS
I /
f-
s; y
■r»>Vi
m
000
MACK
REAL
ESTATE
GROUP
K A /\ ^^ I / INNOVATION
MAUK PARK
NEC Loop 101 &Bell Road
SCOTTSDALE, AZ
0
\
ornjs
ZaOM^TIT.NWC
"I
•CALE.i*-«-
Butler Design Group. Inc
arcnitccts & planners

AVERY
5160
101 BELL PI NORTH LLC 
2415 E CAMELBACK RD STE 920 
PHOENIX, AZ 85016
hcisy l"eei Address LiiDCis 
Bond cSlong line to expose Pop-up Edge
101 BELL SOUTH LLC
2415 E CAMELBACK RD STE 920
PHOENIX, AZ 85016
Uoo Avery Tcirplntc SIGO i
16622 N91ST STREET LLC 
27668 N 85TH LN 
PEORIA, AZ 85383
16624 NORTH 90TH STREET LLC 
16624 N 90TH ST STE 200 
SCOTTSDALE, AZ 85260
16631ST105 LLC
10632 N SCOTTSDALE RD UNIT 453 
SCOTTSDALE, AZ 85254
16674 N 91ST STREET STE 106 LLC 
16674 N91ST ST STE 106 
SCOTTSDALE, AZ 85260
16801 NORTH 94TH STREET 2012 LLC 
10258 E GOLD DUSTAVE 
SCOTTSDALE, AZ 85258
17465 N 93RD ST LLC
9304 E VERDE GROVE VIEW STE 100
SCOTTSDALE, AZ 85255
190 WEST ST JAMES LLC
21710 STEVENS CREEK BLVD STE 200
CUPERTINO, CA 95014
8765 EAST BELL ROAD LLC 
5600 N 4TH ST 
PHOENIX, AZ 85012
8913 BELL LLC
4771 N 20TH STSTE B22
PHOENIX, AZ 85016
90TH & BELL LLC 
16801 N 90TH ST 102 
SCOTTSDALE, AZ 85260
9112 VERDE LLC
9112 E VERDE GROVE VW
SCOTTSDALE, AZ 85255
9208 VGV LLC 
15029 N 74TH 5T 
SCOTTSDALE, AZ 85260
9220 VGV LLC 
15029 N 74TH ST 
SCOTTSDALE, AZ 85260
9221 DESERT VIEW LLC 
9621 E BUTEO DR 
SCOTTSDALE, AZ 85255
9304 E VERDE GROVE VIEW LLC 
9304 E VERDE GROVE VIEW STE 100 
SCOTTSDALE, AZ 85255
9393 VENTURESLLC 
9393 E BELL RD 
SCOTTSDALE, AZ 85260
ADELSON SPORTS LLC
6501 E GREENWAY PKWY 103-504
SCOTTSDALE, AZ 85254
AG LEAF LLC
20865 N90TH PL STE 200 
SCOTTSDALE, AZ 85255
AG-CW EAST BELL ROAD OWNER LLC
30021 TOMAS STE 130
RANCHO SANTA MARGARITA, CA 92688
ANDERSON ROBERT J 
11906 LEMON CREST DR 
LAKESIDE, CA 92040
ANSARI MOEEZ H/BEATRICE L TR 
8105 IRVINE CENTER DR 1100 
IRVINE, CA 92618
APPLE TEN SPE SCOTTSDALE INC 
814 E MAIN ST 
RICHMOND, VA 23219
ARIZONA PUBLIC SERVICE COMPANY 
PO BOX 53999 MS 9565 
PHOENIX, AZ 85072
ARIZONA STATE LAND DEPARTMENT 
1616 W ADAMS ST 
PHOENIX, AZ 85007
ARIZONA STATE OF DEPARTMENT OF 
TRANSPORTATION 
205 S 17TH AVE MD 612E 
PHOENIX, AZ 85007
ARL8LLC
11445 E VIA LINDA STE 2-612 
SCOTTSDALE, AZ 85259
AWW PRINCESS MOB OWNER LLC 
802 N 3RD AVE 
PHOENIX, AZ 85003
AZUL BELL 101 LLC 
8889 E BELL RD 201 
SCOTTSDALE, AZ 85260
EtiqueUes cl'tidieibu Easy Peel
Allez a avery.ca/gabnritsI

AVERY
5160
B & F & Y PROPERTIES LLC 
8765 E BELL RD 113 
SCOTTSDALE, AZ 85260
Easy reel Address Laoeis 
Bend iiloiKi line to expose I’op-ep BdC)C
B J & P INVESTMENTS LLC 
31912 N 141ST ST 
SCOTTSDALE, AZ 85262
Use Avefy Tomplatt 51G0 •
BA NAMAK AZ LLC 
13876 N 83RD PL 
SCOTTSDALE, AZ 85260
BAHIA CAPITAL INVESTMENTS LLC 
8900 E BAHIA DR 200 
SCOTTSDALE, AZ 85260
BAHIA CONDO LLC
8475 E HARTFORD DR STE 100
SCOTTSDALE, AZ 85255
BAHIA DRIVE LLC
625 W DEER VALLEY DR UNIT 103 PMB 618 
PHOENIX, AZ 85027
BAHIA HOLDINGS LLC 
8340 E RAINTREE DR 
SCOTTSDALE, AZ 85260
BAILEY FAMILY TRUST 
9215 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
BARAKAT HOLDINGS LLC 
4602EBERNEILDR 
PHOENIX, AZ 85028
BARNETCHE-LUGO FAMILY TRUST 
9214 E DESERT PARK DR 
SCOTTSDALE, AZ 85255
BASHAH PROPERTIES LLC 
PO BOX 54837 
PHOENIX, AZ 85078
BATES AARON
9221 E DESERT ARROYOS ST 
SCOTTSDALE, AZ 85255
BAYAN HOLDINGS LLC 
8961 E BELL RD STE 202 
SCOTTSDALE, AZ 85260
BAYNE SQUAD FAMILY TRUST 
15012 206TH AVE SE 
RENTON, WA 98059
BEARDSLEY ROBERT D/MARTINEZ MAX J 
103 CALLE PAULA 
SANTA FE, NM 87505
BERNOFF SUCCESS INSTITUTE LLC 
9801 E CARON ST 
SCOTTSDALE, AZ 85258
BGH INVESTMENTS LLC
8913 E BELL RD BLDG E STE lOlB
SCOTTSDALE, AZ 85260
BGH INVESTMENTS LLC 
4821 N SCOTTSDALE RD 
SCOTTSDALE, AZ 85251
BICKHAM JOHN MICHAEL 
16801 N 94TH ST UNIT 1008 
SCOTTSDALE, AZ 85260
BIG SCOTTSDALE LLC 
14160 SVY 72NO AVE STE 110 
TIGARD, OR 97224
BLUE RIDGE HOLDING LLC 
8757 E BELL RD 
SCOTTSDALE, AZ 85260
BOTKIN JULIE M
10883 VIA LOMBARD UNIT 2105 
SAN DIEGO, CA 92129
BOVAPA PARTNERS LLC 
8970 E BAHIA DR STE 100 
SCOTTSDALE, AZ 85260
BRANDEL RYAN 
17708 N 92ND ST 
SCOTTSDALE, AZ 85255
BRONNENKANTADAM 
23650 N 84TH PL 
SCOTTSDALE, AZ 85255
BROWNELL PROPERTIES 2018 LLC 
10270 E GOLD DUST AVE 
SCOTTSDALE, AZ 85258
BROWNLEE CLAY R/DOROTHY J 
16801 N 94TH ST UNIT 2002 
SCOTTSDALE, AZ 85260
BROWNLEE WILLIAM 
ALEXANDER/MADISON 
17829 N 92ND ST 
SCOTTSDALE, AZ 85255
BTS HOLDINGS 103 LLC 
797 E CEDAR DR 
CHANDLER, AZ 85249
BUCCI PATRICK/AIMEE 
9232 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
i
rtiquettos d'adresse Easy Pec
;ry.ca/gabaritsI

AVERY
5160
BUELL CECILY A/L SCOTT 
8355 DK RANCH RD 
FLAG5TAFF, AZ 86005
bend alony line to expose Pop-up PJye
BUNNELL JOHN
16801 N94TH ST APT 2008
SCOTTSDALE, AZ 85260
Use Awry Tempiat
C N S PROPERTIES LLC 
16631 N 9TH ST 
SCOTTSDALE, AZ 85260
C5 VENTURES LLC 
6929 N HAYDEN RD C4-163 
SCOTTSDALE, AZ 85250
CAMDEN USA INC 
PO BOX 27329 
HOUSTON, TX 77227
CARDELLA FAMILY LIVING TRUST 
6343 CARLSBAD DR 
TINLEY PARK, IL 60477
CARSON GROUP LLC 
8269 E DEL CADENA DR 
SCOTTSDALE, AZ 85258
CD 90TH ST LLC 
7898 E ACOMA DR 
SCOTTSDALE, AZ 85260
CHEYENNE INVESTMENT GROUP LLC 
16650 N91ST ST STE 107 
SCOTTSDALE, AZ 85260
CHINNAPPAN AND RAMASAMY REVOCABLE 
TRUST
1585 ANDERSON RD APT 322 
MCLEAN, VA 85288
CHRISTAKOS PROPERTIES LLC 
8573 E PRINCESS DR STE 201 
SCOTTSDALE, AZ 85255
CHRISTENSEN SHARON E 
16801 N 94TH STE 2013 
SCOTTSDALE. AZ 85250
CILIENTO ANGELO 
3917 E HALF HITCH PL 
.PHOENIX, AZ 85050
CLANTON REAL ESTATE HOLDINGS LLC 
16674 N 91ST ST STE 106 
SCOTTSDALE, AZ 85260
COMPULSIVE LLC 
14516 FLATTOP RANCH RD 
AUSTIN, TX 78732
COMSTOCK FAMILY LLC 
NO ADDRESS PROVIDED 
SCOTTSDALE, AZ 85255
CORPORATE CENTER AT DC RANCH 
ASSOCIATION
2394 E CAMELBACK RD 600 
PHOENIX, AZ 85016
COYOTES ICE 3 LLC
7114 E STETSON DR STE 400
SCOTTSDALE, AZ 85251
COYOTES ICE LLC 
9375 E BELL RD 
SCOTTSDALE, AZ 85260
CRANE NORMAN B/VERNABELLE TR 
23005 N74TH ST UNIT 3007 
SCOTTSDALE, AZ 85255
CROW JOHN/MARY MONICA 
17828 N 92ND ST 
SCOTTSDALE, AZ 85255
CROW MADELEINE GRACE/EBERT 
MATTHEW
16801 N 94TH ST UNIT 1062 
SCOTTSDALE, AZ 85260
DAGNEY ENTERPRISES LLC 
7820 E EVANS RD STE 700 
SCOTTSDALE, AZ 85260
DANA FREEWAY BUILDING LLC 
3716 E PALM ST 
MESA, AZ 85215
DC COMMERCIAL LLC 
PO BOX 8540 
STOCKTON, CA 95208
DC RANCH ASSOCIATION INC 
20551 N PIMA RD 
SCOTTSDALE, AZ 85331
DC RANCH ASSOCIATION INC 
20551 N PIMA RD 5TE 180 
SCOTTSDALE, AZ 85255
DC RANCH CROSSING ASSOCIATES LLC 
1860 ALA MOANA BLVD 
HONOLULU, HI 96815
DELLY MAHA 
16801 N 94TH ST 1014 
SCOTTSDALE, AZ 85260
DESCALSO DANIEL/JULIA GAMLEN 
9214 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
Etiquettes d'cidicsse Easy Pe
Allez a avery.ca/gabarits
___ LiiLiETizie GdU.int Averv SKi'lI

AVERY
5160
DESERT FAIRWAYS 204-205, LLC 
8765 E BELL RD 
SCOTT5DALE, AZ 85260
basy Peel Adciress LaDeis 
Bend nioncj hne to expose Pop-up Edge
DINKELMEYER ANDREW JOHN/LISA MARIE 
17781 N 92ND ST 
SCOTTSDALE, AZ 85255
Use Avery Template 5150
DITTRICK PHILLIP 
16674 N91ST ST 104 
SCOTTSDALE, AZ 85260
DUNBAR PROPERTIES LLC 
9170 E BAHIA DR STE 102 
SCOTTSDALE, AZ 85260
DYER HOLDINGS LLC 
9236 E DESERT VILLAGE DR 
SCOTTSDALE, AZ 85255
EDELBACH KENNETH/CHRISTINA R 
2887 SLATE CT NW 
ROCHESTER, MN 55901
ENDURANCE PROPERTIES LLC 
9376 E BAHIA DR STE 103D 
SCOTTSDALE, AZ 85259
ESSARY MATTHEW K/ALISON C 
18198 N 92ND ST 
SCOTTSDALE, AZ 85255
EWR SCOTTSDALE TERRA VERDE LLC 
51 BROADWAY STE 600 
FARGO, ND 58102
EWR SCOTTSDALE TOWERS LLC 
51 BROADWAY N 600 
FARGO, ND 58102
FARR GARY l/PATMORE-FARR CONNIE L 
16801 N94TH ST 2064 
SCOTTSDALE, AZ 85260
FETZER SCOTTSDALE PARTNERS LLC 
1019 W WISE RD STE 201 
SCHAUMBERG, IL 60193
FISCHER 12 LLC 
11153 E KAREN DR 
SCOTTSDALE, AZ 85255
FISCHER FAMILY TRUST 
16801 N 94TH ST 2011 
SCOTTSDALE, AZ 85260
FRANCIS JASON/MORGAN 
17776 N 92ND PL 
SCOTTSDALE, AZ 85255
FRESHWATER LLC 
16655 N90TH ST STE 100 
SCOTTSDALE, AZ 85260
65BC LLC
7337 E DOUBLETREE RANCH RD STE C28a 
SCOTTSDALE, AZ 85258
GARON LIVING TRUST 
17756 N92ND ST 
SCOTTSDALE, AZ 85255
GATES BOX LLC
4840 E JASMINE UNIT 105
MESA, AZ 85205
GIVENS JOHN K/JOREEN J 
16801 N 94TH ST 1004 
SCOTTSDALE, AZ 85260
GOLD5MITH MERYL 
9225 E CANYON VIEW RD 
SCOTTSDALE, AZ 85255
GOODMAN GARRISON M/LEIGH ANNE 
18310 N92ND ST 
SCOTTSDALE, AZ 85255
GRADY JOHN T/JANELLJ 
9239 E CANYON VIEW RD 
SCOTTSDALE, AZ 85255
GRADY JOHN T/JANELLJ 
17733 N 92ND ST 
SCOTTSDALE, AZ 85255
GRANT RUSSELL REVOCABLE TRUST 
9209 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
GREENWAY SADDLERY INC 
2902 E GREENWAY RD 
PHOENIX, AZ 85032
GRSJ TRUST
8053 E THORNTREE DR
SCOTTSDALE, AZ 85266
GRUETZMACHER PATRICK JAMES 
9245 E CANYON VW 
SCOTTSDALE, AZ 85255
GUERRA PROPERTIES LLC 
8765 E BELL RD STE 105 
SCOTTSDALE, AZ 85260
H & L SPEEDWAY PROPERTIES LLC 
30 E CALLE CLARAVISTA 
TUCSON, AZ 85716
Etiquettes d'ndresse E.isy Peel
B
Allcz n evety.ca/gabari

AVERY
5160
H F OFFICE LLC 
10673 E FI RETHROW DR 
SCOTTSDALE, AZ 85255
bcisy 
AOcrreiS^aD^is^
Bend oIohq line lo expose Pop-up Etlg
HAEBIG FAMILY TRUST 
18182 N 92ND ST 
SCOTTSDALE, AZ 85255
Uso Av*-:-ry
HALMI & ROENIGK PROPERTIES LLC 
7402 E VISTA DR 
SCOTTSDALE, AZ 85250
HEGEMON LLC 
7402 E VISTA DR 
SCOTTSDALE, AZ 85250
HHS REAL ESTATE LLC 
8985 E BELL RD 
SCOTTSDALE, AZ 85260
HICKEY DAVID/KELLYS 
18426 N 65TH PL 
PHOENIX, AZ 85054
hilltroym/tiffanyd 
17800 N92ND PL 
SCOTTSDALE, AZ 85255
HM FAMILY TRUST
18291 N PIMA RD STE 110 PMB 159
SCOTTSDALE, AZ 85255
HRUSHKA ADAM J/BARBARA ANN 
16801 N 94TH ST 2006 
SCOTTSDALE, AZ 85260
HUDWIL HOLDINGS LLC
1753 E. BROADWAY RD. STE 101-275
TEMPE, AZ 85282
HUFFMAN TODD D/LYNNE A 
25401 ADDINGTON CT 
PERRYSBURG, OH 43551
IGNARSKIJOLENE L 
9249 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
10 DATA CENTERS LLC 
1101 ENTERPRISE DR 
ROYERSFORD, PA 19468
IRRELEVANT INVESTMENTS LLC 
10101 N92ND ST STE 101 
SCOTTSDALE, AZ 85258
IT CANYON LLC
6940 E DOUBLETREE RANCH RD 
PARADISE VALLEY, AZ 85253
J&C ARIZONA PROPERTIES LLC 
10673 E FIRETHORN DR 
SCOTTSDALE, AZ 85255
JASON DEAN LLC 
17491 N 93RD ST 
SCOTTSDALE, AZ 85255
JCG 16621 PROPERTY LLC 
10115 E BELL RD STE 107-621 
SCOTTSDALE, AZ 85260
JCG 16631 PROPERTY LLC 
10115 E BELL RD STE 107-621 
SCOTTSDALE, AZ 85260
JCG 16631-106 PROPERTY LLC 
10115 E BELL RD STE 107-621 
SCOTTSDALE, AZ 85260
JCG 16650 PROPERTY LLC/R & J PROPERTY 
HOLDINGS LLC
10115 E BELL RD STE 107-621 
SCOTTSDALE, AZ 85260
JCG 9170 PROPERTY LLC 
10115 E BELL RD STE 107-621 
SCOTTSDALE, AZ 85260
JD STROM LLC 
1709 181ST PL SW 
LYNNWOOD, WA 98037
JLNILLC
11445 E VIA LINDA STE 2-521 
SCOTTSDALE, AZ 85259
JOCK AND SONCHEN PATTON TRUST 
17805 N 92ND ST 
SCOTTSDALE, AZ 85255
JOHN F HORNACEK TRUST/SUSAN C 
HORNACEKTRUST 
713 S STONE AVE 
LA GRANGE, IL 60525
JOHN VAN ROOY AND ALLISON VAN ROOY 
REV LIV TR
2918 SWEETWATER AVE 
LAKE HAVASU CITY, AZ 86406
JR CLARK LLC
8765 E BELL RD STE 201
SCOTTSDALE, AZ 85260
JUGGERNAUT HOLDINGS LLC 
16460 N91ST ST 
SCOTTSDALE, AZ 85260
KAKWANI FAMILY TRUST 
9185 E CANYON VIEW 
SCOTTSDALE, AZ 85255
EtiqueUei d'acliesso E;isy Peel
IQ
Allez a avery.ca/gabnrits
i ihl''-.!-/ If' C-dh.iri; Avlt :)l'o0I

AVERY
5160
KALYANAM GOWRI 
9255 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
hasyt"eel Ariciross laocis 
Bend dlonci line la expose Pop-up Eclye
KNASE RICHARD J 
16801 N 94TH ST 1013 
SCOTTSDALE, AZ 85260
KOO ELIZABETH LOKI 
13675 NOEL RD 305 
DALLAS, TX 75240
KRISHNANS FAMILY TRUST 
17709 N 92N0 ST 
SCOTTSDALE, AZ 85255
LAMBERT STEVEN M/RABE JENNIFER L
674NUVOLAVISTAa
RICHLAND, VYA 99352
LANNING PROPERTY 18140 LLC 
12462 N 81STST 
SCOTTADALE,AZ 85260
LEAP DAY LLC
3317 E BELL RD STE 243
SCOTTSDALE, AZ 85032
LEBLANC INVESTMENT PROPERTIES LLC 
8686 E STAGHORN LN 
SCOTTSDALE, AZ 85266
LECKIE ALEX/JEANNE 
9207 E TRAILSIDE VW 
SCOTTSDALE, AZ 85255
LEVY KYLE/MCMILLAN LAUREL 
18338 N 92ND ST 
SCOTTSDALE, AZ852SS
LITERATI LLC
8424 E CALLE BUENA VIS 
SCOTTSDALE, AZ 85255
LITERATI LLC
8424 E CALLE BUENA VIS 
SCOTTSDALE, AZ 85255
LIU chenaiaoyan/alexjohn 
9239 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
LOEPPKY MARK/JILLIAN 
45 CATHEDRAL BLUFFS RD 
CORMAN PARK, SK S7P lAl, CANADA
LONLEY CACTUS LLC 
8937 E BELL RD STE 101 
SCOTTSDALE, AZ 85260
LUZI SCOTT/ALECIA 
9510 HARDING BLVD 
WAUWATOSA, Wl 53226
LYNCH JORDAN/KAI LEY 
18196 N 92ND ST 
SCOTTSDALE, AZ 85255
M G REAL ESTATE HOLDINGS COMPANY LLC 
6540 E CHOLLA DR 
PARADISE VALLEY, AZ 85253
MACKAY NEIL V
16674 N 91ST ST UNIT lOlD
SCOTTSDALE, AZ 85260
MACLEAN LIVING TRUST 
9233 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
MALO PROPERTIES LLC/NATIONAL LASER 
INSTITUTE LLC 
16601 N 90TH ST 100/101 
SCOTTSDALE, AZ 85260
MARK A CHRISTENSEN & SHEILA W 
CHRISTENSEN TR 
9221 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
MARLA A WALBERG LIVING TRUST 
10092 E FLATHORN DR 
SCOTTSDALE, AZ 85255
MCCAGUE THOMAS/LESLEY 
9227 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
MCDONALD JULIE R FRANK 
4859 E MOCKINGBIRD LN 
PARADISE VALLEV, AZ 85253
MCGARITY FAMILY REVOCABLE LIVING 
TRUST
9202 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
MCGOWAN TERENCE B 
16801 N94TH ST APT 2009 
SCOTTSDALE, AZ 85260
MCGOWAN TERENCE B/KLASKO PATRICIA B 
16801 N 94TH ST UNIT 1010 
SCOTTSDALE, AZ 85260
MCLURG DAVE/VERA 
9220 E DESERT PARK DR 
SCOTTSDALE, AZ 85255
MD OFFICES LLC 
5425 E BELL RD STE 121 
SCOTTSDALE, AZ 85254
Etiqi'ettes d’cidmsfe Easy ^eel
Allez a avery.ca/gabarits
Avriv b 1".'I
J

AVERy
5160
MEJIA SERGIO 
17732 N92ND ST 
SCOTTSDALE, AZ 85255
basy reel /xciaiess Laoeis 
iend along line* to oxpoic Pop-up Edge
MENG PROPERTIES LLC 
6557 E VISTA DEL ORO DR 
PRESCOTT, AZ 86303
METIS GROUP THE LLC 
8312 E CALLE DE ALEGRIA 
SCOTTSDALE, AZ 85255
MG REAL ESTATE HOLDINGS COMPANY LLC 
20865 N 90TH PL UNIT 210 
SCOTTSDALE, AZ 85255
MICHAEL AND JULIE SPEETZEN FAMILY 
TRUST
374FERNDALE RDW 
WAYZATA, MN 55391
MILICEVICFRANO P/ANTE 
18254 N92ND ST 
SCOTTSDALE, AZ 85255
MILLSTEIN DIANNE F 
16801 N 94TH ST UNIT 1012 
SCOTTSDALE, AZ 85260
MINOU FAIZ LIVING TRUST 
16801 N 94TH ST APT 2004 
SCOTTSDALE, AZ 85260
MNMW LLC
11811 N TATUM BLVD P129 
PHOENIX, AZ 85028
MOPAR RANCH LLC 
28440 N 75TH ST 
SCOTTSDALE, AZ 85266
MOREIRA LIVING TRUST 
9267 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
MORINATEUTA 
8 CIRCLE DR UNITE 
TIBURON,CA 94920
MREG 101 BELL LLC CP # 53-121889 
60 COLUMBUS OR FL 20 
NEW YORK, NY 10023
MREG 101 BELL NORTH LLC 
60 COLUMBUS CIRFL20 
NEW YORK, NY 10023
MSE INDUSTRIAL INVESTMENTS LLC 
16410 N91ST ST STE 112 
SCOTTSDALE, AZ 85260
MULLINIKS BILL M 
PO BOX 1460 
CAREFREE, AZ 85377
NANCO PROPERTIES LLC 
PO BOX 45347 
PHOENIX, AZ 85064
NAVICAN HOLDINGS LLC 
9170 E BAHIA DR 101 
SCOTTSDALE, AZ 85260
NESTOR FAMILY LIVING TRUST 
21036 N 102ND ST 
SCOTTSDALE, AZ 85255
NGO KELVIN/VU KATHY N 
18212 N 92ND ST 
SCOTTSDALE, AZ 85255
NHP LLC
8900 E BAHIA STE 101 
SCOTTSDALE, AZ 85260
NORTH HILL DEVELOPMENT LLC 
501 NW GRAND BLVD 
OKLAHOMA CITY, OK 73118
NORTH SCOTTSDALE AESTHETICS LLC 
8900 E BAHIA DR STE 110 
SCOTTSDALE, AZ 85260
NORTH SCOTTSDALE SPORTS COMPLEX 
HOLDINGS LLC 
1204 SUNCAST LN STE 2 
EL DORADO HILLS, CA 95762
NUSS JENNIFER/MICHAEL 
9225 E TRAILSIDE VW 
SCOTTSDALE, AZ 85255
OBRIEN REALTY LLC 
9380 E BAHIA DR 202 
SCOTTSDALE, AZ 85260
OMALLEY JAY/STACEY 
9213 E TRAILSIDE VW 
SCOTTSDALE, AZ 85255
ORRISON RICHARD/SHERRY 
9208 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
PARADISE FAB 4 LLC 
8761 E BELL RD 
SCOTTSDALE, AZ 85260
PARAGON HOLDINGS LLC 
9096 E BAHIA DR UNIT 109 
SCOTTSDALE, AZ 85260
HtiquettOb d'ddresse Lnsy '^eel
I
Allez a avery.ca/gabaritsI

AVERY
L—^
5160
PARANTHAMAN AND GOVINDAN TRUST 
17757 N92ND ST 
SCOTTSDALE, A2 85255
PB SQUARE DLLC 
8596 E VOLTAIRE AVE 
SCOTTSDALE, AZ 85260
Ecisy Peel Address Labels
Bend iiloncj line to expose Pop-up hdge
PATRICIA B KLASKO LIVING TRUST 
16801 N 94TH ST APT 1017 
SCOTTSDALE, AZ 85260
PEGASUS DEER VALLEY OWNER LLC 
8888 E RAINTREE DR 155 
SCOTTSDALE, AZ 85260
r# A| 
■ Kfl ■ SJ111 ■] R11
Use Avery 
5160 I
PATRICIA G LOGAN REVOCABLE TRUST 
5621 SADDLE RIDGE DR 
MEDFORD, OR 97504
PENNYPACKER ABBAJAY FAMILY TRUST 
16495 N 113TH WAY 
SCOTTSDALE, AZ 85255
PERIMETER GATEWAY PORTFOUO LLC 
802 N 3RD AVE 
PHOENIX, AZ 85003
PETER CATALANO AND JENNIFER CATALANO 
TRUST
9273 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
PITEA FAMILY TRUST
9820 E THOMPSON PEAK PKWY UNIT 718 
SCOTTSDALE, AZ 85255
PLG HOLDINGS II LLC 
8765 E BELL RD 110 
SCOTTSDALE, AZ 85260
POLLY HOLDINGS LLC/JDR HOLDINGS LLC 
17392 DAIMIERSTUNIT 100 
IRVINE, CA 92614
POTATO GARDEN LLC 
PO BOX 1078 
HIGLEY, AZ 85236
PRECISE INSTRUMENTATION TRAINING & 
CONSULTANTS LLC 
14648 S 46TH ST 
PHOENIX, AZ 85044
R & K REAL ESTATE LLC 
8761 E BELL RD STE 105 
SCOTTSDALE, AZ 85260
R&N DURR TRUST 
11845 E BECKER LN 
SCOTTSDALE, AZ 85259
RAINTREE INVESTMENTS FAMILY LIMITED
PARTNERSH
25457 N 114TH ST
SCOTTSDALE, AZ 85255
RBB HOLDINGS 2 LLC 
7114 E STETSON DR STE 400 
SCOTTSDALE, AZ 85251
REJUVENT PROPERTIES LLC 
9155 E BELL RD STE 101 
SCOTTSDALE, AZ 85260
RENUE BAHIA LLC 
8900 E BAHIA DR STE 105 
SCOTTSDALE, AZ 85260
REVOCABLE TRUST WILLIAM J LYSTER AND 
JERE L LYSTER 
929 HALECREST DR 
ESCONDIDO, CA 92025
REYNOLDS KIMBERLY M 
9233 E CANYON VIEW RD 
SCOTTSDALE, AZ 85255
RICHARD ZACHARY/NICOLE 
9220 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
ROBERT AND JULIANNE HITTENBERGER 
LIVING TRUST \
18240 N 92ND ST 
SCOTTSDALE, AZ 85255
ROBERTSON CONNOR 
9233 E DESERT ARROYOS 
SCOTTSDALE, AZ 85255
ROBISON PROPERTIES LLC 
9376 E BAHIA DR UNIT D-107 
SCOTTSDALE, AZ 85260
RUSCH ROBERT J JR/ANGELA F 
9208 E DESERT PARK DR 
SCOTTSDALE, AZ 85255
RW TRUST/ETAL 
8729 LAKE EDGE DR 
LAUREL, MD 20723
S 8i L KING LLC 
9025 E KAREN DR 
SCOTTSDALE, AZ 85260
SALIDA 1011 LLC 
6412 E LARKSPUR DR 
5COTTSDALE,AZ 85254
SALKIN NEIL/LINDA/HALLDOR50N 
RYAN/JENNIFER
7215 E SILVERSTONE DR APT 2100 
SCOTTSDALE, AZ 85255
Fliqucttes d'adt-;sso Easy Peel
B
Allez a avery.ca/gabciritII

AVERY
5160
SANCHEZ ADALBERTO BARNETCHE/ETAL 
9214 DESERT PARK DR 
SCOTTSDALE, AZ 85255
SCOTTSDALE CITY OF
7227 E INDIAN SCHOOL RD STE 205
SCOTTSDALE, AZ 85251
tasyreei Aacircss uiut^ib 
Benoolong line to oxpobc.* Pop-up ElIqo
SAVONE ANGELO/ANNA TR 
26094 N 88TH WAY 
SCOTTSDALE, AZ 85255
SCOTTSDALE MEDICAL CAMPUS JPBRE LLC 
9343 E BAHIA DR 
SCOTTSDALE, AZ 85260
Use Avetv Tf'-mLitn SIGO !
SCOTTSDALE AREA ASSOC OF REALTORS 
8600 E ANDERSON DR STE 200 
SCOTTSDALE, AZ 85255
SCOTTSDALE REAL CO LLC 
1220 20THSTSE310 
SALEM, OR 97302
SH 781-796 LLC
6890 S 2300 E PO BOX 71870
SALT LAKE CITY, UT 84171
SHEFA BEIT YOSEF PROPERTIES LLC 
7398 E CORTEZ RD 
SCOTTSDALE, AZ 85260
SHELDON ROBERT C/JACQUELINE E 
12917 SE 309TH PL 
AUBURN, WA 98092
SILVERLEAF AUTO GARAGES LLC 
16410 N91ST ST STE 112 
SCOTTSDALE, AZ 85260
SIMON JONGERT TRUST 
18324 N 92ND ST 
SCOTTSDALE, AZ 85255
SKIN & GRIN LLC 
3811 E BELL RD STE 207 
PHOENIX, AZ 85032
SNIDER ROBERT E/CHRISTINE Y 
9572 FENDALL HALL CIR 
MONTGOMERY, AL 36117
SONG BERNICE STURTEVANT TR 
8577 VILLAGE LN 
ROSEMEAD, CA 91770
SOP MCDOWELL MTN BUSINESS PARK II LLC 
2390 E CAMELBACK RD 320 
PHOENIX, AZ 85016
SPEUR PARTNERS LLC 
8486 N 84TH PL 
SCOTTSDALE, AZ 85258
STALEY LINDA L
9201 E DESERT ARROYOS
SCOTTSDALE, AZ 85255
STORAGE INVEST LINE LP
2042 BUSINESS CENTER DR STE 100
IRVINE, CA 92612
STRONG TOWER LLC 
10610 E CHOLLA ST 
SCOTTSDALE, AZ 852S9
STUART BEVERLY 
16801 N 94TH ST APT 1009 
SCOTTSDALE, AZ 85260
SUGOVIC MILOS/BROOKE 
16801 N 94TH ST APT 1016 
SCOTTSDALE, AZ 85260
SULLIVAN CRAIG E/LORI M 
17780 N92ND ST 
SCOTTSDALE, AZ 85255
SUNRENU PROPERTIES LLC 
16674 N91ST ST STE 105 
SCOTTSDALE, AZ 85260
5YLVIE ANIEL LIVING TRUST 
16801 N 94TH ST UNIT 1002 
SCOTTSDALE, AZ 85260
SZABO PROPERTIES LLC 
2907 UUREL LAKE DR 
KINGWOOD, TX 77339
TA DESERT PARKS VISTA LLC
610 NEWPORT CENTER DR STE 1550
NEWPORT BEACH, CA 92660
TATONKA PROPERTIES TWO LLC 
345 SPRINGSIDE DR STE 101 
AKRON, OH 44333
TIERRA MARKETING SERVICES LLC 
9170 E BAHIA DR STE 103A 
SCOTTSDALE, AZ 85260
TLG INVESTMENTS LLC 
9096 E BAHIA DR 102 
SCOTTSDALE, AZ 85260
TNT PROJECT LLC 
7730 E REDFIELD RD BLD 
SCOTTSDALE, AZ 85260
B
Klicuettes d'acliesse Easy Pee
Allez a svery.c^/gabnrits
iJtiii 
Ic Or,bi.ru Av-jiy b i60I

AVERY
5160
TONIC LLC
20909 N90TH PLSTE 202 
SCOTTSDALE, AZ 85255
easy Peel address LdOeis 
Bend alon^ lir.c to expose Pop-up Edge
TOWNSEND FAMILY TRUST 
18226 N 92ND ST 
SCOTTSDALE, AZ 85255
bse Avery Tenip'':itL'' SIGO
TRAILSIDEVIEW LLC 
7010 E ACOMA DR 103 
SCOTTSDALE, AZ 85254
TRW 11971 TRUST 
16801 N94TH ST APT 1005 
SCOTTSDALE, AZ 85260
TULLY REAGAN/MALATEK KEVIN ALAN 
18154 N 92ND ST 
SCOTTSDALE, AZ 85255
USA BUREAU OF RECLAMATION 
23636 N 7TH ST 
PHOENIX, AZ 85024
VALK PROPERTIES THREE LLC 
1450 T L TOWNSEND DR STE 100 
ROCKWALL, TX 75032
VEACH BRENT 
17704 N 92ND PL 
SCOTTSDALE, AZ 85255
VICTORIA ANNE ELIZABETH OBENSHAIN 
DARBY REVOCABLE TRUST 
17728 N 92ND PL 
SCOTTSDALE, AZ 85255
VIKING CAKE HOLDINGS II LLC 
11375 E PARADISE LN 
SCOTTSDALE, AZ 85255
VOICE BUCCI HOLDINGS CORPORATION 
1669 W 3RD AVE STE 202 
VANCOUVER, BC V6J IKl, CANADA
VOICE INSTITUTE LLC 
16674 N91ST ST STE 102 
SCOTTSDALE, AZ 85260
WAGGONER JERRY/KRISTI 
16801 N 94TH ST UNIT 1003 
SCOTTSDALE, AZ 85260
WALLEY DONNA K 
PO BOX 22070 
FLAGSTAFF, AZ 86002
WDG ENTERPRISES LLC 
11068 E JASMINE DR 
SCOTTSDALE, AZ 85255
WEISS KAREN
9229 E CANYON VIEW RD
SCOTTSDALE, AZ 85255
WEST END HOTEL LLC 
4211 REDWOOD AVE UNIT 401 
LOS ANGELES, CA 90066
WOLD WILLIAM/JILL 
16801 N 94TH ST UNIT 2019 
SCOTTSDALE, AZ 85260
WOLLMANN ANDREW F 
16621 N 91ST ST STE 106 
SCOTTSDALE, AZ 85260
WREN VALERIE Q 
18268 N 92ND ST 
SCOTTSDALE, AZ 85255
WRIGHT JOSEPH PATRICK 
16801 N94TH ST APT 2001 
SCOTTSDALE, AZ 85260
ZAMBRANO ALYSSA/DANIEL 
3816 DAWSON ST 
AURORA, CO 80014
ZLOTO DANIELLE/WILNER MICHAEL 
9226 E VIA DE VAQUERO DR 
SCOTTSDALE, AZ 85255
ZUCCA LLC 
11852 E HUNT HWY 
CHANDLER, AZ 85249
I
PiqL.ettes d';)dte,sse Easy Peel
Allezci avery.ca/gnbarits J
10 Grbar t Avgjv 5'60 i

AVERY
5160
Commissioner George Ertel
City of Scottsdale Planning Commission
11725 N. 129th Way
Scottsdale, AZ 85259
Easy rt!fl Address IaDtfiS 
Bond n!ong line lo expose Pop-up E Jgc
Carla
3420 N. 78th 5treet 
Scottsdale, AZ 85251
Use Awry
Chris Schaffner 
7346 E. Sunnyside Dr. 
Scottsdale, AZ 85260
Community Development Director 
Town of Paradise Valley 
6401 E Lincoln Drive 
Paradise Valley, AZ 85253
Constance Laub
10105 E. Via Linda Suite 345
Scottsdale, AZ 85258
David G. Gulino
5235 N. Woodmere Fairway
Scottsdale, AZ 85250
Edwin Bull
Burch & Cracchiolo PA 
1850 N. Central Ave., Ste. 1700 
Phoenix, AZ 85004
John Berry/Michele Hammond 
Berry Riddell, LLC 
6750 E Camelback Rd, Ste 100 
Scottsdale, AZ 85251
John Washington 
3518 N. Chambers Court 
Scottsdale, AZ 85251
Kathy Littlefield 
aty of Scottsdale City Council 
3939 N. Drinkwater Bivd. 
Scottsdale, AZ 85251
Maricopa County Superintendent of 
Schools
4041N. Central Avenue Suite 1200 
Phoenix, AZ 85012
Planning & Development Department 
Maricopa County Planning & Development 
301W Jefferson St., Suite 170 
Phoenix, AZ 85003
Planning St Development Director 
City of Phoenix
200 West Washington Street, 2nd Floor 
Phoenix, AZ 85003
Planning St Engineering Section Manager 
Arizona State Land Department 
1110 W. Washington St.
Phoenix, AZ 85007
Planning and Zoning 
Town of Carefree 
8 Sundial Circle P.O. Box 740 
Carefree, AZ 85377
Planning Department 
Town of Cave Creek 
37622 N Cave Creek Road 
Cave Creek, AZ 85331
Planning Department 
SRP-MIC
10005 E Osborn Road 
Scottsdale, AZ 85256
ADOT Central District - Red Letter 
Arizona Department of Transportation 
2140 W. Hilton Avenue, Mail Drop PMOO 
Phoenix, AZ 85009
Planning St Zoning Division 
Town of Fountain Hills 
16705 E. Avenue of the Fountains 
Fountain Hills, AZ 85268
Superintendent
Scottsdale Unified School District 
8500 E. Jackrabbit Rd 
Scottsdale, AZ 85250
SRP Land Department atten: Sherry 
Wagner/Right-of-Way Technician, SR. 
Mail Station PABIOW 
P.O. Box 52025 
Phoenix, AZ 85072-2025
Southwest Gas Corporation 
2200 N. Central Avenue Ste 101 
Phoenix, AZ 85004
Superintendent
Cave Creek Unified School District
P.O. Box 426
Cave Creek, AZ 85327
Withey Morris, PLC
2525 E. Arizona Biltmore Circle Suite A-212 
Phoenix, AZ 85016
Paradise Valley Unified School District 
15002 N. 32nd Street 
Phoenix, AZ 85032
Maggie Keasler 
7127 E. 6th Ave. 
Scottsdale, AZ 85251
Susan Demmitt/NickSobraske 
Gammage & Burnham 
40 N. Central Ave., 20th Floor 
Phoenix, AZ 85004
Paul Alessio 
7527 E. Tailspin Lane 
Scottsdale, AZ 85255
Rose Law Group
Attn: Jennifer Hall
7144 E Stetson Drive, Suite 300
Scottsdale, AZ 85251
City of Mesa 
Attn: Tye Hodson 
55 N Center Dr 
Mesa, AZ 85201
Etiquettf^s d'cidreshO E;isy Poel
B
Allez ;i avery.ca/gabarits
___ I.':; i.'.ei le '.'i.- lxiril Avery I

AVERY
5160
Michael P. Leary
Commercial Development Consulting 
10278 E. Hillery Dr.
Scottsdale, AZ 85255
basy reel Mciclrebb Louei^ 
Bond cHoiKj lino to export' Pop-up Edge
v^U lU uvt:. 
,
UseAvery Templotci S iGO i
Tom Emele Property Manager 
Salida Condo Assn 
3260 E Indian School Rd 
Phoenix, AZ 85018
Drew Ashmun Property Manager 
The Villas at Desert Park Village / DC Ranch 
1600 W Broadway Rd Unit 200 
Tempe, AZ 85282
Chey Harmon President
The Villas at Desert Park Village / DC Ranch
1600 W Broadway Rd Unit 200
Tempe, AZ 85282
Theodore Meegan Vice-President 
The Villas at Desert Park Village / DC Ranch 
1600 W Broadway Rd Unit 200 
Tempe, AZ 85282
Katherine Benveniste
The Villas at Desert Park Village / DC Ranch 
1600 W Broadway Rd Unit 200 
Tempe, AZ 85282
Etiquettes cl'aclI esse Easy
Allcv .i nvety.ca/gabnrits 1

J
I
TabC
:?
5.

c t?
0 10%
Affidavit of Posting
Required: Signed^ Notarized originais.
Recommended: E-mail copy to your project Coordinator.
19 Project Under Consideration Sigh (White)
□ Public Hearing Notice Sign (Red)
Case Number: 
Project Name: 
Location:
Site Posting Date: 
Appiicant Name:
Sign Company Name: 
Phone Number:
546-PA-2025
SEC Pima Rd & Loop 101 Fwy
09/05/25
Withey Morris Baugh
Dynamite Signs
480-585-3031
I confirm that the site has been posted as indicated by the Project Manager for the case as listed above.
^yysj 
\pplica
ApplicaaftSignatur
09/05/25
Date
Return completed original notarized affidavit AND pictures to the Current Pianning Office no iater than 
14 days after your appiication submittal.
Acknowledged before me on------Septemberii, 2025
MARnCTHCOHtUD 
Houry Public-Aflioni 
Maricop* County 
CemmlutoA f 671441 
My Coffiffl. tfpifti Ocl If. 1016
a
Jpiary0jblic
My commission expires; 
“2^
City of Scottsdale--Current Planning Diyisipn
7447 E Indian School Road, Suite 105, Scottsdale, AZ 85251 ♦ Phone: 480-312-7000 ♦ Fax: 480.312-7088
CP_Amdavit_Posting
i
Page 1 of 1
Revision Date: 20-0ct-04

1®*^^ Early Notification of 
S^iO’roiect Under Consideration^iMM
If,
—r - 
■
vxerj^
roject Under Consideration
Neighborhood Open House Meeting
Date: Wednesday, September 17,2025 
Time: 6:00 P.M - 7:00 P.M.
Location: Scottsdale Maniott at McDowell Mountains • 16770 North Perimeter Drive, Scottsdale
fr ^
sft
Site Address: Southeast Corner of Pima Rd and Loop 101 Fwy, Scottsdale AZ
Project Overview:
Request: Planned Shared Development (PSD) Overlay to share development standards 
between parcels on existing campus (+/-95 acres) and Rezoning to add C-4 (General 
Commercial) zoning district and modify development standards of existing Planned 
Community District (PCD) on 5.4-acres of existing campus.
Description of Project and Proposed Use: Light Industrial Campus with New EVAutomotive 
Service & Delivery on +/-5.4-acres 
Site Acreage:-r-l-SS acres
Site Zoning: 1-1, PCD (Industrial Park, Planned Community District) and 1-1, PCD, ESL
1.
' ‘j
City Contact:
MTessier@scottsdaleaz|o^ ^
SP-fete31^E-''''*^«y“°"^sBaugh,PLC Name:MeredithTessier
Phoneft6D2-230.0600 
Phone #: 480-312-4211
Email Address: george@wmbattomeys.com 
Email Address: 
-
Pre-Application #: 546-PA-2025 
iiT—...
.Posting Date: 9/5/25
fof removing or defacing sign prior to date of last hearing. Applicant Responsible for Sign Remold
<•*0>ro,
M04
»4S(
Com
i'n-0:
'X.
m
m
ibei^
1-331^mmmm
i

i
4
\
<?
-
■Si
■ i4
al :
1
_. y Notification of"^ 
roject Under Consideration
s
■JP^
Jp,
'-*»
Neighborhood Open House Meeting
Date: Wednesday, September 17,2025 
Time: 6:00 P.M-7:00 P.M.
I Location: Scottsdale Marriott at McDowell Mountains ■ 16770 North Perimeter Drive, Scottsdale 
Site Address: Southeast Corner of Pima Rd and Loop 101 Fwy, Scottsdale AZ
Project Overview:
- - 
Request: Planned Shared Development (PSD) Overlay to share development standards
between parcels on existing campus (+/-95 acres) and Rezoning to add C-4 (General 
Commercial) zoning district and modify development standards of existing Planned 
Community District (PCD) on 5.4-acres of existing campus. 
f
Description of Project and Proposed Use: Light Industrial Campus with New EVAutomotive 
^
Service & Delivery on +/-5.4-acres 
Site Acreage: +/-95 acres
Site Zoning: 1-1, PCD (Industrial Park, Planned Community District) and 1-1, PCD, ESL 
(Environmentally Sensitive Lands)
Applicant/Contsct; 
t
Name; George Pasquel HI-Withey Morris Baugh, PLC Npe: Meredi]^ tor IIh 
‘ 
Phone ft: 6M-0600 
Phone#:480-312-4211
Email Address; george(gwmbattomeys.com 
Email Address:
Pre-Application #:546-PA-2025 
MTessier@scottsdalea2.gov
Posting Dste; 915/25
' Psnaity for rwnoving of cWacIng sign prior to (tats of last hsaring. Applicant Responsible for Sign Removal.
mm
'J.,.
"Sepprnl:
' -u |er5, 2025 at 12:03 PM 
53:649918,-111.887694 
’ ' , ■ E Traiiside View 
Scoft^ile AZ 85255

amm
'F'
*
\
I
^^ r
w.--
’ wiiiiimeng
_ . 
c’SSe
>i
2
■«i^u
■aficr
¥arly Notificati(
Project Under Consideration
Neighborhood Open House Meeting
Date: Wednesday, September 17,2025 
Time; 6:00 P.M - 7:00 P.M.
Location: Scottsdale Marriott at McDowell Mountains ■ 16770 North Perimeter Drive, Scottsdale 
Site Address: Southeast Comer of Pima Rd and Loop 101 Fwy, Scottsdale AZ
Project Overview: 
'
Request: Planned Shared Development (PSD) Overlay to share development standards 
between parcels on existing campus (+/-95 acres) and Rezoning to add C-4 (General
Commercial) zoning district and modify development standards of existing Planned 
<5
Community District (PCD) on 5.4-acres of existing campus. 
'
Description of Project and Proposed Use: Light Industrial Campus with New EVAutomotive 
Service & Delivery on +/-S.4-acres 
Site Acreage: +1-95 acres
Site Zoning: 1-1, PCD (Industrial Park, Planned Community District) and 1-1, PCD, ESL 
(Environmentally Sensitive Lands)
Applicant/Contact: 
City Contact:
Name: George Pasquel 111-Wrthey Morris Baugh, PLC Name: Meredith Tessier 
Phone #: 602-230-0600 
Phone #: 480-312-4211
Email Address: george(gwmbattomeys.com Email Address:
Pre-Application»: 546-PA-2025 
MTessier§scottsdaleaz.go\
Posting Date: 9/S/2S
* Penalty for removing or defacing sign prior to date of last hearing. Applicant Responsible for Sign Removal. ,
s
- 
■'■: Sfept
V ' 
Scottsdai
ifKi
.64^276,-1
'^'rv N Pim^Rb 
Scottsdale AZ* 85255

F' Early Notification of
Hgyroject Under Consideration
. '•* fe:.
1-
l:
V.
^-^=5t3!ca-_;~
Neighborhood Open House Meeting
Date; Wednesday, September 17,2025 
Time: 6:00 P.M-7:00 P.M.
Location: Scottsdale Marriott at McDowell Mountains -16770 North Perimeter Drive, Scottsdale 
Site Address: Southeast Corner of Pima Rd and Loop 101 Fwy, Scottsdale AZ
Project Overview:
B Request: Planned Shared Development (PSD) Overlay to share development standards 
between parcels on existing campus {*l-i5 acres) and RezonIng to add C4 (General 
Commercial) zoning district and modify development standards of existing Planned 
Community District (PCD) on 5.4-acres of existing campus.
4
r'n
Description of Project and Proposed Use: Light Industrial Campus with New EV Automotive j 
Service & Delivery on+/-5.4-acres 
*
Site Acreage: +/-95 acres
Site Zoning: 1-1, PCD (Industrial Park, Planned Community District) and H, PCD, ESL 
(Environmentally Sensitive Lands)
lll-Withey Morris Baugh, PLC 
T^ier
iirSirfifMi'ir^ISffPhnri" #; 602-230-0600 
Phone #; 480-312-4211
Email Address: george@wmbattomeys.com 
Email Address;
Pre-Application #: 546-PA-2025 
MTessier@scottsdaleaz.gov
* p^ity (ofnimo^ng or defacing sign prior to date of last hearing. Applicant Responsible for Sign Removal.
A.
r
;
J«S0IV
A
Mm
5^
mi
Is
is:
'J
1*4-
mm
'XM
mu
c
*

Early Notification of 
Project Under Consideratior
-*
llifyOVATIO ^
PARV
I'
SGQTTSDA
•n N \ 
•
Neighborhood Open House Meeting
Date: Wednesday, September 17,2025 
Time: 6:00 P.M-7:00 P.M.
I Location: Scottsdale Marriott at McDoweli Mountains • 16770 North Perimeter Drive, Scottsdale 
Site Address: Southeast Comer of Pima Rd and Loop 101 Fwy, Scottsdale AZ
Project Overview:
Request: Planned Shared Development (PSD) Overlay to share development standards 
between parcels on existing campus (+/-95 acres) and Rezoning to add C-4 (Generai 
Commercial) zoning district and modify deveiopment standards of existing Pianned 
Community District (PCD) on 5.4-acres of existing campus.
Description of Project and Proposed Use: Light industriai Campus with New EV Automotive 
Service & Delivery on +/-5.4-acres 
Site Acreage:+/-95 acres
Site Zoning: H, PCD (Industrial Park, Planned Community District) and H, PCD, ESL 
(Environmentally Sensitive Lands)
ADDlicant/Contact: 
City Contact:
Ks&d,te,go,
Potting Ditt: VSIK
w .
A
nr d.r«:lnii lion ofiof to date ot latt htaring. Applicant Respontibit for Sign Removtt. _
SCQttSCl^l^lSS^S

rrabD

SIGN-IN
MREG101 BELL, LLC
Southeast corner of the Loop 101 Fwy & Pima Road, Scottsdale, AZ 
Neighborhood Open House Meeting
September 17™, 2025 - 6:00 PM - Scottsdale Marriott at McDowell Mountains -16770 N. Perimeter Drive, Scottsdale, AZ 85260
NAME (Please Print)
ADDRESS
PHONE NO,
E-MAIL ADDRESS
ZOSS^ ijfU^E
■48o.€.OP.'T^l3 pErefe.KIET
davbl.<\ri^Al2CL 
/. ^oP[
4.
}
9^Soe 
^
^0 (1
5. i^nirajn g^ty.nXV- 
£■
6. U>Uifg/7 
^
*■.,11 
I 
' 
ll_--
i<«0'aivl?7o
Kaj/y^laoxU^noiLeaiu
7. ^m\jiyiK^sn\ b
Lont)'^ea^ koUi ^/o-5^7-361 (, j>/o^^3a\\o(?nvr^.(avv\
ieC~
7 
oay
I, «<4 'V
H■ C)uy\4r 
’^258'£^.Ds&crt/t»r
Hso-58S-^'i
■XJD^

SIGN-IN
MREG101 BELL, LLC
Southeast corner of the Loop 101 Fwy & Pima Road, Scottsdale, AZ 
Neighborhood Open House Meeting
September 17™, 2025 - 6:00 PM - Scottsdale Marriott at McDowell Mountains -16770 N. Perimeter Drive, Scottsdale, AZ 85260
NAME (Please Print)
ADDRESS
PHONE NO.
E-MAIL ADDRESS
lcnclQr\iple-(^/'(yn
A 
«
72. dhtis ^A,oller\ ^315 £ Vi't.w 12A
701 -M
Cjk 
o ll OiyVl© oL coi
ToLic A 
i? 5
cdh
15./!/^lirec\iw\c{- liH^^ 
^^«
l^:=±r>B^»0 
s^rWiAv QX-
77.
75.
19.
f
20.
_

From:
To:
Subject:
Date:
M
ProlectInDut
What will be the impact? ZN-0001-2026 
Tuesday, February 17, 2026 3:51:33 PM
External Email: Please use caution if opening links or attachments!
HeUo,
I live in the DC Ranch Estates. Over the course of the last 2 years we’ve seen significant rise in neighborhood 
traffic, noise at all hours (due to improper original noise study not accounting for homes), and air pollution.
There is application for re-zoning. I request a new noise study and air pollution studies are conducted on business 
days. The last noise study was incorrect and did not include the proximity of the homes and only listed the soccer 
field. Im not sure, but also believe it was not conducted during business hours. Regardless, an updated study may 
help guide additional zoning requests.
Additionally, how would the rezoning impact pollution and resource (particularly water) usage?
Thank you for looking into this matter.
Bobbi Hopkins
ATTACHMENT #10

City Notifications - Mailing List Selection Map 
Rivian Service and Delivery Center
Iff'-
•rja
mmm
im
P -Vv.u
ils^i
%
m
.*mm
■Ki
liiDS
f‘ L
r.
.0
\v
i, \ 1
mm
;
»?5a
»<
i'l
tS:
t: •■ .
t. ■; •
asS*!*
li
■<
-'..i 5!!..i-v.*.'r\ y
Labels Pulled 
June 1®‘, 2026
Additional Notifications:
Interested Parties List 
Adjacent HOA’s 
P&Z E-Newsletter 
Facebook 
Nextdoor.com
City Website-Projects in the hearing process
Map Legend:
Site Boundary
Properties within 1250-feet
Postcards: 146
ZN-0001-2026
ATTACHMENT #11

IT1
■f
f-
SCOTTSDALE PLANNING COMMISSION 
KIVA-CITY HALL
3939 DRINKWATER BOULEVARD 
SCOTTSDALE, ARIZONA
WEDNESDAY, JUNE 10, 2026
*DRAFT SUMMARIZED MEETING MINUTES *
PRESENT:
ABSENT:
Joe Young, Chair 
William Scarbrough, Vice Chair 
George Ertel, Commissioner 
Michal Ann Joyner, Commissioner 
Doug Drake, Commissioner 
Barney Gonzales, Commissioner 
David Reid, Commissioner
William Scarbrough, Vice Chair
STAFF: 
Tim Curtis
Joe Padilla 
Dustin Robertson 
Casey Steinke 
Chris Zimmer 
Jack Kelly 
Jason McWilliams
CALL TO ORDER
Chair Young called the regular session of the Scottsdale Planning Commission to order at 5:01 p.m.
ROLL CALL
A formal roll call was conducted confirming members present as stated above.
MINUTES REVIEW AND APPROVAL
1. Approval of the May 27, 2026 Regular Meeting Minutes.
Commissioner Reid made a motion to approve the May 27, 2026 Regular Meeting 
Minutes. Second by Commissioner Joyner, the motion unanimously by a vote of six 
(6) to zero (0).
* Note: These are summary action minutes only. A complete copy of the meeting audio is available on the 
Planning Commission page on ScottsdaleAZ.gov. search “Planning Commission”
ATTACHMENT #12

Planning Commission 
Regular Meeting Minutes 
June 10, 2026 
Page 2 of 2
Consent Agenda
2. ZN-0001-2026 (Rivian Service and Delivery Center)
Request by owner for approval of a zoning district map amendment from Industrial Park, 
Planned Community District (1-1 PCD) to General Commercial, Planned Community 
District (C-4 PCD) and a request to amend development standards including Floor Area 
Ratio, Open Space, Building Height, and Setbacks, on a +/-5.4 acre portion of a +/-57.5 
acre site located at 17771 N. Pima Road and 215-04-471 and 215-04-470. Staff contact 
person is Chris Zimmer, 480-312-2347. Applicant contact person is George Pasquel 
III, 602-230-0600.
3. ZN-0004-2026 (Scottsdale NEQ (North East Quadrant) Parking Structure)
Request by owner for a Zoning District Map Amendment from Parking District Downtown 
Overlay (P-2 DO) to Downtown/Multiple Use, Type 3 with Planned Block Development 
Overlay, Downtown Overlay (D/DMU-3 PBD DO) zoning with a development plan for a 
municipal use for a parking structure, including amended development standards for 
setbacks, stepbacks, and building location on a +/-1.05-acre site located at 7375 E. 
Stetson Drive. Staff contact person is Casey Steinke, 480-312-2611. Applicant contact 
person is Carlos De Alva, 520-519-9335.
Items No. 2 & 3; Commissioner Ertel made a motion for recommendation of 
approval to City Council for cases ZN-0001-2026 and ZN-0004-2026 after finding that 
the proposed PCD and PBD criteria have been met and that the proposed Zoning 
District Map Amendments are consistent and conform with the adopted General 
Plan, per the attached stipulations. Second by Commissioner Reid, the motion 
unanimously by a vote of six (6) to zero (0).
ADJOURNMENT
With no further business to discuss, the regular session of the Planning Commission 
adjourned at 5:07 p.m.
* Note: These are summary action minutes only. A complete copy of the meeting audio is available on the 
Planning Commission page on ScottsdaleAZ.gov, search “Planning Commission”