Item 12
ancNini
REPORT
4.
1^
1C
Meeting Date:
General Plan Element: 
General Plan Goal:
July 1,2026
Public Services and Facilities
Provide city service facilities to meet the governmental, 
administrative, public safety, emergency, social, human. 
Cultural, informational, and maintenance needs of the 
community.
ACTION
Design Build Manager Construction Phase Contract for Bond Project No. 63, Old Town Parking 
Structure. Adopt Resolution No. 13730 authorizing:
1. Design Build Manager Contract No. 2026-048-COS-A1 with Chasse Building Team, in an 
amount not to exceed $12,463,464 for Design-Buijd Manager (DBM), GMP 2 construction 
services for Capital Project PD2101 - Bond 2019 Project No. 63 - Build Parking Structures in 
Old Tovvn for the Brown Avenue Parking Structure Expansion.
BACKGROUND
On April 14, 2026 Council adopted Resolution 13635 authorizing contract 2026-048-COS for DBM 
Construction Phase services with the Chasse Building Team, Inc, for Guaranteed Maximum Price 
One (GMP 1) for long lead procurement and preparatory work for garage construction. This council 
action is for approval of the GMP 2 proposal for the balance of the garage construction scope.
ANALYSIS & ASSESSMENT
Recent Staff Action
The design for the garage expansion is finalized and trade bids have been received for all remaining 
material and labor to complete the structure. GMP 1, in an amount not to exceed $3,820,557, 
provided for early procurement for long lead items and some construction including demolition and 
masonry. GMP 2, in an amount not to exceed $12,463,464, provides for the balance of the work. The 
modified contract price will not exceed the total GMP of $16,284,021. This contract is necessary to 
ensure the parking structure can be open for use for Spring Training 2027.
Action Taken
Page 1 of 3

City Council Report | Design Build Services - Bond 63 Build Parking Structures in Old Town 
Community Involvement
Significant community outreach was completed for input during design. During construction, 
ongoing communication will be provided in monthly newsletters.
RESOURCE IMPACTS 
Available funding
Funding for this project is available in PD2101.
Project
Total Project 
Budget 
(in millions)
Funds Spent
(in millions)
Remaining 
Budget 
(in millions)
Funding Sources
PD2101-Build Parking 
structures in Old Town
20.96
1.86
19.1
2019 Bond
Staffing, Workload Impact
The contract administrator responsible for enforcement of all provisions of the contract is Roger 
Berna, Senior Project Manager, Capital Project Management.
Maintenance Requirements
New facilities will be maintained in like fashion to the existing. There will be additional costs for 
maintaining and cleaning the added areas.
OPTIONS & STAFF RECOMMENDATION 
Recommended Approach
Adopt Resolution No. 13730 authorizing Design Build Manager Contract No. 2026-048-COS-A1 with 
Chasse Building Team in an amount not to exceed $12,463,464 for Design-Build Manager, GMP 2 
construction services for Capital Project PD2101 - Bond Project No. 63 - Build Parking Structures in 
Old Town for the Brown Avenue Parking Structure Expansion. This contract will be for Phase Two, for 
the balance of the garage construction.
Proposed Next Steps
Upon Council approval, the DBM will issue subcontracts for remaining construction scope.
RESPONSIBLE DEPARTMENT(S)
Economic Development, Transportation and Infrastructure
STAFF CONTACT
Roger Berna, Sr. Project Manager, rberna(a)scottsdaleaz.gov, (480) 312-7845
Page 2 of 3

City Council Report | Design Build Services - Bond 63 Build Parking Structures in Old Town 
APPROVED BY
1/fO^
4
Alisen Tymkiw, Senidr Director-City Engineer, 
Transportation and Infrastructure 
(480) 312-7760, atvmk.iw@,scottsdaleaz.gov
Date*
ATTACHMENTS
1. Resolution 13730
2. Location Map
3. Contract 2026-048-COS-A1
Page 3 of 3

RESOLUTION NO. 13730
A RESOLUTION OF THE COUNCIL OF THE CITY OF SCOTTSDALE, 
MARICOPA COUNTY, ARIZONA AUTHORIZING DESIGN BUILD MANAGER 
CONTRACT NO. 2026-048-COS-A1 WITH CHASSE BUILDING TEAM, INC. TO 
PROVIDE CONSTRUCTION SERVICES FOR CAPITAL PROJECT PD2101 - 
2019 BOND PROJECT NO. 63 - BUILD NEW PARKING STRUCTURES IN OLD 
TOWN SCOTTSDALE FOR THE BROWN AVENUE PARKING STRUCTURE 
EXPANSION IN AN AMOUNT NOT TO EXCEED $12,463,464.
WHEREAS, the City desires to complete the construction of Capital Project PD2101 - 
Bond 2019 Project No. 63 - Build Parking Structures in Old Town for the Brown Avenue Parking 
Structure Expansion (the “Project”), located at 7234 East Second Street, Scottsdale, Arizona; and
WHEREAS, the City and Chasse Building Team, Inc. desire to modify existing Design 
Build Manager Contract No. 2026-048-COS to contract for additional construction services to 
complete the Project.
follows:
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Scottsdale as
Section 1. The Mayor of the City of Scottsdale is authorized and directed to execute 
Design Build Manager Contract No. 2026-048-COS-A1 with Chasse Building Team, Inc. to 
provide construction services for Capital Project PD2101 - Bond 2019 Project No. 63 - Build 
Parking Structures in Old Town for the Brown Avenue Parking Structure Expansion in an amount 
not to exceed Twelve Million Four Hundred Sixty-Three Thousand Four Hundred Sixty-Four 
dollars ($12,463,464).
Section 2. The City Manager, or designee, is hereby authorized to execute such other 
documents and take such other actions as necessary to carry out the intent of this Resolution.
PASSED AND ADOPTED by the Council of the City of Scottsdale this____day of
_________________2026.
ATTEST:
Ben Lane, City Clerk 
APPROVED AS TO FORM:
CITY OF SCOTTSDALE,
an Arizona municipal corporation
Lisa Borowsky, Mayor
Luis^ Santaella, City Attorney
By: Lydia Tulin, Assistant City Attorney
19279476
Page 1 of 1
ATTACHMENT 1 
Resolution No. 13730

X
CL
(Vrj
(T
IT-
(1
(N
S.
'll
m-i
•U •'
■f* 
. ;
C..1 ;l_-
triMan! iJ tf,
Jm
rtl
N
INDIAN SCHOOL ROADi
NTS
N.
ir
(N
■s.r.
Ll
I-c
CT'
O
_ia
! )
iLi:
^ s
.2
-V 
.. ... ..^El 
-■ 
'1
E^:l‘l 
I H L."L.—rtiX'—«
1^1
col
* *» ‘ T
Tl-
:. -"*
Z| 1
|TT>
V V'.
ii^
. :n ’
' #
» <K J
I • ■ I
Q
4 S^;r>/ Qt
Lj ’
I t I 
I f I1 y • f
PROJECT
LOCATION
1ST STREET!
' lof
r
4n
%.
-r-.
r^;r.S
m
K
r
j
I
i
KLj
km
r!5M
m
t n
.•.'
V
TTlI
' 'ii
ya
=■- , ,■ "T
'? 
' t»
r-o
K-f
' m
cc
Xi
C:
c
L
c
c
c
ir
f\
O'
cs
CX;(\
X'
<!'
C'
0
2
Ll'
Ll
•zc
cr
Ll
C
H:. .1It
. w
' J
M SI ’^'11
S9!5.i
yf^i
1' m ^^fSjSCT
alt dmm
a
w. ■«- » • 
Wl'i i:
f
A
___^--
1
^ flPiii
4lC ^ -V
. i
ap
ATTACHMENT 2
LOCATION
MAP
DEPT
M.M, I DRAWN I DATE 
I SCALE 
I SHT.
T&l RAhI 3/26 I NTS | 1 of 1
CITY OF
scons£

Contract No. 2026-048-COS-A1
CITY OF SCOTTSDALE
FIRST MODIFICATION TO CONSTRUCTION CONTRACT 
CONTRACT NO. 2026-048-COS-A1 
SOLICITATION NO. RFSQ.072024-190 
PROJECT NO. PD2101
THIS CONTRACT MODIFICATION is entered into this
day of
2026, (the
"Effective Date") by the City of Scottsdale, an Arizona municipal corporation, (the “City") and 
Chasse Building Team, Inc., an Arizona corporation (the “Design-Buiid Manager" or “DBM” or 
“Contractor").
WITNESSETH
WHEREAS, the City and Contractor desire to contract for additional construction services for 
Bond Project 63 - Build Parking Structure in Old Town Scottsdale (the “Project”) pursuant to 
Construction Contract No. 2026-048-COS (the “Contract”).
NOW THEREFORE, the City and Contractor mutually agree to modify the Contract as provided 
herein and further acknowledge that this is the first modification to the Contract (the “First 
Modification”).
IN AND FOR CONSIDERATION of the mutual promises and obligations set forth herein, the 
City and Contractor agree the Contract should be modified as follows;
MODIFICATIONS:
1.0 SCOPE OF SERVICES
Article 1 is modified to add the additional Scope of Work specified in Exhibit A.1. 
attached hereto and made part of this First Modification by this reference.
2.0 CONTRACT TIME
Article 3, Section 3.1.1 is modified to add that the Contract Time for the additional 
Scope of Work described in Exhibit A.1. attached hereto, will begin on the 
Effective Date of this First Modification and will be completed within four hundred 
sixty-eight (468) consecutive calendar days. The City and Contractor previously 
entered into Preconstruction Services Contract No. 2025-004-COS and 
Construction Services Contract No. 2026-048-COS as referenced in Exhibit B.1. 
attached hereto and made part of this First Modification by this reference.
3.0 CONTRACT PRICE
Article 4, Section 4.1.1 is modified to add GMP Proposal #2 (“GMP 2"), attached 
hereto as Exhibit C.1 and made part of this First Modification by this reference.
14423500V1
19279488
Page 1 of 3
ATTACHMENT 3

Contract No. 2026-048-COS-A1
GMP 2, in an amount not to exceed Twelve Million Four Hundred Sixty-Three 
Thousand Four Hundred Sixty-Four doliars ($12,463,464), is added to the first 
GMP Proposai ("GMP 1"), attached as Exhibit C to Contract 2026-048-COS in an 
amount not to exceed Three Miiiion Eight Hundred Twenty Thousand Five 
Hundred Fifty-Seven doiiars ($3,820,557), for a totai Contract Price not to exceed 
Sixteen Million Two Hundred Eight-Four Thousand Twenty-One dollars 
$16,284,021 ("Total GMP").
4.0 
PERFORMANCE AND PAYMENT BONDS - DELETE and REPLACE TEXT
Article 9, Section 9.9.1, BONDS AND OTHER PERFORMANCE SECURITY, is 
modified to read as follows: 
/
Before the commencement of the Work, the Contractor must provide a 
Performance Bond and a Payment Bond each in an amount equal to the 
Total GMP. Bonds must be submitted in accordance with Title 34, Chapter 6 
of the Arizona Revised Statutes and will be in substantially the same form as 
Exhibits D and E attached to Contract 2026-048-COS.
AFFIRMATION:
Except as previously amended, or as expressly amended by this First Modification, all terms, 
provisions, and conditions of the Contract are hereby ratified and shall continue in full force and 
effect, and the Contract shall remain enforceable and binding in accordance with its terms.
[END OF TEXT- SIGNATURE PAGE TO FOLLOW]
14423500V1
19279488
Page 2 of 3

Contract No. 2026-048-COS-A1
IN WITNESS WHEREOF, the Parties have executed this First Modification as of the Effective 
Date.
CITY OF SCOTTSDALE,
an Arizona municipal corporation
CONTRACTOR:
Chasse Building Team, Inc., 
an Arizona corporation
By:
Lisa Borowsky, Mayor 
ATTEST:
By:_
Name:
Title:
Ben Lane, City Clerk
REVIEWED BY:
Roger Berna, Principal Project Manager 
City Contract Administrator
Jenn Myers, MPA, CPPO, NIGP-CPP, CPPB 
Purchasing Director
Alison Tymkiw, Senior Director - City Engineer
George Woods, Safety & Risk Management Director 
APPROVED AS TO FORM:
LufSb. Santaella, City Attorney 
By: Lydia Tulin, Assistant City Attorney
14423500V1
19279488
Page 3 of 3

Contract No. 2026-048-COS-A1
EXHIBIT A.1
PROJECT DESCRIPTION 
ADDITIONAL SCOPE OF WORK FOR 
GMP2
Contractor shall provide ail labor, materials and equipment necessary to construct the Project as 
described in the Brown Avenue Parking Structure documents as prepared by DFDG 
Architecture dated April 30, 2026 with all amendments. For the Scope of Work anticipated 
under this First Modification for the Project, refer to Contractor’s proposal dated June 12, 2026, 
attached to this First Modification as Exhibit C.1 and incorporated herein by this reference.
9610034V1
Page 1 of 1

Contract No. 2026-048-COS-A1
EXHIBIT B.1
CONSTRUCTION AGREEMENT(S)
Preconstruction Services Contract No 2025-004-COS, on file with the City Clerk, is included in 
this First Modification by reference.
Construction Services Contract (GMP 1) No. 2026-048-COS, on file with the City Clerk, is 
included in this First Modification by reference.
CONTRACTS ON FILE AT THE SCOTTSDALE CITY CLERK’S OFFICE 
CAN BE FOUND AT THE BELOW LINK:
https://eservices.scottsdaleaz.gov/cityclerk/documentsearch
9610034V1
Page 1 of 1

f
Exhibit C.1, 2026-048-COS-A1, Page 1 of 55
s-ict
':p
CITY OF SCOTTSDALE
BROWN AVE. 
PARKING STRUCTURE
GMP2
....... ^
PREPARED FOR: City of Scottsdale
t •!
p '
ii^
d \
■iTfl
■iV:/
I-.i
MA
Wi;'
I?
fm
HP*”
m
■ ^Tf
*-•-. &
m
!|5|
.lljp
r
-V . —H
c,.
^11
PKisrse-*--.
i
’S
vl
lg>
: f'.'/ '"■'
.■:.rT‘ i
CHASSE
ev/upwa VbAM
■i.-w.
■aIV-%

Exhibit C.1, 2026-048-COS-A1, Page 2 of 55
Brown Ave Parking Structure
Date June 12, 2026 
Estimate GMP2
CHASSE
WAM
DESCRIPTION/TRADE
GMP2
Miscellaneous
294,290
01100 Final Clean
58,134
01170 Survey
28,200
04100
04200
Precast
Slone Veneer
4,496,610
417,832
05100 Steel
513,390
06100 Rough Carpentry
177,543
07420 Metal Panel
53,144
07500 Roofing
43,835
07900 Joint & Fire Sealants
395,820
08100 Doors, Hardware & Trim
21,015
09200 Stucco
183,320
09900 Paint
88,983
10800 Signage
286,325
21100 Fire Sprinkler
395,017
22100 Plumbing
319,220
23100 HVAC
47,907
26100 Electrical
608,913
27130 Radio Amplification
2,150
28100 Fire Alarm
30,914
31100 Earthwork & Paving
648,775
32200 Demo
80,765
32400 Striping & Sionaoe
89,062
32800 Landscape
39,053
00999 General Conditions
1,174,284
SUBTOTAL
10,494,501
Contractor's Contingency
3.00%
373,904
Liability Insurance
1.20%
149,562
Performance & Payment Bond
1.10%
Builders Risk
1.00%
137,098
124,635
Fee
5.00%
563,985
Scottsdale Gross Receipts Tax
5.233%
619,780
TOTAL
12,463,464

Exhibit C.1, 2026-048-COS-A1, Page 3 of 55
EXHIBIT C
GMP SUMMARY
AMOUNT
A
COST OF THE WORK - DIRECT COSTS
AMOUNT
B
Sub-Contractors' Cost of the Work (Labor, Materials, 
Equiprnent, Warranty, Insurance, Profit)
$9,320,217
DBM Self-Performed Cost of the Work (Labor, Materials, 
Equipment, Warranty) 
'
C Total Cost of the Work (A+B)
INDIRECT COSTS
AMOUNT
$9,320,217
D General Conditions (Negotiated Amount)
E
Total Cost of the Work + General Conditions Fee 
(C+D)
$1,174,284
$10,494,501
F DBM Construction Fee (% of E or Negotiated Fixed Fee)
G
H
Payment and Performance Bonds (On E, Total Cost of 
the Work-!■ General Conditions Fee) 
$563,985
$137,098
Insurance (Additional DBM's Insurance not provided in 
the Total Cost of the Work) 
$274,196
I Subtotal Direct + Indirect Costs (E+F+G+H)
J Taxes (Actual Reimbursable limited by Not to Exceed)
K Project Subtotal (1+J)
$619,780
$11,469,780
L
CITY'S PROJECT CONTINGENCY (As determined by 
the City)
$373,904
$12,089,560
M TOTAL GMP (Not to Exceed) (K-fL)
$12,463,464

Exhibit C.1, 2026-048-COS-A1, Page 4 of 55
fofeca^l Outcome
PROJECT; Brown Ave Parkirrj SIruclur*
BID ABSTRACTS FOR: Mfsc«)lantous
CH/\
Sub-Contractor 
Contact 
Email 
Phone 
Base Bid
CHASSE
Ricker Atkinson 
McBee Morman 6i 
Associates. Inc.
SE
/ vV.'.
David Thomas
$0
(480) 921-8t00
MISCELLANEOUS ITEMS:
Sheet A800
Bird Deterrents at New Canopy Location
$
25,000
Fire Extinguisher Cabinet @ 9/ABOO (localions shown on Gt 10)
s
17,550
Bike Racks - 2 on AlOO & A210 (1 -9 Bike & 1-11 Bike per A100). 1 on 
I/A30I (no location for this on AlOO), 1 on 3/A301 (Bike Park Area on 
AlOO but qty. not shown - assumed 2). 2 on 1/A302 (labeled & shown 
on AlOOBt A2I0). Deio, Serpentine pet Spccilicalion 32 33 13 Site 
Bicycle Racks
10,000
Knox Boxes
1,900
SRP Key Box at every Meler/SES Room (any electrical room with a 
door)
9S0
Material Testing
19,890 $
19,890
Hot Une Notification - Safety
24,000
Custom Notification Signage and Banners
45,000
Parking Counting System Allowance
150,000
Bid Forecasted Cost Total;
i
294,290 S
19,890 S
$
$
ToUl Budget: Base Bid * Bid Forecasted Costs
r
$294,290|
I
I

Exhibit C.1, 2026-048-COS-A1, Page 5 of 55 
PROPOSAL for PROFESSIONAL ENGINEERING SERVICES
Proposal No.: 254290-1
May 4, 2026 (Revised)
Date:
Client:
Project:
Attention:
Chasse Building Team 
230 South Siesta Lane 
Tempe, Arizona 85281
Brown Avenue Parking Garage 
7234 East 2™* Street 
Scottsdale, Arizona
Lawrence Chan; lchan@chasse.us
A
ALTA
ENVIRONMENTAL & 
INFRASTRUCTURE
Alta CMTI, LLC, dba Alta Environmental and Infrastructure (hereinafter referred to as “Alta”), 
fonnerly Ricker Atkinson McBee Morman & Associates, bic. (RAMM), appreciates the 
opportunity to provide you with this proposal to perform construction materials testing and 
optional special inspection services for the above referenced project.
The following scope of work and estimated fee are based on our experience with similar projects, 
and a review of the project plans and specifications (75% CD Set dated 4/9/26) and other 
infonnation provided. Charges will be based only on actual time spent and testing performed 
to provide the services required.
On this project there will be no overtime premium for weekday work and no minimum charge per 
trip.
Materials Tesline
Earthwork: Compaction testing during subgrade preparation, fill placement and backfill 
placement in new structure and exterior concrete areas, and sub-slab aggregate base where 
required. Includes geotechnical special inspections where required.
Unit Rates Amount
25 Hours 
$ 
68.00 $
10 
Trips 
20.00
2 
Standard Proctors 
155.00
1 
ABC Sieve and P.I. 
320.00
1,700.00
200.00
310.00
320.00
Subtotal $ 2,530.00
Concrete: Sampling and compressive strength testing of concrete based on an assumed minimum 
testing firequency of one set of 4 cylinders per 100 or less c.y. and at least one set per day’s 
placement (assume 17 sets). The project specifications state conflicting testing frequency.
Unit Rates Amount 
40 Hours 
$ 
68.00 $ 2,720.00
12 Trips 
20.00 
240.00
68 Cylinders 
25.00 
L700.00
Subtotal $ 4,660.00
Alta Environmental & Infrastructure 
2105 S. Hardy Drive, Suite 13, Tempe, Arizona 85282 
Phone 480-9214100 / Fax 480-921-4081

Exhibit C.1, 2026-048-COS-A1, Page 6 of 55
Page 2 / RAMM Proposal No. 254290-1 (Revised May 4,2026)
Brown Avenue Parking Garage - Scottsdale, Arizona
Masonry: Compressive strength testing of grout based on an assumed minimum testing frequency 
of one set of grout per 5,000 sq. ft. or less of masonry construction (estimate 8 sets grout).
Unit Rates Amount 
20 Hours 
$ 
68.00 $ 
1,360.00
8 Trips 
20.00 
160.00
40 Specimens - Grout 
25.00 
1.000.00
Subtotal $ 2.520.00
MATERIALS TESTING TOTAL:
$ 9,710.00
Special Inspections:
Provide special inspections in accordance with the project plans and specifications, and with the 
IBC / ICC. Special inspections provided by this firm will be billed at $ 115.00 per hour and $20.00 
per trip and will be conducted by certified inspectors. We will bill only for the time required to 
complete the inspections.
Concrete Construction / Reinforcing Steel (8 additional trips, 19 hours)................ $2,345.00
Masonry Construction / Reinforcing Steel (6 additional trips, 20 hours)................ $2,420.00
Structural Steel / Welding (6 trips, 25 hours).........................................................$2,995.00
Expansion / Epoxy Anchors (6 trips, 20 hours)......................................................$2,420.00
Soils / Foundations................................................................. Included in Materials Testing
SPECIAL INSPECTION TOTAL:
$ 10,180.00
MATERIALS TESTING & SPECIAL INSPECTION TOTAL:
$ 19,890.00
Fee includes reports for all inspections, test results, transportation, clerical and postage. We look 
forward to working with you on this project.
Respectfully submitted,
Alta Enyiioomental & Infi'astructure
David A. Thomas, P.E. 
Senior Project Manager
/dat
Alta Environmental & Inrrastruclurc 
2105 S. Hardy Drive, Suite 13, Ttmpe, Arizona 85282 
Phone 480-921-8100 / Fax 480-921-4081

Exhibit C.1, 2026-048-COS-A1, Page 7 of 55
forecast Outcome
PROJECT: Brown Ave Parking Structure 
BID ABSTRAaS FOR: Final Oean
Sub-Contractor
Contact 
Email 
Phone 
Base Bid
CHASSE
CH/\:
0E
riVi / 
' I i . •/-;
Sav
BID FORECASTED COST:
Posset Wash Garage Floor - Total 4 Lesrel
5S,334
Street Svseep Cleaning
4,800
CLARIFICATIONS EXHIBIT;
GMP2 includes final dean to power wash total 4 level of garage
flooL
Bid Forecasted Cost Total:
S
58,134 S
$
i
i
Tout Budget: Base Bid * Bid Forecasted Costs
L
$58,134|
T
I

Exhibit C.1, 2026-048-COS-A1, Page 8 of 55
forecast Outcome
PROJECT; Brown Ave Parking Structure 
BID ABSTRACTS FOR: Survey
CH/\SSE
m
IMk;'
Sub-Contractor
Contact
Benchmark
Bj Bautista
Lemme Associates
Email auUitagar^gnchmar^
Phone 480-861-0011
Cori Dennett
cofi@lenmrie-€ng.com
(602) 841-6904
BID FORECASTED COST:
Street Light Pole Staking
Offsite Repair 1st Street & Brown Ave
1,400
4,200
1,800
5,400
Pole Hole/ Locating Service
1,400
1,800
Re-staking
2,800
3,600
Uncferground - Plumbing/ Sewer
1,400
1,800
FINAL Alta Survey
1,400
1,800
Quali lY Assurance
15,600
18,000
CLARIFICATIONS EXHIBIT:
GMP2 includes utility locating services and survey work
required by the City tor tv/o (2) street light poles
GMP2 Includes underground utility surveying for the 
conversion of overhead electrical lines to underground service,
Bid Forecasted Cost Total GMP2:
$
28,200 $
34,200 
$
t
$
Total Budget Base Bid GMP2 + Bid Forecasted Costs L
$28,2001
$34,200|
I
I

Exhibit C.1, 2026-048-COS>A1, Page 9 of 55
May 4,2026
Lawrence Chan 
Chasse Building Team
Re: Brown Avenue Parking Garage
..................................................................................................................................................... .................................................................................................................................■■................
As requested, I am pleased to provide a proposal for construction staking services on the 
above referenced project I have prepared this proposal from the 75% CD. l have included 
the following to be considereii as an express pert phpdr agreement:
Attachment "A" ^S^pe oh^Seivices/Ree SjchpiJul^Ass^ptjori^ Exclusions.
• iv-' 
. .
We look forward;tQdur \yorking relatiDn$hip witltypu amd^pqr company, if you 
have any questions or cpncems, ple^ase feei free to call me at: your convenience at 
480-861-0011 or email me at bbautista@azbenchmark.com.
Sincerely,
'{\
V,
Bj Bautista, R.L.S.
Benchmark Surveying & Consulting, LLC
Benchmark Swyeying & Consulting • 105 N Pasadena Street • Gilbert AZ 85233

/
Exhibit C.1,2026-048-COS-A1, Page 10 of 55
CONSTRUaiON STAKING SCOPE & FEE SCHEDULE FOR: 
BROWN AVENUE PARKING GARAGE
1
Calibration and Control
• Calibrate site horizontally and vertically arid produce horizontal control 
sheet for staking project. Establish additional onsite control for use 
during project.
$1,000
2
Office Calculations
• 
Provide control calculations needed to layout the project.
• 
QA/QC field data to ensure quality of work.
$1,800
3
Limits/Removals
• 
Stake property line or construction limits at 100' Intervals.
• 
Stake offsite curb removals.
$350
4
Rough Grade
• Stake rough grade for curb, detached sidewalk, hardscape and building 
pad. Stakes will be set at 50' intervals plus key points.
$700
5
Water/Fire
• Stake alignment with a single offset at 50' intervals for water main and 
grade to finish grade.
$175
6
Building Control
• 
Stake main grid lines with a double offset on main corners for first floor 
only.
• 
Set finish floor blue top.
• 
Bluetop garage ramp.
• 
Elevate one nut per column.
• 
Staking Is for foundation floor only. 
$2,500
7
Curb/Detached Sidewalk/Hardscape
• 
Stake alignment and grade at 25-35' Intervals.
• 
Stake alignment and grade at grade breaks, angle points and point of 
curvature,
$900
8
Asbuilts
• 
Provide civil as-built data per city requirements only. Including retention 
basin volume and pad cert.
• 
As-builts do not include a Record of Survey and ALTA Surveys, setting of 
property pins if required. Such services shall be completed via a change 
order or on a T&M basis.
• 
As-builts do not include any Civil Engineer's Certifications, substantial 
completion letters, etc.
$1,500
TOTAL FEE, ABOVE SERVICES*
$8,925.00
This is for information only. The project will be billed at a lump sum fee.
V

Exhibit C.1, 2026-048-COS-A1, Page 11 of 55
Assumptions/Exclusions
1. 
Please review this proposal carefully, as we have attempted to provide a complete Scope of 
Services for your project. Any items requested to be staked during the course of construction, 
but not listed In the Scope of Services, will be considered non-contract additional services. 
Additional and re-staking services will be Invoiced at the rates quoted on the Hourly and 
Reimbursable Fee Schedule.
2. 
Any questions regarding the accuracy of construction staking will not be considered unless the 
Surveyor's reference points and stakes are preserved intact In their original and undisturbed 
state. The survey director/field supervisor must be notified immediately if any inaccuracy of 
construction is suspected.
3. 
A minimum 48-hour working day notice may be required for scheduling work.
4. 
Contract staking, additional staking and re-staking services shall be performed on an "upon 
request" basis and must be approved by the General Contractor or Owner prior to their request.
5. 
All staking shall be performed one time only under the Fee Schedule, unless otherwise noted.
6. 
The Surveyor shall coordinate directly with the General Contractor to determine offset distances 
and lath markings, or if unavailable, the surveyor will use industry standards. The Surveyor shall 
provide cut sheets to the General Contractor upon request.
7. 
The Surveyor shall obtain as-builts as soon as possible after construction and maintain a 
continuous file of as-builts, until project completion.
8. 
This proposal Is based on receiving digital data, i.e., CAD files from the Engineer of Record, 
including PDF or a hard copy of the approved stamped plans.
9. 
The General Contractor and his subcontractors shall maintain, and use sets of approved plans at 
the project site and verify to the best of their ability the accuracy all stakes prior to construction. 
The General Contractor and his subcontractors shall not be liable for the accuracy of the 
Surveyor's stakes unless disturbed prior to construction.
10. 
Any changes in, additions to or deletions from the Project within its general scope made by the 
General Contractor will not result in a fee adjustment except by mutual agreement of the 
General Contractor and Surveyor.
11. 
This bid is for construction staking services only. The horizontal control portion of the services 
does not include setting property corners unless Benchmark Surveying & Consulting is the 
original Surveyor of Record for the property, prior to the construction phase.
12. 
This scope and fee proposal does not include Engineer's Certifications, Substantial Completion 
letters, filing of "Approval of Construction" (AOC), for water & sewer, etc. This task is not in the 
purview of a Land Sun^eyor, but rather the Engineer of Record with no exceptions.
13. 
All ALTA Surveys, Topo Maps, Legal Descriptions, Record of Surveys, setting of property pins is 
exciuded in its entirety.

CLIENT; 
Name _
Exhibit C.1, 2026-048-COS-A1, Page 12 of 55
LEMME ASSOCIATES AZ_________
PROPOSAL FOR PROFESSIONAL SERVICES
PROPERTY OWNER; 
Name _____________
Mailing Address
Phone;.
Email;_
Cell;
Address
Phone;.
Email;_
Cell;
PROPERTY LOCATION: Assessor's Parcel No.
7234£ASX2'yLSI
SCOTTSDALE. AZ
Sec
T.
R.
EIAZ DCA
DESCRIPTION OF PROJECT:
BROWN AVENUE PARKING GARAGE
DESCRIPTION OF PROPOSED SERVICES: 
n SURVEY
□ Elevation Cert. (FEMA)
□ Boundary Survey
□ Topo Survey - Locate Features
□ Topo Survey - For Design
□ ALTA
□ Map Recording Process
□ _________
□ _________
fy] CONSTRUCTION STAKING
SITE WORK AND GRADING
□ ROUGH grade site including retention basins
□ FINISH grade site including retention basins
Pi^KING LOT/ROADWAY__________________
□ Rough Subgrade 
50' foot grid
□ Bluetop Subgrade 
50' foot grid
□ Bluetop ABC at 
25' foot grid/stations
□ Curb and Gutters. Islands, Trash Enclosures 
UTILITIES
BUILDING_____________________________
□ 
Pad, Main Corners, Grade
□ 
Building Finish Floor/Pad Certification 
MISCELLANEOUS
50' 'Stations
25' 'Stations
□ Storm sewer staking and control
□ San. sewer staking and control ____
□ Water line staking and control 50' 'Stations
□ Drywell and catch basin locations
□ Light pedestals located and graded
^ ADDITIONAL SCOPE OR COMMENTS
□□□□□□
□□□
Calculations / Office Support
As-Builts (Under Ground Musi Be Open Trenchl) 
New curb and gutter (off site)
Wall Location, Trash Enclosures, Walks 
Gridlines - First Floor 
Gridlines - Upper Floors Add / floor 
Utilities, build grid, curb, sidewalk, etc...
S Modification to approved plans for As-Builts is at Time and Material Rate.
^ Endorsements to insurance certificates, requested by client, that carry fees will be additional to the contract
^ Need Civil AutoCAD File, PDF of City Approved Plan Set & Suivey Control Plan with Coordinate Data______
□ ________________________________
NOTE: 1) Contract Charges and all Outstanding Change Orders. Extra Billing And Reimbursable Expenses must
be paid prior to receipt of “As-Bullf' Drawings.
2) BID ITEMS INCLUDE: ONE set of stakes per structure or activity, providing line and grade, defined as an offset to 
centerline or edge of structure and reference benchmark elevation.
3) This bid may be subject to change, contingent upon review comments, if any.
FEES FOR SERVICES: DTOTAL LUMP SUM BID: ElTIME AND MATERIAL: ^ITEMIZED ABOVE
Total Contract $18,000 NTE
Initial
Lemme Associates AZ 
8607 N. 59“’ Avenue, B4, Glendale AZ 85302
C:\Users\Lynn-HP\Onedrive\Desktop\New Combined Contract Update 2-14-25.Doc
Phone:602 841-6904 
March 3, 2026, Page 1 of 2

Exhibit C.1, 2026-048-COS-A1, Page 13 of 55
CLIENT AND CONSULTANT AGREE AS FOLLOWS:
Client agrees to engage Consultant according to the terms of this agreement ("the Agreement").
1. Scope: Consultant agrees to perform the services set forth on sheet 1 Incorporated herein by this reference 
^Services"),
2. 
Compensation: Client agrees to compensate Consultant for its Services as noted hereon OR according to the 
schedule of payments If attached hereto as Exhibjt "B" and incorporated herein by this reference (''Schedule"). 
Consultant reserves the rijght to increase the fees set forth in Exhibit "A" at reasonable intervals. Endorsements to 
insurance certificates or additional coverage, requested by client, that carry fees will be additional to the 
contract.
3. 
Documentation: Client agrees to provide Consultant with any and all documents necessary to identify the 
ownership, location and condition of the Property, including, but not limited to, deeds, maps, title information, and 
permits; and to obtain for Consultant the authorization of the owner to enter upon the Property for the purpose of 
conducting Consultant's Services thereon.
4. Limitation of Liability: In recognition of the relative risks and benefits of the Project to both the Client and the 
Consultant, the risks have been allocated such that the Client agrees, to the fullest extent permitted by law, to limit the 
liability of the Consultant and Consultants officers, employees, owners and subconsultants for any and all claims, 
losses, costs, damages of any nature whatsoever or claims expenses from any cause or causes, including attorneys' 
fees and costs and expert-witness fees and costs, so that the total aggregate liability of the Consultant and Consultants 
officers, directors, partners, employees, shareholders, owners and subconsultants shall not exceed the Consultant's 
total fee for services rendered on this Project. It is intended that this limitation apply to any and all liability or cause of 
action however alleged or arising, unless otherwise prohibited by law.
5. 
Estimate Is valid for 30 days. Revisions to the bid set prior to 30 days may also affect bid cost.
6. Payment by credit card Is available upon request, there Is an additional 4% processing fee.
SCHEDULE OF FEES 
FOR TIME AND MATERIAL SERVICES
PRINCIPAL
REGISTERED PROFESSIONAL ENGINEER/SURVEYOR
INSPECTION & CONSTRUCTION MANAGEMENT
EXPERT WITNESS
CAD DRAFTING
CLERICAL / OFFICE SUPPORT
DESIGN PROFESSIONAL
FIELD SURVEY PARTY AND EQUIPMENT - SURVEY CREW 2 MAN
$275.00 PER HOUR 
$275.00 PER HOUR 
$225.00 PER HOUR 
$275.00 PER HOUR 
$100.00 PER HOUR 
$100.00 PER HOUR 
$225.00 PER HOUR
$225.00 PER HOUR
OTHER COSTS
MAP RECORDING PROCESS
FEES REQUIRED BY GOVERNMENT AUTHORITIES TO BE PAID BY CLIENT 
EXPEDITED SERVICES WILL BE BILLED 1.S TIMES THE CONTRACT RATES
(Lemme Associates always strives to provide our products/seryices in the most timely manner. Therefore, Expedited 
Service may require overtime for employees involved in the project. Expedited Service applies only to work performed 
by Lemme Assoc/a/es and does not Include any expedited Municipal Review)
IN WITNESS WHEREOF, the parlies hereby execute this Agreement upon the terms and conditions stated above 
and on the date first above written.
CONSULTANT:
CLIENT;
By: MARKSIDLRR
RLS 28232
By;
Title PRESIDENT
Date: 03/03/2026
suivey@lenime-eng.coni, maicus@leninie-eng.com
Printed Name:, 
Date: ______
Lemme /Vssociales AZ 
8607 N. 59“' Avenue, B4, Glendale AZ 85302
C:\Users\Lynn-HP\Onedrive\Desklop\NewComblned Conlracl Update 2-14-25.Doc
Phone:602 841-6904 
March 3, 2026, Page 2 of 2

Exhibit C.1, 2026-048-COS-A1, Page 14 of 55
Foiecast Outcome
PROJECT: Brown Ave Parking Structure 
BID ABSTRACTS FOR: Precast
rmm
Sub-Contractor 
Contact 
Email 
Phone 
Base Bid
Coreslab
Ryan Mohn
rmohn@cofeslab.com
$4,243,660
CH/\SSE
CHJ/M YM.: 'H.*.*;
602-679-1553
Fabricate, Delivef, and Erect
Included
10DT24
Included
ELL Beams
Included
SJIT Beams
Included
InL / Ext Columns
Included
10' Horiz. Shear svall
Included
Grade Spandrels
Included
to-Vert Shear VJall
Included
8" HoriLWall
Included
8- Vert Wall
Included
LB Spandrel
Included
NLB Spandrel
Included
Faux Columns
Included
Anchored Into the Top of the Existing C.I.P. Retaining Walls
Included
FL1 - Formliner Wood Plank Horizcxital Arch Polyrrrefs Cedar Staki
Included
FL2 - Formliner Wood Plank Vertical Arch Potymers Staggered
Included
Inlergal Color
199,770
MISCELLANEOUS:
Dismantle and Re-Erect Crane from 1st to 2nd Street
35,000
Textura Fee
5,430
Performance and Payment Bond
Add $29,050,
BID FORECASTED COST:
Anchor Bolt for Roof Level Light Pole
2,7S0
Night Shift Ught Tower
10,000
Bid Forecasted Cost Total GMP2:
$
252,9S0 $
$
s
$
Total GMP2 Budget: Base Bid r Bid Forecasted Costs
r
$4,496.6101
I
J

Lawrence Chan
Exhibit C.1, 2026-048-COS-A1, Page 15 of 55
From:
Sent:
To:
Cc:
Subject:
Ryan Mohn <rmohn@coreslab,com>
Wednesday, April 22, 2026 2:19 PM 
Adam Johnson
Richard Ballou II; Eric Loeffler; Tracy Schmuker; Mike O'Neil; Lawrence Chan 
RE: Brown Ave Garage - Council GMP1 Approval
CAUTION: This email originated from outside the organization. Do not click links or open attachments 
unless you recognize the source of this email and know the content is safe. CHASSE teammates will 
never be asked to purchase gift cards, change payroll information, share social security numbers, etc. via 
email.
Hello Adam,
Thank you for the call about the night time erect, no need for the daytime erect costs.
I have put together the cost to include integral color mix which will be in the brown tones. The dosage for the mix 
cannot exceed 5%, if the color chosen does exceed the 5% we will have to revisit cost. We typically have not seen 
the dosage for brown colors to exceed 5% unless it is very dark or a black/charcoal color. Please carry an add 
of......................$199,770.00
Thank you,
Ryan Mohn 
Project Consultant
CORESIAB.
STRUCTURES
(ARtZ) INC.
P. O. Box 18150 
Phoenix, AZ 85005
0:602-237-3875 Ext. 378 | C: 602-679-1553 | F: 602-237-3459 
rmohn@coreslab.com | coreslab.com
L'’t.r.’".::"'J
Building A Concrete Future (S)
O®
Conridentiality Notice: This email Is privileged and/or confidential, and the sender docs not waive any related rights or obligations. Any distribution, use, or copying 
of this email or the Information It contains by anyone other than an Intended recipient is unauthorized. If you received this email In error, please advise the sender 
by return email immediately and destroy all copies of the message.
1

3m
■LAB.
SraUdURES
(AltIZjINC
Exhibit C.1, 2026-048-COS-A1, Page 16 of 55
BROWN AVE PARKING GARAGE 
PRECAST BILLING PROJECTION
Description of Work
Scheduled
Value
Mar-26
Apr-26
May-26
Jun-26
Jul-26
Aug-26
Sep-26
Oct-26
Total
Previously Contracted
1 City Submittal
$ 
165,000
S 41,250
$ 
41,250
S
165,000
Remaining Contract Value
1
2
3
4
5
6
7
8
9
Remaining DnD 
Advance Material 
Plant Mobilization 
Fabrication 
Hauling 
Erection
$
$
$
s
$
$
242,000
750,000
75,000
3,126,160
235,800
561,100
$
4,990,060
$ 
750,000
S
80,700
$
80,700
S
80,600
$ 
75,000
$ 1,042,060
$ 1,042,060
$ 1,042,040 
S 117,900 
$ 280,550
$ 
117.900
$ 
280.550
$
S
$
s
$
s
$ 
791,250
$
41.250
$
80,700
s
80,700
$ 1,197,660
$ 1,042,060
$ 1,440,490 i 398,450
242,000
750,000
75,000
3,126,160
235,800
561,100
$
4,990,060
GC NOTE: CORESLAB WILL INVOICE PER THE PROJECTION UNTIL FABRICATION BEGINS. AT WHICH TIME VJE WILL INVOICE BASED ON PERCENTAGE
COMPLETE IN EACH CATEGORY
10
Additional costs If required
11 Textura Fee
12 Bond
S
5.430
$
29,050
13
Total Contract Value $5,155,060.00
3/3/2026

iariz)inc.
Exhibit C.1, 2026-048-COS-A1, Page 17 of 55
February 26, 2026
Mr. Eric Loeffler 
CHASSE Building Team 
230 S. Siesta Lane 
Tempe, AZ 85288
Project: 
2"‘‘ Street and Brown Ave. Parking Garage Expansion
Re: 
Precast Concrete Price
Gentlemen:
Coreslab Structures (ARIZ) Inc. proposes to fabricate, deliver, and erect the following items 
for the lump sum amount(s) listed.
BUDGET PRICE: Fabricate, Deliver, Erect..........................................$5,155,060.00
TEXTURA FEE: (If required).................................................................add $5,430.00
PERFORMANCE AND PAYMENT BOND (If required).................. add $29,050.00
(If required, bond will be provided on a standard AIA forin)
PRECAST PRODUCT
10DT24
ELL Beams
SJIT Beams
Int. / Ext. Columns
10” Horiz. Shear wall
Grade Spandrels
10” Vert Shear Wall 
8” Horiz. Wall 
8” Vert. Wall 
LB Spandrel 
NLB Spandrel 
Faux Columns
PRECAST SCHEDULE
Notice to Proceed (City Submittal Only)................ 12-04-24
Design Development...............................................Complete
Shop Drawings & Calcs......................................... 4-30-26 City Submittal
Advance Materials.................................................3/13/26
City Submittal Approvals....................................... 6/30/26
Mold Set Up...........................................................7/20/26 - 7/24/26
Fabrication..............................................................7/27/26 - 9/14/26
Field Prep Work..................................................... 8/24/26 - 9/14/26
Erection (30 Days)................................................. 9/14/26 — 10/26/26
MAILING: P.O. BOX 18150 • PHOENIX, ARIZONA 85005 
5026 SOUTH 43RD AVENUE • PHOENIX, ARIZONA 85041 • (602) 237-387 5 • (602) 237-3459
ARIZONA • ARKANSAS • CALIFORNIA • CONNECTICUT • FLORIDA • GEORGIA • INDIANA 
KANSAS • MISSOURI • NEBRASKA • NEW MEXICO • OKLAHOMA • ONTARIO • SOUTH CAROLINA • TEXAS

i
2"^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26,2026
Note; In order for Coreslab to commit to the above precast delivery schedules, it is 
imperative that the Contractor meet the milestone dates indicated. Should for any 
reason, these dates not hold, there will be cost and schedule impacts to the job. If 
durations only are given above, they are for planning purposes only. Specific project 
schedule by mutual agreement.
Production Availability: Seller notes that as of this proposal date we have the capacity 
to provide product in accordance with the dates shown above. Available casting space 
is filled on a firct come first served basis and cannot be held or booked until there is an 
executed contract in place.
CLARIFICATIONS
1. This proposal is based on 100% DD drawings prepared by DFDG Architecture 
dated 2/4/26. Any duplication of the drawings and/or sketches and clarifications 
in whole or part for use pn any other project or for the completion of this project 
by others is strictly prohibited without the written permission of Coreslab 
Structures (ARIZI Inc.
2. The precast shear walls as indicated on the structural drawing provided by 
DFDG, will be anchored into the top of the existing G.I.P, retaining walls to 
transfer the diaphragm loads to the foundations. The C.I.P. walls may need to be 
thickened and reinforced down to the spread footings as needed to resist the 
added loads to be done by others. PK Associates to determine the structural 
capacity of the existing CIP retaining walls.
3. The precast is indented at the existing stair and elevator shafts, no precast shafts 
are included. All other walls including Stairs, elevators, electrical, mechanical 
and bathroom walls are by Chasse. Prior to the erection of the precast 
components the existing restroom may require demolition of the roof and or 
parapet and replaced by Chasse due to headroom clearance.
4. Chasse to expose all embeds on the precast columns and CIP walls for the new 
precast components to connect to existing. This includes removal of other 
materials including CIP pilasters, light poles, canopy system etc. The CIP walls 
will need drilled and epoxy connections and dowels for the precast shear walls 
to connect to, located and installed by Coreslab. This is the field prep work 
within the precast schedule for 3 weeks before we start erecting precast.
5. Chasse to expose the deck connections of the existing NLB closure spandrel so 
Coreslab can cut, remove, and demolish the spandrel.
6. The second level has a height requirement of 15’-0” clear for the trucks to drive 
through the garage. The precast system wjll use flat slabs and shallow exterior 
spandrels in the center narrow bay for the clear height.
7. The proposal includes LB and NLB spandrels with top of spandrel being 3’-10 
1/2” above the topping slab. A handrail system will not be required on top of the 
typical parking level spandrels. If the top of spandrels are not at 3’-10 1/2” above
Exhibit C.1, 2026.048.COS-A1, Page 18 of 55
2

2'*' Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26,2026
the topping slab a handrail will be supplied and installed by others, in certain 
areas.
8. The proposal includes a wood board form liner in the exterior walls and spandrels 
as shown in the 100% DD drawings prepared by DFDG Architecture dated 
2/4/26. The precast concrete is to be structural gray concrete ready to accept 
paint/stain by Chasse. There is no formliner within any precast columns. 
There will be no thin set brick cast in the precast, any and all brick must be 
supplied and post applied by others.
9. Any overhead powerlines must be de-energized and moved to allow for the crane 
to operate safely and efficiently.
10. Any existing art on site must be removed prior to the start of erection of the 
precast. Coreslab will need lift access around the perimeter of the structure to 
make connections. If the art is unable to be temporarily moved it must be 
protected in place by others. Other methods of accessing the garage to make 
connections over the art i.e. scaffolding will be supplied by Chasse.
11. The proposal includes incorporating roof level light pole anchor bolts and 
conduit. Coreslab to coordinate with the electrical sub-contractor for 
locations/specs of anchor bolts and conduit (provided by electrical sub­
contractor).
12. A complete special site survey and or as built of the structure to be by Chasse.
13. Critical Drainage Note: In order to maintain headroom clearances on all levels 
the drainage slope must occur on all levels and match.the existing slopes.
14. Minimizing the disruption to the adjacent businesses Coreslab recommends 
erecting the structure during a nightshift. Note, crane will need to be located in 
the streets on the North (!*' St.) and South (2"'* St.) which would require street 
closures during operation (3 week duration on north and 3 week duration on 
south). We will utilize “Just-in-time” truck deliveries for the erection of the 
precast components.
15. During the construction of the double tee units, Coreslab shall implement a 
controlled access zone in accordance with OSHA requirements for fall 
protection. During this time, the entire deck will be a "Controlled Access Zone" 
and no other activity allowed. Infringement and stockpiling of materials or 
equipment will not be allowed in this zone, until all of Coreslab's work is 
completed and the deck released to the General Contractor.
16. Fall Protection Plan - 100% tie off will be used by all field employees when 
working within 6' of an unprotected edge, outside of the controlled access zone, 
and where the fall distance is 6' or greater to the lower level except for the 
following. Unloading Precast Products Delivered to the Jobsite - 
Conventional fall protection is infeasible and creates a greater hazard when 
accessing precast products delivered on trailers. Therefore, Coreslab will only 
allow trained employees to access the product on the trailer for the time necessary 
to complete the rigging activities. This plan establishes that employees are to
Exhibit C.1, 2026-048-COS-A1, Page 19 of 55
3

2"^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
Febniary 26,2026
access the precast product only for the time necessary to attach or detach rigging 
and position dunnage, no other activity is allowed or pennitted. Employees who 
access the trailers will not be tied off while performing these tasks.
17. This proposal is based on Coreslab standard framing details.
18. This proposal is valid until 3/31/26.
PRODUCT FINISHES
This budget assumes a COMMERCIAL GRADE finish for the precast concrete on 
all interior surfaces. A COMMERCIAL GRADE finish defined as an "as cast" 
finish. The surface will contain air holes ("bug holes") and water marks and there 
may be some minor chips and spalls. There may be some scaling and/or scouring. 
There may be patches and streaks of color variation within the surface, and the 
overall color tone may vary between pieces. There may be form marks due to joints, 
dents or holes in a steel form, or knots and grain from a wooden form. Large fins 
from joint bleeding removed, but small fms may remain. Only "honeycombed" 
and/or badly spalled areas will be repaired or finished. Maximum allowable form 
joint offset is 3/16 inch [5 mm]. Hairline (less than 0.006 inches [0.15 mmj) cracks 
due to drying shrinkage will not be filled.
Double Tees:
A steel form finish on underside.
Spandrels and Walls: Exterior finish is smooth form finish to accept paint or stain.
Interior finish is light broom for spandrels and steel trowel for 
walls.
Concrete Materials:
Portland Cement: 
Type II
Sand: 
Salt River
Coarse Aggregate: 
Salt River
INCLUSIONS
1. Embeds and dowels for the cast-in-place walls and precast components to which 
the precast panels are connected. Field located, drilled and epoxy anchors.
2. Column anchor bolts welded to existing column cap plates.
3. All miscellaneous steel items embedded in the members and used for fastening 
the members together.
4. Welding of all precast elements to each other.
5. All exposed lift points to be concealed by industry standard swift-lift covers.
6. Bearing pads for precast products.
7. Structural grouting or drypacking of column bases and horizontal wall joints.
Exhibit e.1, 2026-048-COS-A1, Page 20 of 55
4

2"^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26,2026
8. One move into the job for the erection of all members with a conventional crane 
has been included in this proposal. Additional move-ins that are attributable to 
the Contractor will be charged at $45,000 for each occurrence.
9. Coreslab Structures (ARIZ) Inc. warrants the precast/prestressed concrete work 
for one year from the date of substantial completion.
10. Transportation of products to the jobsite in a clean final condition and installation 
of precast products during night time hours, Monday through Friday.
OPENINGS
Openings not shown on drawings and 12” or larger will be individually priced and
charged to the General Contractor. Openings less than 12” need to be field cut/cored
by the trade requiring them. Coreslab engineering must approve field cut/cored
openings.
EXCLUSIONS
1. Any precast items not listed above
2. All anchors, hardware, reinforcing steel, hangers, steel header angles, anchor 
bolts and/or shoring required by Contractor and/or Engineer's design requirement 
and not shown within Coreslab development drawings.
3. Miscellaneous material for other portions of construction
4. Structural or miscellaneous steel of any kind (other than that included above)
5. Cast in items for other trades
6. All cast-in-place concrete and pour strips
7. Caulking, sealants, or waterproofing
8. Street cleaning or track out of any kind
9. Dust control, specifically water truck and/or driver
10. Painting or staining of any precast concrete
11. Openings (other than included above)
12. Retrafitting of designated CIP foundation and Cl P retaining walls as ‘new’ shear 
wall locations.
13. Painting or galvanizing of any steel enibedments. Any stainless steel.
14. Fireproofing
15. Firevvatch, no specific firewatch personnel is included within this budget
16. Full time, onsite, designated safety monitor
17. Liquidated, actual and/or other damages of any kind
18. Cost of performance or materials payment bonds
19. Peririits of any kind: street, building etc. (except our own truck and crane 
movement permits)
20. Traffic control at/or near the jobsite, lane closure, securing of site
21. Any delivery equipment safety spotters; Haul/transportation drivers are 
responsible for safely moving their loads from the staging area to the crane pick 
location.
22. Truck/trailer staging area
Exhibit C.1, 2026-048-COS-A1, Page 21 of 55
5

2"^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26, 2026
23. Cost of plant and/or field inspection and testing (Coreslab is a PCI Certified Plant 
and PCI Qualified Erector), Any inspection or testing beyond PCI 
recommendations, specifically oiitside/third party or materials source inspection.
24. Repairing or cleaning Coreslab products damaged by others
25. Joint treatment required to receive topping application
26. Field cut openings
27. Treatment of underside of joints between slabs
28. FAA study or FAA crane operational permit
29. Establishment of building control lines
30. Labor and equipment premiums associated with other than night time working 
hours.
31. Composite clean-up crew
32. Protection of work; Risk of loss or damage of the precast members passes to the 
Owner and or Contractor once the members are attached to the structuro unless 
such loss and/or damage is caused by acts or omissions of this subcontractor.
33. Sales tax
GENERAL CONTRACTOR PROVIDED ITEMS
1. Controlling Dust and Respirable Crystalline Silica
The General Contractor shall be responsible for controlling dust (which may 
include respirable crystalline silica) on the project regardless of its source(s) 
including, but not limited to, windblown onto the site, generated by truck and 
equipment travel regardless of who is operating the truck or equipment or 
generated by other parties. Coreslab Structures shall only be responsible for 
control of dust generated by the performance of its work activities such as cutting, 
sawing, drilling, grinding attaching, patching, or altering the precast.
Coreslab Structures shall have the right to stop work and restrict access to the 
affected area(s) under the applicable OSHA standard if it can demonstrate, 
through appropriate monitoring devices or other methods, that the dust being 
generated is or is anticipated to be in excess of OSHA requirements related to 
total dust or respirable crystalline silica.
Any civil penalties imposed by OSHA or other regulatory bodies against 
Coreslab Structures due to non-compliance with the dust standards and due to no 
fault of Coreslab Structures shall be the responsibility of the General Contractor.
2. Firm, level and clear all-weather access for delivery and erection equipment 
under their own power. An unobstructed working strip 65 feet wide will be 
required adjacent to the foundation and north and south side street access of the 
building. Any power line closer than 10 feet to the operating radius of the crane 
required for erection shall either be moved or the power shut off. Any ramp 
required for access of delivery and/or erection equipment will be an 8% or less 
slope and of sufficient width to safely operate all equipment. Coreslab Erection 
Department will approve all site conditions prior to authorizing the start of any 
field operations.
3. Traffic control if required during delivery and/or erection at/or near the jobsite.
Exhibit C.l, 2026'048-COS-A1, Page 22 of 55
6

2"“* Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26,2026
4. Building control lines, corner points, and gridlines to be provided by the 
Contractor. If a gridline exceeds 250’ in length. Contractor to provide 
intermediate control lines. Column centerlines and control lines marked on top 
Of the foundation. Top of the foundationmust be clean of dirt and debris.
5. Clean, level bearing surfaces free from all water, mud, and other obstructions at 
the proper elevation to receive Coreslab components. Where bottom of precast 
members occur below grade, excavations must provide a minimum of 2’ clear to 
any anchor bolt or welded connection.
6. Coreslab will assist in the coordination of foundation embedments and will 
inspect their placement, after cast and prior to precast erection. Any out of 
tolerance embeds will be brought to your attention for correction.
7. Unobstructed lane access.
8. All safety barriers, opening covers or any other safety measures required by 
OSHA or other safety regulatoi-y agency.
9. Adequate protection of curbs, sidewalks, or asphalt to prevent damage caused by 
Coreslab’s heavy trucks and crane.
10. Prep & exposure of existing precast members for ‘new’ connections.
11. Retrofitting of any existing foundation/retaining walls.
DRAFTING, DESIGN AND APPROVALS
This proposal is based on Coreslab’s standard design, manufacturing, and installation 
criteria. Coreslab will provide member design and shop drawings. Approved shop 
drawings shall constitute the extent and scope of work required by Coreslab under 
this Agreement. Coreslab will not manufacture any product until approved shop 
drawings have been received.
QUALITY ASSURANCE
All of the precast/prestressed concrete in this proposal shall be fabricated in 
accordance with PCI MNL-116.
FALL PROTECTION PLAN
100% tie off on the structure will be used by all field employees when working wjthin 
6' of an unprotected edge, outside of the controlled access zone, and where the fall 
distance is 6' Or greater to the lower level.
Unloading Precast Products Delivered to the Jobsite 
Conventional fall protection is infeasible and creates a greater hazard when 
accessing precast products delivered on trailers. Thei'efore, Coreslab will 
only allow trained employees to access the product on the trailer for the time 
necessary to complete the rigging activities. This plan establishes that 
employees are to access the precast product only for the time necessary to 
attach or detach rigging and position dunnage, no other activity is allowed or 
permitted. Employees who access the trailers will not be tied off while 
peiforming these tasks.
Exhibit C.1, 2026-048-COS-A1. Page 23 of 55
7

2"^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26,2026
PAYMENT TERMS
Monthly progress payments required for drafting, design, mobilization, fabrication, 
delivery, erection, and any other work performed during the preceding month. 
Specifically included are pieces fabricated and stored in Coreslab’s yard.
Retention reduced to 5% upon 50% completion of our work. The final release of 
retention is due within 30 days of the end of the project. For residential wrap precast 
parking structures, the final release of retention is due within 30 days of substantial 
completion of the precast structure portion, not the adjoining apartments.
Adherence to the terms and conditions of Arizona’s Prompt Payment Act required for 
both monthly and final payments.
ADDITIONAL INSURED AND INDEMNITY PROVISIONS
Additional insured coverage is to be furnished by an insurance certificate.
Indemnification shall be limited to the extent of bodily injury and property damage 
caused by the negligent acts or omissions of Coreslab Structures (ARIZ) Inc. or by 
anyone employed directly or indirectly by them during the performance of their 
work. In no event, shall Coreslab Structures be required to defend, indemnify, or 
hold harmless any Indemnitee for any negligent acts or omissions of an Indemnitee.
If a subcontract is issued in lieu of signing this proposal letter, the contract indemnity 
clause must read:
“To the fullest extent permitted by law. Coreslab Structures (ARIZ) Inc. shall 
indemnify, defend and hold harmless the General Contractor, Owner, 
Architect/Engineer, Architect’s Engineer’s consultants, and agents and 
employees of any of them (hereinafter referred to as “Indemnitees”) from and 
against claims, damages, losses and expenses, including but not limited to 
attorney’s fees arising out of or resulting from the performance of the Work, 
provided that such claim, damage, loss or expense is attributable to bodily injury, 
sickness, disease or death, or to injur>' to or destruction of tangible property (other 
than the Work itselO, but only to the extent caused by the negligent acts or 
omissions of Coreslab Structures (ARIZ) Inc., anyone directly or indirectly 
employed by Coreslab Structures (ARIZ) Inc., or anyone for whose acts Coreslab 
Structures (ARIZ) Inc. may be liable, regardless of whether or not such claim, 
damage, or expense is caused in part by an Indemnitee. In no event, however, 
shall Coreslab Structures (ARIZ) Inc. be required to defend, indemnify, or hold 
harmless any Indemnitee for any negligent acts or omission of an Indemnitee.”
NOTE: This is the only language we will accept regarding indemnification, in a 
subcontract.
Exhibit C.1, 2026-048-COS-A1, Page 24 of 55
$

2"“* Street and Brown Ave Parking Garage Expansion - Budget Proposal 
Febniary 26,2026
CONTRACT TERMS
If the project Prime Contract is not available at time of bid or budget, Coreslab 
requires the opportunity to address scope, schedule, and terms accordingly.
Final contract is subject to review and comments by Coreslab prior to signature.
No offset clauses will be accepted. This contract shall address this project only, 
without reference or accountability to any other project(s).
Coreslab provided tools and equipment are the exclusive property of Coreslab.
If required. Coreslab’s Professional Liability insurance policy limit is $2,000,000 per 
claim and $2,000,000 in the aggregate per year.
Any cancellation of contract for convenience shall entitle subcontractor to collect for 
Plant Overhead (burden) and lost profit for the duration of time that project would 
have been in Seller’s plant.
GENERAL CONTRACTOR TO CARRY "BUILDER'S RISK"
This proposal is based upon the General Contractor or Owner carrying full coverage 
"Builder’s Risk" on the entire project to which this proposal applies, at ho expense to 
Coreslab. The General Contractor will provide evidence of such coverage to 
Coreslab prior to any product being delivered to the jobsite.
Coreslab agrees to hold the General Contractor harmless for property damage and 
bodily injury which results from, arid which is limited to, acts of negligence on the 
part of Coreslab, its employees, agents, and subcontractors. However, the General 
Contractor agrees to take all necessary protective measures to prevent damage to 
utilities, footings, foundation walls, curbs, sidewalks, driveways, and concrete or 
asphalt paving and to release Coreslab from liability for such damage that occurs. 
Every effort will be made by Coreslab crews to ayoid such damage.
REMEDIAL WORK
Coreslab using its own specialists and workers shall perform remedial jobsite work. 
No backcharges will be accepted unless authorized in writing by a representative of 
Coreslab. If so authorized, invoicing of complete charges must be received in its 
office within 15 days of completion of the work.
UNFORESEEN DELAYS
Coreslab will not be liable for delays in the fabrication of delivery of materials as a 
result of fire, labor difficulties, transit loss or damage, non-availability of supplies 
from usual sources, acts of God, or, without limitation by the foregoing, any causes 
beyond Coreslab’s reasonable control.
Exhibit C.1, 2026-048-COS-A1, Page 25 of 55
9

2’^ Street and Brown Ave Parking Garage Expansion - Budget Proposal 
February 26, 2026
This subcontract shall not be assigned without tlie written consent of Coreslab. A formal 
purchase order or contract submitted must stipulate: "Terms and conditions set forth in 
Coreslab's proposal of Februaty 26, 2026." Coreslab reserves the right to reject any 
subcontract tendered which is inconsistent with terms outlined herein.
We thank you for the opportunity of submitting this proposal.
Sincerely,
CORESLAB STRUCTURES (ARIZ) INC.
Ryan Mohn 
Project Consultant
Exhibit C.1, 2026-048-COS-A1, Page 26 of 55
to

forecast Outcome
PROJECT: Brown Ave Parking Structure 
BID ABSTRAaS FOR: Stone Veneer
CH/\SSE
Sub-Contra<tor
Contact
Re-Create
Rocky Boydston
Slone Ciafters
Tony lewis
Stonecold
Rem Maroney
Emali stontSfecfeateconioanieslewist^ctonecrafters.rocks
Phone 
Base Bid
4B0-492-88SS
$230,02$
602-717-9991
$161,700
(623) 385-7111
$320,600
BRICK VENEER:
Sheet A301/A302
8R1 - Brkk Veneer Colorado Stone Adobe Brick - Saltillo
9S,000
110,000
Included -6,140 SF of
Fl^
6R2 - Brick Veneer Soldier Course Colorado Stone - Saltillo
Included
Included
Included
Columns
Included
48,384
Included - 655 LF ol
Corners
End Stone/Brkk Veneer at Inside Comers
Included
Induded
Included
flashinos Per Specs (047300 Spec)
GFRC:
Add Alternative $520,385
Add Alternative
$727,075
Add Alternative
$727,075
Sheet A301/A302
GRFC) Window Header (4lt tong)
Gf RC2 Window Sill (411 long)
Alternative Add - 15LF
Alternative Add-72LF
Alternative Add - 22LF
Alternative Add - 107LF
GFRC3 at Column - 5 & 7 & 8/A801
Alternative Add - 90EA
Alternative Add
6RFC4 Comice at Parapet - 1/A801
Ahemathre Add - 565 LF
Alternative Add - 6001F
Boom lift to Install GFRCs
Add Alternative $15,000
Add Alternative
$15,000
Add Alternative $15,000
GFRC Cornice at Parapet Support b. Clips System
Add Alternative $150,000
Add Alternative
$150,000
Add Alternative
$150,000
BID FORECASTED COST:
PEDESTRIAN PAVERS:
Repair/ New Concrete Pavers at Canopy Sidewalk Area after 
Con^tfuclion MQOX of Tola! Bmwn Ave^
91.764
91.764
91.764
VEHICULAR PAVERS:
Sh«etC102
New Concrete Pavers Per MAG STD OET225 (Match Existing)
5,440
5,984
5,984
CLARIFICATIONS EXHIBIT:
GMP2 excludes GFRCs - window sill, column top 8r base.
comice and corbels Includes as Foam with EIFS.
VE's:
GFRCs ILO Stucco EIFS - ADO
685,385
692075
892,075
Bid Forecasted Cost Total:
$
192.204 
$
256,132 
$
97,748 $
$
Total Budget: Base Bid + Bid Forecasted Costs
$422,2291
$417,8321
$418,3481
I
Exhibit C.1, 2026-048-COS-A1, Page 27 of 55

Proposal/Sales Agreement
219 W Lone Cactus Rd 
Phoenix, AZ 85027 
P: 602-717-9991
ROC #310561 
www.stonecrafters.rocks
Proposal Date:
Proposal number:
Authored by:
4/23/26
3
RD
Name;
Contact;
Phone;
E-mail;
Project:
Re:
Chasse Building Team 
Lawrence Chan 
323-350-7034 
lchan(®chasse.us 
Brown Avenue Parking 
Revised Plans
Proposal:
Per plans dated: 
Expiration Date: 
Location:
Brick Veneer 
A/9/26 
S/23/26* 
Scottsdale
If you provide a current 5005 form to StoneCrafters then sales tax will not apply to this proposal.
If you do not have a 5005 sales tax form then applicable sales tax based on current rates DURING TIME OF WORK will be applied.
1-6
Description - Per Highlighted Exhibits:
Coronado - Adobe Brick/Saltillo 
Option: Return at windows
Option: CD! VE Caps & Corbels* (see attached Specs) 
Galvanized fastners bid instead of frame
*
$157,500.00
$4,200.00
$155,000.00
*lf, during the performance of the contract, the price of the material increases, 
or fuel surcharges are incurred, the price shall be adjusted 
by an amount necessary to cover the price increase.
♦♦♦MATERIAL DEPOSIT IS 50% OF THE PROJECT TOTAL AND IS REQUIRED TO ORDER MATERIAL^*^ 
Following pavment(s) due as follows: Payments not received within 30 days of Invoice shall be entitled to interest on all 
outstanding balances at the rate of 11/2% per month, commencing with the due date.
Price includes;
1. Over prepared substrate by others, plumb & square
2. Painted substrate will Incur additional expense
3. Coronado - Adobe Brick/Saltillo
4. Use of stucco contractor's scaffolding
Price excludes:
1. Substrate preparation
2. Waterproofing, Sealer, Caulking
3. Backer Rod
4. Sales Tax
5. StoneCrafters scaffolding
Grout joint 
Drystack 
Mortar color
1/2"
No
Grey
StoneCrafters IIC is not responsible for any color variations, and/or discrepancies which may occur In the manufacturing process. 
Sample boards do not depict the percentage of color and/or shapes of stone.
All stone debris associated with this project to be thrown away by StoneCrafters employees Into a customer provided dumpster.
StoneCrafters LLC
Date
Builder
Date
Exhibit C.1, 2026-048-COS-A1, Page 28 of 55

Exhibit C.1, 2026-048-COS-A1, Page 29 of 55
Hii
RE-CREATE
COMPANIES
PROPOSAL
TO
Chassc Building Team 
2400 W Broadwuy Rd 
Mesa, AZ 85202 
P: 480-425-7777 
F: 480-425-7780
PROJECT
Brow-n Ave. Parking Garage 
7234 E. 2nd St 
Scottsdale, AZ8525I
DATE
5/18/2026
PROPOSAL # 
24145
Description
Qiy
Rate
Total
Per 75% CD Set Dated 4.9.26
Brick Veneer
1 
230,025.00 
230,025.00
9350 sf
Using Coronado- Adobe Brick- Saltillo
♦♦Note- Alot of the details that are developing with the soldiering, projections and ubat looks to be 
brick caps are lacking and not included. Also this is a manufatured thin brick there will be alot of 
limitations and inabilty to achieve where the design is headed. I can be availible upon request to 
join a design meeting and assist.
GFRC- Qty Below N ITi
GFRC- Cornice & Cop 1/A80I- 565 If
GFRC- Corbie- 1/A801- 90ea
GFRC- 2'4" Column Base - 2-4/A801- 76 lf(32ea)
GFRC- Capital- 7&8/A80I- 15 ea 
GFRC- 2’ w- Column Recess Face - 6&7/A80I- 613 If 
GFRC- SILL- 2/A702- 72 If 
GFRC-L1NTEL-6/A70I- 15 If
♦♦NOTE- Penetrating all of the Structural Concrete w/ Drilled Anchors & Ties Is Not 
Reccomended. Current Material for GFRC Allowance NTE $200k (alot of missing elevations and 
details in question)
1 
520,385.00 
520,385.00
TOTAL
Proposal by; Rocky Boydston, Estimator. Email: rboydston@recreatecompanies.com 
All proposals are valid for 30 days. ROC257825
CREATIVE MASONRY / PAVER CREATIONS / RE-CREATIONS CUSTOM-STONEWORKS 
phone: 623.780.4771 fax: 623.780.46S5 
2710 W Foothill Drive, Phoenix, AZ 85027

Exhibit C.1, 2026-048-COS-A1, Page 30 of 55
a
RE-CREATE
COMPANIES
PROPOSAL
TO
Cliasse Building Team 
2400 W Broadw'ay Rd 
Mesa, AZ 85202 
P: 480-425-7777 
F: 480-425-7780
PROJECT
Browm Ave. Parking Garage 
7234 E. 2nd St 
Scottsdale, AZ 85251
DATE 
PROPOSAL #
5/18/2026 
24145
Description
CMU
99 If X 22'8" ht- L2-Roof- Stair 1 & Elevator (areas & heights unclear & conflicting) 
I8lfx I0’4'’ht- LLStair2- 1I4/S502-MVV1 
17 Ifx I0'4"ht-LL Elevator* Stair I-INFILL
Using Grey CMU. #5 V @ 32". #5 BB @ 40", Solid Grout, Drill Epoxy
CMU Infill & Repair
2 ca- 4'4" ht- Window Infill- 225/S603
52 Ifx 8" ht- New Lintel- 224/S603 (Includes Angle)
10 ea CMU Shell Face- CMU Crack Repair- I33/SR903
Paver Repair
Crosswalk Pavers- NTE 150 sf- per Cl02 
Us ing $5/sf Paver Allowance
Qty
Rate
Total
1 
101,420.00 
101,420.00
I 12,265.00 
12,265.00
1 
5,440.00 
5,440.00
TOTAL
Proposal by: Rocky Boydston, Estimator. Email: rboydston@recreatecompanies.com 
All proposals are valid for 30 days. ROC257825
CREATIVE MASONRY / PAVER CREATIONS / RE-CREATIONS CUSTOM-STONEWORKS 
phone: 623.780.4771 fax: 623.780.4655 
2710 W Foothill Drive. Phoenix, AZ 85027

Exhibit C.1, 2026-048-COS-A1, Page 31 of 55
HE
RE-CREATE
COMPANIES
PROPOSAL
TO
Chassc Building Team 
2400 W Broadway Rd 
Mesa, AZ 85202 
P; 480-425-7777 
F: 480-425-7780
PROJECT
Brown Ave. Parking Garage 
7234 E. 2nd St 
Scottsdale, AZ 85251
DATE
5/18/2026
PROPOSAL # 
24145
Description
Qty
Rate
Total
Does Not Include Tlie Following:
Pollution Liability Insurance, Proressional Liability Insurance, Wall Bracing/Shoring, Footings, 
Demo, Mortar Wash, Stucco, Lath/Scratch/Brown, Paint, Purging, Door/Window Frames, Precast, 
Latex Modified Mortar, Bonding Agents, IWR, Dr>'-Bloc, Plasticizer, VaporAVater Barrier, Water 
Proofing, Miscellaneous Metals, Flashing/Rcglets, Sealants, Caulking, Insulation, Repair of 
Existing Conditions, Pavers, Trash Haul off. No More Than 2 Mobilizations, Cooled Water, 
Wetting Walls, Shading or Fog Spraying at High Temperatures (T&M Rates Will Apply), Coring, 
Drill/Dowel/Epoxy, Crane, Providing/Hauling Water, Washout Basin, Providing Embed 
Contponents or Sleeves, Installing Embeds/Beams Greater Than 200 Pounds, Dtypacking Embeds, 
Post Installed Anchors, SWPPP, Engineering for scalTolding, As-Builts, Shop Drawings, 
Engineering, Design, Testing, Special Inspections, Just in Time Delivery, Trnfiic Control, Parking 
Fees, Bonds, Permits, Overtinte, Tax, Prevailing Wages, Per Diem, Liquidated Damages, Any Items 
Not Mentioned In Scope Above. TItis estimate is submitted as a package, if not awarded in full 
additional costs may apply.
NOTE:
This project may be aftecled by lariffs on construction materials, which can lead to increased costs 
depending on wlien tliis proposal is accepted
0.00
0.00
TOTAL
$869,535.00
Proposal by: Rocky Boydston, Estimator. Email: rboydston@recreatecompanies.com 
All proposals are valid for 30 days. ROC257825
CREATIVE MASONRY / PAVER CREATIONS / RE-CREATIONS CUSTOM-STONEWORKS 
phone: 623.780.4771 fax: 623.780.4655 
2710 W Foothill Drive, Phoenix, AZ 85027

Exhibit C.1, 2026-048-COS-A1, Page 32 of 55
416 W. Lone Cactiu Drive
Phoenix, Arizont 85027
Office 623-385-7110
AMCA
Fax 623^385-7120
BUDGET
Project Name: Brown Avenue Parking Garage
Bid Date: 5/13/2026 
Bid Time: 1:00pm Addenda Noted: 
None
Plan Date: 
4/9/2026 75% CD drawings 
Spec Section(s): 
4000
Thin brick - $320,600.00
GFRC Sills, Headers, Cornice, Columns, Corbels - $727,075.00 
....
Add to use boom lift for all GFRC Installation ADD:$ 15,500.00 (Not Included in base bid)
*Special Remarks: 
Budget pricing only
* Price* are Hrm for thirty (30) day* for the performance of all MASONRY work covered by the plana & apecincatlon*. Thl* bid la 
subject to the acceptability of the subcontract term & conditions; and, Incorporated Into the subcontract of this Bid Form as an 
attachment.
Inc. Exc. Place
Inc. Exc. Place
X
X
IT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Medium weight CHU per specs 
X Normal weight CMU per specs 
Integral color CMU 
Dryblock additive In block, mortar 
X Architectural precast/cast stone 
X Orout In masonry walls only 
X Control joint 
X Brick
Eftlorescence removal after Initial 
cleaning
X Shoring for masonry lintels 
Hollow metal frames 
X Set & grout hollow metals
frames, at time of construction 
Dry packing for masonry imbeds
____ Wall bracing:
Engineering for wall bracing 
Deadmen for wall bracing 
Trash & debris clean up 
Trash removal from job site 
Floor Protection 
Layout for other trades 
Engineering, surveying layout of 
building corners 
Dust control of job site 
Masonry shop drawings 
Testing U Inspection cost 
Hot b Cold weather protection
X
X
X
X
X
X
IT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Rebar for masonry wall* 
Horizontal wire reinforcement 
Foam, Loose fill Insulation 
Stone
Stone shop drawings, engineering
Faux stone
Faux atone substrate
Relief angles
Steel imbeds, streps
Steel lintels (Under 200«)
Anchor Bolts 
Regie t 
Flashing 
Building paper 
Caulking
Compressible filler, flresafelng
Paint, staining, waterproofing
Stucco
Footings
Demolition
Hard Dig
Over excavation/compactlon 
Spoils removal/flnish grade 
Bond Premiums 
Sales tax, permit fees 
Furnishing sanitary facilities 
"welding
Prevalilng/Davls Bacon Wages
Additional Conditions: Adequate access (no open trenches)
Potable water made available 200' from bulldlng/work
The following Items not exceeding 20011 will be Installed by masons as masonry Is being built! rebar, 
bolts, steel lintels, beam seats, weld plates, flashing, reglet, wall penetrations required by other trades.
Submitted by:
^Ron Maroney, Estimator
Direct Line 623-385-7111 
Ron'astonecoldmasonrv.com
t4c«nM0 Numbera 
AZ*142638
CA8946771
NM9364110
02376230111930
NV*74264
Monatcu-y Unlimited 
Vn7640897‘5801

Exhibit C.1, 2026-048-COS-A1, Page 33 of 55
Fofgcait Outcome
PROJECT: Brown Av* Parking Structura 
BID ABSTRACTS FOR: Stael
CH/\!
ir=
/ V//;- i I '!/ /
Sub-Contractor
Contact
Alignment
Greg Leavttt
Amber Steel
SBtH Steel
Southwest
Mctabmithf Inc
W&W
Roy Hunt
Email ^£rt@dli«nmen^te^
Phone____^480-645 0134
Base Bid
Jacob Odden
QTY
UM
$
$549,300
480-793-6420
iacob^shstcelar com
Jim Toney
MicKaetGilUrd
‘nevj&swmetaUmiths.co
$436,140
(218) 341.026S
214-S48-8273
rnkha^l.l>vv ws.com
480-966-9427
$753,652
KOT BIDDING
NOT BIDDING
PARKING GARAGE:
Sheet A301 &A302
Decofalive Steel Railing €>2’ High
400
IF
US
Induded
kKtuded
IrxkxJed
SheetA402& A701 &A702
V/rooght Iron \Vind<y,v Guard - 1/A402 - 7S% CO
7
EA
VAought Iron VAndo-M Guard • 9/A701. !& 4/A702 - 7S% CO
6
EA
1.000
4,130
Induded
1,000
Included
3.899
Induded
Induded
Sheet A500 & 2/S801 Steel Stair Framing
North Stair 1 (4 levels)
8 Flights
Induded
Induded
Induded
East Stair 2 (4 levels)
Stair Ra ling & Handrail Support Q 11&U&U8(16&/AS10 - 7S% 
CD 
8 Flights
Induded
Included
Induded
Ir^uded
Irtduded
Induded
Handrail at Top Landing gl0/A510 - 7S% CD
Ir^uded
Induded
New lO’A'er level Ramp Har>d Rarhng & Guardrail 
ASOO - DeUil 1/8/9/10-75% CO
39
Lf
13S
Included
Irsduded
Induded
Induded
Sheet AS10-7S%CO
Elevator Pit Ladder & 1/AS10 • 75%CO
1
FA
2.S00
Induded
Induded
Induded
Elevator Sump Pit - Sted Plate Grate ^ 2/A510 ♦ 7$%CO
1
Sheet A800
EA
2,S00
Induded
Induded
Included
Steel Bolard @ S8(6/A800
32
EA
2S0
Included
4,SS6
Induded
Sheet S208 • East Stair -7S%CD
3' X 20Ga Composite Steel Deck
WMr22
321
SF
Induded
Induded
36
Lf
Induded
lr>duded
lixkided
Induded
WI2X16
Induded
Included
Sheet S207 & Detail S219 - North Elevator & Stair • 7S$lCO
• X 20Ga Composite Steel Deck
S4S
SF
Induded
Induded
V/8r40 • Hoist Beam
25
LF
Induded
Irvduded
Included
Included
V/12xl6
43
Lf
Included
Included
Included
VV6X12
Induded
Irvluded
W14X22
Included
Induded
Sheet S209 -7S%CD
SCI -HSS4x4xl/4
260
Lf
Induded
induded
Ifsduded
Sheet S210 6i Detail S218 ♦ New Carsopy - 7S% CP
V/6x20
301 Lf
kKkrded
Induded
V/6xl2
V/t4x22
-1/2* X 20Ga Composite Steel Deck
429
33
LF
2.197
Lf
Induded
Irtduded
Included
Induded
SF
20
Included
Induded
Induded
Induded
Included
Included
Carvopy Beam Detail Per Detail 2I2/S602
Induded
Sheet S303 -75% CD
Induded
Induded
Induded
Steel Lintels per 224/S603
Included
Induded
Column Base Plates. Anchor Bolts & Templates
Included Induded • FOB Only
Embedded Hardware for Steel ConrsecUoru
Induded Induded • FOB Only
Included
Included
Steel Channels. Ledgers end Angles
Induded Included - FOB Only
Induded
Embed Plates
Induded
Induded - FOB Only
V/eld Plates
Induded Induded - FOB Only
Included
Induded
BID FORECASTED COST:
Sheet A502
Sta-r 3 - Located at level 2 A220____________
AESS Level at WeWed location to be smootfi
LS 15.000
Induded
IS,000
20.000
Induded
induded
Sheet A702 -75%CO
Steel Angle 4' x 6* Steel Support for Shutter
110
EA
11,860
11.295
11.860
Sheet A802
Canopy front 10~ R - 3/8‘ decorative Metal Bracket
SO
EA
2S0
12,500
12.S00
12,500,
Misc Sled
IS 10,000
10,000
10.000
10,000
CLARIFICATIONS EXHIBIT:
GI4P2 exdudes Detail 18/A800 - Entrance Barrier Beam EJevabon is 
not suite to r>ew desiga
GMP 2 includes AESS Level I at Canopy locatioo only.
Bid Forecasted Cost Total GMP2:
$
38.490 
$
77,250 $
34.360 $
$
Total Budget GMP2: Base Bid * Bid Forecasted Costs
$587.7901
$51349^
$788,0121
$0|
jg

Amb
Exhibit C.1, 2026-048-COS-A1, Page 34 of 55
er STEEL FABRICATION, INC.
15
11331 E. CiEKMANN ROAD • CHANDLER, ARIZONA 83286-1304 • (480)821-0004 • FAX (480)786-3274
May 18, 2026 
AZ. License 078660
Attn: Estimating
Re: Brown Avenue Parking Garage 
Drawings date: 4/9/2026
Inclusions: Installed unless noted otherwise
1. Column Supported Canopies, AESS level 1
a. 
Columns per 1,2/S209
b. 
Framing per 1,2/S210, Details on S601 and S602
i. Column to beam and rafter connection per detail 216
ii. Rafter Connection to precast per detail 211, embed by precast subcontractor 
ill. 1-1/2“ B-deck Per KEYNOTE 301
2. 
Eyebrow canopies with turnbuckle support
a. 
East Canopy 3/SSI 0, See detail 218, embeds by precast
b. 
Elevator Canopy 4/S207, See detail 219, embeds by Amber steel
3. Elevator Steel
a. 
Galvanized sump embed angle frame and grate,
b. 
Elevator pit ladder
c. 
Level 2 and 3 level framing
i. W14x22 beam with embed connection plate
ii. Ledger angle at perimeter per detail 221, ledger embeds by Amber
iii. 3” X 20 GA composite steel deck
d. 
Roof framing
I. W12 X 16 beams with embed connection plate
ii. Hoist beam with embed plates. See detail 203
iii. Top of CMU embed per detail 213
iv. 3” X 20 GA composite steel deck (I am not sure why 3" deck at the roof?)
4. 
North Stair, see A500 and A501, S801 and S802
a, (7) Stair tower wall openings with Guard railing
5. 
East Stair, See A502 and A503, S801 and S802
6. 400 L.F. of 2' tall Guard railing at top of wall, see A301 and A302
7. 
(7) Windows with 2' tall guard railing on A301
8. 
(7) Wndows with Square Bar fabricated cross bars, bent back and attached to facade. See A(7) 301
9. 
(7) Angle lintels at detail 224, North stair window openings
Base Price: S482.564.00
(16) Bollards at main level
Inset Window Square Bar grids, see 3/A302
Add: $4,556.00 
Add: $3,899.00
Qualifications
1 
Price includes steel to be 1 coat shop prime, freight to jobsite, shop & field drawings, and material 
as noted only.
2 
Price is good for 30 days.
Page 1 of 5

3 Excludes Tax, attachments for other trades, Simpson, architectural panels, standing seam, pre­
finished metal panels, stainless steel, light gauge framing, light gauge ledger track, aluminum, and any 
Items not mentioned in this proposal.
This proposal; and the attached list of exclusions and clarifications, to be part of the contract 
Roy Hunt
Amber Steel Fabrication, Inc.
Exhibit “A”
Amber Steel Fabrication, Inc.
Exclusions to the Contract
The following items are excluded from Amber Steel Fabrication, Inc. scope of work, or are a clarification to the
contract. As such, tltis exclusion document is a part of the contract between the General Contractor and Amber
Steel Fabrication, Inc.
1. 
All demolition.
2. 
All grout and dry pack.
3. 
All finish paint. Also, all finished paint preparation covered under the Painting subcontractor scope of work 
as outlined in the finished paint section of the specifications. This includes the removal of dust, dirt, mud, 
scratches, dings, burn marks and primer chips, scratches and gouges caused by other personnel other that 
Amber Steel, its representatives or subcontractors during shipping, storing, handling and installation.
4. 
Shop applied primer is a rust inhibitor. Over time if material is left exposed to the elements it will rust. 
Finish paint should be applied as soon as possible. Amber steel is not responsible for touch up of material 
that is left exposed for an extended period of time.
5. 
Architectural and Structural elements not left exposed are excluded from priming of welds. Exposed steel 
will be primed as it is welded. No return trip to prime is included in the quote.
6. 
All grates and grate framing such as structural grates, tree grates and walker duct type systems.
7. 
All light gauge framing, 12 gauge and lighter, including metal studs and joist, fascia, soffit, gutters, down
spouts, flashing and all architectural decks used as roofing, fascia, soffit, siding, or suspended ceilings. All 
decks with pre-finished surfaces such as Kynar paint finish. All specialty type decks which are not 
fabricated by Verco Deck Manufacturing Co. And all sheet metal materials.
8. 
Bolts, fasteners, templates and embeds not used to fasten Amber Steel’s product to the structure.
9. 
Mechanical framing for roof and floor penetrations, and mechanical equipment located on the roof or floor 
will be provided by Amber Steel under the following conditions. Exact sizes and dimensions of all 
penetrations including location must be provided for this framing prior to the installation of the deck. 
Enough time must be allowed for the fabrication of these frames in the shop. All material required to 
support suspended mechanical equipment including angles, channels, unistriit and hangers that attach to the 
structural steel for hanging suspended mechanical equipment and piping is excluded. Amber Steel will not 
cut any openings in the roof for any trade. (This item is not negotiable.)
10. 
All nonferrous metals such as stainless, brass, copper, aluminum and chromed finishes. This includes 
ladders, vanity and shelf brackets, handrails and other types of architectural pieces.
11. 
All steel lintels and wall penetration framing not individually shown on the structural drawings. All lintels 
weighing less than 250 lbs. are F.O.B. the job site.
12. 
Locking devices for gates such as deadbolts, pad locks and panic hardware.
13. 
Ail flagpoles, sign posts, playground equipment and TV support brackets.
14. 
All stair nosing.
15. 
Insulation strips for acoustical deck is F.O.B. the job site.
16. 
The fabrication of holes in our steel for other trades, including operable walls, unless arrangements liave
been made prior to the fabrication of the steel.
17. 
All steel shown on Civii, L, M, P and E drawings
18. 
All required bonds are to be paid by the general contractor without holding retention on that amount.
19. 
Al 1 MAG, city, county or state spec, steel not specifically shown on the A or S drawings.
Exhibit G.1, 2026-048-COS.A1, Page 35 of 55 Page 2 of 5

20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
F.O.B. the job site is ciarified to mean our freight to the Job site. It is the General Contractors responsibility 
to provide a means to unload and inventory shipment.
All ladder extensions and roof hatches
Backing in walls for handrail and ladder attachments.
All vanity brackets, shelf brackets and counter top steel framing pieces are F.O.B. the job site.
All Simpson type hangers and saddles.
Shoring of deck and structural steel for concrete pours.
All temporary safety rails and cabling for use by the general contractor and other trades. If coverage is 
needed arrangements have to be made at bid time.
General contractor must assume reasonable responsibility to protect existing floors, ceilings, walls, furniture, 
fixtures, equipment and other exposed architectural finishes in all pre-existing and remodeled buildings. 
Amber Steel will do the same.
Quantities and placement of panel to panel embeds in tilt up buildings and concrete beams are to be 
provided by the general contractor.
Steel joist, trusses and girders are long lead items, taking up to 6 weeks to produce and submit drawings for 
approval. An additional five to six weeks is required to fabricate and deliver joist to the job site following 
the joist drawing approval time period. As such, Amber Steel requires project scheduling to incorporate the 
joist drawing and fabrication schedule into our scope of the work.
Some steel items such as Steel Joist, Structural Metal Decks, Grating Products, Perforated Plates and Gate 
Hardware are fabricated by manufacturing companies. Their products are manufactured to industry 
standards. For example: Steel Joist are manufactured to SJl standards, Structural Metal Decking is 
manufactured to SDI standards and so forth. As such, Amber Steel under this contract agreement acts as a 
purchasing agent and installer only. Any defects in the material must be warranted by the manufacturer. 
Amber Steel warranties the installation only.
It is the General Contractors responsibility to inform all trades attaching products such as HVAC 
equipment, piping, duct work, etc. which weighs in excess of 100 lbs. To any joist, girder, or truss that the 
product must be attached within 3 inches of a joist, girder or truss panel point. Attachment to bridging is 
not allowed. As such Amber Steel is not responsible for any structural modifications, i.e., adding additional 
panel points or beefing up joist, girders, and trusses when attachments are made beyond the 3" limit 
Sales Tax and Bond.
Insurance coverage’s included are as follows;
General Liability Insurance
Per Occurrence Limit: 
1,000,000
Personal & Advertising Limit: 
1,000,000
General Aggregate Limit: 
2,000,000
Products & Completed Operations Aggregate: 2,000,000
Umbrella
2,000,000
2,000,000
Liability per occurrence 
Aggregate
Automobile Insurance:
Combined Single Limit Liability Coverage 
Workers Compensation Insurance 
Limit
Employers Liability Insurance 
Policy Limit-Accident 
Policy Limit-Disease 
Each Employee-Disease
Coverage’s not included above are not included in this proposal, Additional coverages may be added 
at an additional cost to General Contractor.
Monetary retention when held from the contract monthly draws shall be paid as outlined in Arizona 
Statute 34-221 paragraph B section 3 as follows:
3. When the contract is fifty percent completed, one-half of the amount retained includina and
securities substituted under paragraph 5 shall be paid to the contractor upon the contractor’s request 
provided the contractor is making satisfactory progress on the contract and there is no specific 
cause or claim requiring a greater amount to be retained. After the contract is fifty percent
1,000,000
Statutory
1,000,000 
1,000,000 
1,000,000
34.
Exhibit C.1, 2026-048-COS-A1, Page 36 of 55 
Page 3 of S

35.
36.
37.
completed, no more than five percent of the amount of any subseouent propress payment made
under the contract may be retained provided the contractor is making satisfactory progress on the 
project, except that is at any time the owner determines satisfactory progress is not being made ten 
percent retention sliall be reinstated for all progress payments made under the contract subsequent 
to the determination.
Support steel for ceiling hung toilet partitions.
Sales Tax excluded. If project is taxable you will be charged sales tax. If this is a MRRA project 
there will be a change order for sales taxes on material. No material will be purchased prior to 
receiving the appropriate sales tax form (AZ 5000 or 5005) or we receive from the General 
Contractor written clarification on the sales tax issue.
We will only supply lien releases from vendors that prelien the project.
CONTRACTOR
By_
Title:
SUBCONTRACTOR 
Amber Steel Fabrication, Inc.
By:_______________ ___
Title:_________________
I
Exhibit C.1, 2026-048.COS-A1, Page 37 of 55 
Page 4 of 5

Amber Steel Fabrication, Inc.
East Germann Road Chandler. AZ 8f;24Q f480)-82i-ooo4 fax r48o)-786-*^274
PRICE ESCALATION CLAUSE
Due to the uncertainty in the steel market it is necessaiy to include as a condition of our bid the 
following stipulations.
All quotes are good for 7 days only, under the following conditions.
Material must be purchased in the month it is bid.
We must be able to bill for stored material in our yard and be paid for that material with 
our next draw regardless of completion of fabrication and delivery to the job site.
Invoices from the suppliers will be provided as justification for billing
Substitution of material because of shortages must be accepted and any cost 
associated with these substitutions paid for by the owner
Schedules for production of odd or specialty items will be provided and if 
because of project schedule substitutions must be made the additional cost 
if any must be paid for by the owner.
If substitutions do to lack of material is required that cost is to be paid by 
the owner. For example 6 x 6 x 1/4" tube steel. If 6 x 6 x 3/8" tube steel 
has to be substituted the additional cost will be by the owner.
The purchasing of material includes joist and deck. These suppliers qualify their 
bids as to when the project must ship. If these dates are not met there could be 
cost increases from these suppliers.
Usually if a job is progressing and submitals are reviewed and returned in a 
timely manner this should not be a problem
Proof of cost increases
The steel mills issue letters to our local suppliers stating when and how much 
these increases will be. A copy of this letter will be given as proof of cost 
increases
Exhibit e.l, 2026-048-COS-A1, Page 38 of 55 
Page 5 of 5

Exhibit C.1, 2026-048-COS-A1, Page 39 of 55
ALIGNMENT
STEEL
May 18, 2026
Quote #26-1061-Rev 001
Project Name: Brown Avenue Parking Garage
Attention: Lawrence Chan
Phone: 323 350-7034 
Email: lchan@chasse.us
Documents Dated: 100% Drawings
Addendum: none
BASE BID
Furnish, fabricate, and erect the following:
1. HSS, Columns
2. WF, Beam framing
3. Steel Deck 3” 20ga
4. Steel Deck 1 'A 20ga
5. Canopy Steel
6. Threaded studs for wood attachment
7. Steel Celvis & Turnbuckle
8. Ledger angle
9. Bent plate lintels
10. Stair 1
11. Stair2
12. Railing
13. Pit iadder
14. One coat of standard shop primer
15. Steel connection bolts
Deliver only, F.O.B. trucks jobsite, the following:
1. Anchor Bolts for our steel
2. Sump
3. Bollards (20)
4. Embeds
Base Bid
Add 13 - Wrought Iron window guards
$597,800
$4,130
The above pricing is good for 30 days.
Alignment Steel
15270 N. 83" Place, Suite 200 • Scottsdale, Arizona 85260 
T(480)5S3-7873»F(480)584.6873
wv\'vv.aligiimciilsteel.coni
ROC 334578

Brown Avenue Parking Garage 
May 18, 2026 
Page 2
Exhibit C.1, 2026-048-COS-A1, Page 40 of 55
EXCLUSIONS
1. Galvanizing
2. Structural design/engineering, deferred submittals
3. AISC Fabricator & Erector
4. Precast Embeds
5. Entrance Barrier
6. Roof top light fixture
7. Galvanized plate at pipe barrier
8. Bike Racks
9. Sales, use and gross receipts taxes
10. Items on MEP drawings
11. Miscellaneous steel not specifically called out
12. AESS Finishes
13. Cost of bonds
14. Permits
15. Survey
16. Toilet partition supports
17. Counter supports
18. Flashing or sealants
19. Costs of tests & inspections
20. All concrete work and coring, etc.
21. Overtime, weekends or nightwork
22. Grout & placing of same
23. Metal studs, tracks, bridging & accessories
24. Sheet metal 10 gauge & lighter
25. All non-ferrous metals
26. Bolts other than steel to steel
27. All field painting including touch-up of structural, miscellaneous & metal decking 
SPECIAL CONDITIONS AND CLARIFICATIONS
1. This Proposal is based on Forklift Access to the building to erect the Columns. No cost for Crane included.
2. This offer is made with the understanding that a pre-award meeting will include a review and mutual acceptance 
of the scope of work, contract documents, schedule and terms and conditions prior to finalizing an agreement.
3. The design team is fully responsible for any errors, omissions, conflicts, code violations and improper use of 
material, if shown on the bid documents. Our quotation is based on measured quantities as specifically shown 
on the drawings. As we develop the shop drawings, we may discover errors, omissions or conflicts in the 
structural design drawings which we will bring to the General Contractor’s attention for resolving in a timely 
manner. The added cost or delay to the schedule due to the discovery of errors, omissions or conflicts will be 
evaluated and submitted for reimbursement.
4. Others are to remove, relocate, or protect all existing utilities or overhead construction interfering with the erection 
of the structure or limiting the operation of the erecting rig before arrival of erection equipment at the site.
5. All welding will be performed in accordance with AWS standards.
6. Steel will be cleaned per SSPC-SP2 “Hand tool cleaning" and coated with one coat of our standard primer.
Alignment Steel
15270 N. 83'“ Place, Suite 200 • Scottsdale, Arizona 85260 
T{480)553-7873 • F(480)584-6873 
wnv.alignmenlstccl.com
ROC 334578

Brown Avenue Parking Garage 
May 18, 2026 
Page 3
Exhibit C.1, 2026-048-COS-A1, Page 41 of 55
CHANGE ORDER LABOR RATES (Rates do not include Overhead and Profit)
Detailing
Shop
Field
$65.00/hr (straight time) 
$70.00/hr (straight time) 
$96.00/hr (straight time)
DELIVERY AND ERECTION SCHEDULE
To be negotiated at time of award
We appreciate the opportunity to bid on this project and look forward to being of further service to you. Should you 
have any questions, please do not hesitate to contact me.
Sincerely,
Greg Leavitt 
President
greg.leavitt@alignmentsfeel.com
480-645-0134
Alignment Steel
15270 N. 83'* Place, Suite 200 • Scottsdale, Arizona 85260 
1(480)553-7873 • F(480)584-6873 
w'ww.alienmciitsleel.com
ROC 334578

5^H STEEL
FABRICATION
&ERECT10N
“S'
3
’■u
Exhibit C.1, 2026-048-COS-A1, Page 42 of 55
- . ....
V t '
mi
PrOpOSCll for* Brown Avenue Parking Garage - 26150 
Contact Us 1 Estimator-JacobOdden Cell - 218.341.0265
1 i
Email - Jacob@shsteelaz.com
Our Values
u?
6i
i
- I
.»?. 
'I
T
'% •
i
!/ i
ft'
Committed
Commilted to SAFETTY, 
Oui selves each other, 
and our Clients.
Egos at The Door What's Next?
Results-Driven 
Egos at The Door
Execution 
helplul and liuiiihle.
We own it, cind get it done 
No one graduates trorn a broom,
with the end result in mind. Prioritizing your Project over pride.
l^oaclive. 
Innovative. 
Growtli Oriented.
Differentiators
4 Rapid 
JL • Schedule
Proactive
• Communication 3.
A Partner Who 
Keeps Agreements
Details that support 
your next decision.

Exhibit C.1, 2026-048-COS-A1, Page 43 of 55
Quote #26150
Date: 05/18/26 
Attention: Estimating 
Addenda Acknowledged: No
The Following Items Will Be Furnished and Installed:
1. (11) bolt-down bollards per PT8
2. Steel per S207
a. Beams
b. Beam seats per 203, 204,220 as FOB
c. 
Deck
d. Ledger per detail 221
e. Deck supports per 213
i. Embeds as FOB
f. 
Eyebrow per detail 219
i. Embeds as FOB
3. Steel per S208
a. 
Beams
i. Beam seats by others
b. Ledger per detail 222, 207, 214
i. Embeds by others
4. North Canopy
a. SCI columns
i. Anchor bolts and templates as FOB
b. W8x31 fascia beams
c. W8xl0 filler beams per 212 and 216
i. Embeds by others
d. Deck
e. Ledger assumed at detail 211
5. South Canopy
a. Bid similar to North Canopy
6. East canopies per detail 218
a. Embeds by others
7. Lintels per 224 on S303
8. Stairs
a. Stair 1
b. Stair 2
c. Stair 3
9. Ramp rail per A500
a. Connection embeds as FOB
10. Parapet rail per architectural elevations bid similar to stair rails
a. Connection embeds as FOB
11. Elevator Steel:
a. Sump frame and grate as FOB
b. Sill angle
c. 
Pit ladder
12. Wrought Iron Window Crosses:
a. (6) Type 1 per 1/A702 
i. Embeds as FOB
OfTice: (480)-926-6062
620 W. Commerce Ave. Gilbert, AZ 85233
UCERTIFIEO 
t2fA95ICATO« 
< /-otMCTOR
ISNelwoild’
i

Exhibit C.1, 2026-048-COS-A1, Page 44 of 55
13. Notes:
b. (7) Type 2 per 9/A702
a. Aii coated steel bid as standard shop primed
b. Alt precast embeds by others
c. S&H assumes access to existing concrete pad for operating lift - forklifts, boom 
lifts, spider crane, etc. - all shoring, if necessary, for this is assumed to be by 
others
Prices: Base Bid $753,652.00
We appreciate the opportunity to quote this project.
Respectfully,
Jacob H. Odden 
S&H Steel Co. LLC 
AI SC Certified Fabricator 
City of Phoenix Approved
S&H Steel is an AISC Certified Shop and Erector
This proposal was based off architectural and structural drawings dated 
11/14/25.
Raw nialeriol and fuel prices are based on current prices at the date of this proposal. Any 
significant price increases (meaning a price increase exceeding 5%) on materials 
and/fuel necessary to perform the work, that occur during the period of time between the 
date of this propo.sal and sukstantial completion of the project, shall cause the contract to 
be ecpiitably adjusted by an amount reasonably necessary to cover the increa.se. S&H 
.shall provide to the buyer a copy of the relevant material price increases or fuel 
surcharge from S&H suppliers as proof of such increase.
Terms and Conditions:
1. No state, county or city sales ta.\es are included in this bid.
2. All coated steel to be standard shop primed unless noted otherwise; standard primer is 
Sunburst Series #38- compatible with WB4 intumescent paint.
3. This proposal is subject to acceptance within 10 days from this date tendered and sliall be 
subject to satisfactory arrangement of details. Tiie Code of Standard Practice of tlie American 
Institute of Steel Construction, Fifteenth Edition, 2016, is hereby made a part of this proposal 
and sliall govern in all matters to which it is applicable not otherwise provided herein.
4. If accepted, this proposal and our quote number shall be part of any future contract or 
purchase order resulting from this quote.
5. If erection is included in this quote, level, clean and safe access shall be provided for erection 
equipment and materials.
Office: (480)-926-6062
620 W. Commerce Ave. Gilbert, AZ 85233
U CERTIFIED 
S^fAStiCATCK 
uftaoR
G

Exhibit C.1, 2026-048-COS-A1, Page 45 of 55
6. If project is TI or remodei work in existing conditions, S&H assumes having adequate access 
for erection, iaydown, equipment, etc. - we reserve the right to revise this proposal should 
S&H deem access inadequate.
7. If project is Tl or remodel work in existing conditions, this proposal should not be considered 
valid until a site visit can be made to confirm site conditions, and means/methods assumed 
for listed scope above.
8. All line and grade shall be the responsibility of others. Per AISC, prior to column erection, 
one (I) grade nut at each bolt cluster shall be set at proper elevation by Customer. If leveling 
plates are used. Customer shall set plates to grade.
9. All existing materials that connect to our steel must be open and accessible from the floor.
10. All existing materials that connect to our steel must be clean and ready for our materials to 
connect thereto. Removal and reinstallation of fireproofing, paint, etc. is not part of S & H’s 
scope of work.
11. See our list of standard exclusions attached with this proposal for other exclusions.
S&H STEEL CO. LLC
The following items are e.vcluded from or are a clarification to the ‘‘Scope of Work” portion of
the contract between the General Contractor and S&H Steel.
Exclusions:
1. All demolition, cutting, patching, repairing, and shoring.
2. All grout and dry pack.
3. Roof hatches and ladder ups.
4. Sign frames & signage .
5. All gates and fencing.
6. Louver systems.
7. Standing seam and pre-finished metal decking.
8. Light poles with bases and bolts.
9. Non-structural roof curbs (mechanical, skylight, etc.)
10. FAA permits assumed to be provided by GC
11. All name brand grates such as NEMA, all ornamental tree grates and walker duct type 
systems.
12. Application of “Bondo” on AESS steel. If the project specifically requires the application of 
S&H Steel perform the work for the cost of Time and Material.
13. Cold rolled structural steel framing, load bearing metal stud systems, light and heavy gauge 
metals, clips, attachments, purlins, etc.
14. All light gauge framing 12-gauge and lighter, including metal studs. Joist, fascia, soffit, 
gutters, down spouts, flashing and all architectural decks and metal materials used as roofing, 
fascia, soffit, siding, or suspended ceilings. All decks with pre-fmished surfaces such as 
Kynar paint finish. All specialty type decks which are not fabricated by Verco Deck 
Manufacturing Co. And all sheet metal materials.
15. Bolts, fasteners, templates and embeds not used to fasten S&H Steel’s product to the 
structure.
16. All non-ferrous metals such as stainless, brass, copper, aluminum, and chromed finishes 
unless otherwise noted. This includes ladders, vanity and shelf brackets handrails and other 
types of architectural pieces.
17. All steel lintels for wall penetrations not individually shown on the structural drawings.
18. Locking devices for gates such as deadbolts, pad locks and panic hardware.
19. All flagpoles, signposts, playground equipment and TV support brackets.
Office: (480)-926-6062
620 W. Commerce Ave. Gilbert, AZ 85233
AUCERTIFIED
VlfASSICATOR
ISNctwofld’
m

Exhibit C.1, 2026-048-COS-A1, Page 46 of 55
20. All stair nosing.
21. All Simpson-type hangers and saddles.
22. All shoring of deck and structural steel for concrete pours.
23. All steel items including gates, pipe bollards, fencing and railing only shown on the Civil, L, 
M, P &E drawings are excluded unless prior arrangements have been made.
24. All required bonds are to be paid by the general contractor.
25. All MAG, city, county, or state spec. Steel not specifically shown on the A or S drawings.
26. All finish paints. Also, all finished paint preparation covered under the Painting sub­
contractors’ scope of work as outlined in the finished paint section of the specifications. This 
includes the removal of dust, dirt, mud, scratches, dings, burn marks and primer chips, 
scratches and gouges caused shipping, storing handling and installation.
27. Special surface preparation such as sand blasting, and special primer other than standard shop 
primer.
28. Special treatment to steel to enhance/expedite oxidation.
Clarifications:
29. Material is procured from approved for-fabrication drawings only. Early procurement is 
possible at the GC’s request and risk.
30. This proposal is based on an appropriate schedule; whether given, discussed, or assumed. 
Should the project push beyond a reasonable time, S&H reserves the right to re-price, adjust, 
or re-assess our portion of the project.
31. S&H operates under strict and safe guidelines in the field; any specialty safety equipment 
required for a Jobsite, if not previously disclosed, will be accounted for via change order.
32. Mechanical framing for roof and floor penetrations, and mechanical equipment located on the 
roof or floor will be provided by S&H Steel. However, the exact sizes and dimensions of all 
penetrations must be provided for this framing prior to the installation of the deck. All 
material required to support suspended mechanical equipment including angles, channels, 
unistruts and hangers that attach to the structural steel for hanging suspended mechanical 
equipment and piping is excluded.
33. Steel lintels weighing less than 250 Lb. are FOB the Job site.
34. Insulation strips for acoustical deck are F.O.B. the Job site.
35. The drilling, punching, or burning of holes in our steel for other trades, including holes for 
operable walls, are assumed to be by others unless arrangements have been made prior to the 
installation of steel.
36. All vanity brackets, shelf brackets and countertop steel framing pieces, if included in quote, 
are F.O.B. the Job site.
37. All temporary safety rails and cabling for use by the general contractor and other trades is 
excluded from our scope of work. S&H Steel provides OSH A cabling only for our use as we 
deem necessary per OSHA requirements during our phase of construction. Maintenance and 
removal of safety cable, after S&H scope is complete, is by others.
38. No temporary safety cable is assumed on roof level.
39. General Contractor must assume reasonable responsibility to protect existing floors ceilings, 
walls, furniture, fixtures, equipment, and other exposed architectural finishes in all pre­
existing and remodeled buildings. S&H Steel will do the same.
40. Steel Joist, Trusses and Girders are long-lead items; fabrication drawings for approval and 
fabrication will be dependent upon current market standards. As such, S&H Steel requires 
project scheduling to incorporate the Joist drawing and fabrication schedule into our scope of 
the work.
41. Steel decking is a long-lead item; fabrication drawings for approval and fabrication will be 
dependent upon current market standards. As such, S&H Steel requires project scheduling to 
incorporate the Deck drawing and fabrication schedule into our scope of the work.
Office: (480)-926-6062
620 W. Commerce Ave. Gilbert, AZ 85233
U CERTIFIED 
t^fASBKTATOff
ISNotwofld’
i

Exhibit C.1,.2026-048-COS-A1, Page 47 of 55
42. Detailing is generaliy a iong-lead item; fabrication drawings for submittal plus additional 
time required for scrubbing the drawings once they are returned from the approval process 
will be dependent upon current market standards. As such, S&H Steel requires project 
scheduling to incorporate the detailing process into our scope of the work. All drawings must 
be released for fabrication prior to S&H Steel proceeding with fabrication. To avoid 
problems S&H Steel should be consulted prior to job schedules being formatted.
43. Due to the Volatility of material pricing and availability, S&H Steel will issue purchase 
orders for as much material as possible i.e., steel, joist, deck, fasteners, etc. at the time 
authorization to proceed with the project is given from the General Contractor to S&H Steel.
If requested by S&H Steel, the General Contractor must agree to pay for this material net 30 
day regardless of if the material has been fabricated or shipped to the job site. S&H Steel will 
provide insurance, invoices, and other documentation as needed for the G.C. to meet this 
requirement.
44. Some steel items such as Steel Joist, Structural Metal Decks, Grating Products, Perforated 
Plates and Gate Hardware are fabricated by manufacturing companies. Their products are 
manufactured to industry standards. For example: Steel Joist are manufactured to SJl 
standards. Structural Metal Deck is manufactured to SDl standards and so forth. S&H Steel 
has no control over the governing boards which establish the standards for these products. If 
faulty material or workmanship is discovered in the described products, S&H Steel will direct 
the manufacturer of the faulty items to make right through the warranty process any defects in 
the material.
45. It is the General Contractors responsibility to inform all trades attaching products such as 
H VAC equipment. Piping, duct work, etc. which weighs in excess of 100 lb. to any joist, 
girders, or trusses that the product must be attached within 3 inches of a joist girder or truss 
panel point. Attachment to bridging is not allowed. As such, S&H Steel is not responsible 
for any structural modifications i.e., adding additional panel points or beefing up joist girders, 
and trusses wlien products are attached to the panel point beyond the 3” limit.
46. S&H Steel makes every effort to meet the various G.C. certificate of insurance requirements 
on every job. However, in the event a G.C. has insurance requirements contractually 
specified which are not reasonably possible for S&H Steel or its insurance company to 
provide, the G.C. will accept S&H Steel insurance certificate as issued by our insurance 
provider in the dollar amounts proscribed in the contract without penalty to S&H Steel.
47. Monetary retention when held from the contract monthly draws shall be paid as outlined in 
Arizona. Statute 34-221 paragraph B section 3 only if applicable to this project.
48. S&H Steel is not in the design sector of the construction business. As such, S&H Steel 
specificity excludes all engineering and special connection requirements which are not 
designed and shown on the contract documents by the engineer or architect of record as part 
of our work unless agreed to in writing at bid time.
S&H Steel makes no assumption that we know and or iiiulcrstand all codes and standards
related to our scope of work imposed by local, state national and federal entities. We
therefore assume no responsibility for design errors in the contract documents.
Office: (480)-926-6062
620 W. Commerce Ave. Gilbert, AZ 85233
ISNclwoild"
UCERTIFIEO
iQfASSiCATO*

Exhibit C.1, 2026-048-COS-A1, Page 48 of 55
Forecast Outcome
PROJECT: Brown Avc Parking Structure 
BID ABSTRAaS FOR: Rough Carpentry
CHASSE
Sub-Contractor 
Contact
Email
Galindo Construction CMR Construction D«s«rt Structuras
Jim WMtclaw
Jlm@gallndoconstructi 
on
Jeramy Garcia
Jamas Hoodtnpyla
Phona
(602) 697-8596
Base Bid
$158,418
NOT BIDDING
NOT BIDDING
MISCEILANEOUS;
Sheet A301/A502
EXT 1 - Extira Composite Shuttertand Exterior Shutters Direct
Included
2x RS at each side of steel caisopy trusses per 7,10,11/ A80I
Included
2x 12 RS at Horironlal Steel Beams at Canopy location. One 
sided only
Inciuded
Wood framed w/ strip and footing to protection existing 
artwork
Included
BID FORECASTED COST:
WD1AV02 - Concrete Faux Wocxi Headers
4,125
Demo protection of svood framed slnicture and patch back
hardscape to match
15,000
CUtRIFICATIONS EXHIBIT;
GMP2 includes 2x 12 RS at Horiaontal Steel Beams at Canopy 
location. Orte sded only
GMP2 indudes 2x RS at each side of steel canopy trusses per 7,
10, ll/ABOt 
GMP2 indudes Wocxi framed w/ strip and (crating to protection 
existing artwork
Bid Forecasted Cost Total:
$
19,125 
$
$
$
$
Total Budget: Base Bid *■ Bid Forecasted Costs
$177,5431
I

Brown Ave. Parking Garage copy 2
May 21,2026
GCI
GA^LINOO
CONSTRUCTION LLC
Brown Ave. Parking Garage copy 2
3806 N Brown Ave.
Scottsdale , AZ 85251
Submitted by:
Arnie Galindo
GCI Galindo Construction LLC
3715 E. Beverly Ln 
Phoenix, AZ 85032 
Mobile: 602 770 0393
arnie@galindoconstructionllc 
License #: License #: KB-2 ROC 278726
Exhibit C.1, 2026-048-COS-A1, Page 49 of 55
GCI Galindo Construction LLC, License License #: KB-2 ROC 278726
1

Brown Ave. Parking Garage copy 2
May 21,2026
Arnie Galindo
GCI Galindo Construction LLC
3715 E. Beverly Ln
Phoenix , AZ 85032
Mobile 602 770 0393
arnie@galindoconstructionllc
License #: License #: KB-2 ROC 278726
Estimate
aa
Gi^LINDO
CONST^^UCTiON LLC
Project
Brown Ave. Parking Garage copy 2 
3806 N Brown Ave.
Scottsdale , AZ 85251
Customer
Lawrence Chan 
CHASSE Building Team 
230 S Siesta Lane 
Tempe, AZ 85288
lchan@chasse.us
Description
Cost
1. - Provide Labor, Materials and Equipment to Install 
S5 PVC Shutters from Shutterland
Top Profile Straight 
No Divider Rail 
No Tilt Bar
Installed with Fixed Brackets 
UNFINISHED
2. - Labor and materials and equipment to Install 
63 FIberspan Concrete faux headers
288 If
3. - Labor, Materials and equipment to Install 2x RS at each side of steel canopy trusses per details 
7-10-11/A802 Plans dated 4/30/26
4. - Labor and Materials and Equipment to attach 2x12 RS wood to Horizontal steel beams one side only
5. - Art work protective structure
Labor and materials to Install 2 framed boxes with 2x walls, plywood shear exterior
Frame roof with 1/2 plywood, anchor to temporary footings and painting one color exterior paint
Design TBD
52,910.00
47,190.00
33,462.00
7,696.00
17,160.00
Project Total
158,418.00
Tax
Total with Tax
0.00
158,418.00
The customer hereby authorizes the contractor to perform the work as specified.
Exhibit C.1, 2026-048-COS-A1, Page 50 of 55
GCI Galindo Construction LLC, License #: License #: KB-2 ROC 278726
2

Forecast Outcome
PROiECT: Brown Ave Parking Structure 
BIDABSTRAaSFOR: Metal Panel
€-
Sub-Contractor 
Contact 
Email 
Phone 
Base Bid
Western Building
Ben Harbort
Progressive
Ron Glesler
benh2 Abr^mrilcom n.eeilgrff’ororressiveuscom
480-823-3500
$0
602-399-9981
$0
CH/\SSE
cifiLJ Uh:
METAL PANELS
71,041
53,144
Sheet A303
MTl (1073.K2) - Weathered Metal B-Deck at Over Hang Canopy
Included - 269a. 7/8'
Corrugated Panels
Induded - 26ga. 7/8"
Conugated Panels
Trim Related to Metal Panel System for Installation Only
Induded
Induded
Pre Finished
Coreten AZP Raw 
Painted Rust Finish
Antique Rust
Sheet A220 & S207 - Canopy Locations -75% CD
Induded
Induded
CLARIFICATIONS EXHIBIT:
GMP2 includes 26 ga. 7/8' painted njst finish metal panel -1 
side painted and 1 side to be primer only.
Bid Forecasted Cost Total:
$
71,041 t
53,144 $
t
i
Total Budget Base Bid * Bid Forecasted Costs
r
$71,04ll
$53,1441
I
I
Exhibit C.1, 2026-048-COS-A1, Page 51 of 55

Exhibit C.1, 2026-048-COS-A1, Page 52 of 55
Date;
May 18th, 2026
dfi
PROGRESSIVE
ROOFING
P 602.278.4900 
23 N. 35th Ave.
Phoenix, AZ 85009
To:
CH/\'SSE
TE>4Ar
Attn: Lawrence Chan
Re:
Brown Avenue Parking Structure- 76%CD Budget-revi 
7234 East 2nd Street 
Scottsdale, AZ 85251
Scope:
no spec Architectural Metal Panels at Canopies (as quaiified below) 
07 62 00 Sheet Metal Flashing and Trim (as qualified below)
75%CD Budget: $53,144
Add to Base Bid: $7,742 Add for 24ga "AZP Raw" in lieu of 26ga "Antique Rustic" in Base Bid.
Inclusions: 
26ga standard color "Antique Rustic" (1-side paint, 1-side primer), 2-coat PVDF finish,
7/8"corrugated roof panels at lower level canopies and elevetor canopy with trims by 
Western States attached directly to required structural framing by OTHERS.
2yr workmanship warranty by Progressive and 20yr manufacturers finish warranty.
Exclusions: 
tax, permits, bonds (add 1.5%), custom colors/ finishes, framing, sub-framing, post
painting, saw-cutting, protection of our installed metals from damage by OTHERS, 
multiple mobilizations, general sealants, roofing or roof-related flashings, expansion 
joints, engineering, all other metals anything not specifically included above.
Please note: 
This budget is based on our understanding of the 75%CD drawings and specs dated
4-9-26 provided to us and reflects current metal market pricing that is subject to change. 
Please see attached takeoff for coverage.
Oii canning is naturaily inherent in metal and shall not be sole cause for rejection.
Contact;
Ron Giesler 602-278-4900
ron.giester@progressiveus.com
Albuquerque. NM | Clinton. MO I Columbus, OH I Denver. CO | Duncanville. TX 
Flagstaff. AZ I Lehi.UT 1 Mount Joy. PA | Phoenix, AZ | Tucson, AZ

Western®
Exhibit C.1, 2026-048-COS-A1, Page 53 of 55
ILC
AftCmECTUfl<a. FACADES
Proposal
From: Ben Harbort
Benh@wbgemail.com 
(480)-823-3500 
To: Cha$se Building Team 
Attn: Lawrence Chan
RE: Brown Avenue Parking Garage 75% CD Rev 1
Date: 5/15/2026 
Addenda; 0
Taxes: Excluded 
Prevailing Wages: No
Bond: Not included (2%) 
Proposal Valid For: 30 Days
Material Escalation Clause - WBG reserves the right to adjust the bid amount ifmateriai costs increase due to proposed tariffs on steel 
and aluminum before submittal approval or subcontract/work order execution. To prevent price increases, submittals must be approved 
promptly. Delays in approval may lead to price adjustments based on market conditions.
We propose to furnish and Install the following:
Corrugated Panels
Approximately 2,600 SF of 26ga 7/8" Corrugated panels as noted on architectural drawings. Corrugated panels will be from 
manufacturer Western States Metal Roofing using finish Antique Rust. All necessary trims related to the metal panel system 
are included. Framing must be sufficient for panel attachment. Corrugated Panels will be installed over: metal decking and 
framing by others
Plans and specs to not call out for finish type, gauge, or profile. Assumptions are made per Chasse direction.
Job Specific Exclusions: Misc Flashings, Pre-engineered canopies, weather barrier, sub furring of any kind, coping caps, expansion 
joints, sheathing, stainless steel flashings, framing of any kind, multiple mobilizations, blocking, window flashings of any kind, any 
signage or framing for signage, any structural framing, any light gauge framing, gravel stops, FM Global rating, miscellaneous flashings 
for other trades, color matching mockup, and shade materials are excluded from our bid.
Job Specific Notes: Certain panel sizes and joint lines will be chosen by WBG to fit within manufacturer standard sheet size and for 
maximum yield. Any necessary additional framing is by others. WBG Is not responsible for verifying compliance of ASHRAE 90.1 or 
NFPA 285. This proposal is based off WBG's interpretation of drawings by DFDG dated 4/9/26.
Base Bid;
$71,041
Deduct Option: Corten A606-4 Material in lieu of Painted Rusted Finish
♦Panels will be installed pre-rusted and rust in place over time. Panels will take several 
months to rust. Rust may run off metal and onto concrete or surrounding areas. Rust will 
not be sealed by WBG. WBG is not responsible for maintenance of rust. 
_______
-$6,679
Arizona: 4540 E. ivy Street, Mesa, AZ 85205 
Utah: 178 S. 1900 W, Lindon, UT 84042
m
® 480.397.1111 #480.556.1700
www.WesternBuildingGroup.com
Page 1 of 2
AZ 277677, 277678 NV 0070844 CA 971211 UT 10203763-5501

Western® 
Building 
Group'
I Lie
AnCHlIECTURAL FACADES
Exhibit C.1, 2026-048-COS-A1, Page 54 of 55
Proposal
General Notes - This proposal is based upon mutually agreeable contract terms. Western Building Group must have unobstructed visible access 
for dimensioning along with clear and level working conditions for our team members and lift equipment. A clear, safe, and secure laydown or staging 
area is needed for materials and must be provided for by Contractor. Natural thermal movements (or oil-canning of metal wall panels) is not a 
reason for rejection.
General Exclusions - Our proposal excludes the following unless specifically noted In the above proposal: any field testing, pemiltting, bonds of any 
kind, liquidated damages or penalties, structural or sub-framing for roof or walls, blocking, wall or roof sheathing, sheet metal flashings including any 
through wall or flashings and trims for any other items not specifically Included in our proposal. All flashings integral to or integrated Into the glazing 
system or the roofing system for warranty or weathertightness purposes are excluded. All M.E.P. sheet metal related Items, any general sheet metal 
Items not directly associated with our material Installation as noted above, flat roof edge metals and/or gravel stops, any expansion joints or bellows 
systems, any roof hatches, access ladders, skylight flashings, any curbs, all metal materials at any out-buildings, any trash enclosures or gated 
barricades, and any sunshades or trellis are excluded. ABAA Installer Certification. Manufacturers delays In fabrication or freight delays. Acts of God.
Acceptance of this Proposal - A Letter of Intent (LOI) must be Issued to lock In pricing. The LOI must specifically reference the project name and 
proposal date listed herein. Shop drawings, scheduling of crews, and material procurement will not be started until written acceptance of this 
proposal has been received by Western Building Group.
Submittals - Please allow 8-12 weeks for shop drawings/ submittals from the time of a written Notice to Proceed (NTP).
Field Dimensioning - Due to the tight tolerances and material lead times of composite, phenolic, fiber cement, GFRC panels, all adjacent trades and 
their material termination points must be completely installed to properiy field dimension, engineer, and install wall panels. The substrate must meet 
industry standard tolerance of Va - 20'. Schedule impacts may occur if these guidelines are not understood. Pre-mature request for field 
dimensioning will have added cost to the contractor.
Fabrication - Once the substrate has been completed and mutually accepted, allow 6 weeks for 3D scanning, panel fabrication, and delivery.
Schedule - The schedule shall be mutually agreed to. Including but not limtted to supply chain delivery dates, time frame for submittals, adequate 
time for material fabrication from field measure/ 3D scanning, adequate quantities of work to avoid multiple mobilizations, and avoidance of work 
performed out of an efficient sequence.
Material Escalation Clause: In the event that there Is a material, equipment, or labor cost Increases between the effective date of this proposal and 
the date of contract execution, WBG reserves the right to adjust the bid to reflect these Increased costs.
Western Building Group appreciates the opportunity to quote your firm.
Arizona: 4540 E. Ivy Street, Mesa, AZ 85205 
Utah: 178 S. 1900 W, Lindon, UT 84042
S 480.397.1111 #480.556.1700
www.WesternBuildingGroup.com
Page 2 of 2
AZ 277677, 277678 NV 0070844 CA 971211 UT 10203763-5501

Exhibit C.1, 2026-048-COS-A1, Page 55 of 55
Forecast Outcome
PROJECT: Brown Ave Parking Structure 
BID ABSTRACTS FOR: RooRrtg
CH/^SSE
Sub-Contractor
Conuct 
Email 
Phone 
Base Bid
Global Roofing
Jon Atkinson
Proof ttttvt
Sophia Galan
ion.atkinson^global.inc ia.gatangprogff ssiveus com
480-343-1581
$18,900
(602) 278-4900
$29.340
ROOFING:
Sheet 6/A502 7S%CDA510
PVC Roofing vv/ 2’ Rigid Insulation & 8‘ Min Flashing Height
Above Deck (Stairs & Elevator Roof location)
Spray Polyurethane Foam
Roof System
TPORoof Membrane
Roof System:
ClassASPF Roof System
TPOeOm'il
Deck
Spray-applyone (1) inch 
minimum of SPF
Adhered 1/4
Coverboard 
Mechanically Attached 
w/1 Layer 2' Rigid 
 Insulation
Wall/Curbs
Spray-appiy one (1) inch
minimum of SPF on vertical 
walls/curbs, terminating urxJer 
CODiOfl
Baseflashing terminated 
to Reglet 
Countecflashlog
Base
Spray-appiy acryfic base
coatinq 
N/A
Top
Spray-appiy acrylic top
coatifx?
N/A
Install Method
Mechanically bro^cast
aggregate into final top 
coatino
N/A
Warranty:
10 Year NDL No Dollar Umit 
Manufactures System
20 Year NOl No Dollar
Umit Manufactures 
System
Warranty: 2 Year installer's
Warranty 2 Year
Installer's 
Membrane Roofing Add ■ 100% CD's
12,825
Included
BID FORECASTED COST:
Metal Coping Cap
14,495
14,495
CURIFICATIONS EXHIBIT:
GMP2 Includes 60 Mil TPO w/ adhered 1/4" coverboard
mechanically attached 1 layer 2" rigid Insulation ILO PVC
V£'s:
PVC Roofing Per Drawings Callout
1.200
Bid Forecasted Cost Total:
$
27,320 
$
14,495 
$
$
$
Total Budget: Base Bid ♦ Bid Forecasted Costs
r
$46,220
$43,035
I
I