Item 9
cirY couNai
REPORT
Meeting Date:
General Plan Element:
General Plan Goal:
June 9, 2026
Public Services and Facilities
Provide city service facilities to meet the needs of the
community.
ACTION
Job Order Contracting (JOC) for Citywide Mechanical and Plumbing Construction Services. Adopt
Resolution No. 13697, authorizing Job Order Contract (JOC) Contract No. 2026-088-COS with
Evolution Mechanical Projects, LLC, Contract No. 2026-089-COS with McCarthy Building Companies,
Inc. and Contract No. 2026-090-COS with Summa Mechanical Contractors, Inc., each in an amount
not to exceed $6,000,000 for the initial two-year term of each contract for Citywide Mechanical and
Plumbing construction services throughout the City on an as-needed basis.
BACKGROUND
The purpose of this action is to award three (3) Job order contracts (JOCs) for Citywide Mechanical
and Plumbing construction services throughout the City on an as-needed basis.
The initial term of the JOC will be for two (2) years and have a maximum contract term amount of
$6,000,000 and an individual Job Order maximum amount of $2,500,000. This JOC may be renewed
for up to three (3) additional one-year terms each with a maximum contract term amount of
$3,000,000. Renewal of these contracts will be based on the successful JOC contractor performance
and the needs of the City. The contract maximum may be increased at the time the option is
exercised, or at another time deemed prudent by the mutual agreement of both parties. At the
City's direction, a Price Book of common scope line items may be required and utilized.
The citywide mechanical and plumbing Job Order contracts will support the City's need for small
projects which may include work such as: construction and/or installation of HVAC systems, chilled
water systems, fluid coolers, cooling towers, plumbing systems and energy management systems;
required electrical services for complete mechanical/plumbing construction; repair of water supply
piping, waste piping & storm drain piping; water heater service; drain cleaning; installation and
repair of compressed air systems; and construction management.
For each individual job order, the JOC contractor will work with Transportation and Infrastructure
staff throughout project design development, providing input on value engineering, cost estimates,
and construction schedules.
00331391V1
Blueink Bundle ID: Tu2J5gfvnnI
City Council Report | JOC for Citywide Mechanical and Plumbing
ANALYSIS & ASSESSMENT
Recent Staff Action
On March 11, 2026, staff posted a Request for Qualifications for a proposed JOC on the City's
website. Nine responses were received on April 10,2026. A selection panel of City staff members and
an outside contractor thoroughly evaluated all responses. After comprehensive review, the panel
selected Evolution Mechanical Projects, LLC , McCarthy Building Companies, Inc. and Summa
Mechanical Contractors, Inc.
Community Involvement
Staff will continue to use the same community involvement and notification procedures for job orders
issued under this contract that are used when projects are constructed using other procurement
methods.
Community involvement for each individual job order will be coordinated with the sponsoring Division
as design progresses.
RESOURCE IMPACTS
Available funding
Authorization of these JOCs commits no funding. Funding for each individual job order will be
provided by the individual CIP project or operating center associated with the scope of the task and
will be encumbered once negotiations are completed.
Staffing, Workload Impact
Existing Transportation and Infrastructure staff resources are available to provide design and
construction contract administration, construction management and inspection services for these
projects. Melanie Gibson, Project Coordinator in the Transportation and Infrastructure Department,
is the contract administrator.
Future Budget Implications
Combined construction cost for all projects will not exceed $6,000,000 per JOC contract for the initial
two-year term of each respective JOC contract. There is no additional operating budget required as
a result of these contracts.
OPTIONS & STAFF RECOMMENDATION
Recommended Approach:
Adopt Resolution No. 13697, authorizing Job Order Contract (JOC) Contract No. 2026-088-COS with
Evolution Mechanical Projects, LLC, Contract No. 2026-089-COS with McCarthy Building Companies,
Inc. and Contract No. 2026-090-COS with Summa Mechanical Contractors, Inc., each in an amount
Page 2 of 3
Blueink Bundle ID: TuZJSgfvml
City Council Report 1JOC for Citywide Mechanical and Plumbing
not to exceed $6,000,000 for the initial two-year term of each contract for Citywide Mechanical and
Plumbing construction services throughout the City on an as-needed basis.
Proposed Next Steps:
Following approval of the contracts. Evolution Mechanical Projects, LLC, McCarthy Building
Companies, Inc. and Summa Mechanical Contractors, Inc. will be available for citywide Mechanical
and Plumbing construction projects throughout the City on an as needed basis.
RESPONSIBLE DEPARTMENT(S)
Transportation and Infrastructure
STAFF CONTACTS (S)
Melanie Gibson, Project Coordinator, mgibson(5)scottsdaleaz.gov (480) 312-7649
APPROVED BY
Alison Tymkiw, Senior Director - City Engineer,
Transportation and Infrastructure
480-312-7760, ATvmkiw(5)scottsdaleaz.eov
5/20/26 08:38 MST
Date
ATTACHMENTS
1.
Resolution No. 13697
2.
Evaluation Matrix
3.
Contract No. 2026-088-COS
4.
Contract No. 2026-089-COS
5.
Contract No. 2026-090-COS
Page 3 of 3
Blueink Bundle ID: TuZJSgfvml
RESOLUTION NO. 13697
A RESOLUTION OF THE COUNCIL OF THE CITY OF SCOTTSDALE.
MARICOPA COUNTY, ARIZONA, AUTHORIZING CONTRACT NO. 2026-088-
COS WITH EVOLUTION MECHANICAL PROJECTS, LLC, CONTRACT NO.
2026-089-COS WITH MCCARTHY BUILDING COMPANIES, INC. AND
CONTRACT NO. 2026-090-COS WITH SUMMA MECHANICAL
CONTRACTORS, INC. EACH FOR A TWO-YEAR JOB ORDER CONTRACT
FOR CITYWIDE MECHANICAUPLUMBING SERVICES IN AN AMOUNT NOT
TO EXCEED SIX MILLION DOLLARS ($6,000,000) PER CONTRACT.
WHEREAS, the City desires to enter into Job Order Contracts for mechanical/plumbing
projects located throughout the City on an “as-needed” basis, not to exceed Two Million Five
Hundred Thousand Dollars ($2,500,000) per Job Order; and
WHEREAS, the Contracts are for an initial term of two (2) years in an amount not to
exceed Six Million Dollars ($6,000,000) per Contract, with the option for three (3) additional one
(1) year extensions in an amount not to exceed Three Million Dollars ($3,000,000) per Contract
after expiration of the initial term; and
WHEREAS, Evolution Mechanical Projects, LLC, McCarthy Building Companies. Inc.,
and Summa Mechanical Contractors, Inc. have been selected through a competitive process
(Solicitation 26RFSQ025) and are each qualified to render the services desired by the City.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Scottsdale,
Maricopa County, Arizona as follows:
Section 1, The Mayor is hereby authorized and directed to execute Contract No.
2026-088-COS with Evolution Mechanical Projects, LLC, Contract No. 2026-089-COS with
McCarthy Building Companies, Inc., and Contract No. 2026-090-COS with Summa Mechanical
Contractors, Inc. for job order contracting services with a contract amount not to exceed Six
Million Dollars ($6,000,000) for the initial two (2) year term of each respective Contract.
Section 2. The City Manager or designee is hereby authorized to execute such other
documents and take such other actions as necessary to carry out the intent of this Resolution.
PASSED AND ADOPTED by the Council of the City of Scottsdale this_____day of
_____________ , 2026.
ATTEST:
CITY OF SCOTTSDALE, an
Arizona municipal corporation
By:.
Ben Lane, City Clerk
By:.
Lisa Borowsky, Mayor
APPROVED AS TO FORM:
OFFICE OFB4E CITY ATTORNEY
IL
Luis E. Santaella, City Attorney
By: Lydia Tulin, Assistant City Attorney
19183316
Page 1 of 1
ATTACHMENT 1
Resolution No. 13697
SOLICITATION FOR CITYWIDE MECHANICAL &
PLUMBING JOC - 26RFSQ025
Company
Rank
MIDSTATE MECHANICAL
EVOLUTION MECHANICAL PROJECTS
EMCOR
SUMMA MECHANICAL CONTRACTORS
TEMPE MECHANICAL
PROFESSIONAL PIPING SYSTEMS
RE-ACT MECHANICAL SERVICES
MCCARTHY BUILDING COMPANIES
RK SERVICE
2
3
1
ATTACHMENT 2
K*
SC 07=
O
vT
A.
1
^ r' SA
%
X
Mno^i
mj
CITY OF SCOTTSDALE
JOB ORDER CONTRACT
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-088-COS
(Revised .5.6.2026)
19183299
ATTACHMENT 3
Contract No. 2026-088-COS
TABLE OF CONTENTS
RECITALS..................................................... .................. ..................................................1
ARTICLE 1 - CONTRACTOR’S SERVICES AND RESPONSIBILITIES................................. 1
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES................................................17
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME....................................................20
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE............................................... 23
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME....................................... 24
ARTICLE 6 - PROCEDURE FOR PAYMENT.................................................................... .30
ARTICLE 7 - CLAIMS AND DISPUTES..............................................................................33
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION.................................. 35
ARTICLE 9 - INSURANCE AND BONDS.......................................................................... 39
ARTICLE 10 - INDEMNIFICATION..................................................... ............................. 46
ARTICLE 11 - GENERAL PROVISIONS................................. ........................................... 47
ARTICLE 12 - DEFINITIONS.............................................................................................61
EXHIBIT A - STATUTORY PERFORMANCE BOND
EXHIBIT B - STATUTORY PAYMENT BOND
EXHIBIT C - CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
(Revised 5.6.2026)
I
Contract No. 2026-088-COS
CITY OF SCOTTSDALE
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-088-COS
THIS CONTRACT. (“Contract”) is entered into this
day of
2026,
(“Effective Date”) between the City of Scottsdale, an Arizona municipal corporation (the “City”)
and Evolution Mechanical Projects, LLC, a Delaware limited liability company (the "Contractor”).
RECITALS
A.
The Mayor of the City of Scottsdale, Arizona, is authorized and empowered by the
provisions of the City Charter to execute contracts for construction and related services.
B.
The City intends to contract for construction and related services with Contractor for one
or more individual Job Orders.
C.
Contractor has represented to the City the ability to provide or procure the required
construction and related services and, based on this representation, the City engages
Contractor for these services.
FOR AND IN CONSIDERATION of the mutual covenants and considerations contained jn this
Contract, it Is agreed by the City and Contractor as follows:
ARTICLE 1 - CONTRACTOR’S SERVICES AND RESPONSIBILITIES
1.1. GENERAL SERVICES
A.
Contractor will furnish any and all labor, materials, equipment, transportation,
utilities, services and facilities specified in the individual Job Order for which it is
issued a Job Order Notice-to-Proceed for Work in accordance with this Contract.
The City may determine it Is in its best interest to furnish materials and equipment
for an individual Job Order in accordance with the Job Order.
B.
The Work will be performed in a good, workmanlike and substantiai manner and
to the satisfaction of the City Engineer and under the monitoring of the City
Engineer, or designee, with the care and skill of a qualified contractor in Scottsdale,
Arizona.
1. Minor design services may be required for some Job Orders. For those
Job Orders that may require minor design services, Contractor will seek
the services of an Arizona registered architect or engineering professional
to prepare plans for permitting. The procurement of minor design services
will be in accordance with the City’s procurement procedures and code. If
the services of a design professional are used, the design professional
must maintain at least $1,000,000 Professional Liability Coverage.
2. All documents prepared by Contractor are subject to review by the City.
Review by the City is for the benefit of the City only, is not intended to be
for the benefit of any other person and does not relieve Contractor from the
professional liability associated with the documents they have prepared.
(Revised 5:6.2026)
19183299
Page 1 of 67
Contract No. 2026-088-COS
3. Contractor’s Representative shall be reasonably available to the City and
will have the necessary expertise and experience required to supervise the
Contract Services. A Contractor's Representative will be assigned for each
Job Order. Contractor’s Representative will communicate regularly with the
City and will be vested with the authority to act on behalf of Contractor.
C. The City is a member of $AVE cooperative purchasing group. $AVE includes the
State of Arizona, Maricopa County, many Phoenix metropolitan area
municipalities, and many K-12 unified school districts. Under SAVE Cooperate
Purchasing Agreement, and with the concurrence of successful Respondents
under this solicitation, a member of SAVE may access a contract resulting from
this solicitation issued by the City. By signing the JOC Contract, Contractor agrees
to allow other SAVE members the ability to purchase their needs and “use” this
contract for JOC requirements.
1.2. GOVERNMENT APPROVALS AND PERMITS
A.
Unless otherwise provided. Contractor will obtain or assist the City in obtaining all
necessary permits, approvals and licenses required for the prosecution of the Work
from any government or quasi-government entity having jurisdiction over the
Project. Contractor is responsible for obtaining payment for the necessary
environmental permits or file the necessary environmental notices.
B.
Copies of these permits and notices must be provided to the City's Representative
before starting the permitted activity. This provision does not constitute an
assumption by the City of an obligation of any kind for violation of the permit or
notice requirements.
C.
The City is responsible for the City of Scottsdale review and permit(s) fees for
building and demolition permits. The City will pay City review fees for grading and
drainage, water, sewer, storm water management, and landscaping. The City will
also pay for City utility design fees for permanent services.
D.
Contractor is responsible for all other permits and review fees not specifically listed
in Article 1.2(C) above.
E.
Contractor is responsible for the cost of construction-related water meter(s), water
and sewer taps, fire lines and taps, and all water bills on the project meters until
Substantial Completion of the Project. Arrangements for construction water will be
Contractor's responsibility. Construction water does not include "test water”
required to compiete new water line pressure tests.
F.
The M.A.G. Standard Specification 107.12 is modified to read as follows:
“Contractor, at its own expense, is responsible for the acquisition of any necessary
temporary easements for construction purposes, storage, maintenance, and
refuse haul-off as indicated upon the plans, which are required in addition to
existing easements or rights-of-way secured by the City.”
(Revised 5.6.2026)
19183299
Page 2 of 67
Contract No. 2026-088-COS
1.3. PRE-CONSTRUCTION CONFERENCE
A.
After issuance of a Job Order and before the commencement of any Work on any
individual Job Order, a pre-construction conference may be scheduled.
B.
The purpose of this conference is to establish a working relationship between
Contractor, design firms, utility firms, and various City departments. The agenda
will include critical elements of the work schedule, submittal schedule, level of
Record Drawings required, cost breakdown of major lump sum items, payment
application and processing, coor^dination with the utility firms involved, and
emergency telephone numbers for all representatives involved in the course of
construction.
C.
At a minimum, attendees will include Contractor Representative, who is authorized
to execute and sign documents on behalf of the firm, the job superintendent, and
Contractor’s safety officer.
D.
The Job Order Notice-to-Proceed date will be established.
E.
Contractor will provide a Baseline Project Schedule indicating duration, manpower
and equipment resources required to complete all major Work activities. The City
and Design Team will review and comment on the Baseline Project Schedule.
Contractor will revise the Baseline Project Schedule to the satisfaction of the City’s
Representative. No work will begin until the City accepts the Baseline Project
Schedule.
F.
Contractor will submit a Schedule of Values based on the work and bids accepted
from selected Subcontractors. These values will reflect the actual labor time,
materials, profit and overhead for the Work or in accordance with Contractor's price
book.
1.4, CONTROL OF THE WORK
Contractor will properly guard and protect all partially finished work and will be
responsible for the Work until the entire Job Order is completed and accepted by the
City. Any payment for completed portions of the Work will not release Contractor from
this responsibility: however, it will turn over the entire Work in full compliance with the
specifications or Job Order before final settlement is made. In case of suspension of
the Work for any cause whatever. Contractor is responsible for the Project and will take
all precautions necessary to prevent damage to the Project and will erect any necessary
temporary structures, signs, or other facilities at no cost to the City.
A.
After all Work under the Job Order is completed. Contractor will remove all loose
concrete, lumber, wire, reinforcing, debris and other materials not incorporated in
the Work from the site of the Project,
B.
Unless the Job Order states that it is the responsibility of the City or a separate
contractor. Contractor will provide through itself or its Subcontractors the
necessary supervision, labor, inspection, testing, start-up, material, equipment,
machinery, temporary utilities, other temporary facilities, temporary fencing, roll
offs, and dust control to permit Contractor to complete the Work consistent with
(Revised 5.6.2026)
19163299
Page 3 of 67
Contract No. 2026-088-CpS
the Job Order.
C.
Contractor will perform all construction activities efficiently and with the requisite
expertise, skill and competence to satisfy the requirements of the Job Order.
Contractor will at all times exercise complete and exclusive control over the means,
methods, sequences and techniques of construction.
D.
. Survey stakes and marks required for the completion of the construction shown on
the plans and described in the specifications will be furnished by Contractor.
E.
Contractor, its designee or Contractor’s Superintendent will be present at the Work
at all times that construction activities are taking place.
1. All elements of the Work, such as concrete work, pipe work, etc., will be
Under the direct supervision of a foreman or his/her designated
representative on the Site who will have the authority to take actions
required to properly carry out that particular element of the Work.
2. In the event of noncompliance with Article 5.1, the City may require
Contractor to stop or suspend the Work Jn whole or in part.
F.
Where the Job Order requires that a particular product be installed or applied by an
applicator approved by the manufacturer, it is Contractor's responsibility to ensure
the Subcontractor employed for that portion of the Work is pre-approved by the
manufacturer.
G.
Before ordering materials for or doing the Work, Contractor and each
Subcontractor vvill verify measurements at the Site and will be responsible for the
correctness of these measurements. No extra charge or compensation will be
allowed because of differences between actual dimensions and the dimensions
indicated on the drawings: differences, which may be found, will be submitted to
the City for resolution before proceeding with the Work.
H.
Contractor will take field measurements and verify field conditions and carefully
compare these field measurements, conditions and other information known to
Contractor with the Job Order before starting activities. Errors, inconsistencies or
omissions discovered will be immediately reported to the City.
I.
Contractor will establish and maintain all building and construction grades, lines,
levels, and benchmarks, and will be responsible for the accuracy and protection of
these items. This portion of the Work will be performed or supervised by an Arizona
licensed civil engineer or surveyor.
J.
Any person employed by Contractor or any Subcontractor who, in the opinion of the
City, does not perform his/her portion of the Work in a proper, skillful and safe
manner or is intemperate or disorderiy will, at the written request of the City, be
removed from the Work by Contractor or Subcontractor employing this person, and
will not be employed again ih any portion of the Work without the written approval of
the City. Contractor or Subcontractor will hold the City harmless from damages or
claims, which may occur in the enforcement of this Article,
(Revised 5.6.2026)
19183299
Page 4 of 67
Contract No. 2026-088-COS
K.
Contractor assumes responsibility for the proper performance of the Work of
Subcontractors and any acts and omissions in connection with this performance.
Nothing in the Contract Documents is intended or considered to create any legal
or contractual relationship between the City and any Subcontractor or Sub-
Subcontractor, including but not limited to any third-party beneficiary rights.
L.
Contractor will coordinate the activities of all Subcontractors. If the City performs
other work on the Project or at the Site with separate contractors under the City's
control, Contractor agrees to reasonably cooperate and coordinate its activities
with those of the separate contractors so that the Project can be completed in an
orderly and coordinated manner without unreasonable disruption.
M.
On a daily basis. Contractor will prepare a Contractor’s Daily Report. The City's
CPM Project Inspector or the Public Works Project Coordinator will provide a
sample report format to Contactor. The report will detail the activities that took
place during the course of the day, all equipment utilized and the number of hours
operated, and ail personnel on the Site including Subcontractors. Unless
otherwise arranged, the Daily Reports will be submitted on a daily basis to the
City’s CPM Inspector or the Public Work’s Project Coordinator. The Daily Reports
will also be made available to the City’s Representative upon request. Failure to
provide Daily Reports as arranged or requested above will result in the retention
of monthly progress payments until the Reports are brought up to date.
N.
In the event of noncompliance with this Article 1.4, the City may require Contractor
to stop or suspend the construction in whole or in part. Any suspension due to
Contractor’s noncompliance will not be considered a basis for an increase in the
Job Order Price or extension of the Job Order Time.
1.5. CONTROL OF THE WORK SITE
A.
Throughout all phases of construction, including any suspension of the Work,
Contractor will keep the Site reasonably free from debris, trash and construction
wastes to permit Contractor to perform its construction services efficiently, safely
and without interfering with the use of adjacent land areas. Upon Substantial
Completion of the Work, or a portion of the Work, Contractor will remove all debris,
trash, construction waste, materials, equipment, machinery and tools arising from
the Work or applicable portions of it to permit the City to occupy the Project or a
portion of the Project for its intended use.
B.
Dust Control. Contractor will take whatever steps, procedures or means required
to prevent abnormal dust conditions due to his construction operations in
connection with this Contract. The dust control measures will be maintained at all
times during construction of the Project(s) to the satisfaction of the City in
accordance with the requirements of the Maricopa County Health Department Air
Pollution Control Regulations and City of Scottsdale Supplement to M.A.G.
Standard Specifications together with applicable provisions of Federal and State
Law.
C.
Dust Control Coordinator. Subject to the requirements or exemptions contained
A.R.S. §49-474.05, as amended, Contractor shall comply with the training,
permitting, and Dust Control Coordinator requirements applicable to the Site and
(Revised 5.6.2026)
19183299
Page 5 of 67
Contract No. 2026-088-GOS
the Project. The Dust Control Coordinator must have full authority to ensure that
dust control measures are implemented at the Site, including authority to conduct
inspections, deploy dust suppression resources, and modify or shutdown activities
as needed to control dust. The Dust Control Coordinator must be responsible for
managing dust prevention and dust control on the Site, including the use of leaf
blowers and street sweeping equipment. The Dust Control Coordinator must have
a valid Dust Training Certification Identification Card readily accessible on the Site
while acting as the Dust Control Coordinator.
A Subcontractor who is engaged in dust generating operations at a Site that is
subject to a Dust Control Permit issued by a County Control Officer and that
requires the control of PM-10 emissions from dust generating operations must
register with the County Control Officer. The Subcontractor must have its
registration number readily accessible on the Site while conducting any dust
generating operations.
D.
Storage on Site. Only materials and equipment, which are to be used directly in
the Work, will be brought to and stored on the Site by Contractor. When equipment
is no longer required for the Work, it will be removed promptly from the Site.
Protection of construction materials and equipment stored at the Site from Weather,
theft, damage and all other adversity is solely the responsibility of Contractor.
E.
Waste Products. Contractor is responsible for the cost to dispose of all waste
products including excess earth material which will not be incorporated into the
Work under this Contract. The waste product referred to will become the property
of Contractor. Contractor will provide for the legal disposal at an appropriate off
site location for all waste products, debris, etc., and will make necessary
arrangements for its disposal. Any disposal/dumping of waste products or unused
materials will conform to applicable Federal, State and Local Regulations.
F.
Contractor will supervise and direct the Work. Contractor will be solely responsible
for the means, methods, techniques, sequences and procedures of construction.
Contractor will employ and maintain on the Site a qualified supervisor or
superintendent who will have been designated in writing by Contractor as
Contractor’s Representative. The Contractor’s Representative will have full
authority to act on behalf of Contractor and all communications given to the
Representative will be as binding as if given to Contractor. The Representative
will be present on the Site at all times as required to perform adequate supervision
and coordination of the Work. Where appropriate all Provisions of M.A.G., Section
105.5, will be applicable.
G.
Abnormal Weather: In the event of abnormal weather conditions, such as
windstorms, rainstorms, etc.. Contractor will immediately inspect the Work and Site
and take all necessary actions to insure public access and safety are maintained.
H.
Damage to Property at the Site. Contractor will be responsible for any and all
damage or loss to property at the Site, except to the extent caused by the acts or
omissions of the City or its representatives, employees or agertts and not covered
by insurance. The costs and expenses incurred by Contractor under this Article
will be paid as a Cost of the Work to the extent that these costs and expenses are
in excess of or are not covered by required insurance, and to the extent of any
(Revised 6.6.2026)
19183299
Page 6 of 67
Contract No. 2026-088-COS
deductibles, but they will not increase the Job Order Price.
Damage to Property of Others. Contractor will avoid damage, as a result of
Contractor’s operations, to existing sidewalks, curbs, streets, alleys, pavements,
utilities, adjacent property, the work of separate contractors and the property of the
City. Contractor will repair any damage caused by the operations of Contractor,
and these costs will be paid as a Cost of the Work to the extent that the costs and
expenses are in excess of or are not covered by required insurance, and to the
extent of any deductible, but they will not increase the Job Order Price.
Failure of Contractor to Repair Damage. Within ten (10) days written notice to
Contractor by the City, if Contractor fails to cornmence the repair of damage to
property as provided in Articles 1.5(H) and 1.5(l), and diligently pursue the repair,
then the City may elect to repair the damages at its own expense and to deduct
from payments due or to become due to Contractor, amounts paid or incurred by
the City in correcting the damage (provided Contractor has not commenced such
repair during the 10 day notice period).
1.6. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
J.
A.
Shop Drawings, Product Data, Samples and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of
the Work for which submittals are required the way Contractor proposes to
conform to the information given and the design concept expressed in the Contract
Documents. Contractor will review, approve and verify that all submittals meet the
intent of the Contract Documents.
B.
Three (3) copies of each Shop Drawing, Product Data, Sample, and similar
submittals required by the Contract Documents will be delivered to the City in
compliance with the approved schedule so as to cause no delay in the Work or in
the activities of the City or of separate contractors. Submittals made by Contractor,
which are not required by the Contract Documents, may be returned without
action,
C.
Contractor will perform no portion of the Work requiring submittal and review of
Shop Drawings, Product Data, Samples, or similar submittals until the respective
subrnittal has been approved by the City. All Work will be In compliance with
approved submittals. Contractor will not be relieved of responsibility for any errors
or omissions in Shop Drawings, Product Data, Samples, or similar submittals by
the City’s approval. Deviation from the original specifications will be specifically
noted on the submittal to the City and the City will be allowed seven (7) days to
approve or reject any deviations.
D.
By approving, verifying and submitting Shop Drawings, Product Data, Samples
and similar submittals. Contractor represents that Contractor has determined and
verified materials, field measurements and field construction criteria, or will do so,
and has checked and coordinated the information contained within the submittals
with the requirements of the Work and of the Job Order.
E.
Contractor will not be relieved of responsibility for deviations from requirements of
the Job Order by the City's approval of Shop Drawings, Product Data, Samples or
(Revised 5.6.2026)
19183299
Page 7 of 67
Contract No. 2026-088-COS
similar submittals unless Contractor has specifically informed the City in writing of
the deviation at the tinie of submittal and the City has given written approval to the
specific deviation. Contractor will not be relieved of responsibility for errors or
omissions in Shop Drawings, Product Data, Samples, or similar submittals by the
City’s approval.
F.
Contractor will direct specific attention, in writing or on resubmitted Shop Drawings,
Product Data, Samples, or similar submittals, to revisions other than those
requested by the City on previous submittals.
G.
Informational submittals upon which the City is not expected to take responsive
action may be so identified in the Contract Documents.
H.
When professional certification of performance criteria of materials, systems or
equipment is required by the Job Order, the City will be entitled to rely upon the
accuracy and completeness of the calculations and certifications.
1.7. QUALITY CONTROL, TESTING AND INSPECTION
A.
Inspection. The City’s Inspectors may be stationed on the Site to report to the
City’s Representative, or designee, as to the progress of the Work. The City’s
Representative, or designee, may also report as to the manner in which the Work
is being performed and report whenever it appears that material furnished or Work
performed by Contractor fails to fulfill the requirements of the specifications, this
Contract or the Job Order. The Inspector may direct the attention of Contractor to
any failure or infringement but this inspection will not relieve Contractor from any
obligation to furnish acceptable materials or to provide completed construction that
complies with the Contract or the Job Order in every way. The Inspector is for the
purpose of assisting the City’s Representative and should not be confused with an
Inspector with a City regulatory agency or with an inspector from a laboratory under
Article 1.8.
B.
In case of any dispute arising between the Inspector and Contractor as to material
furnished or the manner of performing the Work, the Inspector will have the
authority to reject materials or Suspend the Work until the question and issue can
be referred to and decided by the City. Inspectors are not authorized to revoke,
alter, enlarge, relax, or release any requirements of the specifications. Inspectors
will in no case act as foremen or perform other duties for Contractor or interfere
with the management of the Work by Contractor.
C.
Inspection or supervision by the City’s Representative, or designee, wii) not be
considered as direct control of an individual worker or the Work. The direct control
will be solely the responsibility of Contractor.
D.
The furnishing of these services for the City will not make the City responsible for
or give the City control over construction means, methods, techniques, sequenced
procedures or for safety precautions or programs or responsibility for Contractor’s
failure to perform the Work in compliance with the Contract Documents.
{Revised:6.6.2026)
19183299
Page 8 of 67
Contract No. 2026-088-COS
1.8. MATERIALS TESTING
All materials used in the Work will be new and unused, unless otherwise noted, and will
meet all quality requirements of the Job Order.
A.
All construction materials to be used on the Work or incorporated into the Work,
equipment, plant, tools, appliances or methods to be used in the Work may be
subject to the inspection and approval or rejection of the City. Any materials
rejected by the City will be removed immediately and replaced in a manner
acceptable to the City without increasing the Job Order Price.
B.
The procedures and methods used to sample and test material will be determined
by the City. Unless othenwise specified, samples and tests will be made in
compliance with the following: The City of Scottsdale Minimum Sampling
Frequency Guide, the City of Scottsdale Material Testing Manual and the standard
methods of AASHTO or ASTM, DSPM and MAG supplements.
C.
The City will select a pre-qualified City or Independent Testing Laboratory and will
pay for Initial City Acceptance Testing.
1. When the first and subsequent tests indicate noncompliance with the Job
Order, the cost associated with that noncompliance will be incurred by
Contractor without increasing the Job Order Price.
2. When the first and subsequent tests indicate noncompliance with the Job
Order, all retesting will be performed by the same testing agency. The cost
associated with the noncompliance will be incurred by Contractor without
increasing the Job Order Price.
3. Contractor will cooperate with the selected testing laboratory and all others
responsible for the testing and inspecting of the Work and will provide them
access to the Work at all times.
D.
At the option of the City, materials may be approved at the source of supply before
delivery is started.
E.
Code compliance testing and inspections required by codes or ordinances, or by
a plan approval authority, and which are made by a legally constituted authority,
will be incurred by Contractor without increasing the Job Order Price, unless
otherwise provided in the Job Order.
F.
Contractor’s convenience and quality control testing and inspections will be the
sole responsibility of Contractor and incurred by Contractor without increasing the
Job Order Price.
G.
All soils and materials testing will be performed and paid for by the City. The City
will order tests and distribute test results for all construction areas. The City will
be responsible for ordering testing and will distribute test results within 24 hours of
receipt.
(Revised 6.6.2026)
19183299
Page 9 of 67
Contract No. 2026-088-COS
1.9. PROJECT RECORD DOCUMENT/AS BUILTS
A.
During the construction period, Contractor will maintain at the Site a set of Blueline
or Blackline Prints of the Construction Document drawings and Shop Drawings for
Project Record Document purposes.
1. Contractor will mark these drawings to indicate the actual installation where
the installation varies appreciably from the original Construction
Documents. Contractor will give particular attention to information on
concealed elements, which would be difficult to identify or measure and
record later. Items required to be marked include but are not limited to:
Dimensional changes to the drawings;
Revisions to details shown on drawings;
Depths of foundations below first floor;
Locations and depths of underground utilities;
Revisions to routing of piping and conduits;
Revisions to electrical circuitry;
Actual equipment locations;
Duct size and routing;
Locations of concealed internal utilities;
Changes made by Adjustment; and
Details not on original Contract Drawings.
2. Contractor will mark completely and accurately Project Record Documents,
prints of Construction Documents or Shop Drawings; whichever is the most
capable of indicating the actual physical condition. Where Shop Drawings
are marked, show cross-reference on the Construction Documents
location.
3. Contractor will mark sets of Project Record Drawings Prints with red
erasable colored pencil.
4. Contractor will note Request for Information (RFI) Numbers, American
Standards Institute (ASI) Numbers and Adjustment Numbers, etc., as
required to identify the source of the change to the Construction
Documents.
5. Contractor will at the time of Substantial Completion, submit Project Record
Drawing Prints and Shop Drawings to the City or its representative for
review and comment.
B.
Immediately upon receipt of the reviewed Project Record Drawings from the City,
Contractor will correct any deficiencies or omissions to the drawings and prepare
the following for submission to the City:
1. A complete set of PDF electronic files of all Project Record Drawing
prepared in Microstation format compatible with City of Scottsdale CADD
requirements. If a Design Professional is contracted with, the Design
Professional will provide files of the original Construction Documents to
(Revised 5.6.2026)
19183299
Page 10 of 67
Contract No. 2026-088-COS
Contractor for use in preparing these final Project Record Documents, or
Contractor may contract with the Design Professional to revise and update
the electronic drawing files. Each drawing will be clearly marked with “As-
Built Document" and shall be certified by an Arizona Registered Land
Surveyor.
2, A complete set of As-Built reproducible mylars from the final Microstation
drawings and an electronic pdf file on CD are required.
3. The original copy of the Project Record Drawings with redline mark-ups.
1.10. PROJECT SAFETY
A.
The Occupational Safety and Health Act (OSHA) and the City of Scottsdale loss
control procedures are the minimum standard for safety and environmental
protection and must be fully complied with at airtimes. Ail Work will be performed
in compliance with all applicable federal, state and local laws, ordinances, statutes,
rules and regulations including ADOSH policies and procedures. Contractor may
be required to attend a City safety briefing session at the pre-construction meeting.
The session will be attended by the Contract Administrator, the designated Risk
Management staff, and a Contractor’s Representative. Contractors that violate the
aforementioned rules and regulations may be subject to job shutdown and or
removal from City facilities.
B.
The Risk Management Division makes available a packet which contains the City’s
OSHA compliance guidelines, emergency evacuation, the City’s safety and health
plan, and other safety Information.
C.
Contractor Will conduct tailgate safety meetings regularly to ensure that safety on
the job is given priority.
D.
Contractor will contact the City’s Representative and the Risk Management
Division within twenty-four (24) hours of the occurrence of an accident or injury
arising out of Contractor’s Work under this Contract.
E.
Contractor employees are encouraged to abate or remedy any unsafe act or
condition, which may arise in the course of Contractor’s Work under this Contract.
F.
The City reserves the right to conduct safety audits at the Site and stop unsafe
acts at any time. In addition, the City will be notified within four (4) hours should
any OSHA inspection occur at a Site.
G.
Contractor recognizes the importance of performing the Work in a safe manner so
as to prevent damage, injury or loss to;
1. All individuals at the Site, whether working or visiting:
2. The Work, including materials and equipment incorporated into the Work
or stored on-Site or off-Site; and
3. All other property at the Site or adjacent to the Site.
(Revised 5.6.2026)
19183299
Page 11 of 67
Contract No. 2026-088-COS
H.
Contractor assumes responsibility for implementing and monitoring all safety
precautions and programs related to the performance of the Work.
I.
Contractor will, before commencing construction, designate a Safety
Representative with the necessary qualifications and experience to supervise the
implementation and monitoring of all safety precautions and programs related to
the Work. Unless otherwise required by the Contract Documents, Contractor’s
Safety Representative will be an individual stationed at the Site who may have
responsibilities on the Project in addition to safety.
J.
Contractor must provide OSHA 300A Summary log information including total
recordable cases, total case rates, and lost workday incident rates for the past two
(2) calendar years. The Safety Representative shall make routine daily
inspections of the Site and shall hold weekly safety meetings with Contractor’s
personnel. Subcontractors and others as applicable.
K.
Contractor will immediately report in writing any safety-related injury, loss, damage
or accident arising from the Work to City’s Representative and, to the extent
mandated by Legal Requirements, to all government or quasi-governmental
authorities having jurisdiction over safety-related matters involving the Project or
the Work.
L.
Contractor’s responsibility for safety under this Article 1.10 is not intended in any
way to relieve Subcontractors and Sub-Subcontractors of their own contractual
and legal obligations and responsibility for;
1. Complying with all Legal Requirements, including those related to health
and safety matters; and
2. Taking all necessary measures to implement and monitor all safety
precautions and programs to guard against injury, losses, damages or
accidents resulting from their performance of the Work.
M.
Contractor and Subcontractors must agree to provide Material Safety Data Sheets
for all substances that are delivered to the City of Scottsdale, that come under the
Occupational Safety and Health Administration Toxic and Hazardous Substances
- Hazard Communication Standard, 29 CFR 1910.1200 Hazard Communication
(reference Occupational Safety and Health Standards, Subpart Z Toxic and
Hazardous Substances - Hazardous Communication Standard).
All Contractors and all Subcontractors using chemicals on City of Scottsdale
property shall use only the safest chemicals, with the least harmful ingredients.
These chemicals shall be approved for use by a City of Scottsdale representative
before bringing them on the property.
Contractor and all Subcontractors shall make every attempt to apply approved
chemicals with highly volatile organic compounds, outside of working hours.
Adequate ventilation will be used at all times during the application of these
approved chemicals.
(Revised 5,6.2026)
19183299
Page 12 of 67
Gontraet No. 2026-088-COS
In conjunction with the Occupational Safety and Health Standards, Subpart Z Toxic
and Hazardous Substances - Hazard Communication Standard, 29 CFR
1910.1200 Hazard Communication, Contractor and Subcontractors are informed
of the presence of (or possible presence of) chemicals in the area where the Work
requested will be performed. It is the responsibility of Contractor or all selected
Subcontractors to contact the City of Scottsdale for specific information relative to
the type of chemicals present and location of appropriate Material Safety Data
Sheets.
Unless included in the Work, if Contractor encounters onsite material which he
reasonably believes to contain asbestos, polychlorinated biphenyl (PCB), or other
hazardous substances or materials regulated by Public Health Laws, it will
immediately stop Work and report the condition to the City.
If the material is found to contain asbestos, PCB or other hazardous substances
or materials regulated by Public Health Laws, Contractor will nOt resume Work in
the affected area until the material has been abated or rendered harmless.
Contractor and the City may agree, in writing, to continue Work in non-affected
areas onsite. An extension of the Contract Time may be granted as provided in
Article 5.
1.11. WARRANTY
A.
Contractor warrants that any material or service supplied to the City shall fully
conform to all requirements of this Contract and all representations of the
Contractor, and shall be fit for all purposes and uses required by this Contract. The
materials and services supplied under this Contract shall comply with all applicable
federal, state and local laws, and the Contractor shall maintain all applicable
licenses and permits.
B.
The provisions of M.A.G., Section 108.8 will apply with the following additional
requirements:
1. Should Contractor fail to begin repairs or corrective work within fourteen
(14) calendar days after receipt of written notice from the City, the City may
perform the necessary work and Contractor agrees to reimburse the City
for the actual cost.
2. The warranty period on any part of the Work repaired or replaced will be
extended for a period of one (1) year from the date of the repair or
replacement.
3. This warranty will not apply to damage caused by normal wear and tear or
by acts beyond Contractor’s control.
C.
Contractor's warranty obligation excludes defects caused by abuse, alterations, or
failure to maintain the Work by persons other than Contractor or anyone for whose
acts Contractor may be liable.
D.
Contractor's warranty obligation will be for one (1) year.
(Revised 5.6.2026)
19183299
Page 13 of 67
Contract No. 2026-088-COS
E. Nothing in this warranty is intended to iimit any manufacturer's warranty which
provides the City with greater warranty rights than those found in this Article 1.11
or the Contract Documents. Contractor will provide the City with all manufacturers’
warranties upon Substantial Completion of each Job Order.
1.12. CORRECTION OF DEFECTIVE WORK
A.
Contractor agrees to correct any Work that is found to not be in conformance with
the Contract Documents, including that part of the Work subject to Article 1.11
above, within a period of one (1) year from the date of Substantial Completion of
the Work or any portion of the Work, or within any longer period to the extent
required by the Contract Documents. All removal/replacement work, as directed
by the City to Contractor, in compliance with this Contract, MAG standards and
City codes will have cost determinations by the City and be issued as a Job Order
Adjustment to the Project. A Progress Payment, or partial or entire use or
occupancy of the Project by the City will not constitute acceptance of Work not in
accordance with the Contract Documents.
During the Work, Contractor shall take meaningful steps to begin correction of any
nonconforming Work as notified by the City. This includes the correction, removal
or replacement of the nonconforming Work and any damage caused to other parts
of the Work affected by the nonconforming Work. If Contractor fails to begin the
necessary steps during the Work, the City, in addition to any other remedies
provided under the Contract Documents, may provide Contractor with written
notice that the City will commence correction of any nonconforming Work, at its
discretion, through its employees, agents or other third parties.
Contractor shall take meaningful steps to begin correction of nonconforming Work
subject to Article 1.11 above. These measures include but are not limited to timely
correction of th? Work. If Contractor fails to initiate necessary measures for this
Work within seven (7) days of receipt of written notice from the City, the City, in
addition to any other remedies provided under the Contract Documents, may
provide Contractor with written notice that the City will begin correction of the
nonconforming Work, at its discretion, through its employees, agents or other third
parties.
B.
If the City does perform this corrective Work, Contractor will be responsible for all
reasonable costs incurred by the City in performing the correction without
increasing the Job Order Price.
C.
Contractor shall immediately respond to any nonconforming Work that creates an
emergency.
D.
The one (1) year period referenced in Article 1.11 above applies only to
Contractor's obligation to correct nonconforming Work and is not intended to
constitute a period of limitations for any other rights or remedies the City may have
regarding Contractor’s other obligations under the Contract Documents.
(Revised 5,6.2026]
19183299
Page 14 of 67
Contract No. 2026-088-COS
1.13. SUBCONTRACTOR AND MAJOR SUPPLIER SELECTIONS
A.
Contractor shall select major Subcontractors and major Suppliers, subject to first
obtaining the City's approval. Major Subcontractors may be selected based on
qualifications or a combination of qualifications and price. Subcontractors must
not be selected based on price alone. Except as noted belovv, the selection of
major Subcontractors/Suppliers is the responsibility of Contractor, but the City
must approve in writing the selection of ail Subcontractors. In any case. Contractor
is solely responsible for the performance of the selected Subcontractors/Suppliers.
Contractor shall prepare a Subcontractor/Supplier selection pian and submit the
plan to the City for approvai or Contractor may use the City’s plan as described in
Articie 1.13(B). This Subcontractor seiection plan will identify those Subcontractor
trades anticipated to be selected by qualifications only as provided in Article
1.13(B) and those Subcontractor trades anticipated to be seiected by qualifications
and competitive bid as provided in Article 1.13(C). This plan will also identify those
Subcontractors that wili not be selected through a formalized quaiifications-based
selection process. The Subcontractor selection pian must be consistent with the
selection requirements included in this Contract.
B.
Selection by qualifications only - The City may approve the selection of a
Subcontractor(s) or Supplier(s) based only on their qualifications when Contractor
can demonstrate it is in the best interest of the Project.
1. Contractor wiil apply the Subcontractor selection plan approved by the City
in the evaluation of the qualifications of a Subcontractor(s) or Supplier(s)
and provide the City with its review and recommendation. The selection
plan will be Contractor's own selection pian approved by the City or the
City’s selection plan as provided in this Article 1.13(B).
2. Contractor will negotiate costs for services/supplies from the
Subcontractor(s)/Supplier(s) under the approved qualifications only
method.
City Selection Plan:
3. Contractor may elect to comply with the following City procedures in its
selection of Subcontractor(s) or Suppliers(s) based on qualifications oniy;
a. The Request for Qualifications (RFQ) will contain the best
description of the services or material desired; and
b. A statement that oniy unpriced statements of quaiifications wiil be
considered; and
c. State the requirements for the project, such as drawings and
descriptive literature; and
d. State the criteria for evaluating the qualifications; and
e. A ciosing date and time for receipt of a statement of quaiifications
(Revised 5.6.2026)
19163299
Page 15 of 67
Contract No. 2026-088-COS
and the location where the statements should be delivered or
mailed; and
f.
A statement that discussions may be held; and
g. A statement that only statements of qualifications determined to be
acceptable will be considered for award.
4. The RFQ may be amended after the submission of the statements of
qualifications. Any amendment will be distributed only to bidders who
submitted statements of qualifications. Those bidders will be permitted to
submit new unpriced statements of qualifications or to amend statements
already submitted.
C.
5. Statements of Qualifications will not be opened publicly but will be opened
in the presence of Contractor. The contents of unpriced statements of
qualifications will not be disclosed to Unauthorized persons.
6. Statements of Qualifications will be evaluated solely in accordance with the
criteria stated in the RFQ and will be determined to be either acceptable
for further consideration or unacceptable. A determination that the
statement is unacceptable shall be in writing, state the basis of the
determination and be retained by Contractor. Contractor will notify the
bidder of the determination and the bidder will not be given an opportunity
to amend its statement of qualifications further.
7. Contractor may conduct discussions with any bidder who submits an
acceptable or potentially acceptable statement of qualifications. During
discussions, Contractor will not disclose any information derived from any
other bidder’s statement of qualifications.
8. Contractor will negotiate costs for sen/ices/supplies from the
Subcontractor(s)/Supplier(s) selected under this method.
Selection by qualifications and competitive bid - Contractor will apply the
City’s Subcontractor selection plan stated above or Contractor’s selection plan, if
previously approved by the City, in Contractor’s evaluation of the qualifications of
Subcontractor(s)/Supplier(s) and wjll provide the City with the selected process to
prequalify prospective Subcontractors/Suppliers. Selection may not be based on
price alone. All Work by major Subcontractors and major Suppliers will then be
competitively bid to the prequalified Subcontractors unless a Subcontractor or
supplier was selected in accordance with Article 1.13(B) above. Contractor may
elect to corhply with the following procedures in step 2 of its competitive bid
process.
1. Contractor will develop Subcontractor and Supplier interest, submit the
names of a minimum of three (3) qualified Subcontractors or Suppliers for
each trade in the Project and solicit bids for the various Work categories. If
there are not three (3) qualified Subcontractors/Suppliers available for a
specific trade or there are extenuating circumstances, Contractor may
request approval by the City to submit less than three (3) names. Without
(Revised 5.6.2026)
19183299
Page 16 of 67
Contract No. 2026-088-COS
first giving written notice to the City, no change in the recommended
Subcontractors/Suppliers will be allowed.
2. If the City objects to any nominated Subcontractor/Supplier of to any self-
performed Work for good reason, Contractor will nominate a substitute
Subcontractor/Supplier that is acceptable to the City.
3. Contractor will distribute Drawings and Specifications, and when
appropriate, conduct a pre-bid conference with prospective Subcontractors
and Suppliers. Contractor will then review the price bids submitted by
Subcontractors and Suppliers and make its selection based on the
responsive and responsible bidder with the lowest price.
4. If Contractor desires to self-perform certain portions of the Work, it must
request to be one of the approved Subcontractor bidders for those specific
bid packages. Contractor’s bid will be evaluated in accordance with the
process identified in the Invitation for Bids. If events warrant and the City
concurs that in order to insure compliance with the Project Schedule or
cost. Contractor may self-perform Work without bidding or re-bidding the
Work.
D.
If after receipt of sub-bids or after award of Subcontractors and Suppliers, the City
objects to any nominated Subcontractor/Supplier or to any self-performed Work
for good reason, Contractor will nominate a substitute Subcontractor or Supplier,
preferably if this option is still available, from those who submitted Subcontractor
bids for the Work affected. Once the substitute Subcontractors and Suppliers are
consented to by the City, Contractor’s proposed price for the Work or portion of the
Work will be correspondingly adjusted to reflect any higher or lower costs from any
substitution. Under no circumstances will the City's objection or comment on any
Subcontractor or Supplier relieve Contractor of its sole responsibility for control
over the methods, means and processes by which the Work is accomplished. The
City must approve in writing the selected Subcontractor Selection Plan before work
commences on any Job Order.
E.
Contractor shall incorporate by reference the terms and conditions of this Contract,
in any subcontract or supplier contract hereunder.
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES
2.1 INFORMATION AND SERVICES
The City will furnish Contractor, at no cost to Contractor, the following information or
services for this Project:
1. One copy of data pertinent to the Work. However, Contractor will be
responsible for searching the records and requesting information required
for the Project.
2. Ail available data and information relative to policies, standards, criteria,
studies, etc.
(Revised 5.6.2026)
19183299
Page 17 of 67
Contract No. 2026-088-COS
3. Project funding and budget allocations and any changes affecting the
funding or budget allocations.
4. For purpose of determining the Job Order Price, any Plans and
Specifications.
5. For purpose of Project Record Drawing Prints, a GADD file of the
Construction Documents in Microstatibn format compatible with City of
Scottsdale CADD requirements.
2.2
CITY’S REPRESENTATIVE
The City's Representative will be responsible for providing City-supplied information and
approvals in a timely manner to permit Contractor to fulfill its obligations under the Contract
Dpcumehts.
2.3
DESIGN PROFESSIONAL SERVICES
A.
The City may contract separately with one or more Design Professionals to provide
architectural or engineering design of the Project in accordance with the provisions
of A. R.S. §34-603.
B.
The City may contract with the Design Professional to provide some or all of the
following services during the performance of the Work;
1. The Design Professional may provide administration of the Work. The City
and Contractor will endeavor to communicate through the Design
Professional. Communications by and with the Design Professional's
consultants Will be through the Design Professional.
2. The Design Professional may visit the Site at intenrals appropriate to the
stage of construction to become generally familiar with the progress and
quality of the completed Work and to determine in general if the Work is
being performed in accordance with the Contract Documents. The Design
Professional will keep the City informed of progress of the Work and will
endeavor to guard the City against defects and deficiencies in the Work.
3. Upon Contractor’s submittals, the Design Professional may review and
approve or take other appropriate action on submittals as Shop Drawings,
Product Data and Samples in accordance with Article 1.6.
4. All drawings produced for projects considered to be performed under
Contractor are the property of the City and are owned in whole by the City
for any and all future use and considerations.
2.4
CITY’S SEPARATE CONTRACTORS
The City is responsible for all Work performed on the Project or at the Site by separate
contractors under the City's control. The City Will contractually require its separate
contractors to cooperate with and coordinate their activities so as not to interfere with
Contractor in order to enable Contractor to timely complete the Work consistent with the
(Revised 5.6:2026)
19163299
Page 18 of 67
Contract No. 2026-088-COS
Contract Documents. Contractor agrees to reasonably cooperate and coordinate its
activities with those of the separate contractors so that the Project can be completed in
an orderly and coordinated manner without unreasonable disruption.
2.5 FURNISHING OF SERVICES AND INFORMATION
A. The City will be responsible for the payment or waiver of the following:
B.
1. City review and permit(s) fees for building, encroachment, and demolition
permits including City, State and County.
2. City review fees for grading and drainage, water, sewer and landscaping.
3. Utility design fees or permanent sen/ices fees are paid by the City, but all
submittals are the responsibility of Contractor.
4. Obtaining Nationwide 404 Permits.
6. city Development Fees.
Unless expressly stated to the contrary in the Contract Documents, the City will
provide, at its own cost and expense, for Contractor’s information the following:
1. To the extent available, surveys describing the property, boundaries,
topography and reference points for use during construction, including
existing service and utility lines;
2. Temporary and permanent easements, zoning and other requirements and
encumbrances affecting land use, necessary to permit the proper design
and construction of the Project and enable Contractor to perform the Work;
3. A legal description and street or physical address of the Site;
4. To the extent available, as-built record or historical drawings of any existing
structures at the Site;
5. To the extent available, environmental studies, reports and impact
statements describing the environmental conditions, including hazardous
materials, in existence at the Site; and
6. To the extent available. Geotechnical studies describing subsurface
conditions and other surveys describing other latent or concealed physical
conditions at the Site.
7. The City will provide all City standards and guidelines, supplementary
conditions and special provisions that will be included in the plans and
specifications for the Project. These may include but are not limited to:
disposal of surplus material, special security provisions, investigation of
underground facilities,, traffic controls and regulations, special quality
control testing and termite treatment requirements.
(Revise 5.6.2026)
19183299
Page 19 of 67
Contract No. 2026-088-COS
2.6 PROJECT MANAGEMENT SERVICES
A.
The City may contract separately with one or more Technical Consultants to
provide project management assistance for the Project. The Technical
Consultant's contract as well as contracts with other firms hired by the City will be
furnished to Contractor. Contractor will not have any right, however, to limit or
restrict any Project modifications that are mutually acceptable to the City and
Technical Consultant.
B.
The Technical Consultant services will augment the City staffing resources to
effectively manage the objectives of the City and the Project with the goal of
managing the key Project communication, cost and time parameters.
C.
The Technical Consultant may provide pre-programming and design standards.
D.
The City may contract with the Technical Consultant to provide any or all of the
sen/ices or functions of the City’s project manager during the performance of the
construction.
2.7
PERMIT REVIEW AND INSPECTIONS
For clarification, permitting activities are handled by the City of Scottsdale
Developmental Services, Fire and Planning Departments. Obtaining any permits and
submittals are the responsibility of the City.
2.8
UTILITY COMPANY COORDINATION
Contractor will be responsible for coordinating utility design work for permanent service
to the Project and will ensure that the work takes place in a timely manner and does not
impact the Project schedule. Any utility design fees for permanent services to a Job
Order will be paid by the City in accordance with Article 2.6.
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME
3.1 CONTRACT TIME
A.
The initial term of this Contract will be for two (2) years and will commence on the
Effective Date, with the option to extend for three (3) additional years in one (1)
year increments.
1. The option to extend may be exercised based on Contractor’s successful
performance and the needs of the City.
2. A contract modification will be processed for each extension and will
commence on or about the anniversary date of the Contract. Each extension
must be authorized by the Contract Administrator and Purchasing Director for
the City and need not return to the City’s Council for approval.
B.
The Contract will remain in full force and effect during the performance of any Job
Order.
(Revised 5.6.2026)
19183299
Page 20 of 67
Contract No. 2026-088-COS
3.2
JOB ORDER TIME
A.
Job Orders may be issued at any time during the term of this Contract.
B.
Each individual Job Order will include a Job Order Notice-to-Proceed date,
Duration of the Work as determined in accordance with this Article 3.2 and a
calculated Substantial Completion date.
C.
Contractor agrees that it wiil commence performance of the Work and achieve the
approved Job Order Time.
D.
Job Order Time may be subject to adjustment in accordance with Article 5.
3.3
SUBSTANTIAL COMPLETION
A.
Substantial Completion of each Job Order is when all construction has been
completed with the exception of final inspection punch list work and further defined
in Article 12. The purpose of granting or acknowledging Substantial Completion is
to stop Job Order Tjme.
B.
Before notifying the City in accordance with Article 3.3(C), Contractor will inspect
the Work and prepare and Submit to the City a comprehensive list of, items to be
completed or corrected. Contractor will proceed promptly to complete and correct
items on the list. Failure to include an item on the list does not alter the
responsibility of Contractor to complete all Work in accordance with the Contract
Documents.
C.
Contractor will notify the City when it believes a Job Order, or to the extent
permitted in the Contract Documents, a portion of the Job Order, is substantially
complete.
D.
Within five (5) days of the City’s receipt of Contractor’s notice in accordance with
Article 3.3(C). the City and Contractor will jointly inspect the Work to confirm
Substantial Completion.
E.
Once Substantial Completion of the Work is confirmed in accordance with Article
3.3(D), the City will prepare and issue a Certificate of Substantial Completion that
will state:
1. The date of Substantial Completion of the Work or portion of the Work;
2. The remaining items of Work that have to be completed within thirty (30)
calendar days before Final Acceptance;
3. Provisions (to the extent not already provided in the Contract Documents)
establishing the City's and Contractor’s responsibility for the Project’s
security, maintenance, utilities and insurance pending Final Acceptance.
F.
The City, at its option, may use a portion of the Work which has been determined
to be substantially complete provided, however, that:
(Revised 5.6.2026)
19183299
Page 21 of 67
Contract No. 2026-088-COS
1. Certificate of Substantial Completion has been issued for the portion of
Work addressing the items in Article 3.3(E)(2).
2. Contractor and the City have obtained the consent of their sureties and
insurers, and to the extent applicable, the appropriate government
authorities having jurisdiction over the Project, and
3. The City and Contractor agree that the City’s use of occupancy will not
interfere with Contractor’s completion of the remaining Work required under
Article 3.3(E).
3.4
PUNCH LIST PREPARATION
A minimum of seven (7) days before Substantial Completion, Contractor, in conjunction
with the City, will prepare a comprehensive list of Punch List items, which the City may
edit and supplement. Contractor will proceed promptly to complete and correct the
Punch List items. Failure to include an item on the Punch List does not alter the
responsibility of Contractor to complete all Work |n accordance with the Contract
Documents. Warranties required by the Contract Documents will not commence until
the date of Final Acceptance, unless othenwise provided in the Contract Documents.
Seven (7) days before the City issues its Final Acceptance Letter, Contractor will deliver
to the City all Operation and Maintenance Manuals necessary for the City to assume
responsibility for the operation and maintenance of that portion of the Work.
3.5
FINAL ACCEPTANCE
Upon receipt of written notice that the Work or identified portions of the Work is ready for
final inspection and acceptance, the City and Contractor will jointly inspect to verify that
the remaining items of Work have been completed as required under Article 3.3(E).
Upon verification that the items have been satisfactorily completed, the City will issue a
Final Acceptance Letter.
3.6
LIQUIDATED DAMAGES
A.
Contractor understandsthat if Substantial Completion is not attained within the Job
Order Time, as may be adjusted for each Job Order, the City will suffer darhages,
based on the anticipated loss caused by the breach and the difficulty in determining
and accurately specifying the damages. Contractor agrees that if Substantial
Completion is not attained within the Job Order Time as adjusted. Contractor will
pay the City the amount prescribed in Article 3.6(B) below as liquidated damages
for each Day that Substantial Completion extends beyond the date determined by
the Job Order Time as adjusted.
B.
The following will be the liquidated damages for each Job Order unless a specific
amount has been determined for each individual Job Order.
(Revised 5.6.2026)
19183299
Page 22 of 67
Contract No. 2026-088-COS
L QUIDATED DAMAGES
Original Job Order Amount
Daily Charges
From more than To and including Calendar Day or Fixed Date
$00
$25,000
$200
25,001
50,000
250
50,001
100,000
280
100,001
500,000
430
500,001
750,000
500
750,001
1,000,000
570
1,000,001
1,250,000
610
1,250,001
1,500,000
650
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE
4.1 CONTRACT PRICE
The fee for individual projects performed under this contract will be negotiated on a
project-by-project basis as Job Orders. The amount paid to the Contractor under this
contract for all Job Orders shall not exceed Six Million Dollars ($6,000,000) for the initial
two (2) year term and Three Million Dollars ($3,000,000) for any successive one (1) year
contract extension. The Contractor agrees at its own cost and expense, to do ail the
Work as specified in the Contract Documents and any Work contingent to the Contract
and necessary for the construction of the improvements. The Contractor will completely
construct the Work and install the materials, free and clear of all claims, liens, and
charges of any kind, in the manner and under the conditions specified within the time or
times stated in each Job Order.
A.
In no event will any individual Job Order Price exceed Two Million Five Hundred
Thousand Dollars ($2,500,000). If the City opts to extend this Contract in
accordance with Article 3.1(A), the Contract Modification may increase the
maximum amount, if necessary, at that time.
B.
The Job Order Price is subject to Adjustments made in accordance with Article 5.
C.
Unless otherwise provided in the Contract Documents, the Job Order Price is
considered to include all sales, use, consumer and other taxes throughout the term
of this Contract, whether or not yet effective or merely scheduled to go into effect.
D.
Contractor must secure and maintain, during the life of the Contract, State of
Arizona and City of Scottsdale Transaction Privilege (sales) Tax Licenses.
To obtain a State of Arizona Privilege (Sales) Tax License Application, please go
to the following website:
https://azdor.qov/transaction-privileqe-tax/tpt-license/applvinq-tpt-license
To obtain a City of Scottsdale Transaction (Sales) Tax License Application, please
go to the following website:
https://www.scottsdaleaz.qov/taxes/resources
(Revised 5.6.2026)
19183299
Page 23 of 67
Contract No. 2026-088-COS
Contractor must demonstrate compliance with the E-Verify Program as provided
in Article 11.33 and as required byA.R.S. §41-1080, as amended, before issuance
of any License by the City,
4.2 RESPONSIBILITY FOR PRIVILEGE (SALES) TAXES
A. Contractor is responsible for payment of all applicable State of Arizona and City of
Scottsdale transaction privilege (sales) taxes due on construction income whether
or not these taxes are specifically separated in the bid amount. The taxes are to
be reported on either a progressive billing (accrual) basis or cash receipts basis,
depending on the method chosen at the time application was made for the
Privilege (sales) Tax License.
City Privilege (sales) tax exemptions/deductions may be applicable to certain
projects. Contractor is advised to consider this as it prepares its bid. Please
review, in detail. Sections 415, 465, and 110 of the Scottsdale Revised City Code,
Appendix C to determine if exemptions/ deductions are applicable. For tax
guidance, please reference the City Code and other tax resources at the following
website:
http://www.scottsdaleaz.gov/taxes/
The State of Arizona has similar exemptions; please reference A.R.S. Title 42 at
the following website:
http://www.azleq.state.az.us/ArizonaRevisedStatutes.asp?Title=42
For further questions regarding tax treatment, please contact the Arizona
Department of Revenue at 602-255-2060 and the City of Scottsdale Tax & Audit
Section at 480-312-2768.
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME
5.1 DELAYS TO THE WORK
A.
Delays may be compensable, concurrent, excusable or non-excusable as defined
in Article 12.
B.
If Contractor is delayed in the performance of the Work due to acts, omissions,
conditions, events, or circumstances beyond its control and due to no fault of its
own or those for whom Contractor is responsible, the Job Order Time for
performance may be reasonably extended by Job Order Adjustment.
C.
Contractor must request a Job Order Adjustment by written notice, including an
estimate of the probable effect of delay on progress of the Work. In the case of a
continuing delay, only one request is necessary.
D.
Written notice will be received within fourteen (14) days of the commencement of
the cause of the delay. If written notice is received more than fourteen (14) days
after commencement of the cause of the delay, the period of delay will be
considered to commence fourteen (14) days before the giving of any notice.
(Revised 6.6.2026)
19183299
Page 24 of 67
Contract No. 2026-088-COS
E.
If adverse weather conditions are the basis for a Job Order Adjustment request,
the requests shall be documented by data substantiating that weather conditions
were abnormal for the period of time and could not have been reasonably
anticipated, and that weather conditions had an adverse effect on the scheduled
construction.
F.
Permitting Contractor to proceed to complete any Work, or any part of the Work,
after the date to which the time of completion may have been extended, will in no
way act as a waiver on the part of the City of any of its legal rights.
G.
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34-609(E), as amended. Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that requires
notice of delays, provides for arbitration or other procedures for settlement or
provides for liquidated damages.
H.
In addition to Contractor’s right to request a time extension for those events stated
in this Article 5.1, Contractor may also be entitled to an appropriate adjustment of
the Job Order Price provided, however, that the Job Order Price will not be
adjusted for delays caused by reason of force majeure as defined in this Contract.
5.2 DIFFERING SITE CONDITIONS
5.2.1. If Contractor encounters a Differing Site Condition(s), Contractor may be entitled
to an adjustment in the Job Order Price or Job Order Time(s) to the extent
Contractor's cost or time of performance are the direct result of a Differing Site
Condition(s).
5.2.2. Upon encountering a Differing Site Condition, Contractor shall provide prompt
written notice to the City of the condition, which notice will not be later than seven
(7) days after the condition has been encountered. Final costs must be
submitted within thirty (30) days after notice is received by the City, unless
extended by written agreement of the parties. Contractor must give the City’s
Contract Administrator written notice of and an opportunity to observe such
condition before disturbing or altering the Differing Site conditions. The failure
of Contractor to give written notice and make the Claim as required by this Article
and Article 7.1.5 shall constitute a waiver by Contractor of any rights arising out
of or relating to such Differing Site Conditions.
5.2.3. In order for Contractor to obtain any additional compensation or time extensions
for Differing Site Conditions, Contractor must demonstrate that it encountered a
material difference at the Site, as defined in Article 12, that required it to expend
additional cost or time. Contractor will also establish that it actually and
reasonably relied upon the representations found in the Contract Documents
concerning the Site conditions.
(Revised 5.6.2026)
19183299
Page 25 of 67
Contract No. 2026-088-COS
5.3
APPLICATION FOR EXTENSION OF TIME
6.3.1
If performance by Contractor is delayed for a reason set forth in Article 5,
Contractor may be allowed a reasonable extension of time in conformance with
this Article. Before Contractor’s time extension request may be considered,
Contractor shall notify the City of the condition which allegedly has caused Or is
causing the delay, and shall submit a written application to the City identifying:
1.
Liquidated damage assessment rate, as specified in the Contract;
2.
OriginaUob Order Price;
3.
Original Job Order Time;
4.
Any previous Job Order Adjustments granted (number and duration); and
5.
The extension of time requested.
5.3.2
In addition, the application for extension of time shall set forth in detail;
1.
The: nature of each alleged cause of delay in completing the Work;
2.
The date upon which each such cause of delay began and ended and the
number of dates attributable to each such cause;
3.
A statement that Contractor waives all claims except for those delineated
in the application, and the particulars of any claims which Contractor does
not agree to waive. For time extensions for Substantial Completion and
final completion payments, the application shall include a detailed
statement of the dollar amounts of each claim item reserved; and
4.
A statement indicating Contractor’s understanding that the time extension
is granted only for purposes of permitting continuation of Contract
performance and payment for Work performed and that the City retains its
right to conduct an investigation and assess liquidated damages as
appropriate in the future.
6.4
ERRORS, DISCREPANCIES AND OMISSIONS
A.
If Contractor observes errors, discrepancies or omissions in the Contract
Documents, it will promptly notify the City and request clarification. Contractor will
provide a copy of this notice to the City’s Representative.
B.
If Contractor proceeds with the Work affected by the errors, discrepancies or
omissions, without receiving any clarifications, it does so at its own risk. Adjustments
involving these circumstances made by Contractor before clarification by the Design
Professional will be at Contractor’s risk.
(Revised 5.6.2026)
19183299
Page 26 of 67
Contract No. 2026-088-COS
5.5 CITY REQUESTED CHANGE IN WORK
A.
The City reserves the right to make, at any time during the progress of the Work,
any alterations as may be found necessary or desirable.
B.
These alterations and changes will not invalidate this Contract nor release the
surety and Contractor agrees to perform the Work as altered, the same as if it had
been a part of the original Job Order. Contractor will notify the surety of the
changes and will assure that the alterations and changes are adequately covered
by the surety bond.
C.
The City will request a proposal for a change in Work from Contractor, and an
Adjustment to the Job Order Price or Job Order Time will be made based on a
mutual agreed upon cost and time.
5.6
LEGAL REQUIREMENTS
The Job Order Price or Job Order Time will be adjusted to compensate Contractor for
the effects of any changes in the Legal Requirements enacted after the date of the
Contract affecting the performance of the Work.
5.7
JOB ORDER ADJUSTMENTS
A.
In accordance with the City of Scottsdale Procurement Code, and related Rules
and Procedures, the City and Contractor will negotiate in good faith and as
expeditiously as possible the appropriate Job Order Adjustment(s). Upon reaching
an agreement, the parties will prepare and execute an appropriate Adjustment
reflecting the terms of their agreement. The change in Work may or may not
include an Adjustment in the Job Order Price or Job Order Time.
B.
All changes in Work authorized by Job Order Adjustments will be performed under
the conditions of the Contract Documents. The decision to make an Adjustment
to the Job Order rests solely with the City and any decision to make a Job Order
Adjustment must be promptly complied with by Contractor, subject to the
provisions of Article 5.8.
C.
The execution of a Job Order Adjustment by Contractor shall constitute conclusive
evidence of Contractor’s agreement to the ordered changes in the Work, the Job
Order Price, and the Job Order Time by Contractor. Contractor, by executing the
Job Order Adjustment, waives and forever releases any claim against the City for
any additional time or compensation for matters relating to, arising out of, or
resulting from the Work included within or affected by the executed Job Order
Adjustment of which Contractor knew or should have known.
5.8 UNILATERAL DETERMINATION OF JOB ORDER VALUE
If no mutual agreement occurs between the City and Contractor, the change in Job Order
Price, if any, shall be derived by determining the reasonable actual costs incurred or
savings achieved, resulting from revisions to the Work. Such reasonable actual costs
or savings shall include a component for direct job site overhead and profit but shall not
include home-office overhead or other indirect costs and components. The calculation
(Revised 5.6.2026)
19183299
Page 27 of 67
Contract No. 2026-088-COS
of actual costs shall conform to the markup schedule in Article 5.12 below. Any such
costs or savings shall be documented in the format and with such content and detail as
the City requires. Contractor shall promptly submit such documentation and other
backup as the City may require in evaluating the actual costs incurred.
5.9
ADDITIONAL JOB ORDER COST REQUIREMENTS
Contractor’s or Subcontractor’s submittals shall include the cost of materials, sales tax,
and the cost of all transport. The cost of items listed shall be directly related to the Job
Order Adjustment. Indirect costs not specifically related to the Job Order Adjustment
shall not be considered. Contractor’s or Subcontractor’s Direct Labor Costs shall be
limited to the hourly rate of directly involved workmen, employer contributions toward
Contractor standard benefits, pensions, unemployment or social security (if any), and
employer costs for paid sick and annual leave. Contractor’s or Subcontractor’s
Overhead shall include license fees, bond premiums, supervision, wages of timekeepers
and clerks, incidentals, home and field office expense, and vehicle expense directly
related to the Project, and all other direct Project expenses not included in Contractor’s
material, direct labor, and equipment costs.
5.9.1
The allowance for overhead and profit shall be limited to the following schedule;
1.
For Contractor, for any work performed by Contractor’s own forces, fifteen
(15%) percent of the Subtotal of Costs to Contractor.
2.
For Contractor, for any work performed by its Subcontractor, six (6%)
percent of the amount due to the Subcontractor.
3.
For each Subcontractor or Sub-subcontractor involved, for any work
performed by their own forces, fifteen (15%) of their materials and direct
labor costs.
4.
For each Subcontractor, for work performed by its Sub-Subcontractor(s),
six (6%) percent of the amount due to the Sub-subcontractor.
5.10 LIMITATION OF COMPENSABLE ITEMS
5.10.1 For Job Order Adjustment, the total cost or credit to the City shall be based on
the following schedule:
1. Contractor’s Materials Costs.
2. Contractor’s Direct Labor Costs.
3. Contractor’s Equipment Costs (includes owned/rented equipment).
4. Applicable Subcontractor Costs.
5. Subtotal of Costs to Contractor.
6. Contractor’s Overhead and Profit.
(Revised S.6.2026)
19183299
Page 28 of 67
Contract No. 2026-088-GOS
7. Total Cost or Credit to the City.
6.11 FIELD ORDERS
A.
The City has authority to initiate Field Orders that do not materially and adversely
affect the Work, including the design, quality, performance and workmanship
required by the Contract Documents. Field Orders will be made by written order
and will be binding on the City and Contractor. Contractor will carry out any written
Field Orders promptly.
B.
Field Orders will not involve an adjustment in the Job Order Price dr Job Order
Times unless or until it becomes a Job Order Adjustment.
C.
Contractor may make minor changes in the Work, provided, however that
Contractor will promptly inform the City, in writing, of any changes and record the
changes, if appropriate, on the Project Record Documents maintained by
Contractor.
5.12 JOB ORDER PRICE ADJUSTMENTS
A.
The increase or decrease in Job Order Price resulting from a change in the Work
will be determined by one or more of the following methods:
1. Unit prices stated in the Contract or as subsequently agreed to between
the parties:
2. A mutually agreed upon accepted, lump sum, properly itemized and
supported by sufficient substantiating data to permit evaluation by the City;
and
3. Costs, fees and any other markups.
B.
If an increase or decrease cannot be agreed to as stated in Article 5.7(A), the cost
of the change of the Work will be determined by the reasonable expense and
savings in the performance of the Work resulting from the change, including a
reasonable overhead and profit, as may be stated in the Contract Documents.
Contractor will maintain a documented, itemized accounting, evidencing the
expenses and savings associated with these changes.
C.
If Unit Prices are stated in the Contract Documents, or are later agreed to by the
parties, but application of the Unit Prices will cause substantial inequity to the City
or Contractor because of differences in the character or quantity of the unit items
as originally contemplated, the Unit Prices will be equitably adjusted.
D.
If the City and Contractor disagree upon whether Contractor Is entitled to be paid
for any services required by the City, the amount to be paid, other disagreements
over the Scope of Work, proposed changes to the Work, or the time required to
complete the Work, the City and Contractor will resolve the disagreements in
accordance with Article 7.
1, As part of the negotiation process. Contractor Will furnish the City with a
(Revised 5.6,2026)
19183299
Page 29 of 67
Contract No. 2026-088-eOS
good faith estimate of the costs to perform the disputed services, or the
additional time required in accordance with the City's interpretations.
2. If the parties are unable to agree and the City expects Contractor to perform
the services in accordance with the City's interpretations, Contractor will
proceed to perform the disputed services, conditioned upon the City issuing
a written order to Contractor;
(a) directing Contractor to proceed; and
(b) specifying the City's interpretation of the services that are to be
performed.
E. Emergencies, in any emergency affecting the safety of persons or property,
Contractor will act, at its discretion, to prevent threatened damage, injury or loss.
Any change in the Job Order Price or Job Order Time(s) resulting from emergency
work will be determined as provided in this Article 5.
ARTICLE 6- PROCEDURE FOR PAYMENT
6.1
JOB ORDER PAYMENT REQUEST
A.
At the pre-construction conference prescribed in Article 1.3, Contractor will submit
for the City’s review and approval a Schedule of Values. The Schedule of Values
will include values for all items comprising the Job Order Price and will serve as
the basis for monthly progress payments made to Contractor throughout the Work.
B.
At least five (5) working days before the date established for a progress payment.
Contractor will rheet vyith the City’s Representative to review the progress of the
Work, as it will be reflected on the Contractor Payment Request.
C.
The Contractor Payment Request will constitute Contractor's representation that
the Work has been performed consistent with the Job Order including any
Adjustment(s), has progressed to the point indicated in the Contractor Payment
Request, and that title to all Work will pass to City free and clear of all claims, liens,
encumbrances, and security interests upon the incorporation of the Work into the
Project.
6.2
PARTIAL PAYMENTS
A.
Partial progress payment will be made for Job Orders with Job Order Time greater
than 30 Days and may be made if the Job Order Time is less than 30 Days.
B.
The Contractor Payment Request may request payment for equipment and
materials not yet incorporated into the Project if construction progress is in
reasonable conformance with the approved schedule.
C.
For equipment and materials suitably stored at the Site, the equipment and
materials will be protected by suitable insurance and the City will receive the
equipment and materials free and clear of all liens and encumbrances.
(Revised 5.6.2026)
19183299
Page 30 of 67
Contract No. 2026-088-COS
1. For materials and equipment stored off the Site, the City must approve the
storage. The material and equipment must be stored within Maricopa
County and be accessible for the City’s inspection. Title to the materials
and equipment will include applicable insurance, bonding, storage and
transportation to the Site..
2. The City will be^named as an Additional Insured on all insurance and bonds
required for all stored materials or equipment
6.3
PAYMENT OF JOB ORDER PRICE
A.
Payments should be provided on the City format for a Pay Application which is
based on the agreed upon Schedule of Values. Payment will be made no later
than fourteen (14) days after the Contractor Payment Request is certified and
approved, but in each case less the total of payments previously made.
B.
The Contractor Payment Request shall be deemed approved and certified for
payment seven (7) days after the date of submission to the City by Contractor
unless before that time the City prepares and issues a specific written finding
setting forth those items in detail in the Contractor Payment Request that are not
approved for payment under the Contract. The finding will indicate the specific
amounts the City intends to withhold, the reasons and contractual basis for the
withholding, and the specific measures Contractor must take to rectify the City's
concerns. The City may withhold an amount from the progress payment sufficient
to pay the expenses the City reasonably expects to incur in correcting the
deficiency set forth in the written finding. Contractor and the City will attempt to
resolve the City’s concerns. If the parties cannot resolve the concerns. Contractor
may pursue its rights under the Contract Documents, including those under Article
7.
6.4
RETENTION ON JOB ORDER PAYMENTS
In compliance with A.R.S. §34-609, as amended, there is no retention for job-order
contracting construction services contracts.
6.5
FINAL PAYMENT
A.
After receipt of a final Contractor Payment Request, the City will make final
payment as required by this Article 6.5, provided that Contractor has completed all
of the Work in conformance with the Job Order and Contract Documents and a
Final Acceptance Letter has been issued by the City.
B.
At the time of submission of its final Contractor Payment Request. Contractor will
provide the following information:
1. An affidavit that there are no claims, obligations or liens outstanding Or
unsatisfied for labor, services, material, equipment, taxes or other items
performed, furnished or incurred for or in connection with the Work which
will in any way affect the City’s interests: and
2. A general release executed by Contractor waiving, upon receipt of final
(Revised 5.6.2026)
19183299
Page 31 of 67
Contract No. 2026-088-COS
payment by Contractor, all claims, except those claims previously made in
writing to the City and remaining unsettled at the time of final payment.
6.6
PAYMENTS TO SUBCONTRACTORS OR SUPPLIERS
A.
Contractor will pay its Subcontractors or suppliers within seven (7) calendar days
of receipt of each progress payment from the City. Contractor will pay for the
amount of Work performed or materials supplied by each Subcontractor or supplier
as accepted and approved by the City with each progress payment, No Contract
between Contractor and its Subcontractors and suppliers may materially alter the
rights of any Subcontractor or supplier to receive prompt payment as provided in
this Contract.
B.
If Contractor falls to make payments in accordance with these provisions, the City
may take any one or more of the following actions and Contractor agrees that the
City may take these actions:
1. To hold Contractor in default under this Contract;
2. Withhold future payments until proper payment has been made to
Subcontractors or suppliers in accordance with these provisions:
3. Reject all future offers to perform work for the City for a period not to exceed
one (1) year from the Substantial Completion date of the Job Order at issue;
or
4. Terminate this Contract for cause.
C.
Should the City fail or delay in exercising or enforcing any right, power, privilege,
or remedy under this Article, the failure or delay will not be considered a waiver,
release, or modification of the requirements of this Article or of any of the terms or
provisions of this Contract.
D.
Contractor will include these prompt payment provisions in every subcontract,
including procurement of materials and leases of equipment for this Contract.
6.7
AUDIT AND INSPECTION
A. Records of Contractor's direct personnel payroll, reimbursable expenses related
to each Job Order and records of accounts between the City and Contractor will
be kept on a generally recognized accounting basis and will be available for three
(3) years after completion of the Project.
From the effective date of this Contract and until three (3) years after the date of
final payment by the City of Scottsdale to Contractor, the City, its authorized
representative, or the appropriate federal or state agencies, reserve the right to
audit Contractor’s records to verify the accuracy and appropriateness of all pricing
data, including data used to negotiate the Contract Documents. The City of
Scottsdale or its authorized representative will have access, during normal working
hours, to all necessary Contractor and Subcontractor facilities, and will be provided
adequate and appropriate workspace, in order to conduct audits in compliance
(Revised 5.6.2026)
19183299
Page 32 of 67
B.
C.
Contract No. 2026-088-COS
with the provisions of this Article. The City of Scottsdale will give Contractor or
Subcontractor reasonable advance notice of intended audits.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if, upon audit of Contractor’s records, the audit discloses Contractor has
provided false, misleading, or inaccurate cost and pricing data.
Contractor will include a similar provision in ail of its contracts with Suppliers,
Subconsultants and Subcontractors providing services under the Contract
Documents to ensure the City, its authorized representative, or the appropriate
federal or state agency, has access to the Supplier, Subconsultant and
Subcontractor records to verify the accuracy of cost and pricing data.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if the above provision is not included in Supplier, Subconsultant and
Subcontractor contracts, and one or more Suppliers, Subconsultants or
Subcontractors do not allow the City to audit their records to verify the accuracy
and appropriateness of pricing data.
If an audit in accordance with this Article, discloses overcharges of any nature by
Contractor to the City in excess of 1% of the total contract billings, the actual cost
of the City’s audit will be reimbursed to the City by Contractor. Any adjustments
or payments which must be made as a result of any audit or inspection of
Contractor's invoices or records will be made within a reasonable amount of time
(not to exceed 90 days) from presentation of the City’s findings.
F. This audit provision includes the right to inspect personnel records as required by
Section 11,33.
D.
E.
G. City may, at reasonable times, inspect the place of business of Contractor or its
Subcontractor(s) that is related to the performance of this Contract.
ARTICLE 7- CLAIMS AND DISPUTES
7.1 REQUESTS FOR CONTRACT ADJUSTMENTS AND RELIEF
7.1.1
If either Contractor or the City believes that it is entitled to relief against the other
for any event arising out of or related to the Work, that party will provide written
notice to the other party of the basis for its claim for relief. The claims shall set
forth in detail all known facts and circumstances supporting the claim; final costs
associated with any claim upon which notice has been given must be submitted in
writing to the City within thirty (30) days after notice has been received.
7.1.2
This notice will, if possible, be made before incurring any cost or expense and in
accordance with any specific notice requirements contained in applicable articles
of the Contract.
7.1.3
In the absence of any specific notice requirement, written notice will be given within
a reasonable time, not to exceed ten (10) days, after the occurrence giving rise to
the claim for relief or after the claiming party reasonably should have recognized
the event or condition giving rise to the request, whichever is later.
(Revised 5.6.2026}
19183299
Page 33 of 67
Contract No. 2026-088-COS
7.1.4
This notice will include sufficient information to advise the other party of the
circumstances giving rise to the claim for relief, the specific contractual adjustment
or relief requested and the basis of the request. ANY NOTICE OF CLAIM NOT
FILED WITH THE CITY WITHIN SUCH TIME AND IN COMPLIANCE WITH THE
PRECEEDING PROVISIONS SHALL BE CONSIDERED TO HAVE BEEN
WAIVED AND SHALL BE DISMISSED,
7.1.5
In the event Contractor seeks to make a claim for an increase in the Job Order
Price, as a condition precedent to any liability of the City therefore, unless
emergency conditions exist, Contractor shall strictly comply with the requirements
of this section and such claim shall be made by Contractor before proceeding to
execute any Work for which a claim is made. Failure to comply with this condition
precedent shall constitute a waiver by Contractor of any claims for compensation.
7.1.6
Contractor must continue its performance under this Contract regardless of the
existence of any claims by Contractor.
7.1.7
In a claim by Contractor against the City for compensation in excess of the Job
Order Price, any liability of the City to Contractor shall be strictly limited and
computed in accordance with the Contract Documents and shall in no event
include indirect costs, such as home office overheads or consequential damages
of Contractor or any estimated costs or damages.
7.2 DISPUTE AVOIDANCE AND RESOLUTION
7.2.1 The parties are fully committed to working with each other throughout the Project
and agree to communicate regularly with each other at all times so as to avoid or
minimize disputes or disagreements. If disputes or disagreements do arise, the
Contractor and the City each commit to resolving the disputes or disagreements in
an amicable, professional and expeditious manner so as to avoid unnecessary
losses, delays and disruptions to the Work.
The Contractor and the City will first attempt to resolve disputes or disagreements
at the field level through discussions between the Contractor’s Representative(s)
and the City’s Representative(s) as described in Article 7.4.
7.2.3 If a dispute or disagreement cannot be resolved pursuant to Article 7.2.2, upon the
request of either party, the parties’ Representatives as described in Article 7.4 will
meet as soon as conveniently possible, but in no case later than thirty (30) days
after the request is made, to attempt to resolve the dispute or disagreement.
Before any meetings between the parties Representatives, the parties will
exchange relevant information that will assist the parties in resolving their dispute
or disagreement.
7.2.2
7.2.4
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34 609(E). as amended. Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that
(Revised 5.6.2026)
19183299
Page 34 of 67
Contract No. 2P26-088-COS
requires notice of delays, provides for arbitration or other procedures for
settlement or provides for iiquidated damages.
7.3
DUTY TO CONTINUE PERFORMANCE
Unless provided to the contrary in the Contract Documents. Contractor will continue to
perform the Work and the City will continue to satisfy its payment obligations to
Contractor, until final resolution of any dispute or disagreement between Contractor and
the City.
7.4
REPRESENTATIVES OF THE PARTIES
A.
City’s Representatives
1. The City designates the individual listed below as the City's Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
City of Scottsdale
Attn: Alison TymkiW
7447 E. Indian School Road, Suite 205
Scottsdale. AZ 85251
480-312-7250
2. The City will designate an individual for each Job Order as the City’s
Representative. This person will manage the Job Order.
3. The City’s Contract Administrator shall be Melanie Gibson, or designee.
B.
Contractor’s Representatives
1. Contractor designates the individual listed below as Contractor’s Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
Evolution Mechanical Project dba IMCOR
Attn: Ed R. White
1841 E. Washington Street
Phoenix, AZ 85034
602-257-1319
2. Contractor will designate an individual for each Job Order as Contractor’s
Representative.
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION
8.1 CITY'S RIGHT TQ STOP JOB ORDER SERVICES
A. The City may, at its discretion and without cause, Order Contractor in writing to
stop and suspend any Job Order. Immediately after receiving this notice.
(Revised 5.6.2026)
19183299
Page 35 of 67
B.
Contract No. 2026-088-COS
Contractor will discontinue advancing the Job Order. The suspension will not
exceed one hundred eighty (180) consecutive days. If the City suspends the Job
Order for one hundred eighty-one (181) consecutive days or more, the suspension
will be considered a termination for convenience.
Contractor may seek an adjustment of the Job Order Price or Job Order Time if its
cost or time to perform the Contract Services has been adversely impacted by any
suspension or stoppage of the Work by the City.
8.2 TERMINATION FOR CONVENIENCE
A.
The City reserves the right to terrninate this Contract, in whole or in part, or
abandon any portion of any Job Order for which services have not been performed
by Contractor, at its sole convenience and discretion, upon written notice given
pursuant to this Contract.
1. Contractor will estimate the value of the Work it has completed and submit
its appraisal to the City for evaluation. The City will have the right to inspect
the Work, to appraise the Work completed.
Contractor shall be entitled to receive just and equitable compensation for
the percentage of Work actually completed and materials accepted before
the effective date of the termination. This compensation will be an amount
mutually agreed upon by Contractor and the City based on the Job Order
and Scope of Work. If there Is no mutual agreement, the final determination
will be made in accordance with this Article.
2. The City will make the final payment within 60 days after Contractor has
delivered the last of the partially completed items and the final fee has been
agreed upon.
If the City terminates this Contract in compliance with this Article and
proceeds to complete the Job Order through its employees, agents or other
third parties, the City’s rights to use the Work product will be as stated in
Article 8.4.
B.
Upon termination of construction services during any Job Order, Contractor will
proceed with the following obligations:
1. Stop Work as stated in the notice;
2. Place no further subcontracts or orders;
3. Terminate all subcontracts to the extent they relate to the Work terminated;
4. Assign to the City all right, title and interest of Contractor under the
subcontracts terminated, in which case the City will have the right to settle or
to pay any termination settlement proposal arising out of those terminations;
5. Take any action that may be necessary for the protection and preservation
of the property related to the Contract that is in the possession of Contractor
(Revised 5.6.2026)
19183299
Page 36 of 67
Contract No. 2026-088-COS
and which the City has or may acquire an interest; and
6. Comply with the requirements of Article 6.5(B),
C.
Contractor wili submit complete termination inventory scheduies no later than sixty
(60) days from the date of the notice of termination.
D.
The City will pay Contractor the following:
1. The direct value of its completed Work and materials supplied as of the date
of termination:
2. The reasonable costs and expenses attributable to the termination;
3. Contractor will be entitled to profit and overhead on completed Work but will
not be entitled to anticipated profit or anticipated overhead. If it appears
Contractor would have sustained a loss on the entire Work had the Job
Order been completed, Contractor will not be allowed profit and the City will
reduce the settlement to refect the indicated rate of loss;
4. Contractor will maintain all records and documents for three (3) years after
final settlement. These records will be maintained and subject to auditing as
required in Article 6.7; and
5. Take any action that may be necessary for the protection and preservation
of the property related to the Job Order(s) that is in the possession of
Contractor and in which the City has or may acquire an interest.
8.3
CANCELLATION FOR CAUSE
The City may also cancel this Contract or any part of it with seven (7) days notice for
cause in the event of any default by Contractor, or if Contractor fails to comply with
any ofthe terms and conditions of this Contract, Unsatisfactory performance, despite
a reasonable opportunity to cure as Judged by the City’s Representative and failure to
provide the City, upon request, with adequate assurances of future performance will
all be causes allowing the City to cancel this Contract for cause. In the event of
cancellation for cause, the City will not be liable to Contractor for any amount as
damages, and Contractor will be liable to the City for any and all damages sustained
as a result of the default that caused the cancellation.
8.4 CITY’S RIGHT TO PERFORM AND CANCEL FOR CAUSE
A. If Contractor persistently fails to;
1. Provide a sufficient number of skilled workers;
2. Supply the materials required by the Contract Documents or Job Order(s);
3. Comply with applicable Legal Requirements;
4. Timely pay, without cause. Subconsultants or Subcontractors;
(Revised 5.6.2026)
19183299
Page 37 of 67
Contract No. 2026-088-COS
5. Perform the Contract Services with promptness and diligence to ensure
that a Job Order is completed by the Job Order Time, as the times may be
adjusted; or
6. Perform other material obligations under the Contract Documents and/or
individual Job Orders;
Then the City, in addition to any other rights and remedies provided in the Contract
Documents or by law, will have the rights stated in Articles 8.2 and 8.3.
In the event the City cancels this Contract or any part of the services under any
Job Order, the City will notify Contractor in writing, and immediately upon receiving
this notice. Contractor will discontinue advancing the Work under this Contract or
the Job Order and proceed to close all operations of any affected Job Order or this
Contract.
B. If the City provides Contractor with a written order to provide adequate maintenance
of traffic, adequate cleanup, adequate dust control or to correct deficiencies or
damage resulting from abnormal weather conditions, and Contractor fails to comply
in a time frame specified, the City may have the Work accomplished by other
sources at Contractor's expense and without an increase to the Job Order Price
C. Upon the occurrence of an event stated in Article 8.4(B), the City may provide vyritten
notice to Contractor that it intends to cancel the Contract unless the problem cited
is cured, or commenced to be cured, within seven (7) days of Contractor’s receipt of
notice.
1. If Contractor fails to cure, or reasonably commence to cure, the problem,
then the City may give a second written notice to Contractor of its intent to
cancel within an additional seven (7) day period.
2. If Contractor, within this second seven (7) day period, fails to cure, or
reasonably comrrience to cure the problem, then the City may declare the
Contract cancelled for default by providing written notice to Contractor of
this declaration.
D. Upon declaring the Contract cancelled in accordance with Article 8.4(C), and for the
purpose of completing the Work, the City may for all Job Orders enter upon the
premises and take possession of all materials, equipment, scaffolds, tools,
appliances and other items, which have been purchased or provided for the
performance of the Work, all of which Contractor now transfers, assigns and sets
over to the City for this purpose, and to employ any person or persons to complete
the Work and provide all of the required labor, services, materials, equipment and
other items.
E. If through any cause. Contractor fails to fulfill in a timely and proper manner its
obligations under this Contract, or if Contractor violates any of the covenants.
Contracts, or stipulations of this Contract, the City may withhold any payments to
Contractor for the purpose of setoff until the exact amount of damages due the City
from Contractor is determined by a court of competent jurisdiction.
(Revised 5.6.2026)
19183299
Page 38 of 67
Contract No. 2026-088-COS
F. In the event of a cancellation, Contractor will not be entitled to receive any further
payments under the Contract Documents until the Work on all Job Orders is
completed in accordance with the Contract Documents. At that time, Contractor wili
only be entitled to be paid for Work performed and accepted by the City before its
default.
G. If the City’s cost and expense of completing the Work exceeds the unpaid balance
of a Job Order Price, then Contractor will be obligated to pay the difference to the
City. These costs and expenses will include not only the cost of completing the
Work, but also losses, damages, costs and expense, including attorneys’ fees and
expenses, incurred by the City in connection with the reprocurement and defense of
claims arising from Contractor’s default.
H. If the City cancels this Contractor cause and the cancellation is determined to have
been without legal right, the cancellation for cause will be considered to have been
a termination for convenience in accordance with the provisions of Article 8.2.
ARTICLE 9 - INSURANCE AND BONDS
9.1 INSURANCE REQUIREMENTS
A.
At the same time as execution of this Contract, Contractor will furnish the City of
Scottsdale a Certificate of Insurance on a standard insurance industry ACORD
form. The ACORD form will be issued by an insurance company authorized to
transact business in the State of Arizona or one that is named on the List of
Qualified Unauthorized Insurers maintained by the Arizona Department of
Insurance.
B.
Contractor, Subcontractors and Subconsultants must procure and maintain, until
all of their obligations have been discharged, including any warranty periods under
this Contract are satisfied, insurance against claims for injury to persons or
damage to property, which may arise from or in connection with the performance
of the Work by Contractor, its agents, representatives, employees, or
Subcontractors.
C.
The insurance requirements are minimum requirements for this Contract and in no
way limit the indemnity covenants contained in this Contract.
D.
The City in no way warrants that the minimum lirnits contained in this Contract are
sufficient to protect Contractor from liabilities that might arise out of the
performance of the Contract Services under this Contract by Contractor, its agents,
representatives, employees. Subcontractors or Subconsultants and Contractor is
free to purchase any additional insurance as may be determined necessary. The
City will not pay for higher limits, but if Contractor pays for insurance with higher
limits. Contractor will name the City as an additional insured on any additional
insurance.
E.
Claims Made. In the event any Insurance policies required by this Contract are
written on a “claims made” basis, coverage shall continue uninterrupted throughout
the term of this Contract by keeping coverage in force using the effective date of
{Revised 5:6.2026)
19183299
Page 39 of 67
Contract No. 2026-088-COS
this Contract as the retroactive date on aii "claims made” policies. The retroactive
date for exclusion of claims must be on or before the effective date of this Contract,
and can never be after the effective date of this Contract. Upon completion or
termination of this Contract, the “claims made” coverage shall be extended for an
additional three (3) years using the original retroactive date, either through
purchasing an extended reporting option; or by continued renewal of the original
insurance policies. Submission of annual Certificates of Insurance, citing the
applicable coverages and provisions specified herein, shall continue for three (3)
years past the completion or termination of this Contract.
F. Deductibles and Self-Insured Retentions. The policies stated in this Article may
provide coverage which contains deductibles or self-insured retention amounts.
Any deductibles or self-insured retention are not applicable to the policy limits
provided to the City. Contractor is solely responsible for any deductible or self-
insured retention amount. The City, at its option, may require Contractor to secure
payment of any deductible or self-insured retention by a surety bond or irrevocable
and unconditional Letter of Credit. Any self-insured retentions and deductibles
must be declared to and approved by the City. If not approved, the City may
require that the insurer reduce or eliminate any self-insured retentions with respect
to the City, its officers, officials, agents, employees, and volunteers.
9.2 MINIMUM SCOPE AND LIMITS OF INSURANCE
Contractor must provide coverage at least as broad and with limits of liability not less
than those stated below.
A. Commercial General Liability-Occurrence Form
General Aggregate
Products-Completed Operations Aggregate
Personal & Advertising Injury
Each Occurrence
Fire Damage (Any one fire)
Medical Expenses (Any one person)
$2,000,000
$2,000,000
$1,000,000
$2,000,000
$100,000
OPTIONAL
Contractor must maintain “occurrence” form Commercial General Liability
insurance with a limit of not less than $2,000,000 for each occurrence, $2,000,000
Products and Completed Operations Annual Aggregate, and a $2,000,000
operations, independent contractors, products completed operations, personal
injury and advertising injury. If any Excess insurance is utilized to fulfill the
requirements of this paragraph, the Excess insurance must be "follow form" equal
or broader in coverage scope than underlying insurance.
B. Automobile Liabilitv-Anv Auto or Owned. Hired and Non-Owned Vehicles
Combined Single Limit Per Accident
For Bodily Injury and Property Damage
$1,000,000
Contractor must maintain Business/Automobile Liability insurance with a limit of
$1,000,000 each accident on Contractor owned, hired, and non-owned vehicles
assigned to or used in the performance of the Contractor's work or services under
(Revised 5.6.2026)
19163299
Page 40 of 67
Contract No. 2026-088-COS
this Contract. If any Excess insurance is utiiized to fulfili the requirements of this
paragraph, the Excess insurance must be “follow form” equal or broader in
coverage scope than underlying insurance.
C. Workers Compensation and Employers Liability
Workers' Compensation
Employers Liability: Each Accident
Disease - Each Employee
Disease - Policy Limit
Statutory
$500,000
$500,000
$1,000,000
Contractor must maintain Workers Compensation insurance to cover obligations
imposed by federal and state statutes applicable to Contractor’s employees
engaged in the performance of work or services under this Contract and must also
maintain Employers’ Liability Insurance. The insurer must agree to waive all rights
of subrogation against the City, its officers, officials, agents, employees, and
volunteers for losses arising from Work performed by Contractor fOr the City.
D. Coverage Terms and Required Endorsements
1. The Comrriercial General Liability and Automobile Liability policies are to
contain, or be endorsed to contain, the following provisions: The City, its
officers, officials, agents, and employees are to be named as additional
insureds with respect to liability arising out of activities performed by, or on
behalf of. Contractor including the City's general supervision of Contractor,
products and completed operations of Contractor, and automobiles owned,
leased, hired, or borrowed by Contractor.
2. Except for Contractors Professional Liability and Workers Compensation
insurance, for all insurance policies required under this Contract, the City,
its officers, officials, agents, and employees must be additional insureds to
the full limits of liability purchased by Contractor even if those lirhits of
liability are in excess of those required by this Contract.
3. Except for Contractors Professional Liability and Workers Compensation
insurance, all insurance policies required under this Contract, including any
excess insurance policies, must be primary insurance with respect to the
City, its officers, officials, agents, and employees. Any insurance or self-
insurance maintained by the City, its officers, officials, agents, and
employees will be in excess of the coverage provided by Contractor and
must not contribute to it.
4. For all insurance policies required under this Contract, insurance coverage
must apply separately to each insured against whom a claim is made or
suit is brought, except with respect to the limits of the insurer’s liability.
5. For all insurance policies required under this Contract, insurance coverage
must not be limited to the liability assumed under the indemnification
provisions of this Contract.
6. All insurance policies required under this Contract, rriust contain a waiver
(Revised 5.6.2026)
19183299
Page 41 of 67
Contract No. 2026-088-COS
of subrogation against the City, its officers, officials, agents, and
employees, for losses arising from Work performed by Contractor for the
City.
7. For ail insurance policies required under this Contract, if Contractor
receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt
notice to the Contract Administrator for the City, unless such coverage is
immediately replaced with similar policies.
8. Contractor, its successors or assigns, is required to maintain Commercial
Genera! Liability insurance as specified in this Contract for a minimum
period of three (3) years following completion and acceptance of the Work.
Contractor must submit Certificates of Insurance evidencing the
Commercial General Liability insurance during this three (3) year period
containing all the insurance requirements stated in this Contract including
naming the City of Scottsdale, its agents, representatives, officers,
directors, officials and employees as Additional Insured as required.
9. The Commercial General Liability policy will be at least as broad as the
Insurance Service Office, Inc.’s CG 0 0 01 07 98.
9.3 OTHER INSURANCE REQUIREMENTS
A.
B.
The policies are to contain, or be endorsed to contain, the following provisions:
Contractors Professional Liability: Contractor must carry Contractors Professional
Liability insurance to cover the residual, contingent, and passive design exposures
of Contractor.
Contractors Professional Limits of Liability: Contractor must carry limits of
$1,000,000 each Project and $2,000,000 in the Aggregate under a stand-alone
policy or included by endorsement under the Commercial General Liability policy.
Contractor, its successors and or assigns, is required to maintain this Professional
Liability insurance as specified in this Contract for a minimum period of three (3)
years following completion and acceptance of the Work. Certificates of Insurance
citing that applicable coverage is in force and contains the provisions required by
this Contract must be submitted for the three (3) year period. In the event the
Professional Liability insurance policy is written on a “claims made" basis,
coverage will extend for three (3) years past completion and acceptance of the
work or services, and Contractor, or its selected Design Professional will submit
Certificates of Insurance as evidence the required coverage is in effect. The
Design Professional must annually submit Certificates of Insurance citing that the
applicable coverage is in force and contains the required provisions for a three (3)
year period. If there is no Professional Liability work or service as a part of this
Contract, the City will waive the Professional Liability insurance requirement in
writing.
C. Builders Risk-Installation Insurance (Course of Construction^
Builders Risk-Installation and/or Boiler and Machinery Insurance coverage to be
(Revised 5.6.2026)
19183299
Page 42 of 67
Contract No. 2026-088-COS
provided by Contractor as determined necessary by the City prior to the start of
construction,
Contractor bears all responsibility for loss to all Work being performed and to
buildings under construction. Unless waived in writing by the City of Scottsdale,
Contractor will purchase and maintain in force Builders Risk-Installation insurance
on the entire Work until completed and accepted by the City. This insurance will
be Special Causes of Loss or Open Perils policy form, for the completed value, at
replacement cost equal to each Job Order contract price and all subsequent
modifications.
This Builders Risk-Installation insurance must cover the entire Work including
reasonable compensation for architects and Contractor’s’ services and expenses
and other “soft costs” made necessary by an insured loss. Builders Risk-
Installation insurance must provide coverage from the time any covered property
comes under Contractor's control and or responsibility, and continue without
interruption during course of construction, renovation and or installation, including
any time during which any project property or equipment is in transit, off site, or
while on site for future use or installation. Insured property must include, but not
be limited to, scaffolding, false work, and temporary buildings at the site. This
insurance must also cover the cost of removing debris, including demolition as may
be legally required by operation of any law, ordinance, regulation or code.
Contractor must also purchase and maintain Boiler and Machinery insurance with
the same requirements as Builders Risk-Installation insurance stated above if the
Work to be performed involves any exposures or insurable property normally
covered under a Boiler and Machinery insurance policy or made necessary as
required by law and or testing requirements in the performance of this Contract.
Contractor will be responsible for any and all deductibles and the City must also
be named as a Loss Payee under these policies. Contractor’s insurance must be
primary and not contributory; and waive all rights of subrogation against the City
of Scottsdale, its officer, officials and employees. Contractor's insurance must
name the City of Scottsdale, Contractor and all tiers of Subcontractors as insureds
as respects their insurable interest at the time of loss. It must contain a provision
that this insurance will not be canceled or materially altered without at least thirty
(30) days advance notice to the City. Contractor is also required to give the City
thirty (30) days advance written notice of the coverage termination for the Project.
The Builders Risk-Installation insurance must be endorsed so that the insurance
will not be canceled or lapse because of any partial use or occupancy by the City.
Builders Risk-Installation Insurance must be maintained until whichever of the
following first occurs: (i) final payment has been made; or (ii) until no person or
entity, other than the City, has an insurable interest in the property required to be
covered,
9.4 SUBCONSULTANT’S AND SUBCONTRACTOR’S INSURANCE
Unless Contractor’s Subconsultants and Subcontractors can provide the same level of
coverage as detailed in Article 9.2 and name the City and Contractor as Additional
Insureds, Contractor’s certificates must include all Subcontractors and Subconsultants
(Revised 5.6.2026)
19183299
Page 43 of 67
Contract No. 2026-088-COS
as insureds under its policies or Contractor must maintain separate certificates and
endorsements for each Subcontractor and Subconsultant. All coverages for
Subcontractors and Subconsultants must be in the amounts shown in Article 9.2, except
for the General Liability Each Occurrence limit, which shall be $1,000,000. Certificates
must contain a provision that the insurance will not be canceled or. materially altered
without at least thirty (30) days advance notice to the City.
9.5
NOTICE OF CANCELLATION
If Contractor receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt notice to the
City’s Contract Administrator, unless such coverage is immediately replaced with similar
policies. Each insurance policy required by the Insurance provisions of this Contract
must provide the required coverage and must not be suspended, voided, canceled by
either party, reduced in coverage or In limits until thirty (30) days written notice has first
been given in accordance with Article 11.24, herein.
9.6
ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers duly licensed or approved to conduct business
in the State of Arizona and with an A. M. Best rating of ho less than B++6. The City in
no way warrants that the above required minimum insurer rating is sufficient to protect
Contractor from potential insurer insolvency. Failure to maintain insurance as required
may result in termination of this Contract at the City's sole discretion.
9.7 VERIFICATION OF COVERAGE
A.
Contractor must furnish the City Certificates of Insurance (ACORD form or
. equivalent approved by the City) and with original endorsements effecting
coverage as required by this Contract. The certificates and endorsements for each
insurance policy are to be signed by a person authorized by that insurer to bind
coverage on its behalf. Any policy endorsements that restrict or limit coverages
must be clearly noted on the Certificate of Insurance.
B.
All certificates and endorsements are to be received and approved by the City
before Contract Services commence except for Builders Risk-Installation
Insurance. Each insurance policy required by this Contract must be in effect at or
before the earlier of commencement of Work under the Contract Documents or the
signing of this Contract, except for Builders Risk-Installation Insurance which, if
required by the City, must be in effect before commencement of the Work and
remain in effect for the duration of the Project. Failure to maintain the insurance
policies as required by this Contract or to provide evidence of renewal is a material
breach of contract.
C.
All Certificates of Insurance required by this Contract must be sent directly to the
City of Scottsdale, Attn: Capital Project Management Office. The project number
and project description must be inciuded on the Certificates of Insurance.
The City reserves the right to require complete, certified copies of all insurance
policies required by this Contract, at any time. Failure to provide a Certificate of
Insurance with the appropriate verbiage will result in rejection of Contractor's
Certificate and delay in contract execution. Additional Certificates of Insurance
(Revised 5.6.2026)
19183299
Page 44 of 67
Contract No. 2026-088-COS
submitted without referencing a Contract number will be subject to rejection and
returned or discarded.
9.8
APPROVAL
Any variation from the insurance requirements in this Article 9 must be approved by the
City’s Risk Management Division, whose decision will be final. Said variation will not
require a formal contract amendment but may be made by administrative action.
9.9 BONDS AND OTHER PERFORMANCE SECURITY
A.
Before execution of each individual Job Order, Contractor must provide a
performance bond and a payment bond for all construction services, each in an
amount equal to the full amount of the agreed upon cost for that Job Order.
Contractor may, at its own option, provide Payment and Performance Bonds for
the entire Contract Price amount, but there shall be no obligation for the City to
reimburse Contractor for bond costs incurred, except on an actual cost basis as
each individual Job Order is issued. Bonds must be submitted in accordance with
Title 34, Chapter 6 of the Arizona Revised Statutes and must be in substantially
the same form as Exhibits A and B attached to this Contract.
B.
Each bond must be executed by a surety company or companies holding a
Certificate of Authority to transact surety business in the State of Arizona, issued
by the Director of the Arizona Department of Insurance. A copy of the Certificate
of Authority must accompany the bonds. The Certificate must have been issued
or updated within two (2) years before the execution of this Contract.
C.
The bonds must be made payable and acceptable to the City of Scottsdale.
D.
The bonds must be written or countersigned by an authorized representative of the
surety and the bonds must have attached a certified copy of the Power of Attorney
of the signing official.
1. If one Power of Attorney is submitted, it must be for twice the total Job
Order Price.
E.
2. If two Powers of Attorney are submitted, each must be for the total Job
Order Price. Personal or individual bonds are not acceptable.
3. Upon the request of any person or entity appearing to be a potential
beneficiary of bonds covering payment of obligations arising under the
Contract Documents, Contractor must promptly furnish a copy of the bonds
or must permit a copy to be made.
All bonds submitted for this Project must be provided by a company which has
been rated "A or better" by the A.M, Best Company.
(Revised 5.6.2026)
19183299
Page 45 of 67
Contract No. 2026-088-COS
ARTICLE 10 - INDEMNIFICATION
10.1 CONTRACTOR’S GENERAL INDEMNIFICATION
To the fullest extent permitted by law, Contractor, its successors, assigns and
guarantors, must defend, indemnify and hold harmless the City of Scottsdale, its agents,
representatives, officers, directors, officials and employees from and against all
allegations, demands, proceedings, suits, actions, claims, damages, losses, expenses,
including but not limited to, reasonable attorney fees, court costs, and the cost of
appellate proceedings, and all claim adjusting and handling expense, investigation and
litigation, for bodily injury or personal injury (including death), or loss or damage to
tangible or intangible property caused, or alleged to be caused, in whole or in part,
related to, arising from or out of, or resulting from any acts, omissions, negligence,
recklessness, or intentional wrongful conduct to the extent caused by Contractor or any
of its owners, officers, directors, agents or employees performing Work or Services
under this Contract, including but not limited to, any Subcontractor or anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable
and any injury or damages by any of Contractor employees. This indemnity includes
any claim or amount arising out of, or recovered under, the Worker’s Compensation Law
or arising out of the failure of Contractor to conform to any federal, state, or local law,
statute, ordinance, rule, regulation, or court decree. It is the specific intention of the
parties that the City shall, in all instances, except for Claims arising solely from the
negligent or willful acts or omissions of the City, be indemnified by Contractor from and
against any and all claims. It is agreed that Contractor will be responsible for primary
investigation, defense, and judgment costs where this indemnification is applicable. In
consideration of the award of this Contract, Contractor agrees to waive all rights of
subrogation against the City, its officers, agents, representatives, directors, officials, and
employees for losses arising from the work performed by Contractor for the City.
Insurance provisions in this Contract are separate and independent from the indemnity
provisions of this Article and, will not be construed in any way to limit the scope and
magnitude of the indemnity provisions. Nothing in this paragraph shall limit the
responsibility of Contractor’s insurer to pay the City for valid claims that are covered by
Contractor’s insurance policy. The indemnity provisions of this paragraph shall not be
construed in any way to limit the scope and magnitude and applicability of the insurance
provisions.
10.2 INTELLECTUAL PROPERTY
A.
Contractor must pay all royalties and license fees associated with its performance
of services.
B.
To the extent permitted by law. Contractor shall indemnify and hold harmless the
City against any liability, including costs and expenses, for infringement of any
patent, trademark, or copyright arising out of Contract performance or use by the
City of materials furnished or Work performed under this Contract.
C.
Contractor must defend any action or proceeding brought against the City based
on any claim that the Work, or ahy part of the Work, or the operation or use of the
Work or any part of it, constitutes infringement of any United States patent or
copyright, now or subsequently issued. The City will give prompt written notice to
(Revise 5.6.2026)
19183299
Page 46 of 67
Contract No. 2026-088-COS
Contractor of any action or proceeding and will reasonably provide authority,
information and assistance in the defense of the action. Contractor shall indemnify
and hold harmless the City from and against all damages, expenses, losses,
royalties, profits and costs, including but not limited to attorneys’ fees and
expenses awarded against the City or Contractor in any action or proceeding.
Contractor agrees to keep the City informed of all developments in the defense of
these actions. The City may be represented by, and actively participate through,
its own counsel in any suit or proceedings if it so desires.
D.
If the City is enjoined from the operation or use of the Work, or any part of the
Work, as the result of any patent or copyright suit, claim, or proceeding. Contractor
shall at its sole expense take reasonable steps to procure the right to operate or
use the Work. If Contractor cannot procure this right within a reasonable time.
Contractor will promptly, at Contractor's option and at Contractor’s expense,
without an increase to the Job Order Price, (i) modify the Work so as to avoid
infringement of any patent or copyright or (ii) replace the Work with Work that does
not infringe or violate any patent or copyright.
E.
Articles 10.2(C) and 10.2(D) will not be applicable to any suit, claim or proceeding
based on infringement or violation of a patent or copyright:
1. Relating solely to a particular process or product of a particular
manufacturer specified by the City and not offered or recommended by
Contractor to the City; or
2. Arising from modifications to the Work by the City or its agents after
acceptance of the Work; or
3. Relating to the copyrights of any specification, drawings, or any Design
Documents provided by the City, the Design Professional, any consultant
retained by the City, or by a Subcontractor or Supplier.
F.
The obligations stated in this Article 10.2 will constitute the sole Contract between
the parties relating to liability for infringement of violation of any patent or copyright.
ARTICLE 11 - GENERAL PROVISIONS
11.1 MARSHALING AREA
Contractor shall contact the City of Scottsdale, Development Services to determine the
requirements for obtaining a permit for marshaling areas it proposes to use. Marshaling
areas must be fenced. Contractor will obtain written approval from the property owner
for marshaling area use. This approval must contain any requirements, which are a
condition of this approval. Marshaling yard requirements according to M.A.G.
Subsection 107.6.1 and the City of Scottsdale Supplemental Specifications will apply.
11.2 CONTRACT DOCUMENTS
A.
Contract Documents are as defined in Article 12.
B.
The Contract Documents form the entire Contract between the City and
(Revised 5.6.2026)
19183299
Page 47 of 67
Contract No. 2026-088-COS
Contractor. No oral representations or other Contracts have been made by the
parties except as specifically staled in the Contract Documents. Each provision of
law and any terms required by law to be in this Contract are a part of this Contract
as if fully stated herein.
C.
In the event of any inconsistency, conflict, or ambiguity between or among the
Contract Documents, the Contract Documents will take precedence in the order in
which they are listed in the definition of Contract Documents in Article 12. As to
drawings and plans, given dimensions will take precedence over scaled
measurements, and large-scale plans over small-scale plans. Contract
specifications will take precedence over contract plans.
D.
The Contract Documents are intended to permit the parties to complete the Work
and all obligations required by the Contract Documents within the times and prices
agreed upon for each Job Order. The Contract Documents are intended to be
complementary and interpreted in harmony so as to avoid conflict, with words and
phrases interpreted in a manner consistent with construction and design industry
standards.
E.
This Contract, the Plans, Standard Specifications and Details, Special Provisions,
Performance Bond, Payment Bond, Certificates of Insurance, Job Orders and Job
Order Adjustments (if any) are by reference made a part of this Contract to the
same extent as if set forth in full.
F. Work Product
1. All Work products (electronically or manually generated) including but not
limited to: cost estimates, studies, design analyses, original mylar
drawings. Computer Aided Drafting and Design (CADD) file diskettes, and
other related documents which are prepared or procured in the
performance of this Contract (collectively referred to as documents) are to
be and remain the property of the City and are to be delivered to the City
before the final payment is made to Contractor. In the event these
documents are altered, modified or adapted without the written consent of
Contractor or the Subconsultants, which consent Contractor or the
Subconsultants will not unreasonably withhold, the City agrees to hold
Contractor and the Subconsultants harmless to the extent permitted by law
from the legal liability arising out of the City’s alteration, modification or
adoption of the documents.
2. The copyrights, patents, trade secrets or other intellectual property rights
associated with the ideas, concepts, techniques, inventions, processes or
works of authorship developed, created by Contractor, its Subconsultants
or personnel, during the course of performing this Contract or arising out of
the Project will belong to Contractor.
11.3 MODIFICATIONS
The Contract Documents may not be changed, altered, or amended in any way except
as consistent with the City of Scottsdale Procurement Code, as amended.
(Revised 5.6.2026)
19183299
Page 48 of 67
Contract No. 2026-088-COS
11.4 TIME IS OF THE ESSENCE
Time is of the essence with respect to the dates and times stated in the Contract
Documents.
11.6 COOPERATION AND FURTHER DOCUMENTATION
Contractor agrees to provide the City any other duly executed documents, as will be
reasonably requested by the City, to implement the intent of the Contract Documents.
11.6 ASSIGNMENT
Neither Contractor nor the City will, without the written consent of the other, assign,
transfer or sublet any portion of this Contract or part of the Work or the obligations
required by the Contract Documents.
11.7 FORCE MAJEURE
Except for payment of sums due, neither party shall be liable to the other nor deemed in
default under this Contract if and to the extent that such party’s performance of this
Contract is prevented by reason of force majeure. The term "force majeure" means an
occurrence that is beyond the control of the party affected and occurs without its fault or
negligence. Without limiting the foregoing, force majeure includes acts of God; acts of
the public enemy; war; riots; strikes; mobilization; labor disputes; civil disorders; fire;
flood; lockouts; injections-interventiOn-acts; or failures or refusals to act by government
authority; and other similar occurrences beyond the control of the party declaring force
majeure which such party is unable to prevent by exercising reasonable diligence.
11.8 FUNDS APPROPRIATION
Multiterm contracts for job-Order-contracting construction sen/ices are subject to A.R.S.
§34-607, as amended. If the City Council does not appropriate funds to continue this
Contract and pay for charges, the City may terminate this Contract at the end of the
current fiscal period. The City agrees to give written notice to Contractor at least thirty
(30) days before the end of its current fiscal period and will pay Contractor for all
approved charges incurred through the end of the period.
11.9 CONSTRUCTION METHODS
If the City provides Contractor with a written order to provide adequate maintenance of
traffic, clean-up, dust control or to correct deficiencies or damage resulting from
abnormal weather conditions, and Contractor fails to comply in the time frame specified,
the City may have Work accomplished by other sources at Contractor’s expense, without
an increase in the Job Order Price.
11.10 UTILITY RELOCATIONS FOR CONSTRUCTION METHODS
If any utility is relocated or rebuilt to accommodate Contractor’s construction methods
and available equipment, the expense will be borne by Contractor and will be replaced
to the original location before completion of the Job Order at the request of the City’s
(Revised 5.6.2026)
19183299
Page 49 of 67
Contract No. 2026-088-COS
Project Coordinator at Contractor’s sole expense, without an increase in the Job Order
Price.
11.11 DAMAGED UTILITIES DURING CONSTRUCTION
Any utilities damaged during construction shall be replaced at Contractor’s expense,
without an increase in the Job Order Price, as per the requirements of the M.A.G.
Standard Specifications.
11.12 SUCCESSORS AND ASSIGNS
This Contract will extend to and be binding upon Contractor, its successors and assigns,
including any individual, company, partnership, or other entity with or into which
Contractor will merge, consolidate, or be liquidated, or any person, corporation,
partnership, or other entity to which Contractor wili sell its assets, except that services
covered by this Contract may not be assigned or sublet in whole or in part without first
obtaining the written consent of the Purchasing Director and Contract Administrator.
11.13 CONFLICT IN LANGUAGE
All services and Work performed will conform to all applicable City of Scottsdale codes,
ordinances and requirements as outlined in the Contract Documents. If there is a conflict
in interpretation between provisions in this Contract and those in exhibits, the provisions
in this Contract will prevail.
11.14 THIRD PARTY BENEFICIARY
Nothing under the Contract Documents will be construed to give any rights or benefits
in the Contract Documents to anyone other than the City and Contractor, and ail duties
and responsibilities undertaken in accordance with the Contract Documents will be for
the sole and exclusive benefit of the City and Contractor and not for the benefit of any
other or third party.
11.15 GOVERNING LAW AND VENUE
This Contract and all Contract Documents will be considered to be rriade under and will
be construed in accordance with and governed by the laws of the State of Arizona
without regard to the conflicts or choice of law provisions. Any action to enforce any
provision of this Contract or to obtain any remedy with respect to this Contract shall be
brought in the Superior Court of Maricopa County, Arizona, and for this purpose, each
party expressly and irrevocably consents to the jurisdiction and venue of that Court and
waives the right to have such action removed to Federal District Court.
11.16 SEVERABILITY
If any provision of the Contract Documents or their application to any person or
circumstance is invalid, illegal or unenforceable to any extent, the rernaindef of the
Contract Documents and the application of the Contract Documents will not be affected
and will be enforceable to the fullest extent permitted by law. In accordance with the
provisions of A.R.S. § 41-194.01, as amended, should the Attorney General give notice
to the City that any provision of th e Contract Documents violates state law or the Arizona
(Revised 5.6.2026)
19183299
Page 50 of 67
Contract No. 2026-088-COS
Constitution, or that it may violate a state statute or the Arizona Constitution, and the
Attorney General submits the offending provision to the Arizona Supreme Court, the
offending provision(s) shall be immediately severed and struck from the Contract
Documents and the City and Contractor shall* within ten (10) days after such notice,
negotiate in good faith to resolve any Issues related to the severed provision(s).
11.17 LEGAL REQUIREMENTS
Contractor shall perform all Contract Services in accordance with all Legal
Requirements and will provide all notices applicable to the Contract Services as required
by the Legal Requirements.
11.18 INDEPENDENT CONTRACTOR
The services the Contractor provides to the City are that of an Independent Contractor.
Neither parly to this Contract shall be deemed to be the employee or agent of the other
party to the Contract. Upon request, the Contractor shall provide the required I.R.S.
From W-9 which is available from the IRS website at www.|RS,gov under its forms
section.
Any provisions in the Contract Documents that may appear to give the City the right to
direct Contractor as to the details of accomplishing the Work or to exercise a measure
of control over the Work means that Contractor will follow the wishes of the City as to
the results of the Work only. These results will comply with all applicable laws and
ordinances.
11.19 CITY'S RIGHT OF CANCELLATION
Pursuant to A.R.S. § 38-511, as amended, the City may cancel any contract or
agreement, without penalty or obligation, if any person significantly involved in
initialing, negotiating, securing, drafting, or creating the contract on behalf of the City’s
departments or agencies is, at any time while the contract or any extension of the
contract is in effect, an employee of any other party to the contract in any capacity or
a contractor to any other party to the contract with respect to the contract’s subject
matter. The cancellation will be effective when all other parties to the contract receive
the City’s written notice unless the notice specifies a later time.
11.20 SURVIVAL
Except as expressly agreed herein, all warranties, representations and indemnifications
by Contractor shall survive the completion, expiration, and/or termination of this
Contract.
11.21 COVENANT AGAINST CONTINGENT FEES
Contractor warrants that no person has been employed or retained to solicit or secure
this Contract upon any contract or understanding for a commission, percentage,
brokerage, or contingent fee, and that no member of the City Council, or any employee
of the City of Scottsdale has any interest, financially, or otherwise, in the firm. For breach
or violation of this warranty, the City will have the right to annul this Contract without
(Revised 5.6.2026)
19183299
Page 51 of 67
Contract No. 2026-088-COS
liability, or at its discretion to deduct from the Contract Price or consideration, the fuli
amount of any commission, percentage, brokerage, or contingent fee.
11.22 NO WAIVER
Either party’s failure to insist on strict performance of any term or condition of the
Contract shall not be deemed waiver of that term or condition even if the party accepting
or acquiescing in the nonconforming performance knows of the nature of the
performance and fails to object to it.
11.23 HEADINGS
The headings used in this Contract, or any other Contract Documents, are for ease of
reference only and will not in any way be construed to limit or alter the meaning of any
provision.
11.24 NOTICE
All notices or demands required by this Contract must be given to the other party in
writing, delivered by hand or by registered or certified mail at the addresses stated
below, or to any other address the parties may substitute by giving written notice as
required by this section. Notice by electronic mail or facsimile will not be considered
notice,
To City:
City of Scottsdale
Attn: Alison Tymkiw
7447 E. Indian School Road, Suite 205
Scottsdale. AZ 85251
To JOC Contractor:
Evolution Mechanical Project dba IMCOR
Attn: Ed R. White
1841 E. Washington Street
Phoenix, AZ 85034
11.25 ADDITIONAL CITY RIGHTS REGARDING SECURITY INQUIRIES
Projects may be completed in both secure and non-secure City facilities. All Contractor
and Subcontractor employees may be required to pass mandatory background checks
prior to the start of any Work and be issued access badges by City of Scottsdale
Municipal Security. In addition to the foregoing, the City reserves the right to: (1) have
an employee/prospective employee of Contractor be required to provide fingerprints and
execute any other documentation as may be necessary to obtain criminal justice
information pursuant to A.R.S. § 41-1750(G)(4): (2) act on newly acquired information
whether or not that information should have been previously discovered; (3) unilaterally
change its standards and criteria relative to the acceptability of Contractor's employees
or prospective employees; and, (4) object, at any time and for any reason, to an
employee of Contractor performing Work (including supervision and oversight) under
this Contract.
A, Provisions Applicable to all Contractor Contracts and Subcontracts. Contractor will
include the terms of this provision for employee background and security checks
(Ravised 5.6.2026)
19183299
Page 52 of 67
Gontract No. 2026-088-COS
and screening in all contracts and subcontracts for Work performed under this
Contract, including supervision and oversight.
B. Materiality of Security Inquiry Provisions. The Security Inquiry provisions of this
Contract, as stated above, are material to the City’s entry into this Contract and
any breach by Contractor may, at the City’s sole option and unfettered discretion,
be considered to be a breach of contract of sufficient magnitude to terminate this
Contract. Termination will subject Contractor to liability for its breach of contract.
11.26 HAZARDOUS MATERIALS
A.
Upon discovery of hazardous materials Contractor will comply with all applicable
laws/ordinances and regulations and take all appropriate health and safety
precautions.
B.
Unless included in the Work, if Contractor encounters onsite, or as material to be
incorporated in the Work, any material which it reasonably believes to contain
asbestos, polychlorinated biphenyl (PCB), or other hazardous substances or
materials regulated by public health laws, it will immediately stop work and report
the condition to the City.
C.
If the material is found to contain asbestos, PCB or other hazardous substances or
materials regulated by public health laws. Contractor will not resume Work In the
affected area until the material has been abated or rendered harmless. Contractor
and the City may agree, in writing, to continue Work in non-affected areas onsite.
D.
An extension of Job Order Time may be granted in accordance with Article 5.
E.
Contractor will comply with all applicable laws/ordinances and regulations and take
all appropriate health and safety precautions upon discovery.
F.
Despite the provisions of this Article 11.26, the City is not responsible for
hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable. Contractor will
indemnify, defend and hold harmless the City and the City’s officers, directors,
employees and agents from and against all claims, losses, damages, liabilities and
expenses, including attorneys’ fees and expenses, arising out of or resulting from
those hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable.
11.27 TRAFFIC CONTROL
A.
Complete street closures will not be permitted unless specified in the Special
Provisions or approved by the City. The timing and sequence of street closures
will be approved by the Traffic Engineering Director, or designee, at least fourteen
(14) days before the closure. This approval is necessary to provide coordination
with other roadway projects and special events.
B.
Adequate barricades and lighted warning signs must be installed and maintained
by Contractor throughput the duration of any Project. All traffic control must be in
accordance with the current version of the City of Scottsdale Supplement to MAG
(Revised 5.6.2026)
19183299
Page 53 of 67
c.
Contract No. 2026-088-COS
Uniform Standard Specifications Section 401 or as required by the approved
barricade plan unless otherwise specified in the Special Provisions.
Contractor wiil submit a construction schedule and a barricade plan to the City
Traffic Engineering Director, or designee, for approval or modification at least
seventy-two (72) hours before construction is initiated, and must wait to commence
construction untii the plan is signed as accepted by the City Traffic Engineering
Director, or designee.
11.28 MATERIAL SOURCE
No material source has been designated by the City for use under this Contract. MAG
Specification, Section 106 will apply as will ADOT Standard Specifications 1982, Section
106.1, 106.2, 106.7 & 106.8, which outline controls and Section 1001-1, -2, & -4
concerning approval of Contractor-Furnished Source and supplemental Contracts in
regards to environmental analysis and the liability for materials testing costs.
Contractor and Subcontractor furnished material sources situated in the 100-year flood
plain of any stream or watercourse will not be allowed if located within 1.0 mile upstream
and 2.0 miles downstream of any highway structure or surfaced roadway crossing.
A Contractor and Subcontractor-furnished source will be defined as a material source,
which is neither an ADOT furnished source nor a commercial source, as defined in this
Contract.
A commercial source will be defined as a material source in which the owner or producer
has been regularly engaged for at least one (1) year during regular business hours on a
regular basis in the processing and selling of sand, rock, ready mixed Portland cement
concrete, asphaltic concrete and other similar products normally produced and sold to
all parties. The company must have an Arizona retail sales tax license.
The location of any new material source or existing non-commercial material source
proposed for use under this Contract must be reviewed by the appropriate agency
having flood plain management jurisdiction over the area of proposed source location.
Contractor and Subcontractor will obtain a letter from the agency addressed to the
Contract Administrator certifying that the proposed source location conforms to the
required conditions and the applicable Standard Specifications. Contractor will
familiarize himself with the nature and extent of the Contract Documents, work to be
performed, all local conditions, and federal, state and local laws, ordinances, rules and
regulations that in any manner may affect cost, progress or performance of the Work.
11.29 FAMILIARIZATION WITH APPLICABLE LAWS
Contractor will familiarize itself with the nature and extent of the Contract Documents,
work to be performed, all local conditions, and federal, state and local laws, ordinances,
rules and regulations that in any manner may affect cost, progress or performance of
the Work. Contractor shall comply with all applicable federal, state, and local laws,
statutes, ordinances, standards, orders, rules, and regulations, including, as applicable,
workers’ compensation laws, minimum and maximum salary and wage statutes and
regulations, prompt payment and licensing laws and regulations.
(Revised 5.6.2026)
19183299
Page 54 of 67
Contract No. 2026-088-COS
11.30 NATIVE PLANTS
Contractor agrees it will take whatever steps, procedures or means necessary to
remove, move, displace and save all native plants within the contract work area in
accordance with the City of Scottsdale Revised Code, as amended, and all applicable
state and county statutes, ordinances, codes and other policy requirements and
recognized methods, procedures, techniques and equipment for protection, salvage,
and handling of all plants to be moved from the construction area. This is not a pay item
unless specified upon the Schedule of Bid Items.
11.31 ENDANGERED HARDWOODS
Contractor agrees any construction, building addition or alteration project which Is
financed by monies of this state or its political subdivisions will not use endangered
tropical hardwood unless an exemption is granted by the Director of the State of Arizona,
Department of Administration.
11.32 CONSTRUCTION ACTIVITY
Contractor agrees that all construction activity occurring on Site shall conform to the
hour and noise requirements of the City of Scottsdale Revised Code, as amended.
11.33 COMPLIANCE WITH LOCAL, STATE AND FEDERAL LAWS
A, Contractor understands and acknowledges the applicability to it of the American with,
Disabilities Act, the Immigration Reform and Control Act of 1986, the Drug Free
Workplace Act of 1989, Fair Labor Standards Act, Age Discrimination in Employment
Act, Family and Medical Leave Act, National Labor Relations Act, Occupational Safety
and Health Act, and other local, state or federal law governing Contractor’s labor and
employment practices. Contractor agrees to comply with these laws in performing this
Contract and to permit the City to verify compliance. Contractor further agrees that
any violation of provision on the part of Contractor, Its employees, agents or assigns
will constitute a material breach of this Contract.
Contractor will also comply with A.R.S. §34-301, “Employment of Aliens on Public
Works Prohibited," and A.R.S. §34-302, "Residence Requirements for Employees,” as
amended. Contractor will include the terms of this provision in all contracts and
subcontracts for Work performed under this Contract, including supervision and
oversight.
Under the provisions of A.R.S. §41-4401 and Exhibit C. attached hereto,
Contractor warrants to the City that Contractor and aii its Subcontractors wiil
comply with all Federal Immigration laws and regulations that relate to its
employees and that Contractor and all its Subcontractors now comply with the
E-Verify Program under A.R.S; §23-214(A).
A breach of this warranty by Contractor or any of its Subcontractors will be considered
a material breach of this Contract and may subject Contractor or Subcontractor to
penalties up to and including termination of this Contract or any subcontract.
The City retains the legal right to inspect the papers of any employee of Contractor or
(Revised 5.6.2026)
19183299
Page 55 of 67
Contract No, 2026-088-COS
any Subcontractor who works on this Contract to ensure, that Contractor or any
Subcontractor is complying with the warranty given above.
The City may conduct random verification of the employment records of Contractor
and any of its Subcontractors to ensure compliance with this warranty. Contractor
agrees to indemnify, defend and hold the City harmless for, from and against all losses
and liabilities arising from any and all violations of these statutes.
The City will not consider Contractor or any of its Subcontractors in material breach of
this Contract if Contractor and its Subcontractors establish that they have complied
with the employment verification provisions prescribed by 8 USCA §1324(a) and (b) of
the Federal Immigration and Nationality Act and the E-Verify requirements prescribed
by A.R.S. §23-214{A), as amended. The “E-Verify Program" means the employment
verification pilot program as jointly administered by the United States Department of
Homeland Security and the Social Security Administration or any of its successor
programs.
The provisions of this Article must be included in any contract Contractor enters into
with any and all of its Subcontractors who provide services under this Contractor any
Subcontract. "Services” are defined as furnishing labor, time or effort in the State of
Arizona by a Contractor or Subcontractor. Services include construction or
maintenance of any structure, building or transportation facility or improvement to real
property. Contractor will take appropriate steps to assure that all Subcontractors
comply with the requirements of the E-Verify Program. Contractor’s failure to assure
compliance by all its Subcontractors with the E-Verify Program may be considered a
material breach of this Contract by the City.
B. Compliance with Americans with Disabilities Act. The City of Scottsdale assures full
compliance with Title VI of the Civil Rights Act of 1964, Title II of the Americans with
Disabilities Act of 1990 (ADA), and other related authorities in all of its programs and
activities. The City’s Title VI and ADA Programs require that no person shall, on the
grounds of race, color, national origin and disability, be excluded from participation in,
be denied the benefits of, or be othenvise subjected to discrimination under any
program or activity. This policy is also applicable to contractors and/or consultants
conducting work on behalf of the city.
Contractor acknowledges that, in accordance with the Americans with Disabilities Act
(ADA), programs, sen/ices and other activities provided by a public entity to the public,
whether directly or through a contractor, must be accessible to the disabled public.
Contractor will provide the services specified in this Contract in a manner that complies
with the ADA and any and all other applicable federal, state and local disability rights
legislation. Contractor agrees not to discriminate against disabled persons in the
provision of services, benefits or activities provided under this Contract and further
agrees that any violation of this provision on the part of Contractor, its employees,
agents or assigns will constitute a material breach of this Contract.
C, Equal Employment Opportunity and Discrimination. For the duration of this Contract,
Contractor represents and warrants it will comply with all applicable local, stale and
federal laws governing equal employment opportunities, or prohibiting employment or
other discrimination based on any protected characteristic including but not limited to
actual or perceived race, color, religion, sex, age, disability, national origin, sexual
orientation, gender identity, or U.S. military status. City of Scottsdale Revised Code,
(Revised 5.6.2026)
19183299
Page 56 of 67
Contract No. 2026-088-COS
Chapter 15 mandates Contractor compliance with the policies contained therein.
Contractor agrees that any violation of provision on the part of Contractor, its
employees, agents or assigns will constitute a material breach of this Contract.
Contractor will include the terms of this provision in all contracts and subcontracts for
work performed under this Contract, including supervision and oversight. The
Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, sexual orientation, gender
identity, or national origin.
D. No Preferential Treatment or Discrimination. In accordance with the provisions of
Article II, Section 36 of the Arizona Constitution, the City will not grant preferential
treatment to or discriminate against any individual or group on the basis of race, sex,
color, ethnicity or national origin. To avoid the appearance of impropriety. Contractor
shall not make any donation to the City, of any goods or services during the term of
this Contract, unless it has specifically been approved by the City Manager dr
designee.
E. Advertising. No advertising or publicity concerning the City using Contractor’s services
shall be undertaken without prior written approval of such advertising or publicity by
the Contract Administrator and the City Attorney.
11.34 DATA CONFIDENTIALITY
A.
As used in this Contract, data means all information, whether written or verbal,
including plans, photographs, studies, investigations, audits, analyses, samples,
reports, calculations, internal memos, meeting minutes, data field notes, work
product, proposals, correspondence and any other similar documents or
information prepared by or obtained by Contractor in the performance of this
Contract.
B.
The parties agree that all data, including originals, images, and reproductions,
prepared by, obtained by, or transmitted to Contractor in connection with
Contractor’s performance of this Contract is confidential and proprietary
information belonging to the City.
C.
Contractor will not divulge data to any third party without first obtaining the written
consent of the City. Contractor will not use the data for any purposes except to
perform the services required under this Contract. These prohibitions will not apply
to the following data provided Contractor has first given the required notice to the
City:
1. Data, which was known to Contractor before its performance under this
Contract unless the data was acquired in connection with the Work
performed for the City;
2. Data which was acquired by Contractor in its performance under this
Contract and which was disclosed to Contractor by a third party, who to the
best of Contractor's knowledge and belief, had the legal right to make
disclosures and Contractor is not otherwise required to hold the data in
(Revised 5.6.2026)
10163299
Page 57 of 67
Contract No. 2026-088-COS
confidence; or
3. Data, which is required to be disclosed by virtue of law, regulation, or court
order to which Contractor is subject.
D.
In the event Contractor is required or requested to disclose data to a third party, or
any other information to which Contractor became privy as a result of any other
contract with the City, Contractor will first notify the City as required in this Article
of the request or demand for the data. Contractor will give the City sufficient facts
so that the City can be given an opportunity to first give its consent or take any
action the City may consider appropriate to protect the data or other information
from disclosure.
E.
Unless prohibited by law, within ten (10) days after completion of services for a
third party on real or personal property owned or leased by the City, Contractor will
promptly deliver, as stated in this Article, a copy of all data to the City. All data will
continue to be subject to the confidentiality requirements of this Contract.
F.
Contractor assumes all liability for maintaining the confidentiality of the data in its
possession and agrees to compensate the City if any of the provisions of this
Article are violated by Contractor, its employees, agents or Subconsultants. Solely
for the purposes of seeking injunctive relief, it is agreed that a breach of this Article
will be considered to cause irreparable harm that justifies injunctive relief in court.
11.35 CONFLICT OF INTEREST
A.
To evaluate and avoid potential conflicts of interest. Contractor will provide written
notice to the City, as stated in this Article, of any work or services performed by
Contractor for third parties that may involve or be associated with any real property
or personal property owned or leased by the City. The notice will be given seven
(7) business days before commencement of the Project by Contractor for a third
party, or seven (7) business days before an adverse action as defined below.
Written notice and disclosure will be sent to the City Senior Representative
identified in Article 7.4.
B.
Actions that are considered to be adverse to the City under this Contract include
but are not limited to:
C.
1. Using data as defined in this Contract acquired in connection with this
Contract to assist a third party in pursuing administrative or judicial action
against the City;
2. Testifying or providing evidence on behalf of any person in connection with
an administrative or judicial action against the City; and
3. Using data to produce income for Contractor or its employees
independently of performing the services under this Contract, without first
obtaining the written consent of the City.
Contractor represents that except for those persons, entities and projects identified
to the City, the services to be performed by Contractor under this Contract are not
(Revised 5.6.2026)
19183299
Page 58 of 67
Contract No. 2026-088-COS
expected to create an interest with any person, entity, or third party project that is
or may be adverse to the interests of the City.
D,
Contractor’s faiiure to provide a written notice and disclosure of the information
stated in this Articie on Conflicts of interest will constitute a material breach of this
Contract.
E.
This Contract is subject to canceliation by the City of Scottsdale in accordance with
the provisions of A.R.S. § 38 511, as amended.
11.36 COMMENCEMENT OF STATUTORY LIMITATION PERIOD AND STATUTE OF
REPOSE
A.
Before Final Completion. As to acts or failures to act occurring before the relevant
date of Final Completion, any applicable statute of limitations will commence to run
and any alleged cause of action will be considered to have accrued in any and all
events not later than the date of Final Completion.
B.
Between Punch List Preparation and Final Completion. As to acts or failures to
act occurring between the relevant date of Punch List Preparation and before Final
Completion, any applicable statute of limitation will begin to run and any alleged
cause of action will be considered to have accrued in any events not later than the
date of Final Completion.
C.
After Completion. As to acts or failures to act occurring after the date of Final
Completion, any applicable statute of limitations will commence to run and any
alleged cause of action will be considered to have accrued in any and all events
not later than the date of any correction of the Work or failure to correct the Work
by the Contractor, or the date of actual commission of any other act or failure to
perform any duty or obligation by the Contractor or the City, whichever occurs last.
D.
Statute of Repose. The time period for the applicable Statute of Repose will
commence to run at the time specified in A.R.S. §12-552 as it is amended or
renumbered from time to time.
11.37 LOSS AND DAMAGES
Except as expressly provided in this Contract, all loss or damage arising out of the nature
of the Work to be done or from the action of the elements, or from any unforeseen
circumstances, in the prosecution of the same, or from any unusual obstructions or
difficulties which may be encountered in or during the prosecution of the Work, or from
any casualty whatsoever of every description, will be sustained and borne by Contractor
at its sole cost and expense. By signing this Contract, all rights of subrogation are waived
against the City, its officers, officials, agents and employees.
11.38 RIGHTS-OF-WAY
The M.A.G. Standard Specification 107.12 is modified to read as follows: “Contractor, at
its own expense, is responsible for the acquisition of any necessary temporary
easements for construction purposes, storage and maintenance purposes, which are
(Revised 5.6.2026)
19163299
Page 59 of 67
Contract No. 2026-088-COS
required in addition to existing easements or rights of way secured by the City as
indicated upon the plans."
11.39 EXISTING TRAFFIC AND STREET SIGNS AND TRAFFIC SIGNAL EQUIPMENT
Contractor will use due care when excavating at or near intersections where traffic signal
underground conduit is located. Contractor will notify the Transportation Maintenance
Traffic Signal Division (tel. 480.312.5620) at least forty-eight (48) hours in advance of
any work at the intersections. Contractor will be responsible for the installation and
maintenance of temporary overhead traffic signal cable as specified by the
Transportation Department when underground conduit is to be severed by excavations
at the intersection. The Transportation Department will have all underground traffic
conduit located and will provide the necessary City Technicians to assist Contractor in
identifying wiring phases and direction of conduit runs upon twenty-four (24) hours’
notice from Contractor and at least one (1) day before Contractor’s scheduled wiring and
installation of temporary cables. Contractor will be responsible for the wiring and
connection of all temporary cable within the pull boxes and terminal compartments. The
Transportation Department will provide a City technician to assist Contractor with
connecting field wiring within the traffic signal control cabinet. Contractor will provide, at
its expense, at least one off-duty uniformed Police Officer as may be required to direct
traffic while the traffic signal is turned off and the wiring is transferred. Contractor will
be responsible as specified by the Traffic Department for the repair and restoration of
all traffic signal overhead and underground items that have been damaged or modified.
The City does not permit the splicing of Magnetic Detector Loops.
11.40 CERTIFICATION OF USE OF BENCHMARKS
In compliance with the City’s Design Standards & Policies Manual (DS&PM), Sections
9-1.1 and 9-1.301, it is the City’s intent that Contractor must use both horizontal and
vertical benchmarks with City of Scottsdale published values for any survey on all public
works projects. These published values are available for public use at the following
website:
https://eservices.scoltsdalea2.qov/maps/benchmarks. AT LEAST 1
HORIZONTAL AND 1 VERTICAL BENCHMARK MUST MATCH THE NORTHING,
EASTING OR ELEVATION VALUES PUBLISHED ON THE CITY’S WEBSITE. If
required by the City, Contractor must sign and submit with this Contract, the Certificate
of Use attached and by reference made a part of this Contract.
11.41 TAX INDEMNIFICATION
The fee listed in this Contract includes any and all taxes applicable to the activities under
this Contract. The City will have no obligation to pay additional amounts for taxes of any
type. Contractor, its Subcontractors, Subconsultants and Suppliers, shall pay all
Federal, state and local taxes applicable to its operation and any persons employed by
Contractor, its Subcontractors, Subconsultants and Suppliers, except as may be
otherwise provided in this Contract. Contractor shall, and also require its
Subcontractors, Subconsultants and Suppliers to hold the City harmless from any
responsibility for taxes, damages and interest, if applicable, contributions required under
Federal, and/or state and local laws and regulations and any other costs including
transaction privilege taxes, unemployment compensation insurance. Social Security and
Worker’s Compensation.
(Revised 5.6.2026)
19183299
Page 60 of 67
Contract No. 2026-088-COS
11.42 ISRAEL BOYCOTT/FORCED LABOR PROVISIONS
By executing this contract, Contractor certifies that it is not currently engaged in and will
not for the duration of this Contract engage in boycott activity proscribed by A.R.S. § 35-
393 et seq, as amended.
Pursuant to A.R.S. § 35-394, as amended. Contractor warrants and certifies that it does
not currently, and agrees for the duration of this Contract that it will not use:
1)
The forced labor of ethnic Uyghurs in the People’s Republic of China.
2)
Any goods or services produced by the forced labor of ethnic Uyghurs in the
People's Republic of China.
3)
Any contractors, subcontractors or suppliers that use the forced labor or any goods
or services produced by the forced labor of ethnic Uyghurs in the People's Republic
of China.
If Contractor becomes aware during the term of this Contract that Contractor is not in
compliance with this Article, Contractor shall notify the City within five (5) business days
after becoming aware of the noncompliance. Failure of Contractor to provide a written
certification that Contractor has remedied the noncompliance within one hundred eighty
(180) days after notifying the City of its noncompliance will result in automatic termination
of this Contract, unless an earlier contract termination, cancellation, or expiration date
applies.
ARTICLE 12 - DEFINITIONS
“Allowance" means an agreed amount by the City and Contractor for items which may be required
to complete the scope of work.
“As-Built Document” - “As-built in construction is equivalent to “as-is." Drawings deemed “as-
built” are final drawings that include all changes made during the actual construction process.
These drawings represent the actual existing constructed conditions as opposed to designs or a
proposed condition. The As-Built Documents should be per A.R.S. § 32-152,
“Btueline or Blackline Prints" - Prints that allows comparison of document versions to show what
has been revised.
"City” or "Owner" means the City of Scottsdale, Arizona, an Arizona municipal corporation.
Regulatory activities handled by the City of Scottsdale Development Services, Planning and Fire
Departments or any other City department are not subject to the responsibilities of the City under
this Contract.
“City’s Representative” means the person designated in Article 7.4(A)(2).
"City’s Senior Representative" means the person designated in Article 7.4(A)(1).
"Claim" means a written request for either payment of additional monies or extension of contract
time, submitted in accordance with the terms of this Contract or applicable law.
“Construction Coordinator” means a City employee who coordinates the daily construction
activities with Contractor, and with their inspection staff that performs quality control inspections,
(Revised 6.6.2026)
19183299
Page 61 of 67
Contract No. 2026-088-COS
enforces project plans and specifications and adopted City codes and ordinances.
“Construction Documents” means the plans, specifications and drawings prepared by the Design
Professional after correcting for permit review requirements and incorporating any approved
amendments, addenda, exhibits and Job Order Adjustments.
“Construction Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Contract Administratoi"' means the person designated in Article 7.4(A) or designee. The Contract
Administrator will sen/e as Contractor's primary point of contact with the City, monitor Contractor’s
performance, review and approve invoices, establish delivery schedules, and in conjunction with
Purchasing ensure Certificates of Insurance are current, conform to the requirements of this
Contract, and are in the City’s possession. Contractor will direct any reports and/or special
requests to the Contract Administrator,
“Contract Documents” means the following items and documents in descending order of
precedence executed by the City and Contractor: (1) Job Order Adjustments; (2) Contract
Modifications; (3) Job Orders; (4) this Contract including all exhibits and attachments; (5)
Contractor’s Proposal (if any); (6) Contractor Statement of Qualifications.
"Contract Modification” means a specific written concurrence between the City and Contractor for
changes to this Contract consistent with the City of Scottsdale Procurement Code, as amended.
"Contract Price” means the amount or amounts stated in Article 4 subject to any Contract
Modifications.
“Contract Services" means the sen/ices required by the Contract Documents.
"Contract Time(s)" means the time stated in Article 3, subject to Contract Modifications as
permitted by this Contract.
“Contractor" is Contractor selected by the City to provide or procure construction services as
detailed in this Job Order Contract.
“Contractor Payment Request” means the City form used by Contractor to request progress
payments for Job Orders in accordance with Article 6.
"Contractor’s Representative” means the person described in Article 7.4(B)(2).
"Contractor’s Senior Representative" means the person described in Article 7.4(B)(1).
“Day(s)” means calendar days unless otherwise specifically noted in the Contract Documents.
“Delay” means an unanticipated event or interference with the progress of a critical path work
activity being performed at the time that causes the completion date of the project to be extended.
Delays may be caused by the City, Contractor, third parties or Force Majeure events. Delays may
be excusable, compensable, non*compensable or concurrent.
"Delay, Compensable" means delay that results from the City’s actions or inactions that entitle
Contractor to both a time extension and delay damages.
(Revised 5.6.2026)
19183299
Page 62 of 67
Contract No. 2026-088-COS
"Delay, Concurrent" means two (2) dr more delays, within the same timeframe, both of which
wouid independently impact the Project Schedule. If one delay is caused by the City and the
other by Contractor, Contractor will generally be entitled to an excusable, non-compensable time
extension, to the degree the delays may "overlap.”
"Delay, Excusable" means an unforeseeable delay caused by an event beyond the control and
without the fault or negligence of Contractor (including its Suppliers and Subcontractors).
Excusable delays may be compensable or non-compensable, depending upon whether the terms
of the Contract or the law allows recovery of delay costs. Unless othenwise shown, it will generally
be presumed that these delays are non-compensable.
"Delay, Non-Excusable" means a delay within the control of Contractor, its Suppliers and
Subcontractors, or a delay resulting from a risk taken by Contractor under the terms of the
Contract. Contractor will not be due any time extension or delay damages, and may be
responsible for paying to the City, actual or liquidated damages for the delay.
"Deliverables" means the work products prepared by Contractor in performing the scope of work
described in this Contract. Sorne of the rhajor deliverables to be prepared and provided by
Contractor may include, but are not limited to: Construction Management Plan, Project Schedule,
Schedule of Values, alternative system evaluations, procurement strategies and plans, cost
estimates, construction market surveys, cash flow projections. Subcontractor procurement plari.
Subcontractor Contracts, Subcontractor bid packages. Supplier Contracts, and others as
indicated in this Contract or required by the Project Team.
"Design Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Design Team” or "Design Professional” refers to licensed design professionals, as defined in
A.R.S. §34-101 as amended.
"Differing Site Conditions” comply with M.A.G. Standard Specifications, Subsection 102.4.
"Effective Date" means the date specified in this Contract on which the Contract becomes
effective, but if no date is specified, the date on which the City executes this Contract.
"Field Order" means a written field directive prepared and signed by the City, directing a change
in Work that does not include an adjustment in the Job Order Time or Job Order Price.
“Final Acceptance" means the completion of a Job Order as prescribed in Article 3.5.
“Financial Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
"Hazardous Substance" -_means:
(a) Any substance designated pursuant to sections 311 (b) (2) (A) and 307(a) of the clean
water act.
(b) Any element, compound, mixture, solution or substance designated pursuant to
section 102 of CERCLA.
(c) Any hazardous waste having the characteristics identified under or listed pursuant to
section 49-922.
(d) Any hazardous air pollutant listed under section 112 of the federal clean air act (42
United States Code section 7412).
(Revised;5.6.2026)
19183299
Page 63 of 67
Contract No. 2026-088-COS
(e) Any imminently hazardous chemical substance or mixture with respect to which the
administrator has taken action pursuant to section 7 of the federal toxic substances
control act (15 United States Code section 2606).
(f) Any substance which the director, by rule, either designates as a hazardous substance
following the designation of the substance by the administrator under the authority
described in subdivisions (a) through (e) of this paragraph or designates as a
hazardous substance oh the basis of a determination that such substance represents
an imminent and substantial endangerment to public health.
“Horizontal Construction" ^ as used in this Contract is defined in A.R.S. §34-101, as amended.
"Informational Submittals" - Submittals are required (common with construction projects) for the
architect and engineer to verify that the correct products and quantities will be installed on a
project.
“Job Order" or "Project" means a specific scope of Contract Services done pursuant to an
individual Job Order and includes a specific written Contract between the City and Contractor for
a Job Order including a Scope of Work, a Job Order Price, a Job Order Time and any special
conditions that may apply to be performed under this Contract. The Job Order includes the plans,
technical specifications, special provisions and Contractor’s proposal either by reference or
inclusion.
"Job-Order-Contracting" means a project delivery method as defined in A.R.S. §34-101, as
amended.
"Job Order Adjustment” or “Adjustment" means a written order signed by an authorized
representative of the City and which approves changes in the Work required under a Job Order,
the Job Order Price, and/or the Job Order Time consistent with the City of Scottsdale Procurement
Code, as amended.
“Job Order Notice-to-Proceed," (NTP) means a written notice given by the City to Contractor fixing
the date on which Contractor will start to perform Contractor's obligations under that individual
Job Order.
“Job Order Price” means the amount negotiated between Contractor and the City for an individual
Job Order that includes costs, overhead, bonding, insurance, profit and other costs as agreed to
and calculated on the Unit Prices, cost-coefficient and special items as prescribed in. Article 4.
"Job Order Time" or "Duration of the Work” means the number of Day(s) from a Job Order Notice-
to-Proceed to Substantial Completion. The approved Job Order Time will be made part of this
Contract by executing an individual Job Order for specific Work.
"Legal Requirements” means all applicable federal, state and local laws, codes, ordinances,
rules, regulations, orders and decrees of any government or quasi-government entity having
jurisdiction over a Project or Site, the practices involved in a Project or Site, or any Work.
"Liquidated Damages" means an amount Contractor will pay in compliance with Article 3.6.
"Maintenance Services" - as used in this Contract Is defined in A.R.S. §34-101, as amended.
“Must”, “will” and “shall” as used in this Contract are mandatory.
(Revised S.6.2026)
19183299
Page 64 of 67
Contract No. 2026-088-COS
“Operations Services” - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Owner Agent," “City’s Agent” or "Owner Representative" see "City’s Senior Representative."
“Payment Request" means a form that is accepted by the City and used by Contractor in
requesting progress payments or final payment and which will include any supporting
documentation as is required by the Contract Documents or the City, and is based on a monthly
estimate of the dollar value of the Work completed.
“Product Data" means illustrations, standard schedules, performance charts, instructions,
brochures, diagrams and other information furnished by Contractor to illustrate materials or
equipment for some portion of the Work.
“Professional Certification” ~ Professional certification is a designation which indicates that a
person is qualified to perform a job or task. Professional certification can be trade certification or
professional designation.
“Project Record Documents” means the documents created pursuant to Article 1.9.
“Project Record Drawing Prints” - Set of current design drawings used by construction contractor
for reference during construction. These drawings are typically marked up during the construction
process and are used to develop the subsequent As-Built Documents.
"Project Team" - Consists of the Design Professional, the Contractor, the Contract Administrator,
the City’s representatives and other stakeholders who are responsible for making decisions
regarding the Project,
“Punch List” means those minor items of Work to be completed before Final Acceptance which
do not prevent the Project from being used for the purpose for which it is intended and which will
not prevent the issuance of a Certificate of Occupancy.
"Samples" means physical examples that illustrate materials, equipment, or workmanship
representative of a part of the Work and which establish the standards by which that portion of
the Work will be judged.
“Schedule of Values (SOV)" means the Document specified in the construction phase, which
divides the Job Order Price into pay items, such that the sum of all pay items equals the Job Order
Price for the construction phase Work, or for any portion of the Work having a separate specified
Job Order Price. The SOV may or may not be output from the Progress Schedule depending on
whether the Progress Schedule is cost-loaded or not.
“Shop Drawings” means drawings, diagrams, schedules and other data specially prepared for the
Work by Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor
to illustrate some portion of the Work.
“Site” means the land or premises on which a Job Order is located. Contractor will require ail
Subcontractors to include the street address of the Job Order in their contracts.
“Specifications" means those sections of the Contract Documents for the construction phase
consisting of written technical descriptions of materials, equipment, construction systems.
(Revised 6.6.2026)
19183299
Page 65 of 67
Contract No. 2G26-088-COS
standards and workmanship as applied to the Work and certain applicable administrative details.
“Subcontractor” or “Subconsultant" means a person or firm having a direct contract with
Contractor or any other person or firm having a contract with Contractor at any tier, who undertake
to perform a part of the Work for which Contactor is responsible. All Subcontractors,
Subconsultants and Suppliers must be selected in accordance with the subcontractor and major
supplier selection provisions of this Contract.
"Substantial Completion” means when the Work, or when an agreed upon portion of the Work is
sufficiently complete so that the City can occupy and use the Project or a portion Of it for its
intended purposes. This may include, but is not Hmited to: (1) approval by the City Fire Marshall
and local authorities (Certificate of Occupancy); (2) issuance of elevator permit; (3) demonstration
to the City that all systems are in place, functional, and displayed to the City or its representative;
(4) installation of all materials and equipment; (5) City review and acceptance of all systems; (6)
City review and acceptance of draft O&M manuals and record documents; (7) City operation and
maintenance training completed; (8) HVAC test and balance completed [provide minimum 30
days before projected substantial completion]; (9) completed landscaping and site work; and (10)
final cleaning.
“Supplier" means a manufacturer, fabricator, supplier, distributor, material man or vendor having
a direct contract with Contractor or any Subcontractor or Subconsultant to furnish materials or
equipment to be incorporated in the in the Work by Contractor or any Subcontractor or
Subconsultant.
"Work” means the entire completed Jop Order or the various separately identifiable parts of the
Job Order, required to be furnished in accordance with the Contract Documents. Work includes
and is the result of performing or furnishing labor and furnishing and incorporating materials,
resources and equipment into the Job Order, and performing or furnishing services and
documents as required by the Contract Documents.
[END OF TEXT- SIGNATURE PAGE TO FOLLOW]
(Revised 5.6.2026)
19183299
Page 66 of 67
Contract No. 2026-088-COS
CITY OF SCOTTSDALE, ARIZONA
CONTRACT NO. 2026-088-COS
________ CONTRACT___________
THE CITY OF SCOTTSDALE, by its Mayor and City Clerk have subscribed their names this
_____day of____________________ 2026.
CITY OF SCOTTSDALE,
an Arizona municipal corporation
CONTRACTOR:
Evolution Mechanical Projects, LLC,
a Delaware limited liability company
By:
Lisa Borowsky, Mayor
ATTEST:
By:_
Name:
Title:
Ben Lane, City Clerk
REVIEWED BY:
Melanie Gibson
City Contract Administrator
Jenn Myers, MPA, CPPO, NIGP-CPP, CPPB
Purchasing Director
Alison Tymkiw, Senior Director - City Engineer
George Woods
Safety & Risk Management Director
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
Lq,^. Santaella, City Attorney
By: Lydia Tulin, Assistant City Attorney
(Revised 5.6.2026)
19183299
Page 67 of 67
Contract No. 2026-088-COS
EXHIBIT A
STATUTORY PERFORMANCE BOND
PURSUANT TO TITLE 34. CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond nriust be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That,
___________________________ (hereinafter called the Principal) as Principal, and
___________________________, a corporation organized and existing under the laws of the State of
_________________with its principal office in the City of........................................ . (hereinafter called
the Surety), as Surety, are held and firmly bound unto the City of Scottsdale, County of Maricopa, State of
Arizona in the amount of_______________
^___________Doliars ($___________ J, for the payment
whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors
successors and assigns, jointly and severaily, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdaie, dated the
_____day of ____________ , 20___, for Bid No. (bid number). Project No. (project number), (project
name), which contract is hereby referred to and made a part hereof as fully and to the same extent as if
copied at length herein.
NOW THEREFORE, the condition of this obligation is Such, that if the Principal faithfully performs and fulfills
all of the undertakings, covenants, terms, conditions and Contracts of the contract during the original term
of the contract and any extension of the contract, with or without notice to the surety, and during the life of
any guaranty required under the contract, and also performs and fulfills all of the undertakings, covenants,
terms; conditions and Contracts of all duly authorized modifications of the contract that may hereafter be
made, notice of which modifications to the surety being hereby waived, the above obligation Is void.
Otherwise it remains in full force and effect.
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Title 34, Chapter 6,
Arizona Revised Statutes, and all liabilities on this Bond will be determined in accordance with the
provisions of Title 34. Chapter 6, Arizona Revised Statutes, to the extent as if it were copied at length in
this Contract. The prevailing party in a suit on this bond will recover as part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court. The performance under this bond is limited to the
construction to be performed under the contract and does not include any design services, preconstruction
services, financial services, maintenance services, operations services or any other related services
included in the contract.
WITNESS our hands the
.day of.
.20
PRINCIPAL
BY:
SURETY
(SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug.2024)
Page 1 of 1
Contract No. 2026-088-COS
EXHIBIT B
STATUTORY PAYMENT BOND
PURSUANT TO TITLE 34. CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That.
(hereinafter called the Principal), as Principal, and
. a corporation organized and existing under the laws of the
with Its principal office in the City of
State of____________
(hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Scottsdale,
County of Maricopa, State of Arizona, in the amount of________________ _________ Dollars
($_____________). for the payment whereof, the said Principal and Surety bind themselves,
and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale
dated the_____day of__________________ , 20___, for Bid No. (bid number). Project No.
(project number), (project name), which contract is hereby referred to and made a part hereof as
fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of this obligation is such that if the Principal promptly pays all
monies due to all persons supplying labor or materials to the Principal or the Principal's
subcontractors in the prosecution of the work provided for in the contract, this obligation is void.
Otherwise it remains in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Title 34, Chapter
6, of the Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance
with the provisions, conditions and limitations of Title 34, Chapter 6, Arizona Revised Statutes; to
the same extent as if they were copied at length in this Contract.
The prevailing party in a suit on this bond will recover as a part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court.
WITNESS our hands the
day of.
_.20__ ;.
PRINCIPAL
BY:
SURETY (SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug.2024)
Page 1 of 1
Contract No. 2026-088-COS
EXHIBIT C
CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
Contract Title/Number ("Contract”):.
Contractor (Legal Name):________
E-Verify Company ID#: __________
Date of Enrollment:____________
The undersigned contractor (“Contractor") hereby represents, warrants, and certifies to the City
of Scottsdale that:
□ The Contractor has employees that will be providing services within the State of Arizona and
agrees with the following:
1. The Contractor complies with all federalimmigration laws.
2. The Contractor is registered with and actively uses the federal E-Verify system to verify
employment eligibility of all newly hired employees in Arizona, as required by Arizona Revised
Statutes § 41-4401 and § 23-214(A).
3. The Contractor does not employ unauthorized aliens for the performance of services related to
the Contract.
4. The Contractor shall retain records demonstrating E-Verify compliance and will produce such
records upon request from the City.
5. The Contractor will require all subcontractors who perform work underthe Contract within the
State of Arizona to comply with these requirements.
□ The Contractor and any of its subcontractors do not have employees within the State of
Arizona or employees that will be providing services for the Contract in the State of Arizona.
A breach of this warranty is considered a material breach of contract, subject to penalties up to and
including termination of the contract. The undersigned represents and warrants that he or she is duly
authorized to execute this warranty on behalf of Contractor.
Contractor (Legal Name):,
Authorized Representative Signature:.
Name:_______________________
Title:_________________________
Date:________________________
Last Updated: April 7, 2026
Page 1 of 1
k
5
T='\'t
'r-
m
/■f
CITY OF SCOTTSDALE
JOB ORDER CONTRACT
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-089-COS
(Revised .5.6.2026)
19183309
ATTACHMENT 4
Contract No. 2026-089-COS
TABLE OF CONTENTS
RECITALS................................................................................ ............................. ............1
ARTICLE 1 - CONTRACTOR'S SERVICES AND RESPONSIBILITIES........................... ......1
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES ...................... ................... 17
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME..................................... .............. 20
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE .............................. ..........23
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME.................. ....................24
ARTICLE 6 - PROCEDURE FOR PAYMENT...................................................................... 30
ARTICLE 7 - CLAIMS AND DISPUTES.............................................................................. 33
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION.................................. 35
ARTICLE 9 - INSURANCE AND BONDS................ ............................................................39
ARTICLE 10 - INDEMNIFICATION ..................................................................................... 46
ARTICLE 11 - GENERAL PROVISIONS............. .................... ..................................... 47
ARTICLE 12 - DEFINITIONS............................................. ............................................... .61
EXHIBIT A - STATUTORY PERFORMANCE BOND
exhibit B - STATUTORY PAYMENT BOND
EXHIBIT C - CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
(Revised 5.6.2026)
Contract No. 2026-089-COS
CITY OF SCOTTSDALE
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-089-COS
THIS CONTRACT, ("Contract") is entered into this
day of
2026,
("Effective Date") between the City of Scottsdale, an Arizona municipal corporation (the “City")
and McCarthy Building Companies, Inc., a Missouri corporation (the "Contractor").
RECITALS
A.
The Mayor of the City of Scottsdale, Arizona, is authorized and empowered by the
provisions of the City Charter to execute contracts for construction and related services.
B.
The City intends to contract for construction and related sen/ices with Contractor for one
or more individual Job Orders.
C.
Contractor has represented to the City the ability to provide or procure the required
construction and related sen/ices and, based on this representation, the City engages
Contractor for these services.
FOR AND IN CONSIDERATION of the mutual covenants and considerations contained in this
Contract, it is agreed by the City and Contractor as follows;
ARTICLE 1 - CONTRACTOR'S SERVICES AND RESPONSIBILITIES
1.1. GENERAL SERVICES
A.
Contractor will furnish any and all labor, materials, equipment, transportation,
utilities, sen/ices and facilities specified in the individual Job Order for which it is
issued a Job Order Notice-tp-Proceed for Work in accordance with this Contract.
The City may determine it is in its best interest to furnish materials and equipment
for an individual Job Order in accordance with the Job Order.
B.
The Work will be performed in a good, workmanlike and substantial manner and
to the satisfaction of the City Engineer and under the monitoring of the City
Engineer, or designee, with the care and skill of a qualified contractor in Scottsdale,.
Arizona,
1. Minor design services may be required for some Job Orders. For those
Job Orders that may require minor design sen/ices. Contractor will seek
the services of an Arizona registered architect or engineering professional
to prepare plans for permitting. The procurement of minor design services
will be In accordance with the City’s procurement procedures and code. If
the services of a design professional are used, the design professional
must maintain at least $1,000,000 Professional Liability Coverage.
2, All documents prepared by Contractor are subject to review by the City.
Review by the City is for the benefit of the City only, is not intended to be
for the benefit of any other person and does not relieve Contractor from the
professional liability associated with the documents they have prepared.
(Revised 5.6.2026)
19183309
Page 1 of67
Contract No. 2026-089-COS
3. Contractor’s Representative shall be reasonably available to the City and
will have the necessary expertise and experience required to supervise the
Contract Services, A Contractor’s Representative will be assigned for each
Job Order. Contractor’s Representative will communicate regularly with the
City and will be vested with the authority to act on behalf of Contractor.
C. The City is a member of $AVE cooperative purchasing group. SAVE includes the
State of Arizona, Maricopa County, many Phoenix metropolitan area
municipalities, and many K-12 unified school districts. Under SAVE Cooperate
Purchasing Agreement, and with the concurrence of successful Respondents
under this solicitation, a member of SAVE may access a contract resulting from
this solicitation issued by the City. By signing the JOC Contract, Contractor agrees
to allow other SAVE members the ability to purchase their needs and “use” this
contract for JOC requirements.
1.2. GOVERNMENT APPROVALS AND PERMITS
A.
Unless otherwise provided. Contractor will obtain or assist the City in obtaining all
necessary permits, approvals and licenses required for the prosecution of the Work
from any government or quasi-government entity having jurisdiction over the
Project. Contractor is responsible for obtaining payment for the necessary
environmental permits or file the necessary environmental notices.
B.
Copies of these permits and notices must be provided to the City's Representative
before starting the permitted activity. This provision does not constitute an
assumption by the City of an obligation of any kind for violation of the permit or
notice requirements.
C.
The City is responsible for the City of Scottsdale review and permit(s) fees for
building and demolition permits. The City will pay City review fees for grading and
drainage, water, sewer, storm water management, and landscaping. The City will
also pay for City utility design fees for permanent services.
D.
Contractor is responsible for all other permits and review fees not specifically listed
in Article 1.2(C) above.
E.
Contractor is responsible for the cost of construction-related water meter(s), water
and sewer taps, fire lines and taps, and all water bills on the project meters until
Substantial Completion of the Project. Arrangements for construction water will be
Contractor's responsibility. Construction water does not include “test water”
required to complete new water line pressure tests.
F.
The M.A.G. Standard Specification 107.12 is modified to read as follows:
“Contractor, at its own expense, is responsible for the acquisition of any necessary
temporary easements for construction purposes, storage, maintenance, and
refuse haul-off as indicated upon the plans, which are required in addition to
existing easements or rights-of-way secured by the City.”
(Revised 5,6.2026)
19183309
Page 2 of 67
Contract No. 2026-089-COS
1.3. PRE-CONSTRUCTION CONFERENCE
A.
After issuance of a Job Order and before the commencement of any Work on any
individual Job Order, a pre-construction conference may be scheduled.
B.
The purpose of this conference is to establish a working relationship between
Contractor, design firms, utility firms, and various City departments. The agenda
will include critical elements of the work schedule, submittal schedule, level of
Record Drawings required, cost breakdown of major lump sum items, payment
application and processing, coordination with the utility firms involved, and
emergency telephone numbers for all representatives involved in the course of
construction.
C.
At a minimum, attendees will include Contractor Representative, who is authorized
to execute and sign documents on behalf of the firm, the job superintendent, and
Contractor’s safety officer.
D.
The Job Order Notice-to-Proceed date will be established.
E.
Contractor will provide a Baseline Project Schedule indicating duration, manpower
and equipment resources required to complete all major Work activities. The City
and Design Team will review and comment on the Baseline Project Schedule.
Contractor will revise the Baseline Project Schedule to the satisfaction of the City’s
Representative. No work will begin until the City accepts the Baseline Project
Schedule.
F.
Contractor will submit a Schedule of Values based on the work and bids accepted
from selected Subcontractors, These values will reflect the actual labor time,
materials, profit and overhead for the Work or in accordance with Contractor’s price
book.
1.4. CONTROL OF THE WORK
Contractor will properly guard and protect all partially finished work and will be
responsible for the Work until the entire Job Order is completed and accepted by the
City. Any payment for completed portions of the Work will not release Contractor from
this responsibility: however, it will turn over the entire Work in full compliance with the
specifications or Job Order before final settlement is made. In case of suspension of
the Work for any cause whatever. Contractor is responsible for the Project and will take
all precautions necessary to prevent damage to the Project and will erect any necessary
temporary structures, signs, or other facilities at no cost to the City.
A.
After all Work under the Job Order is completed, Contractor will remove all loose
concrete, lumber, wire, reinforcing, debris and other materials not incorporated in
the Work from the site of the Project.
B.
Unless the Job Order states that it is the responsibility of the City or a separate
contractor. Contractor will provide through itself or its Subcontractors the
necessary supervision, labor, inspection, testing, start-up, material, equipment,
machinery, temporary utilities, other temporary facilities, temporary fencing, roll
offs, and dust control to permit Contractor to complete the Work consistent with
(Revised 5.6.2026)
19183309
Page 3 of 67
Contract No. 2026-089-COS
the Job Order.
C.
Contractor will perform all construction activities efficiently and with the requisite
expertise, skill and competence to satisfy the requirements of the Job Order.
Contractor will at all times exercise complete and exclusive control over the means,
methods, sequences and techniques of construction.
D.
Survey stakes and marks required for the completion of the construction shown on
the plans and described in the specifications will be furnished by Contractor.
E.
Contractor, its designee or Contractor's Superintendent will be present at the Work
at all times that construction activities are taking place.
1. All elements of the Work, such as concrete work, pipe work, etc., will be
under the direct supervision of a foreman or his/her designated
representative on the Site who will have the authority to take actions
required to properly carry out that particular element of the Work.
2. In the event of noncompliance with Article 5.1, the City may require
Contractor to stop or suspend the Work in whole or in part.
F.
Where the Job Order requires that a particular product be installed or applied by an
applicator approved by the manufacturer, it is Contractor’s responsibility to ensure
the Subcontractor employed for that portion of the Work is pre-approved by the
manufacturer.
G.
Before ordering materials for or doing the Work, Contractor and each
Subcontractor will verify measurements at the Site and will be responsible for the
correctness of these measurements. No extra charge or compensation will be
allowed because of differences between actual dimensions and the dimensions
indicated on the drawings; differences, which may be found, will be submitted to
the City for resolution before proceeding with the Work.
H.
Contractor will take field measurements and verify field conditions and carefully
compare these field measurements, conditions and other information known to
Contractor with the Job Order before starting activities. Errors, inconsistencies or
omissions discovered will be immediately reported to the City.
I.
Contractor will establish and maintain all building and construction grades, lines,
levels, and benchmarks, and will be responsible for the accuracy and protection of
these items. This portion of the Work will be performed or supervised by an Arizona
licensed civil engineer or surveyor.
J.
Any person employed by Contractor or any Subcontractor who, in the opinion of the
City, does not perform his/her portion of the Work in a proper, skillful and safe
manner or is intemperate or disorderly will, at the written request of the City, be
removed from the Work by Contractor or Subcontractor employing this person, and
will not be employed again in any portion of the Work without the written approval of
the City. Contractor or Subcontractor will hold the City harmless from damages or
claims, which may occur in the enforcement of this Article.
(Revised 5.6.2026)
19183309
Page 4 of 67
Contract No. 2026-089-COS
K.
Contractor assumes responsibility for the proper performance of the Work of
Subcontractors and any acts and omissions in connection with this performance.
Nothing in the Contract Documents is intended or considered to create any legal
or contractual relationship between the City and any Subcontractor or Sub-
Subcontractor, including but not limited to any third-party beneficiary rights.
L.
Contractor will coordinate the activities of all Subcontractors. If the City performs
other work on the Project or at the Site with separate contractors under the City’s
control, Contractor agrees to reasonably cooperate and coordinate its activities
with those of the separate contractors so that the Project can be completed in an
orderly and coordinated manner without unreasonable disruption.
M.
On a daily basis. Contractor will prepare a Contractor’s Daily Report. The City’s
CPM Project Inspector or the Public Works Project Coordinator will provide a
sample report format to Contactor. The report will detail the activities that took
place during the course of the day, all equipment utilized and the number of hours
operated, and all personnel on the Site including Subcontractors. Unless
otherwise arranged, the Daily Reports will be submitted on a daily basis to the
City's CPM Inspector or the Public Work’s Project Coordinator. The Daily Reports
will also be made available to the City’s Representative upon request. Failure to
provide Daily Reports as arranged or requested above will result in the retention
of monthly progress payments until the Reports are brought up to date.
N.
In the event of noncompliance with this Article 1.4, the City may require Contractor
to stop or suspend the construction in whole or in part. Any suspension due to
Contractor’s noncompliance will not be considered a basis for an increase in the
Job Order Price or extension of the Job Order Time.
1.5. CONTROL OF THE WORK SITE
A.
Throughout all phases of construction, including any suspension of the Work,
Contractor will keep the Site reasonably free from debris, trash and construction
wastes to permit Contractor to perform its construction services efficiently, safely
and without interfering with the use of adjacent land areas. Upon Substantial
Completion of the Work, or a portion of the Work, Contractor will remove all debris,
trash, construction waste, materials, equipment, machinery and tools arising from
the Work or applicable portions of it to permit the City to occupy the Project or a
portion of the Project for its intended use.
B.
Dust Control. Contractor will take whatever steps, procedures or means required
to prevent abnormal dust conditions due to his construction operations in
connection with this Contract. The dust control measures will be maintained at all
times during construction of the Project(s) to the satisfaction of the City in
accordance with the requirements of the Maricopa County Health Department Air
Pollution Control Regulations and City of Scottsdale Supplement to M.A.G.
Standard Specifications together with applicable provisions of Federal and State
Law.
C.
Dust Control Coordinator. Subject to the requirements or exemptions contained
A.R.S. §49-474.05, as amended. Contractor shall comply with the training,
permitting, and Dust Control Coordinator requirements applicable to the Site and
(Revised 5.6.2026)
19183309
Page 5 of 67
Contract No. 2026-089-COS
the Project. The Dust Control Coordinator must have full authority to ensure that
dust control measures are implemented at the Site, including authority to conduct
inspections, deploy dust suppression resources, and modify or shutdown activities
as needed to control dust. The Dust Control Coordinator must be responsible for
managing dust prevention and dust control on the Site, including the use of leaf
blowers and street sweeping equipment. The Dust Control Coordinator must have
a valid Dust Training Certification Identification Card readily accessible on the Site
while acting as the Dust Control Coordinator.
A Subcontractor who is engaged in dust generating operations at a Site that is
subject to a Dust Control Permit issued by a County Control Officer and that
requires the control of PM-10 emissions from dust generating operations must
register with the County Control Officer. The Subcontractor must have its
registration number readily accessible on the Site while conducting any dust
generating operations.
D.
Storage on Site. Only materials and equipment, which are to be used directly in
the Work, will be brought to and stored on the Site by Contractor. When equipment
is no longer required for the Work, it will be removed promptly from the Site.
Protection of construction materials and equipment stored at the Site from weather,
theft, damage and all other adversity is solely the responsibility of Contractor.
E.
Waste Products. Contractor is responsible for the cost to dispose of all waste
products including excess earth material which will not be incorporated into the
Work under this Contract. The waste product referred to will become the property
of Contractor. Contractor will provide for the legal disposal at an appropriate off
site location for all waste products, debris, etc., and will make necessary
arrangements for its disposal. Any disposal/dumping of waste products or unused
materials will conform to applicable Federal, State and Local Regulations.
F.
Contractor will supervise and direct the Work. Contractor will be solely responsible
for the means, methods, techniques, sequences and procedures of construction.
Contractor will employ and maintain on the Site a qualified supervisor or
superintendent who will have been designated in writing by Contractor as
Contractor’s Representative. The Contractor’s Representative will have full
authority to act on behalf of Contractor and all communications given to the
Representative will be as binding as if given to Contractor. The Representative
will be present on the Site at all times as required to perform adequate supervision
and coordination of the Work. Where appropriate all Provisions of M.A.G., Section
105.5, will be applicable.
G.
Abnormal Weather. In the event of abnormal weather conditions, such as
windstorms, rainstorms, etc. . Contractor will immediately inspect the Work and Site
and take all necessary actions to insure public access and safety are maintained.
H.
Damage to Property at the Site. Contractor yrill be responsible for any and all
damage or loss to property at the Site, except to the extent caused by the acts or
omissions of the City or its representatives, employees or agents and not covered
by insurance. The costs and expenses incurred by Contractor under this Article
will be paid as a Cost of the Work to the extent that these costs and expenses are
In excess of or are not covered by required insurance, and to the extent of any
(Revised 5.6.2026)
19183309
Page 6 Of 67
Contract No. 2026-089-COS
deductibles, but they will not increase the Job Order Price.
I.
Damage to Property of Others. Contractor will avoid damage, as a result of
Contractor’s operations, to existing sidewalks, curbs^ streets, alleys, pavements,
utilities, adjacent property, the work of separate contractors and the property of the
City. Contractor will repair any damage caused by the operations of Contractor,
and these costs will be paid as a Cost of the Work to the extent that the costs and
expenses are in excess of or are not covered by required insurance, and to the
extent of any deductible, but they will not increase the Job Order Price.
J.
Failure of Contractor to Repair Damage. Within ten (10) days written notice to
Contractor by the City, if Contractor fails to commence the repair of damage to
property as provided in Articles 1.5(H) and 1.5(1), and diligently pursue the repair,
then the City rriay elect to repair the damages at its own expense and to deduct
from payments due or to become due to Contractor, amounts paid or incurred by
the City in correcting the damage (provided Contractor has not commenced such
repair during the 10 day notice period).
1.6. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A.
Shop Drawings, Product Data, Samples and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of
the Work for which submittals are required the way Contractor proposes to
conform to the information given and the design concept expressed in the Contract
Documents. Contractor will review, approve and verify that all submittals meet the
intent of the Contract Documents.
B.
Three (3) copies of each Shop Drawing, Product Data, Sample, and similar
submittals required by the Contract Documents will be delivered to the City in
compliance with the approved schedule so as to cause no delay in the Work or In
the activities of the City or of separate contractors. Submittals made by Contractor,
which are hot required by the Contract Documents, may be returned without
action.
C.
Contractor will perform no portion of the Work requiring submittal and review of
Shop Drawings, Product Data, Samples, or similar submittals until the respective
submittal has been approved by the City. All Work will be in compliance with
approved submittals. Contractor will not be relieved of responsibility for any errors
or omissions in Shop Drawings, Product Data, Samples, or similar submittals by
the City's approval. Deviation from the original specifications will be specifically
noted on the submittal to the City and the City will be allowed seven (7) days to
approve or reject any deviations.
D.
By approving, verifying and submitting Shop Drawings, Product Data, Samples
and similar submittals. Contractor represents that Contractor has determined and
verified materials, field measurements and field construction criteria, or will do so,
and has checked and coordinated the information contained within the submittals
with the requirements of the Work and of the Job Order.
E.
Contractor will not be relieved of responsibility for deviations from requirements of
the Job Order by the City's approval of Shop Drawings, Product Data, Samples or
(Revised 5.6.2026)
19183309
Page? of 67
Contract No. 2026-089-COS
similar submittals unless Contractor has specifically informed the City in writing of
the deviation at thetime of submittal and the City has given written approval to the
specific deviation. Contractor will not be relieved of responsibility for errors or
omissions in Shop Drawings, Product Data, Samples, or similar submittals by the
City’s approval.
F.
Contractor will direct specific attention, in writing or on resubmitted Shop Drawings,
Product Data, Samples, or similar submittals, to revisions other than those
requested by the City on previous submittals.
G.
Informational submittals upon which the City is not expected to take responsive
action may be so identified in the Contract Documents.
H.
When professional certification of performance criteria of materials, systems or
equipment is required by the Job Order, the City will be entitled to rely upon the
accuracy and completeness of the calculations and certifications.
1.7. QUALITY CONTROL, TESTING AND INSPECTION
A.
Inspection. The City’s Inspectors may be stationed on the Site to report to the
City’s Representative, or designee, as to the progress of the Work. The City’s
Representative, or designee, may also report as to the manner in which the Work
is being performed and report whenever it appears that material furnished or Work
performed by Contractor fails to fulfill the requirements of the specifications, this
Contract or the Job Order. The Inspector may direct the attention of Contractor to
any failure or infringement but this inspection will not relieve Contractor from any
obligation to furnish acceptable materials or to provide completed construction that
complies With the Contract or the Job Order in every way. The Inspector is for the
purpose of assisting the City’s Representative and should not be confused with an
Inspector with a City regulatory agency or with an inspector from a laboratory under
Article 1.8.
B.
In case of any dispute arising between the Inspector and Contractor as to material
furnished or the manner of performing the Work, the Inspector will have the
authority to reject materials or suspend the Work until the question and issue can
be referred to and decided by the City, inspectors are not authorized to revoke,
alter, enlarge, relax, or release any requirements of the specifications. Inspectors
will in no case act as foremen or perform other duties for Contractor or interfere
with the management of the Work by Contractor.
G. Inspection or supervision by the City's Representative, or designee, will not be
considered as direct control of an individual worker or the Work. The direct control
will be solely the responsibility of Contractor.
D. The furnishing of these services for the City will not make the City responsible for
or give the City control over construction means, methods, techniques, sequenced
procedures or for safety precautions or programs or responsibility for Contractor’s
failure to perform the Work in compliance with the Contract Documents.
(Revised 5.6.2026)
19183309
Page 8 of 67
Contract No. 2026-089-COS
1.8. MATERIALS TESTING
B.
All materials used in the Work will be new and unused, unless otherwise noted, and will
meet all quality requirements of the Job Order.
A. All construction materials to be used on the Work or incorporated into the Work,
equipment, plant, tools, appliances or methods to be used in the Work may be
subject to the inspection and approval or rejection of the City. Any materials
rejected by the City will be removed immediately and replaced in a manner
acceptable to the City without increasing the Job Order Price.
The procedures and methods used to sample and test material will be determined
by the City. Unless otherwise specified, samples and tests will be made in
compliance with the following: The City of Scottsdale Minimum Sampling
Frequency Guide, the City of Scottsdale Material Testing Manual and the standard
methods of AASHTO or ASTM, DSPM and MAG supplements.
C.
The City will select a pre-qualified City or Independent Testing Laboratory and will
pay for initial City Acceptance Testing.
1. When the first and subsequent tests indicate noncompliance with the Job
Order, the cost associated with that noncompliance will be incurred by
Contractor without increasing the Job Order Price.
2. When the first and subsequent tests indicate noncompliance with the Job
Order, all retesting will be performed by the same testing agency. The cost
associated with the noncompliance will be incurred by Contractor without
increasing the Job Order Price.
3. Contractor will cooperate with the selected testing laboratory and all others
responsible for the testing and inspecting of the Work and will provide them
access to the Work at ail times.
D.
At the option of the City, materials may be approved at the source of supply before
delivery is started.
E.
Code compliance testing and inspections required by codes or ordinances, or by
a plan approval authority, and which are made by a legally constituted authority,
will be incurred by Contractor without increasing the Job Order Price, unless
otherwise provided in the Job Order.
F.
Contractor’s convenience and quality control testing and inspections will be the
sole responsibility of Contractor and incurred by Contractor without increasing the
Job Order Price.
G.
All soils and materials testing will be performed and paid for by the City. The City
will order tests and distribute test results for all construction areas. The City will
be responsible for ordering testing and will distribute test results within 24 hours of
receipt.
(Revised 5.6.2026)
19183309
Page 9 of 67
Contract No. 2026-089-COS
1.9. PROJECT RECORD DOCUMENT/AS BUILTS
A. During the construction period, Contractor will maintain at the Site a set of Blueline
or Blackline Prints of the Construction Document drawings and Shop Drawings for
Project Record Document purposes.
1. Contractor will mark these drawings to indicatethe actual installation where
the installation varies appreciably from the original Cbnstructidn
Documents. Contractor will give particular attention to information on
concealed elements, which would be difficult to identify or measure and
record later. Items required to be marked include but are not limited to:
Dimensional changes to the drawings;
Revisions to details shown on drawings;
Depths of foundations below first floor;
Locations and depths of underground utilities;
Revisions to routing of piping and conduits;
Revisions to electrical circuitry;
Actual equipment locations;
Duct size and routing;
Locations of concealed internal utilities;
Changes made by Adjustment; and
Details not on original Contract Drawings.
2. Contractor will mark completely and accurately Project Record Documents,
prints of Construction Documents or Shop Drawings; whichever is the most
capable of indicating the actual physical condition. Where Shop Drawings
are marked, show cross-reference on the Construction Documents
location.
3. Contractor will mark sets of Project Record Drawings Prints with red
erasable colored pencil.
4. Contractor will note Request for Information (RFI) Numbers, American
Standards Institute (ASI) Numbers and Adjustment Numbers, etc., as
required to identify the source of the change to the Construction
Documents.
5. Contractorwill at the time of Substantial Completion, submit Project Record
Drawing Prints and Shop Drawings to the City or its representative for
review and comment
B. Immediately upon receipt of the reviewed Project Record Drawings from the City,
Contractor will correct any deficiencies or omissions to the drawings and prepare
the following for submission to the City:
1. A complete set of PDF electronic files of all Project Record Drawing
prepared in Microstation format compatible with City of Scottsdale CADD
requirements. If a Design Professional is contracted with, the Design
Professional will provide files of the original Construction Documents to
(Revised 6.6.2026)
19183309
Page 10 of 67
Contract No. 2026-089-COS
Contractor for use in preparing these final Project Record Documents, or
Contractor may contract with the Design Professional to revise and update
the electronic drawing files. Each drawing will be clearly marked with "As-
Built Document” and shall be certified by an Arizona Registered Land
Surveyor.
2. A complete set of As-Built reproducible mylars from the final Microstation
drawings and an electronic pdf file on CD are required,
3. The original copy of the Project Record Drawings with redline mark-ups.
1.10. PROJECT SAFETY
A.
The Occupational Safety and Health Act (OSHA) and the City of Scottsdale loss
control procedures are the minimum standard for safety and environmental
protection and must be fully complied with at all times. All Work will be performed
In compliance with all applicable federal, state and local laws, ordinances, statutes,
rules and regulations including ADOSH policies and procedures. Contractor may
be required to attend a City safety briefing session at the pre-construction meeting.
The session will be attended by the Contract Administrator, the designated Risk
Management staff, and a Contractor’s Representative. Contractors that violate the
aforementioned rules and regulations may be subject to job shutdown and or
removal from City facilities.
B.
The Risk Management Division makes available:a packet which contains the City's
OSHA compliance guidelines, emergency evacuation, the City’s safety and health
plan, and other safety information.
C.
Contractor will conduct tailgate safety meetings regularly to ensure that safety on
the job is given priority.
D.
Contractor will contact the City’s Representative and the Risk Management
Division within twenty-four (24) hours of the occurrence of an accident or injury
arising out of Contractor’s Work under this Contract.
E.
Contractor employees are encouraged to abate or remedy any unsafe act or
condition, which may arise in the course of Contractor’s Work under this Contract.
F.
The City reserves the right to conduct safety audits at the Site and stop unsafe
acts at any time. In addition, the City will be notified within four (4) hours should
any OSHA inspection occur at a Site.
G.
Contractor recognizes the importance of performing the Work in a safe manner so
as to prevent damage, injury or loss to:
1. All individuals at the Site, whether working or visiting;
2. The Work, iricluding materials and equipment incorporated into the Work
or stored on-Site or off-Site; and
3. All other property at the Site or adjacent to the Site.
(Revised 5.6.2026)
19183309
Page 11 Of 67
Contract No. 2026-089-COS
H.
J.
K.
Contractor assumes responsibility for implementing and monitoring all safety
precautions and programs related to the performance of the Work.
Contractor will, before commencing construction, designate a Safety
Representative with the necessary qualifications and experience to supervise the
implementation and monitoring of all safety precautions and programs related to
the Work. Unless otherwise required by the Contract Documents, Contractor’s
Safety Representative will be an individual stationed at the Site who may have
responsibilities on the Project in addition to safety.
Contractor must provide OSHA 300A Summary log information including total
recordable cases, total case rates, and lost workday incident rates for the past two
(2) calendar years. The Safety Representative shall make routine daily
inspections of the Site and shall hold weekly safety meetings with Contractor’s
personnel, Subcontractors and others as applicable.
Contractor will immediately report in writing any safety-related injury, loss, damage
or accident arising from the Work to City’s Representative and, to the extent
mandated by Legal Requirements, to all government or quasi-governmental
authorities having jurisdiction over safety-related matters involving the Project or
the Work.
L.
M.
Contractor’s responsibility for safety under this Article 1.10 is not intended in any
way to relieve Subcontractors and Sub-Subcontractors of their own contractual
and legal obligations and responsibility for;
1. Complying with all Legal Requirements, including those related to health
and safety matters; and
2, Taking all necessary measures to implement and monitor ail safety
precautions and programs to guard against injury, losses, damages or
accidents resulting from their performance of the Work.
Contractor and Subcontractors must agree to provide Material Safety Data Sheets
for all substances that are delivered to the City of Scottsdale, that come under the
Occupational Safety and Health Administration Toxic and Hazardous Substances
- Hazard Communication Standard, 29 CFR 1910.1200 Hazard Communication
(reference Occupational Safety and Health Standards, Subpart Z Toxic and
Hazardous Substances - Hazardous Communication Standard).
All Contractors and all Subcontractors using chemicals on City of Scottsdale
property shall use only the safest chemicals, with the least harmful ingredients.
These chemicals shall be approved for use by a City of Scottsdale representative
before bringing them on the property.
Contractor and all Subcontractors shall make every attempt to apply approved
chemicals with highly volatile organic compounds, outside of working hours.
Adequate ventilation will be used at all times during the application of these
approved chemicals.
(Revised 5.6.2026)
19183309
Page 12 of 67
Contract No. 2026-089-COS
In conjunction with the Occupational Safety and Health Standards, Subpart Z Toxic
and Hazardous Substances - Hazard Communication Standard, 29 CFR
1910.1200 Hazard Communication, Contractor and Subcontractors are informed
of the presence of (or possible presence of) chemicals in the area where the Work
requested will be performed. It is the responsibility of Contractor or all selected
Subcontractors to contact the City of Scottsdale for specific information relative to
the type of chemicals present and location of appropriate Material Safety Data
Sheets.
Unless included in the Work, if Contractor encounters onsite material which he
reasonably believes to contain asbestos, polychlorinated biphenyl (PCB), or other
hazardous substances or materials regulated by Public Health Laws, it will
immediately stop Work and report the condition to the City.
If the material is found to contain asbestos, PCB or other hazardous substances
or materials regulated by Public Health Laws, Contractor will not resume Work in
the affected area until the material has been abated or rendered harmless.
Contractor and the City may agree, in writing, to continue Work in non-affected
areas onsite. An extension of the Contract Time may be granted as provided in
Article 5.
1.11. WARRANTY
A.
Contractor warrants that any material or service supplied to the City shall fully
conform to all requirements of this Contract and all representations of the
Contractor, and shall be fit for all purposes and uses required by this Contract. The
materials and services supplied under this Contract shall comply with all applicable
federal, state and local laws, and the Contractor shall maintain all applicable
licenses and permits.
B.
The provisions of M.A.G., Section 108.8 will apply with the following additional
requirements:
1. Should Contractor fail to begin repairs or corrective work within fourteen
(14) calendar days after receipt of written notice from the City, the City may
perform the necessary work and Contractor agrees to reimburse the City
for the actual cost.
2. The warranty period on any part of the Work repaired or replaced will be
extended for a period of one (1) year from the date of the repair or
replacement.
3. This warranty will not apply to damage caused by normal wear and tear or
by acts beyond Contractor’s control.
C.
Contractor's warranty obligation excludes defects caused by abuse, alterations, or
failure to maintain the Work by persons other than Contractor or anyone for whose
acts Contractor may be liable.
D. Contractor's warranty obligation will be for one (1) year.
(Revised 5.6.2026)
19183309
Page 13 of 67
Contract No. 2026-089-COS
E. Nothing in this warranty is intended to limit any manufacturer's warranty which
provides the City with greater warranty rights than those found in this Article 1.11
or the Contract Documents. Contractor will provide the City with all manufacturers’
warranties upon Substantial Completion of each Job Order.
1.12. CORRECTION OF DEFECTIVE WORK
A. Contractor agrees to correct any Work that is found to not be in conformance with
the Contract Documents, including that part of the Work subject to Article 1.11
above, within a period of one (1) year from the date of Substantial Completion of
the Work or any portion of the Work, or within any longer period to the extent
required by the Contract Documents, All removal/replacement work, as directed
by the City to Contractor, in compliance with this Contract, MAG standards and
City codes will have cost determinations by the City and be issued as a Job Order
Adjustment to the Project. A Progress Payment, or partial or entire use or
occupancy of the Project by the City will not constitute acceptance of Work not in
accordance with the Contract Documents.
B.
C.
D.
During the Work, Contractor shall take meaningful steps to begin correction of any
nonconforming Work as notified by the City. This includes the correction, removal
or replacement of the nonconforming Work and any damage caused to other parts
of the Work affected by the nonconforming Work. If Contractor fails to begin the
necessary steps during the Work, the City, in addition to any other remedies
provided under the Contract Documents, may provide Contractor with written
notice that the City will commence correction of any nonconforming Work, at its
discretion, through its employees, agents or other third parties.
Contractor shall take meaningful steps to begin correction of nonconforming Work
subject to Article 1.11 above. These measures include but are not limited to timely
correction of the Work. If Contractor fails to initiate necessary measures for this
Work within seven (7) days Of receipt of written notice from the City, the City, in
addition to any other remedies provided under the Contract Documents, may
provide Contractor with written notice that the City will begin correction of the
nonconforming Work, at its discretion, through its employees, agents or other third
parties.
If the City does perform this corrective Work, Contractor will be responsible for all
reasonable costs incurred by the City in performing the correction without
increasing the Job Order Price.
Contractor shall immediately respond to any nonconforming Work that creates an
erhergency.
The one (1) year period referenced in Article 1.11 above applies only to
Contractor’s obligation to correct nonconforming Work and is not intended to
constitute a period of limitations for any other rights or remedies the City may have
regarding Contractor’s other obligations under the Contract Documents.
(Revised 5.6.2026)
19183309
Page 14 of 67
Contract No. 2026-089-COS
1.13. SUBCONTRAGTOR AND MAJOR SUPPLIER SELECTIONS
A.
Contractor shall select major Subcontractors and major Suppliers, subject to first
obtaining the City’s approval. Major Subcontractors may be selected based on
qualifications or a combination of qualifications and price. Subcontractors must
not be selected based on price alone. Except as noted below, the selection of
major Subcontractors/Suppliers is the responsibility of Contractor, but the City
must approve in writing the selection of all Subcontractors. In any case, Contractor
is solely responsible for the performance of the selected Subcontractors/Suppliers.
Contractor shall prepare a Subcontractor/Supplier selection plan and submit the
plan to the City for approval or Contractor may use the City’s plan as described in
Article 1.13(B). This Subcontractor selection plan will identify those Subcontractor
trades anticipated to be selected by qualifications only as provided in Article
1.13(B) and those Subcontractor trades anticipated to be selected by qualifications
and competitive bid as provided in Article 1.13(C). This plan will also identify those
Subcontractors that will not be selected through a formalized qualifications-based
selection process. The Subcontractor selection plan must be consistent with the
selection requirements included in this Contract.
B.
Selection by qualifications only - The City may approve the selection of a
Subcontractor(s) or Supplier(s) based only on their qualifications when Contractor
can demonstrate it is in the best interest of the Project.
1. Contractor will apply the Subcontractor selection plan approved by the City
in the evaluation of the qualifications of a Subcontractor(S) or Supplier(s)
and provide the City with its review and recommendation. The selection
plan will be Contractor's own selection plan approved by the City or the
City’s selection plan as provided in this Article 1.13(B).
2. Contractor vyill negotiate costs for services/supplies from the
Subcontractor(s)/Supplier(s) under the approved qualifications only
method.
City Selection Plan:
3. Contractor may elect to comply with the following City procedures in its
selection of Subcontractor(s) or Suppliers(s) based on qualifications only:
a. The Request for Qualifications (RFQ) will contain the best
description of the services or material desired; and
b. A statement that only unpriced statements of qualifications will be
considered; and
c. State the requirements for the project, such as drawings and
descriptive literature; and
d. State the criteria for evaluating the qualifications; and
e. A closing date and time for receipt of a statement of qualifications
(Revised .5.6.2026)
19183309
Page 15of67
Contract No. 2026-089-COS
and the location where the statements should be delivered or
mailed; and
f.
A statement that discussions may be held; and
g. A statement that only statements of qualifications determined to be
acceptable will be considered for award.
4. The RFQ may be amended after the submission of the statements of
qualifications. Any amendment will be distributed only to bidders who
submitted statements of qualifications. Those bidders will be permitted to
submit new unpriced statements of qualifications or to amend statements
already submitted.
5. Statements of Qualifications will not be opened publicly but will be opened
in the presence of Contractor. The contents of unpriced statements of
qualifications will not be disclosed to unauthorized persons.
6. Statements of Qualifications will be evaluated solely in accordance with the
criteria stated in the RFQ and will be determined to be either acceptable
for further consideration or unacceptable, A determination that the
statement is unacceptable shall be in writing, state the basis of the
determination and be retained by Cpntractor. Contractor will notify the
bidder of the determination and the bidder will not be given an opportunity
to amend its statement of qualifications further.
7. Contractor may conduct discussions with any bidder who submits an
acceptable or potentially acceptable statement of qualifications. During
discussions, Contractor will not disclose any information derived from any
other bidder’s statement of qualifications,
8. Contractor will negotiate costs for services/supplies from the
Subcontractor(s)/Supplier(s) selected under this method,
C. Selection by qualifications and competitive bid - Contractor will apply the
City’s Subcontractor selection plan stated above or Contractpr’s selectiPn plan, if
previously approved by the City, in Contractor’s evaluation of the qualifications of
Subcontractor(s)/Supplier(s) and will provide the City With the selected process to
prequalify prospective SubcOntractors/Suppliers. Selection may not be based oh
price alone. All Work by major Subcontractors and major Suppliers will then be
competitively bid to the prequaiified Subcontractors unless a Subcontractor or
Supplier was selected in accordance with Article 1 13(B) above. Contractor may
elect to comply with the following procedures in step 2 of its competitive bid
process.
1. Contractor will develop Subcontractor and Supplier interest, submit the
names of a minimum of three (3) qualified Subcontractors or Suppliers for
each trade in the Project and solicit bids for the various Work categories. If
there are not three (3) qualified Subcontractors/Suppliers available for a
specific trade or there are extenuating circumstances, Contractor may
request approval by the City to submit less than three (3) names. Without
(Revised 5.6.2026)
19183309
Page 16 of 67
Contract No. 2026-089-COS
first giving written notice to the City, no change in the recommended
Subcontractors/Suppliers will be allowed.
2. If the City objects to any nominated Subcontractor/Supplier or to any self-
performed Work for good reason, Contractor will nominate a substitute
Subcontractor/Supplier that is acceptable to the City.
3. Contractor will distribute Drawings and Specifications, and when
appropriate, conduct a pre-bid conference with prospective Subcontractors
and Suppliers. Contractor will then review the price bids submitted by
Subcontractors and Suppliers and make its selection based on the
responsive and responsible bidder with the lowest price.
4. If Contractor desires to self-perform certain portions of the Work, it must
request to be one of the approved Subcontractor bidders for those specific
bid packages. Contractor’s bid will be evaluated in accordance with the
process identified in the Invitation for Bids. If events warrant and the City
concurs that in order to insure compliance with the Project Schedule or
cost. Contractor may self-perform Work without bidding or re-bidding the
Work.
D.
If after receipt of Sub-bids or after award of Subcontractors and Suppliers, the City
objects to any nominated Subcontractor/Supplier or to any self-performed Work
for good reason. Contractor will nominate a substitute Subcontractor or Supplier,
preferably if this option is still available, from those who submitted Subcontractor
bids for the Work affected. Once the substitute Subcontractors and Suppliers are
consented to by the City, Contractor’s proposed price for the Work or portion of the
Work will be correspondingly adjusted to reflect any higher or lower costs from any
substitution. Under no circumstances will the City’s objection or comment on any
Subcontractor or Supplier relieve Contractor of its sole responsibility for control
over the methods, means and processes by which the Work is accomplished. The
City must approve in writing the selected Subcontractor Selection Plan before work
commences on any Job Order.
E.
Contractor shall incorporate by reference the terms and conditions of this Contract,
in any subcontract or supplier contract hereunder.
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES
2.1 INFORMATION AND SERVICES
The City will furnish Contractor, at no cost to Contractor, the following information or
services for this Project;
1. One copy of data pertinent to the Work. However, Contractor will be
responsible for searching the records and requesting information required
for the Project.
2. All available data and information relative to policies, standards, criteria,
studies, etc.
(Revised 5.6.2026)
19183309
Page 17 of 67
Contract No, 2026-089-COS
3. Project funding and budget allocations and any changes affecting the
funding or budget allocations.
4. For purpose of determining the Job Order Price, any Plans and
Specifications.
5. For purpose of Project Record Drawing Prints, a CADD file of the
Construction Documents in Microstation format compatible with City of
Scottsdale CADD requirements.
2.2
CITY’S REPRESENTATIVE
The City’s Representative will be responsible for providing City-supplied information and
approvals in a timely manner to permit Contractor to fulfill its obligations under the Contract
Documents.
2.3
DESIGN PROFESSIONAL SERVICES
A.
The City may contract separately with one or more Design Professionals to provide
architectural or engineering design of the Project in accordance with the provisions
of A.R.S. §34-603.
B.
The City may contract with the Design Professional to provide some or all of the
following services during the performance of the Work:
1. The Design Professional may provide administration of the Work. The City
and Contractor will endeavor to communicate through the Design
Professional. Communications by and with the Design Professional's
consultants will be through the Design Professional.
2. The Design Professional may visit the Site at intervals appropriate to the
stage of construction to become generally familiar with the progress and
quality of the completed Work and to determine in general if the Work is
being performed in accordance with the Contract Documents. The Design
Professional Will keep the City informed of progress of the Work and will
endeavor to guard the City against defects and deficiencies in the Work.
3. Upon Contractor's submittals, the Design Professional may review and
approve or take other appropriate action on submittals as Shop Drawings,
Product Data and Sarnples in accordance with Article 1.6.
4. All drawings produced for projects considered to be performed under
Contractor are the property of the City and are owned in whole by the City
for any and all future use and considerations.
2.4
CITY’S SEPARATE CONTRACTORS
The City is responsible for all Work performed on the Project or at the Site by separate
contractors under the City’s control. The City will contractually require its separate
contractors to cooperate with and coordinate their activities so as not to interfere with
Contractor in order to enable Contractor to timely complete the Work consistent with the
(Revised S.6.2026)
19183309
Page 18 of 67
Contract No. 2026-089-COS
Contract Documents. Contractor agrees to reasonably cooperate and coordinate its
activities with those of the separate contractors so that the Project can be completed in
an orderly and coordinated manner without unreasonable disruption.
2.5 FURNISHING OF SERVICES AND INFORMATION
A. The City will be responsible for the payment or waiver of the following:
1. City review and permit(s) fees for building, encroachment, and demolition
permits including City, State and County.
2. City review fees for grading and drainage, water, sewer and landscaping.
3. Utility design fees or permanent services fees are paid by the City, but all
submittals are the responsibility of Contractor.
4. Obtaining Nationwide 404 Permits.
5. City Development Fees.
B. Unless expressly stated to the contrary in the Contract Documents, the City will
provide, at its own cost and expense, for Contractor’s information the following:
1. To the extent available, surveys describing the property, boundaries,
topography and reference points for use during construction, including
existing service and utility lines;
2. Temporary and permanent easements, zoning and other requirements and
encumbrances affecting land use, necessary to permit the proper design
and construction of the Project and enable Contractor to perform the Work;
3. A legal description and street or physical address of the Site;
4. To the extent available, as-built record or historical drawings of any existing
structures at the Site;
5. To the extent available, environmental studies, reports and Impact
statements describing the environmental conditions, including hazardous
materials, in existence at the Site; and
6. To the extent available. Geotechnical studies describing subsurface
conditions and other surveys describing other latent or concealed physical
conditions at the Site.
7. The City will provide all City standards and guidelines, supplementary
conditions and special provisions that will be included in the plans and
specifications for the Project. These may include but are not limited to:
disposal of surplus material, special security provisions, investigation of
underground facilities, traffic controls and regulations, special quality
control testing and termite treatment requirements.
(Revised 5.6.2026)
19183309
Page 19 of 67
Contract No. 2026-089-COS
2.6
PROJECT MANAGEMENT SERVICES
A.
The City may contract separately with one or more Technical Consultants to
provide project management assistance for the Project. The Technical
Consultant’s contract as well as contracts with other firms hired by the City will be
furnished to Contractor. Contractor will not have any right, however, to limit or
restrict any Project modifications that are mutually acceptable to the City and
Technical Consultant.
B.
The Technical Consultant services \Will augment the City staffing resources to
effectively manage the objectives of the City and the Project with the goal of
managing the key Project communication, cost and time parameters.
C.
The Technical Consultant may provide pre-programming and design standards.
D.
The City may contract with the Technical Consultant to provide any or all of the
services Or functions of the City’s project manager during the performance of the
construction.
2.7
PERMIT REVIEW AND INSPECTIONS
For clarification, permitting activities are handled by the City of Scottsdale
Developmental Services, Fire and Planning Departments. Obtaining any perrnits and
submittals are the responsibility of the City.
2.8
UTILITY COMPANY COORDINATION
Contractor will be responsible for coordinating utility design work for permanent service
to the Project and will ensure that the work takes place in a timely manner and does not
impact the Project schedule. Any utility design fees for permanent services to a Job
Order will be paid by the City in accordance with Article 2.6.
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME
3.1 CONTRACT TIME
A. The initial term of this Contract will be for two (2) years and will commence on the
Effective Date, with the option to extend for three (3) additional years in one (1)
year increments.
1. The option to extend may be exercised based on Contractor’s successful
performance and the needs of the City.
2. A contract modification will be processed for each extension and will
commence on or about the anniversary date of the Contract. Each extension
must be authorized by the Contract Administrator and Purchasing Director for
the City and need not return to the City’s Council for approval.
. B. The Contract will remain in full force and effect during the performance of any Job
Order.
(Revised 6.6:2026)
19183309
Page 20 of 67
Contract No. 2026-089-COS
3.2
JOB ORDER TIME
A.
Job Orders may be issued at any time during the term of this Contract.
B.
Each individual Job Order will include a Job Order NotIce-to-Proceed date,
Duration of the Work as determined in accordance with this Article 3.2 and a
calculated Substantial Completion date.
C.
Contractor agrees that it will commence performance of the Work and achieve the
approved Job Order Time.
D.
Job Order Time may be subject to adjustment in accordance with Article 5.
3.3
SUBSTANTIAL COMPLETION
A.
Substantial Completion of each Job Order is when all construction has been
completed with the exception of final inspection punch list work and further defined
in Article 12. The purpose of granting or acknowledging Substantial Completion is
to stop Job Order Time.
B.
Before notifying the City in accordance with Article 3.3(C). Contractor will inspect
the Work and prepare and submit to the City a comprehensive list of items to be
completed or corrected. Contractor will proceed promptly to complete and correct
items on the list. Failure to include an item on the list does not alter the
responsibility of Contractor to complete all Work in accordance with the Contract
Documents.
C.
Contractor will notify the City when it believes a Job Order, or to the extent
permitted in the Contract Documents, a portion of the Job Order, is substantially
complete,
D.
Within five (5) days of the City’s receipt of Contractor’s notice in accordance with
Article 3.3(C), the City and Contractor will jointly inspect the Work to confirm
Substantial Completion.
E.
Once Substantial Completion of the Work is confirmed in accordance with Article
3.3(D), the City will prepare and issue a Certificate of Substantial Completion that
will state:
1. The date of Substantial Completion of the Work or portion of the Work;
2. The remaining items of Work that have to be completed within thirty (30)
calendar days before Final Acceptance;
3. Provisions (to the extent not already provided in the Contract Documents)
establishing the City’s and Contractor’s responsibility for the Project’s
security, maintenance, utilities and insurance pending Final Acceptance.
F.
The City, at its option, may use a portion of the Work which has been determined
to be substantially complete provided, however, that:
(Revised 5.6.2026)
19183309
Page 21 of 67
Contract No. 2026-089-COS
1. Certificate of Substantial Completion has been issued for the portion of
Work addressing the items in Article 3.3(E)(2).
2. Contractor and the City have obtained the consent of their sureties and
insurers, and to the extent applicable, the appropriate government
authorities having jurisdiction over the Project, and
3. The City and Contractor agree that the City’s use or occupancy will not
interfere with Contractor’s completion of the remaining Work required under
Article 3.3(E).
3.4
PUNCH LIST PREPARATION
A minimum of seven (7) days before Substantial Completion, Contractor, in conjunction
with the City, will prepare a comprehensive list of Punch List items, which the City may
edit and supplement. Contractor will proceed promptly to complete and correct the
Punch List items. Failure to include an item on the Punch List does not alter the
responsibility of Contractor to complete all Work in accordance with the Contract
Documents, Warranties required by the Contract Documents will not commence until
the date of Final Acceptance, unless otherwise provided in the Contract Documents.
Seven (7) days before the City issues its Final Acceptance Letter, Contractor will deliver
to the City all Operation and Maintenance Manuals necessary for the City to assume
responsibility for the operation and maintenance of that portion of the Work.
3.5
FINAL ACCEPTANCE
Upon receipt of written notice that the Work or identified portions of the Work Is ready for
final inspection and acceptance, the City and Contractor will jointly inspect to verify that
the remaining items of Work have been completed as required under Article 3.3(E).
Upon verification that the items have been satisfactorily completed, the City will issue a
Final Acceptance Letter.
3.6
LIQUIDATED DAMAGES
A.
Contractor understands that if Substantial Completion is not attained within the Job
Order Time, as may be adjusted for each Job Order, the City will suffer damages,
based on the anticipated loss caused by the breach and the difficulty in determining
and accurately specifying the damages. Contractor agrees that if Substantial
Completion is not attained within the Job Order Time as adjusted. Contractor will
pay the City the amount prescribed in Article 3.6(B) below as liquidated damages
for each Day that Substantial Completion extends beyond the date determined by
the Job Order Time as adjusted.
B.
The following will be the liquidated damages for each Job Order unless a specific
amount has been determined for each individual Job Order.
(Revised 5.6.2026)
19163309
Page 22 of 67
Contract No. 2026-089-COS
LIQUIDATED DAMAGES
Original Job Order Amount
From more than To and including Calendar Day or Fixed Date
Daily Charges
$00
25,001
$25,000
50,001
50,000
$200
100,001
100,000
250
500,001
500,000
280
750,001
750,000
430
500
1,000,001
1,250,001
1,000,000
1,250,000
570
1,500,000
610
650
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE
4.1 CONTRACT PRICE
The fee for individual projects performed under this contract w/ill be negotiated on a
project-by-project basis as Job Orders. The amount paid to the Contractor under this
contract for all Job Orders shall not exceed Six Million Dollars ($6,000,000) for the initial
two (2) year term and Three Million Dollars ($3,000,000) for any successive one (1) year
contract extension. The Contractor agrees at its own cost and expense, to do all the
Work as specified in the Contract Documents and any Work contingent to the Contract
and necessary for the construction of the improvements. The Contractor will completely
construct the Work and install the materials, free and clear of all claims, liens, and
charges of any kind, in the manner and under the conditions specified within the time or
times stated in each Job Order.
A.
In no event will any individual Job Order Price exceed Two Million Five Hundred
Thousand Dollars ($2,500,000). If the City opts to extend this Contract in
accordance with Article 3.1(A), the Contract Modification may increase the
maximum amount, if necessary, at that time.
B.
The Job Order Price is subject to Adjustments made in accordance with Article 5.
C.
Unless othenwise provided in the Contract Documents, the Job Order Price is
considered to include all sales, use, consumer and other taxes throughout the term
of this Contract, whether or not yet effective or merely scheduled to go into effect.
D.
Contractor must secure and maintain, during the life of the Contract, State of
Arizona and City of Scottsdale Transaction Privilege (sales) Tax Licenses.
To obtain a State of Arizona Privilege (Sales) Tax License Application, please go
to the following website:
https://azdor.qov/transaction-privileqe-taxytpt-license/aDPlvinQ-tpt-license
To obtain a City of Scottsdale Transaction (Sales) Tax License Application, please
go to the following website:
https://www.scottsdaleaz.qov/taxes/resources
(Revised 5.6.2026)
19183309
Page 23 of 67
Contract No. 2026-089-COS
Contractor must demonstrate compliance with the E-Verify Program as provided
in Article 11.33 and as required by A.R.S. §41-1080, as amended, before issuance
of any License by the City.
4.2 RESPONSIBILITY FOR PRIVILEGE (SALES) TAXES
A. Contractor is responsible for payment of all applicable State of Arizona and City of
Scottsdale transaction privilege (sales) taxes due on construction income whether
or not these taxes are specifically separated in the bid amount. The taxes are to
be reported on either a progressive billing (accrual) basis or cash receipts basis,
depending on the method chosen at the time application was made for the
Privilege (sales) Tax License.
City Privilege (sales) tax exemptions/deductions may be applicable to certain
projects. Contractor is advised to consider this as it prepares its bid. Please
review, in detail. Sections 415, 465, and 110 of the Scottsdale Revised City Code,
Appendix C to determine if exemptions/ deductions are applicable. For tax
guidance, please reference the City Code and other tax resources at the following
website:
http://www.scottsdaleaz.QOv/taxes/
The State of Arizona has similar exemptions; please reference A.R.S. Title 42 at
the following website:
http://www.azleq.state.az.us/ArizonaRevisedStatutes.asp?Title=42
For further questions regarding tax treatment, please contact the Arizona
Department of Revenue at 602-255-2060 and the City of Scottsdale Tax & Audit
Section at 480-312-2768.
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME
5.1 DELAYS TO THE WORK
A.
Delays may be compensable, concurrent, excusable or non-excusable as defined
in Article 12.
B.
If Contractor is delayed in the performance of the Work due to acts, omissions,
conditions, events, or circumstances beyond its control and due to no fault of its
own or those for whom Contractor is responsible, the Job Order Time for
performance may be reasonably extended by Job Order Adjustment.
C.
Contractor must request a Job Order Adjustment by written notice, including an
estimate of the probable effect of delay on progress of the Work. In the case of a
continuing delay, only one request is necessary.
D.
Written notice will be received within fourteen (14) days of the commencement of
the cause of the delay. If written notice is received more than fourteen (14) days
after commencement of the cause of the delay, the period of delay will be
considered to commence fourteen (14) days before the giving of any notice.
(Revised 5.6.2026)
19183309
Page 24 of 67
Contract No. 2026-089-COS
E.
if adverse weather conditions are the basis for a Job Order Adjustment request,
the requests shall be documented by data substantiating that weather conditions
were abnormal for the period of time and could not have been reasonably
anticipated, and that weather conditions had an adverse effect on the scheduled
construction.
F.
Permitting Contractor to proceed to complete any Work, or any part of the Work,
after the date to which the time of completion may have been extended, will in no
way act as a waiver on the part of the City of any of its legal rights.
G.
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34-609(E), as amended. Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that requires
notice of delays, provides for arbitration or other procedures for settlement or
provides for liquidated damages.
H.
In addition to Contractor's right to request a time extension for those events stated
in this Article 5.1, Contractor may also be entitled to an appropriate adjustment of
the Job Order Price provided, however, that the Job Order Price will not be
adjusted for delays caused by reason of force majeure as defined in this Contract,
5.2 DIFFERING SITE CONDITIONS
5.2.1. If Contractor encounters a Differing Site Condition(s), Contractor may be entitled
to an adjustment in the Job Order Price or Job Order Time(s) to the extent
Contractor’s cost or time of performance are the direct result of a Differing Site
Condition(s).
5.2.2. Upon encountering a Differing Site Condition, Contractor shall provide prompt
written notice to the City of the condition, which notice will not be later than seven
(7) days after the condition has been encountered. Final costs must be
submitted within thirty (30) days after notice is received by the City, unless
extended by written agreement of the parties. Contractor must give the City’s
Contract Administrator written notice of and an opportunity to obsen/e such
condition before disturbing or altering the Differing Site conditions. The failure
of Contractor to give written notice and make the Claim as required by this Article
and Article 7.1.5 shall constitute a waiver by Contractor of any rights arising out
of or relating to such Differing Site Conditions.
5.2.3. In order for Contractor to obtain any additional compensation or time extensions
for Differing Site Conditions, Contractor must demonstrate that it encountered a
material difference at the Site, as defined in Article 12, that required it to expend
additional cost or time. Contractor will also establish that it actually and
reasonably relied upon the representations found in the Contract Documents
concerning the Site conditions.
(Revised 5.6.2026)
19163309
Page 25 of 67
Contract No. 2026-089-COS
5.3 APPLICATION FOR EXTENSION OF TIME
5.3.1 If performance by Contractor is delayed for a reason set forth in Article 5,
Contractor may be allowed a reasonable extension of time in conformance with
this Article. Before Contractor’s time extension request may be considered,
Contractor shall notify the City of the condition which allegedly has caused or is
causing the delay, and shall submit a written application to the City identifying;
Liquidated damage assessment rate, as specified in the Contract:
Original Job Order Price;
Original Job Order Time;
Any previous Job Order Adjustments granted (number and duration): and
The extension of time requested.
1.
2.
3.
4.
5.
5.3.2 In addition, the application for extension of time shall set forth in detail;
5.4
1.
The nature of each alleged cause of delay in completing the Work;
2.
The date upon which each such cause of delay began and ended and the
number of dates attributable to each such cause;
3.
A statement that Contractor waives all claims except for those delineated
in the application, and the particulars of any claims which Contractor does
not agree to waive. For time extensions for Substantial Completion and
final completion payments, the application shall include a detailed
statement of the dollar amounts of each claim item reserved; and
4.
A statement indicating Contractor's understanding that the time extension
is granted only for purposes of permitting continuation of Contract
performance and payment for Work performed and that the City retains its
right to conduct an investigation and assess liquidated damages as
appropriate in the future.
ERRORS, DISCREPANCIES AND OMISSIONS
A.
If Contractor observes errors, discrepancies or omissions in the Contract
Documents, it will promptly notify the City and request clarification. Contractor will
provide a copy of this notice to the City’s Representative.
B.
If Contractor proceeds with the Work affected by the errors, discrepancies or
omissions, without receiving any clarifications, it does so at its own risk. Adjustments
involving these circumstances made by Contractor before clarification by the Design
Professional will be at Contractor's risk.
(Revised 5.6.2026)
19183309
Page 26 of 67
Contract No. 2026-089-COS
6.6 CITY REQUESTED CHANGE IN WORK
A.
The City reserves the right to make, at any time during the progress of the Work,
any alterations as may be found necessary or desirable.
B.
These alterations and changes will not invalidate this Contract nor release the
surety and Contractor agrees to perform the Work as altered, the same as If it had
been a part of the original Job Order. Contractor will notify the surety of the
changes and will assure that the alterations and changes are adequately covered
by the surety bond.
C.
The City will request a proposal for a change in Work from Contractor, and an
Adjustment to the Job Order Price or Job Order Time will be made based on a
mutual agreed upon cost and time.
6.6
LEGAL REQUIREMENTS
The Job Order Price or Job Order Time will be adjusted to compensate Contractor for
the effects of any changes in the Legal Requirements enacted after the date of the
Contract affecting the performance of the Work.
6.7
JOB ORDER ADJUSTMENTS
A.
In accordance with the City of Scottsdale Procurement Code, and related Rules
and Procedures, the City and Contractor will negotiate in good faith and as
expeditiously as possible the appropriate Job Order Adjustment(s). Upon reaching
an agreement, the parties will prepare and execute an appropriate Adjustment
reflecting the terms of their agreement. The change in Work may or may not
include an Adjustment in the Job Order Price or Job Order Time.
B.
All changes in Work authorized by Job Order Adjustments will be performed under
the conditions of the Contract Documents. The decision to make an Adjustment
to the Job Order rests solely with the City and any decision to make a Job Order
Adjustment must be promptly complied with by Contractor, subject to the
provisions of Article 5.8.
C.
The execution of a Job Order Adjustment by Contractor shall constitute conclusive
evidence of Contractor’s agreement to the ordered changes in the Work, the Job
Order Price, and the Job Order Time by Contractor. Contractor, by executing the
Job Order Adjustment, waives and forever releases any claim against the City for
any additional time or compensation for matters relating to, arising out of, or
resulting from the Work included within or affected by the executed Job Order
Adjustment of which Contractor knew or should have known.
6.8 UNILATERAL DETERMINATION OF JOB ORDER VALUE
If no mutual agreement occurs between the City and Contractor, the change in Job Order
Price, if any, shall be derived by determining the reasonable actual costs incurred or
savings achieved, resulting from revisions to the Work. Such reasonable actual costs
or savings shall include a component for direct job site overhead and profit but shall not
include home-office overhead or other indirect costs and components. The calculation
(Revised 5.6.2026)
19183309
Page 27 of 67
Contract No. 2026-089-COS
of actual costs shall conform to the markup schedule in Article 5.12 below. Any such
costs or savings shaii be documented in the format and with such content and detaii as
the City requires. Contractor shaii promptly submit such documentation and other
backup as the City may require in evaluating the actuai costs incurred.
5.9
ADDITIONAL JOB ORDER COST REQUIREMENTS
Contractor’s or Subcontractor's submittals shall include the cost of materials, sales tax,
and the cost of all transport. The cost of items listed shall be directly related to the Job
Order Adjustment. Indirect costs not specifically related to the Job Order Adjustment
shall not be considered. Contractor’s or Subcontractor’s Direct Labor Costs shall be
limited to the hourly rate of directly involved workmen, employer contributions toward
Contractor standard benefits, pensions, unemployment or social security (if any), and
employer costs for paid sick and annual leave. Contractor’s or Subcontractor’s
Overhead shall include license fees, bond premiums, supervision, vvages of timekeepers
and clerks, incidentals, home and field office expense, and vehicle expense directly
related to the Project, and all other direct Project expenses not included in Contractor's
material, direct labor, and equipment costs.
5.9.1
The allowance for overhead and profit shall be limited to the following schedule:
1.
For Contractor, for any work performed by Contractor’s own forces, fifteen
(15%) percent of the Subtotal of Costs to Contractor.
2.
For Contractor, for any work performed by its Subcontractor, six (6%)
percent of the amount due to the Subcontractor.
3.
For each Subcontractor or Sub-subcontractor involved, for any work
performed by their own forces, fifteen (15%) of their materials and direct
labor costs.
4.
For each Subcontractor, for work perforrried by its Sub-Subcontractor(s),
six (6%) percent of the amount due to the Sub-subcontractor.
5.10 LIMITATION OF COMPENSABLE ITEMS
5.10.1 For Job Order Adjustment, the total cost or credit to the City shall be based on
the following schedule;
1. Contractor’s Materials Costs.
2. Contractor’s Direct Labor Costs.
3. Contractor’s Equipment Costs (includes owned/rented equipment).
4. Applicable Subcontractor Costs.
5. Subtotal of Costs to Contractor.
6. Contractor’s Overhead and Profit.
(Revised 5.6.2026)
19183309
Page 28 of 67
Contract No. 2026-089-COS
7, Total Cost or Credit to the City.
5.11 FIELD ORDERS
A.
The City has authority to initiate Field Orders that do not materially and adversely
affect the Work, including the design, quality, performance and \Arorkmanship
required by the Contract Documents. Field Orders will be made by written order
and will be binding on the City and Contractor. Contractor will carry out any written
Field Orders promptly.
B.
Field Orders will not involve an adjustment in the Job Order Price or Job Order
Times unless or until it becomes a Job Order Adjustment.
C.
Contractor may make minor changes in the Work, provided, however that
Contractor will promptly inform the City, in writing, of any changes and record the
changes, if appropriate, on the Project Record Documents maintained by
Contractor.
5.12 JOB ORDER PRICE ADJUSTMENTS
A.
The increase or decrease in Job Order Price resulting from a change in the Work
will be determined by one or more of the following methods;
1. Unit prices stated in the Contract or as subsequently agreed to between
the parties;
2. A mutually agreed upon accepted, lump sum, properly itemized and
supported by sufficient substantiating data to permit evaluation by the City;
and
3. Costs, fees and any other markups,
B.
If an increase or decrease cannot be agreed to as stated in Article 5.7(A). the cost
of the change of the Work will be determined by the reasonable expense and
savings in the performance of the Work resulting from the change, including a
reasonable overhead and profit, as may be stated in the Contract Documents.
Contractor will maintain a documented, itemized accounting, evidencing the
expenses and savings associated with these changes.
C.
If Unit Prices are slated in the Contract Documents, or are later agreed to by the
parties, but application of the Unit Prices will cause substantial inequity to the City
or Contractor because of differences in the character or quantity of the unit items
as originally contemplated, the Unit Prices will be equitably adjusted.
D.
If the City and Contractor disagree upon whether Contractor is entitled to be paid
for any services required by the City, the amount to be paid, other disagreements
over the Scope of Work, proposed changes to the Work, or the time required to
complete the Work, the City and Contractor will resolve the disagreements in
accordance with Article 7,
1. As part of the negotiation process. Contractor will furnish the City with a
(Revised 5.6.2026)
19183309
Page 29 of 67
Contract No. 2026-089-COS
good faith estimate of the costs to perform the disputed services, or the
additional time required in accordance with the City's interpretations.
2. If the parties are unable to agree and the City expects Contractor to perform
the services in accordance with the City's interpretations, Contractor will
proceed to perform the disputed services, conditioned upon the City issuing
a written order to Contractor:
(a) directing Contractor to proceed; and
(b) specifying the City's interpretation of the services that are to be
performed.
E. Emergencies. In any emergency affecting the safety of persons or property.
Contractor will act, at its discretion, to prevent threatened damage, injury or loss.
Any change in the Job Order Price or Job Order Time(s) resulting from emergency
work will be determined as provided in this Article 5.
ARTICLE 6- PROCEDURE FOR PAYMENT
6.1 JOB ORDER PAYMENT REQUEST
A.
B.
C.
At the pre-construction conference prescribed in Article 1.3, Contractor will submit
for the City's review and approval a Schedule of Values. The Schedule of Values
will include values for all items comprising the Job Order Price and will serve as
the basis for monthly progress payments made to Contractor throughout the Work.
At least five (5) working days before the date established for a progress payment,
Contractor will meet with the City’s Representative to review the progress of the
Work, as it will be reflected on the Contractor Payment Request.
The Contractor Payment Request will constitute Contractor’s representation that
the Work has been performed consistent with the Job Order including any
Adjustment{s), has progressed to the point indicated in the Contractor Payment
Request, and that title to all Work will pass to City free and clear of all claims, liens,
encumbrances, and security interests upon the incorporation of the Work into the
Project.
6.2 PARTIAL PAYMENTS
A.
Partial progress payment will be made for Job Orders with Job Order Time greater
than 30 Days and may be made if the Job Order Time is less than 30 Days.
B.
The Contractor Payment Request may request payment for equipment and
materials not yet incorporated into the Project if construction progress is in
reasonable conformance with the approved schedule.
G. For equipment and materials suitably stored at the Site, the equipment and
materials will be protected by suitable insurance and the City will receive the
equipment and materials free and clear of all liens and encumbrances.
(Revised 5.6.2026)
19183309
Page 30 of 67
Contract No. 2026-089-COS
1. For tnaterials and equipment stored off the Site, the City must approve the
storage. The material and equipment must be stored within Maricopa
County and be accessible for the City’s inspection. Title to the materials
and equipment will include applicable insurance, bonding, storage and
transportation to the Site..
2. The City will be named as an Additional Insured on all insurance and bonds
required for all stored materials or equipment
6.3
PAYMENT OF JOB ORDER PRICE
A.
Payments should be provided on the City format for a Pay Application which is
based on the agreed upon Schedule of Values. Payment will be made no later
than fourteen (14) days after the Contractor Payment Request is certified and
approved, but in each case less the total of payments previously made-
B.
The Contractor Payment Request shall be deemed approved and certified for
payment seven (7) days after the date of submission to the City by Contractor
unless before that time the City prepares and issues a specific written finding
setting forth those items in detail in the Contractor Payrtient Request that are not
approved for payment under the Contract. The finding will indicate the specific
amounts the City intends to withhold, the reasons and contractual basis for the
withholding, and the specific measures Contractor must take to rectify the City’s
concerns. The City may withhold an amount from the progress payment sufficient
to pay the expenses the City reasonably expects to incur in correcting the
deficiency set forth in the written finding. Contractor and the City will attempt to
resolve the City’s concerns. If the parties cannot resolve the concerns. Contractor
may pursue its rights under the Contract Documents, including those under Article
7.
6.4
RETENTION ON JOB ORDER PAYMENTS
In compliance with A.R.S. §34-609, as amended, there is no retention for job-order-
contracting construction services contracts.
6.5
FINAL PAYMENT
A.
After receipt of a final Contractor Payment Request, the City will make final
payment as required by this Article 6.5, provided that Contractor has completed all
of the Work in conformance with the Job Order and Contract Documents and a
Final Acceptance Letter has been issued by the City.
B.
At the time of submission of its final Contractor Payment Request, Contractor will
provide the following information;
1. An affidavit that there are no claims, obligations or liens outstanding or
unsatisfied for labor, services, material, equiprfient, taxes or other items
performed, furnished or incurred for or in connection with the Work which
will in any way affect the City's interests; and
2. A general release executed by Contractor waiving, upon receipt of final
(Revised 5.6.2026)
19183309
Page 31 of 67
Contract No. 2026-089-COS
payment by Contractor, all claims, except those claims previously made in
writing to the City and remaining unsettied at the time of finai payment.
6.6
PAYMENTS TO SUBCONTRACTORS OR SUPPLIERS
A.
Contractor wiii pay its Subcontractors or suppliers within seven (7) calendar days
of receipt of each progress payment from the City. Contractor wiii pay for the
amount of Work performed or materials supplied by each Subcontractor or supplier
as accepted and approved by the City with each progress payment. No Contract
between Contractor and its Subcontractors and suppiiers may materially alter the
rights of any Subcontractor or supplier to receive prompt payment as provided in
this Contract.
B.
If Contractor fails to make payments in accordance with these provisions, the City
may take any one or more of the following actions and Contractor agrees that the
City may take these actions:
1. To hold Contractor in default under this Contract;
2. Withhold future payments until proper payment has been made to
Subcontractors or suppliers in accordance with these provisions;
3. Reject all future offers to perform work for the City for a period not to exceed
one (1) year from the Substantial Completion date of the Job Order at issue;
or
4. Terminate this Contract for cause.
C.
Should the City fail or delay in exercising or enforcing any right, power, privilege,
or remedy under this Article, the failure or delay will not be considered a waiver,
release, or modification of the requirements of this Article or of any of the terms or
provisions of this Contract.
D.
Contractor will include these prompt payment provisions in every subcontract,
including procurement of materials and leases of equipment for this Contract.
6.7
AUDIT AND INSPECTION
A. Records of Contractor’s direct personnel payroll, reimbursable expenses related
to each Job Order and records of accounts between the City and Contractor will
be kept on a generally recognized accounting basis and will be available for three
(3) years after completion of the Project.
From the effective date of this Contract and until three (3) years after the date of
final payment by the City of Scottsdale to Contractor, the City, its authorized
representative, or the appropriate federal or state agencies, reserve the right to
audit Contractor’s records to verify the accuracy and appropriateness of all pricing
data, including data used to negotiate the Contract Documents. The City of
Scottsdale or its authorized representative will have access, during normal working
hours, to all necessary Contractor and Subcontractor facilities, and will be provided
adequate and appropriate workspace, in order to conduct audits in compliance
(Revised 5.6.2026)
19183309
Page 32 of 67
Contract No. 2026-089-COS
with the provisions of this Article, The City of Scottsdale will give Contractor or
Subcontractor reasonable advance notice of intended audits.
B.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if, upon audit of Contractor's records, the audit discloses Contractor has
provided false, misleading, or inaccurate cost and pricing data.
C.
Contractor will include a sirnilar provision in all of its contracts with Suppliers,
Subconsultants and Subcontractors providing services under the Contract
Documents to ensure the City, its authorized representative, or the appropriate
federal or state agency, has access to the Supplier, Subconsultant and
Subcontractor records to verify the accuracy of cost and pricing data.
D.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if the above provision is not included in Supplier, Subconsultant and
Subcontractor contracts, and one or more Suppliers, Subconsultants or
Subcontractors do not allow the City to audit their records to verify the accuracy
and appropriateness of pricing data.
E.
If an audit in accordance with this Article, discloses overcharges of any nature by
Contractor to the City in excess of 1% of the total contract billings, the actual cost
of the City's audit wiil be reimbursed to the City by Contractor. Any adjustments
or payments which must be made as a result of any audit or inspection of
Contractor's invoices or records will be made within a reasonable amount of time
(not to exceed 90 days) from presentation of the City’s findings.
F.
This audit provision includes the right to inspect personnel records as required by
Section 11.33.
G.
City may, at reasonable times, inspect the place of business of Contractor or its
Subcontractor(s) that is related to the performance of this Contract.
ARTICLE 7- CLAIMS AND DISPUTES
7.1 REQUESTS FOR CONTRACT ADJUSTMENTS AND RELIEF
7.1.1
If either Contractor or the City believes that it is entitled to relief against the other
for any event arising out of or related to the Work, that party will provide written
notice to the other party of the basis for its claim for relief. The claims shall set
forth in detail all known facts and circumstances supporting the claim; final costs
associated with any claim upon which notice has been given must be submitted in
writing to the City within thirty (30) days after notice has been received.
7.1.2 This notice will, if possible, be made before incurring any cost or expense and in
accordance with any specific notice requirements contained in applicable articles
of the Contract.
7.1.3
In the absence of any specific notice requirement, written notice will be given within
a reasonable time, not to exceed ten (10) days, after the occurrence giving rise to
the claim for relief or after the claiming party reasonably should have recognized
the event or condition giving rise to the request, whichever is later.
(Revised 5.6.2026)
19183309
Page 33 of 67
Contract No. 2026-089-COS
7.1.4
This notice will include sufficient information to advise the other party of the
circumstances giving rise to the claim for relief, the specific contractual adjustment
or relief requested and the basis of the request. ANY NOTICE OF CLAIM NOT
FILED WITH THE CITY WITHIN SUCH TIME AND IN COMPLIANCE WITH THE
PRECEEDING PROVISIONS SHALL BE CONSIDERED TO HAVE BEEN
WAIVED AND SHALL BE DISMISSED.
7.1.5
In the event Contractor seeks to make a claim for an increase in the Job Order
Price, as a condition precedent to any liability of the City therefore, unless
emergency conditions exist, Contractor shall strictly comply with the requirements
of this section and such claim shall be made by Contractor before proceeding to
execute any Work for which a claim is made. Failure to comply with this condition
precedent shall constitute a waiver by Contractor of any claims for compensation.
7.1.6
Contractor must continue its performance under this Contract regardless of the
existence of any claims by Contractor.
7.1.7
In a claim by Contractor against the City for compensation in excess of the Job
Order Price, any liability of the City to Contractor shall be strictly limited and
computed in accordance with the Contract Documents and shall in no event
include indirect costs, such as home office overheads or consequential damages
of Contractor or any estimated costs or damages.
7.2 DISPUTE AVOIDANCE AND RESOLUTION
7.2.1
The parties are fully committed to working with each other throughout the Project
and agree to communicate regularly with each other at all times so as to avoid or
minimize disputes or disagreements. If disputes or disagreements do arise, the
Contractor and the City each commit to resolving the disputes or disagreements in
an amicable, professional and expeditious manner so as to avoid unnecessary
losses, delays and disruptions to the Work,
7.2.2
The Contractor and the City will first attempt to resolve disputes or disagreements
at the field level through discussions between the Contractor’s Representalive(s)
and the City’s Representative(s) as described in Article 7.4.
7.2.3
If a dispute or disagreement cannot be resolved pursuant to Article 7.2.2, upon the
request of either party, the parties’ Representatives as described in Article 7.4 wilt
meet as soon as conveniently possible, but in no case later than thirty (30) days
after the request is made, to attempt to resolve the dispute or disagreement.
Before any meetings between the parties Representatives, the parties will
exchange relevant information that will assist the parties in resolving their dispute
or disagreement,
7.2.4
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34 609(E), as amended. Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that
(Revised 5.6.2026)
19183309
Page 34 of 67
Contract No. 2026-089-COS
requires notice of delays, provides for arbitration or other procedures for
settlement or provides for liquidated damages.
7.3
DUTY TO CONTINUE PERFORMANCE
Unless provided to the contrary in the Contract Documents, Contractor will continue to
perform the Work and the City will continue to satisfy its payment obligations to
Contractor, until final resolution of any dispute or disagreement between Contractor and
the City.
7.4
REPRESENTATIVES OF THE PARTIES
A.
City’s Representatives
1. The City designates the individual listed below as the City’s Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
City of Scottsdale
Attn: Alison Tymkiw
7447 E. Indian School Road, Suite 205
Scottsdale, AZ 85251
480-312-7250
2. The City will designate an individual for each Job Order as the City’s
Representative. This person will manage the Job Order.
3. The City’s Contract Administrator shall be Melanie Gibson, or designee.
B.
Contractor’s Representatives
1. Contractor designates the individual listed below as Contractor’s Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
McCarthy Building Companies, Inc.
Attn: Matt Lyons
6225 North 24th Street, Suite 125
Phoenix, AZ 85016
602-819-4375
2. Contractor will designate an individual for each Job Order as Contractor’s
Representative.
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION
8.1 CITY'S RIGHT TO STOP JOB ORDER SERVICES
A. The City may, at its discretion and without cause, order Contractor in writing to
stop and suspend any Job Order. Immediately after receiving this notice,
(Revised 5.6.2026)
19183309
Page 35 of 67
Contract No. 2026-089-GOS
Contractor will discontinue advancing the Job Order; The suspension will not
exceed one hundred eighty (180) consecutive days. If the City suspends the Job
Order for one hundred eighty-one (181) consecutive days or more, the suspension
will be considered a termination for convenience.
B.
Contractor may seek an adjustment of the JOb Order Price or Job Order Tiniie if its
cost or time to perform the Contract Services has been adversely impacted by any
suspension or stoppage of the Work by the City.
8.2 TERMINATION FOR CONVENIENCE
A.
The City reserves the right to terminate this Contract, in whole or in part, or
abandon any portion of any Job Order for which services have not been performed
by Contractor, at its sole convenience and discretion, upon written notice given
pursuant to this Contract.
1. Contractor will estimate the value Of the Work it has completed and submit
its appraisal to the City for evaluation. The City will have the right to inspect
the Work, to appraise the Work completed.
contractor shall be entitled to receive just and equitable compensation for
the percentage of Work actually completed and materials accepted before
the effective date of the termination. This compensation will be an amount
mutually agreed upon by Contractor and the City based on the Job Order
and Scope of Work. If there is no mutual agreement, the final determination
will be made in accordance with this Article.
2. The City will make the final payment within 60 days after Contractor has
delivered the last of the partially completed items and the final fee has been
agreed Upon.
If the City terminates this Contract in compliance with this Article and
proceeds to complete the Job Order through its employees, agents or other
third parties, the City’s rights to use the Work product will be as stated in
Article 8.4.
B.
Upon termination of construction services during any Job Order, Contractor vvill
proceed with the following obligations:
1. Stop Work as stated in the notice;
2. Place no further subcontracts or orders;
3. Terminate all subcontracts to the extent they relate to the Work terminated;
4. Assign to the City all right, title and interest of Contractor under the
subcontracts terminated, in which case the City will have the right to settle or
to pay any termination settlement proposal arising out of those terminations;
5. Take any action that may be necessary for the protection and preservation
of the property related to the Contract that is in the possession of Contractor
(Revised 5.6.2026)
19183309
Page 36 of 67
Contract No. 2026-089-COS
and which the City has or may acquire an interest; and
6. Comply with the requirements of Article 6.5(B).
C.
Contractor will submit complete termination inventory schedules no later than sixty
(60) days from the date of the notice of termination.
D.
The City will pay Contractor the following:
1. The direct value of its completed Work and materials supplied as of the date
of termination;
2. The reasonable costs and expenses attributable to the termination;
3. Contractor will be entitled to profit and overhead on completed Work but will
not be entitled to anticipated profit or anticipated overhead. If it appears
Contractor would have sustained a loss on the entire Work had the Job
Order been completed. Contractor will not be allowed profit and the City will
reduce the settlement to reflect the indicated rate of loss;
4. Contractor will maintain all records and documents for three (3) years after
final settlement. These records will be maintained and subject to auditing as
required in Article 6.7; and
5. Take any action that may be necessary for the protection and preservation
of the property related to the Job Order(s) that is in the possession of
Contractor and in which the City has or may acquire an interest.
8.3
CANGELLATION FOR CAUSE
The City may aiso cancel this Contract or any part of it with seven (7) days notice for
cause in the event of any default by Contractor, or if Contractor fails to comply with
any of the terms and conditions of this Contract. Unsatisfactory performance, despite
a reasonable Opportunity to cure as judged by the City’s Representative and failure to
provide the City, upon request, with adequate assurances of future performance will
ail be causes allowing the City to cancel this Contract for cause. In the event of
cancellation for cause, the City will not be liable to Contractor for any amount as
damages, and Contractor will be liable to the City for any and all damages sustained
as a result of the default that caused the cancellation.
8.4
CITY'S RIGHT TO PERFORM AND CANCEL FOR CAUSE
A. If Contractor persistently fails to;.
1. Provide a sufficient number of Skilled workers;
2. Supply the materials required by the Contract Documents or Job Order(s);
3. Comply with applicable Legal Requirements;
4. Timely pay, without cause. Subconsultants or Subcontractors;
(Revised 5.6.2026)
19183309
Page 37 of 67
Contract No. 2026-089-COS
5. Perform the Contract Services with promptness and diligence to ensure
that a Job Order is completed by the Job Order Time, as the times may be
adjusted; or
6. Perform other material obligations under the Contract Documents and/or
individual Job Orders;
Then the City, in addition to any other rights and remedies provided in the Contract
Documents or by law, will have the rights stated in Articles 8.2 and 8.3.
In the event the City cancels this Contract or any part of the services under any
Job Order, the City will notify Contractor in writing, and immediately upon receiving
this notice. Contractor will discontinue advancing the Work under this Contract or
the Job Order and proceed to close all operations of any affected Job Order or this
Contract.
B. If the City provides Contractor with a written order to provide adequate maintenance
of traffic, adequate cleanup, adequate dust control or to correct deficiencies or
damage resulting from abnormal weather conditions, and Contractor fails to comply
in a time frame specified, the City may have the Work accomplished by other
sources at Contractor’s expense and without an increase to the Job Order Price
C. Upon the occurrence of an event stated in Article 8.4(B), the City may provide written
notice to Contractor that it intends to cancel the Contract unless the problem cited
is cured, or commenced to be cured, within seven (7) days of Contractor's receipt of
notice.
1. If Contractor falls to cure, or reasonably commence to cure, the problem,
then the City may give a second written notice to Contractor of its intent to
cancel within an additional seven (7) day period.
2. If Contractor, within this second seven (7) day period, fajls to cure, or
reasonably commence to cure the problem, then the City may declare the
Contract cancelled for default by providing written notice to Contractor of
this declaration.
D. Upon declaring the Contract cancelled in accordance with Article 8.4(C), and for the
purpose of completing the Work, the City may for all Job Orders enter upon the
premises and take possession of all materials, equipment, scaffolds, tools,
appliances and other items, which have been purchased or provided for the
performance of the Work, all of which Contractor now transfers, assigns and sets
over to the City for this purpose, and to employ any person or persons to complete
the Work and provide all of the required labor, services, materials, equipment and
other items.
E. If through any cause. Contractor fails to fulfill in a timely and proper manner its
obligations under this Contract, or if Contractor violates any of the covenants,
Contracts, of stipulations of this Contract, the City may withhold any payments to
Contractor for the purpose of setoff until the exact amount of damages due the City
from Contractor is determined by a court of competent jurisdiction.
(Revised 5.6.2026)
19183309
Page 38 of 67
Contract No. 2026-089-COS
9.1
F. in the event of a cancellation. Contractor will not be entitled to receive any further
payments under the Contract Documents until the Work on all Job Orders is
completed in accordance with the Contract Documents. At that time, Contractor will
only be entitled to be paid for Work performed and accepted by the City before its
default.
G. If the City’s cost and expense of completing the Work exceeds the unpaid balance
of a Job Order Price, then Contractor will be obligated to pay the difference to the
City. These costs and expenses will include not only the cost of completing the
Work, but also losses, damages, costs and expense, including attorneys’ fees and
expenses, incurred by the City in connection with the reprocurement and defense of
claims arising from Contractor’s default.
H. If the City cancels this Contract for cause and the cancellation is determined to have
been without legal right, the cancellation for cause will be considered to have been
a termination for convenience in accordance with the provisions of Article 8.2.
ARTICLE 9 - INSURANCE AND BONDS
INSURANCE REQUIREMENTS
A.
At the same time as execution of this Contract, Contractor will furnish the City of
Scottsdale a Certificate of Insurance on a standard insurance industry ACORD
form. The ACORD form will be issued by an insurance company authorized to
transact business in the State of Arizona or one that is named on the List of
Qualified Unauthorized Insurers maintained by the Arizona Department of
Insurance.
B.
Contractor, Subcontractors and Subconsultants must procure and maintain, until
all of their obligations have been discharged, including any warranty periods under
this Contract are satisfied, insurance against claims for injury to persons or
damage to property, which may arise from or in connection with the performance
of the Work by Contractor, its agents, representatives, employees, or
Subcontractors.
C.
The insurance requirements are minimum requirements for this Contract and in no
way limit the indemnity covenants contained in this Contract.
D.
The City in no way warrants that the minimum limits contained in this Contract are
sufficient to protect Contractor from liabilities that might arise out of the
performance of the Contract Services under this Contract by Contractor, its agents,
representatives, employees, Subcontractors or Subconsultants and Contractor is
free to purchase any additional insurance as may be determined necessary. The
City will not pay for higher limits, but if Contractor pays for insurance with higher
limits, Contractor will name the City as an additional insured on any additional
insurance.
E.
Claims Made. In the event any insurance policies required by this Contract are
written on a “claims made’’ basis, coverage shall continue uninterrupted throughout
the term of this Contract by keeping coverage in force using the effective date of
(Revised 5.6.2026)
19163309
Page 39 of 67
Contract No. 2026-089-COS
this Contract as the retroactive date on all “claims made" policies. The retroactive
date for exclusion of claims must be on or before the effective date of this Contract,
and can never be after the effective date of this Contract. Upon completion or
termination of this Contract, the “claims made" coverage shall be extended for an
additional three (3) years using the original retroactive date, either through
purchasing an extended reporting option; or by continued renewal of the original
insurance policies. Submission of annual Certificates of Insurance, citing the
applicable coverages and provisions specified herein, shall continue for three (3)
years past the completion or termination of this Contract.
F. Deductibles and Self-Insured Retentions. The policies stated in this Article may
provide coverage which contains deductibles or self-insured retention amounts.
Any deductibles or self-insured retention are not applicable to the policy limits
provided to the City. Contractor is solely responsible for any deductible or self-
insured retention amount. The City, at its option, may require Contractor to secure
payment of any deductible or self-insured retention by a surety bond or irrevocable
and unconditional Letter of Credit. Any self-insured retentions and deductibles
must be declared to and approved by the City. If not approved, the City may
require' that the insurer reduce or eliminate any self-insured retentions with respect
to the City, its officers, officials, agents, employees, and volunteers.
9.2 MINIMUM SCOPE AND LIMITS OF INSURANCE
Contractor must provide coverage at least as broad and with limits of liability not less
than those stated below.
A. Commercial General Liability-Occurrence Form
General Aggregate
Products-Completed Operations Aggregate
Personal & Advertising Injury
Each Occurrence
Fire Damage (Any one fire)
Medical Expenses (Any one person)
$2,000,000
$2,000,000
$1,000,000
$2,000,000
$100,000
OPTIONAL
Contractor must maintain “occurrence" form Commercial General Liability
insurance with a limit of not less than $2,000,000 for each occurrence, $2,000,000
Products and Completed Operations Annual Aggregate, and a $2,000,000
operations, independent contractors, products completed operations, personal
injury and advertising injury. If any Excess insurance is utilized to fulfill the
requirements of this paragraph, the Excess insurance must be "follow form" equal
or broader in coverage scope than underlying insurance.
B, Automobile Liabilitv-Anv Auto or Owned. Hired and Non-Owned Vehicles
Combined Single Limit Per Accident
For Bodily Injury and Property Damage
$1,000,000
Contractor must maintain Business/Automobile Liability insurance with a limit of
$1,000,000 each accident on Contractor owned, hired, and non-owned vehicles
assigned to or used in the performance of the Contractor’s work or services under
(Revised 5.6.2026)
19183309
Page 40 of 67
Contract No. 2026-089-COS
this Contract. If any Excess insurance is utilized to fulfill the requirements of this
paragraph, the Excess insurance must be "follow form” equal or broader in
coverage scope than underlying insurance.
C. Workers Compensation and Employers Liability
Workers’ Compensation
Employers Liability; Each Accident
Disease - Each Employee
Disease - Policy Limit
Statutory
$500,000
$500,000
$1,000,000
Contractor must maintain Workers Compensation insurance to cover obligations
imposed by federal and state statutes applicable to Contractor’s employees
engaged in the performance of work or services under this Contract and must also
maintain Employers’ Liability Insurance. The insurer must agree to waive all rights
of subrogation against the City, its officers, officials, agents, employees, and
volunteers for losses arising from Work performed by Contractor for the City.
D. Coverage Terms and Required Endorsements
1. The Commercial General Liability and Automobile Liability policies are to
contain, or be endorsed to contain, the following provisions: The City, its
officers, officials, agents, and employees are to be named as additional
insureds with respect to liability arising out of activities performed by, or on
behalf of. Contractor including the City's general supervision of Contractor,
products and completed operations of Contractor, and automobiles owned,
leased, hired, or borrowed by Contractor.
2. Except for Contractors Professional Liability and Workers Compensation
insurance, for all insurance policies required under this Contract, the City,
its officers, officials, agents, and employees must be additional insureds to
the full limits of liability purchased by Contractor even if those limits of
liability are in excess of those required by this Contract.
3. Except for Contractors Professional Liability and Workers Compensation
insurance, all insurance policies required under this Contract, including any
excess insurance policies, must be primary insurance with respect to the
City, its officers, officials, agents, and employees. Any insurance or self-
insurance maintained by the City, its officers, officials, agents, and
employees will be in excess of the coverage provided by Contractor and
must not contribute to it.
4. For all insurance policies required under this Contract, insurance coverage
must apply Separately to each Insured against whom a claim is made or
suit is brought, except with respect to the limits of the insurer's liability.
5. For all insurance policies required under this Contract, insurance coverage
must not be limited to the liability assumed Under the indemnification
provisions of this Contract.
6. All insurance policies required under this Contract, must contain a vvaiver
(Revised 5.6.2026)
19183309
Page 41 of 67
Contract No. 2026-089-eos
of subrogation against the City, its officers, officials, agents, and
employees, for losses arising from Work performed by Contractor for the
City.
7. For all insurance policies required under this Contract, if Contractor
receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt
notice to the Contract Administrator for the City, unless such coverage is
immediately replaced with similar policies.
8. Contractor, its successors of assigns, is required to maintain Commercial
General Liability insurance as specified in this Contract for a minimum
period of three (3) years following completion and acceptance of the Work.
Contractor must submit Certificates of Insurance evidencing the
Commercial General Liability insurance during this three (3) year period
containing all the insurance requirements stated in this Contract including
naming the City of Scottsdale, its agents, representatives, officers,
directors, officials and employees as Additional Insured as required.
9. The Commercial General Liability policy will be at least as broad as the
Insurance Service Office, Inc.’s CG 0 0 01 07 98.
9.3 other INSURANCE REQUIREMENTS
The policies are to contain, or be endorsed to contain, the following provisions:
A.
Contractors Professional Liability: Contractor must carry Contractors Professional
Liability insurance to cover the residual, contingent, and passive design exposures
of Contractor.
B.
Contractors Professional Limits of Liability: Contractor must carry limits of
$1,000,000 each Project and $2,000,000 in the Aggregate under a stand-alone
policy or included by endorsement under the Commercial General Liability policy.
Contractor, its successors and or assigns, is required to maintain this Professional
Liability insurance as specified in this Contract for a minimum period of three (3)
years following completion and acceptance of the Work. Certificates of Insurance
citing that applicable coverage is in force and contains the provisions required by
this Contract must be submitted for the three (3) year period. In the event the
Professional Liability insurance policy is written on a “claims made" basis,
coverage will extend for three (3) years past completion and acceptance of the
work or services, and Contractor, or its selected Design Professional will submit
Certificates of Insurance as evidence the required coverage is in effect, The
Design Professional must annually submit Certificates of Insurance citing that the
applicable coverage is in force and contains the required provisions for a three (3)
year period. If there is no Professional Liability work or service as a part of this
Contract, the City will waive the Professional Liability insurance requirement in
writing.
C.
Builders Risk-Installation Insurance fCourse of Construction)
Builders Risk-Installation and/or Boiler and Machinery Insurance coverage to be
(Revised 5.6.2026)
19183309
Page 42 of 67
Contract No. 2026-089-COS
provided by Contractor as determined necessary by the City prior to the start of
coristruction.
Contractor bears all responsibility for loss to all Work being performed and to
buildings under construction. Unless waived in writing by the City of Scottsdale,
Contractor will purchase and maintain in force Builders Risk-Installation insurance
on the entire Work until completed and accepted by the City. This insurance will
be Special Causes of Loss or Open Perils policy form, for the completed value, at
replacement cost equal to each Job Order contract price and all subsequent
modifications.
This Builders Risk-Installation insurance must cover the entire Work including
reasonable compensation for architects and Contractor’s’ services and expenses
and other "soft costs’’ made necessary by an insured loss. Builders Risk-
Installation insurance must provide coverage from the time any covered property
comes under Contractor’s control and or responsibility, and continue without
interruption during course of construction, renovation and or installation, including
any time during which any project property or equipment is in transit, off site, or
while on site for future use or installation. Insured property must include, but not
be limited to. scaffolding; false work, and temporary buildings at the site. This
insurance must also cover the cost of removing debris, including demolition as may
be legally required by operation of any law, ordinance, regulation or code.
Contractor must also purchase and maintain Boiler and Machinery insurance with
the same requirements as Builders Risk-Installation insurance stated above if the
Work to be performed involves any exposures or insurable property normally
covered under a Boiler and Machinery insurance policy or made necessary as
required by law and or testing requirements in the performance of this Contract.
Contractor will be responsible for any and all deductibles and the City must also
be named as a Loss Payee under these policies. Contractor’s insurance must be
primary and not contributory; and waive all rights of subrogation against the City
of Scottsdale, its officer, officials and employees. Contractor’s insurance must
name the City of Scottsdale, Contractor and all tiers of Subcontractors as insureds
as respects their insurable interest at the time of loss. It must contain a provision
that this insurance will not be canceled or materially altered without at least thirty
(30) days advance notice to the City. Contractor is also required to give the City
thirty (30) days advance written notice of the coverage termination for the Project.
The Builders Risk-Installation insurance must be endorsed so that the insurance
vyill not be canceled or lapse because of any partial use or occupancy by the City.
Builders Risk-Installation insurance must be maintained until whichever of the
following first occurs: (i) final payment has been made; or (ii) until no person or
entity, other than the City, has an insurable interest in the property required to be
covered.
9.4 SUBCONSULTANT’S AND SUBCONTRACTOR’S INSURANCE
Unless Contractor’s Subconsultants and Subcontractors can provide the same level of
coverage as detailed in Article 9.2 and name the City and Contractor as Additional
Insureds, Contractor’s certificates must include all Subcontractors and Subconsultants
(Revised 5.6.2026)
19183309
Page 43 of 67
Contract No. 2026-089-COS
as insureds under its policies or Contractor must maintain separate certificates and
endorsements for each Subcontractor and Subconsultant. All coverages for
Subcontractors and Subconsultants must be in the amounts shown in Article 9.2, except
for the General Liability Each Occurrence limit, which shall be $1,000,000. Certificates
must contain a provision that the insurance will not be canceled or materially altered
without at least thirty (30) days advance notice to the City.
9.5
NOTICE OF CANCELLATION
If Contractor receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt notice to the
City’s Contract Administrator, unless such coverage is immediately replaced with similar
policies. Each insurance policy required by the insurance provisions of this Contract
must provide the required coverage and must not be suspended, voided, canceled by
either party, reduced in coverage or in limits until thirty (30) days written notice has first
been given in accordance with Article 11.24, herein.
9.6
ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers duly licensed or approved to conduct business
in the State of Arizona and with an A. M. Best rating of no less than B++6. The City in
no way warrants that the above required minimum insurer rating is sufficient to protect
Contractor from potential insurer insolvency. Failure to maintain insurance as required
may result in termination of this Contract at the City’s sole discretion.
9.7
VERIFICATION OF COVERAGE
A.
Contractor must furnish the City Certificates of Insurance (ACORD form or
equivalent approved by the City) and with original endorsements effecting
coverage as required by this Contract. The certificates and endorsements for each
insurance policy are to be signed by a person authorized by that insurer to bind
coverage on its behalf Any policy endorsements that restrict or limit coverages
must be clearly noted on the Certificate of Insurance.
B.
All certificates and endorsements are to be received and approved by the City
before Contract Services commence except for Builders Risk-Installation
Insurance. Each insurance policy required by this Contract must be in effect at or
before the earlier of commencement of Work under the Contract Documents or the
signing of this Contract, except for Builders Risk-Installation Insurance which, if
required by the City, must be in effect before commencement of the Work and
remain in effect for the duration of the Project. Failure to maintain the insurance
policies as required by this Contract or to provide evidence of renewal is a material
breach of contract.
C.
All Certificates of Insurance required by this Contract must be sent directly to the
City of Scottsdale, Attn; Capital Project Management Office. The project number
and project description must be Included on the Certificates of Insurance,
The City reserves the right to require complete, certified copies of all insurance
policies required by this Contract, at any time. Failure to provide a Certificate of
insurance with the appropriate verbiage will result in rejection of Contractor’s
Certificate and delay in contract execution. Additional Certificates of Insurance
(Revised 5.6.2026)
19183309
Page 44 of 67
Contract No. 2026-089-COS
submitted without referencing a Contract number wili be subject to rejection and
returried or discarded.
9.8
APPROVAL
Any variation from the insurance requirements in this Article 9 must be approved by the
City's Risk Management Division, whose decision will be final. Said variation will not
require a formal contract amendment but may be made by administrative action.
9.9
BONDS AND OTHER PERFORMANCE SECURITY
t
A.
Before execution of each individual Job Order, Contractor must provide a
performance bond and a payment bond for all construction services, each in an
amount equal to the full amount of the agreed upon cost for that Job Order.
Contractor may, at its own option, provide Payment and Performance Bonds for
the entire Contract Price amount, but there shall be no obligation for the City to
reimburse Contractor for bond costs incurred, except on an actual cost basis as
each individual Job Order is issued. Bonds must be submitted in accordance with
Title 34, Chapter 6 of the Arizona Revised Statutes and must be in substantially
the same form as Exhibits A and B. attached to this Contract.
B.
Each bond must be executed by a surety company or companies holding a
Certificate of Authority to transact surety business in the State of Arizona, issued
by the Director of the Arizona Department of Insurance. A copy of the Certificate
of Authority must accompany the bonds. The Certificate must have been issued
or updated within two (2) years before the execution of this Contract.
C.
The bonds must be made payable and acceptable to the City of Scottsdale.
D.
The bonds must be written or countersigned by an authorized representative of the
surety and the bonds must have attached a certified copy of the Power of Attorney
of the signing official.
1. If one Power of Attorney is submitted, it must be for twice the total Job
Order Price.
E
2. If two Powers of Attorney are submitted, each must be for the total Job
Order Price. Personal or individual bonds are not acceptable.
3. Upon the request of any person or entity appearing to be a potential
beneficiary of bonds covering payment of obligations arising under the
Contract Documents, Contractor must promptly furnish a copy of the bonds
or must permit a copy to be made.
All bonds submitted for this Project must be provided by a company which has
been rated "A or better" by the A.M. Best Company.
(Revised 5.6.2026)
19183309
Page 45 of 67
Contract No, 2026-089-COS
ARTICLE 10 - INDEMNIFICATION
10.1 CONTRACTOR’S GENERAL INDEMNIFICATION
To the fullest extent permitted by law, Contractor, its successors, assigns and
guarantors, must defend, indemnify and hold harmless the City of Scottsdale, its agents,
representatives, officers, directors, officials and employees from and against all
allegations, demands, proceedings, suits, actions, claims, damages, losses, expenses,
including but not limited to, reasonable attorney fees, court costs, and the cost of
appellate proceedings, and all claim adjusting and handling expense, investigation and
litigation, for bodily injury or personal injury (including death), or loss or damage to
tangible or intangible property caused, or alleged to be caused, in whole or in part,
related to, arising from or out of, or resulting from any acts, omissions, negligence,
recklessness, or intentional wrongful conduct to the extent caused by Contractor or any
of its owners, officers, directors, agents or employees performing Work or Services
under this Contract, including but not limited to, any Subcontractor or anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable
and any injury or damages by any of Contractor employees. This indemnity includes
any claim or amount arising out of, or recovered under, the Worker's Compensation Law
or arising out of the failure of Contractor to conform to any federal, state, or local law,
statute, ordinance, rule, regulation, or court decree. It is the specific intention of the
parties that the City shall, in all instances, except for Claims arising solely from the
negligent or willful acts or omissions of the City, be indemnified by Contractor from and
against any and all claims. It is agreed that Contractor will be responsible for primary
investigation, defense, and judgment costs where this indemnification is applicable. In
consideration of the award of this Contract, Contractor agrees to waive all rights of
subrogation against the City, its officers, agents, representatives, directors, officials, and
employees for losses arising from the work performed by Contractor for the City.
Insurance provisions in this Contract are separate and independent from the indemnity
provisions of this Article and will not be construed in any way to limit the scope and
magnitude of the indemriity provisions. Nothing in this paragraph shall limit the
responsibility of Contractor’s insurer to pay the City for valid claims that are covered by
Contractor’s insurance policy. The indemnity provisions of this paragraph shall not be
construed in any way to limit the scope and magnitude and applicability of the insurance
provisions.
10.2 INTELLECTUAL PROPERTY
A.
Contractor must pay all royalties and license fees associated with its performance
of services.
B.
To the extent permitted by law. Contractor shall indemnify and hold harmless the
City against any liability, including costs and expenses, for infringement of any
patent, trademark, or copyright arising out of Contract performance or use by the
City of materials furnished or Work performed under this Contract.
C.
Contractor must defend any action or proceeding brought against the City based
on any claim that the Work, or any part of the Work, or the operation or use of the
Work or any part of it, constitutes infringement of any United States patent or
copyright, now or subsequently Issued. The City will give prompt written notice to
(Revised 5.6.2026)
19183309
Page 46 of 67
Contract No. 2026-089-COS
Contractor of any action or proceeding and will reasonably provide authority,
information and assistance in the defense of the action. Contractor shall indemnify
and hold harmless the City from and against all damages, expenses, losses,
royalties, profits and costs, including but not limited to attorneys’ fees and
expenses awarded against the City or Contractor in any action or proceeding.
Contractor agrees to keep the City informed of all developments in the defense of
these actions. The City may be represented by, and actively participate through,
its own counsel in any suit or proceedings if it so desires.
D.
If the City is enjoined from the operation or use of the Work, or any part of the
Work, as the result of any patent or copyright suit, claim, or proceeding, Contractor
shall at its sole expense take reasonable steps to procure the right to operate or
use the Work. If Contractor cannot procure this right within a reasonable time,
Contractor will promptly, at Contractor's option and at Contractor’s expense,
without an increase to the Job Order Price, (I) modify the Work so as to avoid
infringement of any patent or copyright or (ii) replace the Work with Work that does
not infringe or violate any patent or copyright.
E.
Articles 10.2(C) and 10.2(D) will not be applicable to any suit, claim or proceeding
based on infringement or violation of a patent or copyright:
1. Relating solely to a particular process or product of a particular
manufacturer specified by the City and not offered or recommended by
Contractor to the City; or
2. Arising from modifications to the Work by the City or its agents after
acceptance of the Work; or
3. Relating to the copyrights of any specification, drawings, or any Design
Documents provided by the City, the Design Professional, any consultant
retained by the City, or by a Subcontractor or Supplier.
F.
The obligations stated in this Article 10.2 will constitute the sole Contract between
the parties relating to liability for infringement of violation of any patent or copyright.
ARTICLE 11 - GENERAL PROVISIONS
11.1 MARSHALING AREA
Contractor shall contact the City of Scottsdale, Development Services to determine the
requirements for obtaining a permit for marshaling areas it proposes to use. Marshaling
areas must be fenced. Contractor will obtain written approval from the property owner
for marshaling area use. This approval must contain any requirements, which are a
condition of this approval. Marshaling yard requirements according to M.A.G.
Subsection 107.6.1 and the City of Scottsdale Supplemental Specifications will apply.
11.2 CONTRACT DOCUMENTS
A.
Contract Documents are as defined in Article 12.
B.
The Contract Documents form the entire Contract between the City and
(Revised 5.6.2026)
19183309
Page 47 of 67
Contract No. 2026-089-COS
Contractor. No oral representations or other Contracts have been made by the
parties except as specifically stated in the Contract Documents. Each provision of
lavi/ and any terms required by law to be in this Contract are a part of this Contract
as if fully stated herein.
C.
In the event of any inconsistency, conflict, or ambiguity between or among the
Contract Documents, the Contract Documents will take precedence in the order in
which they are listed in the definition of Contract Documents in Article 12. As to
drawings and plans, given dimensions will take precedence over scaled
measurements, and large-scale plans over small-scale plans. Contract
specifications will take precedence over contract plans.
D.
The Contract Documents are intended to permit the parties to complete the Work
and all obligations required by the Contract Documents within the times and prices
agreed upon for each Job Order. The Contract Documents are intended to be
complementary and interpreted in harmony so as to avoid conflict, with words and
phrases interpreted in a manner consistent with construction and design industry
standards,
E.
This Contract, the Plans, Standard Specifications and Details, Special Provisions,
Performance Bond, Payment Bond, Certificates of Insurance, Job Orders and Job
Order Adjustments (if any) are by reference made a part of this Contract to the
same extent as if set forth in full.
F.
Work Product
1. All Work products (electronically or manually generated) including but not
limited to: cost estimates, studies, design analyses, original mylar
drawings. Computer Aided Drafting and Design (CADD) file diskettes, and
other related documents which are prepared or procured in the
performance of this Contract (collectively referred to as documents) are to
be and remain the property of the City and are to be delivered to the City
before the final payment is made to Contractor. In the event these
documents are altered, modified or adapted without the written consent of
Contractor or the Subconsultants, which consent Contractor or the
Subconsultants will not unreasonably withhold, the City agrees to hold
Contractor and the Subconsultants harmless to the extent permitted by law
from the legal liability arising out of the City's alteration, modification or
adoption of the documents.
2. The copyrights, patents, trade secrets or other intellectual property rights
associated with the ideas, concepts, techniques, inventions, processes or
works of authorship developed, created by Contractor, its Subconsultants
or personnel, during the course of performing this Contract or arising out of
the Project will belong to Contractor.
11.3 MODIFICATIONS
The Contract Documents may not be changed, altered, or amended in any way except
as consistent with the City of Scottsdale Procurement Code, as amended.
(Revised 5.6.2026)
19183309
Page 48 of 67
Contract No. 2026-089-COS
11.4 TIME IS OF THE ESSENCE
Time is of the essence with respect to the dates and linies stated in the Contract
Documents.
11.6 COOPERATION AND FURTHER DOCUMENTATION
Contractor agrees to provide the City any other duly executed documents, as will be
reasonably requested by the City, to implement the intent of the Contract Documents.
11.6 ASSIGNMENT
Neither Contractor nor the City will, without the written consent of the other, assign,
transfer or sublet any portion of this Contract or part of the Work or the obligations
required by the Contract Documents.
11.7 FORCE MAJEURE
Except for payment of sums due, neither party shall be liable to the other nor deemed in
default under this Contract if and to the extent that such party’s performance of this
Contract is prevented by reason of force majeure. The term "force majeure" means an
occurrence that is beyond the control of the party affected and occurs without its fault or
negligence. Without limiting the foregoing, force majeure includes acts of God; acts of
the public enemy; war; riots; Strikes; mobilization; labor disputes; civil disorders; fire;
flood; lockouts; injections-intervention-acts; or failures or refusals to act by government
authority; and other similar occurrences beyond the control of the party declaring force
majeure which such party is unable to prevent by exercising reasonable diligence.
11.8 FUNDS APPROPRIATION
Multiterm contracts for job-order-cpntracting construction services are subject to A.R.S.
§34-607, as amended. If the City Council does not appropriate funds to continue this
Contract and pay for charges, the City may terminate this Contract at the end of the
current fiscal period. The City agrees to give written notice to Contractor at least thirty
(30) days before the end of its current fiscal period and will pay Contractor for all
approved charges incurred through the end of the period.
11.9 CONSTRUCTION METHODS
If the City provides Contractor with a written order to provide adequate maintenance of
traffic, clean-up, dust control or to correct deficiencies or damage resulting from
abnormal weather conditions, and Contractor fails to comply in the time frame specified,
the City may have Work accomplished by other sources at Contractor’s expense, without
an increase in the Job Order Price.
11.10 UTILITY RELOCATIONS FOR CONSTRUCTION METHODS
If any utility is relocated or rebuilt to accommodate Contractor’s construction methods
and available equipment, the expense will be borne by Contractor and will be replaced
to the original location before cornpletlon of the Job Order at the request of the City’s
(Revised 5.6.2026)
19183309
Page 49 of 67
Contract No. 2026-089-COS
Project Coordinator at Contractor’s sole expense, without an increase in the Job Order
Price,
11.11 DAMAGED UTILITIES DURING CONSTRUCTION
Any utilities damaged during construction shall be replaced at Contractor’s expense,
without an increase in the Job Order Price, as per the requirements of the M.A.G.
Standard Specifications.
11.12 SUCCESSORS AND ASSIGNS
This Contract will extend to and be binding upon Contractor, its successors and assigns,
including any individual, company, partnership, or other entity with or into which
Contractor will merge, consolidate, or be liquidated, or any person, corporation,
partnership, or other entity to which Contractor will sell its assets, except that services
covered by this Contract may not be assigned or sublet in whole or in part without first
obtaining the written consent of the Purchasing Director and Contract Administrator.
11.13 CONFLICT IN LANGUAGE
All services and Work performed will conform to all applicable City of Scottsdale codes,
ordinances and requirements as outlined in the Contract Documents. If there is a conflict
in interpretation between provisions in this Contract and those in exhibits, the provisions
in this Contract will prevail.
11.14 THIRD PARTY BENEFICIARY
Nothing under the Contract Documents will be construed to give any rights or benefits
in the Contract Documents to anyone other than the City and Contractor, and all duties
and responsibilities undertaken in accordance with the Contract Documents will be for
the sole and exclusive benefit of the City and Contractor and not for the benefit of any
other or third party.
11.15 GOVERNING LAW AND VENUE
This Contract and all Contract Documents will be considered to be made under and will
be construed in accordance with and governed by the laws of the State of Arizona
without regard to the conflicts or choice of law provisions. Any action to enforce any
provision of this Contract or to obtain any remedy with respect to this Contract shall be
brought in the Superior Court of Maricopa County, Arizona, and for this purpose, each
party expressly and irrevocably consents to the jurisdiction and venue of that Court and
waives the right to have such action removed to Federal District Court.
11.16 SEVERABILITY
If any provision of the Contract Documents or their application to any person or
circumstance is invalid, illegal or unenforceable to any extent, the remainder of the
Contract Documents and the application of the Contract Documents will not be affected
and will be enforceable to the fullest extent permitted by law. In accordance with the
provisions of A.R.S. § 41-194.01, as amended, should the Attorney General give notice
to the City that any provision of the Contract Documents violates state law or the Arizona
(Revised 5.6.2026)
19183309
Page 50 of 67
Contract No. 2026-089-COS
Constitution, or that it may violate a state statute or the Arizona Constitution, and the
Attorney General submits the offending provision to the Arizona Supreme Court, the
offending provision(s) shall be immediately severed and struck from the Contract
Documents and the City and Contractor shall, within ten (10) days after such notice,
negotiate in good faith to resolve any issues related to the severed provision(s).
11.17 LEGAL REQUIREMENTS
Contractor shall perform all Contract Services in accordance with all Legal
Requirements and will provide all notices applicable to the Contract Services as required
by the Legal Requirements.
11.18 INDEPENDENT CONTRACTOR
The services the Contractor provides to the City are that of an Independent Contractor.
Neither party to this Contract shall be deemed to be the employee or agent of the other
party to the Contract. Upon request, the Contractor shall provide the required I.R.S.
From W-9 which is available from the IRS website at www.IRS.gov under its forms
section.
Any provisions in the Contract Documents that may appear to give the City the right to
direct Contractor as to the details of accomplishing the Work or to exercise a measure
of control over the Work means that Contractor will follow the wishes of the City as to
the resuits of the Work only. These results will comply with all applicable laws and
ordinances.
11.19 CITY’S RIGHT OF CANCELLATION
Pursuant to A.R.S. § 38-511, as amended, the City may cancel any contract or
agreement, without penalty or obligation, if any person significantly involved in
initiating, negotiating, securing, drafting, or creating the contract on behalf of the City’s
departments or agencies is, at any time while the contract or any extension of the
contract is in effect, an employee of any other party to the contract in any capacity or
a contractor to any other party to the contract with respect to the contract’s subject
matter. The cancellation wili be effective when ail other parties to the contract receive
the City’s written notice unless the notice specifies a later time.
11.20 SURVIVAL
Except as expressly agreed herein, all warranties, representations and indemnifications
by Contractor shall survive the completion, expiration, and/or termination of this
Contract.
11.21 COVENANT AGAINST CONTINGENT FEES
Contractor warrants that no person has been employed or retained to solicit or secure
this Contract upon any contract or understanding for a commission, percentage,
brokerage, or contingent fee, and that no member of the City Council, or any employee
of the City of Scottsdale has any interest, financially, or othenvise, in the firm. For breach
or violation of this warranty, the City will have the right to annul this Contract without
(Revised 5.6.2026)
19183309
Page 51 of 67
Contract No. 2026-089-COS
liability, or at its discretion to deduct from the Contract Price or consideration, the full
amount of any commission, percentage, brokerage, or contingent fee.
11.22 NO WAIVER
Either party’s failure to insist on strict performance of any term or condition of the
Contract shali not be deemed waiver of that term or condition even if the party accepting
or acquiescing in the nonconforming performance knows of the nature of the
performance and fails to object to it.
11.23 HEADINGS
The headings used in this Contract, or any other Contract Documents, are for ease of
reference only and will not in any way be construed to limit or alter the meaning of any
provision.
11.24 NOTICE
All notices or demands required by this Contract must be given to the other party in
writing, delivered by hand or by registered or certified mail at the addresses stated
below, or to any other address the parties may substitute by giving written notice as
required by this section. Notice by electronic mail or facsimile will not be considered
notice.
To City:
City of Scottsdale
Attn; Alison Tymkiw
7447 E. Indian School Road, Suite 205
Scottsdale. AZ 85251
To JOC Contractor:
McCarthy Building Companies, Inc.
Attn: Matt Lyons
6225 North 24th Street, Suite 125
Phoenix, AZ 85016
11.25 ADDITIONAL CITY RIGHTS REGARDING SECURITY INQUIRIES
Projects may be completed in both secure and non-secure City facilities. All Contractor
and Subcontractor employees may be required to pass mandatory background checks
prior to the start of any Work and be issued access badges by City of Scottsdale
Municipal Security. In addition to the foregoing, the City reserves the right to: (1) have
an employee/prospective employee of Contractor be required to provide fingerprints and
execute any other documentation as may be necessary to obtain criminal justice
information pursuant to A.R.S. § 41-1750(G)(4): (2) act on newly acquired information
whether or not that information should have been previously discovered; (3) unilaterally
change its standards and criteria reiative to the acceptability of Contractor's employees
or prospective employees; and, (4) object, at any time and for any reason, to an
employee of Contractor performing Work (including supervision and oversight) under
this Contract.
A. Provisions Applicable to all Contractor Contracts and Subcontracts. Contractor will
include the terms of this provision for employee background and security checks
(Revised 5.6.2026)
19183309
Page 52 of 67
Contract No. 2026-089-COS
and screening in all contracts and subcontracts for Work performed under this
Contract, including supervision and oversight.
B. Materiality of Security Inquiry Provisions. The Security Inquiry provisions of this
Contract, as stated above, are material to the City’s entry into this Contract and
any breach by Contractor may, at the City's sole option and Unfettered discretion,
be considered to be a breach of contract of sufficient magnitude to terminate this
Contract. Termination will subject Contractor to liability for its breach of contract.
11.26 HAZARDOUS MATERIALS
A.
Upon discovery of hazardous materials Contractor will comply with all applicable
laws/ordinances and regulations and take ali appropriate health and safety
precautions.
B.
Unless included in the Work, if Contractor encounters onsite, or as material to be
incorporated in the Work, any material which it reasonably believes to contain
asbestos, polychlorinated biphenyl (PCB), or other hazardous substances or
materials regulated by public health laws, it will immediately stop work and report
the condition to the City.
C.
If the material is found to contain asbestos, PCB or other hazardous substances or
materials regulated by public health laws. Contractor will not resume Work in the
affected area until the material has been abated or rendered harmless. Contractor
and the City may agree, in writing, to continue Work in non-affected areas onsite.
D.
An extension of Job Order Time may be granted in accordance with Article 5.
E.
Contractor will comply with all applicable laws/ordinances and regulations and take
ail appropriate health and safety precautions upon discovery.
F.
Despite the provisions of this Article 11.26, the City is not responsible for
hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable. Contractor will
indemnify, defend and hold harmless the City and the City’s officers, directors,
employees and agents from and against all claims, losses, damages, liabilities and
expenses, including attorneys’ fees and expenses, arising out pf or resulting from
those hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable.
11.27 TRAFFIC CONTROL
A.
Complete street closures will not be pertriitted unless specified in the Special
Provisions or approved by the City. The timing and sequence of street closures
will be approved by the Traffic Engineering Director, or designee, at least fourteen
(14) days before the closure. This approval is necessary to provide coordination
with other roadway projects and special events.
B.
Adequate barricades and lighted warning signs must be installed and maintained
by Contractor throughout the duration of any Project. All traffic control must be in
accordance with the current version of the City of Scottsdale Supplement to MAG
(Revised 5.6.2026)
19163309
Page 53 of 67
Contract No. 2026-089-COS
Uniform Standard Specifications Section 401 or as required by the approved
barricade plan unless otherwise specified in the Special Provisions.
C. Contractor will submit a construction schedule and a barricade plan to the City
Traffic Engineering Director, or designee, for approval or modification at least
seventy-two (72) hours before construction is initiated, and must wait to commence
construction until the plan is signed as accepted by the City Traffic Engineering
Director, or designee.
11.28 MATERIAL SOURCE
No material source has been designated by the City for use under this Contract, MAG
Specification, Section 106 will apply aswill ADOT Standard Specifications 1982, Section
106.1, 106.2, 106.7 & 106.8, which outline controls and Section 1001-1, -2, & -4
concerning approval of Contractor-Furnished Source and supplemental Contracts in
regards to environmental analysis and the liability for materials testing costs,
Contractor and Subcontractor furnished material sources situated in the 100-year flood
plain of any stream or watercourse will not be allowed if located within 1.0 mile upstream
and 2.0 miles downstream of any highway structure or surfaced roadway crossing.
A Contractor and Subcontractor-furnished source will be defined as a material source,
which is neither an ADOT furnished source nor a commercial source, as defined in this
Contract.
A commercial source will be defined as a material source in which the owner or producer
has been regularly engaged for at least one (1) year during regular business hours on a
regular basis in the processing and selling of sand, rock, ready mixed Portland cement
concrete, asphaltic concrete and other similar products normally produced and sold to
all parties. The company must have an Arizona retail sales tax license.
The location of any new material source or existing non-commercial material source
proposed for use under this Contract must be reviewed by the appropriate agency
having flood plain management jurisdiction over the area of proposed source location.
Contractor and Subcontractor will obtain a letter from the agency addressed to the
Contract Administrator certifying that the proposed source location conforms to the
required conditions and the applicable Standard Specifications. Contractor will
familiarize himself with the nature and extent of the Contract Documents, work to be
performed, all local conditions, and federal, state and local laws, ordinances, rules and
regulations that in any manner may affect cost, progress or performance of the Work.
11.29 FAMILIARIZATION WITH APPLICABLE LAWS
Contractor will familiarize itself with the nature and extent of the Contract Documents,
work to be performed, all local conditions, and federal, state and local laws, ordinances,
rules and regulations that in any manner may affect cost, progress or performance of
the Work. Contractor shall comply with all applicable federal, state, and local laws,
statutes, ordinances, standards, orders, rules, and regulations, including, as applicable,
workers’ compensation laws, minimum and maximum salary and wage statutes and
regulations, prompt payment and licensing laws and regulations.
(Revised 5.6.2026)
19183309
Page 54 of 67
Contract No. 2026-089-COS
11.30 NATIVE PLANTS
Contractor agrees it will take whatever steps, procedures or means necessary to
remove, move, displace and save all native plants within the contract work area in
accordance with the City of Scottsdale Revised Code, as amended, and all applicable
state and county statutes, ordinances, codes and other policy requirements and
recognized methods, procedures, techniques and equipment for protection, salvage,
and handling of all plants to be moved from the construction area. This is not a pay item
Unless specified upon the Schedule of Bid Items.
11.31 ENDANGERED HARDWOODS
Contractor agrees any construction, building addition or alteration project which is
financed by monies of this state or its political subdivisions will not use endangered
tropical hardwood unless an exemption is granted by the Director of the State of Arizona,
Department of Administration.
11.32 CONSTRUCTION ACTIVITY
Contractor agrees that all construction activity occurring on Site shall conform to the
hour and noise requirements of the City of Scottsdale Revised Code, as amended.
11.33 COMPLIANCE WITH LOCAL, STATE AND FEDERAL LAWS
A. Contractor understands and acknowledges the applicability to it of the American with
Disabilities Act, the Immigration Reform and Control Act of 1986, the Drug Free
Workplace Act of 1989, Fair Labor Standards Act, Age Discrimination in Employment
Act, Family and Medical Leave Act, National Labor Relations Act, Occupational Safety
and Health Act, and other local, state or federal law governing Contractor's labor and
employment practices. Contractor agrees to comply With these laws in performing this
Contract and to permit the City to verify compliance. Contractor further agrees that
any violation of provision on the part of Contractor, its employees, agents or assigns
will constitute a material breach of this Contract.
Contractor will also comply with A.R.S. §34-301, “Employment of Aliens on Public
Works Prohibited," and A.R.S. §34-302, “Residence Requirements for Employees," as
amended. Contractor will include the terms of this provision in all contracts and
subcontracts for Work performed under this Contract, including supervision and
oversight.
Under the provisions of A.R.S. §41-4401 and Exhibit C. attached hereto,
Contractor warrants to the City that Contractor and all its Subcontractors will
comply with all Federal Immigration laws and regulations that relate to its
employees and that Contractor and all its Subcontractors now comply with the
E-Verify Program under A.R.S. §23-214(A).
A breach of this warranty by Contractor or any of its Subcontractors will be considered
a material breach of this Contract and may subject Contractor or Subcontractor to
penalties up to and including termination of this Contract or any subcontract.
The City retains the legal right to inspect the papers of any employee of Contractor or
(Revised 5.6.2026)
19183309
Page 55 of 67
Contract No. 2026-089-COS
any Subcontractor who works on this Contract to ensure that Contractor or any
Subcontractor is complying with the warranty given above.
The City may conduct random verification of the employment records of Contractor
and any of its Subcontractors to ensure compliance with this warranty. Contractor
agrees to indemnify, defend and hold the City harmless for, from and against all losses
and liabilities arising from any and all violations of these statutes.
The City will not consider Contractor or any of its Subcontractors in material breach of
this Contract if Contractor and its Subcontractors establish that they have complied
with the employment verification provisions prescribed by 8 USCA § 1324(a) and (b) of
the Federal Immigration and Nationality Act and the E-Verify requirements prescribed
by A.R.S. §23-214(A). as amended. The "E-Verify Program" means the employment
verification pilot program as jointly administered by the United States Department of
Homeland Security and the Social Security Administration or any of its successor
programs.
The provisions of this Article must be included in any contract Contractor enters into
with any and all of its Subcontractors who provide services under this Contractor any
Subcontract. “Services” are defined as furnishing labor, time or effort in the State of
Arizona by a Contractor or Subcontractor. Services include construction or
maintenance of any structure, building or transportation facility or improvement to real
property. Contractor will take appropriate steps to assure that all Subcontractors
comply with the requirements of the E-Verify Program, Contractor's failure to assure
compliance by all its Subcontractors with the E-Verify Program may be considered a
material breach of this Contract by the City.
B. Compliance with Americans with Disabilities Act. The City of Scottsdale assures full
compliance with Title VI of the Civil Rights Act of 1964, Title II of the Americans with
Disabilities Act of 1990 (ADA), and other related authorities in ail of its programs and
activities. The City’s Title VI and ADA Programs require that no person shall, on the
grounds of race, color, national origin and disability, be excluded from participation in,
be denied the benefits of, or be otherwise subjected to discrimination under any
program or activity. This policy is also applicable to contractors and/or consultants
conducting work on behalf of the city.
Contractor acknowledges that, in accordance with the Americans with Disabilities Act
(ADA), programs, services and other activities provided by a public entity to the public,
whether directly or through a contractor, must be accessible to the disabled public.
Contractor will provide the services specified in this Contract in a manner that complies
with the ADA and any and all other applicable federal, state and local disability rights
legislation. Contractor agrees not to discriminate against disabled persons in the
provision of services, benefits or activities provided under this Contract and further
agrees that any violation of this provision on the part of Contractor, its employees,
agents or assigns will constitute a material breach of this Contract.
C. Equal Employment Opportunity and Discrimination. For the duration of this Contract,
Contractor represents and warrants it will comply with all applicable local, state and
federal laws governing equal employment opportunities, or prohibiting employment or
other discrimination based on any protected characteristic including but not limited to
actual or perceived race, color, religion, sex, age, disability, national origin, sexual
orientation, gender identity, or U.S. military status. City of Scottsdale Revised Code,
(Revised 5.6.2026)
19163309
Page 56 of 67
Contract No. 2026-089-GOS
Chapter 15 mandates Contractor compliance with the policies contained therein.
Contractor agrees that any violation of provision on the part of Contractor, its
employees, agents or assigns will constitute a material breach of this Contract.
Contractor will include the terms of this provision in all contracts and subcontracts for
work performed under this Contract, including supervision and oversight. The
Contractor will, in ali solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, sexual orientation, gender
identity, or national origin.
D. No Preferential Treatment or Discrimination. In accordance with the provisions of
Article II, Section 36 of the Arizona Constitution, the City will not grant preferential
treatment to or discriminate against any individual or group on the basis of race, sex,
color, ethnicity or national origin. To avoid the appearance of impropriety, Contractor
shall not make any donation to the City, of any goods or services during the term of
this Contract, unless it has specifically been approved by the City Manager or
designee.
E. Advertising. No advertising or publicity concerning the City using Contractor’s services
shall be undertaken without prior written approval of such advertising or publicity by
the Contract Administrator and the City Attorney.
11.34 DATA CONFIDENTIALITY
A.
As used in this Contract, data means all information, whether written or verbal,
including plans, photographs, studies, investigations, audits, analyses, samples,
reports, calculations, internal memos, meeting minutes, data field notes, work
product, proposals, correspondence and any other similar documents or
information prepared by or obtained by Contractor in the performance of this
Contract.
B.
The parties agree that all data, including originals, images, and reproductions,
prepared by, obtained by, or transmitted to Contractor in connection with
Contractor’s performance of this Contract is confidential and proprietary
information belonging to the City.
C.
Contractor will not divulge data to any third party without first obtaining the written
consent of the City. Contractor will not use the data for any purposes except to
perform the services required under this Contract. These prohibitions will not apply
to the following data provided Contractor has first given the required notice to the
City:
1. Data, which was known to Contractor before its performance under this
Contract unless the data was acquired in connection with the Work
performed for the City;
v
2. Data which was acquired by Contractor in its performance under this
Contract and which was disclosed to Contractor by a third party, who to the
best of Contractor’s knowledge and belief, had the legal right to make
disclosures and Contractor is not otherwise required to hold the data in
(Revised 6.6.2026)
19183309
Page 57 of 67
Contract No. 2026-089-COS
confidence; or
3. Data, which is required to be disclosed by virtue of law, regulation, or court
order to which Contractor is subject.
D.
In the event Contractor is required or requested to disclose data to a third parly, or
any other information to which Contractor became privy as a result of any other
contract with the City, Contractor wiil first notify the City as required in this Article
of the request or demand for the data. Contractor will give the City sufficient facts
so that the City can be given an opportunity to first give its consent or take any
action the City may consider appropriate to protect the data or other information
from disclosure.
E.
Unless prohibited by law, within ten (10) days after completion of services for a
third party on real or personal property owned or leased by the City, Contractor will
promptly deliver, as stated in this Article, a copy of all data to the City. All data will
continue to be subject to the confidentiality requirements of this Contract.
F.
Contractor assumes all liability for maintaining the confidentiality of the data in its
possession and agrees to compensate the City if any of the provisions of this
Article are violated by Contractor, its employees, agents or Subconsultants. Solely
for the purposes of seeking injunctive relief, it is agreed that a breach of this Article
will be considered to cause irreparable harm that justifies injunctive relief in court.
11.35 CONFLICT OF INTEREST
A.
To evaluate and avoid potential conflicts of interest. Contractor will provide written
notice to the City, as stated in this Article, of any work or services performed by
Contractor for third parties that may involve or be associated with any real property
or personal property owned or leased by the City. The notice will be given seven
(7) business days before commencement of the Project by Contractor for a third
party, or seven (7) business days before an adverse action as defined below.
Written notice and disclosure will be sent to the City Senior Representative
identified in Article 7.4.
B.
Actions that are considered to be adverse to the City under this Contract include
but are not limited to:
1. Using data as defined in this Contract acquired in connection with this
Contract to assist a third party in pursuing administrative or judicial action
against the City;
2. Testifying or providing evidence on behalf of any person in connection with
an administrative or judicial action against the City; and
3. Using data to produce income for Contractor or its employees
independently of performing the services under this Contract, without first
obtaining the written consent of the City.
C.
Contractor represents that except for those persons, entities and projects identified
to the City, the services to be performed by Contractor under this Contract are not
(Revised 5.6.2026)
19183309
Page 58 of 67
Contract No. 2026-089-COS
D.
expected to create an interest with any person, entity, or third party project that is
or may be adverse to the interests of the City.
Contractor's failure to provide a written notice and disclosure of the information
stated in this Article on Conflicts of Interest will constitute a material breach of this
Contract.
E. This Contract is subject to cancellation by the City of Scottsdale in accordance with
the provisions of A.R.S. § 38 511, as amended.
11.36 COMMENCEMENT OF STATUTORY LIMITATION PERIOD AND STATUTE OF
REPOSE
A.
Before Final Completion. As to acts or failures to act occurring before the relevant
date of Final Completion, any applicable statute of limitations will commence to run
and any alleged cause of action will be considered to have accrued in any and all
events not later than the date of Final Completion.
B.
Between Punch List Preparation and Final Completion. As to acts or failures to
act occurring between the relevant date of Punch List Preparation and before Final
Completion, any applicable statute of limitation will begin to run and any alleged
cause of action will be considered to have accrued in any events not later than the
date of Final Completion.
C.
After Completion. As to acts or failures to act occurring after the date of Final
Completion, any applicable statute of limitations will commence to run and any
alleged cause of action will be considered to have accrued in any and all events
not later than the date of any correction of the Work or failure to correct the Work
by the Contractor, or the date of actual commission of any other act or failure to
perform any duty or obligation by the Contractor or the City, whichever occurs last.
D.
Statute of Repose. The time period for the applicable Statute of Repose will
commence to run at the time specified in A.R.S. §12-552 as it is amended or
renumbered from time to time.
11.37 LOSS AND DAMAGES
Except as expressly provided in this Contract, all loss or damage arising out of the nature
of the Work to be done or from the action of the elements, or from any unforeseen
circumstances, in the prosecution of the same, or from any unusual obstructions or
difficulties which may be encountered in or during the prosecution of the Work, or from
any casualty whatsoever of every description, will be sustained and borhe by Contractor
at its sole cost and expense. By signing this Contract, all rights of subrogation are waived
against the City, its officers, officials, agents and employees.
11.38 RIGHTS-OF-WAY
The M.A.G. Standard Specification 107.12 is modified to read as follows; "Contractor, at
its own expense, is responsible for the acquisition of any necessary temporary
easements for construction purposes, storage and maintenance purposes, which are
(Revised 5.6.2026)
19183309
Page 59 of 67
Contract No. 2026-089-COS
required in addition to existing easements or rights of way secured by the City as
indicated upon the pians."
11.39 EXISTING TRAFFIC AND STREET SIGNS AND TRAFFIC SIGNAL EQUIPMENT
Contractor will use due care when excavating at or near intersections where traffic signal
underground conduit is located. Contractor will notify the Transportation Maintenance
Traffic Signal Division (tel. 480.312.5620) at least forty-eight (48) hours in advance of
any work at the intersections. Contractor will be responsible for the installation and
maintenance of temporary overhead traffic signal cable as specified by the
Transportation Department when underground conduit is to be severed by excavations
at the intersection. The Transportation Department will have all underground traffic
conduit located and will provide the necessary City Technicians to assist Contractor in
identifying wiring phases and direction of conduit runs upon twenty-four (24) hours’
notice from Contractor and at least one (1) day before Contractor's scheduled wiring and
installation of temporary cables. Contractor will be responsible for the wiring and
connection of all temporary cable within the puli boxes and terminal compartments. The
Transportation Department will provide a City technician to assist Contractor with
connecting field wiring within the traffic signai control cabinet. Contractor will provide, at
its expense, at least one off-duty uniformed Police Officer as may be required to direct
traffic while the traffic signal is turned off and the wiring is transferred. Contractor will
be responsible as specified by the Traffic Department for the repair and restoration of
all traffic signal overhead and underground items that have been damaged or modified.
The City does not permit the splicing of Magnetic Detector Loops.
11.40 CERTIFICATION OF USE OF BENCHMARKS
In compliance with the City’s Design Standards & Policies Manual (DS&PM), Sections
9-1.1 and 9-1.301, it is the City’s intent that Contractor must use both horizontal and
vertical benchmarks with City of Scottsdale published values for any survey on all public
works projects. These published values are available for public use at the following
website:
https://eservices.scottsdaleaz.qov/maps/benchmarks. AT LEAST 1
HORIZONTAL AND 1 VERTICAL BENCHMARK MUST MATCH THE NORTHING,
EASTING OR ELEVATION VALUES PUBLISHED ON THE CITY’S WEBSITE. If
required by the City, Contractor must sign and submit with this Contract, the Certificate
of Use attached and by reference made a part of this Contract.
11.41 TAX INDEMNIFICATION
The fee listed in this Contract includes any and all taxes applicable to the activities under
this Contract. The City will have no obligation to pay additional amounts for taxes of any
type. Contractor, its Subcontractors, Subconsultants and Suppliers, shall pay all
Federal, state and local taxes applicable to its operation and any persons employed by
Contractor, its Subcontractors, Subconsultants and Suppliers, except as may be
otherwise provided in this Contract. Contractor shall, and also require its
Subcontractors, Subconsultants and Suppliers to hold the City harmless from any
responsibility for taxes, damages and interest, if applicable, contributions required under
Federal, and/or state and local laws and regulations and any other costs including
transaction privilege taxes, unemployment compensation insurance. Social Security and
Worker’s Compensation.
(Revised 5.6.2026)
19183309
Page 60 of 67
Contract No. 2026-089-COS
11.42 ISRAEL BOYCOTT/FORCED LABOR PROVISIONS
By executing this contract, Contractor certifies that it is not currentiy engaged in and will
not for the duration of this Contract engage in boycott activity proscribed by A.R.S. § 35-
393 et seq, as amended.
Pursuant to A.R.S. § 35-394, as amended. Contractor warrants and certifies that it does
not currently, and agrees for the duration of this Contract that it will not use;
1)
The forced labor of ethnic Uyghurs in the People's Republic of China.
2)
Any goods or services produced by the forced labor of ethnic Uyghurs in the
People's Republic of China.
3)
Any contractors, subcontractors or suppliers that use the forced labor or any goods
or services produced by the forced labor of ethnic Uyghurs in the People's Republic
of China.
If Contractor becomes aware during the term of this Contract that Contractor is not in
compliance with this Article, Contractor shall notify the City within five (5) business days
after becoming aware of the noncompliance. Failure of Contractor to provide a written
certification that Contractor has remedied the noncompliance within one hundred eighty
(180) days after notifying the City of its noncompliance will result in automatic termination
of this Contract, unless an earlier contract termination, cancellation, or expiration date
applies.
ARTICLE 12-DEFINITIONS
“Allowance” means an agreed amount by the City and Contractor for items which may be required
to complete the scope of work.
“As-Built Document” - “As-built in construction is equivalent to "as-is." Drawings deemed “as-
built” are final drawings that include all changes made during the actual construction process.
These drawings represent the actual existing constructed conditions as opposed to designs or a
proposed condition. The As-Built Documents should be per A.R.S. § 32-152.
“Blueline or Blackline Prints" - Prints that allows comparison of document versions to show what
has been revised.
“City" or “Owner" means the City of Scottsdale, Arizona, an Arizona municipal corporation.
Regulatory activities handled by the City of Scottsdale Development Services, Planning and Fire
Departments or any other City department are not subject to the responsibilities of the City under
this Contract.
"City’s Representative" means the person designated in Article 7.4(A)(2).
"City's Senior Representative" means the person designated in Article 7.4(A)(1).
“Claim” means a written request for either payment of additional monies or extension of contract
time, submitted in accordance with the terms of this Contract or applicable law.
“Construction Coordinator” means a City employee who coordinates the daily construction
activities with Contractor, and with their inspection staff that performs quality control inspections,
(Revised 5.6.2026)
19183309
Page 61 of 67
Contract No. 2026-089-COS
enforces project plans and specifications and adopted City codes and ordinances.
“Construction Documents” means the plans, specifications and drawings prepared by the Design
Professional after correcting for permit review requirements and incorporating any approved
amendments, addenda, exhibits and Job Order Adjustments.
“Construction Services” - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Contract Administrator” means the person designated in Article 7.4(A) or designee. The Contract
Administrator will serve as Contractor’s primary point of contact with the City, monitor Contractor’s
performance, review and approve invoices, establish delivery schedules, and in conjunction with
Purchasing ensure Certificates of Insurance are current, conform to the requirements of this
Contract, and are in the City’s possession. Contractor will direct any reports and/or special
requests to the Contract Administrator.
"Contract Documents" means the following items and documents in descending order of
precedence executed by the City and Contractor: (1) Job Order Adjustments; (2) Contract
Modifications: (3) Job Orders; (4) this Contract including all exhibits and attachments; (5)
Contractor's Proposal (if any); (6) Contractor Statement of Qualifications.
"Contract Modification" means a specific written concurrence between the City and Contractor for
changes to this Contract consistent with the City of Scottsdale Procurement Code, as amended.
“Contract Price" means the amount or amounts stated in Article 4 subject to any Contract
Modifications.
“Contract Services” means the services required by the Contract Documents.
“Contract Time(s)” means the time stated in Article 3, subject to Contract Modifications as
permitted by this Contract.
“Contractor” is Contractor selected by the City to provide or procure construction services as
detailed in this Job Order Contract.
“Contractor Payment Request” means the City form used by Contractor to request progress
payments for Job Orders in accordance with Article 6.
“Contractor’s Representative” means the person described in Article 7.4(B)(2).
"Contractor’s Senior Representative" means the person described in Article 7.4(B)(1).
“Day(s)” means calendar days unless othenvise specifically noted in the Contract Documents.
“Delay” means an unanticipated event or interference with the progress of a critical path work
activity being performed at the time that causes the completion date of the project to be extended.
Delays may be caused by the City, Contractor, third parties or Force Majeure events. Delays may
be excusable, compensable, non-compensable or concurrent.
“Delay, Compensable” means delay that results from the City’s actions or inactions that entitle
Contractor to both a time extension and delay damages.
(Revised 5.6.2026)
19183309
Page 62 of 67
Contract No. 2026-089-GOS
“Delay, Concurrent" means two (2) or more delays, within the same timeframe, both of which
would independently impact the Project Schedule. If one delay is caused by the City and the
other by Contractor, Contractor will generally be entitled to an excusable, non-compensable time
extension, to the degree the delays may “overlap.”
"Delay, Excusable" means an unforeseeable delay caused by an event beyond the control and
without the fault or negligence of Contractor (including its Suppliers and Subcontractors).
Excusable delays may be compensable or non-compensable, depending upon whether the terms
of the Contract or the law allows recovery of delay costs. Unless otherwise shown, it will generally
be presumed that these delays are non-compensable.
“Delay, Non-Excusable” means a delay within the control of Contractor, its Suppliers and
Subcontractors, or a delay resulting from a risk taken by Contractor under the terms of the
Contract. Contractor will not be due any time extension or delay damages, and may be
responsible for paying to the City, actual or liquidated damages for the delay.
"Deliverables" means the work products prepared by Contractor in performing the scope of work
described in this Contract. Some of the major deliverables to be prepared and provided by
Contractor may include, but are not limited to: Construction Management Plan, Project Schedule,
Schedule of Values, alternative system evaluations, procurement strategies and plans, cost
estimates, construction market surveys, cash flow projections, Subcontractor procurement plan.
Subcontractor Contracts, Subcontractor bid packages. Supplier Contracts, and others as
indicated in this Contract or required by the Project Team.
"Design Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
"Design Team” or “Design Professional" refers to licensed design professionals, as defined in
A.R.S. §34-101 as amended.
“Differing Site Conditions" comply with M.A.G. Standard Specifications, Subsection 102.4.
"Effective Date" means the date specified in this Contract on which the Contract becomes
effective, but if no date is specified, the date on which the City executes this Contract.
"Field Order" means a written field directive prepared and signed by the City, directing a change
in Work that does not include an adjustment in the Job Order Time or Job Order Price.
"Final Acceptance" means the completion of a Job Order as prescribed in Article 3.5.
“Financial Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
"Hazardous Substance" -_means:
(a) Any substance designated pursuant to sections 311(b) (2) (A) and 307(a) of the clean
water act.
(b) Any element, compound, mixture, solution or substance designated pursuant to
section 102 of CERCLA.
(c) Any hazardous waste having the characteristics identified under or listed pursuant to
section 49-922.
(d) Any hazardous air pollutant listed under section T12 of the federal clean air act (42
United States Code section 7412).
(Revised 5.6.2026)
19183309
Page 63 of 67
Contract No, 2026-089-COS
(e) Any imminently hazardous chemical substance or mixture with respect to which the
administrator has taken action pursuant to section 7 of the federal toxic substances
control act (15 United States Code section 2606).
(f) Any substance which the director, by rulOj either designates as a hazardous substance
following the designation of the substance by the administrator under the authority
described In subdivisions (a) through (e) of this paragraph or designates as a
hazardous substance on the basis of a determination that such substance represents
an imminent and substantial endangerment to public health.
"Horizontal Gonstruction" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Informational Submittals'’ - Submittals are required (common with construction projects) for the
architect and engineer to verify that the correct products and quantities will be installed on a
project.
“Job Order" or “Project" means a specific scope of Contract Services done pursuant to an
individual Job Order and includes a specific written Contract between the City and Contractor for
a Job Order including a Scope of Work, a Job Order Price, a Job Order Time and ariy special
conditions that may apply to be performed under this Contract. The Job Order includes the plans,
technical specifications, special provisions and Contractor’s proposal either by reference or
inclusion.
"Job-Order-Contractjng" means a project delivery method as defined in A.R.S. §34-101, as
amended.
“Job Order Adjustment” or “Adjustment" means a written order signed by an authorized
representative of the City and which approves changes in the Work required under a Job Order,
the Job Order Price, and/or the Job Order Time consistent with the City of Scottsdale Procurement
Code, as amended.
“Job Order Notice-to-proceed," (NTP) means a written notice given by the City to Contractor fixing
the date on which Contractor will start to perform Contractor’s obligations under that individual
Job Order.
"Job Order Price” means the amount negotiated between Contractor and the City for an individual
Job Order that includes costs, overhead, bonding, insurance, profit and other costs as agreed to
and calculated on the Unit Prices, cost-coefficient and special items as prescribed in Article 4.
"Job Order Time" or "Duration of the Work" means the number of Day(s) from a Job Order Notice-
to-Proceed to Substantial Completion. The approved Job Order Time will be made part of this
Contract by executing an individual Job Order for specific Work.
“Legal Requirements” means all applicable federal, state and local laws, codes, ordinances,
rules, regulations, orders and decrees of any government or quasi-government entity having
jurisdiction over a Project or Site, the practices involved In a Project or Site, or any Work.
"Liquidated Damages" means an amount Contractor will pay in compliance with Article 3.6.
"Maintenance Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Must”, “will" and "shall” as used in this Contract are mandatory.
(Revised 5.6.2026)
19183309
Page 64 of 67
Contract No. 2026-089-COS
“Operations Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Owner Agent," “City's Agent" or "Owner Representative" see "City’s Senior Representative."
“Payment Request" means a form that is accepted by the City and used by Contractor in
requesting progress payments or final payment and which will include any supporting
documentation as is required by the Contract Documents or the City, and is based on a monthly
estimate of the dollar value of the Work completed.
"Product Data" means illustrations, standard schedules, performance charts, instructions,
brochures, diagrams and other information furnished by Contractor to illustrate materials or
equipment for some portion of the Work.
"Professional Certification" - Professional certification is a designation which indicates that a
person is qualified to perform a job or task. Professional certification can be trade certification or
professional designation.
“Project Record Documents" means the documents created pursuant to Article 1.9.
"Project Record Drawing Prints” - Set of current design drawings used by construction contractor
for reference during construction. These drawings are typically marked up during the construction
process and are used to develop the subsequent As-Built Documents.
"Project Team" - Consists of the Design Professional, the Contractor, the Contract Administrator,
the City's representatives and other stakeholders who are responsible for making decisions
regarding the Project.
“Punch List" means those minor items of Work to be completed before Final Acceptance which
do not prevent the Project from being used for the purpose for which it is intended and which will
not prevent the issuance of a Certificate of Occupancy.
“Samples" means physical examples that illustrate materials, equipment, or workmanship
representative of a part of the Work and which establish the standards by which that portion of
the Work will be judged.
“Schedule of Values (SOV)" means the Document specified in the construction phase, which
divides the Job Order Price into pay items, such that the sum of all pay items equals the Job Order
Price for the construction phase Work, or for any portion of the Work having a separate specified
Job Order Price. The SOV may or may not be output from the Progress Schedule depending on
whether the Progress Schedule is cost-loaded or not.
"Shop Drawings” means drawings, diagrams, schedules and other data specially prepared for the
Work by Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor
to illustrate some portion of the Work.
“Site” means the land or premises on which a Job Order is located, Contractor will require all
Subcontractors to include the street address of the Job Order in their contracts.
“Specifications” means those sections of the Contract Documents for the construction phase
consisting of written technical descriptions of materials, equipment, construction systems,
(Revised 5.6.2026)
19183309
Page 65 of 67
Contract No. 2026-089-COS
standards and workmanship as applied to the Work and certain applicable administrative details.
“Subcontractor" or "Subconsultant" means a person or firm having a direct contract with
Contractor or any other person or firm having a contract with Contractor at any tier, who undertake
to perform a part of the Work for which Contactor is responsible. All Subcontractors;
Subconsultants and Suppliers must be selected in accordance with the subcontractor and major
supplier selection provisions of this Contract.
“Substantial Completion" means when the Work, or when an agreed upon portion of the Work is
sufficiently complete so that the City can occupy and use the Project or a portion of it for its
intended purposes. This may Include, but is not limited to: (1) approval by the City Fire Marshall
and local authorities (Certificate of Occupancy): (2) issuance of elevator permit; (3) demonstration
to the City that all systems are in place, functional, and displayed to the City or its representative;
(4) installation of all materials and equipment; (5) City review and acceptance of all systems; (6)
City review and acceptance of draft O&M manuals and record documents; (7) City Operation and
maintenance training completed; (8) HVAC test and balance completed [provide minimum 30
days before projected substantial completion]; (9) completed landscaping and site work; and (10)
final cleaning.
“Supplier” means a manufacturer, fabricator, supplier, distributor, material man or vendor having
a direct contract with Contractor or any Subcontractor or Subconsultant to furnish materials or
equipment to be incorporated in the in the Work by Contractor or any Subcontractor or
Subconsultant.
“Work" means the entire completed Jop Order or the various separately identifiable parts of the
Job Order, required to be furnished in accordance with the Contract Documents. Work includes
and is the result of performing or furnishing labor and furnishing and incorporating materials,
resources and equipment into the Job Order, and performing or furnishing services and
documents as required by the Contract Documents.
[END OF TEXT- SIGNATURE PAGE TO FOLLOW]
(Revised 5.6.2026)
19183309
Page66 of 67
Contract No. 2026-089-COS
CITY OF SCOTTSDALE, ARIZONA
CONTRACT NO. 2026-089-COS
_______ CONTRACT
THE CITY OF SCOTTSDALE, by its Mayor and City Clerk have subscribed their names this
_____day of_____________________ 2026.
CITY OF SCOTTSDALE,
an Arizona municipal corporation
CONTRACTOR:
McCarthy Building Companies, Inc.,
a Missouri corporation
By:
Lisa Borowsky, Mayor
ATTEST:
By:_
Name:
Title:
Ben Lane, City Clerk
REVIEWED BY:
Melanie Gibson
City Contract Administrator
Jenn Myers, MPA. CPPO, NIGP-CPP, CPPB
Purchasing Director
Alison Tymkiw, Senior Director - City Engineer
George Woods
Safety & Risk Management Director
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
Lui«^. Santaella, City Attorney
By: Lydia Tulin, Assistant City Attorney
(Revised 5.6.2026)
19183309
Page 67 of 67
Contract No. 2026-089-GOS
EXHIBIT A
STATUTORY PERFORMANCE BOND
PURSUANT TO TITLE 34, CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That, __________________________ (hereinafter called the Principal) as Principal, and
________________________ , a corporation organized and existing under the laws of the State of
_______________ with its principal office in the City of______________ . (hereinafter calied
the Surety), as Surety, are held and firmly bound unto the City of Scottsdale, County of Maricopa, State of
Arizona in the amount of________________________ Dollars ($__________), for the payment
whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale, dated the
__^ day of ______________, 20__ , for Bid No. (bid number). Project No. (project number), (project
name), which contract is hereby referred to and made a part hereof as fully and to the same extent as if
copied at length herein.
NOWTHEREFORE, the condition of this obligation is such, that if the Principal faithfully performs and fulfills
all of the undertakings, covenants, terms, conditions and Contracts of the contract during the original term
of the contract and any extension of the contract, with or without notice to the surety, and during the life of
any guaranty required under the contract, and also performs and fulfills all of the undertakings, covenants,
terms, conditions and Contracts of all duly authorized modifications of the contract that may hereafter be
made, notice of which modifications to the surety being hereby waived, the above obligation is void,
Otherwise it remains in full force and effect.
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Title 34, Chapter 6,
Arizona Revised Statutes, and all, liabilities on this Bond will be determined in accordance with the
provisions of Title 34, Chapter 6, Arizona Revised Statutes, to the extent as if it were copied at length in
this Contract. The prevailing party in a suit on this bond will recover as part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court. The performance under this bond is limited to the
construction to be performed under the contract and does not include any design services, preconstruction
services, financial services, maintenance services, operations services or any other related services
included in the contract.
WITNESS our hands the
day of.
20_
PRINCIPAL
BY:
SURETY
(SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug.2024)
Page 1 of 1
Contract No. 2026-089-COS
EXHIBIT B
STATUTORY PAYMENT BOND
PURSUANT TO TITLE 34. CHAPTER 6.
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That,
_____________________ (hereinafter called the Principal), as Principal, and
___________________________ a corporation organized and existing under the laws of the
State of______■
. with its principal office in the City of________ __________
(hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Scottsdale,
County of Maricopa, State of Arizona, in the amount of________________________Dollars
($________ ____), for the payment whereof, the said Principal and Surety bind themselves,
and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale
dated the____ day of_________________ , 20__ , for Bid No. (bid number). Project No.
(project number), (project name), which contract is hereby referred to and made a part hereof as
fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of this obligation is such that if the Principal promptly pays all
monies due to all persons supplying labor or materials to the Principal or the Principal's
subcontractors in the prosecution of the work provided for in the contract, this obligation is void.
Otherwise it remains in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Title 34, Chapter
6, of the Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance
with the provisions, conditions and limitations of Title 34, Chapter 6, Arizona Revised Statutes, to
the same extent as if they were copied at length in this Contract.
The prevailing party in a suit on this bond will recover as a part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court,
WITNESS our hands the
. day of.
20__ .
PRINCIPAL
BY:
SURETY (SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug.2024)
Page 1 of 1
Contract No. 2026-089-COS
EXHIBIT C
CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
Contract Title/Number ("Contract”):.
Contractor (Legal Name): ________
E-Verify Company ID#:
-______
Date of Enrollment:____________ _
The undersigned contractor ("Contractor”) hereby represents, warrants, and certifies to the City
of Scottsdale that:
□ The Contractor has employees that will be providing services within the State of Arizona and
agrees with the following:
1. The Contractor complies with all federal immigration laws.
2. The Contractor is registered with and actively uses the federal E-Verify system to verify
employrnent eligibility of all newly hired employees in Arizona, as required by Arizona Revised
Statutes §41-4401 and § 23-214(A).
3. The Contractor does not employ unauthorized aliens for the performance of services related to
the Contract.
4. The Contractor shall retain records demonstrating E-Verify compliance and will produce such
records upon request from the City.
5. The Contractor will require all subcontractors who perform work under the Contract within the
State of Arizona to comply with these requirements.
□ The Contractor and any of its subcontractors do not have employees within the State of
Arizona or employees thatvyill be providing services for the Contract in the State of Arizona.
A breach of this warranty is considered a material breach of contract, subject to penalties up to and
including termination of the contract. The undersigned represents and warrants that he or she is duly
authorized to execute this warranty on behalf of Contractor.
Contractor (Legal Name):.
Authorized Representative Signature:,
Name:_______________________
Title:_________________________
Date:________________________
Last Updated: April 7, 2026
Page 1 of 1
SCO?
Ify
m
+
•V
i-
X
CITY OF SCOTTSDALE
JOB ORDER CONTRACT
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-090-COS
(Revised .5.6.2026)
19183313
ATTACHMENT 5
Contract No. 2026-090-COS
TABLE OF CONTENTS
RECITALS.......... .................................................................................................. ............ 1
ARTICLE 1 - CONTRACTOR’S SERVICES AND RESPONSIBILITIES..................................1
ARTICLE 2 - CITY'S SERVICES AND RESPONSIBILITIES ...... ....................17
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME......................... ................... 20
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE......
..................... ......23
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME.......
.................. ...... 24
ARTICLE 6 - PROCEDURE FOR PAYMENT.............................. ....... ...................... 30
ARTICLE 7 - CLAIMS AND DISPUTES..............................................................................33
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION...................................35
ARTICLE 9 - INSURANCE AND BONDS............................................................................ 39
ARTICLE 10 - INDEMNIFICATION .....................................................................................46
ARTICLE 11 - GENERAL PROVISIONS....... ....................................................................47
ARTICLE 12 - DEFINITIONS.......... ........................................................................ .......... 61
EXHIBIT A - STATUTORY PERFORMANCE BOND
EXHIBIT B - STATUTORY PAYMENT BOND
EXHIBIT C - CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
(Revised 5.6:2026)
I
Contract No. 2026-090-008
CITY OF SCOTTSDALE
SOLICITATION NO. 26RFSQ025
CONTRACT NO. 2026-090-COS
THIS CONTRACT, ("ConlraGl") is entered into this
day of
2026.
(“Effective Date") between the City of Scottsdaie, an Arizona municipai corporation (the “City")
and Summa Mechanical Contractors, Inc., an Arizona corporation (the ''Contractor").
RECITALS
A.
The Mayor of the City of Scottsdaie, Arizona, is authorized and empowered by the
provisions of the City Charter to execute contracts for construction and related services.
B.
The City intends to contract for construction and related services with Contractor for one
or more individual Job Orders.
C.
Contractor has represented to the City the ability to provide or procure the required
construction and related services and, based on this representation, the City engages
Contractor for these services.
FOR AND IN CONSIDERATION of the mutual covenants and considerations contained in this
Contract, it is agreed by the City and Contractor as follows:
ARTICLE 1 - CONTRACTOR'S SERVICES AND RESPONSIBILITIES
1.1. GENERAL SERVICES
A.
Contractor will furnish any and all labor, materials, equipment, transportation,
utilities, services and facilities specified in the individual Job Order for which it is
issued a Job Order Notice-to-Proceed for Work in accordance with this Contract.
The City may determine it is in its best interest to furnish materials and equipment
for an individual Job Order in accordance with the Job Order.
B.
The Work will be performed in a good, workmanlike and substantial manner and
to the satisfaction of the City Engineer and under the monitoring of the City
Engineer, or designee, with the care and skill of a qualified contractor in Scottsdale,
Arizona.
1. Minor design services may be required for some Job Orders. For those
Job Orders that may require minor design services. Contractor will seek
the services of an Arizona registered architect or engineering professional
to prepare plans for permitting. The procurement of minor design services
will be In accordance with the City's procurernent procedures and code. If
the services of a design professional are used, the design professional
must maintain at least $1,000,000 Professional Liability Coverage.
2. All documents prepared by Contractor are subject to review by the City.
Review by the City is for the benefit of the City only, is not intended to be
for the benefit of any other person and does not relieve Contractor from the
professional liability associated with the documents they have prepared.
(Revised 5.6.2026)
19183313
Page 1 of 67
Contract No. 2026-090-COS
3. Contractor’s Representative shall be reasonably available to the City and
will have the necessary expertise and experience required to supervise the
Contract Services. A Contractor's Representative will be assigned for each
Job Order. Contractor’s Representative will communicate regularly with the
City and will be vested with the authority to act on behalf of Contractor,
C. The City is a member of SAVE cooperative purchasing group. SAVE includes the
State of Arizona, Maricopa County, many Phoenix metropolitan area
municipalities, and many K-12 unified school districts. Under SAVE Cooperate
Purchasing Agreement, and with the concurrence of successful Respondents
under this solicitation, a member of SAVE may access a contract resulting from
this solicitation issued by the City. By signing the JOC Contract, Contractor agrees
to allow other SAVE members the ability to purchase their needs and "use" this
contract for JOC requirements.
1.2. GOVERNMENT APPROVALS AND PERMITS
A.
Unless othenvise provided. Contractor will obtain or assist the City in obtaining all
necessary permits, approvals and licenses required for the prosecution of the Work
from any government or quasi-government entity having jurisdiction over the
Project. Contractor is responsible for obtaining payment for the necessary
environmental permits or file the necessary environmental notices.
B.
Copies of these permits and notices must be provided to the City's Representative
before starting the permitted activity. This provision does not constitute an
assumption by the City of an obligation of any kind for violation of the permit or
notice requirements.
C.
The City is responsible for the City of Scottsdale review and permit(s) fees for
building and demolition permits. The City will pay City review fees for grading and
drainage, water, sewer, storm water management, and landscaping. The City will
also pay for City utility design fees for permanent services.
D.
Contractor is responsible for all other permits and review fees not specifically listed
in Article 1.2(C) above.
E.
Contractor is responsible for the cost of construction-related water meter(s), water
and sewer taps, fire lines and taps, and all water bills on the project meters until
Substantial Completion of the Project. Arrangements for construction water will be
Contractor's responsibility. Construction water does not include "test water”
required to complete new water line pressure tests.
F.
The M.A.G. Standard Specification 107.12 is modified to read as follows:
“Contractor, at its own expense, is responsible for the acquisition of any necessary
temporary easements for construction purposes, storage, maintenance, and
refuse haul-off as indicated upon the plans, which are required in addition to
existing easements or rights-of-way secured by the City."
(Revised 5.6.2026)
19183313
Page 2 of 67
Contract No. 2026-090-COS
1.3. PRE-CONSTRUCTION CONFERENCE
A.
After issuance of a Job Order and before the commencement of any Work on any
individual Job Order, a pre-construction conference may be scheduled.
B.
The purpose of this conference is to establish a working relationship between
Contractor, design firms, utility firms, and various City departments. The agenda
will include critical elements Of the work schedule, submittal schedule, level of
Record Drawings required, cost breakdown of major iump sum items, payment
application and processing, coordination with the utiiity firms involved, and
emergency telephone numbers for all representatives invoived in the course of
construction.
C.
At a minimum, attendees wiii inciude Contractor Representative, who is authorized
to execute and sign documents on behalf of the firm, the job superintendent, and
Contractor's safety officer.
D.
The Job Order Notice-to-PrOceed date will be established.
E.
Contractor will provide a Baseline Project Schedule indicating duration, manpower
and equipment resources required to complete all major Work activities. The City
and Design Team will review and comment on the Baseline Project Schedule.
Contractor will revise the Baseline Project Schedule to the satisfaction of the City’s
Representative. No work will begin until the City accepts the Baseline Project
Schedule.
F.
Contractor will submit a Schedule of Values based on the work and bids accepted
from selected Subcontractors. These values will reflect the actual labor time,
materials, profit and overhead for the Work or in accordance with Contractor’s price
book.
1.4. CONTROL OF THE WORK
Contractor will properly guard and protect all partially finished work and will be
responsible for the Work until the entire Job Order is completed and accepted by the
City. Any payment for completed portions of the Work will not release Contractor from
this responsibility: however, it will turn over the entire Work in full compliance with the
specifications or Job Order before final settlement is made. In case of suspension of
the Work fOr any cause whatever. Contractor is responsible for the Project and will take
all precautions necessary to prevent damage to the Project and will erect any necessary
temporary structures, signs, or other facilities at no cost to the City.
A.
After all Work under the Job Order is completed. Contractor will remove all loose
concrete, lumber, wire, reinforcing, debris and other materials not incorporated in
the Work from the site of the Project.
B.
Unless the Job Order states that it is the responsibility of the City or a separate
contractor. Contractor will provide through itself or its Subcontractors the
necessary supen/ision, labor, inspection, testing, start-up, material, equipment,
machinery, temporary utilities, other temporary facilities, temporary fencing, roll
offs, and dust control to permit Contractor to complete the Work consistent with
(Revised 5.6.2026)
19183313
Page 3 of 67
Contract No. 2026-090-COS
the Job Order.
C.
Contractor will perform all construction activities efficiently and with the requisite
expertise, skill and competence to satisfy the requirements of the Job Order.
Contractor will at all times exercise complete and exclusive control over the means,
methods, sequences and techniques of construction.
D.
Survey stakes and marks required for the completion of the construction shown on
the plans and described in the specifications will be furnished by Contractor.
E.
Contractor, its designee or Contractor's Superintendent will be present at the Work
at all times that construction activities are taking place.
1. All elements of the Work, such as concrete work, pipe work, etc., will be
under the direct supervision of a foreman or his/her designated
representative on the Site who will have the authority to take actions
required to properly carry out that particular element of the Work,
2. In the event of noncompliance with Article 5.1, the City may require
Contractor to stop or suspend the Work in whole or in part.
F.
Where the Job Order requires that a particular product be installed or applied by an
applicator approved by the manufacturer, it is Contractor’s responsibility to ensure
the Subcontractor employed for that portion of the Work is pre-approved by the
manufacturer.
G.
Before ordering materials for or doing the Work, Contractor and each
Subcontractor will verify measurements at the Site and will be responsible for the
correctness of these measurements. No extra charge or compensation will be
allowed because of differences between actual dimensions and the dimensions
indicated on the drawings; differences, which may be found, will be submitted to
the City for resolution before proceeding with the Work.
H.
Contractor will take field measurements and verify field conditions and carefully
compare these field measurements, conditions and other information known to
Contractor with the Job Order before starting activities. Errors, inconsistencies or
omissions discovered will be immediately reported to the City.
I.
Contractor will establish and maintain all building and construction grades, lines,
levels, and benchmarks, and will be responsible for the accuracy and protection of
these items. This portion of the Work will be performed or supervised by an Arizona
licensed civil engineer or surveyor.
J.
Any person employed by Contractor or any Subcontractor who, in the opinion of the
City, does not perform his/her portion of the Work in a proper, skillful and safe
manner or is intemperate or disorderly will, at the written request of the City, be
removed from the Work by Contractor or Subcontractor employing this person, and
will not be employed again in any portion of the Work without the written approval of
the City. Contractor or Subcontractor will hold the City harmless from damages or
claims, which may occur in the enforcement of this Article.
(Revised 5.6.2026)
19183313
Page 4 of 67
Contract No. 2026-090-COS
K.
Contractor assumes responsibility for the proper performance of the Work of
Subcontractors and any acts and omissions in connection with this performance.
Nothing in the Contract Documents is intended or considered to create any legal
or contractual relationship between the City and any Subcontractor or Sub-
Subcontractor, including but not limited to any third-party beneficiary rights.
L.
Contractor will coordinate the activities of all Subcontractors. If the City performs
other work on the Project or at the Site with separate contractors under the City’s
control, Contractor agrees to reasonably cooperate and coordinate its activities
with those of the separate contractors so that the Project can be completed in an
orderly and coordinated manner without unreasonable disruption.
M.
On a daily basis. Contractor will prepare a Contractor's Daily Report. The City’s
CPM Project Inspector or the Public Works Project Coordinator will provide a
sample report format to Contactor. The report will detail the activities that took
place during the course of the day, all equipment utilized and the number of hours
operated, and all personnel on the Site including Subcontractors. Unless
otherwise arranged, the Daily Reports will be submitted on a daily basis to the
City’s CPM Inspector or the Public Work’s Project Coordinator. The Daily Reports
will also be made available to the City’s Representative upon request. Failure to
provide Daily Reports as arranged or requested above will result in the retention
of monthly progress payments until the Reports are brought up to date.
N.
In the event of noncompliance with this Article 1.4, the City may require Contractor
to stop or suspend the construction in whole or in part. Any suspension due to
Contractor’s noncompliance will not be considered a basis for an increase in the
Job Order Price or extension of the Job Order Time.
1.5. CONTROL OF THE WORK SITE
A.
Throughout all phases of construction, including any suspension of the Work,
Contractor will keep the Site reasonably free from debris, trash and construction
wastes to permit Contractor to perform its construction services efficiently, safely
and without interfering with the use of adjacent land areas. Upon Substantial
Completion of the Work, or a portion of the Work, Contractor will remove all debris,
trash, construction waste, materials, equipment, machinery and tools arising from
the Work or applicable portions of it to permit the City to occupy the Project or a
portion of the Project for its intended use.
B.
Dust Control. Contractor will take whatever steps, procedures or means required
to prevent abnormal dust conditions due to his construction operations in
connection with this Contract. The dust control measures will be maintained at all
times during construction of the Project(s) to the satisfaction of the City in
accordance with the requirements of the Maricopa County Health Department Air
Pollution Control Regulations and City of Scottsdale Supplement to M.A.G.
Standard Specifications together with applicable provisions of Federal and State
Law.
C.
Dust Control Coordinator. Subject to the requirements or exemptions contained
A.R.S. §49-474.05, as amended. Contractor shall comply with the training,
permitting, and Dust Control Coordinator requirements applicable to the Site and
(Revised 5.6.2026)
19183313
Page 5 of 67
Contract No, 2026-090-COS
the Project. The Dust Control Coordinator must have full authority to ensure that
dust control measures are implemented at the Site, including authority to conduct
inspections, deploy dust suppression resources, and modify or shutdown activities
as needed to control dust. The Dust Control Coordinator must be responsible for
managing dust prevention and dust control on the Site, including the use of leaf
blowers and street sweeping equipment. The Dust Control Coordinator must have
a valid Dust Training Certification Identification Card readily accessible on the Site
while acting as the Dust Control Coordinator.
A Subcontractor who is engaged in dust generating operations at a Site that is
subject to a Dust Control Permit issued by a County Control Officer and that
requires the control of PM-10 emissions from dust generating operations must
register with the County Control Officer. The Subcontractor must have its
registration number readily accessible on the Site while conducting any dust
generating operations.
D.
Storage on Site. Only materials and equipment, which are to be used directly in
the Work, will be brought to and stored on the Site by Contractor. When equipment
is no longer required for the Work, it will be removed promptly from the Site.
Protection of construction materials and equipment stored at the Site from weather,
theft, damage and all other adversity is solely the responsibility of Contractor.
E.
Waste Products. Contractor is responsible for the cost to dispose of all waste
products including excess earth material which will not be incorporated into the
Work under this Contract. The waste product referred to will become the property
of Contractor. Contractor will provide for the legal disposal at an appropriate off
site location for all waste products, debris, etc., and will make necessary
arrangements for its disposal. Any disposal/dumping of waste products or unused
materials will conform to applicable Federal, State and Local Regulations.
F.
Contractor will supervise and direct the Work. Contractor will be solely responsible
for the means, methods, techniques, sequences and procedures of construction,
Contractor will employ and maintain on the Site a qualified supervisor or
superintendent who will have been designated in writing by Contractor as
Contractor's Representative. The Contractor’s Representative will have full
authority to act on behalf of Contractor and all communications given to the
Representative wi|l be as binding as if given to Contractor. The Representative
will be present on the Site at all times as required to perform adequate supervision
and coordination of the Work. Where appropriate all Provisions of M.A.G,, Section
105.5, will be applicable.
G.
Abnormal Weather. In the event of abnormal weather conditions, such as
windstorms, rainstorms, etc.. Contractor will immediately inspect the Work and Site
and take all necessary actions to insure public access and safety are maintained.
H.
Damage to Property at the Site. Contractor will be responsible for any and all
damage or loss to property at the Site, except to the extent caused by the acts or
omissions of the City or its representatives, employees or agents and not covered
by insurance. The costs and expenses incurred by Contractor under this Article
will be paid as a Cost of the Work to the extent that these costs and expenses are
in excess of or are not covered by required insurance, and to the extent of any
(Revised 5.6.2026)
19183313
Pages of67
Contract No. 2026-090-COS
deductibles, but they will not increase the Job Order Price.
I.
Damage to Property of Others. Contractor will avoid damage, as a result of
Contractor's operations, to existing sidewalks, curbs, streets, alleys, pavements,
utilities, adjacent property, the work of separate contractors and the property of the
City. Contractor will repair any damage caused by the operations of Contractor,
and these costs will be paid as a Cost of the Work to the extent that the costs and
expenses are in excess of or are not covered by required insurance, and to the
extent of any deductible, but they will not increase the Job Order Price.
J.
Failure of Contractor to Repair Damage. Within ten (10) days written notice to
Contractor by the City, if Contractor fails to commence the repair of damage to
property as provided in Articles 1.5(H) and 1.5(1), and diligently pursue the repair,
then the City may elect to repair the damages at its own expense and to deduct
from payments due or to become due to Contractor, amounts paid or incurred by
the City in correcting the damage (provided Contractor has not commenced such
repair during the 10 day notice period).
1.6. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A.
Shop Drawings, Product Data, Samples and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of
the Work for which submittals are required the way Contractor proposes to
conform to the information given and the design concept expressed in the Contract
Documents. Contractor will review, approve and verify that all submittals meet the
intent of the Contract Documents.
B.
Three (3) copies of each Shop Drawing, Product Data, Sample, and similar
submittals required by the Contract Documents will be delivered to the City in
compliance with the approved schedule so as to cause no delay in the Work or in
the activities of the City or of separate contractors. Submittals made by Contractor,
which are not required by the Contract Documents, may be returned without
action.
C.
Contractor will perform no portion of the Work requiring submittal and review of
Shop Drawings, Product Data, Samples, or similar submittals until the respective
submittal has been approved by the City. All Work will be in compliance with
approved submittals. Contractor will not be relieved of responsibility for any errors
or omissions in Shop Drawings, Product Data, Samples, or similar submittals by
the City's approval. Deviation from the original specifications will be specifically
noted on the submittal to the City and the City will be allowed seven (7) days to
approve or reject any deviations.
D.
By approving, verifying and submitting Shop Drawings, Product Data, Samples
and similar submittals. Contractor represents that Contractor has determined and
verified materials, field measurements and field construction criteria, or will do so,
and has checked and coordinated the information contained within the submittals
with the requirements of the Work and of the Job Order.
E.
Contractor will not be relieved of responsibility for deviations from requirements of
the Job Order by the City's approval of Shop Drawings, Product Data, Samples or
(Revised 5.6.2026)
19183313
Page 7 of 67
Contract No. 2026-090-COS
similar submittals unless Contractor has specifically informed the City in writing of
the deviation at the time of submittal and the City has given written approval to the
specific deviation. Contractor will not be relieved of responsibility for errors or
omissions in Shop Drawings, Product Data, Samples, or similar submittals by the
City’s approval.
F.
Contractor will direct specific attention, in writing or on resubmitted Shop Drawings,
Product Data, Samples, or similar submittals, to revisions other than those
requested by the City on previous submittals.
G.
Informational submittals upon which the City is not expected to take responsive
action may be so identified in the Contract Documents.
H.
When professional certification of performance criteria of materials, systems or
equipment is required by the Job Order, the City will be entitled to rely upon the
accuracy and completeness of the calculations and certifications.
1.7. QUALITY CONTROL, TESTING AND INSPECTION
A. Inspection. The City's Inspectors may be stationed on the Site to report to the
City’s Representative, or designee, as to the progress of the Work. The City’s
Representative, or designee, may also report as to the manner in which the Work
is being performed and report whenever it appears that material furnished or Work
performed by Contractor fails to fulfill the requirements of the specifications, this
Contract or the Job Order. The Inspector may direct the attention of Contractor to
any failure or infringement but this inspection will not relieve Contractor from any
obligation to furnish acceptable materials or to provide completed construction that
complies with the Contract or the Job Order in every way. The Inspector is for the
purpose of assisting the City's Representative and should not be confused with an
Inspector with a City regulatory agency or with an inspector from a laboratory under
Article 1.8.
B.
In case of any dispute arising between the Inspector and Contractor as to material
furnished or the manner of performing the Work, the Inspector will have the
authority to reject materials or suspend the Work until the question and issue can
be referred to and decided by the City. Inspectors are not authorized to revoke,
alter, enlarge, relax, or release any requirements of the specifications. Inspectors
will in no case act as foremen or perform other duties for Contractor or interfere
with the management of the Work by Contractor.
C.
Inspection or supen/ision by the City’s Representative, or designee, will not be
considered as direct control of an individual worker or the Work. The direct control
will be solely the responsibility of Contractor.
D.
The furnishing of these services for the City will not make the City responsible for
or give the City control over construction means, methods, techniques, sequenced
procedures or for safety precautions or programs or responsibility for Contractor’s
failure to perform the Work in compliance with the Contract Documents.
(Revised 5.6.2026)
19183313
Page 8 of 67
Contract No. 2026-090-COS
1.8. MATERIALS TESTING
All materials used in the Work will be new and unused, unless otherwise noted, and will
meet all quality requirements of the Job Order.
A.
All construction materials to be used on the Work or incorporated into the Work,
equipment, plant, tools, appliances or methods to be used in the Work may be
subject to the inspection and approval or rejection of the City. Any materials
rejected by the City will be removed immediately and replaced in a manner
acceptable to the City without increasing the Job Order Price,
B.
The procedures and methods used to sample and test material will be determined
by the City. Unless otherwise specified, samples and tests will be made in
compliance with the following: The City of Scottsdale Minimum Sampling
Frequency Guide, the City of Scottsdale Material Testing Manual and the standard
methods of AASHTO or ASTM, DSPM and MAG supplements.
C.
The City will select a pre-qualified City or Independent Testing Laboratory and will
pay for initial City Acceptance Testing.
1. When the first and subsequent tests indicate noncompliance with the Job
Order, the cost associated with that noncompliance will be incurred by
Contractor without increasing the Job Order Price.
2. When the first and subsequent tests indicate noncompliance with the Job
Order, all retesting will be performed by the same testing agency. The cost
associated with the noncompliance will be incurred by Contractor without
increasing the Job Order Price.
3. Contractor will cooperate with the selected testing laboratory and all others
responsible for the testing and inspecting of the Work and will provide them
access to the Work at all times.
D.
At the option of the City, materials may be approved at the source of supply before
delivery is started.
E.
Code compliance testing and inspections required by codes or ordinances, or by
a plan approval authority, and which are made by a legally constituted authority,
will be incurred by Contractor without increasing the Job Order Price, unless
otherwise provided in the Job Order.
F.
Contractor's convenience and quality control testing and inspections will be the
sole responsibility of Contractor and incurred by Contractor without increasing the
Job Order Price.
G.
All soils and materials testing will be performed and paid for by the City. The City
will order tests and distribute test results for all construction areas. The City will
be responsible for ordering testing and will distribute test results within 24 hours of
receipt.
(Revised 5.6.2026}
19183313
Page 9 of 67
Contract No. 2026-090-COS
1.9. PROJECT RECORD DOCUMENT/AS BUILTS
A.
During the construction period, Contractor will maintain at the Site a set of Blueline
or Blackline Prints of the Construction Document drawings and Shop Drawings for
Project Record Document purposes.
1. Contractor will mark these drawings to indicate the actual installation where
the installation varies appreciably from the original Construction
Documents. Contractor will give particular attention to information on
concealed elements, which would be difficult to identify or measure and
record later. Items required to be marked include but are not limited to;
Dimensional changes to the drawings;
Revisions to details shown on drawings;
Depths of foundations below first floor;
Locations and depths of underground utilities;
Revisions to routing of piping and Conduits;
Revisions to electrical Circuitry;
Actual equipment locations;
Duct size and routing;
Locations of concealed internal utilities;
Changes made by Adjustment; and
Details not on original Contract Drawings.
2. Contractor will mark completely and accurately Project Record Documents,
prints of Construction Documents or Shop Drawings; whichever is the most
capable of indicating the actual physical condition. Where Shop Drawings
are marked, show cross-reference on the Construction Documents
location.
3. Contractor will mark sets of Project Record Drawings Prints with red
erasable colored pencil.
4. Contractor will note Request for Information (RFI) Numbers, American
Standards Institute (ASI) Numbers and Adjustment Numbers, etc., as
required to identify the source of the change to the Construction
Documents.
5. Contractor will at the time of Substantial Completion, submit Project Record
Drawing Prints and Shop Drawings to the City or its representative for
review and comment.
B.
Immediately upon receipt of the reviewed Project Record Drawings from the City,
Contractor will correct any deficiencies or omissions to the drawings and prepare
the following for submission to the City:
1. A complete set of PDF electronic files of all Project Record Drawing
prepared in Microstation format compatible with City of Scottsdale CADD
requirements. If a Design Professional is contracted with, the Design
Professional will provide files of the original Construction Documents to
(Revised 5.6.2026)
19183313
Page 10 of 67
Contract No. 2026-090-COS
j
Contractor for use in preparing these final Project Record Documents, or
Contractor may contract with the Design Professional to revise and update
the electronic drawing files. Each drawing will be clearly marked with “As-
Built Document” and shall be certified by an Arizona Registered Land
Surveyor.
2. A complete set of As-Built reproducible mylars from the final Microstation
drawings and an electronic pdf file on CD are required.
3. The original copy of the Project Record Drawings with redline mark-ups.
1.10. PROJECT SAFETY
A.
The Occupational Safety and Health Act (OSHA) and the City of Scottsdale loss
control procedures are the minimum standard for safety and environmental
protection and must be fully complied with at all times. Al( Work will be performed
in compliance with all applicable federal, state and local laws, ordinances, statutes,
rules and regulations including ADOSH policies and procedures. Contractor may
be required to attend a City safety briefing session at the pre-construction meeting.
The session will be attended by the Contract Administrator, the designated Risk
Management staff, and a Contractor’s Representative. Contractors that violate the
aforementioned rules and regulations may be subject to job shutdown and or
removal from City facilities.
B.
The Risk Management Division makes available a packet which contains the City’s
OSHA compliance guidelines, emergency evacuation, the City’s safety and health
plan, and other safety information.
C.
Contractor will conduct tailgate safety meetings regularly to ensure that safety on
the job is given priority.
D.
Contractor will contact the City’s Representative and the Risk Management
Division within twenty-four (24) hours of the occurrence of an accident or injury
arising out of Contractor’s Work under this Contract.
E.
Contractor employees are encouraged to abate or remedy any unsafe act or
condition, which may arise in the course of Contractor’s Work under this Contract.
F.
The City reserves the right to conduct safety audits at the Site and stop unsafe
acts at any time. In addition, the City will be notified within four (4) hours should
any OSHA inspection occur at a Site.
G.
Contractor recognizes the importance of performing the Work in a safe manner so
as to prevent damage, injury or loss to:
1. All individuals at the Site, whether working or visiting;
2. The Work, including materials and equipment incorporated into the Work
or stored on-Site or off-Site; and
3. All other property at the Site or adjacent to the Site.
(Revised 5.6.2026)
19183313
Page 11 of 67
Contract No. 2026-090-COS
H.
Contractor assumes responsibility for implementing and monitoring all safety
precautions and programs related to the performance of the Work.
I.
Contractor will, before commencing construction, designate a Safety
Representative with the necessary qualifications and experience to supervise the
implementation and monitoring of ail safety precautions and programs related to
the Work. Unless otherwise required by the Contract Documents, Contractor’s
Safety Representative will be an individual stationed at the Site who may have
responsibilities on the Project in addition to safety.
J.
Contractor must provide OSHA 300A Summary log information including total
recordable cases, total case rates, and lost workday incident rates for the past two
(2) calendar years. The Safety Representative shall make routine daily
inspections of the Site and shall hold weekly safety meetings with Contractor’s
personnel, Subcontractors and others as applicable.
K.
Contractor will immediately report in writing any safety-related injury, loss, damage
or accident arising from the Work to City’s Representative and, to the extent
mandated by Legal Requirements, to all government or quasi-governmental
authorities having jurisdiction over safety-related matters involving the Project or
the Work.
L.
Contractor’s responsibility for safety under this Article 1.10 is not intended in any
way to relieve Subcontractors and Sub-Subcontractors of their own contractual
and legal obligations and responsibility for:
1. Complying with all Legal Requirements, including those related to health
and safety matters; and
2. Taking all necessary measures to implement and monitor all safety
precautions and programs to guard against injury, losses, damages or
accidents resulting from their performance of the Work.
M. Contractor and Subcontractors must agree to provide Material Safety Data Sheets
for all substances that are delivered to the City of Scottsdale, that come under the
Occupational Safety and Health Administration Toxic and Hazardous Substances
- Hazard Communication Standard, 29 CFR 1910.1200 Hazard Communication
(reference Occupational Safety and Health Standards, Subpart Z Toxic and
Hazardous Substances - Hazardous Communication Standard).
All Contractors and all Subcontractors using chemicals on City of Scottsdale
property shall use only the safest chemicals, with the least harmful ingredients.
These chemicals shall be approved for use by a City of Scottsdale representative
before bringing them on the property.
Contractor and all Subcontractors shall make every attempt to apply approved
chemicals with highly volatile organic compounds, outside of working hours.
Adequate ventilation will be used at all times during the application of these
approved chemicals.
(Revised 5.6.2026)
19183313
Page 12 of 67
Contract No. 2026-090-COS
In conjunction with the Occupational Safety and Health Standards, Subpart Z Toxic
and Hazardous Substances - Hazard Communication Standard, 29 CFR
1910.1200 Hazard Communication, Contractor and Subcontractors are informed
of the presence of (or possible presence of) chemicals in the area where the Work
requested will be performed. It is the responsibility of Contractor or all selected
Subcontractors to contact the City of Scottsdale for specific information relative to
the type of chemicals present and location of appropriate Material Safety Data
Sheets.
Unless included in the Work, if Contractor encounters onsite material which he
reasonably believes to contain asbestos, polychlorinated biphenyl (PCS), or other
hazardous substances or materials regulated by Public Health Laws, it will
immediately stop Work and report the condition to the City.
If the material is found to contain asbestos, PCB or other hazardous substances
or materials regulated by Public Health Laws, Contractor will not resume Work in
the affected area until the material has been abated or rendered harmless.
Contractor and the City may agree, in writing, to continue Work in non-affected
areas onsite. An extension of the Contract Time may be granted as provided in
Article 5.
1.11. WARRANTY
A.
Contractor warrants that any material or service supplied to the City shall fully
conform to all requirements of this Contract and all representations of the
Contractor, and shall be fit for all purposes and uses required by this Contract. The
materials and services supplied under this Contract shall comply with all applicable
federal, state and local laws, and the Contractor shall maintain all applicable
licenses and permits.
B.
The provisions of M.A.G., Section 108.8 will apply with the following additional
requirements:
1. Should Contractor fail to begin repairs or corrective work within fourteen
(14) calendar days after receipt of written notice from the City, the City may
perform the necessary work and Contractor agrees to reimburse the City
for the actual cost.
2. The warranty period on any part of the Work repaired or replaced will be
extended for a period of one (1) year from the date of the repair or
replacement.
3. This warranty will not apply to damage caused by normal wear and tear or
by acts beyond Contractor’s control.
C.
Contractor’s warranty obligation excludes defects caused by abuse, alterations, or
failure to maintain the Work by persons other than Contractor or anyone for whose
acts Contractor may be liable.
D.
Contractor's warranty obligation will be for one (1) year.
(Revised 5.6.2026)
19183313
Page 13 of 67
Contract No. 2026-090-COS
E. Nothing in this warranty is intended to limit any manufacturer’s warranty which
provides the City with greater warranty rights than those found in this Article 1.11
or the Contract Documents. Contractor will provide the City with all manufacturers’
warranties upon Substantial Completion of each Job Order.
1.12. CORRECTION OF DEFECTIVE WORK
A. Contractor agrees to correct any Work that Is found to not be in conformance with
the Contract Documents, including that part of the Work subject to Article 1.11
above, within a period of one (1) year from the date of Substantial Completion of
the Work or any portion of the Work, or within any longer period to the extent
required by the Contract Documents. All removal/replacement work, as directed
by the City to Contractor, in compliance with this Contract, MAG standards and
City codes will have cost determinations by the City and be issued as a Job Order
Adjustment to the Project. A Progress Payment, or partial or entire use or
occupancy of the Project by the City will not constitute acceptance of Work not in
accordance with the Contract Documents,
During the Work, Contractor shall take meaningful steps to begin correction of any
nonconforming Work as notified by the City. This includes the correction, removal
or replacement of the nonconforming Work and any damage caused to other parts
of the Work affected by the nonconforming Work. If Contractor fails to begin the
necessary steps during the Work, the City, in addition to any other remedies
provided under the Contract Documents, may provide Contractor with written
notice that the City will commence correction of any nonconforming Work, at its
discretion, through its employees, agents or other third parties.
Contractor shall take meaningful steps to begin correction of nonconforming Work
subject to Article 1.11 above. These measures include but are not limited to timely
correction of the Work. If Contractor fails to initiate necessary measures for this
Work within seven (7) days of receipt of written notice from the City, the City, in
addition to any other remedies provided under the Contract Documents, may
provide Contractor with written notice that the City will begin correction of the
nonconforming Work, at its discretion, through its employees, agents or other third
parties.
B.
If the City does perform this corrective Work, Contractor will be responsible for all
reasonable costs incurred by the City in performing the correction without
increasing the Job Order Price.
C.
Contractor shall immediately respond to any nonconforming Work that creates an
emergency.
D.
The one (1) year period referenced in Article 1.11 above applies only to
Contractor’s obligation to correct nonconforming Work and is not intended to
constitute a period of limitations for any other rights or remedies the City may have
regarding Contractor’s other obligations under the Contract Documents.
(Revised 5.6:2026)
19183313
Page 14 of 67
Contract No. 2026-090-COS
1.13. SUBCONTRACTOR AND MAJOR SUPPLIER SELECTIONS
A.
Contractor shall select major Subcontractors and major Suppliers, subject to first
obtaining the City's approval. Major Subcontractors may be selected based on
qualifications or a combination of qualifications and price. Subcontractors must
not be selected based on price alone. Except as noted below, the selection of
major Subcontractors/Suppliers is the responsibility of Contractor, but the City
must approve in writing the selection of all Subcontractors. In any case. Contractor
is solely responsible for the performance of the selected Subcontractors/Suppliers.
Contractor shall prepare a Subeontractor/Supplier selection plan and submit the
plan to the City for approval or Contractor may use the City's plan as described in
Article 1.13(B), This Subcontractor selection plan will Identify those Subcontractor
trades anticipated to be selected by qualifications only as provided in Article
1.13(B) and those Subcontractor trades anticipated to be selected by qualifications
and competitive bid as provided in Article 1.13(C). This plan will also identify those
Subcontractors that will not be selected through a formalized qualifications-based
selection process. The Subcontractor selection plan must be consistent with the
selection requirements included in this Contract.
B.
Selection by qualifications only - The City may approve the selection of a
Subcontractpr(s) or Supplier(s) based only on their qualifications when Contractor
can demonstrate it is in the best interest of the Project.
1. Contractor will apply the Subcontractor selection plan approved by the City
in the evaluation of the qualifications of a Subcontractor(s) or Supplier(s)
and provide the City with its review and recommendation. The selection
plan will be Contractor’s own selection plan approved by the City or the
City's selection plan as provided in this Article 1.13(B).
2. Contractor will negotiate costs for sen/ices/supplies from the
Subcontractor(s)/Supplier(s) under the approved qualifications only
method.
City Selection Plan:
3. Contractor may elect to comply with the following City procedures in its
selection of Subcontractor(s) or Suppliers(s) based on qualifications only:
a. The Request for Qualifications (RFQ) will contain the best
description of the services or material desired; and
b. A statement that only unpriced statements of qualifications will be
considered; and
c. State the requirements for the project, such as drawings and
descriptive literature; and
d. State the criteria for evaluating the qualifications; and
e. A closing date and time for receipt of a statement of qualifications
(Revised 5.6.2026)
19183313
Page 15 of 67
Contract No. 2026-090-COS
and the location where the statements should be delivered or
mailed; and
f.
A statement that discussions may be held; and
g. A statement that only statements of qualifications determined to be
acceptable will be considered for award.
4. The RFQ may be amended after the submission of the statements of
qualifications. Any amendment will be distributed only to bidders who
submitted statements of qualifications. Those bidders will be permitted to
submit new unpriced statements of qualifications or to amend statements
already submitted.
5. Statements of Qualifications will not be opened publicly but will be opened
in the presence of Contractor. The contents of unpriced statements of
qualifications will not be disclosed to unauthorized persons.
6. Statements of Qualifications will be evaluated solely in accordance with the
criteria stated in the RFQ and will be determined to be either acceptable
for further consideration or unacceptable. A determination that the
statement is unacceptable shall be in writing, state the basis of the
determination and be retained by Contractor. Contractor will notify the
bidder of the determination and the bidder will not be given an opportunity
to amend its statement of qualifications further.
7. Contractor may conduct discussions with any bidder who submits an
acceptable or potentially acceptable statement of qualifications. During
discussions, Contractor will not disclose any information derived from any
other bidder’s statement of qualifications.
8. Contractor will negotiate costs for services/supplies from the
Subcontraclor{s)/Supplier(s) selected under this method.
C. Selection by qualifications and competitive bid - Contractor will apply the
City’s Subcontractor selection plan stated above or Contractor’s selection plan, if
previously approved by the City, in Contractor's evaluation of the qualifications of
Subcontractor(s)/Supplier(s) and will provide the City with the selected process to
prequalify prospective Subcontractors/Suppliers. Selection may not be based on
price alone. All Work by major Subcontractors and major Suppliers will then be
competitively bid to the prequaiified Subcontractors unless a Subcontractor or
Supplier was selected in accordance with Articie 1.13(B) above. Contractor may
elect to comply with the following procedures in step 2 of its competitive bid
process.
1. Contractor will develop Subcontractor and Supplier interest, submit the
names of a minimum of three (3) qualified Subcontractors or Suppliers for
each trade in the Project and solicit bids for the various Work categories. If
there are not three (3) qualified Subcontractors/Suppliers available for a
specific trade or there are extenuating circumstanceSi Contractor may
request approval by the City to submit less than three (3) names. Without
(Revised 5.6.2026)
19183313
Page 16 of 67
Contract No. 2026-090-COS
first giving written notice to the City, no change in the recommended
Subcontractors/Suppliers will be allowed.
2. If the City objects to any nominated Subcontractor/Supplier or to any self-
performed Work for good reason, Contractor will nominate a substitute
Subcontractor/Supplier that is acceptable to the City.
3. Contractor will distribute Drawings and Specifications, and when
appropriate, conduct a pre-bid conference with prospective Subcontractors
and Suppliers. Contractor will then review the price bids submitted by
Subcontractors and Suppliers and make its selection based on the
responsive and responsible bidder with the lowest price.
4. If Contractor desires to self-perform certain portions of the Work, it must
request to be one of the approved Subcontractor bidders for those specific
bid packages. Contractor’s bid will be evaluated in accordance with the
process Identified in the Invitation for Bids. If events warrant and the City
concurs that in order to insure compliance with the Project Schedule or
cost, Contractor may self-perform Work without bidding or re-bidding the
Work.
D.
If after receipt of sub-bids or after award of Subcontractors and Suppliers, the City
objects to any nominated Subcontractor/Supplier or to any self-performed Work
for good reason. Contractor will nominate a substitute Subcontractor or Supplier,
preferably if this option is still available, from those who submitted Subcontractor
bids for the Work affected. Once the substitute Subcontractors and Suppliers are
consented to by the City, Contractor’s proposed price for the Work or portion of the
Work will be correspondingly adjusted to reflect any higher or lower costs from any
substitution. Under no circumstances will the City’s objection or comment on any
Subcontractor or Supplier relieve Contractor of its sole responsibility for control
over the methods, means and processes by which the Work is accomplished. The
City must approve in writing the selected Subcontractor Selection Plan before work
commences on any Job Order:
E.
Contractor shall incorporate by reference the terms and conditions of this Contract,
in any subcontract or supplier contract hereunder.
ARTICLE 2 - CITY'S SERVICES AND RESPONSIBILITIES
2.1 INFORMATION AND SERVICES
The City will furnish Contractor, at no cost to Contractor, the following information or
services for this Project:
1. One copy of data pertinent to the Work. However, Contractor will be
responsible for searching the records and requesting information required
for the Project.
2. All available data and information relative to policies, standards, criteria,
studies, etc.
(Revised 5.6.2026)
19183313
Page 17 of 67
Contract No. 2026-090-COS
3. Project funding and budget allocations and any changes affecting the
funding or budget allocations.
4. For purpose of determining the Job Order Price, any Plans and
Specifications.
5. For purpose of Project Record Drawing Prints, a CADD file of the
Construction Documents in Microstation format compatible with City of
Scottsdale CADD requirements.
2.2
CITY'S REPRESENTATIVE
The City’s Representative will be responsible for providing City-supplied Information and
approvals in a timely manner to permit Contractor to fulfill its obligations under the Contract
Documents.
2.3
DESIGN PROFESSIONAL SERVICES
A.
The City may contract separately with one or more Design Professionals to provide
architectural or engineering design of the Project in accordance with the provisions
of A.R.S. §34-603.
B.
The City may contract with the Design Professional to provide some or ali of the
following services during the performance of the Work:
1. The Design Professional may provide administration of the Work. The City
and Contractor will endeavor to communicate through the Design
Professional. Communications by and with the Design Professional's
consultants will be through the Design Professional.
2. The Design Professional may visit the Site at intervals appropriate to the
stage of construction to become generally familiar with the progress and
quality of the completed Work and to determine in general if the Work is
being performed in accordance with the Contract Documents. The Design
Professional will keep the City informed of progress of the Work and will
endeavor to guard the City against defects and deficiencies in the Work.
3. Upon Contractor’s subrriittals, the Design Professional may review and
approve or take other appropriate action on submittals as Shop Drawings,
Product Data and Samples in accordance with Article 1.6.
4. All drawings produced for projects considered to be performed under
Contractor are the property of the City and are owned in whole by the City
for any and all future use and considerations.
2.4 CITY’S SEPARATE CONTRACTORS
The City is responsible for all Work performed on the Project or at the Site by separate
contractors under the City’s control. The City will contractually require its separate
contractors to cooperate with and coordinate their activities so as not to interfere With
Contractor in order to enable Contractor to timely complete the Work consistent with the
(Revised 5.6.2026)
19183313
Page 18 of 67
ConUact No. 2026-090-GOS
Contract Documents. Contractor agrees to reasonably cooperate and coordinate its
activities with those of the separate contractors so that the Project can be completed in
an orderly and coordinated manner without unreasonable disruption.
2.5 FURNISHING OF SERVICES AND INFORMATION
A. The City will be responsible for the payment or waiver of the following:
1. City review and permit(s) fees for building, encroachment, and demolition
permits including City, State and County.
2. City review fees for grading and drainage, water, sewer and landscaping.
3. Utility design fees or permanent services fees are paid by the City, but all
submittals are the responsibility of Contractor.
4. Obtaining Nationwide 404 Permits.
5. City Development Fees.
B; Unless expressly stated to the contrary in the Contract Documents, the City will
provide, at its own cost and expense, for Contractor’s information the following:
1. To the extent available, surveys describing the property, boundaries,
topography and reference points for use during construction, including
existing service and utility lines;
2. Temporary and permanent easements, zoning and other requirements and
encumbrances affecting land use, necessary to permit the proper design
and construction of the Project and enable Contractor to perform the Work;
3. A legal description and street or physical address of the Site;
4. To the extent available, as-built record or historical drawings of any existing
structures at the Site;
5. To the extent available, environmental studies, reports and irnpact
statements describing the environmental conditions, including hazardous
materials, in existence at the Site; and
6. To the extent available, Geotechnical studies describing subsurface
conditions and other sun/eys describing other latent or concealed physical
conditions at the Site.
7. The City will provide all City standards and guidelines, supplementary
conditions and special provisions that will be included in the plans and
specifications for the Project. These may include but are not limited to:
disposal of surplus material, special security provisions, investigation of
underground facilities, traffic controls and regulations, special quality
control testing and termite treatment requirements.
(Revised 5.6.2026)
19183313
Page 19 of 67
Contract No. 2026-090-COS
2.6 PROJECT MANAGEMENT SERVICES
A.
The City may contract separately with one or more Technical Consultants to
provide project management assistance for the Project. The Technical
Consultant’s contract as well as contracts with other firms hired by the City will be
furnished to Contractor. Contractor will not have any right, however, to limit or
restrict any Project modifications that are mutually acceptable to the City and
Technical Consultant.
B.
The Technical Consultant sen/ices will augment the City staffirig resources to
effectively manage the objectives of the City and the Project with the goal of
managing the key Project communication, cost and time parameters.
C.
The Technical Consultant may provide pre-programming and design standards.
D.
The City may contract with the Technical Consultant to provide any or ail of the
services or functions of the City’s project manager during the performance of the
construction.
2.7
PERMIT REVIEW AND INSPECTIONS
For clarification, permitting activities are handled by the City of Scottsdale
Developmental Services, Fire and Planning Departments. Obtaining any permits and
submittals are the responsibility of the City.
2.8
UTILITY COMPANY COORDINATION
Contractor will be responsible for coordinating utility design work for permanent service
to the Project and will ensure that the work takes place in a timely manner and does not
impact the Project schedule. Any utility design fees for permanent services to a Job
Order will be paid by the City jn accordance with Article 2.6.
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME
3.1 CONTRACT TIME
A.
The initial term of this Contract will be for two (2) years and will commence on the
Effective Date, with the option to extend for three (3) additional years in one (1)
year increments.
1. The option to extend may be exercised based on Contractor’s successful
performance and the needs of the City.
2. A contract modification will be processed for each extension and will
commence on or about the anniversary date of the Contract. Each extension
must be authorized by the Contract Administrator and Purchasing Director for
the City and need not return to the City’s Council for approval.
B.
The Contract will remain in full force and effect during the performance of any Job
Order.
(Revised 5.6.2026)
19183313
Page 20 of 67
Contract No. 2026-090-COS
3.2
JOB ORDER TIME
A.
Job Orders may be issued at any time during the term of this Contract.
B.
Each individual Job Order will include a Job Order Notice-to-Proceed date,
Duration of the Work as determined in accordance with this Article 3.2 and a
calculated Substantial Completion date.
C.
Contractor agrees that it will commence performance of the Work and achieve the
apprpved Job Order Time.
D.
Job Order Time may be subject to adjustment in accordance with Article 5.
3.3
SUBSTANTIAL COMPLETION
A.
Substantial Completion of each Job Order is when all construction has been
completed with the exception of final inspection punch list work and further defined
in Article 12. The purpose of granting or acknowledging Substantial Completion is
to stop Job Order Time.
B.
Before notifying the City in accordance with Article 3.3(C), Contractor will inspect
the Work and prepare and submit to the City a comprehensive list of items to be
completed or corrected. Contractor will proceed promptly to complete and correct
items on the list. Failure to include an item on the list does not alter the
responsibility of Contractor to complete all Work in accordance with the Contract
Documents.
C.
Contractor will notify the City when it believes a Job Order, or to the extent
permitted in the Contract Documents, a portion of the Job Order, is substantially
complete.
D.
Within five (5) days of the City's receipt of Contractor’s notice in accordance with
Article 3.3(C), the City and Contractor will jointly inspect the Work to confirm
Substantial Completion.
E.
Once Substantial Completion of the Work is confirmed in accordance with Article
3.3(D), the City will prepare and issue a Certificate of Substantial Completion that
will state;
1. The date of Substantial Completion of the Work or portion of the Wor1<;
2. The remaining items of Work that have to be completed within thirty (30)
calendar days before Final Acceptance;
3. Provisions (to the extent not already provided in the Contract Documents)
establishing the City's and Contractor's responsibility for the Project's
security, maintenance, utilities and insurance pending Final Acceptance.
F.
The City, at its option, may use a portion of the Work which has been determined
to be substantially complete provided, however, that:
(Revised 6.6.2026)
19183313
Page 21 of 67
Contract No. 2d26-090-COS
1. Certificate of Substantial Completion has been issued for the portion of
Work addressing the items in Article 3.3(E)(2).
2. Contractor and the City have obtained the consent of their sureties and
insurers, and to the extent applicable, the appropriate government
authorities having jurisdiction over the Project, and
3. The City and Contractor agree that the City’s use or occupancy wili not
interfere with Contractor’s completion of the remaining Work required under
Article 3.3(E).
3.4
PUNCH List PREPARATION
A minimum of seven (7) days before Substantial Completion, Contractor, in conjunction
with the City, will prepare a comprehensive list of Punch List items, which the City may
edit and supplement. Contractor will proceed promptly to complete and correct the
Punch List items. Failure to include an item on the Punch List does not alter the
responsibility of Contractor to complete all Work in accordance with the Contract
Documents. Warranties required by the Contract Documents will not commence until
the date of Final Acceptance, unless othenwise provided in the Contract Documents.
Seven (7) days before the City issues its Final Acceptance Letter, Contractor will deliver
to the City all Operation and Maintenance Manuals necessary for the City to assurne
responsibility for the operation and maintenance of that portion of the Work.
3.5
FINAL ACCEPTANGE
Upon receipt of written notice that the Work or identified portions of the Work is ready for
final inspection and acceptance, the City and Contractor will jointly inspect to verify that
the remaining items of Work have been completed as required under Article 3.3(E).
Upon verification that the items have been satisfactorily completed, the City will issue a
Final Acceptance Letter.
3.6
LIQUIDATED DAMAGES
A.
Contractor understands that if Substantial Corripletion is not attained within the Job
Order Time, as may be adjusted for each Job Order, the City will suffer damages,
based on the anticipated loss caused by the breach and the difficulty in determining
and accurately specifying the damages. Contractor agrees that if Substantial
Completion is not attained within the Job Order Time as adjusted. Contractor will
pay the City the amount prescribed in Article 3.6(B) below as liquidated damages
, for each Day that Substantial Completion extends beyond the date determined by
the Job Order Time as adjusted.
B.
The following will be the liquidated damages for each Job Order unless a specific
amount has been determined for each individual Job Order.
(Revised 5.6.2026)
19183313
Page 22 of 67
Contract No. 2026-090-COS
L QUIDATED DAMAGES
Original Job Order Amount
Daily Charges
From more than
To and including Calendar Day or Fixed Date
$00
$25,000
$200
25,001
50,000
250
50,001
100,000
280
100,001
500,000
430
500,001
750,000
500
750,001
1,000,000
570
1,000,001
1,250,000
610
1,250,001
1,500,000
650
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE
4.1 CONTRACT PRICE
The fee for individual projects performed under this contract will be negotiated on a
project-by-project basis as Job Orders. The amount paid to the Contractor under this
contract for all Job Orders shall not exceed Six Million Dollars ($6,000,000) for the initial
two-year term and Three Million Dollars ($3,000,000) for any successive one (1) year
contract extension. The Contractor agrees at its own cost and expense, to do all the
Work as specified in the Contract Documents and any Work contingent to the Contract
and necessary for the construction of the improvements. The Contractor will completely
construct the Work and install the materials, free and clear of all claims, liens, and
charges of any kind, in the manner and under the conditions specified within the time or
times stated in each Job Order.
A.
In no event will any individual Job Order Price exceed Two Million Five Hundred
Thousand Dollars ($2,500,000). If the City opts to extend this Contract in
accordance with Article 3.1(A), the Contract Modification may increase the
maximum amount, if necessary, at that time.
B.
The Job Order Price is subject to Adjustments made in accordance with Article 5.
C.
Unless otherwise provided in the Contract Documents, the Job Order Price is
considered to include all sales, use, consumer and other taxes throughout the term
of this Contract, whether or not yet effective or merely scheduled to go into effect.
D.
Contractor must secure and maintain, during the life of the Contract, State of
Arizona and City of Scottsdale Transaction Privilege (sales) Tax Licenses.
To obtain a State of Arizona Privilege (Sales) Tax License Application, please go
to the following website:
https://azdor.qov/transaction-privileqe-tax/tpt-license/applvinq-tpt-license
To obtain a City of Scottsdale Transaction (Sales) Tax License Application, please
go to the following website:
https://www.scottsdaleaz.qov/taxes/resources
(Revised 5.6.2026)
19183313
Page 23 of 67
Contract No. 2026-090-COS
Contractor must demonstrate compliance with the E-Verify Program as provided
in Article 11.33 and as required by A.R.S. §41-1080, as amended, before issuance
of any License by the City.
4.2 RESPONSIBILITY FOR PRIVILEGE (SALES) TAXES
A. Contractor is responsible for payment of all applicable State of Arizona and City of
Scottsdale transaction privilege (sales) taxes due on construction income whether
or not these taxes are specifically separated in the bid amount. The taxes are to
be reported on either a progressive billing (accrual) basis or cash receipts basis,
depending on the method chosen at the time application was made for the
Privilege (sales) Tax License.
City Privilege (sales) tax exemptions/deductions may be applicable to certain
projects. Contractor is advised to consider this as it prepares its bid. Please
review, in detail. Sections 415, 465, and 110 of the Scottsdale Revised City Code,
Appendix C to determine if exemptions/ deductions are applicable. For tax
guidance, please reference the City Code and other tax resources at the following
website:
http.7/www.scottsdaleaz.qov/taxes/
The State of Arizona has similar exemptions; please reference A.R.S. Title 42 at
the following website:
http://wvm.azleq.state.az.us/ArizonaRevisedStatutes.asp?Title=42
For further questions regarding tax treatment, please contact the Arizona
Department of Revenue at 602-255-2060 and the City of Scottsdale Tax & Audit
Section at 480-312-2768.
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME
5.1 DELAYS TO THE WORK
A.
Delays may be compensable, concurrent, excusable or non-excusable as defined
in Article 12.
B.
If Contractor is delayed in the performance of the Work due to acts, omissions,
conditions, events, or circumstances beyond its control and due to no fault of its
own or those for whom Contractor is responsible, the Job Order Time for
performance may be reasonably extended by Job Order Adjustment.
C.
Contractor must request a Job Order Adjustment by written notice, including an
estimate of the probable effect of delay on progress of the Work. In the case of a
continuing delay, only one request is necessary.
D.
Written notice will be received within fourteen (14) days of the commencement of
the cause of the delay. If written notice is received more than fourteen (14) days
after commencement of the cause of the delay, the period of delay will be
considered to commence fourteen (14) days before the giving of any notice.
(Revised 5.6.2026)
19183313
Page 24 of 67
Contract No. 2026-090-COS
E.
If adverse weather conditions are the basis for a Job Order Adjustment request,
the requests shall be documented by data substantiating that weather conditions
were abnormal for the period of time and could not have been reasonably
anticipated, and that weather conditions had an adverse effect on the scheduled
construction.
F.
Permitting Contractor to proceed to complete any Work, or any part of the Work,
after the date to which the time of completion may have been extended, will in no
way act as a waiver on the part of the City of any of its legal rights.
G.
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34-609(E), as amended, Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that requires
notice of delays, provides for arbitration or other procedures for settlement or
provides for liquidated damages.
H.
In addition to Contractor’s right to request a time extension for those events stated
in this Article 5.1, Contractor may also be entitled to an appropriate adjustment of
the Job Order Price provided, however, that the Job Order Price will not be
adjusted for delays caused by reason of force majeure as defined in this Contract.
5.2 DIFFERING SITE CONDITIONS
5.2.1. If Contractor encounters a Differing Site Condition(s), Contractor may be entitled
to an adjustment in the Job Order Price or Job Order Time(s) to the extent
Contractor’s cost or time of performance are the direct result of a Differing Site
Condition{s).
5.2.2. Upon encountering a Differing Site Condition, Contractor shall provide prompt
written notice to the City of the condition, which notice will not be later than seven
(7) days after the condition has been encountered, Final costs must be
submitted within thirty (30) days after notice is received by the City, unless
extended by written agreement of the parties. Contractor must give the City's
Contract Administrator written notice of and an opportunity to observe such
condition before disturbing or altering the Differing Site conditions. The failure
of Contractor to give written notice and make the Claim as required by this Article
and Article 7.1.5 shall constitute a waiver by Contractor of any rights arising out
of or relating to such Differing Site Conditions.
5.2.3. In order for Contractor to obtain any additional compensation or time extensions
for Differing Site Conditions, Contractor must demonstrate that it encountered a
material difference at the Site, as defined in Article 12, that required it to expend
additional cost or time. Contractor will also establish that it actually and
reasonably relied upon the representations found in the Contract Documents
concerning the Site conditions.
(Revised 5.6.2026)
19183313
Page 25 of 67
Contract No. 2026-090-COS
5.3
APPLICATION FOR EXTENSION OF TIME
5.3.1
If performance by Contractor is delayed for a reason set forth in Article 5,
Contractor may be allowed a reasonable extension of time in conformance with
this Article. Before Contractor’s time extension request may be considered,
Contractor shall notify the City of the condition which allegedly has caused or is
causing the delay, and shall submit a written application to the City identifying;
1.
Liquidated damage assessment rate, as specified in the Contract;
2.
Original Job Order Price;
3.
Originai Job Order Time;
4.
Any previous Job Order Adjustments granted (number and duration); and
5.
The extension of time requested.
5.3.2
In addition, the application for extension of time shall set forth in detail;
1.
The nature of each alleged cause of delay In completing the Work;
2.
The date upon which each such cause of delay began and ended and the
number of dates attributable to each such cause;
3.
A statement that Contractor waives all claims except for those delineated
In the application, and the particulars of any claims which Contractor does
not agree to waive. For time extensions for Substantial Completion and
final completion payments, the application shall include a detailed
statement of the dollar amounts of each claim item reserved; and
4.
A statement indicating Contractor’s understanding that the time extension
is granted only for purposes of permitting continuation of Contract
performance and payment for Work performed and that the City retains its
right to conduct an investigation and assess liquidated damages as
appropriate in the future.
5.4
ERRORS, DISCREPANCIES AND OMISSIONS
A.
If Contractor observes errors, discrepancies or omissions in the Contract
Documents, it will promptly notify the City and request clarification. Contractor will
provide a copy of this notice to the City’s Representative.
B.
If Contractor proceeds with the Work affected by the errors, discrepancies or
omissions, without receiving any clarifications, it does so at its own risk. Adjustments
involving these circumstances made by Contractor before clarification by the Design
Professional will be at Contractor’s risk.
(Revised 5.6.2026)
19183313
Page 26 of 67
Contract No. 2026-090-COS
6.5
CITY REQUESTED CHANGE IN WORK
A.
The City reserves the right to make, at any time during the progress of the Work,
any alterations as may be found necessary or desirable.
B.
These alterations and changes will not invalidate this Contract nor release the
surety and Contractor agrees to perform the Work as altered, the same as if it had
been a part of the original Job Order. Contractor will notify the surety of the
changes and will assure that the alterations and changes are adequately covered
by the surety bond.
C.
The City will request a proposal for a change in Work from Contractor, and ah
Adjustment to the Job Order Price or Job Order Time will be made based on a
mutual agreed upon cost and time.
5.6
LEGAL REQUIREMENTS
The Job Order Price or Job Order Time will be adjusted to compensate Contractor for
the effects of any changes in the Legal Requirements enacted after the date of the
Contract affecting the performance of the Work.
5.7
JOB ORDER ADJUSTMENTS
A.
In accordance with the City of Scottsdale Procurement Code, and related Rules
and Procedures, the City and Contractor will negotiate in good faith and as
expeditiously as possible the appropriate Job Order Adjustment(s). Upon reaching
an agreement, the parties will prepare and execute an appropriate Adjustment
reflecting the terms of their agreement. The change in Work may or may hot
include an Adjustment in the Job Order Price or Job Order Time.
B.
All changes in Work authorized by Job Order Adjustments will be performed under
the conditions of the Contract Documehts. The decision to make an Adjustment
to the Job Order rests solely with the City and any decision to make a Job Order
Adjustment must be promptly complied with by Contractor, subject to the
provisions of Article 5,8.
C.
The execution of a Job Order Adjustment by Contractor shall constitute conclusive
evidence of Contractor’s agreement to the ordered changes in the Work, the Job
Order Price, and the Job Order Time by Contractor. Contractor, by executing the
Job Order Adjustment, waives and forever releases any claim against the City for
any additional time or compensation for matters relating to, arising out of, or
resulting from the Work included within or affected by the executed Job Order
Adjustment of which Contractor knew or should have known.
5.8 UNILATERAL DETERMINATION OF JOB ORDER VALUE
If no mutual agreement occurs between the City and Contractor, the change in Job Order
Price, if any, shall be derived by deterrnining the reasonable actual costs Incurred or
savings achieved, resulting from revisions to the Work. Such reasonable actual costs
or savings shall include a component for direct job site overhead and profit but shall not
include home-office overhead or other indirect costs and components. The calculation
(Revised 5.6.2026)
19183313
Page 27 of 67
Contract No. 2026-090-COS
of actual costs shall conform to the markup schedule in Article 5.12 below. Any such
costs or savings shall be documented in the format and with such content and detail as
the City requires. Contractor shall promptly submit such documentation and other
backup as the City may require in evaluating the actual costs incurred.
5.9
ADDITIONAL JOB ORDER COST REQUIREMENTS
Contractor's or Subcontractor's submittals shall include the cost of materials, sales tax,
and the cost of all transport. The cost of items listed shall be directly related to the Job
Order Adjustment. Indirect costs not specifically related to the Job Order Adjustment
shall not be considered. Contractor's or Subcontractor's Direct Labor Costs shall be
limited to the hourly rate of directly involved workmen, employer contributions toward
Contractor standard benefits, pensions, unemployment or social security (if any), and
employer costs for paid sick and annual leave. Contractor's or Subcontractor's
Overhead shall include license fees, bond premiums, supervision, wages of timekeepers
and clerks, incidentals^ home and field office expense, and vehicle expense directly
related to the Project, and all other direct Project expenses not included in Contractor's
material, direct labor, and equipment costs.
6.9.1
The allowance for overhead and profit shaN be limited to the following schedule:
1.
For Contractor, for any work performed by Contractor's own forces, fifteen
(15%) percent of the Subtotal of Costs to Contractor.
2.
For Contractor, for any work performed by its Subcontractor, six (6%)
percent of the amount due to the Subcontractor.
3.
For each Subcontractor or Sub-subcontractor involved, for any work
performed by their own forces, fifteen (15%) of their materials and direct
labor costs.
4.
For each Subcontractor, for work performed by its Sub-Subcontractor(s),
six (6%) percent of the amount due to the Sub-subcontractor.
6.10 LIMITATION OF COMPENSABLE ITEMS
5.10.1 For Job Order Adjustment, the total cost or credit to the City shall be based on
the following schedule:
1. Contractor's Materials Costs.
2. Contractor's Direct Labor Costs.
3. Contractor's Equipment Costs (includes owned/rented equipmerit).
4. Applicable Subcontractor Costs.
5. Subtotal of Costs to Contractor.
6. Contractor's Overhead and Profit.
(Revised 6,6.2026)
19183313
Page 28 of 67
Contract No. 2026-090-COS
7. Total Cost or Credit to the City.
5.11 FIELD ORDERS
A.
The City has authority to initiate Field Orders that do not materially and adversely
affect the Work, including the design, quality, performance and workmanship
required by the Contract Documents. Field Orders will be made by written order
and wili be binding on the City and Contractor. Contractor will carry out any written
Field Orders promptly.
B.
Field Orders will not involve an adjustment in the Job Order Price or Job Order
Times unless or until it becomes a Job Order Adjustment.
C.
Contractor may make minor changes in the Work, provided, however that
Contractor will promptly inform the City, in writing, of any changes and record the
changes, if appropriate, on the Project Record Documents maintained by
Contractor.
5.12 JOB ORDER PRICE ADJUSTMENTS
A.
The increase or decrease in Job Order Price resulting from a change in the Work
will be determined by one or more of the following methods:
1. Unit prices stated in the Contract or as subsequently agreed to between
the parties:
2. A mutually agreed upon accepted, lump sum, properly itemized and
supported by sufficient substantiating data to permit evaluation by the City;
and
3. Costs, fees and any other markups.
B.
If an increase or decrease cannot be agreed to as stated in Article 5.7(A), the cost
of the change of the Work will be determined by the reasonable expense and
savings in the performance of the Work resulting from the change, including a
reasonable overhead and profit, as may be stated in the Contract Documents.
Contractor will maintain a documented, itemized accounting, evidencing the
expenses and sayings associated with these changes.
C.
If Unit Prices are stated in the Contract Documents, or are later agreed to by the
parties, but application of the Unit Prices will cause substantial inequity to the City
or Contractor because of differences in the character or quantity of the unit items
as originally contemplated, the Unit Prices will be equitably adjusted.
D.
If the City and Contractor disagree upon whether Contractor is entitled to be paid
for any services required by the City, the amount to be paid^ other disagreements
over the Scope of Work, proposed changes to the Work, or the time required to
complete the Work, the City and Contractor will resolve the disagreements in
accordance with Article 7.
1. As part of the negotiation process, Contractor will furnish the City with a
(Revised 5.6.2026)
19183313
Page 29 of 67
Contract No. 2026-090-COS
good faith estimate of the costs to perform the disputed services, or the
additional time required in accordance with the City's interpretations.
2. If the parties are unable to agree and the City expects Contractor to perform
the services in accordance with the City's interpretations, Contractor will
proceed to perform the disputed services, conditioned upori the City issuing
a written order to Contractor:
(a) directing Contractor to proceed; and
(b) specifying the City's interpretation of the services that are to be
performed.
E. Emergencies. In any emergency affecting the safety of persons or property.
Contractor will act, at its discretion, to prevent threatened damage, injury or loss.
Any change in the Job Order Price or Job Order Time(s) resulting from emergency
work will be determined as provided in this Article 5.
ARTICLE 6- PROCEDURE FOR PAYMENT
6.1 JOB ORDER PAYMENT REQUEST
A.
At the pre-construction conference prescribed in Article 1.3, Contractor will submit
for the City’s review and approval a Schedule of Values. The Schedule of Values
will include values for all items comprising the Job Order Price and will serve as
the basis for monthly progress payments made to Contractor throughout the Work.
B.
At least five (5) working days before the date established for a progress payment.
Contractor will meet with the City’s Representative to review the progress of the
Work, as it will be reflected on the Contractor Payment Request.
C.
The Contractor Payment Request will constitute Contractor’s representation that
the Work has been performed consistent with the Job Order including any
Ad]ustment(s), has progressed to the point indicated in the Contractor Payment
Request, and that title to all Work will pass to City free and clear of all claims, liens,
encumbrances, and security interests upon the incorporation of the Work into the
Project.
6.2
PARTIAL PAYMENTS
A.
Partial progress payment will be made for Job Orders with Job Order Time greater
than 30 Days and may be made if the Job Order Time is less than 30 Days.
B.
The Contractor Payment Request may request payment for equipment and
materials not yet incorporated into the Project if construction progress is in
reasonable conformance with the approved schedule.
C.
For equipment and materials suitably stored at the Site, the equipment and
materials will be protected by suitable insurance and the City vyill receive the
equipment and materials free and clear of all liens and encumbrances.
(Revised 5.6.2026)
19183313
Page 30 of 67
Contract No. 2026-090-COS
1. For materials and equipment.stbred off the Site, the City must approve the
storage. The material and equipment must be stored within Maricopa
County and be accessible for the City’s inspection. Title to the materials
and equipment will include applicable insurance, bonding, storage and
transportation to the Site..
2. The City will be named as an Additional Insured on all insurance and bonds
required for all stored materials or equipment
6.3
PAYMENT OF JOB ORQER PRICE
A.
Payments should be provided on the City format for a Pay Application which is
based bn the agreed upon Schedule of Values. Payment will be made no later
than fourteen (14) days after the Contractor Payment Request is certified and
approved, but in each case less the total of payments previously made.
B.
The Contractor Payment Request shall be deemed approved and certified for
payment seven (7) days after the date of submission to the City by Contractor
unless before that time the City prepares and issues a specific written finding
setting forth those items in detail in the Contractor Payment Request that are not
approved for payment under the Contract. The finding will indicate the specific
amounts the City intends to withhold, the reasons and contractual basis for the
withholding, and the specific measures Contractor must take to rectify the City’s
concerns. The City may withhold an amount from the progress payment sufficient
to pay the expenses the City reasonably expects to incur in correcting the
deficiency set forth in the written finding. Contractor and the City will attempt to
resolve the City’s concerns. If the parties cannot resolve the concerns. Contractor
may pursue its rights under the Contract Documents, including those under Article
7.
6.4
RETENTION ON JOB ORDER PAYMENTS
In compliance with A.R.S. §34-609, as amended, there is no retention for job-order-
contracting construction services contracts.
6.5
FINAL PAYMENT
A.
After receipt of a final Contractor Payment Request, the City will make final
payment as required by this Article 6.5, provided that Contractor has completed all
of the Work in conformance with the Job Order and Contract Documerits and a
Final Acceptance Letter has been issued by the City.
B.
At the time of submission of its final Contractor Payment Request, Contractor will
provide the following infornriation;
1. An affidavit that there are no claims, obligations or liens outstandihg or
unsatisfied for labor, services, material, equipment, taxes or other items
performed, furnished or incurred for or in connection with the Work which
will in any way affect the City’s interests; and
2. A general release executed by Contractor waiving, upon receipt of final
(Revised 5.6.2026)
19183313
Page 31 of 67
Contract No. 2026-090-COS
payment by Contractor, all claims, except those claims previously made in
writing to the City and remaining unsettled at the time of final payment.
6.6
PAYMENTS TO SUBCONTRACTORS OR SUPPLIERS
A.
Contractor will pay its Subcontractors or suppliers within seven (7) calendar days
of receipt of each progress payment from the City. Contractor will pay for the
amount of Work performed or materials supplied by each Subcontractor or supplier
as accepted and approved by the City with each progress payment. No Contract
between Contractor and its Subcontractors and suppliers may materially alter the
rights of any Subcontractor or supplier to receive prompt payment as provided in
this Contract.
B.
If Contractor fails to make payments in accordance with these provisions, the City
may take any one or more of the following actions and Contractor agrees that the
City may take these actions:
1. To hold Contractor in default under this Contract;
2. Withhold future payments until proper payment has been made to
Subcontractors or suppliers in accordance with these provisions;
3. Reject all future offers to perform work for the City for a period not to exceed
one (1) year from the Substantial Completion date of the Job Order at issue;
or
4. Terminate this Contract for cause.
C.
Should the City fail or delay in exercising or enforcing any right, power, privilege,
or remedy under this Article, the failure or delay will not be considered a waiver,
release, or modification of the requirements of this Article or of any of the terms or
provisions of this Contract.
D.
Contractor will include these prompt payment provisions in every subcontract,
including procurement of materials and leases of equipment for this Contract.
6.7
AUDIT AND INSPECTION
A, Records of Contractor’s direct personnel payroll, reimbursable expenses related
to each Job Order and records of accounts between the City and Contractor will
be kept on a generally recognized accounting basis and will be available for three
(3) years after completion of the Project.
From the effective date of this Contract and until three (3) years after the date of
final payment by the City of Scottsdale to Contractor, the City, its authorized
representative, or the appropriate federal or state agencies, reserve the right to
audit Contractor’s records to verify the accuracy and appropriateness of all pricing
data, including data used to negotiate the Contract Documents. The City of
Scottsdale or its authorized representative will have access, during normal working
hours, to all necessary Contractor and Subcontractor facilities, and will be provided
adequate and appropriate workspace, in order to conduct audits in compliance
(Revised 5.6.2026)
19183313
Page 32 of 67
Contract No. 2026-090-COS
with the provisions of this Article. The City of Scottsdale will give Contractor or
Subcontractor reasonable advance notice of intended audits.
B.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if, upon audit of Contractor’s records, the audit discloses Contractor has
provided false, misleading, or inaccurate cost and pricing data.
C,
Contractor will include a similar provision in all of its contracts with Suppliers,
Subconsultants and Subcontractors providing services under the Contract
Documents to ensure the City, its authorized representative, or the appropriate
federal or state agency, has access to the Supplier, Subconsultant and
Subcontractor records to verify the accuracy of cost and pricing data.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if the above provision is not included in Supplier, Subconsultant and
Subcontractor contracts, and one or more Suppliers, Subconsultants or
Subcontractors do not allow the City to audit their records to verify the accuracy
and appropriateness of pricing data.
E.
If an audit in accordance with this Article, discloses overcharges of any nature by
Contractor to the City in excess of 1% of the total contract billings, the actual cost
of the City’s audit will be reimbursed to the City by Contractor. Any adjustments
or payments which must be made as a result of any audit or inspection of
Contractor’s invoices dr records will be made within a reasonable amount of time
(not to exceed 90 days) from presentation of the City's findings.
F.
This audit provision includes the right to inspect personnel records as required by
Section 11.33.
D.
G. City may, at reasonable times, inspect the place of business of Contractor or its
Subcontractor(s) that is related to the performance of this Contract.
ARTICLE 7- CLAIMS AND DISPUTES
7.1 REQUESTS FOR CONTRACT ADJUSTMENTS AND RELIEF
7.1.1
If either Contractor or the City believes that it is entitled to relief against the other
for any event arising out of or related to the Work, that party will provide written
notice to the other party of the basis for its claim for relief. The claims shall set
forth in detail all known facts and circumstances supporting the claim; final costs
associated with any claim upon which notice has been given must be submitted in
writing to the City within thirty (30) days after notice has been received.
7.1.2
This notice will, if possible, be made before incurring any cost or expense and in
accordance with any specific notice requirements contained in applicable articles
of the Contract.
7.1.3
In the absence of any specific notice requirement, written notice will be given within
a reasonable time, not to exceed ten (10) days, after the occurrence giving rise to
the claim for relief or after the claiming party reasonably should have recognized
the event or condition giving rise to the request, whichever is later.
(Revised 5.6.2026)
19183313
Page 33 of 67
Contract No. 2026-090'COS
7.1.4
This notice will include sufficient information to advise the other party of the
circumstances giving rise to the claim for relief, the specific contractual adjustment
or relief requested and the basis of the request. ANY NOTICE OF Cl-AIM NOT
FILED WITH THE CITY WITHIN SUCH TIME AND IN COMPLIANCE WITH THE
PRECEEDING PROVISIONS SHALL BE CONSIDERED TO HAVE BEEN
WAIVED AND SHALL BE DISMISSED.
7.1.5
In the event Contractor seeks to make a claim for an increase in the Job Order
Price, as a condition precedent to any liability of the City therefore, unless
emergency conditions exist. Contractor shall strictly comply with the requirements
of this section and such claim shall be made by Contractor before proceeding to
execute any Work for which a claim is made. Failure to comply with this condition
precedent shall constitute a waiver by Contractor of any claims for compensation.
7.1.6
Contractor must continue its performance under this Contract regardless of the
existence of any claims by Contractor.
7.1.7
In a claim by Contractor against the City for compensation in excess of the Job
Order Price, any liability of the City to Contractor shall be strictly limited and
computed in accordance with the Contract Documents and shall in no event
include indirect costs, such as home office overheads or consequential damages
of Contractor or any estimated costs or damages.
7.2 DISPUTE AVOIDANCE AND RESOLUTION
7.2.1
The parties are fully committed to working with each other throughout the Project
and agree to communicate regularly with each other at all times so as to avoid or
minimize disputes or disagreements. If disputes or disagreements do arise, the
Contractor and the City each commit to resolving the disputes or disagreements in
an amicable, professional and expeditious manner so as to avoid unnecessary
losses, delays and disruptions to the Work.
7.2.2
The Contractor and the City will first attempt to resolve disputes or disagreements
at the field level through discussions between the Contractor’s Representative(s)
and the City’s Representative(s) as described in Article 7.4.
7.2.3
If a dispute or disagreement cannot be resolved pursuant to Article 7.2.2, upon the
request of either party, the parties’ Representatives as described in Article 7.4 will
meet as soon as conveniently possible, but in no case later than thirty (30) days
after the request is made, to attempt to resolve the dispute or disagreement.
Before any meetings between the parties Representatives, the parties will
exchange relevant information that will assist the parties in resolving their dispute
or disagreement.
7.2.4
In the event Contractor incurs expenses related to a delay for which the City is
responsible pursuant to A.R.S. §34 609(E), as amended. Contractor and the City
will negotiate an equitable adjustment to the Job Order Price and/or Job Order
Time. This provision does not void any other section of this Contract that
(Revised 6.6.2026)
19183313
Page 34 of 67
\
Contract No. 2026-090-COS
requires notice of delays, provides for arbitration or other procedures for
settlement or provides for liquidated damages.
7.3
DUTY TO CONTINUE PERFORMANCE
Unless provided to the contrary in the Contract Documents, Contractor will continue to
perform the Work and the City will continue to satisfy its payment obligations to
Contractor, until final resolution of any dispute or disagreement between Contractor and
the City.
7.4
REPRESENTATIVES OF THE PARTIES
A.
City’s Representatives
1. The City designates the individual listed below as the City's Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
City of Scottsdale
Attn: Alison Tymkiw
7447 E. Indian School Road, Suite 205
Scottsdale, AZ 85251
480-312-7250
2. The City will designate an individual for each Job Order as the City’s
Representative. This person will manage the Job Order.
3. The City's Contract Administrator shall be Melanie Gibson, or designee.
B.
Contractor’s Representatives
1. Contractor designates the individual listed below as Contractor’s Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2.3:
Summa Mechanical Contractors, Inc.
Attn: Samantha Kitchen
2222 West Grant Street
Phoenix, AZ 85Q09
602-254-2165
2. Contractor will designate an individual for each Job Order as Contractor’s
Representative.
ARTICLE 8 - SUSPENSION^ TERMINATION AND CANCELLATION
8.1 CITY’S RIGHT TO STOP JOB ORDER SERVICES
A. The City may, at its discretion and without cause, order Contractor in writing to
stop and suspend any Job Order. Immediately after receiving this notice,
(Revised 6.6.2026)
19183313
Page 35 of 67
Contract No. 2026-090-COS
Contractor will discontinue advancing the Job Order. The suspension will not
exceed one hundred eighty (180) consecutive days. If the City suspends the Job
Order for one hundred eighty-one (181) consecutive days or more, the suspension
will be considered a termination for convenience.
B. Contractor may seek an adjustment of the Job Order Price or Job Order Time if its
cost or time to perform the Contract Services has been adversely impacted by any
suspension or stoppage of the Work by the City.
8.2 TERMiNATION FOR CONVENIENCE
A.
The City reserves the right to terminate this Contract, in whole or in part, or
abandon any portion of any Job Order for v/hich services have not been performed
by Contractor, at its sole convenience and discretion, upon written notice given
pursuant to this Contract.
1. Contractor will estimate the value of the Work it has completed and submit
its appraisal to the City for evaluation. The City will have the right to inspect
the Work, to appraise the Work completed.
Contractor shall be entitled to receive just and equitable compensation for
the percentage of Work actually completed and materials accepted before
the effective date of the terminatibn. This compensation will be an amount
mutually agreed upon by Contractor and the City based on the Job Order
and Scope of Work. If there is no mutual agreement, the final determination
will be made in accordance with this Article.
2. The City will make the final payment within 60 days after Contractor has
delivered the last of the partially completed items and the final fee has been
agreed upon.
If the City terminates this Contract in Compliance with this Article and
proceeds to complete the Job Order through its employees, agents or other
third parties, the City’s rights to use the Work product will be as stated in
Article 8.4.
B.
Upon termination of construction services during any Job Order, Contractor will
proceed with the following obligations:
1. Stop Work as stated in the notice;
,2. Place no further subcontracts or orders;
3. Terminate all subcontracts to the extent they relate to the Work terminated;
4. Assign to the City all right, title and interest of Contractor under the
subcontracts terminated, in which case the City will have the right to settle or
to pay any termination settlement proposal arising out of those terminations;
5. Take any action that may be necessary for the protection and preservation
of the property related to the Contract that is in the possession of Contractor
(Revised 5.6.2026)
19183313
Page 36 of 67
c.
Contract No. 2026-090-COS
and which the City has or may acquire an interest; and
6. Comply with the requirements of Article 6.5(B).
Contractor will submit complete termination inventory schedules no later than sixty
(60) days from the date of the notice of termination.,
D. The City will pay Contractor the following:
1. The direct value of its completed Work and materials supplied as of the date
of termination;
2. The reasonable costs and expenses attributable to the termination;
3. Contractor will be entitled to profit and overhead on completed Work but will
not be entitled to anticipated profit or anticipated overhead. If it appears
Contractor would have sustained a loss on the entire Work had the Job
Order been completed, Contractor will not be allowed profit and the City will
reduce the settlement to reflect the indicated rate of loss;
4. Contractor will maintain all records and documents for three (3) years after
final settlement. These records will be maintained and subject to auditing as
required in Article 6,7; and
5. Take any action that may be necessary for the protection and preservation
of the property related to the Job Order(s) that is in the possession of
Contractor and in which the City has or may acquire an interest.
8.3
CANCELLATION FOR CAUSE
The City may also cancel this Contract or any part of it with seven (7) days notice for
cause in the event of any default by Contractor, or if Contractor fails to comply with
any of the terms and conditions of this Contract. Unsatisfactory performance, despite
a reasonable opportunity to cure as judged by the City’s Representative and kilure to
provide the City, upon request, with adequate assurances of future performance will
all be causes allowing the City to cancel this Contract for cause. In the event of
cancellation for cause, the City will not be liable to Contractor for any amount as
damages, and Contractor will be liable to the City for any and all damages sustained
as a result of the default that caused the cancellation.
8.4
CITY’S RIGHT TO PERFORM AND CANCEL FOR CAUSE
A. If Contractor persistently fails to:
1. Provide a sufficient nurnber of skilled workers;
2. Supply the materials required by the Contract Documents or Job Order(s);
3. Comply with applicable Legal Requirements;
4. Timely pay, without cause. Subconsultants or Subcontractors;
(Revised 5.6.2026)
19183313
Page 37 of 67
Contract No. 2026-090-COS
B.
C.
5. Perform the Contract Services with promptness and diligence to ensure
that a Job Order is completed by the Job Order Time, as the times may be
adjusted; or
6. Perform other material obligations under the Contract Documents and/or
individual Job Orders;
Then the City, in addition to any other rights and remedies provided in the Contract
Documents or by law, will have the rights stated in Articles 8.2 and 8.3.
In the event the City cancels this Contract or any part of the services under any
Job Order, the City will notify Contractor in writing, and immediately upon receiving
this notice. Contractor will discontinue advancing the Work under this Contract or
the Job Order and proceed to close all operations of any affected Job Order or this
Contract.
If the City provides Contractor with a written order to provide adequate maintenance
of traffic, adequate cleanup, adequate dust control or to correct deficiencies or
damage resulting from abnormal weather conditions, and Contractor fails to comply
in a time frame specified, the City may have the Work accomplished by other
sources at Contractor’s expense and without an increase to the Job Order Price
Upon the occurrence of an event stated in Article 8.4(B), the City may provide written
notice to Contractor that it intends to cancel the Contract unless the problem cited
is cured, or commenced to be cured, within seven (7) days of Contractor’s receipt of
notice.
1. If Contractor fails to cure, or reasonably commence to cure, the problem,
then the City may give a second written notice to Contractor of its intent to
cancel within an additional seven (7) day period.
2. If Contractor, within this second seven (7) day period, fails to cure, or
reasonably commence to cure the problem, then the City may declare the
Contract cancelled for default by providing written notice to Contractor of
this declaration.
D. Upon declaring the Contract cancelled in accordance with Article 8.4(C), and for the
purpose of completing the Work, the City may for all Job Orders enter upon the
premises and take possession of all materials, equipment, scaffolds, tools,
appliances and other items, which have been purchased or provided for the
performance of the Work, all of which Contractor now transfers, assigns and sets
over to the City for this purpose, and to employ any person or persons to complete
the Work and provide all of the required labor, services, materials, equipment and
other items.
E. If through any cause. Contractor fails to fulfill in a timely and proper manner its
obligations under this Contract, or if Contractor violates any of the covenants.
Contracts, or stipulations of this Contract, the City may withhold any payments to
Contractor for the purpose of setoff until the exact amount of damages due the City
from Contractor is determined by a court of competent jurisdiction.
(Revised 5.6.2026)
19183313
Page 38 of 67
Contract No. 2026-090-COS
F. In the event of a cancellation, Contractor will not be entitled to receive any further
payments under the Contract Documents until the Work on all Job Orders is
completed in accordance with the Contract Documents. At that time, Contractor will
only be entitled to be paid for Work performed and accepted by the City before its
default.
G. if the City's cost and expense of completing the Work exceeds the unpaid balance
of a Job Order Price, then Contractor will be obligated to pay the difference to the
City. These costs and expenses will include not only the cost of completing the
Work, but also losses, damages, costs and expense, including attorneys’ fees and
expenses, incurred by the City in connection with the reprocurement and defense of
claims arising from Contractor’s default.
H. If the City cancels this Contract for cause and the cancellation is determined to have
been without legal right, the cancellation for cause will be considered to have been
a termination for convenience in accordance with the provisions of Article 8.2.
ARTICLE 9 - INSURANCE AND BONDS
9.1 INSURANCE REQUIREMENTS
A.
At the same time as execution of this Contract, Contractor will furnish the City of
Scottsdale a Certificate of Insurance on a standard insurance industry ACORD
form. The ACORD form vvill be issued by an insurance company authorized to
transact business in the State of Arizona or one that is named on the List of
Qualified Unauthorized Insurers maintained by the Arizona Department of
Insurance.
B.
Contractor. Subcontractors and Subconsultants must procure and maintain, until
all of their obligations have been discharged, including any warranty periods under
this Contract are satisfied, insurance against claims for injury to persons or
damage to property, which may arise from or in connection with the performance
of the Work by Contractor, its agents, representatives, employees, or
Subcontractors.
C.
The insurance requirements are minimum requirements for this Contract and in no
way limit the indemnity covenants contained in this Contract.
D.
The City in no way warrants that the minimum limits contained in this Contract are
sufficient to protect Contractor from liabilities that might arise out of the
performance of the Contract Services under this Contract by Contractor, its agents,
representatives, employees. Subcontractors or Subconsultants and Contractor is
free to purchase any additional insurance as may be determined necessary. The
City will not pay for higher limits, but if Contractor pays for insurance with higher
limits. Contractor will name the City as an additional insured on any additional
insurance.
E.
Claims Made. In the event any insurance policies required by this Contract are
written on a “claims made” basis, coverage shall continue uninterrupted throughout
the term of this Contract by keeping coverage in force using the effective date of
(Revised 5.6.2026)
19183313
Page 39 of 67
Contract No. 2026-090-COS
this Contract as the retroactive date on all “claims made” policies. The retroactive
date for exclusion of claims must be on or before the effective date of this Contract,
and can never be after the effective date of this Contract. Upon completion or
termination of this Contract, the “claims made” coverage shall be extended for an
additional three (3) years using the original retroactive date, either through
purchasing an extended reporting option; or by continued renewal of the original
insurance policies. Submission of annual Certificates of Insurance, citing the
applicable coverages and provisions specified herein, shall continue for three (3)
years past the completion or termination of this Contract.
F. Deductibles and Self-Insured Retentions. The policies stated in this Article may
provide coverage which contains deductibles or self-insured retention amounts.
Any deductibles or self-insured retention are not applicable to the policy limits
provided to the City. Contractor is solely responsible for any deductible or self-
insured retention amount. The City, at its option, may require Contractor to secure
payment of any deductible or self-insured retention by a surety bond or irrevocable
and unconditional Letter of Credit. Any self-insured retentions and deductibles
must be declared to and approved by the City. If not approved, the City may
require that the insurer reduce or eliminate any self-insured retentions with respect
to the City, its officers, officials, agents, employees, and volunteers.
9.2 MINIMUM SCOPE AND LIMITS OF INSURANCE
Contractor must provide coverage at least as broad and with limits of liability not less
than those stated below.
A. Commercial General Liability-Occurrence Form
Generai Aggregate
Products-Completed Operations Aggregate
Personal & Advertising Injury
Each Occurrence
Fire Damage (Any one fire)
Medical Expenses (Any one person)
$2,000,000
$2,000,000
$1,000,000
$2,000,000
$100,000
OPTIONAL
Contractor must maintain “occurrence” form Commercial General Liability
insurance with a limit of not less than $2,000,000 for each occurrence, $2,000,000
Products and Completed Operations Annual Aggregate, and a $2,000,000
operations, independent contractors, products completed operations, personal
injury and advertising injury. If any Excess insurance is utilized to fulfill the
requirements of this paragraph, the Excess insurance must be "follow form" equal
or broader in coverage scope than underlying insurance.
B. Automobile Liabilitv-Anv Auto or Owned, Hired and Non-Owned Vehicles
Combined Single Limit Per Accident
For Bodily Injury and Property Damage
$1,000,000
Contractor must maintain Business/Automobile Liability insurance with a limit of
$1,000,000 each accident on Contractor owned, hired, and non-owned vehicles
assigned to or used in the performance of the Contractor’s work or services under
(Revised 5.6.2026)
19183313
Page 40 of 67
Contract No. 2026-090-COS
this Contract. If any Excess insurance is utilized to fulfill the requirements of this
paragraph, the Excess insurance must be “follow form” equal or broader in
coverage scope than underlying insurance.
C. Workers Compensation and Employers Liability
Workers’ Compensation
Employers Liability: Each Accident
Disease - Each Employee
Disease - Policy Limit
Statutory
$500,000
$500,000
$1,000,000
Contractor must maintain Workers Compensation insurance to cover obligations
imposed by federal and state statutes applicable to Contractor's employees
engaged in the performance of work or services under this Contract and must also
maintain Employers’ Liability Insurance. The insurer must agree to waive all rights
of subrogation against the City, its officers, officials, agents, employees, and
volunteers for losses arising from Work performed by Contractor for the City.
D. Coverage Terms and Required Endorsements
1. The Commercial General Liability and Automobile Liability policies are to
contain, or be endorsed to contain, the following provisions: The City, its
officers, officials, agents, and employees are to be named as additional
insureds with respect to liability arising out of activities performed by, or on
behalf of. Contractor including the City's general supervision of Contractor,
products and completed operations of Contractor, and automobiles owned,
leased, hired, or borrowed by Contractor.
2. Except for Contractors Professional Liability and Workers Compensation
insurance, for all insurance policies required under this Contract, the City,
its officers, officials, agents, and employees must be additional insureds to
the full limits of liability purchased by Contractor even if those limits of
liability are in excess of those required by this Contract.
3. Except for Contractors Professional Liability and Workers Compensation
insurance, aH insurance policies required under this Contract, including any
excess insurance policies, must be primary insurance with respect to the
City, its officers, officials, agents, and employees. Any insurance or self-
insurance maintained by the City, its officers, officials, agents, and
employees will be in excess of the coverage provided by Contractor and
must not contribute to it.
4. For all insurance policies required under this Contract, insurance coverage
must apply separately to each insured against whom a claim is made or
suit is brought, except with respect to the limits of the insurer's liability.
5. For all insurance policies required under this Contract, insurance coverage
must not be limited to the liability assumed under the indemnification
provisions of this Contract.
6. All insurance policies required under this Contract, must contain a waiver
(Revised 5.6.2026)
19183313
Page 41 of 67
Contract No. 2026-090-COS
of subrogation against the City, its officers, officials, agents, and
employees, for losses arising from Work performed by Contractor for the
City.
7. For all insurance policies required under this Contract, if Contractor
receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt
notice to the Contract Administrator for the City, unless such coverage is
immediately replaced with similar policies.
8. Contractor, its successors or assigns, is required to maintain Commercial
General Liability insurance as specified in this Contract for a minimum
period of three (3) years following completion and acceptance of the Work.
Contractor must submit Certificates of Insurance evidencing the
Commercial General Liability insurance during this three (3) year period
containing all the insurance requirements stated in this Contract including
naming the City of Scottsdale, its agents, representatives, officers,
directors, officials and employees as Additional Insured as required.
9. The Commercial General Liability policy will be at least as broad as the
Insurance Service Office, Inc.'s CG 0 0 01 07 98.
9.3 OTHER INSURANCE REQUIREMENTS
The policies are to contain, or be endorsed to contain, the following provisions;
A.
Contractors Professional Liability: Contractor must carry Contractors Professional
Liability insurance to cover the residual, contingent, and passive design exposures
of Contractor.
B.
Contractors Professional Limits of Liability: Contractor must carry limits of
$1,000,000 each Project and $2,000,000 in the Aggregate under a stand-alone
policy or included by endorsement Under the Commercial General Liability policy.
Contractor, its successors and or assigns, is required to maintain this Professional
Liability insurance as specified in this Contract for a minimum period of three (3)
years following completion and acceptance of the Work. Certificates of Insurance
citing that applicable coverage is in force and contains the provisions required by
this Contract must be submitted for the three (3) year period. In the event the
Professional Liability insurance policy is written on a “claims made” basis,
coverage will extend fOr three (3) years past completion and acceptance of the
work or services, and Contractor, or its selected Design Professional will submit
Certificates of Insurance as evidence the required coverage is in effect, the
Design Professional must annually submit Certificates of Insurance citing that the
applicable coverage is in force and contains the required provisions for a three (3)
year period. If there is no Professional Liability work or service as a part of this
Contract, the City will waive the Professional Liability insurance requirement in
writing.
C.
Builders Risk-Installation Insurance fCoUrse of Construction^
Builders Risk-Installation and/or Boiler and Machinery Insurance coverage to be
(Revised 5.6.2026)
19183313
Page 42 of 67
Contract No. 2d26-090-COS
provided by Contractor as deter/nined necessary by the City prior to the start of
construction.
Contractor bears all responsibility for loss to all Work being performed and to
buildings under construction. Unless waived in writing by the City of Scottsdale,
Contractor will purchase and maintain in force Builders Risk-Installation insurance
on the entire Work until completed and accepted by the City. This insurance will
be Special Causes of Loss or Open Perils policy form, for the completed value, at
replacement cost equal to each Job Order contract price and all subsequent
modifications.
this Builders Risk-Installation insurance must cover the entire Work including
reasonable compensation for architects and Contractor's’ services and expenses
and other “soft costs" made necessary by an insured loss. Builders Risk-
Installation insurance must provide coverage from the time any covered property
comes under Contractor’s control and or responsibility, and continue without
interruption during course of construction, renovation and or installation, including
any time during which any project property or equipment is in transit, off site, or
while on site for future use or installation. Insured property must include, but not
be limited to, scaffolding, false work, and temporary buildings at the site. This
insurance must also cover the cost of removing debris, including demolition as may
be legally required by operation of any law, ordinance, regulation or code.
Contractor must also purchase and maintain Boiler and Machinery insurance with
the same requirements as Builders Risk-Installation insurance stated above if the
Work to be performed involves any exposures or insurable property normally
covered under a Boiler and Machinery insurance policy or made necessary as
required by law and or testing requirements in the performance of this Contract.
Contractor will be responsible for any and all deductibles and the City must also
be named as a Loss Payee under these policies. Contractor’s insurance must be
primary and not contributory; and waive all rights of subrogation against the City
of Scottsdale, its officer, officials and employees. Contractor’s insurance must
name the City of Scottsdale, Contractor and all tiers of Subcontractors as insureds
as respects their insurable interest at the time of loss. It must contain a provision
that this insurance will not be canceled or materially altered without at least thirty
(30) days advance notice to the City. Contractor is also required to give the City
thirty (30) days advance written notice of the coverage termination for the Project.
The Builders Risk-Installation insurance must be endorsed so that the insurance
will not be canceled or lapse because of any partial use or occupancy by the City.
Builders Risk-Installation Insurance must be maintained until whichever of the
following first occurs: (i) final payment has been made; or (ii) until no person or
entity, other than the City, has an insurable interest in the property required to be
covered.
9.4 SUBCONSULTANT’S AND SUBCONTRACTOR’S INSURANCE
Unless Contractor’s Subconsultants and Subcontractors can provide the same level of
coverage as detailed in Article 9.2 and name the City and Contractor as Additional
Insureds, Contractor's certificates must include all Subcontractors and Subconsultants
(Revised 5:6.2026)
19183313
Page 43 of 67
Contract No. 2026-090-COS
as insureds under its policies or Contractor must maintain separate certificates and
endorsements for each Subcontractor and Subconsultant. All coverages for
Subcontractors and Subcdnsultants must be in the amounts shown in Article 9.2, except
for the General Liability Each Occurrence limit, which shall be $1,000,000. Certificates
must contain a provision that the insurance will not be canceled or materially altered
Without at least thirty (30) days advance notice to the City.
9.5
NOTICE OF CANCELLATION
If Contractor receives notice that any of the required policies of insurance are materially
reduced or cancelled, it will be Contractor’s responsibility to provide prompt notice to the
City’s Contract Administrator, unless such coverage is immediately replaced with similar
policies. Each insurance policy required by the insurance provisions of this Contract
must provide the required coverage and must not be suspended, voided, canceled by
either party, reduced in coverage or in limits until thirty (30) days written notice has first
been given in accordance with Article 11.24, herein.
9.6
ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers duly licensed or approved to conduct business
in the State of Arizona and with an A. M. Best rating of no less than B++6. The City in
no way warrants that the above required minimum insurer rating is sufficient to protect
Contractor from potential insurer insolvency. Failure to maintain insurance as required
may result in termination of this Contract at the City’s sole discretion.
9.7
VERIFICATION OF COVERAGE
A.
Contractor must furnish the City Certificates of Insurance (ACORD form or
equivalent approved by the City) and with original endorsements effecting
coverage as required by this Contract. The certificates and endorsements for each
insurance policy are to be signed by a person authorized by that insurer to bind
coverage on its behalf. Any policy endorsements that restrict or limit coverages
must be clearly noted on the Certificate of Insurance.
B.
All certificates and endorsements are to be received and approved by the City
before Contract Services commence except for Builders Risk-Installation
Insurance. Each insurance policy required by this Contract must be in effect at or
before the earlier of commencement of Work under the Contract Documents or the
signing of this Contract, except for Builders Risk-Installation Insurance which, if
required by the City, must be in effect before commencement of the Work and
remain in effect for the duration of the Project. Failure to maintain the insurance
policies as required by this Contract or to provide evidence of renewal is a material
breach of contract.
•i
C. All Certificates of Insurance required by this Contract must be sent directly to the
City of Scottsdale, Attn: Capital Project Management Office. The project number
and project description must be inciuded on the Certificates of Insurance.
The City reserves the right to require complete, certified copies of all insurance
policies required by this Contract, at any time. Failure to provide a Certificate of
Insurance with the appropriate verbiage will result in rejection of Contractor’s
Certificate and delay in Contract execution. Additional Certificates of Insurance
(Revised 5,6:2026)
19183313
Page 44 of 67
Contract No. 2026-090-COS
submitted without referencing a Contract number will be subject to rejection and
returned or discarded.
9.8
APPROVAL
Any variation from the insurance requirements in this Article 9 must be approved by the
City’s Risk Management Division, whose decision will be final. Said variation will not
require a formal contract amendment but may be made by administrative action.
9.9 BONDS AND OTHER PERFORMANCE SECURITY
A.
Before execution of each individual Job Order, Contractor must provide a
performance bond and a payment bond for all construction services, each in an
amount equal to the full amount of the agreed upon cost for that Job Order.
Contractor may, at its own option, provide Payment and Performance Bonds for
the entire Contract Price amount, but there shall be no obligation for the City to
reimburse Contractor for bond costs incurred, except on an actual cost basis as
each individual Job Order is issued. Bonds must be submitted in accordance with
Title 34, Chapter 6 of the Arizona Revised Statutes and must be in substantially
the same form as Exhibits A and B. attached to this Contract.
B.
Each bond must be executed by a surety company or companies holding a
Certificate of Authority to transact surety business in the State of Arizona, issued
by the Director of the Arizona Department of Insurance. A copy of the Certificate
of Authority must accompany the bonds. The Certificate must have been issued
or updated within two (2) years before the execution of this Contract.
C.
The bonds must be made payable and acceptable to the City of Scottsdale.
D.
The bonds must be written or countersigned by an authorized representative of the
surety and the bonds must have attached a certified copy of the Power of Attorney
of the signing official.
1. If one Power of Attorney is submitted, it must be for twice the total Job
Order Price.
2. If two Powers of Attorney are submitted, each must be for the total Job
Order Price. Personal or individual bonds are not acceptable.
3. Upon the request of any person or entity appearing to be a potential
beneficiary of bonds covering payment of obligations arising under the
contract Documents, Contractor must promptly furnish a copy of the borids
or must permit a copy to be made.
E.
All bonds submitted for this Project must be provided by a company which has
been rated "A or better" by the A.M. Best Company.
(Revised 5.6.2026)
19183313
Page 45 of 67
Contract No. 2026-090-COS
ARTICLE 10 - INDEMNIFICATION
10.1 CONTRACTOR’S GENERAL INDEMNIFICATION
To the fullest extent permitted by law, Contractor, its successors, assigns and
guarantors, must defend, indemnify and hold harmless the City of Scottsdale, its agents,
representatives, officers, directors, officials and employees from and against all
allegations, demands, proceedings, suits, actions, claims, damages, losses, expenses,
including but not limited to, reasonable attorney fees, court costs, and the cost of
appellate proceedings, and all claim adjusting and handling expense, investigation and
litigation, for bodily injury or personal injury (including death), or loss or damage to
tangible or intangible property caused, or alleged to be caused, in whole or in part,
related to, arising from or out of, or resulting from any acts, omissions, negligence,
recklessness, or intentional wrongful conduct to the extent caused by Contractor or any
of its owners, officers, directors, agents or employees performing Work or Services
under this Contract, including but not limited to, any Subcontractor or anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable
and any injury or damages by any of Contractor employees. This indemnity includes
any claim or amount arising out of, or recovered under, the Worker's Compensation Law
or arising out of the failure of Contractor to conform to any federal, state, or local law,
statute, ordinance, rule, regulation, or court decree. It is the specific intention of the
parties that the City shall, in all instances, except for Claims arising solely from the
negligent or willful acts or omissions of the City, be indemnified by Contractor from and
against any and all claims. It is agreed that Contractor will be responsible for primary
investigation, defense, and judgment costs where this indemnification is applicable. In
consideration of the award of this Contract, Contractor agrees to waive all rights of
subrogation against the City, its officers, agents, representatives, directors, officials, and
employees for losses arising from the work performed by Contractor for the City.
Insurance provisions in this Contract are separate and independent from the indemnity
provisions of this Article and will not be construed in any way to limit the scope and
magnitude of the indemnity provisions. Nothing in this paragraph shall limit the
responsibility of Contractor's insurer to pay the City for valid claims that are covered by
Contractor's insurance policy. The indemnity provisions of this paragraph shall not be
construed in any way to limit the scope and magnitude and applicability of the insurance
provisions.
10.2 INTELLECTUAL PROPERTY
A.
Contractor must pay all royalties and license fees associated with its performance
of services.
B.
To the extent permitted by law. Contractor shall indemnify and hold harmless the
City against any liability, including costs and expenses, for infringement of any
patent, trademark, or copyright arising out of Contract performance or use by the
City of materials furnished or Work performed under this Contract.
C.
Contractor must defend any action or proceeding brought against the City based
on any claim that the Work, or any part of the Work, or the operation or use of the
Work or any part of it, constitutes infringement of any United States patent or
copyright, now or subsequently issued. The City will give prompt written notice to
(Revised 5.6.2026)
19183313
Page 46 of 67
Contract No. 2026-090-COS
Contractor of any action or proceeding and wilf reasonably provide authority,
information and assistance in the defense of the action. Contractor shall indemnify
and hold harmless the City from and against all damages, expenses, losses,
royalties, profits and costs, including but not limited to attorneys’ fees and
expenses awarded against the City or Contractor in any action or proceeding.
Contractor agrees to keep the City informed of all developments in the defense of
these actions. The City may be represented by, and actively participate through,
its own counsel in any suit or proceedings if it so desires.
D.
If the City is enjoined from the operation or use of the Work, or any part of the
Work, as the result of any patent or copyright suit, claim, or proceeding. Contractor
shall at its sole expense take reasonable steps to procure the right to operate or
use the Work. If Contractor cannot procure this right within a reasonable time,
Contractor will promptly, at Contractor’s option and at Contractor’s expense,
without an increase to the Job Order Price, (i) modify the Work so as to avoid
infringement of any patent or copyright or (ii) replace the Work with Work that does
not infringe or violate any patent or copyright.
E.
Articles 10.2(C) and 10.2(D) will not be applicable to any suit, claim or proceeding
based on infringement or violation of a patent or copyright:
1. Relating solely to a particular process or product of a particular
manufacturer specified by the City and not offered or recommended by
Contractor to the City; or
2. Arising from modifications to the Work by the City or its agents after
acceptance of the Work; or
3. Relating to the copyrights of any specification, drawings, or any Design
Documents provided by the City, the Design Professional, any consultant
retained by the City, or by a Subcontractor or Supplier.
F.
The obligations stated in this Article 10.2 will constitute the sole Contract between
the parties relating to liability for infringement of violation of any patent or copyright.
ARTICLE 11 - GENERAL PROVISIONS
11.1 MARSHALING AREA
Contractor shall contact the City of Scottsdale, Development Services to determine the
requirements for obtaining a permit for marshaling areas it proposes to use. Marshaling
areas must be fenced. Contractor will obtain written approval from the property owner
for marshaling area use. This approval must contain any requirements, which are a
condition of this approval. Marshaling yard requirements according to M.A.G.
Subsection 107.6.1 and the City of Scottsdale Supplemental Specifications will apply.
11.2 CONTRACT DOCUMENTS
A.
Contract Documents are as defined in Article 12.
B.
The Contract Documents form the entire Contract between the City and
(Revised 6,6.2026)
19183313
Page 47 of 67
Contract No. 2026-090-COS
Contractor. No oral representations or other Contracts have been made by the
parties except as specifically stated in the Contract Documents. Each provision of
law and any terms required by law to be in this Contract are a part of this Contract
as if fully stated herein.
C.
In the event of any inconsistency, conflict, or ambiguity between or among the
Contract Documents, the Contract Documents will take precedence in the order in
which they are listed In the definition of Contract Documents in Article 12. As to
drawings and plans, given dimensions will take precedence over scaled
measurements, and large-scale plans over small-scale plans. Contract
specifications wili take precedence over contract plans.
D.
The Contract Documents are intended to permit the parties to complete the Work
and all obligations required by the Contract Documents within the times and prices
agreed upon for each Job Order. The Contract Documents are intended to be
complementary and interpreted in harmony so as to avoid conflict, with words and
phrases interpreted in a manner consistent with construction and design industry
standards.
E.
This Contract, the Plans, Standard Specifications and Details, Special Provisions,
Performance Bond, Payment Bond, Certificates of Insurance, Job Orders and Job
Order Adjustments (if any) are by reference made a part of this Contract to the
same extent as if set forth in full.
F.
Work Product
1. All Work products (electronically or rrianually generated) including but not
limited to: cost estimates, studies, design analyses, original mylar
drawings. Computer Aided Drafting and Design (CADD) file diskettes, and
other related documents which are prepared or procured in the
performance of this Contract (collectively referred to as documents) are to
be and remain the properly of the City and are to be delivered to the City
before the final payment is made to Contractor. In the event these
documents are altered, modified or adapted without the written consent of
Contractor or the Subconsultants, which consent Contractor or the
Subeonsultants will not unreasonably withhold, the City agrees to hold
Contractor and the Subconsultants harmless to the extent permitted by law
from the legal liability arising out of the City’s alteration, modification or
adoption of the documents.
2. The copyrights, patents, trade secrets or other intellectuai property rights
associated with the ideas, concepts, techniques, inventions, processes or
works of authorship developed, created by Contractor, its Subconsultants
or personnel, during the course of performing this Contract or arising out of
the Project will belong to Contractor.
11.3 MODIFICATIONS
The Contract Documents may not be changed, altered, or amended in any way except
as consistent with the City of Scottsdale Procurement Code, as amended.
(Revised 5.6.2026)
19183313
Page 48 of 67
Contract No. 2026-090-COS
11.4 TIME IS OF THE ESSENCE
Time is of the essence with respect to the dates and times stated in the Contract
Documents.
11.6 COOPERATION AND FURTHER DOCUMENTATION
Contractor agrees to provide the City any other duly executed documents, as will be
reasonably requested by the City, to implement the intent of the Contract Documents.
11.6 ASSIGNMENT
Neither Contractor nor the City will, without the written consent of the other, assign,
transfer or sublet any portion of this Contract or part of the Work or the obligations
required by the Contract Documents.
11.7 FORCE MAJEURE
Except for payment of sums due, neither party shall be liable to the other nor deemed in
default under this Contract if and to the extent that such party’s performance of this
Contract is prevented by reason of force majeure. The term "force majeure" means an
occurrence that is beyond the control of the party affected and occurs without its fault or
negligence. Without limiting the foregoing, force majeure includes acts of God; acts of
the public enemy; war; riots; strikes; mobilization; labor disputes; civil disorders; fire;
flood; lockouts; injections-intervention-acts; or failures or refusals to act by government
authority; and other similar occurrences beyond the control of the party declaring force
majeure which such party is unable to prevent by exercising reasonable diligence.
11.8 FUNDS APPROPRIATION
Multiterm contracts for job-order-cohtracting construction services are subject to A.R.S.
§34-607, as amended. If the City Council does not appropriate funds to continue this
Contract and pay for charges, the City may terminate this Contract at the end of the
current fiscal period. The City agrees to give written notice to Contractor at least thirty
(30) days before the end of its current fiscal period and will pay Contractor for all
approved charges incurred through the end of the period.
11.9 CONSTRUCTION METHODS
If the City provides Contractor with a written order to provide adequate maintenance of
traffic, clean-up, dust control or to correct deficiencies or damage resulting from
abnormal weather conditions, and Contractor fails to comply in the time frame specified,
the City may have Work accomplished by other sources at Contractor's expense, without
an increase in the Job Order Price.
11.10 UTILITY RELOCATIONS FOR CONSTRUCTION METHODS
If any utility is relocated or rebuilt to accommodate Contractor’s construction methods
and available equipment, the expense will be borne by Contractor and will be replaced
to the original location before completion of the Job Order at the request of the City’s
(Revised 5.6.2026)
19183313
Page 49 of 67
Contract No. 2026-090-COS
Project Coordinator at Contractor’s sole expense, without an increase in the Job Order
Price,
11.11 DAMAGED UTILITIES DURING CONSTRUCTION
Any utilities damaged during construction shall be replaced at Contractor’s expense,
without an increase in the Job Order Price, as per the requirements of the M.A.G.
Standard Specifications.
11.12 SUCCESSORS AND ASSIGNS
This Contract will extend to and be binding upon Contractor, its successors and assigns,
including any individual, company, partnership, or other entity with or into which
Contractor will merge, consolidate, or be liquidated, or any person, corporation,
partnership, or other entity to which Contractor will sell its assets, except that services
covered by this Contract may not be assigned or sublet in whole or in part without first
obtaining the written consent of the Purchasing Director and Contract Administrator.
11.13 CONFLICT IN LANGUAGE
Ali services and Work performed will conform to all applicable City of Scottsdale codes,
ordinances and requirements as outlined in the Contract Documents. If there is a conflict
in interpretation between provisions in this Contract and those in exhibits, the provisions
in this Contract will prevail.
11.14 THIRD PARTY BENEFICIARY
Nothing under the Contract Documents will be construed to give any rights or benefits
in the Contract Documents to anyone other than the City and Contractor, and all duties
and responsibilities undertaken in accordance with the Contract Documents will be for
the sole and exclusive benefit of the City and Contractor and not for the benefit of any
other or third party.
11.15 GOVERNING LAW AND VENUE
This Contract and all Contract Documents will be considered to be made under and will
be construed in accordance with and governed by the laws of the State of Arizona
without regard to the conflicts or choice of law provisions. Any action to enforce any
provision of this Contract or to obtain any remedy with respect to this Contract shall be
brought in the Superior Court of Maricopa County, Arizona, and for this purpose, each
party expressly and irrevocably consents to the jurisdiction and venue of that Court and
waives the right to have such action removed to Federal District Court.
11.16 SEVERABILITY
If any provision of the Contract Documents or their application to any person or
circumstance is invalid, illegal or unenforceable to any extent, the remainder of the
Contract Documents and the application of the Contract Documents will not be affected
and will be enforceable to the fullest extent permitted by law. In accordance with the
provisions of A.R.S. § 41-194.01, as amended, should the Attorney General give notice
to the City that any provision of the Contract Documents violates state law or the Arizona
(Revised 5.6.2026)
19183313
Page 50 of 67
Contract No. 2026-090-COS
Constitution, or that it may violate a state statute or the Arizona Constitution, and the
Attorney General submits the offending provision to the Arizona Supreme Court, the
offending provision(s) shall be immediately severed and struck from the Contract
Documents and the City and Contractor shall, within ten (10) days after such notice,
negotiate in good faith to resolve any issues related to the severed provision(s).
11.17 LEGAL REQUIREMENTS
Contractor shall perform all Contract Services in accordance with all Legal
Requirements and will provide all notices applicable to the Contract Services as required
by the Legal Requirements.
11.18 INDEPENDENT CONTRACTOR
The services the Contractor provides to the City are that of an Independent Contractor,
Neither party to this Contract shall be deemed to be the employee or agent of the other
party to the Contract. Upon request, the Contractor shall provide the required I.R.S.
From W-9 which is available from the IRS website at www.IRS.gov under its forms
section.
Any provisions in the Contract Documents that may appear to give the City the right to
direct Contractor as to the details of accomplishing the Work or to exercise a measure
of control over the Work means that Contractor will follow the wishes of the City as to
the results of the Work only. These results will comply with all applicable laws and
ordinances.
11.19 CITY’S RIGHT OF CANCELLATION
Pursuant to A.R.S. § 38-511, as amended, the City may cancel any contract or
agreement, without penalty or obligation, if any person significantly involved in
initiating, negotiating, securing, drafting, or creating the contract on behalf of the City's
departments or agencies is, at any time while the contract or any extension of the
contract is in effect, an employee of any other party to the contract in any capacity or
a contractor to any other party to the contract with respect to the contract’s subject
matter. The cancellation will be effective when all other parties to the contract receive
the City’s written notice unless the notice specifies a later time.
11.20 SURVIVAL
Except as expressly agreed herein, all warranties, representations and indemnifications
by Contractor shall survive the completion, expiration, and/or termination of this
Contract,
11.21 COVENANT AGAINST CONTINGENT FEES
Contractor warrants that no person has been employed or retained to solicit or secure
this Contract upon any contract or understanding for a commission, percentage,
brokerage, or contingent fee, and that no member of the City Council, or any employee
of the City of Scottsdale has any interest, financially, or otherwise, in the firm. For breach
or violation of this warranty, the City will have the right to annul this Contract without
(Revised 5.6.2026)
19183313
Page 51 of 67
Contract No. 2026-090-COS
liability, or at its discretion to deduct from the Contract Price or consideration, the full
amount of any commission, percentage, brokerage, or contingent fee.
11.22 NO WAIVER
Either party’s failure to insist on strict performance of any term or condition of the
Contract shall not be deemed waiver of that term or condition even if the party accepting
or acquiescing in the nonconforming performance knows of the nature of the
performance and fails to object to it.
11.23 HEADINGS
The headings used in this Contract, or any other Contract Documents, are for ease of
reference only and will not in any way be construed to limit or alter the meaning of any
provision.
11.24 NOTICE
Ail notices or demands required by this Contract must be given to the Other party in
writing, delivered by hand or by registered or certified mail at the addresses stated
below, or to any other address the parties may substitute by giving written notice as
required by this section. Notice by electronic mail or facsimile will not be considered
notice.
To City:
City of Scottsdale
Attn: Alison Tymkiw
7447 E. Indian School Road, Suite 205
Scottsdale, AZ 85251’
To JOC Contractor:
Summa Mechanical Contractors, Inc.
Attn: Samantha Kitchen
2222 West Grant Street
Phoenix, AZ 85009_____________
11.25 ADDITIONAL CITY RIGHTS REGARDING SECURITY INQUIRIES
Projects may be completed in both secure and non-secure City facilities. All Contractor
and Subcontractor employees may be required to pass mandatory background checks
prior to the start of any Work and be issued access badges by City of Scottsdale
Municipal Security. In addition to the foregoing, the City reserves the right to: (1) have
an employee/prospective employee of Contractor be required to provide fingerprints and
execute any other documentation as may be necessary to obtain criminal justice
information pursuant to A.R.S. § 41-1750(G)(4); (2) act on newly acquired Information
whether or not that information should have been previously discovered; (3) unilaterally
change its standards and criteria relative to the acceptability of Contractor's employees
or prospective employees; and, (4) object, at any time and for any reason, to an
employee of Contractor performing Work (including supervision and oversight) under
this Contract.
A. Provisions Applicable to all Contractor Contracts and Subcontracts. Contractor will
include the terms of this provision for employee background and security checks
(Revised 5.6.2026)
19183313
Page 52 of 67
Contract No. 2026-090-COS
and screening in all contracts and subcontracts for Work performed under this
Contract, including supervision and oversight.
B. Materiality of Security Inquiry Provisions. The Security Inquiry provisions of this
Contract, as stated above, are material tp the City’s entry into this Contract and
any breach by Contractor may, at the City’s sole option and unfettered discretion,
be considered to be a breach of contract of sufficient magnitude to terminate this
Contract. Termination will subject Contractor to liability for its breach of contract.
11.26 HAZARDOUS MATERIALS
A.
Upon discovery of hazardous materials Contractor will comply with all applicable
laws/ordinances and regulations and take all appropriate health and safety
precautions.
B.
Unless included in the Work, if Contractor encounters onsite, or as material to be
incorporated in the Work, any material which it reasonably believes to contain
asbestos, polychlorinated biphenyl (PCB), or other hazardous substances or
materials regulated by public health laws, it wili immediately stop work and report
the condition to the City.
C.
If the material is found to contain asbestos, PCB or other hazardous substances or
materials regulated by public health laws, Contractor will not resume Work in the
affected area until the material has been abated or rendered harmless. Contractor
and the City may agree; in writing, to continue Work in non-affected areas onsite.
D.
An extension of Job Order Time may be granted in accordance with Article 5.
E.
Contractor will comply with all applicable laws/ordinances and regulations and take
all appropriate health and safety precautions upon discovery.
F.
Despite the provisions of this Article 11.26, the City is not responsible for
hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable. Contractor will
indemnify, defend and hold harmless the City and the City’s officers, directors,
employees and agents from and against all claims, losses, damages, liabilities and
expenses, including attorneys’ fees and expenses, arising out of or resulting from
those hazardous conditions or materials introduced to the Site by Contractor,
Subcontractors or anyone for whose acts they may be liable.
11.27 TRAFFIC CONTROL
A.
Complete street closures will not be permitted unless specified in the Special
Provisions or approved by the City. The timing and sequence of street closures
will be approved by the Traffic Engineering Director, or designee, at least fourteen
(14) days before the closure. This approval is necessary to provide coordination
with other roadway projects and special events.
B.
Adequate barricades and lighted warning signs must be installed and maintained
by Contractor throughout the duration of any Project. All traffic control must be in
accordance with the current version of the City of Scottsdale Supplement to MAG
(Revised 6.6.2026)
19183313
Page 53 of 67
Contract No. 2026-090-COS
C.
Uniform Standard Specifications Section 401 or as required by the approved
barricade plan unless othenwise specified in the Special Provisions.
Contractor will submit a construction schedule and a barricade plan to the City
Traffic Engineering Director, or designee, for approval or modi^cation at least
seventy-two (72) hours before construction is initiated, and must wait to commence
construction until the plan is signed as accepted by the City Traffic Engineering
Director, or designee.
11.28 MATERIAL SOURCE
No material source has been designated by the City for use under this Contract. MAG
Specification, Section 106 will apply as will ADOT Standard Specifications 1982, Section
106.1, 106.2, 106.7 & 106.8, which outline controls and Section 1001-1, -2, & -4
concerning approval of Contractor-Furnished Source and supplemental Contracts in
regards to environmental analysis and the liability for materials testing costs.
Contractor and Subcontractor furnished material sources situated in the 100-year flood
plain of any stream or watercourse will not be allowed if located within 1.0 mile upstream
and 2.0 miles downstream of any highway structure or surfaced roadway crossing.
A Contractor and Subcontractor-furnished source will be defined as a material source,
which is neither an ADOT furnished source nor a commercial source, as defined in this
Contract.
A commercial source will be defined as a material source in which the owner or producer
has been regularly engaged for at least one (1) year during regular business hours on a
regular basis in the processing and selling of sand, rock, ready mixed Portland cement
concrete, asphaltic concrete and other similar products normally produced and sold to
all parties. The company must have an Arizona retail sales tax license.
The location of any new material source or existing non-commercial material source
proposed for use under this Contract must be reviewed by the appropriate agency
having flood plain management jurisdiction over the area of proposed source location.
Contractor and Subcontractor will obtain a letter from the agency addressed to the
Contract Administrator certifying that the proposed source location conforms to the
required conditions and the applicable Standard Specifications. Contractor will
familiarize himself with the nature and extent of the Contract Documents, work to be
performed, all local conditions, and federal, state and local laws, ordinances, rules and
regulations that in any manner may affect cost, progress or performance of the Work.
11.29 FAMILIARIZATION WITH APPLICABLE LAWS
Contractor will familiarize itself with the nature and extent of the Contract Documents,
work to be performed, all local conditions, and federal, state and local laws, ordinances,
rules and regulations that in any manner may affect cost, progress or performance of
the Work. Contractor shall comply with all applicable federal, state, and local laws,
statutes, ordinances, standards, orders, rules, and regulations, including, as applicable,
workers’ compensation laws, minimum and maximum salary and wage statutes and
regulations, prompt payment and licensing laws and regulations.
(Revised 5.6.2026)
19183313
Page 54 of 67
Contract No. 2026-090-COS
11.30 NATIVE PLANTS
Contractor agrees it will take whatever steps, procedures or means necessary to
remove, move, displace and save all native plants within the contract work area in
accordance with the City of Scottsdale Revised Code, as amended, and all applicable
state and county statutes, ordinances, codes and other policy requirements and
recognized methods, procedures, techniques and equipment for protection, salvage,
and handling of all plants to be moved from the construction area. This is not a pay item
unless specified upon the Schedule of Bid Items.
11.31 ENDANGERED HARDWOODS
Contractor agrees any construction, building addition or alteration project: which is
financed by monies of this state or its political subdivisions will riot use endangered
tropical hardwood unless an exemption is granted by the Director of the State of Arizona,
Department of Administration.
11.32 CONSTRUCTION ACTIVITY
Contractor agrees that all construction activity occurring on Site shall conform to the
hour and noise requirements of the City of Scottsdale Revised Code, as amended.
11.33 COMPLIANCE WITH LOCAL, STATE AND FEDERAL LAWS
A. Contractor understands and acknowledges the applicability to it of the American with
Disabilities Act, the Immigration Reform and Control Act of 1986, the Drug Free
Workplace Act of 1989, Fair Labor Standards Act, Age Discrimination in Employment
Act, Family and Medical Leave Act, National Labor Relations Act, Occupational Safety
and Health Act, and other local, state or federal law governing Contractor’s labor and
employment practices. Contractor agrees to comply with these laws in performing this
Contract and to permit the City to verify compliance. Contractor further agrees that
any violation of provision on the part of Contractor, its employees, agents or assigns
will constitute a material breach of this Contract.
Contractor will also comply with A.R.S. §34-301, “Employment of Aliens on Public
Works Prohibited," and A.R.S. §34-302, “Residence Requirements for Ernployees," as
amended. Contractor will include the terms of this provision in all contracts and
subcontracts for Work performed under this Contract, including supervision and
oversight.
Under the provisions of A.R.S. §41-4401 and Exhibit C. attached hereto,
Contractor warrants to the City that Contractor and ail its Subcontractors wijl
comply with ail Federal Immigration laws and regulations that relate to its
employees and that Contractor and all its Subcontractors now comply with the
E-Verify Program under A.R.S. §23-214(A).
A breach of this warranty by Contractor or any of its Subcontractors will be considered
a material breach of this Contract and may subject Contractor or Subcontractor to
penalties up to and including termination of this Contract or any subcontract.
The City retains the legal right to inspect the papers of any employee of Contractor or
(Revised 5.6.2026)
19183313
Page 55 of 67
Contract No. 2026-090-COS
any Subcontractor who works on this Contract to ensure that Contractor or any
Subcontractor is complying with the warranty given above.
The City may conduct random verification of the employment records of Contractor
and any of its Subcontractors to ensure compliance with this warranty. Contractor
agrees to indemnify, defend and hold the City harmless for, from and against all losses
and liabilities arising from any and all violations of these statutes.
The City will not consider Contractor or any of its Subcontractors in material breach of
this Contract if Contractor and its Subcontractors establish that they have complied
with the employment verification provisions prescribed by 8 USCA §1324(a) and (b) of
the Federal Immigration and Nationality Act and the E-Verify requirements prescribed
by A.R.S. §23-214(A), as amended. The “E-Verify Program" means the employment
verification pilot program as jointly administered by the United States Department of
Homeland Security and the Social Security Administration or any of its successor
programs.
The provisions of this Article must be included in any contract Contractor enters into
with any and all of its Subcontractors who provide services under this Contractor any
Subcontract. “Services” are defined as furnishing labor, time or effort in the State of
Arizona by a Contractor or Subcontractor. Services include construction or
maintenance of any structure, building or transportation facility or improvement to real
property. Contractor will take appropriate steps to assure that all Subcontractors
comply with the requirements of the E-Verify Program. Contractor’s failure to assure
compliance by all its Subcontractors with the E-Verify Program may be considered a
material breach of this Contract by the City.
B. Compliance with Americans with Disabilities Act. The City of Scottsdale assures full
compliance with Title VI of the Civil Rights Act of 1964, Title II of the Americans with
Disabilities Act of 1990 (ADA), and other related authorities in all of its programs and
activities. The City's Title VI and ADA Programs require that no person shall, on the
grounds of race, color, national origin and disability, be excluded from participation in,
be denied the benefits of, or be othenwise subjected to discrimination under any
program or activity. This policy is also applicable to contractors and/or consultants
conducting work on behalf of the city.
Contractor acknowledges that, in accordance with the Americans with Disabilities Act
(ADA), programs, services and other activities provided by a public entity to the public,
whether directly or through a contractor, must be accessible to the disabled public.
Contractor will provide the services specified in this Contract in a manner that complies
with the ADA and any and all other applicable federal, state and local disability rights
legislation. Contractor agrees not to discriminate against disabled persons in the
provision of services, benefits or activities provided under this Contract and further
agrees that any violation of this provision on the part of Contractor, its employees,
agents or assigns will constitute a material breach of this Contract.
C. Equal Employment Opportunity and Discrimination. For the duration of this Contract,
Contractor represents and warrants it will comply with all applicable local, state and
federal laws governing equal employment opportunities, or prohibiting employment or
other discrimination based on any protected characteristic including but not limited to
actual or perceived race, color, religion, sex, age, disability, national origin, sexual
orientation, gender identity, or U.S. military status. City of Scottsdale Revised Code,
(Revised 5.6.2026)
19183313
Page 56 of 67
Contract No. 2026-090-COS
Chapter 15 mandates Contractor compliance with the policies contained therein.
Contractor agrees that any violation of provision on the part of Contractor, its
employees, agents or assigns will constitute a material breach of this Contract.
Contractor will include the terms of this provision in all contracts and subcontracts for
work performed under this Contract, including supervision and oversight. The
Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to racei color, religion, sex, sexual orientation, gender
identity, or national origin.
D. No Preferential Treatment or Discrimination. In accordance with the provisions of
Article II, Section 36 of the Arizona Constitution, the City will not grant preferential
treatment to or discriminate against any individual or group on the basis of race, sex,
color, ethnicity or national origin. To avoid the appearance of impropriety, Contractor
shall not make any donation to the City, of any goods or services during the term of
this Contract, unless it has specifically been approved by the City Manager or
designee.
E. Advertising. No advertising or publicity concerning the City using Contractor’s services
shall be undertaken without prior written approval of such advertising or publicity by
the Contract Administrator and the City Attorney.
11.34 DATA CONFIDENTIALITY
A.
As used in this Contract, data means all Information, whether written or verbal,
including plans, photographs, studies, investigations, audits, analyses, samples,
reports, calculations, internal memos, meeting minutes, data field notes, work
product, proposals, correspondence and any other similar documents or
information prepared by or obtained by Contractor in the performance of this
Contract.
B.
The parties agree that all data, including originals, images, and reproductions,
prepared by, obtained by, or transmitted to Contractor in connection with
Contractor’s performance of this Contract is confidential and proprietary
information belonging to the City.
C.
Contractor will not divulge data to any third party without first obtaining the written
consent of the City. Contractor will not use the data for any purposes except to
perform the services required under this Contract. These prohibitions will not apply
to the following data provided Contractor has first given the required notice to the
City:
1. Data, which was known to Contractor before its performance under this
Contract unless the data was acquired in connection with the Work
performed for the City;
2. Data which was acquired by Contractor in its performance under this
Contract and which was disclosed to Contractor by a third party, who to the
best of Contractor’s knowledge and belief, had the legal right to make
disclosures and Contractor is not otherwise required to hold the data in
(Revised 5.6.2026)
19183313
Page 57 of 67
Contract No. 2026-090-COS
confidence; or
3. Data, which is required to be disclosed by virtue of law, regulation, or court
order to which Contractor is subject.
D.
In the event Contractor is required or requested to disclose data to a third party, or
any other information to which Contractor became privy as a result of any other
contract with the City, Contractor will first notify the City as required in this Article
of the request or demand for the data, Contractor will give the City sufficient facts
so that the City can be given an opportunity to first give its consent or take any
action the City may consider appropriate to protect the data or other information
from disclosure.
E.
Unless prohibited by law, within ten (10) days after completion of services for a
third party on real or personal property owned or leased by the City, Contractor will
promptly deliver, as stated in this Article, a copy of all data to the City. All data will
continue to be subject to the confidentiality requirements of this Contract.
F.
Contractor assumes all liability for maintaining the confidentiality of the data in its
possession and agrees to compensate the City if any of the provisions of this
Article are violated by Contractor, its employees, agents or Subconsultants. Solely
for the purposes of seeking injunctive relief, it is agreed that a breach of this Article
will be considered to cause irreparable harm that justifies injunctive relief in court.
11.35 CONFLICT OF INTEREST
A.
To evaluate and avoid potential conflicts of interest. Contractor will provide written
notice to the City, as stated in this Article, of any work or services performed by
Contractor for third parties that may involve or be associated with any real property
or personal property owned or leased by the City. The notice will be given seven
(7) business days before commencement of the Project by Contractor for a third
party, or seven (7) business days before an adverse action as defined below.
Written notice and disclosure will be sent to the City Senior Representative
identified in Article 7.4.
B.
Actions that are considered to be adverse to the City under this Contract include
but are not limited to:
1. Using data as defined in this Contract acquired in connection with this
Contract to assist a third party in pursuing administrative or judicial action
against the City;
2. Testifying or providing evidence on behalf of any person in connection with
an administrative or judicial action against the City; and
3. Using data to produce income for Contractor or its employees
independently of performing the services under this Contract, without first
obtaining the written consent of the City.
C.
Contractor represents that except for those persons, entities and projects identified
to the City, the services to be performed by Contractor under this Contract are not
(Revised 5.6.2026)
19183313
Page 58 of 67
Contract No. 2026-090-COS
D.
expected to create an interest with any person, entity, or third party project that is
or may be adverse to the interests of the City.
Contractor's failure to provide a written notice and disclosure of the information
stated in this Article on Conflicts of Interest will constitute a material breach of this
Contract.
E. This Contract is subject to cancellation by the City of Scottsdale in accordance with
the provisions of A.R.S. § 38 511, as amended.
11.36 COMMENCEMENT OF STATUTORY LIMITATION PERIOD AND STATUTE OF
REPOSE
A.
Before Final Completion. As to acts or failures to act occurring before the relevant
date of Final Completion, any applicable statute of limitations will commence to run
and any alleged cause of action will be considered to have accrued in any and all
events not later than the date of Final Completion.
B.
Between Punch List Preparation and Final Completion. As to acts or failures to
act occurring between the relevant date of Punch List Preparation and before Final
Completion, any applicable statute of limitation will begin to run and any alleged
cause of action will be considered to have accrued in any events not later than the
date of Final Completion.
C.
After completion. As to acts or failures to act occurring after the date of Final
Completion, any applicable statute of limitations will commence to run and any
alleged cause of action will be considered to have accrued in any and all events
not later than the date of any correction of the Work or failure to correct the Work
by the Contractor, or the date of actual commission of any other act or failure to
perform any duty or obligation by the Contractor or the City, whichever occurs last.
D.
Statute of Repose. The time period for the applicable Statute of Repose will
comnrience to run at the time specified in A.R.S. §12-552 as it is amended or
renumbered from time to time.
11.37 LOSS AND DAMAGES
Except as expressly provided in this Contract, all loss or damage arising out of the nature
of the Work to be done or from the action of the elements, or from any unforeseen
circumstances, in the prosecution of the same, or from any unusual obstructions or
difficulties which may be encountered in or during the prosecution of the Work, or from
any casualty whatsoever of every description, will be sustained and borne by Contractor
at its sole cost and expense. By signing this Contract, all rights of subrogation are waived
against the City, its officers, officials, agents and employees.
11.38 RIGHTS-OF-WAY
The M.A.G. Standard Specification 107.12 is modified to read as follows: “Contractor, at
its own expense, is responsible for the acquisition of any necessary temporary
easements for construction purposes, storage and maintenance purposes, which are
(Revised 6.6.2026)
19183313
Page 59 of 67
Contract No. 2026-090-COS
required in addition to existing easements or rights of way secured by the City as
indicated upon the plans.”
11.39 EXISTING TRAFFIC AND STREET SIGNS AND TRAFFIC SIGNAL EQUIPMENT
Contractor will use due care when excavating at or near intersections where traffic signal
underground conduit is located. Contractor will notify the Transportation Maintenance
Traffic Signal Division (tel. 480.312.5620) at least forty-eight (48) hours in advance of
any work at the intersections. Contractor will be responsible for the installation and
maintenance of temporary overhead traffic signal cable as specified by the
Transportation Department when underground conduit is to be severed by excavations
at the intersection. The Transportation Department will have all underground traffic
conduit located and will provide the necessary City Technicians to assist Contractor in
identifying wiring phases and direction of conduit runs upon twenty-four (24) hours’
notice from Contractor and at least one (1) day before Contractor's scheduled wiring and
installation of temporary cables. Contractor will be responsible for the wiring and
connection of all temporary cable within the pull boxes and terminal compartments. The
Transportation Department will provide a City technician to assist Contractor with
connecting field wiring within the traffic signal control cabinet. Contractor will provide, at
its expense, at least one off-duty uniformed Police Officer as may be required to direct
traffic while the traffic signal is turned off and the wiring is transferred. Contractor will
be responsible as specified by the Traffic Department for the repair and restoration of
all traffic signal overhead and underground items that have been damaged or modified.
The City does not permit the splicing of Magnetic Detector Loops.
11.40 CERTIFICATION OF USE OF BENCHMARKS
In compliance with the City’s Design Standards & Policies Manual (DS&PM), Sections
9-1.1 and 9-1.301, it is the City’s intent that Contractor must use both horizontal and
vertical benchmarks with City of Scottsdale published values for any survey on all public
works projects. These published values are available for public use at the following
website:
https://eservices.scottsdaleaz.qov/maps/benchmarks. AT LEAST 1
HORIZONTAL AND 1 VERTICAL BENCHMARK MUST MATCH THE NORTHING,
EASTING OR ELEVATION VALUES PUBLISHED ON THE CITY’S WEBSITE. If
required by the City, Contractor must sign and submit with this Contract, the Certificate
of Use attached and by reference made a part of this Contract.
11.41 TAX INDEMNIFICATION
The fee listed in this Contract includes any and all taxes applicable to the activities under
this Contract. The City will have no obligation to pay additional amounts for taxes of any
type. Contractor, its Subcontractors, Subconsultants and Suppliers, shall pay all
Federal, state and local taxes applicable to its operation and any persons employed by
Contractor, its Subcontractors, Subconsultants and Suppliers, except as may be
othenA/ise provided in this Contract. Contractor shall, and also require its
Subcontractors, Subconsultants and Suppliers to hold the City harmless from any
responsibility for taxes, damages and interest, if applicable, contributions required under
Federal, and/or state and local laws and regulations and any other costs including
transaction privilege taxes, unemployment compensation insurance, Social Security and
Worker’s Compensation.
(Revised 5.6.2026)
19183313
Page 60 of 67
Contract No. 2026-090-COS
11.42 ISRAEL BOYCOTT/FORCED LABOR PROVISIONS
By executing this contract, Contractor certifies that it is not currently engaged in and will
not for the duration of this Contract engage in boycott activity proscribed by A.R.S. § 35-
393 et seq, as amended.
Pursuant to A.R.S. § 35-394, as amended, Contractor warrants and certifies that it does
not currently, and agrees for the duration of this Contract that it will not use:
1)
The forced labor of ethnic Uyghurs in the People's Republic of China.
2)
Any goods or services produced by the forced labor of ethnic Uyghurs in the
People's Republic of China.
3)
Any contractors, subcontractors or suppliers that use the forced labor or any goods
or services produced by the forced labor of ethnic Uyghurs in the People's Republic
of China.
If Contractor becomes aware during the term of this Contract that Contractor is not in
compliance with this Article, Contractor shall notify the City within five (5) business days
after becoming aware of the noncompliance. Failure of Contractor to provide a written
certification that Contractor has remedied the noncompliance within one hundred eighty
(180) days after notifying the City of its noncompiiance will result in automatic termination
of this Contract, unless an earlier contract termination, cancellation, or expiration date
applies.
ARTICLE 12- DEFINITIONS
“Allowance" means an agreed amount by the City and Contractor for items which may be required
to complete the scope of work.
“As-Built Document” - "As-built in construction is equivalent to “as-is." Drawings deemed “as-
built" are final drawings that include all changes made during the actual construction process.
These drawings represent the actual existing constructed conditions as opposed to designs or a
proposed condition. The As-Built Documents should be per A.R.S. § 32-152.
“Blueline or Blackline Prints" - Prints that allows comparison of document versions to show what
has been revised.
“City" or “Owner” means the City of Scottsdale, Arizona, an Arizona municipal corporation.
Regulatory activities handled by the City of Scottsdale Development Services, Planning and Fire
Departments or any other City department are not subject to the responsibilities of the City under
this Contract.
“City's Representative" means the person designated in Article 7.4(A)(2).
"City's Senior Representative" means the person designated in Article 7.4(A)(1).
"Claim” means a written request for either payment of additional monies or extension of contract
time, submitted in accordance with the terms of this Contract or applicable law.
“Construction Coordinator” means a City employee who coordinates the daily construction
activities with Contractor, and with their inspection staff that performs quality control inspections.
(Revised 5.6.2026)
19183313
Page 61 of 67
Contract No. 2026-090-COS
enforces project plans and specifications and adopted City codes and ordinances.
“Construction Documents” means the plans, specifications and drawings prepared by the Design
Professional after correcting for permit review requirements and incorporating any approved
amendments, addenda, exhibits and Job Order Adjustments.
“Construction Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Contract Administrator” means the person designated in Article 7.4(A) or designee. The Contract
Administrator will serve as Contractor’s primary point of contact with the City, monitor Contractor’s
performance, review and approve invoices, establish delivery schedules, and in conjunction with
Purchasing ensure Certificates of Insurance are current, conform to the requirements of this
Contract, and are in the City’s possession. Contractor will direct any reports and/or special
requests to the Contract Administrator.
"Contract Documents" means the following items and documents in descending order of
precedence executed by the City and Contractor: (1) Job Order Adjustments; (2) Contract
Modifications: (3) Job Orders; (4) this Contract including all exhibits and attachments; (5)
Contractor’s Proposal (if any); (6) Contractor Statement of Qualifications.
"Contract Modification” means a specific written concurrence between the City and Contractor for
changes to this Contract consistent with the City of Scottsdale Procurement Code, as amended.
“Contract Price" means the amount or amounts stated in Article 4 subject to any Contract
Modifications.
“Contract Services” means the services required by the Contract Documents.
"Contract Time(s)’’ means the time stated in Article 3, subject to Contract Modifications as
permitted by this Contract.
“Contractor” is Contractor selected by the City to provide or procure construction services as
detailed in this Job Order Contract.
“Contractor Payment Request" means the City form used by Contractor to request progress
payments for Job Orders in accordance with Article 6.
“Contractor’s Representative" means the person described in Article 7.4(B)(2).
"Contractor’s Senior Representative" means the person described in Article 7.4(B)(1).
“Day(s)” means calendar days unless othenwise specifically noted in the Contract Documents.
"Delay” means an unanticipated event or interference with the progress of a critical path work
activity being performed at the time that causes the completion date of the project to be extended.
Delays may be caused by the City, Contractor, third parties or Force Majeure events. Delays may
be excusable, compensable, non-compensable or concurrent.
“Delay, Compensable" means delay that results from the City’s actions or inactions that entitle
Contractor to both a time extension and deiay damages.
(Revised:5.6.2026)
19183313
Page 62 of 67
Contract No. 2026-090-eOS
"Delay, Concurrent" means two (2) or more delays, within the same timeframe, both of which
would Independently impact the Project Schedule. If one delay Is caused by the City and the
other by Contractor, Contractor will generally be entitled to an excusable, non-compensable time
extension, to the degree the delays may “overlap.”
"Delay, Excusable" means an unforeseeable delay caused by an event beyond the control and
without the fault or negligence of Contractor (including its Suppliers and Subcontractors).
Excusable delays may be compensable or non-cbmpensable, depending upon whether the terms
of the Contract or the law allows recovery of delay costs. Unless otherwise shown, it will generally
be presumed that these delays are non-compensable.
“Delay, Non-Excusable” means a delay within the control of Contractor, its Suppliers and
Subcontractors, or a delay resulting from a risk taken by Contractor under the terms of the
Contract. Contractor will not be due any time extension or delay damages, and may be
responsible for paying to the City, actual or liquidated damages for the delay.
“Deliverables" means the work products prepared by Contractor in performing the scope of work
described in this Contract. Some of the major deliverables to be prepared and provided by
Contractor may include, but are not limited to: Construction Management Plan, Project Schedule,
Schedule of Values, alternative system evaluations, procurement strategies and plans, cost
estimates, construction market surveys, cash flow projections. Subcontractor procurement plan.
Subcontractor Contracts, Subcontractor bid packages, Supplier Contracts, and others as
indicated in this Contract or required by the Project Team.
“Design Services" - as Used in this Contract is defined in A.P.S. §34-101, as amended.
“Design Team” or “Design Professional" refers to licensed design professionals, as defined in
A.R.S. §34-101 as amended.
“Differing Site Conditions" comply with M.A.G. Standard Specifications, Subsection 102.4.
“Effective Date" means the date specified in this Contract on which the Contract becomes
effective, but if no date is specified, the date on which the City executes this Contract.
“Field Order” means a written field directive prepared and signed by the City, directing a change
in Work that does not include an adjustment in the Job Order Time or Job Order Price.
“Final Acceptance” means the completion of a Job Order as prescribed in Article 3.5.
“Financial Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Hazardous Substance" -means:
(a) Any substance designated pursuant to sections 311 (b) (2) (A) and 307(a) of the clean
water act.
(b) Any element, compound, mixture, solution or substance designated pursuant to
section 102 of CERCLA.
(c) Any hazardous waste having the characteristics identified under or listed pursuant to
section 49-922.
(d) Any hazardous air pollutant listed under section 112 of the federal clean air act (42
United States Code section 7412).
(Revised 5.6.2026)
19183313
Page 63 of 67
Contract No. 2026-090-COS
(e) Any imminently hazardous chemical substance or mixture with respect to which the
administrator has taken action pursuant to section 7 of the federal toxic substances
control act (15 United States Code section 2606).
(f) Any substance which the director, by rule, either designates as a hazardous substance
following the designation of the substance by the administrator under the authority
described in subdivisions (a) through (e) of this paragraph or designates as a
hazardous substance on the basis of a determination that such substance represents
an imminent and substantial endangerment to public health.
“Horizontal Construction" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Informational Submittals" - Submittals are required (common with construction projects) for the
architect and engineer to verify that the correct products and quantities will be installed on a
project.
“Job Order" or “Project” means a specific scope of Contract Services done pursuant to an
individual Job Order and includes a specific written Contract between the City and Contractor for
a Job Order including a Scope of Work, a Job Order Price, a Job Order Time and any special
conditions that may apply to be performed under this Contract. The Job Order includes the plans,
technical specificatidns, special provisions and Contractor’s proposal either by reference or
inclusion.
"Job-Order-Contracting" means a project delivery method as defined in A.R.S. §34-101, as
amended.
“Job Order Adjustment" or “Adjustment" means a written order signed by an authorized
representative of the City and which approves changes in the Work required under a Job Order,
the Job Order Price, and/or the Job Order Time consistent with the City of Scottsdale Procurement
Code, as amended.
“Job Order NotIce-to-Proceed," (NTP) means a written notice given by the City to Contractor fixing
the date on which Contractor will start to perform Contractor’s obligations under that individual
Job Order.
“Job Order Price” means the amount negotiated between Contractor and the City for an individual
Job Order that includes costs, overhead, bonding, insurance, profit and other costs as agreed to
and calculated on the Unit Prices, cost-coefficient and special items as prescribed in Article 4.
“Job Order Time" or “Duration of the Work" means the number of Day(s) from a Job Order Notice-
to-Proceed to Substantial Completion. The approved Job Order Time will be made part of this
Contract by executing an individual Job Order for specific Work.
“Legal Requirements" means all applicable federal, state and local laws, codes, ordinances,
rules, regulations, orders and decrees of any government or quasi-government entity having
jurisdiction over a Project or Site, the practices involved in a Project or Site, or any Work.
"Liquidated Damages" means an amount Contractor will pay in compliance with Article 3.6.
"Maintenance Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Must”, “will" and “shall” as used in this Contract are mandatory.
(Revised 5.6.2026)
19183313
Page 64 of 67
Contract No. 2026-090-COS
“Operations Services" - as used in this Contract is defined in A.R.S. §34-101, as amended.
“Owner Agent,” "City’s Agent" or “Owner Representative” see “City’s Senior Representative.”
“Payment Request” means a form that is accepted by the City and used by Contractor in
requesting progress payments or final payment and which will include any supporting
documentation as is required by the Contract Documents or the City, and is based on a monthly
estimate of the dollar value of the Work completed.
“Product Data" means illustrations, standard schedules, performance charts, instructions,
brochures, diagrams and other information furnished by Contractor to illustrate materials or
equipment for some portion of the Work.
"Professional Certification” - Professional certification is a designation which indicates that a
person is qualified to perform a job or task. Professional certification can be trade certification or
professional designation.
“Project Record Documents" means the documents created pursuant to Article 1.9.
“Project Record Drawing Prints" - Set of current design drawings used by construction contractor
for reference during construction. These drawings are typically marked up during the construction
process and are used to develop the subsequent As-Built Documents.
"Project Team” - Consists of the Design Professional, the Contractor, the Contract Administrator,
the City’s representatives and other stakeholders who are responsible for making decisions
regarding the Project.
“Punch List" means those minor items of Work to be completed before Final Acceptance which
do not prevent the Project from being used for the purpose for which it is intended and which will
not prevent the issuance of a Certificate of Occupancy.
“Samples" means physical examples that illustrate materials, equipment, or workmanship
representative of a part of the Work and which establish the standards by which that portion of
the Work will be judged.
"Schedule of Values (SOV)" means the Document specified in the construction phase, which
divides the Job Order Price into pay items, such that the sum of all pay items equals the Job Order
Price for the construction phase Work, or for any portion of the Work having a separate specified
Job Order Price. The SOV may or may not be output from the Progress Schedule depending on
whether the Progress Schedule is cost-loaded or not.
“Shop Drawings" means drawings, diagrams, schedules and other data specially prepared for the
Work by Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor
to illustrate some portion of the Work.
“Site" means the land or premises on which a Job Order is located. Contractor will require all
Subcontractors to include the street address of the Job Order in their contracts.
“Specifications” means those sections of the Contract Documents for the construction phase
consisting of written technical descriptions of materials, equipment, construction systems.
(Revised 5.6.2026)
19183313
Page 65 of 67
Contract No. 2026-090-COS
standards and workmanship as applied to the Work and certain applicable administrative details.
“Subcontractor” or "Subconsultant” means a person or firm having a direct contract with
Contractor or any other person or firm having a contract with Contractor at any tier, who undertake
to perform a part of the Work for which Contactor is responsible. All Subcontractors,
Subconsultants and Suppliers must be selected in accordance with the subcontractor and major
supplier selection provisions of this Contract.
“Substantial Completion” means when the Work, or when an agreed upon portion of the Work is
sufficiently complete so that the City can occupy and use the Project or a portion of it for its
intended purposes. This may include, but is not limited to: (1) approval by the City Fire Marshall
and local authorities (Certificate of Occupancy): (2) issuance of elevator permit; (3) demonstration
to the City that all systems are in place, functional, and displayed to the City or its representative:
(4) installation of all materials and equipment; (5) City review and acceptance of all systems; (6)
City review and acceptance of draft O&M manuals and record documents; (7) City operation and
maintenance training completed; (8) HVAC test and balance completed [provide minimum 30
days before projected substantial completion]; (9) completed landscaping and site work; and (10)
final cleaning.
"Supplier" means a manufacturer, fabricator, supplier, distributor, material man or vendor having
a direct contract with Contractor or any Subcontractor or Subconsultant to furnish materials or
equipment to be incorporated in the in the Work by Contractor or any Subcontractor or
Subconsultant.
“Work" means the entire completed Jop Order or the various separately identifiable parts of the
Job Order, required to be furnished in accordance with the Contract Documents. Work includes
and is the result of performing or furnishing labor and furnishing and incorporating materials,
resources and equipment into the Job Order, and performing or furnishing services and
documents as required by the Contract Documents.
[END OF TEXT- SIGNATURE PAGE TO FOLLOW]
(Revised 5.6.2026)
19183313
Page 66 of 67
Contract No. 2026-090-COS
CITY OF SCOTTSDALE, ARIZONA
CONTRACT NO. 2026-090-COS
CONTRACT___________
THE CITY OF SCOTTSDALE, by its Mayor and City Clerk have subscribed their names this
_____day of____________________ , 2026.
CITY OF SCOTTSDALE,
an Arizona municipal corporation
CONTRACTOR:
Summa Mechanical Contractors, Inc.,
an Arizona corporation
By:
Lisa Borowsky, Mayor
ATTEST:
By:_
Name:
Title:
Ben Lane, City Clerk
REVIEWED BY:
Melanie Gibson
City Contract Administrator
Jenn Myers, MPA, CPPO, NIGP-CPP, CPPB
Purchasing Director
Alison Tymkiw, Senior Director - City Engineer
George Woods
Safety & Risk Management Director
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
L6f5 E. Santaella, City Attorney
By: Lydia Tulin, Assistant City Attorney
(Revised 5.6.2026)
19183313
Page 67 of 67
Contract No. 2026-090-COS
i
EXHIBIT A
STATUTORY PERFORMANCE BOND
PURSUANT TO TITLE 34, CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That, __________________________ (hereinafter called the Principal) as Principal, and
________________________ , a corporation organized and existing under the laws of the State of
_______________ with its principai office in the City of____________________ , (hereinafter called
the Surety), as Surety, are held and firmly bound unto the City of Scottsdale, County of Maricopa, State of
Arizona in the amount of________________________ Dollars ($____________ ), for the payment
whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale, dated the
____ day of_______________ , 20__ , for Bid No. (bid number). Project No. (project number), (project
name), which contract is hereby referred to and made a part hereof as fully and to the same extent as if
copied at length herein.
NOW THEREFORE, the condition of this obligation is such, thatif the Principal faithfully performs and fuirills
all of the undertakings, covenants, terms, conditions and Contracts of the contract during the original term
of the contract and any extension of the contract, with or without notice to the surety, and during the life of
any guaranty required under the contract, and also performs and fulfills all of the undertakings, covenants,
terms, conditions and Contracts of all duly authorized modifications of the contract that may hereafter be
made, notice of which modifications to the surety being hereby waived, the above obligation is void.
Otherwise it remains in full force and effect.
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Title 34, Chapter 6,
Arizona Revised Statutes, and all liabilities on this Bond will be determined in accordance with the
provisions of Title 34, Chapter 6, Arizona Revised Statutes, to the extent as if it were copied at length in
this Contract. The prevailing party in a suit on this bond will recover as part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court. The performance under this bond is limited to the
construction to be performed under the contract and does not include any design services, preconstruction
services, financial services, maintenance services, operations services or any other related services
included in the contract.
WITNESS our hands the
day of.
20_
PRINCIPAL
BY:
SURETY
(SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug.2024)
Page 1 of 1
Contract No. 2026-09b-COS
EXHIBIT B
STATUTORY PAYMENT BOND
PURSUANT TO TITLE 34, CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That.
_ (hereinafter called the Principal), as Principal, and
. a corporation organized and existing under the laws of the
_, with its principal office in the City of
State of ______
(hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Scottsdale,
County of Maricopa, State of Arizona, in the amount of__________________________ Dollars
($_______________). for the payment whereof, the said Principal and Surety bind themselves,
and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale
dated the_____day of__________________ , 20___, for Bid No. (bid number). Project No.
(project number), (project name), which contract is hereby referred to and made a part hereof as
fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of this obligation is such that if the Principal promptly pays all
monies due to all persons supplying labor or materials to the Principal or the Principal's
subcontractors in the prosecution of the work provided for in the contract, this obligation is void.
Otherwise it remains in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Title 34, Chapter
6, of the Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance
with the provisions, conditions and limitations of Title 34, Chapters, Arizona Revised Statutes, to
the same extent as if they were copied at length in this Contract.
The prevailing party in a suit on this bond wili recover as a part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court.
WITNESS our hands the
day of
.,20_
PRINCIPAL
BY:
SURETY (SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
(Revised Aug:2024)
Page 1 of 1
Contract No. 2026-090-COS
EXHIBIT C
CONTRACTOR E-VERIFY COMPLIANCE WARRANTY
Gontraet Title/Number (“Contract”);.
Contractor (Legal Name):________
E-Verify Company ID#:_________ _
Date of Enrollment:_____________
The undersigned contractor (“Contractor”) hereby represents, warrants, and certifies to the City
of Scottsdale that;
□ The Contractor has employees that will be providing services within the State of Arizona and
agrees with the following:
1. The Contractor complies with all federal immigration laws.
2. The Contractor is registered with and actively uses the federal E-Verify system to verify
employment eligibility of all newly hired employees in Arizona, as required by Arizona Revised
Statutes § 41-4401 and § 23-214(A).
3. The Contractor does not employ unauthorized aliens for the performance of services related to
the Contract.
4. The Contractor shall retain records demonstrating E-Verify compliance and will produce such
records upon request from the City.
5. The Contractor will require all subcontractors who perform work under the Contract within the
State of Arizona to comply with these requirements.
□ The Contractor and any of its subcontractors do not have employees within the State of
Arizona or employees that will be providing services for the Contract in the State of Arizona.
A breach of this warranty is considered a material breach of contract, subject to penalties up to and
including termination of the contract. The undersigned represents and warrants that he or she is duly
authorized to execute this warranty on behalf of Contractor.
Contractor (Legal Name):
Authorized Representative Signature:
Name:_______________________
Title: ________________ .
Date:__________________
.
Last Updated: April 7, 2026