Attachment E - Conceptual Building Elevations
Extracted text (via pymupdf)
19681 characters
F.F. 0' - 0" F.F. 0' - 0" Pit Level -8' - 2" Pit Level -8' - 2" Control Joint 4' - 0" 20 19 18 12 11 10 Control Joint 17' - 4" Control Joint 13' - 4" 3' - 4" 10' - 8" 3' - 4" 12' - 0" Control Joint 13' - 4" Control Joint 6' - 0" Control Joint 12' - 8" Control Joint 12' - 8" 12' - 0" 4' - 0" 20 20 20 20 20 20 35 21 18a 19 25 25 25 25 25 25 25 19 18a 18a E 56 11 53 Top of Parapet (Low) 21' - 4" Top of Parapet (Low) 21' - 4" Truss Bearing 24' - 0" Truss Bearing 24' - 0" 18a 318 4' - 0" 14' - 8" 19 19 19 19 19 19 19 323 19 318 1 22 47 22 22 56 16' - 8" 27' - 7" 3' - 4" 8' - 0" 323 11 27 323 27 11 323 323 323 27 11 27 11 323 323 1 1 11 323 323 323 329 329 9 329 329 276 276 276 323 323 19 21 HVAC Unit is located on the roof, behind the gabled entry tower. 26 9 276 329 323 19a 329 1 11 8' - 0" 14' - 8" 0' - 8" 18a 8' - 0" 8' - 0" 1 6' - 0" 0' - 8" 10' - 8" 19a INTEGRAL COLOR SPLIT-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 19, 19a EXTERIOR FINISH MATERIAL LEGEND STOREFRONT DOORS/WINDOWS Color: Dark Bronze Anodized Aluminum Manuf: YKK TINTED GLAZING Color: Solarban 90 on Clear Manuf: Vitro Architectural Glass OVERHEAD DOORS Color: Dark Bronze Manuf: TBD BOLLARDS, BRACKETS AND AWNINGS Color: TBD Manuf: Dunn Edwards Paints Keynotes: 11, 20, 276 STANDING SEAM METAL ROOF Color: Dark Bronze Manuf: Berridge Keynote: 9 INTEGRAL COLOR SMOOTH-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 323 UNPAINTED STRUCTURAL HALF-HIGHS Color: Promenade Manuf: Superlite by Oldcastle Keynote: 18a PAINTED EIFS CLADDING SYSTEM, CORNICE, AND TRIM Color: DE6226 Foggy Day Manuf: Dunn Edwards Keynotes: 318, 329 MORTAR Color: Coosa Frost Manuf: Coosa Masonry Cements Scale Project number Date Drawn by Checked by 2026 Aho Architects, LLC. All Rights Reserved. C NOT FOR CONSTRUCTION 3/16" = 1'-0" 1/22/2026 11:27:44 AM A200 Exterior Elevation - False Front (South) 25019 1/22/2026 MB ARC CONCEPTUAL Express Oil Change & Tire Engineers Single Building / Right Hand Oil Change / Rear Enter / Side Tire Storage Goodyear, Arizona Keynote Schedule Tag Text 1 Wall Pack / Electrical Fixture. See Electrical. 9 Pre-finished standing seam metal roof system. See Specification 074113.16 Standing Seam Metal Roof Panels. See Finish Schedule for color. 11 Pre-finished metal canopy. See Details. 18a Unpainted structural half-highs. See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19 Integral color split-face CMU (bond beam where indicated; see Structural). See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19a Integral color split-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 20 4" diameter painted concrete-filled steel pipe bollard. Color as indicated on Finish Schedule. Paint embedded portion of bollard. Use primer and two finish coats. See Details. See Specification 055000 Metal Fabrications. 21 Cast-in-place concrete wall. See Structural. Membrane waterproofing at perimeter of foundation wall as specified. See Specification 334600 Subdrainage. 22 Signage (By Others). See Electrical. 25 Control joint. For control joints in concrete floor slabs, coordinate location with equipment layout by others. Max. distance between control joints in slabs not to exceed 12'-0". Control joints in walls shall be 4'-0" max from wall intersection or corner and every 20'-0". 26 Fire Department Lock Box (Knox Company Model 3200) mounted 60" above finished grade. See Specification Section 104413 Fire Department Lock Box." 27 Pre-finished metal coping at exposed tops only over self-adhered membrane flashing and pressure treated wood blocking. Slope to drain. Color as indicated on Finish Schedule. 35 Submersible foundation sump pump. Provide Zoeller M98 or comparable product. Coordinate location with Civil and tie into Civil’s storm drainage system. 47 Provide address identification as directed by the Local Fire Marshal or AHJ. Number size to be 16 inches minimum in a contrasting color. 53 Conduit to be centered horizontally for lights in canopy. Verify with sign company prior to rough-in. 56 Metal louver or vent. Color to match adjacent surface. See Mechanical. 276 Tube Steel Brackets, See details for member sizes. See Specification Section 051200 Structural Steel Framing. Color/finish as indicated on the Finish Schedule. 318 Painted preformed EIFS cornice and trim, See Specification Section 072400 EIFS Exterior Insulation and Finish System. 323 Integral color smooth-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. 329 Drainable EIFS cladding system: EIFS cladding adhered with adhesive applied in vertical ribbons on fluid applied vapor permeable air barrier on ½” exterior plywood sheathing on 2x6 wood framing. See details for EIFS thickness. 3/16" = 1'-0" 1 01_Exterior Elevation_False Front (South) No. Description Date Attachment E - Conceptual Building Elevations F.F. 0' - 0" F.F. 0' - 0" Pit Level -8' - 2" Pit Level -8' - 2" 21 20 20 20 20 20 20 20 20 20 20 20 20 26 27 28 6 7 8 18a 18a 19 35 19 18a 18a 4' - 0" 25 25 25 25 Control Joint 6' - 0" 25 25 25 Control Joint 15' - 4" Control Joint 13' - 4" Control Joint 13' - 4" Control Joint 6' - 0" Control Joint 12' - 8" Control Joint 12' - 8" 56 56 B 53 27 Top of Parapet (Low) 21' - 4" Top of Parapet (Low) 21' - 4" Truss Bearing 24' - 0" Truss Bearing 24' - 0" 318 19 19 19 19 19 19 19 19 19 19 19 19 1 22 22 22 19 323 18a 19 11 318 27 323 27 323 11 323 323 18a 11 1 1 26 323 323 323 11 11 323 323 19 18a 27 18a 323 318 27 323 25 24 323 11 11 323 329 276 329 9 276 329 47 323 4' - 0" 8' - 0" 287 276 323 HVAC Unit is located on the roof, behind the gabled entry tower. 19a 1 10' - 8" 0' - 8" 6' - 0" 9 19a 329 276 1 323 10' - 8" 0' - 8" 6' - 0" 8' - 0" 1 11 18a INTEGRAL COLOR SPLIT-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 19, 19a EXTERIOR FINISH MATERIAL LEGEND STOREFRONT DOORS/WINDOWS Color: Dark Bronze Anodized Aluminum Manuf: YKK TINTED GLAZING Color: Solarban 90 on Clear Manuf: Vitro Architectural Glass OVERHEAD DOORS Color: Dark Bronze Manuf: TBD BOLLARDS, BRACKETS AND AWNINGS Color: TBD Manuf: Dunn Edwards Paints Keynotes: 11, 20, 276 STANDING SEAM METAL ROOF Color: Dark Bronze Manuf: Berridge Keynote: 9 INTEGRAL COLOR SMOOTH-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 323 UNPAINTED STRUCTURAL HALF-HIGHS Color: Promenade Manuf: Superlite by Oldcastle Keynote: 18a PAINTED EIFS CLADDING SYSTEM, CORNICE, AND TRIM Color: DE6226 Foggy Day Manuf: Dunn Edwards Keynotes: 318, 329 MORTAR Color: Coosa Frost Manuf: Coosa Masonry Cements Scale Project number Date Drawn by Checked by 2026 Aho Architects, LLC. All Rights Reserved. C NOT FOR CONSTRUCTION 3/16" = 1'-0" 1/22/2026 11:28:00 AM A201 Exterior Elevation - Rear Entry (North) 25019 1/22/2026 ARC N/A CONCEPTUAL Express Oil Change & Tire Engineers Single Building / Right Hand Oil Change / Rear Enter / Side Tire Storage Goodyear, Arizona Keynote Schedule Tag Text 1 Wall Pack / Electrical Fixture. See Electrical. 9 Pre-finished standing seam metal roof system. See Specification 074113.16 Standing Seam Metal Roof Panels. See Finish Schedule for color. 11 Pre-finished metal canopy. See Details. 18a Unpainted structural half-highs. See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19 Integral color split-face CMU (bond beam where indicated; see Structural). See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19a Integral color split-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 20 4" diameter painted concrete-filled steel pipe bollard. Color as indicated on Finish Schedule. Paint embedded portion of bollard. Use primer and two finish coats. See Details. See Specification 055000 Metal Fabrications. 21 Cast-in-place concrete wall. See Structural. Membrane waterproofing at perimeter of foundation wall as specified. See Specification 334600 Subdrainage. 22 Signage (By Others). See Electrical. 25 Control joint. For control joints in concrete floor slabs, coordinate location with equipment layout by others. Max. distance between control joints in slabs not to exceed 12'-0". Control joints in walls shall be 4'-0" max from wall intersection or corner and every 20'-0". 26 Fire Department Lock Box (Knox Company Model 3200) mounted 60" above finished grade. See Specification Section 104413 Fire Department Lock Box." 27 Pre-finished metal coping at exposed tops only over self-adhered membrane flashing and pressure treated wood blocking. Slope to drain. Color as indicated on Finish Schedule. 35 Submersible foundation sump pump. Provide Zoeller M98 or comparable product. Coordinate location with Civil and tie into Civil’s storm drainage system. 47 Provide address identification as directed by the Local Fire Marshal or AHJ. Number size to be 16 inches minimum in a contrasting color. 53 Conduit to be centered horizontally for lights in canopy. Verify with sign company prior to rough-in. 56 Metal louver or vent. Color to match adjacent surface. See Mechanical. 276 Tube Steel Brackets, See details for member sizes. See Specification Section 051200 Structural Steel Framing. Color/finish as indicated on the Finish Schedule. 287 Fire department connection. 318 Painted preformed EIFS cornice and trim, See Specification Section 072400 EIFS Exterior Insulation and Finish System. 323 Integral color smooth-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. 329 Drainable EIFS cladding system: EIFS cladding adhered with adhesive applied in vertical ribbons on fluid applied vapor permeable air barrier on ½” exterior plywood sheathing on 2x6 wood framing. See details for EIFS thickness. 3/16" = 1'-0" 1 02_Exterior Elevation_Rear Entry (North) No. Description Date F.F. 0' - 0" F.F. 0' - 0" Pit Level -8' - 2" Pit Level -8' - 2" Control Joint 4' - 0" Control Joint 4' - 0" 25 25 21 35 20 56 11 D D 4' - 0" 1' - 4" 3' - 4" 5' - 3 5/8" 3' - 4" 2' - 8" Control Joint 4' - 0" 8' - 8" 25 25 Control Joint 11' - 0" Control Joint 11' - 0" 12' - 0" 22 Top of Parapet (Low) 21' - 4" Top of Parapet (Low) 21' - 4" Truss Bearing 24' - 0" Truss Bearing 24' - 0" 18a 22 18a 18a 19 56 56 27' - 7" 26 1 11 18a 323 329 276 9 318 27 27 19 19 11 323 19 323 18a 318 27 9 276 329 27 323 19 11 1 323 19 27' - 7" 323 9 1 1 8' - 0" 19a 9 329 19a 8' - 0" 11 8' - 0" INTEGRAL COLOR SPLIT-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 19, 19a EXTERIOR FINISH MATERIAL LEGEND STOREFRONT DOORS/WINDOWS Color: Dark Bronze Anodized Aluminum Manuf: YKK TINTED GLAZING Color: Solarban 90 on Clear Manuf: Vitro Architectural Glass OVERHEAD DOORS Color: Dark Bronze Manuf: TBD BOLLARDS, BRACKETS AND AWNINGS Color: TBD Manuf: Dunn Edwards Paints Keynotes: 11, 20, 276 STANDING SEAM METAL ROOF Color: Dark Bronze Manuf: Berridge Keynote: 9 INTEGRAL COLOR SMOOTH-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 323 UNPAINTED STRUCTURAL HALF-HIGHS Color: Promenade Manuf: Superlite by Oldcastle Keynote: 18a PAINTED EIFS CLADDING SYSTEM, CORNICE, AND TRIM Color: DE6226 Foggy Day Manuf: Dunn Edwards Keynotes: 318, 329 MORTAR Color: Coosa Frost Manuf: Coosa Masonry Cements 0' - 8" 1' - 0" 2' - 8" Fully grouted 8" unpainted structural half-highs with #4 bars @ 24" vertical #4 bars @ 12" (4) #4 bars con't 3' - 4" Cast stone wall cap 3' - 4" ELEVATION SECTION Cast stone wall cap Concrete foundation Unpainted structural half-highs (Keynote #18a) See Civil for length and loction Notes: 1. This detail is based on the wall not retaining any soil Scale Project number Date Drawn by Checked by 2026 Aho Architects, LLC. All Rights Reserved. C NOT FOR CONSTRUCTION As indicated 1/22/2026 11:28:08 AM A202 Exterior Elevation - Right (East) 25019 1/22/2026 ARC N/A CONCEPTUAL Express Oil Change & Tire Engineers Single Building / Right Hand Oil Change / Rear Enter / Side Tire Storage Goodyear, Arizona Keynote Schedule Tag Text 1 Wall Pack / Electrical Fixture. See Electrical. 9 Pre-finished standing seam metal roof system. See Specification 074113.16 Standing Seam Metal Roof Panels. See Finish Schedule for color. 11 Pre-finished metal canopy. See Details. 18a Unpainted structural half-highs. See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19 Integral color split-face CMU (bond beam where indicated; see Structural). See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19a Integral color split-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 20 4" diameter painted concrete-filled steel pipe bollard. Color as indicated on Finish Schedule. Paint embedded portion of bollard. Use primer and two finish coats. See Details. See Specification 055000 Metal Fabrications. 21 Cast-in-place concrete wall. See Structural. Membrane waterproofing at perimeter of foundation wall as specified. See Specification 334600 Subdrainage. 22 Signage (By Others). See Electrical. 25 Control joint. For control joints in concrete floor slabs, coordinate location with equipment layout by others. Max. distance between control joints in slabs not to exceed 12'-0". Control joints in walls shall be 4'-0" max from wall intersection or corner and every 20'-0". 26 Fire Department Lock Box (Knox Company Model 3200) mounted 60" above finished grade. See Specification Section 104413 Fire Department Lock Box." 27 Pre-finished metal coping at exposed tops only over self-adhered membrane flashing and pressure treated wood blocking. Slope to drain. Color as indicated on Finish Schedule. 35 Submersible foundation sump pump. Provide Zoeller M98 or comparable product. Coordinate location with Civil and tie into Civil’s storm drainage system. 56 Metal louver or vent. Color to match adjacent surface. See Mechanical. 276 Tube Steel Brackets, See details for member sizes. See Specification Section 051200 Structural Steel Framing. Color/finish as indicated on the Finish Schedule. 318 Painted preformed EIFS cornice and trim, See Specification Section 072400 EIFS Exterior Insulation and Finish System. 323 Integral color smooth-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. 329 Drainable EIFS cladding system: EIFS cladding adhered with adhesive applied in vertical ribbons on fluid applied vapor permeable air barrier on ½” exterior plywood sheathing on 2x6 wood framing. See details for EIFS thickness. 3/16" = 1'-0" 1 03_Exterior Elevation_Right (East) No. Description Date 1/2" = 1'-0" 2 Screen Wall Detail F.F. 0' - 0" F.F. 0' - 0" Pit Level -8' - 2" Pit Level -8' - 2" Control Joint 4' - 0" 25 18a 18a Control Joint 4' - 0" 25 20 20 21 11 27 22 12' - 0" 22 Top of Parapet (Low) 21' - 4" Top of Parapet (Low) 21' - 4" Truss Bearing 24' - 0" Truss Bearing 24' - 0" 1 318 18a 144 18a 1 19 323 11 323 27 19 19 276 329 9 27 9 329 276 323 19 11 11 1 11 26 18a 323 27' - 7" 1 1 1 15' - 0" 17' - 4" 15' - 0" 11 323 F 323 19 19a 318 9 276 276 329 329 329 323 323 276 19a 323 19 8' - 0" INTEGRAL COLOR SPLIT-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 19, 19a EXTERIOR FINISH MATERIAL LEGEND STOREFRONT DOORS/WINDOWS Color: Dark Bronze Anodized Aluminum Manuf: YKK TINTED GLAZING Color: Solarban 90 on Clear Manuf: Vitro Architectural Glass OVERHEAD DOORS Color: Dark Bronze Manuf: TBD BOLLARDS, BRACKETS AND AWNINGS Color: TBD Manuf: Dunn Edwards Paints Keynotes: 11, 20, 276 STANDING SEAM METAL ROOF Color: Dark Bronze Manuf: Berridge Keynote: 9 INTEGRAL COLOR SMOOTH-FACE CMU Color: Huntington Gray Manuf: Echelon Keynote: 323 UNPAINTED STRUCTURAL HALF-HIGHS Color: Promenade Manuf: Superlite by Oldcastle Keynote: 18a PAINTED EIFS CLADDING SYSTEM, CORNICE, AND TRIM Color: DE6226 Foggy Day Manuf: Dunn Edwards Keynotes: 318, 329 MORTAR Color: Coosa Frost Manuf: Coosa Masonry Cements Scale Project number Date Drawn by Checked by 2026 Aho Architects, LLC. All Rights Reserved. C NOT FOR CONSTRUCTION 3/16" = 1'-0" 1/22/2026 11:28:16 AM A203 Exterior Elevation - Left (West) 25019 1/22/2026 ARC N/A CONCEPTUAL Express Oil Change & Tire Engineers Single Building / Right Hand Oil Change / Rear Enter / Side Tire Storage Goodyear, Arizona Keynote Schedule Tag Text 1 Wall Pack / Electrical Fixture. See Electrical. 9 Pre-finished standing seam metal roof system. See Specification 074113.16 Standing Seam Metal Roof Panels. See Finish Schedule for color. 11 Pre-finished metal canopy. See Details. 18a Unpainted structural half-highs. See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19 Integral color split-face CMU (bond beam where indicated; see Structural). See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 19a Integral color split-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. Color as indicated on Finish Schedule. 20 4" diameter painted concrete-filled steel pipe bollard. Color as indicated on Finish Schedule. Paint embedded portion of bollard. Use primer and two finish coats. See Details. See Specification 055000 Metal Fabrications. 21 Cast-in-place concrete wall. See Structural. Membrane waterproofing at perimeter of foundation wall as specified. See Specification 334600 Subdrainage. 22 Signage (By Others). See Electrical. 25 Control joint. For control joints in concrete floor slabs, coordinate location with equipment layout by others. Max. distance between control joints in slabs not to exceed 12'-0". Control joints in walls shall be 4'-0" max from wall intersection or corner and every 20'-0". 26 Fire Department Lock Box (Knox Company Model 3200) mounted 60" above finished grade. See Specification Section 104413 Fire Department Lock Box." 27 Pre-finished metal coping at exposed tops only over self-adhered membrane flashing and pressure treated wood blocking. Slope to drain. Color as indicated on Finish Schedule. 144 Electrical meter. See Electrical. Paint to match adjacent building materials. 276 Tube Steel Brackets, See details for member sizes. See Specification Section 051200 Structural Steel Framing. Color/finish as indicated on the Finish Schedule. 318 Painted preformed EIFS cornice and trim, See Specification Section 072400 EIFS Exterior Insulation and Finish System. 323 Integral color smooth-face CMU (bond beam where indicated; see Structural), projected 1/2". See Specification 042200 Concrete Unit Masonry. 329 Drainable EIFS cladding system: EIFS cladding adhered with adhesive applied in vertical ribbons on fluid applied vapor permeable air barrier on ½” exterior plywood sheathing on 2x6 wood framing. See details for EIFS thickness. 3/16" = 1'-0" 1 04_Exterior Elevation_Left (West) No. Description Date Scale Project number Date Drawn by Checked by 2026 Aho Architects, LLC. All Rights Reserved. C NOT FOR CONSTRUCTION 1/22/2026 11:28:19 AM R100 3D Rendering 25019 1/22/2026 Author Checker CONCEPTUAL Express Oil Change & Tire Engineers Single Building / Right Hand Oil Change / Rear Enter / Side Tire Storage Goodyear, Arizona False Front (South) Elevation Rear Entry (North) Elevation No. Description Date