MCSO FY24 BUDGET PRESENTATION TO THE BOARD JAN23.PPTX
Extracted text (via pymupdf)
3941 characters
January 23, 2023
FY24 MCSO Budget Presentation
•
Baseline
•
Overtime
•
General Fund
•
Compliance
•
Technology
•
Vehicles
•
Detention Fund
•
Above-Base
Summary
•
Upcoming Items
•
Capital Projects
FY23 Budget Baseline $481M
Detention $276.8M
General
Fund $149.1M
Compliance $31.3M
Other $23.8M
2
3
Request $5M to be added
to MCSO General Fund
Overtime Budget
GENERAL FUND
Overtime Right-Sizing
4
GENERAL FUND
Other Critical Needs
1) RMS/CAD System
$ 10.5M
2) Fixed-Wing Airplane
$ 3.7M
3) 6 Deputy Service Aides $ 425K
- adds a shift to successful program
•
Current systems are not integrated, nor
are they compliant with FBI’s NIBRS
requirements (National Incident-Based
Reporting). $2.3M/yr support ongoing.
Adds 2 programmer analyst positions.
•
Cessna Grand Caravan to replace 1978
Cessna 206 > 12,100 flight hours; will
increase passenger capacity (10 vs 4) and
is needed to comply with latest FAA
avionics regulations. We perform ~100
extradition flights per year (could be 200
with this plane).
•
Deputy Staffing Study results will support
the need for these positions to help carry
administrative load.
5
COMPLIANCE FUND
Critical Needs
1) Body-Worn Camera / Taser Refresh
$ 3M
- 5-year contract, total cost $22M
- Updated hardware and Evidence.com integration
2) Increase Contract for
$ 1M
Investigative Services
3) Civilian Investigator Positions
$ 600K
- 4 added mid-year + 4 contractors
6
KEY TECHNOLOGY UPGRADES
• Technology Tools & License Updates
$ 2.5M
- Annual R&M increases ~9% $1.2M; Data Center Refresh $700K; Backup Capacity $200K
- Body Cam integration w/ Evidence.com $200K; Text Archiving $100K; Jail controls $100K
• Key Technology Personnel Additions
$ 1.1M
- IT Governance positions recommended by audit; Key systems support positions
• Training Center/Range/Media Room/EOR A/V Updates
$ 500K
- 4-year roll-out plan (start with classrooms and range)
• HR Records Digitization/Training/Recruiting
$ 400K
- Digitization $200K; HUB training $20K; Recruiting $180K
• Wireless DAS (Cellular Booster)
$ 200K
- District 1, PPEV, SWAT Barn, Training, Range, Major Crimes
• Durango Warehouse Setup & Services
$ 200K
- Cellular DAS, wireless access setup, security, other user-funded equipment
• SHIELD Budget Transfer
$ 2.1M
- Ongoing Maintenance/Bug-Fixes/Enhancements
7
VEHICLE STUDY
Phase 3 of 4-year response to County vehicle study
• 27 Vehicles for Specific Coverage Issues and
to Support Operational Needs
$2.4M
• 23 Patrol Vehicles: 4-5 per District/Major Crimes/SID
$2.3M
• Vehicle Equipment (radios, lights, docks, etc.)
$500K
• Vehicle Repairs (ageing fleet + Eqmt Services cost increases)
$1.0M
Total
$6.2M
+ 2 New buses ($350K each) to complete the replacement plan (Equipment Services Budget)
8
DETENTION FUND
1) Body Scanners,
X-Ray Inspection Systems,
& Security Personnel
$ 5.7M
-
to combat fentanyl threat to the
safety of our employees and inmates
MCSO Budget Request
FY24 Summary
9
MCSO Upcoming Funding Items
10
1) SWORN Staffing Study
$ TBD
- Report is close to being completed
2) ITR Post-Occupancy Findings
$ TBD
- Key modifications will be recommended
3) MDC Refresh (equipment only)
$ 5M (est.)
- Current equipment is 5 yrs old and goes end-of-life in 18 mos.
CAPITAL PROJECTS
Critical Needs
1) MCSO Headquarters Lobby Hardening
$ 3 M (est.)
- Additional entrance barriers / ballistic glass / mailroom security
2) MASH Animal Shelter
$ 15 M
- Houses evidentiary animals and provides inmate training and rehab
3) Investigations/SWAT/Fleet/K-9 Facility
$ 20 M (est.)
- Combines strategic functions of MCSO in one efficient location
Key Active Projects
1) District 1 Remodel + East Valley SVU
2) District 3 Remodel
3) Property & Evidence Security System
4) Durango Warehouse
11