Extracted text (via ocr_local)
8025 characters
n City Clerk Document No. City Council Meeting Date:_January 28, 2021 AMENDMENT TO CITY OF CHANDLER AGREEMENT STREET MAINTENANCE REPAVING, SURFACE SEAL AND REPAIR SERVICES CITY OF CHANDLER AGREEMENT NO. PW0-745-4183 THIS AMENDMENT NO, 1 (Amendment No. 1) Is made and entered into by and between the City of Chandler, an Arizona municipal corporation (City), and M.R. Tanner Development and Construction, Inc., (Contractor), (City and Contractor may individually be referred to as Party and collectively referred to as Parties) and made , 20___ (Effective Date), RECITALS WHEREAS, the Parties entered into an agreement for street maintenance, repaving, surface seal and repair services (Agreement); and WHEREAS, the term of the Agreement was May 1, 2020, through April 30, 2021, with the option of up to four one-year extensions; and WHEREAS, the Parties wish to exercise the first option through this Amendment to extend the Agreement for one year. AGREEMENT NOW THEREFORE, the Parties agree as follows: 1. The recitals are accurate and are incorporated and made a part of the Agreement by this reference, 2. Section 4, Price is amended to read as follows: The City will pay the Contractor the per unit cost set forth in Revised Exhibit B of the original Agreement, attached to and made a part of this Amendment No. 1. Total payments made to the Contractor during the term of this Amendment No. 1 will not exceed $7,600,000, 3. Section 5, Term is amended to read as follows: The Agreement is extended for a one-year period May 1, 2021, through April 30, 2022. Page 1 of 6 4, All other terms and conditions of the Agreement remain unchanged and in full force and effect. If a conflict or ambiguity arises between this Amendment No. 1 and the Agreement, the terms and conditions in this Amendment No. 1 prevail and control. IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. FOR THE CITY FOR T! CONTRACTOR By: By: Its: Mayor. Its: _ Wence Tt APPROVED AS TO FORM: By: City Attorney qe ATTEST: By: City Clerk Page 2 of 6 EXHIBIT B COMPENSATION AND FEES The City makes no guarantee of quantities. Prices shall be tax inclusive. Item.. Heep, Eee ek Unit “No. || “Description... : “L-Qty- |: Unit” “~Price Asphalt Patch Removals and Replace wee 1 Mill Asphalt 1.5"- 2,0" (1-165,000) 1 SY $4.00 2 Mill Asphalt 1.5"- 2.0” (165,001-335,000) 1 SY $1.90 3 Mill Asphalt 1.5"- 2,0" (335,001-600,000) 1 SY $1.80 4 Pave 2” (12.5mm_EVAC A/C Mix) (1-165,000) 1 SY $15.00 5 Pave 2” (12.5mm_EVAC A/C Mix) (165,001-335,000) 1 SY $9.75 6 Pave 2” (12.5mm_EVAC A/C Mix) (335,001-600,000) 1 SY $9.65 7__| A/C Base Repair (1-35,000) 1 SY $14.00 8 | A/C Base Repair (35,001 - 65,000) 1 SY $12.50 9 __| A/C Base Repair (65,001 - 100,000+) 1 SY $10.00 Speed Humps per COC Traffic Specifications (includes 10 _| striping pattern per CoC Traffic Engineering Specs) (1-4) 1 EA $1,250.00 Speed Humps per COC Traffic Specifications (includes 11 _| striping pattern per CoC Traffic Engineering Specs) ( 5-8) 1 EA $1,000.00 Speed Humps per COC Traffic Specifications (includes 12__| striping pattern per CoC Traffic Engineering Specs (8+) 1 EA $750.00 13 | Crack Fill (1-200,000) 1 LF $3.90 14 | Crack Fill (200,001 - 400,000) i LF $3.00 15 | Crack Fill (400,001-600,000+) _ 1 LF $3.00 eh Si eas Utility / Monument Adjustments : eB 16 | Pre-lower manhole frame and covers 1 EA $275.00 47 Adjust Existing manhole frame, rings, and covers per EA MAG Detail 270, 271, 420-1 and/ 422 1 $485.00 Install and adjust CITY provided Composite manhole 18 | frame, rings, and cover per City of Chandler Detail C-400 4 AL and/or C-401. Invoiced as Each per adjustment. $100,000.00 19 Pre-lower valves, survey monuments, and sanitary EA sewer cleanouts 1 $275.00 Page 3 of 6 Adjust frame and covers for valves, survey monuments, 20 and sanitary sewer cleanouts per MAG Detall 270 1 EA $405.00 _ Slurry.Seal Type'll 21 | CSS-1h, (1 - 250) 1 ton $580.00 22 | CSS-th, (251 - 750) 1 ton $570.00 23 | CSS-1h, (751 - 1,000+) 1 ton $560.00 24 | Dry Aggregate Type Il, (1 - 525), Residential 1 ton $150.00 25 | Dry Aggregate Type Il, (526 - 1,575), Residential 1 ton $150.00 26 | Dry Aggregate Type II, (1,576 - 4,750+), Residential 1 ton $150.00 27 _| Dry Aggregate Type Il, (1 - 305), Arterial 1 Ton $160.00 28 | Dry Aggregate Type Il, (306 - 915), Arterial 1 ton $160.00 29 | Dry Aggregate Type Il, (916 -2,750+), Arterial 1 ton $160.00 30 | Group 1 TRMSS, (1 ~ 115,000) 1 Gallon $7.75 31 Group | TRMSS, (115,001 - 230,000) 1 Gallon $7.50 32__| Group | TRMSS, (231,001 - 350,000+) 1 Gailon $6.90 33 | Group II OPSS, (1 - 115,000) 1 Gallon $7.75 34 | Group Il OPSS, (115,001 — 230,000) 1 Gallon $7.50 35 | Group Il OPSS, (231,001 - 350,000+) 1 Gallon $6.90 36 | Group Ill PMM, (1 - 115,000) 1 Gallon $8.00 37 __| Group III PMM, (115,001 - 230,000) 1 Gallon $8.00 38 | Group Ill PMM, (231,001 - 350,000+) 1 Gallon $8.00 39 | Group IV Onyx Mastic Seal, (1 - 115,000) 1 Gallon $9.00 40 _| Group IV Onyx Mastic Seal, (115,001 — 230,000) 1 Gallon $9.00 41__| Group IV Onyx Mastic Seal, (231,001 ~ 350,000+) 1 Gallon $9.00 ae ne Alley Milling - Dust Control i 4a Milling Alley/Alley Right-of-Way (1-115,000), Average 1 sy depth 6” $8.00 43 Milling Alley/Aliey Right-of-Way (115,001 - 350,000+). 1 sy Average depth 6” $8.00 4A Asphalt Millings (supply, prepare, haul, and place) (1- 1 sy 115,000). Average depth 6” $12.00 45 Asphalt Millings (supply, prepare, haul, and place) 1 sy (115,001 - 350,000+). Average depth 6” $12.00 46 | Asphalt Emulsion (Fog Seal) (1-25,000) 1 Gallon $4,00 Asphalt Emulsion (Fog Seal) (25,001-65,000+) 1 Gallon $4,00 47 | Pre-construction video of alleyway conditions 1 Ls $1.00 48 | Material and Density Testing 1 Ls $1.00 Striping 49 | 4" Yellow Paint 1 LF $0.90 © 50 | 4” White Paint 1 LF $0.90 Page 4 of 6 51 6" White Paint 1 LF $0.90 52 . : 1 8" White Paint (Turn Lane) - Temporary LF $1.90 53 . 1 8” White Thermo (Turn Lane) LE $1.90 54 . . 1 12” White Paint (Crosswalks) - Temporary LF $2.80 55 , 1 12” White Thermo (Crosswalks) LF $4.00 56 . 1 18” White Paint (Stop Bars) - Temporary LF $4,00 57 . 1 18” White Thermo (Stop Bars) LF $5.00 58 . 1 24” White Thermo (Railroad Stop Bars) LF $5.00 59 1 Railroad Symbols (Per MUTCD) SETS $50.00 60 Schoo! Crosswalks: 24”X10' Yellow High Visibility 4 Rectangles SETS $100.00 61 1 $25.00 School Roll Out Yellow Dots (24” Dia.) EA 62 we 1 Turn Arrows, Paint - Temporary EA $70.00 63 1 Turn Arrows, Thermo EA $125.00 64 | Bike Lane Symbols 1 EA $75.00 65__| White Raised Pavement Markers (RPMs) 1 EA $5.00 66 | Yellow Raised Pavement Markers (RPMs) 1 EA $5.00 67 _| Blue Fire Hydrant Reflectors 1 EA $5.00 68 | Temporary Chip Seal Pavement Markers/Tabs, Yellow 1 EA $5.00 69 Temporary Chip S Seal Pavement eee White 1 EA $5,00 me ; ‘Miscellaneous : ee pana 70 | General Survey 1 HR $165.00 71 | Project Signs 1 EA $18.00 72 | Contractor Informational Signs 1 EA $18.00 Traffic Control Arterial Roadway Sections (Contractor to $ 250,000 73 , 1 AL be paid as invoiced per one 24 hour day) Traffic Control Residential and Collector Roadway 74 | Sections (Contractor to be paid as invoiced per one 24 1 AL $100,000 hour day) City of Chandler Uniformed Police Officer. (Contractor $ 75,000 75 | to be paid as invoiced the actual cost of hiring police 1 AL OTe officer per day) Page 5 of 6 76 | Owner's Allowance for unforeseen conditions 1 AL §__38,000 L Night and weekend work: It is anticipated that most work wil! be performed during daytime barricading restriction hours from 5:00AM to 4:00PM, Premium compensation for CITY Streets Project Manager Pre-Approved night, weekend, and holiday work shall be billed as a multiplier factor to be applied to individual unit cost on each bid item used. No additional compensation will be permitted for night and weekend work. Description-Premium Compensation PERCENTAGE The contractor must provide this multiplier factor to be stated as a 0% percentage amount. Page 6 of 6