Extracted text (via pymupdf)
1539 characters
then or thereafter due to CM@Risk (if any) and otherwise immediately reimbursed to City by CM@Risk. ARTICLE 7 - CONTRACT PRICE 7.1 CONTRACT PRICE 7.1.1 In exchange for CM@Risk's full, timely, and acceptable performances and construction of the Work under this Contract, and subject to all of the terms of this Contract, City will pay CM@Risk the "Contract Price," which: The sum of the CM@Risk's Fee and reimbursable Cost of the Work, as defined in Section 15 of the General Conditions, which the CM@Risk guarantees will not exceed the GMP set forth in Exhibit D in the amount of $3,513.861.76. Costs which would cause the GMP to be exceeded must be paid by CM@Risk without reimbursement from City. 7.1.2 The Contract Price is all-inclusive and specifically includes all fees, cost, insurance and bond premiums, allowances, construction contingency, owner's contingency, and taxes of any type necessary to fully, properly and timely perform and construct Work. 7.2 COSTS For any portion of the Work which, either through this Contract, Change Order or otherwise, is performed and paid for on a cost, or time and materials basis, the costs which may be reimbursed to CM@Risk and chargeable against the Contract Price will be determined as set forth in MAG ยง 109.5. SIGNATURE PAGE TO FOLLOW City of Chandler Construction Manager at Risk Construction Services Public Works & Utilities Department, Capital Projects Division Project Name: VETERAN'S MEMORIAL PHASE II Project No.: PR2004.401 Rev. 3/9/2021 C-8 of 17