Development Booklet, Attachment A

City of Chandler — Regular Meeting (2021-07-15)

View PDF Meeting page

Extracted text (via pymupdf) 21222 characters
The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 1 
 
Development Narrative 
Facility Overview - The Oasis/El Oasis – A Live Love Community Center 
The Oasis (El Oasis) will be located at 482 E. Erie St. on a 1.88-acre site [81,814 s.f.] currently 
zoned MF-2. This project consists of three main components: Plazita, Education, and Community 
Garden. Each component has a varying level of community involvement and participation, but 
the goal is that all three components work together. By blending the components of The Oasis, 
the space becomes a memorable “gathering place”, where everyone is welcome and plays a part 
in building a stronger and safer community. A key element of the project approach is partnering 
both with the local neighbors as well as P-20 educational partners from both the immediate 
neighborhoods (Galveston Elementary, Willis Junior High, Chandler High) as well as post-
secondary providers including the Maricopa Community College District and ASU. 
 
With an intention to create a functional and beautiful structure while also leaving as much green 
space as possible, one building will house all the proposed Oasis components. Located at the 
front of the site, the community center building welcomes people onto a 70’-wide shaded 
community porch, inviting neighbors to connect and learn with each other. The massing of the 
building rises from 10-feet at the south up to 20-feet at the north, creating a space that is both 
respectful of the residential scale of the neighborhood and rises to the community scale to 
create a space for gathering.  
 
Constructed of a simple material palate – the wood-frame building is clad in a variety of 
textured and weathered steel, with frameless windows in custom steel boxes. The architecture 
is both culturally appropriate and timeless without relying on cliche or style. Simple, warm, and 
rich, the architecture expresses a forward-thinking approach to construction skinned with 
ordinary materials in a creative manner.  
 
The building, totaling 5,000 square feet, includes a large community room that can be broken 
down into smaller co-working/tutoring/training space or a single meeting space serving up to 90 
people.  It will also include an open workroom, public restrooms a generous teaching kitchen, 
and storage/operations space that can store vehicles and equipment in support of the overall 
facility and community gardens.  Adjacent to the building are 16 parking spaces, including 2 ADA 
stalls, in addition to the on-street parking. 
 
Use/Activity Descriptions 
Plazita - Gathering Together 
Creating a beautiful space where our neighbors can relax, breathe deeply, and connect with 
each other is the heart of The Plazita at The Oasis. The large community room in the center of 
the building spills out into a covered outdoor patio (within the building roof line) and a turf open 
space with an exterior shade canopy.  This then opens out to the short side soccer field and the 
gardens at large. Gathered from neighborhood input, there is a need for safe places where

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 2 
 
children can play and learn together, and families can spend time together under the shade of a 
tree celebrating family milestones, such as quinceañeras or reunions.  While there is a city park 
nearby, shade is limited, and the park is subject to flooding at times.  The Plazita will provide an 
additional community accessible safe recreation space for play and supervised activity for 
children and families. The Plazita is a critical element of the project, as a safe space that will 
bring community and neighbors together. 
 
Education- Learning Together 
The Community Learning component is the most tangible element of the Oasis environment. 
Tutoring, educational support, and safe spaces for studying will be available for students of all 
ages after school or during school breaks as needed. Vocational and life skill classes for both 
students and adults will also be offered, promoting a lifetime learning model that invites all ages 
and stages of life to be involved. A generous kitchen space will make it possible to teach ground-
to-table cooking for all ages, incorporating fresh fruit and vegetables into the traditional foods 
eaten by neighborhood families. Professional mentor relationships and training programs will be 
created for community members interested in learning more about a specific occupation or 
trade, and for helping to develop local entrepreneurial businesses. 
  
Garden - Growing Together 
The Community Garden accomplishes multiple goals. Varieties of fruits and vegetables will be 
seasonally grown, harvested, and shared with neighbors to feed their families. There will also be 
opportunities for individuals and families in the neighborhood to be involved in planting, 
nurturing, and harvesting their own food as well. There will be space for crop-style growing as 
well as smaller community plots - where neighbors can cultivate and care for their own plot. In 
addition, partnerships with the neighborhood schools will create opportunities for students and 
teachers to be involved in gardening projects as well. 
 
The overall vision is that The Oasis will have a transforming effect on the community through 
relationships, generosity, and love. 
 
Landscaping 
The approach to site landscaping is focus on providing plantings at the public sidewalk edge that 
is both complimentary to the surrounding neighborhood while still being inviting to the 
community, including the incorporation of a walkway from the public sidewalk to the entry 
porch (front door) of the Community Education Center. This south oriented walkway attaches to 
a sidewalk that travels north along the west edge of the building, transiting through two-thirds 
of the site. The focus is to provide pedestrian accessibility to both the facility as well as the 
community gardens. 
 
Xeriscape plantings and native trees from the approved street tree planting list would be used in 
the front yard of the property. Landscaping will be used to support screening the garage door

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 3 
 
entrance on the west face of the building. The balance of the trees on the site will draw from a 
variety of drought tolerant species native to central Arizona while provide a variety of 
alternatives to provide examples of habitats throughout Arizona, including N. Arizona and the 
Mogollon Rim. 
 
The east and north property lines will provide tree rows that (for the east) separates the site 
from the alley easement, as well as provide additional screening to the adjoining single-family 
units. 
 
The intent is to replace the existing sterile site perimeter chain link with variable fencing options 
that include CMU, decorative steel, and green wall (grid fencing with plantings growing through.  
The driveway at the southwest corner of the site will incorporate a swing gate, setback from the 
street frontage. 
 
Immediately north of the Community Education Center, the open/shaded Plaza will be turf as 
will an adjacent short-sided soccer field. The soccer field will support drainage needs for the site 
and will be anchored on the north by a variegated 4–6-foot screen wall that provides a 
separation from the more finely developed southern one-third of the site from the northern 
Community Gardens. 
 
The community gardens will incorporate raised bed, small plot gardens up through row crops. 
The current diagram is indicative and will change both with the seasons as well as responding to 
community preferences for planting types and the curriculum needs of educational partners. 
 
The site is served by Salt River Project flood irrigation infrastructure and this will be the primary 
source of landscape water for the north portion of the site. Typical xeriscape irrigation will be 
used along the southern frontage and rights-of-way. 
 
Parking 
16 parking stalls (including 2 accessible stalls) are provided along the drive aisle located on the 
west perimeter of the site. Additionally, two parking stalls will be provided within the garage 
portion of the building with an additional 3 stalls available at the face of the building. The facility 
dominantly serves the local community located in relative proximity to the site. As a result, a 
significant amount of travel to the site is anticipated to be by pedestrians. 
 
Hours of Operation 
The site can be broken into two broad uses: the southern Community Education Center/Plaza 
and the Community Gardens/grass field. 
 
The community gardens/grass field are intended for use from dawn to dusk throughout the 
year.

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 4 
 
 
The Community Education Center/Plaza are principally intended for use during typical 8am-5pm 
Monday to Friday, with more limited activity on Saturday and Sunday.  The potential for evening 
activity would principally be Monday to Saturday (5pm-10 pm).  The uses are focused on 
education and neighborhood meetings/community gathering activities.   Events, such as 
weddings and Quinceañaras will typically occur Thursday to Saturday late afternoon into the 
evening (4pm-10pm). 
 
An on-site employee will be located at the facility during normal business hours. 
 
Live Love Chandler (LLC) – Non-Profit Developer and Operator  
 
Introduction 
Live Love Chandler is a community development non-profit dedicated to building strong 
communities by connecting people and caring for our neighbors.  A strong community is 
demonstrated best by the compassionate actions of its members for each other.  We believe 
connecting with others is the foundation for learning to authentically care for others.  Once we 
truly care for others, we discover we are stronger together, learning, serving, and growing side-
by-side.  It starts with connecting, and that drives much of what we do at Live Love. 
 
The service area for Liv Love is broadly bounded by Arizona Avenue to the West, the Ivanhoe 
Street alignment to the North, McQueen to the East, and Chandler Blvd to the South.   
 
Since our start in 2007, Live Love has been primarily funded by donations from our volunteers 
and loyal supporters.  Connecting is the foundation for much of what we do at Live Love, but it is 
also the foundation for most of how we fund and support those activities.  Our donors and 
volunteers are essential members of our team and directly affect our success.  Most business 
sponsorships and corporate grants given to Live Love have been a direct result of a donor or 
volunteer making the connection for us.  Examples of this include The Grove, Intel, Paypal, JP 
Morgan Chase & Co., Norwex, Major League Baseball Players Trust, and Isagenix.  
 
History 
Since 2007, we have been bringing people together in safe and supportive environments to 
share, learn, and grow together.  With the help of the City of Chandler Neighborhood Programs 
staff, we have selected neighborhoods that are often overlooked by other service providers; 
areas where a few residents were working to create healthy growth and change right where 
they lived. Hours of listening to neighbors on porches and at kitchen tables provided the vision 
for where to begin. 
 
It started with a large-scale service day where community volunteers were invited to work side-
by-side with neighborhood residents on home improvement projects such as painting and

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 5 
 
landscaping.  This, Live Love Day, became an annual event for several years as we learned to 
partner with our neighbors in downtown Chandler.  As we began to connect more closely with 
them, we discovered there was a great opportunity to care for our senior adult neighbors on a 
more regular basis.  The monthly Saturday Serve Day was launched in 2009 to connect with and 
care for our senior adults by assisting with practical and needed assistance. This activity 
continues to this day, allowing volunteers to build long-term caring relationships with some of 
our most treasured community members. 
 
Our early years also included neighborhood holiday events.  Tents, tables, and chairs would be 
organized on a central corner and neighbors would gather for potluck style meals with music, 
art, raffles, family photos, and games.  Rain or shine, people would show up for these 
anticipated block parties, thankful for the chance to connect with each other.   
 
As time went on, it became clear we needed a fixed place to continue our efforts.  In 2012, we 
purchased an abandoned home that we restored with the help of our community. It became a 
tangible representation of our mission to build community by connecting with and caring for 
others.  Here are some of the ways we have been connecting and caring in Chandler: 
 
Connecting 
 
Our Connecting activities focus on providing opportunities for neighbors to interact in a safe and 
fun environment where they can get to know each other, build on what they have in common, 
and tear down the walls that divide them.  This has happened through holiday celebrations, 
neighborhood soccer games, and a variety of workshops and community education events.  
These activities typically take place at the Live Love House, a home previously known as “the 
drug house” in the neighborhood. 
 
Key Services  - School Break Program 
Students in the neighborhood are often home alone during summer, fall and spring break 
weeks.  For this reason, a hands-on learning program was organized to give them a safe place to 
connect with others.  Workshops have included dance, karate, music, art, cooking, and 
gardening, to name a few.  Field trips to local points of interest were also a favorite.  We also 
encouraged reading skills for all ages and snacks to ensure the students were receiving healthy 
food while out of school. 
 
Key Services  - Community Education 
To support parents and adults in our neighborhood, we hosted several education series which 
covered topics they were most interested in.  Guest speakers were invited in to speak on topics 
such as community resources, local government, immigration issues, gang activity and 
prevention, and drug and alcohol use and prevention.  A light dinner was also provided to 
ensure families could participate who were just coming home from work and school.

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 6 
 
 
Key Services  - Soccer at the Park 
In response to parents’ requests for activities to do with their kids, the monthly Soccer at the 
Park was started.  It has traditionally been kids vs. adults and the rivalry is strong.  This has been 
an easy activity for inviting friends and neighbors, and almost always includes hanging around 
afterward for pizza or snacks.  Everyone is truly disappointed when it becomes too hot to play 
during the summer months, as the park does not have lights and is not considered by neighbors 
to be safe at night. 
 
Key Services  - Caring 
Providing support and practical assistance to our neighbors is the priority of our Caring activities.  
Bringing together volunteers to work side-by-side with residents as well as supporting local 
schools, we have been working to restore beauty and dignity in the lives of our neighbors.  In 
whatever way possible, we strive to promote compassionate connections with those we serve, 
one neighbor to another.  
 
Key Services  - Saturday Service Day 
Our monthly Saturday Serve days care for the local downtown Chandler community.  We do 
light yard work such as mowing, pulling weeds, & other minor home repairs for those unable to 
complete these tasks on their own. We also deliver canned food and a friendly smile to the 
senior adult residents of a local subsidized apartment complex. 
 
Key Services  - Mentor/School Support 
The Mentor and School Support program works in partnership with our neighborhood schools to 
support teachers and students on their learning journey.  Volunteers helped students at both 
Willis Jr. High and Sacaton Schools throughout the school year with a wide range of activities, 
including helping in classrooms, cheering on students at sporting events, leading after school 
clubs, or even spending a few moments with students at lunch.  The goal is to be present in 
ways that say to both students and teachers: “we see you and care about your success.”  
 
Compliance with the Zoning Code 
The Applicant sees compliance being demonstrated in two principal ways: 
 
o The proposed physical development is substantially below the density of development and 
heights that the existing MF-2 zoning permits 
o Proposed 6% lot coverage vs allowed 45% 
o Proposed 20’ maximum building height vs allowed 35’ 
o Proposed side yard setbacks are in excess of 40’ vs allowed 5’

The Oasis/El Oasis – 482 E. Erie Street (APN: 302-65-106) 
Updated Written Narrative in Support of a Use Permit Request 
 
 
 
Page | 7 
 
o The landscaping and open space provided on the site represents a material improvement 
over the scale of open space and landscaping that the typical MF-2 development use would 
likely propose.

A
T
A
A
8'-0"
PUE
8'-0"
PUE
25'-0"
FRONT
SETBACK
30'-0"
REAR SETBACK
25'-0"
SIDE
SETBACK
59'-8"
36'-6"
390'-3"
24'-9 1/2"
DRIVE 
AISLE
19'-0"
9'-0"
20'-0"
20'-0"
25'-0" 
SIDE 
SETBACK
10'-0"
10'-0"
CONCRETE DRIVE & TURN AROUND
PAVED PARKING AREA
BBQ
PIZZA FIRE OVEN
TURF WITH STRING LIGHTS
GABION [10' HT. MAX]
RECREATION COURT
COMMUNITY GARDEN
10' LANDSCAPE BUFFER
GABION [30" HT. MAX]
GABION [30" HT. MAX]
MANUAL STEEL GATE
[30" HT. MAX]
10' LANDSCAPE BUFFER
PROVIDE 1 TREE AND
6 SHRUBS PER 30 LF
DRIVE ENTRANCE
PER MAG 215 /
TDM#4 TABLE 5
INTERIOR OF SITE TO HAVE 1 TREE AND
6 SHRUBS PER 1,000 SF OF AREA PLUS
ADDITIONAL GROUND COVER TO TOTAL
50% COVERAGE.
IRRIGATION
REFUSE / TRASH
PER UDM DETAIL
C-113
10' LANDSCAPE BUFFER
COMMUNITY EDUCATION
CENTER
1
2
4
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18 19
23
22
21
20
PASSENGER LOADING
ZONE
TYPICAL PARKING STALL
4450 north twelfth street number 268    phoenix, arizona 85014    tel 602.264.6617   email jack3@debartoloarchitects.com
debartoloarchitects
OVERALL SITE PLAN
1
1"   = 40'
chandler, arizona 85225
LIVE LOVE
482 east erie streetOASIS
N
SD1.0
NOTES:
- LOT COVERAGE: [5,000 / 81,814 SF] 0.061% SF
- PARKING PROVIDED: 25 PARKING STALLS [INCLUDING 2 ADA STALLS] [2 STALLS PROVIDED IN GARAGE]
- NO PROPOSED LIGHTING SHALL TRESPASS ONTO ADJACENT PROPERTIES.
- SETBACK ALONG STREET FRONTAGE SHALL PROVIDE 1 TREE AND 6 SHRUBS PLUS ADDITIONAL TO ACHIEVE 50% COVERAGE.

4450 north twelfth street number 268    phoenix, arizona 85014    tel 602.264.6617   email jack3@debartoloarchitects.com
debartoloarchitects
MATERIALS
1
chandler, arizona 85225
LIVE LOVE
482 east erie streetOASIS
SD3.0
 1
1 - WEATHERED BOX RIB DECK
2 - LOW E GLAZING
3 - WEATHERED STEEL
4 - WEATHERED CORRUGATED DECK
5 - STUCCO - PAINT COLOR [DE6373 PORPOISE LRV65]
 3
 2
 4
 5

LANDSCAPE PLAN OVERVIEW
North and East Property Line Tree Species:
West Property Line Tree Species:Acacia
South Property Line Tree

Fence along North and East property lines to vary 
between vine support (green wall), view fencing and 
6' CMU wall. Green Wall and View Fence constructed 
in combination with 2'-0" high CMU knee wall. Along
these alley frontages at every 100', a 20' section of
6' CMU wall will be built.  The knee wall visible from
alley side, concealed by berm on Oasis side. 
2" Tube Steel Post 
3" Welded Wire Mesh 
it 
. 
I 
r--.., 
 
>drt_,,,-.,._ 
...,._ ,--
'.l?:. 
r--.., 
..... 
 'tl t 
I,.,.. 1-.. L..• r;
r--... ""'
·1 
,._ • 1' I<>. 
-
 tf ., , ,. 16'.' ~,
. 
A; ... , .  r,,.-... ! 1 ... I<!! ......  
.! ., 
,,. .., ,_ I"", ... l.ac!!':., 0 l'-!i 'ft .. ,.
£ 
I!! 
 1'1' 
I
 1 A  
/ 
" 
l". I& 
-x ·n 
-
la ilt .u 
' 
f
 -
 . 
...  
-R
,-
..J :1" I'll 
rfi ... 	 
I 
6'-0"
< 
.,. .. , .. N 
.. I 
-" ol- •. ,c .. ;...
" 
-,., ..a.., .. 
In
I 
Ill!!. -
. 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
EAST/NORTH FENCE CONCEPT 
EL OASIS 
/ 
-
/ 
V 
)v 
/ 
/ 
V 
V 
V 
V 
V 
/ 
/ 
/ 
I 
I 
I 
I 
2' CMU Block Knee Wall 
1 /2" Steel Picket 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
Scale: 1 /2"= 1 '-0"
3-7-21
KRISTIAN KELLEY LANDSCAPE ARCHITECTURE 
LANDSCAPE PLAN - FENCE DIAGRAMS

ERIE STREET
DATE:
REVISIONS:
DATE:
PROJ. # :
REVISIONS:
L A N D C O R
C O N S U L T I N G
6859 E. Rembrandt Ave, #124
Mesa, AZ 85212
Ph: (480) 223-8573
landcorconsulting.com
3/8/21
1567
-
CHANDLER, ARIZONA
EL OASIS
PRELIMINARY GRADING PLAN
DATE:
PRELIMINARY
GRADING PLAN
PRELIMINARY GRADING PLAN
PGD
DRAINAGE NOTE: