CITY OF CHANDLER
CHANGE ORDER NO. 3
DATE _ 10/7/2021
Change Order not valid until signed by both the City and the Contractor. Contractor's signature indicates
agreement herewith, including any adjustments in the Contract Price or Contract Time.
ProjectName: Cooper Road Improvements (Alamosa Drive to Riggs Road)
Project No.: $T1503.401; Federal No.: CHN-0(235)D; ADOT No.: SZ181 01C
User Dept.: Public Works & Utilities NTP Date: February 22, 2021
TO: Pulice Construction, Inc. 8660 East Hartford Drive, Suite 305, Scottsdale, AZ
85255
(CONTRACTOR) (Address)
ontractor must make the following changes to this contract: (Detail scope change (Exh. A) / cost breakdown
fer B), if needed), (Exh. C) Summary CPM Update Ltr.
The following contract change order is for multiple items associated with the construction and time
associated with this project:
e The first item entails the removal of 2,440 L.F. of the existing 12” ACP waterline along Cooper Road
from N. of Blue Ridge Way to N. of Kaibab Place and installation of a new 12” DIP waterline in the same
location. This work was not anticipated as part of the original contract design and has been
recommended by City staff to be done at this time. This work will be done using existing contract
bid prices along with agreed costs for additional services and contract general conditions associated
with this work for a total of $1,018,177.85 per Exhibit B. The contract completion time will be extended
an additional 28 calendar days revising the final completion date from May 18, 2022, to June 15, 2022,
e The second item entails full monetary compensation for the agreed upon contract delays due to
extensive construction conflicts with utility companies work preventing the contractor from
completing the critical path items. This compensation is based on the contractor's general conditions
of $1,333.00 per calendar day for 74 calendar days for a total of $98,642.00. This monetary settlement
has been agreed to compensate the contractor for the delays and no further delay related
compensation will remain unresolved as of 10/07/2021. A future no-cost contract time extension for
the 74 calendar days may be done if additional contract time is needed (Exhibit C).
e The third item consists of obtaining funding of $300,000.00 to be added to the contract bid item #238
~ Miscellaneous Work Allowance - Wet Utilities to be used for grout filling over 7000 If. of the existing
16" and 12" ACP waterline along Cooper Road being abandoned in place from Riggs Road to Blue Ridge
Way. Final costs for this work will be determined using a negotiated lump sum cost or under time &
materials,
Legal approved 9/6/18 Rev. 4/8/2021 ST1503.401; Federal No.: CHN-0(235)D; ADOT No.: SZ181 01C CO 3 Page 1 of 3
Cooper Road Improvements (Alamosa Drive to Riggs Road)
OWNER NAME & DATE APPROVAL: Jeff Auker 10/8/2021
Changes result in the following revised contract amount and time:
Original contract amount: $17,174,000.00
Current contract amount, prior to this Change Order: (incl. previous Change
Orders) $17,174,000.00
Net change resulting from this Change Order: (if over $50,000 from contract
amount previously approved by Council, Council approval is required) $1,416,819.85
Revised contract amount, including this Change Order: $18,590,819.85
Last contract amount approved by Council: $17,174,000.00
Change Order % of last contract amount approved by Council: (if over 10%
of previous contract amount approved by Council, Council approval is required) 8.3%
Contract time or completion date prior to this Change Order: (incl.
previous Change Orders) 450 or
Days Date
Net change resulting from this Change Order: 28
Days
Revised contract time OR completion date: 478 or
Days Date
SIGNATURE PAGE TO FOLLOW
Legal approved 9/6/18 Rev. 4/8/2021 $T1503.401; Federal No.: CHN-0(235)D; ADOT No.: SZ181 01C CO 3 Page 2 of 3
Cooper Road Improvements (Alamosa Drive to Riggs Road)
THE ABOVE IS AGREED TO BY:
Pulice Construction, Inc, wD 10/12/2021
CONTRACTOR (CY Signatu re
vmjimenez:
Signer Email Address
Date
For Change Orders of $50,000 or more, or 10% or more of last contract amount approved by Council:
Approved by
Council on:
MAYOR Date Date
Recommended By:
Approved as to Form
(initials):
Andrew Goh, CIP City Date
City Attorney by: Engineer
Attest: City Clerk: V
Date
E-copy: Owner / Project Mgr. / Orig.- City Clerk
Page 3 of 3
Legal approved 9/6/18 Rev. 4/8/2021 $T1503.401; Federal No.: CHN-0(235)D; ADOT No.: SZ181 01C CO 3
‘ Cooper Road Improvements (Alamosa Drive to Riggs Road)
Exhibit B
Change Order Additional Waterline Work
Pulice has reviewed the additional work for removing the existing ACP waterline from Blue Ridge
Way to Kaibab Place and replace with new ductile waterline. For the bid item number 180, 179, 159,
158, 157, 154, 10, 171, 175 and 163 Pulice will use the existing bid item price to be compensated for this
work, These bid items alone will not cover the total cost of this additional work. Below is a breakdown of
several items that will also be increased.
Bid Item QTY UNIT PRICE PRICE
180 | 12" DIP 2440 $ 227.00 | $ 553,880.00
178 | 6" DIP 20 $s 200.00 | $ 4,000.00
159 | 12" Valve 14 S$ 3,200.00 | $ 44,800.00
158 | 8" Valve 2 § 2,200.00 | $ 4,400.00
157 | 6" Valve 3 S$ 1,700.00 | $ 5,100.00
154 | Services 3 $ 5,000.00 | $ 15,000.00
10 | Pipe Removal 2440 $ 100.00 | $ 244,000.00
175 | Waterline Connect 7 S 600.00 | $ 4,200.00
Allowance (Temp Service Work) 3 S$ 5,000.00 | $ 15,000.00
248 Construction Surveying and Layout (GPS
MAPPING) 1 § 35,000.00 | $ 1,750.00
245 | QC 1 $ 125,000.00 $ 6,250.00
70 | Traffic Control ‘l. $ 380,000.00 s 19,000.00
232 Miscellaneous Work (Maintenance of Plant
Operation) 1 $ 25,000.00 | $ 1,250.00
Material Price Increase 1 S$ 62,223.85 | $ 62,223.85
General Conditions 28 S$ 1,333.00 | $ 37,324.00
Total $ 1,018,177.85
Bid items 248, 245 and 70 will increase by %5. The percentage was obtained by using the total
price of additional work at $910,000.00 divided by the original contract amount of $17,174,000.00.
The installation of the waterline will require quality control to be on site taking densities on the
backfill and installation of waterline. There will also be a requirement of a registered land surveyor to
come on site and take as-built shots every 100 feet of the pipe and every fitting. Also, to facilitate this
work there will be a traffic control set up for a lane shift for the entire three-month duration of the
installation. There will also be a requirement of a flagger at all intersections.
In three locations a temporary water service will need to be installed to keep homeowners in
service during the operation. This work will involve installing a saddle and running a temporary line to
the existing water meters. The installation of the 12” water line and the removal of the existing ACP
waterline is estimated to take three months however the schedule will be impacted by 28 days.
Pulice is requesting compensation in the amount of $1,333.00 a day for additional overhead
required to manage this project longer both for general administration and branch management. The
total days of delay that are ‘attributed to the additional water line work is 28 days.
DURATION
DESCRIPTION (HOURS) RATE ($) _| TOTAL ($/HOUR)
PROJECT MANAGER 8 $ 60,00 | $ 480.00
PROJECT ENGINEER 8 § 35.00 | $ 280.00
PROJECT ENGINEER 8 § 35.00 | $ 280.00
OFFICE
ADMINSTARTOR 8 $ 22.88 | $ 183.00
TRAILER 1 (DAY) § 10,00 | § 10.00
BRANCH/CORPERATE 1 (DAY) $100.00 | $ 100.00
TOTAL $ 1,333.00
Above is a break down of all the onsite overhead support, along with the branch and corporate
support costs.
TIME AND MATERIALS SUMMARY
PROJECT:
‘Cooped Road Improvements
DATE DURATION
|PROJECT NO:;(+Fed/ADOT Nos If applicable)
'ST1503.401 CHNO235D SZ18101C
BID ITEM NO TO APPLY TO;
IWORK DESCRIPTION: (+fleld dir, clo etc)
ALB pipe increase for additional pipe material.
TOTAL EQUIPMENT
DATE
[SHEET 1
ISHEET 2
SHEET 3.
SHEET 4
SHEET 5
en fo | co] 20/0 en [en
SUBTOTAL
[TOTAL MATERIAL,
DATE
SHEET 4
SHEET 2
SHEET 3
SHEET 4
SHEET 5
58,634.98
SUBTOTAL
$
$
$
§
$
$
$
58,634.98
TOTAL LABOR
DATE
SHEET 1
SHEET 2
SHEET 3
ISHEET 4
SHEET 5
SUBTOTAL
ke] [olcolcolcolen|
TOTAL SUBCONTRACTOR
DATE
SHEET 1
SHEET 2
SHEET 3.
[SHEET 4
SHEET 5
|e }<> || <0] <0] <0] 05]
SUBTOTAL
SUBTOTAL|
58,634.98
CURRENT TAX RATE
SALES TAX.
5.07%|
2,972.79
BOND.
oe E80
1,00%|
616.08
TOTAL COST
$
$
$
62,223.85
TIME AND MATERIALS WORKSHEET
[pRoJect: i [Cooper Road Improvements SHEETNO. | DATE ]
[PROJECT NO:(+Fed/ADOT Nos It [ST1503.401 CHNOZISD SZ16101C 1 [_aranon |
[BID ITER No To APPLY To: 1
WORK DESCRIPTION; (t1leld dir, ef0 etc) ALE pipe Increase for additional plpe material. :
[EGuipaient (ADOT Standard Specifications 109(0)(9) 1
[OWNED BY CONTRACTOR RENTAL RATE BLUE BOOK HOURS “AHOUNT
DESCRIPTION HOG’ R HERR SBR Regular a ea
SUBTOTAL 5
[OUTSIDE RENTED EQUIPMENT HOURS "AMOUNT
DESCRIPTION Foc RENTATINGOTC! Regular
= =
SUBTOTAI
QUANTITY NT UNIT PRICE ‘ANOUNT,
[ALB Pipe Increase. 1 is. 5 50,986.94 50,986.04
50,586.04
TABOR
HOURS RATES PAY
DESCRIPTION Reguar ‘Overtime Hourly Rate Fringe Rate Regular Pay ‘Overtime Pay ‘Amount
‘SUBTOTAL =
SUBCONTRACTOR
QUANTITY TAIT UNIT PRICE TOTAL
| E
| ‘SUBTOTAL z
| [SUMMARY
| TOTAL EQUIPMENT] $ i
MATERIAL SUBTOTAL| S__ 60,986.94
MARK UP; 15% 7,648.06
TOTAL MATERIAL, 58,634.98
TABOR SUBTOTAL| :
MARK UP FIRST $50,000] 15% =
HARK UP $50,001 to $100,000 12%
MARK UP $100,001 PLUS| 10%
TOTAL LABOR| 3 :
‘SUBCONTRACT SUBTOTAL s =
MARK UP $3,000 OR tess ‘$300
HARK UP $3,001 TO $10,000 1074
MARK UP $10,001 PLUS] A
TOTAL SUBCONTRACTOR| z =
SUBTOTAL] $ 68,634.98
CURRENT TAK RATE.
SALES TAX, 65%] 7.80%] 5.07%| 2,972.79
| l 1.00%] 616.08
TOTAL COST 62,223.85
JSee MAG 109.5.3 and ADOT Standard Specification 109 (D2).
al FF (Ses ADOT Standard Specification 109 (O)(3)
Rental Rates (Without Oporators)
HERR = F x ((1.15 x RY/176] + HOG => Overhead and profit of 15% already Included.
Where:
HERR (Sftour) = Hourly Equipment Rental Rate
F = Adjustment factor to R
R (Simonth) = Current RRBB Monthly Rate
Stand-By Time
SBR = F x (R176) x 0.5
ISBR (S/hou) = Sland-By Rate
F = Adjustment factor to R
R (Simonth) = Curcent RRBB Monthly Rate
HOG ($/month) = Hourly Operating Cost (major costs of equipment operation, such as fuel end oll, lubrication, feld repairs, tres, expendable parts and supplies.
176 hourlmonth = 8 hourlday x 22 daylmonth => Convert R from $/month to $/nour,
1176 hour/month = 8 hourlday x 22 daylmonth => Convert R from $/month to $fnour.
Outside Rented Equipment
(Rental Invotce x 4.40] + HOC => Overhead and profit of 10% already Included.
HOG ($/month) = Hourly Operating Cost (major costs of such as fuel and oll, ion, fleldrepatts, tres, parts and supplies,
0,933 => Per MAG 109.51.
0.933 => Per MAG 109.5.1.
AATERIAL
Per MAG Section 109.6.2, overhead and profit percentage Is 18%.
BOR
holldays, etc. Overhead and,
150% mark up for labor Includes the following: 35% for Items such as Social Security;
oft for labor per MAG Section 109.5.3..
dicare; Workman's Cr tion; Federal and State un
loverhead and profit percentage per MAG Section 109.5.4.
SALES TAK
165% per Arizona State Statute 42-5075 (B).
D
1s typical,
Contactor
Inspector
uSLYAdXZ LNANAQVNVM STVIMFLVN YNOA.. LZOz/v/0L
0 sz
o0"ors'L $| 00'S8E 00°090'L $| 00°S9z dvoouv | LNaW30 {olsawod] soov BAzaIS anos-esioiarw| af kl zt lvl o> osz
0006s‘, $| 00°0ES 00°Sb9 $| 00'SLZ ivoouvl | LNSW39 [olsawodl soovn 331 xW -estoicrm] .90 | zh |val © vz
oo"oss $| 00°0SS oo"0sz $} 00°0SZ Lvoouv. | LNSW30 [oltsawodl soovn 3a1-esioiarn] so fl wz |va L oez
oosai'z $| 00°'SZZ $| OO'SLE LvoouvL | LNSW30 fousanodl soovn BBL -ssloiarn] zi | zt |val © zz
OO°OLS $| OO'OEL $| 00°09 Lvoouvl | LN3W35 lollsawodl s90v 1 ONS Sp -esLo lary u90- | va Z az
oo'ssp‘L $| 00° SEP $| OO'O6L LVOOUVL | LNSWSO [OILSAWOG] SOOV/N ONS Sy - Esto lar wth | wa & o0z
0 OGL
oo'szg $| O00°SZL oo"ssg $| 00°S6 LS4OWE ONILVINSNI 314 /M [NHHL HSdd09 -suIMUsOveL) 00s kl eo zt [awl Zz ost
oo-o0e $} 0O'SZ o000E $| OO'SZL «M0738 BNI YBLVM GaINE-NOILNVS. <= 31a -Sdv¥L10315q] 0007 kl 90 |aw v OLL
oo"seL $| 00'S oo'seL $| 00'S {Bsvoled sTIo se} (HOIHLWOL) Sdvl-dvemArod| oor f| .co [wl] ze og}
gs's¢ $| Ov'0 19°87 $| SEO IC .80-.90 SNOILVYOSHAd ZZ /m OAOIHL I 80) MOVIE -dvVEMATOd] Opp fk] woz [ml Gol os}
o0'sz9'L $| S9°0 oorosz'L $| 0s°0 iC .Z1-.01 SNOUVYOSYRS 22 /M (CHOIHL I 80) MOVIE -dveMAIOd] Ory fe] .Ze [a] oos'z IIT op
0 OeL
oo'ose $]| OO'SZ 00°00S $| 00°0S L3XSVD LNIVELSSY VHNVUld| «90 |va}] OL Ozh
Gorooe $| 007001 oo"s6L $| 00°S9 LBYSVO LNIVELS3Y VHNVUld 180 |va] ¢ OLL
oo0ze'vz $| OO'O9L 00°00z‘SL $}| OO'OOL ALBNSVS LNIVELSSY VHNVeld| wb |wal ZSb ooL
0 06
00"096 $| OO'v~ 00°0%9 $| 00°91 Avoouv. | LNSW20 LASVO MM PL - Sdid <Od> 0S€9d Id | «90 | 9 08
00°0zL'L $| 00°8z 00°0r8 $} OO? Lvoouvt | LNSW39 12YSVO /M PL = 3did <Od> 0Se9d 1d bf 80 [an OZ
00°0Sz‘LoL $| 0S'Or oo'o0s‘z2 $| OO'LE Lwoouv. | LNaWw30 13SVO /M PL -3did <Od> ose0d 1d | uct | -n| oos'z [|] o9
os
AVISALVIA ANI YSLVM TWNOILIGGV ub 8 80 *.90 <> YaquO SDNVHO! or
og
oz
OL
TWLOL, EREFFING TWLOL Borda LNA wad | ONINTT NOILdlwosaa ~ aziS f{ S2is [il] ALO ||) Snr
NID INSYUND te0z bz Laas SNIDd SWIL CIs 0202 '6z HSG0190 NO
GVOW SOOIY -9}- SANG VSONV1V
SNTTSLNA *YaSNIDNS
YATGNVHS SO ALID -Y3NMO
SLNAINSAOUdWI GVO" YAd009 <> LABHSGVaNdS ASVA1SY TIWISALVIN
9102 ‘pZ HAGWALdaS “ALva
9@@s8 ZV ‘YSTGNVHO
L33uLS M3IAMIV4 “3 Coes
66LE-€S2 (8p) 4
6L2b-€S2 (08h) d
OTT ‘SHOIANES ® SLONGONd ONidid G1V
uSLdadxXa LNANFOVNVI STVIAALVA YNOA, bZ0e/r/0b
“WLOL, [30rd LINN WLOL [sor IINn wad | ONINTT NOILdwOSaa azis p] aais |i] Alo ||, aNr
ONIod INSUUND be0e v2 das ONIDSd SWI dis 0202 ‘6z Y3E0190 NO
v6"986'0S $ viiad SIEM 9 *3INLL GV
95°009'88L $ LOELO‘ZEL TWLOLENS ony
: $| 00°0% : 00°02 LBMSVD O14 YSESNY 19ASN USS WASNHOL odds GOSt| uB/b fF 0 osy
- $| 00°SE 00°SZ LDIN®E O14 did ‘DVL -LDINe ssore| 0 osr-
0 Ory
00°Or LL $| 00°09 00°092, 00°07 amg - dvo slugaq TVWSs 6b ocr
007060‘ $] OO'OLL oo"ose'L 00°02 [OlLSSWOG] AINO NOILOSS WOLLOE wt - OBA V¥9S Od-€ 6L oy
O0°ObZ'L $| 00°06 oo"oes'L 00°02 [O1LSSWOG] AINO NOILLOAS dOL «82 - OBGA VPSS Ode 6L Oly
oo"sez'L $| 00°S9 oo"0s6 00°0S «YaLVMu AINO GI NSWA1Od dOd-NON ~ O8SA W9S Dd-¢| 6L oor
0 ose
oo'ss0'z $| 00°S69 oo'szs‘L 00°Ss¢s ELE EEF] [GuvH 8 WALS SSoe] LON dO /M SUN Ae [SLSO] AX - SATA SLY9) val © ose
oo"066'L $| 00°S66 o0"0s9'L 00°Szg aa4 aad [qdvH ® WALS SSP0e] LNN dos SUN MY [SISO] PW - SATIVA BLVD val z oze
oo°0es‘9z $| OO'S68'L oo-oso‘zz oo'sZs‘t 384 Bed [GYVH 2 WSLS SSP0s] LAN dO /M SUN Mu [Sls] TW -3ATVA SLv9) val vb ose
0 ose
- $| 00°Ser'e 00°002'L [qSAOuddv YS TONVHO)] PW - LNVYGAH Suls|ng rsp] 90 | va ove
0 oce
ao"o0r $| 00°007 oo'sze o0o0°Ssze [dv -OF did] ONITdNOD X314 SONVY GSONSLXS 1108-1 XVWAH 480 | Va L oze
oo"0s9 ~__$| 00°0S9 oo"0ss 00°0SS [dov-0F did] ONMdNOD XS14 SONVY GSQNALXS 1108-1 XVWAH wh [val + oe
S 0 oos
a0°09z $| 00°S9 00°OrL 00°Sse [OLLSSWOd) SOOV /M LNIVELSSY LNIOP dIdO-UVIS IG - €SL9 1d ry wo jval 7 o6z
oo"ore $| 00°S8 oo"ost 00'Sr [O1LLSSWOG] SOO /M LNIVELSSY LNIOP dINO-YVLS IG - SLO Id ry .20 [val 7 gz
oo"0Ez‘OL $| OO'SSL 00°019°S 00°s8 [olLSAWOd] SOOV /M LINIVELSSY LNIOP dl¥o-AVLS Id -€SL0 1d rw wth [va] 99 kA
WLOL, Zoid LINN WLOL Bold LINN wanda | ONINTT NOILdwosaa azis P| sais |i} Alo ||/an7
ONiondd INSHUND toe ve das ONION SWI Ole 020 ‘6c YSEOLOO. No
Bid Schedule
Bid
Item Bid Item Description QTY
180 | 12" DIP 2440
180 | 6" DIP 105
159 | 12" Valve 14
158 | 8" Valve 2
157 | 6" Valve 3
154 | Services 3
10 | Pipe Removal 2440
171 | Remove Hydrant 3
175 | Waterline Connect 7
163 | Remove and Salvage Valve 9
vie 0 LE
aren [Se OO+02L 00+691 co+egl © oo+z91 OO+991 00+S91
foRE 40H a 5 - - a
ses ceed
Bend
esta
ROLES TE, EIS
Ter
[acay
fazay
00+04 VIS OL 00+S9L VIS ret tear
tO DED ELEN
‘witeg, — cree,
NVid SNIAVd
Lp BE RZL
bags
Fezieieo
5e2i2i=91
dvouw Y¥ad009
Trat : a eiy ‘pacedolg tet
earner = 9. ep029. Gui
cer { a : t i cer
gver geen
Bwu neivaae aaa BG
‘pong was 5S
oon 3 aun 3G i i
eee }6 eeee=S . hvatoreel-od prosktcaheetreto| aot grant
Sepou-sarTaneeersia\tarearea\tesa nelson
inna aaracam 35
ror a0 ‘as 209 sou Tome Tw @| PEE
Tet
‘os-9 130 ‘ais OD Ae aba LIM NAG MULE THIS —ZHZT ‘| ever
“ge 05-929 “is OD aoe anaenar MLR LaML=ED
orn tone Lad eee BL RE eT aulpayen Bugsixe 0} auuod -Vvz |= SS ae a a ever
suncwa 10
‘vi mt Laatoye ‘WyrOy OL XaLTO ONY aur OHSU
‘end Sagi 00 20 aks Yr A vO 28S TMS Kadota Ses : SUILSJE/\ SAOWSY - 471 OE .
“Dyn intload ‘MeMDY OL VRIES IZEC
“Rumaava Juno "Wak 170 "OLS TVA 30d SHON JON FoMHD THLSHE
a1 oon-9 ane “ais “909 sad waviros auNOMGD somaLcron GS] DEL
Wet
ny Sekt SvRau¥ SOV ws YOM SHvId JavIcON OL BSE
OU SEES DE TRIS OB Ge Shes @| eve = oe SAJEA uQ ~ WA | zeaeeg en - ye ever
Aes wir as a S09 wd a rar] EVEL sc queipAH ol4 Wa Looe 3 egesy — CETTE ey
nora SF Se sea St a i : a : SUILaIeM did 9-41 8e ee E
Cee
po eet pret ue SUSE dIG u2b = F1 02E
SeOGE 130 “ws WR aod AvaCANG aUioNE LIMIsIOD A “pe ;
[ise and srcva) G29 120 oo we NOLEN 3508 tTIN LaNaL=KOD G
GS-9 GS-9 10 “OLS 909 AMY amv anVAOS LOMO “FOL 03s Aa_Ly'so
‘bee 10 “OLS Ym Aga SvaIOS HDHD 6 LoNAL SC)
‘ON
eyies
Me Sa 2 DAS “OY ae O¥D TENE LOTALECD eS
NoWAnOSaa
S310N NOUSNISNOD
“avawuve SNuz0G SAORON fa
“THonneyn ona nora fr
ar a Sea ZAarO [|
+” ae amusia aware Fe
pouwen onus auva0 ew ararou fl
et
a irzr®
— f0°or
Foote A0Lsco
unonea/ Lama ¥ amis LroWys [F
Nouaidasaq ON}
SBLON TAOWS
‘ozor/ay oT
ocre-rat (on) Sirol 5395)
cera voz “anoMO ‘ozaz/a
ius ovana io SE a
ANMLUYdIC SHIOM OMEN
OO+FOZI *VLS_3NID HOLW
00+S91 ‘VIS 3NID HOWWH, 20°99
NOLLWANILNOD HOS OE 133HS 33S
B77 Z|
NOILWANLINOD HO4 9¢ 133HS 33S
4
i] 2
pounce UL HY HI OAL wermpewrnan om
suozpy - Jojpasyg sme
ett
=
Sno A g : rk Ws 834009 SOTI+9S1 “VAS
= E i w0ex,0z Y [3.
sof
i
i
Fe
2 a
fi
Bs
wae Tt]
pT
n/a ossodoug/ “7
Spe ue aL SEE,
ee O0+SLL O0+rL1 oo+eZt 00+zz1 OO+1LL 00+041 53
ssa sms Ss wan eo '@ p09 Guy Ms ) Bs
OES TEA =e evel | Los Na <A pee ene EEL, ‘tas ever | ee
;— Seel -- =f EOS geet
Eras SEEEEAS. a2 How 21.19 7 sh bret | 35
OO+SLL VLS OL OOO VLS ait und .c2sdcdad :
NV1d ONIAVd S35 A
qavouy Y¥ad000 2 z
iby Woipon Sacodong 2
© 33019 Suns3 ¢ ; é
evel ever | £
ara Jo- 38+ --- ever | 2
: lg. ares. Hy
vyeL u Siross aE wer | &
‘Sere nouvauns coy mas @) sd Nouvauan vata TE © 1H VIG qBS0z0¥e : ES 3
David LaswenaiN 332 @) swe waves ms SY as z
Dinu Me sume 322 @) rag ann anv 325) * ~ 2
smd ton ns 346 © sre ned mois 7s PT Uaipey Besedesd
send sacar 335 Ol ZpEL
Pia lees f =
: oo —_ crel
Qin a eee
ay ret
veel
rel
veel
By
a; Bros
LBL. NVICGN G3Soddu.
= : ; ff —- fe. —/ MA a & ‘ee &. estoy ye Lf
re eee eel
gel e
mena nas i Fires ge azay
ver : ya1 sang 2% eng Susisg : ER ah
adiq @AOWSY - 47 00S
aAIEA BAOWAY - YF |
agen
cau
‘Tord ts 19nl0ud ‘NivAOY OL anWwIRE BNUSIR
‘onusea fouvn
“IC-2 ONY O°-9 “als JOD 204 IAWA LscrOY
SY, NOWD3S LNOROAYG TWOUAL 204
‘Ter 3s eee |
On}
ord na soaLoad
‘Tord mi Lauiows ‘vou ot aauino GAY oun srAse
‘er 130 "ULE “Sv ABU moKaIG I1D30N0D ,2 LIME
ove HAA, TRE a US TR Be RMD TaN L3MALENOD
Ye 3aid “02e 190 "Ls “TY Bod saLEND aa BERD WoILITA L9nuisN09 (1
NOWAIuOSaa
S21ON NOWDNYISNOD.
19 ae : Ps al ka
T
[4
a
, Sore
ii oo+¥e1 > oo+eci biases
ooeze
‘horuvd 3¥ 2oray [5]
sunsren/inaranva DY DrasoG LAKE [i]
Nowanuosaa On
SGION TVAOWSY
OO+SZI WIS ANI HOLY
2/8 oF
3 50
OO+OZI VIS 3NI HOIWN
‘2or/a| TY
scec~2ae (co) iva sea00|
sezet vaozay "enaNNG ‘oz0r/a| Sar
e vo] awa
ANSALUVd30 SHYOM OMENd | —ozoera] 7
auye| uno
NOILWANILNOD YO4 6E 133HS 33S
z
&
NOILVANILNOD HOI Z¢ 133HS 33S
aa ean sree ree oe EERE
sou 9k rr nye AHL
suoZpy - sojpueyg ine me
‘fom Tv sued
ec ming Sang WY HE
~~] ie?)
LHOTUBS BALM
Kooi
a eas
2509} 5 OE
Sep aut-sei"nvarecosta\tas2arga\rraa\uae rant p\pEar Be
e zat ay | SURE, oo+8Zt OO+ZL1 O0+9Z1 OO+SZb
ETE =| let : Hoe) SaLino t : Ter
—— oes — i ee u dade Car aad ctv le Co eS sp oat . sitet os on
ever zal
00+8ZlL WLS OL 00+SZ} VLS S00
NV1d SNIAVYd as
dqvou Y¥ad000
PLEIN, HLYON
Saas) “Ter
“lon lel .
{Lf i NOT ever ever
Sel ter |’ seat st | Sve
Dire aura Goue a @ —_shvid neuro ames 3 @| 4
pene smnvooiaun 335 @) ser wos 28
sng es sun 5 @) stor 3an navn 2250 i
‘eng won sus ne © sore evan racus 25 |
sore aarosom 3 Of TET zal
erat oT) ereb
ever | over
i ae
Ter : Tet
ayer i wet
ra i Spall] ever
*Woe-2 130 “CLs “VO AGe ea LIN Neva MOIS TLsM @
cpr w w9110u
‘ong ni somi0ud NaN OL AMLLN ONY Gyro ONS
i Aatod ‘NivRa OL YAGI SNH
"TOD AG¥ wavaNds UIwINGD sInALSOD
DOD Ge SAVE 2080 TSN
nou eee 7a "OLS TV wae NOWIAVL aTLING GAY OAND TWESHE
‘oye ROUDIE INOMOAVA WOU 2d
wraranya SY Twi ony JOMaRNS Saved ©
aa. eee 130 “tus “OM AB4 Muro TravENAOR LoML=NC
ove BAL TEE 00 "GS DM ABW OUND TENG LoMaL=NOD
Sof Sant "Uae “190 "US DVM D4 AOLLTO an euND WOLADA LoMALSNOD
‘Ter Hs “eS YH we aE JaWME THIEN @)
‘Ure 30 ‘als YH ASa so TuD¥NGD 2 LaMaLsNCo ()
Q
®
‘NouAINaSaa ON}
sparaava DY ora [E
ainwena/naranva “DY seeteoC Inve [F
Nowanosaa “On|
= 3
SBION NOUIONUISNOD = bil exe. _
2 alsekeepele {8
g col pepe be ls
5 S
s 3
ml
Soret
y MsOsZR F
2
es
a
=
Pah
r=}
NOLLWANILNOD HO4 Ov 133HS 33S
|
“cave |
NOLLVANILNOD HO4 BF 133HS 33S
00+S41 ‘VIS ANIT HOLWH
ANBWLYYE30 SHYOM OMEN
sauna MeL myo sont. 4 OLY
Buozpy - 4e/pueyo
S
Pe ES 6S eS ee ee
= se mizas FF NBUVOORY lute VES
AO HOTS LIAS coveatee
vie 0 OF
er on | BESTR ETT
oo+esL
O0+181
OO+621
00+8Zt
i
,
i
i
i
eee
Bisa
46t1qu1S
"re a No 7130 Ao AVIA TeAL NUNN LoTMUSADD
eal
aera | FE
swe ae | Sirs
Nowe 3SI0_ROGUOE oye
ever E
veel i
OOFES! VLS OL 00+8/L VIS Ss
ES 1w6ty aang pozodoug
NVid SNIAVd as
qvouy 4ad0090
age er HLYON
= erer e
Svel
veel a eros
oat ANOW) NVIO3H caSOdoud
re neuron cous a © naLva amas a= © 27s
sm ssaeauN 3 @) aera wx: 325 ©} EEE
snd Wee suet 325 ©) ane win anv 5 Sas “
sa anon aus az © sievig teva mois 335 [63 6 pga
wna sevacam 325 Ol SHET ra ia
evel he~-- = = —
vrel le carey i Iz
i ie LAT nvigan aasoaoue ie
ae ae 3g
ie a ge
3. a
12 Ba. S-OEE “UO AIS Vn od NOUN anuAD Ow nina THD & i ws
ovid m sa3i0ug ret OO ge ae =e
‘Tas we Janie wera of watino any aura ows Gf nn ap
“Dvd Ni A2moud Ray OL AIO onaLsOa eel Fe
“a tim i ae
he Jk iat 0 ais vm a ar sev Ts sini eae a3
ES
re
adig arowsy - 47 00S
JUPIPAH @AOWAY - Wa | assesses 4
SAIEA SAOWAY - Wa ¢
sulpezen, Bunsixy 0} auuog - yy Z
SIIAIBS Ja}eM\ - VAL
SABA FED ZL - VAD
821 ZLXTLXTL - Wa Cassano
BAIEA 9 - WA Lo
queipAH adl4 Wa}
w9- S1S€
821 OXZLXZL - VA Lf
a7an
over
veel
evel
eel
veel
evel
ever
rel
cyel
Seer
veel
¥- NOUDIS IRGHOAYA TWoUNAL 104
sramanva IY TWIEN' aNY JOvIBERE Swveted ©)
aod ‘Sacer tom oe
1)
190 US SY and AVADAIG 28230600 LoMLSND
“2-51 Sums NO S3¥190 any
Gr2~9 “130 "OLS 209 abd aM SAWAIGES LOAN
LNG “AS YH 2d sO SLRONOD 3 LaNsKEO
JBL UE 30 “as DY ane aarD TievINTON LoMaLstED CF
"SE aga “us Dyn add wn TOME Lanwisne ©
IS YW a OLR NY ay TwotLuaK L9MwLSKOD
‘Nowaivosaa ON}
S310N NOUDNUSNOD.
Raed
avou y¥ad009
any Hvsogs0/auvna3
NT LuvARLS
“JBAOwas auyeyem Buunp
SOIMS Ul PIBMPZ LeEMa]g deay
9} aippes sadimas Asesodwia} e |je}Su}
8
aasodoud: =
ay SX
as 90+621_N 01.520 8
NOIWANILNOD YO4 6¢ 133HS 33S
= acts
ALINORNOD, KOSH MLUON
a
A =
25 ——=
Aid
q¢
“ro anuso0 aero ae
‘rommn sxsoa v000 OW ores ag
‘yn aunues at euvaoiny 30 01 aunos oneTeL aA
“ees Aa cuvoots 38 ok em A 89 ioe ano 3
ay
QF
2 =
Se
Wouatwassa ze
S310N TWAOWSE g38
‘oz0z/a) ary a
29] exx0340| 2
77) Eg
ara era
ANZWLYYd30 SYYOM BMENE ‘oz02/s] NG
ra ears
ounce 2H. yay somIms H permyerane eR,
suoz}y - Jejpusyg mene nt
37,20
2 Tz.
ve 222 zz
Hla OF Wis oC td 8
00+841 ‘VIS ANIT HOLVH
eR = OLE
ata Whales
Sep cat-eerrnraretasis\eaea"sa\sza\worsngces"
ae-9 7
“HORE 130 "CLS DVN AG AvABAYO ILROWOD L9MALsNCD
ANGMGAYE DY"TVISN ONY BavUDaNS IuveIid ©
fo)
10)
(swrnd tna snievy) G2z-9 “10 3D 19d OURHYeL ISON Hen Lancia G)
oye FAL THE BO LS VM GOAN TONS LMSC
ve dat ‘bee “190 “als “OV ae Ltr aN MUD OLN 19nL=IOD
NoLAnIoSaa
= id vs Yt
Ly _.g0°9¢
os T6r
3}0d ds G3s0d0ue
— be
93.
ve ee wer OA oo+sel oo+zeL o0+S8L o0+S81 o0+reL oo+eet
easE *UoK A ;
ames amas wer we .. Ke tpeL
SST ET a im
ra aio Bros EES Bo, ees i oral
BS a i ig Ba By 25 veer
00*88l VIS OL OOSS VIS weet = Ee MG Bebe tone a ae
NV1d SNIAVd Poet a i. Bed
aqvouy Y¥ad000
EE g [Sms roarenanare| a cay ay cel
yer CR pee ee ee bt ee oie ein cee ok ce ee ee sper
Sree) az ; on peel
‘ae voUvouna oon mas @) Sev pouvouN ava 32 ©) ,
rosin 25 @) swe was CE ‘s aa e
Sisedms ieusnda ce) adig aaowey - +7 00S". ! 2 i
5 © swing ives mais 335 ne
ney UBIPKH BAOWEY = WE bem gh we
erer Fas SAIEA SAOWDY - V5 Se eral
arama ed SUILE}e/\\ 0} UO - Wa L! : 2 Boe ca
SBDIMOS JAJEM - VAT Bis 7
ited emma sm ANIA BILD .ZL- WAZ 5 ES
sog-9 anus 909 tu abt LIP free rls a ee AAPA W- VA LA feo: ard
“Be1'0 3akl “toot Gaels ‘Yn Ae SVG KoLID TSM G) TPCT P——— ad ee t
‘Se ie ws on os aa st a on GE SARA WQ- WA Le : Ee ais
“ary sve ems ok JUBIPAY Olly Wal | taf ET
” eso in | PPT * ‘
eae fe ere w9- 41 08%
wietugone ie ac k 5 sulvs}eM did «web ~ 4100S i
“ei-9 be hs 909 at stn Sa Tse SNOUWATTE 7 TOMLNOD avou u43ad009
‘oye a “as rym Aad Rau Orv HLNG AT SLND LOL souvoasey Deu/rouraus arin MES ESS
NOILVANILNOD NOs OF 133HS 33S
00+¢8l “LS 3NIT HOLA
S3LON NOUSNYLSNOD “ONT 8 -\-
wu ous som] 2S =
*Snvr0e auras F2ils = [rere
“guar we wae orem OS TR Ra go / sa ove) 2iaisig
Ten Sa LITT ONY SOTGH ail] RD HF
‘nor saan ob ada onussa Dia ow snows il] ~ 3 rT “Jeaowas aulayem Guunp —]
= rine Eetind GB 8 “Tiel BdMUSS U] SJBJOLW BSE} JO YOG deay z
saccnewusvaanimvel| 28 “juswese|dei-
ca a 2° _ Greer se. pue jecowes Buunp aoiuas ul ajdoed daay/*
eee a Teal 0} J@P4O U! UOEIO] SIU} Je BAJEA & |/EISUI
ov Pal sar
ANSHLEYEG SOM OMeNa | aeaE Tit aa =| pue uMep anus 48}8M e dn 39s 0} peau III r|
omen emp 3 : 5 = =
aon sag igs
poss TEA mm |
ec na has WP NS “ ee VBL ‘e3s0coue @ is |=
SOOO rOuYOOSSY ALIGNED NOZOMMIVE HLYON s0c0 . Auer oRiva KLAN
& nee ie BOL a3sodow os eae ae
—— ~~ ~~ INS LETT ONY LRLVM 209 SZ LHOIT ONY XGLVM 209 FZ iS
wor hs = eto ee
ber cai-cerraveeunata\ arr en\sesacusnccus a end Htssa Caaacheons
Buozjiy - te;puryg
S
Ci
Se
ble 2 ey aazan | Soares oo+s6L 00+z6L 00+ 161 00+061 oo+68L oo+saL
ne — THO BLN 7,
cee ae | eae YS ote fe Bund @asodoea
= —— over Len. as evel
STRSEIO TOTS Se oe ee Pe ey eigen ee ee —
a wala Lo — el
peel Bat oat ae ars aa rT PREL
OOFEEL VLS OL 00+88l VLS - REE soe 3s
NV1d SNIAVd = BBB nnn cm
avou Y¥ad000 7 Wi ons totais
Zz 3poup EuNing
ee wer S ée f- 5 ever
oper Sees Oo nthe io ee ay
Fear ES gore St — ¥ EOS Wer
ig2 3 \L nows nan caso
Si nowvonnn cone maz @) SW Nowra aLYAa oe © Ee Be a Ec i
‘via won asus 335 @ gid SUILLO}E\\ Bunsixe O01 PeuUdD - Vae rai y aN: —_
wna aoresom a QZ hET é g
ce SAIE/A SAOWSY - WA Z---“+ =~, sre — TE
=. Z
rel SABA SED 7] - Was es 0s T rel
ane .8- VAL a sermon ena!
SUILS}EM dIC wZb - 47 SE, é mee - 8
pal & & & £
ver aaa en ie : are
Her jusuieoe|des aes iz SFer
£ is IF
pue |eAowal Bulinp aoiues ul ajdoed deay age SE
“wr we sano¥d auina ATTVA antsea Kaun Gl PPTL i : : pues
ori Wows wera oki ow oun SUS 0} JEPJO Ul SUO}}ED0] SOU} Je SAIeA e ||e}SU! PERE
‘eran ae aa rcs pue uMop jnys Ja}eM e dn jas 0} pasu IIIA
“80-9 100 “us oD wna seowW soNe THis =
nanaiva SY Twin ob SONeaaTS vatee ©} ‘ oy avod ¥ad009
TEE Shes "is DY ade Was aatime TwiSW @) | selaassy staweanoh vrs vi \ i | scurry saprwoanen mas yn
“S-08e 190 “ls ¥n 304 Ava aLxoN0D LonaLsNED G) = q > \ |
{end 394 emo) 622-9 190 999 Ade ROUIDNVAL EON pn LanaLeNED _ @Eh| = ,
eno» grees tnt sue nny (HEVt! GUS NO avI30 ony IT ST RE 5 it
852-9 7 ope-o 100 “cus 209 ade anv SHANE AEERSS 1 ma
"es 9h a YN akONO 2 Lote i \ | FS
$iky "S18 “ts VM ane wero THONG JanatsncD i s ant he
“oY. 3a "955 190 tus YM we waLIMD ane aba TaUADA ianaren sas : i
‘NouaieOSsa “ON Ps
Lj T a :
_ = Se =5
Sle AS
a ag
sre snutoa sor FF Pai ag
rvs aenane u3eoN08 3rorDs i a 25
‘AYaaNW UswENeD JAORTY [o he am
“Uno ASIUYIN OL STASIS ONE TACHGY ONY Anas [6] _ 1. eh Su
Botrn 2nus90 Aor [9 6 covet Sawn las ag
mace one aa}3e
EoNGo/ tana “BY BR0a LAS [ey] I ear Tela|aa
rr =) lalslelela a S123
SALON TVAOWSE frefee| oe eon 5 3
‘ozs a7 S
orcemoae (cae) azva| 70210] s
C7 oF
iv ree 4.
baer sl = e_ oy
“
483,
wud
Pale MA
WELL — 0292 2 U8
2
Sep-ceieat “nee otosia\ta0area\reea\ncuoncoes a\Fatu M4739 Ceci Nea
PULICE
Arizona: ROCO71463-A, ROCO37256-B4
Exhibit C
October 6, 2021
Clty of Chandler
215 East Buffalo Street, Chandler AZ 85244
Attention: PaulAhlas Construction Manager
Reference: Cooper RD (Riggs Road to Alamosa Drive)
§T1503-401 CHNO235D $Z18101C
Subject: Conflict/Delay additional contract time and general conditions
Dear Mr. Ahlas,
This letter requests our agreed upon extension of 74 calendar days due to utility conflicts and additional work the
project has experienced. The daily cost of these general conditions shall be added to this contract. 74 days at
$1,333.00 per day = $98,642.00.
Pulice Construction, Inc. appreciates the City of Chandler approach in working through this topic, with the goal of
establishing a realistic project completion date.
Attached, is the back-up information that was requested.
If you have any questions, please contact me.
Regards,
Pulice Construction, Inc.
Pulice Construction, Inc. « 8660 E, Hartford Drive, Suite 305, Scottsdale, AZ, 85255 © 602.944.2241 e www.pulice.com |
PULIGG 3 weer on etr eect SR ESS
$T1503-401 CHN0235D SZ18101C Cooper Rd Improvements
Narrative Summary of Project CPM Updates
February — Substantial Completion Date 4/24/22 (7 days delayed)
o Removals delayed due to homeowner meetings extending beyond NTP,
March — Substantial Completion Date 5/01/22 (14 days delayed)
© Conflicts found at Cooper Road and Chandler Heights, Southwest corner pipe work installed up to
century link cabinet, pipe work started in southeast corner out of Manhole #4. Further work held
due to conflicts within cooper road crossing. Unknown estimated date for conflict resolution.
April — Substantial Completion Date 5/05/22 (18 days delayed)
0 Conflicts found at Cooper Road and Chandler Heights remain unresolved and continue to push
Cooper Road crossing and RWCD completion,
o Conflicts discovered with Cox Communications with the Private irrigation installation at Via de
Palmas & Via de Arboles. Installation to continue, completion of private irrigation pending
resolution.
© Conflicts discovered with SRP power poles at Via de Palmas, completion of private irrigation
pending resolution.
o Conflict discovered at Victoria Street with Century Link. Conflict involved with 24in storm drain
and 12in water line. Installation of these items to continue elsewhere, completion pending conflict
resolution. Resolution date unknown.
o Relief given on milestone #1 completion date by COC. Third crew expected to begin waterline
work north of Chandler Heights 5/13/21.
May ~ Substantial Completion Date 06/01/2022 (45 days delayed)
© Conflicts found at Cooper Road and Chandler Heights remain unresolved and continue to push
Cooper Road crossing and RWCD completion, anticipated resolution date 07/09/21.
0 Conflicts discovered with Cox Communications and SRP with Private irrigation installation at Via de
Palmas & Via de Arboles. Installation to continue, completion of private irrigation pending
resolution. Anticipated conflict resolution date: 6/13/21
0 Conflict discovered at Victoria Street with Century Link, Conflict involved with 24in storm drain
and 12in water line. Installation of these items to continue elsewhere, completion pending conflict
resolution. Anticipated conflict resolution date: 7/16/21
o Waterline work begins North of Chandler Heights along with streetlight and fiber conduit.
o Fiber Conduit original start date: 1/18/22 — 8-day impact to Baseline Schedule.
\ 0 Streetlight Conduit original start date: 1/29/22 — 15-day impact to Baseline schedule.
o Water Main work original start date 1/30/22 — 36-day impact to Baseline schedule.
AZ Office 8660 E, Hartlord Drive, Suite 305, Scottsdale, AZ 85255 © CA Office 31:11 Camino De Rio North, Suite 720, San Diego, CA 92108
TX Office 10100 West Sam Houston Patkway South, Suite 300, Houston TX, 77099
PULICG 3 ese
°
The Project Schedule would have been an additional 59 calendar days behind schedule if the
above items were not started ahead the original start date.
June — Substantial Completion Date 6/08/22 (52 days delayed)
fe)
Conflicts found at Cooper Road and Chandler Heights remain unresolved and continue to push
Cooper Road crossing and RWCD completion, anticipated resolution date 07/09/21.
Conflicts discovered with Cox Communications and SRP with Private irrigation installation at Via de
Palmas & Via de Arboles resolved 6/13/21. Work to continue towards completion following
resolution. Completion anticipated 7/13/21
Conflict discovered at Victoria Street with Century Link. Conflict involved with 24in storm drain
and 12in water line. Installation of these items to continue elsewhere, completion pending conflict
resolution. Anticipated conflict resolution date: 8/05/21
Water main work for South bound Cooper road North of Chandler Heights completed. North
bound work started 6/30/21.
o Water main work original start date: 1/18/22 — 15-day impact to Baseline schedule.
The Project Schedule would have been an additional 15 calendar days behind schedule if the
above items were not started ahead the original start date.
July — Substantial Completion Date 06/15/22 (59 days delayed)
ce}
Conflicts found at Cooper Road and Chandler Heights resolved 07/09/21. Cooper Road crossing
completed.
Conflict found with Century Link regarding 24in RWCD crossing Chandler Heights. Work must be
completed prior to scheduling a Dry Up with RWCD. Anticipated conflict resolution date: 8/12/21
Conflicts discovered with Cox Communications and SRP with Private irrigation installation at Via de
Palmas & Via de Arboles resolved 6/13/21. Work completed 7/21, method developed to deliver
water on new private irrigation south of STA 149+00.
Conflict discovered at Victoria Street with Century Link. Conflict involved with 24in storm drain
and 12in water line. Installation of these items to continue elsewhere, completion pending conflict
resolution. Anticipated conflict resolution date: 8/05/21
North bound water line work continuing, completion expected 8/04/21.
Value Engineering agreement between Pulice and COC.
o Scope reduced of Horizontal Boring the 30in casing for water main installation.
o Original schedule impact: 59 days including excavation and bore for both South bound and
North bound. Actual installation reduced to 5 days. :
The Project Schedule would have been an additional 46 calendar days behind schedule if the
above items were not started ahead the original start date.
AZ Office 8660 E. Hartford Drive, Suite 305, Scottsdale, AZ 85255 © CA Office 3111 Camino De Rio North, Suite 720, San Diego, CA 92108
TX Office 10100 West Sam Houston Parkway South, Suite 300, Houston TX, 77099 ||
PULICG rrr eres ee Se
August — Substantial Completion Date 6/30/22 (74 days delayed)
© Conflict found with Century Link regarding 24in RWCD crossing Chandler Heights resolved
8/12/21, Remaining work completed, RWCD switched to new system 8/30/21.
© Conflict discovered at Victoria Street with Century Link. Conflict involved with 24in storm drain
and 12in water line. Conflict resolved 8/10/21, Storm Drain work completed Riggs to Cloud. Water
mainline work resumed and completed. Testing begins and side street tie ins to follow.
Pulice is requesting a compensation of $1,333.00 a day totaling to $98,642.00 for general conditions.
Bid Item QTy UNIT PRICE PRICE
General Conditions 74 $ 1,333.00 | $ 98,642.00
Total $ 98,642.00
AZ Office 8660 E, Hartford Drive, Suite 305, Scottsdale, AZ 85255 « CA Office 31:11 Camino De Rio Nor th, Suite 720, San Diego, CA 92.108
TX Office 10100 West Sam Houston Patkway South, Suite 300, Houston TX, 77099