Sustainability Presentation

City of Chandler — Work Session (2021-11-04)

View PDF Meeting page

Extracted text (via pymupdf) 3520 characters
Sustainability Ordinance
City Council Work Session
November 4, 2021

•
Data Centers
•
Electric Vehicle Charging
Proposed 
Amendments:

Data Centers
*as a primary use 
•
Table of Permitted Uses –
Unlisted Use
•
Nothing Akin therefore not 
permitted by-right
•
Existing Data Centers 
located in PAD Zoning
Current Zoning Code:

Data Centers
*as a primary use 
Price Road
Dobson Road
Germann Road
•
NWC Germann and Ellis (1)
•
SEC Price and Germann (2)
•
Continuum (3, 4 & 5)
Remaining zoned sites:
1
2
3
4
5

Data Centers
*as a primary use 
•
Require significant cooling
o
Water
o
Electric
•
Noise
•
Multiple backup generators
•
Minimal employees –
inconsistent with General Plan 
Employment Designation
Sustainability concerns:

Data Centers
*as a primary use 
•
Table of Permitted Uses –
PROHIBITED
•
Does not remove existing 
rights
Proposed Amendment:
-For new data centers-

Data Centers
*as a primary use 
•
Require neighborhood 
outreach/meetings – notice 
½-mile
•
Require noise study -
before/after construction
•
Provide sound mitigation 
for mechanical equipment –
chillers, backup generators
•
Provide neighborhood 
liaison
Proposed Amendment:
-For existing data centers-

Data Centers
*as a primary use 
•
New data centers
•
Existing data centers
Questions?
Proposed Amendment:

Electric Vehicle 
Charging

Electric Vehicle 
Charging
•
Definitions
•
Things to consider
•
Valley comparison
•
Draft methodology
•
Draft concepts

Electric Vehicle 
Charging
Definitions:
•
Charger types:
o
Level 1: 120 V AC plug (house)
o
Level 2: 240 V (Res.) 208 V (Comm.)
o
Level 3: DC Fast Charge 480+ V
•
EV Capable: Panel capacity, dedicated 
branch, raceway
•
EV Ready: + Conduit, junction box
•
EV Installed: + Level 2 charging 
stations

Electric Vehicle 
Charging
Things to consider:
•
Wide range of predictions
•
EV infrastructure costs significantly 
less than retrofitting
•
Design: Aesthetics, safety, interface 
with pedestrians
•
Where is the EV for extended periods 
of time?
•
Regional system limitations – outside 
of Zoning Code

Electric Vehicle 
Charging
Valley Comparison:
•
Zoning Code: Avondale (recently 
adopted)
•
Building Code: 6 yes, 5 no
Nationally
•
Excellent case studies
•
Blanket percentage vs. targeted

Electric Vehicle 
Charging
Draft Methodology:
•
Take a targeted approach vs. standard 
percentage
•
Concentrate on EV Capable and EV 
Ready
•
Maintain Design Aesthetic 
expectations
•
Signage

Electric Vehicle 
Charging
Draft concepts:
•
Level 2 chargers - Residential and 
Employment Areas 
•
Level 3 fast chargers – Downtown, 
Regional Commercial (Level 3 can be a 
destination) 
•
Charging station locations
•
Retractable cords, do not obstruct 
sidewalk (safety)
Land Use
EV Ready
EV Installed
Single Family 
100% off street 
parking
0%
Multi Family
20% parking 
spaces EV ready
2%, installed for all 
developments > 25 
spaces
Multi Family 
Duplex/Triplex/Town-
homes
(Assigned covered 
parking)
1 Ready per unit
0%
Commercial
15% EV ready
2%, installed for all 
developments > 25 
spaces
Office
20% EV ready
2%, installed for all 
developments > 25 
spaces
Hotels
20% EV ready
2%, installed for all 
developments > 25 
spaces
Entertainment
15% EV ready
2%, installed for all 
developments > 25 
spaces
Industrial 
15% EV ready
2%, installed for all 
developments > 25 
spaces

Electric Vehicle 
Charging
Council feedback/direction

Next Steps
Stakeholder outreach
-Fall/Winter 2021
Finalize draft
-Winter 2021/Spring 2022
Public notification
-Spring 2022
Public hearings
-Summer 2022