Extracted text (via pymupdf)
3225 characters
IJ '
CH"NQLER
j\Var1zona
Community of Innovation
CITY OF CHANDLER, ARIZONA
PUBLIC WORKS & UTILITIES DEPARTMENT
CAPITAL PROJECTS DIVISION
CONSTRUCTION CONTRACT
WARNER ROAD & NEVADA STREET TRAFFIC
SIGNAL
CITY PROJECT NO.: ST2006.401
MAYOR
Kevin Hartke
VICE MAYOR
Mark Stewart
COUNCIL
Matt Orlando
OD Harris
Christine Ellis
Rene Lopez
Terry Roe
Andrew Goh, P .E.
CIP City Engineer
Rev .4/1 /2021
:.: (::
') :'
•'
Page i
'
/
. ...
City of Chandler Construction Bid
Page C-5
Public Works & Utilities Department, Capital Projects Division
Project Name: WARNER ROAD & NEVADA STREET TRAFFIC SIGNAL
Project No.: ST2006.401
Rev.7/16/2021
3.5
CONTROL OF THE PROJECT SITE
Contractor must control and maintain the Project Site in accordance with Section 4.5
of the General Conditions.
3.6
PROJECT SAFETY
Contractor must implement and enforce Project safety in accordance with Section 4.6
of the General Conditions.
3.7
MATERIALS QUALITY, SUBSTITUTIONS AND SHOP DRAWINGS
Contractor must provide materials testing and submit substitute materials and Shop
Drawings in accordance with Section 4.7 of the General Conditions.
3.8
PROJECT RECORD DOCUMENTS
Contractor must maintain and make available the Project Record Documents in
accordance with Section 4.8 of the General Conditions.
3.9
WARRANTY AND CORRECTION OF DEFECTIVE WORK
Contractor must provide warranties and correct defective Work in accordance with
Section 4.9 of the General Conditions.
CITY RESPONSIBILITIES
4.1
City will have the responsibilities, and provide the information specified in, and
subject to the conditions set forth in, Section 5 of the General Conditions.
CONTRACT TIME
5.1
GENERAL
5.1.1
The total Contract Duration is 210 Calendar Days (including Substantial
Completion by 180 Calendars Days and Final Acceptance by 210 Calendar Days).
5.1.2
The Contract Time will start with the Notice to Proceed (NTP) and end with Final
Acceptance, as set forth in Article 5.4 below.
5.1.3
The Contract Time will be as set forth in the Project Schedule. Contractor agrees
that it will commence performance of the Work and complete the Project through
Final Acceptance within the Contract Time.
5.1.4
Time is of the essence of this Contract for the Project, and for each phase and
designated Milestone thereof.
IN WITNESS WHEREOF, the Parties hereto have executed this Contract through their duly authorized
representatives and bind their respective entitles as of the effective date.
"CITY"
CITY OF CHANDLER
MAYOR
Recommended By:
Andrew Goh, P.E.
CIP City Engineer
APPROVED AS TO FORM:
City Attorney
ATTEST:
City Clerk
"CONTRACTOR"
Bruce W. Balls
Name
Title
Date
Date
'ovuce b@ bmV\tvt:\.ctiv:1€) •
Signer Email Address
County of Maricopa
Seal
)ss.
)
SUBSCRIBED AND SWORN TO before me, the undersigned notary public, by 8Y-UC e_ R,C\...,{ Ls who was identified as
the C:£b
of 2:,f FuvrfY.:::lufi on this
. (o
day of '1 20 2 2-.
My commission expires:
No
City of Chandler Construction Bid
Public Works & Utilities Department, Capital Projects Division
Project Name: WARNER ROAD & NEVADA STREET TRAFFIC SIGNAL
Project No.: ST2006.401
Rev.7/16/2021
Page C-10