CITY OF CHANDLER, ARIZONA 
PUBLIC WORKS & UTILITIES DEPARTMENT 
CAPITAL PROJECTS DIVISION 
CONSTRUCTION CONTRACT 
WARNER ROAD & NEVADA STREET TRAFFIC 
SIGNAL 
CITY PROJECT NO.: ST2006.401 
MAYOR 
Kevin Hartke 
VICE MAYOR 
Mark Stewart 
COUNCIL 
Matt Orlando 
OD Harris 
Christine Ellis 
Rene Lopez 
Terry Roe 
Andrew Goh, P .E. 
CIP City Engineer 
Rev .4/1 /2021 
:.: (:: 
') :' 
•' 
Page i 
'
/
 . ...

City of Chandler Construction Bid  
 Page C-5 
Public Works & Utilities Department, Capital Projects Division  
Project Name: WARNER ROAD & NEVADA STREET TRAFFIC SIGNAL 
Project No.: ST2006.401 
Rev.7/16/2021 
3.5 
CONTROL OF THE PROJECT SITE 
Contractor must control and maintain the Project Site in accordance with Section 4.5 
of the General Conditions. 
3.6 
PROJECT SAFETY 
Contractor must implement and enforce Project safety in accordance with Section 4.6 
of the General Conditions. 
3.7 
MATERIALS QUALITY, SUBSTITUTIONS AND SHOP DRAWINGS 
Contractor must provide materials testing and submit substitute materials and Shop 
Drawings in accordance with Section 4.7 of the General Conditions. 
3.8 
PROJECT RECORD DOCUMENTS 
Contractor must maintain and make available the Project Record Documents in 
accordance with Section 4.8 of the General Conditions. 
3.9 
WARRANTY AND CORRECTION OF DEFECTIVE WORK 
Contractor must provide warranties and correct defective Work in accordance with 
Section 4.9 of the General Conditions. 
 CITY RESPONSIBILITIES 
4.1 
City will have the responsibilities, and provide the information specified in, and 
subject to the conditions set forth in, Section 5 of the General Conditions. 
 CONTRACT TIME 
5.1 
GENERAL 
5.1.1 
The total Contract Duration is 210 Calendar Days (including Substantial 
Completion by 180 Calendars Days and Final Acceptance by 210 Calendar Days). 
5.1.2 
The Contract Time will start with the Notice to Proceed (NTP) and end with Final 
Acceptance, as set forth in Article 5.4 below. 
5.1.3 
The Contract Time will be as set forth in the Project Schedule. Contractor agrees 
that it will commence performance of the Work and complete the Project through 
Final Acceptance within the Contract Time. 
5.1.4 
Time is of the essence of this Contract for the Project, and for each phase and 
designated Milestone thereof.

IN WITNESS WHEREOF, the Parties hereto have executed this Contract through their duly authorized 
representatives and bind their respective entitles as of the effective date. 
"CITY" 
CITY OF CHANDLER 
MAYOR 
Recommended By: 
Andrew Goh, P.E. 
CIP City Engineer 
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
"CONTRACTOR" 
Bruce W. Balls 
Name 
Title 
Date 
Date 
'ovuce b@ bmV\tvt:\.ctiv:1€) • 
Signer Email Address 
County of Maricopa 
Seal 
)ss. 
) 
SUBSCRIBED AND SWORN TO before me, the undersigned notary public, by 8Y-UC e_ R,C\...,{ Ls who was identified as 
the C:£b
of 2:,f FuvrfY.:::lufi	 on this 
. (o 
day of '1  20 2 2-.
My commission expires: 
No 
City of Chandler Construction Bid 
Public Works & Utilities Department, Capital Projects Division 
Project Name: WARNER ROAD & NEVADA STREET TRAFFIC SIGNAL 
Project No.: ST2006.401 
Rev.7/16/2021 
Page C-10