January 2022 Project Status Update
Extracted text (via pymupdf)
4767 characters
Projects Designer Contractor Status Comments ROADWAY AND TRAFFIC PROJECTS ST1503, Cooper Road Imprv. [Alamosa Drive (aprx. 3,500 ft. north of Chandler Heights Road) to Riggs Road for two through lanes each direction] Entellus Pulice Construction Construction underway. Completion scheduled for mid 2022. Federal funds ST1614, Chandler Heights Road Imprv. [McQueen Road to Gilbert Road for two through lanes each direction] Kimley-Horn tbd Construction contract award in February 2022. Long lead procurement NTP Spring 2022. Start construction Summer 2022. Federal funds ST1616, Ocotillo Road Imprv. [Gilbert Road to 148th Street for two through lanes each direction] Ritoch-Powell tbd Open bids late January 2022. Construction contract award April 2022. Long lead NTP late Spring 2022. Start construction late Summer 2022. Federal funds ST1804, Chandler Heights Road Imprv. [Gilbert Road to Val Vista Drive for two through lanes each direction] Kimley-Horn tbd Design in progress. Bid scheduled for Spring 2023. Federal funds ST1908, Bicycle Detection System [40 intersections] n/a n/a Purchase of bicycle detection cameras Federal funds ST1909, Alleyway Rehab PM10 Dust Emission Reduction n/a Cactus Asphalt Construction underway. Federal funds ST2001, Lindsay Road Imprv. [Ocotillo Road to Hunt Highway for two through lanes in each direction] Kimley-Horn tbd Design in progress. Bid scheduled for summer 2023. Federal funds ST2002, Traffic Study of Kyrene Road [Chandler Boulevard to Loop 202] AZTEC n/a Study complete. ST2003, Gilbert Road Imprv. [Ocotillo Road to Chandler Heights Road for new traffic signals and three through lanes in each direction] Sunrise Engineering Sunland Asphalt Construction complete. ST2004, Alma School Road Imprv. [Pecos Road to Germann Road for three through lanes in each direction to match development imprv.] Wood Sunland Asphalt Construction complete. ST2006, Traffic Signal at Warner Road and Nevada Street Stanley Consultants tbd Design complete. Construction in 2022 ST2007, Hamilton Street Imprv. [Appleby Road to Carob Drive] Nfra Consultants tbd Design in progress. Construction in 2022 ST2009, Dobson Road Imprv. at Intel Driveways #1 and #4 [Price Rd / Market Pl to Chaparral Way] Premier DCS Contracting Design in progress. Funded by 20% from Intel and 80% from State TPT per ARS 42-5032.02 ST2012, Arterial Congestion Monitoring [Install data collection devices at major intersections, and use data to map traffic congestion and mobility.] Y.S. Mantri & Assoc. tbd Design complete. Installation in 2022 Grant funds ST2103, Intersection Imprv. at Ray Road and Dobson Road tbd tbd Study to begin in Feb 2022. Study only. Future phases tbd. ST2104, Traffic Signal at Ocotillo Road and Pinelake Way Y2K Engineering tbd Design in progress. ST2113, Alley Rehab PM10 Dust Emissions Reduction 2 (FMA Areas 16, 25, 39, and 40) Premier / Olsson tbd Design in progress. Federal funds PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS ST1612, Chandler Boulevard Bike Lanes [I-10 to 56th Street] Kimley-Horn Combs Construction Construction complete. Federally funded ST1613, Downtown ADA Improvements [Downtown Chandler on Chicago Street, Washington Street, and Boston Street] J2 DNG Phase I construction complete. Phase II construction complete. Locally funded. ST1701, McClintock Drive Bike Lanes [Loop 202 to north of Ray Road] & Kyrene Road Bike Lanes - [Chandler Boulevard to north of Ray Road] Aztec AJP Electric Construction complete. Federally funded ST2011, Study of Price Road, Ocotillo Road, and Chandler Heights Road Separated Bike Lanes TY Lin n/a Study in progress. Study was put on hold temporarily to amend contract to allow for addition of Chandler Heights Road analysis. Awarded design assistance grant for FY2020 ST2016, Park & Ride Shade Canopies, Phase 2 [two parking canopies covering 40 parking spaces & electric vehicle charging station] LEA-Architects TSG Constructors Construction underway. Anticipate completion Spring 2022. Funded with State Lottery Proceeds ST2106, Frye Road Protected Bike Lanes [Paseo Trail to San Marcos Elementary School] TY Lin tbd Study completed by Y2K. Design to begin January 2022. Construction in summer/ fall 2023. $3.2 Million grant awarded for construction and $650,000 for design. Kyrene Branch and Highline Canal Shared Use Paths Kimley-Horn tbd Study to begin early 2022. Design in FY 2022-23. Construction in 2024- 25. Pursuing federal funding. Price Road Flexible Transit tbd Study completed in collaboration with Valley Metro. Contract award anticipated in Spring 2022 with operations beginning summer 2022. Awarded $2 Million grant for project startup and two years of operations. Transportation Project Status January 3, 2022