Contract - Achen Gardner

City of Chandler — Regular Meeting (2022-02-24)

View PDF Meeting page

Extracted text (via pymupdf) 850290 characters
City of Chandler Construction Manager at Risk Construction Services 
Page  i 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 4/1/2021 
 
 
CITY OF CHANDLER, ARIZONA 
 
 
 
 
CHANDLER HEIGHTS ROAD UTILITY 
RELOCATIONS - GMP 1 
 
CITY PROJECT NO. WW2111.401 
 
 
 
 
CONSTRUCTION SERVICES CONTRACT 
(CONSTRUCTION MANAGER AT RISK) 
 
 
 
 
 
 
 
 
__________________________________________________ 
Andrew Goh, P.E. 
CIP City Engineer

City of Chandler Construction Manager at Risk Construction Services 
Page  ii 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 4/1/2021 
CITY OF CHANDLER, ARIZONA 
 
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
CITY PROJECT NO.: WW2111.401 
 
 
TABLE OF CONTENTS 
 
 
 PARTICIPANTS AND PROJECT .............................................................................. 1 
 CONTRACT DOCUMENTS ..................................................................................... 3 
 PRE-CONSTRUCTION SERVICES ........................................................................... 3 
 CONSTRUCTION SERVICES ................................................................................... 3 
 CITY RESPONSIBILITIES ........................................................................................ 5 
 CONTRACT TIME ................................................................................................... 5 
 CONTRACT PRICE.................................................................................................. 8 
 
 
EXHIBIT A – PROJECT SPECIFIC SPECIAL PROVISIONS .................................................... SP-1 
EXHIBIT B – GENERAL CONDITIONS ................................................................................ GC-1 
EXHIBIT C – TECHNICAL SPECIFICATIONS ........................................................................ TS-1 
EXHIBIT D – ACCEPTED GMP/PRICE PROPOSAL .......................................................... GMP-1 
EXHIBIT E – SUBCONTRACTOR’S LIST FORM ................................................................. SUB-1 
EXHIBIT F – GIS / GPS DATA DELIVERY REQUIREMENTS (IF APPLICABLE) .................... GIS-1

City of Chandler Construction Manager at Risk Construction Services  
C-1 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
CONSTRUCTION MANAGER AT RISK 
CONSTRUCTION SERVICES CONTRACT 
PROJECT NO.: WW2111.401 
 
THIS CONTRACT is made and entered into on the ______day of _______________, 2021, (“Effective 
Date”) by and between City of Chandler, an Arizona municipal corporation, hereinafter called 
“City” and the “Construction Manager at Risk” or “CM@Risk” designated below (City and 
CM@Risk may individually be referred to as “Party” and collectively referred to as “Parties”). 
 
City and CM@Risk agree as follows: 
 
 PARTICIPANTS AND PROJECT 
 
CITY: 
 
CIP City Engineer:  
 
Andrew Goh, P.E. 
 
Public Works & Utilities Department 
 
P.O. Box 4008, Mail Stop 407 
 
Chandler, AZ  85244-4008 
 
Phone:  480-782-3343 
 
Email:    andrew.goh@chandleraz.gov 
 
CITY: 
 
Construction Project Manager: 
 
Paul Ahlas 
 
Public Works & Utilities Department 
 
P.O. Box 4008, Mail Stop 407 
 
Chandler, AZ  85244-4008 
 
Phone:  480-782-3328 
 
Email:    paul.ahlas@chandleraz.gov 
 
CM@RISK: 
Achen-Gardner Construction, LLC 
 
555 S. 79th St. Chandler AZ 85226 
 
Arizona ROC No.: 
261745 A, 261746 B1, 261747 B4 
Federal Tax ID No.: 
27-1394157 
Business Organization: 
limited liability company 
State Where Organized: 
Arizona 
 
Statutory Agent Name: 
CT Corporation 
 
Statutory Agent Mailing Address: 
3800 N Central Ave. #460 Phoenix AZ 
85012 
 
CM@Risk’s Authorized Project Representative: 
 
 
Name:  Dan Broderick 
 
 
Title:  
Project Manager 
 
 
Phone:  480-940-1300 / 602-376-9434 
 
 
 
 
Email:  
dbroderick@achen.com

City of Chandler Construction Manager at Risk Construction Services  
C-2 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
 
PROJECT DESCRIPTION: 
 
Relocation of sanitary sewer and potable water utilities for an SRP 230kV transmission system. 
 
PROJECT LOCATION: 
 
Chaparral Way from Dobson Road to Lake Drive

City of Chandler Construction Manager at Risk Construction Services  
C-3 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
 CONTRACT DOCUMENTS 
 
2.1 
CONTRACT DOCUMENTS 
 
The Contract between City and CM@Risk will consist of the following Contract 
Documents: 
 
1. This Construction Services Contract and all of its Exhibits, including Project 
Plans and Technical Specifications. 
2. General Conditions and General Conditions Appendices, incorporated by 
reference. 
3. Project Specific Special Provisions as set forth in Exhibit A, incorporated by 
reference. 
4. Accepted GMP/Price Proposal as set forth in Exhibit D, incorporated by reference. 
 
2.2 
In the event of any inconsistency, conflict, or ambiguity between or among the Contract 
Documents, the Contract Documents will take precedence as described in Section 14.1.4 
of the General Conditions. 
 
2.3 
DEFINITIONS 
 
The definitions in Sections 2 and 15 of the General Conditions apply to all the 
Contract Documents, including this Agreement.   
 
 PRE-CONSTRUCTION SERVICES 
 
Although CM@Risk has performed Pre-Construction Services pursuant to a separate Contract 
between City and CM@Risk, the completion, quality and accuracy of those services and the 
deliverables provided by City thereunder directly impact CM@Risk’s performance of its 
obligations under this Contract. Therefore, all of CM@Risk’s obligations, duties, and warranties 
in relation to Pre-Construction Services and deliverables survive completion of the Pre-
Construction Services Contract and are incorporated herein. Any breach of any of CM@Risk’s 
duties, obligations, or warranties under the Pre-Construction Services Contract will likewise be 
considered a breach of this Contract. 
 
 CONSTRUCTION SERVICES 
 
4.1 
GENERAL 
 
4.1.1 
CM@Risk agrees at its own cost and expense, to do all work necessary and required to 
fully, timely and properly complete the construction of the Project in strict accordance 
with the Contract Documents in a good and workmanlike manner, free and clear of all 
claims, liens, and charges whatsoever, in the manner and under the conditions specified, 
and within the schedule, stated in attached Exhibit A.

City of Chandler Construction Manager at Risk Construction Services  
C-4 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
4.1.2 
CM@Risk must provide all of the labor and materials, and perform the Work in 
accordance with Section 4 of the General Conditions. Some, but not all, of the major 
components of the Construction Services and the corresponding subsections of Section 
4 of the General Conditions are set forth below. 
 
4.1.3 
This is a contract for complete construction services in accordance with the Construction 
Manager at Risk method of delivery of construction services.  CM@RISK has participated 
in the design process and been an active member of the Project Design Team and is fully 
aware of any issues and constraints involved in this Construction Project.   
 
4.1.4 
CM@RISK is the CITY’s fiduciary responsible for undertaking all necessary action 
contemplated under the contract documents to construct the Project and ensure timely 
and quality completion of the Project at a cost within the Guaranteed Maximum Price 
(GMP).   
 
4.1.5 
At all times relevant to this Contract and performance of the Work, the CM@Risk must fully 
comply with all Laws, Regulations, or Legal Requirements applicable to City, the Project 
and the Contract, including, without limitation, those set forth on attached Exhibit A. 
 
4.1.6 
CM@Risk must perform the Work under this Contract using only those firms, team 
members and individuals designated by CM@Risk consistent with the Statement of 
Qualifications dated August 11, 2021, the GMP Proposal, or otherwise approved by City 
pursuant to the General Conditions. No other entities or individuals may be used without 
prior approval of the Project Manager 
 
4.1.7 
CM@Risk will comply with all terms and conditions of the General Conditions. 
 
4.1.8 
In the event of a conflict between this Contract and the General Conditions or an exhibit 
hereto or appendix thereto, the terms of this Contract will control. 
 
4.1.9 
Ownership of Work Product.  Notwithstanding anything to the contrary in this Contract, 
all Work Product prepared or otherwise created in connection with the performance of 
this Contract, including the Work, are to be and remain the property of City. For purposes 
of this provision, “Work Product” will include all designs, drawings, plans, specifications, 
ideas, renderings and other information or matter, in whatever form created (e.g., 
electronic or printed) and in all media now known or hereinafter created. All Work 
Product will be considered Work Made for Hire as defined in the United States Copyright 
Act 17 U.S.C. § 101 (Copyright Act). If for any reason, any such Work is found not to be a 
Work Made for Hire, CM@Risk hereby transfers and assigns ownership of the copyright 
in such Work to City. The rights in this Section are exclusive to City in perpetuity. 
 
4.2 
CM@RISK’S PRE-CONTRACT AND PRE-WORK DELIVERABLES

City of Chandler Construction Manager at Risk Construction Services  
C-5 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
4.2.1 
The CM@Risk must provide the Deliverables in accordance with Section 4.2 of the 
General Conditions.   
 
4.3 
PRE-CONSTRUCTION CONFERENCE 
Refer to Section 4.3 of the General Conditions. 
 
4.4 
PERFORMANCE 
OF 
THE 
WORK 
(INCLUDING 
FIELD 
MEASUREMENTS, 
SUBCONTRACTORS, AND SUPPLIERS) 
Refer to Section 4.4 of the General Conditions. 
 
4.5 
CONTROL OF THE PROJECT SITE 
Refer to Section 4.5 of the General Conditions. 
 
4.6 
PROJECT SAFETY 
Refer to Section 4.6 of the General Conditions. 
 
4.7 
MATERIALS QUALITY, SUBSTITUTIONS AND SHOP DRAWINGS 
Refer to Section 4.7 of the General Conditions. 
 
4.8 
PROJECT RECORD DOCUMENTS 
Refer to Section 4.8 of the General Conditions. 
 
4.9 
WARRANTY AND CORRECTION OF DEFECTIVE WORK 
Refer to Section 4.9 of the General Conditions. 
 
 CITY RESPONSIBILITIES 
 
5.1 
City will have the responsibilities, and provide the information specified in, and subject 
to the conditions set forth in, Section 5 of the General Conditions. 
 
 CONTRACT TIME 
 
6.1 
GENERAL 
 
6.1.1 
The Contract Duration is 90 Calendar Days. 
 
6.1.2 
The Contract Time will start with the Notice to Proceed (NTP) and end with Final 
Acceptance, as set forth in Article 6.4 below. The Notice to Proceed cannot be issued until 
approval and acceptance by City of the GMP or Fixed Price.

City of Chandler Construction Manager at Risk Construction Services  
C-6 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
6.1.3 
The Contract Time will be as set forth in the Project Schedule. CM@Risk agrees that it 
will 
commence performance of the Work and complete the Project through Final 
Acceptance within the Contract Time. 
 
6.1.4 
Time is of the essence of this Contract for the Project, and for each phase and 
designated Milestone thereof. 
 
6.2 
PROJECT SCHEDULE 
 
6.2.1 
The Project Schedule approved as part of the GMP Proposal and incorporated herein as 
part of the attached Exhibit D must be updated and maintained throughout CM@Risk’s 
performance under this Contract in accordance with Section 6.2 of the General 
Conditions. 
 
6.2.2 
Failure on the part of CM@Risk to adhere to the approved Project Schedule will be 
deemed a material breach and sufficient grounds for termination of this Contract by City. 
 
6.2.3 
Work must be completed to meet the following milestones after the Notice to Proceed: 
 
 
Milestone 
 
Time 
Liquidated damages for delay 
 
1. 
      
within 
     days 
$      
per calendar day 
6.3 
SUBSTANTIAL COMPLETION 
 
Substantial Completion must be achieved no later than the Substantial Completion Date 
set forth in the Project Schedule.  Substantial Completion will be determined in 
accordance with Section 6.3 of the General Conditions. 
 
6.4 
FINAL ACCEPTANCE 
 
6.4.1 
Final Acceptance will be obtained within the time period set forth in the Project Schedule. 
 
6.4.2 
Final Acceptance will be issued pursuant to Section 6.5 of the General Conditions. 
 
6.5 
LIQUIDATED DAMAGES 
 
6.5.1 
Substantial Completion Liquidated Damages. CM@Risk acknowledges and agrees that 
if CM@Risk fails to obtain Substantial Completion of the Work within the Contract Time, 
City will sustain extensive damages and serious loss as a result of such failure. The exact 
amount of such damages will be extremely difficult to ascertain. Therefore, City and 
CM@Risk agree that if CM@Risk fails to achieve Substantial Completion of the Work 
within the Contract Time, City will be entitled to retain or recover from CM@Risk, as

City of Chandler Construction Manager at Risk Construction Services  
C-7 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
liquidated damages and not as a penalty, the sum per calendar day as indicated in MAG 
§ 108.9. 
 
6.5.2 
Final Acceptance Liquidated Damages. For the same reasons set forth in Article 6.5.1 
above, City and CM@Risk further agree that if CM@Risk fails to achieve Final Acceptance 
of the Work within the Contract Time, City will be entitled to retain or recover from 
CM@Risk, as liquidated damages and not as a penalty, the sum per calendar day as 
indicated in MAG § 108.9 commencing from the actual date of Substantial Completion or 
Final Acceptance as required under the Contract. 
 
6.5.3 
MAG Liquidated Damages. If no liquidated damages are specified in Articles 6.5.1 or 6.5.2 
above, then the liquidated damages provisions in MAG § 108.9 will apply. 
 
6.5.4 
City may deduct liquidated damages described in this Article 6.5 from any unpaid 
amounts then or thereafter due CM@Risk under this Agreement. Any liquidated damages 
not so deducted from any unpaid amounts due CM@Risk will be payable to City at the 
demand of City, together with interest from the date of the demand at the highest lawful 
rate of interest payable by CM@Risk. 
 
6.6 
MUTUAL WAIVER OF CONSEQUENTIAL DAMAGES ONLY 
 
6.6.1 
CM@Risk and City waive claims against each other for consequential damages arising 
out of or relating to this Contract. This mutual waiver includes: 
 
6.6.1.1 Damages incurred by City for rental expenses, for losses of use, income, profit, financing, 
business and reputation, and for loss of management or employee productivity or of 
the services of such persons; and 
 
6.6.1.2 Damages incurred by CM@Risk for principal office expenses including the compensation 
of personnel stationed there, for losses of financing, business and reputation, and for loss 
of profit except anticipated profit arising directly from the Work. 
 
6.6.2 
This mutual waiver is applicable, without limitation, to all consequential damages due 
to either Party’s termination of this Contract. Nothing contained in this Article 6.6 will 
be deemed to preclude an award of liquidated damages, when applicable, in accordance 
with Article 6.5 above. 
 
6.6.3 
Nothing herein will be deemed to constitute a waiver of any other remedy available to 
City in the event of CM@Risk’s default under this Contract prior to full performance of the 
Work including, as applicable, specific performance or completion of the Work on behalf 
of CM@Risk, the cost and expense of which will be offset against any monies then or 
thereafter due to CM@Risk (if any) and otherwise immediately reimbursed to City by 
CM@Risk.

City of Chandler Construction Manager at Risk Construction Services  
C-8 of 17 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
 
 CONTRACT PRICE 
 
7.1 
CONTRACT PRICE 
 
7.1.1 
In exchange for CM@Risk’s full, timely, and acceptable performances and construction of 
the Work under this Contract, and subject to all of the terms of this Contract, City will 
pay CM@Risk the “Contract Price,” which:  
 
The sum of the CM@Risk’s Fee and reimbursable Cost of the Work, as defined in Section 
15 of the General Conditions, which the CM@Risk guarantees will not exceed the GMP 
set forth in Exhibit D in the amount of $1,371,579.28.  Costs which would cause the 
GMP to be exceeded must be paid by CM@Risk without reimbursement from City. 
 
7.1.2 
The Contract Price is all-inclusive and specifically includes all fees, cost, insurance and 
bond premiums, allowances, construction contingency, owner’s contingency, and taxes 
of any type necessary to fully, properly and timely perform and construct Work. 
 
7.2 
COSTS 
For any portion of the Work which, either through this Contract, Change Order or 
otherwise, is performed and paid for on a cost, or time and materials basis, the costs 
which may be reimbursed to CM@Risk and chargeable against the Contract Price will be 
determined as set forth in MAG § 109.5. 
 
 
 
SIGNATURE PAGE TO FOLLOW

IN WITNESS WHEREOF, the Parties hereto have executed this Contract through their duly authorized 
representatives and bind their respective entitles as of the effective date. 
"CITY" 
CITY OF CHANDLER 
MAYOR 
Recommended By: 
Andrew Goh, P.E. 
CIP City Engineer 
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
"CM@RISK" 
Achep.:Gar~erCon 
'-
/ 
. 
Signature \ 
Daniel J. Spitza 
Name 
President 
Title 
dspitza@achen.com 
City Clerk 
Signer Email Address 
ATTEST: If Corporation 
Secretary 
STATE OF ARIZONA 
County of Maricopa 
C 
Date 
Date 
1-28-2022 
Date 
Seal 
)ss. 
) 
SUB1§RIBE~ AND SWORN Tf? before me, the undersigned nota 
blic, by µ Clr\1'/l l S ~ ~ .\-z..O... who was identified as 
the \ v-e..S 1 ~ti\+-
of ~ d\W-G,a.ro.Mr on this _ 2 __ --------1_ dayof J a.n\.-\.1>.r~ ,20 '2.2... 
C. ooS-1-nJ..c.,{-. of\ 1...t-c_ 
My commission expires: 
City of Chandler Construction Manager at Risk Construction Services 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
C-9 of 17

EXHIBIT A 
City of Chandler Construction Manager at Risk Construction Services 
SP-1 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
PROJECT SPECIFIC 
SPECIAL PROVISIONS 
N/A

EXHIBIT B 
City of Chandler Construction Manager at Risk Construction Services 
GC-1 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
GENERAL CONDITIONS

GENERAL CONDITIONS 
Approved date: October 19, 2021

Revised: 10/19/2021 
GC-2 of 75 
TABLE OF CONTENTS 
SECTION 1 - SCOPE OF THESE GENERAL CONDITIONS ............................................................................... 3 
SECTION 2 - GENERAL DEFINITIONS ............................................................................................................ 3 
SECTION 3 - STANDARD SPECIFICATIONS AND DETAILS ........................................................................... 7 
SECTION 4 - CONT R ACT OR’S R ES PONS IBILIT IES FOR CONST RUCT ION SE RVIC ES .................................. 8 
SECTION 5 - CITY RESPONSIBILITIES .......................................................................................................... 27 
SECTION 6 - CONTRACT TIME ...................................................................................................................... 29 
SECTION 7 - CONTRACT PRICE .................................................................................................................... 35 
SECTION 8 - PAYMENT ................................................................................................................................. 35 
SECTION 9 - CHANGES TO THE CONTRACT ................................................................................................ 40 
SECTION 10 - SUSPENSION AND TERMINATION ...................................................................................... 43 
SECTION 11 - INSURANCE AND BONDS ..................................................................................................... 44 
SECTION 12 - INDEMNIFICATION ............................................................................................................... 49 
SECTION 13 - DISPUTE RESOLUTION .......................................................................................................... 49 
SECTION 14 - MISCELLANEOUS PROVISIONS ............................................................................................ 50 
SECTION 15 - PROVISIONS APPLICABLE SOLELY TO GMP AND COST-BASED CONTRACTS, CHANGE 
ORDERS, AND JOB ORDERS ......................................................................................................................... 57 
SECTION 16 - PROVISIONS APPLICABLE SOLELY TO JOB ORDER CONTRACTS (JOC) ........................... 60 
SECTION 17 - PROVISIONS APPLICABLE SOLELY TO PRE-CONSTRUCTION SERVICES FOR 
CONSTRUCTION MANAGER AT RISK .......................................................................................................... 65 
SECTION 18 - APPENDICES ...................................................................................................... APP-1 of 30 
Appendix 1 – Policy Statement for Calculating Delays and Damages 
Appendix 2 – Cost Reduction Incentive Proposals for Design Bid Build Contracts  
Appendix 3 – Contractor’s Affidavit Regarding Settlement of Claims 
Appendix 4 – Forms of Performance Bond 
Appendix 5 – Forms of Payment Bond 
Appendix 6 – Dispute Resolution 
Appendix 7 – Certificate of Completion 
Appendix 8 – Construction Sign Detail 
Appendix 9 – Cost of the Work (Applicable solely to Construction Manager at Risk and 
Job Order Contracting) 
Appendix 10 Landscape Establishment Period

General Conditions 
Revised: 10/19/2021 
GC-3 of 75 
 
SECTION 1 - SCOPE OF THESE GENERAL CONDITIONS 
These General Conditions encompass provisions that apply, and are incorporated into all 
construction contracts entered into by the City of Chandler, unless otherwise specifically excluded in the 
executed Contract.  
SECTION 2 - GENERAL DEFINITIONS 
Allowance :  A specific amount for a specific item of Work, if any, that City agrees has not been sufficiently 
designed, detailed, or selected (including design changes from 90% to 100% as authorized by and at 
the discretion of the City) at the time the Contract Price is agreed to for Contractor to provide a definitive 
price.  
Alternate Systems Evaluations or Alternative Analysis:  Alternatives for design, means and methods or 
other scope considerations that are evaluated using value analysis principles and have the potential to 
reduce construction costs while still delivering a quality and functional Project that meets City 
requirements. 
Change Order:  A written instrument issued after execution of the Contract Documents signed by City 
and Contractor, stating their agreement upon all of the following: the addition, deletion or revision in 
the scope of services or deliverables; the amount of the adjustment to the Contract Price, the extent 
of the adjustment to the Contract Time, or modifications of other contract terms. The Contract Price 
and the Contract Time may be changed only by Change Order. 
Consultant:  Person or firm that provides professional services. 
City (Owner or OWNER):  City of Chandler, a municipal corporation, with whom Contractor has entered 
into the Contract and for whom the Work or Services are to be provided pursuant to the Contract(s). 
Contingent Bid Items:  This is a minor bid item which is likely, but not certain, to occur during the course 
of work. If the Engineer determines that this work is required, the Contractor will accomplish the work 
and payment will be made based on the contingent unit bid price included in the proposal. Since the 
quantity listed in the proposal is primarily for bid comparison, the amount of work required by the 
Engineer may vary materially from this. 
Contract:  The written agreement executed between City and Contractor, including all of the Contract 
Documents. 
Contract Documents:  The documents which together form the Contract between City and Contractor, 
as identified in Article 2 of the Contract, or are otherwise incorporated into the Contract, including the 
Contract, the exhibits thereto, these General Conditions, any Notice to Proceed, and any Job Order 
(if applicable), the Plans and Specifications, Project Schedule, written and properly executed Change 
Orders, MAG Specifications and City’s amendments thereto, and any other documents so designated in 
the Contract. 
Contract Price:  The agreed-upon price to be paid to Contractor for full, timely, and acceptable completion 
of the Work or Services under the terms of the Contract. 
Contract Time(s):  The number of calendar days or the dates related to the applicable phase, Substantial 
Completion, or Final Acceptance as stated in Contract Documents. Contract Time starts with the Notice

General Conditions 
 
Revised: 10/19/2021 
 
GC-4 of 75 
 
to Proceed (NTP) and ends with Final Acceptance. The Contract Time is set forth in the Contract and 
is based upon the Project Schedule agreed to by City in writing. 
 
Contractor:  The person or business association with whom City has entered into an agreement for 
construction related Work or Services in relation to the Project at issue.  
 
Contractor Payment Request:  The form that is accepted by City and used by Contractor in requesting 
progress payments or final payment and which must include such supporting documentation as is 
required by the Contract Documents or City. 
 
Construction Budget:  The City’s budget for construction of the Project. 
 
Construction Documents:  The Plans, Specifications, and Drawings prepared and issued by the Design 
Professional and approved by City for construction, meaning the documents are sealed by the 
Design Professional (as required), acceptable for permitting and incorporated into the Contract by 
this reference. All amendments and modifications to the Construction Documents must be approved in 
writing by City prior to incorporation into the Contract. 
 
Cost of the Work:  The term Cost of the Work will mean costs necessarily incurred by Contractor in the 
proper performance of the Work. Such costs will be at rates not higher than the standard paid at the 
place of the Project except with prior consent of City. 
 
Critical Path Method (CPM):  A scheduling technique which identifies the logical sequence of the activities 
occurring in a Construction Project, the anticipated time required to complete each activity in the 
Project, and the activities that must be completed on schedule to finish the Project within the anticipated 
time. Typically, activities are arranged in a network that shows both activities and their dependencies. 
CPM is also used as a management technique which enables contracting parties to predict when 
activities may occur so that resources can be effectively used and limitations can be identified.  
 
Critical Path:  Critical Path is the sequence of project network activities which add up to the longest overall 
duration. Once established in the Project Schedule, the Critical Path for the Project must not be 
changed without prior written approval of City. 
 
Day:  Calendar day(s) unless otherwise specifically stated in the Contract Documents. 
 
Design Professional:  The qualified, licensed person, firm or corporation who furnishes design and 
construction administration services required under the Contract Documents. These services may 
include, but are not limited to: development of Construction Drawings and Documents, review of 
Contractor Submittal(s), review of and response 
to 
Requests for Information, approval and 
certification of progress payment applications, construction administration, and construction contract 
close out. 
 
Differing Site Conditions:  Concealed or latent physical conditions or subsurface conditions at the Site 
that, (i) materially differ from the conditions indicated in the Contract Documents, or (ii) are of an unusual 
nature, differing materially from the conditions ordinarily encountered and generally recognized as 
inherent in the Work at the general area of the Site. Caliche, rock, hard-digging or sandy/silty soil 
encountered on a project is not considered a “Differing Site Condition.” 
 
Drawings (Plans):  Documents, which visually represent the scope, extent and character of the Work to 
be furnished and performed by Contractor during the construction phase and which have been prepared

General Conditions 
 
Revised: 10/19/2021 
 
GC-5 of 75 
 
or approved by the Design Professional and City.  These documents include Drawings that have reached 
a sufficient state of completion and released by Design Professional solely for the purposes of review 
and use in performing constructability or bid-ability reviews by Contractor and in preparing cost 
estimates (e.g. Master Planning and Programming, Schematic Design, Design Development, and 
Construction Drawings), but “not for construction.” Shop Drawings are not Drawings as so defined. 
 
Final Acceptance:  The City’s acceptance of the facility or project from the Contractor after all Work is 
completed, tested, and inspected in accordance with the contract requirements. Final Acceptance results 
in a Letter of Acceptance (LOA). 
 
Fixed Price:  A fixed price or amount for a Contract Price, Scope of Work, materials, or other item under 
a Contract, Change Order, or other agreement, which City agrees, in writing, to pay instead of the actual 
cost.  
 
Float:  The number of Days by which an activity can be delayed without lengthening the Critical Path and 
extending the Contract Time. Unless otherwise expressly agreed in writing, all Float belongs to City. 
 
Laws, Regulations, or Legal Requirements:  Any and all applicable laws, rules, regulations, ordinances, 
codes and orders applicable to the Project of any and all governmental bodies, agencies, authorities 
and courts having jurisdiction and any applicable provisions of the Development Agreement for the 
Project (if any), including, without limitation, those provisions relating to the design and construction 
of the Project. 
 
Line Item:  The individual elements of Work identified on a bid or other schedule and associated with a 
price or a unit price and quantity particular to that individual element of the Work. Also refers to 
individual items of work within the Schedule of Values. 
 
Liquidated Damages:  Designated damages for the City to collect as compensation upon a specific breach 
(example: late delivery). 
 
Long-Lead Item:  Long-lead item refers to the equipment, product, or system that is identified at the 
earliest stage of a project to have a delivery time long enough to affect directly the Critical Path/the overall 
lead time of the project. 
 
MAG:  The Maricopa Association of Governments. 
 
MAG Specifications:  The most current version of the Uniform Standard Specifications for Public Works 
Construction published by MAG. 
 
MAG Standard Details:  The most current version of the Uniform Standard Details as published by MAG. 
 
Minor change:  A change in the Work having no impact on cost or time or the City-approved design intent, 
as determined by City. 
 
Notice to Proceed (NTP):  A written notice given by City to Contractor fixing the date on which 
Contractor will start to perform Contractor’s obligations under the Contract. 
 
Project:  The Project specified in the Contract (including a Job Order). 
Project Manager:  The Project Manager designated in Article 1 of the Contract, or any successor thereto 
designated by City. The Project Manager has the authority to act on behalf of City, as delineated and

General Conditions 
 
Revised: 10/19/2021 
 
GC-6 of 75 
 
limited by the Contract Documents and applicable law. And City will communicate with Contractor 
through the Project Manager. However, the Project Manager has no authority to bind City or City 
Council in contravention of any City code, State or Federal statute or regulation, or these General 
Conditions. 
 
Project Schedule:  The schedule for the completion of the Project agreed to and required by City. 
 
Project Specific Conditions:  Additional conditions which apply to the specific Project and Scope of Work 
which are set forth in Exhibit D of the Contract. 
 
Project Team:  The Project Team consisting of the Design Professional, Contractor, Project Manager, and 
such others as City may designate. 
 
Punch List:  The list initially prepared by Contractor pursuant to the Contract Documents, reviewed and 
supplemented by the Project Manager (and at the sole option of the Project Manager, the Design 
Professional) and approved by City containing items of incomplete work not impacting Substantial 
Completion, if allowed for under the Contract, and to be completed or corrected by Contractor after 
Substantial Completion and before Final Acceptance in accordance with the Contract Documents. 
 
Quality Assurance (QA) Testing:  Testing performed to verify the accuracy and applicability of the QC 
testing results and to ascertain that the materials installed meet the specified levels of quality in 
accordance with the Contract Documents. 
 
Quality Control (QC) Testing:  Testing performed to assure that the materials installed comply with the 
requirements in the Contract Documents. 
 
Requests for Information (RFIs):  Formal written request from Contractor to City or Design Professional 
for the Project seeking clarification or additional information needed for Contractor to properly 
complete the Work or Services under the Contract. City may require RFI’s to be submitted on a specific 
form or in a specified format. 
 
Schedule of Values (SOV):  The specified document prepared by Contractor, and approved and accepted 
by City, which divides the Contract Price into pay items, such that the sum of all pay items equals 
the Contract Price for the construction phase Work, or for any portion of the Work having a separate 
specified Contract Price. 
 
Scope of Work:  The scope of work agreed to or required by City and incorporated into the Contract as 
Exhibit A. 
 
Shop Drawings:  All drawings, diagrams, schedules and other data specifically prepared for the Work 
by Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to 
illustrate some portion of the Work. 
 
Site:  The land or premises on which the Project is located. 
 
Specifications:  The part(s) of the Contract Documents for the construction phase consisting of written 
technical descriptions of materials, equipment, construction systems, standards and workmanship as 
applied to the Work and certain administrative details applicable thereto. Where specified, the Project 
must be constructed using the current Uniform Standard Specifications and Details for Public Works 
Construction as furnished by the Maricopa Association of Governments, as amended by City.

General Conditions 
 
Revised: 10/19/2021 
 
GC-7 of 75 
 
Subconsultant:  A person, firm or corporation having a Contract with Consultant/Contractor to furnish 
services required as its independent professional associate or consultant with respect to the Project. 
 
Subcontractor:  An individual or firm having a direct Contract with Contractor or any other individual or firm 
having a Contract with the aforesaid contractors at any tier, who undertakes to perform a part of pre-
construction services or construction phase Work at the Site for which Contractor is responsible. 
Subcontractors must be selected through the Subcontractor selection process described in the Contract 
Documents, if any. 
 
Substantial Completion:  The date when the City determines that the Work (or separable units of Phases 
as provided in the Contract Documents) is essentially and satisfactorily complete in accordance with the 
Contract Documents such that the Project is ready for use by the City for its intended purpose, opening to 
the general public, full occupancy or use by City (including, without limitation, all separate units, or 
rooms, facilities, access, income-generating areas, and all areas serving the general public, as applicable, 
must be ready for full operation without material inconvenience or discomfort), including, to the extent 
applicable to the Work, the following: all materials, equipment, systems, controls, features, facilities, 
accessories, and similar elements are installed in the proper manner and in operating condition, 
inspected, and approved; surfaces have been painted; masonry and concrete cleaned with any sealer 
or other finish applied; utilities and systems connected and functioning; site work complete; 
permanent heating, ventilation, air conditioning, vertical transportation, and other systems properly 
operating with proper controls; lighting and electrical systems installed, operable and controlled; paving 
completed, signage installed, and other work as applicable, has been performed to a similar state of 
essential and satisfactory completion. 
 
Supplier:  A manufacturer, fabricator, distributor, or vendor having a direct Contract with Contractor 
or with any Subcontractor to furnish materials or equipment to be incorporated in the construction 
phase Work by Contractor or any Subcontractor. 
 
Total Float:  Number of Days by which pre-construction services or construction phase Work or any part 
of the same may be delayed without necessarily extending a pertinent Contract Time or schedule 
milestone in the Project Schedule. 
 
Work:  The entire completion of construction or the various separately identifiable parts thereof, 
required to be furnished during the construction phase. Work includes and is the result of performing 
or furnishing labor and furnishing and incorporating materials, resources and equipment into the 
construction, and performing or furnishing services and documents as required by the Contract 
Documents for the construction phase. 
 
Writing:  Typing, printing, photography and other modes of representing or reproducing words in a 
visible form, including email, and expressions. 
 
SECTION 3 - STANDARD SPECIFICATIONS AND DETAILS 
3.1 
City operates under the latest revision of the MAG Specifications and MAG Standard 
Details as amended by City.  City’s current amendment to the MAG Specifications, part of 
the City’s Unified Development Manual, may be found in the downloaded from City’s website 
at http://www.chandleraz.gov.   
3.2 
Copies of the MAG Specifications and MAG Standard Details are available at the 
Maricopa Association of Governments office, 302 N. 1st Avenue, Suite 300, Phoenix,

General Conditions 
 
Revised: 10/19/2021 
 
GC-8 of 75 
 
Arizona. 
 
They 
may 
also 
be 
downloaded 
from 
their 
website 
at: 
http://www.azmag.gov/Newsroom/Publications 
3.3 
The MAG Specifications and Standard Details and City’s amendments thereto are 
incorporated into the Contract by this reference. 
 
SECTION 4 - CONT R ACT OR’S R ES PONS IBILIT IES FOR CONST RUCT ION SE RVIC ES  
4.1 
GENERAL 
4.1.1 
Contractor must construct the Work in accordance with the Contract Documents and as 
outlined in Exhibit A of the Contract to the satisfaction of City, exercising the degree of 
professional care, skill, diligence, quality and judgment that a professional construction 
manager engaged, experienced and specializing in the construction management of 
construction and facilities of similar scope, function, size, quality, complexity and detail in 
urban areas throughout the United States comparable to Chandler, Arizona would exercise 
at such time, under similar conditions. Contractor must, at all times, perform the Work in 
conformance with sound and generally accepted engineering principles and construction 
management and construction contracting practices. 
4.1.2 
If Contractor observes errors, discrepancies or omissions in the Contract Documents, 
Contractor must promptly notify the Design Professional and City and request clarification. 
If Contractor, with the exercise of reasonable care, should have recognized such error, 
inconsistency, omission or difference and fails to report it to City, and if Contractor 
proceeds with the Work affected by such observed errors, discrepancies or omissions, 
without receiving such clarifications, Contractor does so at its own risk and will be liable to 
City for damages resulting from proceeding without clarification. 
4.1.3 
Project Team and agents of each of them, testing agencies and governmental agencies with 
jurisdictional interests will be provided access to the Work at reasonable times for their 
observation, inspection and testing.  Contractor must provide proper and safe conditions for 
such access. 
4.1.4 
Contractor must comply with, and require all Subcontractors to comply with, the Arizona 
Contractors’ license laws, including all requirements with respect to being duly registered 
and licensed. 
4.1.5 
Contractor must insure that all employees performing any Work for which Contractor is 
responsible have a legal right to live and work in the United States. In addition, all 
compensation of any such employee must meet all applicable requirements of the Fair Labor 
Standards Act (FLSA) and Federal Minimum Wage laws. 
4.1.6 
Contractor must comply with the Immigration Reform and Control Act of 1986 (IRCA).  
Contractor understands and acknowledges the applicability of the IRCA activities.  
Contractor agrees to comply with the IRCA while performing their work and to permit City 
inspection of Contractor personnel records to verify such compliance. 
4.1.7 
Pursuant to MAG Specifications §§ 107.4, Contractor must report immediately any discovery 
of archeological ruins or artifacts.  Excavation must stop immediately so that City can decide 
on the pertinent steps to follow such discovery. 
4.1.8 
All property owners that may be affected by the proposed construction activities must be

General Conditions 
 
Revised: 10/19/2021 
 
GC-9 of 75 
 
notified of the scope, duration of the construction activities and possible interference with 
their day-to-day activities by Contractor prior to start of construction.  In addition, individual 
residential or commercial interferences, such as driveway restrictions, water outages, and 
all other Work adjacent to residence/business, require 48-hour notification in advance of 
specific adjoining Work.  Notification may be through door hangers or other procedures 
approved by the City. 
4.1.9 
Access must be maintained to adjacent properties at all times during construction. Where 
property has more than one point of access, no more than one access will be restricted or 
closed at any one time. Access to adjacent private driveways will be maintained during all 
non-working hours. 
4.1.10 
Contractor must furnish and erect construction signs in accordance with Project 
Specifications. The signs must be professionally prepared and subject to approval by City, 
must be maintained by Contractor for the duration of the project, and must be removed by 
Contractor during the final project clean up.  
4.1.11 
The number of signs required, the size, shape, installation requirements and information to 
be included for construction signs is established on the detail sheet, provided, however, 
signs must be a minimum of 4 foot by 8 foot and must be installed so that the bottom of 
the sign is at least 4 foot above grade.  No direct payment will be made for furnishing and 
erecting construction signs. The cost thereof must be included in other items for which 
direct payment is made. Sign locations will be determined by City. 
4.1.12 
All required construction signs must be installed by Contractor within 7 Days of Notice to 
Proceed.   
4.1.13 
The Work to be accomplished under these Contract Documents has been designed for City 
by a Design Professional retained by City for this purpose.  It is understood that normal 
construction Administration for the purpose of interpretation of the Contract Documents is 
provided by City. Should any services of the Design Professional be required to assist in the 
corrections of errors or omissions by Contractor, or services of the Design Professional be 
required because of changes in structure or equipment where Contractor has requested 
approval of substitute methods or material, or any other items detailed herein below, those 
services will be provided by the Design Professional at the standard hourly rates previously 
negotiated with City and must be paid for by the Contractor. 
4.1.14 
Contractor must reimburse City for costs incurred by the Design Professional for additional 
services to the Project through no fault of City or the Design Professional including, but not 
limited to, the following conditions: 
a. Additional Site visits, investigations, inspections, design work or reports by 
the Design Professional which are required due to damages to existing 
facilities or completed Work caused by the Contractor in his performance, 
Contractor’s negligence, or Contractor’s Work which is rejected as defective 
or as failing to conform to the Contract Documents; 
b. Design Professional construction phase services rendered on the project 
during the time the project remains incomplete after the Contract date of 
final completion will be charged to Contractor at a rate previously negotiated 
City; and 
c. All retesting required due to the failure of Contractor’s Work to meet the

General Conditions 
 
Revised: 10/19/2021 
 
GC-10 of 75 
 
requirements of the Contract Documents will be at Contractor’s expense.  All 
standby and travel time by the City’s testing lab, the Design Professional or 
City due to Contractor’s inability to be prepared for testing at the agreed 
upon time will be at the Contractor’s expense. 
4.1.15 
City may withhold from any payment otherwise due to Contractor any amounts necessary 
to pay the Design Professional for such additional services as provided herein above.   
4.1.16 
Contractor will not be required to bear additional costs incurred by City due to errors by the 
Design Professional. 
4.2 
 CONTRACTOR’S PRE-CONTRACT AND PRE-WORK DELIVERABLES 
4.2.1 
Prior to award of the Contract, Contractor must execute Contract and deliver to City.  
Failure to do so may delay Contract award.  Contractor must also provide to City its 
Contractor’s License classification and number and its Federal Tax I.D. number. 
4.2.2 
Before beginning any Work under the Contract, Contract must be fully executed by City.  
4.2.3 
After Contract award, City will issue to Contractor an award letter.  At that time Contractor 
must deliver to City such bonds and certificates of insurance with endorsements in such 
amounts (and other evidence of insurance requested by City) required under Section 11 of 
these General Conditions, and as the Contract requires. 
4.2.4 
As evidence of Workmen’s Compensation Insurance, Contractor must, upon request, 
provide a letter of certification from the Industrial Commission of Arizona that Contractor 
is insured by the State Compensation Fund or is an authorized self-insurer or a certificate 
of insurance issued by an insurance company authorized by the Insurance Department 
of Arizona to write Workmen’s Compensation and Occupational Disease Insurance in the 
State of Arizona. 
4.2.5 
Within 10 Days of the date of the executed Contract letter issued by City, Contractor must 
submit to City for review and acceptance the following items: 
4.2.5.1 
Comprehensive construction Project Schedule including a Critical Path Method (CPM) 
diagram schedule as described in Section 6.2.  Project Schedule must be in Microsoft Project 
standard file format.  Within 10 Days of receipt of City’s comments, Contractor must make 
all required corrections, adjustments, and additions to complete the Project Schedule and 
resubmit to City for review.   
4.2.5.2 
Preliminary schedule of submittals and Shop Drawings.  Within 10 Days of receipt of City’s 
comments, Contractor must submit the corrected and completed schedule of Shop 
Drawings submissions for approval.  Contractor’s schedule of Shop Drawings and sample 
submittals will be acceptable to City if it provides a workable arrangement for reviewing and 
processing the required submittals.   
4.2.5.3 
Schedule of Values in a form specified by City reflecting the subcontracts and other 
categories that will be used to submit Pay Applications for the Work. The total amount of 
the Schedule of Values must not be greater than the Contract Price. The Schedule of Values 
will be reviewed at the Pre-Construction Conference and revised by Contractor within 10 
Days after Pre-Construction Conference in response to comments and questions from City. 
Once accepted by City in writing, the Schedule of Values for the Project must not be changed 
without the prior written approval of City.

General Conditions 
 
Revised: 10/19/2021 
 
GC-11 of 75 
 
4.2.6 
Video Recording Requirement. Prior to performing any Work, Contractor must document 
the existing conditions of the Site, all other areas where Work will occur and all adjacent 
areas that may be impacted by the Work via digital video format.  Contractor must video 
record and index all areas, features, buildings and other public and private improvements 
that could potentially be impacted by the Work.  Video recording must be coordinated with 
City.  When video recording private property, Contractor must also coordinate the video 
recording with the private property owner, if possible.  Contractor must provide City with a 
copy of said digital video format prior to performing any Work. 
4.2.7 
Aerial Drone Construction Photography. 
4.2.7.1 
If Contract duration is greater than 90 calendar days, Contractor must engage a professional 
unmanned aerial vehicle (UAV) aerial pilot to photograph the Site prior to construction 
mobilization, at three-month intervals during construction, and following final inspection.  
Drone camera specifications must meet the following minimum requirements:  
a. 1-inch CMOS 
b. Pixels: 20M 
c. FOV 84  8.8 mm/24 mm (35 mm format equivalent) f/2.8-f/11 auto focus at 1 m-   
d. For photographing: 16.9 Aspect Ratio: 5472x3078 
e. For video shooting: MP4/MOV/H.264 
f. 
FHD: 1920x1080 120p @100Mbps 
g. File format: High Definition (HD) JPEG for digital photos and HD MPEG 4 for 
digital video. 
h. All metadata to be recorded including GPS data and preserved with photographs 
provided.   
 
Interval 
JPEG 
3 month intervals 
At an altitude (AGL) between 
70-90 ft. 
3 month intervals 
Images to be taken every 50-
100 ft. to be determined based 
on project scope. 
4.2.7.2 
Drone photos to be taken in sequential geographical order and then organized and provided in 
the same manner unless otherwise specified.   
4.2.7.3 
Photos to be provided digitally via an online file share service and/or by a USB drive to contractor. 
4.2.7.4 
Drone pilots to obey ALL local (city, county, state) UAV regulations as well as FAA UAV 
guidelines including, but not limited to, conducting all flights during daylight hours, not exceeding 
maximum altitude ceilings (depending on area), not flying over people, yielding to other aircraft. 
4.2.7.5 
Drone pilots must fly drone within visual line of sight (VSOL) and have visual spotter when 
needed. Drone pilots only to operate in favorable weather conditions when minimum visibility is 
3 miles or greater. 
4.2.7.6 
Drone pilots to conduct a preflight checklist and visually inspect the entire flight path prior to flying 
to ensure a safe flight. 
4.2.7.7 
Airspace Authorizations. Operations in Class G airspace are allowed without air traffic control 
(ATC) permission. Operations in Class B, C, D and E airspace need ATC authorization. Drone

General Conditions 
 
Revised: 10/19/2021 
 
GC-12 of 75 
 
pilots to schedule each flight in advance and based on airspace if required will notify nearby 
airports/control towers, etc. 
4.2.8 
Government Approvals and Permits. 
4.2.8.1 
Contractor must obtain all necessary permits for the Work and pay all applicable fees, 
unless otherwise noted on the Plans and in the Specifications. City permit fees will be paid 
internally by City. For bidding purposes, an allowance for all permit fees is included in the 
bid schedule under the item “allowance for permit fees.” The Contractor will be paid for 
the actual cost of the permit fees upon submitting a receipt showing the fee Contractor 
has paid. Excluded from the above allowance are items such as all costs incurred by the 
Contractor in securing the permit except for the actual permit fee established by the 
agency, cost for all shut downs or outages, cost for pole bracing, cost of permits for 
construction water, cost of construction water, cost for any additional insurance 
requirements, cost for any licenses, and other similar type costs. Contractor is specifically 
notified of the need to obtain the necessary environmental permits or file the necessary 
environmental and regulatory permit notices. 
4.2.8.2 
Copies of all permits and the associated notices must be provided to City prior to starting 
the permitted activity. 
4.3 
PRE-CONSTRUCTION CONFERENCE 
4.3.1 
Prior to the commencement of any Work, City will schedule a Pre-Construction Conference. 
4.3.2 
The purpose of this Conference is to establish a working relationship between Contractor, 
the utility firms, and various City agencies. The agenda will include critical elements of the 
Work schedule, submittal schedule, cost breakdown of major lump sum items, Payment 
Requests and processing, coordination with the involved utility firms, and emergency 
telephone numbers for all representatives involved in the course of construction. 
4.3.3 
Minimum attendance by Contractor at any mandatory meeting with City must be (1) 
Contractor’s Representative, who is authorized to execute and sign documents on behalf 
of the firm, (2) Contractor’s on-site Superintendent, and (3) Contractor’s Safety Office, 
or other employee responsible for safety. 
4.4 
PERFORMANCE OF THE WORK (INCLUDING FIELD MEASUREMENTS, 
SUBCONTRACTORS, AND SUPPLIERS) 
4.4.1 
Unless otherwise provided in the Contract Documents to be the responsibility of City or a 
separate Contractor, Contractor must provide through itself or Subcontractors the 
necessary supervision, labor, inspection, testing, start-up, material, equipment, machinery, 
temporary utilities and other temporary facilities to permit Contractor to complete the 
Work consistent with the Contract Documents. 
4.4.2 
Contractor must perform all construction activities efficiently and with the requisite 
expertise, skill and competence to satisfy the requirements of the Contract Documents. 
Contractor must at all times exercise complete and exclusive control over the means, 
methods, safety, sequences and techniques of construction. 
4.4.3 
Contractor’s Superintendent must be present at the Site at all times that material Work 
under this Contract is taking place. Contractor’s Superintendent or designee must be 
present at the Site at all times any other Work under this Contract is taking place.

General Conditions 
 
Revised: 10/19/2021 
 
GC-13 of 75 
 
Superintendent must not be replaced without written notice to City.  Whenever the 
Superintendent is not present at a particular part of the Work where the City or Design 
Professional may desire to inform the Contractor relative to interpretation of the Drawings 
and Specifications or to disapproval or rejection of materials or Work performed, the City 
or Design Professional may provide such information in writing to the foreman or other 
worker in charge of the particular part of the Work in reference to which the information is 
given.  Information so given will be as binding as if given to the Superintendent. 
4.4.4 
All elements of the Work must be under the direct supervision of a foreman or his 
designated representative on the Site who must have the authority to take actions required 
to properly carry out that particular element of the Work. 
4.4.5 
Working Hours.  Except in connection with the safety or protection of persons or the Work 
or property at the Site or adjacent thereto, and except as otherwise indicated, all Work at 
the Site must be performed during regular working hours, and Contractor will not permit 
overtime work or the performance of Work on Saturday, Sunday or any legal holiday without 
City’s written consent given after prior written notice to City.  If it will become absolutely 
necessary to perform Work at night or on Saturdays, Sundays or legal holidays, the City 
must be informed at least 24 hours in advance of the beginning of performance of such 
Work.  Only such Work will be done at night as can be done satisfactorily as determined by 
the City.  Good lighting and all other necessary facilities for carrying out and inspecting the 
Work must be provided and maintained at all points where such Work is being done.  
Further, unless such non-normal work hours are performed at City’s request or required by 
the Contract Documents, Contractor must pay to City all additional costs incurred by City by 
reason of such non-normal working hours.  Expenses incurred by City for overtime 
compensation must be reimbursed by Contractor as follows: (i) City staff at the rate set forth 
in current City Fee Schedule as published on City website, (ii) Design Professional and staff 
at the standard hourly rates previously negotiated with City, and (iii) all others at actual cost 
plus ten percent administrative overhead.  Such costs may be deducted by City from any 
payments due to Contractor.  Provided, however, if overtime work or work during other 
than normal hours is at the request of City and not due to Contractor delay, City will pay the 
cost of City overtime expenses. 
4.4.6 
Where the Contract Documents require that a particular product be installed or applied by 
an applicator approved by the manufacturer, it is Contractor’s responsibility to ensure 
the Subcontractor employed for such work is approved by the manufacturer.  All materials 
and equipment must be stored, applied, installed, connected, erected, used, cleaned and 
conditioned in accordance with the instructions of the applicable manufacturer, fabricator, 
supplier or distributor, except as otherwise provided in the Contract Documents; but no 
provisions of any such instructions will be effective to impose on City of Design Professional 
responsibility for the means, methods, techniques, sequences or procedures of 
construction or for safety precautions incident thereto. 
4.4.7 
Before starting the Work, Contractor must carefully study and compare the various 
Plans, Drawings, other Contract Documents, and Specifications relative to that portion of 
the Work, as well as the information furnished by City, must take field measurements of any 
existing conditions related to that portion of the Work and must observe any conditions at 
the Site affecting it. The exactness of grades, elevations, dimensions, or locations given 
on any Drawings, or the Work installed by other contractors, is not guaranteed by City. 
4.4.8 
Before ordering materials or doing Work, Contractor and each Subcontractor must verify

General Conditions 
 
Revised: 10/19/2021 
 
GC-14 of 75 
 
measurements at the Site and will be responsible for the correctness of such 
measurements. No extra charge or compensation will be allowed because of differences 
between actual dimensions and the dimensions indicated on the Contract Documents, 
including the Drawings. 
4.4.9 
Ground Level Construction Photography. 
4.4.9.1 
The Contractor must furnish progress photographs of the project.  The photographer 
selected by the Contractor must be approved by the City and must be either a commercial 
photographer or an individual experienced and equipped for such photography.   
4.4.9.2 
The Contractor must deliver to City all photographs taken during that period with each 
application for payment.  If the current photographs do not accompany the application, the 
application will not be reviewed and will be returned to the Contractor as incomplete. 
4.4.9.3 
Photographs must be identified by use of typewritten labels affixed to the back of the 
photograph.  The label must provide a description of the view, the direction from which the 
photograph was taken, the name of the project, City’s project number, the name of 
Contractor and the date of the photography.  The stationing must also be included for all 
pipeline installations.   
4.4.9.4 
Photographs must be taken during the construction period and must be of aesthetic 
composition and depict the progress of the Work from the beginning of construction 
through and including the finished product.  City may vary the specified frequency so that 
significant progress or changes can be recorded on the photographs.  
4.4.10 
Underground Facilities. 
4.4.10.1 
The existence and number of facilities as shown on the Plans are estimated from 
information furnished by the particular utility.  Contractor is responsible for field verification 
and location of all utilities prior to the start of construction.  No field work will be allowed to 
start until Contractor has contacted Arizona 811 and all affected utilities have been located.  
In addition Contractor must expose and physically locate all potentially conflicting utilities 
prior to construction.  The actual locations of the utilities must be compared to locations 
shown on the Plans and any required changes in alignment and grade must be made at the 
time of construction in consultation with Project Manager.  It is generally recognized and 
Contractor should anticipate that information from Arizona 811 or information from utility 
companies during project design, frequently fails to disclose all underground facilities.  The 
fact that more utility lines or other underground facilities are located in the Project Site than 
shown on the Project Plans does not constitute an “unforeseen Condition” and such 
undisclosed underground facilities do not differ materially from the conditions which 
Contractor should expect. The provisions of Sections 105.4, 105.6, 107.11 and 109.8.1 of the 
MAG Uniform Standard Specifications for Public Works Construction apply and are 
incorporated herein by this reference.   
4.4.10.2 
Contractor is responsible for all coordination with utility companies.  The provisions of 
Sections 105.4, 105.6, 107.11 and 109.8.1 of the MAG Uniform Standard Specifications for 
Public Works Construction strictly apply and no additional compensation will be paid to 
Contractor for delays due to utility work on the project.  
4.4.11 
Relocation of Existing Water Meters.  When a service line has been extended and a line 
setter installed in a meter box, City forces will re-install meter.  No compression fittings will

General Conditions 
 
Revised: 10/19/2021 
 
GC-15 of 75 
 
be utilized. 
4.4.12 
Water Turn-On or Turn-Off. 
4.4.12.1 
Contractor must coordinate all water line turn-ons and turn-offs through the City.  
Application must be made to the Municipal Utility Division and Contractor must pay the 
established charges.  The City will close existing valves, but will not guarantee a bone-dry 
Shutdown. 
4.4.12.2 
Contractor must notify all customers affected by the turn-off not less than 48 hours in 
advance.  Notification must be in writing, must give the reason for the turn-off and must 
give the estimated time and duration that water service will be interrupted. Contractor is 
also notified that water turn-off will not be permitted on the Day before and after 
Thanksgiving Day and Christmas Day. 
4.4.12.3 
No direct payment will be made to Contractor for turn-ons or turn-offs. Costs associated 
therewith will be included in other items for which direct payment is made. 
4.4.13 
Tests and Inspections. 
4.4.13.1 
Contractor must give City timely (at a minimum, twenty-four hours) notice of readiness of 
the Work for all required inspections, tests or approvals.  Contractor must give timely notice 
to City in advance of backfilling or otherwise covering any part of the Work so that city 
representative may, if desired, observe such part of the Work before it is concealed.  
Whenever Contractor varies the normal period during which Work or any portion of it is 
carried on each Day, Contractor must give timely notice to City so that city representative 
may, if desired, be present to observe the Work in progress.  If Contractor fails to give such 
timely notice, any Work done in the absence of city representative will be subject to 
rejection.  If Contractor gives such notice to City, but then is not ready for such inspections, 
tests, approvals or observations at the time so noticed, Contractor must reimburse City for 
all costs incurred by the attendance of city representatives.   
4.4.13.2 
If any law, ordinance, rule, regulation, code, or orders of any public body having jurisdiction 
requires any Work (or part thereof) to be inspected, tested or approved, Contractor (unless 
another party is specified in the Contract Documents) must assume full responsibility 
therefor, pay all costs in connection therewith and furnish City the required certificates of 
inspection, testing, or approval. Contractor must also be responsible for and must pay all 
costs in connection with any inspection or testing required by the Specifications in 
connection with City's acceptance of a manufacturer, fabricator, supplier or distributor of 
materials or equipment proposed to be incorporated in the Work, or of materials or 
equipment submitted for approval prior to Contractor's purchase thereof for incorporation 
in the Work. The cost of all other inspections, tests and approvals required by the Contract 
Documents will be paid by City (unless otherwise specified). 
4.4.13.3 
All inspections, tests or approvals other than those required by law, ordinance, rule, 
regulation, code or order of any public body having jurisdiction must be performed by 
organizations acceptable to City and by the Design Professional if so specified. 
4.4.13.4 
Neither observations by City, the Design Professional nor inspections, tests or approvals by 
others will relieve Contractor from their obligations to perform the Work in accordance with 
the Contract Documents.

General Conditions 
 
Revised: 10/19/2021 
 
GC-16 of 75 
 
4.4.14 
Uncovering Work.  If any Work that is to be observed, inspected, tested or approved is 
covered without written concurrence of City, it must, if requested by City be uncovered for 
observation. Unless Contractor has given City timely notice of Contractor's intention to 
cover such Work and City has not acted with reasonable promptness in response to such 
notice, Contractor must furnish all necessary labor, material and bear all the expenses of 
such uncovering, exposure, observation, inspection and testing and of satisfactory 
reconstruction, including compensation for additional professional services, and an 
appropriate deductive Change Order will be issued. 
4.4.15 
In all cases of interconnection of its Work with existing or other Work, Contractor must verify 
at the Site all dimensions relating to such existing or other Work.  Any errors due to 
Contractor’s failure to so verify all such grades, elevations, locations or dimensions must 
be promptly rectified by Contractor without any increase in the Contract Price. Any design 
errors or omissions noted by Contractor during this review must be reported promptly to 
City. 
4.4.16 
Contractor must establish and maintain all construction grades, lines, levels, and 
benchmarks, and will be responsible for accuracy and protection of same. This Work 
must be performed or supervised by a licensed civil engineer or surveyor in the State of 
Arizona. 
4.4.17 
Contractor must photograph all buried piping of greater than four (4) inches in diameter 
prior to backfill.   
4.4.18 
Contractor is responsible for the proper performance of the work of Subcontractors and any 
acts and omissions in connection with such performance. Nothing in the Contract 
Documents is intended or deemed to create any legal or contractual relationship 
between City and any Subcontractor or Sub-Subcontractor, including but not limited to any 
third-party beneficiary rights. 
4.4.19 
Contractor must coordinate the activities of all Subcontractors. Contractor must 
coordinate performance of the Work with City’s Public Works & Utilities Department and 
other departments or agencies within City. The Design Professional and other contractors 
or parties involved in the Project. If City performs other work on the Project or at the Site with 
separate contractors under City’s control, Contractor agrees to cooperate and coordinate 
its activities with those of such separate contractors so that the Project can be completed 
in an orderly and coordinated manner without unreasonable disruption. 
4.4.20 
Contractor will not substitute or change any Subcontractor or Supplier without the prior 
written approval of City. Any substitute or replacement Subcontractor or Supplier must 
be required to meet the same qualifications and selection criteria and process as the 
original Subcontractor or Supplier. If a Subcontract/Supplier selection plan has been 
approved by City, Contractor will follow that plan unless otherwise approved by City in 
writing. 
4.4.21 
Contractor must not change or replace any members of its Project team, including 
Contractor’s Representative, Project Manager, or Superintendent, without an explanation for 
the change being given to City, and receiving prior written approval of the change from City, 
which approval will not be unreasonably withheld. 
4.4.22 
Subcontractors whose scope of work has a value greater than 15% of the total Contract Price 
are required to furnish performance and payment bonds to Contractor, unless otherwise

General Conditions 
 
Revised: 10/19/2021 
 
GC-17 of 75 
 
approved in writing by City. 
4.4.23 
Contractor must comply with MAG Specification § 108.2 (E) unless otherwise specified in 
Contract Documents. 
4.5 
CONTROL OF THE PROJECT SITE 
4.5.1 
Throughout all phases of construction, including suspension of Work, Contractor must keep 
the Site reasonably free from debris, trash and construction wastes to permit Contractor to 
perform its construction services efficiently, safely and without interfering with the use of 
adjacent land areas. 
Prior to Final Acceptance of the Work, or a portion of the Work, 
Contractor must remove all debris, trash, construction wastes, materials, equipment, 
machinery and tools arising from the Work or applicable portions thereof to permit City 
to occupy the Project or a portion of the Project for its intended use. 
4.5.2 
Contractor must take whatever steps, procedures or means necessary to prevent dust 
nuisance due to construction operations. The dust control measures must be maintained 
at all times to the satisfaction of City and in accordance with the requirements of the 
Maricopa County Bureau of Air Pollution Control Rules and Regulations. 
4.5.3 
Contractor must maintain Americans with Disabilities Act (ADA) and American National 
Standards 
Institute (ANSI) accessibility requirements during construction activities, 
including 
without 
limitation compliance with the 2010 regulations governing 
implementation of the ADA to the extent applicable. 
ADA and ANSI accessibility 
requirements must include, but not be limited to, parking, building access, areas of refuge, 
and emergency exit paths of travel. Contractor i s  responsible for the coordination of all 
Work to minimize disruption to residents and the public. 
4.5.4 
Only materials and equipment used directly in the Work will be brought to and stored on the 
Site by Contractor. When equipment is no longer required for Work, it must be removed 
promptly from the Site. Protection of construction materials and equipment stored at the 
Site from weather, theft, damage and all other adversity is solely the responsibility of the 
Contractor. 
4.5.5 
Contractor agrees all persons working on the Site must act at all times in the best interest 
of the Project and will comply with all applicable rules and regulations reasonably set forth 
by City related to the Site. Notwithstanding the foregoing or anything in this Agreement to 
the contrary, City may remove from the Site any individual who City deems in their 
reasonable discretion to be creating a disturbance or causing any problem on the Site. 
4.5.6 
Contractor will be responsible to City for the acts and omissions of Contractor’s employees, 
Subcontractors and their agents and employees, and any other person performing any of 
the Work under a Contract with Contractor, or claiming by, through or under Contractor, for 
all damages, losses, costs and expenses resulting from such acts or omissions. 
4.5.7 
City may conduct criminal, drive history, and all other requested background checks of 
Contractor and Subcontractor personnel performing Work or who have access to City’s 
information, data, or facilities in accordance with City’s current background check policies, 
or the provisions of the Project Specific Conditions. Any officer, employee or agent that 
fails to background check must be replaced immediately. 
4.5.8 
City will have a final authority, based upon security reasons: (i) to determine when

General Conditions 
 
Revised: 10/19/2021 
 
GC-18 of 75 
 
security clearance of Contractor’s and Subcontractor’s personnel is required; (ii) to determine 
the nature of the security clearance, up to and including fingerprinting personnel; and 
(iii) to determine whether or not any individual or entity may provide Services or perform 
Work under the Contract. 
4.5.9 
If City objects to any personnel for any reasonable cause, then Contractor must, upon notice 
from City, remove such individual from the Project. 
4.6 
PROJECT SAFETY 
4.6.1 
The Project and all Work performed in relation thereto is governed by applicable provisions 
of the federal laws, including but not limited to, the latest amendments of the following: 
a. Williams-Steiger Occupational Safety & Health Act of 1970, Public Law, 91-596. 
b. Part 1910 and Part 1926 – Occupational Safety and Health Standards, 
Chapter XVII of Title 29, Code of Federal Regulations. 
c. Part 1518 – Safety and Health Regulations for Construction, Chapter XIII of 
Title 29, Code of Federal Regulations. 
4.6.2 
Contractor is responsible for safety of the job Site for employees of Contractor as well 
as for members of the general public and others who may drive or walk through or be at 
the Site.  
4.6.3 
Contractor recognizes the importance of performing the Work in a safe manner so as to 
prevent damage, injury or loss to: (i) all individuals at the Site, whether working or visiting; 
(ii) the Work, including materials and equipment incorporated into the Work and stored On-
Site or Off-Site; and (iii) all other property at the Site or adjacent thereto, including trees, 
shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for 
removal, relocation or replacement in the course of construction; and (iv) the owners or 
tenants of adjacent property and their patrons, employees and invitees. 
4.6.4 
Contractor assumes responsibility for implementing and monitoring all safety precautions 
and programs related to the performance of the Work. 
4.6.5 
Contractor must provide a “competent person’ as required by O.S.H.A regulations. The 
“competent person” must be identified at the Pre-Construction Conference with City 
advised in writing of any changes. 
4.6.6 
The “competent person” must make routine daily inspections of the Site and must hold 
weekly safety meetings with Contractor’s personnel, Subcontractors and others as 
applicable. 
4.6.7 
Contractor and Subcontractors must comply with all legal and regulatory requirements 
relating to safety, as well as any City specific safety requirements set forth in the Contract 
Documents, provided that such City-specific requirements do not violate any applicable 
legal and regulatory requirements. 
4.6.8 
Contractor will immediately report in writing any safety-related injury, loss, damage or 
accident arising from the Work to Project Manager and, to the extent mandated by Legal 
Requirements, to all government or quasi-government authorities having jurisdiction over 
safety-related matters involving the Project or the Work.

General Conditions 
 
Revised: 10/19/2021 
 
GC-19 of 75 
 
4.6.9 
Contractor’s responsibility for safety under this Section is not intended in any way to 
relieve Subcontractors and Sub-Subcontractors of their own contractual and legal 
obligations and responsibility for (i) complying with all Legal Requirements, including those 
related to health and safety matters, and (ii) taking all necessary measures to implement 
and monitor all safety precautions and programs to guard against injury, losses, damages 
or accidents resulting from their performance of the Work. 
4.6.10 
As between City and Contractor, Contractor is responsible to City for any and all the safety 
issues relating to the Work on the Project. Contractor must administer and manage the 
safety program. This will include, but not necessarily be limited to review of the safety 
programs of each Subcontractor. Contractor must monitor the establishment and 
execution of compliance with all applicable regulatory and advisory agency construction 
safety standards. Contractor’s responsibility for review, monitoring, and coordination of the 
Subcontractor’s safety programs will not extend to direct control over execution of the 
Subcontractors’ safety programs. Notwithstanding Contractor’s safety obligations to City, 
it is agreed and understood that each individual Subcontractor will remain controlling 
employer responsible for the safety programs and precautions applicable to its own work 
and the activities of other’s work in areas designated to be controlled by such Subcontractor 
for purposes of workers compensation insurance coverage. 
4.6.11 
Nothing in this agreement will relieve Contractor of his responsibility to maintain traffic, 
structures, etc., as noted on the Plans, Specifications, and Project Specific Conditions. 
Contractor is responsible to provide all necessary shoring, bracing and trench support as 
is necessary to maintain traffic structures, etc., as stipulated in the Plans, Specifications, and 
Special Provisions. If the stability of adjoining building, walls, roadways, etc., is endangered 
by Contractor’s excavation, shoring, bracing, or under pinning must be provided as 
necessary to ensure project safety. Cost for shoring, bracing, underpinnings, and trench 
support will be included in the appropriate items listed in the Contract Price, and no 
additional payment will be made for this work. 
4.7 
MATERIALS QUALITY, SUBSTITUTIONS, AND SHOP DRAWINGS 
4.7.1 
Quality Control and Quality Assurance Testing. 
4.7.1.1 
All construction materials to be used or incorporated in the Project are subject to 
inspection, Quality Control & Quality Assurance Testing, and approval or rejection by City. 
Any material rejected by City must be removed immediately and replaced in an acceptable 
manner to City at no additional cost to City. When QC/QA tests indicate noncompliance 
with the Contract Documents, retesting must be performed by the same testing laboratory 
that performed the tests that indicated noncompliance. 
4.7.1.2 
The Contractor must establish, provide, and maintain an effective Quality Control Testing 
Program (QCTP). The Contractor must develop his own program or procure the services of 
a consultant. In either case, the party performing the tests must be currently certified by the 
National Bureau of Standards in the National Voluntary Laboratory Accreditation Program 
(NVLAP) for construction 
services or the AASHTO Accreditation Plan (AAP) for Soils, 
Asphalt and Concrete. The Contractor must provide all support necessary to perform QC 
and QA testing and sampling (i.e. shoring for testing trench backfill, backhoes, motor 
graders, loaders, etc. to facilitate testing and sampling). The City will perform the QA testing. 
4.7.1.3 
The Contractor must submit a written QCTP to the City as a required submittal. The 
Contractor must not begin Work until the Quality Control Program has been reviewed and

General Conditions 
 
Revised: 10/19/2021 
 
GC-20 of 75 
 
accepted by the City. Resumes of all personnel that will be associated directly or indirectly 
with the QCTP must be included. 
4.7.1.4 
The QCTP must include, but not be limited to, on-site/field and laboratory testing of all 
material delivered to the Site and any existing materials or conditions pertinent to the 
project. 
4.7.1.5 
All testing must be under the direction of a Professional Engineer registered in the State of 
Arizona, knowledgeable in Materials Testing. All “Test Report” forms must be stamped by 
said Engineer. 
4.7.1.6 
The written QCTP will set forth the responsibilities of the engineer, project manager, 
supervisory personnel and each technician assigned to this project. Substitutions or 
replacement of personnel must require prior written approval by the City. All personnel must 
be proficient within their assigned duties and possess certification(s) commensurate with 
their position and responsibilities. The minimum certification(s) for each technician must 
be NICET Level II, Arizona Technical Testing Institute, American Concrete Institute, or other 
nationally recognized program applicable to the project and approved by the City of 
Chandler. The written QCTP must include a description of the required field and 
construction materials laboratory tests, including required frequencies that meet the 
minimums established herein. 
4.7.1.7 
The Contractor must establish a system to record and report all material test results.  The 
daily test reports must include, but not be limited to: 
a. Test designation; 
b. Date of test; 
c. Name of tester; 
d. Location of test/sample (station and offset); 
e. Product suppliers and product codes (as applicable); 
f. 
Depth/elevation of test/sample; 
g. Test result; 
h. Control requirement(s); 
i. 
Cause of rejection (if applicable); 
j. 
Results of retests (if applicable); and 
k. Remedial action (if applicable). 
4.7.1.8 
The Contractor must submit test results to the designated City representative.   
4.7.1.9 
The Contractor must also submit a weekly report to the City summarizing the testing 
and construction activities completed by emailing the report to the email addresses noted 
above. All weekly reports must be submitted simultaneously to the Contractor and the 
City of Chandler. The report must include individual summary sheets for each utility line, 
structure, and portion of the pavement section. Cores must be numbered sequentially 
throughout the Project. Re-cores must reference the original core by number and must 
contain the averaged values for thickness and density. Total pavement thickness must be 
reported. Vertical location of tests for underground utilities must indicate the depth of the

General Conditions 
 
Revised: 10/19/2021 
 
GC-21 of 75 
 
excavation at the location of the test (i.e., cut to flow line [if applicable], depth to bottom 
or top of pipe, etc.). Density tests must be numbered sequentially. If the minimum number 
of tests has not been performed per the written QCTP, this must be stated in the weekly 
summary report with an explanation of the circumstances. 
4.7.1.10 
The City will maintain a copy of the Project test results and weekly reports in the Project 
file. In cases where quality control activities do not comply with the contract provisions, the 
City may: 
a. Order the Contractor to replace ineffective or unqualified quality control 
personnel. 
b. Order the Contractor to stop operations until appropriate corrective action is 
taken. 
4.7.1.11 
Although minimum testing requirements are specified herein, the Contractor bears full 
responsibility for the quality of the materials and their installation and may elect to 
perform additional testing beyond the requirements set forth herein to ensure compliance. 
4.7.1.12 
The Quality Control requirements contained in this Section are in addition to and separate 
from Quality Assurance Testing, which will be performed by the City of Chandler or its 
representative. If the Quality Assurance test results are not in agreement with the Quality 
Control test results, the Contractor will have the option to retain a third party consultant for 
referee tests. The third party consultant must meet the same requirements as the 
consultant performing the Quality Control Testing. The results of the third party will be 
binding. All cost incurred by the referee testing will be the Contractor’s expense. If the 
Contractor elects not to retain a third party for referee testing, the City of Chandler test 
results will prevail. 
4.7.1.13 
Except as otherwise noted within this Section, Work or materials required by this Section are 
non- pay items. Per MAG Section 101, a non-pay item is an item of Work for which no 
separate payment will be made, the cost of which is to be included as an incidental cost 
for associated item(s) included on the Bid Schedule or Schedule of Values. 
4.7.2 
Trade Names and Substitutions. 
4.7.2.1 
Substitutions prior to bid will only be considered if in compliance with Arizona Revised 
Statute § 34-104. 
4.7.2.2 
Contractor, if requested by City, must submit Samples or any additional information that 
may be necessary to evaluate the acceptability of the substitution. 
4.7.2.3 
City will make the final decision and will notify Contractor in writing as to whether the 
substitution has been accepted or rejected. 
4.7.2.4 
If City does not respond within 15 working days, Contractor must continue to perform the 
Work in accordance with the Contract Documents and the substitution will be considered 
rejected. 
4.7.3 
Shop Drawings. 
4.7.3.1 
Contractor must prepare and submit Shop Drawings which show details of all Work to insure 
proper installation of the Work using those materials and equipment specified under the 
approved Plans and Specifications.

General Conditions 
 
Revised: 10/19/2021 
 
GC-22 of 75 
 
4.7.3.2 
Contractor must submit a schedule of Shop Drawing submissions, which avoids bulk 
submissions to the extent reasonably possible, with the Project Schedule for City approval.  
The schedule of Shop Drawing submissions must include all of the items for which Shop 
Drawings are required by the Contract Documents, including the Specifications. Unless 
otherwise noted, Shop Drawings will not be required for items specified or detailed in 
the Uniform Standard Specifications and Details or the Technical Specifications.  
4.7.3.3 
Shop Drawings must be numbered consecutively for each Specification section and must 
accurately and distinctly present the following: 
a. All working and erection dimensions. 
b. Arrangements and sectional views. 
c. Necessary details, including complete information for making connections 
between work under this Contract and work under other Contracts. 
d. Kinds of materials and finishes. 
e. Parts list and description thereof. 
4.7.3.4 
Each Drawing or page must include: 
a. Project Name, City of Chandler Project Number and descriptions. 
b. Submittal date and space for revision dates. 
c. Identification of equipment, product or material. 
d. Name of Contractor and Subcontractor. 
e. Name of Supplier and Manufacturer. 
f. 
Relation to adjacent structure of material. 
g. Physical dimensions clearly identified. 
h. ASTM and Federal Specifications references. 
i. 
Identification of and justification for deviations from the Contract Documents. 
j. 
Contractor’s stamp, initialed or signed, dated and certifying the review 
of submittal, certification of field measurements and compliance with 
Contract. 
k. Location at which the equipment or materials are to be installed. 
4.7.3.5 
Location will mean both physical location and location relative to other connected or 
attached material. City will return unchecked any submittal, which does not contain 
complete data on the Work and full information on related matters. 
4.7.3.6 
Stock or standard drawings will not be accepted for review unless full identification and 
supplementary information is shown thereon in ink or typewritten form. 
4.7.3.7 
Contractor must schedule, prepare and submit all Shop Drawings in accordance with a time-
table 
that will allow its suppliers and manufacturers sufficient time to fabricate, 
manufacture, inspect, test and deliver their respective products to the project Site in a 
timely manner so as to not delay the complete performance of the Work. 
4.7.3.8 
If the Shop Drawings show departures from the Contract requirements, Contractor must

General Conditions 
 
Revised: 10/19/2021 
 
GC-23 of 75 
 
make specific mention thereof in the Letter of Transmittal; otherwise review of such 
submittals by City will not constitute review of the departure. Review of the Drawings will 
constitute review of the specific subject matter for which the Drawings were submitted 
and not of any other structure, material, equipment, or apparatus shown on the Drawings. 
4.7.3.9 
The review of Shop Drawings will be general and will not relieve Contractor of responsibility 
for the accuracy of such Drawings, nor for the proper fitting and construction of the Work, 
nor for the furnishing of materials or Work required by the Contract. No construction 
called for by Shop Drawings will be initiated until such Drawings have been reviewed and 
approved by City. 
4.7.3.10 
The procedure in seeking review of the Shop Drawings will be as follows: 
a. Contractor must submit complete sets of Shop Drawings and other 
descriptive data as specified in this Section. 
b. After Contractor’s submittal or resubmittal of Shop Drawings, if Contractor 
has submitted Shop Drawings in accordance with the City-approved 
submittal schedule, or upon resubmission, City will be provided with three 
(3) calendar weeks for review. Should City require additional review time 
above and beyond the three (3) calendar weeks, Contractor may ask for a 
time extension or monetary compensation, if they can present valid, factual 
evidence that actual damages were incurred by Contractor. City will 
determine 
the amount of the time extension or the monetary 
compensation to be awarded Contractor, if any, in accordance with City’s 
Policy Statement for Calculating Delays and Damages, Appendix 1. 
4.7.3.11 
Contractor will be responsible for all extra costs incurred by City caused by Contractor’s 
failure to comply with the procedure outline above. 
4.7.4 
Long Lead Time Items. Contractor must submit Shop Drawings, as required by the Engineer, 
on all long lead items to be furnished and installed as part of the project within 10 Days 
after the date of the executed Contract letter issued by City. In addition, Contractor 
must order all long lead items to be furnished and installed as part of this Project within 3 
Days after receiving approved Shop Drawings. For all long lead times for which Shop 
Drawings are not required, Contractor must order said long lead items within 15 Days after 
the date of the executed Contract letter issued by City. Within 2 Days after ordering 
long lead items, Contractor must supply copies of all purchase orders, along with an 
accurate delivery schedule from the supplier. 
4.7.5 
Construction Water. If Contractor uses water from City’s water system for construction 
water, Contractor must obtain a fire hydrant meter from City of Chandler Utility Services 
(480-782-2280) and all construction water must be obtained through the hydrant meter. 
Contractor must pay all fees related to the hydrant meter and all water bills for construction 
water. All cost for meters and construction water will be included in the Contract Price. 
4.8 
PROJECT RECORD DOCUMENTS 
4.8.1 
During the construction period, Contractor must maintain at the jobsite a full-size set of 
prints of the Construction Document Drawings and Shop Drawings for Project Record 
Document purposes. 
4.8.2 
Contractor must mark these Drawings to indicate the actual installation where the installation

General Conditions 
 
Revised: 10/19/2021 
 
GC-24 of 75 
 
varies from the original Construction Documents. Contractor must give particular attention 
to information on elements that will be concealed, which would be difficult to identify or 
measure and record later. Items required to be marked include but are not limited to: 
a. Dimensional changes to the Drawings. 
b. Revisions to details shown on Drawings. 
c. Locations and depths of underground utilities. 
d. Revisions to routing of piping and conduits. 
e. Actual equipment locations. 
f. 
Changes made by Change Order or Addendum. 
g. Details not on original Contract Drawings. 
4.8.3 
Contractor must mark completely and accurately Project Record Drawing sets of 
Construction Documents. 
4.8.4 
Contractor must mark Project Record Drawings sets with red erasable colored pencil. 
4.8.5 
Contractor must note Request for Information (RFI) Numbers and Change Order numbers, 
etc., as required to identify the source of the change to the Construction Documents. 
4.8.6 
Contractor must submit Project Record Drawing sets and Shop Drawings to City or its 
representative for review and comment. 
4.8.7 
Upon receipt of the reviewed Project Record Drawings from City, Contractor must correct 
any deficiencies and omissions to the Drawings and submit the final original of the Project 
Record Drawings to City prior to Final Payment. 
4.8.8 
Project Manager will review the Project Record Drawings monthly prior to the date 
established for the Payment Request and will be the sole judge of acceptance of these 
Drawings. 
4.9 
WARRANTY AND CORRECTION OF DEFECTIVE WORK 
4.9.1 
Contractor warrants to City that the construction, including all materials and equipment 
furnished as part of the Work, will be new unless otherwise specified in the Contract 
Documents, of good quality, and free of defects in materials and workmanship.  Contractor’s 
warranty obligation excludes defects caused by abuse, alterations, or unreasonable failure 
to maintain the construction by persons other than Contractor, subcontractors, or others 
under Contractor’s control.  Nothing in this warranty will limit any manufacturer’s warranty 
which provides City with greater warranty rights than set forth herein or in the Contract.  
Contractor will provide City with all manufacturers’ warranties and operation and 
maintenance manuals upon substantial completion of the Work.  Contractor’s warranty 
must be for one (1) year, in accordance with MAG Specification § 108.8, and will commence 
for all portions of the Work upon Final Acceptance of the entire Work as determined by City 
under the Contract.  All statutory or other warranties, express or implied, related to latent 
defects will remain in force and are not limited by this provision. 
4.9.2 
City May Stop the Work.  If the Work is defective, or Contractor fails to supply sufficient 
skilled workmen or suitable materials or equipment, City may order Contractor to stop the 
Work without cost to City, or any portion thereof, until the cause for such order has been

General Conditions 
 
Revised: 10/19/2021 
 
GC-25 of 75 
 
eliminated; however, this right of City to stop the Work will not give rise to any duty on the 
part of City to exercise this right for the benefit of Contractor or any other party. 
4.9.3 
Correction or Removal of Defective Work. 
4.9.3.1 
If required by City, Contractor must promptly, without cost to City and as specified by City, 
either correct any defective Work, whether or not fabricated, installed or completed, or, if 
the Work has been rejected by City, remove it from the Site and replace it with non-defective 
Work. Contractor must correct any Work which may be displaced in correcting, removing or 
replacing defective Work. No compensation will be allowed Contractor for such removal, 
replacement or remedial Work.  Contractor must reimburse City for costs incurred by City 
due to such correction or removal including but not limited to additional expenses for 
inspection, testing or observation and for repeated reviews by the City or Design 
Professional.   
4.9.3.2 
Upon failure on the part of the Contractor to comply within a reasonably prompt time with 
any written order of City to correct or remove defective Work, City has authority to cause 
nonconforming materials or rejected Work to be remedied, removed, or replaced at the 
Contractor's expense and to deduct the costs from any moneys due or to become due the 
Contractor. 
4.9.4 
City May Correct Defective Work.  If Contractor fails within a reasonable time after written 
notice of City to proceed to correct defective Work or to remove and replace rejected Work 
as required by City or if Contractor fails to perform the Work in accordance with the Contract 
Documents (including any requirements of the progress schedule), City may, after 7 Days' 
written notice to Contractor, correct and remedy any such deficiency.  To the extent 
necessary to complete corrective and remedial action, City may exclude Contractor from all 
or part of the Work, and suspend Contractor's services related thereto, take possession of 
Contractor's tools, appliances, construction equipment and machinery at the Site and 
incorporate in the Work all materials and equipment stored at the Site or for which City has 
paid Contractor, but which are stored elsewhere. Contractor must allow City, city 
representatives, agents and employees such access to the Site as may be necessary to 
enable City to exercise City’s rights under this Section.  All direct and indirect costs of City in 
exercising such rights will be charged against Contractor in an amount verified by City 
representative, and a Change Order will be issued incorporating the necessary revisions in 
the Contract Documents and a reduction in the Contract Price.  Such direct and indirect 
costs will include, in particular but without limitation, compensation for additional 
professional services required and all costs of repair and replacement of Work or others 
destroyed or damaged by correction, removal or replacement of Contractor's defective 
Work. Contractor will not be allowed an extension of the Contract Time because of any delay 
in Contractor’s performance of the Work attributable to the exercise by City or City's rights 
hereunder. 
4.9.5 
Correction or Removal of Unauthorized Work. 
4.9.5.1 
Any Work done beyond the lines and grades shown on the Drawings or established by the 
Design Professional or any changes in, additions to, or deductions from the Work done 
without written authority will be considered as unauthorized and will not be paid for. Work 
so done may be ordered remedied, removed, or replaced at the Contractor's expense. 
4.9.5.2 
Upon failure on the part of the Contractor to comply promptly with any order of the City, 
City will have authority to cause unauthorized Work to be remedied, removed, or replaced

General Conditions 
 
Revised: 10/19/2021 
 
GC-26 of 75 
 
at the Contractor's expense and to deduct the costs from any moneys due or to become 
due the Contractor. 
4.9.6 
Correction Period - One Year Guarantee. 
4.9.6.1 
If, within one year after the date of Final Acceptance, or such longer period of time as may 
be prescribed by law or by the terms of any applicable special guarantee required by the 
Contract Documents, or by any specific provision of the Contract Documents, any Work is 
found to be defective, Contractor must promptly, without cost to City and in accordance 
with City's written instructions, either correct such defective Work, or, if it has been rejected 
by City, remove it from the Site and replace it with non-defective Work. If Contractor does 
not promptly comply with the terms of such instructions, or in an emergency where delay 
would cause serious risk of loss or damage, City may have the defective Work corrected or 
the rejected Work removed and replaced, and all direct and indirect costs of such removal 
and replacement, including compensation for additional professional services, must be paid 
by Contractor. Such action by the City will not relieve the Contractor of the guarantees 
required by this Section or elsewhere in the Contract Documents.  
4.9.6.2 
If, in the opinion of the City, defective Work creates a dangerous condition or requires 
immediate correction or attention to prevent further loss to the City or to prevent 
interruption of operation of the City, the City will attempt to give the notice required by this 
Section.  If the Contractor cannot be contacted or does not comply with the City's request 
for correction within a reasonable time as determined by the City, the City may, 
notwithstanding the provisions of this Section, proceed to make such correction or provide 
such attention; and the costs of such correction or attention will be charged against the 
Contractor.  Such action by the City will not relieve the Contractor of the guarantees 
required by this Section or elsewhere in the Contract Documents. 
4.9.6.3 
This Section does not in any way limit the guarantee on any items for which a longer 
guarantee is specified or on any items for which a manufacturer or supplier gives a 
guarantee for a longer period. The Contractor agrees to act as co-guarantor with such 
manufacturer or supplier and must furnish the City all appropriate guarantee or warranty 
certificates upon completion of the Project.  No guarantee period, whether provided for in 
this Section or elsewhere, will in any way limit the liability of Contractor or their sureties or 
insurers under the indemnity or insurance provisions of these General Conditions and the 
Project Specific Special Conditions. 
4.9.7 
Acceptance of Defective Work. 
4.9.7.1 
If, instead of requiring correction or removal and replacement of defective Work, City may 
accept Work when in the best interest of the City to do so with appropriate monetary credit 
from Contractor.  If any such acceptance occurs prior to final payment, a Change Order will 
be issued incorporating the necessary revisions in the Contract Documents, including 
appropriate reduction in the Contract Price; or, if the acceptance occurs after final payment, 
an appropriate amount must be paid by Contractor to City. 
4.9.7.2 
Alternatively, City may require Contractor to furnish at Contractor's expense, a special 
performance guarantee or other surety prior to acceptance of defective work. 
4.9.8 
The Warranty period begins on the Final Acceptance date noted in the Certificate of 
Completion, irrespective of early completion by some Subcontractors of their work.

General Conditions 
 
Revised: 10/19/2021 
 
GC-27 of 75 
 
4.9.9 
Contractor’s warranty obligation must be in accordance with MAG Specifications. 
4.9.10 
Nothing in the warranties contained  in  the  Contract  Documents are intended to limit  any 
manufacturer’s warranty which provides City with greater warranty rights than set forth 
in this 
Section or the Contract Documents. Contractor must provide City with all 
manufacturers’ warranties 
prior to Substantial Completion, if applicable, or Final 
Acceptance. 
4.9.11 
Contractor agrees that it will be responsible to manage and administer the correction of any 
Work that is not in conformance with the Contract Documents during the warranty periods 
set forth in this Section, or during any longer periods to the extent required by the Contract 
Documents. A progress payment, or partial or entire use or occupancy of the Project by City, 
will not constitute acceptance of Work not in accordance with the Contract Documents. 
4.9.12 
When notified of a warranty issue, Contractor must respond in writing within 48-hours and 
must perform warranty Work as soon as material for said repairs are available (as judged 
solely by City), and in any event Contractor must, take immediate steps to commence and 
complete correction of nonconforming Work no later than the time period set forth in 
City’s written notification in accordance with the Contract Documents. This includes the 
correction, removal or replacement of the nonconforming Work and any damage caused 
to other parts of the Work affected by the nonconforming Work. If defects develop which 
are determined by City to be an emergency, City will notify Contractor, via the most 
expeditious means regarding the nature and condition of the defects. In turn, Contractor 
must immediately dispatch necessary forces to correct the defect or the emergency 
condition in accordance with Contract Documents. 
4.9.13 
The time periods referenced in this Section apply only to Contractor’s obligation to 
correct nonconforming Work and is not intended to constitute a period of limitations for any 
other rights or remedies that City may have regarding Contractor’s other obligations under 
the Contract Documents. 
4.9.14 
Without limiting the foregoing or anything in these General Conditions or the Contract 
to the contrary, Contractor must obtain and provide to City all warranties for any portion 
of the Project offered by the manufacturer, installer or provider thereof. City and the user 
of the facility will have the right to the full value and benefit of all such warranties. 
Contractor must ensure all such warranties are fully transferrable to facilitate the full value 
of this Section. 
4.9.15 
Contractor’s warranty excludes damages or defects caused by abuse, alterations to the Work 
not executed by or through Contractor, improper or insufficient maintenance, improper 
operation, or normal wear and tear and normal usage. 
4.9.16 
In the event of any noncompliance with this entire Section 4, City may require Contractor to 
stop or suspend the Work in whole or in part. 
 
SECTION 5 - CITY RESPONSIBILITIES 
5.1 
CITY PROJECT MANAGER AND INSPECTORS 
5.1.1 
Project Manager is responsible for providing City-supplied information and approvals in a 
timely manner to assist Contractor to fulfill its obligations under the Contract Documents.

General Conditions 
 
Revised: 10/19/2021 
 
GC-28 of 75 
 
5.1.2 
Project Manager will also provide Contractor with prompt notice when it observes any 
failure on the part of Contractor to fulfill its contractual obligations, including any default 
or defect in the Project or non-conformance with the Drawings and Specifications. 
5.1.3 
City may utilize Field Inspectors to assist Project Manager during construction in 
observing performance of Contractor. City’s use of Inspectors is for the purpose of assisting 
Project Manager. 
5.1.4 
The Inspectors are authorized to inspect all Work and materials furnished. Such inspections 
may extend to all or part of the Work and to preparation, fabrication or manufacture of the 
materials to be used.  The Inspectors have the authority to issue instructions contrary to 
the Construction Documents if approved and coordinated with the directions of Project 
Manager. 
5.1.5 
The Inspectors have the authority to reject work or materials until any questions at issue can 
be decided by Project Manager. 
5.1.6 
The use of Inspectors by City will not make City responsible for or give City control 
over construction means, methods, techniques, sequences or procedures or for safety 
precautions or programs or responsibility for Contractor’s failure to perform the Work in 
accordance with Contract Documents. The Inspectors are not authorized to direct any of 
Contractor’s activities, employees or Subcontractors. 
5.2 
DESIGN PROFESSIONAL SERVICES 
City may contract separately with one or more Design Professionals to provide 
construction administration of the Project. The Design Professional’s Contract, as well as 
other firms hired by City may be furnished to Contractor. Contractor does not have the right 
to limit or restrict or reject any Contract modifications that are mutually acceptable to City 
and Design Professional. 
5.3 
 CIT Y ’S SEP AR AT E CONT R ACT ORS 
City is responsible for all work performed on the Project or at the Site by separate 
contractors retained by City. City will contractually require its separate contractors to 
reasonably cooperate with, and reasonably coordinate their activities so as not to interfere 
with Contractor in order to enable Contractor to timely complete the Work consistent with 
the Contract Documents. Contractor must immediately notify the Project manager, and 
address the matter in the next monthly status report, if any activities of such separate 
contractors are expected to interfere, or are interfering, with Contractor and such 
interference will or could result in any delay in Contractor’s performance of the Work. 
5.4 
PERMIT REVIEW AND INSPECTIONS 
5.4.1 
If requested by Contractor, Project Manager will provide assistance and guidance in 
obtaining necessary reviews, permits and inspections. 
5.4.2 
The regulating agencies of City, such as Development and Sustainability, Fire and 
Planning Departments, enforce legal requirements. The enforcement activities of City are 
independent and separate from this Agreement. 
5.5 
PLANS AND SPECIFICATIONS TO THE CONTRACTOR.   
Contractor will be provided up to five copies of the Contract Documents as are reasonably 
necessary for the execution of the Work.  Additional copies will be furnished, upon request,

General Conditions 
 
Revised: 10/19/2021 
 
GC-29 of 75 
 
at the cost of reproduction.   
 
SECTION 6 - CONTRACT TIME 
6.1 
CONTRACT TIME 
6.1.1 
The Contract Time will start with the Notice to Proceed (“NTP”) and end with Final 
Acceptance.  
6.1.2 
Beginning on the date of the NTP, Contractor must begin to fulfill Contractor’s obligations 
under the Contract. Contractor’s obligations include providing City and other agencies 
with any submittals required by the Project Specific Special Provisions, including but not 
limited to, an approved Project Schedule, Traffic Control Plans, and a Stormwater Pollution 
Prevention Plan. Contractor must submit all such required submittals before any physical 
construction work commences on the Site. NTP does not authorize construction work 
until all contract insurance, bonds, and schedules are submitted to and accepted by the 
City. 
6.1.3 
The Contract Time will be as set forth in the Project Schedule. Contractor agrees that it 
will commence performance of the Work and complete the Project through both 
Substantial Completion and Final Acceptance within the Contract Time. 
6.1.4 
Time is of the essence of this Contract, for the Project, for the Work, and for each phase and 
designated Milestone thereof. 
6.1.5 
Failure of Contractor to perform any covenant or condition contained in the Contract 
Documents within the time periods specified herein, will constitute a material breach of this 
Contract entitling City to terminate the Contract unless Contractor applies for and receives 
an extension of time, in accordance with the procedures set forth in the Contract 
Documents. 
6.1.6 
Failure of City to insist upon the performance of any covenant or condition within the time 
periods specified herein, will not constitute a waiver of Contractor’s duty to perform every 
other covenant or condition within the designated periods, unless a specific waiver is 
granted in writing for each such covenant or condition. 
6.1.7 
City’s agreement to waive a specific time provision or to extend the time for performance 
will not constitute a waiver of any other time provisions contained in the Contract 
Documents.  Failure of Contractor to complete performance promptly within the additional 
time authorized in the waiver or extension of time agreement constitutes a material breach 
of this Contract entitling City to all the remedies set forth herein or provided by law. 
6.2 
PROJECT SCHEDULE 
6.2.1 
The Project Schedule must be in Microsoft Project standard file format, must be updated and 
maintained throughout the Contract Time, and must contain the following: 
6.2.1.1 
Detailed representation of all activities for the project, both on-site construction and major 
procurement.  All significant activities together with the resource loading requirements for 
each and all items appearing on the schedule of values or bid schedule for progress 
payments must be shown on the Project Schedule or in attached transmittal letter as 
described in Section 6.2.8.

General Conditions 
 
Revised: 10/19/2021 
 
GC-30 of 75 
 
6.2.1.2 
Dependencies between activities must be indicated so that it may establish as to the effect 
the progress of any one activity would have on other activities and on the Schedule. 
6.2.1.3 
Activities for submission, review, and approval of all required submittals. 
6.2.1.4 
An amount of time will be established prior to the final completion date for “punch list and 
cleanup”.  No other activities will be scheduled during this period.  Punch list and cleanup 
must be shown on the Project Schedule and must be entirely completed prior to the 
expiration of the Contract Time. 
6.2.2 
Within 10 Days of receipt of City’s comments, Contractor must make all required 
corrections, adjustments, and additions to complete the Project Schedule and resubmit to 
City for review.  City’s review of and response to the Project Schedule is for the purpose of: 
(1) City planning and staffing for the Project as may be required from time to time; (2) 
ensuring Contractor’s general conformance with the scheduling requirements of the 
Contract Documents and completion of the Project within the Contract Time; and (3) 
monitoring and evaluating the construction status for purposes of approving monthly 
progress payments. Acceptance of a submitted schedule by City should in no way be 
construed as an affirmation or admission that the schedule is reasonable or workable by 
Contractor. The responsibility for completing the Work on the Project within the Contract 
Time remains the obligation of Contractor. City’s review  does not relieve Contractor from 
compliance with the requirements of the Contract Documents or be construed as 
relieving Contractor of its complete and exclusive control over the means, methods, 
sequences and techniques for executing the work. 
6.2.3 
The Project Schedule must show milestones, including milestones for City-furnished 
information, and must include activities for City-furnished material and construction by 
other contractors when those activities are interrelated with Contractor activities. 
6.2.4 
The Project Schedule must be revised as required by conditions and progress of the Work, 
but such revisions do not relieve Contractor of its obligations to complete the Work 
within the Contract Time, as adjusted in accordance with the Contract Documents. No 
modification to the Contract Documents or the Contract Time will be effective unless 
approved in advance by City. 
6.2.5 
For all items of materials and equipment that are critical or may require long lead times to 
acquire, the Project Schedule must show dates for submission, review and approval of 
submittals, ordering, and delivery. 
6.2.6 
An updated Project Schedule must be submitted monthly to City as part of the Payment 
Request. The monthly submittal must include one full size plot of the entire schedule and 
one electronic copy containing the schedule in Microsoft Project standard file format. In 
addition, Contractor must, upon request by City, provide a copy of all submitted schedule 
data in electronic 
format which must be clearly labeled with the Project description, 
scheduling program name and version number, and schedule print/data date. 
6.2.7 
Contractor must provide City with a monthly status report with each Project Schedule 
detailing the progress of the Work, including: (i) if the Work is proceeding according to 
schedule, (ii) any discrepancies, conflicts, or ambiguities found to exist in the Contract 
Documents that require resolution, and (iii) other information detailing items that require 
resolution so as not to jeopardize the ability to complete the Work in the Contract Time.

General Conditions 
 
Revised: 10/19/2021 
 
GC-31 of 75 
 
6.2.8 
With each Project Schedule submittal, Contractor must include a transmittal letter 
including the following: 
a. Description of problem tasks, referenced to field instructions or requests 
for information (RFI’s), as appropriate. 
b. Current and anticipated delays including: 
(i) 
Cause of the delay. 
(ii) 
Corrective action and schedule adjustments to correct the delay. 
(iii) 
Known or potential impacts and their delay on other activities, 
milestones, and their impact on the Substantial Completion and 
Final Acceptance dates. 
(iv) 
Changes in construction sequence. 
c. Pending items and status thereof including but not limited to: 
(i) Time Extension requests; 
(ii) 
Substantial Completion date status; 
(iii) 
Final Acceptance date status. 
d. If ahead of schedule, the number of calendar Days ahead. 
e. If behind schedule, the number of calendar Days behind. 
f. 
Other Project or scheduling concerns. 
6.2.9 
Critical Path Method (CPM). 
6.2.9.1 
Unless otherwise specified in the Contract, the Project Schedule must include a Critical 
Path 
Method (CPM) diagram schedule showing the sequence of activities, the 
interdependence of each activity and identifies the Critical Path. 
6.2.9.2 
The CPM diagram schedule must be in calendar Days and indicate duration, earliest and 
latest start and finish dates for all activities, and total Float Times for all activities except 
critical activities. The CPM diagram must be presented in a time scaled graphical format for 
the Project as a whole. 
6.2.9.3 
The CPM diagram schedule must indicate all relationships between activities. 
6.2.9.4 
The activities making the Project Schedule must contain sufficient detail to assure that 
adequate planning has been done for proper execution of the Work and such that it provides 
an appropriate basis for monitoring and evaluation the progress of the Work. Individual 
activities must not exceed 30 Days in length, in most cases. 
6.2.9.5 
The CPM diagram schedule must be based upon activities, which coincide with the Schedule 
of Values. 
6.2.9.6 
The CPM diagram schedule must show all submittals associated with each work activity and 
the review time for each submittal. 
6.2.10 
Float Time. 
6.2.10.1 
The total Float Time within the overall schedule is for the exclusive use of City, but City 
may approve Contractor’s use of Float as needed to meet contract Milestones and

General Conditions 
 
Revised: 10/19/2021 
 
GC-32 of 75 
 
the Project completion date. 
6.2.10.2 
Contractor will not be allowed to sequence, hide, or reallocate Float Time through 
such strategies, as extending activity duration estimates to consume available Float, using 
preferential logic, or using extensive crew/resource sequencing, tec. No time extensions 
will be granted nor delay damages paid until a delay occurs which extends the Work beyond 
the Contract Time. 
6.2.11 
City-Caused Delays.  City-caused delays on the Project, if any, may be offset by City-caused 
time savings (i.e., Critical Path submittals returned in less time than allowed by the Contract, 
approval of substitution requests and credit changes which result in savings of time to 
Contractor, etc.) In such an event, Contractor will not be entitled to receive a time extension 
or delay damages until all City-caused time savings are exceeded and the Contract Time is 
also exceeded. 
6.2.12 
Rain-Related Delays.  Contractor is required, in preparing the Project Schedule to take into 
account all relevant weather conditions, including normal rainfall and distribution. No 
additional compensation will be given for any rain-related delays or impacts on the Work 
or the Project Schedule. No time extension will be granted in the Project Schedule unless 
the rainfall during the construction of Work is unusually severe, was not reasonably 
anticipated, and the total rainfall was significantly in excess of the normal rainfall for the 
Project Site location. Normal rainfall for the Project will be determined from the 10-year 
average rainfall for the Site as measured by the National Oceanic and Atmospheric 
Administration or comparable source of reliable information for rainfall in Chandler, 
Arizona. In addition, the excessive rainfall must have actually impacted Work activities on 
the Critical Path and caused delay beyond any remaining Float at the time of the rain- caused 
delay. The burden of documenting normal rainfall, the excessive rainfall and the impact on 
Critical Path activities is on Contractor. All other provisions in the Contract Documents 
relating to claims, including without limitation notice requirements, apply to any claim by 
Contractor for a rain delay. 
6.2.13 
City’s “Policy Statement for Calculating Delays and Damages,” Appendix 1 to these 
General Conditions, will apply to all claims of delay and delay damages. 
6.2.14 
Force Majeure.  If Contractor is delayed or prevented from the performance of any Work 
required under this Contract by reason of acts of God or other causes beyond the control 
and without fault of Contractor (financial inability excepted), performance of that Work will 
be excused, but only for the period of the delay.  The time for performance of the Work will 
be extended for a period equivalent to the period of delay. In addition, the parties agree if 
Contractor’s delayed or suspended performance directly arises out of or directly results 
from the COVID-19 pandemic, Contractor’s delayed or suspended performance may be 
excused as set forth in this clause. Provided, however; Contractor must give the City written 
notice within 30 days of the occurrence of the event giving rise to COVID-19 pandemic 
related delayed or suspended performance. For COVID-19 pandemic related delay or 
suspended performance, the parties must agree in writing to the length of the excused 
delay or suspended performance. Further, Contractor must obtain the City’s written 
approval to use any allowance established as part of the project for delays and costs related 
to the COVID-19 pandemic. 
6.3 
SUBSTANTIAL COMPLETION 
6.3.1 
When Contractor considers that the Work, phase or a portion thereof, which City agrees in

General Conditions 
 
Revised: 10/19/2021 
 
GC-33 of 75 
 
writing to accept separately, is substantially complete, City will prepare and submit to 
Contractor a comprehensive Punch List of items to be completed or corrected prior to Final 
Acceptance and Final Payment. Failure to include an item on such Punch List does not alter 
the responsibility of Contractor to complete all Work in accordance with the Contract 
Documents. 
6.3.2 
Upon receipt of Contractor’s Punch List, Project Manager will make an inspection to 
determine whether the Work or designated portion thereof is substantially complete. 
Project Manager may, at Project Manager’s sole option, be assisted in such inspection by 
the Design Professional for the Project. If the inspection by the Project Manager discloses 
any item, whether or not included on Contractor’s Punch List, which is not sufficiently 
completed in accordance with the Contract Documents so that City can occupy or utilize 
the Work, phase or designated portion thereof for its intended use, Contractor must, 
before issuance of the Certificate of Substantial Completion, complete or correct such 
item upon notification by Project Manager. In such case, Contractor must then submit a 
request for another inspection by Project Manager to determine Substantial Completion. 
6.3.3 
Certificate of Substantial Completion. 
6.3.3.1 
The Project Manager will not issue a Certificate of Substantial Completion unless and until 
the Work (or separable units or Phases as provided in the Contract Documents) is 
essentially and satisfactorily complete in accordance with the Contract Documents, such 
that the Project is ready for use by City for its intended purpose, opening to the general 
public, full occupancy or use by City (including, without limitation, all separate units, or 
rooms, facilities, access, income-generating areas, and all areas serving the general public, 
as applicable, must be ready for full-operation 
without material inconvenience or 
discomfort), including, to the extent applicable to the Work, the following: all materials, 
equipment, systems, controls, features, facilities, accessories and similar elements are 
installed in the proper manner and in operating condition, inspected and approved; 
surfaces have been painted; masonry and concrete cleaned with any sealer or other finish 
applied; utilities and systems connected and functioning; site work complete; permanent 
heating, 
ventilation, air condition, vertical transportation and other systems properly 
operating with proper controls; lighting and electrical systems installed, operable and 
controlled; paving completed, signage installed, and other Work as applicable, has 
been performed to a similar state of essential and satisfactory completion. A minor 
amount of Work, as determined by and at the discretion of the Project Manager, such 
as installation of minor accessories or items, a minor amount of painting, minor 
replacement of defective work, minor adjustment of controls or sound 
systems, or 
completion or correction of minor exterior work that cannot be completed as a result of 
weather conditions, will not delay determination of Substantial Completion. If prior 
written approval is obtained from City for purposes of Substantial Completion, specified 
areas of the entire Work or Project may be individually certified as Substantially 
Complete. In no event will Substantial Completion be deemed to have occurred unless 
and until: (i) a temporary certificate of occupancy has been issued by the appropriate 
Governmental Authorities (as applicable) and (ii) all terms and Work required under this 
Agreement have been fulfilled by Contractor and same will have also been approved and 
accepted by City, subject only to the Punch List items. 
6.3.3.2 
If requested by City, Contractor must complete and turn-over to City the Project on a phased 
basis. Each phase will have a separate inspection by the Project Manager, a Punch List 
generated, and then an inspection by City with final approval and acceptance only after the

General Conditions 
 
Revised: 10/19/2021 
 
GC-34 of 75 
 
Project Manager’s Punch List. 
6.4 
PARTIAL UTILIZATION 
6.4.1 
City at City’s option may use and occupy any substantially completed parts of the Work 
which has specifically been identified in the Contract Documents, or which City, the Design 
Professional and Contractor agree constitutes a separately functioning and usable part of 
the Work that can be used by City for its intended purpose, without significant interference 
with Contractor’s performance of the remainder of the Work, provided, however, if the 
portion of the Work to be used or occupied has not been found to be substantially complete, 
City must do so in accordance with Section 6.3 prior to such occupancy.   
6.4.2 
In lieu of the issuance of a Certificate of Substantial Completion as to part of the Work, City 
may take over operation of a facility constituting part of the Work whether or not it is 
substantially complete if such facility is functionally and separately usable; provided that 
prior to any such takeover, City and Contractor agree in writing as to the division of 
responsibilities between City and Contractor for security, operation, safety, maintenance, 
correction period, heat, utilities and insurance with respect to such facility. 
6.4.3 
Substantial Completion of or City's beneficial occupancy of a part of the Project will not alter 
the fact that the one-year warranty for the whole Project starts at the date of Final 
Completion of the whole Project. 
6.5 
FINAL ACCEPTANCE 
6.5.1 
Unless otherwise expressly agreed to in writing by City, Final Acceptance must be obtained 
by no later than 30 Days (60 Days for federally funded contracts) after the date of Substantial 
Completion. Failure to timely obtain Final Acceptance will be a material breach of the 
Contract. 
6.5.2 
Upon receipt of written notice that the Work is ready for final inspection and acceptance, City 
and Contractor will jointly inspect to verify that the remaining items of Work have been 
completed. There will be no partial acceptance. Final Acceptance will not occur until all 
items of Work, including Punch List Items, have been completed to City’s satisfaction as 
reflected in the written Final Acceptance. 
6.5.3 
Final Payment will not be due, owing, or paid by City until Final Acceptance is issued. 
6.5.4 
Landscape Establishment Period. Unless otherwise expressly agreed to in writing by City, the 
Landscape Establishment Period will begin on the date of Final Acceptance of the Project and 
will run 90 Calendar Days thereafter. Landscape Establishment Period requirements are 
detailed in General Conditions Appendices, attached herein. 
6.6 
CONTINUATION OF WORK 
6.6.1 
Permitting Contractor to continue and finish the Work or any part of it after the time fixed 
for its completion (whether milestone, phase, Substantial Completion or Final Acceptance) 
or after the date to which the time fixed for any completion may have been extended, does 
not operate as a waiver by City of any rights under the Contract Documents, law or equity. 
6.6.2 
Furthermore, the timely completion of the Work being of the utmost importance under 
this Contract, notwithstanding the existence of one or more disputes between the parties 
concerning the scope of the Work, the Project Schedule, Contract Time, payments or any

General Conditions 
 
Revised: 10/19/2021 
 
GC-35 of 75 
 
other matter, and further notwithstanding a party’s invocation of the Dispute Resolution 
provisions specified in Appendix 6  of these General Conditions, unless City suspends 
the Contract or Contractor’s performance pursuant to Section 10 of these General 
Conditions, Contractor will continue to prosecute the Work, including any Change Order 
work or Extra Work Orders, in a diligent and timely manner and not stop, slow down or 
impede by action or inaction the progress of the Work, including commencing performance 
of and thereafter completing any additional work called out in any Change Order or Extra 
Work Order issued by Project Manager with the approval of City, so long as City makes 
payment to Contractor in accordance with Section 8 of these General Conditions. 
 
SECTION 7 - CONTRACT PRICE 
7.1 
UNIT PRICE CONTRACTS 
7.1.1 
The Contract Price for all Unit Price Contracts will be the amount set forth in the Contract 
or Change Order multiplied by the verified quantity provided. 
7.1.2 
Measurements of quantities to determine the total Contract Price must be in accordance with 
MAG Specification §§ 109.1 and 109.2. 
7.1.3 
The Unit Price may only be changed as set forth in Section 9 below. 
7.2 
CHANGE ORDERS 
7.2.1 
Unit Price Change Orders.  The Change Order Price for all Unit Price Change Orders will be 
the amount set forth in the Change Order multiplied by the verified quantity provided. 
7.2.2 
Measurements of quantities to determine the total Change Order Price must be in 
accordance with MAG Specifications §§ 109.1 and 109.2. 
7.2.3 
The Unit Price may only be changed as set forth in Section 9 below. 
 
7.2.4 
MAG Specification § 109.4.1 is modified as follows: Before § 109.4.1, the following is added:  
Any deduction or increase in the Contract Price must be supported by a signed, written 
Change Order fully executed by City, and supported by such backup as the Project Manager 
may require. No adjustments in any Unit Prices will be allowed.  Sections 109.4.1(A) and (B) 
and 109.4.2(A) are deleted in their entirety. 
7.3 
SALES TAX 
Contractor is required to pay all applicable sales tax in accordance with the law of the state of 
Arizona and this cost must be included in all Contract Prices.  When equipment, materials or 
supplies generally taxable to Contractor are eligible for a tax exemption due to the nature 
of the Project, Contractor must assist City in applying for and obtaining such tax credits and 
exemptions which will be paid or credited to City.   
 
SECTION 8 - PAYMENT 
8.1 
PAYMENT FOR CONSTRUCTION SERVICES 
8.1.1 
Payment for the Work will be made in accordance with MAG Standard Specification § 109 
as amended below.  
8.1.2 
Contractor must submit to City for review a completed Contractor Payment Request signed

General Conditions 
 
Revised: 10/19/2021 
 
GC-36 of 75 
 
by Contractor, covering the Work completed as of the date of the Request and accompanied 
by such supporting documentation as is required by the Contract Documents and also as 
City may reasonably require.  A Contractor Payment Request will not be considered 
complete unless it is accompanied by an updated Project Schedule and a certification that 
the on-site, red lined, as built Drawings are up to date.  If payment is requested on the basis 
of materials and equipment not incorporated in the Work but delivered and suitably, 
securely stored at the Site or at another location (such as a bonded warehouse) agreed to 
in writing, the Contractor Payment Request must also be accompanied by such data, 
satisfactory to City, as will establish City's title to the material and equipment and protect 
City's interest therein, including applicable insurance. Each subsequent Contractor Payment 
Request must include an affidavit of Contractor stating that all previous progress payments 
received on account of the Work have been applied to discharge in full all of Contractor's 
obligations reflected in prior Contractor Payment Requests.  
8.1.3 
Except for Work performed under a JOC contract, the Contracting Agency will retain 10 
percent of all estimates as a guarantee for complete performance of the Contract in 
accordance with Arizona Revised Statutes Section 34-221 or 34-607.  The Contractor may 
elect to deposit securities in lieu of retention in accordance with Arizona Revised Statutes 
Section 34-221, Paragraph C.5. or 34-607, Paragraph B.5. 
8.1.4 
The payment process functions as follows: Prior to the payment cycle date, Contractor must 
send a draft Contractor Payment Request to Project Manager.  The Project Team will review 
the Request and agree upon any necessary adjustments.  Contractor must certify the final 
Request by signing and returning to Project Manager. 
8.1.5 
When construction of the Project is fifty percent (50%) completed, Contractor may 
request payment of one-half of the retention pursuant to A.R.S. § 34-609(B)(3), subject to all 
of City’s rights to withhold or offset payments, and other rights of City, under the Contract. 
8.1.6 
City reserves the right under A.R.S. § 34-609(B)(3) to reinstate the ten percent (10%) retention 
if City determines that satisfactory progress is not being made. 
8.1.7 
Contractor’s Warranty of Title. 
8.1.7.1 
Contractor warrants and guarantees that title to all Work, materials and equipment covered 
by any Contractor Payment Request, whether incorporated in the Project or not, will pass 
to City at the time of payment, free and clear of all liens, claims, security interests, and 
encumbrances, provided that this will not preclude the Contractor from installing metering 
devices or other equipment of utility companies or municipalities, the title of which is 
commonly retained by the utility company or municipality. 
8.1.7.2 
No materials, supplies, or equipment for the Work under this Contract will be purchased 
subject to any chattel mortgage or under a conditional sale contract or other agreement by 
which an interest therein, or any part thereof, is retained by the seller or supplier. 
8.1.7.3 
Nothing contained in this Section will defeat or impair the right of such persons furnishing 
materials or labor under any bond given by the Contractor for their protection, or any right 
under any law permitting such persons to look to funds due the Contractor in the hands of 
the City. The provisions of this Section must be inserted in all subcontracts and material 
contracts, and notices of its provision must be given to all persons furnishing materials for 
the Work when no formal contract is entered into for such materials.

General Conditions 
 
Revised: 10/19/2021 
 
GC-37 of 75 
 
8.2 
PAYMENT UPON SUBSTANTIAL COMPLETION 
8.2.1 
No payment will be made upon Substantial Completion, except for a regularly-scheduled 
monthly progress payment, as allowed by Section 8.2.2. 
8.2.2 
No further payments will be made to Contractor until Final Acceptance. 
8.3 
FINAL PAYMENT 
8.3.1 
Subject to all of City’s rights to withhold or offset payment, and other rights under the 
Contract, Final Payment including remaining retainage will be paid only after: 
a. Work has been fully completed (including completion of all incorrect or 
incomplete work items) and the written Final Acceptance has been issued by 
City; 
b. Necessary operating manuals, any excess materials and supplies necessary 
for matching materials and supplies incorporated into the Work, 
acceptable sewer video results (if applicable), and complete “as-built” 
Drawings (including the Building Information Model, if required by the 
Contract Documents) have been delivered to City, as specified in this 
Section 8.3; 
c. Full and unconditional lien waivers and releases by Contractor and any 
person performing labor or supplying material, machinery, fixtures, or tools 
for the Work have been delivered to Contractor; 
d. All conditions and requirements imposed by City or any financing entity 
for the corresponding disbursement have been met; and 
e. Contractor delivers to City a Contractor Payment Request requesting Final 
Payment. 
8.3.2 
Contractor must also submit a signed copy of Contractor’s Affidavit Regarding Settlement 
of Claims, Appendix 3 to these General Conditions, and Certificate of Completion, Appendix 7 
to these General Conditions, prior to Final Payment. 
8.3.3 
In addition, if required under the Project Specific Special Provisions, Contractor must 
compile a complete equipment list and maintenance manual to be submitted to City 
as a precondition to Final Payment. The list must include the following items for all 
equipment supplied under the Plumbing, Electrical, Air Conditioning, Elevator, and other 
Special Equipment Specifications: 
a. Name, Model and Manufacturer. 
b. Complete parts lists and Drawings. 
c. Local source of supply for replacement parts along with suppliers’ telephone 
numbers. 
d. Local service organizations serving the equipment and their telephone 
numbers. 
e. All tags, inspection slips, instruction packages, etc., removed from 
equipment must be properly identified as to pieces of equipment from 
which they were taken.

General Conditions 
 
Revised: 10/19/2021 
 
GC-38 of 75 
 
8.3.4 
Contractor must also deliver to City, prior to Final Payment, one (1) digital (in the format 
specified by City), and if requested by City, one (1) hard copy, of any applicable 
Maintenance manuals. Each manual must include all manufacturer’s operation and 
maintenance instructions and “as-built” Drawings with the list herein specified. It must also 
include all other diagrams and instructions necessary to properly operate and maintain the 
equipment, the name, address and telephone number of Contractor and all Subcontractors 
involved. 
8.4 
 CIT Y ’S RIGHT TO WITHHOLD PAYMENT 
City may withhold payment to such extent as may be necessary in City’s opinion to protect 
City from loss for which Contractor is responsible, including, without limitation, if any of 
the following conditions exist: 
a. Defective Work not remedied; 
b. Third party claims filed or reasonable evidence indicating probable filing of 
such claims unless security acceptable to City is provided by Contractor; 
c. Failure of Contractor to make payments properly to Subcontractors or for 
labor, materials or equipment; 
d. Reasonable evidence that the Work cannot be completed for the unpaid 
balance of the Contract Price; 
e. Damage to City or another Contractor; 
f. 
Reasonable evidence that the Work will not be completed within the Contract 
Time, and that the unpaid balance would not be adequate to cover actual or 
liquidated damages for the anticipated delay; 
g. Failure to carry out the Work in accordance with the Contract Documents; or 
h. Contractor is in default of any of its other obligations under the Contract 
Documents. 
8.5 
JOINT/DIRECT CHECKS 
To promote the timely completion and progress of the Work or when appropriate and 
necessary, payments to Contractor may be made  jointly to Contractor and its employees, 
agents, Subcontractors and suppliers, or any of them.  For federally funded contracts, see 
federal provisions for additional requirements for the joint check process. 
8.6 
PAYMENT NOT A WAIVER 
No payment (nor use or occupancy of the Project by City) will be deemed acceptance or 
approval of the Work or as a waiver of any claims, rights, or remedies of City. 
8.7 
LIENS AND BOND CLAIMS 
Contractor must make all payments, in the time required, of all labor and materials 
furnished to Contractor in the course of the Work and must promptly furnish evidence of 
such payments as City may require. Contractor must pay when due all claims arising out of 
performance of the Work covered by this Contract for which a lien may be filed either 
against the real estate or leasehold interest of City, or against payments due from City to 
Contractor, or for which a claim may be made against any payment or performance bond 
or both. To the fullest extent permitted by law, Contractor agrees that no liens or other 
claims in the nature of a lien against the real estate, leasehold, or other interest of City, 
against payment due from City to Contractor, or against any payment or performance

General Conditions 
 
Revised: 10/19/2021 
 
GC-39 of 75 
 
bond, must be filed or made in connection with the Work by any party who has supplied 
professional services, labor, materials, machinery, fixtures, tools, or equipment used in or 
in connection with the performance of this Contract, and Contractor agrees to remove or 
to cause to be removed any such liens or claims in the nature of a lien or bond claim within 
10 Days upon receiving notice or obtaining actual knowledge of the existence of such liens 
or claim. In addition, Contractor agrees to defend, indemnify, and hold harmless City 
from and against any and all such liens and claims. This paragraph does not apply to claims 
and liens of Contractor due to non-payment for work performed. 
8.8 
 FIN AN CI AL R ECORDKE EPI NG AND C IT Y ’S AUD I T RIGHT  
8.8.1 
Records for all Contracts between City and Contractor must, upon reasonable notice, be 
open to inspection and subject to audit, scanning, and reproduction during normal 
business working hours. Such audits may be performed by any City’s representative or any 
outside representative engaged by City for the purpose of examining such records. City or 
its designee may conduct such audits or inspections throughout the term of this Contract 
and for a period of five years after Final Payment or longer if required by law. City’s 
representatives may (without limitation) conduct verifications such as counting employees 
at the Site, witnessing the distribution of payroll, verifying information and amounts through 
interviews and written confirmations with Contractor employees, field and agency labor, 
Subcontractors, and vendors. 
8.8.2 
Contractor’s “records” must include any and all information, materials and data of every kind 
and 
character, including without limitation, records, books, papers, documents, 
subscriptions, recordings, agreements, purchase orders, leases, contracts, commitments, 
arrangements, notes daily diaries, superintendent reports, drawings, receipts, vouchers and 
memoranda, and any and all other agreements, sources of information and matters that 
may in City’s judgment have any bearing on or pertain to any matters, rights, duties or 
obligations under or covered by any Contract Document. Such records must include (hard 
copy, as well as computer readable data if it can be made available), written policies and 
procedures; time sheets; payroll registers; payroll records; cancelled payroll checks; 
subcontract files (including proposals of successful and unsuccessful bidders, bid recaps, 
negotiation notes, etc.); original bid estimates; estimating work sheets; correspondence; 
Change Order files (including documentation covering negotiated settlements); back-
charge logs and supporting documentation; invoices and related payment documentation; 
general ledger, information detailing cash and trade discounts earned, insurance rebates 
and dividends; and any other Contractor records which may have a bearing on matters of 
interest to City or the Project in connection with Contractor’s dealings with City or the 
Project (all foregoing 
hereinafter referred to as “records”) to the extent necessary to 
adequately permit evaluation and verification of any or all of the following: 
a. Compliance with Contract requirements for deliverables; 
b. Compliance with approved Plans and Specifications; 
c. Compliance with § 14.9 below; 
d. Compliance with Contract provisions regarding the pricing of Change Orders; 
e. Accuracy of Contractor representations regarding the pricing of invoices; or 
f. 
Accuracy of Contractor representations related to claims submitted by 
Contractor or any of their employees.

General Conditions 
 
Revised: 10/19/2021 
 
GC-40 of 75 
 
8.8.3 
Contractor must require all payees (examples of payees include Subcontractors, Suppliers, 
Insurance Carriers, etc.) to comply with the provisions of this Section by including the 
requirements hereof in a written Contract Agreement between Contractor and payee. 
Contractor will ensure that all payees (including those entering into lump sum contracts) 
have the same right to audit provisions contained in this contract included in their contracts 
with Contractor. 
8.8.4 
City’s authorized representative(s) (including, without limitation, Project Manager) must have 
reasonable access to Contractor’s facilities, must be allowed to interview all current or former 
employees to discuss matters pertinent to the performance of this contract and must be 
provided adequate and appropriate work space, in order to conduct audits in compliance 
with this Section. 
8.8.5 
If an audit inspection or examination in accordance with this Section, discloses overpricing 
or overcharges to City (of any nature) by Contractor or Contractor’s Subcontractors in excess 
of $100,000 in addition to making adjustments for the overcharges, the reasonable actual 
cost of City’s audit must be reimbursed to City by Contractor. Any adjustments or payments 
which must be made as a result of any such audit or inspection of Contractor’s invoices or 
records must be made within a reasonable amount of time (not to exceed 90 Days) from 
presentation of City’s findings to Contractor. 
8.8.6 
In addition to the normal paperwork documentation Contractor typically furnishes to City, 
Contractor agrees to furnish, upon written request from City, any of the documentation 
necessary for City to exercise its audit rights under this Section 8.8 in computer readable file 
formats (Word, Excel, or .pdf), as City may designate. 
8.8.7 
City, its authorized representative, and the appropriate agency, reserve the right to 
audit Contractor’s records in compliance with local, state or federal policies, statutes 
or at City’s discretion, within three (3) years of Final Acceptance of the Work. 
 
SECTION 9 - CHANGES TO THE CONTRACT 
9.1 
FIELD ORDERS 
City may authorize minor changes in the Work not involving an adjustment in the Contract 
Price or the Contract Times, which are consistent with the overall intent of the Contract 
Documents.  These may be accomplished by a written Field Order on the standard form 
approved and executed by City.  Such Field Orders must be binding and Contractor must 
perform the change promptly. If Contractor believes that a Field Order justifies an increase 
in the Contract Price or Contract Time, Contractor may make a claim therefor as provided 
in Section 7.2. 
9.2 
EXTRA WORK/CHANGES IN THE WORK 
9.2.1 
City reserves the right to make such changes in the Plans and Specifications for the Work, 
as it may deem appropriate and any such change as set forth in a written Change Order 
must be deemed a part of this Contract as if originally incorporated herein. 
9.2.2 
In the event City and Contractor cannot agree on the terms of a Change Order, or 
when circumstances otherwise require, the Project Manager has the authority to direct the 
Contractor to perform extra work, if the work in question is an item not provided for in the 
Contract as awarded. The Project Manager will have the authority to determine, based 
upon factual evidence presented by the Contractor, whether the work in question is an

General Conditions 
 
Revised: 10/19/2021 
 
GC-41 of 75 
 
item not provided for in the Contract as awarded. If the Project Manager directs the 
Contractor to perform extra work, the Project Manager’s instructions will include a price 
that the Contractor cannot exceed in charging the City for the extra work. Upon receipt of 
the Project Manager’s directions to perform extra work, the Contractor must promptly 
proceed with the extra work and document the actual cost thereof. Contractor’s right to 
payment for extra work will be determined under Subsection 9.2.4 below. The Contractor is 
responsible to manage the extra work to ensure that the price limits set by the Project 
Manager are not exceeded. Contractor must perform the extra work and submit 
documentation for the actual cost of the extra work to the City. A Change Order will be 
issued to cover this work. 
9.2.3 
Contractor will not be entitled to payment for extra work unless a written Change Order, in 
form and content prescribed by City, has been executed by City. On all requests for Change 
Orders, Contractor must specify the increased or decreased costs and whether it 
believes any extensions of time will be necessary to complete its Work as modified by the 
Change Order. If extra work is performed under Subsection 9.2.2 above, a corresponding 
Change Order will be prepared, approved and processed by City before payment can be 
made to Contractor. 
9.2.4 
In general, pricing for Change Orders will include the same mark-up percentages that were 
in effect when the Contract was awarded. The cost or credit to the City resulting from a 
change in the Work is subject to Appendix 1 (Policy Statement for Calculating Delays and 
Damages) and will be determined, based on the type of pricing for the Contract involved, as 
follows: 
a. By mutual acceptance of a lump sum properly itemized in a form acceptable 
to City; 
b. By unit prices stated in the Contract Documents; 
c. When the City determines that a Unit Price Book Job Order associated with 
a Job Order Contract requires a Change Order, by using the same Total Cost 
Data and CCI that are in effect when the Change Order is anticipated to be 
issued; or 
d. By actual cost and a percentage fee covering overhead and profit, as follows: 
(i) 
Contractor will perform the extra work and be compensated for actual 
cost of labor, materials and equipment. 
(ii) 
Contractor will have the right to add the fee percentage applicable 
to the Work under the Contract, or if no such fee has been agreed 
to by the parties, not more than five percent (5%) to the 
Subcontractor’s prices for authorized extra work performed solely 
by Subcontractors. Such percentage will include all of Contractor’s 
charges for overhead, profit, administration and supervision. 
(iii) 
Contractor or Subcontractor will have the right to add the fee 
percentage applicable to Work under the Contract for self-performed 
extra work, or if no such fee has been agreed to by the parties, 
Contractor’s or Subcontractor’s maximum total allowable additions 
for overhead, profit, administration and supervision will not exceed 
ten percent (10%) of actual verifiable labor, materials and 
equipment for such self- performed extra work.

General Conditions 
 
Revised: 10/19/2021 
 
GC-42 of 75 
 
9.2.5 
Any agreement which modifies the terms of the Contract (including Change Orders) will 
be approved in writing by the Project Manager. Once properly executed by both parties, 
these modifications to the Contract will have the same effect as if they had been included in 
the original Contract. 
9.3 
ACCURACY OF CHANGE ORDER PRICING INFORMATION 
9.3.1 
Subject to Sections 9.3.2 through 9.3.4, signature by the contracting parties  constitutes full 
accord and satisfaction between City and Contractor for all costs, damages, and expenses 
of whatever kind of nature, including delay, impact or acceleration damages, which may be 
occasioned by a Change Order of other modification of the Contract agreed to in writing. 
9.3.2 
Accurate Change Order Pricing Information: Contractor agrees that it is responsible for 
submitting accurate cost and pricing data to City to support its Fixed Price, Unit Price, or 
Cost Plus Change Order Proposals or other Contract Price adjustments under the 
Contract. Contractor further agrees to submit Change Order proposals with cost and 
pricing data which is accurate, complete, current, and in accordance with the terms of 
the Contract with respect to pricing of change orders. Contractor agrees that any “buy-
out savings” on Change Orders will accrue 100% to Owner. “Buy-out savings” are defined 
as any savings negotiated by the Contractor with a Subcontractor or a Material Supplier 
after receiving approval of a Change Order amount that was designated to be paid to a 
specific Subcontractor or Supplier for the Approved Change Order work. 
9.3.3 
Right to Verify Change Order Pricing Information: Contractor agrees that City, through 
its designated representative, will have the right to examine, copy, and scan the records 
of the Contractor, Subcontractor or Sub-Subcontractor’s records (during the Contract 
period and up to three years after final payment is made on the Contract) to verify the 
accuracy and appropriateness of the pricing data used to price all Change Order 
proposals or claims. Contractor agrees that if City determines the cost and pricing data 
submitted (whether approved or not) was inaccurate, incomplete, not current, or not in 
compliance with the terms of the Contract 
regarding pricing of Change Orders, an 
appropriate Contract Price adjustment will be made. Such post-approval Contact Price 
adjustments will apply to all levels of contractors and Subcontractors and to all types of 
Change Order proposals, specifically including Fixed Price, Unit Price, and Cost Plus Change 
Orders. 
9.3.4 
Requirements for Detailed Change Order Pricing Information: Contractor agrees to 
provide a detailed breakdown of allowable labor and labor burden cost (i.e., base wage 
rate of applicable classifications of workers, payroll taxes, and insurance and benefits 
costs).  This information will be used to evaluate the potential cost of labor and labor burden 
related to Change Order work. It is intended that this information represent an accurate 
estimate of the Contractor’s actual labor and labor burden cost components. Information 
is not intended to establish fixed billing or Change Order pricing labor rates. However, at the 
time Change Orders are priced, the submitted cost data for labor rates may be used to price 
Change Order work. The accuracy of any such agreed upon labor rate cost components 
used to price Change Orders will be subject to later audit. Approved Change Order 
amounts may be adjusted later to correct the impact of inaccurate labor cost 
components if the agreed upon labor cost components are determined to be inaccurate. 
9.4 
EMERGENCIES 
In any emergency affecting the safety of persons or property, Contractor will act, at its

General Conditions 
 
Revised: 10/19/2021 
 
GC-43 of 75 
 
discretion, to prevent threatened damage, injury or loss. Any change in the Contract Price or 
Contract Time resulting from emergency work will be determined as provided in this Section. 
9.5 
DIFFERING SITE CONDITIONS 
9.5.1 
If Differing Site Conditions are encountered at the Project Site, then notice by the observing 
party must be given to the other party promptly before conditions are disturbed (to the extent 
practicable) and in no event later than 14 Days after first observance of the conditions. 
City will promptly investigate such conditions and, if City determines that Differing Site 
Conditions exist and they materially cause an increase in the cost of, or time required for, 
performance of any part of the Work, Contractor will be entitled to equitable adjustment 
in the Contract Price or Construction Schedule (and other time requirements), or both. If it 
is determined by City that the conditions at the Project Site are not Differing Site Conditions 
and no change is justified, then City will so notify Contractor in writing, stating the reasons. 
Claims in opposition to such determination must be made within 14 Days after City has 
given notice of its decision. If City and Contractor cannot agree on an adjustment in the 
Contract Price or Construction Schedule (and other time requirements), the adjustment 
may be submitted to dispute resolution as provided these General Conditions. 
9.6 
CHANGES IN LAWS, REGULATIONS, OR LEGAL REQUIREMENTS OR TAXES 
In the event of a material change in applicable Laws, Regulations, or Legal Requirements, or 
taxes subsequent to the date of the Contract by the parties, Contractor may be entitled 
to a Change Order, in City’s discretion, to the extent Contractor can document to the 
satisfaction of City that such change significantly increases Contractor’s actual cost of 
performance of the Work. 
 
SECTION 10 -SUSPENSION AND TERMINATION 
10.1 
SUSPENSION 
City may suspend the Contract and Contractor’s performance in accordance with MAG 
Specifications § 105.1 and 108.7. 
10.2 
TERMINATION BY THE CITY FOR CAUSE 
10.2.1 
MAG Specifications § 108.11 applies to the Contract. 
10.2.2 
City may also terminate the Contract if City determines, in its sole discretion that Contractor 
has: 
a. After prior written notice, refused or failed to supply enough properly skilled 
workers or proper materials; 
b. After prior written notice, failed to make payment to Subcontractors for 
materials or labor in accordance with the respective agreements between 
Contractor and the Subcontractors; 
c. 
After prior written notice, disregards laws, ordinances, or rules, regulations or 
orders of a public authority having jurisdiction;  
d. After prior written notice, repeatedly failed to comply with written directives 
from City; 
e. Is adjudged as bankrupt or insolvent; 
f. 
Made a general assignment for the benefit of creditors;

General Conditions 
 
Revised: 10/19/2021 
 
GC-44 of 75 
 
g. Appointed a trustee or receiver for itself or any of its property; 
h. Filed a petition to take advantage of any debtor's act, or to reorganize under 
the bankruptcy or similar laws; or 
i. 
Otherwise breached a provision of the Contract Documents or any other 
contract between City and Contractor. 
10.2.3 
When any of the above reasons exist, City may terminate the Contract, without prejudice to 
any other rights or remedies of City, after giving Contractor and Contractors’ surety, if any, 
7 Days written notice of City’s intent to terminate the Contract and Contractor’s failure to 
cure any such reasons. Upon such termination, City may: (1) take possession of the Site 
and of all materials thereon owned by Contractor; or (2) finish the Work by whatever 
reasonable method City may deem expedient. When City terminates the Contract for one of 
the reasons state above, Contractor will not be entitled to receive further payment until the 
Work is finished. If the unpaid balance of the Contract Price existing at the time of such 
termination exceeds the costs and expenses of finishing the Work and any other damages 
incurred by City, such excess will be paid to Contractor. If such costs, expenses and damages 
exceed such unpaid balance, Contractor must pay the difference to City. This obligation 
for payment will survive termination of the Contract. 
10.3 
TERMINATION BY CITY FOR CONVENIENCE 
City may also terminate the Contract at any time for its convenience upon 7 Days written 
notice to Contractor specifying the termination date. In the event of termination which is 
not the fault, in whole or in part, of Contractor, City will pay to Contractor only such 
compensation, including reimbursable expenses, due for Work properly performed on 
the Project prior to the termination date. Upon any termination of the Contract, no further 
payments will be due from City to Contractor. 
10.4 
A.R.S. § 38-511 
The Contract is subject to, and may be terminated by City in accordance with, the provisions 
of A.R.S. § 38-511. 
 
SECTION 11 -INSURANCE AND BONDS 
11.1 
INSURANCE REQUIREMENTS 
11.1.1 
After Contract award, the Contractor must furnish the City a certificate of insurance on a 
standard insurance industry ACORD form.  The ACORD form must be issued by an insurance 
company authorized to transact business in the State of Arizona possessing a current A.M. 
Best, Inc. rating of A-7, or better and legally authorized to do business in the State of Arizona 
with policies and forms satisfactory to City.  Provided, however, the A.M. Best rating 
requirement may not be deemed to apply to required Worker’s Compensation coverage. 
11.1.2 
The Contractor and any of its Subcontractors must procure and maintain, until all of their 
obligations have been discharged, including any warranty periods under this Contract are 
satisfied, the insurances set forth below. 
11.1.3 
The insurance requirements set forth below are minimum requirements for this Contract 
and in no way limit the indemnity covenants contained in this Contract. 
11.1.4 
The City in no way warrants that the minimum insurance limits contained in this Contract 
are sufficient to protect Contractor from liabilities that might arise out of the performance

General Conditions 
 
Revised: 10/19/2021 
 
GC-45 of 75 
 
of the Contract services under this Contract by Contractor, its agents, representatives, 
employees, or Subcontractors and the Contractor is free to purchase any additional 
insurance as may be determined necessary. 
11.1.5 
Failure to demand evidence of full compliance with the insurance requirements in this 
Contract or failure to identify any insurance deficiency will not relieve the Contractor from, 
nor will it be considered a waiver of its obligation to maintain the required insurance at all 
times during the performance of this Contract. 
11.1.6 
Use of Subcontractors:  If any Work is subcontracted in any way, the Contractor must 
execute a written agreement with Subcontractor containing the same Indemnification 
Clause and Insurance Requirements as the City requires of the Contractor in this Contract.  
The Contractor is responsible for executing the Contract with the Subcontractor and 
obtaining Certificates of Insurance and verifying the insurance requirements. 
11.2 
MINIMUM SCOPE AND LIMITS OF INSURANCE 
11.2.1 
The Contractor must provide coverage with limits of liability not less than those stated 
below. 
11.2.1.1 
Commercial General Liability-Occurrence Form.  Contractor must maintain “occurrence” 
form Commercial General Liability insurance with a limit of not less than $2,000,000 for each 
occurrence, $4,000,000 aggregate.  Said insurance must also include coverage for products 
and completed operations, independent contractors, personal injury and advertising injury. 
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess 
insurance must be “follow form” equal or broader in coverage scope than underlying 
insurance. 
11.2.1.2 
Automobile Liability-Any Automobile or Owned, Hired and Non-Owned Vehicles.  Contractor 
must maintain Business/Automobile Liability insurance with a limit of $1,000,000 each 
accident on Contractor owned, hired, and non-owned vehicles assigned to or used in the 
performance under this Contract.  If any Excess or Umbrella insurance is utilized to fulfill 
the requirements of this paragraph, the Excess  or Umbrella insurance must be “follow 
form” equal or broader in coverage scope than underlying insurance. 
11.2.1.3 
Workers Compensation and Employers Liability Insurance.  Contractor must maintain 
Workers Compensation insurance to cover obligations imposed by federal and state 
statutes having jurisdiction of Contractor employees engaged in the performance of Work 
under this Contract and must also maintain Employers’ Liability insurance of not less than 
$1,000,000 for each accident and $1,000,000 disease for each employee.  
11.2.1.4 
Builders’ Risk/Installation Floater Insurance.  The Contractor bears all responsibility for loss 
to all equipment or Work under construction.  Unless waived in writing by the City the 
Contractor will purchase and maintain in force Builders’ Risk/Installation Floater insurance 
on the entire Work until completed and accepted by the City.  This insurance will be Special 
Causes of Loss policy form, (minimally including perils of fire, flood, lightning, explosion, 
windstorm and hail, smoke, aircraft and vehicles, riot and civil commotion, theft, vandalism, 
malicious mischief, and collapse), completed value, replacement cost policy form equal to 
the contract price and all subsequent modifications.  The Contractor’s Builders’ 
Risk/Installation Floater insurance must be primary and not contributory. 
a. Builders’ Risk/Installation Floater insurance must cover the entire Work

General Conditions 
 
Revised: 10/19/2021 
 
GC-46 of 75 
 
including reasonable compensation for architects and engineers’ services 
and expenses and other “soft costs” made necessary by an insured loss.  
Builders’ Risk/Installation Floater insurance must provide coverage from the 
time any covered property comes under the Contractor’s control and or 
responsibility, and continue without interruption during course of 
construction, renovation and or installation, including any time during which 
any Project property or equipment is in transit, off Site, or while on Site for 
future use or installation.  Insured property must include, but not be limited 
to, scaffolding, false work, and temporary buildings at the Site.  This 
insurance must also cover the cost of removing debris, including demolition 
as may be legally required by operation of any law, ordinance, regulation or 
code. 
b. The Contractor must also purchase and maintain Boiler and Machinery 
insurance with the same requirements as Builders’ Risk/Installation Floater 
insurance cited above if the Work to be performed involves any exposures 
or insurable property normally covered under a Boiler and Machinery 
insurance policy or made necessary as required by law or testing 
requirements in the performance of this Contract/Agreement.  The 
Contractor will be responsible for any and all deductibles under these 
policies and the Contractor waives all rights of recovery and subrogation 
against the City under the Contractor- Builders’ Risk/Installation Floater 
insurance described herein. 
c. Builders’ Risk/Installation Floater Insurance must be maintained until 
whichever of the following first occurs: (i) final payment has been made; or, 
(ii) until no person or entity, other than the City, has an insurable interest in 
the property required to be covered. 
d. The Builders’ Risk/Installation Floater insurance must be endorsed so that 
the insurance will not be canceled or lapse because of any partial use or 
occupancy by the City. 
e. The Builders Risk/Installation Floater insurance must include as named 
insureds, the City, the Contractor, and all tiers of Subcontractors and others 
with an insurable interest in the Work who will be named as additional 
insureds unless they are able to provide the same level of coverage with the 
City and Contractor named as additional insureds. Certificates must contain 
a provision that the insurance will not be canceled or materially altered 
without at least 30 Days advance notice to the City.  The City must also be 
named as a Loss Payee under the Builders’ Risk/Installation Floater coverage. 
f. 
The Builders Risk/Installation Floater insurance must be written using the 
Special Causes of Loss policy form, replacement cost basis. 
g. All rights of subrogation under the Builders Risk/Installation Floater 
insurance are, by this Contract/Agreement, waived against the City, its 
officers, officials, agents and employees. 
h. The Contractor is responsible for payment of all deductibles under the 
Builders’ Risk/Installation Floater insurance policy. 
11.2.1.5 
Pollution Liability Insurance (Including Errors and Omissions).  For Job Orders, Pollution 
Liability Insurance is only required if applicable and determined on a project specific basis.

General Conditions 
 
Revised: 10/19/2021 
 
GC-47 of 75 
 
Contractor must maintain Pollution Liability Insurance with a limit of not less than 
$5,000,000 per loss, $5,000,000 aggregate for losses caused by pollution conditions 
including coverage for bodily injury, property damage, defense costs, clean-up costs, and 
completed operations that arise from the operations of Contractor as described in this 
Contract.  
a. The policy must provide for complete professional service coverage, 
including coverage for pollution liability that is a result of a breach of 
professional duties. 
b. The policy must provide for protection again claims for third-party bodily 
injury, property damage, or environmental damage caused for pollution 
conditions resulting from general contracting activities for which Contractor 
is legally liable. 
c. The policy must provide for cleanup costs when mandated by governmental 
entities, when required by law, or as a result of third-party claims. 
d. Completed Operations Coverage must be kept in place for up to the statute 
of repose. 
e. The policy must be endorsed to include the following additional insured 
language: “City, its elected officials, trustees, employees, agents, and 
volunteers must be named as additional insureds with respect to liability 
arising out of the activities performed by, or on behalf of Contractor”.   
f. 
If Work under this Contract requires the transportation of any hazardous 
material or regulated substances, Contractor must carry Auto Liability with a 
CA 9948 endorsement or equivalent.   
g. If Work under this Contract requires the disposal of any hazardous materials 
from the job site, Contractor must obtain a certificate of insurance for 
Pollution Legal Liability from the disposal site operator with a limit of not less 
than $5,000,000 per loss, $5,000,000 aggregate. 
11.3 
ADDITIONAL POLICY PROVISIONS REQUIRED 
11.3.1 
Self-Insured Retentions or Deductibles.  Any self-insured retentions and deductibles must 
be declared and approved by the City.  If not approved, the City may require that the insurer 
reduce or eliminate any deductible or self-insured retentions with respect to the City, its 
officers, officials, agents, employees, and volunteers. 
11.3.2 
The Contractor’s insurance must contain broad form contractual liability coverage. 
11.3.3 
The Contractor's insurance coverage must be primary insurance with respect to the City, its 
officers, officials, agents, and employees.  Any insurance or self-insurance maintained by 
the City, its officers, officials, agents, and employees will be in excess of the coverage 
provided by the Contractor and must not contribute to it. 
11.3.4 
The Contractor's insurance must apply separately to each insured against whom claim is 
made or suit is brought, except with respect to the limits of the insurer's liability. 
11.3.5 
Coverage provided by the Contractor must not be limited to the liability assumed under the 
indemnification provisions of this Contract.

General Conditions 
 
Revised: 10/19/2021 
 
GC-48 of 75 
 
11.3.6 
The policies must contain a severability of interest clause and waiver of subrogation against 
the City, its officers, officials, agents, and employees, for losses arising from Work 
performed by the Contractor for the City. 
11.3.7 
The Contractor, its successors and or assigns, are required to maintain Commercial General 
Liability insurance as specified in this Contract for a minimum period of 3 years following 
completion and acceptance of the Work.  The Contractor must submit a Certificate of 
Insurance evidencing Commercial General Liability insurance during this 3 year period 
containing all the Contract insurance requirements, including naming the required 
Additional Insureds set forth herein. 
11.3.8 
If a Certificate of Insurance is submitted as verification of coverage, the City will reasonably 
rely upon the Certificate of Insurance as evidence of coverage but this acceptance and 
reliance will not waive or alter in any way the insurance requirements or obligations of this 
Contract.   
11.3.9 
Insurance Cancellation During Contract Term.   
11.3.9.1 
If any of the required policies expire during the life of this Contract, the Contractor must 
forward renewal or replacement Certificates to the City within 10 Days after the renewal 
date containing all the required insurance provisions. 
11.3.9.2 
Each insurance policy required by the insurance provisions of this Contract must provide 
the required coverage and must not be suspended, voided or canceled except after 30 Days 
prior written notice has been given to the City, except when cancellation is for non-payment 
of premium, then 10 Days prior notice may be given.  Such notice must be sent directly to 
Chandler Law-Risk Management Department, Post Office Box 4008, Mailstop 628, Chandler, 
Arizona  85225. If any insurance company refuses to provide the require notice, the 
Contractor or its insurance broker must notify the City of any cancellation, suspension, non-
renewal of any insurance within 7 Days of receipt of insurers’ notification to that effect. 
11.3.10 
City as Additional Insured.  The above-referenced policies are to contain, or be endorsed to 
contain, the following provisions: 
11.3.10.1 
The Commercial General Liability and Automobile Liability policies are to contain, or be 
endorsed to contain, the following provisions:  The City, its officers, officials, agents, and 
employees are additional insureds with respect to liability arising out of activities performed 
by, or on behalf of, the Contractor including the City's general supervision of the Contractor; 
Products and Completed Operations of the Contractor; and automobiles owned, leased, 
hired, or borrowed by the Contractor. 
11.3.10.2 
The City, its officers, officials, agents, and employees must be additional insureds to the full 
limits of liability purchased by the Contractor even if those limits of liability are in excess of 
those required by this Contract. 
11.4 
BONDS AND OTHER PERFORMANCE SECURITY 
11.4.1 
After Contract award, Contractor must provide a Performance Bond and a Payment Bond, 
each in an amount equal to the full amount of the Contract Price. 
11.4.2 
Each such bond must be executed by a surety company or companies holding a Certificate 
of Authority to transact surety business in the State of Arizona, issued by the Director of the 
Arizona Department of Insurance and must be named in the current list of "Companies

General Conditions 
 
Revised: 10/19/2021 
 
GC-49 of 75 
 
Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable 
Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff Bureau of 
Accounts, U.S. Treasury Department. A copy of the Certificate of Authority must accompany 
the bonds. The Certificate must have been issued or updated within two (2) years prior to 
the execution of this Agreement. The bonds must be written or countersigned by an 
authorized representative of the surety who is either a resident of the state of Arizona or 
whose principal office is maintained in this state, as by law required. 
11.4.3 
The bonds must be made payable and be acceptable to City. The bond forms for the 
performance and payment bonds must be in the forms required under A.R.S. § 34-221, et. 
Seq., as in Appendices 4  and 5 of these General Conditions. 
11.4.4 
Upon the request of any person or entity appearing to be a potential beneficiary of bonds 
covering payment of obligations arising under the Contract Documents, Contractor must 
promptly furnish a copy of the bonds or must permit a copy to be made. 
11.4.5 
All bonds submitted for this Project must be provided by a company which has been rated AM 
Best rating of A- or better for the prior four quarters by the latest edition of the ‘Results 
Best’s Key Rating Guide (Property/Casualty)” published by the A.M. Best Company. 
11.4.6 
Personal or individual bonds are not acceptable. 
11.4.7 
If the surety on any Bond furnished by Contractor is declared a bankrupt or becomes 
insolvent, or Contractor’s right to do business is terminated in any state where any part of 
the Project is located, or it ceases to meet the requirements of this Section 11.4, Contractor 
must within 5 Days thereafter substitute another Bond and surety, both of which must be 
acceptable to City. 
 
SECTION 12 - INDEMNIFICATION 
12.1 
To the extent permitted by law, the Contractor and its owners, officers, directors, agents, 
employees, and subconsultants (collectively "lndemnitor") must indemnify, save, and hold 
harmless the City and its officers, officials, agents, and employees (collectively "lndemnitee") 
from any and all claims, actions, liabilities, damages, losses, or expenses (including court 
costs, attorneys' fees, and costs of claim processing, investigation, and litigation) (collectively 
"Claims") caused or alleged to be caused, in whole or in part, by the negligent, reckless, 
wrongful, or willful acts, errors, or omissions of Indemnitor in connection with this 
Agreement. This indemnity includes any Claim or amount arising out of or recovered under 
workers' compensation laws or on account of Indemnitor's failure to conform to any federal, 
state, or local law, statute, ordinance, rule, regulation, or court decree. Indemnitor must 
indemnify lndemnitee from and against any and all Claims, except those arising solely from 
lndemnitee's own negligent, reckless, wrongful, or willful acts, errors, or omissions. 
Indemnitor is responsible for primary loss investigation, defense, and judgment costs where 
this indemnification applies. In consideration of the award of this Agreement, Indemnitor 
agrees to waive all rights of subrogation against lndemnitee for losses arising from or 
related to this Agreement. Indemnitor's obligations under this provision survive the 
termination or expiration of this Agreement. 
 
SECTION 13 -DISPUTE RESOLUTION 
13.1 
All disputes arising out of or relating to the Contract, the Work or the Project, other than 
termination under Section 10, will be resolved pursuant to the Dispute Resolution

General Conditions 
 
Revised: 10/19/2021 
 
GC-50 of 75 
 
process set forth in Appendix 6 of these General Conditions, and not pursuant to MAG 
Specifications § 110. 
13.2 
Contractor agrees that during any dispute between the parties, Contractor will continue to 
perform its obligations under the Contract until such dispute is resolved. 
13.3 
Notwithstanding any other provision in this Contract, City has the right to immediately file in 
court and pursue an action for a temporary restraining order and injunctive relief against 
Contractor if City determines that such action is necessary to protect its interests under the 
Contract, to obtain specific performance of any provision of the Contract, to advance the 
completion of the Project, or to protect health, welfare and safety. 
 
 
SECTION 14 - MISCELLANEOUS PROVISIONS 
14.1 
CONTRACT DOCUMENTS 
14.1.1 
The Contract Documents are intended to permit the parties to complete the Work 
and all obligations required by the Contract Documents within the Contract Times for the 
Contract Price. The Contract Documents are intended to be complementary and interpreted 
in harmony so as to avoid conflict, with words and phrases interpreted in a manner 
consistent with construction and design industry standards. 
14.1.2 
It is the intent of the Contract Documents to describe a functionally complete Project (or 
part thereof) to be constructed in accordance with the Contract Documents.  Any labor, 
documentation, services, materials, or equipment that may reasonably be inferred from the 
Contract Documents or from prevailing custom or trade usage as being required to produce 
the intended result must be provided by Contractor whether or not specifically called for at 
no additional cost to City.   
14.1.3 
The Contract Documents establish the rights and obligations of the parties and include the 
Contract, Addenda (which pertain to the Contract Documents), Contractor's Bid or Proposal 
(including documentation accompanying the Bid and any post-Bid documentation 
submitted prior to Contract award) when attached as an exhibit to the Contract, the 
accepted Project Schedule, the Notice to Proceed, the Performance Bond, the Payment 
Bond, Project Design, Engineering and Specifications, these General Conditions, the Project 
Specific Special Provisions, Technical Specifications, Contract Drawings, as the same may be 
more specifically identified in the Contract, Change Orders, Work Change Directives, Field 
Orders and the written interpretations and clarifications of the Design Professional or City 
representative and Modifications issued after execution of the Contract.  Approved Shop 
Drawings and the reports and drawings of subsurface and physical conditions are not 
Contract Documents.   
14.1.4 
In the event of any inconsistency, conflict, or ambiguity between or among the Contract 
Documents, the Contract Documents will take precedence as follows from highest to lowest: 
Change Orders, Addenda, Contract, Project Specific Special Provisions, General Conditions, 
Technical Specifications, Drawings/Plans, Chandler Amendments to MAG Standard 
Specifications and Chandler Standard Details, and MAG Uniform Standard Specifications 
and Details for Public Works Construction.  If applicable to this Contract, Federal Provisions 
prevail. 
14.1.5 
On the Drawings, given dimensions will take precedence over scaled measurements and

General Conditions 
 
Revised: 10/19/2021 
 
GC-51 of 75 
 
large scale drawings over small-scale drawings.  
14.1.6 
Clarifications and interpretations of the Contract Documents will be issued by the Design 
Professional through the City. 
14.1.7 
The headings used in this Agreement or any other Contract Documents, are for ease of 
reference only and must not in any way be construed to limit or alter the meaning of any 
provision. 
14.1.8 
The Contract Documents form the entire agreement between City and Contractor. No 
oral representations or other agreements have been made by the parties except as 
specifically stated in the Contract Documents. 
14.1.9 
The Contract Documents may not be changed, altered, or amended in any way except in 
writing signed by a duly authorized representative of each party in the form of a Change 
Order. 
14.1.10 
Re-Use of Documents.  Neither Contractor nor any Subcontractor, manufacturer, fabricator, 
supplier or distributor will have or acquire any title to or ownership rights in any of the 
Drawings, Specifications or other documents (or copies of any thereof) prepared by or 
bearing the seal of the Design Professional; and they must not re-use any of them on 
extensions of the Project or any other project without written consent of City and the Design 
Professional and specific written verification or adaptation by the Design Professional. 
14.2 
REFERENCE STANDARDS 
14.2.1 
Reference to standards, specifications, manuals, or codes of any technical society, 
organization, or association, or to Laws or Regulations, whether such reference be specific 
or by implication, will mean the standard, specification, manual, code, or Laws or 
Regulations in effect at the time of opening of Bids (or on the Effective Date of the Contract 
if there were no Bids), except as may be otherwise specifically stated in the Contract 
Documents. 
14.2.2 
The provisions of any such standard, specification, manual or code, or any instruction of a 
Supplier will not change the duties or responsibilities of City, Contractor, Design 
Professional or Project Manager, or any of their Subcontractors, consultants, agents, or 
employees from those set forth in the Contract Documents, nor will any such provision or 
instruction assign to City, Contractor, Design Professional, or any of their agents, or 
employees any duty or authority to supervise or direct the performance of the Work or any 
duty or authority to undertake responsibility inconsistent with the provisions of the 
Contract Documents. 
14.3 
COMPLIANCE WITH ARIZONA LAW AND FEDERAL LAW 
14.3.1 
Compliance with A.R.S. § 41-4401.  Pursuant to the provisions of A.R.S. § 41-4401, the 
Contractor hereby warrants to the City that the Contractor and each of its subcontractors 
(“Subcontractors”) must comply with all Federal Immigration laws and regulations that 
relate to the immigration status of their employees and the requirement to use E-Verify set 
forth in A.R.S. §23-214(A).   
14.3.2 
A breach of the Contractor Immigration Warranty constitutes a material breach of this 
Contract and subject to penalties up to and including termination of this Contract.

General Conditions 
 
Revised: 10/19/2021 
 
GC-52 of 75 
 
14.3.3 
The City retains the legal right to inspect the papers of any Contractor or Subcontractor 
employee who works on this Contract to ensure that the Contractor or Subcontractor is 
complying with the Contractor Immigration Warranty.  The Contractor agrees to assist the 
City in the conduct of any such inspections.  
14.3.4 
The City may, at its sole discretion, conduct random verifications of the employment records 
of the Contractor and any Subcontractors to ensure compliance with Contractors 
Immigration Warranty.  The Contractor agrees to assist the City in performing any such 
random verifications.  
14.3.5 
The provisions of this Article must be included in any contract the Contractor enters into 
with any and all of its subcontractors who provide services under this Contract or any 
subcontract.  “Services” are defined as furnishing labor, time or effort in the State of Arizona 
by a contractor or subcontractor.  Services include construction or maintenance of any 
structure, building or transportation facility or improvement to real property.  
14.4 
HAZARDOUS ENVIRONMENTAL CONDITIONS 
14.4.1 
Contractor will not be responsible for any Hazardous Environmental Condition uncovered 
or revealed at the Site which was not shown or indicated in Drawings or Specifications or 
identified in the Contract Document to be within the scope of the Work.  Contractor will be 
responsible for a Hazardous Environmental Condition created with any materials brought 
to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is 
responsible. 
14.4.2 
If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone 
for whom Contractor is responsible creates a Hazardous Environmental Condition. 
Contractor must immediately:  
a. Secure or otherwise isolate such condition; 
b. Stop all Work in connection with such condition and in any area affected 
thereby; and 
c. Notify City and promptly thereafter confirm such notice in writing. 
14.4.3 
City will promptly retain a qualified expert to evaluate such condition or take corrective 
action, if any. 
14.4.4 
Contractor will be responsible for any and all civil or criminal penalties, fines, damages, or 
other charges imposed by any regulatory agency or court for sewage discharges that are in 
violation of applicable statutes and laws and that are a result, direct or indirect, of work 
performed under this Contract.  Contractor will also be responsible for reimbursement to 
City for administration, reporting, and tracking expenses required as a result of any spill 
event.  In the event the regulatory agency or court imposes a probationary period, 
Contractor must post bond for the probationary period to ensure that all such costs are 
reimbursed to City.  This responsibility will apply whether penalties are imposed directly on 
Contractor or any of its Subcontractors, or the City of Chandler.  Contractor must defend 
and indemnify City against such penalties.  Regulatory agencies may include, but are not 
limited to, the Arizona Department of Environmental Quality (ADEQ) and the United States 
Environmental Protection Agency (USEPA). 
14.5 
COOPERATION AND FURTHER DOCUMENTATION

General Conditions 
 
Revised: 10/19/2021 
 
GC-53 of 75 
 
Contractor agrees to provide City such other duly executed documents as may be 
reasonably requested by City to implement the intent of the Contract Documents. 
14.6 
ASSIGNMENT 
Neither Contractor nor City will, without the written consent of the other assign, transfer or 
sublet any portion of this Agreement or part of the Work or the obligations required by 
the Contract Documents, any such assignment will be void, will transfer no rights to the 
purported assignee, and would be a material breach of the Contract. 
14.7 
SUCCESSORS 
Contractor and City intend that the provisions of the Contract Documents are binding upon 
the parties, their employees, agents, heirs, successors and assigns. 
14.8 
LAWFUL PRESENCE 
Pursuant to A.R.S. §§ 1-501 and 1-502, City is prohibited from awarding a contract to any 
natural person who cannot establish that such person is lawfully present in the United 
States.  To establish lawful presence, a person must produce qualifying identification and 
sign a City-provided affidavit affirming the identification provided is genuine.  This 
requirement will be imposed at the time of contract award.  This requirement does not 
apply to business organizations such as corporations, partnerships, or limited liability 
companies. 
14.9 
NO BOYCOTT OF ISRAEL CERTIFICATION 
By Contractor's signature on this Contract, Contractor certifies under A.R.S. § 35-393.01 that 
Contractor is not currently engaged in and for the duration of this Contract will not engage 
in a boycott of Israel. 
14.10 
NO THIRD PARTY BENEFICIARY 
Nothing under the Contract Documents will be construed to give any rights or benefits in 
the Contract Documents to anyone other than City and Contractor, and all duties and 
responsibilities undertaken pursuant to the Contract Documents will be for the sole and 
exclusive benefit of City and Contractor and not for the benefit of any other party, unless 
otherwise expressly set forth in the Contract Documents. 
14.11 
GOVERNING LAW AND VENUE 
The Agreement and all Contract Documents will be deemed to be made under, and will 
be construed in accordance with and governed by the laws of the State of Arizona without 
regard to the conflicts or choice of law provisions thereof.  Any court action to enforce any 
provision of the Contract or to obtain any remedy with respect hereto must be brought 
in the Superior Court, Maricopa County, Arizona, and for this purpose, each party hereby 
expressly and irrevocably consents to the jurisdiction and venue of such Court. 
14.12 
SEVERABILITY 
If any provision of the Contract Documents or the application thereof to any person or 
circumstance will be invalid, illegal or unenforceable to any extent, the remainder of the 
affected provision, the remainder of the Contract Documents, and the application 
thereof will not be affected and will be enforceable to the fullest extent permitted by law. 
14.13 
LEGAL REQUIREMENTS 
At all times relevant to its entry into this Contract and performance of the Services and 
the Work, Contractor must fully comply with all Laws, Regulations, or Legal Requirements 
applicable to City, the Project, and the Contract, including, without limitation, those set

General Conditions 
 
Revised: 10/19/2021 
 
GC-54 of 75 
 
forth on Exhibit C of the Contract. 
14.14 
PARTIAL INVALIDITY 
If any provision of the Contract is held by a court of competent jurisdiction to be invalid, 
void or unenforceable, the remaining provisions will nevertheless continue in full force 
without being impaired or invalidated in any way. 
14.15 
ATTORNEYS' FEES 
Should either party to the Contract bring an action to enforce any provision of the Contract, 
the prevailing party will be entitled to recover reasonable attorneys' fees and costs in 
connection therewith. 
14.16 
CONFLICT OF INTEREST 
14.16.1 
Contractor agrees to disclose any financial or economic interest with the Project property, 
or any property affected by the Project, existing prior to the execution of the Contract. 
Further, Contractor agrees to disclose any financial or economic interest with the Project 
property, or any property affected by the Project, if Contractor gains such interest during 
the course of this Contract. If Contractor gains financial or economic interest in the Project 
during the course of this Contract, this may be grounds for terminating this Contract. Any 
decision to terminate the Contract must be at the sole discretion of City. 
14.16.2 
Contractor will not engage the services on this Contract of any present City employee who 
was involved as a decision maker in the selection or approval processes, or who negotiated 
or approved billings or Contract Modifications for this Contract. 
14.16.3 
Contractor agrees that it will not perform services on this Project for a contractor, 
subcontractor, or any supplier, not covered under this Contract. 
14.17 
INDEPENDENT CONTRACTOR 
Contractor is and must be an independent contractor. Any provisions in the Contract 
Documents that may appear to give City the right to direct Contractor as to the details of 
accomplishing the Work or to exercise a measure of control over the Work means that 
Contractor must follow the wishes of City as the results of the Work only. These results 
must comply with all applicable laws and ordinances. 
14.18 
NOTICE OF INJURY 
Should City or Contractor suffer injury or damage to their person or property because of 
any error, omission or act of the other party or of any of the other party's employees or 
agents or others for whose acts the other party is legally liable, claim must be made in 
writing to the other party within 7 Days of the first observance of such injury or damage. 
14.19 
CONFIDENTIALITY 
Contractor, for the benefit of City, hereby agrees it will not release or cause or permit 
to be released to the public any press notices, publicity (oral or written) or advertising 
promotion relating to, any statement regarding, or any other public announcement or 
disclosure or cause or permit to be publicly announced or disclosed, in any manner 
whatsoever, the specific terms and conditions of this Agreement or any comment relating 
to the Project or the Site. Notwithstanding the foregoing, Contractor will be entitled to 
disclose the terms of the Agreement to the extent required by law or in the course of 
enforcing or defending a claim or action hereunder. Contractor must give City reasonably 
prompt notice of any disclosure or statement made pursuant to this provision.

General Conditions 
 
Revised: 10/19/2021 
 
GC-55 of 75 
 
14.20 
DATA CONFIDENTIALITY 
14.20.1 
As used in the Contract, “data” means all information, whether written or verbal, including 
plans, specifications, renderings, photographs, studies, investigations, audits, analyses, 
samples, reports, calculations, internal memos, meeting minutes, data field notes, work 
product, proposals, correspondence and any other similar documents or information 
prepared by, obtained by, or transmitted to the City in the performance of this Contract. 
14.20.2 
Contractor agrees that all data, regardless of form, including originals, images, and 
reproductions, prepared by, obtained by, or transmitted to City in connection with the 
Contractor’s performance of this Contract is confidential and proprietary information 
belonging to City. 
14.20.3 
Except as specifically provided in this Contract, Contractor or its Subcontractors must not 
divulge data to any third party without prior written consent of City.  Contractor or its 
Subcontractors must not use data for any purposes except to perform Work required under 
this Contract.  These prohibitions will not apply to the following data provided Contractor 
has first given the required notice to City: 
a. Data which was known to Contractor or its Subcontractors prior to its 
performance under this Contract unless such data was acquired in 
connection with Work performed for City; 
b. Data which was acquired by Contractor or its Subcontractors in its 
performance under this Contract and which was disclosed to Contractor or 
its Subcontractors by a third party, who to the best of Contractor’s or its 
Subcontractor’s knowledge and belief, had the legal right to make such 
disclosure and Contractor or its Subcontractors are not otherwise required 
to hold such data in confidence; or  
c. Data which is required to be disclosed by virtue of law, regulation, or court 
order, to which the Contractor or its Subcontractors are subject. 
14.20.4 
In the event the Contractor or its Subcontractors are required or requested to disclose data 
to a third party, or any other information to which the Contractor or its Subcontractors 
became privy as a result of any other contract with City, the Contractor must first notify City 
as set forth in this Section of the request or demand for the data.  The Contractor or its 
Subcontractors must give City sufficient facts so that City can be given an opportunity to 
first give its consent or take such action that City may deem appropriate to protect such 
data or other information from disclosure. 
14.20.5 
Unless prohibited by law, within 10 Days after completion of services for a third party on 
real or personal property owned or leased by City, the Contractor must promptly deliver, as 
set forth in this Section, a copy of all data to City.  All data will continue to be subject to the 
confidentiality agreements of this Contract.  
14.20.6 
Contractor or its Subcontractors assume all liability for maintaining the confidentiality of 
the data in its possession and agree to compensate City if any of the provisions of this 
Section are violated by Contractor, its employees, agents, or Subcontractors.  Solely for the 
purposes of seeking injunctive relief, it is agreed that a breach of this Section will be deemed 
to cause irreparable harm that justified injunctive relief in court.  Contractor agrees that the 
requirements of this Section will be incorporated into all subcontracts entered into by 
Contractor.  A violation of this Section may result in immediate termination of this Contract

General Conditions 
 
Revised: 10/19/2021 
 
GC-56 of 75 
 
without notice.   
14.21 
SURVIVAL 
All warranties, representations and indemnifications by Contractor must survive the 
completion or termination of this Agreement. 
14.22 
COVENANTS AGAINST CONTINGENT FEES 
Contractor warrants that no person has been employed or retained to solicit or secure 
this Agreement upon an agreement or understanding for a commission, percentage, 
brokerage, or contingent fee, and that no member of City Council, or any employee of 
City has any interest, financially, or otherwise, in the firm. For breach or violation of this 
warrant, City will have the right to annul the Contract without liability or at its discretion to 
deduct from the Contract Price or consideration, the full amount of such commission, 
percentage, brokerage, or contingent fee. 
14.23 
NO WAIVER 
The failure of either party to enforce any of the provisions of the Contract Documents or to 
require performance of the other party of any of the provisions hereof must not be construed 
to be a waiver of such provisions, nor will it affect the validity of the Contract Documents or 
any part thereof, or the right of either party to thereafter enforce each and every provision. 
14.24 
NONEXCLUSIVE REMEDIES 
The remedies set forth in this Contract are cumulative and not exclusive, and failure to 
exercise any remedy (including, without limitation, any right to terminate) will not preclude 
any party from exercising any other right in seeking any other remedy available to it at law 
or in equity. 
14.25 
PROJECT COMMUNICATIONS 
14.25.1 
All communications concerning the performance of the Work or the Project will be provided 
to the designated Project Manager and Contractor’s Representative set forth in Article 1 
of the Contract. City may change the designated Project Manager and, subject to Section 
4.4.20 of these General Conditions, Contractor may change Contractor Representative, by 
written notice to the other. 
14.25.2 
Project communications may be exchanged by e-mail, but email communications cannot 
change the terms of the Contract or the Scope of Work, or effectuate any change that 
requires a written Change Order. 
14.25.3 
When any provisions of the Contract Documents requires Contractor or the Design 
Professional to give written notice to City, it will be deemed to have been validly given if 
delivered in person or if delivered at or sent by registered or certified mail, postage prepaid, 
to the Parties indicated in Contract Article 1, incorporated by reference.   
14.25.4 
When any provisions of the Contract Documents requires City, Project Manager, or the 
Design Professional to give written notice to Contractor, it will be deemed to have been 
validly given if delivered in person to the person designated in the Contract Documents as 
Contractor’s Resident Superintendent, or if delivered at or sent by registered or certified 
mail, postage prepaid, to Contractor at the last address in the Contract Documents or such 
substitute address which Contractor designates in writing, or to the business address 
known to the giver of notice.

General Conditions 
 
Revised: 10/19/2021 
 
GC-57 of 75 
 
14.26 
DRUG FREE WORKPLACE PROGRAM 
14.26.1 
City has adopted a policy establishing a drug free workplace for itself and as a requirement 
for Contractors doing business with City, to ensure the safety and health of employees 
working on City projects. 
14.26.2 
Contractor must require a drug free workplace for all employees working under the 
Contract. Specifically, all employees of Contractor who are working under a Contract with 
City must be notified, in writing, by Contractor that they are prohibited from the 
manufacture, distribution, 
dispensation, possession or unlawful use of a controlled 
substance in the workplace. 
14.27 
Failure to require a drug free workplace in accordance with the City’s policy may result 
in termination of the Contract and possible debarment form bidding on future City projects. 
SECTION 15 - PROVISIONS APPLICABLE SOLELY TO GMP AND COST-BASED CONTRACTS, 
CHANGE ORDERS, AND JOB ORDERS 
15.1 
ADDITIONAL DEFINITIONS 
The definitions set forth in Section 2 apply to GMP and Cost-Based Contracts, Change 
Orders, and Job Orders, together with the additional definitions set forth below. 
 
Baseline Cost Model – 
A breakdown and estimate of the scope of the Project developed by CM@Risk pursuant to Section 17.5 
of these General Conditions. 
 
CM@Risk or Construction Manager at Risk – 
The person or firm selected by City to provide pre-construction and/or construction services as 
detailed in a Construction Manager at Risk Contract with City. In these General Conditions, the term 
“Contractor” includes CM@Risk under both Pre-Construction and Construction Services Contracts. 
CM@Risk Fee or Contractor’s Fee – 
An agreed to percentage in an accepted GMP that represents the Contractor’s fee for performance of 
the Work. 
 
Contract Documents – 
Where compensation under the Contract is based upon a GMP accepted by City, the term “Contract 
Documents” also includes the accepted GMP Proposal. 
 
Contract Price – 
Where compensation under the Contract based upon a GMP accepted by City, the term “Contract 
Price” refers to the GMP. 
 
Cost-Based Contract, Change Order, or Job Order – 
A Contract, Change Order, or Job Order where the Contract Price is based upon the actual cost 
of performing the Work, subject to the terms of the Contract Documents, including this Section 15. 
These would include those generally referred to as “Cost of the Work plus a Fee with a GMP,” 
“Time and Materials,” or “Cost Plus a Fee.” 
 
Cost of the Work – 
The direct costs necessarily incurred by Contractor in the proper, timely, and complete performance 
on the Work. The Cost of the Work will include only those costs set forth in Section 15.2 of these 
General Conditions.

General Conditions 
 
Revised: 10/19/2021 
 
GC-58 of 75 
 
Deliverables – 
The work products prepared by Contractor in performing the scope of work described in the Contract. 
Some of the major deliverables to be prepared and provided by Contractor during pre-construction 
may include but are not limited to: the Baseline Cost Model and Schedule that validate City’s plan and 
budget, Construction Management Plan, Detailed Project Schedule, Schedule of Values, alternative 
system evaluations, procurement strategies and plans, Detailed Cost Estimates, construction market 
surveys, cash flow projections, GMP Proposals, Subcontractor procurement plan, Subcontractor 
agreements, Subcontractor bid packages, Supplier agreements, Constructability Review, Cost Control 
Log, Traffic control and phasing plans and others as indicated in this Contract or required by the 
Project Team. 
 
Pre-Construction Services Contract – 
The Contract entered into between City and the CM@Risk for Pre-Construction Services to be provided 
by the CM@Risk, including, without limitation, the generation of a GMP Proposal. If the GMP Proposal 
is accepted by City and a Construction Contract is entered into between City and CM@Risk, the duties, 
obligations and warranties of the CM@Risk under the Pre-Construction Services Contract survive and 
are incorporated into the resulting Construction Contract. 
 
Pre-Construction Services – 
The services to be provided under the Pre-Construction Services Contract, including Section 17 of 
these General Conditions. 
 
Detailed Project Schedule – 
The Detailed Project Schedule developed by the CM@Risk for the review and approval of the Project 
Manager in accordance with Section 17.3 of these General Conditions, if applicable. 
 
General Conditions Costs – 
Those costs set forth in Section 4 of Appendix 9 to these General Conditions. 
 
GMP Plans and Specifications – 
The plan and specifications upon which the Guaranteed Maximum price Proposal is based. 
 
GMP Proposal – 
The proposal of Contractor submitted pursuant to Section 17.7 of these General Conditions for the 
entire Work and/or portion (phases) of the Work. 
 
Guaranteed Maximum Price or GMP – 
The Guaranteed Maximum Price set forth in the Contract, Change Order, or Job Order if applicable. 
15.2 
CONTRACT PRICE 
15.2.1 
The Contract Price for all Contracts, Change Orders, and Job Orders based upon payment 
of the Cost of the Work plus a Fee with a GMP, time and materials, or cost-plus a fee will be 
the Cost of the Work incurred plus the Fee agreed to in writing by City, limited to the amount 
of the GMP, if agreed to. Unless otherwise expressly provided in the Contract, Change 
Order, or Job Order, all Cost Based pricing will be subject to and limited to GMP. 
15.2.2 
The Contract Price may only be changed as set forth in Section 9 above. 
15.2.3 
Only costs specifically designated as reimbursable costs are eligible for payment by City or 
may be charged against the Contract Price. All other costs will not be paid by City and will

General Conditions 
 
Revised: 10/19/2021 
 
GC-59 of 75 
 
not be chargeable against the Contract Price. 
15.2.4 
Cost-Based Contracts. For Contracts, Change Orders, or Job Orders, reimbursable costs 
must be determined pursuant to Appendix 9 to these General Conditions, Cost of the Work, 
and not by MAG Specifications §109.5. 
15.3 
ALLOWANCES 
15.3.1 
Contractor must include in the Contract Price all Allowances stated in the Contract 
Documents and agreed to in writing by City. Items covered by these Allowances must be 
supplied for such amounts and by such persons as City may direct, provided Contractor will 
not be required to employ persons against whom Contractor makes a reasonable objection. 
Materials, labor, and equipment under an Allowance will be selected by City in accordance 
with a schedule to be mutually agreed upon by City, Design Professional and Contractor or 
otherwise in reasonably sufficient time to avoid delay in the Work. 
15.3.2 
Unless otherwise provided in the Contract Documents: 
15.3.2.1 
These Allowances must cover the cost to Contractor, less any applicable trade discount, of 
the materials, labor, and equipment required by the Allowances, delivered at the Site, and 
all applicable taxes; 
15.3.2.2 
Contractor’s costs for unloading and handling on the Site, labor, installation costs, overhead, 
profit and other expenses relating to materials, labor, and equipment required by the 
Allowance must be included in the Contract Sum and not in the Allowance; and 
15.3.2.3 
Whenever the cost is more or less than the Allowance, the Contract Sum must be adjusted 
accordingly by Change Order, the amount of which will recognize the difference between 
actual costs for an Allowance item and the amount of the Allowance item and changes, if 
any, in handling costs on the Site, labor, installation costs, overhead, profit and other 
expenses. 
15.4 
CONTINGENCY 
An agreed to amount in the GMP that may only be used in accordance with the terms set 
forth in these General Conditions and with prior written approval by the City. 
15.4.1 
Construction Contingency.  This GMP includes a dollar amount listed as a Construction 
Contingency which will be readily available for increased costs for subcontractors, material, 
and equipment subject to prior approval of City, which approval will not be withheld 
unreasonably.  The Construction Contingency may also be used, at the discretion of City, to 
reimburse CM@Risk for unexpected costs due to (a) scope gaps between trade 
subcontractors; (b) contract default by trade subcontractors; (c) unforeseen field conditions, 
but only as defined in Section 9.5 above; (d) work completed to meet the intent of the 
design, but which was not indicated on the plans; (e) costs overruns not covered by 
allowances; (f) costs of corrective work not provided for elsewhere; and (g) implementation 
of any Recovery Plan.  Cost for which CM@Risk desires to be paid from the Construction 
Contingency must be documented by CM@Risk on a time and materials basis and are 
subject to verification by City.  If agreed to by City, a “Use of Contingency” form will be 
executed by both parties authorizing the actual cost of the work to be paid and included in 
the Work Item Direct Costs.  The Construction Contingency is not allocated to any particular 
item of the Project but may be used for any portion of the work as determined above.  Any 
amount not used in the Construction Contingency will belong to City and will reduce the

General Conditions 
 
Revised: 10/19/2021 
 
GC-60 of 75 
 
GMP.  
15.4.2 
Owner’s Contingency.  This GMP also includes a dollar amount listed as an Owner’s 
Contingency which may be used only by the City (owner department) for upgrades and 
changes in scope or other changes not already included within the intent of the Project 
Program.  City will provide CM@Risk with a Work Change Directive authorizing CM@Risk to 
perform the additional work and to transfer funds from the Owner’s Contingency to the 
Work Item Direct Costs category to be paid with such direct costs.  These additional costs 
will be in an amount mutually agreed upon by CM@Risk and City or will be documented by 
CM@Risk on a time and materials basis and are subject to verification by City.  Any amount 
not used in the Owner’s Contingency will belong to the City and will reduce the GMP. 
15.5 
REDUCTION IN RETENTION 
If the Contract Price is based upon a GMP, in order to receive payment of one-half of the 
retention as set forth in Section 8.1.5 above, Contractor must also submit to the Project 
Manager a complete accounting of the Actual Reimbursable Cost of the Work to date, 
including all such documentation (including, without limitation, invoices, subcontract, 
subcontractor change orders, purchase orders, records of payment, etc.) as City may require, 
to establish whether the payments made to Contractor equal, exceed, or are less than the 
actual reimbursable Cost of the Work to date. Any excess payments by City, as determined 
by the Project Manager, will be deducted from the one-half retention payment to be made 
to Contractor, and any additional excess amounts paid to Contractor will be refunded by 
Contractor to City. The Project Manager’s determinations as to Actual Reimbursable Cost 
of the Work will be the basis of payment until final Project Closeout and Final Payment 
under the Contract. 
15.6 
FINAL PAYMENT 
If the Contract Price is based upon a GMP, as a further condition precedent to Final Payment 
by City, Contractor must submit to the Project Manager a complete final accounting of 
the Actual Reimbursable Cost of the Work, including all such documentation (including, 
without limitation, invoices, subcontracts, subcontractor change orders, purchase orders, 
records of payment, etc.) as City may require, to establish whether the payments made to 
Contractor equal, exceed, or are less than the Actual Reimbursable Cost of the Work to 
date. Any excess payments by City, as determined by the Project Manager, will be deducted 
from the one-half retention payment to be made to Contractor, and any additional excess 
amounts paid to Contractor will be refunded by Contractor to City. Disputes relating to the 
Final Cost of the Work will be subject to City’s audit rights under Sections 8.8 above and 15.7 
below, and the dispute resolution process under Section 13 above. 
15.7 
OPEN BOOK 
On any GMP-based or Cost-Based Contract, Job Order, or Change Order, City may attend 
any and all meetings or discussions pertaining to the Project, including bid openings, and 
must have access to all books, invoices, accounts, memoranda, correspondence, and 
written communications or records of any kind pertaining to the Project, including without 
limitation, those stored in electronic format. 
15.8 
DIFFERING SITE CONDITIONS AND/OR CHANGE IN LAWS 
A Change Order for increased costs under Section 9.5 or 9.6 above will only be considered 
or granted by City to the extent such actual, documented costs are justified. 
 
SECTION 16 - PROVISIONS APPLICABLE SOLELY TO JOB ORDER CONTRACTS (JOC)

General Conditions 
 
Revised: 10/19/2021 
 
GC-61 of 75 
 
16.1 
ADDITIONAL DEFINITIONS 
The definitions set forth in Sections 2 and below will apply to all Job Order Contracts and 
Job Orders. In addition, the definitions set forth in Section 15.1 above will apply to all Cost-
Based Job Orders. 
 
Contract – 
Includes the Job Order Master Agreement and Job Order Project Agreements issued and agreed to by City 
and JOC Contractor. 
 
JOC Contractor’s Coefficient – 
A numerical factor that represents JOC Contractor total costs (indirect and direct costs, sales tax, 
profit, etc.) and other adjustments for market conditions. 
 
Job Order Request for Proposal (RFP) – 
The Request for Proposals issued by City for each Job Order Project Agreement relating to a specific 
Project. 
 
Job Order Cost Proposal – 
The Proposal submitted by JOC Contractor in response to a Job Order Request for Proposal (RFP) issued 
by City to develop a Job Order Project Agreement for a specific Project. 
 
Guaranteed Maximum Price (GMP) Job Order – 
Job Order under which JOC Contractor is compensated for actual costs incurred. 
 
Job Order Project Agreement (Job Order) – 
The agreement for a specific project, as it may be modified by all Change Orders, executed by the 
Parties, which incorporates the terms and conditions of the Job Order Master Agreement.  
16.2 
ORDERING AND PROCESSING PROCEDURES FOR JOB ORDERS 
16.2.1 
The process for developing and issuing a Job Order for a particular Project consists of three 
(3) procedures: (1) issuance of a RFP by City; (2) JOC Contractor’s response to the RFP in the 
form of JOC Contractor’s Job Order Cost Proposal; and (3) Issuance of a Job Order by City, as 
set for below. 
16.2.2 
RFP’s For Job Orders 
16.2.2.1 
City will provide to JOC Contractor RFP with a Scope of Work (SOW) describing the Work to 
be performed, which may include special instructions and conditions, material submittal 
requirements, and, if applicable, a complete set of sketches, construction drawings and 
specifications for the Job Order. 
16.2.2.2 
Some Job Order RFP’s will be issued by City without detailed sketches, drawing and 
specifications and will rely on JOC Contractor to produce them for City review and approval 
and is considered to be Pre-Construction and incidental design services included in JOC 
Contractor’s overhead for GMP Job Orders. In addition JOC Contractor will not be 
reimbursed for any Pre-Job Order costs, including proposal preparation, attendance during 
negotiations, or site visits. 
16.2.3 
JOC Contractor’s Job Order Cost Proposal 
16.2.3.1 
JOC Contractor must respond within ten (10) calendar days of the RFP date or site visit,

General Conditions 
 
Revised: 10/19/2021 
 
GC-62 of 75 
 
whichever is later or as otherwise indicated on a case-by-case basis, by submitting JOC 
Contractor’s Job Order Cost Proposal to the City representative. 
16.2.3.2 
Unless otherwise required under the terms of the RFP, JOC Contractor’s Job Order Cost 
Proposal must include the following. 
a. JOC Contractor’s Job Order Cost Proposal in PDF and electronic format; 
b. A Project Schedule and schedule of values that reflects the costs of each work 
element on the schedule. The schedule must show all milestones (e.g., 
permits, submittals, ordering materials, demolition, work phases, closeout 
and completion date); and 
c. Necessary documentation will be required to indicate that adequate scoping, 
layout, setup and planning to accomplish the Work has been done. 
Examples of documentation that might reasonably be expected include 
sketches, drawings, calculations, catalog cuts and specifications produced 
to a level of detail and skill that could be expected of experienced, 
competent Project Managers with five or more periods experience in their 
respective trade. 
16.2.3.3 
JOC Contractor must select Subcontractors based on qualifications alone or on a 
combination of qualifications and price and must not select Subcontractors based on 
price alone. A qualifications and price selection may be a one-step selection based on 
a combination of qualifications and price or two-step selection. In a two-step selection, 
the first step must be based on qualifications alone and the second step may be based or 
a combination of qualifications and price or on price alone. 
16.2.3.4 
Upon request, JOC Contractor must provide City with copies of Subcontractor quotes and 
the basis for selection of each Subcontractor. 
16.2.3.5 
If City objects to a selected Subcontractor, City will make the objection and the reasons for 
the objection known to the JOC Contractor. JOC Contractor must then present an 
acceptable Subcontractor for the applicable discipline. City will not unreasonably object 
to or withhold approval of a Subcontractor. 
16.2.3.6 
For self-performed work, the City retains the right to have the JOC Contractor establish JOC 
Contractor’s costs by bidding their costs against at least three (3) other interested trade 
Contractors. No self- performed work will be allowed to be performed on a lump sum basis. 
16.2.4 
Issuance of Job Order 
16.2.4.1 
City Representative will compare the JOC Contractor’s Job Order Cost Proposal with the City’s 
estimate, 
schedules and other requirements, and then, if the City Representative 
determines it is in the best interest of City, arrange a meeting with JOC Contractor, at which 
time the JOC Contractor’s Job Order Cost Proposal will be discussed and negotiated. 
16.2.4.2 
If the City Representative determines that it is in the best interest of the City, City will then 
issue a Job Order to JOC Contractor for execution. 
16.2.4.3 
Specific Job Orders may vary, but unless agreed to by City in writing otherwise, the content 
of Job Orders under the Contract will generally be as follow, all of which will be signed 
and/or initialed by JOC Contractor’s designated representative:

General Conditions 
 
Revised: 10/19/2021 
 
GC-63 of 75 
 
a. The description of the Scope of the Work and Project Schedule (attached as 
Exhibit A to the Job Order); 
b. The address or location of the Work; 
c. The Contract Price for Work (Construction) included in the Project (attached 
as Exhibit B to the Job Order); 
d. The name of the JOC Contractor representative for the Project; 
e. The Drawings and Specifications for the Project; 
f. 
If any shop drawings, project date and/or samples are required for the Job 
Order, the date for delivery of each required item (included in the Project 
Schedule, Exhibit A to the Job order); and 
g. Project Specific Provisions, if any, in Exhibit A  to the Job Order, 
including, without limitation, whether any of the following are required: 
Pre-Construction Conference, weekly progress meetings, field office, 
storage enclosure, materials and equipment handling facility, submittals, 
shop drawings, product data, equipment list, samples, project manual, 
schedule of values, Construction progress schedule, narrative reports, 
progress report, progress charts, progress photographs, materials status 
report, Construction diagram, Construction status report, operation and 
maintenance data, operating maintenance instructions and parts list, and 
as-build drawings. 
16.2.5 
Job Order Intent. Each Job Order will be interpreted to include all items reasonably 
necessary to complete the Project under that Job Order as described in the scope of the 
Work in that Job Order. All Work must be performed in a professional manner and all 
materials used must be new and of the highest quality and of the type best adapted to 
their purpose, unless otherwise specified. The Notice to Proceed date, and the award date 
established therein, will be deemed an integral part of the Job Order the same as if set forth 
therein. 
16.3 
INCIDENTAL DESIGN SERVICES 
16.3.1 
This effort includes all “extensions of design” for systems that are typically specified in 
a performance oriented manner by consultants and designers. Examples include: fire 
sprinkler systems, fire alarm and sprinkler systems, DDC controls, control systems, 
prefabricated metal building and similar situations. These designs are normally provided 
under submittals as a shop drawing with engineering backup and as appropriate, seals of 
registered engineers specializing in the particular system. 
16.3.2 
Incidental design includes all documents, sketches, schematic diagrams, floor plan 
layouts, equipment schedules and other documents produced by the JOC Contractor to 
define the work required for projects that the City does not develop formal or abbreviated 
designs requiring a seal by a registered engineer. Incidental design does not include 
preparation of designs requiring an architect or engineer seal. 
16.3.3 
JOC Contractor represents, covenants, and agrees, and contractually assumes the 
obligation to furnish, all of the required Design Services through properly licensed and 
experienced Design Professionals in complete accordance with all of the duties imposed 
on a Design Professional under the Contract Documents, Laws, Regulations, or Legal

General Conditions 
 
Revised: 10/19/2021 
 
GC-64 of 75 
 
Requirements, and the common law. 
16.3.4 
All Design Documents (and all other Project-related documents, models, computer 
drawings and other electronic expression, photographs and other expressions CADD, and 
BIM files and images included) that JOC Contractor and/or JOC Contractor’s Design 
Professional(s) prepare in connection with a Job Order and the copyrights therein 
(collectively, the “Instruments of Service”) will be the property of City. JOC Contractor 
covenants and agrees to execute any additional document reasonably requested by City 
to confirm such assignment without any additional compensation. 
16.4 
CONSTRUCTION SERVICES 
16.4.1 
The following subsections of this Section 16.4 set forth requirements beyond those set forth 
in Section 4 above which apply to Construction Services performed under a Job Order. 
16.4.2 
JOC Contractor must perform the Work using only those firms, team members and 
individuals designated by JOC Contractor consistent with each Job Order or otherwise 
approved by City pursuant to the General Conditions. No other entities or individuals may 
be used without the prior written approval of the Project Manager. 
16.4.3 
Construction Phasing 
16.4.3.1 
City use of the facilities is anticipated while the Work is being performed. The Work must 
be planned and accomplished so that there will be a minimum of interference and 
inconvenience to occupants in the building and agencies in the vicinity and to other 
craftsmen who may have to do work in the affected facilities. Any blockage of building 
exits or driveways must be coordinated in advance. 
16.4.3.2 
If applicable, furniture, portable office equipment and wall appurtenances not rigidly 
fastened to the walls must be moved by JOC Contractor, protected from damage and 
replaced to the original position upon completion of the work. If the work required by 
the Job Order will not allow furniture and portable office equipment to be replaced to its 
original position, new locations will be designated by City. Incidental costs associated with 
moving one-piece furnishings up to approximately 150 pounds to perform such tasks as 
painting, carpet or tile replacement, etc., are considered a general cost of building 
renovation and must be included in the JOC Contractor’s Coefficient. Costs for large scale 
or wholesale removal and replacement of large quantities of 
desks or modular 
workstations, copiers, multiple full file cabinets, etc. to another location or storage outside 
the work space, or disassembly and reassembly of modular furniture is not considered 
part of the JOC Contractor’s Coefficient and will be priced separately. 
16.4.3.3 
The work must, so far as practicable, be done in definite sections or divisions and confined 
to limited areas which must be completed before work in other sections or divisions are 
begun. 
16.4.4 
Work Site Conflicts. In the event of a conflict between JOC Contractor and others in an 
occupied facility or where other Contractors are performing work on the same facility 
under other Contracts, City will decide to dispute and that decision will be final. 
16.4.5 
Ownership of Work Product. Work Product prepared or otherwise created in connection 
with the performance of this Contract, including the Work, are to be and remain the 
property of City. For purposes of this provision, “Work Product” will include all designs,

General Conditions 
 
Revised: 10/19/2021 
 
GC-65 of 75 
 
drawings, plans, specifications, ideas, renderings and other information or matter, in 
whatever form created (e.g., electronic or printed) and in all media now known or 
hereinafter created. All Work Product will be considered Work Made for Hire as defined 
in the United States Copyright Act 17 U.S.C. §101 (Copyright Act). If for any reason any such 
Work is found not to be a work for hire, JOC Contractor hereby transfers and assigns 
ownership of the copyright in such Work to City. The rights in this Section are exclusive to 
City in perpetuity. 
16.5 
OPTIONAL LIQUIDATED DAMAGES 
16.5.1 
Specific Job Orders. City will have the right to assess liquidated damages in relation to 
any specific JOC Project Agreement as set forth below. 
16.5.2 
Substantial Completion Liquidated Damages. JOC Contractor acknowledges and agrees 
that if JOC Contractor fails to obtain Substantial Completion of the Work within the Contract 
Time, City will sustain extensive damages and serious loss as a result of such failure. The 
exact amount of such damages will be extremely difficult to ascertain. Therefore, City and 
JOC Contractor agree that if JOC Contractor fails to achieve Substantial Completion of the 
Work within the Contract Time, City will 
be entitled to retain or recover from JOC 
Contractor, as liquidated damages and not as a penalty, the sum per calendar day as 
indicated in MAG § 108.9. 
16.5.3 
Final Acceptance Liquidated Damages. For the same reasons set forth in Section 16.5.2 
above, City and JOC Contractor further agree that if JOC Contractor fails to achieve Final 
Acceptance of the Work within the Contract Time, City will be entitled to retain or recover 
from JOC Contractor, as liquidated damages and not as a penalty, the sum per calendar 
day as indicated in MAG § 108.9 commencing from the actual date of Substantial 
Completion or Final Acceptance as required under any specific JOC Project Agreement. 
16.5.4 
MAG Liquidated Damages. Liquidated damages provisions in MAG § 108.9 may apply to any 
specific JOC Project Agreement.   
16.5.5 
City may deduct liquidated damages assessed pursuant to this Section 16.5 from any 
unpaid amounts then or thereafter due JOC Contractor under the Contract or any specific 
JOC Project Agreement between JOC Contractor and City. Any liquidated damages not so 
deducted from any unpaid amounts due JOC Contractor must be payable to City at the 
demand of City, together with interest from the date of the demand at the highest lawful 
rate of interest payable to JOC Contractor. 
16.6 
PERFORMANCE MEASUREMENT 
16.6.1 
Performance Assessment. After the Final Acceptance of Work under each Job Order, City 
will complete a written evaluation of the performance of JOC Contractor on the Job Order. 
16.6.2 
Consideration in Assignment of Work. JOC Contractor’s record of cost, schedule and 
quality performance and comparative assessments will be significant considerations in 
City’s determination whether to award future Job Orders. JOC Contractor agrees that any 
determination by City not to not award future Job Orders or Option periods based on 
performance will be at the sole discretion of City. 
 
SECTION 17 - PROVISIONS APPLICABLE SOLELY TO PRE-CONSTRUCTION SERVICES FOR 
CONSTRUCTION MANAGER AT RISK

General Conditions 
 
Revised: 10/19/2021 
 
GC-66 of 75 
 
17.1 
ADDITIONAL DEFINITIONS 
The definitions set forth in Section 2 and 15.1 above will apply to all Pre-Construction 
Services Contracts. 
17.2 
GENERAL 
17.2.1 
CM@Risk must perform the  Services required by, and in accordance with the Contract 
Documents and as outlined in Exhibit A of the Contract to the satisfaction of the 
Project Manager, exercising the degree of care, skill, diligence and judgment a professional 
construction manager experienced in the performance of such services for construction 
and/or facilities of similar scope, function, size, quality, complexity and detail to the 
Project in urban areas throughout the United States, would exercise at such time, under 
similar conditions. CM@Risk must, at all times, perform the required services consistent 
with sound and generally accepted engineering principles and construction management 
and construction contracting practices. 
17.2.2 
As a participating member of the Project Team, CM@Risk must provide to City and Design 
Professional a written evaluation of City’s Project Program and budget, each in terms of 
the other, with recommendations as to the appropriateness of each. CM@Risk must 
prepare a Baseline Cost Model that validates City’s budget. The Baseline Cost Model must 
include all assumptions and basis of estimates in enough detail so that the Project Team 
can compare future detail estimates to the Baseline Cost model for variances. City and 
Design Professional will provide all the reasonably required data that is available in 
order to reach agreement between the team members that the Baseline Cost Model is an 
accurate projection of the costs of the Project. 
17.2.3 
CM@Risk must attend Project Team meetings, which may include, but are not limited to, 
bi- weekly Project management meetings, Project workshops, special Project meetings, 
construction document rolling reviews, public meetings and partnering sessions. CM@Risk 
attendance at design or other meetings in which CM@Risk is provided the opportunity but 
does not actively participate and/or is not properly prepared is not acceptable. Repeated 
instances of non-participation and/or lack of preparedness will be grounds for termination 
of CM@Risk Contract for default. 
17.2.4 
CM@Risk must provide Pre-Construction Services, described herein, in a timely manner 
and consistent with the intent of the most current Drawings and Specifications. CM@Risk 
must promptly notify City in writing whenever CM@Risk determines any Drawings or 
Specifications are inappropriate for the Project and/or cause changes in the scope of Work 
that deviates more than the allowed contingencies within the Baseline Cost Model or 
requires an adjustment in the Baseline Cost Model, Detailed Cost Estimate, Detailed 
Project Schedule, GMP Proposals and/or in the Contract Time for the Work, to the extent 
such as established. 
17.2.5 
CM@Risk when requested by City, must attend, make presentations and participate as may 
be appropriate in public agency and or community meetings, relevant to the Project. 
CM@Risk must provide drawings, schedule diagrams, budget charges and other materials 
describing the Project when their use is required or appropriate in any such public agency 
meetings. 
17.2.6 
Ownership of Work Product. All Work Product prepared or otherwise created in connection 
with the performance of this Contract, including the Work, are to be and remain the property

General Conditions 
 
Revised: 10/19/2021 
 
GC-67 of 75 
 
of City. For purposes of this provision, “Work Product” will include all designs, drawings, 
plans, specifications, ideas, renderings and other information or material, in whatever 
form created (e.g., electronic or printed) and in all media now know or hereinafter created. 
All Work Product will be considered Work Made for Hire as defined in the United States 
Copyright Act 17 U.S.C. 
§101 (Copyright Act). If for any reason any such Work is found not to be a work for 
hire, Contractor hereby transfers and assigns ownership of the copyright in such Work to 
City. The rights in this Section are exclusive to City in perpetuity. 
17.2.7 
CM@Risk represents to City in completing Pre-Construction Services and providing the 
reports 
and analysis required thereunder, that Work can be properly and timely 
constructed within the GMP Proposal, if accepted. CM@Risk does not assume any design 
responsibilities unless specifically called for in the scope of work, but CM@Risk will be 
responsible for their errors, omissions or inconsistencies included in the Work. 
17.3 
DETAILED PROJECT SCHEDULE 
17.3.1 
The fundamental purpose of the Detailed Project Schedule is to identify, coordinate and 
record the tasks and activities to be performed by all of the Project Team members and 
then for the Project Team to utilize that Deliverable as a basis for managing and 
monitoring all member’s compliance with the schedule requirements of the Project. 
Each Project Team member is responsible for its compliance with the Detailed Project 
Schedule requirements. CM@Risk must, however, develop and maintain the Detailed 
Project Schedule on behalf of and to be used by the Project Team based on input from the 
other Project Team members. The Baseline Project Schedule must be developed as part 
of the Baseline Cost Model. The Detailed Project Schedule must use the Critical Path 
method (“CPM”) technique, unless required otherwise, in writing by City. CM@Risk must 
use scheduling software acceptable to City to develop the Detailed Project Schedule. 
The Detailed Project Schedule must be presented in graphical and tabular reports as 
agreed upon by the Project Team. If Project phasing as described below is required, the 
Detailed Project Schedule must indicate milestone dates for the phases once 
determined. As part of construction phase, City may require CM@Risk to prepare a 
“resource loaded” schedule for all work, including work performed by Subcontractors, 
detailing each of the project tasks and the required/anticipated number of personnel per 
day for each task. CM@Risk must also indicate on the schedule its ability to meet said 
required/anticipated personnel requirements. 
17.3.2 
CM@Risk must include and integrate in the Detailed Project Schedule the services and 
activities required of City, Design Professional and CM@Risk including all construction 
phase activities based on the input received from City and the Design Professional. 
The Detailed Project Schedule must define activities as determined by City to the extent 
required to show: (a) the coordination between preliminary design and various pre-
construction documents, (b) any separate long-lead procurements, (c) any permitting 
issues, (d) any land, right-of-way, or easement acquisition, (e) bid packaging strategy and 
awards to Subcontractors and Suppliers, (f) major stages of construction, (g) start-up and 
commissioning, and (h) occupancy of the completed Work by City. The Detailed Project 
Schedule must include by example and not limitation, proposed activity sequences and 
durations for design, procurement, construction and testing activities, milestone dates for 
actions and decisions by the Project Team, preparation and processing of shop drawings 
and samples, delivery of materials or equipment requiring long-lead time procurement (if 
any), milestone dates for various construction phases, Total Float for all activities to the

General Conditions 
 
Revised: 10/19/2021 
 
GC-68 of 75 
 
extent authorized by City, relationships between the activities, 
City’s occupancy 
requirements showing portions of the Project having occupancy priority, and proposed 
dates for Final Acceptance. 
17.3.3 
A Baseline Project Schedule must be initiated with the project Baseline Cost Model and 
agreed to by the project team at the same time. CM@Risk must update and maintain a 
detailed Project Schedule throughout pre-construction such that it will not require major 
changes at the start of the construction phase to incorporate CM@Risk’s plan for the 
performance of the construction phase Work. CM@Risk must provide updates and/or 
revisions to the Detailed Project Schedule for use by the Project Team, whenever required, 
but no less often than at the Project Team meetings. CM@Risk must include with such 
submittals a narrative describing its analysis of the progress achieved to-date vs. the 
Baseline Project Schedule, including any concerns regarding delays or potential delays, and 
any recommendations regarding mitigating actions. 
17.3.4 
If phased construction is deemed appropriate at the time of developing the Baseline Cost 
Model or during the development of the Detailed Project Schedule, and City approves, 
CM@Risk must review the design and make recommendations regarding the phased 
issuance of Construction Documents to facilitate phased construction of the Work, with 
the objective of reducing the Project Schedule and/or Cost of the Work. CM@Risk must take 
into consideration such factors as natural and practical lines of work severability, 
sequencing effectiveness, access and availability constraints, total time for completion, 
construction market conditions, labor and materials availability, and any other factors 
pertinent to saving time and cost. 
17.3.5 
Long Lead Time Items. As part of developing the Detailed Project Schedule, CM@Risk must 
identify all long lead time materials, fabrications, equipment, or other items which may 
impact the Project Schedule and may require early action on the part of the Project Team. 
Dates for selecting and ordering long lead time items will be included and highlighted 
in the Detailed Project Schedule 
17.3.6 
Equipment Plan. Contractor must develop an Equipment Plan that addresses all rental 
and owned equipment, regardless of whether such equipment will be provided by 
CM@Risk or subcontractor(s), that will be necessary to construct the Project and the cost 
of which will be included as a Cost of the Work in the GMP Proposal. The Equipment Plan 
will seek to minimize the cost of the equipment to City and maximize the efficient and 
coordinated use of the equipment for completion of the Project. The Equipment Plan will 
not only include the costs and allowable lease rates for the equipment, but will also include 
an equipment schedule that will be incorporated into the Detailed Project Schedule and the 
Schedule of Values submitted with the GMP Proposal. 
17.4 
DESIGN DOCUMENT REVIEWS 
17.4.1 
CM@Risk must evaluate periodically the availability of labor, materials/equipment, cost- 
sensitive aspects of the design; and other factors that may create an unacceptable variance 
to the Baseline Cost Model and/or Baseline Project Schedule. 
17.4.2 
CM@Risk must recommend, in conjunction with the Project Team, those additional surface 
and subsurface investigations that, in its professional opinion, are required to provide the 
necessary 
information for CM@Risk to construct the Project. 
These additional 
investigations, if agreed to 
be necessary by the Project Manager and the Design 
Professional, will be acquired by City and copies of the reports will be provided to CM@Risk.

General Conditions 
 
Revised: 10/19/2021 
 
GC-69 of 75 
 
17.4.3 
CM@Risk must meet with the Project Team as required to review designs during their 
development. CM@Risk must familiarize itself with the evolving documents through 
pre- 
construction. CM@Risk must proactively advise the Project Team and make 
recommendations on factors related to construction costs, and concerns pertaining to the 
feasibility and practicality 
of any proposed means and methods, selected materials, 
equipment and building systems, and, labor and material availability. CM@Risk must 
furthermore advise the Project Team on proposed site improvements, excavation and 
foundation considerations, as well as, concerns that exist with respect to coordination of 
the Drawings and Specifications. CM@Risk must use established value analysis principles 
in recommending cost effective alternatives. 
17.4.4 
CM@Risk must routinely conduct constructability and bid-ability reviews of the Drawings 
and Specifications as necessary to satisfy the needs of the Project Team. The reviews must 
attempt to identify all discrepancies and inconsistencies in the Construction Documents 
especially those related to clarity, consistency, completeness and coordination of Work of 
Subcontractors and Suppliers. 
17.4.4.1 
CM@Risk must evaluate whether: (a) the Drawings and Specifications are configured to 
enable efficient construction; (b) design elements are standardized; (c) construction 
efficiency 
is 
properly 
considered 
in 
the 
Drawings 
and 
Specifications; 
(d) 
module/preassembly design is prepared to facilitate fabrication, transport and installation; 
(e) sequences of Work required by or inferable from the Drawings and Specifications are 
practicable; (f) the design has taken into consideration efficiency issues concerning access 
and entrance to the site, laydown and storage 
of materials, staging of site facilities, 
construction parking, and other similar pertinent issues; and (g) the design maintains 
continued operation of the existing City systems and maintains traffic on adjacent 
roadways. CM@Risk must also review the Drawings and Specifications to ensure that what 
is depicted therein can be constructed as designed and must promptly inform the Project 
Team of any issues. 
17.4.4.2 
CM@Risk must check cross-reference and complementary Drawings and sections within 
the Specifications and in general evaluate whether: (a) the Drawings and Specifications 
are sufficiently clear and detailed to minimize ambiguity and to reduce scope interpretation 
discrepancies; (b) named materials and equipment are commercially available and are 
performing well, or otherwise, in similar installations; (c) Specifications include alternatives 
in the event a requirement cannot be met in the field; and (d) in its professional opinion, the 
Project is likely to be subject to Differing Site Conditions. 
17.4.4.3 
The results of the reviews must be provided to Project Team in formal, written reports 
clearly 
identifying all reviewed documents and the discovered discrepancies and 
inconsistencies in the Drawings and Specifications with notations and recommendations 
made on the Drawings, Specifications and other documents. CM@Risk must meet with 
Project Team to discuss any findings and review reports. 
17.4.4.4 
CM@Risk’s reviews must be from a Contractor’s perspective, and though it will serve to 
eliminate/reduce the number of RFIs) and changes during the construction phase, 
responsibility for the Drawings and Specifications will remain with the Design Professional 
and not CM@Risk. 
17.4.5 
It is CM@Risk’s responsibility to assist the Design Professional in ascertaining that, in 
CM@Risk’s professional opinion, the Construction Documents are in accordance with

General Conditions 
 
Revised: 10/19/2021 
 
GC-70 of 75 
 
applicable Laws, Regulations, or Legal Requirements, building codes, sound engineering 
principle’s rules and regulations. If CM@Risk recognizes that portions of the Construction 
Documents are at variance with applicable laws, statutes, ordinances, building codes, 
sound engineering principle’s rules and regulations, it must promptly notify the Project Team 
in writing, describing the apparent variance of deficiency. However, the Design Professional 
is ultimately responsible for the compliance of the Drawings and Specifications with those 
laws, statutes, ordinances, building codes, rules and regulations. 
17.4.6 
The Project Team will routinely identify and evaluate using value analysis principles and 
alternate systems, approaches, design changes that have the potential to reduce Project 
costs while still delivering a high quality and fully functional Project consistent with 
the Project Program. If the Project Team agrees, CM@Risk in cooperation with the Design 
Professional, will perform a cost/benefit analysis of the alternatives and submit such in 
writing to the Project Team. City, through the Project Manager, will direct which alternatives 
will be incorporated into the Project. The Design Professional will have full design 
responsibility for the review and incorporation of CM@Risk suggested alternatives into 
the Drawings and Specifications. CM@Risk must analyze the costs and schedule impacts of 
the alternatives against the Baseline 
Cost Model and Schedule and provide a 
recommendation for the Project Team’s consideration and City’s approval prior to the 
establishment of the GMP. 
17.5 
BASELINE COSTS MODEL, DETAILED COST ESTIMATES, AND SCHEDULE OF VALUES 
17.5.1 
At the conclusion of the Master Planning and Programming, if required, CM@Risk will 
review all available information regarding the design and scope of the Project using 
CM@Risk’s experience in performing similar work, knowledge of similar projects and 
current and projected construction costs and, based upon that review, must develop a 
Baseline Cost Model for review by the Project Team and approval by City.  Once approved 
by City, the Baseline Cost Model will be continually referenced as detailed estimates are 
created as the design progresses throughout Pre-Construction until the final GMP for the 
entire Project is established.  A final GMP for the entire Project must be established and 
approved by City prior to the start of construction. It is the responsibility of CM@Risk 
to ensure City has sufficient information to evaluate  and  approve  a  final  GMP  prior  to  
the  time  necessary to  start  construction  so construction can be completed within the 
Contract Time.  The Project Detailed Cost Estimate will be the best representation from 
CM@Risk of what the complete functional Project’s construction costs will be as indicated 
by the most current available documents and will be constantly checked against the 
Baseline Cost Model. CM@Risk must communicate to the Project Team and assumptions 
made in preparing the Baseline Cost Model. The Baseline Cost 
Model must support 
CM@Risk’s Detailed Cost Estimates and may be broken down initially as dictated by the 
available information, as required by City. 
17.5.2 
After receipt of the Design Professional’s most current documents from certain specified 
pre- construction milestones, CM@Risk must provide a draft Detailed Cost Estimate 
including a detailed written report detailing any variances to the Baseline Cost Model and 
Baseline Project Schedule. The Design Professional and CM@Risk will reconcile any 
disagreements on the estimate to arrive at an agreed upon Detailed Cost Estimate for the 
construction costs based on the scope of the Project through that specified pre-
construction milestone. Pre-Construction milestones applicable to this paragraph are: 
Master Planning and Programming, Schematic Design, 50% Design Development, 100% 
Design Development, and 50% Construction Drawings, If no consensus is reached, City will

General Conditions 
 
Revised: 10/19/2021 
 
GC-71 of 75 
 
make the final determination. If the Project Team requires additional updates of the 
Detailed Cost Estimate beyond that specified in this paragraph, CM@Risk must provide the 
requested information in a timely manner. 
17.5.3 
If at any point the Detailed Cost Estimate submitted to City exceeds the previously 
accepted Baseline Cost Model or previously approved Detailed Cost Estimate agreed to as 
set forth in Section 17.5.2 above, CM@Risk must make appropriate recommendations to 
project Team on means/methods, materials, and or other design elements that it 
believes will reduce the estimated construction costs, such that it is equal to or less than 
the established Project Team’s Baseline Cost Model. 
17.5.4 
Unless other levels of completion are agreed to in writing in the Construction Documents, 
at 50% Construction Drawings and included with the associated report, CM@Risk must 
also submit to the Project Team for review and approval a Schedule of Values that complies 
with the following requirements. The Schedule of Values must be based on City standard 
bid schedule and highlight significant variances from any previously submitted Schedule 
of Values. The Schedule of Values must be directly related to the breakdowns reflected in 
the Detailed Project Schedule and CM@Risk’s Detailed Cost Estimate.  In addition, the 
Schedule of Values must:  (a) detail unit prices and quantity take-offs, (b) detail all other 
contingencies and unit price Work shown and specified in the detailed design documents. 
17.5.5 
CM@Risk is to track, estimate/price and address the Project Team’s overall project cost issues 
that arise outside of the Baseline Cost Model and the latest approved Detailed Cost 
Estimate such as: City generated changes, Project Team proposed changes, alternate 
system analysis, constructability items and value engineering analysis. The system used 
to implement this process will be referred to as the Design Evolution Log. This is to be 
addressed between the Baseline Cost Model and the Master Planning and Programming 
Detailed Cost Estimate, and then (unless other levels of completion are agreed to in writing 
in the Construction Documents) between the Detailed Cost Estimates for each of the pre-
construction milestones thereafter, Schematic Design, 50% Design Development, 100% 
Design Development, and 50% Construction Documents, and the bid packages for all 
Phases. 
17.5.6 
Upon request by City, CM@Risk must submit to City a cash flow projection for the Project 
based on the current updated/revised Detailed Project Schedule and the anticipated level of 
payments for CM@Risk during the design and construction phases. In addition, if requested 
by City and based on information provided by City, CM@Risk must prepare a cash flow 
projection for the entire Project based on historical records for similar types of projects 
to assist City in the financing process. 
17.5.7 
Construction Water. CM@Risk must estimate the quantity of water to be used and include 
the cost thereof in each Detailed Cost Estimate and GMP Proposal provided by City. 
17.6 
SUBCONTRACTOR AND MAJOR SUPPLIER SELECTIONS 
17.6.1 
There are two ways to select Subcontractors and major Suppliers prior to submission of a 
GMP Proposal: (1) qualifications-based selection; or (2) a combination of qualifications 
and price. Except as noted below, the selection of Subcontractors/Suppliers is the sole 
responsibility of CM@Risk. In any case, CM@Risk is solely responsible for the performance 
of the selected Subcontractors/Suppliers, and for compliance with the requirements of 
Title 34 of the Arizona Revised Statutes in the selection of a Subcontractors/Suppliers, 
to the extent applicable. CM@Risk must comply with its Subcontractor Selection Plan

General Conditions 
 
Revised: 10/19/2021 
 
GC-72 of 75 
 
submitted with its Statement of Qualifications. 
17.6.2 
City may approve the selection of a Subcontractor(s) or Suppliers(s) based only on their 
qualifications when CM@Risk can demonstrate it is in the best interest of the Project. All 
Work that is performed, after such a qualifications-based selection, for a price that is 
negotiated by CM@Risk will be billed in accordance with the GMP for actual costs and may 
be subject to audit by City. 
17.6.2.1 
Qualifications based selection of a Subcontractor(s)/Supplier(s) should only occur prior to 
the submittal of the GMP Proposal. 
17.6.2.2 
If a Subcontractor/Supplier selection plan was submitted and agreed to by City, CM@Risk 
must apply the plan in the evaluation of the qualifications of a Subcontractor(s) or 
Supplier(s) and provide City with its review and recommendations. 
17.6.2.3 
CM@Risk must receive written City approval for each selected Subcontractor(s) and 
Supplier(s). 
17.6.2.4 
CM@Risk must negotiate costs for services/supplies from each Subcontractor/Supplier 
selected under this method. 
17.6.3 
All Work must be competitively bid unless a Subcontractor or Supplier was selected pursuant 
to Section 17.6.2 above. 
17.6.3.1 
CM@Risk must develop Subcontractor and Supplier interest, submit the names of a 
minimum of three qualified Subcontractors or Suppliers for each trade in the Project for 
approval by City and solicit bids for the various Work categories. If there are not three 
qualified Subcontractors/Suppliers available for a specific trade or there are extenuating 
circumstances warranting such, CM@Risk may request approval by City to submit less 
than three names. Without prior written notice to City, no change in the recommended 
Subcontractors/Supplies will be allowed. 
17.6.3.2 
If City objects to any nominated Subcontractor/Supplier or to any self-performed Work for 
good 
reason, CM@Risk must nominate a substitute Subcontractor/Supplier that is 
acceptable to City. 
17.6.3.3 
CM@Risk must distribute Drawings and Specifications, and when appropriate, conduct a 
Pre- Bid Conference with prospective Subcontractors and Suppliers. 
17.6.3.4 
If CM@Risk desires to self-perform certain portions of the Work, it must request to be one of 
the approved Subcontractor bidders for those specific bid packages. CM@Risk’s bid will 
be evaluated in accordance with the process identified below. If events warrant and City 
concurs that it is necessary in order to ensure compliance with the Project Schedule 
and/or the most recent Detailed Cost Estimate, CM@Risk may be authorized to self-
perform Work without bidding or rebidding the Work. When CM@Risk self-performs work 
without bidding, only the actual costs associated with performing the Work in accordance 
with the approved GMP will be billed and may be subject to audit by City. 
17.6.3.5 
CM@Risk must receive, open, record and evaluate the bids; provided, however, that if 
CM@Risk or one of its affiliates is bidding to self-perform the Work that is the subject of the 
bid, then the bids must be received, opened, recorded and evaluated by Project Manager 
instead of CM@Risk. Bids for each category of Work must be opened and recorded at a 
pre-determined time. The apparent low bidders must be interviewed to determine the

General Conditions 
 
Revised: 10/19/2021 
 
GC-73 of 75 
 
responsiveness of their proposals. In evaluating the responsiveness of bid proposals 
CM@Risk, in addition to bid price, may consider the following factors: past performance 
on similar projects, qualifications and 
experience of personnel assigned, quality 
management plan, approach or understanding of the 
Work to be performed, and 
performance 
schedule 
to 
complete 
the 
Work. 
The 
final 
evaluation 
of 
Subcontractor/Supplier bids must be done with Project Manager in attendance to observe 
and witness the process. CM@Risk must resolve any Subcontractor/Supplier bid withdrawal, 
protest or disqualification in connection with the award at no increase in the Cost of Work. 
17.6.4 
CM@Risk will be required to prepare two different reports on the subcontracting process. 
17.6.4.1 
Within fifteen days after each major Subcontractor/Supplier bid opening process; 
CM@Risk must prepare a report for City’s review and approval identifying the 
recommended Subcontractors/Supplier for each category of Work. The report must detail: 
(a) the name of the recommended Subcontractor/Supplier and the amount of the 
Subcontractor/Supplier bid for each sub-agreement; (b) the sum of all recommended 
Subcontractor/Supplier bids received; (c) and trade work and its cost that CM@Risk intends 
to self-perform, if any. 
17.6.4.2 
Upon completion of the Subcontractor/Supplier bidding process, CM@Risk must submit 
a summary report to City of the entire Subcontractor/Supplier selection process. The report 
must indicate, by bid process, all Subcontractors/Suppliers contacted to determine 
interest, the Subcontractors/Suppliers solicited, the bids received and costs negotiated, 
and the recommended Subcontractors/Suppliers for each category of Work. 
17.6.5 
The approved Subcontractors/Suppliers will provide a Schedule of Values with their bid 
proposals, which will be used to create the overall Project Schedule of Values. 
17.6.6 
If after receipt of sub-bids or after award to Subcontractors and Suppliers, City objects to 
any nominated Subcontractor/Supplier or to any self-performed Work without any 
reasonable basis, CM@Risk must nominate a substitute Subcontractor or Supplier, 
preferably if such option is still available, from those who submitted Subcontractor bids 
for the Work affected.  Once such substitute Subcontractors and Suppliers are consented 
to by City, CM@Risk’s proposed GMP for the Work or portion thereof must be 
correspondingly adjusted to reflect any higher or lower costs form any such substitution. 
17.7 
GMP PROPOSAL 
17.7.1 
When a GMP Proposal is submitted for a phase of the Work, the GMP will have a Detailed Cost 
Estimate of the Costs of the Work (as set forth in Section 15.2) in each phase of the Work 
that is being proposed plus the current estimate for all other Work. City will not approve 
the GMP for the phase of work without a total estimate for the complete Project. City may 
request a GMP Proposal for all or any portion of the Project and at any time during pre-
construction. Any GMP Proposals submitted by CM@Risk must be based on and consistent 
with Baseline Cost Model and the current update/revised Detailed Cost Estimate at the 
time of the request and include any clarifications or assumptions upon which the GMP 
Proposal(s) are based. 
17.7.2 
A GMP Proposal for the entire Project will be the sum of the Cost of the Work, CM@Risk Fee, 
and General Conditions Cost. CM@Risk guarantees to complete the Project at or less than 
the final GMP Proposal amount plus approved Change Orders. CM@Risk will be responsible 
for any costs for expenses that would cause the Cost of the Work actually incurred,

General Conditions 
 
Revised: 10/19/2021 
 
GC-74 of 75 
 
including the Construction Fee and General Conditions Costs, to exceed the GMP. 
17.7.3 
CM@Risk must prepare its GMP Proposal in accordance with City’s request for GMP Proposal 
requirements based on the most current completed Drawings and Specifications at that 
time, which unless otherwise directed by City in writing, will be at 100% Construction 
Drawings. CM@Risk must mark the face of each document of each set upon which its GMP 
Proposal is based. 
These documents must be identified as the GMP Plans and 
Specifications. CM@Risk must send one set of those documents to the Project Manager, 
keep one set and return the third set to the Design Professional. 
17.7.4 
An updated/revised Detailed Project Schedule, Equipment Plan, and Schedule of Values 
must be included in any GMP Proposal(s), all of which must reflect the GMP Plans and 
Specifications the Detailed Project Schedule must be shown in relationship to the Project 
Schedule and identify any variance to the Baseline Project Schedule. Any such Detailed 
Project Schedule updates/revisions must continue to comply with the requirements of 
Section 17.3.1 through 17.3.5. 
17.7.5 
GMP Proposals(s) Review and Approval 
17.7.5.1 
CM@Risk must meet with the Project Team to review the GMP Proposal(s) and the written 
statement of its basis. In the event the Project Team discovers inconsistencies or 
inaccuracies 
in the information presented, CM@Risk must make adjustments as 
necessary to the GMP Proposal. 
17.7.5.2 
If during the review and negotiation of GMP Proposals design changes are required, City 
may authorize and cause the Design Professional to revise the GMP Plans and Specifications 
to the extent necessary to reflect the agreed-upon assumptions and clarifications contained 
in the final approved GMP Proposal. Such revised GMP Plans and Specification will be 
furnished to CM@Risk. CM@Risk must promptly notify the Project Team in writing if any 
such revised 
GMP Plans and Specifications are inconsistent with the agreed upon 
assumptions and clarifications. 
17.7.6 
All portions of or items comprising the GMP Proposal are subject to audit by City, as 
deemed appropriate by City, including, without limitation, any based upon unit prices or 
Work to be self- performed by CM@Risk, or its affiliates. 
17.8 
PAYMENT PROCEDURE FOR PRE-CONSTRUCTION SERVICES 
17.8.1 
Requests for monthly payments by CM@Risk for Pre-Construction Services must be 
submitted monthly and must be accompanied by a progress report, detailed invoices 
and receipts, if applicable. Any requests for payment must include, as a minimum, a 
narrative description of the tasks accomplished during the billing period, a listing of any 
Deliverables submitted, and copies of any Subconsultants’ requests for payment, plus 
similar narrative and listings of Deliverables associated with their Work. Payment for 
services negotiated as a lump sum will be made in accordance with the percentage of work 
completed during the preceding month. 
17.8.2 
In no event will City pay more than seventy-five (75%) of the Contract Price until acceptance 
of ALL Pre-Construction Services and award of the final approved Construction Services 
Contract for the entire Project by City Council. If CM@Risk does not prepare a GMP 
Proposal that is acceptable to City, or the GMP Proposal exceeds the City’s Construction 
Budget, then CM@Risk understands and acknowledges that it will forfeit any right to

General Conditions 
 
Revised: 10/19/2021 
 
GC-75 of 75 
 
receive the 25% of the Contract Price being retained by City. 
17.8.3 
CM@Risk agrees that no charges or claims for costs or damages of any type will be made by 
it for any delays or hindrances beyond the reasonable control of City during the progress of 
any portion of Pre-Construction Services specified in this Contract. Such delays or 
hindrances, if 
any, will be solely compensated for by an extension of time for such 
reasonable period and may be mutually agreed between the parties. It is understood 
and agreed, however, that permitting CM@Risk to proceed to complete any such Services, 
in whole or in part after the date to which the time of completion may have been extended, 
will in no way act as a waiver on the part of City of any of their respective legal rights herein. 
17.8.4 
No compensation to CM@Risk will be allowed contrary to Article I, Chapter I, Title 34 of the 
Arizona Revised Statutes. 
17.8.5 
If any service(s) executed by CM@Risk is abandoned or suspended in whole or in part, for 
a period of more than 180 days through no fault of CM@Risk, CM@Risk is to be paid for 
the services performed prior to the abandonment or suspension. 
17.9 
SURVIVAL OF THE DESIGN SERVICES CONTRACT, DUTIES, OBLIGATIONS AND 
WARRANTIES 
If the GMP Proposal is accepted by City and a Construction Contract is entered into 
between City and CM@Risk, the duties, obligations and warranties of CM@Risk under the 
Pre- Construction Services Contract survive and are incorporated into the resulting 
Construction Contract.

App’d 1/7/22 
APP-1 of 32 
 
General Conditions Appendices 
 
 
 
SECTION 15 – APPENDICES 
 
The following Appendices attached hereto are referenced in the General Conditions and 
are incorporated herein. 
 
 
Appendix 1 – Policy Statement for Calculating Delays and Damages 
Appendix 2 – Cost Reduction Incentive Proposals for Design Bid Build Contracts 
Appendix 3 – Contractor’s Affidavit Regarding Settlement of Claims 
Appendix 4 – Forms of Performance Bond 
Appendix 5 – Forms of Payment Bond 
Appendix 6 – Dispute Resolution 
Appendix 7 – Certificate of Completion 
Appendix 8 – Construction Sign Detail 
Appendix 9 – Cost of the Work (Applicable solely to Construction Manager at Risk and 
Job Order Contracting) 
Appendix 10 Landscape Establishment Period

App’d 1/7/22 
APP-2 of 32 
General Conditions  
Appendix 1 
 
 
 
 
 
 
CALCULATING DELAYS AND DAMAGES 
 
 
The purpose of this policy statement is to establish guidelines and procedures for negotiation 
between the Contractor and City of Chandler relating to compensation for delays pursuant to 
Arizona Revised Statutes (A.R.S.) 34-221(F). This policy statement contains notice requirements in 
addition to those set forth in the Contractor Documents, and will be the Contract Provision 
contemplated by that statute. 
 
NOTE: As used herein, the term “Engineer” will refer to the City of Chandler City Engineer or 
his/her designated representative. Nothing in this Policy Statement will be construed to void any 
provision in the Contract which requires timely notice of delays or provides for arbitration or 
any other procedure for settlement or provides for liquidated damages. 
 
I. 
TYPES OF DELAYS: 
 
For the purposes of this document, there are essentially four types of delays encountered by 
City of Chandler Construction Contractors; excusable/compensable, excusable/non-
compensable, non- excusable, and concurrent. Only delays that extend Contract 
Completion Time set forth in the Contract Document will be considered for issues 
relating to Contract extensions or additional compensation. All other delays are 
considered to be activity delays and do not entitle the Contractor to either time 
extensions or additional compensation. Contract Completion Time will be defined as the 
date set forth in Maricopa Association of Governments (MAG) Uniform Standard Specification 
Section 101 and as may be modified by the Contract Documents. 
 
A. 
Excusable/Compensable: 
 
These are delays caused solely by the City’s actions or inactions, are unreasonable 
under the circumstances, and which were not within the contemplation of the 
parties to the Contract at or prior to the time of execution of the Contract. 
Since the Contractor presumably has no control over the events causing the delay, 
he may be entitled to both contract time extensions and additional compensation for 
delay damages. Further, he/she may be entitled to additional compensation from 
the impact of that delay on other work. Examples of excusable/compensable (E/C) 
delays include: failure to properly locate an underground City-owned utility within 
2 feet of the actual location; failure to relocate City-owned utilities far enough in 
advance of construction in an area where the Contractor is scheduled to work 
that it delays start or completion of the Contractor’s regularly scheduled work; 
failure to provide City-furnished equipment or materials in a timely manner if 
required by the Contract; failure to acquire necessary Right-of-Way or Public Utility 
Easements prior to the Contractor beginning Work in the area; failure to timely return 
Shop Drawings or other Contract Submittals in accordance with the Contract; 
unreasonable delay by the City in making decisions which affect critical activities; 
surveying errors when the City is contractually responsible for providing Project 
Surveying. This list is not meant to be all inclusive, but is intended merely as examples 
of the type of City action or inaction which can result in a Contractor’s claim for 
additional time and compensation.

App’d 1/7/22 
APP-3 of 32 
General Conditions  
Appendix 1 
 
 
 
 
B. 
Excusable/Non-compensable: 
 
These are delays over which neither the City nor the Contractor had control. Since 
both parties to the Contract have been potentially damaged by the delay, but 
neither have caused it, only Time Extensions are warranted. Examples of excusable, 
non-compensable (E/N) delays include: unusually severe weather; fire; acts of God; 
failure of non-City owned utilities (SRP, CenturyLink, Cable TV, Southern Pacific 
Railroad, and Southwest Gas, etc.) to properly or timely locate accurately; failure of 
non-City owned utilities to relocate in advance of construction; the voluntary or 
involuntary filing for Bankruptcy protection by a Supplier or Subcontractor which 
causes the Supplier/Subcontractor to fail to meet a contractual deadline provided 
the Contractor can provide documentation that he/she executed the required 
Purchase Orders/Subcontract Agreements and received delivery schedules which, 
if met, would have eliminated the delay; delays as a result of an incomplete 
shutdown of a City or non-City owned utility main (the City does not guarantee a 
complete shutdown). This list also is not necessarily all inclusive but merely 
indicative of type and class of E/N delays. 
 
C. 
Non-excusable/Non-compensable: 
 
These are delays caused by the actions or inactions of Contractor or an officer, 
employee, agent, Subcontractor, Supplier or any other party for whom the 
Contractor is responsible. Since the Contractor has assumed responsibility for the 
risks associated with the events that caused the delay, he/she are not entitled to 
either time extensions or monetary delay damages. All non-excusable delays are 
also non-compensable. Examples of non- excusable, non-compensable (N/N) 
delays include: failure to perform by the Contractor, its Subcontractors and/or 
Suppliers (except as noted in section I.B above); failure to provide adequate 
labor, 
materials, 
and/or 
equipment 
on 
the 
Project; 
failure 
to 
perform 
contractually-required coordination with utilities, agencies and other Contractors; 
failure to notify the Engineer, in writing, of delay impacts within two working days, 
as required by MAG 104.2.3, or the next work day, as required by MAG 109.8.2; 
failure to timely submit Shop Drawings; failure to pothole or otherwise visually locate 
utilities sufficiently ahead of the Work to allow the Engineer to direct corrective 
action when necessary; delays due to retesting of previously failed work, re-
inspection, and/or restaking resulting from faulty workmanship, poor quality 
control, or lack of compliance with Contract Specifications. Again, this list is not 
necessarily all inclusive. 
 
D. 
Concurrent: 
 
When two or more delays occur simultaneously or overlap, each delay is 
analyzed separately to determine its impact on the overall project completion date 
based on when that delay started. Once again, only those delays which actually 
extend the contract completion time are considered as delays. The concurrent 
delay is considered an additional delay only to the extent it prolongs the delay to 
the Contract Completion Time beyond the date that the one it is concurrent with 
had already delayed that date. For example, if two delays are concurrent, and one 
is five days long and the second is seven days long, the second concurrent delay will

App’d 1/7/22 
APP-4 of 32 
General Conditions  
Appendix 1 
 
 
only extend the Contract Completion Time by two days. The same method of analysis 
is used when there are multiple concurrent delays. Only those extending the Project 
Completion Date are considered to be delays for the purposes of this policy. The 
portion of each concurrent delay that delays the completion of the work is classified 
in the same manner as described previously for individual delays and being either 
E/C, E/N or N/N. 
 
An example of a concurrent delay is where the City delays furnishing material, 
but the Contractor could not have installed it anyway due to unusually severe 
weather. The effect of the first delaying activity will extend for the full duration 
and will be considered controlling on the Contractor’s schedule. A subsequent, 
concurrent delay will thereafter only be considered to effect the project completion 
(if at all) once the first delaying activity has ceased to impact the project completion. 
In this case, if the unusually severe weather continued and delayed the work after 
the material was delivered, the first portion of the delay would be classified E/C 
(delay for material) and the second as E/N (delay due to unusually severe weather). 
Using the procedure set forth above, the entire concurrent portion would be 
considered E/C as shown in the chart which follows. 
 
Example of a Concurrent Delay: 
 
 
 
 
E/C Delay 
E/N Delay 
 
 
 
City Related Material Delay 
 
 
 
Rain Delay 
 
 
 
 
 
II. 
ANALYZING THE DELAY: 
 
The Contractor must provide all documents required or requested by the Engineer to analyze the 
delay(s). It is important to understand that, prior to the delay analysis, delays and their impacts are 
alleged issues. The information the Contractor provides will be compared with the Inspector’s Daily 
Log, Schedules and other available Project information and together they will support or refute that 
delays occurred and, if so, how they impact other work and the overall project completion. The 
Contractor’s delay in providing these documents will be considered prima facie evidence that either 
the delay did not occur or it did not impact the Project Completion Date and any claim for time 
extension or damages will be denied. 
 
The Engineer will accept delay analyses in CPM format, as these may demonstrate to his/her 
satisfaction whether or not Project Completion has been impacted by a specific event. If the 
Contractor chooses not to use CPM scheduling procedures, then the burden will be on the 
Contractor to prove to the Engineer’s satisfaction that the Project Completion has been 
impacted. The procedures below assume that the Contractor is using CPM scheduling methods.

App’d 1/7/22 
APP-5 of 32 
General Conditions  
Appendix 1 
 
 
As a minimum the Contractor must provide the following materials to the Engineer: 
 
A. 
As-Planned Schedule. The initial construction schedule, required by the Contract 
Documents, will be considered the baseline schedule. It is to the Contractor’s 
advantage that the As-Planned (baseline) Schedule be as detailed as possible in 
order for delays, as they occur, to be incorporated into the schedule in 
representative locations. It is also to the Contractor’s advantage to use a computer 
software program to generate the schedule since updated schedules are required 
monthly by the Contract Documents and since updated schedules are required 
to support delays and requests for additional compensation for delays. The As-
Planned (baseline) Schedule must be presented in network format which clearly 
shows the interrelationships of the activities. The Contractor must also provide a 
printout of the activities showing early start, early finish, late start, late finish, 
duration and float. The activity list printout must also indicate predecessor and 
successor activities. 
 
B. 
As-Built Schedules. The as planned (baseline) schedule must be updated with 
complete progress-to-date information (actualized) up to the date of the start of the 
alleged delay. Each updated schedule will serve as the as-built schedule for analyzing 
the alleged delay and provide a new baseline as-planned schedule for the next delay. 
This process must be repeated for each alleged delay as it occurs. In updating the 
baseline schedule, the alleged delay must be treated as an activity and inserted into 
the schedule as a predecessor to the impacted activity (ies). When an activity that 
has already started is impacted, it is preferable to divide this activity into two 
parts and show the impact affecting the second part. For schedules which 
incorporate a time line (or data date), the delay activity must be inserted at the time 
it actually occurred. Some software scheduling programs have a PAUSE-RESUME 
feature that can be used to facilitate the requirements. The updated schedule must 
also be accompanied by a listing of activities as with the baseline schedule. This 
activities list must contain the alleged delay as an activity showing the duration and 
the activities which are predecessors and successors to it. When computer 
generated schedules are used, the Contractor must provide, in electronic media 
format, the complete data files for the updated schedule that included the delay 
activity, preferably either in Suretrak or in Microsoft Project. Each electronic media 
must contain a label identifying the Project name, Contractor’s name, program 
name and version number, data date and project finish date. 
 
C. 
Other Documents: In order to determine the amount of the alleged delay and if 
it is compensable, the Contractor must provide all backup documentation relevant to 
the issue and as required by the Engineer. This documentation must include copies 
of such items as: purchase orders; delivery schedules; correspondence; memoranda 
of telephone calls; force account daily worksheets (initialed by the Inspector); 
payroll data; estimating (bid) worksheets; and any other materials which may be 
requested by the Engineer. 
 
D. 
Procedure: Only after receipt of sufficient documentation will the Engineer analyze 
each alleged delay and determine if it is supported or refuted. If supported, the 
Engineer will determine if it is excusable or non-excusable, compensable or non-
compensable. If the Engineer determines that the delay did not affect the Project 
Completion, the as-planned schedule, which has been updated to the date of the 
alleged delay, must be revised to indicate this. If the Engineer determines the delay

App’d 1/7/22 
APP-6 of 32 
General Conditions  
Appendix 1 
 
 
did occur but was N/N, then no time extension will be granted. It is imperative that 
an actualized schedule be submitted as soon as the occurrence of the alleged delay 
is known. In no event will the Contractor submit an actualized updated schedule 
later than 60 days after the occurrence of the alleged delay becomes known. 
 
If the Engineer determines the delay did occur and was excusable but, due to a 
reason listed in section I.B. is non-compensable, he/she will determine the length 
of the E/N delay and prepare a Change Order to add that time to the Contract. The 
Engineer’s decision will be final. 
 
If the Engineer determines the delay was excusable and compensable, he/she will 
determine the length of the E/C delay and proceed to review the Contractor’s 
damage calculations in accordance with Section III. The Engineer will check the 
Contractor’s calculations, review the backup documentation provided, and prepare a 
Change Order to cover both the additional compensation and the time extension. 
The Engineer’s decision on both the time extension and additional compensation for 
the delay will be final. 
 
If the issue involves a concurrent delay, the Engineer will analyze available data 
to determine the portions which are E/C, E/N, and/or N/N as described above. The 
Engineer will proceed to determine the length of E/C delay and verify the Contractor’s 
delay damage calculations, if any are provided. Upon completion of this review, the 
Engineer will prepare a Change Order for the Contractor’s review and signature. 
The Engineer’s decision regarding excusable delay and additional compensation for 
the delay is final. 
 
The amount of time the Engineer will require to analyze the alleged delay(s) will 
depend upon the Engineer’s workload, the complexity of the delay analysis, 
availability of supporting data, extent of cooperation by the Contractor, and other 
factors beyond the Engineer’s control. It is entirely possible other delay(s) may 
occur while the Engineer is analyzing particular claim for delay(s). The Engineer’s 
failure to respond to the Contractor in a set period of time will not be used as the 
basis for a further delay claim or as justification for extending and existing delay 
claim. The time required for delay analysis by the Engineer will not be counted 
against the time allotted for processing Final Payment as required by (MAG Section 
109.7(B)) or the release of retention and Final Payment as prescribed by A.R.S. 
Arizona Revised Statutes §34-221. 
 
III. 
CALCULATING MONETARY DELAY DAMAGES: 
 
Additional compensation for delay, when authorized by the Engineer, will be calculated in accordance 
with MAG Section 109.5 ACTUAL COST WORK with the following exceptions: 
 
A. 
No additional compensation or other monetary damages will be awarded or paid for 
any loss of anticipated profits by the Contractor, Subcontractors or Suppliers. 
 
B. 
No additional compensation or other monetary damages will be awarded for home 
office overhead or non-project general conditions of the Contractor, Subcontractors 
or Suppliers. 
 
C. 
Equipment:

App’d 1/7/22 
APP-7 of 32 
General Conditions  
Appendix 1 
 
 
1. 
Contractor-owned equipment rate calculations must be computed in 
accordance with Section 109.04(D)(3), Arizona Department of Transportation 
“Standard Specifications for Road and Bridge Construction,” 2008 or latest 
edition and as modified herein. Year and regional adjustment factors must 
be based on the most recent publications of the Rental Rate Blue Book for 
Construction 
Equipment, published 
by 
the 
Equipment 
Guide-Book 
Company, San Jose, CA, same as provided by ADOT and in print as of the 
date of alleged delay. In no event will the compensation for Contractor-
owned equipment exceed the purchase price, including tax, paid by the 
Contractor for the equipment. Compensation will not be allowed for small 
tools or equipment that show a daily equipment rental rate of less than $5.00 
per day or for unlisted equipment that has a value of less than for 
hundred dollars ($400.00). 
2. 
For leased and rented equipment or equipment not otherwise listed in the 
Blue Book, rental contracts, or other supporting data will be used to establish 
the hourly rate. No hourly operating expense will be allowed for delay on 
standby equipment. In no case will equipment be considered for rental which 
exceeds the hourly rate for the first eight hours and the daily rate 
divided by eight for all additional hours as compared with similar 
equipment listed in the Blue Book. The hourly standby rate must be 
computed as the lesser of: 
 
a. 
Dividing the monthly invoice or rental value by 176 hours 
per month when the equipment is utilized by the Contractor 
for more than three weeks; 
 
b. 
Dividing the monthly invoice or rental value by 40 hours per 
week when the equipment is utilized by the Contractor for 
more than three days. 
 
In no event will compensation be paid for delay at more than 
8 hours per day or 40 hours per week. 
 
3. 
Except for vehicles used by supervisory personnel, all equipment will be paid 
at the “standby” rate during the delay period. 
 
4. 
Equipment brought solely to mitigate the delay (such as pumps, light plants, 
etc.) may be paid in accordance with ADOT section 109.04(D) (3). 
 
5. 
The Blue Book regional adjustment will apply in determining rental rates. 
 
D. 
Material: 
 
Allowable material charges may include, in addition to material incorporated in the 
work material used to mitigate the delay such as barricades, plates, shoring, cold 
mix, etc. Except in emergencies the Contractor will not employ such material 
without the prior written approval of the Engineer. 
 
E. 
Labor: 
 
1. 
Except for Supervisory Personnel (Superintendent, Project Engineer, and 
Foremen), labor wages will not be paid after the first one-half day of

App’d 1/7/22 
APP-8 of 32 
General Conditions  
Appendix 1 
 
 
claimed delay or impact. It is expected the Contractor will reassign or 
layoff unneeded employees. 
 
2. 
For Foreman wages to be included, that Foreman must have been 
actively employed on the project prior to the commencement of the delay 
and be directly responsible for the activity being delayed. 
 
3. 
Labor burden must be actual amounts incurred but must not exceed the 
ADOT approved rate. 
 
F. 
All costs (equipment, material, and labor) must be substantiated by the City of 
Chandler’s Daily Work Reports. 
 
IV. 
DOCUMENT REQUIRED FOR CLAIM ANALYSIS: 
 
For purposes of reviewing the Contractor’s request for additional compensation, it will be required 
that the Contractor submit the following listed information. Information requested must be prepared 
on forms which are substantially similar to the City of Chandler’s Daily Work Report form, a copy of 
which is attached as an exhibit. 
 
A. 
Labor: 
 
For each employee, laborer, and foreman, for which compensation is requested: 
Name, classification, dates of work performed, daily hours worked, total hours worked, 
labor rates, labor burden rates, overtime or premium time charges. Further, the 
Contractor must make available for inspection and copying to the Engineer the 
following listed documentation. 
 
1. 
Certified payroll reports for the period of work claimed. 
2. 
Accounting of Fringe Benefits – certified by a CPA. 
3. 
Contractor’s and Subcontractor’s daily field reports and daily diaries. 
 
B. 
Materials: 
 
For all materials for which compensation is requested, if any, total quantities of 
materials, prices, extensions and transportation costs must be provided on a daily 
basis. Further, the Contractor must make available for inspection and copying to the 
Engineer the following listed documentation. 
 
1. 
Invoices for all materials incorporated. 
2. 
Weigh tickets. 
3. 
Purchase orders. 
4. 
Delivery schedules. 
5. 
Quotes or proposals from manufacturers or supplier. 
6. 
Freight bills, Bills of Lading, or other documentation to show transportation 
costs. 
7. 
Restocking charges-invoices from vendor. 
 
C. 
Equipment: 
 
For all equipment, the Contractor must provide the Engineer with the designation, 
dates and hours of usage, dates and hours of standby, if any, daily hours, total hours,

App’d 1/7/22 
APP-9 of 32 
General Conditions  
Appendix 1 
 
 
rental rates and extension for each unit of equipment and machinery. Rental 
rates will be as established in Section III. Further, the Contractor must make 
available for inspection and copying to the Engineer the following listed 
documentation. 
 
1. 
Owned: 
a. 
Purchase contracts(s). 
b. 
Depreciation schedule(s). 
c. 
Invoices for fuel, lube, repairs and other operating costs. 
 
2. 
Leased: 
a. 
Lease agreement with hourly rate, overtime rate, double shift rate, etc. 
b. 
Invoices or other documentation showing hours worked on a daily 
basis. 
 
D. 
Subcontractors/Owner-Operators: 
 
In the event the Contractor submits a claim which includes requests for 
compensation for Subcontractors of Owner-Operators, the same information 
requested of the Contractor must be provided by the Subcontractor/Owner-
Operator. Further, the Contractor must make available for inspection and copying 
to the Engineer the following listed documentation. 
 
1. 
Bid/Estimate work sheets and/or spreadsheets. 
2. 
Subcontract Agreements or Agreements with Owner-Operator. 
3. 
All invoices and billing statements received from the Subcontractor/Owner- 
Operator which relates to the amount requested. 
 
E. 
Miscellaneous: 
 
Further, the Contractor must make available for inspection and copying to the 
Engineer the following listed documentation. 
 
1. 
Evidence of payment for bonds and insurance premiums (MAG 109.5.6). 
2. 
Taxes – unless the Contractor can show otherwise, taxes are reimbursable at 
65% of the total cost (less bonds and insurance). 
 
V. 
TIME LIMIT ON SUBMISSIONS OF CLAIM FOR DELAY OR IMPACT DAMAGES: 
 
No claims for delay or impact damages will be considered or allowed more than 45 days after the 
event or occurrence which the Contractor claims gives rise to the delay or impact. In no event will 
a claim for delay or impact damages be considered after submission by the Contractor of the Final 
Payment Request.

App’d 1/7/22 
APP-10 of 32 
General Conditions  
Appendix 2 
 
 
 
 
COST REDUCTION INCENTIVE PROPOSALS 
FOR DESIGN BID BUILD CONTRACTS 
 
 
The Contractor may submit to the Engineer proposals for modifying the Plans, Specifications, or 
other requirements of the Contract for the sole purpose of reducing the total cost of Project 
construction. The proposals must not impair in any manner the essential functions or characteristics 
of the project; including but not limited to service life, economy of operations, ease of maintenance, 
desired appearance, compatibility with existing or planned equipment, standardization of 
systems, or  design and safety standards. 
 
It must not be inferred from this Policy that the Engineer is required to consider any proposal 
submitted. 
 
Submissions that propose changes in the basic design of a bridge, propose changes in pipe line 
size, materials, bedding conditions, pipe specifications; or that propose any change in pavement 
design will not be considered. 
 
Proposals submitted pursuant to this Policy will be identified as Cost Reduction Incentive Proposals. 
They must be submitted in writing and, at a minimum, contain the following. 
 
1. 
Complete the attached or similar cost reduction incentive proposal form. 
 
2. 
A description of both the existing Contract Requirements for performing the work 
and the proposed changes. 
 
3. 
All Engineering Drawings and computations necessary for the thorough and 
expeditious evaluation. 
 
4. 
An itemization of the existing Contract Requirements that must be changed if the 
Proposal is adopted and a recommendation as to the manner in which the change 
should be made. 
 
5. 
A detailed estimate of the cost of performing the Work under the existing Contract 
and under the proposed changes, including the cost of developing and 
implementing the changes. 
 
6. 
The Contract items affected by the proposed changes and any variations in 
quantities resulting from the changes. 
 
7. 
An objective estimate of any effects the proposal will have on collateral cost to the 
City, costs of related items, and cost of maintenance and operation. 
 
8. 
A statement as to the effect that the Proposal will have on the time for the 
completion of the Project. 
 
9. 
A statement as to the time by which a Change Order adopting the Proposal must 
be executed or when the Engineer must have given verbal approval. 
 
Proposals will be processed expeditiously; however, the City will not be liable for any delay in acting 
upon any Proposal nor for any failure to accept any Proposal pursuant to this Special Provision.

App’d 1/7/22 
APP-11 of 32 
General Conditions  
Appendix 2 
 
 
 
The Engineer will be the sole judge of the acceptability of a Proposal and of the estimated net 
savings in construction costs from the adoption of all or any part of the Proposal. The Contractor 
will be notified in writing by the Engineer as to whether his/her Proposal has been accepted. The 
decision by the Engineer is final. 
 
When the City deems such action to be appropriate, it reserves the right to require the Contractor to 
share equally in the cost to the City of investigating, evaluating, and processing the proposal as a 
condition for the consideration of such Proposal. Such cost must be shared whether the Proposal is 
accepted or rejected. When such a condition is imposed, the City will estimate these costs and the 
Contractor must indicate his acceptance thereof in writing. Such acceptance will authorize the City 
to deduct the Contractor’s share of the costs from any monies due or that may become due to the 
Contractor under the Contract. 
 
If the Contractor’s Proposal is accepted in whole or in part, the necessary Contract Modifications 
and Contract Price Adjustments will be affected by the execution of a Change Order which will 
specifically state that it is executed pursuant to this Special Provision. 
 
The Contractor must continue to perform the work in accordance with the requirements of the 
Contract until a Change Order incorporating the Proposal has been executed or until he/she has 
been given verbal approval by the Engineer that his/her Proposal has been accepted. If the 
Change Order has not been executed or he/she has not been given verbal approval on or before the 
date specified on the attached cost reduction incentive proposal form or on or before such other date 
as the Contractor may have subsequently specified in writing, the Proposal may be deemed to be 
rejected. 
 
The executed Change Order will incorporate the changes in the Plans, Specifications, or other 
requirements of the Contract which are necessary to permit the Proposal, or such part of it which has 
been accepted, to be put into effect, and will include any condition – upon which the City’s approval 
thereof is based, if such approval is conditional. The executed Change Order may also extend 
the time for the completion of the Contract if such an extension has been deemed to be 
warranted by the Engineer as a result of his evaluation of the Proposal. 
 
The executed Change Order will also establish the estimated net savings in the cost of performing 
the Work attributable to the Proposal effectuated by the Change Order. In determining the net 
savings, the right is reserved to the Engineer to disregard the Contract bid prices if, in his/her 
judgment, such prices do not represent a fair measure of the value of the Work to be performed or 
to be deleted. The net savings will be established by determining the Contractor’s cost of performing 
the Work, taking into account his/her cost of developing the Proposal and implementing the 
change, and reducing  this amount by any ascertainable collateral costs to the City. The executed 
Change Order may provide that the Contractor be paid 50 percent of the estimated net savings 
amount. 
 
The executed Change Order may also provide for the adjustment in Contract prices. Contract prices 
may be adjusted by subtracting the City’s share of the accrued net savings. 
 
The amount specified to be paid to the Contractor in the executed Change Order which effectuates a 
Cost Reduction Proposal will constitute full compensation to the Contractor for the Cost Reduction 
Proposal and the performance of the work thereof pursuant to the said Change Order. 
 
Upon acceptance of a Cost Reduction Incentive Proposal, any restrictions imposed by the

App’d 1/7/22 
APP-12 of 32 
General Conditions  
Appendix 2 
 
 
 
Contractor on its use or on disclosure of the information will become void, and the City thereafter 
will have the right to use all or any part of the Proposal without obligation or compensation of any 
kind to the Contractor.

App’d 1/7/22 
APP-13 of 32 
General Conditions  
Appendix 2 
 
 
 
 
 
COST REDUCTION INCENTIVE PROPOSAL FORM 
 
 
 
TO: 
CIP City Engineer 
 
 
FROM: 
 
 
 
PROJECT NAME: 
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS 
 
 CITY PROJECT NUMBER: 
WW2111.401 
 
 
DATE: 
 
 
Summary of Change (Brief description of proposed change including advantages and disadvantages): 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ESTIMATED COST SUMMARY (Attached detailed estimate): 
 
A. 
Original Cost: 
$   
 
B. 
Proposed Cost: 
$   
 
C. 
Construction Savings (A-B): 
$   
 
D. 
Gross Savings (Included OH 
%, Bond 
%) 
$   
 
E. 
Contractor Implementing 
$_  
 
F. 
City Implementing Cost: 
$_  
 
Reduction in Contract Price (C+D-E-F) x 50%: 
$   
 
 
 
 
 
Date by which a Change Order must be issued so as to obtain maximum cost reduction:

App’d 1/7/22 
APP-14 of 32 
General Conditions  
Appendix 3 
 
 
 
 
 
CITY OF CHANDLER, ARIZONA 
PUBLIC WORKS & UTILITIES DEPARTMENT 
 
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS 
 
 
________________________, Arizona 
Date ____________________________ 
 
Project Name:  CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS 
City Project No.:  WW2111.401 
To the City of Chandler, Arizona 
Gentlemen: 
This is to certify that all lawful claims for materials, rental of equipment and labor used in connection 
with the construction of the above project, whether by subcontractor or claimant in person, have been 
duly discharged. 
 
The undersigned, for the total compensation of $________________________, as set out in the final pay 
application, as full and complete payment under the terms of the contract, hereby waives and 
relinquishes any and all further claims or right of lien under, in connection with, or as a result of the 
above described project.  The undersigned further agrees to indemnify and save harmless the City of 
Chandler against any and all liens, claims or liens, suits, actions, damages, charges and expenses 
whatsoever, which said City may suffer arising out of the failure of the undersigned to pay for all labor 
performances and materials furnished for the performance of said installation. 
 
Signed and dated at ________________, this _________ day of _______________ 20_____. 
 
__________________________________ 
CONTRACTOR 
 
By _______________________________ 
STATE OF ARIZONA 
 
) 
) SS 
COUNTY OF MARICOPA 
) 
 
The foregoing instrument was subscribed and sworn to before me this __________ day of 
__________________ 20 _________. 
 
___________________________________ 
 
 
 
 
 
Notary Public 
 
___________________________________ 
 
 
 
 
 
My Commission Expires

App’d 1/7/22 
APP-15 of 32 
General Conditions  
Appendix 4 
 
 
 
PERFORMANCE BOND 
 
ARIZONA STATUTORY PERFORMANCE BOND 
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Contract amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:___________________________________________________ 
 
(hereinafter "Principal"), and __________________________________________________________ (hereinafter "Surety"), a 
corporation organized and existing under the laws of the State of ______________ with its principal office in the City 
of _____________________________, holding a certificate of authority to transact surety business in Arizona issued by 
the Director of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto 
__________________________(hereinafter "Obligee") in the amount of __________________________________________ 
(Dollars) ($___________), for the payment whereof, Principal and Surety bind themselves, and their heirs, 
administrators, executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated  
 
the ____________ day of _______________________, 20___ for construction of CHANDLER HEIGHTS ROAD UTILITY 
RELOCATIONS, WW2111.401 which contract is hereby referred to and made a part hereof as fully and to the 
same extent as if copies at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal faithfully performs 
and fulfills all the undertakings, covenants, terms, conditions and agreements of the contract during the original 
term of the contract and any extension of the contract, with or without notice of the Surety, and during the life of 
any guaranty required under the contract, and also performs and fulfills all the undertakings, covenants, terms, 
conditions, and agreements of all duly authorized modifications of the contract that may hereafter be made, 
notice of which modifications to the Surety being hereby waived, the above obligation is void.  Otherwise it 
remains in full force and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2, 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions of 
Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length in this 
Contract. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees 
that may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
____________________________________ 
PRINCIPAL          
SEAL 
___________________________________ 
             AGENT OF RECORD 
By _________________________________ 
____________________________________ 
SURETY  
 
SEAL 
___________________________________ 
               AGENT ADDRESS

App’d 1/7/22 
APP-16 of 32 
General Conditions  
Appendix 5 
 
 
 
PAYMENT BOND 
 
 
ARIZONA STATUTORY PAYMENT BOND 
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES 
(Penalty of this Bond must be 100% of the Contract amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:________________________________________________  
 
(hereinafter "Principal"), as Principal, and _________________________________________(hereinafter "Surety"), a 
corporation organized and existing under the laws of the State of __________________   with its principal office in the 
City of __________________, holding a certificate of authority to transact surety business in Arizona issued by the 
Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly 
bound 
unto 
________________________ 
 
(hereinafter 
"Obligee") 
in 
the 
amount 
of 
______________________________________________ (Dollars) ($___________), for the payment whereof, the Principal and 
Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, 
firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the _________ day of 
_______________________, 20___ for construction of CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS, 
WW2111.401 which contract is hereby referred to and made a part hereof as fully and to the same extent as if 
copied at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal promptly pays all 
moneys due to all persons supplying labor or materials to the Principal or the Principal's subcontractors in the 
prosecution of the work provided for in said contract, this obligation is void. Otherwise it remains in full force and 
effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions, 
conditions and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were 
copied at length in this Contract. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees 
that may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
____________________________________ 
PRINCIPAL          
SEAL 
___________________________________ 
                 AGENT OF RECORD 
By _________________________________ 
____________________________________ 
SURETY  
 
SEAL 
___________________________________ 
                  AGENT ADDRESS

App’d 1/7/22 
APP-17 of 32 
General Conditions  
Appendix 6 
 
 
 
 
DISPUTE RESOLUTION 
 
A. 
INFORMAL DISPUTE RESOLUTION 
 
The parties to the Contract agree that time is of the essence in relation to 
performance of the Contract and completion of the Project, therefore any and all 
disputes in relation to the Contract will initially be referred to the Project Manager, 
the Design Professional Representative and/or the Contractor Representative as 
applicable to the dispute, for immediate resolution. If, after good faith efforts to 
reach a resolution, none is reached, any party to the dispute may submit the 
dispute to the Dispute Resolution Representative (“DRR”) process set forth below, 
which is intended to be an expedited process. 
 
B. 
DISPUTE RESOLUTION REPRESENTATIVE (“DRR”) PROCESS 
 
1. 
The Parties under the Contract agree that all claims and disputes in relation to 
the Project which are not resolved in the ordinary course of the Project 
(“Claim” or “Claims”) will, as a prerequisite to any mediation, or litigation of 
the Claim, first be submitted for resolution between the designated 
Dispute Resolution Representatives of the Parties as set forth herein (the 
“DRR Process”). 
 
2. 
The DRR Process will be initiated through service of a DRR Notice as set 
forth below: 
 
a. 
For claims by the Contractor or the Design Professional, the DRR 
Process will be initiated by the party asserting the claim serving 
written notice on the City setting forth in detail: (i) the basis for the 
claim; (ii) the effect of the Claim upon the construction of, and/or 
Project Schedule for, the Project; 
(iii) the specific relief requested, the amount thereof, and how such 
was calculated; (iv) the parties involved in the Claim, and how 
they are involved; (v) the specific contract provisions in the Contract 
Documents (including, if applicable, drawings and specifications) 
which apply; and (vi) efforts made to date to resolve the Claim. 
 
b. 
For claims by the City, the DRR process will be initiated by the 
City providing written notice to the other parties of the basis and 
amount of its claim, the parties involved in the Claim, and how they 
are involved, the provisions in the Contract Documents that apply, 
and the relief requested. 
 
c. 
The DRR Notice will be hand-delivered and e-mailed to the other 
parties’ designated Dispute Resolution Representatives. 
 
3. 
The other parties will respond in writing to the DRR Notice (“DRR 
Response”) within ten (10) calendar days of receipt of the DRR Notice, setting 
forth those items set forth in the DRR Notice that they agree with, dispute, 
and/or have questions concerning. The DRR Response will be hand-delivered 
and e-mailed to the other parties’ Dispute Resolution Representatives.

App’d 1/7/22 
APP-18 of 32 
General Conditions  
Appendix 6 
 
 
4. 
The designated Dispute Resolution Representatives for the Parties to the 
claim will then meet as soon as possible and in any event within twenty (20) 
calendar days of submission of the DRR Notice (regardless of whether a 
DRR Response has been submitted by all parties involved in the dispute), at 
a mutually agreed upon time and place, to attempt to resolve the Claim 
based upon the DRR Notice and DRR Response. 
 
5. 
At any time after the first meeting required above, either party may 
terminate the DRR Process by written notice to the other party. 
 
6. 
The parties may agree, in writing, to extend or modify the time limits or 
other provisions of the DRR process in relation to a specific pending Claim. 
 
7. 
Unless otherwise designated in a written notice to the other parties, the City 
and the representatives of the Contractor and of the Design Professional will 
act as the parties’ designated Dispute Resolution Representatives. 
 
8. 
If a resolution of the Claim is reached, that resolution must be set forth in 
writing and must be signed by the Parties’ designated Dispute Resolution 
Representative. If the resolution involves a change in any Contract 
Documents, the Contract Price, the Project Schedule, or any other change 
requiring a written Change Order or Amendment, the parties must execute 
an appropriate written Change Order or Amendment pursuant to the terms 
of the Contract Documents. 
 
C. 
MEDIATION 
 
1. 
Unless extended by written agreement of the parties involved in the dispute, 
any Claim not resolved through the DRR process set forth above within 
five (5) calendar days after the meeting required under B (4) above, or after 
the DRR is terminated pursuant to ¶ B (5) above, whichever is earlier, will be 
submitted to mediation as a condition precedent to litigation by either party. 
 
2. 
The mediation will be commenced by written demand upon the other party 
for mediation. If the parties cannot agree upon a mediator within ten (10) 
calendar days of the written demand, either party may make a request to the 
Civil Presiding Judge of the Maricopa County Superior  Court to appoint a 
mediator. The mediation will occur within forth (40) calendar days of the 
written demand for mediation, unless the parties agree, in writing, to a 
longer period of time. 
 
3. 
The qualifications for the mediator will be that he/she be: (a) an 
experienced mediator, arbitrator or litigator of construction disputes; and (b) 
having engaged a significant portion of his/her time involving and/or 
resolving construction disputes for at least the past five (5) years. 
 
4. 
Each party will provide to the other party and the mediator all of the 
information and documentation required under B(1) and (2) above, together 
with any additional information and documentation which the party believes 
relevant. In addition, the parties will exchange, and provide to the mediator 
such additional memoranda, information and/or documentation, as the

App’d 1/7/22 
APP-19 of 32 
General Conditions  
Appendix 6 
 
 
mediator may request, and in the form and at such times, as the mediator 
may direct. 
 
5. 
The parties will share the mediator’s fee and any filing fees equally. The 
mediation will be held in Chandler, Arizona, unless another location is 
mutually agreed upon.  Agreements reached in mediation will be specifically 
enforceable in any court having jurisdiction thereof. 
 
D. 
LITIGATION 
 
Any claim arising out of or related to the Contract, except Claims relating to aesthetic 
effect and except those claims waived as provided for in the Contract 
Documents, must be resolved through litigation in the Maricopa County, Arizona 
Superior Court.

App’d 1/7/22 
APP-20 of 32 
General Conditions  
Appendix 7 
 
 
 
 
CITY OF CHANDLER, ARIZONA 
PUBLIC WORKS & UTILITIES DEPARTMENT 
 
CERTIFICATE OF COMPLETION 
 
 
PROJECT NAME: 
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS 
CITY PROJECT NO.: 
WW2111.401 
If Federally Funded: 
 
FEDERAL NO.: 
 
ADOT NO: 
 
 
 
(This section to be completed by Prime) 
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER FOR THIS 
PROJECT HAVE BEEN DELIVERED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BID 
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE CONTRACT HAVE 
BEEN COMPLETED AS OF THE COMPLETION DATE LISTED HERE: 
 
FINAL ACCEPTANCE DATE: 
 
 
PRIME CONTRACTOR: 
FIRM NAME: 
 
PRINCIPAL: 
 
TITLE: 
 
SIGNATURE: 
 
DATE: 
 
 
 
 
CERTIFIED BY [INSERT NAME AND TITLE OF PARTY THAT OVERSEES CONSTRUCTION]: 
FIRM NAME: 
 
SIGNATURE: 
 
DATE: 
 
 
 
 
 
PROJECT ACCEPTED BY CITY OF CHANDLER: 
NAME: 
 
SIGNATURE: 
 
DATE:

App’d 1/7/22 
APP-21 of 32 
General Conditions  
Appendix 8 
 
 
 
CONSTRUCTION SIGN DETAIL 
 
 
8' 
 
 
 
  3"   
 
 
CITY OF CHANDLER 
  5"   
 
 
 
  3"   
 
 
PUTTING YOUR FUNDS TO WORK 
  5"   
 
 
 
  3"   
 
 
PROJECT TITLE: 
  5"   
 
4' 
 
 
  3"   
 
 
PROJECT NUMBER: 
  3"   
 
 
 
  2"   
 
 
PROJECT COST: 
  3"   
 
 
 
  2"   
 
 
CONTRACTOR: 
  3"   
 
 
 
  2"   
 
 
MANAGED BY: 
PUBLIC WORKS & UTILITIES DEPARTMENT 
  3"   
 
 
 
CAPITAL PROJECTS DIVISION 
  3"   
 
 
 
 
 
 
 
 
 
 
 
                              <--- 4" X 4" POSTS ---> 
 
 
 
 
NOTES: 
 
SIGN(S) MUST BE FURNISHED AND ERECTED PRIOR TO COMMENCEMENT OF CONSTRUCTION.  POSTS 
MUST BE ANCHORED A MINIMUM OF TWO FEET INTO THE GROUND. BOTTOM OF SIGN MUST BE A 
MINIMUM OF FOUR FEET ABOVE THE GROUND. 
 
TYPICAL PROJECT IDENTIFICATION SIGN FOR GENERAL PROJECTS MUST BE NON-REFLECTORIZED 
GREEN BACKGROUND, AND NON-REFLECTORIZED WHITE LETTERS AND NUMERALS. 
 
ONE SIGN MUST BE ERECTED FOR BUILDINGS AND OTHER LIMITED AREA SINGLE SITES.  FOR MULTIPLE 
SITES, ONE SIGN MUST BE ERECTED AT EACH SITE. 
 
FOR LINEAR PROJECTS ONE HALF MILE OR LONGER, PLACE ONE SIGN AT EACH END OF THE PROJECT.

App’d 1/7/22 
APP-22 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
 
COST OF THE WORK 
(APPLICABLE SOLELY TO CONSTRUCTION MANAGER AT RISK AND JOB ORDER CONTRACTING) 
SECTION 1 – COSTS TO BE REIMBURSED 
1.1 Cost of the Work 
The term Cost of the Work will mean costs necessarily incurred by Contractor in the proper 
performance of the Work. Such costs must be at rates not higher than the standard paid at the place 
of the Project except with prior consent of City. The Cost of the Work will include only the items set 
forth in this Section 1. 
 
1.2 Labor Costs 
1.2.1 
Wages of construction workers directly employed by the Contractor to perform the 
construction of the Work at the site or, with City’s approval, at off-site workshops. Cost to 
be reimbursed will be the actual wages paid to the individuals performing the work. 
 
1.2.2 
Wages or salaries of the Contractor’s supervisory and administrative personnel when 
stationed at the site with City’s approval. No Contractor personnel stationed at the 
Contractor’s home or branch offices will be charged to the Cost of the Work. Non-field 
office based Contractor management and support personnel are expected to provide 
service and advice from time to time throughout the job and his/her time devoted to 
Project matters is considered to be covered by the Contractor’s Fee. 
 
1.2.3 
Wages and salaries of Contractor’s supervisory or administrative personnel who would 
normally be stationed at the field office in accordance with Section 1.2.2 but who become 
engaged, at factories, 
workshops or on the road, in expediting the production or 
transportation of materials or equipment required for the Work, but only for that portion 
of his/her time required for the Work. Employee bonuses and/or costs associated with 
Employee Stock Ownership Plans (“ESOP”) will not be considered reimbursable labor or 
labor burden costs and will be considered non-reimbursable costs considered to be covered 
by the Contractor’s Fee. 
 
1.2.4 
Costs paid or incurred by Contractor for taxes, insurance, contributions, assessments and 
benefits required by law or collective bargaining agreements and, for personnel not 
covered by such agreements, customary benefits such as sick leave, medical and health 
benefits, holiday, vacations and pensions, provided such costs are based on wages and 
salaries included in the Cost of the Work under Subparagraphs 1.2.1 through 1.2.3. 
 
1.2.4.1 Cost of the Work will include the actual net cost to Contractor for worker’s 
compensation insurance attributable to the wages chargeable to the Cost of Work per this 
Agreement. The actual net cost of worker’s compensation must take into consideration 
all cost adjustments due to experience modifiers, premium discounts, policy dividends, 
retrospective rating plan premium 
adjustments, assigned risk pool rebates, any 
applicable weekly maximums, etc. Contractor may charge an estimated amount for 
worker’s compensation insurance costs, but will make appropriate cost adjustments to 
actual costs within 45 days of receipt of actual cost adjustments from the insurance 
carrier.

App’d 1/7/22 
APP-23 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
 
1.2.4.3 Overtime wages paid to salaried personnel (if approved in advance in writing by City) 
will be reimbursed at the actual rate of overtime pay paid to the individual. No time 
charges for overtime hours worked on the Project will be allowed if the individual is not paid 
for the overtime worked. 
 
1.2.4.4 Any overtime premium or shift differential expense to be incurred by Contractor for hourly 
workers will require City’s advance written approval before the incremental cost of the 
overtime premium or shift differential will be considered a reimbursable cost. If the 
Contractor is required to work overtime as a result of an inexcusable delay or other 
coordination problems caused by the Contractor or anyone he/she is responsible for, 
the overtime premium and/or shift differential expense portion of the payroll expense 
and related labor burden costs will be considered as cost not to be reimbursed. 
 
1.2.4.5 Reimbursable labor burden costs will be limited to payroll taxes, worker’s compensation 
insurance, the employer’s portion of union benefit costs for union employees working on the 
Project, and the actual verifiable fringe benefit costs incurred by Contractor for non-union 
individuals working on the Project subject to the following maximum percentages for the 
following reimbursable non-union fringe benefit costs. The following maximums (as a 
percentage of reimbursable actual wages by individual) will apply for each of the following 
types of fringe benefit costs specifically attributable to each of the non-union personnel 
working on the Project: 
 
• 
Medical Insurance, Dental, Life & AD&D Insurance: 
12.00% 
• 
Holiday, vacation and other paid time not worked: 
10.00% 
• 
Pension Plan Contributions to Vested Employee Account, 
Simplified Employee Pension Plans, or 401K matching plans 
(Note: ESOP related costs are covered by the Contractor Fee) 
10.00% 
For non-union personnel, no other fringe benefit costs (other than the three specific 
categories listed immediately above, will be considered reimbursable Cost of Work. Any 
labor burden costs that are in excess of the amounts considered reimbursable or are 
otherwise not considered reimbursable under the terms of this agreement are intended to 
be covered by the Contractor Fee. 
 
1.3 
Subcontract Costs 
1.3.1 
Payments made by Contractor to Subcontractors in accordance with the requirements of 
the subcontracts. 
 
1.3.2 
For Scope of Work Bid Packages typically performed by Subcontractors, Contractor may 
“self- perform” such work on an actual cost basis subject to an agreed upon Guaranteed 
Maximum Price for the “self-performed work”. The Contractor must, unless agreed to by City 
in writing, bid his/her proposed guaranteed Maximum Price for the work to be “self-
performed” against at least three other interested trade Contractors. All savings under 
any such Subcontract for “self-performed work” must be applied to reduce the Cost of Work 
under the Contract and the Guaranteed Maximum Price. For purposes of defining “self-
performed work” subject to this provision, any division of Contractor, or any separate 
Contractor or Subcontractor that is partially owned or wholly owned by the Contractor or 
any of his/her employees or employee’s relatives will be considered a related party entity

App’d 1/7/22 
APP-24 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
and will be subject to this provision regarding “self-performed work”. No self-performed work 
will be allowed to be performed on a Fixed Price basis. 
 
1.3.3 
Contractor (with respect to its Suppliers, Subcontractors and all lower tier Subcontractors) 
must provide City advance written notice and must obtain City’s approval for any proposed 
Subcontract Change Order, Material Purchase Order, or other financial commitment in an 
amount in excess of $5,000 prior to placing such order or entering into such agreement 
(regardless of whether or not any such commitment will affect the prime contract 
Guaranteed Maximum Cost). It is agreed that sums applicable to any Subcontract Change 
Order, Purchase Order or other financial commitment entered into in violation of the above 
notice and approval requirement will not be included in the amounts owning to Contractor, 
Subcontractors or Suppliers whether as Costs of the Work or as reasonable termination 
costs in the event of termination. 
 
1.4 
Costs of Material and Equipment Incorporated in the Completed Construction 
1.4.1 
Costs, including transportation and storage, of materials and equipment incorporated or 
to be incorporated in the completed construction. 
 
1.4.2 
Costs of materials described in the preceding Subparagraph 1.4.1 in excess of those 
actually installed to allow for reasonable waste and spoilage. Unused excess materials, in 
any, will become City’s property at the completion of the Work or, at City’s option, may be 
sold by the Contractor. Any amounts realized from such sales must be credited to City as a 
deduction from the Cost of Work. 
 
1.4.3 
Proceeds from the sale of recyclable materials, scrap, waste, etc. will be credited to job cost. 
 
1.5 
Costs of Other materials and Equipment, Temporary Facilities and Related Items 
1.5.1 
Costs, including transportation and storage, installation, maintenance, dismantling and 
removal of materials, supplies, temporary facilities, machinery, equipment and hand tools 
not customarily owned by construction workers, that are provided by the Contractor at the 
site and fully consumed in the performance of the Work; and cost (less salvage value) of such 
items if not fully consumed, whether sold to others or retained by Contractor. Cost for 
items previously used by Contractor will mean fair market value. 
 
1.5.2 
Rental charges for temporary facilities, machinery, equipment, and hand tools not 
customarily owned by construction workers that are provided by Contractor at the site, 
whether rented from Contractor or others, and costs of transportation, installation, minor 
repairs and replacements, 
dismantling and removal thereof. Rates and quantities of 
equipment rented will be subject to City’s prior written approval. 
 
1.5.2.1 The Projected usage for each piece of equipment to be rented for use on the Project and 
the estimated total rentals must be considered by Contractor before the piece of 
equipment is rented so that an appropriate rent versus buy decision can be made. 
Purchased equipment must be considered “job owned”. At the completion of the Project, 
Contractor must transfer title and possession of all remaining job-owned equipment to 
City, or Contractor may keep any such equipment for an appropriate fair market value 
credit to job cost, which will be mutually agreed to by City and Contractor.

App’d 1/7/22 
APP-25 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
1.5.2.2 Each piece of equipment to be rented must have hourly, daily, weekly and monthly rates 
and the most economical rate available will be reimbursed based on the circumstances of 
actual need and usage of the piece of equipment while it is stationed at the jobsite. 
When the piece of equipment is no longer needed for the work, no rental charges will be 
reimbursed if the piece of equipment remains at the jobsite for the convenience of 
Contractor. 
 
1.5.2.3 Equipment Rental Rates 
1.5.2.3.1 Compensation for equipment used on the Project will be paid in accordance with the 
Equipment Plan submitted by Contractor in the accepted GMP Proposal and no payments 
will be made in excess of the rates set forth in the Equipment Plan, or actual 
documented costs, whichever is less. 
 
1.5.2.3.2 All equipment rental rates and costs are subject to City’s right to audit when submitted as 
part of Equipment Plan and/or at any time during the Project. 
 
1.5.2.4 The aggregate rentals chargeable for each piece of Contractor owned tools or equipment 
must not exceed 50% of the fair market value of such equipment at the time of its 
commitment to the Work. The original purchase price and date of purchase of the equipment 
will be documented with a copy of the purchase invoice for the piece of equipment. Such 
aggregate limitations will apply and no further rentals will be charged even if a piece of 
equipment is taken off the job and is later replaced by a similar piece of equipment. For 
purposes of computing the aggregate rentals applicable to aggregate rental limitations, 
rental charges for similar pieces of equipment will be combined if the pieces of equipment 
were not used at the same time. 
 
1.5.2.5 Fair market value for used material and equipment as referred to in the Contract Documents 
will mean the estimated price a reasonable purchaser would pay to purchase the used 
material or equipment at the time it was initially needed for the job. Note: This is usually 
lower than the price a reasonable purchaser would pay for similar new construction material 
or construction equipment. 
 
1.5.2.6 All losses resulting from lost, damaged or stolen tools and equipment will be the sole 
responsibility of Contractor, and not City, and the cost of such losses will not be 
reimbursable under the Contract. 
 
1.5.2.7 Contractor will be required to maintain a detailed equipment inventory of all job-owned 
equipment (either purchased and charged to job cost or job-owned through aggregate 
rentals) and such inventory must be submitted to City each month. For each piece of 
equipment, such inventory should contain at a minimum (1) original purchase price or 
acquisition cost (2) acquisition date (3) approved Fair Market Value at the time the piece of 
equipment was first used on the job and (4) final disposition. 
 
1.5.2.8 All costs incurred for minor maintenance and repairs will be reimbursed at actual cost. Such 
costs include routine and preventative maintenance, minor repairs and other incidental 
costs. Repairs and/or replacement of a capital nature are considered to be covered by the 
rental rates. Major repairs and overhauls are not considered routine and ordinary; 
consequently such costs are not reimbursable and are intended to be covered by the rental

App’d 1/7/22 
APP-26 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
rates. 
 
1.5.3 
Costs of removal of debris from the Site. 
 
1.5.4 
Costs of document reproductions, facsimile transmissions and long-distance telephone 
calls, postage and parcel delivery charges, telephone service at the site and reasonable 
petty cash expenses of the site office. 
 
1.5.5 
That portion of the reasonable expenses of Contractor’s personnel incurred while 
traveling in discharge of duties connected with the Work. 
 
1.5.5.1 No travel expenses will be reimbursed to Contractor’s representatives unless Project related 
travel required them to travel to a destination more than 100 miles from the Project 
location. Any travel involving airfare will require advance written approval by an authorized 
City’s representative. 
 
1.5.6 
Costs of materials and equipment suitably stored off the site at a mutually acceptable 
location, if approved in advance by the City. 
 
1.5.7 
Reproduction costs will be the actual costs of reproduction subject to a maximum of five 
cents ($.05) per square foot for prints and a maximum of five cents ($.05) per 8 ½ by 11-
inch page for offset print or photo copied contract documents, specifications, etc. 
Telephone costs will be the actual costs paid to the third party telephone company for the 
field office telephone. 
 
1.6 
Miscellaneous Costs 
1.6.1 
That portion of insurance and bond premiums that can be directly attributed to the Contract. 
The City will reimburse Contractor for contractually required bond at time of first pay 
application for GMP and Cost-Based contracts upon receipt of proof of payment from 
the Contractor. If the Contractor completes Work for less than the Contract Price, 
Contractor must credit the City a pro- rated amount for the unused portion of the bond 
payment 
 
1.6.1.1 Contractor’s actual cost for insurance will be considered to be included within the Maximum 
limit for General Conditions Costs. All premiums for any insurance and bonds required for 
the Project must reflect the net actual costs to Contractor after taking into consideration cost 
adjustments due 
to experience modifiers, premium 
discounts, policy dividends, 
retrospective rating plan premium adjustments, assigned risk pool rebates, refunds, etc. 
 
1.6.1.2 The amount to be reimbursed to Contractor for all contractually required insurance will be 
actual costs not to exceed a total of 2% of the Contract Value, unless Contractor 
establishes to City’s satisfaction that the actual cost is higher and City agrees to such actual 
higher cost in writing. If Contractor’s cost of contractually required insurance is greater 
than the amount agreed to be reimbursed per this Contract Provision, the difference will 
be considered to be covered by the Contractor’s Fee.  The City will reimburse Contractor 
for contractually required insurance on a monthly basis for GMP and Cost-Based 
contracts. If Contractor can demonstrate substantial savings by paying for all insurance in 
advance, the City may agree to reimburse all insurance costs at time of first pay application

App’d 1/7/22 
APP-27 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
for GMP and Cost-Based contracts with proof of payment from Contractor. 
 
1.6.2 
Sales, use or similar taxes imposed by a governmental authority that are related to the Work. 
 
1.6.3 
Fees and assessments for the building permit and for other permits, licenses and 
inspections for which Contractor is required by the Contract Documents to pay. 
 
1.6.4 
Fees of laboratories for tests required by the Contract Documents, except those related to 
defective or nonconforming Work and which do not fall within the scope of ¶ 1.7.3 below. 
 
1.6.5 
Royalties and license fees paid for the use of a particular design, process or product 
required by 
the Contract Documents; the cost of defending suites or claims for 
infringement of patent rights arising from such requirement of the Contract Documents; and 
payments made in accordance with legal judgments against Contractor resulting from such 
suites or claims and payments of settlements made with City’s consent. However, such 
costs of legal defenses, judgments and settlements must not be included in the calculation 
of the Contractor’s Fee or subject to the Guaranteed Maximum Price. 
 
1.6.6 
Data processing costs related to the Work. However, any such data processing costs will be 
limited to the cost of personal computer hardware used at the field office in the 
normal day to day administration, management and control of the Project. The 
aggregate charges for any such hardware must not exceed the Fair Market Value of the 
hardware at the time it was brought to the field office. If the total charges for any particular 
piece of hardware reach an amount equal to the Fair Market Value, that particular piece of 
hardware must be turned over to City whenever it is no longer needed for the Project. If 
Contractor elects to keep the particular piece of hardware, the job costs must be credited 
with a mutually agreeable amount which will represent the Fair Market Value of the 
particular piece of hardware at the time it was no longer needed for the job. Software or 
other costs associated with the use of computer programs will not be considered to be a 
reimbursable cost and will be considered to be covered by the Contractor’s Fee. 
 
1.6.7 
Deposits lost for causes other than Contractor’s negligence or failure to fulfill a specific 
responsibility to City as set forth in the Contract Documents. 
 
1.6.8 
Legal, mediation and arbitration costs, including attorneys’ fees, other than those arising 
from disputes between City and Contractor, reasonably incurred by Contractor in the 
performance of the Work and with City’s prior written approval; which approval will not be 
unreasonably withheld. 
 
1.6.9 
Expenses incurred in accordance with Contractor’s standard personnel policy for relocation 
and temporary living allowances of personnel required for the Work, if pre-approved by City 
in writing. If City authorizes the reimbursement of relocation costs, the reimbursable 
relocation expenses will be limited to a maximum of $50,000 per person. Any relocation 
cost incurred by Contractor in excess of the amount reimbursed by City will be considered to 
be covered by the Contractor’s Fee. 
 
1.7 
Other Costs and Emergencies 
1.7.1 
Other costs incurred in the performance of the Work if and to the extent approved in

App’d 1/7/22 
APP-28 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
advance in writing by City. 
 
1.7.2 
Costs due to emergencies incurred in taking action to prevent threatened damage, injury or 
loss in case of an emergency affecting the safety of persons and property. 
 
1.7.3 
Costs of repairing or correcting damaged or nonconforming Work executed by Contractor, 
Subcontractors or Suppliers, provided that such damaged or nonconforming Work was not 
caused by negligence or failure to fulfill a specific responsibility of Contractor and only to the 
extent that the cost of repair or correction is not recoverable by Contractor from 
insurance, sureties, Subcontractors or Suppliers. 
 
1.8 
Related Party Transactions 
1.8.1 
The term “related party” will mean a parent, subsidiary, affiliate or other entity having 
common ownership or management with Contractor; any entity in which any stockholder in, 
or management employee of, Contractor owns any interest in excess of ten percent in the 
aggregate; or any person or entity which has the right to control the business or affairs of 
Contractor. The term “related party” includes any member of the immediate family of any 
person identified above. 
 
1.8.2 
If any of the costs to be reimbursed arise from a transaction between Contractor and a 
related party, Contractor must notify City in writing of the specific nature of the 
contemplated transaction, including the identity of the related party and the anticipated 
cost to be incurred, before any such transaction is consummated or cost incurred. If City, 
after such notification, authorizes in writing 
the proposed transaction, then the cost 
incurred will be included as a cost to be reimbursed, and Contractor must procure the Work, 
equipment, goods or service from the related party, as a Subcontractor. If City fails to 
authorize the transaction, Contractor must procure the Work, equipment, goods or 
service from some person or entity other than a related party. 
 
SECTION 2 – COSTS NOT TO BE REIMBURSED 
 
2.1 
The Cost of Work must not include: 
 
2.1.1 
Salaries and other compensation of Contractor’s personnel stationed at Contractor’s principal 
office or offices other than the site office, except as specifically provided in Subparagraphs 
1.2.2 and 1.2.3. 
 
2.1.2 
Expenses of Contractors’ principal office and offices other than the site office. 
 
2.1.3 
Overhead and general expenses, except as may be expressly included in Section 1. 
 
2.1.3.1 Costs of Contractor’s home office computer services or other outside computer processing 
services will be considered overhead and general expense. Accordingly, Contractor should 
not plan to perform any such computer related services or alternatives at the field office 
when such services or functions can be performed at Contractor’s home or branch offices, 
or other outside service locations. 
 
2.1.4 
Contractor’s capital expenses, including interest on Contractor’s capital employed for the Work.

App’d 1/7/22 
APP-29 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
 
2.1.5 
Rental costs of machinery and equipment, except as specifically provided in subparagraph 
1.5.2. 
 
2.1.6 
Except as provided in Subparagraph 1.7.3 of the Agreement, costs due to the negligence or 
failure to fulfill a specific responsibility of Contractor, Subcontractors and Suppliers or 
anyone directly or indirectly employed by any of them or for whose acts of them may be 
liable. 
 
2.1.7 
Any cost not specifically and expressly described in Section 1. 
 
2.1.8 
Costs, other than costs included in Change Orders approved by City that would cause the 
GMP to be exceeded. 
 
SECTION 3 – DISCOUNTS, REBATES, REFUNDS AND SAVINGS 
 
3.1 
Cash discounts obtained on payments made by Contractor will accrue to City if (1) before 
making the payment, Contractor included them in an Application for Payment and 
received payment therefore from City, or (2) City has deposited funds with Contractor with 
which to make payments; otherwise, cash discounts will accrue to Contractor. Trade 
discounts, rebates, refunds and amounts received from sales or surplus materials and 
equipment will accrue to City, and Contractor must make provisions so that they can be 
secured. 
 
3.1.1 
Cost of the Work will be credited with all insurance policy discounts, performance and 
payment bond rebates or refunds, refunds or return premiums from any Subcontractor 
default insurance, refunds or rebates from any Contractor controlled insurance programs 
applicable to the Project, merchandise rebates of any nature, refunds of any nature, 
insurance dividends; and a portion of any volume rebates or free material credits earned 
with purchase of material or other goods and services charged to the job. 
 
3.1.2 
“Cash” discounts which may accrue to Contractor will be limited to a maximum of 1.5% of 
invoice cost. Any portion of “Cash” discounts greater than 1.5% will automatically accrue 
to City if Contractor is eligible to take advantage of the discounts. 
 
3.2 
Amounts that accrue to City in accordance with the provisions of Paragraph 3.1 will be 
credited to City as a deduction from the Cost of the Work. 
 
3.3 
Any and all savings on the GMP, or any separately guaranteed items comprising the GMP, 
will belong to City, subject to any express right in the Contract for Contractor to share in 
savings. Savings are subject to City’s right to audit, and may be audited separately. 
 
SECTION 4 – GENERAL CONDITIONS COSTS 
 
4.1 
General Conditions Costs may include, but are not limited to, the following types of costs 
incurred by Contractor during construction of the Work to the extent they are reimbursable 
Costs of the Work as delineated above: payroll costs for Work conducted at the site, payroll 
costs for the superintendent and full-time general foremen, payroll costs for management

App’d 1/7/22 
APP-30 of 32 
General Conditions  
Appendix 9 – CM@Risk & JOC 
 
 
personnel resident and working on the site workers not included as direct labor costs 
engaged in support (e.g. loading/unloading, clean-up, etc.), administrative office personnel, 
costs of offices and temporary facilities including office materials, office supplies, office 
equipment, minor expenses, utilities, fuel, sanitary facilities and telephone services at the 
site, costs of liability insurance premiums not included in labor burdens for direct labor 
costs, costs of bond premiums, costs of consultants not in the direct employ of Contractor 
or Subcontractors, fees for permits and licenses. 
 
4.2 
General Conditions Costs may be paid on a percentage of the Contract Price or on a 
lump/stipulate sum basis as set forth in the Contract. All costs included in the General 
Conditions Costs will not be separately invoiced to or paid by City. 
 
4.3 
The total amount of General Conditions Costs for the Work may be divided by the number of 
days allowed for performance of the Work, to determine a fixed daily rate for General 
Conditions Costs that may be used in computing the General Conditions Costs allocated to 
any period of time, or for any adjustments in the General Conditions Costs agreed to in  
 
writing by City.

App’d 1/7/22 
APP-31 of 32 
General Conditions  
Appendix 10 
 
 
LANDSCAPE ESTABLISHMENT PERIOD 
 
Section 1 – Description and General 
Contractor is in direct control of work performed under the Landscape Establishment Period. If work 
is subcontracted, a representative of the Contractor will be present at the site of the work for all 
hours that the subcontractor works. Subcontracting of Landscape Establishment work will be 
permitted for weed eradication with herbicides, because of special licensing. A licensed temporary 
service may be used to supply labor to Contractor if Contractor has received approval from City 
Representatives.  Contractor will submit the required subcontract documentation. 
 
Contractor must provide adequate personnel to accomplish the required maintenance of the plant 
materials at intervals acceptable to City Representatives. 
 
If not healthy at the end of the maintenance period, the maintenance must be continued until the 
plant material is approved by City. 
 
1.1 Time and Schedule 
Unless otherwise expressly agreed to in writing by City, the Landscape Establishment Period will be 
per General Conditions Section 6.5.4.   
 
1.2 Planted Stock and Seeding Establishment 
1.2.1 
Tree planting and staking must be per City of Chandler Standard Detail C-801.  
1.2.2 
All trees will stand erect on their own without stakes when brought to this site. If the tree 
cannot stand on its own when nursery stakes are removed, the tree will be removed and 
replaced. 
 
1.3 Pre-Emergent Herbicide and Weed Control 
1.3.1 
Contractor will provide three applications of an approved pre-emergent herbicide on all 
unpaved areas of the project, as directed by City Representatives, to control weed growth in 
all areas of the project. The number of applications may be increased as directed by the City 
Representative, and at no additional cost to City, if the City Representative deems additional 
applications are required to control weed growth. 
1.3.2 
Application sequence will be approved in advance by City. The first application of pre-
emergent will be completed prior to the application of Decomposed Granite and will be 
included with the cost of the Decomposed Granite as specified and part of the Construction 
Phase portion of work. The second application of pre-emergent will be completed after 
installation of the Decomposed Granit and no later than half-way through the Landscape 
Establishment Period. The third and final application of pre-emergent will be applied 15 
days prior to completion of the Landscape Establishment portion of the project. The second 
and third pre-emergent applications will be included with the cost of Landscape 
Establishment. Watering will be completed in accordance with the manufacturer’s 
recommendations, as included and as related to each application. 
1.3.3 
The pre-emergent herbicide will be applied in accordance with the Technical Specifications 
and the recommendations of the pre-emergent herbicide manufacturer, as approved by 
City Representatives.

App’d 1/7/22 
APP-32 of 32 
General Conditions  
Appendix 10 
 
 
1.3.4 
The control of weeds will be accomplished by the use of herbicides. Manual removal of 
weeds will be required, after herbicides have taken affect. 
1.3.5 
Contractor is responsible for the removal and disposal of all trash and debris that during 
the Landscape Establishment Period. Contractor will keep the project in a neat and orderly 
manner during the duration of the Landscape Establishment Period. 
 
1.4 Water 
The water used during Landscape Establishment to properly maintain the plant material will be 
furnished by City, at designated sources from within the project limits, at no charge to Contractor. 
Contractor will be responsible for all equipment, materials and labor necessary to load, transport and 
unload water for watering purposes. 
 
1.5 Plant Material Replacements 
The plant material replacement will be considered as included in the work for Landscape 
Establishment, and will be made at no charge to the City. 
1.5.1 
Shrub and Plant Replacement - During the second half of the Landscaping Establishment 
period, Contractor will provide, where required, plant replacements as follows: 
 
Original Size 
Replacement Size 
1 gallon 
5 gallon 
5 gallon 
15 gallon 
15 gallon 
24-inch box 
36-inch box 
48-inch box 
 
1.5.2 
Tree Replacement – During the second half of the Landscape Establishment Period, 
Contractor will provide plant material replacements for existing plants that die as follows: 
 
Existing Plant Material Sizes 
Replacement Size 
Trees: 
 
2-inch Caliper 
24-inch box 
4-inch Caliper 
36-inch box 
6-inch Caliper and greater 
54-inch box 
Shrubs: 
 
All Existing Shrubs 
15 gallon 
 
1.6 Measurement and Payment 
See Technical Specifications for Measurement Payment provisions.

EXHIBIT C 
City of Chandler Construction Manager at Risk Construction Services 
TS-1 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
TECHNICAL SPECIFICATIONS

CITY OF CHANDLER 
 
PUBLIC WORKS AND UTILITIES DEPARTMENT 
 
 
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS 
CHAARRAL WAY: DOBSON ROAD TO LAKE DRIVE 
 
PROJECT NO. WW2111.401 
 
AGENCY REVIEW SET 
 
TECHNICAL SPECIFICATIONS 
 
DECEMBER 2021 
 
 
MAYOR 
KEVIN HARTKE 
 
CITY COUNCIL 
 
Council Member Christine Ellis 
Council Member OD Harris  
Council Member Matt Orlando 
 
 
 
 
 
 
 
 
 
 
Council Member Rene Lopez 
 
Council Member Terry Roe 
 
 
 
 
 
CITY MANAGER 
JOSHUA WRIGHT 
 
PUBLIC WORKS & UTILTIES DIRECTOR 
JOHN KNUDSON, PE

December 2021 
 
City of Chandler  
21-047 
TOC-2 
Chandler Heights Road Utility Relocations  
 
DIVISION 11 EQUIPMENT 
 
11295 
 
HYDRAULIC VALVES 
 
DIVISION 15 MECHANICAL 
 
15050 
 
PIPING SYSTEMS 
15051 
 
BURIED PIPING INSTALLATION 
15061 
 
DUCTILE IRON PIPE 
15064 
 
COPPER PIPE 
15067 
 
VCP PIPE 
15120 
 
PIPING SPECIALTIES AND ACCESSORIES 
 
 
END OF 
TABLE OF CONTENTS

December 2021 
  
City of Chandler 
21-047 
01010-1 
Chandler Heights Road Utility Relocations 
SECTION 01010 
SUMMARY OF WORK 
PART 1 - GENERAL 
1.1       SUMMARY 
A. The work covered under this Contract will be performed within the City of 
Chandler in the following general locations: 
1. 
Chaparral Way – Lake Drive to Dobson Road 
1.2       DESCRIPTION OF OWNER'S PROJECT 
A. The overall scope project will consist of the following installation: 
1. 
Relocation of approximately 72 linear feet of 8-inch potable water line 
2. 
Relocation of approximately 72 linear feet of 12-inch potable water line 
3. 
Relocation of approximately 125 linear feet of 16-inch potable water line 
4. 
Relocation of approximately 70 linear feet of 15-inch sanitary sewer 
5. 
Addition of a new sanitary sewer manhole. 
6. 
Complete all testing and disinfection on new and relocated waterlines prior to 
connecting to existing water distribution system. Contractor to coordinate and 
plan construction activities with existing operational needs of the City. 
7. 
Complete all testing on new sewer lines prior to connecting to existing sewer 
system. Contractor to coordinate and plan construction activities with 
existing operational needs of the City. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01050-1 
Chandler Heights Road Utility Relocations 
SECTION 01050 
FIELD ENGINEERING/SURVEYING 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. The CONTRACTOR shall hire a surveyor licensed in the State of Arizona to 
perform all surveying responsibilities.  It is also the CONTRACTOR'S 
responsibility to notify the ENGINEER, in writing, of any discrepancy found 
between the topographic survey provided and the baseline conditions provided in 
the Contract Documents within 14 days of the Notice to Proceed.  The 
CONTRACTOR further takes the responsibility to correct any discrepancies not 
reported to the ENGINEER within the specified construction schedule as part of 
the finished grading required as part of this Project at no cost to the OWNER. 
B. The CONTRACTOR shall provide competent, qualified personnel and materials 
required to perform all construction layout staking and re-staking (as necessary) of 
the Work and will protect and preserve the established reference points and will 
make no change or relocations without the prior written approval of the OWNER. 
C. The CONTRACTOR will report to the OWNER whenever any reference point is 
lost or destroyed or requires relocation because of necessary changes in grades or 
locations.  The CONTRACTOR will replace and accurately relocate all reference 
points so lost, destroyed, or moved at no additional cost to the OWNER. 
D. Field surveying shall include GIS location and data of all new construction as 
required by the City of Chandler. The CONTRACTOR shall provide the GIS 
location and data at each application of payment to verify content. If data is 
missing or does not meet City of Chandler requirements, portions of the new 
construction shall be exposed to obtain the data at no additional cost to the 
OWNER. The City of Chandler requirements are identified below: 
1. 
Contractor shall provide survey grade GPS / GIS data, meeting the following 
requirements for all facilities to be owned and/or operated by the City of 
Chandler. 
a. 
ESRI File Geodatabase format: 
1) All GPS point data, along with corresponding GIS Attribute data, 
must be submitted in ESRI File Geodatabase format.  
2) The City of Chandler will provide a copy of the File Geodatabase in 
ESRI ArcGIS format, upon submitting a data request form attached 
herewith. 
Please 
submit 
the 
data 
request 
form 
to 
Kristy.Noelson@Chandleraz.gov 
b. 
Data dictionary and Attribute data:

December 2021 
  
City of Chandler 
21-047 
01050-2 
Chandler Heights Road Utility Relocations 
1) Attribute data should be provided for each of the GPS’d Utility 
Feature listed in section ‘d’ below. All Attribute data should 
conform to the ESRI File Geodatabase format, provided by the City. 
A copy of the data dictionary will be made available to the 
CONTRACTOR. 
c. 
Coordinate System: 
1) Horizontal  Datum:  Arizona  State  Plane  Coordinates,  Central  
Zone  NAD83  (HARN) Vertical Datum: NAVD88 
d. 
Point Data for GPS: 
1) Water System Features: 
a) 
Water main location (top of pipe), size and material (one (1) 
coordinate provided every 100 feet minimum) and at fittings. 
b) Water fitting location (top of feature), size, material and type 
including:  Bend (22.5, 45, or 90), Tee, Tapping Sleeve, Cross, 
Coupling, End Cap, Line Stop, Reducer, Saddle, Other. 
c) 
Water valve location (center of valve box cover), size and type. 
d) Fire hydrant location (top of hydrant), manufacturer and year. 
e) 
Water service line location (at connection to main, any bends, 
and termination at meter box or meter vault or at the edge of 
easement or ROW), size and material. 
f) 
Water blow-off and air release valve location (center of cover), 
size, type and manufacturer. 
g) Water manhole or vault location (center of cover), size and 
type. 
2) Waste Water System features:  
a) 
Sewer manhole and cleanout location (center of cover), size, 
material, and cover type. 
b) Sewer gravity main location (invert of pipe), size, material and 
flow direction (from) at all manholes, cleanouts and structures. 
c) 
Sewer service line location, size and material (at connection to 
main, and termination at cleanout, or stub out at edge of the 
easement or ROW). 
d) Sewer force main location (top of pipe), size, and material (one 
(1) coordinate provided every 100 feet minimum) and at 
fittings. 
e) 
Sewer force main (and gravity) fitting location (top of feature), 
size, material and type including: Bend (22.5, 45, or 90), Tee, 
Tapping Sleeve, Cross, Coupling, End Cap, Linestop, Reducer, 
Saddle, Wye, Other 
f) 
Sewer force main valve location (center of valve box cover), 
size and type. 
g) Sewer  force  main  air  release  valve  location  (center  of  
cover),  size,  type  and manufacturer. 
h) Sewer force main manhole or vault location (center of cover), 
size and material.

December 2021 
  
City of Chandler 
21-047 
01050-3 
Chandler Heights Road Utility Relocations 
i) 
Sewer structure (center of structure), type (diversion, junction 
box) 
3) Standard GPS Metadata on all points collected: Date, Time, 
Height, 
Horiz_Precision, 
Vert_Precision, Northing, 
Easting, 
Surveyor, Datafile, and Comments 
2. 
Refer to the included information, following this specification, from the City 
of Chandler. Contractor shall meet all requirements.  
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED)

DATA DICTIONARY: 
 
 
WATER

FeatureClassName 
FITTING_PNT 
DatasetType 
FeatureClass 
 
FieldName 
FEATUREOWNER 
Type 
String 
Length 
20 
AliasName 
FEATUREOWNER 
DomainName 
WS_FEATUREOWNER 
DefaultValue 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WS_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WS_SPATIALSOURCE_STD 
GPS 
MATERIAL 
String 
20 
MATERIAL 
WS_MATERIAL 
null 
DIAMETER1 
String 
8 
DIAMETER1 
null 
null 
DIAMETER2 
String 
8 
DIAMETER2 
null 
null 
TYPE 
String 
30 
TYPE 
WS_FITTING_TYPE 
null 
BEND 
String 
20 
BEND 
WS_FITTING_BEND 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
 
 
 
 
FeatureClassName 
DatasetType 
SYSTEM_VALVE_PNT 
FeatureClass 
 
FieldName 
FEATUREOWNER 
Type 
String 
Length 
20 
AliasName 
FEATURE OWNER 
DomainName 
WS_FEATUREOWNER 
DefaultValue 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLE STATUS 
WS_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIAL SOURCE 
WS_SPATIALSOURCE 
GPS 
DIAMETER 
String 
8 
Diameter 
WS_SYSVAL_DIAM 
null 
TYPE 
String 
25 
TYPE 
WS_SYSVAL_TYPE 
null 
VALVETYPE 
String 
10 
VALVE TYPE 
WS_SYSVAL_VALVETYPE 
null 
FUNCTION 
String 
25 
FUNCTION 
WS_SYSVAL_FUNCTION 
null 
GROUNDTYPE 
String 
25 
GROUNDTYPE 
WS_SYSVAL_GROUNDTYPE 
null 
WO_CAT_CODE 
String 
10 
WO CAT CODE 
null 
1310A06 
WO_CAT 
String 
25 
WO CAT 
null 
System Valves 
WATERTYPE 
String 
25 
WATERTYPE 
null 
POTABLE 
GPS_DATE 
Date 
8 
GPS DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS COMMENT 
null 
null

FeatureClassName 
HYDRANT_PNT 
DatasetType 
FeatureClass 
 
FieldName 
HYDRANT_ID 
Type 
String 
Length 
25 
AliasName 
HYDRANT_ID 
DomainName 
null 
DefaultValue 
HYD-VERIFY 
FEATUREOWNER 
String 
25 
Feature Owner 
WS.FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
25 
Lifecycle Status 
WS_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
25 
Spatial Source 
WS_SPATIALSOURCE_STD 
GPS 
BARRELDIAMETER 
Double 
8 
Barrel Diameter 
null 
6 
LARGENOZZLEDIAMETER 
Double 
8 
Large Nozzle Diameter 
null 
4.5 
SMALLNOZZLEDIAMETER 
Double 
8 
Small Nozzle Diameter 
null 
2.5 
OUTLETCONFIGURATION 
Double 
8 
Outlet Configuration 
null 
3 
SEATDIAMETER 
Double 
8 
Seat Diameter 
null 
6 
MANUFACTURER 
String 
25 
Manufacturer 
WS_HYD_MANUFACTURER 
null 
YEARMANUFACTURED 
String 
25 
Manufacture Year 
null 
null 
COLOR 
String 
25 
Color 
WS_HYD_COLOR 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
50 
GPS_COMMENT 
null 
null 
 
 
 
 
FeatureClassName 
DatasetType 
WATER_MANHOLE_PNT 
FeatureClass 
 
FieldName 
Type 
Length 
AliasName 
DomainName 
DefaultValue 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
WS_FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WS_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WS_SPATIALSOURCE_STD 
GPS 
SUBTYPE 
String 
25 
SUBTYPE 
WS_SUBTYPE 
null 
ACCESSDIAMETER 
String 
8 
ACCESSDIAMETER 
WS_ACCESSDIAMETER 
32 
GROUNDTYPE 
String 
20 
GROUNDTYPE 
WS_GROUNDTYPE 
null 
COVERMATERIAL 
String 
10 
COVERMATERIAL 
WS_COVERMATERIAL 
null 
COVERTYPE 
String 
8 
COVERTYPE 
WS_COVERTYPE 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null

FeatureClassName 
WATER_VAULT_PNT 
DatasetType 
FeatureClass 
 
FieldName 
SUBTYPE 
Type 
String 
Length 
20 
AliasName 
SUBTYPE 
DomainName 
null 
DefaultValue 
null 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
WS_FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WS_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WS_SPATIALSOURCE_STD 
GPS 
SUB_TYPE 
String 
20 
SUB_TYPE 
WS_VAULT_SUB_TYPE 
null 
ADDRESS 
String 
50 
ADDRESS 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
50 
GPS_COMMENT 
null 
null

Domain: 
WS_FEATUREOWNER 
Description: TYPE OF SERVICE 
 
Code 
Name 
COC 
Chandler 
GRIC 
Gila River Indian Community 
COG 
Gilbert 
GOULD 
Gould 
INTEL 
Intel 
COUNTY 
Maricopa County 
COM 
Mesa 
MICROCHIP 
Microchip 
MOTOROLA 
Motorola 
COP 
Phoenix 
PRIVATE 
Private 
SRP 
SRP 
SRVWUA 
SRVWUA 
COT 
Tempe 
UNKNOWN 
UNKNOWN 
 
Domain: 
WS_SPATIALSOURCE_STD 
Description: SPATIAL SOURCE 
 
Code 
Name 
GPS 
GPS 
 
 
 
Domain: 
WS_FITTING_TYPE 
Description: FITTING TYPE 
 
Code 
Name 
11B 
11B 
22B 
22B 
45B 
45B 
90B 
90B 
COUPLING 
COUPLING

CROSS 
CROSS 
ENDCAP 
ENDCAP 
LINESTOP 
LINESTOP 
OTHER 
OTHER 
REDUCER 
REDUCER 
SADDLE 
SADDLE 
TAPPING SLEEVE 
TAPPING SLEEVE 
TEE 
TEE 
UNKNOWN 
UNKNOWN 
WYE 
WYE 
 
 
Domain: 
WS_FITTING_BEND 
Description: FITTING BEND 
 
Code 
Name 
HORIZONTAL 
HORIZONTAL 
NONE 
NONE 
VERTICAL 
VERTICAL 
 
 
 
Domain: 
WS_LIFECYCLESTATUS 
Description: SYSTEM VALVE LIFECYCLE STATUS 
 
Code 
Name 
ABANDONED 
ABANDONED 
ACTIVE 
ACTIVE 
FUTURE 
FUTURE 
INACTIVE 
INACTIVE 
REMOVED 
REMOVED 
UNKNOWN 
UNKNOWN 
 
 
Domain: 
WS_SYSVAL_DIAM 
Description: SYSTEM VALVE DIAMETER 
 
Code 
Name 
2 
2 
3 
3

4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
16 
16 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48 
 
 
Domain: 
WS_SYSVAL_TYPE 
Description: SYSTEM TYPE 
 
Code 
Name 
ARV 
ARV 
BLOWOFF 
BLOWOFF 
STANDARD 
STANDARD 
 
 
Domain: 
WS_SYSVAL_VALVETYPE 
Description: SYSTEM VALVE TYPE 
 
Code 
Name 
BALL 
BALL 
BUTTERFLY 
BUTTERFLY 
GATE 
GATE 
INSERTA 
INSERTA 
PIV 
PIV 
PLUG 
PLUG 
UNKNOWN 
UNKNOWN 
 
 
Domain: 
WS_SYSVAL_FUNCTION 
Description: SYSTEM VALVE FUNCTION 
 
Code 
Name

ARV 
ARV 
BACKFLOW 
BACKFLOW 
BYPASS 
BYPASS 
FDC 
FDC 
FIRELINE 
FIRELINE 
HYDRANT 
HYDRANT 
INLINE 
INLINE 
PUMPOUT 
PUMPOUT 
PUMPSTATION 
PUMPSTATION 
SERVICE 
SERVICE 
STUBOUT 
STUBOUT 
UNKNOWN 
UNKNOWN 
VAULT 
VAULT 
WPF 
WPF 
ZONE_SPLIT_VALVES 
ZONE_SPLIT_VALVES 
 
 
Domain: 
WS_SYSVAL_GROUNDTYPE 
Description: SYSTEM VALVE FUNCTION 
 
Code 
Name 
ASPHALT 
ASPHALT 
CONCRETE 
CONCRETE 
LANDSCAPE 
LANDSCAPE 
UNKNOWN 
UNKNOWN 
 
 
Domain: 
WS_HYD_MANUFACTURER 
Description: HYDRANT MANUFACTURER 
 
Code 
Name 
AMERICANDARLING 
AMERICANDARLING 
AVK 
AVK 
CLOW 
CLOW 
DRESSER 
DRESSER 
GREENBERG 
GREENBERG 
KENNEDY 
KENNEDY 
MUELLER 
MUELLER 
PACIFIC 
PACIFIC 
UNKNOWN 
UNKNOWN

WATEROUS 
WATEROUS 
 
 
 
Domain: 
WS_MATERIAL 
Description: MATERIAL 
 
Code 
Name 
ABS 
ABS 
ACP 
ACP 
BRASS 
BRASS 
CIP 
CIP 
DIP 
DIP 
PCPP 
PCPP 
PE 
PE 
PVC 
PVC 
RCP 
RCP 
RPM 
RPM 
RTR 
RTR 
STL 
STL 
TRUSS 
TRUSS 
VCP 
VCP 
 
 
Domain: 
WS_YES_NO 
Description: YES OR NO 
 
Code 
Name 
YES 
YES 
NO 
NO 
 
 
Domain: 
WS_HYD_COLOR 
Description:COLOR OF HYDRANT 
 
Code 
Name 
BLACK/ALUMINUM 
BLACK/ALUMINUM 
BLACK/YELLOW 
BLACK/YELLOW

GREEN 
GREEN 
RED 
RED 
RED/YELLOW 
RED/YELLOW 
UNKNOWN 
UNKNOWN 
WHITE 
WHITE 
YELLOW 
YELLOW 
 
 
Domain: 
WS_SUBTYPE 
Description: SUBTYPE OF MANHOLE 
 
Code 
Name 
PUMPOUT STATION 
PUMPOUT STATION 
UNKNOWN 
UNKNOWN 
VALVE ACCESS 
VALVE ACCESS 
 
 
Domain: 
WS_ACCESSDIAMETER 
Description: ACCESS DIAMTER 
 
Code 
Name 
22 
22 
24 
24 
26 
26 
28 
28 
30 
30 
32 
32 
38 
38 
 
 
Domain: 
WS_GROUNDTYPE 
Description: GROUND TYPE 
 
Code 
Name 
ASPHALT 
ASPHALT 
CONCRETE 
CONCRETE

DIRT 
DIRT 
UNKNOWN 
UNKNOWN 
 
 
Domain: 
WS_COVERMATERIAL 
Description: COVERMATERIAL 
 
Code 
Name 
ALUMINUM 
ALUMINUM 
CASTIRON 
CASTIRON 
UNKNOWN 
UNKNOWN 
 
 
Domain: 
WS_COVERTYPE 
Description: COVER TYPE 
 
Code 
Name 
BOLTED 
BOLTED 
SEALED 
SEALED 
UNKNOWN 
UNKNOWN 
VENTED 
VENTED 
 
 
Domain: 
WS_VAULT_SUB_TYPE 
Description: SUBTYPE OF VAULT 
 
Code 
Name 
FIRELINE 
FIRELINE 
METER 
METER 
UNKNOWN 
UNKNOWN 
VALVE 
VALVE

DATA DICTIONARY: 
 
 
SEWER

FeatureClassName 
SEWER_MANHOLE_PNT 
DatasetType 
FeatureClass 
 
FieldName 
Type 
Length 
AliasName 
DomainName 
DefaultValue 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
WW_FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WW_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WW_SPATIALSOURCE 
GPS 
LID 
String 
20 
LID 
WW_MANHOLE_LID 
null 
TYPE 
String 
20 
TYPE 
null 
null 
COVER_MATERIAL 
String 
20 
COVER_MATERIAL 
null 
null 
COVER_HOLE 
String 
20 
COVER_HOLE 
null 
null 
COVER_SIZE 
String 
20 
COVER_SIZE 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null 
 
 
FeatureClassName 
DatasetType 
SEWER_CLEANOUT_PNT 
FeatureClass 
 
FieldName 
FEATUREOWNER 
LIFECYCLESTATUS 
Type  Length AliasName 
String 
20 
FEATUREOWNER 
String 
20
 
LIFECYCLESTATUS 
DomainName 
WW_FEATUREOWNER 
WW_LIFECYCLESTATUS 
DefaultValue 
null 
null 
LOCATIONDESCRIPTION String 
100 
LOCATIONDESCRIPTION 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
LID 
String 
20 
LID 
null 
WW_SPATIALSOURCE 
WW_SEWER_LID 
null 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null 
 
 
FeatureClassName 
DatasetType 
SEWER_FITTING_PNT 
FeatureClass 
 
FieldName 
Type 
Length 
AliasName 
DomainName 
DefaultValue 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
WW_FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WW_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WW_SPATIALSOURCE 
null 
SIZE_ 
String 
20 
SIZE_ 
null 
null 
MATERIAL 
String 
20 
MATERIAL 
WW_MATERIAL 
null 
TYPE 
String 
30 
TYPE 
WW_FITTING_TYPE 
null 
BEND 
String 
20 
BEND 
WW_BEND 
null 
LOCATIONDESCRIPTION 
String 
100 
LOCATIONDESCRIPTION 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null

FeatureClassName 
SEWER_CONTROL_VALVE_PNT 
DatasetType 
FeatureClass 
 
FieldName 
Type 
Length 
AliasName 
DomainName 
DefaultValue 
TYPE 
String 
25 
TYPE 
null 
null 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
null 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WW_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WW_SPATIALSOURCE 
GPS 
LOCATIONDESCRIPTION 
String 
100 
LOCATIONDESCRIPTION 
null 
null 
DIAMETER 
String 
8 
DIAMETER 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null 
 
 
FeatureClassName 
DatasetType 
SEWER_MISC_STRUCT_PNT 
FeatureClass 
 
FieldName 
Type 
Length 
AliasName 
DomainName 
DefaultValue 
TYPE 
String 
25 
TYPE 
WW_TYPE 
null 
FEATUREOWNER 
String 
20 
FEATUREOWNER 
WW_FEATUREOWNER 
null 
LIFECYCLESTATUS 
String 
20 
LIFECYCLESTATUS 
WW_LIFECYCLESTATUS 
null 
SPATIALSOURCE 
String 
20 
SPATIALSOURCE 
WW_SPATIALSOURCE 
GPS 
LOCATIONDESCRIPTION 
String 
100 
LOCATIONDESCRIPTION 
null 
null 
GPS_DATE 
Date 
8 
GPS_DATE 
null 
null 
GPS_COMMENT 
String 
30 
GPS_COMMENT 
null 
null

Domain: WW_FEATUREOWNER 
Description: WASTEWATER FEATURE OWNER 
 
Code 
Name 
COC 
COC 
PRIVATE 
PRIVATE 
CONTRACTOR 
CONTRACTOR 
TOG 
TOG 
UNKNOWN 
UNKNOWN 
 
 
Domain: WW_LIFECYCLESTATUS 
Description: WASTEWATER FEATURE LIFECYCLESTATUS 
 
Code 
Name 
ACTIVE 
ACTIVE 
FUTURE 
FUTURE 
PULLED 
PULLED 
INACTIVE 
INACTIVE 
UNKNOWN 
UNKNOWN 
ABANDONED 
ABANDONED 
 
 
Domain: WW_SPATIALSOURCE 
Description: WASTEWATER FEATURE SPATIAL SOURCE 
 
Code 
Name 
GPS 
GPS 
 
 
 
Domain: WW_TYPE 
Description: WASTEWATER TYPE 
 
Code 
Name 
DIVERSION 
DIVERSION 
JUNCTION 
JUNCTION 
 
 
Domain: WW_SEWER_LID 
Description: WASTEWATER LID 
 
Code 
Name 
OLD 
OLD 
NEW 
NEW

Domain: WW_BEND 
Description: WASTEWATER BEND 
 
Code 
Name 
HORIZONTAL 
HORIZONTAL 
VERTICAL 
VERTICAL 
NONE 
NONE 
 
 
Domain: WW_MATERIAL 
Description: WASTEWATER MATERIAL 
 
Code 
Name 
ACP 
ACP 
CONCRETE 
CONCRETE 
DIP 
DIP 
HDPE 
HDPE 
MJDIP 
MJDIP 
PVC 
PVC 
PVC LINED VCP 
PVC LINED VCP 
RCP ABS 
RCP ABS 
STEEL ENCASED VCP 
STEEL ENCASED VCP 
TLOCKLINE LINE RCP 
TLOCKLINE LINE RCP 
UNKNOWN 
UNKNOWN 
VCP 
VCP 
 
 
Domain: WW_FITTING_TYPE 
Description: WASTEWATER FITTING_TYPE 
 
Code 
Name 
ARV 
ARV 
FLOW METER 
FLOW METER 
NO_FLOW_POINT 
NO_FLOW_POINT 
OTHER 
OTHER 
OWNERSHIP_CHANGE 
OWNERSHIP_CHANGE 
PLUG 
PLUG 
REDUCER 
REDUCER 
UNKNOWN 
UNKNOWN

December 2021 
  
City of Chandler 
21-047 
01090-1 
Chandler Heights Road Utility Relocations 
SECTION 01090 
REFERENCE STANDARDS/ABBREVIATIONS 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. This Section lists many of the construction industry organizations, professional 
and technical associations, societies and institutes, and government agencies 
issuing, promoting, or enforcing standards to which references may be made in 
the Contract Document, along with the abbreviations commonly used for those 
references.  Also included are certain general requirements for the use of industry 
standards specified and for application of the standards in quality control. 
1.2       USE OF REFERENCE STANDARDS 
A. Work specified by reference to the published standard or specification of a 
government agency, technical association, trade association, professional society 
or institute, testing agency, or other organization shall conform to, or surpass the 
minimum standards of quality for materials and workmanship established by the 
designated standard or specification. 
B. Where so specified, products or workmanship shall also conform to the additional 
prescriptive or performance requirements included within the Contract 
Documents to establish a higher or more stringent standard of quality than that 
required by the referenced standard. 
C. Where the specific date or issue of the standard is not included with the reference 
to the standard, the edition, including all amendments published and available on 
the first published date of the Invitation to Bid, shall apply. 
D. Where two or more standards are specified to establish quality, the product, and 
workmanship shall conform to or surpass the requirements of both. 
E. In case of conflict between referenced standards, the more stringent shall apply. 
F. Where both a standard and a brand name are specified for a product in the 
Contract Document, the proprietary product named shall conform to or surpass 
the requirements of the specified reference standard.  The listing of a trade name 
in a Contract Document shall not be construed a warranting that such product 
conforms to the respective reference standard. 
G. Copies of Standards: 
1. 
Copies of applicable referenced standards have not been bound in this 
Contract Document.

December 2021 
  
City of Chandler 
21-047 
01090-2 
Chandler Heights Road Utility Relocations 
2. 
Where copies of standards are needed by the CONTRACTOR for 
superintendence and quality control of the Work, obtain a copy or copies 
directly from the publication source and maintain in an orderly manner at the 
job site, available to the CONTRACTOR'S personnel, subcontractors, 
OWNER, and ENGINEER. 
3. 
Submittals:  Submit for approval the requests to use products conforming to 
printed standards or publications with a different publication date from that 
effective under the Contract.  Clearly indicate the changes in product or 
workmanship quality involved in the proposed change, if any, and reasons for 
the request. 
1.3       ABBREVIATIONS 
A. Abbreviations for trade organizations and government agencies.  The following is 
a list of construction industry organizations and government agencies to which 
references may be made in the Contract Document, with abbreviations used. 
 
 
 
AA 
Aluminum Association 
 
 
AAMA 
American Architectural Manufacturers Association 
 
 
AAMA 
Architectural Aluminum Manufacturers' Association 
 
 
AASHTO 
American Association of State Highway and Transportation Officials 
 
 
ABPA 
Acoustical and Board Products Association 
 
 
ACI 
American Concrete Institute 
 
 
ADA 
Americans With Disabilities Act 
 
 
ADEQ 
Arizona Department of Environmental Quality 
 
 
ADHS 
Arizona Department of Health Services 
  
 
AFBMA 
Anti-Friction Bearing Manufacturers' Association 
 
 
AGA 
American Gas Association 
 
 
AGC 
Associated General Contractors 
 
 
AGMA 
American Gear Manufacturers' Association 
 
 
AHC 
Architectural Hardware Consultant 
 
 
AI 
Asphalt Institute 
 
 
AIA 
American Institute of Architects 
 
 
AIA 
American Insurance Association 
 
 
AIEE 
American Institute of Electrical Engineers 
 
 
AISC 
American Institute of Steel Construction 
 
 
AISI 
American Iron and Steel Institute 
 
 
AITC 
American Institute of Timber Construction 
 
 
ALS 
American Lumber Standards 
 
 
AMCA 
Air Moving and Conditioning Association 
 
 
AMG 
Arizona Masonry Guild 
 
 
ANSI 
American National Standards Institute 
 
 
APA 
American Plywood Association 
 
 
API 
American Petroleum Institute 
 
 
AREA 
American Railway Engineering Association 
 
 
ARI 
Air Conditioning and Refrigeration Institute

December 2021 
  
City of Chandler 
21-047 
01090-3 
Chandler Heights Road Utility Relocations 
 
 
ARMA 
Asphalt Roofing Manufacturers Association 
 
 
ASAE 
American Society of Agricultural Engineers 
 
 
ASCE 
American Society of Civil Engineers 
 
 
ASHRAE 
American Society of Heating, Refrigerating, and Air Conditioning 
Engineers, Inc. 
 
 
ASME 
American Society of Mechanical Engineers 
 
 
ASTM 
American Society for Testing and Materials 
 
 
AWI 
Architectural Woodwork Institute 
 
 
AWPA 
American Wood Preservers' Association 
 
 
AWPB 
American Wood Preservers Bureau 
 
 
AWPI 
American Wood Preservers' Institute 
 
 
AWS 
American Welding Society 
 
 
AWSC 
American Welding Society Code 
 
 
AWI 
Architectural Woodwork Institute 
 
 
AWWA 
American Water Works Association 
 
 
 
BHMA 
Builders Hardware Manufacturers' Association 
 
 
BIA 
Brick Institute of America 
 
 
 
CBMA 
Certified Ballast Manufacturers' Association 
 
 
CDA 
Copper Development Association 
 
 
CGA 
Compressed Gas Association 
 
 
CISPI 
Cast Iron Soil Pipe Institute 
 
 
CLFMI 
Chain Link Fence Manufacturer's Institute 
 
 
CMAA 
Crane Manufacturers' Association of America 
 
 
CRA 
California Redwood Association 
 
 
CRSI 
Concrete Reinforcing Steel Institute 
 
 
CS 
Commercial Standards 
 
 
CSI 
Construction Specifications Institute 
 
 
CTI 
Cooling Tower Institute 
 
 
 
FGMA 
Flat Glass Manufacturer's Association 
 
 
FIA 
Factory Insurance Association 
 
 
FM 
Factory Mutual 
 
 
FS 
Federal Specification 
 
 
FTI 
Facing Tile Institute 
 
 
 
GA 
Gypsum Association 
 
 
 
HI 
Hydraulic Institute 
 
 
HMI 
Hoist Manufacturers' Institute 
 
 
 
ICBO 
International Conference of Building Officials 
 
 
ICEA 
Insulated Cable Engineers' Association 
 
 
IEEE  
Institute of Electrical and Electronics Engineers, Inc. 
 
 
IES 
Illuminating Engineering Society

December 2021 
  
City of Chandler 
21-047 
01090-4 
Chandler Heights Road Utility Relocations 
 
 
ISA 
Instrument Society of America 
 
 
 
JIC 
Joint Industry Conferences of Hydraulic Manufacturers 
 
 
 
LIA 
Lead Industries Association 
 
 
 
MAG 
Maricopa Association of Governments 
 
 
MIA 
Marble Institute of America 
 
 
MIA 
Masonry Institute of America 
 
 
MLMA 
Metal Lath Manufacturers Association 
 
 
MS 
Military Specifications 
 
 
MMA 
Monorail Manufacturers' Association 
 
 
 
NAAMM 
National Association of Architectural Metal Manufacturers 
 
 
NBFU 
National Board of Fire Underwriters 
 
 
NBHA 
National Builders' Hardware Association 
 
 
NBS 
National Bureau of Standards 
 
 
NCMA 
National Concrete Masonry Association 
 
 
NEC 
National Electrical Code 
 
 
NEMA 
National Electrical Manufacturers' Association 
 
 
NESC 
National Electric Safety Code 
 
 
NFPA 
National Fire Protection Association 
 
 
NFPA 
National Forest Products Association 
 
 
NGA 
National Glass Association 
 
 
NHLA 
National Hardwood Lumber Association 
 
 
NKCA 
National Kitchen Cabinet Association 
 
 
NLMA 
National Lumber Manufacturers' Association 
 
 
NMWIA 
National Mineral Wool Insulation Association 
 
 
NTMA 
National Terrazzo and Mosaic Association 
 
 
NWMA 
National Woodwork Manufacturers' Association 
 
 
 
OECI 
Overhead Electrical Crane Institute 
 
 
OSHA 
Occupational Safety and Health Administration (both Federal and 
State) 
 
 
 
PCA 
Portland Cement Association 
 
 
PCI 
Pre-cast Concrete Institute 
 
 
PDI 
Plumbing Drainage Institute 
 
 
PEI 
Porcelain Enamel Institute 
 
 
PS 
Product Standards Section - U.S. Department of Commerce 
 
 
 
RLM 
RLM Standards Institute, Inc. 
 
 
RMA 
Rubber Manufacturers' Association 
 
 
 
SAE 
Society of Automotive Engineers 
 
 
SDI 
Steel Deck Institute

December 2021 
  
City of Chandler 
21-047 
01090-5 
Chandler Heights Road Utility Relocations 
 
 
SDI 
Steel Door Institute 
 
 
SIGMA 
Sealed Insulating Glass Manufacturing Association 
 
 
SJI 
Steel Joist Institute 
 
 
SMACNA Sheet Metal and Air Conditioning Contractors National Association 
 
 
SSPC 
Steel Structures Painting Council 
 
 
SWI 
Steel Window Institute 
 
 
 
TEMA 
Tubular Exchanger Manufacturers' Association 
 
 
TCA 
Tile Council of America 
 
 
TIMA 
Thermal Insulation Manufacturers Association 
 
 
TPI 
Truss Plate Institute 
 
 
 
UBC 
Uniform Building Code 
 
 
UFC 
Uniform Fire Code 
 
 
UL 
Underwriters' Laboratories, Inc. 
 
 
USDA 
United States Department of Agriculture 
 
 
USPS 
United States Postal Service 
 
 
 
VI 
Vermiculite Institute 
 
 
 
WCLA 
West Coast Lumberman's Association 
 
 
WCLB 
West Coast Lumber Bureau 
 
 
WCLIB 
West Coast Lumber Inspection Bureau 
 
 
WIA 
Woodwork Institute of Arizona 
 
 
WPOA 
Western Plumbing Officials Association 
 
 
WWPA 
Western Wood Products Association 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01143-1 
Chandler Heights Road Utility Relocations 
SECTION 01143 
COORDINATION WITH OWNER'S OPERATIONS 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. The intent of this Section is to provide CONTRACTOR a sequence to perform the 
Work in such a manner that continuous, uninterrupted access to the businesses is 
maintained operational throughout the construction period. 
B. The sequences of Work and Schedule of Completion are specified under Section 
01010, Summary of Work.  
C. Except for the construction hours specified in this Section, CONTRACTOR'S 
means and methods shall be implemented such that the traffic lanes shall remain 
in continuous satisfactory operation during the entire construction period.  Work 
shall be so scheduled and conducted by CONTRACTOR such that it shall not 
impede any hindrances to the public and businesses.  In performing the Work 
shown and specified, CONTRACTOR shall plan and schedule the Work to meet 
both the constraints outlined in this Section and City of Chandler traffic control 
standards. 
D. Work not specifically covered in Section 01010, Summary of Work, or in the 
following paragraphs may, in general, subject to the operating requirements 
outlined in this Section.   
1.2       OVERTIME 
A. All overtime work by CONTRACTOR necessary to conform to the requirements 
of this Section shall be performed by CONTRACTOR at no additional cost to the 
OWNER and shall be performed in accordance with the General Conditions.  
CONTRACTOR shall make no claims for extra compensation as a result thereof. 
B. PRODUCTS (NOT USED) 
PART 2 - EXECUTION 
2.1       COORDINATION DESCRIPTION 
A. No more than two (2) lanes shall be closed to traffic at any one time between 8:30 
AM and 4:30 PM. No more than one (1) traffic lane shall be closed during peak 
hours. Contractor shall submit a construction schedule for approval by the 
OWNER.

December 2021 
  
City of Chandler 
21-047 
01143-2 
Chandler Heights Road Utility Relocations 
B. Potable Piping Tie-In: 
1. 
The CONTRACTOR shall prepare a plan with scheduling, means and 
methods, disinfection, and the proposed connections at each tie-in.  The tie-in 
plans shall be approved by the OWNER 30 days prior to starting the first 
water lateral tie-in.   
2. 
Work may occur at night or during the weekend to ensure minimal disruption 
to businesses. 
C. Sewer Piping Tie-In: 
1. 
CONTRACTOR shall coordinate all sewer bypass pumping operations with 
the City of Chandler per Section 02145, Diversion of Sewage Flow and 
Dewatering. The CONTRACTOR shall notify the OWNER 72 hours prior to 
bypassing the pipeline. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01300-1 
Chandler Heights Road Utility Relocations 
SECTION 01300 
SUBMITTALS 
PART 1 - GENERAL 
1.1       SUMMARY 
A. The CONTRACTOR shall include a completed transmittal form for all submittals.  
Transmittal forms will be furnished to CONTRACTOR by ENGINEER.  Submittals 
shall be sent to the ENGINEER. 
1.2       SECTION INCLUDES 
A. Shop Drawings. 
B. Material and Equipment Record. 
C. Samples. 
D. Daily reports. 
E. Testing results. 
F. Construction photographs. 
G. Record Drawings. 
1.3       DATA REFERENCE SYMBOLS AND DESCRIPTIONS 
A. The submittal data required for Shop Drawings and operations manuals shall contain, 
but not necessarily be limited to, that data and material as defined by the coded 
legend set forth below.  The submittal data required shall be as indicated and 
specified under various headings of the specifications. 
 
LEGEND 
DATA REFERENCE SYMBOLS AND DESCRIPTIONS 
 
Symbol 
 
                                      Description 
 
 A 
 
Letters of Certification of Compliance on materials, equipment, etc. 
 
 B 
 
Samples.

December 2021 
  
City of Chandler 
21-047 
01300-2 
Chandler Heights Road Utility Relocations 
 
 
 
Symbol 
 
 
Description 
 
 C 
 
Final certified drawings showing outline dimensions, foundation 
layout or mounting information, and other pertinent dimensions. 
 
 D 
 
Field erection instructions, assembly drawings and/or diagrams, 
detailed reference drawing lists, and lists of erection details. 
 
 
E 
 
Shop detail drawings showing individual sub-assemblies and 
fabricated pieces with material specifications and other applicable 
data. 
     
    F 
 
Installation instructions, operating and/or service manuals, and all 
other data pertinent to operating or servicing the complete apparatus.  
Preventative maintenance instructions and recommended frequency. 
 
 G 
 
General bulletins and catalog cuts describing complete apparatus 
including operating principles and fundamentals. 
 
 H 
 
Service data sheets showing design performance, utility requirements, 
etc., as applicable to the specific duty for which the equipment is 
furnished.  
 
 
I  
 
Head capacity curves for pumps.  Impeller size furnished and 
maximum size available shall be noted on these data sheets. 
 
 K 
 
Curves and/or data for overall range of operation from minimum to 
maximum capacity or load, showing capacity or load, utilities motive 
medium required, total or incremental differential head, and other 
pertinent information applicable to the equipment or its component 
assemblies. 
 
 
L 
 
Materials of construction of all components. 
 
 M 
 
Renewal parts list with diagrammatic or cross-section drawings 
showing part identification.  Material analysis or trades designation 
for each significant part is to be noted on parts lists or on a separate 
sheet. 
 
 N  
 
 
   O 
 
Stuffing box sizes; packing sizes; specifications and arrangement; and 
mechanical seal details, specifications, etc., if furnished in equipment. 
 
Bearing manufacturer's standard identification and/or interchangeable 
number for all anti-friction bearings in the equipment proper and its 
accessory items. 
 
 
P 
 
Material gradation, design mix, job mix formula, and/or material 
analysis.

December 2021 
  
City of Chandler 
21-047 
01300-3 
Chandler Heights Road Utility Relocations 
 
 
 
1.4       SHOP DRAWINGS 
A. The CONTRACTOR shall submit Shop Drawings for the equipment and materials 
specified herein.  CONTRACTOR shall submit the shop drawings online via 
“Newforma”. The shop drawings shall be addressed to (Brandy.Nixon@wilson-
engineers.com).  Text shall be in electronic ASCII format.  Drawings and figures 
shall be in AutoCAD “.dwg”, or bitmap “.bmp,” tiff “.tiff,” jpeg “.jpg,” gif “.gif,” or 
pdf “.pdf” format. 
B. ENGINEER shall return electronic Shop Drawings to CONTRACTOR within 14 
calendar days of receipt by ENGINEER. 
C. The CONTRACTOR may request submittals be reviewed up to two times for each 
equipment or construction material item, regardless of manufacturer or supplier, by 
the ENGINEER. 
D. Each Shop Drawing submittal shall include an electronic copy of the relevant 
Specification Section.  Each and every paragraph of the Specification Section shall be 
clearly marked to indicate whether the requirements for equipment and/or services in 
the Specification Section are met.  If clarifications are needed to any of the 
paragraphs in the Specification Section, they shall be addressed next to the paragraph 
or in an attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an explanation 
of any deviation and/or exception shall be provided. The CONTRACTOR shall 
furnish equipment and/or services as specified if an exception and/or deviation is 
rejected. 
E. The CONTRACTOR will be held responsible for any delay in progress of the Work 
due to resubmittal of Shop Drawings.  Time for completion of the Contract will not 
be extended due to CONTRACTOR’s failure to promptly submit complete and 
acceptable Shop Drawings, product data and samples. 
F. Do not execute Work required by Shop Drawings until accepted Shop Drawings are 
received from ENGINEER. 
G. Before submitting Shop Drawings for review, CONTRACTOR shall check Shop 
Drawings for accuracy, ascertain that all Work contiguous with and having bearing 
on other Work shown on Shop Drawings is accurately drawn, and that Work shown 
is in conformity with Contract requirements.  The CONTRACTOR is responsible for 
all submittals from subcontractors and suppliers.

December 2021 
  
City of Chandler 
21-047 
01300-4 
Chandler Heights Road Utility Relocations 
H. All such Drawings and details, when submitted, must bear the stamp of approval of 
CONTRACTOR, bearing checked data, as evidence that such Drawings and details 
have been checked by the CONTRACTOR.  Said "stamp" shall clearly state that the 
CONTRACTOR has checked the Drawings by providing signature certification. Any 
Drawings submitted without such executed stamp of approval, or whenever it is 
evident (despite the stamp) that the Drawings have not been checked, they will be 
returned to the CONTRACTOR for resubmission and will not be considered.  In such 
event, it will be deemed that CONTRACTOR has not complied with this provision 
and the CONTRACTOR shall bear risk of all delays to the same extent as if no 
Drawings or details had been submitted. 
I. 
The CONTRACTOR shall prepare composite Drawings and installation layouts, 
when required to solve tight field conditions.  Such Drawings shall consist of 
dimensioned plans and elevations, and must give complete information particularly 
as to size and location of sleeves, inserts, attachments, openings, conduits, ducts, 
boxes, structural interferences, etc.  These composite drawings and installation 
layouts shall be coordinated in the field by the CONTRACTOR and his 
subcontractors for proper relationship to the Work of other trades, based on field 
conditions, and shall be checked and approved by them before submission to the 
ENGINEER for his final review.  The CONTRACTOR shall have competent 
technical personnel readily available for such coordinating and checking, as well as 
for supervision of field installation of Work as per the Drawings and installation 
layouts, which have been previously determined by him to be correct and carry the 
ENGINEER'S review stamp. 
J. 
Submission of Shop Drawings (in either original submission or when resubmitted 
with corrections) constitute evidence that the CONTRACTOR has checked all 
information thereon, and that he accepts and is willing to perform the Work as shown 
in a workmanlike manner and in accordance with best standard practice. 
K. Cost of any changes in construction due to improper checking and coordination by 
the CONTRACTOR shall be paid for by the CONTRACTOR, and the 
CONTRACTOR shall be responsible for all additional costs, including coordination. 
L. Shop Drawings shall clearly delineate the following information: 
1. 
ENGINEER'S name and Project number, Project name and address. 
2. 
Drawing title, number, date, and scale. 
3. 
Names of CONTRACTOR, subcontractor, and fabricator. 
4. 
Letters of Certification of Compliance 
5. 
Working and erection dimensions. 
6. 
Arrangements and sectional views. 
7. 
Necessary details, including complete information for making connections with 
other Work. 
8. 
Kinds of materials and finishes.

December 2021 
  
City of Chandler 
21-047 
01300-5 
Chandler Heights Road Utility Relocations 
9. 
Show descriptive names of materials and equipment, classified item numbers, 
and locations at which materials or equipment are to be installed in the Work. 
Use same reference identification as shown on Contract Drawings. 
M. The ENGINEER shall provide the CONTRACTOR with a form to accompany the 
Shop Drawings. 
N. If Shop Drawings show variations from Contract Documents because of standard 
shop practice or other reasons, make specific mention of such variations in the 
transmittal form. 
O. Shop Drawings review will be general.  It shall not relieve the CONTRACTOR of 
responsibility for accuracy of such Shop Drawings, nor proper fitting, construction of 
Work, furnishing of materials, or Work required by Contract Documents and not 
indicated on Shop Drawings.  Shop Drawings review shall not be construed as 
approving departures from Contract Documents. 
P. Review of Shop Drawings and schedules shall not relieve the CONTRACTOR from 
responsibility for any violation indicated on such Drawings or schedules of local, 
County, State, or Federal laws, rules, ordinances, or rules and regulations of 
commissions, boards or other authorities or utilities having jurisdiction. 
Q. When product data, consisting of manufacturer's printed literature, is required to be 
submitted to ENGINEER, it shall be submitted in original form.  Any fading type of 
reproduction will not be accepted. 
1.5       CONSTRUCTION PHOTOGRAPHS 
A. Per City of Chandler Contract Requirements. 
1.6       TESTING RESULTS 
A. CONTRACTOR shall furnish to ENGINEER copies of all testing results for all tests 
required in the Specifications. 
1.7       RECORD DRAWINGS 
A. Per Section 01700, Contract Closeout.  CONTRACTOR shall update Record 
Drawings whenever a change occurs and shall be made available for review by 
ENGINEER with the pay application.  Failure of CONTRACTOR to maintain 
updated Record Drawings shall be justification for refusal of Pay Application. 
1.8       ALL ADDITIONAL SUBMITTALS  
A. As required by the Contract Documents.

December 2021 
  
City of Chandler 
21-047 
01300-6 
Chandler Heights Road Utility Relocations 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01400-1 
Chandler Heights Road Utility Relocations 
SECTION 01400 
QUALITY CONTROL 
PART 1 - GENERAL 
1.1       RELATED SECTIONS 
A. Section 01300, Submittals. 
1.2       QUALIFICATIONS 
A. Installation of materials and equipment shall be performed in a workman like manner 
by mechanics skilled in their particular trade. 
1.3       REGULATORY REQUIREMENTS 
A. Unless indicated or specified otherwise, all materials and workmanship for the 
mechanical trades shall conform to the editions of the various standards, codes, 
manuals, and Specifications in effect on the date of advertisement for bids. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01700-1 
Chandler Heights Road Utility Relocations 
SECTION 01700 
CONTRACT CLOSEOUT 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. Tasks listed under this Section shall be completed prior to Contract closeout and 
approval of the CONTRACTOR'S final pay request. 
1.2       RELATED SECTIONS 
A. Section 01300, Submittals. 
1.3       CONTRACT CLOSEOUT SUBMITTALS 
A. The following documents are to be submitted as specified to the ENGINEER 
prior to approval of the CONTRACTOR'S final pay request: 
1. 
Record Drawings shall be furnished by the CONTRACTOR.  One set of 
bluelines annotated to show all changes shall be delivered by the 
CONTRACTOR to the ENGINEER.  The Record Drawings shall reflect all 
changes made by Change Order, addenda, field order, Work directive, and 
any other changes made and approved during the course of the Work. 
2. 
Certification of Final Completion. 
3. 
Evidence of Payment and Release of Labor and Material Liens as outlined in 
the Conditions of the Contract.  Affidavit of Settlement of Claims shall be 
furnished by the CONTRACTOR and all subcontractors.   
4. 
Release of claims as outlined in the conditions of the Contract. 
5. 
Evidence of Compliance with Requirements of Governing Authorities, 
including Certificate of Occupancy and Certificates of Inspection. 
1.4       SITE CONDITIONS 
A. Prior to approval of the CONTRACTOR'S final pay request, and after Work has 
been completed, the CONTRACTOR shall dispose of all waste material and 
conduct final cleaning of completed work as specified in Section 01710, 
Cleaning. 
B. All areas shall be restored to a condition equal to or better than the original. 
C. Site grading shall be performed to the lines and grades as shown or conforming to 
adjacent contours.

December 2021 
  
City of Chandler 
21-047 
01700-2 
Chandler Heights Road Utility Relocations 
1.5       MAINTENANCE AND GUARANTEE 
A. The CONTRACTOR shall comply with the maintenance and guarantee 
requirements contained in the General Conditions. 
B. Replacement of earth fill or backfill, where it has settled below the required finish 
elevations, shall be considered as a part of such required repair Work, and any 
repair or resurfacing constructed by the CONTRACTOR which becomes 
necessary by reason of such settlement shall likewise be considered as a part of 
such required repair Work, unless the CONTRACTOR shall have obtained a 
statement in writing from the affected private owner or public agency releasing 
the CONTRACTOR from further responsibility in connection with such repair or 
resurfacing. 
C. The CONTRACTOR shall make all repairs and replacements promptly upon 
receipt of written order from the OWNER.  If the CONTRACTOR fails to make 
such repairs or replacements promptly, the OWNER reserves the right to do the 
Work and the CONTRACTOR and his surety shall be liable to the OWNER for 
the cost thereof. 
1.6       BOND 
A. The CONTRACTOR shall provide a bond to guarantee performance of the 
provisions contained in Paragraph 1.5, above, and the General Conditions. 
1.7       RE-INSPECTION FEES 
A. Should CONTRACTOR fail to complete and correct punch list items such that 
additional inspections are required by ENGINEER, CONTRACTOR shall pay 
ENGINEER'S standard rates per person per hour for ENGINEER'S additional 
services.  If CONTRACTOR has any questions with regard to any items on punch 
list, he shall request clarification before final inspection. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
01710-1 
Chandler Heights Road Utility Relocations 
SECTION 01710 
CLEANING 
PART 1 - GENERAL 
1.1       SUMMARY 
A. This Section outlines requirements for cleaning of the Project Work.  This Section 
is complementary to the General Conditions and nothing herein shall be 
considered to waive any requirements of the General Conditions. 
1.2       REQUIREMENTS OF REGULATORY AGENCIES 
A. Safety and Insurance Standards:  Maintain Project in accordance with the 
following safety and insurance standards: 
1. 
State Industrial Commission of Arizona (OSHA). 
B. Fire Protection:  Store volatile waste in covered metal containers and remove 
from premises daily. 
C. Pollution Control:  Conduct cleanup and disposal operations to comply with local 
ordinances and anti-pollution laws.  Burning or burying of rubbish and waste 
material on the Project site is not permitted.  Disposal of volatile fluid waste (such 
as mineral spirits, oil, or paint thinner) in storm or sanitary sewer systems or into 
streams or waterways is not permitted. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION 
3.1       DURING CONSTRUCTION 
A. During 
the 
construction 
period, 
the 
material 
to 
be 
used                              
in the Work shall be kept in an orderly manner, neatly stacked or piled. 
B. Clean up frequently (at least weekly) all refuse, rubbish, scrap materials, and 
debris caused by operations, to the end that at all times the site of the Work shall 
present a neat, orderly, and workmanlike appearance.  Sprinkle dusty debris with 
water. 
C. Provide for the disposal of all waste products, trash, debris, etc., and make 
necessary arrangement for legal disposal of same off the site.  Never throw

December 2021 
  
City of Chandler 
21-047 
01710-2 
Chandler Heights Road Utility Relocations 
rubbish from windows or other parts of building.  Lower waste materials in a 
controlled manner with as few handling as possible. 
D. Remove all surplus material, false-work, temporary structures, including 
foundations thereof, plant of any description and debris of every nature resulting 
from operations and put the site in a neat, orderly condition. 
E. Remove carpentry nails, pieces of rebar, pieces of cut metal, metal strapping, and 
pieces of wood. Wire (bare or insulated), shall also be recovered from the ground 
at the end of each day. 
F. General contractor shall provide trash gondolas or containers for use by all trades.  
3.2       FINAL CLEANING 
A. Use experienced workmen or professional cleaners for final cleaning.  Provide 
adequate ventilation during use of volatile or noxious substances. 
B. All existing improvements, inside or outside the property that are disturbed, 
damaged, or destroyed by the Work under the Contract, shall be restored to the 
condition in which they originally were, or to the satisfaction of the OWNER. 
C. CONTRACTOR shall clean all sidewalks by power washing to remove tire trend 
marks. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
02100-1 
Chandler Heights Road Utility Relocations 
SECTION 02100 
SITE PREPARATION 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. Prepare the construction site for new construction. 
1.2       SECTION INCLUDES 
A. Protection of certain existing trees and vegetation. 
B. Clearing and grubbing. 
C. Removing below grade improvements (including stumps). 
D. Installing and maintaining barricades and warning signs. 
E. All other miscellaneous items of Work required to complete the site preparation.  
1.3       RELATED SECTIONS 
A. Section 02200, Earthwork. 
1.4       PROJECT CONDITIONS 
A. Traffic:  Conduct site-clearing operations to ensure minimum interference with 
roads, streets, walks, and other adjacent occupied or used facilities.  Do not close 
or obstruct streets, walks, or other occupied or used facilities without permission 
from authorities having jurisdiction. 
B. Protection of Existing Improvements:  Provide protection as necessary to prevent 
damage to existing improvements indicated to remain in place. 
1. 
Protect improvements on adjoining properties and OWNER'S property. 
2. 
Restore damaged improvements to their original or better condition, as 
acceptable to OWNER. 
C. Protection of Existing Trees and Vegetation: 
1. 
Existing vegetation in the field not scheduled for removal shall be 
undisturbed by the CONTRACTOR.  The CONTRACTOR shall NOT 
remove from the site any plants unless specifically approved by the 
ENGINEER. 
2. 
Protect existing trees and vegetation indicated to remain against unnecessary 
cutting, breaking or skinning of roots, skinning or bruising of bark, 
smothering of trees by stockpiling construction materials or excavated

December 2021 
  
City of Chandler 
21-047 
02100-2 
Chandler Heights Road Utility Relocations 
materials within drip line, excess foot or vehicular traffic or parking of 
vehicles within the drip line.  Prior to initiating site clearing activities, the 
CONTRACTOR shall mark the limits of the disturbance areas either by 
placing lime, flags, or survey stakes at the limits shown on the Plans. 
3. 
Do not destroy vegetation which may be naturally located in the periphery of 
proposed disturbed areas (within a zone ± 5 feet from the limits of 
construction).  The ENGINEER shall be notified if existing plants are located 
within the fringes of the construction limits.  The ENGINEER shall issue 
instructions at that time. 
4. 
Adjustments may be made in the limits of construction to protect the affected 
plants based on a field review of the staked limits.  The adjusted construction 
limits shall be considered the permanent construction limits for the duration 
of the Project.  If the ENGINEER recommends that construction limits be 
adjusted to preserve existing plants, the CONTRACTOR, at his own option, 
may elect to clear the subject vegetation and revegetate with like-kind size 
and species as required herein and by Landscape Drawings at no additional 
cost to the OWNER.  The CONTRACTOR shall be entirely responsible for 
removal, storage, and replanting of such vegetation in accordance with City’s 
Landscape Design of Right-of-Way, medians, and retention basin Technical 
Design Manual no. 8. 
5. 
During the course of the Work the CONTRACTOR shall: 
a. 
Water trees, shrubs, and other vegetation to remain within limits of 
Contract Work as required to maintain their health during the course of 
construction operations at no additional cost to the OWNER.   
b. 
Provide protection for roots over 1-1/2-inches in diameter that are cut 
during construction operations.  Temporarily cover exposed roots with 
wet burlap to prevent the roots from drying out; cover with earth as soon 
as possible. 
c. 
Repair or replace trees and vegetation indicated to remain that are 
damaged by construction operations in a manner acceptable to the 
ENGINEER. 
d. 
Trees to be protected in place shall not be pruned unless limbs are 
damaged, or at the direction of the ENGINEER.  Employ a licensed 
arborist to repair damaged trees and shrubs.  Replace trees that cannot be 
repaired and restored to full growth status, as determined by the arborist. 
e. 
Trees may be pruned for routing maintenance during construction with 
ENGINEER’S approval at no additional cost to the OWNER. 
D. Provide a temporary construction fence/barrier to protect trees and vegetation at 
the limits reviewed and approved by the ENGINEER.  The barrier shall be 
installed and remain in place for the duration of the Project or as directed by the 
ENGINEER. 
PART 2 - PRODUCTS

December 2021 
  
City of Chandler 
21-047 
02100-3 
Chandler Heights Road Utility Relocations 
2.1       MATERIALS 
A. Fencing:  Any fencing removed as obstructions shall be restored to match existing 
with property OWNER’s approval/acceptance. 
B. Barricades, warning signs, and related equipment shall be placed as required. 
C. Tree Protection Fence/Barrier:  Shall be a commercially available product 
acceptable to the ENGINEER for its intended purpose.  The barrier shall be 
similar to a nylon woven material or woven wire fence such as TENAX Nordic 
Snow Fence, or approved equal, with approved stakes approximately 36-inches in 
height.  Submit material sample and Shop Drawings for barrier installation to the 
ENGINEER for approval prior to use. 
PART 3 - EXECUTION 
3.1       PREPARATION 
A. Site Clearing 
1. 
General:  Remove trees, shrubs, grass and other vegetation, improvements or 
obstructions, as required, to permit installation of new construction.  Remove 
similar items elsewhere on site or premises as specifically indicated.  
Removal includes digging out and off-site disposal of stumps and roots. 
a. 
Cut minor roots and branches of trees indicated to remain in a clean and 
careful manner where such roots and branches obstruct installation of 
new construction. 
2. 
Clearing and Grubbing:  Within the limits of Work, clear site of trees, shrubs 
and other material, except for those indicated to be left standing. 
a. 
Completely remove stumps, roots, and other debris protruding through 
the ground surface.  Stump removal and backfilling of holes is required 
for trees indicated on the Plans to be removed. 
b. 
Use only hand methods for grubbing inside drip line of trees indicated to 
remain. 
c. 
Fill depressions caused by clearing and grubbing operations with 
satisfactory soil material, unless further excavation or earthwork is 
indicated. 
d. 
Place fill material in horizontal layers not exceeding 6-inches loose 
depth, and thoroughly compact each layer to a density equal to adjacent 
original ground. 
3. 
Disposal of Waste Material: 
a. 
Burning on OWNER'S Property:  Burning is not permitted on 
OWNER'S property. 
b. 
Removal from OWNER'S Property:  Remove waste materials from 
OWNER'S property at no additional cost to the Project.

December 2021 
  
City of Chandler 
21-047 
02100-4 
Chandler Heights Road Utility Relocations 
4. 
All miscellaneous items not specifically mentioned or designated on the 
Drawings as removal items, but required for the completion of the Work, 
shall be removed.  All such items removed shall be hauled from the site. 
B. Barricades and Warning Signs: 
1. 
Construction sites shall be properly barricaded with appropriate warning 
signs affixed to prevent unauthorized access to the construction site. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
02145-1 
Chandler Heights Road Utility Relocations 
 
 SECTION 02145 
DIVERSION OF SEWAGE FLOW AND DEWATERING 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
This Section provides minimum requirements for temporary bypass pump 
station and dewatering of sewers as required to completing work and prior to 
acceptance.  
B. Requirements: 
1. 
CONTRACTOR shall provide all labor, materials, equipment, and 
supervision to temporarily bypass pump sewage flow around the 
CONTRACTOR'S Work and to dewater the pipeline for removal. The bypass 
strategy shall maintain flow to prevent wastewater backup into the City’s 
sewage collection system or discharge to the environment. 
2. 
The actual design of the bypass arrangement shall be prepared by the 
CONTRACTOR, and shall be submitted to the OWNER and ENGINEER for 
review.  Means and methods of accomplishing the bypassing shall be the 
responsibility of the CONTRACTOR. 
3. 
The CONTRACTOR shall have the entire bypassing system in place and 
tested before bypassing any sewage. 
4. 
The CONTRACTOR shall notify the OWNER 72 hours prior to bypassing 
the pipeline. The wastewater levels shall be continuously monitored by the 
CONTRACTOR.  
5. 
CONTRACTOR is responsible for immediate and proper cleanup should any 
spill occur, regardless of amount. 
6. 
CONTRACTOR shall connect bypass piping to the existing collection 
system and utilize temporary pumps and control equipment. 
7. 
CONTRACTOR shall utilize a pumping system with 100% back-up 
capability. In the event a pump shall fail, an alternate equally sized pump 
shall be ready to be utilized immediately. This requires the alternate pump(s) 
to be connected to the forcemain system. 
8. 
The forcemain system shall include a 100% redundant pipeline for use should 
the primary forcemain fail during operation. The redundant pipeline shall be 
equally sized to accommodate 100% of the pumped flow. The redundant 
pipeline shall be connected to the forcemain system and include a number of 
valves to be actuated to allow it to operate immediately. The forcemains shall 
be sized with a velocity of less than 5 feet per second. 
9. 
CONTRACTOR shall coordinate operation of temporary bypass pump 
station with authorized City of Chandler personnel. CONTRACTOR shall

December 2021 
  
City of Chandler 
21-047 
02145-2 
Chandler Heights Road Utility Relocations 
 
not operate any equipment in or about temporary bypass pump station 
without prior written consent from OWNER and copied to ENGINEER. 
10. Bypass pump operation shall include a lighting system at the bypass pump 
operation and the forcemain discharge. The lighting system shall be gas 
operated.  
11. CONTRACTOR shall provide qualified personnel, at a minimum two (2), 
on-site 24 hours per day to maintain the bypass pumps and pipeline. 
12. CONTRACTOR shall continuously monitor hydrogen sulfide concentrations 
at the suction side of the bypass pump operation and the forcemain discharge. 
CONTRACTOR shall provide temporary covering at each location to 
minimize hydrogen sulfide releases. This may include providing and 
installing a temporary odor control system as determined by the OWNER.  
13. CONTRACTOR shall provide, install, and maintain safety signs as 
determined by the OWNER. CONTRACTOR shall plan for at least 20 signs 
measuring 14-inches by 10-inches. Signs shall be installed prior to testing the 
bypass pumping system. 
C. Experience: 
1. 
CONTRACTOR shall utilize staff and/or a subcontractor that has been 
directly responsible for the bypass pumping of sewage flows during the 
completion of a similar pipeline project. 
1.2       SUBMITTALS 
A. Provide a detailed plan for the bypass pump operation. The plan shall include the 
following items: 
1. 
Detailed layout of the temporary pumping system. Include layouts of the 
pump station and forcemain. The layout shall include all redundant pumps 
and forcemains. 
2. 
Pump suction piping size and layout. 
3. 
Pump equipment data sheets. Data sheets shall include a system head curve 
along with a pump curve to verify its operating point. The system head curve 
calculations shall be developed by the CONTRACTOR and be included 
within the submittal for review.  
4. 
Forcemain diameter and material data sheets. 
5. 
Forcemain sizing calculations. 
6. 
Detailed list of personnel to be utilized for the bypass pump operation. The 
list shall also include the local supplier of the by-pass pumps and forcemains. 
7. 
Detailed list of additional parts and equipment to be placed at the site should 
the system not operate as intended.  
8. 
Additional temporary measures that are planned to be supplied to ensure safe 
and reliable bypass pump operation.  
9. 
Detailed list of items and methods utilized to repair or replace items damaged 
or modified due to the by-pass pump operation.

December 2021 
  
City of Chandler 
21-047 
02145-3 
Chandler Heights Road Utility Relocations 
 
B. The plan shall include a detailed daily schedule and a list of daily activities that 
will be completed before, during, and after the bypass operation. Include all 
personnel that are planned to work on the pipeline and the bypass pump operation.  
C. Provide an emergency contact list for all of the personnel to be at the site. Include 
all of the OWNER’s and ENGINEER’s personnel. Once the emergency contact 
list is finalized, three (3) copies shall be printed, laminated, and placed at 
locations along the bypass pump operation as determined by the OWNER.  
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. CONTRACTOR shall provide temporary piping, fittings, conduits, and all other 
equipment to bypass sewer flow around the CONTRACTOR'S Work as required.  
CONTRACTOR shall furnish all necessary labor supervision to set up and 
operate the pumping system.  Equipment shall be equipped with sound attenuation 
devices to keep noise level within limits specified in the City of Chandler Codes 
or stated in the Contract Documents.  Bypass shall be of adequate capacity and 
size to handle the required flows.  
B. Bypass piping shall be polyethylene pipe with Standard PE Code Designation 
PE3408 as defined in AWWA C906, have a minimum Cell Classification of PE 
334434C as defined in ASTM D3350, and designed using Hydrostatic Design 
Basis of 1,600 psi as specified in ASTM D2837.  The physical properties of the 
polyethylene pipe shall have minimum test values as specified in ASTM D3350.  
Properties shall be substantiated with test data. 
C. The polyethylene shall be designed by CONTRACTOR in accordance with the 
procedures of AWWA Design Manual M55, applicable MAG standards and these 
Specifications.  All material properties used in design calculations shall be long-
term (time-corrected) values.  CONTRACTOR shall be familiarized with site 
conditions when preparing the pipe design. 
D. CONTRACTOR shall calculate the required minimum wall thickness using the 
following parameters: 
1. 
Modulus of Soil Reaction:  E's = 500 psi (fully deteriorated). 
2. 
Unit Weight of Soil:  w = 140 pcf. 
3. 
Vacuum Pressure:  PV = 14.7 psi. 
4. 
Ground Water Depth Above Invert:  h = 4 feet. 
5. 
Live Loads:  AASHTO H-20. 
6. 
Safety Factor:  N = 2.0. 
7. 
Internal Operating Temperature (Design):  Tn = 24° C to 33° C. 
8. 
Minimum Depth of Cover:  d = 2 feet. 
9. 
Maximum Depth of Cover:  d =10 feet.

December 2021 
  
City of Chandler 
21-047 
02145-4 
Chandler Heights Road Utility Relocations 
 
10. Poisson's Ratio for Long Term Loading:  m = 0.45. 
11. Bedding Constant:  K = 0.1. 
12. Time Lag Factor:  TL = 1.5. 
13. Long Term Apparent Modulus of Elasticity:  E = 23,000 psi. 
14. Working Pressure:  P = 110 psi. 
15. Test Pressure:  P = 150 psi. 
16. Ovality Compensation Factor:  f0 = 0.5. 
17. Recurrent Surge Velocity:  DVRS = 2.9 ft./sec. 
18. Occasional Surge Velocity:  DVOS = 6.2 ft./sec. 
19. Bulk Modulus of Water:  K = 300,000 psi. 
20. Effective Modulus of Pipe Material:  Ed = 150,000 psi. 
21. Design Factor for use in AWWA M55 eq 4-1:  DF = 0.5. 
22. Allowable Deflection:  As described in AWWA M55, Table 5-11. 
E. CONTRACTOR shall maintain on-site sufficient equipment and materials to 
ensure continuous and successful operation of the bypass and dewatering systems.  
The CONTRACTOR shall maintain on-site a sufficient number of valves, tees, 
elbows, connections, tools, sewer plugs, piping, and other parts or system 
hardware to ensure immediate repair or modification of any part of the system as 
necessary. 
F. All equipment shall be placed on a new plastic tarp, adequately sized, and bermed 
to protect against gasoline, oil, and hydraulic fluid spills. 
PART 3 - EXECUTION 
3.1       PROTECTION 
A. In areas where flows are bypassed, all bypass flow shall be discharged to a 
downstream sanitary sewer manhole following a bypass plan approved by the 
OWNER and ENGINEER.  No bypassing to ground surface receiving waters, 
canals, storm drains, or bypassing which results in groundwater contamination or 
potential health hazards shall be permitted in accordance with the General 
Conditions. 
3.2       DAMAGES 
A. The CONTRACTOR shall repair, without cost to OWNER, any damage that may 
result from his negligence, inadequate or improper mechanical or electrical 
failures. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
02200-1 
Chandler Heights Road Utility Relocations 
 
SECTION 02200  
EARTHWORK 
PART 1 - GENERAL 
1.1       RELATED DOCUMENTS 
A. This Section covers excavating, trenching, backfilling, and grading as indicated 
on the Project Drawings, together with all incidental Work in connection 
therewith, including subgrade preparation and restoration, legally disposing of 
surplus and waste materials, and final site grading.  Areas disturbed by 
construction shall be graded and excavated or filled in such a manner that 
completed items will conform to lines, grades, and elevations of surrounding area.  
Drawings and General Provisions of the Contract, including General and 
Supplementary Conditions and Division 1 Specification Sections, apply to this 
Section. 
1.2       SUMMARY 
A. This Section includes the following: 
1. 
Subbase course for walks and pavements. 
2. 
Excavating and backfilling trenches within building lines. 
3. 
Excavating and backfilling for underground mechanical and electrical 
utilities and appurtenances. 
4. 
Placing on-site fill material. 
B. Related Section:  The following Section contains requirements that relate to this 
Section. 
1. 
Section 02100, Site Preparation. 
 
1.3       DEFINITIONS 
A. Excavation consists of the removal of material encountered to subgrade elevations 
and the reuse or disposal of materials removed. 
B. Subgrade:  The uppermost surface of an excavation or the top surface of a fill or 
backfill immediately below subbase, drainage fill, or topsoil materials. 
C. Borrow:  Soil material obtained off site when sufficient approved soil material is 
not available from excavations. 
D. Subbase Course:  The layer placed between the subgrade and base course in a 
paving system or the layer placed between the subgrade and surface of a 
pavement or walk.

December 2021 
  
City of Chandler 
21-047 
02200-2 
Chandler Heights Road Utility Relocations 
 
E. Base Course:  The layer placed between the subbase and surface pavement in a 
paving system. 
F. Capillary Water Barrier:  Course of clean sand or washed granular material placed 
above a water barrier sheet supporting interior concrete slab-on-grade placed to 
cut off upward capillary flow of pore water. 
G. Unauthorized excavation consists of removing materials beyond indicated 
subgrade elevations or dimensions without direction by the ENGINEER.  
Unauthorized excavation, as well as remedial Work directed by the ENGINEER, 
shall be at the CONTRACTOR'S expense. 
H. Structures:  Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, 
mechanical and electrical appurtenances, or other man-made stationary features 
constructed above or below ground surface. 
I. 
Utilities include on-site underground pipes, conduits, ducts, and cables, as well as 
underground services within building lines. 
1.4       SUBMITTALS 
A. General:  Submit the following according to the Conditions of the Contract and 
Division 1 Specification Sections. 
B. Samples of the following: 
1. 
60 lb. representative samples of each proposed fill and backfill soil material 
from on-site or borrow sources. 
C. Test Reports:  In addition to test reports required under field quality control, 
submit the following: 
1. 
Laboratory analysis of each soil material proposed for fill and backfill from 
on-site and borrow sources. 
2. 
One optimum moisture-maximum density curve for each soil material. 
D. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the 
paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected.

December 2021 
  
City of Chandler 
21-047 
02200-3 
Chandler Heights Road Utility Relocations 
 
1.5       QUALITY ASSURANCE 
A. Codes and Standards:  Perform earthwork complying with requirements of 
authorities having jurisdiction. 
B. Pre-installation Conference:  Before commencing earthwork, meet with 
representatives of the governing authorities, OWNER, ENGINEER, consultants, 
Geotechnical Engineer, independent testing agency, and other concerned entities.  
Review earthwork procedures and responsibilities including testing and inspection 
procedures and requirements.  Notify participants at least three working days prior 
to convening conference.  Record discussions and agreements and furnish a copy 
to each participant. 
C. Soils Testing Service: CONTRACTOR shall employ, at his own expense, an 
independent testing agency, certified in the State of Arizona, to perform all testing 
services as specified herein.  Selection of a testing agency is subject to 
ENGINEER’S approval.  Submit a written description of proposed soils testing 
agency giving qualifications of personnel, equipment, and other information 
which may be requested by ENGINEER. 
1.6       PROJECT CONDITIONS 
A. Existing Utilities:  Do not interrupt existing utilities serving facilities occupied by 
the OWNER or others except when permitted in writing by the ENGINEER and 
then only after acceptable temporary utility services have been provided. 
1. 
Provide a minimum 48 hours' notice to the ENGINEER and receive written 
notice to proceed before interrupting any utility. 
PART 2 - PRODUCTS 
 
2.1       SOIL MATERIALS 
A. General:  Provide approved borrow soil materials from offsite when sufficient 
approved soil materials are not available from excavations. 
B. Site Soils:  The granular site soils may be used as fill in all areas of the site.  The 
clayey site soils shall not be used as subsurface wall or retaining wall backfill.  
The clayey sand site soils may be used in all other areas provided these soils are 
placed and compacted at moisture contents at or above optimum in exterior slab 
and facility areas.  All materials shall be free of organics, debris, and rubble. 
C. Imported Soils:  Additional fill required shall be imported soils meeting the 
following requirements: 
1. 
Maximum Particle Size:  3-inches.

December 2021 
  
City of Chandler 
21-047 
02200-4 
Chandler Heights Road Utility Relocations 
 
2. 
Maximum Swell Potential:  1.5% based on a sample which is remolded to 
95% of the ASTM D698 maximum dry density at a moisture content of 2% 
below optimum placed under a surcharge of 100 psf and wetted. 
3. 
Maximum Percent Passing No. 200 Sieve:  40. 
4. 
Corrosion Potential: Sulfate Content (ARIZ 733) = 1,000 ppm (max), 
Chloride Content (ARIZ 733) = 500 ppm (max). 
D. Backfill and Fill Materials:  As shown in the Drawings. 
E. Subbase and Base Material:  Maricopa Association of Governments (MAG) 
Specification Section 702 for Select (Subbase) Type A or B and aggregate base 
(Base). 
F. Engineered Fill: Site soils as describe above subbase or base materials or 
aggregate base course (ABC) according to MAG Standard Specification Section 
702. 
G. Bedding Material:  Subbase or base materials with 100% passing a 1-inch sieve 
and not more than 8% passing a No. 200 sieve. 
1. 
If on-site material can be used as bedding material, the CONTRACTOR shall 
take necessary steps to separate the suitable bedding material from the sandy 
clay and sandy silt found on site.  The bedding material must meet all 
requirements of this Specifications Document and MAG Standard 
Specification Section 601. 
2. 
If on-site material does not meet the bedding material requirements, the 
CONTRACTOR shall supply the specified bedding material at no additional 
cost to the OWNER. 
H. Capillary Water Barrier: 
1. 
Washed, evenly graded mixture of crushed stone, or crushed or uncrushed 
gravel, ASTM D448, coarse aggregate Grading Size 57, with 100% passing a 
1-1/2-inch sieve and not more than 5% passing a No. 8 sieve. 
2. 
Clean, washed natural or manufactured, non-plastic sand. 
 
3. 
Either of the above soil materials. 
I. 
Filtering Material:  Evenly graded mixture of natural or crushed gravel or crushed 
stone and natural sand, with 100% passing a 1-1/2-inch sieve and 0% to 5% 
passing a No. 50 sieve. 
J. 
Impervious Fill:  Clayey gravel and sand mixture capable of compacting to a 
dense state. 
2.2       ACCESSORIES 
A. Warning Tape:  Acid- and alkali-resistant polyethylene film warning tape 
manufactured for marking and identifying underground utilities, 6-inches wide 
and 4 mils thick, continuously inscribed with a description of the utility.

December 2021 
  
City of Chandler 
21-047 
02200-5 
Chandler Heights Road Utility Relocations 
 
1. 
Tape Colors:  Provide tape colors to utilities as follows: 
a. 
Red:  Electric. 
b. 
Yellow:  Gas, oil, steam, and dangerous materials. 
c. 
Orange:  Telephone and other communications. 
d. 
Blue:  Water systems. 
e. 
Green:  Sewer systems. 
f. 
Purple: Reclaimed Water 
PART 3 - EXECUTION 
 
3.1       PREPARATION 
A. Protect subgrades and foundation soils against freezing temperatures or frost.  
Provide protective insulating materials as necessary. 
B. Provide erosion control measures following the most current City of Chandler 
Standards to prevent erosion or displacement of soils and discharge of soil-
bearing water runoff per the National Discharge Elimination System (NPDES) or 
airborne dust to adjacent properties and walkways. 
C. Tree protection as specified on the Drawings. 
3.2       DEWATERING 
A. Prevent surface water and subsurface or groundwater from entering excavations, 
from ponding on prepared subgrades, and from flooding Project site and 
surrounding area. 
B. Protect subgrades and foundation soils from softening and damage by rain or 
water accumulation. 
3.3       EXCAVATION 
A. Explosives:  Do not use explosives. 
B. Unclassified Excavation:  Excavation is unclassified and includes excavation to 
required subgrade elevations regardless of the character of materials and 
obstructions encountered. 
C. Classified Excavation:  Excavation is classified and includes excavation to 
required subgrade elevations. Excavation will be classified as earth excavation or 
rock excavation as follows: 
1. 
Earth excavation includes excavation of obstructions visible on surface; 
underground structures, utilities, and other items not indicated that we are 
required to be demolished and removed; together with soil and other

December 2021 
  
City of Chandler 
21-047 
02200-6 
Chandler Heights Road Utility Relocations 
 
materials encountered that are not classified as rock or unauthorized 
excavation. 
a. 
Intermittent drilling, blasting, or ripping to increase production and not 
necessary to permit excavation of material encountered will be classified 
as earth excavation. 
3.4       EXCAVATION FOR WALKS AND PAVEMENTS 
A. Excavate surfaces under walks and pavements to indicated cross sections, 
elevations, and grades. 
B. Pavement excavation, backfilling and compaction shall be as specified in MAG 
Section 205. 
3.5       EXCAVATION FOR UTILITY TRENCHES 
A. Excavate trenches to indicated slopes, lines, depths, and invert elevations. 
B. Trench excavation, backfilling and compaction shall be as specified in MAG 
Section 601. 
3.6       APPROVAL OF SUBGRADE 
A. Notify the ENGINEER when excavations have reached required subgrade. 
B. When the ENGINEER determines that unforeseen unsatisfactory soil is present, 
continue excavation and replace with compacted backfill or fill material as 
directed. 
1. 
Unforeseen additional excavation and replacement material will be paid 
according to the Contract provisions for changes in Work. 
C. Reconstruct subgrades damaged by freezing temperatures, frost, rain, 
accumulated water, or construction activities, as directed by the ENGINEER. 
3.7       UNAUTHORIZED EXCAVATION 
A. Fill unauthorized excavation under foundations or wall footings by extending 
indicated bottom elevation of concrete foundation or footing to excavation 
bottom, without altering required top elevation.  Lean concrete fill may be used to 
bring elevations to proper position when acceptable to the ENGINEER. 
1. 
Fill unauthorized excavations under other construction as directed by the 
ENGINEER. 
B. Where indicated widths of utility trenches are exceeded, provide stronger pipe 
which may require higher strength pipe than specified or different pipe material 
depending on the limits of unauthorized excavation.  Special installation 
procedures maybe required by the ENGINEER.

December 2021 
  
City of Chandler 
21-047 
02200-7 
Chandler Heights Road Utility Relocations 
 
3.8       STORAGE OF SOIL MATERIALS 
A. Stockpile excavated materials acceptable for backfill and fill soil materials, 
including acceptable borrow materials.  Stockpile soil materials without 
intermixing.  Place, grade, and shape stockpiles to drain surface water.  Cover to 
prevent windblown dust. 
1. 
Stockpile soil materials away from edge of excavations.  Do not store within 
drip line of remaining trees. 
3.9       BACKFILL 
A. Backfill excavations promptly, but not before completing the following: 
1. 
Acceptance of construction below finish grade including, where applicable, 
damp proofing, waterproofing, and perimeter insulation. 
2. 
Surveying locations of underground utilities for Record Documents. 
3. 
Testing, inspecting, and approval of underground utilities. 
4. 
Concrete formwork removal. 
5. 
Removal of trash and debris from excavation. 
6. 
Removal of temporary shoring and bracing, and sheeting. 
7. 
Installing permanent or temporary horizontal bracing on horizontally 
supported walls. 
B. Structural Backfill: 
1. 
General Structural Fill:  Backfill with on-site material and compact to a 
uniform minimum density of 95% of the maximum density as determined by 
ASTM D698.  Additional backfill material shall be added if required.  Fill 
material should be free from vegetation, debris, and deleterious material, and 
should contain no particles larger than 6-inches in dimension.  The plasticity 
index shall not exceed 18 as determined by ASTM D4318.  Fill shall be 
placed in lifts no more than 8-inches and compacted to a minimum of 95% of 
maximum dry density as determined by ASTM D698.  Moisture content 
during compaction shall be maintained within 2% of the optimum moisture 
content, as determined by ASTM D698. 
2. 
CONTRACTOR may utilize ½ sack CLSM for backfill per MAG Section 
604.  
3.10       UTILITY TRENCH BACKFILL 
A. Place and compact bedding course on rock and other unyielding bearing surfaces 
and to fill unauthorized excavations.  Shape bedding course to provide continuous 
support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of 
conduits. 
B. Concrete backfill trenches that carry below or pass under footings and that are 
excavated within 18-inches of footings.  Place concrete to level of bottom of 
footings.

December 2021 
  
City of Chandler 
21-047 
02200-8 
Chandler Heights Road Utility Relocations 
 
C. Provide 4-inch thick concrete base slab support for piping or conduit less than 2 
feet 6-inches below surface of roadways.  After installation and testing, 
completely encase piping or conduit in a minimum of 4-inch of concrete before 
backfilling or placing roadway sub-base. 
D. Place and compact initial backfill of satisfactory soil material or sub-base 
material, free of particles larger than 1-inch, to a height of 12-inches over the 
utility pipe or conduit. 
1. 
Carefully compact material under pipe haunches and bring backfill evenly up 
on both sides and along the full length of utility piping or conduit to avoid 
damage or displacement of utility system. 
E. Coordinate backfilling with utilities testing. 
F. Fill voids with approved backfill materials as shoring and bracing, and sheeting is 
removed. 
G. Place and compact final backfill of satisfactory soil material to final subgrade. 
H. Install warning tape directly above utilities, 12-inches below finished grade, 
except 6-inches below subgrade under pavements and slabs. 
3.11       SUBSURFACE DRAINAGE BACKFILL 
A. Subsurface Drain:  Place a layer of filter fabric around perimeter of drainage 
trench or at footing, as indicated.  Place a 6-inch compacted course of filtering 
material on filter fabric to support drainage pipe.  After installing and testing, 
encase drainage pipe in a minimum of 6-inches of compacted filtering material 
and wrap in filter fabric, overlapping edges at least 6-inches. 
B. Drainage Backfill:  Place and compact drainage backfill of filtering material over 
subsurface drain, in width indicated, to within 12-inches of final subgrade.  
Overlay drainage backfill with one layer of filter fabric, overlapping edges at least 
6-inches. 
C. Impervious Fill:  Place and compact impervious fill material over drainage 
backfill to final subgrade. 
3.12       FILL 
A. The following apply to the areas within and extending 5 feet beyond the footprint 
of the facilities and exterior slabs. 
1. 
Clear and grub the site by removing and disposing of all vegetation, debris, 
rubble, and remnants of former developments. 
2. 
Strip the area of all stockpiled fill zones, loose backfill zones, and unstable 
soils.  During stripping observe the surface for evidence of buried debris, 
vegetation or disturbed materials that shall require additional removal.  If

December 2021 
  
City of Chandler 
21-047 
02200-9 
Chandler Heights Road Utility Relocations 
 
encountered, these materials should be removed.  Areas steeper than 5H to 
1V shall be benched and any depressions widened to accommodate 
compaction equipment. 
3. 
Prepare the ground surface in fill areas and in areas cut to grade by 
scarifying, moisture conditioning and compacting the exposed surface soils 
to a depth of 8-inches. 
4. 
Moisture condition and place all fill and backfill materials to achieve 
specified grades.  Fill materials shall be moisture conditioned, placed, and 
compacted in horizontal lifts. 
B. Place fill material in layers to required elevations for each location listed below. 
1. 
Under grass, use satisfactory excavated or borrow soil material. 
2. 
Under walks and pavements, use sub-base or base material, or satisfactory 
excavated or borrow soil material. 
3. 
Under steps and ramps, use sub-base material. 
4. 
Under building slabs, use drainage fill material. 
5. 
Under footings and foundations, use engineered fill. 
3.13       MOISTURE CONTROL 
A. The moisture content of soil and base materials at the time of compaction shall be: 
 
TYPE 
AREA OF USE 
MOISTURE CONTENT 
On-site Granular 
Structure, Exterior Slab 
Optimum  3%  
On-site Clayey Soils 
Structure, Exterior Slab 
Optimum to Optimum +3%  
On-site Soils 
Pavement 
2% Below Optimum or Lower 
Imported Soils 
Structure, Exterior Slab, 
Pavement 
Optimum 3%  
Base Material 
Structure, Pavement 
Optimum 3%  
3.14       COMPACTION 
A. Place backfill and fill materials in layers not more than 8-inches in loose depth for 
material compacted by heavy compaction equipment, and not more than 4-inches 
in loose depth for material compacted by hand-operated tampers. 
B. Place backfill and fill materials evenly on all sides of structures to required 
elevations.  Place backfill and fill uniformly along the full length of each 
structure. 
C. Compact subgrade, fill, backfill, sub-base fill or base material to the following 
minimum percent compaction of the ASTM D698 maximum dry density in each 
lift:

December 2021 
  
City of Chandler 
21-047 
02200-10 
Chandler Heights Road Utility Relocations 
 
 
               MATERIAL 
MINIMUM COMPACTION 
Soil: 
 
 
Below foundations and pavement sections 
(fill thickness less than 5 feet). 
95% 
 
Below foundations (fill thickness greater than 
5 feet). 
100% 
 
Below concrete floor slabs (above footings). 
90% 
 
Subsurface wall backfill. 
95% 
Base Material (Subbase and Base Courses): 
 
 
Below concrete floor slabs. 
95% 
 
Below pavement surfacing. 
100% 
Backfill (not adjacent to structures and beyond 
exterior slab areas): 
90% 
 
3.15       GRADING 
A. General:  Uniformly grade areas to a smooth surface, free from irregular surface 
changes.  Comply with compaction requirements and grade to cross sections, 
lines, and elevations indicated. 
1. 
Provide a smooth transition between existing adjacent grades and new 
grades. 
2. 
Cut out soft spots, fill low spots, and trim high spots to conform to required 
surface tolerances. 
B. Site Grading:  Slope grades to direct water away from buildings and to prevent 
ponding.  Finish subgrades to required elevations within the following tolerances: 
1. 
Lawn or Unpaved Areas:  0.10 feet. 
2. 
Walks:  0.10 feet. 
3. 
Pavements:  1/2-inch. 
3.16       SUBBASE AND BASE COURSES 
A. Under pavements and walks, place sub-base course material on prepared 
subgrades.  Place base course material over sub-bases to pavements. 
1. 
Shape sub-base and base to required crown elevations and cross-slope grades. 
2. 
When thickness of compacted sub-base or base course is 6-inches or less, 
place materials in a single layer. 
3. 
When thickness of compacted sub-base or base course exceeds 6-inches, 
place materials in equal layers with no layer more than 6-inches thick or less 
than 3-inches thick when compacted.

December 2021 
  
City of Chandler 
21-047 
02200-11 
Chandler Heights Road Utility Relocations 
 
B. Pavement Shoulders:  Place shoulders along edges of sub-base and base course to 
prevent lateral movement.  Construct shoulders at least 12-inches wide of 
acceptable soil materials and compact simultaneously with each sub-base and 
base layer. 
3.17       FIELD QUALITY CONTROL 
A. Testing Agency Services:  Allow testing agency to inspect and test each subgrade 
and each fill or backfill layer.  Do not proceed until test results for previously 
completed Work verify compliance with requirements. 
1. 
Perform field in-place density tests according to ASTM D1556 (sand cone 
method), ASTM D2167 (rubber balloon method), or ASTM D2937 (drive 
cylinder method), as applicable. 
a. 
Field in-place density tests may also be performed by the nuclear 
method according to ASTM D2922, provided that calibration curves are 
periodically checked and adjusted to correlate to tests performed using 
ASTM D1556.  With each density calibration check, check the 
calibration curves furnished with the moisture gages according to ASTM 
D3017. 
b. 
When field in-place density tests are performed using nuclear methods, 
make calibration checks of both density and moisture gages at beginning 
of Work, on each different type of material encountered, and at intervals 
as directed by the ENGINEER. 
2. 
Trench Backfill:  In each compacted initial and final backfill layer, perform 
at least one field in-place density test for each 150 feet or less of trench, but 
no fewer than two tests. 
B. When testing agency reports that subgrades, fills, or backfills are below specified 
density, scarify and moisten or aerate, or remove and replace soil to the depth 
required, recompact, and retest until required density is obtained. 
C. Minimum number of in-place density test are as follows:

December 2021 
  
City of Chandler 
21-047 
02200-12 
Chandler Heights Road Utility Relocations 
 
TEST LOCATION 
FREQUENCY OF TEST 
Utility Trench Bedding, Shading 
and Backfill 
1 Test every 300 L.F. of Trench  
12” compacted lift  
Manhole Backfill 
1 Test every other 12” compacted lift – 
Alternating sides of manhole 
Structural Backfill or Retaining 
Wall Backfill 
1 test every 200 L.F.  
12” compacted lift  
Finished subgrade beneath On-Site 
Pavements 
1 test every 300 L.F. of Pavement or Fraction 
thereof 
ABC beneath On-Site Pavements 
1 test every 300 L.F. of Pavement or Fraction 
thereof 
 
3.18       PROTECTION 
A. Protecting Graded Areas:  Protect newly graded areas from traffic, freezing, and 
erosion.  Keep free of trash and debris. 
B. Repair and re-establish grades to specified tolerances where completed or 
partially completed surfaces become eroded, rutted, settled, or lose compaction 
due to subsequent construction operations or weather conditions. 
1. 
Scarify or remove and replace material to depth directed by the ENGINEER; 
reshape and recompact at optimum moisture content to the required density. 
C. Settling:  Where settling occurs during the Project correction period, remove 
finished surfacing, backfill with additional approved material, compact, and 
reconstruct surfacing. 
1. 
Restore appearance, quality, and condition of finished surfacing to match 
adjacent work, and eliminate evidence of restoration to the greatest extent 
possible. 
3.19       DISPOSAL OF SURPLUS AND WASTE MATERIALS 
A. Remove waste material, including unsatisfactory soil, trash, and debris, and 
legally dispose of it off the OWNER'S property. 
 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
02530-1 
Chandler Height Road Utility Relocations 
 
SECTION 02530 
MANHOLES 
GENERAL 
1.1       SUMMARY 
A. Furnish and install all polymer concrete manholes and accessories for sanitary 
manholes as indicated on the Plans and as specified herein. 
1.2       SECTION INCLUDES 
A. Polymer Concrete Manholes. 
1.3       RELATED SECTIONS 
A. Section 01300, Submittals. 
B. Section 02532, Manhole FRP Inserts 
C. Section 15051, Buried Piping. 
D. Section 15067, VCP Pipe. 
E. Section 15120, Pipe Specialties and Accessories. 
1.4       REFERENCES 
A. ASTM C 478 (most current) Standard Specification for Precast Reinforced 
Concrete Manhole Sections. 
B. ASTM C 579 (most current) Standard Test Methods for Compressive Strength of 
Chemical-Resistant Mortars, Grouts, Monolithic, Surfacing, and Polymer 
Concretes. 
C. ASTM C 443 (most current) Standard Specification for Joints for Concrete Pipe 
and Manholes Using Rubber Gaskets. 
D. ASTM C 580 (most current) Standard Test Method for Flexural Strength and 
Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic 
Surfacings, and Polymer Concretes. 
E. ASTM C 857 (most current) Standard Practice for Minimum Structural Design 
Loading for Underground Utility Structures.

December 2021 
  
City of Chandler 
21-047 
02530-2 
Chandler Height Road Utility Relocations 
 
F. ACI 350-06 Code Requirements for Environmental Engineering Concrete 
Structures & Commentary. 
G. ACI 440.1R-15 Guide for the Design and Construction of Structural Concrete 
Reinforced with Fiber-Reinforced Polymer (FRP) Bars. 
H. ACI 548.6R-96 Polymer Concrete-Structural Applications State-of-the-Art 
Report. 
I. 
ASTM D 648 (most current) Test Method for Deflection Temperature of Plastics 
Under Flexural Load in Edgewise Position. 
J. 
ASTM D 6783 (most current) Standard Specification for Polymer Concrete Pipe. 
K. ASTM D 2584 (most current) Test Method for Ignition Loss of Cured Reinforced 
Resins. 
L. ASTM C 923 (most current) Standard Specifications for Resilient Connectors 
between Concrete Manholes Structures and Pipe. 
M. ASTM C 990 (most current) Standard Specification for Joints for Concrete Pipe, 
Manholes and Precast Box Sections using Preformed Flexible Joint Sealants. 
N. ASTM C 497 (most current) Test Methods for Concrete Pipe, Manhole Sections, 
or Tile. 
O. All other applicable ASTM and ANSI Standards. 
1.5       SUBMITTALS 
A. Descriptive submittals shall be made in accordance with the Data Reference 
Symbols defined in Section 01300, Submittals. 
 
Item 
Shop Drawings 
O&M Manuals 
 
All Manholes 
C,D,E,F,H,I,L, 
M,N,O 
C,D,E,F,H,I,L, 
M,N,O 
B. Each Shop Drawing submittal shall include a hard copy of the relevant 
Specification Section.  Each and every paragraph of the Specification Section 
shall be clearly marked to indicate whether the requirements for equipment and/or 
services in the Specification Section are met.  If clarifications are needed to any of 
the paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected.

December 2021 
  
City of Chandler 
21-047 
02530-3 
Chandler Height Road Utility Relocations 
 
PRODUCTS 
2.1       MANHOLES 
A. Provide polymer concrete manhole sections, monolithic base sections and related 
components referencing to ASTM C 478. ASTM C 478 material and 
manufacturing is allowed compositional and dimensional differences required by 
a polymer concrete product. 
B. Provide base riser section with monolithic floors, unless shown otherwise. 
C. Provide riser sections joined with bell and spigot / ship-lap design seamed with 
butyl mastic and or rubber gaskets (ASTM C 990) so that on assembly, manhole 
base, riser and top section make a continuous and uniform manhole structure. 
D. Construct riser sections for polymer concrete manholes from standard polymer 
concrete manhole sections of the diameter indicated on drawings. Use various 
lengths of polymer concrete manhole sections in combination to provide correct 
height with the fewest joints. 
E. Design wall sections for depth and loading conditions with wall thickness as 
designed by polymer concrete manufacturer. 
F. Provide tops to support AASHTO HS-20 or HL-93 or vehicle loading or loads as 
required and receiving cast iron frame covers or hatches, as indicated on 
drawings. 
2.2       DESIGN CRITERIA: 
A. Polymer Concrete Manhole risers, cones, flat lids, grade rings and manhole base 
sections shall be designed by manufacturer to meet the intent of ASTM C 478 
with allowable compositional and sizing differences as designed by the polymer 
concrete manufacturer. 
1. 
AASHTO HS-20 or HL-93 design or as required loading applied to manhole 
cover and transition and base slabs. 
2. 
Polymer manholes will be designed based upon live and dead load criteria in 
ASTM C 857 and ACI 350-06. 
3. 
Unit soil weight of 120 pcf located above portions of manhole, including 
base slab projections. 
4. 
Internal liquid pressure based on unit weight of 63 pcf. 
5. 
Dead load of manhole sections fully supported by polymer concrete manhole 
base. 
2.3       DESIGN: 
A. Polymer Concrete Manhole risers, cones, flat lids, grade rings and manhole base 
sections shall be designed by manufacturer to meet loading requirements of

December 2021 
  
City of Chandler 
21-047 
02530-4 
Chandler Height Road Utility Relocations 
 
ASTM C 478, ASTM C 857 and ACI 350-06 as modified for polymer concrete 
manhole design as follows: 
1. 
Polymer Concrete Mix Design shall consist of thermosetting resin, sand, and 
aggregate. No Portland cement shall be allowed as part of the mix design 
matrix. All sand and aggregate shall be inert in an acidic Environment. 
2. 
Reinforcement – Shall use acid resistant reinforcement (FRP Bar) in 
accordance with ACI 440.1R-06 as applicable for polymer concrete design. 
3. 
The wall thickness of polymer concrete structures shall not be less than that 
prescribed by the manufacturer’s design by less than 95% of stated design 
thickness. 
4. 
Thermosetting Resin - The resin shall have a minimum deflection 
temperature of 158° F when tested at 264 psi (1.820 mPa) following Test 
Method D 648. The resin content shall not be less than 7% of the weight of 
the sample as determined by test method D 2584. Resin selection shall be 
suitable for applications in the corrosive conditions to which the polymer 
concrete manhole structures will be exposed. 
5. 
Each polymer concrete manhole component shall be free of all defects, 
including indentations, cracks, foreign inclusions and resin starved areas that, 
due to their nature and degree or extent, detrimentally affect the strength and 
serviceability of the component part. Cosmetic defect shall not be cause for 
rejection. The nominal internal diameter of manhole components shall not 
vary more than 2%. Variations in height of two opposite sides of risers and 
cones shall not be more the 5/8 inch. The under run in height of a riser or 
cone shall not be more than ¼ in/ft of height with a maximum of ½ inch in 
any one section. 
6. 
Marking and Identification - Each manhole shall be marked with the 
following information –  
a. 
Manufacturer’s name or trademark,  
b. 
Manufacturer’s location 
c. 
 and Production Date. 
7. 
Manhole joints shall be assembled with a bell/spigot or shiplap butyl mastic 
and/or gasketed joint so that on assembly, manhole base, riser and top section 
make a continuous and uniform manhole. Joint sealing surfaces shall be free 
of dents, gouges and other surface irregularities that would affect joint 
integrity. 
8. 
Minimum clearance between wall penetrations and joints shall be per 
manufacturer’s design. 
9. 
Construct invert channels to provide smooth flow transition with minimal 
disruption of flow at pipe-manhole connections. Invert slope through 
manhole is as indicated on drawings. All precast base sections to be cast 
monolithically. Polymer bench and channel are to be constructed with all 
polymer concrete material. Extended ballast slab requirements for buoyancy 
concerns can be addressed with cementitious concrete material. 
10. Provide resilient connectors conforming to requirements of ASTM C 923 or 
other options as available. All connectors are to be water tight. Install

December 2021 
  
City of Chandler 
21-047 
02530-5 
Chandler Height Road Utility Relocations 
 
approved resilient connectors at each pipe entering and exiting manholes in 
accordance with manufacturer’s instructions. 
2.4       QUALITY CONTROL 
A. Facility Quality Control should be maintained by adhering to ISO 9001:2008 for 
manufacturing. All fabricators will be ISO 9001:2008 Certified. All fabrication 
will take place in an all polymer concrete fabrication facility. At no time will the 
polymer concrete fabrication facility share the facility with a cementitious precast 
product production facility. Fabricator is also to provide references of 5 previous 
projects in the last 5 years performed with both OWNER and CONTRACTOR for 
reference and review by owner. Polymer concrete shall be cast in a polymer only 
facility and shall not be manufactured in a cementitious concrete facility.  
2.5       GROUTING 
A. All materials needed for grouting and patching will be a polyester mortar 
compound provided by the manufacturer or an approved equal by the 
manufacturer.  
2.6       MANHOLE RINGS 
A. All manhole rings shall be molded from high density polyethylene as defined in 
ASTM specification D-4976.  
2.7       MANHOLE COVERS 
A. Manhole cover shall be made of non-metallic composite materials capable of 
withstanding traffic loading requirements that meet or exceed HS-20 rating. The 
cover shall be inert to corrosion and have a built-in rubber gasket seal to reduce 
the escape of toxic gases and odors. 
2.8       MANUFACTURER 
A. Polymer Concrete Manholes: 
1. 
Armorock LLC, Boulder City, Nevada. 
2. 
Approved equal. 
B. Manhole Rings:  
1. 
Ladtech Inc, Buffalo, MN. 
2. 
Approved equal. 
C. Manhole Covers:  
1. 
Composite Access Products, McAllen, TX. 
2. 
Approved equal.

December 2021 
  
City of Chandler 
21-047 
02530-6 
Chandler Height Road Utility Relocations 
 
EXECUTION 
3.1       INSTALLATION 
A. All manholes shall be constructed in accordance with MAG Standard Detail 420.  
B. Workmanship shall be of the highest grade throughout and in accordance with the 
best standard practice for this type of equipment. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
02532-1 
Chandler Heights Road Utility Relocations 
 
SECTION 02532 
MANHOLE FRP INSERTS 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
Provide all labor, materials, equipment and incidentals as shown on the 
Drawings, to furnish and install manhole Fiber Reinforced Polyester (FRP) 
inserts. 
B. General: 
1. 
Manholes shall conform in shape, size, dimensions, material, and other respects 
to the details shown on the Drawings or as directed by ENGINEER. 
2. 
HDPE rings and covers shall be the standard frame and grate or cover, unless 
otherwise shown on the Drawings, and shall be as specified in the Uniform 
Standard Specifications for Public Works Construction by the Maricopa 
Association of Governments (MAG). 
3. 
All proposed manholes shall not have access steps of any kind. 
1.2       QUALITY ASSURANCE 
A. Standard Specifications and Details: 
1. 
Conform to all applicable requirements of Section 625 and all applicable 
requirements of Part No. 600 and 700 of the Uniform Standard Specifications 
for Public Works Construction by MAG as supplemented by the City of 
Chandler.  If there is a conflict between MAG Standard Specifications and these 
Specifications, the provision of these Specifications shall govern. 
B. Reference Standards: Comply with the applicable provisions and recommendations 
of the following, unless otherwise shown or specified. 
1. 
MAG Section 625, as supplemented by the City of Chandler. 
2. 
International Counsel Code: 
a. 
IBC - International Building Code - 2006. 
3. 
ASTM D-3753, Standard Specification for Glass-Fiber Reinforced Polyester 
Manholes. 
4. 
ASTM C-581, Practice for Determining Chemical Resistance of Chemical 
Thermosetting Resins Used in Glass-Fiber Reinforced Structures Intended for 
Liquid Service. 
5. 
ASTM D-2412, Test Method for Determination of External Loading 
Characteristics of Plastic Pipe by Parallel Plate Loading. 
6. 
ASTM D-695, Test Methods for Compressive Properties of Rigid Plastics.

December 2021 
  
City of Chandler 
21-047 
02532-2 
Chandler Heights Road Utility Relocations 
 
7. 
ASTM D-2584, Test Method for Ignition Loss of Cured Reinforced Resins. 
8. 
ASTM D-790, Test Method for Flexural Properties of Unreinforced and 
Reinforced Plastics and electrical Insulating Materials. 
9. 
ASTM D-2583, Test Method for Indentation Hardness of Rigid Plastics by 
means of a Barcol Impressor. 
10. AASHTO H-20, Axle Loading. 
1.3       SUBMITTALS 
A. Shop Drawings:  Submit for approval the following: 
1. 
Drawings showing design and construction details of FRP insert, including 
cutout locations, and installation procedures. 
PART 2 - PRODUCTS 
2.1       MANHOLE FRP INSERTS 
A. Resin: The resins used shall be unsaturated, supplier certified, commercial grade 
polyester resins.  Mixing lots of resin from different manufacturers, or “odd-lotting” 
of resins shall not be permitted.  Quality-assurance records on the resin shall be 
maintained. Non-pigmented resin is required to allow for light or “sand” color of 
manhole surface in order to facilitate easy from grade interior inspection. UV 
inhibitors shall be added directly to resins to prevent photodegradation. 
B. Reinforcing Materials: The reinforcing materials shall be commercial grade “E” type 
glass in the form of mat, continuous roving, chopped roving, roving fabric, or both, 
having a coupling agent that will provide a suitable bond between the glass 
reinforcement and the resin. 
C. Surfacing Material: If reinforcing material is used on the surface exposed to the 
contained substance, it shall be a commercial grade chemical-resistant glass or 
organic surfacing mat having a coupling agent that will provide a suitable bond with 
the resin. 
D. Fillers and Additives: Fillers, when used, shall be inert to the environment and 
manhole construction. Additives, such as thixotropic agents, catalysts, promoters, 
etc., may be added as required by the specific manufacturing process to be used to 
meet the requirements of this standard.  However, calcium carbonate mixed by the 
fabricator shall not be permitted. The resulting reinforced plastic material must meet 
the requirement of this specification. 
E. Laminate: The laminate shall consist of multiple layers of glass matting and resin. 
The surface exposed to the sewer/chemical environment shall be resin rich and shall 
have no exposed fibers.

December 2021 
  
City of Chandler 
21-047 
02532-3 
Chandler Heights Road Utility Relocations 
 
2.2       DESIGN CRITERIA 
A. HDPE frames, covers, and similar required items shall be provided as specified in 
Specification 02530 Manholes. 
B. Design and Fabrication: 
1. 
Exterior Surface: The exterior surface shall be relatively smooth with no sharp 
projections. Hand-work finish is acceptable if enough resin is present to 
eliminate fiber show. The exterior surface shall be free of blisters larger than 
0.5” in diameter, delamination and fiber show.  Gel-coat or paint or other 
coatings are not allowed. 
2. 
Interior Surface: The interior surfaces shall be resin rich with no exposed fibers. 
Interior surface shall be smooth for improved corrosion resistance and reduced 
sludge build-up. The surface shall be free of crazing, delamination, blisters 
larger than 0.5” in diameter, and wrinkles of 0.125” or greater in depth. Surface 
pits shall be permitted up to 6/ft2 if they are less than 0.75” in diameter and less 
than 0.0625” deep. Voids that cannot be broken with finger pressure and that are 
entirely below the resin surface shall be permitted up to 4/ft2 if they are less than 
0.5” in diameter and less than 0.0625” thick. Gel-coat or paint or other coatings 
are not allowed. 
3. 
Repairs: Any manhole repair is required to meet all requirements of this 
specification. 
4. 
Manhole Lengths: Manhole lengths shall be in whole or 1/2-foot increments +/- 
2”. 
5. 
Load Rating: The complete manhole shall have a minimum dynamic load rating 
of 16,000 lbs. when tested in accordance with ASTM 3753, 8.4 (note 1). To 
establish this rating the complete manhole shall not leak, crack, or suffer other 
damage when load tested to 40,000 lbs. and shall not deflect vertically 
downward more than 0.25” at the point of load application when loaded to 
24,000 lb 
6. 
Stiffness: The cylindrical portion of the manhole is to be tested in accordance 
with ASTM Method D 2412. The manhole cylinder shall have the minimum 
pipe-stiffness values shown in the table below, when tested in accordance with 
ASTM 3753, Section 8.5, (note 1). 
Manhole Length (ft) 
PSI 
 
 
3 - 6 
 
 
0.72 
 
 
7 - 12  
 
1.26 
 
 
3 - 20  
 
2.01 
 
 
21 - 25  
 
3.02 
 
 
26 - 35  
 
5.24 
7. 
Soundness: In order to determine soundness, an air or water test is to be applied 
to the manhole test sample.  While holding the pressure between 3-5 psi, the 
entire manhole must be inspected for leaks.  Any leakage through the laminate is 
cause for failure of the test.  Refer to ASTM 3753, Sec. 8.6.

December 2021 
  
City of Chandler 
21-047 
02532-4 
Chandler Heights Road Utility Relocations 
 
8. 
Chemical Resistance: Per ASTM C 581; (see ASTM 3753, Section 8.7), 
Flexural strength, flexural modulus, and barcol hardness are plotted versus time 
on log-log coordinates. The line defined by these points is extrapolated to 
100,000 hours. The minimum extrapolation retention allowed for any of these 
properties is 50%. Test samples used are actual pieces of manhole or samples 
manufactured in a manner consistent in every way with the manhole component 
construction.   
9. 
Physical Properties: 
 
Flexural Strength (cone): Hoop:   15.4 x 103 psi 
 
 
 
 
 
Axial:   17.2 x 103 psi  
 
Flexural Strength (pipe) Hoop:   22.5 x 103 psi  
 
 
 
 
 
Axial:   14.3 x 103 psi  
 
Compressive Strength:  
  8.9  x 103 psi 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. General: The manhole installation should strictly follow the manufacturers 
recommended installation procedures. 
1. 
To Install the Fiberglass Manhole: Fiberglass manholes must be installed 
according to Containment Solution’s Fiberglass Manhole Installation 
Instructions. In addition to these instructions, local codes may apply and should 
be consulted as applicable in manhole installation. Correct manhole installation 
requires proper concrete foundation, good backfill and proper handling to 
prevent manhole damage and insure long-term corrosion resistant service. 
B. General Installation Outline: Containment Solution’s complete Manhole installation 
instructions must be consulted before actual installation is performed. 
1. 
Prepare Excavation/Make Manhole Pipe Cut-Outs for stubout connections: 
Prepare excavation in a normal manner. Excavation at manhole location should 
be at least wide enough to accommodate the slab specified and to provide 
working room around manhole.  Insure the depth of manhole is sufficient to 
allow at least one course of brick or one concrete ring for adjustment of ring and 
cover at top of final grade. Pipe cut-outs at the flowline are made in manhole 
prior to setting manhole in place over pipe in trench. Quarter marks have been 
provided on barrel to facilitate alignment of cut-outs. 
2. 
Pour Concrete Base: Concrete slab base should be a minimum of 6” thick for up 
to 48” diameter manholes (8” for larger diameter manholes). Concrete slab 
should extend a minimum of 12” beyond manhole outside wall for manholes up 
to 20’ in depth (24” up to 35’ in depth). 
3. 
Set Manhole: To lift manhole, insert an appropriately sized timber or steel beam, 
8” longer than the cone top opening, crosswise inside the manhole to the 
underside of the collar with a rope or chain attached to backhoe or other lifting

December 2021 
  
City of Chandler 
21-047 
02532-5 
Chandler Heights Road Utility Relocations 
 
device. Lower manhole into wet concrete base to a minimum depth of 4”. 
Minimum 2” thick concrete bearing surface beneath bottom edge of the manhole 
is required. Plumb manhole using standard bubble level and by moving manhole 
with hands. Work concrete around manhole base and 6 inch minimum over 
incoming lines. Inverts and laterals are made following standard procedures. 
4. 
Backfill: Backfilling is done just as soon as the concrete base has hardened 
enough to provide sufficient support for manhole and fill. Native soil ( or sand, 
in unstable areas), free of large stones, debris, or concrete chunks may be used 
for backfill. Backfill should be place evenly around manhole in 12” maximum 
lifts and should thoroughly tamped to 90% standard proctor density before the 
next layer is installed. Backfill material shall be subject to approval by the 
engineer. 
5. 
Bring to Grade: Construct chimney on flat shoulder of manhole using precast 
concrete rings 
3.2       GRADING RINGS 
A. Grading rings shall be used for all precast manholes, where required.  Grade rings 
shall be a maximum of 12-inches in height, constructed on the roof slab or cone 
section on which the manhole frame and cover shall be placed.  The height of the 
grade rings shall be such as is necessary to bring the manhole frame to the proper 
grade. 
3.3       GRADING AT MANHOLES 
A. All manholes in unpaved areas shall be built, as shown on the Drawings or directed 
by the ENGINEER, to an elevation higher than the original ground.  The ground 
surface shall be graded to drain away from the manhole.  Fill shall be placed around 
manholes to the level of the upper rim of the manhole frame, and the surface evenly 
graded on a 1 to 5 slope to the existing surrounding ground, unless otherwise shown 
on the Drawings or directed by the ENGINEER.  The slope shall be covered with 4-
inches of top soil, seeded and maintained until a satisfactory growth of grass is 
obtained. 
B. Manholes in paved areas and areas receiving gravel shall be constructed to meet the 
final surface grade as shown on the Drawings. 
C. Sole responsibility for the proper height of all manholes necessary to reach the final 
grade at all locations belongs to CONTRACTOR.   Caution:  ENGINEER'S review 
of Shop Drawings for manhole components will be general in nature, provide an 
adequate supply of random length precast manhole riser sections to adjust any 
manhole to meet field conditions for final grading.

December 2021 
  
City of Chandler 
21-047 
02532-6 
Chandler Heights Road Utility Relocations 
 
3.4       MANHOLE WATERTIGHTNESS 
A. All manholes shall be free of visible leakage.  Each manhole shall be tested for leaks 
and inspected, and all leaks shall be repaired in a manner subject to ENGINEER'S 
approval.  Manhole testing shall conform to the requirements of Section 15051, 
Buried Piping Installation. 
3.5       FLEXIBLE PIPE JOINT AT MANHOLE BASE 
A. An approved flexible joint shall be provided between each pipe entering and exiting 
the manhole.  This may be accomplished by the installation in the manhole base of 
the bell end of a pipe or by other means subject to approval of ENGINEER.  Joints 
shall be similar to the approved pipe joints.  The joint into the manhole base shall be 
completely watertight. 
3.6       MANHOLE COVER AND FRAME INSTALLATION 
A. Follow manufacturer's printed instructions and approved Shop Drawings. 
B. Manhole lids shall be non-locking.  
C. Set castings accurately to required location, alignment and elevation, plumb, level, 
true and free of rack, measured from established lines and levels.  Brace temporarily 
or anchor temporarily in formwork. 
D. Protection from Dissimilar Materials: 
1. 
Coat all aluminum surfaces in contact with dissimilar materials such as concrete, 
masonry, steel and other metals as specified in Section 09900, Painting. 
3.7       INSPECTION 
A. The quality of all materials, the process of manufacture, and the finished sections 
shall be subject to inspection and approval by the Engineer, or other representative of 
the owner.  Such inspections shall be made at the place of manufacture, or at site of 
delivery, and the sections shall be subject to rejection on account of failure to meet 
any of the specification requirements.  Sections rejected after delivery to the job site 
shall be marked for identification and shall be removed from the job at once.  All 
sections which have been damaged after delivery will be rejected, and if already 
installed shall be acceptable if repaired or removed and replaced at the contractor’s 
expense. 
B. At the time of inspection the material will be examined for compliance with the 
requirements of this specification and the approved drawings.

December 2021 
  
City of Chandler 
21-047 
02532-7 
Chandler Heights Road Utility Relocations 
 
3.8       MEASUREMENT 
A. This item will be measured will be measured by each type of individual structure 
completed.  The depth will be measured from the flow line to the top of the rim.  The 
size shall be nominal inside diameter.  This item includes, but is not limited to the 
following: 
1. 
Structural excavation. 
2. 
Loading, hauling, and disposing of all excess material. 
3. 
Furnishing all labor and materials including fiberglass, concrete, mortar, bricks, 
drop pipe and fittings, manhole rings and covers. 
4. 
Placing and compacting all backfill. 
5. 
Final Grading. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
11295-1 
Chandler Heights Road Utility Relocations 
SECTION 11295 
HYDRAULIC VALVES 
PART 1 - GENERAL 
1.1       SUMMARY 
A. Furnish and install all valves and valve accessories for water as indicated on the 
Plans and as specified herein, including all appurtenances required for a complete 
and operational installation. 
1.2       SECTION INCLUDES 
A. Gate valves. 
B. In-line valves. 
C. Valve appurtenances. 
1.3       RELATED SECTIONS 
A. Section 01300, Submittals. 
1.4       REFERENCES 
A. ANSI/AWWA C500 - Gate Valves. 
B. ANSI/AWWA C509 - Resilient-Seated Gate Valves. 
C. ANSI B16.1. 
D. ANSI B46.1. 
E. ASTM A126. 
F. ASTM A269. 
G. ASTM A48. 
H. ASTM A536. 
I. 
ASTM A582. 
J. 
ASTM B271. 
K. ASTM D429.

December 2021 
  
City of Chandler 
21-047 
11295-2 
Chandler Heights Road Utility Relocations 
L. ASTM D1784. 
M. ASTM D2000. 
N. ASTM F439. 
O. All other applicable ASTM and ANSI Standards. 
1.5       SUBMITTALS 
A. Descriptive submittals shall be made in accordance with the Data Reference 
Symbols defined in Section 01300, Submittals. 
 
Item 
Shop Drawings 
O&M Manuals 
 
All Valves 
C,D,E,F,H,I,L, 
M,N,O 
C,D,E,F,H,I,L, 
M,N,O 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 2 - PRODUCTS 
2.1       GENERAL 
A. All buried valves shall be provided with a valve box and cover. 
2.2       GATE VALVES 
A. Cast Iron Gate Valves: 
1. 
Gate valves shall conform to AWWA C509, 200 psi working pressure, resilient 
seated, iron body, bronze mounted, non-rising stem. All valves shall have an 
opening direction of counter-clockwise.  All gate valves shall be as 
manufactured by Clow Valve Co, Mueller Company, Kennedy Valve Co, or 
American Flow Control. 
2. 
All aboveground gate valves shall have handwheel/lever/t-handle geared 
operators or electric actuators as specified in the Valve Schedule and as shown 
on the Drawings.  All buried valves shall be equipped with valve box and cover 
per City of Chandler standard details and either a handwheel and pedestal or

December 2021 
  
City of Chandler 
21-047 
11295-3 
Chandler Heights Road Utility Relocations 
with operating nut as specified and as shown on the Drawings.  Valves 
specified with an operating nut shall be installed with a ground level valve 
position indicator.   
2.3       INSERTION VALVES 
A. Ductile Iron Valves: 
1. 
Gate valves shall conform to AWWA C509, 200 psi working pressure, resilient 
seated, ductile iron body, non-rising stem. All valves shall have an opening 
direction of counter-clockwise.  All insertion valves shall be as manufactured 
by Mueller Co or approved equal. 
2. 
All aboveground gate valves shall have handwheel/lever/t-handle geared 
operators or electric actuators as specified in the Valve Schedule and as shown 
on the Drawings.  All buried valves shall be equipped with valve box and 
extension stem per City of Chandler standard details and either a handwheel 
and pedestal or with operating nut as specified and as shown on the Drawings.  
Valves specified with an operating nut shall be installed with a ground level 
valve position indicator.   
2.4       COMBINATION AIR/VACUUM ASSEMBLIES 
A. The combination air/vacuum assembly shall automatically vent small pockets of air 
as they accumulate in the system while the system is operating and pressurized, or 
discharge large volumes of air during the filling or draining of a pipeline or piping 
system. 
B. The main valve parts shall consist of a body and cover, float, seat, and internal lever 
pins and retaining screws. 
C. The valves shall be manufactured by  
1. 
Dorot DAV-P-2-NPT-KA,  
2. 
A.R.I. D-40.  
3. 
Approved equal. 
2.5       VALVE APPURTENANCES 
A. Valve Boxes:  Provide each buried valve with a valve box as follows: 
1. 
Made of heavy pattern cast iron, two-piece adjustable telescoping type. 
2. 
Lower section shall enclose operating nut and stuffing box and rest on bonnet. 
3. 
Inside diameter shall be at least 4-1/2-inches. 
4. 
Provide extension stem and operating nut.  
5. 
Cover shall be heavy-duty cast iron with direction to open arrow cast in.  
6. 
Provide ground level valve position indicator for all buried valves. 
2.6       SHOP PAINTING 
A. The manufacturer shall paint all valves, floor boxes, and valve boxes as follows:

December 2021 
  
City of Chandler 
21-047 
11295-4 
Chandler Heights Road Utility Relocations 
1. 
Clean and remove oil, grease, dirt, loose mill scale, and other foreign 
substances from un-galvanized ferrous-metal surfaces. 
2. 
Solvent scrub with stiff bristle brush followed by brush-off abrasive blast 
cleaning to a minimum surface profile depth of 1.5 mils. 
3. 
Valves, floor boxes, and valve boxes to be installed in exterior or buried 
conditions shall have prime coat Series 69-1255 (beige) H.B. Epoxoline II; one 
coat, 3-5 mils dry film thickness (DFT). 
4. 
Valves and floor boxes to be installed in interior exposure conditions shall have 
prime coat Series 135 Chembuild; one coat, 3-5 mils DFT. 
B. CONTRACTOR shall determine the quantity of each type of valve to the 
manufacturer. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Valves of the various types and pattern shall be installed at the respective locations 
as shown on the Drawings, listed in the valve schedule, and specified herein.  All 
appurtenances required for operation and control of the valves shall be included.  
Joints and connections shall be made in accordance with applicable requirements 
for pipeline or pipe joints.  Valve stems shall be plumb and vertical unless otherwise 
specifically shown.  Each valve shall be adjusted for smooth and easy operation 
and shall be watertight when placed in operation under maximum working pressure. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15050-1 
Chandler Heights Road Utility Relocations 
SECTION 15050 
PIPING SYSTEMS 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope:  This Section specifies systems of process piping and general requirements 
for piping systems.  Detailed Specifications for the components listed on the Piping 
System Specification Sheets are found in other Sections of Division 15, 
Mechanical.  This Section shall be used in conjunction with those Sections. 
B. Related Sections: 
1. 
Section 02200, Earthwork. 
2. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. This Section contains references to the following documents.  They are a part of 
this Section as specified and modified.  In case of conflict between the requirements 
of this Section and those of the listed documents, the requirements of this Section 
shall prevail. 
B. Unless otherwise specified, references to documents shall mean the documents in 
effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective 
date of the Agreement if there were no Bids).  If referenced documents have been 
discontinued by the issuing organization, references to those documents shall mean 
the replacement documents issued or otherwise identified by that organization or, 
if there are no replacement documents, the last version of the document before it 
was discontinued.  Where document dates are given in the following listing, 
references to those documents shall mean the specific document version associated 
with that date, whether or not the document has been superseded by a version with 
a later date, discontinued, or replaced. 
1. 
AASHTO M36/M36M - Metallic (Zinc or Aluminum) Coated Corrugated 
Steel Culverts and Underdrains. 
2. 
ANSI A13.1 - Scheme for the Identification of Piping Systems. 
3. 
ANSI B1.20.1 - Pipe Threads, General Purpose (Inch). 
4. 
ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250, 
and 800. 
5. 
ANSI B16.3 - Malleable Iron Threaded Fittings Class 150 and 300. 
6. 
ANSI B16.5 - Pipe Flanges and Flanged Fittings. 
7. 
ANSI B16. - Factory Made Wrought Steel Buttwelding Fittings. 
8. 
ANSI B16.11 - Forged Steel Fittings, Socket Welding and Threaded. 
9. 
ANSI B16.12 - Cast Iron Threaded Drainage Fittings.

December 2021 
  
City of Chandler 
21-047 
15050-2 
Chandler Heights Road Utility Relocations 
10. ANSI B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure 
Fittings. 
11. ANSI B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 
12. ANSI B31.1 - Power Piping. 
13. ANSI B31.3 - Chemical Plant and Petroleum Refinery Piping. 
14. ASME Section IX - Boiler and Pressure Vessel Code; Welding and Brazing 
Qualifications. 
15. ASTM A47 - Malleable Iron Castings. 
16. ASTM A74 - Cast Iron Soil Pipe and Fittings. 
17. ASTM A105/A105M - Forgings, Carbon Steel, for Piping Components. 
18. ASTM A106 - Seamless Carbon Steel Pipe for High Temperature Service. 
19. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, 
Flanges, and Pipe Fittings. 
20. ASTM A197 - Cupola Malleable Iron. 
21. ASTM A234/A234M - Pipe Fittings of Wrought Carbon Steel and Alloy Steel 
for Moderate and Elevated Temperatures. 
22. ASTM A312/A312M - Seamless and Welded Austenitic Stainless Steel Pipe. 
23. ASTM A403/A403M - Wrought Austenitic Stainless Steel Piping Fittings. 
24. ASTM A536 - Ductile Iron Castings. 
25. ASTM A570/A570M - Hot Rolled Carbon Steel Sheet and Strip, Structural 
Quality. 
26. ASTM B88 - Seamless Copper Water Tube. 
27. ASTM C76 - Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. 
28. ASTM C443-REV A - Standard Specification for Joints for Circular Concrete 
Sewer and Culvert Pipe, Using Rubber Gaskets. 
29. ASTM C564 - Rubber Gaskets for Cast Iron Soil Pipe and Fittings. 
30. ASTM D1248 - Polyethylene Plastics Molding and Extrusion Materials. 
31. ASTM D1784 - Rigid Poly (Vinyl Chloride) (PVC) Compounds and 
Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds. 
32. ASTM D1785 - Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, 
and 120.  
33. ASTM D2241 - Poly (Vinyl Chloride) (PVC) Plastic Pipe (SDR-PR). 
34. ASTM D2513 - Thermoplastic Gas Pressure Pipe, Tubing, and Fittings. 
35. ASTM D2665 - Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent 
Pipe and Fittings. 
36. ASTM D2996 - Filament Wound Reinforced Thermosetting Resin Pipe. 
37. ASTM D3034 - Standard Specification for Type PSM Poly (Vinyl Chloride) 
(PVC) Sewer Pipe and Fittings. 
38. ASTM D3261 - Butt Fusion Polyethylene (PE) Plastic Fittings for 
Polyethylene (PE) Plastic Pipe and Tubing. 
39. ASTM D4174 - Cleaning, Flushing, and Purification of Petroleum Fluid 
Hydraulic Systems. 
40. ASTM D4101 - Propylene Plastic Injection and Extrusion Materials. 
41. ASTM F441 - Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, 
Schedules 40 and 80.

December 2021 
  
City of Chandler 
21-047 
15050-3 
Chandler Heights Road Utility Relocations 
42. AWWA C105 - Polyethylene Encasement for Ductile-Iron Piping for Water 
and Other Liquids. 
43. AWWA C110 - Ductile Iron and Gray Iron Fittings, 3" Through 48", for Water 
and Other Liquids. 
44. AWWA C111 - Rubber Gasket Joints for Ductile Iron and Gray Iron Pressure 
Pipe and Fittings. 
45. AWWA C115 - Flanged Ductile Iron and Gray Iron Pipe with Threaded 
Flanges. 
46. AWWA C151 - Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand-
Lined Molds, for Water or Other Liquids. 
47. AWWA C200 - Steel Water Pipe 6" and Larger. 
48. AWWA C205 - Cement Mortar Protective Lining and Coating for Steel Water 
Pipe - 4" and Larger - Shop Applied. 
49. AWWA C206 - Field Welding of Steel Water Pipe. 
50. AWWA C207 - Steel Pipe Flanges for Waterworks Services - Sizes 4" 
Through 144". 
51. AWWA C208 - Dimensions for Fabricated Steel Water Pipe Fittings. 
52. AWWA C209 - Cold Applied Tape Coating for Special Sections, Connections, 
and Fittings for Steel Water Pipelines. 
53. AWWA C210 - Liquid Epoxy Coating Systems for the Interior and Exterior 
of Steel Water Pipe. 
54. AWWA C214 - Tape Coating Systems for the Exterior of Steel Water 
Pipelines. 
55. AWWA 301 - Pre-stressed Concrete Pressure Pipe, Steel Cylinder Type, for 
Water and Other Liquids. 
56. AWWA C303 - Reinforced Concrete Pressure Pipe, Steel Cylinder Type, Pre-
tensioned, for Water and Other Liquids. 
57. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
58. AWWA C651 - Disinfecting Water Mains. 
59. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe, 4" Through 12", for 
Water. 
60. AWWA M11 - Steel Pipe - A Guide for Design and Installation. 
61. CISPI 301 - Specification Data for Hubless Cast Iron Sanitary System with 
No-Hub Pipe and Fittings. 
62. FEDSPEC L-C-530B(1) - Coating, Pipe, Thermoplastic Resin, or 
Thermosetting Epoxy. 
63. MIL-H-13528B - Hydrochloric Acid, Inhibited, Rust Removing. 
64. MIL-STD-810C - Environmental Test Methods. 
65. SAE J1227 - Assessing Cleanliness of Hydraulic Fluid Power Components and 
Systems. 
66. UPC - Uniform Plumbing Code. 
C. Fittings and Coupling Compatibility: 
1. 
To assure uniformity and compatibility of piping components, fittings and 
couplings for grooved end piping systems shall be furnished by the same 
manufacturers.

December 2021 
  
City of Chandler 
21-047 
15050-4 
Chandler Heights Road Utility Relocations 
PART 2 - PRODUCTS 
2.1       PIPING MATERIALS 
A. Unless otherwise specified, piping materials including pipe, gaskets, fittings, 
connection and joint assemblies, linings, and coatings shall be selected from those 
listed on the Piping System Specification Sheets.   
B. Piping materials shall conform to detailed specifications for each type of pipe and 
piping appurtenance specified in other Sections of Division 15, Mechanical.   
C. All piping shall be compatible with the fluid to which it is exposed. 
D. All piping and valves to be used for the air release valve connections shall be copper 
or brass material.  
E. All piping which comes in contact with potable water shall have NSF 61 
certification.  
2.2       PIPING IDENTIFICATION 
A. Plastic Tracer Tape: 
1. 
Tracer tape shall be per MAG Section 610, colored the same as the background 
colors, as specified in Table A, Paragraph 3.5 of this Section.   
2. 
Tape shall be capable of stretching to twice its original length and shall be as 
manufactured by Allen Systems, W. H. Brady Co., Seton Name Plate 
Corporation, Marking Services, Inc., or approved equal. 
3. 
The message shall read "CAUTION _____ PIPE BURIED BELOW," with 
bold letters approximately 2-inches high.  The blank shall be filled with the 
particular system fluid, such as chlorine, potable water line, or storm sewer 
line.  All lines shall have tracer tape. 
2.3       VALVES 
A. Valves of the same size and service shall be provided by a single valve 
manufacturer.  Packing shall be non-asbestos material.  Actual length of valves 
shall be within 1/16-inch () of the manufacturer's specified length.  Flanges shall 
meet the requirement of ANSI B16.5.  Push-on and mechanical joints shall meet 
the requirements of AWWA C111.   
2.4       SUBMITTALS 
A. Descriptive submittals shall be made in accordance with the Data Reference 
Symbols defined in Section 01300, Submittals. 
 
 
1. 
Item  
  
Shop Drawings 
 
O&M Manuals 
 
 
 
All Piping 
A,C,D,E 
 
 
A,C,D,E

December 2021 
  
City of Chandler 
21-047 
15050-5 
Chandler Heights Road Utility Relocations 
B. All additional submittal information shall be included with this submittal 
information as noted in the Division 15, Mechanical, Pipe Material Specifications. 
C. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Location: 
1. 
Piping shall be provided as specified, except for adjustments, to avoid 
architectural and structural features. 
B. Piping Sizes: 
1. 
Where the size of piping is not specified, the CONTRACTOR shall provide 
piping of the sizes required by UPC.  Unless specified otherwise, small piping 
(less than 1-inch in diameter) required for services not described by UPC shall 
be 1/2-inch. 
C. Anchorage for Buried Piping: 
1. 
All plugs, caps, tees, and bends in buried pressure piping systems shall be 
anchored by means of restrained joints as specified. 
D. Bedding and Backfill: 
1. 
All 4-inch diameter and larger piping, the bedding and backfill shall be as 
shown on the Contract Drawings. 
2. 
All pipe smaller than 4-inches in diameter shall conform to Section 02200, 
Earthwork.    
3.2       PIPING IDENTIFICATION 
A. Pipe Coding: 
1. 
Pipe identification per Specifications Section 15051, Buried Piping 
Installation. 
B. Plastic Tracer Tape:

December 2021 
  
City of Chandler 
21-047 
15050-6 
Chandler Heights Road Utility Relocations 
1. 
A single line of tape, as specified in Paragraph 2.2.A of this Section, shall be 
provided 2-1/2 feet above the centerline of buried pipe. 
2. 
For pipelines buried 8 feet or greater below finished grade, CONTRACTOR 
shall provide a second line of tape 12-inches below finished grade, above and 
parallel to each buried pipe. 
3. 
Tape shall be spread flat with message side up before backfilling. 
C. Locator Tape: 
1. 
Detectable pipe locating tape, as specified in Section 2.2.B of this Section, 
shall be installed per MAG Section 616.5. 
3.3       TESTING 
A. General: 
1. 
Upon completion of piping, but prior to application of insulation on exposed 
piping, the CONTRACTOR shall test the piping systems in accordance with 
the appropriate MAG and City of Chandler Specifications.  Pressures, media, 
and test durations shall be as specified in the PIPESPEC.  Equipment which 
may be damaged by the specified test conditions shall be isolated.  Testing 
shall be performed using calibrated test gages and calibrated volumetric 
measuring equipment to determine leakage rates.  Each test gage shall be 
selected so that the specified test pressure falls within the upper half of the 
gage's range.  Unless otherwise specified, the CONTRACTOR shall notify the 
ENGINEER 24 hours prior to each test. 
2. 
Unless otherwise specified, testing, as specified herein, shall include existing 
piping systems that connect with new pipe systems.  Existing pipe shall be 
tested to the nearest existing valve.  Any piping that fails the test shall be 
repaired.  Repair of existing piping will be considered and paid for as extra 
Work. 
3. 
All blow off assemblies shall be removed after successful testing of the new 
pipes as specified in the Drawings.  
B. Liquid Systems: 
1. 
Pressure and leakage testing for water systems shall be in accordance with 
MAG Section 610.  Unless otherwise specified, leakage from other buried 
liquid piping systems shall be less than 0.02 gallons per hour per inch diameter 
per 100 feet of buried piping. 
2. 
Potable Water Systems Additional Requirements: 
a. 
The CONTRACTOR shall provide all vents, piping, plugs, bulkheads, 
valves, bracing, blocking, pump, including measuring device and all other 
equipment necessary for making the tests, except pressure gages. 
b. 
The pipe shall be tested between each valve or between a valve and the 
closed end of the pipe. 
c. 
Pipe test section shall be limited to 1/2 linear mile, or less, unless 
otherwise approved in writing by the Engineer. Testing cannot be done 
against an existing valve. The new pipeline must be separated from any 
potable system in such a way to prevent any potential for cross-

December 2021 
  
City of Chandler 
21-047 
15050-7 
Chandler Heights Road Utility Relocations 
contamination between the existing potable water system and the new 
pipeline. 
d. 
The test shall be made after the backfilling is completed or compacted, 
regardless of the compaction method. 
e. 
All connections, blow-offs, hydrants and valves shall be tested with the 
main, where practical. 
f. 
The test section shall be slowly filled with potable water and all air shall 
be vented from the line.  The rate of filling shall be as approved by the 
ENGINEER, with at least 24-hour notice required before filling is 
scheduled. 
C. Drains: 
1. 
Drain systems, other than pumped drain systems, shall be tested in accordance 
with UPC. 
3.4       CLEANING AND FLUSHING 
A. General: 
1. 
Piping systems shall be cleaned following completion of testing and prior to 
connection to operating, control, regulating, or instrumentation equipment. 
2. 
The CONTRACTOR may, at his option, clean and test sections of buried 
piping systems.  Use of this procedure, however, will not waive the 
requirement for a full pressure test of the completed system. 
3. 
Unless specified otherwise, piping 24-inches in diameter and smaller shall first 
be cleaned by pulling a tightly fitting cleaning ball or swab through the system. 
4. 
Piping larger than 24-inches in diameter may be cleaned manually or with a 
cleaning ball or swab. 
B. Liquid Systems: 
1. 
After completion of cleaning, liquid systems, unless otherwise specified, shall 
be flushed with clean water. 
C. Water Systems: 
1. 
For non-potable water systems, final flushing and microbiological testing, as 
specified in MAG Section 611.15, is not required. 
3.5       PIPING SPECIFICATION SHEETS (PIPESPEC) 
A. Piping and valves for groupings of similar plant processes or types of service lines 
are specified on individual piping specification sheets (PIPESPECS).  Piping 
services are grouped according to the chemical and physical properties of the fluid 
conveyed and/or by the temperature or pressure requirements.  Piping services 
specified in the PIPESPECS and on the Drawings are alphabetically arranged by 
designated service symbols.

December 2021 
  
City of Chandler 
21-047 
15050-8 
Chandler Heights Road Utility Relocations 
TABLE A - PIPING SERVICES 
Symbol 
         Service 
Fluid Category 
Pipe Marker 
Background Color 
W 
    Potable Water 
          Liquid 
  Blue 
SS 
   Sanitary Sewer 
          Liquid 
 Green 
 
(The remainder of this page has been intentionally left blank)

December 2021 
  
City of Chandler 
21-047 
15050-9 
Chandler Heights Road Utility Relocations 
 
PIPING SYMBOL/SERVICE 
SS / SANITARY SEWER 
 
 
 
 
 
Refer to section 15067, Vitrified Clay Pipe. 
 
 
 
 
 
 
 
 
 
 
 
PIPING SYMBOL/SERVICE 
POT / POTABLE WATER 
 
 
Medium: 
Water. 
  
Pressure: 
As shown on buried and exposed 
piping schedules.  All requirements 
of COC. 
  
  
Duration: 
2 hours. 
  
  
Gasket Requirements: 
  
Flange: 
Red Rubber Gasket Material (SBR) 
conforming to ASTM D1330. 
  
  
Push-on/Mech. Cpl: 
Nitrile or Neoprene. Areas within 35 
foot SRP easement shall be fitted 
with Fluoroelastomer Fluorel Viton 
suitable for water service of up to 
212oF. 
  
  
  
  
Buried and Encased Pipes: 
  
(See Drawings for pipe sizes and materials.) 
  
2” and Smaller\ 
Copper Tube; ASTM B88, Type K, drawn.   
Ref. Spec. Section 15064, Copper Pipe. 
 
Copper Conn; Solder type with 
threaded adapters. 
 
 
 
Copper Ftgs; Wrought copper 
or bronze, ANSI 
B16.22. 
 
 
 
Copper Interior Lining; None. 
Copper Exterior Coating; None.

December 2021 
  
City of Chandler 
21-047 
15050-10 
Chandler Heights Road Utility Relocations 
4” and Larger 
 
Ductile Iron; AWWA C151  
with cement mortar lining. Ref.  
Spec. Section 15061 
 
 
 
Ductile Iron Conn; Restrained 
push-on rubber gasket 
joint.  Flanged adapters 
for valves and ends. 
 
 
 
Ductile Iron Ftgs; Ductile iron 
per Spec. Section 
15061. 
 
 
 
Ductile Iron Exterior Coating;  
Bituminous Coated,  
Polyethylene Wrap 
  
 
 
  
Remarks: 
 
  
1.  Potable water lines shall be disinfected in 
accordance with AWWA C651-92. 
 
  
2.  All piping, fittings, valves, and any other 
material that comes in contact with 
drinking water shall comply with 
NSF Standards 60 and 61.

December 2021 
  
 
 
 
 
City of Chandler 
21-047 
 
15050-11 
Chandler Heights Road Utility Relocations 
PIPING SCHEDULE TABLES 
 
1. Potable water lines shall be disinfected in accordance with AWWA C651-92. 
2. All piping, fittings, valves, and any other material that comes in contact with drinking water shall comply with NSF Standards 60 
and 61. 
 
 
BURIED PIPE 
SERVICE 
DESCRIPTION 
PIPE 
SYMBOL 
PIPE 
MATERIAL SPECIFICATION CLASS/ 
TYPE 
INTERIOR 
LINING 
EXTERIOR 
COATING JOINT TYPE 
TEST 
PRESSURE 
POTABLE WATER 4-
INCHES AND LARGER 
W 
DIP 
15061 
350 
CM 
BC/PE 
MJ 
PER 15051 
POTABLE WATER 3-
INCHES AND SMALLER 
W 
COP 
15064 
K 
NONE 
P 
BZ 
PER 15051 
SANITARY SEWER 
SS 
VCP 
15067 
Extra 
Strength 
N/A 
N/A 
CJ 
PER 15051 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15051-1 
Chandler Heights Road Utility Relocations 
SECTION 15051 
BURIED PIPING INSTALLATION 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
CONTRACTOR shall provide all labor, materials, equipment, and incidentals 
as shown, specified, and required to install and test all buried piping, fittings, 
and specials.  The Work includes, but is not limited to, the following: 
a. 
All types and sizes of buried piping, except those specified under other 
Sections. 
b. 
Supports, restraints, and thrust blocks. 
c. 
Pipe encasements. 
d. 
Work on or affecting existing piping. 
e. 
Testing. 
f. 
Cleaning. 
g. 
Installation of all jointing and gasketing materials, specials, flexible 
couplings, mechanical couplings, harnessed and flanged adapters, 
sleeves, tie rods, and all other Work required to completing the buried 
piping installation. 
h. 
Incorporation of valves, meters and special items shown or specified into 
the piping systems as required and as specified in the appropriate Division 
15, Mechanical Sections. 
i. 
Unless otherwise specifically shown, specified, or included under other 
Sections, all buried piping work required begins at the outside face of 
structures or structure foundations and extending away from structure. 
B. Coordination: 
1. 
Review installation procedures under other Sections and coordinate with the 
Work that is related to this Section. 
2. 
Section 15051, Buried Pipe Installation, specifies the installation of all buried 
piping materials specified in Sections of Division 15, Mechanical.  Coordinate 
with these Sections. 
C. Related Work Specified Elsewhere: 
1. 
Section 02200, Earthwork. 
2. 
Section 11295, Hydraulic Valves. 
3. 
Section 15050, Piping Systems. 
4. 
Section 15061, Ductile Iron Pipe. 
5. 
Section 15064, Copper Pipe. 
6. 
Section 15067, VCP Pipe. 
7. 
Section 15020, Piping Specialties and Accessories.

December 2021 
  
City of Chandler 
21-047 
15051-2 
Chandler Heights Road Utility Relocations 
1.2       QUALITY ASSURANCE 
A. CONTRACTOR shall conform to all applicable requirements of Parts 600 and 700 
of the Uniform Standard Specifications for Public Work Construction by the 
Maricopa Association of Governments (MAG).  If there is a conflict between MAG 
Standard Specifications and these Specifications, the provisions of these 
Specifications shall govern. 
B. Requirements of Regulatory Agencies: 
1. 
Comply with requirements of UL, FM, and other jurisdictional authorities, 
where applicable. 
2. 
Refer to the General and Supplementary Conditions regarding permit 
requirements for this Work. 
C. Reference Standards:  Comply with applicable provisions and recommendations of 
the following, except as otherwise shown or specified. 
1. 
ASTM D2321 - Practice for Underground Installation of Flexible Thermoplas-
tic Pipe. 
2. 
ASTM D2774 - Practice for Underground Installation of Thermoplastic 
Pressure Piping. 
3. 
AWWA C105 - Polyethylene Encasement for Ductile Iron Piping for Water 
and Other Liquids. 
4. 
AWWA C111 - Rubber Gasket Joints for Ductile Iron Pressure Pipe and 
Fittings. 
5. 
AWWA C200 - Steel Water Pipe. 
6. 
AWWA C205 - Cement Mortar Protective Lining and Coating for Steel Water 
Pipe. 
7. 
AWWA C206 - Field Welding of Steel Water Pipe. 
8. 
AWWA C207 - Steel Pipe Flanges for Waterworks Service. 
9. 
AWWA C208 - Dimensions for Fabricated Steel Water Pipe Fittings. 
10. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
11. AWWA C606 - Grooved and Shouldered Joints. 
12. AWWA C651 - Disinfecting Water Mains. 
13. AWWA M11 - Steel Pipe - A Guide for Design and Installation. 
14. AWWA M23 - PVC - Design and Installation. 
15. AWWA M41 - Ductile Iron Pipe and Fittings. 
16. ASCE MOP No. 37 - Design and Construction of Sanitary and Storm Sewers 
17. Concrete Pipe Handbook - American Concrete Pipe Association. 
1.3       SUBMITTALS 
A. Shall be in accordance with Section 15050, Piping Systems, submittal information. 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the

December 2021 
  
City of Chandler 
21-047 
15051-3 
Chandler Heights Road Utility Relocations 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Deliver materials to the site to ensure uninterrupted progress of the Work. 
B. Handle all pipe, fittings, specials, and accessories carefully with approved handling 
devices.  Do not drop or roll material off trucks.  Do not otherwise drop, roll, or 
skid piping. 
C. Store pipes and fittings on heavy wood blocking or platforms so they are not in 
contact with the ground. 
D. Unload pipe, fittings, and specials opposite to or as close to the place where they 
are to be installed as is practical to avoid unnecessary handling.  Keep pipe interiors 
completely free from dirt and foreign matter. 
E. Inspect delivered pipe for cracked, gouged, chipped, dented, or other damaged 
material and immediately remove defective pipe from site. 
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. Required pipe materials are listed in the Piping Schedule.  Refer to applicable 
Sections for Material Specifications. 
B. General: 
1. 
Marking Piping: 
a. 
Clearly mark each piece of pipe or fitting with a designation conforming 
to those shown on the laying schedule and/or Shop Drawings. 
b. 
Cast or paint material, type, and pressure designation on each piece of 
pipe or fitting 4-inches in diameter and larger.  Each piece of steel pipe 
shall be clearly marked with the thickness of the steel in the pipe wall. 
c. 
Pipe and fittings smaller than 4-inches in diameter shall be clearly marked 
by manufacturer as to material, type, and rating.

December 2021 
  
City of Chandler 
21-047 
15051-4 
Chandler Heights Road Utility Relocations 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. General: 
1. 
Installation of all pipe, fittings, valves, specials, and appurtenances shall be 
subject to the review and/or approval of the ENGINEER. 
2. 
Install piping as shown, specified, and as recommended by the manufacturer 
and in conformance with referenced standards, and approved Shop Drawings. 
3. 
Request instructions from ENGINEER before proceeding if there is a conflict 
between the manufacturer's recommendations and the Contract Documents. 
4. 
All piping shall be inspected by the ENGINEER prior to installation.  
ENGINEER'S inspection will not relieve CONTRACTOR or manufacturer 
from responsibility for damaged products. 
5. 
All piping shall be carefully examined for cracks, damage, or other defects 
before installation.  Any piping that is defective, including but not limited to, 
cracked, damaged, in poor condition, or with damaged linings or improper 
markings shall be rejected unless the product can be repaired in a manner 
acceptable to the manufacturer and ENGINEER.  Any piping found to be 
broken or defective after it has been installed shall be removed, replaced, or 
repaired at the CONTRACTOR'S expense. 
6. 
Minimum earth cover over the piping shall be as shown on the Drawings, 
specified or directed by the ENGINEER, but in no case shall the earth cover 
be less than 4 feet for all piping. 
7. 
Required earthwork shall be as specified in applicable Sections of Division 2, 
Site Work.  
8. 
Present all conflicts between piping systems and equipment, structures or 
facilities to ENGINEER for determination of corrective measures before 
proceeding. 
9. 
Take field measurements, where required, prior to installation to ensure proper 
fitting of Work.  The CONTRACTOR shall uncover the existing pipelines 
sufficiently in advance of the proposed Work in order that the type and location 
of the existing pipes and joints and other information required to fabricate the 
proposed piping can be determined.  It shall be the responsibility of the 
CONTRACTOR to obtain whatever information is required to complete the 
connections of the proposed pipelines to the existing pipelines.  Refer to 
Paragraph 3.3 of this Section, as applicable. 
10. Interior of all piping and mating surfaces shall be inspected and all dirt, gravel, 
sand, debris or other foreign material shall be completely removed from the 
interior and mating surfaces before installation.  Measures shall be taken to 
maintain the interior of all piping clean until acceptance of the completed 
Work.  Care shall be taken to prevent foreign matter from entering joint space.  
Bell and spigot mating surfaces shall be wiped clean immediately before 
piping is laid.  For ductile iron pipe, the bell and spigot mating surfaces shall 
be thoroughly cleaned with a wire brush.

December 2021 
  
City of Chandler 
21-047 
15051-5 
Chandler Heights Road Utility Relocations 
11. Install piping accurately to line and grade shown, specified or directed, unless 
otherwise approved by the ENGINEER.  Accurate means of determining and 
checking the alignment and grade shall be used, which shall be subject to the 
approval of the ENGINEER.  Any modifications to the Contract Documents 
to suit the pipe manufacturer's standard shall be approved by the ENGINEER. 
Remove and relay piping that is incorrectly installed, at CONTRACTOR'S 
expense. 
12. Do not lay piping in water, unless otherwise specified in these Specifications 
or approved by the ENGINEER.  Ensure that the water level in the trench is at 
least 6-inches below the bottom of piping.  Maintain a dry trench until jointing 
and backfilling are complete, unless otherwise specified in these Specifications 
or approved by the ENGINEER. 
13. Where unforeseen conditions will not permit the installation of piping as 
shown or specified, no piping shall be installed without approval of the 
ENGINEER.  Do not modify structures or facilities without approval of the 
ENGINEER. 
14. Start laying piping at lowest point and proceed toward the higher elevations, 
unless otherwise approved by the ENGINEER.  Slope piping uniformly 
between elevations shown on the Drawings or as otherwise directed by the 
ENGINEER. 
15. Place bell and spigot piping so that the bells face the direction of laying, unless 
otherwise approved by the ENGINEER. 
16. Piping shall be installed so that the barrel of the piping, and not the joints, 
receives the bearing pressure from the trench bottom or other bedding 
condition. 
17. No piping shall be brought into position until the preceding length, valve, 
fitting, or special has been bedded and secured in place. 
18. Whenever pipe laying is not actively in progress, the open ends of the piping 
shall be closed by a temporary plug or cap to prevent soil, water, and other 
foreign matter from entering the piping. 
19. Field cutting of metallic piping, where required for inserting valves, fitting, 
specials, and closures, shall be made with a machine specially designed for 
cutting piping and in accordance with the manufacturer's instructions.  Cuts 
shall be carefully done, without damage to piping, so as to leave a smooth end 
at right angles to the axis of the piping.  Cut end shall be tapered and sharp 
edges filed off smooth.  Flame cutting shall not be permitted.  Piping damaged 
by the CONTRACTOR by improper or careless methods of cutting shall be 
replaced or repaired at his expense. 
20. Blocking under piping shall not be permitted, unless specifically approved by 
ENGINEER for special conditions. 
21. Protective linings and coatings shall be touched up prior to installation, where 
required. 
22. Except where bends, wyes or similar fittings are used, changes in alignment 
and grade of the piping shall be made by deflecting joints or with beveled pipe.  
Permissible joint deflection shall not exceed 75% of the amount allowed by 
the manufacturer.

December 2021 
  
City of Chandler 
21-047 
15051-6 
Chandler Heights Road Utility Relocations 
23. All joints shall be made in the presence of the ENGINEER, or his duly 
authorized representative, except as otherwise approved. 
24. Special care shall be taken to ensure that each section of piping abuts against 
the next in such a manner that there will be not shoulder or unevenness of any 
kind along the piping invert. 
25. Piping shall be rotated as required to place outlets in proper position. 
26. Blind flanges and cleanouts shall be provided at locations shown on the 
Drawings, specified, or required.  Cleanouts on buried piping shall include all 
pipes, fittings, and appurtenances required to bring cleanout to finished grade 
and terminate in a flange and blind flange or suitably capped piping as shown.  
Cleanout piping shall be same as that specified for the main run. 
27. All gravity lines shall pitch uniformly at the grade shown or as specified or 
approved. 
28. Short pipe stubs, maximum 4 feet in length, shall be used at all manholes and 
other wall faces, except as otherwise specified. 
29. Field painting shall be accomplished after joints are made. 
30. All piping shall be plugged watertight with a suitable cap or plug securely 
fastened to the end of the piping at all contact interfaces. 
31. CONTRACTOR shall notify ENGINEER in advance of backfilling 
operations. 
32. On steep slopes, take measures acceptable to ENGINEER to prevent 
movement of the pipe during installation. 
33. Thrust Restraint:  During the installation of the pipe, thrust blocks, tied joints, 
or proprietary restrained joint systems shall be provided wherever required for 
thrust restraint.  Thrust restraint shall conform to the applicable requirements 
of Paragraph 3.2 of this Section. 
34. Exercise care to avoid flotation when installing pipe in cast-in-place concrete. 
B. Manufacturer's Installation Specialist: 
1. 
Provide the services of a competent installation specialist of the pipe 
manufacturer when pipe laying begins if the CONTRACTOR is not 
experienced in laying and jointing a particular type of pipe. 
2. 
Retain installation specialist at the site for a minimum of two days or until 
competency of the pipe laying crew has been satisfactorily demonstrated. 
C. Separation of Sewers and Potable Water Pipe Lines: 
1. 
Conform to the requirements of all applicable requirements of the Uniform 
Standard Specifications for Public Work Construction by the Maricopa 
Association of Governments (MAG).   
D. Plugs: 
1. 
Temporarily plug installed pipe at the end of each day's Work or other 
interruption to the installation of any pipe line.  Plugging shall prevent the entry 
of animals, liquids, or persons into the pipe or the entrance or insertion of 
deleterious materials. 
2. 
Install standard plugs into all bells at dead ends, tees or crosses.  Cap all spigot 
ends.

December 2021 
  
City of Chandler 
21-047 
15051-7 
Chandler Heights Road Utility Relocations 
3. 
Fully secure and block all plugs and caps installed for pressure testing to 
withstand the specified test pressure. 
4. 
Where plugging is required for phasing of the Work or for subsequent 
connection of piping, install watertight, permanent type plugs. 
E. Bedding Pipe:  Bed pipe as specified below and in accordance with the details 
shown. 
1. 
Trench excavation and backfill and bedding materials shall conform to the 
requirements of Section 02200, Earthwork, as applicable. 
2. 
Excavate trenches below the pipe bottom by an amount specified.  Remove all 
loose and unsuitable material from the trench bottom. 
3. 
Carefully and thoroughly compact all pipe bedding with hand held pneumatic 
compactors. 
4. 
Do not lay pipe until the ENGINEER approves the bedding condition.  If a 
conflict exists, obtain clarification from ENGINEER before proceeding. 
5. 
No pipe shall be brought into position until the preceding length has been 
bedded and secured in its final position. 
F. Laying Pipe: 
1. 
Conform to manufacturer's instructions and requirements of the standards 
listed below, where applicable: 
a. 
Ductile Iron Pipe:  AWWA C600, AWWA C105. 
b. 
ASCE Manual of Practice No. 37. 
G. Polyethylene Encasement: 
1. 
Provide polyethylene encasement for ductile iron piping to prevent contact 
between the pipe and surrounding bedding material and backfill. 
2. 
Polyethylene may be supplied in tubes or in sheet material. 
3. 
Polyethylene encasement materials and installation shall be in accordance with 
the requirements of MAG Section 610.5. 
H. Jointing Pipe: 
1. 
Ductile Iron Mechanical Joint Pipe: 
a. 
Wipe clean the socket, plain end and adjacent areas immediately before 
making joint.  Make certain that cut ends are tapered and sharp edges are 
filed off smooth. 
b. 
Lubricate the plain ends and gasket with soapy water or an approved pipe 
lubricant, in accordance with AWWA C111, just prior to slipping the 
gasket onto the plain end of the joint assembly. 
c. 
Place the gland on the plain end with the lip extension toward the plain 
end, followed by the gasket with the narrow edge of the gasket toward the 
plain end. 
d. 
Insert the pipe into the socket and press the gasket firmly and evenly into 
the gasket recess.  Keep the joint straight during assembly. 
e. 
Push gland toward socket and center it around pipe with the gland lip 
against the gasket. 
f. 
Insert bolts and hand tighten nuts.

December 2021 
  
City of Chandler 
21-047 
15051-8 
Chandler Heights Road Utility Relocations 
g. 
Make deflection after joint assembly, if required, but prior to tightening 
bolts.  Alternately tighten bolts 180 degrees apart to seat the gasket 
evenly.  The bolt torque shall be as follows: 
 
Pipe Size 
(inches) 
Bolt Size 
(inches) 
Range of Torque 
(ft-lbs) 
3 
5/8 
45-60 
4-24 
3/4 
75-90 
30-36 
1 
100-120 
42-48 
1-1/4 
120-150 
 
h. 
All bolts and nuts shall be heavily coated with two 10 mil minimum coats 
of coal-tar epoxy coating as manufactured by Koppers, Tnemec, or equal. 
i. 
Restrained mechanical joints shall be in accordance with Section 15061, 
Ductile Iron Pipe. 
2. 
Ductile Iron Push-On Joint Pipe: 
a. 
Prior to assembling the joints, the last 8-inches of the exterior surface of 
the spigot and the interior surface of the bell shall be thoroughly cleaned 
with a wire brush, except where joints are lined or coated with a special 
protective lining or coating. 
b. 
Rubber gaskets shall be wiped clean and flexed until resilient.  Refer to 
manufacturer's instructions for procedures to ensure gasket resiliency 
when assembling joints in cold weather.  
c. 
Insert gasket into joint recess and smooth out the entire circumference of 
the gasket to remove bulges and to prevent interference with the proper 
entry of the spigot of the entering pipe. 
d. 
Immediately prior to joint assembly, apply a thin film of approved 
lubricant to the surface of the gasket which will come in contact with the 
entering spigot end of pipe.  CONTRACTOR may, at his option, apply a 
thin film of lubricant to the outside of the spigot of the entering pipe. 
e. 
For assembly, center spigot in the pipe bell and push pipe forward until it 
just makes contact with the rubber gasket.  After gasket is compressed and 
before pipe is pushed or pulled all the way home, carefully check the 
gasket for proper position around the full circumference of the joint.  Final 
assembly shall be made by forcing the spigot end of the entering pipe past 
the rubber gasket until it makes contact with the base of the bell.  When 
more than a reasonable amount of force is required to assemble the joint, 
the spigot end of the pipe shall be removed to verify the proper positioning 
of the rubber gasket.  Gaskets which have been scoured, or otherwise 
damaged, shall not be used. 
f. 
Maintain an adequate supply of gaskets and joint lubricant at the site at 
all times when pipe jointing operations are in progress. 
3. 
Proprietary Joints: 
a. 
Pipe which utilizes proprietary joints such as Fastite, by American Cast 
Iron Pipe Company, Tyton by U.S. Pipe Incorporated, restrained joints

December 2021 
  
City of Chandler 
21-047 
15051-9 
Chandler Heights Road Utility Relocations 
described under Paragraph 3.2 of this Section, or other such joints shall 
be installed in strict accordance with the manufacturer's instructions. 
4. 
Mechanical Coupling Joints: 
a. 
Prior to the installation and assembly of mechanical couplings, the joint 
ends shall be cleaned thoroughly with a wire brush to remove foreign 
matter.  Following this cleaning, lubricant shall be applied to the rubber 
gasket or inside of the coupling housing and to the joint ends.  After 
lubrication, the gasket shall be installed around the joint end of the 
previously installed piece and the joint end of the subsequent piece shall 
be mated to the installed piece.  The gasket shall be positioned and the 
coupling housing placed around the gasket and over the grooved or 
shouldered joint ends.  The bolts shall be inserted and the nuts screwed up 
tightly by hand.  The bolts shall then be tightened uniformly in order to 
produce an equal pressure on all parts of the housing.  When the housing 
clamps meet metal to metal, the joint is complete and further tightening is 
not required. 
I. 
Backfilling: 
1. 
Conform to the applicable requirements of Section 02200, Earthwork. 
2. 
Place backfill as construction progresses.  Backfill by hand and use power 
tampers until pipe is covered by at least 1 foot of fill. 
J. 
Connections to Valves: 
1. 
Install valves as shown. 
2. 
Provide suitable adapters when valves and piping have different joint types. 
3. 
Provide thrust restraint at all valves at pipeline terminations. 
K. Transitions from One Type of Pipe to Another: 
1. 
Provide all necessary adapters, specials and connection pieces required when 
connecting different types and sizes of pipe or connecting pipe made by 
different manufacturers. 
L. Closures: 
1. 
Provide all closure pieces shown or required to complete the Work. 
3.2       THRUST RESTRAINT 
A. Provide thrust restraint on all pressure piping systems and where otherwise shown 
and specified.  Pipe joints shall be restrained as specified in Paragraph 3.2.C of this 
Section. 
B. Thrust restraint shall be accomplished by means of restrained pipe joints.  Concrete 
thrust blocks shall be used only when specifically shown on the Drawings or as 
directed by the ENGINEER.  Thrust restraints shall be designed for the axial thrust 
exerted by the test pressure given in the Buried Piping Schedule. 
C. Restrained Pipe Joints:

December 2021 
  
City of Chandler 
21-047 
15051-10 
Chandler Heights Road Utility Relocations 
1. 
Pipe joints shall be restrained by means suitable to the type of pipe being 
installed. 
a. 
Ductile iron push-on joints and mechanical joints shall be restrained 
utilizing a proprietary restrained joint system such as American Fast-Grip 
and American Flex-Ring Joint, MEGALUG Ductile Iron Pipe Restraints 
as manufactured by EBAA Iron Inc., TR Flex Gripper Ring and TR Flex 
Joints,, , and tie rods, or other system approved by ENGINEER.   
b. 
Pipe thrust restraint shall be in accordance with the Schedule of 
Restrained Pipe Lengths and as noted on the Project Drawings. 
2. 
Schedule of Restrained Pipe Lengths:  Restrained pipe lengths shall conform 
to the requirements of AWWA M41 for ductile iron pipe.  Restrained pipe 
lengths shall be as shown on the Construction Plans.  For pipe not specifically 
illustrated on the Plans, CONTRACTOR shall submit a lay schedule 
identifying restrained lengths complying with AWWA M41. 
D. Concrete Thrust Blocks: 
1. 
Thrust blocks shall be constructed of Class “B” concrete, conforming to the 
requirements of MAG. 
2. 
Blocks shall be placed against undisturbed soil as shown on Drawings or as 
directed by the ENGINEER. Concrete shall be placed so that pipe joints and 
fitting joints will be accessible for repair. 
3. 
Size of the concrete thrust blocks shall be per MAG details or as directed by 
the ENGINEER. 
4. 
Concrete thrust blocks shall not be used for pipe restraint except where 
specifically shown on the Drawings, or as approved by the ENGINEER. 
3.3       WORK AFFECTING EXISTING PIPING 
A. Location of Existing Piping: 
1. 
Locations of existing piping shown should be considered approximate. 
2. 
CONTRACTOR shall determine the true locations of existing piping to which 
Work is to be performed, and locations of other facilities which could be 
disturbed during earthwork operations, or which may be affected by 
CONTRACTOR'S Work already installed. 
B. Taking Existing Pipelines Out of Service: 
1. 
Do not take pipelines out of services, unless specifically provided for under 
this Project or approved by ENGINEER. 
2. 
Notify ENGINEER at least 48 hours prior to taking pipeline out of service. 
C. Work on Existing Pipelines: 
1. 
Cut or tap pipes as shown or required with machines specifically designed for 
this Work. 
2. 
Install temporary plugs to prevent entry of mud, dirt, water, and debris. 
3. 
Provide all necessary adapters, fittings, pipe, and appurtenances required to 
complete the Work.

December 2021 
  
City of Chandler 
21-047 
15051-11 
Chandler Heights Road Utility Relocations 
4. 
Existing pipelines that are cut and abandoned shall be adequately capped or 
filled with grout. 
3.4       TESTING OF PIPING 
A. General: 
1. 
Test all piping except as otherwise authorized by ENGINEER. 
2. 
Notify ENGINEER 48 hours in advance of testing. 
3. 
Provide all testing apparatus, including pumps, hoses, gauges, and fittings. 
4. 
Unless otherwise noted, pipelines shall hold specified test pressure for two 
hours. 
5. 
Repair and retest pipelines that fail to hold specified test pressure or which 
exceed the allowable leakage rate. 
6. 
Unless otherwise specified, test pressures required are at the lowest elevation 
of the pipeline section being tested. 
7. 
Conduct all tests in the presence of ENGINEER. 
8. 
Advise local authorities having jurisdiction if their presence is required during 
testing. 
9. 
All testing shall conform to the MAG Standard Specifications.  In case of 
contradiction with these Specifications the CONTRACTOR shall notify the 
ENGINEER before proceeding with the testing. 
B. Schedule of Pipeline Tests: 
1. 
Test piping at the test pressures listed in the Buried Piping Schedule and 
respective pipe material specification. 
2. 
All piping shall be water tested after installation, except as otherwise specified 
or directed by ENGINEER. 
3. 
For piping not included in the Schedule, the ENGINEER will notify 
CONTRACTOR in writing of the test pressure to be used. 
C. Pressure Test Procedure: 
1. 
Complete backfill and compaction at least to the pipe centerline before testing, 
unless otherwise required or approved by ENGINEER.  
2. 
Allow concrete for thrust blocks to reach design strength before testing. 
3. 
Fill section to be tested slowly with water and expel all air.  Install corporation 
cocks, if necessary, to remove all air. 
4. 
Test only one section of pipe at a time. 
5. 
Apply specified test pressure for two hours and observe pressure gage.  Check 
carefully for leaks while test pressure is being maintained. 
D. Leakage Testing: 
1. 
Conduct leakage test for all liquid piping after satisfactory completion of 
pressure test. 
2. 
Allow concrete pipe to stand full of water at least 12 hours prior to starting 
leakage test.

December 2021 
  
City of Chandler 
21-047 
15051-12 
Chandler Heights Road Utility Relocations 
3. 
Maintain test pressure constantly for the minimum test period and accurately 
measure the amount of water which must be added to maintain the test 
pressure. 
4. 
Allowable Leakage Rates (in gallons per hour per 1,000 feet per inch 
diameter): 
a. 
DIP Push-On or Mechanical Joints:  0.075. 
b. 
Copper, Steel, and Thermoplastic:  None. 
5. 
Leakage Test Procedure: 
a. 
Examine exposed pipe, joints, fittings, and valves.  Repair visible leakage 
or replace the defective pipe, fitting, or valve. 
b. 
Refill the line under test to reach the required test pressure. 
c. 
Provide a test container filled with a known quantity of water at the start 
of the test.  Attach the test pump suction to the test container. 
d. 
Pump water from the test container into the line with the test pump to hold 
the specified test pressure for the test period.  Water remaining in the 
container shall be measured and the amount used during the test shall be 
recorded on the test report. 
e. 
Perform all repair, replacement, and retesting required because of failure 
to meet testing requirements. 
f. 
Leakage shall be less than rate specified above. 
3.5       DISPOSAL OF WATER 
A. CONTRACTOR shall provide suitable means for disposal of test and flushing 
water so that no damage results to facilities or waterways. 
B. Means of disposal of test and flushing water shall be subject to the approval of 
ENGINEER, local governing authorities, and regulatory agencies. 
C. CONTRACTOR shall be responsible for any damage caused by his water disposal 
operations. 
3.6       CLEANING 
A. Cleaning: 
1. 
Thoroughly clean all piping and flush prior to placing in service in a manner 
approved by ENGINEER. 
2. 
Piping 24-inches in diameter and larger shall be inspected from inside and all 
debris, dirt and foreign matter removed. 
3. 
If piping that requires disinfection has not been kept clean during storage or 
installation, CONTRACTOR shall swab each section individually before 
installation with a 5% hypochlorite solution, to ensure clean piping. 
3.7       PIPING SCHEDULE 
A. The following abbreviations are used in the Buried Piping Schedule: 
1. 
Service Abbreviations: 
a. 
Potable Water: W.

December 2021 
  
City of Chandler 
21-047 
15051-13 
Chandler Heights Road Utility Relocations 
b. 
Reclaimed Water:  RW. 
2. 
Material Abbreviations: 
a. 
Asbestos Concrete Pipe:  ACP 
b. 
Chlorinated Polyvinyl Chloride:  CPVC 
c. 
Copper Pipe:  COP 
d. 
Ductile Iron Pipe:  DIP 
e. 
Glass-Lined Ductile Iron Pipe:  GDIP 
f. 
Galvanized Steel:  GST 
g. 
Polyethylene:  PE 
h. 
Polyvinyl Chloride:  PVC 
i. 
Stainless Steel Pipe:  SST 
j. 
Vitrified Clay Pipe:  VCP 
3. 
Lining/Coating Abbreviations: 
a. 
Bituminous Coated:  BC 
b. 
Cement Mortar Lined:  CM 
c. 
Galvanized:  GALV 
d. 
Glass Lined:  GL 
e. 
Polyethylene Wrap:  PE 
f. 
Protecto 401 Ceramic Epoxy:  CE 
g. 
T-Lock:  TL 
h. 
Painting:  P (Painted per Section 09900) 
4. 
Joint Abbreviations: 
a. 
Bell and Spigot:  BS 
b. 
Butt Wrapped:  BW 
c. 
Flanged:  FL 
d. 
Mechanical Joint:  MJ 
e. 
Soldered:  SD  
f. 
Solvent Welded:  SW 
g. 
Welded:  W

December 2021 
  
City of Chandler 
21-047 
15051-14 
Chandler Heights Road Utility Relocations 
BURIED PIPING SCHEDULE 
 
Service 
Material Interior 
Lining 
Exterior 
Coating 
Pressure Class 
Joint 
Test Pressure 
(psig) 
Potable Water (Up to 
12-inch Diameter) 
DIP 
CML 
BC,PE 
350 
MJ/BS 
200 
Potable Water (Less 
than 2-inch 
Diameter) 
COP 
N/A 
PE 
350 
SD 
200 
Sanitary Sewer 
ASTM 
C700 
VCP 
N/A 
N/A 
Extra Strength 
BS 
3.5 
 
 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15061-1 
Chandler Height Road Utility Relocations 
SECTION 15061 
DUCTILE IRON PIPE 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope:  
1. 
CONTRACTOR shall provide all labor, materials, equipment, and incidentals 
as shown, specified, and required to furnish and install ductile iron pipe and 
fittings.   
2. 
The extent of ductile iron pipe to be furnished is shown on the Drawings and 
in the schedules included in Section 15051, Buried Piping Installation. 
B. Definition:  Where cast iron pipe is specified, the term and symbol shall mean 
ductile iron pipe. 
C. Related Work Specified Elsewhere: 
1. 
Section 02200, Earthwork. 
2. 
Section 11295, Hydraulic Valves. 
3. 
Section 15050, Piping Systems. 
4. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. Manufacturer Qualifications:  Manufacturer shall have a minimum of five years of 
experience in the production of ductile iron pipe and fittings and shall show 
evidence of satisfactory service in at least five installations. 
B. Unless otherwise specified, references to documents shall mean the documents in 
effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective 
date of the Agreement if there were no Bids).  If referenced documents have been 
discontinued by the issuing organization, references to those documents shall mean 
the replacement documents issued or otherwise identified by that organization or, 
if there are no replacement documents, the last version of the document before it 
was discontinued.  Where document dates are given in the following listing, 
references to those documents shall mean the specific document version associated 
with that date, whether or not the document has been superseded by a version with 
a later date, discontinued, or replaced. 
1. 
ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250, 
and 800. 
2. 
ANSI B16.5 - Pipe Flanges and Flanged Fittings. 
3. 
ASTM C150 - Portland Cement. 
4. 
AWWA C104 (ANSI A21.4) - Cement Mortar Lining for Ductile Iron and 
Gray Iron Pipe and Fittings for Water.

December 2021 
  
City of Chandler 
21-047 
15061-2 
Chandler Height Road Utility Relocations 
5. 
AWWA C105 (ANSI A21.5) - Polyethylene Encasement for Ductile Iron 
Piping for Water and Other Liquids. 
6. 
AWWA C110 (ANSI A21.10) - Ductile Iron and Gray Iron Fittings, 3" 
Through 48", for Water and Other Liquids. 
7. 
AWWA C111 (ANSI A21.11) - Rubber Gasket Joints for Ductile Iron and 
Gray Iron Pressure Pipe and Fittings. 
8. 
AWWA C115 (ANSI A21.15) - Flanged Ductile Iron and Gray Iron Pipe with 
Threaded Flanges. 
9. 
AWWA C150 (ANSI A21.50) - Thickness Design of Ductile Iron Pipe. 
10. AWWA C151 (ANSI A21.51) - Ductile Iron Pipe, Centrifugally Cast, in Metal 
Molds or Sand-Lined Molds, for Water or Other Liquids. 
11. AWWA C153 (ANSI A21.53) - Ductile Iron Compact Fittings, 3" Through 
12" for Water and Other Liquids. 
12. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
13. AWWA C606 - Grooved and Shouldered Type Joints. 
14. MAG - Uniform Standard Specifications and Details for Public Work 
Construction. 
15. City of Chandler Unified Standard Specifications. 
1.3       SUBMITTALS 
A. Shall be in accordance with Section 15050, Piping Systems, submittal information. 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 2 - PRODUCTS 
2.1       GENERAL 
A. Pipe design, materials, and manufacturer shall comply with the following 
documents:

December 2021 
  
City of Chandler 
21-047 
15061-3 
Chandler Height Road Utility Relocations 
ITEM 
DOCUMENT 
Thickness Design 
AWWA C150 
Manufacturing Requirements: 
Water or Other Liquid 
 
AWWA C151 
Gravity Service Pipe 
ASTM A716 
Joints: 
Rubber Gasket 
Threaded Flange 
 
AWWA C111 
AWWA C115 
Fittings: 
Water or Other Liquid 
 
AWWA C110/AWWA C153 
Cement Mortar Lining 
AWWA C104 
Polyethylene Encasement 
AWWA C105 
 
2.2       PIPE 
A. Unless otherwise specified, ductile iron pipe shall be Pressure Class 350 for below 
ground installations and Special Thickness Class 53 for above ground. 
B. For grooved end pipe or flanged end, wall thickness shall be minimum Class 53, 
except where the specified pressure requires heavier pipe. 
C. All ductile iron pipes shall conform to the requirements of MAG Standard 
Specification Section 750 "Iron Water Pipe and Fittings." 
D. All ductile iron pipes shall be as manufactured by American Cast Iron Pipe 
Company, U.S. Pipe, Griffin Pipe Products Company, or approved equal.  
2.3       GASKETS 
A. Unless otherwise specified, gasket stock shall be a synthetic rubber compound in 
which the elastomer is nitrile or neoprene. 
B. The compound shall contain not less than 50% by volume nitrile or neoprene and 
shall be free from factice, reclaimed rubber, and other deleterious substances. 
C. Gaskets shall comply with AWWA C111 for push-on and mechanical joints, and 
with AWWA C606 for grooved end joints. 
D. For high temperature gaskets refer to section 15050, Piping Systems. 
2.4       FITTINGS 
A. Parent pipe and branch outlets shall be centrifugally cast ductile iron pipe designed 
in accordance with ANSI/AWWA C150/A21.50 and manufactured in accordance 
with ANSI/AWWA C151/A21.51.  Minimum class shall be Thickness Class 53.

December 2021 
  
City of Chandler 
21-047 
15061-4 
Chandler Height Road Utility Relocations 
B. Ends shall be flanged, restrained mechanical joint, or restrained push-on to suit the 
condition specified, except for transmission mains where indicated otherwise on 
the Drawings. 
C. The AWWA C153 compact ductile iron fittings in sizes 3-inches through 12-inches 
are an acceptable substitute for standard fittings, unless otherwise specified. 
D. Long radius elbows shall be provided where specified. 
E. Welded-on outlets shall be limited to branch outlets having a nominal diameter less 
than 70% of the nominal diameter of the main line pipe (maximum size of 30-
inches). Welded-on outlets may be provided for tees, tangential outlets, or lateral 
outlets fabricated at a specific angle to the main line pipe as shown on the Drawings.  
Welded-on outlets shall be fabricated by the pipe manufacturer at the same facility 
where the pipe is produced.  The pipe cement mortar lining shall only be applied or 
repaired after the outlet has been welded on at the manufacturing facilities where 
the pipe is produced.  The pipe manufacturer shall have a minimum of five years 
experience in the fabrication and testing of outlets of similar size and configuration 
as shown on the Drawings or specified herein. 
F. Weldment for welded-on outlets shall be based on the method described in Section 
VII of the ASME Unified Pressure Vessel Code.  Reinforcing welds shall be placed 
using Ni-Rod FC 55 cored wire or Ni-Rod 55 electrodes manufactured by INCO 
Alloys (or an electrode with equivalent performance properties).  Carbon steel 
electrodes are not acceptable.   
G. All ductile iron pipe fittings shall be as manufactured by the same manufacturer as 
the ductile iron pipe. 
2.5       JOINTS 
A. Push-On Joints:  
1. 
Push-on joints shall be the rubber ring compression type suitable for buried 
service.  Unrestrained push-on joints shall be Fastite Joint as manufactured by 
American Cast Iron Pipe Company, the Tyton Joint as manufactured by U.S. 
Pipe, or equal.  This joint is not permitted on fittings or specials, unless 
otherwise specified.  Push-on joints shall have an allowable deflection of up to 
5 degrees at specified pressures.  Joint assembly and field cuts shall be made 
in strict conformance with AWWA C600 and pipe manufacturer's 
recommendations. 
B. Flange Assemblies: 
1. 
Unless otherwise specified, flanges shall be ductile iron and shall be threaded-
on flanges conforming to ANSI/AWWA A21.15/C115 or cast-on flanges 
conforming ANSI/AWWA A21.10/C110. 
2. 
Flanges shall be adequate for 250 psi working pressure. 
3. 
Bolt circle and bolt holes shall match those of ANSI B16.1, Class 125 flanges 
and ANSI B16.5, Class 150 flanges.

December 2021 
  
City of Chandler 
21-047 
15061-5 
Chandler Height Road Utility Relocations 
4. 
Where specified, flanges shall be threaded-on or cast-on flanges conforming 
to ANSI B16.1, Class 250. 
5. 
Unless otherwise specified, bolts and nuts for flange assemblies shall conform 
with the requirements of Section 15120, Piping Specialties and Accessories.  
Gaskets shall be as specified with the requirements of Section 15120, Piping 
Specialties and Accessories. 
C. Mechanical Joints: 
1. 
Where specified, restrained mechanical joints shall be the positive restraint 
type.  Mechanical joints with retainer glands are not acceptable. 
2. 
Locked mechanical hydrant tees, bends, and adapters are an acceptable 
substitute for anchoring fire hydrants and valves to the pipe main. 
D. Restrained Joints: 
1. 
Unless otherwise specified, restrained joints shall be flanged or grooved end 
for exposed service and push-on or grooved end for buried service.  Restrained 
pipe shall be applied the entire length of pipe as shown on the Construction 
Drawings. 
2. 
Restrained joints for pipe shall be: 
a. 
TR Flex Gripper Ring and TR Flex joint products with exact 
specifications as manufactured by US Pipe 
b. 
American Fast Grip and Flex-Ring joint as manufactured by American 
Cast Iron Pipe Company 
c. 
MEGALUG Ductile Iron Pipe Restraints as manufactured by EBAA Iron 
Inc. 
d. 
 Or equal.   
3. 
Restrained joints for fittings shall be: 
a. 
Series 1100 megalug restraint produced by EBAA Iron, Inc.  
b. 
Series 3000-30000S Stargrip by Star Pipe Products 
c. 
Sigma DIP One Lok SLDE Series 
d. 
Tyler Union Tuf Grip Restraint 
4. 
Restrained joints shall be capable of being deflected after full assembly.   
5. 
Joint assembly shall be in strict conformance with AWWA C600 and 
manufacturer's recommendations.   
6. 
No field cuts of restrained pipe are permitted without prior approval of the 
Construction Manager.   
E. Bolts and Nuts: 
1. 
Corrosion-resistant bolts and nuts for use with ductile iron joints shall be high-
strength, low-alloy steel as specified in ANSI/AWWA C111/A21.11. 
2. 
Below grade installations require type 316 stainless steel. 
2.6       PIPE COATING 
A. Unless otherwise specified, pipe and fittings shall be coated with asphaltic material 
as specified in AWWA C151.

December 2021 
  
City of Chandler 
21-047 
15061-6 
Chandler Height Road Utility Relocations 
B. Polyethylene Encasement: 
1. 
All buried ductile iron pipe and fittings shall be wrapped with polyethylene 
film in tube form as specified in AWWA C105 and MAG Section 610. 
2.7       PIPE LINING 
A. Cement mortar lining. 
B. Unless otherwise specified, interior surfaces of pipe and fittings shall be cement 
mortar lined in accordance with AWWA C104.  
C. Cement shall be ASTM C150, Type II or V, low alkali, containing less than 0.60% 
alkalies. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. General: 
1. 
Piping runs specified on the Drawings shall be followed as closely as possible.  
Proposed deviations shall be submitted in accordance with Section 01300, 
Submittals. 
2. 
Pipe shall be installed in accordance with AWWA C600 and MAG Section 
610. 
B. Insulating Sections: 
1. 
Where a metallic non-ferrous pipe or appurtenance is connected to ferrous pipe 
or appurtenance, an insulating section shall be provide. 
C. Anchorage: 
1. 
Anchorage shall be provided as specified.  Calculations and Drawings for 
proposed alternative anchorage shall be submitted in accordance with Section 
01300, Submittals. 
3.2       ACCEPTANCE TESTING 
A. Hydrostatic pressure tests shall be conducted in accordance with Section 4 of 
AWWA C600, except that test pressures and allowable leakage shall be as listed in 
Section 15050, Piping Systems. 
B. The CONTRACTOR shall conduct the tests in the presence of the ENGINEER 
and/or OWNER. 
C. All welded-on outlets shall be rated for a working pressure of 250 psi and must 
have a minimum safety factor of 2.0 based on proof of design hydrostatic test 
results.

December 2021 
  
City of Chandler 
21-047 
15061-7 
Chandler Height Road Utility Relocations 
D. Prior to the application of any coating or lining in the outlet area all weldments for 
branch outlets to be supplied on this project shall be subject to an air pressure test 
of at least 15 psi.  Air leakage is not acceptable.  Any leakage shall be detected by 
applying an appropriate soapy water solution to the entire exterior surface of the 
weldment and adjoining pipe edges or by immersing the entire area in a vessel of 
water and visually inspecting the weld surface for the presence of air bubbles.  Any 
weldment that shows signs of visible leakage shall be repaired and retested in 
accordance with the manufacturer's written procedures.    
3.3       POLYETHYLENE TUBE 
A. Polyethylene encasement shall be used on all buried ductile iron pipe, unless 
otherwise specified.  Installation of polyethylene shall be as specified in MAG 
Section 610 and these Specifications.  Pipe, fittings, valves, and couplings shall be 
wrapped.  Fittings that require concrete backing shall be wrapped prior to placing 
the concrete. 
B. The polyethylene tube seams and overlaps shall be wrapped and held in place by 
means of a 2-inch wide plastic backed adhesive tape.  The tape shall be Polyken 
No. 900 (polyethylene), Scotchwrap No. 50 (polyvinyl), or equal.  The tape shall 
be such that the adhesive shall bond securely to both metal surfaces and 
polyethylene film.  Bedding and initial backfill for polyethylene wrapped pipe shall 
be a well-graded granular material which will not cut or damage the polyethylene 
tube during placement and backfilling.  Sharp angular material over 0.5-inches shall 
not be used with polyethylene encasement. 
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15064-1 
Chandler Heights Road Utility Relocations 
SECTION 15064 
COPPER PIPE 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
CONTRACTOR shall provide all labor, materials, equipment and 
incidentals, as shown, specified, and required to furnish and install copper 
pipe and fittings. 
2. 
The extent of copper pipe is shown and specified in the schedules included in 
Sections 15051, Buried Piping Installation. 
3. 
All jointing materials, end caps, and other appurtenances and accessories 
shall be provided. 
4. 
It is the intent of the Contract Documents to provide complete and workable 
piping systems.  Any supplementary fittings and appurtenances required for 
proper completion of the Work shall be considered as having been included 
under this Section. 
B. Related Sections: 
1. 
Section 02200, Earthwork. 
2. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. Manufacturer's Qualifications: 
1. 
Manufacturer shall have a minimum of five years of experience in the 
production of copper pipe and fittings, and shall show evidence of 
satisfactory service in at least five installations. 
2. 
Each type of pipe and fitting shall be obtained from no more than one 
manufacturer. 
B. Requirements of Regulatory Agencies:  Comply with the applicable provisions of 
the following regulatory agencies, where applicable: 
1. 
Underwriters' Laboratories, Inc. 
2. 
National Fire Protection Association. 
3. 
ASME, Boiler and Pressure Vessel Code. 
4. 
State and Local Building Codes and Ordinances. 
5. 
Uniform Plumbing Code. 
C. Reference Standards:  Comply with applicable provisions and recommendations 
of the following, except as otherwise shown or specified. 
1. 
ANSI B16.22, Wrought Copper and Copper Alloy Solder Joint Pressure 
Fittings.

December 2021 
  
City of Chandler 
21-047 
15064-2 
Chandler Heights Road Utility Relocations 
2. 
ANSI B16.26, Cast Copper Alloy Fittings for Flared Copper Tubes. 
3. 
ASTM B32, Specification for Solder Metal. 
4. 
ASTM B42, Specification for Standard Size Seamless Copper Pipe. 
5. 
ASTM B68, Specification for Bright Annealed Seamless Copper Tube. 
6. 
ASTM B75, Specification for Seamless Copper Tube. 
7. 
ASTM B88, Specification for Seamless Copper Water Tube. 
8. 
ASTM B280, Specification for Seamless Copper Tube for Air-Conditioning 
and Refrigeration Field Service. 
9. 
ASTM B302, Specification for Threadless Copper Pipe. 
10. ASTM B306, Specification for Copper Drainage Tube (DWV). 
D. Inspection:  The quality of all materials provided and adequacy of installation 
shall be subject to the review and approval of the ENGINEER. 
1.3       SUBMITTALS  
A. Shop Drawings:  Submit for approval the following: 
1. 
Detailed drawings and data on pipe fittings and appurtenances.  Submit these 
with Shop Drawings required under Section 15051, Buried Piping 
Installation. 
B. Certificates:  Where specified or otherwise required by the ENGINEER, submit 
test certificates.  Submit Certificates of Compliance with referenced standards. 
C. Each Shop Drawing submittal shall include a hard copy of the relevant 
Specification Section.  Each and every paragraph of the Specification Section 
shall be clearly marked to indicate whether the requirements for equipment and/or 
services in the Specification Section are met.  If clarifications are needed to any of 
the paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Refer to Section 15051, Buried Piping Installation. 
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. Threadless Copper Pipe:  Pipe shall be assembled with brazing-joint pipe fittings. 
Material shall conform to ASTM B302.

December 2021 
  
City of Chandler 
21-047 
15064-3 
Chandler Heights Road Utility Relocations 
B. Couplings and Fittings for Copper Tubing: 
1. 
Unless otherwise specified, couplings for copper tubing 2-inch and smaller 
nominal diameter shall be compression type, bronze or brass, capable of 
holding the full bursting strength of the tubing and shall meet the 
requirements of ANSI B16.26. 
2. 
Product and Manufacturer:  Provide fittings and couplings for copper tubing 
by one of the following: 
a. 
Swagelok. 
b. 
Gyrolok. 
c. 
Or equal. 
C. No galvanized pipe or fittings shall be used for this installation. 
2.2       JOINTING 
A. Reclaimed water piping shall be assembled with soldered type joints.  Fittings 
shall conform to ANSI B 16.22, Wrought Copper and Copper Alloy Solder Joint 
Pressure Fittings. 
B. Soldered joints shall be 95-5 tin-antimony solder, conforming to ASTM B32. 
C. All joints shall conform to manufacturer's recommendations and shall be made by 
skilled workmen. 
D. Joints shall develop full strength and shall be greater than the pipe joined. 
2.3       MARKING 
A. All items shall be marked or labeled with the following information: 
1. 
Metal or alloy designation. 
2. 
Temper. 
3. 
Size and schedule. 
4. 
ASTM specification number. 
5. 
Name and location of supplier. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Refer to Section 15051, Buried Piping Installation, for installation, testing and 
cleaning. 
B. Dielectric Protection:  Copper tubing or fittings shall not be permitted to come in 
contact with steel piping, reinforcing steel, or other steel at any location.  
Electrical checks shall be made to ensure no contact is made between copper 
tubing and steel elements.  Wherever electrical contact is demonstrated by such

December 2021 
  
City of Chandler 
21-047 
15064-4 
Chandler Heights Road Utility Relocations 
test, CONTRACTOR shall provide dielectric protection as specified in Section 
15120, Piping Specialties and Accessories. 
C. All copper piping being buried shall be provided with a protective covering or 
wrapping such as polyethylene wrap as specified in MAG Section 610.6 – 
Polyethylene Corrosion Protection.  
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15067-1 
Chandler Heights Road Utility Relocations 
SECTION 15067 
VITRIFIED CLAY PIPE 
PART 1 - GENERAL 
1.1       SUMMARY 
A. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as 
shown on the plans, specified and required to furnish and install vitrified clay pipe, 
fittings and appurtenances. 
B. The CONTRACTOR shall replace all existing roadway pavement, utility services, 
ditches, monuments and other existing structures to their original condition. 
C. Any pipe, which does not meet specifications or has been rejected, shall be removed 
from the job site at no cost to the owner. 
D. The extent of vitrified clay pipe is shown within the Drawings and in the schedules 
included in Section 15051, Buried Piping Installation. 
1.2       SECTION INCLUDES 
A. Vitrified Clay Pipe (VCP). 
1.3       RELATED SECTIONS 
A. Section 02200, Earthwork.  
B. Section 15050, Piping Systems.  
C. Section 15051, Buried Piping Installation. 
1.4       REFERENCES 
A. National Clay Pipe Institute (NCPI) Engineering Manual 
B. ASTM C12 – Standard Practice for Installing Vitrified Clay Pipe 
C. ASTM C301 – Test Methods for Vitrified Clay Pipe 
D. ASTM C425 – Compression Joints for Vitrified Clay Pipe and Fittings 
E. ASTM C700 – Vitrified Clay Pipe, Extra Strength, Standard Strength, and Perforated 
F. ASTM C828 – Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines

December 2021 
  
City of Chandler 
21-047 
15067-2 
Chandler Heights Road Utility Relocations 
G. ASTM C896 – Terminology Relating to Clay Products 
H. ASTM C1091 – Test Method for Hydrostatic Infiltration Testing of Vitrified Clay 
Pipe Lines 
1.5       SUBMITTAL 
A. Shop Drawings:  Submit for approval the following: 
1. 
Detailed drawings and data on pipe, fittings, gaskets, and appurtenances.  
Submit these with Shop Drawings required under Section 15051, Buried Piping 
Installation.  
B. The manufacturer shall submit design calculations to the ENGINEER.  The design 
calculations shall be signed and sealed by a Registered Professional Engineer 
licensed in the State of Arizona.  The design calculations shall indicate that the pipe 
wall thickness will be satisfactory for all conditions of external pressure and earth 
loadings, special physical loadings, and internal pressure. 
C. Certificates:  Submit certificates of compliance with referenced standards. 
D. Also shall be in accordance with Section 15050, Piping Systems submittal 
information. 
1.6       PRODUCT DELIVERY, STORAGE AND HANDLING 
A. Refer to Section 15051, Buried Piping Installation. 
B. Refer to Manufacturer’s recommendations. 
PART 2 - PRODUCTS 
2.1       SERVICE CONDITIONS 
A. General: 
1. 
Pipe shall be designed for an external live loading, including impact, equal to 
AASHTO, H-20 truck loading with earth cover as shown on the Drawings.  The 
external loading shall be calculated in accordance with the National Clay Pipe 
Institute (NCPI) Engineering Manual and as modified in accordance with the 
City of Chandler Standard Specifications. 
B. Service Conditions: 
1. 
Liquid Service:  (Refer to Section 15051, Buried Piping). 
2. 
Pipe overburden and trench bedding condition:  Refer to Drawings. 
3. 
Pipe should be able to attain the full design life of the pipe when surrounding 
earth is at a continuous temperature of up to 90oC.

December 2021 
  
City of Chandler 
21-047 
15067-3 
Chandler Heights Road Utility Relocations 
2.2       MATERIALS 
A. All materials used in the manufacturing of the piping and its components shall be 
new and of the best quality used for the purpose of commercial practice. 
2.3       VITRIFIED CLAY PIPE (VCP) AND FITTINGS 
A. General: 
1. 
All VCP and fittings shall be suitable for use as a gravity sewer conduit. VCP 
shall be Extra Strength Vitrified Clay Pipe conforming to all the requirements of 
ASTM C700 and MAG Specifications Section 743. 
2. 
Fittings shall be made to such dimensions as will accommodate the joint system 
specified. Wye and Tee branch fittings shall be furnished with spurs securely 
fastened by the manufacturer to the barrel of the fitting. There shall be no 
projection on the inner surface of the barrel. 
3. 
Joints for vitrified clay pipe and fittings shall be factory applied, mechanical, 
flexible-compression type and shall conform to ASTM C425 – Compression 
Joints for Vitrified Clay Pipe and Fittings. Clay pipe joint material must be 
polyurethane. The polyurethane joint must be a standard joint for the pipe 
manufacturer furnishing pipe on this project for a minimum of five years for all 
pipe sizes specified. The polyurethane joint must meet all requirements of 
ASTM C425. 
a. 
Rubber couplings used for mainline connections or reconnecting services 
shall be a stainless steel shielded rubber coupling. Gasket to meet ASTM 
C-425-91 Table 2. Shear ring to be Series 300 stainless steel with a 
minimum thickness of .012". Tightening bands shall be Series 316 stainless 
steel with stainless steel nut and bolt tightening clamps. Shear ring and 
clamps to meet all requirements of ASTM A-240-94A. 
4. 
All pipe load tested shall be loaded to the ultimate limit.  The load test is 
destructive and any pipe section tested shall be rejected from installation. 
PART 3 - EXECUTION 
3.1       TRENCHING, BACKFILLING, AND SUBGRADE PREPARATION 
A. Trenching, backfilling, and sub-grade preparation shall conform to MAG 
Specifications Section 601 and 615, and the City of Chandler Wastewater Technical 
Design Manual.  Bury depth shall be as shown in the Plans. 
B. Sheet, shore, and brace trenches, as necessary, to prevent caving or sliding of trench 
walls, to provide protection for workmen and the pipe, and to protect adjacent 
structures and facilities.

December 2021 
  
City of Chandler 
21-047 
15067-4 
Chandler Heights Road Utility Relocations 
C. Where solid timber sheeting is driven to a level below the top of pipe, it should not 
be removed after the pipe has been installed. The sheeting may be cut off at the level 
of the top of the pipe. 
D. If a movable shield is used, it is imperative that pipe already laid be securely blocked 
or braced to prevent opening of pipe joints when the shield is advanced in the trench. 
E. The bedding shall be placed on a flat undisturbed or restored trench bottom with a 
minimum thickness beneath the pipe barrel of 6 inches or one eighth of the outside 
diameter of the pipe, whichever is greater. "Carefully placed material" shall be sliced 
in the haunches of the pipe with a flattened shovel or other suitable tool. 
F. Pipe barrel shall be placed so that it is true to line and grade and to provide uniform 
and continuous support. 
G. Crushed stone and/or gravel shall have at least one fractured face on each stone. 
Other suitable materials may be approved by the Engineer. 
H. A foundation may be required if soft, spongy, unstable, or other similar material is 
encountered upon which bedding material or pipe is to be placed. Unstable material 
shall be removed to a depth ordered by the Engineer and replaced with foundation 
material suitably densified. 
3.2       TESTING 
A. The CONTRACTOR shall be responsible for testing all pipelines.  All testing shall 
be performed in the presence of the ENGINEER and conform to the following 
paragraphs. 
B. After installation, backfilling, compaction, cleaning and before paving, acceptance 
testing shall be performed by low pressure air testing. 
C. Air Testing 
a. 
Testing shall be performed by the low pressure air test method conforming 
to ASTM C828 - Standard Test Method for Low Pressure Air Test of 
Vitrified Clay Pipe. 
b. 
Each section between manholes or structures will be plugged. Air will be 
introduced into the plugged system. The system passes the test is the rate of 
air loss, as measured by the pressure drop from 3.5 psi to 2.5 psi, does not 
exceed the following table.

December 2021 
  
City of Chandler 
21-047 
15067-5 
Chandler Heights Road Utility Relocations 
 
Table 1 
Minimum Test Time for Various Pipe Sizes 
 
Nominal  
Pipe Size, in. 
T (time) 
min/100 ft 
Nominal  
Pipe Size, in. 
T (time) 
min/100 ft 
 
 
 
 
4 
0.3 
24 
3.6 
6 
0.7 
27 
4.2 
8 
1.2 
30 
4.8 
10 
1.5 
33 
5.4 
12 
1.8 
36 
6.0 
15 
2.1 
39 
6.6 
18 
2.4 
42 
7.3 
21 
3.0 
 
 
 
Lines which fail any testing will be evaluated, repaired/replaced and retested for compliance 
with these specifications and the cost of any re-testing shall be borne by the contractor. 
D. Pressure testing for Gravity Pipe: 
1. 
Shall be in accordance with Section 15050, Piping Systems.  
END OF SECTION

December 2021 
  
City of Chandler 
21-047 
15120-1 
Chandler Heights Road Utility Relocations 
SECTION 15120 
PIPING SPECIALTIES AND ACCESSORIES 
PART 1 - GENERAL  
1.1       DESCRIPTION  
A. Scope:  
1. 
CONTRACTOR shall provide all labor, materials, equipment, and 
incidentals as shown, specified, and required to furnish and install all piping 
specialties and accessories.  Included, but not limited to, are flexible 
couplings, mechanical couplings, flanged adapters, expansion joints, saddle 
taps. 
B. Related Work Specified Elsewhere: 
1. 
Division 15, Mechanical, Sections on piping and piping systems. 
1.2       QUALITY ASSURANCE  
A. Manufacturer's Qualifications: 
1. 
Manufacturer shall have a minimum of five years of experience in the 
production of substantially similar types of piping specialties specified and 
shall show evidence of satisfactory service in at least five installations. 
2. 
Each type of piping specialty and accessory shall be the product of one 
manufacturer. 
1.3       SUBMITTALS  
A. Descriptive submittals shall be made in accordance with Section 01300, 
Submittals. 
B. Coordinate these with Shop Drawings required for the piping systems. 
C. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the 
paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected.

December 2021 
  
City of Chandler 
21-047 
15120-2 
Chandler Heights Road Utility Relocations 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Refer to Division 15, Mechanical, Sections on piping and piping systems. 
PART 2 - PRODUCTS  
2.1       MATERIALS  
A. Couplings:  Unless otherwise specified, piping 2-inches in diameter and larger 
passing from concrete to earth shall be provided with two pipe couplings or 
flexible joints as specified within 2 feet or one pipe diameter of the structure, 
whichever is greater. 
1. 
Below-Grade Restrained Type Coupling: 
a. 
Pressure and Service:  Same as connected piping. 
b. 
Material:  ASTM A536 Ductile Iron. 
c. 
Gasket:  Suitable for water service and specification 15050.  
d. 
Bolts and Nuts:  Type 316 stainless steel bolts and nuts. 
e. 
Product and Manufacturer:   
1) Series 3800, as manufactured by Ebaa Iron Inc. 
2) No approved equal. 
2. 
Sleeve Type, Couplings:  
a. 
Pressure and Service:  Same as connected piping. 
b. 
Material: Carbon steel for carbon steel and exposed ductile iron piping 
systems, or stainless steel for stainless steel and buried or submerged 
ductile iron piping systems. 
c. 
Gasket:  Suitable for water service – NSF 61 Certified and specification 
15050.  
d. 
Bolts and Nuts:  Alloy steel, corrosion-resistant, prime coated.  Buried 
couplings shall have Type 316 stainless steel bolts and nuts. 
e. 
Harnessing:  
1) Harness couplings to restrain pressure piping.  Test pressures for 
pressure pipelines shall conform to the requirements of Section 
15050, Piping Systems. 
2) Adjacent flanges shall be tied with bolts of corrosion resistant alloy 
steel.  Provide flange mounted stretcher bolt plates as shown on the 
Drawings and to be designed by manufacturer, unless otherwise 
approved by the ENGINEER.  
3) Conform to dimensions, size, spacing and materials for lugs, bolts, 
washers and nuts as recommended by manufacturer and approved 
by ENGINEER for the pipe size, wall thickness and test pressure 
required.  However, the following minimum bolting shall be 
provided, unless otherwise approved by the ENGINEER.

December 2021 
  
City of Chandler 
21-047 
15120-3 
Chandler Heights Road Utility Relocations 
 
  Pipe  
 
 
 
   
 Bolt 
Diameter 
      Number 
      Diameter                 At 
 
(Inches)           of Bolts 
       (Inches)       
  (Degrees) 
   4 
 
 
  2 
 
 
  5/8  
 
   
180 
  6-8 
 
 
  2 
 
 
  3/4  
 
   
180 
 10-12  
 
  2 
 
 
  7/8  
    
   180 or 250 
 14-20  
 
  4 
 
 
   1  
 
 
190 
 24-48  
 
  4 
 
 
   1  
 
    
90 
   54 
 
 
  4 
 
 
   1  
 
   
250 
   60 
 
 
  4 
 
 
 1-1/4 
 
     
90 
f. 
Remove pipe stop, unless otherwise shown on the Drawings or 
specified. 
g. 
Product and Manufacturer:  Provide one of the following: 
1) Type 501, Romac Industries. 
2) Or equal. 
3. 
Flanged Adapters:  
a. 
Description:  One end of adapter shall be flanged and the other end shall 
have a sleeve type flexible coupling. 
b. 
Pressure and Service:  Same as connected piping. 
c. 
Material:  Cast iron or steel.  
d. 
Gasket:  Suitable for water service, and specification 15050. 
e. 
Bolts and Nuts:  Type 316 stainless steel. 
f. 
Harnessing:  
1) Harness adapters to restrain pressure piping.  Test pressures for 
pressure pipe lines are included in the piping schedules in Section 
15051, Buried Piping Installation. 
2) For adapters 12-inch diameter and less, provide 1/2-inch minimum 
stainless steel anchor studs installed in a pressure tight anchor boss. 
Provide number of studs required to restrain test pressure and 
service conditions.  Harness shall be as designed and recommended 
by manufacturer; however, the following minimum anchor studs 
shall be provided, unless otherwise approved by ENGINEER.  
a) 
6-inch Diameter and Less:  Two. 
b) 8-inch Diameter and Less:  Four. 
c) 
10-inch Diameter and Less:  Six. 
d) 12-inch Diameter and Less:  Eight. 
3) For adapters larger than 12-inch diameter, provide split-ring harness 
clamps with a minimum of four Type 316 stainless steel bolts.  
Harness assembly shall be as designed and recommended by 
manufacturer.  Dimensions, sizes, spacing, and materials shall be 
suitable for service and conditions encountered and shall be 
approved by ENGINEER. 
4) Harness couplings to restrain pressure piping. 
5) Test pressures for pressure pipe lines are included in Section 15051, 
Buried Piping Installation.

December 2021 
  
City of Chandler 
21-047 
15120-4 
Chandler Heights Road Utility Relocations 
6) Harnessing shall conform to the details shown on the Drawings. 
g. 
Product and Manufacturer:  Provide one of the following:  
1) Style FCA501, as manufactured by Romac Industries. 
2) Style 128, as manufactured by Dresser. 
3) Or approved equal. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Install piping specialties and accessories in accordance with manufacturer's 
instructions. 
B. Make adjustments to expansion joints as required to ensure that they will be fully 
extended when the ambient temperature is at minimum operating temperature and 
fully compressed at maximum operating temperature for the system in which they 
are installed. 
END OF SECTION

EXHIBIT D 
City of Chandler Construction Manager at Risk Construction Services 
GMP-1 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 7/16/2021 
ACCEPTED GMP/PRICE PROPOSAL

EXHIBIT D: 
GMP PROPOSAL FOR CITY OF CHANDLER ‐ CHANDLER HEIGHTS ROAD UTILITY 
RELOCATIONS.  CHAPARRAL WAY: DOBSON TO LAKE DRIVE CMAR PROJECT 
 
 
JANUARY 26, 2022 
 
 
 
 
 
 
 
 
 
  
City of Chandler 
Mr. Paul Young, P.E. 
215 E. Buffalo Street 
Chandler, Arizona 85224 
 
City of Chandler Project No.:  WW2111.401 
Achen‐Gardner Construction, LLC Project No.: 3938101 
 
Dear Mr. Young: 
 
Attached please find Achen‐Gardner Construction, LLC’s (“Achen‐Gardner”) GMP Proposal (“Proposal”) 
including Schedule of Values (SOV) for installation of 8”,12” & 16” water lines and 15” sewer.   
  
This GMP Proposal is for the amount not to exceed $1,371,579.28. Achen‐Gardner does not guarantee 
the Owner Allowance amount. 
 
Should you have any questions and/or comments, please feel free to contact me Lat (480) 403‐9399 or 
e‐mail dbroderick@achen.com.   
 
Sincerely, 
 
 
 
 
 
 
ACHEN‐GARDNER CONSTRUCTION, LLC  
 
 
 
Dan Broderick, Sr. Project Manager 
 
Attachments

INDEX OF EXHIBITS 
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
Exhibit D1: 
Scope of Work 
Exhibit D2: 
Cost Model Form 
Exhibit D3: 
Schedule of Values 
Exhibit D4: 
List of GMP Documents 
Exhibit D5 
Clarifications and Assumptions 
Exhibit D6: 
Subcontractor and Supplier Solicitation Documentation, Award 
 
 
 
Recommendations and Quotes 
Exhibit D7: 
Baseline Project Schedule

EXHIBIT D1:  SCOPE OF WORK 
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
The overall project scope includes the relocation of existing City‐ owned wastewater, reclaimed water 
and potable water pipes to clear an alignment for a proposed SRP undergrounding of a 230‐Kilowatt 
transmission system.  These relocations will occur on Chaparral Way (Dobson Road to Lake Drive) ‐
Package no. 1, on Lake Drive (Chaparral to Alma School) ‐ Package no. 2, on Alma School Road (Lake 
Drive to Chandler Heights Road) and Chandler Heights (Alma School Road to the Union Pacific Railroad) ‐ 
Package 3, then work on Chandler Heights east of the Union Pacific Railroad ‐ Package 4.   
 
The Package 1 GMP project scope on Chaparral Way includes the installations of approximately: 70 LF of 
8” waterline with valves and fittings, 70 LF of 12” waterline with valves and fittings, 260 LF of 16” 
waterline with valves and fittings, and 70 LF of 15” sewer with two new Polymer manholes.  The 
replacement of existing concrete and asphalt surfaces due to the construction are included.

EXHIBIT D2:  COST MODEL FORM  
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
Page 1 of 2 
Date: 26‐Jan‐22
Chandler Heights Road Utility Relocations
Amount
A. Cost of Work
     A1 Cost of Work (self‐performed, subcontractors, suppliers no mark‐up)
$777,529.46
     A2 Cost of Work (subcontractors, suppliers, materialmen)
TOTAL COST OF WORK:
$777,529.46
B. General Conditions
$128,715.68
$906,245.14
C. CM@Risk's Fee 
$81,562.06
SUBTOTAL 2 (A + B + C):
$987,807.20
D. Bonds and Insurance (on Subtotal 1) 
     D1 Bonds (Payment and Performance)
$7,249.96
     D2 Insurance
$17,671.78
$24,921.74
SUBTOTAL 3 (SUBTOTAL 2 + BONDS & INS):
$1,012,728.94
E. Sales Tax 
     E1 Sales Tax
$51,345.36
     E2 Tax Exempt Material Adjustment
‐$4,393.36
$46,952.00
F. Approved Allowances
     F1 Allowances
$25,784.49
     F2 Owner Allowance
$286,113.85
$311,898.34
EXHIBIT D2
TOTAL BONDS & INSURANCE:
TOTAL SALES TAX:
TOTAL ALLOWANCES:
CM@RISK GMP SUMMARY
Project Name:
Project Location:
City of Chandler Project No.:
Chaparral Way ‐ Dobson to Lake
WW2111.401
SUBTOTAL 1 (Cost of Work) (A + B):

EXHIBIT D2:  COST MODEL FORM  
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
 
 
 
 
 
 
 
 
 
Page 2 of 2 
G. Contingencies
    G1 
Construction Contingency
$0.00
    G2
$0.00
$0.00
$1,371,579.28
Establishment of Values:
a. Cost of Work (A) and Allowances (F) to be submitted with GMP Proposal.
b. General Conditions Cost (B) to be established in Baseline Cost Model.
c. CM@Risk Fee as set forth in Section 3.7.3 of this Contract
TOTAL GMP PROPOSAL:
TOTAL CONTINGENCIES:

EXHIBIT D3:  SCHEDULE OF VALUES  
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 1 of 3 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
1/26/22
PROJECT NO.:  WW2111.401
90% GMP FOR CHAPARRAL WAY: DOBSON TO LAKE
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938101
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY 
ITEM
DESCRIPTION
UM
QUANTITY
 UNIT PRICE 
TOTAL
1
MOBILIZATION/DEMOBILIZATION
LS
1.000
$57,936.86
57,936.86
$ 
2
SURVEY
LS
1.000
$4,000.00
4,000.00
$ 
3
INSTALL 8" DIP CL 350 WATERLINE & FITTINGS
LF
70.000
$691.59
48,411.30
$ 
4
INSTALL 24" STEEL CASING (8" DIP)
LF
35.000
$671.45
23,500.75
$ 
5
INSTALL 8" GATE VALVE
EA
2.000
$3,240.96
6,481.92
$ 
6
INSTALL 12" DIP CL 350 WATELRINE & FITTINGS
LF
70.000
$752.33
52,663.10
$ 
7
INSTALL 36" STEEL CASING (12" DIP)
LF
35.000
$923.62
32,326.70
$ 
8
INSTALL 12" GATE VALVE
EA
2.000
$4,383.11
8,766.22
$ 
9
INSTALL 16" DIP CL 350 WATERLINE & FITTINGS
LF
260.000
$538.53
140,017.80
$ 
10
INSTALL 36" STEEL CASING (16" DIP)
LF
35.000
$751.62
26,306.70
$ 
11
INSTALL 16" GATE VALVE
EA
2.000
$8,189.28
16,378.56
$ 
12
INSTALL 1" COMBO AIR VAC VALVE
EA
2.000
$8,037.58
16,075.16
$ 
13
REMOVE 15" PVC SEWER LINE
LF
70.000
$181.56
12,709.20
$ 
14
REMOVE EXISTING MANHOLE
EA
1.000
$8,719.23
8,719.23
$ 
15
INSTALL 15" VCP SEWER LINE
LF
70.000
$535.34
37,473.80
$ 
16
INSTALL 60"  POLYMER MANHOLE
EA
2.000
$28,934.40
57,868.80
$ 
17
ASPHALT REMOVAL & REPLACEMENT
SY
310.000
$210.26
65,180.60
$ 
18
SIDEWALK REMOVAL & REPLACEMENT
SF
660.000
$14.95
9,867.00
$ 
19
CURB & GUTTER REMOVAL & REPLACEMENT
LF
100.000
$43.56
4,356.00
$ 
20
VALLEY GUTTER REMOVAL & REPLACMENT
LF
20.000
$181.00
3,620.00
$ 
21
LANDSCAPING RESTORATION
LS
1.000
$7,100.00
7,100.00
$ 
22
TRAFFIC CONTROL
LS
1.000
$69,899.00
69,899.00
$ 
23
SWPPP
LS
1.000
$6,157.50
6,157.50
$ 
24
BYPASS PUMPING
LS
1.000
$61,713.26
61,713.26
$ 
SUBTOTAL ‐ DIRECT COST OF THE WORK (A1)
777,529.46
$ 
DESIGN DOCUMENT STAGE:   90% WILSON
EXHIBIT D3 ‐ SCHEDULE OF VALUES 90% GMP

EXHIBIT D3 
Page 2 of 3 
 
25
GENERAL CONDITIONS (B)
MO
2.0  $          64,357.84 
128,715.68
$ 
906,245.14
$ 
10100
OVERHEAD AND FEE (7.5% OH, 1.5% FEE)
9.00%
81,562.06
$ 
SUBTOTAL ‐ OVERHEAD AND FEE 
81,562.06
$ 
987,807.20
$ 
10200
INSURANCE (INCL. BUILDERS RISK & POLLUTION LIABILITY)
(D2)
1.95% (Calc on RT #1) 
17,671.78
$ 
10300
BONDS (PAYMENT & PERFORMANCE)
(D1)
0.80% (Calc on RT #1) 
7,249.96
$ 
SUBTOTAL ‐ INSURANCE AND BONDS
24,921.74
$ 
1,012,728.94
$ 
10400
SALES TAXES (5.07% or 7.8% of 65% of Running Total No. 3 (E1)
5.070%
51,345.36
$ 
10450
ESTIMATED TAX EXEMPT MATERIAL ADJUSTMENT (ALLOWANCE)(E2)
5.070% $          86,654.00 
(4,393.36)
$ 
SUBTOTAL ‐ SALES TAXES
46,952.00
$ 
1,059,680.94
$ 
26
ALLOWANCES (F1)
AL
1.0  $          25,784.49 
25,784.49
$ 
10700
OWNER'S ALLOWANCE(AMOUNT INLC. MARK‐UPS (F2)
 
27.0%
286,113.85
$ 
SUBTOTAL ‐ ALLOWANCES AND CONTINGENCY (INCL MUs)
311,898.34
$ 
1,371,579.28
$ 
TOTAL GMP PROPOSAL
RUNNING TOTAL NO. 4 ‐ DIRECT COST OF THE WORK, + OH & FEE + INS & BOND + SALES TAXES)
RUNNING TOTAL NO. 3  ‐ DIRECT COST OF THE WORK + OH & FEE + INS & BOND 
RUNNING TOTAL NO. 1 ‐ DIRECT COST OF THE WORK INCLUDING GCs
RUNNING TOTAL NO. 2  ‐ DIRECT COST OF THE WORK + OH & FEE
 
 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
1/26/22
PROJECT NO.:  WW2111.401
90% GMP FOR CHAPARRAL WAY: DOBSON TO LAKE
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938101
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY ITEM DESCRIPTION
QUANTITY
UM UNIT PRICE
TOTAL
25.1
PROJECT SUPERINTENDENT 
352.00
HR
109.41
 
38,511.40
25.2
SPECIALTY SUPERINTENDENT
176.00
HR
104.01
18,306.00
25.3
PROJECT MANAGER 
176.00
HR
109.41
19,255.70
25.4
PROJECT ENGINEER 
352.00
HR
93.81
33,020.58
25.5
ICE AND WATER
2.00
MO
220.00
 
440.00
25.6
BUY CONSTRUCTION WATER
2.00
MO
1,750.00
 
3,500.00
25.7
TEMPORARY FACILITIES
2.00
MO
7,841.00
 
15,682.00
GENERAL CONDITIONS (DIRECT COSTS)
128,715.68
25
MONTHLY GENERAL CONDITIONS
2
MO
64,357.84
 
NOTE
See Main Schedule of Values Pay Item 25 for GCs 
DESIGN DOCUMENT STAGE:   90% 
WILSON
PAY ITEM 25 ‐ GENERAL CONDITIONS DETAIL

Exhibit D3 
Page 3 of 3 
 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
1/26/22
PROJECT NO.:  WW2111.401
90% GMP FOR CHAPARRAL WAY: DOBSON TO LAKE
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938101
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY 
ITEM
DESCRIPTION
UM
QUANTITY
 UNIT PRICE 
TOTAL
26.1
OFF‐DUTY OFFICER (ALLOWANCE)
LS
1.0
14,960.00
$          
14,960.00
$ 
26.2
PUBLIC RELATIONS (ALLOWANCE)
MO
2.0
3,500.00
$            
7,000.00
$ 
21,960.00
$ 
10100
OVERHEAD AND FEE (7.5% OH, 1.5% FEE)
9.00%
1,976.40
$ 
SUBTOTAL ‐ OVERHEAD AND FEE ©
1,976.40
$ 
23,936.40
$ 
10200
INSURANCE (INCL. BUILDERS RISK & POLLUTION LIABILITY)
1.95% (Calc on RT #1) 
428.22
$ 
10300
BONDS (PAYMENT & PERFORMANCE)
0.80% (Calc on RT #1) 
175.68
$ 
SUBTOTAL ‐ INSURANCE AND BONDS
603.90
$ 
24,540.30
$ 
10400
SALES TAXES (5.07% or 7.8% of 65% of Running Total No. 3
5.070%
1,244.19
$ 
10450
ESTIMATED TAX EXEMPT MATERIAL ADJUSTMENT (ALLOWANCE)
SUBTOTAL ‐ SALES TAXES
1,244.19
$ 
25,784.49
$ 
NOTE
ALLOWANCES ARE ESTIMATES
TOTAL ALLOWANCES  (SEE MAIN SCHEDULE OF VALUES PAY ITEM 26)
SUBTOTAL ‐ DIRECT COST OF THE ALLOWANCES 
PAY ITEM 26 ‐ SCHEDULE OF ALLOWANCES 
DESIGN DOCUMENT STAGE:   90% WILSON
RUNNING TOTAL NO. 1  ‐ DIRECT COST  + OH & FEE 
RUNNING TOTAL NO. 2  ‐ DIRECT COST  + OH & FEE + INS & BOND

EXHIBIT D4:  LIST OF GMP DOCUMENTS 
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
 
Wilson Engineers City of Chandler ‐ Chandler Heights Road Utility Relocations, Chaparral Way: 
Dobson to Lake Drive 90% plan set (pages 1 to 10), Project No. WW2111.401 dated December 
2021. 
 
Wilson Engineers Technical Specifications Submittal for City of Chandler – Chandler Heights 
Road Utility Relocations, Chaparral Way: Dobson to Lake Drive, City Project No. WW2111.401, 
dated December 2021 (Agency Review set, pages 1 to 123). 
 
Executed (12‐16‐21) Pre‐construction Services Contract with Achen‐Gardner Construction, LLC 
and the City of Chandler for the Chandler Heights Road Utility Relocations CMAR Project; City of 
Chandler Project No. WW2111.251.

EXHIBIT D5:  CLARIFICATIONS AND ASSUMPTIONS  
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
 
NOTE: This GMP is based on the following clarifications and assumptions.  
 
1. Fee Exclusions:  GMP excludes all costs associated with City and/or ADOT permit and plan review 
fees, Quality Assurance (QA) (i.e. City/ADOT inspection and testing) costs, impact fees, and utility 
company fees, water meters/meter installations except for construction water, and/or any other 
fees not specifically identified herein. 
2. Unit Price Contract Administration:  This GMP will be administered as a Measured Quantity/Unit 
Price, Guaranteed Not‐to‐Exceed Contract. The Schedules of Values (Re:  Exhibit D3) is defined by the 
individual work/pay items plus fee structure, and markups (re: Exhibit D3, Items 10100 through 
10450). Final contract price/payout will be based on field measured, final completed quantities at the 
approved unit prices, approved allowance and/or contingency utilization, and approved change 
orders. It is understood that these City approved prices including mark‐ups are the “Cost of the 
Work”.  The mark‐up structure on the Schedule of Values (Exhibit D3) will apply to Change Orders 
and/or Extra Work, allowances, and contingencies.  The mark‐ups for MAG section 109.5 do not apply 
for this contract.  Pay Item under‐runs and/or unused items shall fall to Owner’s Allowance for the 
duration of the project. Quantity over‐runs shall be paid at the unit price established in the Schedule 
of Values for the pay item and shall be paid from Owner’s Allowance or Change Orders. 
3. Aerial Construction Photography:  Achen‐Gardner shall provide a pre‐construction video/photographs 
and progress photographs/videos periodically. Aerial videos shall only be provided if FAA and local 
approval is provided to fly a drone camera. Drone videos if allowed, shall be standard drone footage. 
4. Mobilization/Demobilization – includes the following monthly items as defined in the Specifications: 
the field office fencing, work area fencing for three work sites, field offices, temporary utilities, 
material testing, and toilets for the two‐month project duration. Therefore, the 
Mobilization/Demobilization Pay Item shall be invoiced monthly based on the two (2) month project 
duration.  
5. Utility Relocations / Unknown Buried Conflicts:  This GMP excludes all costs associated with removing, 
replacing and/or relocating any existing buried or overhead dry utilities and/or unknown buried 
conflicts. 
6. Final, For‐construction Plans and Technical Provisions:  Funds required for revisions made between 
the 90% and final design documents shall come from Owners Allowance.

FEE SCHEDULE ITEM CLARIFICATIONS 
ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
DIRECT COSTS 
1 
Mobilization 
 
Mobilization & Demobilization 
 
Pre-Construction Video & Progress Photos 
 
Project Clean-Up 
 
Known utility potholing 
 
Small Tools & Consumables 
 
Dust Permit 
 
Project Sign 
 
Quality Control based on MAG testing requirements for frequency and type. 
 
Measured and paid on lump sum basis
2 
Survey 
 
Survey, Staking, Registered Land Surveyor Certified As-Builts 
 
Construction Redlines 
 
GIS point collection and submission per City’s GIS Mapping specifications 
 
Registered Land Surveyor Certification of as-builts 
 
Measured and paid on lump sum basis
3-12 
Potable Water 
 
Includes all installation work associated; dig/lay/bedding/shading/backfill per 
MAG specs and as noted on drawings (ABC full depth where required), 
spoil/debris haul off, slurry backfill to full depth in transverse trenches, 
connections to existing waterlines/service connections (tees), installation of 
valves, and testing (bac tee & chlorination) 
 
Includes 8”,12” and 16” waterline as noted on the plans. 
 
Includes 24” & 36” steel casings where laterals are noted on plans; all lateral 
crossings to be placed under SRP duct banks. Each casing installation is based 
on all 35’ at one time.  
 
Work excludes cathodic protection for all DIP related components 
 
Material pricing good for 30 days 
 
Measured and paid for as noted on Exhibit D3 unit rates summary
13-16 
Sewer 
 
Includes all installation work associated; dig/lay/bedding/shading/backfill, 
spoil/debris haul off, slurry backfill to full depth in transverse trenches, 
manhole connections, manhole installation/rehab as noted on plans, applicable 
sewer encasements, testing, and CCTV.  
 
Includes 15” sewer as noted on the plans 
 
Includes new polymer manholes 60” diameter as noted on the plans 
 
Includes removal of existing manholes as noted on plans 
 
Material pricing good for 30 days 
 
Measured and paid for as noted on Exhibit D3 unit rates summary
17 
Asphalt Removal & 
Replacement 
 
Includes all work associated with the construction including saw cutting, 
spoil/debris haul off, subgrade preparation, and installation of ABC, AC, tack 
coat, and slurry seal 
 
Asphalt thickness to be replaced at 5” Asphalt Concrete (AC) on 12” ABC on 
Dobson and 3” Asphalt Concrete on 6” ABC as noted on the plans 
 
Includes thermoplastic striping 
 
Material pricing good for 30 days 
 
Measured and paid for by the Square Yard
18-20 
Concrete 
 
Includes all work associated; concrete removal, saw cutting, haul off, 
disposal, subgrade preparation, and replacement of concrete with like kind to 
match existing color and textured surfaces. Curb & Gutter replacements per 
mag 220, Sidewalk replacements per MAG 230 and valley gutter/apron 
replacements per MAG 240 
 
Material pricing good for 30 days 
 
Measured and paid for as noted on Exhibit D3 unit rates summary

ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
21 
Landscaping 
 
Includes all work associated including granite removal, spoil/debris haul off, 
subgrade preparation, replacement of decomposed granite and restoration of 
existing irrigation system 
 
This price includes plant establishment & maintenance in accordance with 
City standards for period of 3 months 
 
Measured and paid for as noted on Exhibit D3 unit rates summary
22 
Traffic Control 
 
Traffic Control assumed to leave access of one lane in each direction except 
for installations of casings. Excludes any use of jersey barriers 
 
Message Boards - Variable Message Boards will set up 2 weeks prior to 
construction and then removed after 2 weeks after the start of construction. 
Includes 4 variable message boards 
 
Traffic Control Plans - Includes preparation, submission, and updates of 
Traffic Control Plans (TCP) 
 
Setup & Takedown - Includes installation, maintenance, and removal of 
barricades and signage in accordance with approved TCP 
 
Includes daily maintenance of barricades in accordance with approved TCP 
(assumes 6 hours per day) 
 
Barricades and no plating. 
 
Measured and paid on lump sum basis
23 
SWPPP – Design, 
Implementation, & 
Maintenance 
 
Includes SWPPP plan, implementation of plan, inspections, and removal at 
the completion of the project.  
 
Sweeping 
 
Track Out Pad 
 
Measured and paid on lump sum basis
24 
Bypass Pumping 
 
Includes installation and 2 week operation of bypass for 15” sewer line.  
Assumes that bypass line will need to be buried at Intel entrance and 2 
locations on Dobson Rd. Includes asphalt removal and replacement at these 
locations.
25 
General Conditions 
 
Includes cost of Project Management – Project Supt., Specialty Supt. 
Project Manager, Project Engineer and vehicles.   
 
Ice/drinking water and construction water. 
 
Temporary Facilities (two months) – trailer, fencing, electrical service, 
yard rental, toilets, and trailer furnishings. 
 
Measured and paid on a weekly basis for Project Management and 
monthly for ice and water.
ALLOWANCES 
26.1 
Off Duty Police Officer w/ 
vehicle (Allowance) 
 
Chandler Off-Duty Police Office and Vehicle 
 
Hourly rate may be adjusted to match actual costs incurred (City rates could 
be subject to change during the duration of the project) 
 
Measured and paid on an hourly basis
26.2 
 
Public Relations (Allowance) 
 
Public outreach including business/residential notification, job walks and door 
hangers. 
10700 
Owner’s Allowance 
 
For City requested upgrades and changes per Construction Contract Article 
15.4.2 Owner’s Contingency 
 
Measured and paid for on a cost-plus basis unless unit prices can be utilized 
where applicable
CMAR FEE 
10100 
CMAR Construction Fee 
 
Measured and paid on calculation of 9.0% of subtotal direct costs, 
contingencies, allowances, and job overhead 
BONDS AND INSURANCE 
10200 
Insurance 
 
Measured and paid on calculation of 1.95% of subtotal for direct costs. 
10300 
Performance and Payment 
 
Measured and paid on calculation of .8% of subtotal for direct costs.

ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
Bonds 
SALES TAX 
10400 
Gross Receipts Tax 
 
Calculated based on 65% of 7.8% City of Chandler Sales Tax rate 
 
Calculation may be adjusted to match actual sales tax incurred (City rates 
could be subject to change during the duration of the project) 
 
Measured and paid on calculation of 5.07% of subtotal direct costs, 
contingencies, allowances, job overhead, CMAR fee, bonds and insurance 
10450 
 
Tax Exempt Material 
Adjustment 
 
Tax Exempt material adjustment for water line materials per Title 42 of the 
Arizona Revised Statutes (also reference AZDOR code 535 Pipes or Valves, 
4” diameter or large used to transport oil, natural/artificial gas, water, coal 
slurry) 
 
Measured and paid on lump sum basis
 
** Allowance options with values are referenced above; allowance items can be reallocated to the base 
bid as requested.

EXHIBIT D6:  SUBCONTRACTOR AND SUPPLIER SOLICITATION DOCUMENTATION, 
AWARD RECOMMENDATIONS, AND QUOTES 
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
See following subcontractor and supplier award recommendations spreadsheet with quotes. 
 
1) This Proposal is based on recommended awarded subcontractor and supplier resource values and 
related proposals/quote clarifications, inclusions, exclusions, escalation clauses, and qualifications.  
These proposals/quotes follow this summary sheet. 
2) This summary reflects competitive bids with a specific scope/Schedule of Values provided to all 
subcontractors and suppliers at the time of solicitation.  Actual quantities and extended totals 
reflected in the SOV may be different based on final quantity and cost adjustments due to ongoing 
revisions. 
 
Scope of Work/Material
Subcontractor/Supplier Name
Bid/No Bid
Bid Amount
 Selection Notes 
Recommendations
ABC
Cemex
B
5,491.00
 Lowest  Qualified Bidder 
Recommended
ABC
Buesing
B
5,945.00
ABC
Vulcan
B
8,058.00
Asphalt
Vulcan
B
9,769.00
Lowest  Qualified Bidder
Recommended
Asphalt
Fisher Sand & Rock
NB
0.00
Bypass
Rain for Rent
B
36,248.00
Lowest  Qualified Bidder
Recommended
Bypass
Captial Pump
B
36,340.00
Steel Casing
Trinity
B
25,584.00
Lowest  Qualified Bidder
Recommended
Steel Casing
Dana Kepner
B
29,736.00
Pipe Package
Core & Main
B
93,001.00
Lowest  Qualified Bidder
Recommended
Pipe Package
Dana Kepner
B
100,580.00
Pipe Package
Ferguson
NB
0.00
Polymer Manhole Material
Armorock
B
18,034.00
Specialized 
Recommended
Construct Manhole Base
Preach
B
6,650.00
Specialized 
Recommended
Quality Control
Quality Testing
B
10,732.00
Lowest  Qualified Bidder
Recommended
Quality Control
Ninyo Moore
B
22,489.00
Quality Control
Alt AZ
NB
0.00
Redimix
AZ Materials
B
82,213.00
Lowest  Qualified Bidder
Recommended
Redimix
Desert Redimix
B
83,200.00
Redimix
Calportland
B
92,854.00
Survey
Survey Innovation Group‐Rick
B
4,000.00
Lowest  Qualified Bidder
Recommended
Survey
Bench Mark
NB
0.00
Survey
Atwell
NB
0.00
Traffic Control
Trafficade
B
69,899.00
Qualification Based ‐ performance
Recommended
EXHIBIT D8:  SUBCONTRACTOR SOLICITATION SUMMARY AND RECOMMENDATIONS
Januray 26, 2022

Quote Analysis Report
Page 1 of 1
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 9:29 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
AGGREGATES
AGGREGATES
Vendor Phone
Vendor Name
Vendor Code
Unit Price
7606377179
Cemex Inc
CEMEXINC
Unit Price
6022333339
Buesing Corp
BUESINGCORP
Unit Price
6025288961
Vulcan Materials
VULCANMATERI
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
15.0000
TN
395.00
ABC MAG
2AGABC
13.9000
15.0500
20.4000
Plugged Amount
Quoted Amount
0
5,491
0
5,945
0
8,058
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
5,925
Totals
5,491
5,945
8,058
Diff From Plug
-435
20
2,133
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

GENERAL INFORMATION
MATERIAL PRICING:
 ADDITIONAL CLAUSES 
Category
Item
Value
UoM
Comments
Pricing Escalation
The prices are subject to an escalation of
x.xx
USD/ton
Effective , and each  months thereafter
Surcharges and Fees
Variable Fuel surcharge
xx.xx
USD/Load
Environmental compliance fee
$5.00
USD/Load
Charged on all loads
Full freight recovery
xx.xx
USD/ton
Based on full freight for a load of 22 Tons
Plant Operning fee for non business hours on 
weekdays, weekends
$1,000.00
USD per Each
Subject to notification
Saturday haul premium
Bid upon request
USD/ton
Aggregates account manager for pricing
Standby charge
xx.xx
USD/min
Subject to notification
Re-handling fee
$40.00
USD/Load
Unsuitable material dumped at landfill, to be reloaded
Pricing Conditions
All Sales are subject to CEMEX Standard terms and conditions. Pricing quoted is per short ton and does not include sales tax.  Applicable Sales Tax will apply unless Sales Tax exemption 
certificate is on file at CEMEX prior to pick up or delivery.
Delivered Pricing: Pricing is based on delivery during regular aggregate plant hours.
FOB Pricing:  Material prices are FOB CEMEX facility at the designated location loaded onto buyer’s trucks. Ownership of materials transfers from CEMEX to customer at gate.
Payment terms
Payment Terms are standard as follows: Net 10th Prox. (10th of the month following delivery or pick up)
Delayed portion of payment will attract a Finance charge of the lessor of 1.5% per month, 18% per annum or maximum permitted under applicable laws
Material Availability
All Materials are subject to availability by plant inventory, production schedules, shipping schedules, plant failure and / or equipment breakdown. CEMEX is not liable for lack of 
material, equipment, drivers, disruptions in transportation, and any other shortage.
Delivery Availability
All shipments are subject to truck availability.
Product Performance
All material is per engineer approval and is considered acceptable when tested and sampled per acceptable sampling standards at our plant.
Respectfully,
CEMEX Con Mat South,LLC
Accepted by:
Donald Peters
ACHEN-GARDNER CONSTRUCTION LLC
Phone: 0
Email:  donald.peters@cemex.com
BID-0602604
12/30/2021 12:23 PM
Account:
ACHEN-GARDNER CONSTRUCTION LLC
Project:
D - CHANDLER HEIGHTS RD UTILITY 
RELACATIONS
Account number:
3033003
Project Address:
4758  South Dobson Road
Contact:
Mark McLafferty
Chandler, Arizona 85248
E-mail:
mmclafferty@achen.com
Phone:
480-940-1300
Doc. Expiration Date:
1/31/2022
Price Valid from:
12/30/2021
Customer Service:
602-416-2658
Price Valid to:
3/31/2022
Sales Office Address:
5555 E. Van Buren Street, Suite 155, Phoenix, AZ 
85008
Material Number
Description
Plant
Quantity
UoM
Delivered Price
Truck Type
Notes
 1307799
SPEC BASE COARSE
2108-8985-Agg Trading - 
Sacaton (SO-3233)
400.00
TON
$13.50
16 WHEELER
DELIVERED IN SUPERS

BUESING CORP.
  Highway / Heavy Construction
    AZ Lic. # A-ROC200645
 
Date: 1/3/2022
 
To:       Achen Gardner Construction
Attn:        Mark McLafferty
Phone:
Fax:
  
Bid Date:
January 3, 2022
Project No:
 
Project:       Chandler Heights Road Utilities
Location:
Dobson Road & Chaparral Way
City:
Chandler, Az
We are pleased to submit the following cost estimate:
Pricing Good Through 08/31/2022            (See Standard Provisions)
QUANTITY
UNIT
DESCRIPTION
PRICE / UNIT
TOTAL
385
TON
NON LIMED MAG ABC DELIVERED IN SUPERS
15.05
$            
5,794.25
$            
$
$
Standard Provisions
SUFFICIENT QUANTIIES PER DELIVERY TO INSURE 4 HOUR MINIMUM PER TRUCK
Prices do not include weekend, holiday, off hour, or overtime shipments.  Additional charges may apply if any of
these conditions occur. Unless otherwise stated, dirt haul prices exclude permits, loading, dust control & sweeping.
ALL PRICES ASSUME THAT BUESING CORP'S STANDARD INSURANCE IS ACCEPTABLE
ALL PRICING WILL BE HONORED THROUGH THE DATE SPECIFIED ABOVE
PROVIDED THAT WE RECEIVE A P.O., P.A., OR LETTER OF INTENT WITHIN 30 DAYS .  If 
JOB AWARD IS LONGER THAN 30 DAYS PLEASE NOTIFY US WITHIN THE 30 DAYS ,
AND WE WILL NEGOTIATE WITH MATERIAL SUPPLIERS TO ALLOW THE PRICE TO BE HONORED
Special Provisions
AGGREGATE PRICING INCLUDES AN ALLOWANCE OF 7 MINUTES FOR SUPERS TO GET FROM PROJECT ENTRANCE TO THE
DUMPSITE, UNLOADED & BACK TO THE PROJECT ENTRANCE.
BUESING WILL MAKE EVERY REASONABLE EFFORT TO HONOR THIS QUOTE & MEET CUSTOMER PRODUCTION EXPECTIONS.
HOWEVER, MATERIAL & TRUCK AVAILABILITY ARE BEYOND OUR CONTROL.  ACCEPTANCE OF THIS QUOTE SHALL NOT
SERVE AS A GUARANTEE THAT MATERIALS AND/OR TRUCKS WILL BE AVAILABLE WHEN REQUESTED.
Company Name:
   Date:                   .
and GOOD LUCK !!!
Respectfully Submitted:   Cecil  Wallace
3045 S 7th Street
Phoenix, Arizona  85040
(602) 845-3133
Cell:  (602) 799-5702
 Authorized Person's Signature:_________________________________________________
If These Terms And Conditions Are Acceptable Please Sign This Form And Fax It Back To The Number Below
     ACCEPTANCE OF PROPOSAL
   The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified, provided there is an understanding between
parties that the prime and / or subcontractor must receive an official award. If an official award, contract or subcontract is not consummated this proposal shall become null and void.
Payment due on or before the 25th day of the month for work completed or materials delivered in the month prior.  No retention withheld.
 
"Simply the Best"
-
      Achen Gardner Construction

Attn:
Acct#:
Mark McLafferty
550 SOUTH 79TH STREET
ACHEN-GARDNER CONSTRUCTION LLC
CHANDLER, AZ  85226
SCOTTSDALE, AZ 85256
Quote Name:
Quote #:
 Quotation
CHANDLER HEIGHTS RD UTILITY RELOCATIO
507376
N DOBSON RD & E CHAPPARAL RD / SCOTTS
AZ057705
213235
Quote Created:
Date:
Quote Expiration:
Price Expiration:
Effective From:
Wednesday, December 29, 2021
Sales Rep :
PHOENIX, AZ 85034
Phone:
Fax :
Email:
Special Instructions:
Wednesday, December 29, 2021
Wednesday, December 29, 2021
Friday, January 28, 2022
Thursday, June 30, 2022
Brian Kochert
2526 E University Drive
480-536-0576
kochertb@vmcmail.com
Material quoted based on no specs reviewed. If any changes or different material is required, material is subject to price 
adjustment
Prices quoted are for delivery during normal business hours - Monday thru Friday 6AM to 5PM. Plant Premium for Monday - 
Friday night production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Friday night into Saturday 
morning production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Saturday production (per 8 hour 
shifts) will be charged $1,000.00  per shift.  Plant Premium for Sunday production (per 8 hour shifts)  will be charged 
$2,000.00 per shift. Any overtime will be charged at $350.00 per hour.  Truck stand by will be charged on site after the first 
20 minutes at the rate of $93 per hour or $1.55 per minute. All night work will be subject to an 8 hour minimum hourly haul 
charge. All weekend work will be subject to a 4 hour minimum hourly haul charge.
Product #
Product Name
Plant
Delivered 
Price Per Unit
U/M
Qty
LITCHFIELD RESALE
MAG SPEC ABC   P105
1627P105
Tons
 385
$20.40
STD FRT RATE
Truck Type
Prices quoted above do not include any state or local sales and use tax, if any applies for this project.
Prices quoted are for shipments during normal daytime working hours unless other shipping hours are mutually agreed upon 
in writing by both parties.
This quote is limited to acceptance within 30 days from the date of this quotation after which time quotation is subject to 
review/revision.  Please contact Sales prior to placing the order.
Accepted by:
Sales Representative:
Date:
Date:
We appreciate the opportunity to provide you this quote and trust that Vulcan will have the pleasure of serving your needs for this and future 
projects.
Prices are FOB your jobsite as stated above.  Terms are Net 15 prox.  Please note standard terms and conditions apply.  (Subject to 
credit approval)
Page 1 of 2

GENERAL TERMS AND CONDITIONS
PRICES AND TERMS
Prices are based on the terms and conditions set forth on page 1 of this Quotation, of which these General Terms and Conditions form a part, the terms and conditions stated in 
Customer’s Application for Business Credit, and, if applicable, any terms and conditions relating to the delivery or shipment of materials by truck, barge, vessel, rail or other means 
which are provided by Vulcan to Customer in addition to this Quotation (each, a “Vulcan Sales Document”, and collectively, the “Vulcan Sales Documents”).  Prices are available only 
to the customer specifically named therein, and are only for the quantities mentioned in such Quotation or Sales Order plus or minus 10% of such quantities. A charge of 1.5% per month, 
(18% annum), will accrue on a daily basis from the date of invoice and will continue to accrue on a daily basis on any unpaid balance, both before and after judgment, until the date the 
balance is paid in full, or at the maximum amount permitted by law in which the sale occurred, whichever is less.  However, the assessment of a finance charge on invoices paid in full 
by the payment due date will be waived.  Quotation is offered for furnishing the total aggregate requirements for the project only.  Customer’s contract with Vulcan regarding the sale by 
Vulcan to Customer of the materials listed in this Quotation is subject to the terms and conditions set forth in the Vulcan Sales Documents.  Prices reflect Customer 's acceptance of 
materials at the quoted plant based upon gradation analysis performed and reported by Vulcan 's certified plant quality control personnel. Any penalties that result from in place 
sampling shall be the full responsibility of Customer.
THE TERMS AND CONDITIONS OF THE VULCAN SALES DOCUMENTS GOVERN THE RIGHTS AND OBLIGATIONS OF THE PARTIES
If Customer has issued a purchase order for the materials quoted by Vulcan in this Quotation, this Quotation is not an acceptance of said purchase order, or any of its terms or conditions , 
which are hereby rejected.  Any sale by Vulcan to Customer of the materials listed in this Quotation shall be subject to the terms and conditions set forth in the Vulcan Sales Documents , 
and Customer’s receipt or acceptance of said materials shall constitute acceptance of the offer that this Quotation constitutes.  Any terms or conditions of a subsequent purchase order 
issued by Customer that are inconsistent with the terms and conditions of the Vulcan Sales Documents shall be null and void .
SHIPMENT AND DELIVERY
Unless a "delivered" price is quoted by Vulcan in the Vulcan Sales Documents, all prices are F.O.B. point of shipment from the locations designated. All taxes applicable to the sale or 
delivery of materials that are not paid directly by Customer will be added to the sales price, invoiced to and paid by Customer, unless Customer provides Vulcan with satisfactory 
evidence of exemption from same. Shipment will be in accordance with Customer’s reasonable instructions or, if none, then by whatever means Vulcan shall deem practicable.  
The 
quantities of material delivered to Customer shall be conclusively presumed to be the quantities shown on the tickets produced from a certified weigh scale at Vulcan’s quarry or sales 
yard.
CREDIT AND DEFAULT
Vulcan shall have no obligation to ship or deliver except upon its determination prior to each shipment or delivery that Customer is worthy of the credit to be extended and is not in 
default upon any obligation to Vulcan. Upon default, Customer agrees to pay all of Vulcan’s collection expenses, including attorneys’ fees.  
INSURANCE
A Memorandum of Insurance containing current information regarding Vulcan’s insurance program is available at 
<https://marshdigital.marsh.com/marshconnect/viewMOI.action?clientId=632529479>.
EXCULPATORY PROVISIONS
Vulcan shall have no liability for delay or failure to make shipments, or delivery, as a result of strikes, labor problems, severe weather conditions, casualty, mechanical breakdown or 
other conditions beyond Vulcan’s reasonable control.  In no event shall Vulcan be liable for any incidental or consequential damages. Vulcan’s liability and Customer’s exclusive 
remedy for any cause of action arising out of the provision of material quoted herein shall be the replacement of, or payment of the purchase price for, the materials which are the subject of 
this Quotation.
CHANGE OF TERMS
Vulcan may change the price and/or quantity upon 30 days’ notice to Customer.  Vulcan shall also have right to change, modify or amend any other terms and conditions upon written 
notice of such change to customer.  The effect of the change shall be as stated in the written notice and accepted by Customer upon placing of orders with seller following receipt of such 
notice.  .
APPLICABLE LAW
All orders are subject to acceptance by Vulcan at the headquarters of its Mountain West Division in Phoenix, Arizona, and the laws of the state in which the materials was shipped from 
shall apply to the sale of all materials subject hereto.  In the event material is imported into the U .S., the law in the state in which the material was sold to the customer will prevail.  All
disputes regarding finance charges shall be governed by Alabama law .
LIMITED WARRANTY AND WARRANTY DISCLAIMER
Vulcan warrants for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with Vulcan’s specifications for said material or the 
specifications set forth in Vulcan’s quotation.  VULCAN HEREBY EXCLUDES ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PURPOSE, AND ALL 
OTHER WARRANTIES, EXPRESS OR IMPLIED, OF THE MATERIAL SOLD HEREUNDER, OTHER THAN THE EXPRESS WARRANTY STATED ABOVE.  In addition, 
except to the extent otherwise set forth in the specifications described above, Vulcan makes no warranty whatsoever with respect to specific gravity, absorption, whether the material is 
innocuous, non-deleterious, or non-reactive, or whether the material is in conformance with any plans, other specifications, 
regulations, ordinances, statutes, or other standards 
applicable to Customer’s job or to said material as used by Customer.  VULCAN SHALL IN NO EVENT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL 
DAMAGE CAUSED BY NON-COMPLIANCE OF THE MATERIAL WITH SPECIFICATIONS, OR FOR ANY DEFECTS IN THE MATERIAL SOLD HEREUNDER.
Page 2 of 2

Page 2 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
ASPHALT
ASPHALT
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4807301033
Fisher Sand and 
FISHERSANDAN
Unit Price
6025288961
Vulcan Material
VULCANMATERI
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
TN
98.00
REPLACE ASPHALT
2AC12EVAC
0.0000
90.4500
0.0000
TN
10.00
BYPASS PUMPING
2AC12EVAC
0.0000
90.4500
Plugged Amount
Quoted Amount
0
0
0
9,769
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
0
9,769
Diff From Plug
0
9,769
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Attn:
Acct#:
Mark McLafferty
550 SOUTH 79TH STREET
ACHEN-GARDNER CONSTRUCTION LLC
CHANDLER, AZ  85226
SCOTTSDALE, AZ 85256
Quote Name:
Quote #:
 Quotation
CHANDLER HEIGHTS RD UTILITY RELOCATIO
507376
N DOBSON RD & E CHAPPARAL RD / SCOTTS
AZ057705
213235
Quote Created:
Date:
Quote Expiration:
Price Expiration:
Effective From:
Tuesday, January 4, 2022
Sales Rep :
PHOENIX, AZ 85034
Phone:
Fax :
Email:
Special Instructions:
Wednesday, December 29, 2021
Tuesday, January 4, 2022
Thursday, February 3, 2022
Thursday, June 30, 2022
Brian Kochert
2526 E University Drive
480-536-0576
kochertb@vmcmail.com
PMTR price is contingent on the plant already running a terminal blend mix.
This Hot-Mix Asphalt quote is based on a published average selling price from Poten & Partners for liquid binder of $515/per 
ton. Any increase in price of $25.00 or greater will be billed to the customer at $1.50 per ton for every $25.00 increase.
In the above example, if the published rack rate for liquid binder hits $540/ton during the lifecycle of the project, an increase 
of $1.50/ton will be added to each invoice for that month.   If the rack rate climbs to $565/ton, a second $1.50 Binder 
Surcharge will go into effect.  If pricing drops back down to the initial published rate, we’ll adjust the price back to the original 
quoted per ton price.
Material quoted based on no specs reviewed. If any changes or different material is required, material is subject to price 
adjustment
Prices quoted are for delivery during normal business hours - Monday thru Friday 6AM to 5PM. Plant Premium for Monday - 
Friday night production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Friday night into Saturday 
morning production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Saturday production (per 8 hour 
shifts) will be charged $1,000.00  per shift.  Plant Premium for Sunday production (per 8 hour shifts)  will be charged 
$2,000.00 per shift. Any overtime will be charged at $350.00 per hour.  Truck stand by will be charged on site after the first 
20 minutes at the rate of $93 per hour or $1.55 per minute. All night work will be subject to an 8 hour minimum hourly haul 
charge. All weekend work will be subject to a 4 hour minimum hourly haul charge.
Product #
Product Name
Plant
Delivered 
Price Per Unit
U/M
Qty
LITCHFIELD RESALE
MAG SPEC ABC   P105
1627P105
Tons
 385
$20.40
STD FRT RATE
Truck Type
Product #
Product Name
Plant
ASPHALT
Delivered 
Price Per Unit
U/M
Qty
GOMEZ HMA
3/4" EVAC - PG70-10
231511G
Tons
 72
$90.45
STD FRT RATE
Truck Type
19TH AVE HMA
3/4" EVAC PG70-10
231511H
Tons
 1
$90.10
STD FRT RATE
Truck Type
19TH AVE HMA
3/4" EVAC PG76-22TR+
236411H
Tons
 1
$113.10
STD FRT RATE
Truck Type
19TH AVE HMA
3/4" EVAC PG70-16TR
236611H
Tons
 1
$105.10
STD FRT RATE
Truck Type
Page 1 of 3

Other Charges
Environmental Fee -Agg & Asphalt at $4.00 / Load
Prices quoted above do not include any state or local sales and use tax, if any applies for this project.
Prices quoted are for shipments during normal daytime working hours unless other shipping hours are mutually agreed upon 
in writing by both parties.
This quote is limited to acceptance within 30 days from the date of this quotation after which time quotation is subject to 
review/revision.  Please contact Sales prior to placing the order.
Accepted by:
Sales Representative:
Date:
Date:
We appreciate the opportunity to provide you this quote and trust that Vulcan will have the pleasure of serving your needs for this and future 
projects.
Prices are FOB your jobsite as stated above.  Terms are Net 15 prox.  Please note standard terms and conditions apply.  (Subject to 
credit approval)
Page 2 of 3

GENERAL TERMS AND CONDITIONS
PRICES AND TERMS
Prices are based on the terms and conditions set forth on page 1 of this Quotation, of which these General Terms and Conditions form a part, the terms and conditions stated in 
Customer’s Application for Business Credit, and, if applicable, any terms and conditions relating to the delivery or shipment of materials by truck, barge, vessel, rail or other means 
which are provided by Vulcan to Customer in addition to this Quotation (each, a “Vulcan Sales Document”, and collectively, the “Vulcan Sales Documents”).  Prices are available only 
to the customer specifically named therein, and are only for the quantities mentioned in such Quotation or Sales Order plus or minus 10% of such quantities. A charge of 1.5% per month, 
(18% annum), will accrue on a daily basis from the date of invoice and will continue to accrue on a daily basis on any unpaid balance, both before and after judgment, until the date the 
balance is paid in full, or at the maximum amount permitted by law in which the sale occurred, whichever is less.  However, the assessment of a finance charge on invoices paid in full 
by the payment due date will be waived.  Quotation is offered for furnishing the total aggregate requirements for the project only.  Customer’s contract with Vulcan regarding the sale by 
Vulcan to Customer of the materials listed in this Quotation is subject to the terms and conditions set forth in the Vulcan Sales Documents.  Prices reflect Customer 's acceptance of 
materials at the quoted plant based upon gradation analysis performed and reported by Vulcan 's certified plant quality control personnel. Any penalties that result from in place 
sampling shall be the full responsibility of Customer.
THE TERMS AND CONDITIONS OF THE VULCAN SALES DOCUMENTS GOVERN THE RIGHTS AND OBLIGATIONS OF THE PARTIES
If Customer has issued a purchase order for the materials quoted by Vulcan in this Quotation, this Quotation is not an acceptance of said purchase order, or any of its terms or conditions , 
which are hereby rejected.  Any sale by Vulcan to Customer of the materials listed in this Quotation shall be subject to the terms and conditions set forth in the Vulcan Sales Documents , 
and Customer’s receipt or acceptance of said materials shall constitute acceptance of the offer that this Quotation constitutes.  Any terms or conditions of a subsequent purchase order 
issued by Customer that are inconsistent with the terms and conditions of the Vulcan Sales Documents shall be null and void .
SHIPMENT AND DELIVERY
Unless a "delivered" price is quoted by Vulcan in the Vulcan Sales Documents, all prices are F.O.B. point of shipment from the locations designated. All taxes applicable to the sale or 
delivery of materials that are not paid directly by Customer will be added to the sales price, invoiced to and paid by Customer, unless Customer provides Vulcan with satisfactory 
evidence of exemption from same. Shipment will be in accordance with Customer’s reasonable instructions or, if none, then by whatever means Vulcan shall deem practicable.  
The 
quantities of material delivered to Customer shall be conclusively presumed to be the quantities shown on the tickets produced from a certified weigh scale at Vulcan’s quarry or sales 
yard.
CREDIT AND DEFAULT
Vulcan shall have no obligation to ship or deliver except upon its determination prior to each shipment or delivery that Customer is worthy of the credit to be extended and is not in 
default upon any obligation to Vulcan. Upon default, Customer agrees to pay all of Vulcan’s collection expenses, including attorneys’ fees.  
INSURANCE
A Memorandum of Insurance containing current information regarding Vulcan’s insurance program is available at 
<https://marshdigital.marsh.com/marshconnect/viewMOI.action?clientId=632529479>.
EXCULPATORY PROVISIONS
Vulcan shall have no liability for delay or failure to make shipments, or delivery, as a result of strikes, labor problems, severe weather conditions, casualty, mechanical breakdown or 
other conditions beyond Vulcan’s reasonable control.  In no event shall Vulcan be liable for any incidental or consequential damages. Vulcan’s liability and Customer’s exclusive 
remedy for any cause of action arising out of the provision of material quoted herein shall be the replacement of, or payment of the purchase price for, the materials which are the subject of 
this Quotation.
CHANGE OF TERMS
Vulcan may change the price and/or quantity upon 30 days’ notice to Customer.  Vulcan shall also have right to change, modify or amend any other terms and conditions upon written 
notice of such change to customer.  The effect of the change shall be as stated in the written notice and accepted by Customer upon placing of orders with seller following receipt of such 
notice.  .
APPLICABLE LAW
All orders are subject to acceptance by Vulcan at the headquarters of its Mountain West Division in Phoenix, Arizona, and the laws of the state in which the materials was shipped from 
shall apply to the sale of all materials subject hereto.  In the event material is imported into the U .S., the law in the state in which the material was sold to the customer will prevail.  All
disputes regarding finance charges shall be governed by Alabama law .
LIMITED WARRANTY AND WARRANTY DISCLAIMER
Vulcan warrants for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with Vulcan’s specifications for said material or the 
specifications set forth in Vulcan’s quotation.  VULCAN HEREBY EXCLUDES ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PURPOSE, AND ALL 
OTHER WARRANTIES, EXPRESS OR IMPLIED, OF THE MATERIAL SOLD HEREUNDER, OTHER THAN THE EXPRESS WARRANTY STATED ABOVE.  In addition, 
except to the extent otherwise set forth in the specifications described above, Vulcan makes no warranty whatsoever with respect to specific gravity, absorption, whether the material is 
innocuous, non-deleterious, or non-reactive, or whether the material is in conformance with any plans, other specifications, 
regulations, ordinances, statutes, or other standards 
applicable to Customer’s job or to said material as used by Customer.  VULCAN SHALL IN NO EVENT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL 
DAMAGE CAUSED BY NON-COMPLIANCE OF THE MATERIAL WITH SPECIFICATIONS, OR FOR ANY DEFECTS IN THE MATERIAL SOLD HEREUNDER.
Page 3 of 3

Page 3 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
BYPASS
BYPASS
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4808959225
Rain For Rent
RAINFORRENT
Unit Price
4806265257
Capital Pump & 
CAPITALPUMPE
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
LS
1.00
BYPASS PUMPING
4BYPASSPUMP
2051090
145
36,247.5400
36,340.4500
Plugged Amount
Quoted Amount
0
36,248
0
36,340
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
36,248
36,340
Diff From Plug
36,248
36,340
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Achen-Gardner Construction, LLC
Account: 120490
550 S 79TH ST
CHANDLER, AZ, 85226
Mark McLafferty
480-940-1300
mmclafferty@achen.com
26001 S Arizona Ave
Chandler, AZ, 85248
480-895-9225
rainforrent.com
JWILSON@rainforrent.com
Rain For Rent
Dear Mark McLafferty,
Thank you for your inquiry. As requested, please find attached our proposal 1092-IND-2003666 for Chaparral/Dobson Sewer . We
value this opportunity to provide a solution for your liquid handling need and we are committed to partnering with you to ensure
your project's safe execution and completion.
To convert this proposal into a confirmed order WITHOUT ANY CHANGES, please click the "Start Signing" button to begin the
electronic signature process.
If you would like to CHANGE anything in this proposal or discuss anything further, please call Jon Wilson at 480-895-9225.
Thank you, and I look forward to working with you.
Regards,
Jon Wilson
JWILSON@rainforrent.com
Mobile: 602-725-7839
Branch: 480-895-9225
26001 S Arizona Ave
Chandler, AZ, 85248

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2003666
Sales Rep: Jon Wilson
Rain For Rent
Proposal #
1092-IND-2003666
Project Name
Chaparral/Dobson Sewer
Date Prepared
1/5/2022
Est. Delivery Date
1/24/2022
Prevailing Wage
No
Est. Completion Date
2/12/2022
Project Location
550 South 79th Street
Chandler, AZ, 85226
Project Summary
Sewer bypass Dobson at Chaparral
STATEMENT OF WORK
RFR Responsibilities & Scope of Work
Rain for Rent (RFR) will provide the following:  
Delivery, installation, operation, removal, pickup of all quoted materials/equipment 
Reference Materials
Project is quoted based on applicable/customer provided reference materials noted below: 
Plans
Job Walk 
Verbal / Written Request
Operating Parameters
Customer requests 4" DV100C pump for Primary and Standby.
Customer Responsibilities
It is the customer’s responsibility to inform RFR about prevailing wage at time of proposal. If RFR is informed after the quote is issued that 
certified payroll is required, quote will be subject to additional charges.  
 
Jobsite: 
Customer is responsible for: 
1. Informing RFR of any jobsite or general requirement(s) to perform work on location. 
2. Securing permits, fees, bonding, right of ways, vehicular/pedestrian traffic control, and security.  
3. Providing safe, secure access and egress to an adequate staging area throughout the job which could include brush clearing, grading, and 
removal or replacement of any landscape or hardscape in the temporary right of way for the equipment. 
4. Any damage to the environment including trees, vegetation, stream banks, or any other part of the site caused by the installation, removal, 
construction, pulling or dragging of equipment, or operation of the equipment that would require site restoration or environmental 
countermeasures. 
5. Any excavation, saw cutting, trench plating for the purpose of road crossings, backfilling, restoration, modification, or alteration of any 
permanent structure or site element including changes to pump pad preparation, suction, or discharge chambers during duration of job 
(including installation and removal). 
6. Traffic control including permits and barricades to limit traffic exposure to job site.
 
System:  
1. RFR will provide dedicated equipment with operator and fuel to perform all needed unloading, testing, operations, maintenance, relocating, 
cleaning, and reloading of provided equipment/system.
2. Customer will provide fueling.  
3. 
RFR 
will 
provide 
preventative 
maintenance 
as 
recommended 
by 
manufacturer 
or 
per 
the 
Rental 
Agreement.  https://rainforrentcorp.box.com/v/pumpmaintenance 
4. Customer will supply all needed water for the commissioning, startup, and system testing. Project specific criteria for hydrotesting can be 
provided at an additional charge.  
Proposal Number 1092-IND-2003666 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 2 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2003666
Sales Rep: Jon Wilson
Rain For Rent
5. Customer shall provide all water for flushing and sanitation.
6. RFR shall provide labor for flushing and sanitation.
7. By accepting this quotation, the customer has acknowledged that the equipment proposed herein is suitable for its intended application and 
accepts all liabilities associated with its use. Customer is responsible for compliance with appropriate liquid/material quality standards, 
regulations, and testing protocols to meet all federal, state, local and job location specific requirements. Customer is responsible for all 
waste materials associated with this equipment/system. 
Customer is responsible for: 
1. Any work in confined spaces. 
2. Protecting system from damage including any freeze protection necessary to safeguard equipment from damage. Should equipment become 
frozen and damaged, customer is responsible for repair of equipment. RFR can provide necessary freeze protection at an additional charge 
per executed change order. Equipment stays on rent until it can be returned. 
3. Using equipment in a safe and proper manner in accordance with manufacturers' recommendations, regulatory standards, and industry best 
practices. Improper usage may cause equipment/system failure, damage, possible incidents, injuries, and spills. 
4. Customer is responsible for identifying at-risk service laterals to evaluate and mitigate the potential for sewage backups. Customer must 
communicate the risk of flooding and other potential issues to affected property owners. This may require customer to install additional 
sewer plugs or backflow preventers.
5.  Customer will provide sewer plugs and any associated installation, monitoring, and removal of sewer plugs.
6. Customer is responsible for any residual fluids in system once project is concluded to remove and properly dispose of.
Rental Release: 
Contact the RFR office at 480-895-9225 to schedule rental release and equipment pickup when equipment/system is cleaned and ready to be 
released.  Flushing and cleaning of equipment must be performed to RFR’s standards prior to being called off rent. RFR personnel will perform a 
visual inspection. It is recommended to have a customer representative on-site during inspection. Equipment found not to be in “delivered 
condition” will not be picked up. 
Project Scheduling & Billing
This quote is valid for 30 days. For the quoted items, RFR requires a signed quote prior to scheduling, subject to crew and equipment availability.  
 
Customer acknowledges that availability of equipment/system and/or media will be confirmed at time of order. Additional freight charges may 
apply subject to mutually agreed upon change order.  
 
Billing  
1. Delivery and first week’s labor will be billed at the end of the first week of installation, supported by signed daily work tickets. Any additional 
labor will be billed weekly supported by signed day tickets.  
2. Delivery and labor for this project will be billed upon completion of the installation.  
Safety
Each employee is expected to adhere to the RFR Environmental, Health and Safety programs, which will protect the environment, the health and 
safety of the customer, employees, and others. RFR asks for your full cooperation to succeed in this expected outcome. 
Proposal Number 1092-IND-2003666 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 3 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2003666
Sales Rep: Jon Wilson
Rain For Rent
Achen-Gardner requests sewer bypass to support construction work.
Pricing is for 2 weeks with Pump Operation.
Equipment Rental = $4,193.60 (2 weeks)
Services: Delivery/Return hauling, Install, 2 weeks x 24 hour Pump Operation, Removal= $31,760.00.
Misc Fees are shown.
Details in Statement of Work.
Proposal Number 1092-IND-2003666 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 4 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2003666
Sales Rep: Jon Wilson
Rain For Rent
PROJECT COSTS
Estimated Rental Total
$4,193.60
Estimated Environmental Recovery Fees
$125.80
Total Estimated Recurring Charges
$4,319.40
MOBILIZATION & DE-MOB COSTS
Estimated Delivery
$170.67
Estimated Installation
$1,330.26
Estimated Removal
$1,136.54
Estimated Pickup
$170.67
Estimated Services
$29,120.00
GRAND TOTAL
$36,247.54
-Estimated costs do not include taxes
-Recurring rental project costs will be on a cycle/week/day basis+ tax
PO Number:
By signing this proposal, customer represents that he/she has read and agreed to both the Statement of Work and Quote Agreement sections, and
is also agreeing to the grand total amount listed above, plus any recommended optional items if accepted and initialed. If customer requires a
Purchase Order number to process and submit payment, it must be supplied to Rain for Rent at the time of acceptance of this proposal.
Proposal Acknowledgement
Date
Customer Signature
Customer Name
{{Fullname*}}
{{Signature*}} 
{{Signdate}}
RPP
$587.10
I have received and reviewed the Rental Protection Plan Agreement incorporated as the last page of this estimate. By initialing this paragraph, I
understand that I am agreeing to enter into and be bound by the terms of the Rental Protection Plan Program Agreement and that I am authorized
to enter into this Agreement on behalf of Customer. FOR ALL RENTALS OF EQUIPMENT, EXCEPT THOSE SPECIFICALLY EXCLUDED, YOU MAY EITHER
SHOW PROOF OF PROPERTY INSURANCE IN ACCORDANCE WITH INSURANCE REQUIREMENTS AND RENTAL AGREEMENT OR PURCHASE THE
RENTAL PROTECTION. THE PURCHASE OF THE RENTAL PROTECTION PLAN FOR RENTALS OF EQUIPMENT IS NOT MANDATORY AND MAY BE
DECLINED IF YOU HAVE PROOF OF ALL RISK PROPERTY INSURANCE AS REQUIRED BY CONTRACT.
Rental Protection Plan
{{Initial}}
Created Date: 1/5/2022
Proposal Number 1092-IND-2003666 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 5 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2003666
Sales Rep: Jon Wilson
Rain For Rent
Quote Agreement
If Customer has entered into a Master Service Agreement with Rain for Rent and there is a conflict between these terms and conditions of this Quotation Agreement and the Customer's Master Service
Agreement, then the terms and conditions in the Customer's Master Service Agreement signed by Rain for Rent will prevail. Availability of products and services is subject to change without notice.
Payment terms are net 30 days from invoice date. Interest at the rate of 18% per year shall be charged on any past due invoice. A Fuel Surcharge will be calculated and invoiced based on the diesel fuel
price as published by the Department of Energy on https://www.eia.gov/petroleum/gasdiesel An Environmental Recovery Fee shall apply to all rental charges invoiced for the duration of the rental
pursuant to this quote/Estimate to help offset direct and indirect costs associated with regulatory compliance, obtaining permits, and obtaining licenses. California Air Quality Fee will be added to the cost
of diesel pumps used in California only. This is a State mandated fee. Customer is prohibited from deducting retention from Rain for Rent invoices and charging Rain for Rent liquidated damages. Customer
is responsible for flushing and cleaning tanks, roll off boxes, pipelines, pumps, filters and other Rain for Rent equipment prior to return unless specifically agreed to by both parties in writing. The Terms
and Conditions of the Rain For Rent Rental and Hazardous Material and/or Non-Hazardous Waste Agreement, Credit Application/Master Rental & Sales Agreement, Invoice and this Quotation (also known
as the Rain for Rent Rental/Sale Estimate as may be referenced in any Master Service Agreement, Blanket Purchase Order, or any other contractual document executed between the parties) contain the
complete and final agreement between Rain for Rent and Customer and no other agreement in any way modifying or adding to any of said Terms and Conditions will be binding upon Rain for Rent unless
made in writing and signed by a Rain for Rent Corporate Officer or Rain for Rent authorized representative. The Customer cannot alter the equipment without Rain for Rent's prior written approval.
Customer is responsible for equipment, repairs, maintenance and damage, excluding normal wear and tear or damage caused by Rain for Rent. All returned equipment is subject to inspection by Rain for
Rent personnel. Damages and accrued rent will be invoiced to Customer while equipment is out of service for repairs. The Customer is responsible for damage caused by reactive, corrosive or abrasive
material; including, but not limited to sand, sodium hydroxide, chlorine, and acids. Customer must notify Rain for Rent immediately of any spill so that any necessary repairs to the system can be made and
to minimize service interruption. The Customer assumes all risks of loss due to operation and use of the equipment. Customer will provide "all risk" property insurance for rented equipment. Customer
shall pay Rain for Rent additional expenses caused by unforeseen or changing conditions, including, but not limited to, soil, underground conditions, rock formations, environmental conditions, weather
events, regulations or restrictions, hard pan, boulders, cesspools, gas lines, waterlines, drain pipes, underground electrical conduits or other above ground or underground obstructions. All equipment
rented or used products sold are provided "AS IS, WHERE IS" in their present condition. Rain for Rent makes no warranties, expressed or implied of any kind whatsoever with respect to the equipment or
products. Sold equipment is not to be rented. Customer agrees that customer is renting equipment or purchasing used products based on their judgment and evaluation, without reliance upon any
statements of representations by Rain for Rent, and that Rain for Rent is not responsible for any defects in their operation or for any repairs, parts or services, unless otherwise noted. All new products
sold are provided without warranty beyond the terms of such warranty offered by the manufacturer, if any. Customer must comply with all original manufacturer's terms and conditions for any warranty
claims that may arise. Neither Rain for Rent nor the manufacturer warranties the product if it has failed due to corrosion, misuse or damage; (2) it has been altered, repaired or modified in any way that
would adversely affect its operation; or (3) it was installed or operated other than in accordance with manufacturer's operating instructions. Products supplied by Rain for Rent are warranted to be free
from any defect in workmanship and material under conditions of normal use and service. Rain for Rent's obligation under this warranty is limited to replacing or repairing at the designated
manufacturer's or Rain for Rent facility any part or parts returned to it with transportation charges prepaid, which Rain for Rent determines in its sole discretion to be defective. This Quotation excludes
any additional costs to Rain for Rent associated with Owner Controlled Insurance (OCIP) or WRAP insurance programs that will be added to Rain for Rent's prices. De-watering, Roll-off, Vacuum boxes and
similar equipment are not liquid tight. Rentee accepts full responsibility for all losses, damages and costs caused by or arising out of spills, leakage or discharge from this equipment. Rain for Rent will not
be held liable for any structural or soils subsidence. This Quotation is valid for 30 days and is subject to credit approval. Rain for Rent will take every effort to protect our customers and employees. Due to
the current pandemic, all quoted equipment and services are subject to delay, change, or unilateral cancelation by Rain for Rent. Please be assured every effort will be made to execute the quote as
written. The customer is responsible to inform Rain for Rent of any jobsite hazards, precautions, or entry requirements relating to the Corona Virus prior to Rain for Rent personnel going onsite to perform
work or deliver equipment. This includes informing Rain for Rent if anyone at the jobsite has tested positive and provide a list of actions taken to protect Rain for Rent personnel.
If you elect to maintain All Risk Property Insurance coverage, and the certificate of insurance You provide to Rain for Rent to evidence Your insurance coverage expires or is cancelled for any reason, You
agree Rain for Rent may charge RPP for Your rentals until such time as You provide an acceptable and valid certificate of insurance to Rain for Rent. This Rental Protection Plan Program Agreement (this
"RPP Agreement") is entered into between the undersigned Rentor and Rentee in relation to the Master Rental and Sales Agreement (MRSA) between Rentor and Rentee. If Rentee has checked or
initialed, as applicable, the Rental Protection Plan Program (the "RPP Program") box on the quote, then Rentee has opted-in to the RPP Program and this RPPP Agreement shall supplement the MSRA
whether or not executed by Rentee. Rentee understands and agrees that the RPP Program is not insurance and that the RPP Program provides only limited coverage, as described below.1.Cost;
Deductible; Maximum Coverage; Rentee shall pay a fee equal to 14 percent (14%) of the rental charge for each covered item, which fee shall be listed on each invoice during which period Rentee has
opted to participate in the RPP Program. In the event of a Covered Occurrence, as defined below, Rentee shall further be responsible for the lesser of $500 or 10 percent (10%) of the total loss, as a
deductible. The maximum coverage available under the RPP Program is $150,000 per Covered Occurrence, whether or not there is more than one piece of equipment involved in the
occurrence.2.Coverage; The RPP Program provides coverage only for losses involving Covered Equipment, as defined below, in the following instances: fire that was not caused by Rentee's gross negligence
or willful misconduct; theft for which a police report was filed, and that occurred despite Rentee's reasonable precautions to protect and secure the covered equipment; and vandalism for which a police
report was filed (individually, "Covered Occurrence," and collectively, "Covered Occurrence"). The RPP Program provides coverage only for the following types of equipment: pumps, electric submersible
pumps, tanks, generators, light towers, filtration, boxes, heaters, spillguards, safety products, sprinklers, hoses, pipe, valves and fittings ("Covered Equipment"). Coverage does not extend to any
equipment not owned by Rentor such as re-rented equipment.3.Exclusions; The RPP program does not cover any equipment or event of loss that is not specifically described in Section 2.Without limiting
the foregoing, the RPP Program does not provide coverage for the following: misuse of equipment; willful abuse of equipment; failure to maintain equipment; failure to secure items from theft (including
but not limited to failing to store items in a fenced, locked area or failing to maintain personnel on site); damage or theft while in transit to or from a jobsite; corrosion from any source; any damage caused
by named storm events; any instance that occurs while the account is not in good standing, such as a default as defined in the MRSA or upon written notice of non-payment; and any occurrence not
reported to Rentor within 24 hours after the occurrence. The RPP program does not provide coverage for: electronic equipment (controls, instrumentation, and wiring), flow meters, water meters, wheel
wash systems & accessories, Freezesentry items, or tires.4.Claims; All claims must be submitted within 24 hours of the Covered Occurrence. Rentor's mechanic will inspect the equipment following any
claim. The mechanic's findings as to the cause of the damage and cost of repair will be final. In the event of a theft or vandalism, Rentee must also provide supporting evidence that the site was secured at
the time of loss.
Rental Protection Plan Program Agreement
Proposal Number 1092-IND-2003666 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 6 of 6

9229 S Hardy Drive  Tempe, AZ 85284
Phone: 480-626-5257   Email: Sales@cpepumps.com
Quote #:
CP21-2887
Job Name:
Customer:
Achen Gardner
Location:
550 S 79th Street
Chandler, AZ
Chandler AZ
Contact: 
Mark McLafferty
Phone:
602-877-9392
Email:
MMcLaffertyt@achen.com  
 
Rental Equipment
RATES
Qty
Unit
Rental Period
Description
Day
Week
4 Week
Total
2
ea.
Week
884.00
$      
2,652.00
$     
1,768.00
$        
2
ea.
Week
50.00
$        
150.00
$        
100.00
$           
1
ea.
Week
375.00
$      
1,125.00
$     
375.00
$           
2
ea.
Week
75.00
$        
225.00
$        
150.00
$           
650
ft
Week
0.24
$          
0.72
$            
156.00
$           
1
ea.
Week
158.33
$      
475.00
$        
158.33
$           
14
Day
1,560.00
$        
21,840.00
$      
14
Day
170.00
$           
2,380.00
$        
1
 
Sale
$950.00
 
 
950.00
$             
QUANTITIES ARE ESTIMATES
2 Week Rental Total
$30,584.67
QUANTITIES USED WILL BE BILLED
 
Delivery
$375.00
** This bypass is designed to pump 450gpm @ 20' TDH with
Pick-up
$375.00
     100% Pump redundancy **
Estimated Install Labor
$3,125.00
Estimated Removal Labor
$1,800.00
Estimated Sale Tax
80.78
$             
ESTIMATE TOTAL - 
$36,340.45
 
Prepared by:
Jerry Sheatz
Accepted by:
 
Date:
Date:
Subject to Terms and Conditions on Page 2
Estimate valid for 30 days from issuance date
Wednesday, December 15, 2021
Est. Fuel Burn 40 Gal Per day@$4.25Gal
PE Stamped Bypass Plan
18" Sewer Bypass
Dobson & Chaparral
4" Silenced Pumps
1 person days  24/7 @ $65.00 per Hr.
10' x 12' x 12" Spill Berms
18" to 24" Multi size Plug
6" X 20' Suction Stingers
24/7 Pump Watch 
6" DR17 HDPE Pipe
Misc. Elbows Pipe & Fittings

9229 S Hardy Drive  Tempe, AZ 85284
Phone: 480-626-5257   Email: Sales@cpepumps.com
Terms, Conditions & Specifications
1. Customer agrees to abide by the terms and conditions on the purchase or rental contract.
2. Quantities are estimates and system is designed with information supplied by the customer. Any additional
requirements will incur additional charges.
3. Customer responsible for all permits, traffic control, road crossings, etc.
4. Customer responsible for all FUEL & PM SERVICE during pump rentals.
5. Pump rate is based on 8 hour day, 48 hour week, 192 hour 4 week.
N/A
6. Overtime Charges, if applicable, are Computed: (Monthly Rate / 192) X .5 = O/T Charge Per Hour
N/A
7. Labor rate is for normal working hours. Weekend or nighttime will incur additional charges.
8.  Rental begins when equipment leaves CPE branch.  Pumping systems are on rent during installation.
JOB SPECIFIC TERMS, CONDITIONS & SPECIFICATIONS
 
9.  If Water Bridges are rented, they are placed under customer’s direction.  Customer accepts sole responsibility for placement, ongoing 
maintenance, and suitability for use in each specific traffic location.

Page 4 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
STEEL CASING
CASING
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6368879683
Trinity Product
TRIINITY
Unit Price
6022550234
Dana Kepner Co
DANAKEPNERCO
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
LF
35.00
24" STEEL CASING
2CAS24
190.2100
177.1500
0.0000
LF
70.00
36" STEEL CASING
2CAS36
270.3800
336.2300
Plugged Amount
Quoted Amount
0
25,584
0
29,736
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
25,584
29,736
Diff From Plug
25,584
29,736
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Trinity Products, LLC
1969 W. TERRA LN. O’ FALLON MO, 63366
Tel: (800) 456-7473
Fax: (636) 639-6258
Jan 05, 2022
Quote #: TPIQ55040
Project: Chandler Heights Uti...
QUOTE
Sales Rep:
Adam Manz
amanz@trinityproducts.com
636-887-9683 
REMIT TO:
Trinity Products LLC
PO Box 84103
Chicago, IL, 60689-4003
FOB:
Approx. Ship
Date:
Terms of Sale:
JOBSITE
TBD
NET 30
QUOTE TO:
Achen-Gardner Construction
SHIP TO:
Mark McLafferty
550 South 79th St.
Chandler , Arizona 85226
Tel: 480-940-1300
Job Site
Chandler , Arizona 85224
DESCRIPTION
QTY
UOM
UNIT PRICE
TOTAL
24" x .375" Nominal, New Trinity Lo-profile Spiral Weld Steel
Pipe, A252 Gr. 3, Domestic w/ MTR's, 1pc @ 35'
35
FT
$99.35
$3,477.25
36" x .375" Nominal, New Trinity Lo-profile Spiral Weld Steel
Pipe, A252 Gr. 3, Domestic w/ MTR's, 2pcs @ 35'
70
FT
$149.80
$10,486.00
Freight to Chandler, AZ - Steel Pipe
1
T/L
$6,300.00
$6,300.00
8" x 24", Stainless Steel Spacer with EPDM Liner, Center
Restrained
4
EA
$185.00
$740.00
12" x 36", Stainless Steel Spacer with EPDM Liner, Center
Restrained
4
EA
$295.00
$1,180.00
16" x 36", Stainless Steel Spacer with EPDM Liner, Center
Restrained
4
EA
$275.00
$1,100.00
8" x 24", EPDM Wrap-Around End Seal
2
EA
$170.00
$340.00
12" x 36", EPDM Wrap-Around End Seal
2
EA
$365.00
$730.00
16" x 36", EPDM Wrap-Around End Seal
2
EA
$340.00
$680.00
Freight to Chandler, Arizona - Spacers/End Seals
1
EA
$550.00
$550.00
Accepted by:
 
 
 
Mark McLafferty
Date
SUBTOTAL:
$25,583.25
ESTIMATED TAX:
$0.00
GRAND TOTAL:
$25,583.25
Comments:
All materials are subject to prior sale, mill rolling schedule and price fluctuations upon receipt of order.
Thank you,
Adam Manz
For more information please visit our website @ www.trinityproducts.com
Any claim(s) for damaged or incorrect must be made in writing within five (5) days of receipt of material to be considered valid. Due to the volatility of the steel and fuel markets, all quotations will be su
surcharges at time of order and/or shipment. These surcharges will be monitored monthly and adjusted accordingly. Any recommendations are for educational purposes only, not for commercial work
are subject to prior sale. Trinity Products, LLC is not responsible for delivery problems, delays or costs incurred due to shipping or trucking problems. IMPORTANT: Regarding All Coated Materials: Dama
coating from shipping and handling should be expected. Customer is responsible for all coating repairs. Also included in this agreement is the final pages, titled "Terms and Conditions of Sale of Goods"
part of this order.

TERMS & CONDITIONS OF THE SALE OF GOODS
1. Buyer shall indemnify, defend and hold Seller harmless from and against any and all claims whatsoever, demands, liabilities, causes of action, losses, damages,
costs and expenses, including, without limitation, attorneys' fees and claims for breach of contract, bodily injury (including death) or property damage, arising out
of or relating to Seller furnishing goods hereunder in accordance with shop drawings that were approved, approved as noted, or with respect to which no
exceptions were taken, or in accordance with plans, specifications or other design documents furnished by Buyer to Seller. A shop drawing shall be deemed
approved for all purposes and deemed consistent with plans, specifications and other design documents unless Buyer notifies Seller in writing of a specific
objection having merit within 14 days of receipt of the shop drawing
2. All materials and their attachments remain the property of Trinity Products, Inc. until all payments have been made in full.
3. Trinity Products LLC's sales price is exclusive of any applicable sales tax, use tax, and any other transaction taxes that may be imposed by any governmental entity or agent
thereof whether state, county, municipal, city or otherwise ("Governmental Entity"). The Customer shall be exclusively responsible for the complete payment of any sales, use
or other transaction taxes and shall pay all invoiced sales, use or other transaction taxes upon its receipt of materials from Trinity Products, LLC unless it provides Trinity
Products, LLC with a valid sales tax exemption certificate. In the event that any Governmental Entity at any time deems the Customer's sales tax exemption certificate to be
invalid or inapplicable or otherwise determines that the transaction is subject to a sales tax, use tax, or other transaction taxes the Customer shall immediately upon demand
provide Trinity Products, LLC and/or any of its successors and/or affiliates with monetary funds to cover all applicable sales tax, use tax, and any other transaction taxes that
may have been assessed, including any applicable interest and penalties as well as any costs whatsoever incurred by Trinity Products, LLC, including, but not limited to, any
attorney's fees and accountant's fees.
4. Seller accepts Buyer's order only upon the terms and conditions on the face side hereof and as set forth herein (collectively the "TERMS"), The TERMS form the entire
agreement between the parties. All other terms, proposals, negotiations, representations, recommendations, statements or agreements, whether made or issued
contemporaneously or previously, are excluded from and are not a part of this agreement, and have no binding or enforceable effect. This agreement shall be binding on the
parties and their respective successors and assigns. An e-mail or facsimile transmission by Seller to Buyer at Buyer's last known e-mail address or to Buyer's last known
facsimile number shall be deemed delivered to Buyer upon Seller's transmission thereof, regardless of whether Buyer later claims non-receipt.
5. Buyer's failure to object to any terms as proposed by Seller within ten (10) days after receipt of this Agreement shall be deemed to be Buyer's acceptance of those terms. In
order for any change or amendment to this order to be binding upon Seller it must be accepted in writing by Seller.
6. Unless Seller and Buyer otherwise agree in writing, Buyer shall pay Seller's invoice within thirty (30) days of the invoice date. Interest shall accrue on each late payment at
the lesser of: (a) the highest rate permitted by law, and (b) one and one-half percent per month compounded monthly. Should Seller choose to hire an attorney to collect
monies claimed due hereunder from Buyer to Seller, Buyer shall pay to Seller, in addition to all other sums due to Seller, the reasonable attorneys' fees, expert fees, costs and
other expenses Seller incurs to pursue collection from the Buyer.
7. Should Seller learn of any information that causes Seller concern about Buyer's ability to perform any of its obligations owing to Seller under this sale, Seller has the right to
request Buyer to provide Seller adequate assurance of due performance on such terms as are deemed reasonable by Seller when acting in good faith, including the right to
await full or partial payment from Buyer as demanded by Seller. In such an instance, Seller may suspend its performance pending Buyer's receipt of adequate assurance of
due performance in a manner found acceptable by Seller.
8. Acceptance of contracts is at all times subject to the Seller’s credit approval and the Seller reserves the right to require full or partial payment in advance if, in the Seller’s
opinion, the financial condition of the Buyer does not justify shipment of material. If at any time, in the Seller’s judgment, reasonable doubt exists as to the Buyer’s financial
responsibility, or if Buyer is past due in payment of any amount owing to Seller under this or any other contract, Seller reserves the right, without liability and without
prejudice to any other remedies to suspend performance, decline to ship, or stop any material in transit, until Seller receives payment of all amounts owing to Seller whether
or not due, or adequate assurance of such payment.
9. Although title to the materials does not transfer from the Buyer to the Seller until the materials have been received at the subject construction site, and payments have
been made by the Buyer to the Seller, all prices are F.O.B. Seller's warehouse in Missouri. Buyer shall arrange for all insurance. Risk of loss to each item sold hereunder passes
to Buyer immediately before that item is shipped from Seller's warehouse. Title, ownership, and risk of loss of products and materials provided by Trinity Products, LLC to the
Customer is transferred from Trinity Products, LLC to the Customer (1) at the site of the construction project after fabrication is complete and where the materials supplied by
Trinity Products, LLC will actually be used and/or installed upon final written acceptance by the Customer if payment in full has been made by the Customer to Trinity
Products, LLC, or (2) five (5) days after the aforementioned materials are delivered to the project site where they will be used and/or installed and payment in full has been
made by the Customer to Trinity Products, LLC, whichever occurs first. Actual and constructive possession is not transferred at any other time with the SOLE EXCEPTION of the
event of "Customer pickup" at any of the business locations of Trinity Products, LLC and/or its affiliate locations in the State of Missouri, in which case title, ownership, and risk
of loss are transferred from Trinity Products, LLC to the Customer in the State of Missouri once payment in full has been made by the Customer to Trinity Products, LLC and
the Customer will be invoiced and will pay all applicable Missouri sales/use taxes (including local tax). The Customer shall at all times remain exclusively responsible for
payment to Trinity Products, LLC of any and all sales tax, use tax and any other transaction taxes that may be determined to be applicable by any Governmental Entity that
emanate from this transaction(s) and shall also be responsible for any other costs incurred by Trinity Products, LLC as set forth in term #3 above.

10. It is agreed that no retainage is allowed on this sale for labor or materials and invoices will be paid in full within the thirty day period specified. Any legal fees or other
collection costs shall be borne by Buyer.
11. Seller shall not be responsible for any inability to perform under the TERMS or for any loss or damage due to delays or disruptions resulting directly or indirectly from, or
contributed to by, any act of God, action or omission of Buyer, act of civil or military authorities, fire, strike or other labor dispute, accident, flood, war, riot, terrorism,
transportation delay, inability to obtain material or fuel supplies, or any other circumstances beyond Seller's reasonable control, whether similar or dissimilar to any of the
foregoing.
12. Even if Seller has shop drawings prepared or Seller performs, or directs the performance, of other services in connection with this sale, this sale and the interpretation of
the TERMS are nevertheless governed by Missouri law, including Article 2 of Missouri's Uniform Commercial Code.
13. Except for items sold "AS IS", Buyer shall inspect the goods sold hereunder upon their delivery and shall, to preserve a claim against Seller, notify Seller in writing within
five (5) days thereafter of any defect or deficiency believed to be Seller's responsibility. Should any such item contain a defect, deficiency or non-conformity for which Seller is
responsible, Seller shall repair or replace the item, at Seller's option, or Seller shall instruct Buyer in writing to return that item with shipping instructions in which case Seller's
sole responsibility will be to return to Buyer the price paid therefor plus the cost for the return shipping if paid by the Buyer. Buyer's failure to furnish Seller timely notice of a
defect, deficiency or non-conformity shall constitute unequivocal acceptance of the item(s). Except for the express warranties forming a part of the TERMS, Seller disclaims all
express and implied warranties, including implied warranties of merchantability and fitness for a particular purpose. Seller’s liability to Buyer, whether in
contract, warranty, tort or otherwise, is limited to that permitted under the "terms", and shall in no event exceed the purchase price hereunder. Notwithstanding
anything seemingly to the contrary, Seller shall not be liable to Buyer for any special, incidental, indirect, liquidated or consequential damages, including without
limitation damages for loss of use, lost time, delay, disruption, interference, loss of productivity, inconvenience, lost income, or lost profits. Seller shall have no
obligation to repair, replace, or accept the return of any item sold "AS IS". If Buyer inspects any of the goods prior to the delivery contemplated hereunder, the five (5) day
notice period for those goods shall run from that pre-delivery inspection date.
14. Seller warrants that the material sold hereunder will conform to the description stated herein (subject to tolerances and variations consistent with current trade practices
and practical testing and inspection methods); that Seller will convey good title thereto (except for any liens or encumbrances that may be caused by Buyer); and that Seller
will repair or replace any defective or nonconforming material or repay the purchase price, as Seller may elect, if notified thereof in writing within one (1) year from the date of
delivery. This is Seller’s sole warranty with respect to the material. Seller makes no other warranty of any kind whatever express or implied and all implied warranties of
merchantability and fitness for a particular purpose which exceed the aforesaid obligation are hereby disclaimed by Seller and excluded from this transaction.
15. Should Buyer wish to cancel this order, Buyer may do so only if Seller agrees in writing and material falls under standard material. In the event of any such cancellation of
standard material, the purchase price shall become the sum of: (a) all costs and expenses, direct and indirect, incurred by Seller in producing the order up to the date Seller
agreed in writing to the cancellation, plus (b) Seller's reasonable cancellation costs, which shall include a restocking charge of thirty-five percent (35) percent of the items not
delivered to Buyer or returned by Buyer, plus (c) a reasonable markup for Seller's home office overhead and profit. Non-standard material is non-returnable and order may
not be canceled. Materials deemed non-standard are available from Seller upon request.
16. Any offer made by Seller as part of this Part of this Agreement may be revoked by Seller prior to the acceptance of this Agreement in its entirety by Buyer. In any event,
this offer shall only remain valid for thirty (30) days.
17. Buyer acknowledges that the "terms" form the contract and are deemed made in Missouri, and that Buyer, in relation to this sale, is deemed to be transacting business in
Missouri. any legal action concerning a claim or dispute involving Buyer and Seller, whether in contract, tort or otherwise, shall be brought in a state or federal court for the
county or district in which Seller's office is located, and Buyer consents to the jurisdiction of that court in Missouri. notwithstanding the foregoing, any claim or dispute arising
out of or relating to this contract, or to the goods or services supplied by Seller to Buyer, or to monies claimed due from Buyer to Seller, whether in contract, in tort, or
otherwise, shall be decided by binding arbitration before a single arbitrator. If Buyer's address on this order is located in the United States, the arbitration shall be conducted
under the construction industry arbitration rules of the American Arbitration Association. If Buyer's address on this order is located outside the United States, the arbitration
shall be conducted under the international arbitration rules of the International Centre for dispute resolution. The arbitration award shall be enforceable in the state or
federal court mentioned above. The arbitration locale shall be St. Louis, Missouri. Nothing herein shall be construed as preventing Seller from enforcing any claim or right to a
mechanic's lien or any claim or right against a bond regardless of where such a claim must be filed or enforced.
18. Pricing is based on a continuous manufacturing schedule. Should this process be interrupted through no fault of the Seller. Seller shall be entitled to additional
compensation. Any cost associated with such delays shall be identified by Seller and agreed to by Buyer prior to continuation with manufacturing.
19. Buyer will proceed with changes in the work herein specified only upon receipt of a written order from Buyer specifying the requested change and containing an agreed
price and schedule adjustment.
20. Buyer’s exclusive remedy against Seller for any damages suffered by Buyer in connection with the material and arising out of this transaction shall be for breach of
contract, and Sellers’ liability in this regard shall be limited to repair or replacement of defective or nonconforming material or repayment of the purchase price paid therefore
by Buyer, as Seller may in its sole discretion elect. Because the sales price herein makes no provision for such risk, Seller shall in no event be liable to Buyer for any special or
consequential damages including, but not limited to, erection costs, lost profits, good will, loss of time, unabsorbed overhead, inconvenience or commercial loss. Any action
for breach of this contract must be commenced within one (1) year after the cause of action shall occur, and no such action may be maintained which is not commenced with
in such period.

21. If any provision of this Purchase Order, or portion of any provision, is declared or found to be unenforceable, the balance of this Purchase Order or such provision shall be
interpreted and enforced to the greatest extent possible as if the unenforceable provision or portion had never been a part hereof. In particular, if any interest rate provided
for herein is higher than that permitted by applicable law, it shall automatically be amended to the highest legal rate.

CHANDLER HEIGHTS UTILITY RELOCATIONS -CMAR
DOBSON / CHAPPARAL
PLEASE BE AWARE! THE PROPOSED CHINA TARIFF (SECTION 301, LIST 3) MAY AFFECT PRODUCTS OFFERED IN THIS 
QUOTATION. IF THE TARIFF IS IMPLEMENTED, THE ACTUAL INCREASE IN PRICING WILL BE PASSED ON.
Approximate Projected Lead Time for Delivery of Materials Listed on this Quotation is 90+ Days for Water & 
Sewer Projects and 180+ Days for Water Meters and/or Radios
BO122921B
Lex Cassiere
ACHEN GARDNER CONST - PHOENIX
Quote:
Sales Rep:
Customer:
ACHEN GARDNER LIST
TakeOff Name:
CHANDLER
Project Location:
Bid Date:
Phoenix
2401 South 19th Avenue  
Phoenix, AZ  85009
Phone: 602.255.0234
On Call: 602.757.7991
Standard Hours: 6:00a to 4:00p Monday through Friday
Phone:
eMail:
602.369.2443
lCassiere@danakepner.com
Quote Printed: Wednesday, January 5, 2022
Page 1 of 11

Terms and Conditions
Due to the extreme volatility of raw material, energy, and transportation costs, the prices shown in this quotation are 
only valid for 30 days, with the exception of PVC Pipe prices.  PVC prices will be subject to the Manufacturers price in 
effect at the time of shipment.  Order releases and shipments delivered 60 days beyond the order date, or as stipulated, 
will be subject to the price in effect at the time of shipment.
Totals are for estimating purposes only.  Unit prices prevail.
Dana Kepner Company, Inc. is not responsible for manufacturers ability to ship material or hold prices.
Due to volatility in the copper commodity market, copper tubing pricing will be determined at time of shipment.
Quoted totals do not include taxes.
PVC and HDPE pricing is based on manufacturer's ability to direct ship to the jobsite.
This quote is for the supply of material only.
The materials specifications, sizes, and quantities listed are the interpretations of Dana Kepner Company, Inc. and are 
believed to be correct, but are not guaranteed.
Connecting hardware for Non-DK supplied material is not included in bid, unless otherwise noted.
PVC Sewer Pipe may come in 13', 14', 20', & 22' lengths, based on availability. Regardless of product description in this 
proposal.
Clay Pipe and Fittings are Non-Returnable.
PVC and HDPE material are considered Freight-On-Board from the manufacturer.
Terms are net 30, and Quote is based on award of complete project.
All returns must be approved by management and will have a minimum 15% restock charge.  Nonstocks are not 
returnable, and are shaded gray within this quote.
Manufacturer standard warranty applies.
Thank you for the opportunity to bid this project.
Assumptions
Chandler specifications will prevail in this proposal.
Quote Printed: Wednesday, January 5, 2022
Page 2 of 11

WATER
8" DIP WATERLINE
$7,395.88
24" STEEL CASING (8" WATERLINE)
$6,200.27
8" GATE VALVE
$4,221.06
12" DIP WATERLINE
$12,734.23
36" STEEL CASING (12" WATERLINE)
$11,703.62
12" GATE VALVE
$6,655.54
16" DIP WATERLINE
$49,759.31
36" STEEL CASING (16" WATERLINE)
$11,832.28
16" GATE VALVE
$13,677.26
1" COMBO AIR VAC VALVE
$2,675.65
WATER Total:
$126,855.10
SEWER
15" VCP SEWER
$3,457.87
SEWER Total:
$3,457.87
Total Quote before Taxes:
$130,312.97
Quote Summary
Quote Printed: Wednesday, January 5, 2022
Page 3 of 11

WATER
8" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
Qty
Unit
Description
Price
Total Price
1
108.0 FT
8"X18'1-1/2" PC350 DI PI PE TYTON JOINT, CMNT LIN DUCTILE 
IRON PIPE-ANSI A21.51
$28.63
$3,092.04
2
4.0 HNDRD 20"X400' BLACK POLY TUBE PERFORATED EVERY 20'
$43.73
$174.92
3
1.0 ROLL
3"X1000' DETECTABLE TAPE - WATER - BLUE
$30.77
$30.77
4
3.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$19.44
5
500.0 FT
14 GAUGE TRACER WIRE, BL UE, 30-MIL, HI-STR 250#
$0.16
$80.00
6
2.0 EA
8" FIELD LOK GASKET 
$117.64
$235.28
7
2.0 EA
8" FIELD LOK 350 GASKET (EPDM)(I)
$180.59
$361.18
8
5.0 EA
8" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$187.20
$936.00
9
17.0 EA
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$45.65
$776.05
10
17.0 EA
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$28.80
$489.60
11
1.0 EA
8" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$189.00
$189.00
12
1.0 EA
16X8" MJ TEE, CL, SSB, DI, LESS ACCS
$838.80
$838.80
13
2.0 EA
8" MJ CAP, SSB, DI, LESS ACCS
$86.40
$172.80
$7,395.88
Average Cost per FT:
$73.96
Total Units: 100.0
24" STEEL CASING (8" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
1.0 EA
24"X 35' LONG STEEL CASING PIPE, .375 WALL 
$5,133.33
$5,133.33
2
4.0 EA
CSS8-0824-SS-CR STAINLESS STEEL CASING SPACER 2X2 
PATTERN 8” WIDE
$224.27
$897.08
3
2.0 EA
ESW0824 END SEAL WRAP
$84.93
$169.86
$6,200.27
Average Cost per FT:
$177.15
Total Units: 35.0
Quote Printed: Wednesday, January 5, 2022
Page 4 of 11

8" GATE VALVE
Qty
Unit
Description
Price
Total Price
1
2.0 EA
8" MJ RW DI OL VALVE, LESS ACCS
$1,122.76
$2,245.52
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
6
4.0 EA
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$45.65
$182.60
7
4.0 EA
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$28.80
$115.20
$4,221.06
Average Cost per Each:
$2,110.53
Total Units: 2.0
12" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
** CAN USE THE REMAINDER OF THE DETECTABLE MARKING TAPE & TRACER WIRE FROM THE 8" 
SUBSECTION **
Qty
Unit
Description
Price
Total Price
1
108.0 FT
12"X18' 1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE 
IRON PIPE-ANSI A21.51
$43.87
$4,737.96
2
2.0 HNDRD 30"X200' BLACK POLY TUBE PERFORATED EVERY 20'
$63.64
$127.28
3
3.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$19.44
4
2.0 EA
12" FIELD LOK GASKET  
$170.85
$341.70
5
2.0 EA
12" FIELD LOK 350 GASKET (EPDM)(I)
$266.82
$533.64
6
17.0 EA
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$98.57
$1,675.69
7
17.0 EA
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$38.41
$652.97
8
6.0 EA
12" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$399.00
$2,394.00
9
2.0 EA
12"MJ CAP,CL,SSB,DI,  LESS ACCS
$161.40
$322.80
10
1.0 EA
12" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$304.20
$304.20
11
1.0 EA
16X12" MJ TEE, CL, SSB, DI, LESS ACCS
$1,624.55
$1,624.55
$12,734.23
Average Cost per FT:
$127.34
Total Units: 100.0
Quote Printed: Wednesday, January 5, 2022
Page 5 of 11

36" STEEL CASING (12" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
40.0 FT
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 
WALL
$246.67
$9,866.80
2
4.0 EA
CSS8-1236-SS-CR STAINLESSS STEEL CASING SPACER 2X2 
PATTERN 8” WIDE
$366.67
$1,466.68
3
2.0 EA
ESW1236 END SEAL WRAP
$185.07
$370.14
$11,703.62
Average Cost per FT:
$334.39
Total Units: 35.0
12" GATE VALVE
** QUOTED 2 GATE VALVES. CUSTOMER TO VERIFY WHAT IS NEEDED **
Qty
Unit
Description
Price
Total Price
1
2.0 EA
12" MJ RW DI OL VALVE, LESS ACCS
$2,214.94
$4,429.88
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
6
4.0 EA
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$98.57
$394.28
7
4.0 EA
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$38.41
$153.64
$6,655.54
Average Cost per Each:
$3,327.77
Total Units: 2.0
Quote Printed: Wednesday, January 5, 2022
Page 6 of 11

16" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
** CAN USE THE REMAINDER OF THE DETECTABLE MARKING TAPE & TRACER WIRE FROM THE 8" 
SUBSECTION **
Qty
Unit
Description
Price
Total Price
1
270.0 FT
16"X18'1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE 
IRON PIPE-ANSI A21.51
$70.20
$18,954.00
2
6.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$38.88
3
3.1 HNDRD 34"X308' BLACK POLY TUBE (14-16") 8 MIL
$66.72
$205.50
4
7.0 EA
16" FIELD-LOK GASKET 
$396.13
$2,772.91
5
2.0 EA
16" FIELD LOK 350 GASKET (EPDM)(I)
$621.35
$1,242.70
6
4.0 EA
16" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$903.00
$3,612.00
7
44.0 EA
16" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$186.75
$8,217.00
8
44.0 EA
16" MJ P R GASKET 
$23.54
$1,035.76
9
528.0 EA
3/4X5" COR-TEN TEE HEAD BOLT, WITH NUT
$3.63
$1,916.64
10
4.0 EA
16" MJ 45 BEND, CL, SSB, DI, LESS ACCS
$645.60
$2,582.40
11
8.0 EA
16" L P MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$581.40
$4,651.20
12
1.0 EA
16" FLANGED CROSS C110, CL, TC
$2,627.12
$2,627.12
13
2.0 EA
16" MJXFLG ADAPTOR, CL, SSB, DI, LESS ACCS
$627.60
$1,255.20
14
2.0 EA
16" MJ CAP, SSB, DI, LESS ACCS
$324.00
$648.00
$49,759.31
Average Cost per FT:
$191.38
Total Units: 260.0
36" STEEL CASING (16" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
40.0 FT
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 
WALL
$246.67
$9,866.80
2
4.0 EA
CSS8-1636-SS-CR STAINLESSS STEEL CASING SPACER 2X3 
PATTERN 8” WIDE
$406.07
$1,624.28
3
2.0 EA
ESW1636 END SEAL WRAP
$170.60
$341.20
$11,832.28
Average Cost per FT:
$338.07
Total Units: 35.0
Quote Printed: Wednesday, January 5, 2022
Page 7 of 11

16" GATE VALVE
Qty
Unit
Description
Price
Total Price
1
2.0 EA
16" MJ X FLG RW DI OL VALVE, LESS ACCS
$5,999.76
$11,999.52
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
$13,677.26
Average Cost per Each:
$6,838.63
Total Units: 2.0
1" COMBO AIR VAC VALVE
** QUOTED PER THE CUSTOMERS RFQ. CUSTOMER TO VERIFY THAT ALL MATERIAL MEETS CHANDLER 
SPECS **
** CUSTOMER TO VERIFY ALL MATERIAL NEEDED **
Qty
Unit
Description
Price
Total Price
1
1.0 EA
202B-1438 X 1" IP FORD BRASS SADDLE DOUBLE STRAP TO 
FIT13.20 TO 14.38 OD PIPE
$251.71
$251.71
2
1.0 EA
202B-962X1"IP FORD BRASS SADDLE DOUBLE STRAP TO 
FIT9.05 TO 9.62 OD PIPE
$173.62
$173.62
3
60.0 FT
1"X20' K HARD COPPER TUBE
$8.81
$528.60
4
8.0 EA
1" SOLDER JOINT 90 BEND 
$3.37
$26.96
5
2.0 EA
NL 1" FB1100 FORD CORP STOP (BALL CORP)
$86.21
$172.42
6
2.0 EA
NL 1" L84-44 FORD PJ ELL 1\ MALE IRON PIPE THREAD TO 1\ 
PACK JOINTFOR COPPER OR PLASTIC TUBING (CTS)
$37.01
$74.02
7
2.0 EA
NL B11-444 1" FORD BALL VALVE WITH FEMALE IRON PIPE 
THREAD BOTH ENDS
$108.38
$216.76
8
2.0 EA
NL 1 X 6" BRASS NIPPLE 
$13.21
$26.42
9
2.0 EA
1" 90 ELL, THREADED, NO LEAD BRASS
$8.50
$17.00
10
2.0 EA
1" ARI D-040-1" NYLON BASE AIR VAC
$258.41
$516.82
11
4.0 EA
NO 4 CONCRETE METER BOX, 22X33"
$89.17
$356.68
12
2.0 EA
POLYMER CONCRETE MAG #4 SOLID COVER, "WATER"
$157.32
$314.64
$2,675.65
Average Cost per Each:
$1,337.83
Total Units: 2.0
Quote Printed: Wednesday, January 5, 2022
Page 8 of 11

SEWER
15" VCP SEWER
Qty
Unit
Description
Price
Total Price
1
75.0 FT
15"X 7.5' CLAY PIPE, JCP
$42.17
$3,162.75
2
1.0 ROLL
ADEKA SWELL SEAL X 33' (4"-24")
$127.26
$127.26
3
2.0 EA
15" CLAY COUPLING 
$70.93
$141.86
4
1.0 EA
GALLON CLAY PIPE LUBE 
$26.00
$26.00
$3,457.87
Average Cost per FT:
$48.03
Total Units: 72.0
Quote Printed: Wednesday, January 5, 2022
Page 9 of 11

Prod ID
Description
Unit
Qty
Unit Price Total Price
0308350
8"X18'1-1/2" PC350 DI PI PE TYTON JOINT, CMNT LIN DUCTILE IRON 
PIPE-ANSI A21.51
FT
108.0
$28.63
$3,092.04
0312350
12"X18' 1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE IRON 
PIPE-ANSI A21.51
FT
108.0
$43.87
$4,737.96
0316350
16"X18'1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE IRON 
PIPE-ANSI A21.51
FT
270.0
$70.20
$18,954.00
03GFL06EPDMNS
16" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$621.35
$1,242.70
03GFL08
8" FIELD LOK GASKET 
EA
2.0
$117.64
$235.28
03GFL08EPDMNS
8" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$180.59
$361.18
03GFL12
12" FIELD LOK GASKET  
EA
2.0
$170.85
$341.70
03GFL12EPDMNS
12" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$266.82
$533.64
03GFL16
16" FIELD-LOK GASKET 
EA
7.0
$396.13
$2,772.91
09120H
1"X20' K HARD COPPER TUBE
FT
60.0
$8.81
$528.60
17C1575JCPNS
15"X 7.5' CLAY PIPE, JCP
FT
75.0
$42.17
$3,162.75
17CLUBE
GALLON CLAY PIPE LUBE 
EA
1.0
$26.00
$26.00
18BG0840
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
EA
21.0
$28.80
$604.80
18BG1245
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
EA
21.0
$38.41
$806.61
18L0890
8" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
5.0
$187.20
$936.00
18L08C
8" MJ CAP, SSB, DI, LESS ACCS
EA
2.0
$86.40
$172.80
18L08SL
8" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
1.0
$189.00
$189.00
18L1290
12" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
6.0
$399.00
$2,394.00
18L12C
12"MJ CAP,CL,SSB,DI,  LESS ACCS
EA
2.0
$161.40
$322.80
18L12SL
12" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
1.0
$304.20
$304.20
19G16
16" MJ P R GASKET 
EA
44.0
$23.54
$1,035.76
19L1608T
16X8" MJ TEE, CL, SSB, DI, LESS ACCS
EA
1.0
$838.80
$838.80
19L1612T
16X12" MJ TEE, CL, SSB, DI, LESS ACCS
EA
1.0
$1,624.55
$1,624.55
19L1645
16" MJ 45 BEND, CL, SSB, DI, LESS ACCS
EA
4.0
$645.60
$2,582.40
19L1690
16" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
4.0
$903.00
$3,612.00
19L16AMF
16" MJXFLG ADAPTOR, CL, SSB, DI, LESS ACCS
EA
2.0
$627.60
$1,255.20
19L16C
16" MJ CAP, SSB, DI, LESS ACCS
EA
2.0
$324.00
$648.00
19L16SL
16" L P MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
8.0
$581.40
$4,651.20
20B5
3/4X5" COR-TEN TEE HEAD BOLT, WITH NUT
EA
528.0
$3.63
$1,916.64
30FXD1616NS
16" FLANGED CROSS C110, CL, TC
EA
1.0
$2,627.12
$2,627.12
311108
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE (COLOR 
CODED BLACK)
EA
21.0
$45.65
$958.65
311112
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
EA
21.0
$98.57
$2,069.97
311116
16" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
EA
44.0
$186.75
$8,217.00
33106NL
NL 1 X 6" BRASS NIPPLE 
EA
2.0
$13.21
$26.42
Material List
Quote Printed: Wednesday, January 5, 2022
Page 10 of 11

Prod ID
Description
Unit
Qty
Unit Price Total Price
34190NL
1" 90 ELL, THREADED, NO LEAD BRASS
EA
2.0
$8.50
$17.00
41ARID041
1" ARI D-040-1" NYLON BASE AIR VAC
EA
2.0
$258.41
$516.82
43DL08ML
8" MJ RW DI OL VALVE, LESS ACCS
EA
2.0
$1,122.76
$2,245.52
43DL12ML
12" MJ RW DI OL VALVE, LESS ACCS
EA
2.0
$2,214.94
$4,429.88
43DL16FML
16" MJ X FLG RW DI OL VALVE, LESS ACCS
EA
2.0
$5,999.76
$11,999.52
51564IN
TYPE C 564 VALVE BOX W/NYLON WATER LID
EA
6.0
$242.93
$1,457.58
64202B09624I
202B-962X1"IP FORD BRASS SADDLE DOUBLE STRAP TO FIT9.05 TO 
9.62 OD PIPE
EA
1.0
$173.62
$173.62
64202B14384I
202B-1438 X 1" IP FORD BRASS SADDLE DOUBLE STRAP TO FIT13.20 
TO 14.38 OD PIPE
EA
1.0
$251.71
$251.71
67B11444NL
NL B11-444 1" FORD BALL VALVE WITH FEMALE IRON PIPE THREAD 
BOTH ENDS
EA
2.0
$108.38
$216.76
67FB11004NL
NL 1" FB1100 FORD CORP STOP (BALL CORP)
EA
2.0
$86.21
$172.42
67L8444NL
NL 1" L84-44 FORD PJ ELL 1\ MALE IRON PIPE THREAD TO 1\ PACK 
JOINTFOR COPPER OR PLASTIC TUBING (CTS)
EA
2.0
$37.01
$74.02
68S190
1" SOLDER JOINT 90 BEND 
EA
8.0
$3.37
$26.96
82CMB4
NO 4 CONCRETE METER BOX, 22X33"
EA
4.0
$89.17
$356.68
82PCL4
POLYMER CONCRETE MAG #4 SOLID COVER, "WATER"
EA
2.0
$157.32
$314.64
8820400BLK
20"X400' BLACK POLY TUBE PERFORATED EVERY 20'
HNDRD
4.0
$43.73
$174.92
8830200BLK
30"X200' BLACK POLY TUBE PERFORATED EVERY 20'
HNDRD
2.0
$63.64
$127.28
8834308BLK
34"X308' BLACK POLY TUBE (14-16") 8 MIL
HNDRD
3.1
$66.72
$205.50
88TAPEPR
2"X100' POLY TAPE, PRINTED CORROSION
EA
12.0
$6.48
$77.76
94AMC2005T
ADEKA SWELL SEAL X 33' (4"-24")
ROLL
1.0
$127.26
$127.26
94C011515
15" CLAY COUPLING 
EA
2.0
$70.93
$141.86
94SP055SH
5" X 5' CAST IRON SH SOIL PIPE
FT
30.0
$49.93
$1,497.90
952437535NS
24"X 35' LONG STEEL CASING PIPE, .375 WALL 
EA
1.0
$5,133.33
$5,133.33
953637540RLNS
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 WALL
FT
80.0
$246.67
$19,733.60
95CSS80824SSCRNS
CSS8-0824-SS-CR STAINLESS STEEL CASING SPACER 2X2 PATTERN 8” 
WIDE
EA
4.0
$224.27
$897.08
95CSS8123SSCRNS
CSS8-1236-SS-CR STAINLESSS STEEL CASING SPACER 2X2 PATTERN 8” 
WIDE
EA
4.0
$366.67
$1,466.68
95CSS81636SSCRNS
CSS8-1636-SS-CR STAINLESSS STEEL CASING SPACER 2X3 PATTERN 8” 
WIDE
EA
4.0
$406.07
$1,624.28
95ESW0824NS
ESW0824 END SEAL WRAP
EA
2.0
$84.93
$169.86
95ESW1236NS
ESW1236 END SEAL WRAP
EA
2.0
$185.07
$370.14
95ESW1636NS
ESW1636 END SEAL WRAP
EA
2.0
$170.60
$341.20
95TDWB3
3"X1000' DETECTABLE TAPE - WATER - BLUE
ROLL
1.0
$30.77
$30.77
95WT1430BLUHS
14 GAUGE TRACER WIRE, BL UE, 30-MIL, HI-STR 250#
FT
500.0
$0.16
$80.00
97SDR
SMALL DIRT RING 
EA
6.0
$81.79
$490.74
97VSE8NS
OES 8' VALVE STEM EXTENSION , GRAY
EA
6.0
$264.50
$1,587.00
Total before Taxes:
$130,312.97
Quote Printed: Wednesday, January 5, 2022
Page 11 of 11

Page 5 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
PIPE PACAKGE
PIPEPK
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6024958420
Ferguson Water
FERGUSONWATE
Unit Price
4809267003
Core&Main
COREMAIN
Unit Price
6022550234
Dana Kepner Co
DANAKEPNERCO
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
EA
2.00
1" COMBO AIR VAC
2CAV1
0.0000
1,171.5400
1,337.8300
0.0000
LF
70.00
12" DIP WATERLINE
2DIP12
0.0000
165.1500
181.9200
0.0000
LF
260.00
16" DIP WATERLINE
2DIP16
0.0000
173.2100
191.3900
0.0000
LF
70.00
8" DIP WATERLINE
2DIP8
0.0000
102.2300
105.6600
0.0000
EA
2.00
12" GATE VALVE
2GV12
0.0000
3,051.9500
3,327.7700
0.0000
EA
2.00
16" GATE VALVE
2GV16
0.0000
6,858.1200
6,838.6300
0.0000
EA
2.00
8" GATE VALVE
2GV8
0.0000
1,909.8000
2,110.5300
0.0000
LF
70.00
15" VCP
2VCP15
0.0000
46.6700
49.4000
Plugged Amount
Quoted Amount
0
0
0
93,001
0
100,580
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
0
Totals
0
93,001
100,580
Diff From Plug
0
93,001
100,580
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

ACHEN GARDNER CONSTRUCTION LLC
550 S 79TH STREET
CHANDLER, AZ 85226
Contact: Mark McLafferty
(T) (480) 940-1300
mmclafferty@achen.com

Job
Chandler Heights Utility Relocates Dobson /
Chapparal
Chandler, AZ
Maricopa County
Bid Date: 12/29/2021
Bid #: 2129460
Sales Representative
Vernon Pattan
(T) 480-926-7003
(F) 480-926-7050
Vern.Pattan@coreandmain.com

Core & Main
1410 W Harvard Ave
Gilbert, AZ 85233
(T) 480-926-7003
01/06/2022 - 2:30 PM
Actual taxes may vary
Page 1 of 4
Bid Proposal for Chandler Heights Utility Relocates
Dobson / Chapparal
CUSTOMER
CONTACT
NOTES

Seq# Qty
Description
Units
Price
Ext Price
DUE TO CURRENT SUPPLY CHAIN DISRUPTIONS, MATERIALS
ARE SUBJECT TO PRICING AT TIME OF SHIPMENT. MATERIAL
AVAILABILITY AND TIMELINESS OF SHIPMENTS CANNOT BE
GUARANTEED. THIS TERM SUPERSEDES ALL OTHER
CONTRACTUAL PROVISIONS.
10
8" DIP WATERLINE
20 108 8 TJ PR350 DI PIPE
FT
26.48 2,859.84
30
2
8 TJ FIELD LOK 350 GASKET SBR
EA
123.52
247.04
 
 
50
1
8 SURE STOP LOCKING GASKET
EA
160.15
160.15
 
EPDM HEAT RATED
 
 
80
5
8 MJ 90 C153 IMP
EA
174.14
870.70
90
17 8 TUFGRIP DI TLD-8 L/ACC (I)
EA
43.70
742.90
100 17 8 MJ REGULAR ACC SET L/GLAND
EA
25.80
438.60
110
1
8 MJ L/P SLV C153 IMP
EA
175.81
175.81
120
1
16X8 MJ TEE C153 IMP
EA
780.28
780.28
130
2
8 MJ CAP C153 IMP
EA
80.37
160.74
140
2
16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
273.74
150
2
16 MJ REGULAR ACC SET L/GLAND
EA
56.19
112.38
 
 
170 340 20"X340' POLYWRAP BLK F/6"-8" BS (W/20'PERF)
FT
0.59
200.60
180
2
T-10-2 UPC 10 MIL TAPE 2"X100'
EA
8.00
16.00
190 500 WIRE 14/1 X 500 UF BLUE SOLID FEED 500' ROLL
FT
0.13
65.00
200
1
3X1000' DET TAPE WATER BLUE
RL
52.03
52.03
SUBTOTAL 7,155.81
 
 
220
8" GATE VALVE
230
2
8 F6100 MJ RW GV OL ON L/ACC CLOW GATE VALVE EPOXY COATED W/STAINLESS STEEL BOLTS &
NUTS
EA
1,118.23 2,236.46
240
4
8 TUFGRIP DI TLD-8 L/ACC (I)
EA
43.70
174.80
250
4
8 MJ REGULAR ACC SET L/GLAND
EA
25.80
103.20
260
4
36 564-A BOTTOM ONLY IMP
EA
66.88
267.52
270
2
24 562-A BOTTOM ONLY IMP
EA
47.75
95.50
280
2
16 562-A TOP ONLY IMP
EA
47.03
94.06
290
2
SWSERVICE NPR600-WA 562A POLYM
EA
42.31
84.62
300
2
DC457 DEBRIS CAP-BLUE
EA
57.69
115.38
310
2
8'0" MAG EXT STEM ONLY
EA
253.66
507.32
320
2
VLV STEM EXT SMALL DIRT RING
EA
70.45
140.90
SUBTOTAL 3,819.76
 
 
340
12" DIP WATERLINE
350 108 12 TJ PR350 DI PIPE
FT
40.56 4,380.48
01/06/2022 - 2:30 PM
Actual taxes may vary
Page 2 of 4
ACHEN GARDNER CONSTRUCTION LLC
Job Location: Chandler, AZ
Bid Date: 12/29/2021
Core & Main
2129460
Core & Main
1410 W Harvard Ave
Gilbert, AZ 85233
Phone: 480-926-7003
Fax: 480-926-7050
Bid Proposal for Chandler Heights Utility Relocates Dobson / Chapparal

Seq# Qty
Description
Units
Price
Ext Price
360
2
12 TJ FIELD LOK 350 GASKET SBR
EA
179.39
358.78
 
 
380
2
12 SURE STOP LOCKING GASKET
EA
241.65
483.30
 
EPDM HEAT RATED
 
 
410 17 12 TUFGRIP DI TLD-12 L/ACC (I)
EA
94.36
1,604.12
420 17 12 MJ REGULAR ACC SET L/GLAND
EA
35.55
604.35
430
6
12 MJ 90 C153 IMP
EA
371.16
2,226.96
440
2
12 MJ CAP C153 IMP
EA
150.14
300.28
450
1
12 MJ L/P SLV C153 IMP
EA
282.98
282.98
460
1
16X12 MJ TEE C153 IMP
EA
932.65
932.65
470
2
16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
273.74
480
2
16 MJ REGULAR ACC SET L/GLAND
EA
56.19
112.38
SUBTOTAL 11,560.02
 
 
500
12" GATE VALVE
510
2
12 F6100 MJ RW GV OL ON L/ACC CLOW GATE VALVE EPOXY COATED W/STAINLESS STEEL
BOLTS & NUTS
EA
2,206.36
4,412.72
520
4
12 TUFGRIP DI TLD-12 L/ACC (I)
EA
94.36
377.44
530
4
12 MJ REGULAR ACC SET L/GLAND
EA
35.55
142.20
540
2
36 564-A BOTTOM ONLY IMP
EA
66.88
133.76
550
2
24 562-A BOTTOM ONLY IMP
EA
47.75
95.50
560
2
16 562-A TOP ONLY IMP
EA
47.03
94.06
570
2
SWSERVICE NPR600-WA 562A POLYM
EA
42.31
84.62
580
2
DC457 DEBRIS CAP-BLUE
EA
57.69
115.38
590
2
8'0" MAG EXT STEM ONLY
EA
253.66
507.32
600
2
VLV STEM EXT SMALL DIRT RING
EA
70.45
140.90
SUBTOTAL
6,103.90
 
 
620
16" DIP WATERLINE
630 270 16 TJ CL50 PR350 DI PIPE
FT
65.64
17,722.80
640
7
16 TJ FIELD LOK 350 GASKET SBR
EA
415.95
2,911.65
 
 
660
2
16 SURE STOP LOCKING GASKET
EA
540.24
1,080.48
 
EPDM HEAT RATED
 
 
690
4
16 MJ 90 C153 IMP
EA
840.00
3,360.00
700 44 16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
6,022.28
710 44 16 MJ REGULAR ACC SET L/GLAND
EA
56.19
2,472.36
720
4
16 MJ 45 C153 IMP
EA
600.56
2,402.24
730
8
16 MJ L/P SLV C153 IMP
EA
540.84
4,326.72
740
1
16 FLG CROSS C110 IMP
EA
2,489.30
2,489.30
750
2
16 MJXFLG ADPT C153 IMP
EA
583.81
1,167.62
760
2
16 MJ CAP C153 IMP
EA
301.40
602.80
770
6
16 MAG HDG BOLT&NUT KIT L/GSKT A307A HOT DIP GALV
EA
57.81
346.86
780
6
16X1/8 FF CLOTH IN RUBBER GSKT
EA
21.48
128.88
SUBTOTAL 45,033.99
 
 
800
16" GATE VALVE
810
2
16 F6106 MJXFLG RW GV OL L/ACC ON CLOW GATE VALVE EPOXY COATED W/STAINLESS STEEL
BOLTS & NUTS
EA
6,000.00
12,000.00
01/06/2022 - 2:30 PM
Actual taxes may vary
Page 3 of 4
Bid Proposal for Chandler Heights Utility Relocates Dobson / Chapparal
Bid #: 2129460

Seq# Qty
Description
Units
Price
Ext Price
820
2
16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
273.74
830
2
16 MJ REGULAR ACC SET L/GLAND
EA
56.19
112.38
840
2
16 MAG HDG BOLT&NUT KIT L/GSKT A307A HOT DIP GALV
EA
57.81
115.62
850
2
16X1/8 FF CLOTH IN RUBBER GSKT
EA
21.48
42.96
860
2
36 564-A BOTTOM ONLY IMP
EA
66.88
133.76
870
2
24 562-A BOTTOM ONLY IMP
EA
47.75
95.50
880
2
16 562-A TOP ONLY IMP
EA
47.03
94.06
890
2
SWSERVICE NPR600-WA 562A POLYM
EA
42.31
84.62
900
2
DC457 DEBRIS CAP-BLUE
EA
57.69
115.38
910
2
8'0" MAG EXT STEM ONLY
EA
253.66
507.32
920
2
VLV STEM EXT SMALL DIRT RING
EA
70.45
140.90
SUBTOTAL
13,716.24
 
 
940
1" COMBO AIR VAC VALVE
950
PER DTL 106 / COC DTL C-319
960
1
BR2B1314IP100 SAD 12X1IP 13.14-14.58 DBL STRAP BRNZ SAD
EA
242.57
242.57
970
1
BR2B0899IP100 SAD 8X1IP 8.99-9.67 DBL STRAP BRNZ SAD
EA
167.27
167.27
980
2
B25025N 1 BALL CORP MIPXCF AWWA IP X COP FLARE NO LEAD
EA
75.32
150.64
990
60
1 HARD K COPPER TUBE 20'
FT
8.17
490.20
1000
8
1 WROT COPPER 90 BEND CXC
EA
2.73
21.84
1010
2
P25172N 1 BALL CURB PJCTSXFIP PACK JT CTS X FIP NO LEAD
EA
115.43
230.86
1020
2
1X6 BRASS NIPPLE NO LEAD (I)
EA
11.73
23.46
1030
2
1 BRASS 90 NO LEAD (I)
EA
7.48
14.96
1040
2
1" ARI D040 AIR RELEASE VALVE
EA
257.56
515.12
1050
2
#4 CONC MB EXT/STACK BOX PHOE- NIX
EA
66.73
133.46
1060
2
#4 CONC METER BOX BODY PHOENIX
EA
66.73
133.46
1070
2
#4 MAG POLY LID W/AMR WATER A6001852-H9
EA
109.62
219.24
SUBTOTAL
2,343.08
 
 
1090
15" VCP SEWER
1100
75
BUILDPROD 15" CLAY PIPE
FT
39.95
2,996.25
 
 
1120
4
102800 15 PVC MH STOP RING
EA
39.26
157.04
1130
2
1001-1515 15 CLAYXCLAY CPLG
EA
56.57
113.14
SUBTOTAL
3,266.43
Sub Total
92,999.23
Tax
0.00
Total
92,999.23
UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY
CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP
RESERVES THE RIGHT TO INCREASE PRICES TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO, GOVERNMENT
REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL COMMENCE BASED UPON
MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO
PRICE INCREASES AND/OR APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON BUYER’S ACCEPTANCE OF
SELLER’S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND AT:
https://coreandmain.com/TandC/
01/06/2022 - 2:30 PM
Actual taxes may vary
Page 4 of 4
Bid Proposal for Chandler Heights Utility Relocates Dobson / Chapparal
Bid #: 2129460

CHANDLER HEIGHTS UTILITY RELOCATIONS -CMAR
DOBSON / CHAPPARAL
PLEASE BE AWARE! THE PROPOSED CHINA TARIFF (SECTION 301, LIST 3) MAY AFFECT PRODUCTS OFFERED IN THIS 
QUOTATION. IF THE TARIFF IS IMPLEMENTED, THE ACTUAL INCREASE IN PRICING WILL BE PASSED ON.
Approximate Projected Lead Time for Delivery of Materials Listed on this Quotation is 90+ Days for Water & 
Sewer Projects and 180+ Days for Water Meters and/or Radios
BO122921B
Lex Cassiere
ACHEN GARDNER CONST - PHOENIX
Quote:
Sales Rep:
Customer:
ACHEN GARDNER LIST
TakeOff Name:
CHANDLER
Project Location:
Bid Date:
Phoenix
2401 South 19th Avenue  
Phoenix, AZ  85009
Phone: 602.255.0234
On Call: 602.757.7991
Standard Hours: 6:00a to 4:00p Monday through Friday
Phone:
eMail:
602.369.2443
lCassiere@danakepner.com
Quote Printed: Wednesday, January 5, 2022
Page 1 of 11

Terms and Conditions
Due to the extreme volatility of raw material, energy, and transportation costs, the prices shown in this quotation are 
only valid for 30 days, with the exception of PVC Pipe prices.  PVC prices will be subject to the Manufacturers price in 
effect at the time of shipment.  Order releases and shipments delivered 60 days beyond the order date, or as stipulated, 
will be subject to the price in effect at the time of shipment.
Totals are for estimating purposes only.  Unit prices prevail.
Dana Kepner Company, Inc. is not responsible for manufacturers ability to ship material or hold prices.
Due to volatility in the copper commodity market, copper tubing pricing will be determined at time of shipment.
Quoted totals do not include taxes.
PVC and HDPE pricing is based on manufacturer's ability to direct ship to the jobsite.
This quote is for the supply of material only.
The materials specifications, sizes, and quantities listed are the interpretations of Dana Kepner Company, Inc. and are 
believed to be correct, but are not guaranteed.
Connecting hardware for Non-DK supplied material is not included in bid, unless otherwise noted.
PVC Sewer Pipe may come in 13', 14', 20', & 22' lengths, based on availability. Regardless of product description in this 
proposal.
Clay Pipe and Fittings are Non-Returnable.
PVC and HDPE material are considered Freight-On-Board from the manufacturer.
Terms are net 30, and Quote is based on award of complete project.
All returns must be approved by management and will have a minimum 15% restock charge.  Nonstocks are not 
returnable, and are shaded gray within this quote.
Manufacturer standard warranty applies.
Thank you for the opportunity to bid this project.
Assumptions
Chandler specifications will prevail in this proposal.
Quote Printed: Wednesday, January 5, 2022
Page 2 of 11

WATER
8" DIP WATERLINE
$7,395.88
24" STEEL CASING (8" WATERLINE)
$6,200.27
8" GATE VALVE
$4,221.06
12" DIP WATERLINE
$12,734.23
36" STEEL CASING (12" WATERLINE)
$11,703.62
12" GATE VALVE
$6,655.54
16" DIP WATERLINE
$49,759.31
36" STEEL CASING (16" WATERLINE)
$11,832.28
16" GATE VALVE
$13,677.26
1" COMBO AIR VAC VALVE
$2,675.65
WATER Total:
$126,855.10
SEWER
15" VCP SEWER
$3,457.87
SEWER Total:
$3,457.87
Total Quote before Taxes:
$130,312.97
Quote Summary
Quote Printed: Wednesday, January 5, 2022
Page 3 of 11

WATER
8" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
Qty
Unit
Description
Price
Total Price
1
108.0 FT
8"X18'1-1/2" PC350 DI PI PE TYTON JOINT, CMNT LIN DUCTILE 
IRON PIPE-ANSI A21.51
$28.63
$3,092.04
2
4.0 HNDRD 20"X400' BLACK POLY TUBE PERFORATED EVERY 20'
$43.73
$174.92
3
1.0 ROLL
3"X1000' DETECTABLE TAPE - WATER - BLUE
$30.77
$30.77
4
3.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$19.44
5
500.0 FT
14 GAUGE TRACER WIRE, BL UE, 30-MIL, HI-STR 250#
$0.16
$80.00
6
2.0 EA
8" FIELD LOK GASKET 
$117.64
$235.28
7
2.0 EA
8" FIELD LOK 350 GASKET (EPDM)(I)
$180.59
$361.18
8
5.0 EA
8" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$187.20
$936.00
9
17.0 EA
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$45.65
$776.05
10
17.0 EA
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$28.80
$489.60
11
1.0 EA
8" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$189.00
$189.00
12
1.0 EA
16X8" MJ TEE, CL, SSB, DI, LESS ACCS
$838.80
$838.80
13
2.0 EA
8" MJ CAP, SSB, DI, LESS ACCS
$86.40
$172.80
$7,395.88
Average Cost per FT:
$73.96
Total Units: 100.0
24" STEEL CASING (8" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
1.0 EA
24"X 35' LONG STEEL CASING PIPE, .375 WALL 
$5,133.33
$5,133.33
2
4.0 EA
CSS8-0824-SS-CR STAINLESS STEEL CASING SPACER 2X2 
PATTERN 8” WIDE
$224.27
$897.08
3
2.0 EA
ESW0824 END SEAL WRAP
$84.93
$169.86
$6,200.27
Average Cost per FT:
$177.15
Total Units: 35.0
Quote Printed: Wednesday, January 5, 2022
Page 4 of 11

8" GATE VALVE
Qty
Unit
Description
Price
Total Price
1
2.0 EA
8" MJ RW DI OL VALVE, LESS ACCS
$1,122.76
$2,245.52
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
6
4.0 EA
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$45.65
$182.60
7
4.0 EA
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$28.80
$115.20
$4,221.06
Average Cost per Each:
$2,110.53
Total Units: 2.0
12" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
** CAN USE THE REMAINDER OF THE DETECTABLE MARKING TAPE & TRACER WIRE FROM THE 8" 
SUBSECTION **
Qty
Unit
Description
Price
Total Price
1
108.0 FT
12"X18' 1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE 
IRON PIPE-ANSI A21.51
$43.87
$4,737.96
2
2.0 HNDRD 30"X200' BLACK POLY TUBE PERFORATED EVERY 20'
$63.64
$127.28
3
3.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$19.44
4
2.0 EA
12" FIELD LOK GASKET  
$170.85
$341.70
5
2.0 EA
12" FIELD LOK 350 GASKET (EPDM)(I)
$266.82
$533.64
6
17.0 EA
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$98.57
$1,675.69
7
17.0 EA
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$38.41
$652.97
8
6.0 EA
12" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$399.00
$2,394.00
9
2.0 EA
12"MJ CAP,CL,SSB,DI,  LESS ACCS
$161.40
$322.80
10
1.0 EA
12" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$304.20
$304.20
11
1.0 EA
16X12" MJ TEE, CL, SSB, DI, LESS ACCS
$1,624.55
$1,624.55
$12,734.23
Average Cost per FT:
$127.34
Total Units: 100.0
Quote Printed: Wednesday, January 5, 2022
Page 5 of 11

36" STEEL CASING (12" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
40.0 FT
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 
WALL
$246.67
$9,866.80
2
4.0 EA
CSS8-1236-SS-CR STAINLESSS STEEL CASING SPACER 2X2 
PATTERN 8” WIDE
$366.67
$1,466.68
3
2.0 EA
ESW1236 END SEAL WRAP
$185.07
$370.14
$11,703.62
Average Cost per FT:
$334.39
Total Units: 35.0
12" GATE VALVE
** QUOTED 2 GATE VALVES. CUSTOMER TO VERIFY WHAT IS NEEDED **
Qty
Unit
Description
Price
Total Price
1
2.0 EA
12" MJ RW DI OL VALVE, LESS ACCS
$2,214.94
$4,429.88
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
6
4.0 EA
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$98.57
$394.28
7
4.0 EA
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
$38.41
$153.64
$6,655.54
Average Cost per Each:
$3,327.77
Total Units: 2.0
Quote Printed: Wednesday, January 5, 2022
Page 6 of 11

16" DIP WATERLINE
**QUOTED TJ NON RESTRAINED DI PIPE & THE FIELD LOK GASKET QTY CALLED ON THE CUSTOMERS 
RFQ. CUSTOMER TO VERIFY WHAT TYPE OF RESTRAINED JOINT DI PIPE IS NEEDED**
** QUOTE EPDM GASKET. CUSTOMER TO SPECIFY THE TEMPERATURE THE GASKETS NEED TO BE RATED 
AT. QUOTE MAY NEED TO BE REVISED **
** CAN USE THE REMAINDER OF THE DETECTABLE MARKING TAPE & TRACER WIRE FROM THE 8" 
SUBSECTION **
Qty
Unit
Description
Price
Total Price
1
270.0 FT
16"X18'1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE 
IRON PIPE-ANSI A21.51
$70.20
$18,954.00
2
6.0 EA
2"X100' POLY TAPE, PRINTED CORROSION
$6.48
$38.88
3
3.1 HNDRD 34"X308' BLACK POLY TUBE (14-16") 8 MIL
$66.72
$205.50
4
7.0 EA
16" FIELD-LOK GASKET 
$396.13
$2,772.91
5
2.0 EA
16" FIELD LOK 350 GASKET (EPDM)(I)
$621.35
$1,242.70
6
4.0 EA
16" MJ 90 BEND, CL, SSB, DI, LESS ACCS
$903.00
$3,612.00
7
44.0 EA
16" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
$186.75
$8,217.00
8
44.0 EA
16" MJ P R GASKET 
$23.54
$1,035.76
9
528.0 EA
3/4X5" COR-TEN TEE HEAD BOLT, WITH NUT
$3.63
$1,916.64
10
4.0 EA
16" MJ 45 BEND, CL, SSB, DI, LESS ACCS
$645.60
$2,582.40
11
8.0 EA
16" L P MJ SOLID SLEEVE, SSB, DI, LESS ACCS
$581.40
$4,651.20
12
1.0 EA
16" FLANGED CROSS C110, CL, TC
$2,627.12
$2,627.12
13
2.0 EA
16" MJXFLG ADAPTOR, CL, SSB, DI, LESS ACCS
$627.60
$1,255.20
14
2.0 EA
16" MJ CAP, SSB, DI, LESS ACCS
$324.00
$648.00
$49,759.31
Average Cost per FT:
$191.38
Total Units: 260.0
36" STEEL CASING (16" WATERLINE)
Qty
Unit
Description
Price
Total Price
1
40.0 FT
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 
WALL
$246.67
$9,866.80
2
4.0 EA
CSS8-1636-SS-CR STAINLESSS STEEL CASING SPACER 2X3 
PATTERN 8” WIDE
$406.07
$1,624.28
3
2.0 EA
ESW1636 END SEAL WRAP
$170.60
$341.20
$11,832.28
Average Cost per FT:
$338.07
Total Units: 35.0
Quote Printed: Wednesday, January 5, 2022
Page 7 of 11

16" GATE VALVE
Qty
Unit
Description
Price
Total Price
1
2.0 EA
16" MJ X FLG RW DI OL VALVE, LESS ACCS
$5,999.76
$11,999.52
2
2.0 EA
TYPE C 564 VALVE BOX W/NYLON WATER LID
$242.93
$485.86
3
10.0 FT
5" X 5' CAST IRON SH SOIL PIPE
$49.93
$499.30
4
2.0 EA
OES 8' VALVE STEM EXTENSION , GRAY
$264.50
$529.00
5
2.0 EA
SMALL DIRT RING 
$81.79
$163.58
$13,677.26
Average Cost per Each:
$6,838.63
Total Units: 2.0
1" COMBO AIR VAC VALVE
** QUOTED PER THE CUSTOMERS RFQ. CUSTOMER TO VERIFY THAT ALL MATERIAL MEETS CHANDLER 
SPECS **
** CUSTOMER TO VERIFY ALL MATERIAL NEEDED **
Qty
Unit
Description
Price
Total Price
1
1.0 EA
202B-1438 X 1" IP FORD BRASS SADDLE DOUBLE STRAP TO 
FIT13.20 TO 14.38 OD PIPE
$251.71
$251.71
2
1.0 EA
202B-962X1"IP FORD BRASS SADDLE DOUBLE STRAP TO 
FIT9.05 TO 9.62 OD PIPE
$173.62
$173.62
3
60.0 FT
1"X20' K HARD COPPER TUBE
$8.81
$528.60
4
8.0 EA
1" SOLDER JOINT 90 BEND 
$3.37
$26.96
5
2.0 EA
NL 1" FB1100 FORD CORP STOP (BALL CORP)
$86.21
$172.42
6
2.0 EA
NL 1" L84-44 FORD PJ ELL 1\ MALE IRON PIPE THREAD TO 1\ 
PACK JOINTFOR COPPER OR PLASTIC TUBING (CTS)
$37.01
$74.02
7
2.0 EA
NL B11-444 1" FORD BALL VALVE WITH FEMALE IRON PIPE 
THREAD BOTH ENDS
$108.38
$216.76
8
2.0 EA
NL 1 X 6" BRASS NIPPLE 
$13.21
$26.42
9
2.0 EA
1" 90 ELL, THREADED, NO LEAD BRASS
$8.50
$17.00
10
2.0 EA
1" ARI D-040-1" NYLON BASE AIR VAC
$258.41
$516.82
11
4.0 EA
NO 4 CONCRETE METER BOX, 22X33"
$89.17
$356.68
12
2.0 EA
POLYMER CONCRETE MAG #4 SOLID COVER, "WATER"
$157.32
$314.64
$2,675.65
Average Cost per Each:
$1,337.83
Total Units: 2.0
Quote Printed: Wednesday, January 5, 2022
Page 8 of 11

SEWER
15" VCP SEWER
Qty
Unit
Description
Price
Total Price
1
75.0 FT
15"X 7.5' CLAY PIPE, JCP
$42.17
$3,162.75
2
1.0 ROLL
ADEKA SWELL SEAL X 33' (4"-24")
$127.26
$127.26
3
2.0 EA
15" CLAY COUPLING 
$70.93
$141.86
4
1.0 EA
GALLON CLAY PIPE LUBE 
$26.00
$26.00
$3,457.87
Average Cost per FT:
$48.03
Total Units: 72.0
Quote Printed: Wednesday, January 5, 2022
Page 9 of 11

Prod ID
Description
Unit
Qty
Unit Price Total Price
0308350
8"X18'1-1/2" PC350 DI PI PE TYTON JOINT, CMNT LIN DUCTILE IRON 
PIPE-ANSI A21.51
FT
108.0
$28.63
$3,092.04
0312350
12"X18' 1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE IRON 
PIPE-ANSI A21.51
FT
108.0
$43.87
$4,737.96
0316350
16"X18'1-1/2" PC350 DI PIPE TYTON JOINT, CMNT L DUCTILE IRON 
PIPE-ANSI A21.51
FT
270.0
$70.20
$18,954.00
03GFL06EPDMNS
16" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$621.35
$1,242.70
03GFL08
8" FIELD LOK GASKET 
EA
2.0
$117.64
$235.28
03GFL08EPDMNS
8" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$180.59
$361.18
03GFL12
12" FIELD LOK GASKET  
EA
2.0
$170.85
$341.70
03GFL12EPDMNS
12" FIELD LOK 350 GASKET (EPDM)(I)
EA
2.0
$266.82
$533.64
03GFL16
16" FIELD-LOK GASKET 
EA
7.0
$396.13
$2,772.91
09120H
1"X20' K HARD COPPER TUBE
FT
60.0
$8.81
$528.60
17C1575JCPNS
15"X 7.5' CLAY PIPE, JCP
FT
75.0
$42.17
$3,162.75
17CLUBE
GALLON CLAY PIPE LUBE 
EA
1.0
$26.00
$26.00
18BG0840
8" MJ BOLT & GASKET PAK W/6-3/4X4.0" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
EA
21.0
$28.80
$604.80
18BG1245
12" MJ BOLT & GASKET PAK W/8-3/4X4.5" COR-TEN T-HEAD 
BOLTS/NUTS & MJ GASKET
EA
21.0
$38.41
$806.61
18L0890
8" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
5.0
$187.20
$936.00
18L08C
8" MJ CAP, SSB, DI, LESS ACCS
EA
2.0
$86.40
$172.80
18L08SL
8" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
1.0
$189.00
$189.00
18L1290
12" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
6.0
$399.00
$2,394.00
18L12C
12"MJ CAP,CL,SSB,DI,  LESS ACCS
EA
2.0
$161.40
$322.80
18L12SL
12" LP MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
1.0
$304.20
$304.20
19G16
16" MJ P R GASKET 
EA
44.0
$23.54
$1,035.76
19L1608T
16X8" MJ TEE, CL, SSB, DI, LESS ACCS
EA
1.0
$838.80
$838.80
19L1612T
16X12" MJ TEE, CL, SSB, DI, LESS ACCS
EA
1.0
$1,624.55
$1,624.55
19L1645
16" MJ 45 BEND, CL, SSB, DI, LESS ACCS
EA
4.0
$645.60
$2,582.40
19L1690
16" MJ 90 BEND, CL, SSB, DI, LESS ACCS
EA
4.0
$903.00
$3,612.00
19L16AMF
16" MJXFLG ADAPTOR, CL, SSB, DI, LESS ACCS
EA
2.0
$627.60
$1,255.20
19L16C
16" MJ CAP, SSB, DI, LESS ACCS
EA
2.0
$324.00
$648.00
19L16SL
16" L P MJ SOLID SLEEVE, SSB, DI, LESS ACCS
EA
8.0
$581.40
$4,651.20
20B5
3/4X5" COR-TEN TEE HEAD BOLT, WITH NUT
EA
528.0
$3.63
$1,916.64
30FXD1616NS
16" FLANGED CROSS C110, CL, TC
EA
1.0
$2,627.12
$2,627.12
311108
8" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE (COLOR 
CODED BLACK)
EA
21.0
$45.65
$958.65
311112
12" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
EA
21.0
$98.57
$2,069.97
311116
16" DI PIPE MECHANICAL RESTRAINT FOR DUCTILE IRON PIPE 
(COLOR CODED BLACK)
EA
44.0
$186.75
$8,217.00
33106NL
NL 1 X 6" BRASS NIPPLE 
EA
2.0
$13.21
$26.42
Material List
Quote Printed: Wednesday, January 5, 2022
Page 10 of 11

Prod ID
Description
Unit
Qty
Unit Price Total Price
34190NL
1" 90 ELL, THREADED, NO LEAD BRASS
EA
2.0
$8.50
$17.00
41ARID041
1" ARI D-040-1" NYLON BASE AIR VAC
EA
2.0
$258.41
$516.82
43DL08ML
8" MJ RW DI OL VALVE, LESS ACCS
EA
2.0
$1,122.76
$2,245.52
43DL12ML
12" MJ RW DI OL VALVE, LESS ACCS
EA
2.0
$2,214.94
$4,429.88
43DL16FML
16" MJ X FLG RW DI OL VALVE, LESS ACCS
EA
2.0
$5,999.76
$11,999.52
51564IN
TYPE C 564 VALVE BOX W/NYLON WATER LID
EA
6.0
$242.93
$1,457.58
64202B09624I
202B-962X1"IP FORD BRASS SADDLE DOUBLE STRAP TO FIT9.05 TO 
9.62 OD PIPE
EA
1.0
$173.62
$173.62
64202B14384I
202B-1438 X 1" IP FORD BRASS SADDLE DOUBLE STRAP TO FIT13.20 
TO 14.38 OD PIPE
EA
1.0
$251.71
$251.71
67B11444NL
NL B11-444 1" FORD BALL VALVE WITH FEMALE IRON PIPE THREAD 
BOTH ENDS
EA
2.0
$108.38
$216.76
67FB11004NL
NL 1" FB1100 FORD CORP STOP (BALL CORP)
EA
2.0
$86.21
$172.42
67L8444NL
NL 1" L84-44 FORD PJ ELL 1\ MALE IRON PIPE THREAD TO 1\ PACK 
JOINTFOR COPPER OR PLASTIC TUBING (CTS)
EA
2.0
$37.01
$74.02
68S190
1" SOLDER JOINT 90 BEND 
EA
8.0
$3.37
$26.96
82CMB4
NO 4 CONCRETE METER BOX, 22X33"
EA
4.0
$89.17
$356.68
82PCL4
POLYMER CONCRETE MAG #4 SOLID COVER, "WATER"
EA
2.0
$157.32
$314.64
8820400BLK
20"X400' BLACK POLY TUBE PERFORATED EVERY 20'
HNDRD
4.0
$43.73
$174.92
8830200BLK
30"X200' BLACK POLY TUBE PERFORATED EVERY 20'
HNDRD
2.0
$63.64
$127.28
8834308BLK
34"X308' BLACK POLY TUBE (14-16") 8 MIL
HNDRD
3.1
$66.72
$205.50
88TAPEPR
2"X100' POLY TAPE, PRINTED CORROSION
EA
12.0
$6.48
$77.76
94AMC2005T
ADEKA SWELL SEAL X 33' (4"-24")
ROLL
1.0
$127.26
$127.26
94C011515
15" CLAY COUPLING 
EA
2.0
$70.93
$141.86
94SP055SH
5" X 5' CAST IRON SH SOIL PIPE
FT
30.0
$49.93
$1,497.90
952437535NS
24"X 35' LONG STEEL CASING PIPE, .375 WALL 
EA
1.0
$5,133.33
$5,133.33
953637540RLNS
36"X 40' R/L (RANDOM LENGTH) STEEL CASING PIPE .375 WALL
FT
80.0
$246.67
$19,733.60
95CSS80824SSCRNS
CSS8-0824-SS-CR STAINLESS STEEL CASING SPACER 2X2 PATTERN 8” 
WIDE
EA
4.0
$224.27
$897.08
95CSS8123SSCRNS
CSS8-1236-SS-CR STAINLESSS STEEL CASING SPACER 2X2 PATTERN 8” 
WIDE
EA
4.0
$366.67
$1,466.68
95CSS81636SSCRNS
CSS8-1636-SS-CR STAINLESSS STEEL CASING SPACER 2X3 PATTERN 8” 
WIDE
EA
4.0
$406.07
$1,624.28
95ESW0824NS
ESW0824 END SEAL WRAP
EA
2.0
$84.93
$169.86
95ESW1236NS
ESW1236 END SEAL WRAP
EA
2.0
$185.07
$370.14
95ESW1636NS
ESW1636 END SEAL WRAP
EA
2.0
$170.60
$341.20
95TDWB3
3"X1000' DETECTABLE TAPE - WATER - BLUE
ROLL
1.0
$30.77
$30.77
95WT1430BLUHS
14 GAUGE TRACER WIRE, BL UE, 30-MIL, HI-STR 250#
FT
500.0
$0.16
$80.00
97SDR
SMALL DIRT RING 
EA
6.0
$81.79
$490.74
97VSE8NS
OES 8' VALVE STEM EXTENSION , GRAY
EA
6.0
$264.50
$1,587.00
Total before Taxes:
$130,312.97
Quote Printed: Wednesday, January 5, 2022
Page 11 of 11

Quote Analysis Report
Page 1 of 1
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 8:36 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
POLYMER MANHOLE
POLYMH
Vendor Phone
Vendor Name
Vendor Code
Unit Price
7028249702
Armorock
ARMOROCK
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
EA
2.00
5' POLYMER MANHOLE
2POLYMH
9,017.0000
Plugged Amount
Quoted Amount
0
18,034
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
Total Adjustment
0
0
Totals
18,034
Diff From Plug
18,034
Total Minority
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Q  U  O  T  A  T  I  O  N
Page
 1
of
2
12/28/2021
Notes: 
1. Quote is subject to our standard terms, conditions, and shipping policies. 
2. Payment is due at Net 30. Late Payment service charge for over 30 days will be charged at 18% APR 
3. Quote is valid for 60 days from issue date to receipt of PO after 60 days quote is subject to change based off 
market value of materials.  
4. All applicable taxes are to be paid by purchaser 
5. If owner requires items to be grouted in field contractor is responsible for materials and labor costs incurred.  
6. All loads will be billed at $1475 for each truck. Total of one(1) needed for job. Customer will only be billed for 
trucks used. Additional trucks will be billed at market rate.  
7. Freight requested under 3 days notice may be subject to increased freight rates 
8. Products will be billed at unit pricing per quotation 
9. Rush orders will be priced accordingly. 
10. Contractor shall be responsible for joint sealing and performance.  
11. Miscellaneous items such as grout, epoxy, and hardware are not included with the structures unless a specific 
line item is shown on this quote. Additional charges will apply for any extra items that are not shown on this quote. 
12. Final lead time is determined at date of approved submittal.  
From:
Quote Date: 12/28/2021
To:
Ref: Chandler Heights Road Utility Relocations Chaparra
Chandler, AZ

MH 1
60"-30" Polymer Manhole
10.06'
4,573
$7,382
1
30" CITY OF CHANDLER SEWER A-1700
R&C
2
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50536-S
60 IN X 3 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
4
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 2
60"-30" Polymer Manhole
10.30'
4,529
$7,327
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X2FL
30 IN X 2 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50548-S
60 IN X 4 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
4
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
Spreader Bar
0.00'
0
$1,850
1
SPREADER BAR AND RIGGING FOR
LIFTING
Sub-Total
$16,559
Freight/Delivery
$1,475
$18,034
Total Price for
Chandler Heights Road Utility Relocations Chaparra
Structure
Description
Height
Weight
Price
For:
Ref: Chandler Heights Road Utility Relocations Chaparra
Chandler, AZ
Quote Date: 12/28/2021
Page
2
of
2
12/28/2021
Quotation 7.2.14

Page 7 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
PRECAST
PRECAST
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6022696219
Olson Precast
OLSONPRECAST
Unit Price
6022422007
Preach Masonry
PREACHMASON
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
EA
2.00
INSTALL 60"  POLYMER MAN
4MANHOLE
2051010
90
0.0000
3,325.0000
Plugged Amount
Quoted Amount
0
0
0
6,650
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
0
6,650
Diff From Plug
0
6,650
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Office: (602) 242-2007     Fax: (602) 997-9644
ROC # 82366 & 118937
 Preach Incorporated
 1601 W. Hatcher Road
  Phoenix, AZ 85021-2169
                                      
                                      PROPOSAL
Contractor: Achen Gardner
                Attention: Mark 
Job Name: Chandler Hts. Rd Utility Relocation
Address: Dobson Rd & Chaparral Way, Chandler
                Date: 1-11-2022
Preach Incorporated proposes to supply and install precast manholes on the following:
Bid Item
Description
Quantity
Unit Price
Labor / Materials To Pour 5’ ID 
SS MH Base
      2
$1,700.00
      
Apply Epoxy Coating To Bases
      2
$1,500.00
Insecta Coating
      2  
$125.00
    
    
     
    
      
      
      
      
  
      
           
        Install Both Bases in 1 Trip  
        QUOTE EXPIRES 3/01/22
INCLUDES:  Labor, Concrete, Forming, Applying Of Epoxy To Top Of Base Only, Spark 
Testing & Insecta Coating. Installation Per City Of Chandler Spec’s.
EXCLUDES:  Excavation, Backfilling, Shoring, Barricades, Final Adjustments, Concrete Collar 
Around Frame & Cover, Drop Connections, Pouring of Drop Encasements, Flow Through Plugs 
For Live Sewer Lines, Dewatering, Pipe Gaskets, 3rd Party Inspections Of All Required Testing, 
Concrete Pump Crane For Manholes Beyond The Standard Reach, Weekend or Night Work, 
Davis Bacon Wages, Taxes, Bonds & Permits. Supplying & Setting of Polymer MH Material, 
Supplying & Setting of Frame & Covers.  Vacuum Testing Of MH’s.

Quote Analysis Report
Page 1 of 1
Achen-Gardner Construction, LLC 5
Andy Mortensen
1/26/22 2:48 PM
CHANDLER HEIGHTS RD PCK 1 GMP 2 FINAL
393810011
QUALITY CONTROL
QC
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4804962000
Quality Testing L
QUALITYTESTI
Unit Price
6022431600
Ninyo & Moore
NINYOMOORE
Unit
Quan
Desc
Resource
Activity
Bid
LS
1.00
MATERIALS TESTING (MAG 106.
4QC
2102500
10
10,731.8500
22,489.0000
Plugged Amount
Quoted Amount
0
10,732
0
22,489
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
Totals
10,732
22,489
Diff From Plug
732
12,489
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

PROJECT NAME :
SCOPE OF SERVICES:
LABOR FEES
LABOR 
TYPE
REG
HOURS
REGULAR
RATE
ASS'D
% OT
OVERTIME
HOURS
OVERTIME
RATE(1)
EXTENDED
LABOR COST
Direct
9
122.50
$    
0%
0
122.50
$    
1,102.50
$                         
Direct
1
50.00
$      
0%
0
75.00
$      
50.00
$                              
Direct
92
59.50
$      
0%
0
89.25
$      
5,474.00
$                         
0
-
$         
0%
0
-
$          
-
$                                  
Indirect
34
-
$         
0%
0
-
$          
-
$                                  
SUBTOTAL DIRECT LABOR
6,626.50
$                         
VEHILE AND PER-DIEM CHARGES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED VEHICLE
AND PER-DIEM
25
EA
38.00
$      
950.00
$                            
0
-
$          
-
$                                  
SUBTOTAL VEHICLE AND PER-DIEM CHARGES
950.00
$                            
OTHER PROJECT DIRECT CHARGES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED OTHER 
PROJECT CHARGES
-
$                                  
-
$                                  
-
$                                  
-
$                                  
SUBTOTAL OTHER PROJECT DIRECT CHARGES
-
$                                  
LAB TESTING FEES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED
LABORATORY FEES
60
EA
16.00
$      
960.00
$                            
2
EA
75.00
$      
150.00
$                            
2
EA
85.00
$      
170.00
$                            
2
EA
120.00
$    
240.00
$                            
EA
250.00
$    
-
$                                  
EA
200.00
$    
-
$                                  
EA
190.00
$    
-
$                                  
EA
155.00
$    
-
$                                  
EA
25.00
$      
-
$                                  
EA
35.00
$      
-
$                                  
24
EA
22.00
$      
528.00
$                            
-
$                                  
TOTAL LABORATORY TESTING FEES
2,048.00
$                         
TOTAL ESTIMATE OF ALL FEES 
9,624.50
$             
Estimator
(1) Regular Rate X Overtime Premium of 1.5
CLASSIFICATION
Project Manager
Reporting Technician
Field Technician
Lab Trechnician
503 - Drill & Extract AC Core
305 - Masonry Grout Prisms
DESCRIPTION
416 - Sieve Analysis
301 - Plasticity Index
2
504 - Ignition Furnace Calibration
301 - Concrete Compressive Strength Cylinders
505 - AC Content w/ Gradation (Ignition Method)
510 - AC Gyratory Bulk Density (Set of 2)
509 - AC Maximum Specific Gravity (Rice) (Set of 3)
501 - AC Core Density/Thickness
Date
Jaye Richardson, Sr. Project Manager
January 6, 2022
DESCRIPTION
Trip Charge
DESCRIPTION
PROPOSAL SUMMARY 
Chandler Hts Utility Relocation: Chaparral - Dobson to Lake
Quality Control Testing
COST PROPOSAL,  1/6/2022
3
600
3
3
570
465
$ 10731.85

PROJECT NAME :
DATE:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
M-22
A-22
M-22
J-22
J-22
A-22
S-22
O-22
N-22
D-22
J-23
F-23
M-23
A-23
M-23
J-23
J-23
A-23
S-23
O-23
N-23
D-23
J-24
F-24
23
21
21
22
20
23
21
21
20
22
21
19
23
20
22
22
20
23
20
22
21
20
21
20
0.03
0.03
0%
0.01
0%
0.26
0.26
0%
0%
0.09
0.10
0%
0.03
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.26
0.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.09
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.38
0.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
3
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
 m-h
 m-h
 m-h
2
SCHEDULED PROJECTED MAN-HOURS 
TOTAL FTEs (DIRECT LABOR & VEHICLE)
TOTAL FTEs (ALL LABOR CLASSES)
TOTAL FTEs (INDIRECT LABOR ONLY)
TOTAL FTEs (DIRECT LABOR ONLY)
136 m-h
34 m-h
92 m-h
10 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
January 6, 2022
PROJECT PERSONNEL /
 SUB CONSULTANT MAN-HOURS
9 m-h
Project Manager
1 m-h
 m-h
 m-h
9 m-h
1 m-h
MAR 2022 through FEB 2024
CONSULTANT :
SUBTOTAL
REGULAR
HOURS
%
OT
SUBTOTAL
O/T
TOTAL
Chandler Hts Utility Relocation: Chaparral - Dobson to Lake
QT
92 m-h
34 m-h
 m-h
92 m-h
 m-h
34 m-h
Reporting Technician
Field Technician
Lab Trechnician
TOTAL ACTUAL POSITIONS
7
ABOVE PERIOD - MONTHLY FULL TIME EQUIV. (FTEs)
TOTAL FTEs (SUBCONTRACTED LABOR)
92 m-h
136 m-h
TOTAL VEHICLES
10 m-h
 m-h
34 m-h
ESTIMATED FTEs IN THE MONTH
SCHEDULED PROJECT MAN-HOURS,  1/6/2022

PROJECT NAME :
DATE:
SCHEDULED PROJECTED MAN-HOURS 
January 6, 2022
CONSULTANT :
Chandler Hts Utility Relocation: Chaparral - Dobson to Lake
QT
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
M-24
A-24
M-24
J-24
J-24
A-24
S-24
O-24
N-24
D-24
J-25
F-25
M-25
A-25
M-25
J-25
J-25
A-25
S-25
O-25
N-25
D-25
J-26
F-26
21
22
22
20
22
22
20
23
19
21
21
19
21
22
21
21
22
21
21
23
18
22
20
19
0%
0%
0%
0%
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL FTEs (SUBCONTRACTED LABOR)
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
 m-h
TOTAL FTEs (DIRECT LABOR ONLY)
 m-h
 m-h
 m-h
 m-h
TOTAL FTEs (ALL LABOR CLASSES)
TOTAL FTEs (INDIRECT LABOR ONLY)
TOTAL FTEs (DIRECT LABOR & VEHICLE)
 m-h
 m-h
PROJECT PERSONNEL /
 SUB CONSULTANT MAN-HOURS
SUBTOTAL
OT HOURS
TOTAL
HOURS
%
OT
 m-h
MAR 2024 through FEB 2026
SUBTOTAL
REGULAR
HOURS
 m-h
 m-h
 m-h
 m-h
 m-h
TOTAL VEHICLES
0
ABOVE PERIOD - MONTHLY FULL TIME EQUIV. (FTEs)
ESTIMATED FTEs IN THE MONTH
TOTAL ACTUAL POSITIONS
0
SCHEDULED PROJECT MAN-HOURS,  1/6/2022

SUB CONSULTANT :
PROJECT NAME :
PROJECT OWNER:
PROJECT NUMBER:
GENERAL INFORMATION / ASSUMPTIONS
BASIS OF ESTIMATE
1
2
3
4
Laboratory Facility: This estimate is based upon all laboratory testing being conducted in QT's AASHTO Accredited testing facility.  
The QT facility is a full service production laboratory that services numerous project's simultaneously.   Efforts are always made to 
prioritize samples in accordance with project needs.
Periodic Materials Testing Report Summaries:  Reports will be provided on a weekly basis, although test results will be conveyed in 
real time as requested by the Client. Weekly Reports will be submitted to the designated client representative by the week following the 
timeframe in which the work was performed.  Reports shall show the sampling and testing activities performed by QT during the 
reporting period.  Reports from non-QT entities (i.e. suppliers, other firms, etc.) will be included if provided by the client.  QT utilizes a 
sophisticated materials testing information system for managing and reporting on project test information.  Reports from this system will 
be provided in pdf format for use by client.
ESTIMATE Amount Based on Defined Scope: This cost proposal is considered an initial Time & Materials cost estimate, subject to 
the GENERAL INFORMATION/ASSUMPTIONS as defined herein. For the estimate amount, QT will perform the requested Materials 
sampling and testing, both field and lab, that is specifically identified this cost estimate.
References that Define Materials Testing  Requirements: This cost proposal is based upon the QT's interpretation of sampling and 
testing requirements from the supplied plans and specifications. If these interpretations are in error, if they change, or if the client elects 
to alter the sampling criteria, QT reserves the right to revise the scope and fee to  fit these changes to the assumptions. 
Work Outside of Defined Scope: If sampling and testing work is requested by the client that is not already defined in proposal, such 
work will be accommodated; however, compensation for such services shall be in addition to the Estimate amount.   QT encourages 
client project management to inform  job level project staff that requests for services outside the originally defined scope will result in 
additional costs.  Once identified, QT management will send client project management a Supplemental Agreement (SA) form, defining 
the scope, cost, and description of any requested additional work.  Preferably, the requested additional work will not be performed until 
after the SA form is signed and returned by client management.  However, because requests are often the result of unplanned events, 
and in order to not impact the construction schedule, some work may be performed prior to the SA form being generated and returned.  
Regardless, by requesting the additional services, and then allowing them to be performed on the project, the client is accepting the 
responsibility to pay for requested services.  
Schedule: The estimate amount was developed prior to bid and without the benefit of a detailed project schedule.  In order to properly 
plan resource utilization after the bid, the client shall provide QT with a detailed base schedule prior to construction.  Using this detailed 
base schedule, QT will redistribute the pre-bid designated manpower and testing resources in accordance with the actual planned 
sequence and duration of scheduled construction activities.  This redistribution of resources will be provided to client management for 
comment and to further clarify the scope of planned services.  Significant deviation from the base schedule that results in extra field 
presence, or extra samples, may be considered extra work.
Invoicing:  Invoicing will occur on a 4 week cycle.  Each invoice shall include original scope charges that represent an appropriate, and 
defined, fraction of the original scope estimate amount.   In the event that extra work is requested and provided during the invoicing 
period, such services shall be identified separately from the original scope charges on invoices.   Additional work shall be calculated 
based on the unit prices defined in this cost proposal, or as otherwise superseded in specific Supplemental Agreements.
Assumptions of Production:
We have assumed total of up to 25 trips (or 92 hours) for materials testing services on this project.   This is proposed as an 
assumed on-call time and materials basis. Any work or site visits that are outside those specified  in the cost breakdown is beyond the 
scope of this project and subject to additional charges based on the referenced hourly or unit rates.
Chandler Hts Utility Relocation: Chaparral - Dobson to Lake
City of Chandler
WW2111.401
QT
COST ESTIMATE SUMMARY
175 South Hamilton Place Build 6 Ste 114 Gilbert AZ 85233 Tel (480)496-2000, Fax (480)496-2001

SUB CONSULTANT :
PROJECT NAME :
PROJECT OWNER:
PROJECT NUMBER:
GENERAL INFORMATION / ASSUMPTIONS
Chandler Hts Utility Relocation: Chaparral - Dobson to Lake
City of Chandler
WW2111.401
QT
COST ESTIMATE SUMMARY
LABOR POSITIONS
5
6
7
8
QT CONTINGENCY SERVICES 
9
10
11
12
1/6/2022
Date
Signature
Field Technician(s) - In general, field technician(s) shall be assigned to the project in accordance with the SCHEDULED PROJECT 
MAN-HOURS sheet of this cost proposal, or as modified by a post-bid schedule evaluation.  The technician(s) will cover the requested 
materials sampling and field testing requirements on the project per the scope of the originally defined estimate amount.  For most 
efficiency and familiarity, use of the consistent personnel pool is always the objective, but cannot be guaranteed.  Technician time is 
charged on a portal to portal basis and related vehicle charges will apply.
Lab Technician - Lab Technician Indirect hours have been shown on the SCHEDULED PROJECT MAN-HOURS sheet of this cost 
proposal for information only. A reasonable, approximate estimate of lab testing quantities is reflected in this cost proposal.
All of the QT positions discussed in the QT SERVICES above are based on an assumption of 0% overtime (i.e. 40 regular hours plus 0 
overtime hours per week). Time will be billed as actually worked. Overtime will be considered time in excess of 40 hours in a week, or on 
weekends, or in excess of 8 hours in a day, or night shifts.
Name
Reporting Technician - A reporting technician will accumulate and draft weekly reports for Materials Supervisor to review, evaluate, 
finalize, and transmit to the Client in a timely fashion.  This allows the Materials Supervisor to focus on report content in lieu of data 
input.
Scheduling Cancellation:
For any unforeseen circumstances where a site visit is cancelled upon arrival onsite for scheduled activities, the client will be 
responsible for all charges associated with travel from portal to portal. This is considered services outside the originally defined 
materials testing scope and will result in additional costs. 
Jaye Richardson, Sr. Project Manager
The hours estimated herein do not include Materials Testing/Inspection activities at fabrication yards or supplier production sites located 
off of the project.  In addition, non-compliance items and the associated travel, time, and retesting are out of scope and not accounted 
for in this estimate.  If requested,  these services may require additional funding for the associated efforts.
Materials PM/Supervisor - This person will begin immediately upon notice to proceed and will be involved during the entire contract. 
This person will be dedicated to managing the day to day field and lab materials testing efforts. Initially, this person will work with the 
client QC Manager to develop the Materials Testing Plan for the project.  Then, this person will ensure that testing frequencies are being 
satisfied, that non-conformance issues are being properly addressed and rectified, that both field and lab test data is being properly 
reflected in the QT Materials Information Database, that project specific Periodic Materials Testing Reports are being prepared, 
transmitted and supported in a timely and accurate manner, and that both physical and personnel resources are provided to the job as 
scheduled and appropriate. This person will also attend and participate in project meetings when requested and will be the focal point for 
communication and coordination of materials testing activities between QT and the Client. 
QT's intent is to satisfy the project materials testing needs within the regular labor assumptions defined in this cost proposal. Based on 
past similarly staffed projects, overtime is typically not intended, but often incurred due to the contractor work schedule.  Overtime often 
results from long work days, uncontrollable field delays, weekend and night work, schedule intensity increases, owner agency mandates, 
etc..  This cost proposal assumes zero (0) overtime.  QT will attempt to accommodate short term changes, weekend work, night work, 
shift irregularity, and other unforeseen labor demands within this assumption.  However, testing activities may go beyond the capacity of 
the herein stated manpower and testing assumptions.  QT will work closely with the client to minimize the additional funding needed by 
prioritizing the testing, and adjusting technician schedules in an ongoing, Time & Materials, basis. 
175 South Hamilton Place Build 6 Ste 114 Gilbert AZ 85233 Tel (480)496-2000, Fax (480)496-2001

3202 East Harbour Drive  |  Phoenix, Arizona 85034  |  p. 602.243.1600  |  www.ninyoandmoore.com 
 
 
October 21, 2021 
Proposal No. 12PHX02-04162 
Mr. Mark McLafferty 
Achen-Gardner Construction 
550 South 79th Street 
Tucson, Arizona 85705  
Subject: 
Proposal to Provide Special Inspection 
and Materials Testing Services 
Wales Ranches Sewer Lift Station 
North of the Intersection of Combs Road and Kenworthy Road 
Pinal County, Arizona 
Dear Mr. Mc Lafferty: 
We are pleased to present this proposal to provide special inspection and materials testing 
services at the subject site. In preparation of this proposal, we have reviewed the plans prepared 
by Coe and Van Loo II, LLC dated August 11, 2021. We understand that the project will include the 
construction of a new lift station and approximately 3,250 linear feet of sewer main. Additional 
improvements will include concrete flatwork, underground utilities, and asphalt concrete 
pavements. This proposal was prepared without the benefit of a construction schedule and is 
based on our assumptions as to the needed special inspections and materials testing. 
SCOPE OF SERVICES 
Our scope of services will include the following: 
• 
Review of available geotechnical reports prepared for the site.  
• 
Observation, testing, and sampling during the placement of soil, aggregate, concrete, masonry 
and asphalt. 
• 
Laboratory testing of soil, aggregate, concrete, masonry and asphalt materials. 
• 
Special inspection services for the observation and inspection of concrete and masonry 
reinforcement and structural steel.  
• 
Data analysis and compilation.

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
2 
 
ASSUMPTIONS 
We have made the following assumptions: 
• 
Our services will be scheduled and coordinated by the Project Inspector or Construction 
Manager on an as-needed basis. 
• 
The sewer main can be backfilled and tested at a rate of 200 feet per day. 
• 
Four trips are included for the placement of asphalt concrete pavements along the sewer 
trench alignment.  
• 
Environmental sampling and testing of the subsurface soils is not included within the scope of 
this proposal. 
ESTIMATED FEE 
We propose to provide our services on a time-and-materials basis in accordance with the attached 
Schedule of Fees. We estimate the fee for our services to be approximately $22,489 (Twenty-Two 
Thousand Four Hundred Eighty-Nine Dollars). A breakdown of our fees is presented in the 
attached Table 1. To authorize our services, please sign and return the attached  
Work Authorization and Agreement.  
We look forward to working with you. 
Respectfully submitted, 
NINYO & MOORE 
Sean C. Jacquemin, PE 
Senior Engineer 
Craig Rees 
Principal/Construction Services 
SCJ/ECR/tlp 
Attachments: Table 1 – Breakdown of Estimated Fee  
Schedule of Fees 
Work Authorization and Agreement

Field Technician
140 hours
@
50.00
$        
/hour
7,000.00
$
 
Vehicle/Equipment Usage
140 hours
@
10.00
$        
/hour
1,400.00
$
 
8,400.00
$
 
Field Technician
50 hours
@
50.00
$        
/hour
2,500.00
$
 
Vehicle/Equipment Usage
50 hours
@
10.00
$        
/hour
500.00
$
 
3,000.00
$
 
Special Inspector - Structural Masonry
10 hours
@
68.00
$        
/hour
680.00
$
 
Vehicle/Equipment Usage
10 hours
@
10.00
$        
/hour
100.00
$
 
780.00
$
 
Concrete
12 hours
@
68.00
$        
/hour
816.00
$
 
Structural Steel Special Inspection
16 hours
@
68.00
$        
/hour
1,088.00
$
 
Vehicle/Equipment Usage
28 hours
@
10.00
$        
/hour
280.00
$
 
2,184.00
$
 
Field Technician
30 hours
@
50.00
$        
/hour
1,500.00
$
 
Vehicle/Equipment Usage
30 hours
@
10.00
$        
/hour
300.00
$
 
1,800.00
$
 
Proctor Density
3 tests
@
125.00
$      
/test
375.00
$
 
Gradation
3 tests
@
110.00
$      
/test
330.00
$
 
Atterberg Limit
3 tests
@
90.00
$        
/test
270.00
$
 
Asphalt Marshall Bulk Density
4 tests
@
125.00
$      
/test
500.00
$
 
Maximum Theoretical Specific Gravity (Rice
4 tests
@
125.00
$      
/test
500.00
$
 
Asphalt Extraction/Gradation
4 tests
@
200.00
$      
/test
800.00
$
 
Grout Compressive Strength
8 tests
@
20.00
$        
/test
160.00
$
 
Concrete Cylinders Compressive Strength
60 tests
@
15.00
$        
/test
900.00
$
 
3,835.00
$
 
Project Engineer/Manager
20 hours
@
96.00
$        
/hour
1,920.00
$
 
Data Processor
15 hours
@
38.00
$        
/hour
570.00
$
 
2,490.00
$
 
22,489.00
$               
Concrete 
Earthwork 
Laboratory Testing
Project Management and Data Processing
TOTAL ESTIMATED FEE
Special Inspections
Subtotal
Subtotal
Masonry
Subtotal
Asphalt Paving
Subtotal
Subtotal
Table 1 - Breakdown of Estimated Fee
Subtotal
Subtotal
Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021
1

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
 
 
Schedule of Fees 
Hourly Charges for Personnel 
Professional Staff 
 
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist ..............................................  $ 136 
Senior Engineer/Geologist/Environmental Scientist ................................................................................................  $ 115 
Senior Project Engineer/Geologist/Environmental Scientist ....................................................................................  $ 102 
Project Engineer/Geologist/Environmental Scientist ...............................................................................................  $ 
96 
Senior Staff Engineer/Geologist/Environmental Scientist .......................................................................................  $ 
90 
Staff Engineer/Geologist/Environmental Scientist ...................................................................................................  $ 
80 
GIS Analyst ...............................................................................................................................................................  $ 
84 
Technical Illustrator/CAD Operator ..........................................................................................................................  $ 
48 
Field Staff 
 
Certified Asbestos/Lead Technician ........................................................................................................................  $ 102 
Field Operations Manager ........................................................................................................................................  $ 
74 
Nondestructive Examination Technician (UT, MT, LP) ...........................................................................................  $ 
79 
Supervisory Technician ............................................................................................................................................  $ 
68 
Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) .............................................  $ 
68 
Senior Technician .....................................................................................................................................................  $ 
54 
Technician ................................................................................................................................................................  $ 
50 
Administrative Staff 
 
Geotechnical/Environmental/Laboratory Assistant ..................................................................................................  $ 
43 
Information Specialist ...............................................................................................................................................  $ 
43 
Data Processor .........................................................................................................................................................  $ 
38 
Other Charges 
Concrete Coring Equipment (includes technician) ..............................................................................................  $ 190/hr 
Anchor Load Test Equipment (includes technician) ............................................................................................  $ 190/hr 
GPR Equipment ...................................................................................................................................................  $ 180/hr 
Inclinometer ..........................................................................................................................................................  $ 100/hr 
Hand Auger Equipment .......................................................................................................................................  $ 
80/hr 
Rebar Locator (Pachometer) ...............................................................................................................................  $ 
25/hr 
Vapor Emission Kit ...............................................................................................................................................  $ 
65/kit 
X-Ray Fluorescence ............................................................................................................................................  $ 
70/hr 
PID/FID.................................................................................................................................................................  $ 
25/hr 
Air Sampling Pump ..............................................................................................................................................  $ 
10/hr 
Field Vehicle .........................................................................................................................................................  $ 
10/hr 
Expert Witness Testimony ...................................................................................................................................  $ 400/hr 
Direct Expenses .....................................................................................................................................
Cost plus 15 % 
Special equipment charges will be provided upon request. 
Notes 
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged 
for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday and Sunday. 
Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day and on holidays.  
Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours ex-
ceeding 4 hours. 
Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid 
within 30 days. 
The terms and conditions are included in Ninyo & Moore’s Work Authorization and Agreement form.

Ninyo & Moore   |  2019 Laboratory Testing 
 
 
Schedule of Fees for Laboratory Testing 
SOILS 
 
CONCRETE 
Atterberg Limits, D 4318, T 89, T90 .......................................................... $ 
90 
 
Concrete Core Absorption ASTM C 497 Method A ....................................$ 
85 
California Bearing Ratio (CBR), D 1883 ................................................... $ 450 
 
Concrete Core Compressive Strength, C 42 , T 24-93 ..............................$ 
90 
Chloride and Sulfate Content, ARIZ 733, 736 .......................................... $ 100 
 
Concrete Coring Minimum Charge ..............................................................$ 300 
Clay Expansion, FHA Swell ....................................................................... $ 110 
 
Concrete Laboratory Mix Verification, excluding cylinders  ........................$ 300 
Consolidation, D 2435, T 216-94 .............................................................. $ 250 
 
Concrete Mix Design ....................................................................................$ 2,000 
Crumb Test Dispersion Test, D 4647 ....................................................... $ 
60 
 
Compression Tests, 6x12 Cylinder, C 39, T 22-92 .....................................$ 
15 
Direct Shear, D 3080. T236 ....................................................................... $ 350 
 
Drying Shrinkage, C 157 ..............................................................................$ 300 
Expansion Index, D 4829, UBC 18-2 ........................................................ $ 120 
 
Flexural Test, C 78 ........................................................................................$ 
80 
Expansion Potential (Method A), D 4546 ................................................. $ 110 
 
Gunite/Shotcrete, Panels, 3 cut cores per panel and test,  ACI ................$ 190 
Hydraulic Conductivity, D 5084 ................................................................. $ 300 
 
Lightweight Concrete Fill Compression, C 495 ...........................................$ 
40 
Hydrometer Analysis, D 7928, T 88-93 .................................................... $ 200 
 
Measurement of Concrete Cores, ASTM C 174 .........................................$ 
20 
Double Hydrometer Analysis, D 4221, T 88 ............................................. $ 400 
 
Rapid Chloride Permeability, C 1202 ..........................................................$ 425 
Lime Determination, pH Method, D 62765 ............................................... $ 210 
 
Splitting Tensile Strength, C 496 .................................................................$ 
95 
Standard Proctor Density, D 698 .............................................................. $ 125 
 
Time of Setting of Cement by Vicat Needle, C 191 ....................................$ 250 
Standard Proctor Density Treated Soils, D 698 ....................................... $ 195 
 
 
Modified Proctor Density Treated Soils, D 1557, T 180-93, T 99-94 ...... $ 205 
 
ASPHALT  
Miller Box Resistivity .................................................................................. $ 
60 
 
Asphalt Mix Design Review ..........................................................................$ 400 
Moisture, Ash, & Organic Matter of Peat/Organic Soils........................... $ 
90 
 
Asphalt Mix Design, 5 points, Tex................................................................$ 1,500 
Moisture Only, D 2216, T 265 ................................................................... $ 
25 
 
Asphalt Content/Gradation (Ignition Oven), T 308, D 6307 .......................$ 200 
Moisture and Density, D 2937 ................................................................... $ 
35 
 
Bulk Density Lab Molded Samples, Tex 207F (per set) .............................$ 
50 
Permeability, CH, D 2434, T 215 .............................................................. $ 220 
 
Bulk Specific Gravity per specimen (non-absorptive), D 2726 ..................$ 
25 
pH and Resistivity, ARIZ 236 c.................................................................. $ 100 
 
Bulk Specific Gravity per specimen (coated), D 1188 ................................$ 
45 
Pinhole Dispersion Test, D 4647............................................................... $ 245 
 
Compressive Strength of Hot Mix Asphalt, T 167 .......................................$ 275 
R-value, D 2844, T 190 .............................................................................. $ 250 
 
Extraction, % Asphalt, including Gradation, D 2172, T 164-94 
Sand Equivalent, D 2419, T 176 ............................................................... $ 
90 
 
   T 30-93, Tex 210F .....................................................................................$ 225 
Sieve Analysis, D 422 ................................................................................ $ 
55 
 
Hveem Stability and Unit Weight CTM or ASTM, CT 366..........................$ 200 
Sieve Analysis, C-136 (includes 200 wash), D 422, D 1140 ................... $ 110 
 
Hveem Stability, Tex 208F (per set)  ...........................................................$ 
90 
Solubility ...................................................................................................... $ 
80 
 
Marshall Mix Design, Flow and Unit Weight, (set of 3) T 245-94...............$ 125 
Specific Gravity, D 854, T 100-93 ............................................................. $ 
85 
 
Marshall Mix Design......................................................................................$ 3,500 
Sulfate & Chloride Content ........................................................................ $ 
90 
 
Maximum Theoretical Unit Weight, D 2041, CT 309, Tex 227F ................$ 125 
Swell Test, D 4546 ..................................................................................... $ 290 
 
Molding Specimens, Tex 206F (per set) .....................................................$ 
55 
Thermal Resistivity (ASTM 5334, IEEE 442) ........................................... $ 800 
 
Tensile Strength Ratio D 4867, T283 ..........................................................$ 350 
Triaxial Shear, U.U., D 2850 per point ...................................................... $ 160 
 
SuperPave Mix Design .................................................................................$ 4,000 
Triaxial Shear, C.U., w/pore pressure, D 4767, T 2297 per pt ................ $ 315 
 
 
Triaxial Shear, C.D, D 4767, T 297 per pt ................................................ $ 375 
 
AGGREGATES 
Unconfined Compression, D 2166, T 208 ................................................ $ 175 
 
Absorption, Coarse, C 127 ...........................................................................$ 
50 
 
 
Absorption, Fine, C 128 ................................................................................$ 
75 
MASONRY 
 
Alkali Reactivity, C 1260 ...............................................................................$ 750 
Brick Absorption, C 67 ............................................................................... $ 
65 
 
Alkali-Silica Reactivity, C 1567 .....................................................................$ 750 
Brick Compression, C 67 ........................................................................... $ 
30 
 
Clay Lumps and Friable Particles, C 142 ....................................................$ 
95 
Brick Moisture, C 67 ................................................................................... $ 
30 
 
Fractured Faces, NDOT, T 2303, ARIZ 212e .............................................$ 140 
CMU Block Compression Test, 8x8x16, C 140 ....................................... $ 
75 
 
Los Angeles Abrasion, C 131 or C 535 .......................................................$ 180 
CMU Block Moisture Content, C 140 ........................................................ $ 
70 
 
Moisture, C 566, T 255-92 ............................................................................$ 
25 
Core Compression ..................................................................................... $ 
35 
 
Mortar make properties of fine aggregate, C 87 .........................................$ 300 
Concrete Block Linear Shrinkage, C 426 ................................................. $ 150 
 
Organic Impurities, C 40 ...............................................................................$ 
50 
Grout Prisms Compressive Strength, C 1019 .......................................... $ 
40 
 
Sand Equivalent, D 2419, T 176 ..................................................................$ 
85 
Masonry Grout, 4x4x8 prism compression, UBC 21-18 .......................... $ 
20 
 
Sieve Analysis, Coarse Aggregate, C 136 ..................................................$ 110 
Masonry Mortar, 2x4 cylinder compression, UBC 21-16 ......................... $ 
20 
 
Sieve Analysis, Fine Aggregate (included wash), C 136 ...........................$ 110 
Masonry Prism, half size, compression, UBC 21-17 ............................... $ 120 
 
Sodium Sulfate Soundness (per size fraction), C 88 ..................................$ 240 
Mortar Cubes Compressive Strength, C 109 ........................................... $ 
20 
 
Specific Gravity, Coarse, C 127 ...................................................................$ 125 
 
 
Specific Gravity, Fine, C 128 ........................................................................$ 125 
REINFORCING AND STRUCTURAL STEEL 
 
Unit Weight C 29, T 19 .................................................................................$ 
50 
Chemical Analysis, A-36, A615 ................................................................. $ 125 
 
 
Fireproofing Density Test, UBC 7-6 .......................................................... $ 
50 
 
 
Hardness Test, Rockwell, A-370 ............................................................... $ 
40 
 
 
High Strength Bolt, Nut & Washer Conformance, set, A-325 ................. $ 150 
 
 
Mechanically Spliced Reinforcing Tensile Test, ACI ............................... $ 
80 
 
 
Pre-Stress Strand (7 wire), A 416 ............................................................. $ 150 
 
 
Reinforcing Tensile or Bend up to No. 11, A 615 & A 706 ...................... $ 
85 
 
 
Structural Steel Tensile Test: Up to 200,000 lbs., A 370 ......................... $ 100 
 
 
Welded Reinforcing Tensile Test: Up to No. 11 bars, ACI ...................... $ 
80 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Special preparation of standard test specimens will be charged at the technician’s hourly rate. 
Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
1 
 
WORK AUTHORIZATION AND AGREEMENT 
 
Please Sign and Return One Copy to: 
NINYO & MOORE 
3202 East Harbour Drive 
Phoenix, Arizona  85034 
 
 
 
 
PROPOSAL NO. 12PHX02-04162 
1. 
PROJECT ADDRESS: 
North of the Intersection of Combs Rd. & Kenworthy Rd., Pinal County, Arizona 
 
2. 
PROJECT DESCRIPTION: 
Special Inspection and Materials Testing Services 
 
3. 
SCOPE OF STUDY: 
Please refer to proposal dated October 21, 2021. 
 
4. 
FEE:    $22,489  (Twenty-Two Thousand Four Hundred Eighty-Nine Dollars – Time and Materials) 
 
5. 
PORTION OF FEE IN ADVANCE OF WORK:   None 
 
6. 
CLIENT: 
Achen-Gardner Construction 
PHONE:  (480) 940-1300 
550 South 79th Street 
Tucson, Arizona 85705 
 
 
CONTACT: Mark McLafferty 
PHONE:  (480) 940-1300 
 
7. 
STATEMENT TO BE SENT TO:  Client 
CONDITIONS OF AGREEMENT BETWEEN CLIENT AND NINYO & MOORE 
This AGREEMENT is made by and between: NINYO & MOORE GEOTECHNICAL AND ENVIRONMENTAL SCIENCES 
CONSULTANTS, hereinafter referred to as CONSULTANT, and Achen-Gardner Construction, hereinafter referred to as 
CLIENT. This AGREEMENT between the parties consists of these TERMS, the attached Proposal identified as No. 
12PHX02-04162 dated October 21, 2021, and any exhibits or attachments noted in the Proposal. Together, these elements 
will constitute the entire AGREEMENT superseding any and all prior negotiations, correspondence, or agreements either 
written or oral. Any changes to this AGREEMENT must be mutually agreed to in writing. 
STANDARD OF CARE 
CLIENT recognizes that subsurface conditions may vary from those observed at locations where borings, surveys, or 
explorations are made, and that site conditions may change with time. Data, interpretations, and recommendations by 
CONSULTANT will be based solely on information available to CONSULTANT. CONSULTANT is responsible for those 
data, interpretations, and recommendations, but will not be responsible for other parties' interpretations or use of the 
information developed. 
Services performed by CONSULTANT under this AGREEMENT are expected by CLIENT to be conducted in a manner 
consistent with the level of care and skill ordinarily exercised by members of the geotechnical engineering profession 
practicing contemporaneously under similar conditions in the locality of the project. Under no circumstance is any warranty, 
expressed or implied, made in connection with the providing of geotechnical consulting services. 
SITE ACCESS AND SITE CONDITIONS 
CLIENT will grant or obtain free access to the site for all equipment and personnel necessary for CONSULTANT to perform 
the work set forth in this agreement. CLIENT will notify any and all possessors of the project site that CLIENT has granted 
CONSULTANT free access to the site. Client will protect all property, inside and out, including all plants and landscaping. 
CONSULTANT will take reasonable precautions to reduce the potential for damage to the site, but it is understood by 
CLIENT that, in the normal course of work, some damage may occur and the correction of such damage or alteration is not 
part of this AGREEMENT unless so specified in the Proposal. 
CLIENT is responsible for accurately delineating the locations of all subterranean structures and utilities. CONSULTANT will 
take reasonable precautions to avoid known subterranean structures, and CLIENT waives any claim against 
CONSULTANT, and agrees to defend, indemnify and hold CONSULTANT harmless from any claim or liability for injury or 
loss, including costs of defense, arising from damage done to subterranean structures and utilities not identified or 
accurately located. In addition, CLIENT agrees to compensate CONSULTANT for any time spent or expenses incurred by

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
2 
 
CONSULTANT in defense of any such claim, with compensation to be based upon CONSULTANT's prevailing fee schedule 
and expense reimbursement policy. 
SAMPLE DISPOSAL 
CONSULTANT will dispose of remaining soil, rock, and water samples approximately thirty (30) days after submission of the 
report covering those samples. Further storage or transfer of samples can be made at CLIENT's expense upon CLIENT's 
prior written request. 
MONITORING 
If CONSULTANT is retained by CLIENT to provide a site representative for the purpose of monitoring specific portions of 
construction work or other field activities as set forth in the Proposal, then this phrase applies. For the specified assignment, 
CONSULTANT will report observations and professional opinions to CLIENT or CLIENT’s agent. No action of 
CONSULTANT or CONSULTANT's site representative can be construed as altering any AGREEMENT between the 
CLIENT and others. CONSULTANT will report to CLIENT or CLIENT’s agent any observed geotechnically related work 
which, in CONSULTANT's professional opinion, does not conform with plans and specifications. The CONSULTANT has no 
right to reject or stop work of any agent or subcontractor of CLIENT; such rights are reserved solely for CLIENT. 
Furthermore, CONSULTANT's presence on the site does not in any way guarantee the completion or quality of the 
performance of the work of any party retained by CLIENT to provide field or construction-related services. 
If CONSULTANT is not retained by Client for the purpose of monitoring construction work or field activities, CONSULTANT 
will expressly not be held liable or responsible for such activities or for the geotechnical performance of the completed 
project. Monitoring of construction work or field activities and the geotechnical performance of the completed project is and 
will remain the sole and express responsibility of the CLIENT or other party designated by the CLIENT. CLIENT hereby 
agrees to indemnify and hold harmless CONSULTANT from and against any loss or judgment, suffered by the 
CONSULTANT as a result of a claim or lawsuit resulting from CLIENT’s failure to monitor construction work or field activities 
for which CONSULTANT has not been retained. 
CONSULTANT will not be responsible for and will not have control or charge of specific means, methods, techniques, 
sequences or procedures of construction or other field activities selected by any agent or agreement of CLIENT. It is 
mutually understood and agreed by CLIENT and CONSULTANT that CONSULTANT has no control or enforcement ability 
over any persons or parties who are not employees of CONSULTANT. CONSULTANT does not purport to be, nor is 
CONSULTANT responsible for, any safety precautions nor programs incident thereto for such non-employees of 
CONSULTANT. 
OWNERSHIP AND MAINTENANCE OF DOCUMENTS 
Unless otherwise specified in this Agreement or in an Addendum, and provided that CONSULTANT has been fully paid for 
the Services, CLIENT shall have the right to use the documents, maps, photographs, drawings and specifications resulting 
from CONSULTANT’s efforts on the project, for purposes reasonably contemplated by the parties. CONSULTANT shall 
have the right, but shall not be obligated, to retain copies of all such materials and shall have the right to use the same for 
any purpose, unless such use would be expected to cause harm to CLIENT. CLIENT shall specify in advance, in writing, 
and be charged for all arrangements for special or extended-period maintenance of such materials by CONSULTANT. 
CONSULTANT retains the right of ownership with respect to any patentable concepts or copyrightable materials arising 
from its Services. 
Reuse of any material described by CLIENT, including publication to third parties, on extension of this project or on any 
other project without CONSULTANT’s written authorization, shall be at CLIENT’s risk, and CLIENT agrees to indemnify, 
defend, and hold harmless CONSULTANT from all claims, damages, and expenses, including attorney’s fees, arising out of 
such unauthorized reuse. 
BILLING AND PAYMENT 
CLIENT will pay CONSULTANT in accordance with the procedures indicated in the Proposal and its attachments. Invoices 
will be submitted to CLIENT by CONSULTANT, and will be due and payable upon presentation. If CLIENT objects to all or 
any portion of any invoice, CLIENT will so notify CONSULTANT in writing within fourteen (14) calendar days of the invoice 
date, identify the cause of disagreement, and pay when due that portion of the invoice not in dispute. The parties will 
immediately make every effort to settle the disputed portion of the invoice. In the absence of written notification described 
above, the balance as stated on the invoice will be paid.

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
3 
 
Invoices are delinquent if payment has not been received within thirty (30) days from date of invoice. CLIENT will pay an 
additional charge of three quarters of a percent (.75) per month (or the maximum percentage allowed by law, whichever is 
lower) on any delinquent amount, excepting any portion of the invoiced amount in dispute and resolved in favor of CLIENT. 
Payment thereafter will first be applied to accrued interest and then to the principal unpaid amount. All time spent and 
expenses incurred (including any attorney's fees) in connection with collection of any delinquent amount will be paid by 
CLIENT to CONSULTANT per CONSULTANT's current fee schedules. In the event CLIENT fails to pay CONSULTANT 
within sixty (60) days after invoices are rendered, CLIENT agrees that CONSULTANT will have the right to consider the 
failure to pay the CONSULTANT's invoice as a breach of this AGREEMENT and CONSULTANT may cease work on the 
project. At CONSULTANT’s option, CONSULTANT may waive said major breach upon payment by CLIENT of all 
arrearages and outstanding invoices. 
TERMINATION 
This AGREEMENT may be terminated by either party seven (7) days after written notice in the event of any breach of any 
provision of this AGREEMENT or in the event of substantial failure of performance by either party, or if CLIENT suspends 
the work for more than three (3) months. In the event of termination, CONSULTANT will be paid for services performed prior 
to the date of termination plus reasonable termination expenses, including, but not limited to, the cost of completing 
analyses, records, and reports necessary to document job status at the time of termination. 
RISK ALLOCATION 
Many risks potentially affect CONSULTANT by virtue of entering into this AGREEMENT to perform professional consulting 
services on behalf of CLIENT. The principal risk is the potential for human error by CONSULTANT. For CLIENT to obtain 
the benefit of a fee which includes a nominal allowance for dealing with CONSULTANT's liability, CLIENT agrees to limit 
CONSULTANT's liability to CLIENT and to all other parties for claims arising out of CONSULTANT's performance of the 
services described in this AGREEMENT. The aggregate liability of CONSULTANT will not exceed $50,000 for negligent 
professional acts, errors, or omissions, including attorney’s fees and costs which may be awarded to the prevailing party, 
and CLIENT agrees to indemnify and hold harmless CONSULTANT from and against all liabilities in excess of the monetary 
limit established above. 
Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties voluntarily 
and knowingly entered into, and shall apply to all theories of recovery including, but not limited to, breach of contract, 
warranty, tort (including negligence), strict or statutory liability, or any other cause of action, except for willful misconduct or 
gross negligence. The parties also agree that CLIENT will not seek damages in excess of the limitations indirectly through 
suits with other parties who may join CONSULTANT as a third-party nor by an award of attorney’s fees and costs to the 
prevailing party in excess of the aggregate liability agreed upon herein by the parties. Parties means CLIENT and 
CONSULTANT and their officers, employees, agents, affiliates, and subcontractors. 
Both CLIENT and CONSULTANT agree that they will not be liable to each other, under any circumstances, for special, 
indirect, consequential, or punitive damages arising out of or related to this AGREEMENT. 
INDEMNIFICATION 
If any claim is brought against CONSULTANT, its employees, agents and subcontractors and/or CLIENT by a third party, 
relating in any way to the Services, the contribution and indemnification rights and obligations of CONSULTANT and Client, 
subject to the paragraph titled “Risk Allocation” above, such claim shall be determined as follows: 
1. If any negligence, breach of contract, or willful misconduct of CONSULTANT caused any damage, injury, or loss claimed 
by the third party, then CONSULTANT and CLIENT shall each indemnify the other against any loss or judgement on a 
comparative negligence basis (CLIENT responsibility to include that of its agents, employees, and other contractors); 
and 
2. Unless CONSULTANT was liable for negligence, breach of contract, or willful misconduct which in whole or in part, 
caused the damage, injury, or loss asserted in the third party claim, CLIENT shall indemnify CONSULTANT against the 
claim, liability, loss, legal fees, consulting fees, and other costs of defense reasonably incurred. 
DISCOVERY OF UNANTICIPATED HAZARDOUS MATERIALS 
CLIENT represents that CLIENT has made a reasonable effort to evaluate if hazardous materials are on or near the project 
site, and that CLIENT has informed CONSULTANT of CLIENT's findings relative to the possible presence of such materials.

Ninyo & Moore   |   Wales Ranches Sewer Lift Station, Pinal County, Arizona   |   12PHX02-04162   |   October 21, 2021 
4 
 
Hazardous materials may exist at a site where there is no reason to believe they could or should be present. CONSULTANT 
and CLIENT agree that the discovery of unanticipated hazardous materials constitutes a changed condition mandating a 
renegotiation of the scope of work or termination of services. CONSULTANT and CLIENT also agree that the discovery of 
unanticipated hazardous materials may make it necessary for CONSULTANT to take immediate measures to protect health 
and safety. CLIENT agrees to compensate CONSULTANT for any equipment decontamination or other costs incident to the 
discovery of unanticipated hazardous materials. 
CONSULTANT agrees to notify CLIENT when unanticipated hazardous materials or suspected hazardous materials are 
encountered. CLIENT agrees to make any disclosures required by law to the appropriate governing agencies. CLIENT also 
agrees to hold CONSULTANT harmless for any and all consequences of disclosures made by CONSULTANT which are 
required by governing law. In the event the project site is not owned by CLIENT, CLIENT recognizes that it is CLIENT's 
responsibility to inform the property owner of the discovery of unanticipated hazardous materials or suspected hazardous 
materials. 
Notwithstanding any other provision of the AGREEMENT, CLIENT waives any claim against CONSULTANT and, to the 
maximum extent permitted by law, agrees to defend, indemnify, and save CONSULTANT harmless from any claim, liability, 
and/or defense costs for injury or loss arising from CONSULTANT's discovery of unanticipated hazardous materials or 
suspected hazardous materials, including, but not limited to, any costs created by delay of the project and any cost 
associated with possible reduction of the property's value. 
CLIENT will be responsible for ultimate disposal of any samples secured by CONSULTANT which are found to be 
contaminated. 
DISPUTE RESOLUTION 
If a dispute at law arises from matters related to the services provided under this AGREEMENT and that dispute requires 
litigation, then: 
1. 
The claim will be brought and tried in judicial jurisdiction of the court of the county where CONSULTANT's principal 
place of business is located and CLIENT waives the right to remove the action to any other county or judicial 
jurisdiction, and; 
2. 
The prevailing party will be entitled to recovery of all reasonable costs incurred, including staff time, court costs, 
attorneys' and expert witness fees, and other claim-related expenses. 
GOVERNING LAW AND SURVIVAL 
If any of the provisions contained in this AGREEMENT are held illegal, invalid, or unenforceable, the enforceability of the 
remaining provisions will not be impaired. Risk allocation and indemnities will survive termination or failure of this 
AGREEMENT for any cause. 
The parties have read, or had the opportunity to read, the foregoing, including all attachments, addendums, and exhibits 
hereto, have had an opportunity to discuss the same, understand completely the terms, and willingly enter into this 
AGREEMENT which will become effective on the date signed below by CLIENT. 
 
 
 
Printed Name of Client or Authorized Agent 
 
 
 
 
 
 
 
Signature of Client or Authorized Agent 
 
Date 
 
 
 
 
 
 
 
Craig Rees, Principal/Construction Services 
 
Date 
 
 
PM: SCJ

Page 9 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
REDI MIX
REDIMIX
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6022787777
Arizona Materia
ARIZONAMATER
Unit Price
4804282280
Desert Redi Mix
DESERETREDIM
Unit Price
6028176945
Calportland
CALPORTLAND
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
60.0000
CY
878.00
1/2 SACK CLSM
2CRMAG1/2SK
86.0000
88.2500
98.0000
0.0000
CY
15.00
MAG B CONCRETE
2CRMAGB
123.0000
122.2500
130.0000
78.0000
CY
10.00
MAG C CONCRETE
2CRMAGC
119.0000
118.2500
128.0000
175.0000
EA
2.40
SHORT LOAD CHARGE 1<2 C
2CRSL1-2
200.0000
0.0000
200.0000
125.0000
EA
2.00
SHORT LOAD CHARGE 4<6 C
2CRSL4-6
200.0000
0.0000
200.0000
150.0000
CY
18.00
SRP THERMAL CLSM
2CRTHCLSM
155.0000
P
150.0000
P
150.0000
Plugged Amount
Quoted Amount
0
82,213
2,700
80,500
2,700
90,154
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
56,830
Totals
82,213
83,200
92,854
Diff From Plug
25,383
26,370
36,024
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

PROJECT QUOTATION
Customer Service: 602-278-7777
Fax: 602-278-3077
3636 S 43rd Ave
Phoenix, AZ 85009
CUSTOMER:
Achen Gardner Construction, LLC
PROJECT:
City Of Chandler
Contact:
Mark McLafferty
Address:
Dobson Rd & Chapparal Rd
Phone:
602-877-9329
City,State,Zip:
Chandler , AZ ,
Fax:
Quote ID:
3200     (21)
Email:
mmclafferty@achen.com
Total Qty:
655 CYD (Estimated)
Concrete Products
Qty
Description
Mix Id
Price
Comments
612
1/2 Sack ABC Slurry (COP)
PHCLSM
$82.00
15
MAG-B 2500 PSI 1" Rock
12504
$119.00
10
2000 PSI MAG C
12004
$116.00
18
9 Sack Sand Grout
10574
$155.00
Environmental (Per Each)
$25.00
Fuel Surcharges (Per Each)
$15.00
SHORTLOAD CHARGES (Per Each)
$200.00
Chilled Water (Per Per Yard)
$1.00
Hot Water (Per Per Yard)
$1.00
Add-On Products
Price Increase and Quote Expiration
 Concrete pricing subject to change in the event of cement / fly ash
allocations and / or unanticipated cement / fly ash price increases.
Price Increase #1 : Add $8.00/CYD on 04/01/2022
All prices expire on quoted expiration date. 09/30/2022
Charges and Fees
Arizona Materials accepts no responsiblity for any damage to curb and beyond curb line.  It will be Buyers reponsibility to contact Arizona
Materials Quality Control Department with any concrete issue/concerns within 48 hours after placement.  Buyer is responsible to provide safe
access to point of delivery.  All materials are produced in conformance with ACI / ASTM standards.  Mixes quoted below, unless otherwise stated,
conform to no specific water cement ratio, minimum sack content, shrinkage, temperature requirement, or the plans and specifications of this
project.
All colored concrete loads have a 3 yard minimum.
Arizona Materials cannot guarantee compressive strengths of 5000 PSI or below for loads less than 3 yards. 
5000 PSI or above must be 5 yards or more to quarantee compressive strength.
 
Payment is due and payable on or before the 15th day of the month following to receive 2% discount.  Account must be current in full to be
eligible to apply discount.  A service charge not to exceed the maximum allowed by law applies on unpaid invoice amounts beginning the 1st day
of the month following due date and daily thereafter until paid in full. Should litigation be commenced to enforce payment, the prevailing party is
entitled to reimbursement of reasonable attorney fees and court costs.
Buyer has 30 days to validate quote with P.O. , signing issued quote, or written verification.
Prepared and Submitted By:
Acceptance (void if not accepted before 02/02/2022)
Name:
Charity Medlock
Date:
01/03/2022
Phone:
6026200364
Fax:
Email:
CMEDLOCK@AZMATL.COM
Signature
Date
Print Name
Title
Company

Corporate Offices:
3636 S. 43rd Avenue
Phoenix, AZ  85009
Phone: 602-278-7777
Fax: 602-442-6905
Terms and Conditions of Sale
Additives
Hot / Chilled Water - $1.00 per cubic yard
Nitrogen Cooling -  $9.50 per cubic yard
Non-Chloride Accelerator - $1.50 per unit
Recover - $2.00 per 1/2 Hour
Fiber
Micro Fiber  -  $7.50 per pound
Macro Fiber (Structural) - Priced as Quoted
Color  
Standard Liquid Color - See mix detail for per yard pricing
Color Washout - $25.00 per load
Delivery
Fuel Surcharge - $15.00 per load
Wash Out System Buckets - $25.00 per load (requested at time of order)
Standby Charges - $1.50 per minute beyond 6 minutes per cubic yard
Short Load Charges - 6 yards or less $200.00 per load
Environmental Fee - $25.00 per load
Weekend Delivery - $50.00 per load
Plant Opening Charge - $500.00/hr, 4 hour minimum
Sunday / Holiday Opening - $750.00/hr, 4 hour minimum
All order backs/split loads under 11 yds on one order are subject to Short Load Charges.
Concrete Pricing subject to change in the event of cement / fly ash allocations and/or 
unanticipated cement / fly ash price increases.
All materials are produced in conformance with ACI / ASTM Standards.
Contractor is responsible to provide safe access to the point of delivery.
Arizona Materials accepts no responsibility for damages to any curb and beyond the curb line.
concrete issues/concerns no later than 48 Hours after placement.
www.arizonamaterials.net
It is Contractors responsibility to contact Arizona Materials Quality Control Department with any 
Page 1 of 1

Customer Name 
ACHEN GARDNER CONSTRUCTION LLC 
Attention 
Project Name 
CHANDLER HEIGHTS RD UTILITY RELOCATIONS - COC 
City 
CHANDLER 
Project Address 
DOBSON RD & CHAPPARAL RD 
C/St 
 
Office Phone 
Fax 
Email 
 
Date 
12/29/2021 
Sales 
MARK REINER 
Cell # 
(480) 620-4673 
Email 
mreiner@calportland.com 
Quote # 
124951 
Customer # 
1016934 
Job Start 
12/29/2021 
Job End 
04/01/2022 
 
 
Volume 
Product Number 
Description 
Unit Price 
UOM 
Comments                                  
612.00 PHCLSM 
0.5 SK ABC SLURRY (PHCLSM 1/2) 
$98.00 
CY 
10.00 P2025C01 
2000PSI #57 MAG C 
$124.00 
CY 
15.00 P2525B01 
MAG B 2500PSI #57 ASH 
$126.00 
CY 
637 
Total Volume 
$20.00 
LOAD 
Environmental Fee 
$20.00 
LOAD 
Fuel Surcharge 
Fly ash and lightweight mixes subject to daily availability / All aggregates meet ASTM C 33. 
Comments : PRICE INCREASE 4-1-22 $10.00 CYD EXPIRING 10-1-22 
 
Subject to availability. CalPortland warrants that the concrete as delivered to this project will meet or exceed the design strength specified on the delivery ticket when evaluated 
in accordance with applicable ACI and ASTM standards. CalPortland does not provide Contractor Quality Control. CalPortland guarantees ticketed mix designs of less than 
5,000psi for load of three yards or more. Mix strength for loads less than three yards is not guaranteed. Ticketed mix designs of 5,000psi or greater require a four-yard minimum. 
Three-yard minimum for all colored concrete. Concrete is a natural product. Seller cannot be responsible for variations in color, surface discoloration, popouts or variations in 
the finished product caused by finishing techniques or job site conditions. Due to potential reactive aggregates in Arizona, CalPortland recommends the use of a Class F Fly 
Ash to mitigate Alkali Silica Reactivity (ASR). Purchaser shall assume the liability for the use of a cement-only mix. 
CalPortland reserves the right to postpone or cancel any quotes, current jobs or accepted deliveries if unable to perform due to raw material shortages, allocations or government 
regulations. Prices subject to change due to drastic cost changes of the major components of concrete or surcharges.  
Concrete is batched and delivered at current ambient temperatures. Buyer is responsible for temperature controlled concrete (Ice/Tempered Water). Prices for temperature 
controlled concrete are available upon request. 
Contractor is responsible for providing safe access to the point of delivery.  CalPortland accepts no responsibility for damages to the premises beyond the curb line.   
Customer shall provide and assume responsibility for an area or container for clean out of the concrete truck chutes.  Additional color added by Buyer on-site subject to wash 
out fees. 
All products quoted per Buyers request. Additional products or services ordered are subject to applicable charges.  
 
 
 
 
 
Standard Operating 
hours 
Loads batched outside Standard Operating Hours subject to applicable charges. 
Summer: 3:00AM – 2:00PM 
Winter: 5:00AM – 3:00PM 
Saturday: 5:00AM – 12:00PM 
Standing Time: 
$2.00 per minute beyond 5 minutes per CY. 
Minimum Load Charges: 
 
Excessive Trucking Fee: 
Fuel Surcharge: 
One Minimum Load Charge waived on orders of 1 full load or more. 
Under 6 CY = $200.00 
Split Loads or multiple Order Backs subject to Excessive Trucking Fees. 
Variable Fuel Surcharge based on U.S. Energy Information Administration On-Highway Diesel Fuel Price Index and is adjusted weekly. 
https://www.eia.gov/petroleum/gasdiesel/ 
Terms: 
All pricing is net 30 days with a valid credit application on file.   All applicable sales taxes will be added to price. 
Financing: 
All invoices are due and payable within 30 days of the original billing date.  A Finance Charge of 1.5% per month on a pro-
rated portion thereof (12% Annual Percentage Rate) will be charged upon all balances not paid within 30 days or first 
appearance on a Statement. 
We impose a surcharge of 2.25% on the transaction amount on all credit card products, which is not greater than our cost of 
processing.  We do not surcharge debit cards. 
General Terms & 
Conditions of Sale: 
Acceptance: 
CalPortland Co. Terms and Conditions are applicable and included as page two of this quote.  If you did not receive a copy, 
please contact CalPortland Sales Department at (602) 817-6950. 
For this job quotation to be effective, written acceptance must be received no later than 30 days after quote date. 
 
 
 
 
 
 
 
 
 
Price Expiration: 
04/01/2022 
See acceptance clause below 
Buyer Acceptance: 
 
Name / Title: 
 
Date:

Ready Mix Terms and Conditions 
 
Customer # 
1016934 
Customer Name 
ACHEN GARDNER CONSTRUCTION LLC 
Quote # 
124951 
Project Title 
CHANDLER HEIGHTS RD UTILITY 
RELOCATIONS - COC 
 
  
Tempered Water: 
Heated Water $2.00 per cubic yard. 
Ice: 
$0.50 per pound (Requires 3 – 5 business days notice). 
Non-Chloride Accelerator: 
 
$0.09 per ounce. 
Recover Set Delay Admixture: 
$0.20 per ounce. 
Micro Fiber: 
$6.50 per pound. 
Macro Fiber: 
 
(Structural) Priced individually 
 
Please see manufacturer recommendation / specifications for suggested dosage 
rate. 
Standard Liquid Color: 
See mix detail for per yard pricing. Actual color of concrete may vary due to 
differences in cement, aggregates, job site conditions and finishing methods. 
Three-yard minimum load required. 
Color Washouts: 
 
$25.00 per load 
Standby Charges: 
 
$2.00 per minute beyond 5 minutes per cubic yard. 
Minimum Load: 
Under 6 CY = $200.00  
Excessive Trucking: 
One Excessive Trucking Fee of $200 will be assessed for each additional load 
required due to load sizes or multiple Order Backs. 
Saturday Service: 
$5.00 per cubic yard 
Saturday operating hours 5:00am – 12:00pm 
Loads delivered outside of operating hours subject to additional charges 
Split Load Charges: 
 
$250.00 per load. 
Cancellation Charges: 
$10.00 per cubic yard 
- 
All orders greater than 80 cubic yards cancelled within 24 hours of scheduled 
delivery  
$10.00 per cubic yard (with a minimum of $250.00) 
- 
All orders with scheduled delivery between the hours of 6:00pm – 4:00am 
cancelled within 24 hours of scheduled delivery 
 
 
 
Special Provisions:

DESERT READY MIX 
                                                                                                           READY MIX CONCRETE SALES AND SERVICE 
 
                                                                                                       4011 PRESIDO STREET 
 
                                                                                                    MESA, AZ  85215 
                                                                                                            OFFICE: 480-428-2280  FAX: 480-985-4248 
* E – Environmental | S – Saturday Fee | F – Fuel Surcharge  
 
Begin Date: 
December 29, 2021 
Quote # : 
14798 
Expiration Date: 
April 30, 2022 
MAP/GRID 
184-19   
                                 “This quote does not guarantee product or service availability” 
 
 
 
Item Code 
Item Description 
Est. Qty 
Price 
S500501      
PHCLSM.5 (1/2 SACK SLURRY COP)           
612 Yards 
$85.00 
SRP104       
1/2 SACK MAG CLSM (SRP MIX)                           
Per Yard 
$85.00 
A202001      
MAG C 2000 PSI                    
10 Yards 
$115.00 
A202501      
MAG B 2500 PSI                           
15 Yards 
$119.00 
TC           
TEMPERATURE CONTROL                      
Per Yard 
$1.00 
              Additional Fees                                                                                 Minimum Load Fee 
Quoted By:
BRUCE A. TABET                             
 
Customer: 
ACHEN GARDNER CONSTRUCTION, LLC          
Customer Code: 
ACHE001    
Address: 
 
 
CHANDLER, AZ  85226 
Contact: 
MARK MCLAFFERTY (ESTIMATOR)                          
Phone: 
480-940-1300   
Fax: 
 
Project: 
CHANDLER HEIGHTS RD UTILITY RELOCATION   
Job Address: 
CHANDLER HEIGHTS DOBSON TO CHAPPARAL RD  
Terms Description: 
2% 10TH NET 30                            
Fee ID * 
UOM 
Price 
E01 
Per Yard 
$3.25 
Less than or equal to 
UOM 
Price 
2 Yards 
Load 
$0.00 
3.5 Yards 
Load 
$0.00 
5.5 Yards 
Load 
$0.00 
 
Normal operating hours are Mon-Fri, Sat, Sun or Holidays are subject to surcharges. 
 
Color added at no expressed guarantee. 
 
Drivers do not except cash or make change. 
 
Desert Ready Mix reserves the right to increase prices due to RAW Material cost increases 
such as Cement, Fly Ash, Aggregates or unexpected Fuel increases. 
 
All specialized aggregates are based on availability. 
 
Deliveries less than 6 Cubic yards are subject to our minimum load charges. 
 
This quote does not guarantee product or service availability

Page 10 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 7:59 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
SURVEY
SURVEY
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4805862104
Atwell, LLC
ATWELLLLC
Unit Price
4803136788
Benchmark Surv
BENCHMARKSUR
Unit Price
4809220780
Survey Innovati
SURVEYINNOVA
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
10,000.0000
LS
1.00
SURVEY
4SURVEY
3021490
20
0.0000
0.0000
4,000.0000
Plugged Amount
Quoted Amount
0
0
0
0
0
4,000
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
10,000
Totals
0
0
4,000
Diff From Plug
-10,000
-10,000
-6,000
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

January 7th, 2022 
 
Mark McLafferty 
Achen-Gardner Construction 
550 South 79th Street 
Chandler, AZ 85226 
480-403-9426 
 
SUBJECT:  
Chandler Heights Rd Utility Relocations 
 
Dear Mark: 
 
Rick Engineering Company is pleased to submit this proposal to provide professional survey services on 
the above referenced project. We look forward to working with you on this project. 
 
SCOPE OF WORK: 
 
Control 
• Verify existing horizontal and vertical control and establish new control for site staking. 
 
Subtotal: $510.00 
 
Domestic/Fireline Water Services 
• 
Provide one stake at requested offset on 50-foot intervals for line only. 
• 
Provide two stakes at requested offset including grades to adjacent top of curb elevation for 
fire hydrants, water meter vaults and back flow preventers. 
 
Subtotal: $1,530.00 
 
Sanitary Sewer 
• 
Provide one stake at requested offset on 25-foot intervals for line including grade to invert. 
• 
Provide one offset stake at requested offset for cleanout locations. 
• 
Provide two offset stakes per manhole at requested offset with grades to rim and invert 
elevation. 
 
Subtotal: $340.00 
Asbuilts 
• 
Collect field data for use in preparing final asbuilts. 
1. 
Water  
• 
Provide centerline stations on fire hydrants, valves, fittings, meters and taps. 
• 
Contractor to notify surveyor if vertical dip locations are required to be 
located. 
2. 
Sewer  
• 
Provide centerline stations for manholes, cleanouts and fittings. 
• 
Provide rim and invert elevations for manholes

Page 2 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
Note:  The contractor will note any changes made during the construction phase and provide 
dimensions to the surveyor before completion of final asbuilts are submitted.  Should the 
following be required by the governing municipality, the contractor shall notify the project 
surveyor before back-filling water, fire line, sewer, storm drain facilities or other underground 
pipelines and utilities in order that the surveyor may verify the asbuilt location and elevation of 
said utilities. 
 
Subtotal: $850.00 
 
Calculations, Coordination and Project Management 
• 
Onsite preconstruction meetings to coordinate field staking for synergistic operation with 
construction subcontractors (not to exceed one meeting).  Additional meetings will be 
conducted on a time and materials basis per Fee Schedule. 
• 
Point staking calculation for items contained in this proposal. 
• 
Drafting services to complete contract asbuilts per governing agency. 
• 
Correspondence to client and subcontractors (i.e. cutsheets, staking progress 
memorandums, etc). 
 
Subtotal: $770.00 
 
FEE: 
 
Rick Engineering will provide the above services for a TOTAL FEE of $4,000.00. The attached 
Provisions of Agreement between Achen-Gardner Construction (CLIENT) and RICK are incorporated 
hereunto and made a part of this proposal. Any printing is extra and not a part of this agreement. 
 
 
EXCLUSIONS: 
 
The following items are specifically excluded from the Scope of Work and budget and, if required, 
will either be prepared by others or will be covered by separate agreement between Rick Engineering 
Company and CLIENT. 
 
a) Boundary Discrepancies 
b) Soils Reports 
c) Staking for Finish Landscaping or Hardscape 
d) Any items not listed in the “Scope of Work” 
 
If the above meets with your approval, please execute where indicated below, and return to our 
office for our files.  If there are any questions or concerns, please feel free to contact our office. 
 
Sincerely, 
RICK ENGINEERING COMPANY

Page 3 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
                                                                                                                                  
Randall R. Hager, RLS 
Associate – Construction Survey Manager 
 
 
 
 
 
 
ACCEPTED THIS                                             DAY OF                                          , 2022 
 
BY: ________________________________________________________________  
                                                  CLIENT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Invoices for this project to be mailed to: 
 
Company:  _______________________________________________________________________ 
 
Address:  ________________________________________________________________________ 
 
City/State/Zip:  __________________________________________________________________ 
 
Telephone:  ___________________________________  Email:  ________________ ____________ 
 
Contact person:  __________________________________________________________________ 
 
Please complete, sign and return a copy to RICK ENGINEERING COMPANY

Page 4 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
STANDARD PROVISIONS: ARIZONA 2022 
The Client and Consultant agree that the following provisions shall be a part of their Agreement: 
 1.  This Agreement shall be binding upon the heirs, partners, successors, executors, administrators and assigns of the Client and Consultant. 
 2.  In the event of any increase of costs due to the granting of wage increases and/or other employee benefits to field or office employees due to 
the terms of any labor agreement, rise in the cost of living, or increase in any applicable prevailing wage during the lifetime of this Agreement, 
such increase shall be applied to all remaining compensation.  For services provided on a time and materials or hourly rate basis, increases in the 
applicable rates will be reflected in the billing statement or invoice for the month following the increase. 
 3.  Should litigation at law or equity arising out of this Agreement, including but not limited to an action for declaratory relief, be brought to 
enforce or interpret any term or provision of this Agreement, or to collect any portion of the amount payable under this Agreement or litigation 
commenced either directly or by way of a cross-complaint whether arising out of contract or tort, including a cross-complaint for indemnity, for 
failure or alleged failure to perform or for errors, omissions, or negligence, the prevailing party shall be entitled, in addition to any other award, to 
all litigation and collection expenses, any and all costs of defense, including attorney's fees, expert witness fees, witness fees and court costs and 
any and all other expenses incurred.  
 4.  Neither the Client nor Consultant shall assign his interest in this Agreement without the written consent of the other.  
 5.  This Agreement shall be governed by and construed in accordance with the laws of the State of Arizona.  This Agreement contains the entire 
agreement between Client and Consultant relating to the project and the provision of services by Consultant to the project.  Any agreements, 
promises, negotiations or representations not expressly set forth herein, are of no force or effect.  Subsequent modifications to this Agreement 
shall be in writing and signed by both Client and Consultant. 
 6.  Conditions or representations, alterations, detractions from or to the terms hereof, including delineations hereon, shall not be valid unless they 
are in writing and signed by both Client and Consultant. 
 7.  Client agrees that the Consultant is not responsible for damages arising directly or indirectly from any delays for causes beyond the 
Consultant's control. For purposes of this Agreement, such causes include, but are not limited to, strikes or other labor disputes; severe weather 
disruptions or other natural disasters; fires, riots, war or other emergencies or acts of God; failure of any government agency to act in timely 
manner; failure of performance by the Client or the Client's contractors or consultants; issuance of regulations, orders or other governmental 
actions that limit, restrict or delay the ability of Consultant or Consultant’s workforce to perform; or discovery of any hazardous substances or 
differing site conditions. In addition, if the delays resulting from any such causes increase the cost or time required by the Consultant to perform 
its services in an orderly and efficient manner, the Consultant shall be entitled to an equitable adjustment in schedule and/or compensation. 
 8.  In the event litigation is instituted under the terms and conditions of this Agreement, such litigation is to be brought and tried in the 
appropriate court in the state and county in which the project is located and the parties waive the right to have brought, tried in, or removed to any 
other county or judicial jurisdiction. 
 9.  Client acknowledges that Consultant is not responsible for the performance of work by third parties, including, but not limited to, the 
construction contractor(s), subcontractors, governmental agencies, construction managers, architects, or other consultants.  
10.  Consultant shall only act as an advisor in all governmental relations. Consultant shall not be liable for damages resulting from the actions or 
inactions of governmental agencies including, but not limited to, permit processing, environmental impact reports, dedications, general plans and 
amendments thereto, zoning matters, annexations or consolidations, use or conditional use permits, project or plan approvals and building 
permits. 
11.  Consultant makes no warranty, either express or implied, as to the findings, recommendations, plans, specifications, or professional advice.  
Consultant shall perform in accordance with generally accepted engineering and/or surveying practices or standards in effect at the time of 
performance in the locale where the services are rendered. 
12.  Consultant makes no representation, guarantee, warranty, express or implied concerning estimated cost figures made in connection with 
maps, plans, specifications, or drawings, other than that all such figures are estimates only.  Consultant shall not be responsible for fluctuations in 
cost factors. 
13.  Consultant makes no representations concerning estimates of areas.  Estimates of areas are estimates only and are not to be considered 
precise unless Consultant specifically agrees to provide the precise determination of such areas. 
14.  Client and Consultant agree to cooperate in any and every way or manner on project.   
15.  Consultant makes no representation, either express or implied, concerning soils or geological surveys or subsurface soil tests or general soils 
testing and reporting. 
16.  Upon written request, each of the parties hereto shall execute and deliver, or cause to be executed and delivered, such additional instruments 
and documents which may be necessary and proper to carry out the terms of this Agreement. 
17.  The terms and provisions of this Agreement shall not be construed to alter, waive, or affect any lien or stop notice rights which the 
Consultant may have for the performance of services under this Agreement.

Page 5 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
18.  One or more waivers of any term, condition or covenant by a party shall not be construed as a waiver of subsequent breach of the same or 
any other term, condition, or covenant. 
19.  In the event Client fails to pay Consultant promptly or within sixty (60) days after invoices are rendered, then Client agrees that Consultant 
shall have the right to consider said default a total breach of this Agreement and, upon written notice, the duties, obligations and responsibilities 
of the Consultant under this Agreement are terminated.  In such event, Client shall then promptly pay the Consultant for all the fees, charges, and 
services performed to date by Consultant. 
20.  In the event any term, condition, covenant or provision of this Agreement shall be held to be invalid, void or unenforceable, the remaining 
terms, conditions, covenants and provisions of this Agreement shall be valid and binding on the parties hereto. 
21.  The Client agrees it will require that the Contractor hold harmless, indemnify and defend the Client, the Architect, the Consultant and its 
subconsultants, and each of their officers, directors, principals, employees and agents, from any and all liability claims, losses or damages arising 
or alleged to arise from the performance of the work described herein, but not including the sole negligence or willful misconduct of the Client, 
the Architect or the Consultant or their respective subconsultants, officers directors, principals, employees and agents. 
22.  The Client shall indemnify and hold Consultant harmless with regard to all liability or claims of any kind, including all investigation and 
defense costs, connected directly or indirectly with this project, which liabilities or claims do not result from the sole negligence or willful 
misconduct of the Consultant. 
23.  Consultant has a right to complete all services agreed to be rendered pursuant to this Agreement. In the event this Agreement is terminated 
before the completion of all services, unless Consultant is responsible for such early termination, Client agrees to release Consultant from all 
liability for services performed. 
24.  In the event work prepared or partially prepared by the Consultant be suspended, abandoned, or terminated, the Client shall pay the 
Consultant for all work, fees, deposits, charges and services provided, not to exceed any maximum amount specified herein.  Client 
acknowledges if project work is suspended and restarts, there may be additional charges due to suspension which shall be paid by Client as extra 
work. 
25.  Client agrees that if Client requests services not specified pursuant to the scope of services described within this Agreement, Client agrees to 
pay all such additional services as extra work if authorized in writing. 
26.  Consultant shall be entitled to immediately, and without notice, suspend the performance of any and all of its obligations pursuant to this 
Agreement if Client files a voluntary petition seeking relief under the United States Bankruptcy Code or if there is an involuntary bankruptcy 
petition filed against Client in the United States Bankruptcy Court, and that petition is not dismissed fifteen (15) days after its filing.  Any 
suspension of services made pursuant to the provisions of this Paragraph shall continue until such time as this Agreement has been fully and 
properly assumed or adequate assurance provided in accordance with the applicable provisions of the United States Bankruptcy Court and in 
compliance with the final order or judgments issued by the Bankruptcy Court. 
27.  If payment for Consultant's services is to be made on behalf of Client by a third party, Client agrees that Consultant shall not be required to 
indemnify the third party, in the form of an endorsement or otherwise, as a condition of receiving payment for services. 
28.  Client agrees to purchase and maintain, during construction, builder's liability special peril or other similar insurance which will name 
Consultant as an additional insured.  Client also agrees to require the contractor or contractors to purchase and maintain liability insurance, 
including broad form general liability coverage, comprehensive bodily injury, broad form property damage, independent contractors insurance, 
completed operations and contractual liability coverage, and the exclusions for explosion, collapse or underground coverage shall be deleted; 
automobile including bodily injury, property damage, owned, non-owned and hired vehicles; and worker's compensation insurance including 
employers liability coverage, all of which shall name the Client and Consultant as additional insureds. Certificates of such insurance shall be 
provided to Consultant and the certificate(s) shall include provisions that the above policies are primary and non-contributory with Consultant's 
insurance and that coverage will not be canceled unless at least thirty days prior written notice has been given to Consultant. 
29.  In the event that the plans, specifications, and/or field work covered by this Agreement are those required by various governmental agencies 
and one or more such governmental agency changes its policies, ordinances, procedures or requirements after the date of this Agreement, any 
additional office or field work required, shall be paid by Client as extra work.  
30.  Services provided within the Agreement are for the exclusive use of the Client.  Nothing contained in this Agreement shall be construed to be 
for the benefit of any person not a party to this Agreement and no third-party beneficiary rights are created. 
31.  All original papers, drawings, notes, documents and other work product of Consultant, and copies thereof, produced as a result of the 
Agreement represent professional services, shall remain the property of the Consultant, and Consultant shall retain all copyright and other 
ownership interests.  Client shall have a nonexclusive license to use Consultant’s work product and any items in which Consultant maintains 
ownership and/or copyright interest so long as all fees to be paid under this Agreement have been paid.  Any nonexclusive license Client obtains 
under this Agreement terminates upon the termination of this Agreement.  Consultants work product may be used by Consultant without consent 
of the Client.  
32.  In the event that any changes are made in the plans and/or specifications by the Client or persons other than the Consultant, and such changes 
are not consented to in writing by Consultant, Client acknowledges that the changes and their effects are not the responsibility of Consultant and

Page 6 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
Client agrees to release Consultant from all liability arising from the use of such changes and agrees to defend, indemnify and hold Consultant, its 
officers, directors, principals, agents and employees harmless from and against all claims, demands, damages or costs arising from the changes. 
33.  Client agrees not to use or permit any other person to use plans, drawings or other work product prepared by Consultant, which plans, 
drawings or other work product are not signed and stamped or sealed by Consultant and/or are not final.  Client agrees to be liable and 
responsible for any use of non-final plans, drawings or work product or plans, drawings or work product not signed, and stamped or sealed by 
Consultant and waives liability against Consultant for their use.  Client further agrees that final plans, drawings, and other work products are for 
the exclusive use of Client and may be used by Client only for the project described in this Agreement. 
34.  In the event that any staking is destroyed, damaged, or disturbed by an act of God or parties other than Consultant, the cost of re-staking shall 
be paid for by the Client as extra work.  If the scope of services provided for pursuant to this Agreement does not include construction staking by 
Consultant, Client acknowledges that changes, clarifications, adjustments, and modifications may be necessary because of changed field or other 
conditions.  Client will indemnify and defend Consultant for construction staking by others and from claims arising from changes, clarifications, 
adjustments and modifications which may be necessary to reflect changed field or other conditions, except claims caused by the sole negligence 
or willful misconduct of Consultant. 
35.  Questions concerning location or changes in construction stakes or questions concerning information on plans and specifications must be 
called to the attention of the Consultant upon discovery and before corrective remedy. 
36.  The Consultant shall be notified 24 hours in advance, so that he may check forms, for grade and alignment only, prior to the pouring of 
concrete for cast-in-place concrete structures, thrust blocks, electrical boxes, bridge abutments or piers, or any similar structures staked by 
Consultant.  Consultant can assure compliance to proper grade and alignment only when it has been advised to check in advance. 
37.(a)  If the scope of services to be provided by Consultant pursuant to the terms of this Agreement include the preparation of engineering 
drawings but exclude construction staking services, Client acknowledges that such services normally include coordinating civil engineering 
services and the preparation of as-built drawings pursuant to Uniform Building Code Chapter 70 and/or other statutes, ordinances or laws, and 
Client will be required to retain such services from another consultant or pay Consultant  pursuant to this Agreement for such services as extra 
work. 
   (b) If the scope of services to be provided by Consultant pursuant to the terms of the Agreement, include construction staking services, but 
exclude the preparation of the engineering drawings to be used for construction and construction staking, Client acknowledges the coordination of 
civil engineering services and the preparation of as-built drawings as required by statute, ordinance or law may require the retention by Client of 
another consultant or the original consultant responsible for the design, or pay Consultant pursuant to this Agreement for such services as extra 
work.  Client acknowledges that if Consultant is retained to prepare as-built drawings of plans prepared by others, Client will indemnify, defend 
and hold Consultant harmless from any and all liability in connection with the plans and specifications prepared by others, and the performance 
of work by Consultant on this project as set forth in Paragraph 44. 
38.  In the event Client discovers or becomes aware of apparent errors or omissions, field conditions or discrepancies during the construction 
phase of the project, which apparent errors or omissions, field conditions or discrepancies are resolvable by Consultant, Client agrees to notify 
Consultant and engage Consultant to resolve the problem before construction activities commence or further construction activity proceeds.  
Further, Client agrees to have a provision in its construction contracts for the project which require the contractor to notify Client of any such 
apparent errors or omissions, field conditions or discrepancies so that Client may, in turn, notify Consultant pursuant to the provisions of this 
Paragraph. 
39.  Client shall pay the costs of checking and inspection fees, zoning and annexation application fees, assessment fees, soils engineering fees, 
soil testing fees, aerial topography fees, and other fees and deposits, permits, bond premiums, title company charges, blueprints and 
reproductions, and all other charges not specifically covered by the terms of this Agreement.  
40.  All fees and other charges will be billed monthly as the work progresses and the net amount shall be due at the time of billing. 
41.  A late payment CHARGE will be computed by the Consultant at the periodic rate of 1.5% per month, not to exceed the maximum legal rate, 
which will be applied to any unpaid balance commencing thirty (30) days after the date of the original billing. 
42.  Client agrees that the balance as stated on the billings from Consultant to Client are correct, conclusive and binding on the Client unless 
Client within forty-five (45) days from the date of receipt of such billing, notifies Consultant in writing of the particular items that are alleged to 
be incorrect. 
43. In consideration of the Consultant's fee for services, the Client agrees that the Consultant will perform no onsite construction review, 
construction management, supervision of construction of engineering structures or other construction supervision for this project unless 
specifically contracted for; that such services will be provided by others; and that the Client shall defend, indemnify and hold the Consultant, its 
officers, directors, principals, agents and employees harmless from any and all liability, real or alleged, arising or resulting from the performance 
of construction review, construction management, supervision of construction of engineering structures or supervision by others.  Further, Client 
acknowledges that Consultant will be unable to correct errors or omissions in the plans which customarily become apparent and resolvable during 
construction review.    
44.  Client agrees that, in accordance with generally accepted construction practices, the construction contractor will be required to assume sole 
and complete responsibility for job site conditions during the course of construction of the project, including safety of all persons and property; 
that this requirement shall be made to apply continuously and not be limited to normal working hours.  The Client further agrees to defend,

Page 7 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
indemnify, and hold the Consultant harmless from any and all liability in connection with the performance of work on this project, excepting 
liability arising from the sole negligence or willful misconduct of the Consultant. 
45.  Client agrees to limit the liability of Consultant, its principals and employees to the Client, all contractors and subcontractors on the project, 
due to professional  negligent  acts, errors  or  omissions  of  the  Consultant, breach of contract or any other cause of action however pled to the 
sum of $50,000 or the Consultant's fee, whichever is greater; except that if the contract amount, including any addenda or other contracts 
pertaining to or covering services related to the project, exceeds $150,000, the liability of Consultant shall not exceed $150,000.  Client further 
agrees to notify any contractor and subcontractor who may perform work in connection with any design, report or study prepared by Consultant 
of such limitation of liability, and to require as a condition precedent to their performing their work, a like indemnity of liability on their part as 
against the Consultant. 
46.  The Client hereby agrees to bring no claim for negligence, breach of contract, indemnity or otherwise against the Consultant, its principals, 
employees and agents if such claim, in any way, would involve the Consultant's services for the investigation, detection, abatement, replacement, 
use or specification, or removal of products, materials or processes containing asbestos, asbestos cement pipe, and/or hazardous materials (as 
defined by state, federal and/or local laws or ordinances).  Client further agrees to defend, indemnify and hold harmless Consultant, its officers, 
directors, principals, employees and agents from any asbestos, asbestos cement pipe, and/or hazardous waste material related claims that may be 
brought by third parties as a result of the services provided by the Consultant pursuant to this Agreement except claims caused by the sole 
negligence or willful misconduct of the Consultant. 
47.  Client acknowledges that Consultant's scope of services for this project does not include any services related, in any way, to asbestos and/or 
hazardous waste.  Should Consultant or any other party encounter such materials on the job site, or should it in any way become known that such 
materials are present or may be present on the job site or any adjacent or nearby areas which may affect Consultant's services, Consultant may, at 
its option, terminate work on the project until such time as Client retains a specialist contractor to abate and/or remove the asbestos and/or 
hazardous waste materials and warrant that the job site is free from any hazard which may result from the existence of such materials. 
48.  Digital data files shall be provided to Client only if such delivery has been specified in the scope of services set forth in this Agreement.  If 
the scope of services does not specify that digital data files shall be delivered, all costs associated with delivery of digital data files shall be paid 
by Client.   Client agrees that all digital data files delivered by Consultant are to be used exclusively to fulfill the scope of this Agreement.  Client 
agrees to hold Consultant harmless for any use by client of this data outside or beyond the scope of this Agreement. 
49.  Consultant makes the following representations as to the compatibility of digital data files: 
   (a) All data files are to be used with compatible hardware and software versions as used by Consultant at the time file copies were created. 
   (b) Consultant makes no representation as to the compatibility of any data files other than for the hardware and software versions used by 
Consultant to create the data files. 
   (c) Client agrees to hold Consultant harmless for any use of data files on any hardware or software versions other than those which were used 
by Consultant to create them. 
   (d) If Client requires or requests any special or specific file structure, format or software that is different from those used by Consultant at the 
time Consultant is performing the services set forth in this Agreement, unless otherwise specified in this Agreement, all costs associated with 
creating the file structure or format, and/or acquiring necessary software and/or hardware, shall be the responsibility of Client. 
50.  After the time final data files have been delivered per terms of this Agreement, Consultant will not be held responsible for maintaining copies 
of any digital data related to this Agreement. 
51.  Client agrees that if formats for deliverables of digital files are not specified in this Agreement, they will be delivered using the standards and 
versions of Consultant at the time of creation. 
52.  Client agrees not to use any digital files (drawing or data file), in whole or in part, for any purpose or project other than the project which is 
the subject of this Agreement.  Client waives any and all claims against Consultant resulting in any way from any changes not authorized and/or 
authored by Consultant and/or reuse of the drawings or data for any other project without the express written consent by Consultant.  The transfer 
of drawings or data in electronic media or format shall not be deemed a sale, and Consultant makes no warranties, either express or implied, of 
merchantability or fitness for a particular purpose. 
53.  Because data stored on electronic media can deteriorate undetected or be modified without the Consultant’s knowledge, the Client agrees that 
it will accept responsibility for the completeness, correctness, or readability of the electronic media after an acceptance period of 30 days after 
delivery of the electronic files, and that upon the expiration of this acceptance period, client will indemnify and save harmless the Consultant for 
any and all claims, losses, costs, damages, awards or judgments arising from use of the electronic media files or output generated from them.  The 
Consultant agrees that it is responsible for the accuracy of the sealed drawings that accompany the submittal, and that such accuracy is defined as 
the care and skill ordinarily used by members of the Consultants profession practicing under similar conditions at the same time and in the same 
locality.  Consultant makes no warranties, express or implied, under this Agreement or otherwise, in connection with the Consultant’s services. 
54.  Prior to the commencement of any legal action, in an effort to resolve any conflicts that arise during the design or construction of the project 
which is the subject of this Agreement, or following completion of the project, Client and Consultant agree that all disputes between them arising 
out of or relating to this Agreement, the services performed pursuant to this Agreement, or relating in any way to the project, shall be submitted to 
nonbinding mediation unless the parties mutually agree otherwise.  Each party shall be represented at the mediation by a person or persons with

Page 8 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations.doc 
the authority to bind the party to any agreement, obligation or resolution resulting from the mediation.  Each of the parties agrees to include a 
similar mediation provision in all agreements with any other contractors and consultants retained for the project and to require such contractors 
and consultants to include a similar provision in all agreements with subcontractors, sub-consultants, suppliers or fabricators, thereby providing 
mediation as the primary method for dispute resolution between the parties to those agreements.

Quote Analysis Report
Page 1 of 1
Achen-Gardner Construction, LLC 71
Mark McLafferty
1/13/2022 9:25 AM
CHANDLER HEIGHTS RD DOBSON/CHAPPARAL
39381001
TRAFFIC CONTROL
TRAFFIC
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6024310911
Trafficade Traf
TRAFFICADETR
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
40.0000
DA
4.00
TRAFFIC CONTROL
4TRACCL
2101900
135
40.0000
125.0000
EA
2.00
TRAFFIC CONTROL
4TRACCLSD
2101900
135
125.0000
45.0000
DA
19.00
TRAFFIC CONTROL
4TRACFL
2101900
135
45.0000
150.0000
EA
19.00
TRAFFIC CONTROL
4TRACFLSD
2101900
135
150.0000
80.0000
DA
18.00
TRAFFIC CONTROL
4TRAFDN
2101900
135
80.0000
450.0000
EA
30.00
TRAFFIC CONTROL
4TRAFDNBSD
2101900
135
450.0000
100.0000
DA
24.00
TRAFFIC CONTROL
4TRAFDS
2101900
135
100.0000
750.0000
EA
38.00
TRAFFIC CONTROL
4TRAFDSSD
2101900
135
750.0000
104.0000
HR
136.00
TRAFFIC CONTROL
4TRAFLH
2101900
135
104.0000
40.0000
DA
120.00
TRAFFIC CONTROL
4TRAMB
2101900
135
40.0000
125.0000
EA
8.00
TRAFFIC CONTROL
4TRAMBLPU
2101900
135
125.0000
Plugged Amount
Quoted Amount
0
69,899
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
Total Adjustment
0
69,899
Totals
69,899
Diff From Plug
0
Total Minority
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

WE PROVIDE: 
Achen Gardner Construction. 
Atte: Mark McLafferty (602) 877-9329 
Chandler Heights Utility relocates (CMAR) 
Dobson Rd & Chaparral Way. Chandler AZ. 
Bid Date: 1-05-2022                                                                                             401D 
 
TRAFFIC CONTROL DAILY ESTIMATE 
 
DOBSON RD SOUTH BOUND FULL CHANNEL. MAINTAIN 1 THRU LANE 
IN EACH DIRECTION ON THE E/S OF THE MEDIAN FROM CANYON WAY 
TO 800 FT S/O CHAPARRAL WAY. 24 HRS SET UP. 
 
Estimated cost for equipment rental daily is $100.00*.  
 
Estimated labor cost for set up OR pick up is $750.00* per occurrence. 
 
DOBSON RD NORTH BOUND FULL CHANNEL. MAINTAIN 1 THRU LANE 
IN EACH DIRECTION ON THE W/S OF THE MEDIAN FROM CANYON WAY 
TO CHAPARRAL WAY. DAY TIME SET UP. 
 
Estimated cost for equipment rental daily is $80.00*.  
 
Estimated labor cost for set up, take down, reset OR pick up is $450.00* per 
occurrence. 
 
CHAPARRAL WAY, 2-WAY FLAGMAN STATION USING AFAD UNITS- 
WORK AREA: 200 FT @ BLUE RIDGE WAY OR CRESCENT WAY. DAY 
TIME SET UP. 
 
Estimated cost for equipment rental daily is $45.00*.  
 
Estimated labor cost for set up, take down, reset OR pick up is $150.00* per 
occurrence. 
 
The above estimated labor cost does not included labor for stand-by, 
flaggers or AFAD units. 2 Flaggerade AFADs are $104.00* per hour. 
 
2 Certified flagger are $86.00* per hour. 
 
ADDITIONAL EQUIPMENT FOR CHAPARRAL WAY HARD CLOSURE @ 
BLUE RIDGE WAY. ALLOW LOCAL TRAFFIC ACCESS EAST AND WEST 
OF THE INTERSECTION. DAY TIME SET UP. 
 
Estimated cost for equipment rental daily is $40.00*.  
 
Estimated labor cost for set up, take down, reset OR pick up is $125.00* per 
occurrence. 
 
MESSAGE BOARD RENTAL (AS NEEDE). 
 
1 – VMS Boards with protection equipment is $40.00* per day. 
 
Estimated cost for delivery OR pick up of each unit is $125.00* per 
occurrence. 
 
EXCLUSIONS: 
Message Boards, Temporary No Parking Signs, Municipal Plan Review Fees, Permit Fees, 
Shadow Truck, Project Specialty Signs, Concrete or Water Filled Barrier Wall, Flagman, 
Police Officers, Standby Time and ADA Compliance. 
 
TERMS / CONDITIONS: 
1. Invoices will be based off the actual ticketed equipment and / or labor delivered to 
the job. 
2. Sales tax is not included and will be added to all billings. Tax rate subject to change 
if the prevailing rate changes. 
3. This quote is valid for 60 days. If work starts after 60 days, then Trafficade 
reserves the right to nullify this quote and re-quote at its own discretion. 
4. 0% Retention. 
Trafficade Estimator: Abel Duenez 602-431-0911 
 
BARRICADES 
  
TRAFFIC CONTROL
  
TRAFFIC PLANS 
  
PLATES & SHORING 
  
PAVEMENT MILLING
  
SAWING & CORING 
  
BARRIER WALL 
  
SAFETY SUPPLIES
  
CUSTOM SIGNS 
  
SIGN INSTALLATIONS 
  
ASPHALT PAVING
 
Locations: 
Phoenix 
2533 W. Holly St.
Phoenix, AZ 85009 
Chandler 
17046 S. Weber Dr. 
Chandler, AZ 85226 
Tucson 
2802 N. Flowing Wells 
Tucson, AZ 85705 
Prescott 
11580 E. Santa Fe Loop 
Dewey, AZ 86327 
Flagstaff 
5301 E. Commerce Ave. 
Flagstaff, AZ 86004 
Yuma 
3178 33rd Place, Ste. A 
Yuma, AZ 86365 
Holbrook: 
405 W. Vista Dr. 
Holbrook, AZ 86025 
Kingman: 
2700 Airway Ave. 
Kingman, AZ 86409

EXHIBIT D7:  BASELINE PROJECT SCHEDULE 
 
JANUARY 26, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR CHAPARRAL WAY: DOBSON TO LAKE DRIVE  
PROJECT NO:  WW2111.401 
 
 
See Following Baseline Project Schedule

ID
Task 
Mode
Task Name
Duration
Start
Finish
1
GMP 1 ‐ Chaparral Way
59 days
Mon 4/4/22 Wed 6/1/22
2
DOBSON SEWER
25 days
Mon 4/4/22 Thu 4/28/22
3
INSTALL BYPASS
2 days
Mon 4/4/22 Tue 4/5/22
4
REMOVALS & EX MH
3 days
Mon 4/4/22 Wed 4/6/22
5
INSTALL SEWER
5 days
Thu 4/7/22
Mon 4/11/22
6
PRESSURE TEST SEWER
1 day
Tue 4/12/22 Tue 4/12/22
7
INSTALL MH'S & BACKFILL
6 days
Wed 4/13/22Mon 4/18/22
8
MH COATING BASE
1 day
Tue 4/19/22 Tue 4/19/22
9
MH TESTING
1 day
Wed 4/20/22Wed 4/20/22
10
SEWER CAMERA
1 day
Thu 4/21/22 Thu 4/21/22
11
REMOVE BYPASS
4 days
Fri 4/22/22
Mon 4/25/22
12
PAVING
2 days
Tue 4/26/22 Wed 4/27/22
13
ADJUSTMENTS
1 day
Thu 4/28/22 Thu 4/28/22
14
DOBSON WATER
23 days
Thu 4/28/22 Fri 5/20/22
15
INSTALL 16" WATER 
8 days
Thu 4/28/22 Thu 5/5/22
16
TESTING
7 days
Fri 5/6/22
Thu 5/12/22
17
TIE OVER NEW/OLD WL
1 day
Fri 5/13/22
Fri 5/13/22
18
PAVING
4 days
Sat 5/14/22 Tue 5/17/22
19
ADJUSTMENTS
2 days
Wed 5/18/22Thu 5/19/22
20
STRIPING
1 day
Fri 5/20/22
Fri 5/20/22
21
FLATWORK
4 days
Sat 5/14/22 Tue 5/17/22
22
CHAPARRAL WATER
27 days
Fri 5/6/22
Wed 6/1/22
23
INSTALL 8" 
6 days
Fri 5/6/22
Wed 5/11/22
24
INSTALL 12"
6 days
Thu 5/12/22 Tue 5/17/22
25
TESTING
7 days
Wed 5/18/22Tue 5/24/22
26
TIE OVER NEW/OLD WL
2 days
Wed 5/25/22Thu 5/26/22
27
FLATWORK
2 days
Thu 5/26/22 Fri 5/27/22
28
PAVING
3 days
Sat 5/28/22 Mon 5/30/22
29
ADJUSTMENTS
1 day
Tue 5/31/22 Tue 5/31/22
30
STRIPING
1 day
Wed 6/1/22 Wed 6/1/22
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
Apr 3, '22
Apr 10, '22
Apr 17, '22
Apr 24, '22
May 1, '22
May 8, '22
May 15, '22
May 22, '22
May 29, '22
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: GMP 1 - Chaparral Way
Date: Wed 1/26/22

EXHIBIT E 
Rev.12/1/2020 
Construction Manager at Risk Construction Services 
SUB-1 
 
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No. WW2111.401 
SUBCONTRACTOR’S LIST FORM 
If CM@Risk intends to subcontract any portion of this contract, the CM@Risk must submit the name, address, and contractor’s license number (if 
applicable) of each subcontractor, including the work component of such subcontracting.  Include the form with the bid submittal documents.  CM@Risk 
may make multiple copies of this form as needed.
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed: 
 
 
 
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed: 
 
 
 
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed: 
 
 
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed: 
 
 
 
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed: 
 
 
 
Company Name: 
 
Contact Name: 
 
Contact Email: 
 
Contact Phone: 
 
Work Component: 
 
Percentage of Total 
Work Performed:

EXHIBIT F 
City of Chandler Construction Manager at Risk Construction Services 
GIS-1 
Public Works & Utilities Department, Capital Projects Division 
Project Name: CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS - GMP 1 
Project No.: WW2111.401 
Rev. 4/1/2021 
 
GIS / GPS DATA DELIVERY REQUIREMENTS

GIS / GPS Data Delivery Requirements 
 
Contractor must provide survey grade GPS / GIS data, meeting the following requirements for all 
facilities to be owned and/or operated by the City of Chandler. 
 
a) ESRI File Geodatabase format: 
 
All GPS point data, along with corresponding GIS Attribute data, must be submitted in ESRI File 
Geodatabase format. The City of Chandler will provide a copy of the File Geodatabase in ESRI 
ArcGIS format. Please submit your request through the Project Manager. 
 
b) Data dictionary and Attribute data: 
 
Attribute data should be provided for each of the GPS’d Utility Feature listed in Section ‘d’ below. 
All Attribute data should conform to the ESRI File Geodatabase format, provided by the City. A 
copy of the data dictionary is also attached here for reference 
 
c) Coordinate System: 
 
Horizontal Datum:  Arizona State Plane Coordinates, Central Zone NAD83 (HARN) 
Vertical Datum:  NAVD88 
 
d) Point Data for GPS: 
 
1) Water System Features: 
• 
Water main location (top of pipe), size and material (one (1) coordinate provided every 100 feet 
minimum) and at fittings. 
• 
Water fitting location (top of feature), size, material and type including:  Bend (22.5, 45, or 90), 
Tee, Tapping Sleeve, Cross, Coupling, End Cap, Line Stop, Reducer, 
• 
Saddle, Other. 
• 
Water valve location (center of valve box cover), size and type. 
• 
Fire hydrant location (top of hydrant), manufacturer and year. 
• 
Water service line location (at connection to main, any bends, and termination at meter box or 
meter vault or at the edge of easement or ROW), size and material. 
• 
Water  blow-off  and  air  release  valve  location  (center  of  cover),  size,  type  and 
manufacturer. 
• 
Water manhole or vault location (center of cover), size and type. 
 
2) Waste Water System Features: 
• 
Sewer manhole and cleanout location (center of cover), size, material, and cover type. 
• 
Sewer gravity main location (invert of pipe), size, material and flow direction (from) at all 
manholes, cleanouts and structures. 
• 
Sewer service line location, size and material (at connection to main, and termination at 
cleanout, or stub out at edge of the easement or ROW). 
• 
Sewer force main location (top of pipe), size, and material (one (1) coordinate provided every 
100 feet minimum) and at fittings.

• 
Sewer force main (and gravity) fitting location (top of feature), size, material and type including: 
Bend (22.5, 45, or 90), Tee, Tapping Sleeve, Cross, Coupling, End Cap, Linestop, Reducer, 
Saddle, Wye, Other 
• 
Sewer force main valve location (center of valve box cover), size and type. 
• 
Sewer  force  main  air  release  valve  location  (center  of  cover),  size,  type  and 
manufacturer. 
• 
Sewer force main manhole or vault location (center of cover), size and material. 
• 
Sewer structure (center of structure), type (diversion, junction box) 
 
3) Reclaimed Water System Features: 
• 
Reclaimed  main  location  (top  of  pipe),  size,  and  material  (one  (1)  coordinate provided 
every 100 feet minimum) and at fittings. 
• 
Reclaimed fitting location (top of feature), size, material and type including:   Bend (22.5,  45,  
or  90),  Tee,  Tapping  Sleeve,  Cross,  Coupling,  End  Cap,  Linestop, 
• 
Reducer, Saddle, Other. 
• 
Reclaimed valve location (center of valve box cover), size and type. 
• 
Reclaimed service line location (at connection to main, any bends, and termination at meter 
box or meter vault or at the edge of easement or ROW), size and material. 
• 
Reclaimed blow-off and air release valve location (center of cover), size, type and 
manufacturer. 
• 
Reclaimed manhole or vault location (center of cover), size and type. 
 
4) Storm Water System Features: 
• 
Storm manhole and cleanout location (center of cover), size, material, and cover type. 
• 
Storm gravity main location (invert of pipe), size, material, and flow direction (from) at all 
manholes, cleanouts and structures. 
• 
Storm structure location (center of structure), type and category including: Drywell, Catch 
Basin, Scupper, Bubbler Box, and Collection Vault. 
 
5) Standard GPS Metadata on all points collected: Date, Time, Height, Horiz_Precision, 
Vert_Precision, Northing, Easting, Surveyor, Datafile, and Comments 
 
 
e) Electronic Data Submittal: 
 
Each submittal must consist of  
 
1) ESRI – ArcGIS Geodatabase with cumulative data and attributes, and 
2) Construction plans with collected utilities clearly redlined and changes marked 
 
The frequency of data submittal will be every two weeks after water, sewer, reclaim or storm assets 
go into the ground. Submittals can be emailed to:  GIS@chandleraz.gov

DATA DICTIONARY 
 
 
FOR 
 
 
WATER, SEWER, RECLAIM & STORM

DATA DICTIONARY: 
 
 
WATER

Water Fitting 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WS_SPATIALSOURCE_STD 
MATERIAL 
 MATERIAL 
 String 
20 
  
DIAMETER1 
 DIAMETER1 
 String 
8 
 RWS_FITTING_DIAMETER 
DIAMETER2 
 DIAMETER2 
 String 
8 
  
ROTATION 
 ROTATION 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
TYPE 
 TYPE 
 String 
30 
 WS_FITTING_TYPE 
BEND 
 BEND 
 String 
20 
 WS_FITTING_BEND

Water Hydrant 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 Feature Owner 
 String 
25 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 Lifecycle Status 
 String 
25 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 Spatial Source 
 String 
25 
 WS_SPATIALSOURCE_STD 
BARRELDIAMETER 
 Barrel Diameter 
 Double 
8 
  
LARGENOZZLEDIAMETER 
 Large Nozzle Diameter 
 Double 
8 
  
SMALLNOZZLEDIAMETER 
 Small Nozzle Diameter 
 Double 
8 
  
OUTLETCONFIGURATION 
 Outlet Configuration 
 Double 
8 
  
SEATDIAMETER 
 Seat Diameter 
 Double 
8 
  
MANUFACTURER 
 Manufacturer 
 String 
25 
 WS_HYD_MANUFACTURER 
YEARMANUFACTURED 
 Manufacture Year 
 String 
25 
  
HASLOCK 
 Has Lock ? 
 String 
25 
 GIS_BOOLEAN_YES_NO 
COLOR 
 Color 
 String 
25 
  
ROTATION 
 Symbol Rotation 
 Double 
8 
  
GPSOID 
 GPS ObjectID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
25 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 String 
25 
  
VERT_PREC 
 VERT_PREC 
 String 
25 
  
NORTHING 
 NORTHING 
 String 
25 
  
EASTING 
 EASTING 
 String 
25 
  
DATAFILE 
 DATAFILE 
 String 
25 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50

WATER VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATURE OWNER 
 String 
20 
 RWS_SYSVAL_FUNCTION 
LIFECYCLESTATUS 
 LIFECYCLE STATUS 
 String 
20 
 
WS_SYSVAL_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIAL SOURCE 
 String 
20 
 WS_SYSVAL_SPATIALSOURCE 
TYPE 
 TYPE 
 String 
25 
 RWS_SYSVAL_TYPE 
VALVETYPE 
 VALVE TYPE 
 String 
10 
 RWS_SYSVAL_VALVETYPE 
GROUNDTYPE 
 GROUNDTYPE 
 String 
25 
 WS_SYSVAL_GROUNDTYPE 
DIAMETER 
 Diameter 
 String 
8 
 WS_SYSVAL_DIAM 
GPSOID 
 GPS OBJECTID 
 Integer 
4 
  
GPS_DATE 
 GPS DATE 
 Date 
8 
  
GPS_TIME 
 GPS TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ PREC 
 Double 
8 
  
VERT_PREC 
 VERT PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS COMMENT 
 String 
30 
  
WO_CAT_CODE 
 WO CAT CODE 
 String 
10 
  
WO_CAT 
 WO CAT 
 String 
25

WATER MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WS_SPATIALSOURCE_STD 
ACCESSDIAMETER 
 ACCESSDIAMETER 
 String 
8 
  
ACCESSTYPE 
 ACCESSTYPE 
 String 
20 
  
GROUNDTYPE 
 GROUNDTYPE 
 String 
20 
 WS_SYSVAL_GROUNDTYPE 
COVERMATERIAL 
 COVERMATERIAL 
 String 
10 
  
COVERTYPE 
 COVERTYPE 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

WATER MISC PNT 
  
This feature is used for any miscellaneous information  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50 
  
NOTES 
 NOTES 
 String 
150 
  
SIZE 
 SIZE 
 Double 
8

Water Domains: 
Domain name 
 WS_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
FUTURE  
 FUTURE 
INACTIVE  
 INACTIVE 
REMOVED  
 REMOVED 
UNKNOWN  
 UNKNOWN 
  
  
  
  
Domain name 
 
WS_SYSVAL_SPATIALSOURCE 
APPROVED PLANS  
 APPROVED PLANS 
ASBUILT  
 ASBUILT 
DESIGN  
 DESIGN 
GPS  
 GPS 
HYDRMAINT  
 HYDRMAINT 
ORTHOPHOTO  
 ORTHOPHOTO 
TM7  
 TM7 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WS_HYD_MANUFACTURER 
AMERICANDARLING   AMERICANDARLING 
AVK  
 AVK 
CLOW  
 CLOW 
DRESSER  
 DRESSER 
GREENBERG  
 GREENBERG 
KENNEDY  
 KENNEDY 
MUELLER  
 MUELLER 
PACIFIC  
 PACIFIC 
UNKNOWN  
 UNKNOWN 
WATEROUS  
 WATEROUS 
  
 
 
  
Domain name 
 WS_FEATUREOWNER 
COC  
 Chandler 
COG  
 Gilbert 
COM  
 Mesa 
COP  
 Phoenix 
COT  
 Tempe 
COUNTY  
 Maricopa County 
GOULD  
 Gould 
GRIC  
 GRIC 
INTEL  
 Intel 
MICROCHIP  
 Microchip 
MOTOROLA  
 Motorola 
PRIVATE  
 Private 
SRP  
 SRP 
SRVWUA  
 SRVWUA 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 
WS_SYSVAL_LIFECYCLESTATUS 
FUTURE  
 FUTURE 
UNKNOWN  
 UNKNOWN 
INACTIVE  
 INACTIVE 
ACTIVE  
 ACTIVE 
REMOVED  
 REMOVED 
ABANDONED  
 ABANDONED

Domain name 
 WS_FITTING_BEND 
HORIZONTAL  
 HORIZONTAL 
VERTICAL  
 VERTICAL 
  
  
Domain name 
 WS_SYSVAL_DIAM 
2 
2 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
16 
16 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48 
54 
54 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Domain name 
 WS_FITTING_TYPE 
11B  
 11B 
22B  
 22B 
45B  
 45B 
90B  
 90B 
COUPLING  
 COUPLING 
CROSS  
 CROSS 
ENDCAP  
 ENDCAP 
LINESTOP  
 LINESTOP 
OTHER  
 OTHER 
REDUCER  
 REDUCER 
SADDLE  
 SADDLE 
TAPPING SLEEVE  
 TAPPING SLEEVE 
TEE  
 TEE 
UNKNOWN  
 UNKNOWN 
WYE  
 WYE 
  
  
Domain name 
 
WS_SYSVAL_GROUNDTYPE 
CONCRETE  
 CONCRETE 
ASPHALT  
 ASPHALT 
LANDSCAPE  
 LANDSCAPE 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WS_SPATIALSOURCE_STD 
ASBUILT  
 ASBUILT 
DESIGN  
 DESIGN 
FIELD  
 FIELD 
GPS  
 GPS 
ORTHOPHOTO  
 ORTHOPHOTO 
UNKNOWN  
 UNKNOWN

DATA DICTIONARY: 
 
 
SEWER

SEWER CLEANOUT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
RIM_ELEV 
 RIM_ELEV 
 Double 
8 
  
INV_ELEV 
 INV_ELEV 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

SEWER CONTROL VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
TYPE 
 TYPE 
 String 
25 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
DIAMETER 
 DIAMETER 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

SEWER_FITTING 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
MATERIAL 
 MATERIAL TYPE 
 String 
20 
  
TYPE 
 TYPE 
 String 
30 
  
BEND 
 BEND 
 String 
20 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
SIZE_ 
 SIZE OF FITTING 
 String 
20

SEWER_MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
LID 
 LID TYPE 
 String 
20 
  
TYPE 
 TYPE 
 String 
20 
 WW_MH_TYPE 
COVER_MATERIAL 
 COVER_MATERIAL 
 String 
25 
 
WW_MH_COVER_MATERIAL 
COVER_HOLE 
 COVER_HOLE 
 String 
25 
 WW_MH_COVER_HOLE 
COVER_SIZE 
 COVER_SIZE 
 String 
20 
 WW_MH_COVER_SIZE 
RIM_ELEV 
 RIM_ELEV 
 Double 
8 
  
INV_ELEV 
 INV_ELEV 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
LINER 
 LINER 
 String 
50 
 WW_MH_LINER 
WALL_MATERIAL 
 WALL_MATERIAL 
 String 
50 
 WW_MH_WALL_MATERIAL

SEWER_MISC 
  
For any Miscellaneous features 
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
  
MATERIAL 
 MATERIAL 
 String 
20 
  
TYPE 
 TYPE 
 String 
30 
  
BEND 
 BEND 
 String 
20 
  
NOTES 
 NOTES 
 String 
255 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
SIZE_ 
 SIZE_ 
 String 
20

Sewer Domains: 
Domain name 
 WW_FEATUREOWNER 
COC  
 COC 
PRIVATE  
 PRIVATE 
TOG  
 TOG 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_SPATIALSOURCE 
GPS  
 GPS 
ASBUILT  
 ASBUILT 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_MH_COVER_HOLE 
UNKNOWN  
 UNKNOWN 
SEALED  
 SEALED 
  
  
Domain name 
 WW_MH_LINER 
CAST-IN-PLACE  
 CAST-IN-PLACE 
CEMENTITIOUS  
 CEMENTITIOUS 
COMPOSITE  
 COMPOSITE 
CURED-IN-PLACE  
 CURED-IN-PLACE 
EPOXY  
 EPOXY 
FR PLASTIC INSERT  
 FR PLASTIC INSERT 
FR POLYMER INSERT  
 FR POLYMER INSERT 
INSERT  
 INSERT 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
INACTIVE  
 INACTIVE 
PULLED  
 PULLED 
UNKNOWN  
 UNKNOWN 
 
 
 
Domain name 
 
WW_MH_COVER_MATERIAL 
ALUMINUM  
 ALUMINUM 
CASTIRON  
 CASTIRON 
HDPE COMPOSITE - CAP   HDPE COMPOSITE - CAP 
HDPE COMPOSITE - EJ  
 HDPE COMPOSITE - EJ 
HDPE COMPOSITE - 
HD20  
 HDPE COMPOSITE - HD20 
STEEL  
 STEEL 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_MH_COVER_SIZE 
0 
 Unknown 
4 
4 
6 
6 
8 
8 
22 
22 
24 
24 
26 
26 
28 
28 
30 
30 
32 
32 
38 
38 
48 
48 
60 
60 
  
  
Domain name 
 WW_MH_WALL_MATERIAL 
NONE  
 NONE 
COMPOSITE  
 COMPOSITE 
UNKNOWN  
 UNKNOWN 
CONCRETE  
 CONCRETE 
POURED  
 POURED 
TLOCK  
 TLOCK 
PRECAST  
 PRECAST 
BRICK  
 BRICK

Domain name 
 WW_MH_TYPE 
0 
 UNKNOWN 
1 
 SANITARY SEWER 
2 
 ARV

DATA DICTIONARY: 
 
 
RECLAIM

RECLAIM_FITTING 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
MATERIAL 
 MATERIAL 
 String 
20 
 RWS_MAIN_OR_SERVICE_MATERIAL 
DIAMETER1 
 DIAMETER1 
 String 
8 
 RWS_FITTING_DIAMETER 
DIAMETER2 
 DIAMETER2 
 String 
8 
 RWS_FITTING_DIAMETER 
TYPE 
 TYPE 
 String 
30 
 RWS_FITTING_TYPE 
BEND 
 BEND 
 String 
20 
 RWS_FITTING_BEND 
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

RECLAIM_MISC_STRUCT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
TYPE 
 SUBTYPE 
 String 
20 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50 
  
NOTES 
 Notes 
 String 
150

RECLAIM_MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
ACCESSDIAMETER 
 ACCESSDIAMETER 
 String 
8 
 RWS_GROUNDTYPE 
GROUNDTYPE 
 GROUNDTYPE 
 String 
20 
  
COVERMATERIAL 
 COVERMATERIAL 
 String 
10 
  
COVERTYPE 
 COVERTYPE 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

RECLAIM SYSTEM VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATURE OWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLE STATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIAL SOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
TYPE 
 TYPE 
 String 
25 
 RWS_SYSVAL_TYPE 
VALVETYPE 
 VALVE TYPE 
 String 
10 
 RWS_SYSVAL_VALVETYPE 
FUNCTION 
 FUNCTION 
 String 
25 
 RWS_SYSVAL_FUNCTION 
GROUNDTYPE 
 GROUNDTYPE 
 String 
25 
 RWS_SYSVAL_GROUNDTYPE 
GPSOID 
 GPS OBJECTID 
 Integer 
4 
  
GPS_DATE 
 GPS DATE 
 Date 
8 
  
GPS_TIME 
 GPS TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ PREC 
 Double 
8 
  
VERT_PREC 
 VERT PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS COMMENT 
 String 
30 
  
WO_ZONE 
 WO ZONE 
 Double 
8 
  
DIAMETER 
 DIAMETER 
 Double 
8 
 RWS_SYSVAL_DIAM 
WO_CAT_CODE 
 WO_CAT_CODE 
 String 
10

Reclaim Domains: 
 
Domain name 
 RWS_SYSVAL_VALVETYPE 
BALL  
 BALL 
BUTTERFLY  
 BUTTERFLY 
GATE  
 GATE 
INSERTA  
 INSERTA 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_SYSVAL_FUNCTION 
ARV  
 ARV 
INLINE  
 INLINE 
PUMPOUT  
 PUMPOUT 
PUMPSTATION  
 PUMPSTATION 
SERVICE  
 SERVICE 
STUBOUT  
 STUBOUT 
UNKNOWN  
 UNKNOWN 
VAULT  
 VAULT 
  
  
Domain name 
 RWS_SYSVAL_TYPE 
ARV  
 ARV 
BLOWOFF  
 BLOWOFF 
STANDARD  
 STANDARD 
  
  
Domain name 
 RWS_FEATUREOWNER 
COC  
 CHANDLER 
COM  
 MESA 
INTEL  
 INTEL 
OCA  
 OCA 
OMG  
 OMG 
PRIVATE  
 PRIVATE 
SRP  
 SRP 
TOG  
 GILBERT 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 RWS_FITTING_BEND 
HORIZONTAL  
 HORIZONTAL 
VERTICAL  
 VERTICAL 
  
  
Domain name 
 RWS_MAIN_OR_SERVICE_MATERIAL 
AC  
 AC 
CC  
 CC 
CI  
 CI 
CU  
 COPPER 
DI  
 DI 
PVC  
 PVC 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_FITTING_TYPE 
11B  
 11B 
22B  
 22B 
45B  
 45B 
90B  
 90B 
COUPLING  
 COUPLING 
CROSS  
 CROSS 
ENDCAP  
 ENDCAP 
LINESTOP  
 LINESTOP 
MECHANICAL 
JOINT  
 MECHANICAL JOINT 
OTHER  
 OTHER 
RECHARGE WELL  
 RECHARGE WELL 
REDUCER  
 REDUCER 
SADDLE  
 SADDLE 
TAPPING SLEEVE  
 TAPPING SLEEVE 
TEE  
 TEE 
UNKNOWN  
 UNKNOWN 
WYE  
 WYE

Domain name 
 RWS_SPATIALSOURCE 
ASBUILT  
 ASBUILT 
FIELD  
 FIELD 
GPS  
 GPS 
ORTHOPHOTO  
 ORTHOPHOTO 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
INACTIVE  
 INACTIVE 
REMOVED  
 REMOVED 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_SYSVAL_DIAM 
1.5 
1.5 
2 
2 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
16 
16 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48 
9999 
 UNKNOWN 
 
 
 
 
Domain name 
 RWS_GROUNDTYPE 
ASPHALT  
 ASPHALT 
CONCRETE  
 CONCRETE 
DIRT  
 DIRT 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 RWS_SYSVAL_GROUNDTYPE 
ASPHALT  
 ASPHALT 
CONCRETE  
 CONCRETE 
LANDSCAPE  
 LANDSCAPE 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_FITTING_DIAMETER 
0.63 
0.63 
0.75 
0.75 
1 
1 
1.25 
1.25 
1.5 
1.5 
2 
2 
2.5 
2.5 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
15 
15 
16 
16 
18 
18 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48

DATA DICTIONARY: 
 
 
STORM

SWS_DRAIN_MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER_1 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_SPATIALSOURCE 
STRUCTURE_TYPE 
 STRUCTURE_TYPE 
SmallInteger 
2 
 SWS_STRUCTURE_TYPE 
CHANDLER_NAME 
 CHANDLER_NAME_ON_LID 
 String 
5 
 GIS_BOOLEAN_YES_NO 
DIAMETER 
 DIAMETER 
SmallInteger 
2 
 SWS_SDMH_SIZE 
VENT_HOLE 
 VENT_HOLE 
 String 
30 
 GIS_BOOLEAN_YES_NO 
ACCESS_OPENING_TYPE 
 ACCESS_OPENING_TYPE 
 String 
25 
 SWS_SDMH_ACCESS_OPENING_TYPE 
LID_TYPE 
 LID_TYPE 
 String 
30 
 SWS_SDMH_TYPE 
LID_TEXT 
 LID_TEXT 
 String 
30 
 SWS_SDMH_LID_TEXT 
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8 
  
  
SWS_BUBBLER_BOX 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_SPATIALSOURCE 
GRATE_OPENINGS_NUM 
 GRATE_OPENINGS_NUM 
SmallInteger 
2 
 SWS_GRATE_OPENINGS 
GRATE_LENGTH 
 GRATE_LENGTH 
 Double 
8 
 SWS_GRATE_LENGTH 
GRATE_WIDTH 
 GRATE_WIDTH 
 Double 
8 
 SWS_GRATE_WIDTH 
DRYWELL_ASSOC 
 DRYWELL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
GPSX 
 GPSX 
 Double 
8 
  
GPSY 
 GPSY 
 Double 
8 
  
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8 
  
NOTES 
 NOTES 
 String 
50

SWS_CATCHBASIN 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_LIFECYCLESTATUS 
STRUCTURE_TYPE 
 STRUCTURE_TYPE 
SmallInteger 
2 
 SWS_STRUCTURE_TYPE 
CATCHBASIN_TYPE 
 CATCHBASIN_TYPE 
 String 
25 
 SWS_CB_TYPE 
LOCATION 
 LOCATION 
 String 
100 
  
CITY_EMBLEM 
 CITY_EMBLEM 
 String 
5 
 GIS_BOOLEAN_YES_NO 
ACCESS_OPENING_TYPE 
 ACCESS_OPENING_TYPE 
 String 
25 
 SWS_CB_ACCESS_OPENING_TYPE 
GRATE_LENGTH 
 GRATE_LENGTH 
 Double 
8 
 SWS_GRATE_LENGTH 
GRATE_WIDTH 
 GRATE_WIDTH 
 Double 
8 
 SWS_GRATE_WIDTH 
LID 
 LID 
 String 
5 
 GIS_BOOLEAN_YES_NO 
LID_TYPE 
 LID_TYPE 
 String 
25 
 SWS_CB_LID_TYPE 
DRYWELL_CONN 
 DRYWELL_CONN 
 String 
5 
 GIS_BOOLEAN_YES_NO 
OUTLET_CONN 
 OUTLET_CONN 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLERBOX_CONN 
 BUBBLERBOX_CONN 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLERBOX_DRYWELL_ASSOC 
BUBBLERBOX_DRYWELL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
LAKE_DRAIN 
 LAKE_DRAIN 
 String 
5 
 GIS_BOOLEAN_YES_NO 
GPSX 
 GPSX 
 Double 
8 
  
GPSY 
 GPSY 
 Double 
8 
  
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8 
  
NOTES 
 NOTES 
 String 
50

SWS_DRYWELL_PNT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
Shape 
 Shape 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER_1 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS_1 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_SPATIALSOURCE_1 
FIELD_LOC 
 FIELD_LOC 
 String 
100 
 SWS_DW_LOCATION 
INSTALLER 
 INSTALLER 
 String 
30 
 SWS_DW_INSTALLER 
CHAMBER_TYPE 
 CHAMBER_TYPE 
 String 
30 
 SWS_DW_CHAMBER_TYPE 
LID_SIZE 
 LID_SIZE 
SmallInteger 
2 
 SWS_DW_LID_SIZE 
LID_TYPE 
 LID_TYPE 
 String 
25 
 SWS_DW_LID_TYPE 
NUISANCE_LINE_ASSOC 
 NUISANCE_LINE_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
CONCRETE_PAD 
 CONCRETE_PAD 
 String 
5 
 GIS_BOOLEAN_YES_NO 
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8

SWS_INLET_PNT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
Shape 
 Shape 
 Geometry 
0 
  
CATCHBASIN_TYPE 
 CATCHBASIN_TYPE 
 String 
25 
 SWS_CB_TYPE 
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER_1 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS_1 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_SPATIALSOURCE_1 
FIELD_LOC 
 FIELD_LOC 
 String 
100 
 SWS_FIELD_LOC 
GRATE_ASSOC 
 GRATE_ASSOC 
 String 
25 
 GIS_BOOLEAN_YES_NO 
GRATE_LENGTH 
 GRATE_LENGTH 
 Double 
8 
 SWS_GRATE_LENGTH 
GRATE_WIDTH 
 GRATE_WIDTH 
 Double 
8 
 SWS_GRATE_WIDTH 
INLET_PIPE_DIAM 
 INLET_PIPE_DIAM 
SmallInteger 
2 
 SWS_INLET_PIPE_DIAM 
INLET_NUMBER 
 NUMBER_OF_INLETS 
SmallInteger 
2 
  
TRASHRACK_ASSOC 
 TRASHRACK_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
TRASH_LENGTH 
 TRASH_LENGTH 
 Double 
8 
  
TRASH_WIDTH 
 TRASH_WIDTH 
 Double 
8 
  
NUISANCE_LINE_ASSOC 
 NUISANCE_LINE_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLER_BOX_DRYWELL_ASSOC 
BUBBLER_BOX_DRYWELL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
HEADWALLASSOC 
 HEADWALLASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8

SWS_OUTLET_PNT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER_1 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
 SWS_SPATIALSOURCE_1 
GRATE_ASSOC 
 GRATE_ASSOC 
 String 
25 
 GIS_BOOLEAN_YES_NO 
GRATE_LENGTH 
 GRATE_LENGTH 
 Double 
8 
 SWS_GRATE_LENGTH 
GRATE_WIDTH 
 GRATE_WIDTH 
 Double 
8 
 SWS_GRATE_WIDTH 
INLET_PIPE_DIAM 
 INLET_PIPE_DIAM 
SmallInteger 
2 
 SWS_INLET_PIPE_DIAM 
INLET_NUMBER 
 NUMBER_OF_INLETS 
SmallInteger 
2 
  
TRASHRACK_ASSOC 
 TRASHRACK_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
TRASH_LENGTH 
 TRASH_LENGTH 
 Double 
8 
  
TRASH_WIDTH 
 TRASH_WIDTH 
 Double 
8 
  
NUISANCE_LINE_ASSOC 
 NUISANCE_LINE_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLER_BOX_DRYWELL_ASSOC 
BUBBLER_BOX_DRYWELL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
HEADWALLASSOC 
 HEADWALLASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8

SWS_SCUPPER_PNT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 SWS_FEATUREOWNER_1 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 SWS_LIFECYCLESTATUS_1 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
25 
  
CITY_EMBLEM 
 CITY_EMBLEM 
 String 
5 
 GIS_BOOLEAN_YES_NO 
NUMBER_OPENINGS 
 NUMBER_OPENINGS 
SmallInteger 
2 
  
WIDTH 
 WIDTH 
 Double 
8 
  
SPILLWAY_ASSOC 
 SPILLWAY_ASSOC 
 String 
25 
 GIS_BOOLEAN_YES_NO 
HEADWALL_ASSOC 
 HEADWALL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
NUISANCE_LINE_ASSOC 
 NUISANCE_LINE_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLERBOX_ASSOC 
 BUBBLERBOX_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
BUBBLER_BOX_DRYWELL_ASSOC 
BUBBLER_BOX_DRYWELL_ASSOC 
 String 
5 
 GIS_BOOLEAN_YES_NO 
LAKE_DRAIN 
 LAKE_DRAIN 
 String 
5 
 GIS_BOOLEAN_YES_NO 
RIPRAP 
 RIPRAP 
 String 
25 
 GIS_BOOLEAN_YES_NO 
COMMENTS 
 COMMENTS 
 String 
255 
  
COLLECTED_DATE 
 COLLECTED_DATE 
 Date 
8

Sewer Domains: 
  
Domain name 
 SWS_DW_LOCATION 
AIRPORT  
 AIRPORT 
CITYRETENTION  
 CITY RETENTION 
PARK  
 PARK 
PARKING_LOT  
 PARKING LOT 
PRIVATERETENTION  
 PRIVATE RETENTION 
STREET  
 STREET 
WELL_SITE  
 WELL SITE 
  
  
Domain name 
 SWS_GRATE_LENGTH 
12 
12 
24 
24 
28 
28 
30 
30 
36 
36 
38 
38 
40 
40 
50 
50 
60 
60 
76 
76 
  
  
Domain name 
 SWS_CB_LID_TYPE 
STEEL  
 STEEL 
CONCRETE  
 CONCRETE 
  
  
Domain name 
 SWS_DW_CHAMBER_TYPE 
DOUBLE  
 DOUBLE 
SINGLE  
 SINGLE 
TRIPLE  
 TRIPLE 
           
Domain name 
 SWS_LIFECYCLESTATUS_1 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
INACTIVE  
 INACTIVE 
REMOVED  
 REMOVED 
  
  
Domain name 
 SWS_GRATE_OPENINGS 
1 
1 
2 
2 
3 
3 
4 
4 
5 
5 
6 
6 
  
  
Domain name 
 SWS_SPATIALSOURCE_1 
FIELD  
 FIELD 
GPS  
 GPS 
  
  
Domain name 
 SWS_SPATIALSOURCE 
APPROVED_PLANS  
 APPROVED_PLANS 
ASBUILT  
 ASBUILT 
DESIGN  
 DESIGN 
FIELD  
 FIELD 
GPS  
 GPS 
ORTHOPHOTO  
 ORTHOPHOTO 
UNKNOWN  
 UNKNOWN 
                       
Domain name 
 SWS_SDMH_SIZE

22 
22 
24 
24 
26 
26 
28 
28 
30 
30 
32 
32 
38 
38 
  
  
Domain name 
 GIS_BOOLEAN_YES_NO 
YES  
 YES 
NO  
 NO 
  
  
Domain name 
 SWS_DW_LID_SIZE 
22 
22 
24 
24 
25 
25 
26 
26 
32 
32 
38 
38 
  
  
Domain name 
 SWS_STRUCTURE_TYPE 
1 
 CATCH BASIN 
2 
 SCUPPER 
3 
 DRYWELL 
4 
 MANHOLE 
5 
 OUTLET 
6 
 INLET 
7 
 BUBBLERBOX 
8 
 SPILLWAY 
9 
 SEPARATOR 
          
Domain name 
 
SWS_CB_ACCESS_OPENING_TYPE 
NONE  
 NONE 
RECTANGULAR  
 RECTANGULAR 
ROUND  
 ROUND 
SQUARE  
 SQUARE 
  
  
Domain name 
 SWS_FEATUREOWNER_1 
ADOT  
 ADOT 
CITY_OF_CHANDLER  
 CITY_OF_CHANDLER 
HOA  
 HOA 
PRIVATE  
 PRIVATE 
  
  
Domain name 
 SWS_LIFECYCLESTATUS 
ACTIVE  
 ACTIVE 
FUTURE  
 FUTURE 
REMOVED  
 REMOVED 
INACTIVE  
 INACTIVE 
ABANDONED  
 ABANDONED 
  
  
Domain name 
 SWS_FEATUREOWNER 
ADOT  
 ADOT 
CITY_OF_CHANDLER  
 CITY_OF_CHANDLER 
HOA  
 HOA 
OTHER  
 OTHER

Domain name 
 SWS_SDMH_LID_TEXT 
CHANDLER_SANITATION_SEWER   CHANDLER SANITATION SEWER 
CHANDLER_STORM/SEWER  
 CHANDLER STORM/SEWER 
NONE  
 NONE 
OTHER  
 OTHER 
STORM SEWER  
 STORM SEWER 
  
  
Domain name 
 SWS_DW_INSTALLER 
McGUCKINDRILLING  
 McGUCKIN DRILLING 
OTHER  
 OTHER 
TORRENTRESOURCES  
 TORRENT RESOURCES 
WACODRILLING  
 WACO DRILLING 
  
  
Domain name 
 SWS_GRATE_WIDTH 
6 
6 
12 
12 
16 
16 
18 
18 
24 
24 
28 
28 
30 
30 
36 
36 
38 
38 
44 
44 
72 
72 
  
  
Domain name 
 
SWS_SDMH_ACCESS_OPENING_TYPE 
NONE  
 NONE 
RECTANGULAR  
 RECTANGULAR 
ROUND  
 ROUND 
SQUARE  
 SQUARE 
       
Domain name 
 SWS_FIELD_LOC 
AIRPOR  
 AIRPORT 
CTYRTN  
 CITYRETENTION 
Domain name 
 SWS_CB_TYPE 
NONE  
 NONE 
PARK  
 PARK 
PRKLOT  
 PARKING_LOT 
PVRET  
 PRIVATERETENTION 
STREET  
 STREET 
TYPE_A  
 TYPE_A 
TYPE_B  
 TYPE_B 
TYPE_C  
 TYPE_C 
TYPE_D  
 TYPE_D 
TYPE_E  
 TYPE_E 
TYPE_F  
 TYPE_F 
TYPE_G  
 TYPE_G 
TYPE_H  
 TYPE_H 
TYPE_Q  
 TYPE_Q 
WELLSI  
 WELL_SITE 
Domain name 
 SWS_INLET_PIPE_DIAM 
12 
12 
13 
13 
14 
14 
15 
15 
16 
16 
18 
18 
24 
24 
26 
26 
30 
30 
36 
36 
42 
42 
46 
46 
60 
60 
72 
72

Domain name 
 SWS_SDMH_TYPE 
PRESSURIZED  
 PRESSURIZED 
NON-PRESSURIZED  
 NON-PRESSURIZED 
  
  
Domain name 
 SWS_DW_LID_TYPE 
STEEL  
 STEEL 
GRANITE  
 GRANITE 
CONCRETE_SEALED  
 CONCRETE_SEALED 
GRATE  
 GRATE