City of Chandler Construction Manager at Risk Construction Services
Page i
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 4/1/2021
CITY OF CHANDLER, ARIZONA
DOBSON ROAD IMPROVEMENTS AT
INTEL DRIVEWAYS #1 AND #4
CITY PROJECT NO. ST2009.401
CONSTRUCTION SERVICES CONTRACT
(CONSTRUCTION MANAGER AT RISK)
__________________________________________________
Andrew Goh, P.E.
CIP City Engineer
City of Chandler Construction Manager at Risk Construction Services
Page ii
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 4/1/2021
CITY OF CHANDLER, ARIZONA
DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
CITY PROJECT NO.: ST2009.401
TABLE OF CONTENTS
PARTICIPANTS AND PROJECT .............................................................................. 1
CONTRACT DOCUMENTS ..................................................................................... 3
PRE-CONSTRUCTION SERVICES ........................................................................... 3
CONSTRUCTION SERVICES ................................................................................... 3
CITY RESPONSIBILITIES ........................................................................................ 5
CONTRACT TIME ................................................................................................... 5
CONTRACT PRICE.................................................................................................. 8
EXHIBIT A – PROJECT SPECIFIC SPECIAL PROVISIONS .................................................... SP-1
EXHIBIT B – GENERAL CONDITIONS ................................................................................ GC-1
EXHIBIT C – TECHNICAL SPECIFICATIONS ........................................................................ TS-1
EXHIBIT D – ACCEPTED GMP/PRICE PROPOSAL .......................................................... GMP-1
EXHIBIT E – SUBCONTRACTOR’S LIST FORM ................................................................. SUB-1
EXHIBIT F – GIS / GPS DATA DELIVERY REQUIREMENTS (IF APPLICABLE) .................... GIS-1
City of Chandler Construction Manager at Risk Construction Services
C-1 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
CONSTRUCTION MANAGER AT RISK
CONSTRUCTION SERVICES CONTRACT
PROJECT NO.: ST2009.401
THIS CONTRACT is made and entered into on the ______day of _______________, 2022, (“Effective
Date”) by and between City of Chandler, an Arizona municipal corporation, hereinafter called
“City” and the “Construction Manager at Risk” or “CM@Risk” designated below (City and
CM@Risk may individually be referred to as “Party” and collectively referred to as “Parties”).
City and CM@Risk agree as follows:
PARTICIPANTS AND PROJECT
CITY:
CIP City Engineer:
Andrew Goh, P.E.
Public Works & Utilities Department
P.O. Box 4008, Mail Stop 407
Chandler, AZ 85244-4008
Phone: 480-782-3343
Email: andrew.goh@chandleraz.gov
CITY:
Construction Project Manager:
Paul Ahlas
Public Works & Utilities Department
P.O. Box 4008, Mail Stop 407
Chandler, AZ 85244-4008
Phone: 480-782-3328
Email: paul.ahlas@chandleraz.gov
CM@RISK:
DCS Contracting, Inc.
11535 E. Germann Rd., Chandler, AZ 85286
Arizona ROC No.:
110612
Federal Tax ID No.:
86-0765971
Business Organization:
corporation
State Where Organized:
Arizona
Statutory Agent Name:
Tom Sizer
Statutory Agent Mailing Address: 11535 E. Germann Rd., Chandler, AZ
85286
CM@Risk’s Authorized Project Representative:
Name:
Matthew Byrne
Title:
VP-Chief Estimator
Phone:
480-732-9238 ext. 202
Email:
Matthew.byrne@scscontracting.com
City of Chandler Construction Manager at Risk Construction Services
C-2 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
PROJECT DESCRIPTION:
This project is for improvements on Dobson Road to connect with onsite improvements at Intel
Driveway #1 and #4.
PROJECT LOCATION:
Driveway #1 is the northernmost Intel driveway on Dobson Road with an existing traffic signal, with
improvements northward to Price Road. Driveway #4 is at Dobson Road and Chaparral Way, a
signalized intersection.
City of Chandler Construction Manager at Risk Construction Services
C-3 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
CONTRACT DOCUMENTS
2.1
CONTRACT DOCUMENTS
The Contract between City and CM@Risk will consist of the following Contract
Documents:
1.
This Construction Services Contract and all of its Exhibits, including Project
Plans and Technical Specifications.
2.
General Conditions and General Conditions Appendices, incorporated by
reference.
3.
Project Specific Special Provisions as set forth in Exhibit A, incorporated by
reference.
4.
Accepted GMP/Price Proposal as set forth in Exhibit D, incorporated by reference.
2.2
In the event of any inconsistency, conflict, or ambiguity between or among the Contract
Documents, the Contract Documents will take precedence as described in Section 14.1.4
of the General Conditions.
2.3
DEFINITIONS
The definitions in Sections 2 and 15 of the General Conditions apply to all the
Contract Documents, including this Agreement.
PRE-CONSTRUCTION SERVICES
Although CM@Risk has performed Pre-Construction Services pursuant to a separate Contract
between City and CM@Risk, the completion, quality and accuracy of those services and the
deliverables provided by City thereunder directly impact CM@Risk’s performance of its
obligations under this Contract. Therefore, all of CM@Risk’s obligations, duties, and warranties
in relation to Pre-Construction Services and deliverables survive completion of the Pre-
Construction Services Contract and are incorporated herein. Any breach of any of CM@Risk’s
duties, obligations, or warranties under the Pre-Construction Services Contract will likewise be
considered a breach of this Contract.
CONSTRUCTION SERVICES
4.1
GENERAL
4.1.1
CM@Risk agrees at its own cost and expense, to do all work necessary and required to
fully, timely and properly complete the construction of the Project in strict accordance
with the Contract Documents in a good and workmanlike manner, free and clear of all
claims, liens, and charges whatsoever, in the manner and under the conditions specified,
and within the schedule, stated in attached Exhibit A.
City of Chandler Construction Manager at Risk Construction Services
C-4 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
4.1.2
CM@Risk must provide all of the labor and materials, and perform the Work in
accordance with Section 4 of the General Conditions. Some, but not all, of the major
components of the Construction Services and the corresponding subsections of Section
4 of the General Conditions are set forth below.
4.1.3
This is a contract for complete construction services in accordance with the Construction
Manager at Risk method of delivery of construction services. CM@RISK has participated
in the design process and been an active member of the Project Design Team and is fully
aware of any issues and constraints involved in this Construction Project.
4.1.4
CM@RISK is the CITY’s fiduciary responsible for undertaking all necessary action
contemplated under the contract documents to construct the Project and ensure timely
and quality completion of the Project at a cost within the Guaranteed Maximum Price
(GMP).
4.1.5
At all times relevant to this Contract and performance of the Work, the CM@Risk must fully
comply with all Laws, Regulations, or Legal Requirements applicable to City, the Project
and the Contract, including, without limitation, those set forth on attached Exhibit A.
4.1.6
CM@Risk must perform the Work under this Contract using only those firms, team
members and individuals designated by CM@Risk consistent with the Statement of
Qualifications dated 10/14/2019, the GMP Proposal, or otherwise approved by City
pursuant to the General Conditions. No other entities or individuals may be used without
prior approval of the Project Manager
4.1.7
CM@Risk will comply with all terms and conditions of the General Conditions.
4.1.8
In the event of a conflict between this Contract and the General Conditions or an exhibit
hereto or appendix thereto, the terms of this Contract will control.
4.1.9
Ownership of Work Product. Notwithstanding anything to the contrary in this Contract,
all Work Product prepared or otherwise created in connection with the performance of
this Contract, including the Work, are to be and remain the property of City. For purposes
of this provision, “Work Product” will include all designs, drawings, plans, specifications,
ideas, renderings and other information or matter, in whatever form created (e.g.,
electronic or printed) and in all media now known or hereinafter created. All Work
Product will be considered Work Made for Hire as defined in the United States Copyright
Act 17 U.S.C. § 101 (Copyright Act). If for any reason, any such Work is found not to be a
Work Made for Hire, CM@Risk hereby transfers and assigns ownership of the copyright
in such Work to City. The rights in this Section are exclusive to City in perpetuity.
4.2
CM@RISK’S PRE-CONTRACT AND PRE-WORK DELIVERABLES
City of Chandler Construction Manager at Risk Construction Services
C-5 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
4.2.1
The CM@Risk must provide the Deliverables in accordance with Section 4.2 of the
General Conditions.
4.3
PRE-CONSTRUCTION CONFERENCE
Refer to Section 4.3 of the General Conditions.
4.4
PERFORMANCE
OF
THE
WORK
(INCLUDING
FIELD
MEASUREMENTS,
SUBCONTRACTORS, AND SUPPLIERS)
Refer to Section 4.4 of the General Conditions.
4.5
CONTROL OF THE PROJECT SITE
Refer to Section 4.5 of the General Conditions.
4.6
PROJECT SAFETY
Refer to Section 4.6 of the General Conditions.
4.7
MATERIALS QUALITY, SUBSTITUTIONS AND SHOP DRAWINGS
Refer to Section 4.7 of the General Conditions.
4.8
PROJECT RECORD DOCUMENTS
Refer to Section 4.8 of the General Conditions.
4.9
WARRANTY AND CORRECTION OF DEFECTIVE WORK
Refer to Section 4.9 of the General Conditions.
CITY RESPONSIBILITIES
5.1
City will have the responsibilities, and provide the information specified in, and subject
to the conditions set forth in, Section 5 of the General Conditions.
CONTRACT TIME
6.1
GENERAL
6.1.1
The Contract Duration is 150 Calendar Days.
6.1.2
The Contract Time will start with the Notice to Proceed (NTP) and end with Final
Acceptance, as set forth in Article 6.4 below. The Notice to Proceed cannot be issued until
approval and acceptance by City of the GMP or Fixed Price.
City of Chandler Construction Manager at Risk Construction Services
C-6 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
6.1.3
The Contract Time will be as set forth in the Project Schedule. CM@Risk agrees that it
will
commence performance of the Work and complete the Project through Final
Acceptance within the Contract Time.
6.1.4
Time is of the essence of this Contract for the Project, and for each phase and
designated Milestone thereof.
6.2
PROJECT SCHEDULE
6.2.1
The Project Schedule approved as part of the GMP Proposal and incorporated herein as
part of the attached Exhibit D must be updated and maintained throughout CM@Risk’s
performance under this Contract in accordance with Section 6.2 of the General
Conditions.
6.2.2
Failure on the part of CM@Risk to adhere to the approved Project Schedule will be
deemed a material breach and sufficient grounds for termination of this Contract by City.
6.2.3
Work must be completed to meet the following milestones after the Notice to Proceed:
Milestone
Time
Liquidated damages for delay
1.
within
days
$
per calendar day
6.3
SUBSTANTIAL COMPLETION
Substantial Completion must be achieved no later than the Substantial Completion Date
set forth in the Project Schedule. Substantial Completion will be determined in
accordance with Section 6.3 of the General Conditions.
6.4
FINAL ACCEPTANCE
6.4.1
Final Acceptance will be obtained within the time period set forth in the Project Schedule.
6.4.2
Final Acceptance will be issued pursuant to Section 6.5 of the General Conditions.
6.5
LIQUIDATED DAMAGES
6.5.1
Substantial Completion Liquidated Damages. CM@Risk acknowledges and agrees that
if CM@Risk fails to obtain Substantial Completion of the Work within the Contract Time,
City will sustain extensive damages and serious loss as a result of such failure. The exact
amount of such damages will be extremely difficult to ascertain. Therefore, City and
CM@Risk agree that if CM@Risk fails to achieve Substantial Completion of the Work
within the Contract Time, City will be entitled to retain or recover from CM@Risk, as
City of Chandler Construction Manager at Risk Construction Services
C-7 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
liquidated damages and not as a penalty, the sum per calendar day as indicated in MAG
§ 108.9.
6.5.2
Final Acceptance Liquidated Damages. For the same reasons set forth in Article 6.5.1
above, City and CM@Risk further agree that if CM@Risk fails to achieve Final Acceptance
of the Work within the Contract Time, City will be entitled to retain or recover from
CM@Risk, as liquidated damages and not as a penalty, the sum per calendar day as
indicated in MAG § 108.9 commencing from the actual date of Substantial Completion or
Final Acceptance as required under the Contract.
6.5.3
MAG Liquidated Damages. If no liquidated damages are specified in Articles 6.5.1 or 6.5.2
above, then the liquidated damages provisions in MAG § 108.9 will apply.
6.5.4
City may deduct liquidated damages described in this Article 6.5 from any unpaid
amounts then or thereafter due CM@Risk under this Agreement. Any liquidated damages
not so deducted from any unpaid amounts due CM@Risk will be payable to City at the
demand of City, together with interest from the date of the demand at the highest lawful
rate of interest payable by CM@Risk.
6.6
MUTUAL WAIVER OF CONSEQUENTIAL DAMAGES ONLY
6.6.1
CM@Risk and City waive claims against each other for consequential damages arising
out of or relating to this Contract. This mutual waiver includes:
6.6.1.1 Damages incurred by City for rental expenses, for losses of use, income, profit, financing,
business and reputation, and for loss of management or employee productivity or of
the services of such persons; and
6.6.1.2 Damages incurred by CM@Risk for principal office expenses including the compensation
of personnel stationed there, for losses of financing, business and reputation, and for loss
of profit except anticipated profit arising directly from the Work.
6.6.2
This mutual waiver is applicable, without limitation, to all consequential damages due
to either Party’s termination of this Contract. Nothing contained in this Article 6.6 will
be deemed to preclude an award of liquidated damages, when applicable, in accordance
with Article 6.5 above.
6.6.3
Nothing herein will be deemed to constitute a waiver of any other remedy available to
City in the event of CM@Risk’s default under this Contract prior to full performance of the
Work including, as applicable, specific performance or completion of the Work on behalf
of CM@Risk, the cost and expense of which will be offset against any monies then or
thereafter due to CM@Risk (if any) and otherwise immediately reimbursed to City by
CM@Risk.
City of Chandler Construction Manager at Risk Construction Services
C-8 of 17
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
CONTRACT PRICE
7.1
CONTRACT PRICE
7.1.1
In exchange for CM@Risk’s full, timely, and acceptable performances and construction of
the Work under this Contract, and subject to all of the terms of this Contract, City will
pay CM@Risk the “Contract Price,” which:
The sum of the CM@Risk’s Fee and reimbursable Cost of the Work, as defined in Section
15 of the General Conditions, which the CM@Risk guarantees will not exceed the GMP
set forth in Exhibit D in the amount of $239,525.46. Costs which would cause the GMP
to be exceeded must be paid by CM@Risk without reimbursement from City.
7.1.2
The Contract Price is all-inclusive and specifically includes all fees, cost, insurance and
bond premiums, allowances, construction contingency, owner’s contingency, and taxes
of any type necessary to fully, properly and timely perform and construct Work.
7.2
COSTS
For any portion of the Work which, either through this Contract, Change Order or
otherwise, is performed and paid for on a cost, or time and materials basis, the costs
which may be reimbursed to CM@Risk and chargeable against the Contract Price will be
determined as set forth in MAG § 109.5.
SIGNATURE PAGE TO FOLLOW
EXHIBIT A
City of Chandler Construction Manager at Risk Construction Services
SP-1
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
PROJECT SPECIFIC
SPECIAL PROVISIONS
4.2.7 Aerial Construction Photography
General Conditions Section 4 Subsections 4.2.7.1 & 4.2.7.2 are not applicable to this project.
4.2.8 Government Approvals and Permits
General Conditions Section 4 Subsection 4.2.8.1, City permit fees with be paid internally by
the City and all other fees will be the responsibility of the Contractor.
Subletting of Contract
Contractor must perform, with his own organization, work amounting to not less than 50
percent of the total contract cost.
Failure to submit Subcontractor’s List Form, demonstrating self-performance not less than
50 percent of the total contract cost, will cause the bid to be deemed non-responsive.
Bidders should contact the Arizona Registrar of Contractors for information on license
requirements.
EXHIBIT B
City of Chandler Construction Manager at Risk Construction Services
GC-1
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
GENERAL CONDITIONS
GENERAL CONDITIONS
Approved date: October 19, 2021
Revised: 10/19/2021
GC-2 of 75
TABLE OF CONTENTS
SECTION 1 - SCOPE OF THESE GENERAL CONDITIONS ............................................................................... 3
SECTION 2 - GENERAL DEFINITIONS ............................................................................................................ 3
SECTION 3 - STANDARD SPECIFICATIONS AND DETAILS ........................................................................... 7
SECTION 4 - CONT R ACT OR’S R ES PONS IBILIT IES FOR CONST RUCT ION SE RVIC ES .................................. 8
SECTION 5 - CITY RESPONSIBILITIES .......................................................................................................... 27
SECTION 6 - CONTRACT TIME ...................................................................................................................... 29
SECTION 7 - CONTRACT PRICE .................................................................................................................... 35
SECTION 8 - PAYMENT ................................................................................................................................. 35
SECTION 9 - CHANGES TO THE CONTRACT ................................................................................................ 40
SECTION 10 - SUSPENSION AND TERMINATION ...................................................................................... 43
SECTION 11 - INSURANCE AND BONDS ..................................................................................................... 44
SECTION 12 - INDEMNIFICATION ............................................................................................................... 49
SECTION 13 - DISPUTE RESOLUTION .......................................................................................................... 49
SECTION 14 - MISCELLANEOUS PROVISIONS ............................................................................................ 50
SECTION 15 - PROVISIONS APPLICABLE SOLELY TO GMP AND COST-BASED CONTRACTS, CHANGE
ORDERS, AND JOB ORDERS ......................................................................................................................... 57
SECTION 16 - PROVISIONS APPLICABLE SOLELY TO JOB ORDER CONTRACTS (JOC) ........................... 60
SECTION 17 - PROVISIONS APPLICABLE SOLELY TO PRE-CONSTRUCTION SERVICES FOR
CONSTRUCTION MANAGER AT RISK .......................................................................................................... 65
SECTION 18 - APPENDICES ...................................................................................................... APP-1 of 30
Appendix 1 – Policy Statement for Calculating Delays and Damages
Appendix 2 – Cost Reduction Incentive Proposals for Design Bid Build Contracts
Appendix 3 – Contractor’s Affidavit Regarding Settlement of Claims
Appendix 4 – Forms of Performance Bond
Appendix 5 – Forms of Payment Bond
Appendix 6 – Dispute Resolution
Appendix 7 – Certificate of Completion
Appendix 8 – Construction Sign Detail
Appendix 9 – Cost of the Work (Applicable solely to Construction Manager at Risk and
Job Order Contracting)
Appendix 10 Landscape Establishment Period
General Conditions
Revised: 10/19/2021
GC-3 of 75
SECTION 1 - SCOPE OF THESE GENERAL CONDITIONS
These General Conditions encompass provisions that apply, and are incorporated into all
construction contracts entered into by the City of Chandler, unless otherwise specifically excluded in the
executed Contract.
SECTION 2 - GENERAL DEFINITIONS
Allowance : A specific amount for a specific item of Work, if any, that City agrees has not been sufficiently
designed, detailed, or selected (including design changes from 90% to 100% as authorized by and at
the discretion of the City) at the time the Contract Price is agreed to for Contractor to provide a definitive
price.
Alternate Systems Evaluations or Alternative Analysis: Alternatives for design, means and methods or
other scope considerations that are evaluated using value analysis principles and have the potential to
reduce construction costs while still delivering a quality and functional Project that meets City
requirements.
Change Order: A written instrument issued after execution of the Contract Documents signed by City
and Contractor, stating their agreement upon all of the following: the addition, deletion or revision in
the scope of services or deliverables; the amount of the adjustment to the Contract Price, the extent
of the adjustment to the Contract Time, or modifications of other contract terms. The Contract Price
and the Contract Time may be changed only by Change Order.
Consultant: Person or firm that provides professional services.
City (Owner or OWNER): City of Chandler, a municipal corporation, with whom Contractor has entered
into the Contract and for whom the Work or Services are to be provided pursuant to the Contract(s).
Contingent Bid Items: This is a minor bid item which is likely, but not certain, to occur during the course
of work. If the Engineer determines that this work is required, the Contractor will accomplish the work
and payment will be made based on the contingent unit bid price included in the proposal. Since the
quantity listed in the proposal is primarily for bid comparison, the amount of work required by the
Engineer may vary materially from this.
Contract: The written agreement executed between City and Contractor, including all of the Contract
Documents.
Contract Documents: The documents which together form the Contract between City and Contractor,
as identified in Article 2 of the Contract, or are otherwise incorporated into the Contract, including the
Contract, the exhibits thereto, these General Conditions, any Notice to Proceed, and any Job Order
(if applicable), the Plans and Specifications, Project Schedule, written and properly executed Change
Orders, MAG Specifications and City’s amendments thereto, and any other documents so designated in
the Contract.
Contract Price: The agreed-upon price to be paid to Contractor for full, timely, and acceptable completion
of the Work or Services under the terms of the Contract.
Contract Time(s): The number of calendar days or the dates related to the applicable phase, Substantial
Completion, or Final Acceptance as stated in Contract Documents. Contract Time starts with the Notice
General Conditions
Revised: 10/19/2021
GC-4 of 75
to Proceed (NTP) and ends with Final Acceptance. The Contract Time is set forth in the Contract and
is based upon the Project Schedule agreed to by City in writing.
Contractor: The person or business association with whom City has entered into an agreement for
construction related Work or Services in relation to the Project at issue.
Contractor Payment Request: The form that is accepted by City and used by Contractor in requesting
progress payments or final payment and which must include such supporting documentation as is
required by the Contract Documents or City.
Construction Budget: The City’s budget for construction of the Project.
Construction Documents: The Plans, Specifications, and Drawings prepared and issued by the Design
Professional and approved by City for construction, meaning the documents are sealed by the
Design Professional (as required), acceptable for permitting and incorporated into the Contract by
this reference. All amendments and modifications to the Construction Documents must be approved in
writing by City prior to incorporation into the Contract.
Cost of the Work: The term Cost of the Work will mean costs necessarily incurred by Contractor in the
proper performance of the Work. Such costs will be at rates not higher than the standard paid at the
place of the Project except with prior consent of City.
Critical Path Method (CPM): A scheduling technique which identifies the logical sequence of the activities
occurring in a Construction Project, the anticipated time required to complete each activity in the
Project, and the activities that must be completed on schedule to finish the Project within the anticipated
time. Typically, activities are arranged in a network that shows both activities and their dependencies.
CPM is also used as a management technique which enables contracting parties to predict when
activities may occur so that resources can be effectively used and limitations can be identified.
Critical Path: Critical Path is the sequence of project network activities which add up to the longest overall
duration. Once established in the Project Schedule, the Critical Path for the Project must not be
changed without prior written approval of City.
Day: Calendar day(s) unless otherwise specifically stated in the Contract Documents.
Design Professional: The qualified, licensed person, firm or corporation who furnishes design and
construction administration services required under the Contract Documents. These services may
include, but are not limited to: development of Construction Drawings and Documents, review of
Contractor Submittal(s), review of and response
to
Requests for Information, approval and
certification of progress payment applications, construction administration, and construction contract
close out.
Differing Site Conditions: Concealed or latent physical conditions or subsurface conditions at the Site
that, (i) materially differ from the conditions indicated in the Contract Documents, or (ii) are of an unusual
nature, differing materially from the conditions ordinarily encountered and generally recognized as
inherent in the Work at the general area of the Site. Caliche, rock, hard-digging or sandy/silty soil
encountered on a project is not considered a “Differing Site Condition.”
Drawings (Plans): Documents, which visually represent the scope, extent and character of the Work to
be furnished and performed by Contractor during the construction phase and which have been prepared
General Conditions
Revised: 10/19/2021
GC-5 of 75
or approved by the Design Professional and City. These documents include Drawings that have reached
a sufficient state of completion and released by Design Professional solely for the purposes of review
and use in performing constructability or bid-ability reviews by Contractor and in preparing cost
estimates (e.g. Master Planning and Programming, Schematic Design, Design Development, and
Construction Drawings), but “not for construction.” Shop Drawings are not Drawings as so defined.
Final Acceptance: The City’s acceptance of the facility or project from the Contractor after all Work is
completed, tested, and inspected in accordance with the contract requirements. Final Acceptance results
in a Letter of Acceptance (LOA).
Fixed Price: A fixed price or amount for a Contract Price, Scope of Work, materials, or other item under
a Contract, Change Order, or other agreement, which City agrees, in writing, to pay instead of the actual
cost.
Float: The number of Days by which an activity can be delayed without lengthening the Critical Path and
extending the Contract Time. Unless otherwise expressly agreed in writing, all Float belongs to City.
Laws, Regulations, or Legal Requirements: Any and all applicable laws, rules, regulations, ordinances,
codes and orders applicable to the Project of any and all governmental bodies, agencies, authorities
and courts having jurisdiction and any applicable provisions of the Development Agreement for the
Project (if any), including, without limitation, those provisions relating to the design and construction
of the Project.
Line Item: The individual elements of Work identified on a bid or other schedule and associated with a
price or a unit price and quantity particular to that individual element of the Work. Also refers to
individual items of work within the Schedule of Values.
Liquidated Damages: Designated damages for the City to collect as compensation upon a specific breach
(example: late delivery).
Long-Lead Item: Long-lead item refers to the equipment, product, or system that is identified at the
earliest stage of a project to have a delivery time long enough to affect directly the Critical Path/the overall
lead time of the project.
MAG: The Maricopa Association of Governments.
MAG Specifications: The most current version of the Uniform Standard Specifications for Public Works
Construction published by MAG.
MAG Standard Details: The most current version of the Uniform Standard Details as published by MAG.
Minor change: A change in the Work having no impact on cost or time or the City-approved design intent,
as determined by City.
Notice to Proceed (NTP): A written notice given by City to Contractor fixing the date on which
Contractor will start to perform Contractor’s obligations under the Contract.
Project: The Project specified in the Contract (including a Job Order).
Project Manager: The Project Manager designated in Article 1 of the Contract, or any successor thereto
designated by City. The Project Manager has the authority to act on behalf of City, as delineated and
General Conditions
Revised: 10/19/2021
GC-6 of 75
limited by the Contract Documents and applicable law. And City will communicate with Contractor
through the Project Manager. However, the Project Manager has no authority to bind City or City
Council in contravention of any City code, State or Federal statute or regulation, or these General
Conditions.
Project Schedule: The schedule for the completion of the Project agreed to and required by City.
Project Specific Conditions: Additional conditions which apply to the specific Project and Scope of Work
which are set forth in Exhibit D of the Contract.
Project Team: The Project Team consisting of the Design Professional, Contractor, Project Manager, and
such others as City may designate.
Punch List: The list initially prepared by Contractor pursuant to the Contract Documents, reviewed and
supplemented by the Project Manager (and at the sole option of the Project Manager, the Design
Professional) and approved by City containing items of incomplete work not impacting Substantial
Completion, if allowed for under the Contract, and to be completed or corrected by Contractor after
Substantial Completion and before Final Acceptance in accordance with the Contract Documents.
Quality Assurance (QA) Testing: Testing performed to verify the accuracy and applicability of the QC
testing results and to ascertain that the materials installed meet the specified levels of quality in
accordance with the Contract Documents.
Quality Control (QC) Testing: Testing performed to assure that the materials installed comply with the
requirements in the Contract Documents.
Requests for Information (RFIs): Formal written request from Contractor to City or Design Professional
for the Project seeking clarification or additional information needed for Contractor to properly
complete the Work or Services under the Contract. City may require RFI’s to be submitted on a specific
form or in a specified format.
Schedule of Values (SOV): The specified document prepared by Contractor, and approved and accepted
by City, which divides the Contract Price into pay items, such that the sum of all pay items equals
the Contract Price for the construction phase Work, or for any portion of the Work having a separate
specified Contract Price.
Scope of Work: The scope of work agreed to or required by City and incorporated into the Contract as
Exhibit A.
Shop Drawings: All drawings, diagrams, schedules and other data specifically prepared for the Work
by Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to
illustrate some portion of the Work.
Site: The land or premises on which the Project is located.
Specifications: The part(s) of the Contract Documents for the construction phase consisting of written
technical descriptions of materials, equipment, construction systems, standards and workmanship as
applied to the Work and certain administrative details applicable thereto. Where specified, the Project
must be constructed using the current Uniform Standard Specifications and Details for Public Works
Construction as furnished by the Maricopa Association of Governments, as amended by City.
General Conditions
Revised: 10/19/2021
GC-7 of 75
Subconsultant: A person, firm or corporation having a Contract with Consultant/Contractor to furnish
services required as its independent professional associate or consultant with respect to the Project.
Subcontractor: An individual or firm having a direct Contract with Contractor or any other individual or firm
having a Contract with the aforesaid contractors at any tier, who undertakes to perform a part of pre-
construction services or construction phase Work at the Site for which Contractor is responsible.
Subcontractors must be selected through the Subcontractor selection process described in the Contract
Documents, if any.
Substantial Completion: The date when the City determines that the Work (or separable units of Phases
as provided in the Contract Documents) is essentially and satisfactorily complete in accordance with the
Contract Documents such that the Project is ready for use by the City for its intended purpose, opening to
the general public, full occupancy or use by City (including, without limitation, all separate units, or
rooms, facilities, access, income-generating areas, and all areas serving the general public, as applicable,
must be ready for full operation without material inconvenience or discomfort), including, to the extent
applicable to the Work, the following: all materials, equipment, systems, controls, features, facilities,
accessories, and similar elements are installed in the proper manner and in operating condition,
inspected, and approved; surfaces have been painted; masonry and concrete cleaned with any sealer
or other finish applied; utilities and systems connected and functioning; site work complete;
permanent heating, ventilation, air conditioning, vertical transportation, and other systems properly
operating with proper controls; lighting and electrical systems installed, operable and controlled; paving
completed, signage installed, and other work as applicable, has been performed to a similar state of
essential and satisfactory completion.
Supplier: A manufacturer, fabricator, distributor, or vendor having a direct Contract with Contractor
or with any Subcontractor to furnish materials or equipment to be incorporated in the construction
phase Work by Contractor or any Subcontractor.
Total Float: Number of Days by which pre-construction services or construction phase Work or any part
of the same may be delayed without necessarily extending a pertinent Contract Time or schedule
milestone in the Project Schedule.
Work: The entire completion of construction or the various separately identifiable parts thereof,
required to be furnished during the construction phase. Work includes and is the result of performing
or furnishing labor and furnishing and incorporating materials, resources and equipment into the
construction, and performing or furnishing services and documents as required by the Contract
Documents for the construction phase.
Writing: Typing, printing, photography and other modes of representing or reproducing words in a
visible form, including email, and expressions.
SECTION 3 - STANDARD SPECIFICATIONS AND DETAILS
3.1
City operates under the latest revision of the MAG Specifications and MAG Standard
Details as amended by City. City’s current amendment to the MAG Specifications, part of
the City’s Unified Development Manual, may be found in the downloaded from City’s website
at http://www.chandleraz.gov.
3.2
Copies of the MAG Specifications and MAG Standard Details are available at the
Maricopa Association of Governments office, 302 N. 1st Avenue, Suite 300, Phoenix,
General Conditions
Revised: 10/19/2021
GC-8 of 75
Arizona.
They
may
also
be
downloaded
from
their
website
at:
http://www.azmag.gov/Newsroom/Publications
3.3
The MAG Specifications and Standard Details and City’s amendments thereto are
incorporated into the Contract by this reference.
SECTION 4 - CONT R ACT OR’S R ES PONS IBILIT IES FOR CONST RUCT ION SE RVIC ES
4.1
GENERAL
4.1.1
Contractor must construct the Work in accordance with the Contract Documents and as
outlined in Exhibit A of the Contract to the satisfaction of City, exercising the degree of
professional care, skill, diligence, quality and judgment that a professional construction
manager engaged, experienced and specializing in the construction management of
construction and facilities of similar scope, function, size, quality, complexity and detail in
urban areas throughout the United States comparable to Chandler, Arizona would exercise
at such time, under similar conditions. Contractor must, at all times, perform the Work in
conformance with sound and generally accepted engineering principles and construction
management and construction contracting practices.
4.1.2
If Contractor observes errors, discrepancies or omissions in the Contract Documents,
Contractor must promptly notify the Design Professional and City and request clarification.
If Contractor, with the exercise of reasonable care, should have recognized such error,
inconsistency, omission or difference and fails to report it to City, and if Contractor
proceeds with the Work affected by such observed errors, discrepancies or omissions,
without receiving such clarifications, Contractor does so at its own risk and will be liable to
City for damages resulting from proceeding without clarification.
4.1.3
Project Team and agents of each of them, testing agencies and governmental agencies with
jurisdictional interests will be provided access to the Work at reasonable times for their
observation, inspection and testing. Contractor must provide proper and safe conditions for
such access.
4.1.4
Contractor must comply with, and require all Subcontractors to comply with, the Arizona
Contractors’ license laws, including all requirements with respect to being duly registered
and licensed.
4.1.5
Contractor must insure that all employees performing any Work for which Contractor is
responsible have a legal right to live and work in the United States. In addition, all
compensation of any such employee must meet all applicable requirements of the Fair Labor
Standards Act (FLSA) and Federal Minimum Wage laws.
4.1.6
Contractor must comply with the Immigration Reform and Control Act of 1986 (IRCA).
Contractor understands and acknowledges the applicability of the IRCA activities.
Contractor agrees to comply with the IRCA while performing their work and to permit City
inspection of Contractor personnel records to verify such compliance.
4.1.7
Pursuant to MAG Specifications §§ 107.4, Contractor must report immediately any discovery
of archeological ruins or artifacts. Excavation must stop immediately so that City can decide
on the pertinent steps to follow such discovery.
4.1.8
All property owners that may be affected by the proposed construction activities must be
General Conditions
Revised: 10/19/2021
GC-9 of 75
notified of the scope, duration of the construction activities and possible interference with
their day-to-day activities by Contractor prior to start of construction. In addition, individual
residential or commercial interferences, such as driveway restrictions, water outages, and
all other Work adjacent to residence/business, require 48-hour notification in advance of
specific adjoining Work. Notification may be through door hangers or other procedures
approved by the City.
4.1.9
Access must be maintained to adjacent properties at all times during construction. Where
property has more than one point of access, no more than one access will be restricted or
closed at any one time. Access to adjacent private driveways will be maintained during all
non-working hours.
4.1.10
Contractor must furnish and erect construction signs in accordance with Project
Specifications. The signs must be professionally prepared and subject to approval by City,
must be maintained by Contractor for the duration of the project, and must be removed by
Contractor during the final project clean up.
4.1.11
The number of signs required, the size, shape, installation requirements and information to
be included for construction signs is established on the detail sheet, provided, however,
signs must be a minimum of 4 foot by 8 foot and must be installed so that the bottom of
the sign is at least 4 foot above grade. No direct payment will be made for furnishing and
erecting construction signs. The cost thereof must be included in other items for which
direct payment is made. Sign locations will be determined by City.
4.1.12
All required construction signs must be installed by Contractor within 7 Days of Notice to
Proceed.
4.1.13
The Work to be accomplished under these Contract Documents has been designed for City
by a Design Professional retained by City for this purpose. It is understood that normal
construction Administration for the purpose of interpretation of the Contract Documents is
provided by City. Should any services of the Design Professional be required to assist in the
corrections of errors or omissions by Contractor, or services of the Design Professional be
required because of changes in structure or equipment where Contractor has requested
approval of substitute methods or material, or any other items detailed herein below, those
services will be provided by the Design Professional at the standard hourly rates previously
negotiated with City and must be paid for by the Contractor.
4.1.14
Contractor must reimburse City for costs incurred by the Design Professional for additional
services to the Project through no fault of City or the Design Professional including, but not
limited to, the following conditions:
a. Additional Site visits, investigations, inspections, design work or reports by
the Design Professional which are required due to damages to existing
facilities or completed Work caused by the Contractor in his performance,
Contractor’s negligence, or Contractor’s Work which is rejected as defective
or as failing to conform to the Contract Documents;
b. Design Professional construction phase services rendered on the project
during the time the project remains incomplete after the Contract date of
final completion will be charged to Contractor at a rate previously negotiated
City; and
c. All retesting required due to the failure of Contractor’s Work to meet the
General Conditions
Revised: 10/19/2021
GC-10 of 75
requirements of the Contract Documents will be at Contractor’s expense. All
standby and travel time by the City’s testing lab, the Design Professional or
City due to Contractor’s inability to be prepared for testing at the agreed
upon time will be at the Contractor’s expense.
4.1.15
City may withhold from any payment otherwise due to Contractor any amounts necessary
to pay the Design Professional for such additional services as provided herein above.
4.1.16
Contractor will not be required to bear additional costs incurred by City due to errors by the
Design Professional.
4.2
CONTRACTOR’S PRE-CONTRACT AND PRE-WORK DELIVERABLES
4.2.1
Prior to award of the Contract, Contractor must execute Contract and deliver to City.
Failure to do so may delay Contract award. Contractor must also provide to City its
Contractor’s License classification and number and its Federal Tax I.D. number.
4.2.2
Before beginning any Work under the Contract, Contract must be fully executed by City.
4.2.3
After Contract award, City will issue to Contractor an award letter. At that time Contractor
must deliver to City such bonds and certificates of insurance with endorsements in such
amounts (and other evidence of insurance requested by City) required under Section 11 of
these General Conditions, and as the Contract requires.
4.2.4
As evidence of Workmen’s Compensation Insurance, Contractor must, upon request,
provide a letter of certification from the Industrial Commission of Arizona that Contractor
is insured by the State Compensation Fund or is an authorized self-insurer or a certificate
of insurance issued by an insurance company authorized by the Insurance Department
of Arizona to write Workmen’s Compensation and Occupational Disease Insurance in the
State of Arizona.
4.2.5
Within 10 Days of the date of the executed Contract letter issued by City, Contractor must
submit to City for review and acceptance the following items:
4.2.5.1
Comprehensive construction Project Schedule including a Critical Path Method (CPM)
diagram schedule as described in Section 6.2. Project Schedule must be in Microsoft Project
standard file format. Within 10 Days of receipt of City’s comments, Contractor must make
all required corrections, adjustments, and additions to complete the Project Schedule and
resubmit to City for review.
4.2.5.2
Preliminary schedule of submittals and Shop Drawings. Within 10 Days of receipt of City’s
comments, Contractor must submit the corrected and completed schedule of Shop
Drawings submissions for approval. Contractor’s schedule of Shop Drawings and sample
submittals will be acceptable to City if it provides a workable arrangement for reviewing and
processing the required submittals.
4.2.5.3
Schedule of Values in a form specified by City reflecting the subcontracts and other
categories that will be used to submit Pay Applications for the Work. The total amount of
the Schedule of Values must not be greater than the Contract Price. The Schedule of Values
will be reviewed at the Pre-Construction Conference and revised by Contractor within 10
Days after Pre-Construction Conference in response to comments and questions from City.
Once accepted by City in writing, the Schedule of Values for the Project must not be changed
without the prior written approval of City.
General Conditions
Revised: 10/19/2021
GC-11 of 75
4.2.6
Video Recording Requirement. Prior to performing any Work, Contractor must document
the existing conditions of the Site, all other areas where Work will occur and all adjacent
areas that may be impacted by the Work via digital video format. Contractor must video
record and index all areas, features, buildings and other public and private improvements
that could potentially be impacted by the Work. Video recording must be coordinated with
City. When video recording private property, Contractor must also coordinate the video
recording with the private property owner, if possible. Contractor must provide City with a
copy of said digital video format prior to performing any Work.
4.2.7
Aerial Drone Construction Photography.
4.2.7.1
If Contract duration is greater than 90 calendar days, Contractor must engage a professional
unmanned aerial vehicle (UAV) aerial pilot to photograph the Site prior to construction
mobilization, at three-month intervals during construction, and following final inspection.
Drone camera specifications must meet the following minimum requirements:
a. 1-inch CMOS
b. Pixels: 20M
c. FOV 84 8.8 mm/24 mm (35 mm format equivalent) f/2.8-f/11 auto focus at 1 m-
d. For photographing: 16.9 Aspect Ratio: 5472x3078
e. For video shooting: MP4/MOV/H.264
f.
FHD: 1920x1080 120p @100Mbps
g. File format: High Definition (HD) JPEG for digital photos and HD MPEG 4 for
digital video.
h. All metadata to be recorded including GPS data and preserved with photographs
provided.
Interval
JPEG
3 month intervals
At an altitude (AGL) between
70-90 ft.
3 month intervals
Images to be taken every 50-
100 ft. to be determined based
on project scope.
4.2.7.2
Drone photos to be taken in sequential geographical order and then organized and provided in
the same manner unless otherwise specified.
4.2.7.3
Photos to be provided digitally via an online file share service and/or by a USB drive to contractor.
4.2.7.4
Drone pilots to obey ALL local (city, county, state) UAV regulations as well as FAA UAV
guidelines including, but not limited to, conducting all flights during daylight hours, not exceeding
maximum altitude ceilings (depending on area), not flying over people, yielding to other aircraft.
4.2.7.5
Drone pilots must fly drone within visual line of sight (VSOL) and have visual spotter when
needed. Drone pilots only to operate in favorable weather conditions when minimum visibility is
3 miles or greater.
4.2.7.6
Drone pilots to conduct a preflight checklist and visually inspect the entire flight path prior to flying
to ensure a safe flight.
4.2.7.7
Airspace Authorizations. Operations in Class G airspace are allowed without air traffic control
(ATC) permission. Operations in Class B, C, D and E airspace need ATC authorization. Drone
General Conditions
Revised: 10/19/2021
GC-12 of 75
pilots to schedule each flight in advance and based on airspace if required will notify nearby
airports/control towers, etc.
4.2.8
Government Approvals and Permits.
4.2.8.1
Contractor must obtain all necessary permits for the Work and pay all applicable fees,
unless otherwise noted on the Plans and in the Specifications. City permit fees will be paid
internally by City. For bidding purposes, an allowance for all permit fees is included in the
bid schedule under the item “allowance for permit fees.” The Contractor will be paid for
the actual cost of the permit fees upon submitting a receipt showing the fee Contractor
has paid. Excluded from the above allowance are items such as all costs incurred by the
Contractor in securing the permit except for the actual permit fee established by the
agency, cost for all shut downs or outages, cost for pole bracing, cost of permits for
construction water, cost of construction water, cost for any additional insurance
requirements, cost for any licenses, and other similar type costs. Contractor is specifically
notified of the need to obtain the necessary environmental permits or file the necessary
environmental and regulatory permit notices.
4.2.8.2
Copies of all permits and the associated notices must be provided to City prior to starting
the permitted activity.
4.3
PRE-CONSTRUCTION CONFERENCE
4.3.1
Prior to the commencement of any Work, City will schedule a Pre-Construction Conference.
4.3.2
The purpose of this Conference is to establish a working relationship between Contractor,
the utility firms, and various City agencies. The agenda will include critical elements of the
Work schedule, submittal schedule, cost breakdown of major lump sum items, Payment
Requests and processing, coordination with the involved utility firms, and emergency
telephone numbers for all representatives involved in the course of construction.
4.3.3
Minimum attendance by Contractor at any mandatory meeting with City must be (1)
Contractor’s Representative, who is authorized to execute and sign documents on behalf
of the firm, (2) Contractor’s on-site Superintendent, and (3) Contractor’s Safety Office,
or other employee responsible for safety.
4.4
PERFORMANCE OF THE WORK (INCLUDING FIELD MEASUREMENTS,
SUBCONTRACTORS, AND SUPPLIERS)
4.4.1
Unless otherwise provided in the Contract Documents to be the responsibility of City or a
separate Contractor, Contractor must provide through itself or Subcontractors the
necessary supervision, labor, inspection, testing, start-up, material, equipment, machinery,
temporary utilities and other temporary facilities to permit Contractor to complete the
Work consistent with the Contract Documents.
4.4.2
Contractor must perform all construction activities efficiently and with the requisite
expertise, skill and competence to satisfy the requirements of the Contract Documents.
Contractor must at all times exercise complete and exclusive control over the means,
methods, safety, sequences and techniques of construction.
4.4.3
Contractor’s Superintendent must be present at the Site at all times that material Work
under this Contract is taking place. Contractor’s Superintendent or designee must be
present at the Site at all times any other Work under this Contract is taking place.
General Conditions
Revised: 10/19/2021
GC-13 of 75
Superintendent must not be replaced without written notice to City. Whenever the
Superintendent is not present at a particular part of the Work where the City or Design
Professional may desire to inform the Contractor relative to interpretation of the Drawings
and Specifications or to disapproval or rejection of materials or Work performed, the City
or Design Professional may provide such information in writing to the foreman or other
worker in charge of the particular part of the Work in reference to which the information is
given. Information so given will be as binding as if given to the Superintendent.
4.4.4
All elements of the Work must be under the direct supervision of a foreman or his
designated representative on the Site who must have the authority to take actions required
to properly carry out that particular element of the Work.
4.4.5
Working Hours. Except in connection with the safety or protection of persons or the Work
or property at the Site or adjacent thereto, and except as otherwise indicated, all Work at
the Site must be performed during regular working hours, and Contractor will not permit
overtime work or the performance of Work on Saturday, Sunday or any legal holiday without
City’s written consent given after prior written notice to City. If it will become absolutely
necessary to perform Work at night or on Saturdays, Sundays or legal holidays, the City
must be informed at least 24 hours in advance of the beginning of performance of such
Work. Only such Work will be done at night as can be done satisfactorily as determined by
the City. Good lighting and all other necessary facilities for carrying out and inspecting the
Work must be provided and maintained at all points where such Work is being done.
Further, unless such non-normal work hours are performed at City’s request or required by
the Contract Documents, Contractor must pay to City all additional costs incurred by City by
reason of such non-normal working hours. Expenses incurred by City for overtime
compensation must be reimbursed by Contractor as follows: (i) City staff at the rate set forth
in current City Fee Schedule as published on City website, (ii) Design Professional and staff
at the standard hourly rates previously negotiated with City, and (iii) all others at actual cost
plus ten percent administrative overhead. Such costs may be deducted by City from any
payments due to Contractor. Provided, however, if overtime work or work during other
than normal hours is at the request of City and not due to Contractor delay, City will pay the
cost of City overtime expenses.
4.4.6
Where the Contract Documents require that a particular product be installed or applied by
an applicator approved by the manufacturer, it is Contractor’s responsibility to ensure
the Subcontractor employed for such work is approved by the manufacturer. All materials
and equipment must be stored, applied, installed, connected, erected, used, cleaned and
conditioned in accordance with the instructions of the applicable manufacturer, fabricator,
supplier or distributor, except as otherwise provided in the Contract Documents; but no
provisions of any such instructions will be effective to impose on City of Design Professional
responsibility for the means, methods, techniques, sequences or procedures of
construction or for safety precautions incident thereto.
4.4.7
Before starting the Work, Contractor must carefully study and compare the various
Plans, Drawings, other Contract Documents, and Specifications relative to that portion of
the Work, as well as the information furnished by City, must take field measurements of any
existing conditions related to that portion of the Work and must observe any conditions at
the Site affecting it. The exactness of grades, elevations, dimensions, or locations given
on any Drawings, or the Work installed by other contractors, is not guaranteed by City.
4.4.8
Before ordering materials or doing Work, Contractor and each Subcontractor must verify
General Conditions
Revised: 10/19/2021
GC-14 of 75
measurements at the Site and will be responsible for the correctness of such
measurements. No extra charge or compensation will be allowed because of differences
between actual dimensions and the dimensions indicated on the Contract Documents,
including the Drawings.
4.4.9
Ground Level Construction Photography.
4.4.9.1
The Contractor must furnish progress photographs of the project. The photographer
selected by the Contractor must be approved by the City and must be either a commercial
photographer or an individual experienced and equipped for such photography.
4.4.9.2
The Contractor must deliver to City all photographs taken during that period with each
application for payment. If the current photographs do not accompany the application, the
application will not be reviewed and will be returned to the Contractor as incomplete.
4.4.9.3
Photographs must be identified by use of typewritten labels affixed to the back of the
photograph. The label must provide a description of the view, the direction from which the
photograph was taken, the name of the project, City’s project number, the name of
Contractor and the date of the photography. The stationing must also be included for all
pipeline installations.
4.4.9.4
Photographs must be taken during the construction period and must be of aesthetic
composition and depict the progress of the Work from the beginning of construction
through and including the finished product. City may vary the specified frequency so that
significant progress or changes can be recorded on the photographs.
4.4.10
Underground Facilities.
4.4.10.1
The existence and number of facilities as shown on the Plans are estimated from
information furnished by the particular utility. Contractor is responsible for field verification
and location of all utilities prior to the start of construction. No field work will be allowed to
start until Contractor has contacted Arizona 811 and all affected utilities have been located.
In addition Contractor must expose and physically locate all potentially conflicting utilities
prior to construction. The actual locations of the utilities must be compared to locations
shown on the Plans and any required changes in alignment and grade must be made at the
time of construction in consultation with Project Manager. It is generally recognized and
Contractor should anticipate that information from Arizona 811 or information from utility
companies during project design, frequently fails to disclose all underground facilities. The
fact that more utility lines or other underground facilities are located in the Project Site than
shown on the Project Plans does not constitute an “unforeseen Condition” and such
undisclosed underground facilities do not differ materially from the conditions which
Contractor should expect. The provisions of Sections 105.4, 105.6, 107.11 and 109.8.1 of the
MAG Uniform Standard Specifications for Public Works Construction apply and are
incorporated herein by this reference.
4.4.10.2
Contractor is responsible for all coordination with utility companies. The provisions of
Sections 105.4, 105.6, 107.11 and 109.8.1 of the MAG Uniform Standard Specifications for
Public Works Construction strictly apply and no additional compensation will be paid to
Contractor for delays due to utility work on the project.
4.4.11
Relocation of Existing Water Meters. When a service line has been extended and a line
setter installed in a meter box, City forces will re-install meter. No compression fittings will
General Conditions
Revised: 10/19/2021
GC-15 of 75
be utilized.
4.4.12
Water Turn-On or Turn-Off.
4.4.12.1
Contractor must coordinate all water line turn-ons and turn-offs through the City.
Application must be made to the Municipal Utility Division and Contractor must pay the
established charges. The City will close existing valves, but will not guarantee a bone-dry
Shutdown.
4.4.12.2
Contractor must notify all customers affected by the turn-off not less than 48 hours in
advance. Notification must be in writing, must give the reason for the turn-off and must
give the estimated time and duration that water service will be interrupted. Contractor is
also notified that water turn-off will not be permitted on the Day before and after
Thanksgiving Day and Christmas Day.
4.4.12.3
No direct payment will be made to Contractor for turn-ons or turn-offs. Costs associated
therewith will be included in other items for which direct payment is made.
4.4.13
Tests and Inspections.
4.4.13.1
Contractor must give City timely (at a minimum, twenty-four hours) notice of readiness of
the Work for all required inspections, tests or approvals. Contractor must give timely notice
to City in advance of backfilling or otherwise covering any part of the Work so that city
representative may, if desired, observe such part of the Work before it is concealed.
Whenever Contractor varies the normal period during which Work or any portion of it is
carried on each Day, Contractor must give timely notice to City so that city representative
may, if desired, be present to observe the Work in progress. If Contractor fails to give such
timely notice, any Work done in the absence of city representative will be subject to
rejection. If Contractor gives such notice to City, but then is not ready for such inspections,
tests, approvals or observations at the time so noticed, Contractor must reimburse City for
all costs incurred by the attendance of city representatives.
4.4.13.2
If any law, ordinance, rule, regulation, code, or orders of any public body having jurisdiction
requires any Work (or part thereof) to be inspected, tested or approved, Contractor (unless
another party is specified in the Contract Documents) must assume full responsibility
therefor, pay all costs in connection therewith and furnish City the required certificates of
inspection, testing, or approval. Contractor must also be responsible for and must pay all
costs in connection with any inspection or testing required by the Specifications in
connection with City's acceptance of a manufacturer, fabricator, supplier or distributor of
materials or equipment proposed to be incorporated in the Work, or of materials or
equipment submitted for approval prior to Contractor's purchase thereof for incorporation
in the Work. The cost of all other inspections, tests and approvals required by the Contract
Documents will be paid by City (unless otherwise specified).
4.4.13.3
All inspections, tests or approvals other than those required by law, ordinance, rule,
regulation, code or order of any public body having jurisdiction must be performed by
organizations acceptable to City and by the Design Professional if so specified.
4.4.13.4
Neither observations by City, the Design Professional nor inspections, tests or approvals by
others will relieve Contractor from their obligations to perform the Work in accordance with
the Contract Documents.
General Conditions
Revised: 10/19/2021
GC-16 of 75
4.4.14
Uncovering Work. If any Work that is to be observed, inspected, tested or approved is
covered without written concurrence of City, it must, if requested by City be uncovered for
observation. Unless Contractor has given City timely notice of Contractor's intention to
cover such Work and City has not acted with reasonable promptness in response to such
notice, Contractor must furnish all necessary labor, material and bear all the expenses of
such uncovering, exposure, observation, inspection and testing and of satisfactory
reconstruction, including compensation for additional professional services, and an
appropriate deductive Change Order will be issued.
4.4.15
In all cases of interconnection of its Work with existing or other Work, Contractor must verify
at the Site all dimensions relating to such existing or other Work. Any errors due to
Contractor’s failure to so verify all such grades, elevations, locations or dimensions must
be promptly rectified by Contractor without any increase in the Contract Price. Any design
errors or omissions noted by Contractor during this review must be reported promptly to
City.
4.4.16
Contractor must establish and maintain all construction grades, lines, levels, and
benchmarks, and will be responsible for accuracy and protection of same. This Work
must be performed or supervised by a licensed civil engineer or surveyor in the State of
Arizona.
4.4.17
Contractor must photograph all buried piping of greater than four (4) inches in diameter
prior to backfill.
4.4.18
Contractor is responsible for the proper performance of the work of Subcontractors and any
acts and omissions in connection with such performance. Nothing in the Contract
Documents is intended or deemed to create any legal or contractual relationship
between City and any Subcontractor or Sub-Subcontractor, including but not limited to any
third-party beneficiary rights.
4.4.19
Contractor must coordinate the activities of all Subcontractors. Contractor must
coordinate performance of the Work with City’s Public Works & Utilities Department and
other departments or agencies within City. The Design Professional and other contractors
or parties involved in the Project. If City performs other work on the Project or at the Site with
separate contractors under City’s control, Contractor agrees to cooperate and coordinate
its activities with those of such separate contractors so that the Project can be completed
in an orderly and coordinated manner without unreasonable disruption.
4.4.20
Contractor will not substitute or change any Subcontractor or Supplier without the prior
written approval of City. Any substitute or replacement Subcontractor or Supplier must
be required to meet the same qualifications and selection criteria and process as the
original Subcontractor or Supplier. If a Subcontract/Supplier selection plan has been
approved by City, Contractor will follow that plan unless otherwise approved by City in
writing.
4.4.21
Contractor must not change or replace any members of its Project team, including
Contractor’s Representative, Project Manager, or Superintendent, without an explanation for
the change being given to City, and receiving prior written approval of the change from City,
which approval will not be unreasonably withheld.
4.4.22
Subcontractors whose scope of work has a value greater than 15% of the total Contract Price
are required to furnish performance and payment bonds to Contractor, unless otherwise
General Conditions
Revised: 10/19/2021
GC-17 of 75
approved in writing by City.
4.4.23
Contractor must comply with MAG Specification § 108.2 (E) unless otherwise specified in
Contract Documents.
4.5
CONTROL OF THE PROJECT SITE
4.5.1
Throughout all phases of construction, including suspension of Work, Contractor must keep
the Site reasonably free from debris, trash and construction wastes to permit Contractor to
perform its construction services efficiently, safely and without interfering with the use of
adjacent land areas.
Prior to Final Acceptance of the Work, or a portion of the Work,
Contractor must remove all debris, trash, construction wastes, materials, equipment,
machinery and tools arising from the Work or applicable portions thereof to permit City
to occupy the Project or a portion of the Project for its intended use.
4.5.2
Contractor must take whatever steps, procedures or means necessary to prevent dust
nuisance due to construction operations. The dust control measures must be maintained
at all times to the satisfaction of City and in accordance with the requirements of the
Maricopa County Bureau of Air Pollution Control Rules and Regulations.
4.5.3
Contractor must maintain Americans with Disabilities Act (ADA) and American National
Standards
Institute (ANSI) accessibility requirements during construction activities,
including
without
limitation compliance with the 2010 regulations governing
implementation of the ADA to the extent applicable.
ADA and ANSI accessibility
requirements must include, but not be limited to, parking, building access, areas of refuge,
and emergency exit paths of travel. Contractor i s responsible for the coordination of all
Work to minimize disruption to residents and the public.
4.5.4
Only materials and equipment used directly in the Work will be brought to and stored on the
Site by Contractor. When equipment is no longer required for Work, it must be removed
promptly from the Site. Protection of construction materials and equipment stored at the
Site from weather, theft, damage and all other adversity is solely the responsibility of the
Contractor.
4.5.5
Contractor agrees all persons working on the Site must act at all times in the best interest
of the Project and will comply with all applicable rules and regulations reasonably set forth
by City related to the Site. Notwithstanding the foregoing or anything in this Agreement to
the contrary, City may remove from the Site any individual who City deems in their
reasonable discretion to be creating a disturbance or causing any problem on the Site.
4.5.6
Contractor will be responsible to City for the acts and omissions of Contractor’s employees,
Subcontractors and their agents and employees, and any other person performing any of
the Work under a Contract with Contractor, or claiming by, through or under Contractor, for
all damages, losses, costs and expenses resulting from such acts or omissions.
4.5.7
City may conduct criminal, drive history, and all other requested background checks of
Contractor and Subcontractor personnel performing Work or who have access to City’s
information, data, or facilities in accordance with City’s current background check policies,
or the provisions of the Project Specific Conditions. Any officer, employee or agent that
fails to background check must be replaced immediately.
4.5.8
City will have a final authority, based upon security reasons: (i) to determine when
General Conditions
Revised: 10/19/2021
GC-18 of 75
security clearance of Contractor’s and Subcontractor’s personnel is required; (ii) to determine
the nature of the security clearance, up to and including fingerprinting personnel; and
(iii) to determine whether or not any individual or entity may provide Services or perform
Work under the Contract.
4.5.9
If City objects to any personnel for any reasonable cause, then Contractor must, upon notice
from City, remove such individual from the Project.
4.6
PROJECT SAFETY
4.6.1
The Project and all Work performed in relation thereto is governed by applicable provisions
of the federal laws, including but not limited to, the latest amendments of the following:
a. Williams-Steiger Occupational Safety & Health Act of 1970, Public Law, 91-596.
b. Part 1910 and Part 1926 – Occupational Safety and Health Standards,
Chapter XVII of Title 29, Code of Federal Regulations.
c. Part 1518 – Safety and Health Regulations for Construction, Chapter XIII of
Title 29, Code of Federal Regulations.
4.6.2
Contractor is responsible for safety of the job Site for employees of Contractor as well
as for members of the general public and others who may drive or walk through or be at
the Site.
4.6.3
Contractor recognizes the importance of performing the Work in a safe manner so as to
prevent damage, injury or loss to: (i) all individuals at the Site, whether working or visiting;
(ii) the Work, including materials and equipment incorporated into the Work and stored On-
Site or Off-Site; and (iii) all other property at the Site or adjacent thereto, including trees,
shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for
removal, relocation or replacement in the course of construction; and (iv) the owners or
tenants of adjacent property and their patrons, employees and invitees.
4.6.4
Contractor assumes responsibility for implementing and monitoring all safety precautions
and programs related to the performance of the Work.
4.6.5
Contractor must provide a “competent person’ as required by O.S.H.A regulations. The
“competent person” must be identified at the Pre-Construction Conference with City
advised in writing of any changes.
4.6.6
The “competent person” must make routine daily inspections of the Site and must hold
weekly safety meetings with Contractor’s personnel, Subcontractors and others as
applicable.
4.6.7
Contractor and Subcontractors must comply with all legal and regulatory requirements
relating to safety, as well as any City specific safety requirements set forth in the Contract
Documents, provided that such City-specific requirements do not violate any applicable
legal and regulatory requirements.
4.6.8
Contractor will immediately report in writing any safety-related injury, loss, damage or
accident arising from the Work to Project Manager and, to the extent mandated by Legal
Requirements, to all government or quasi-government authorities having jurisdiction over
safety-related matters involving the Project or the Work.
General Conditions
Revised: 10/19/2021
GC-19 of 75
4.6.9
Contractor’s responsibility for safety under this Section is not intended in any way to
relieve Subcontractors and Sub-Subcontractors of their own contractual and legal
obligations and responsibility for (i) complying with all Legal Requirements, including those
related to health and safety matters, and (ii) taking all necessary measures to implement
and monitor all safety precautions and programs to guard against injury, losses, damages
or accidents resulting from their performance of the Work.
4.6.10
As between City and Contractor, Contractor is responsible to City for any and all the safety
issues relating to the Work on the Project. Contractor must administer and manage the
safety program. This will include, but not necessarily be limited to review of the safety
programs of each Subcontractor. Contractor must monitor the establishment and
execution of compliance with all applicable regulatory and advisory agency construction
safety standards. Contractor’s responsibility for review, monitoring, and coordination of the
Subcontractor’s safety programs will not extend to direct control over execution of the
Subcontractors’ safety programs. Notwithstanding Contractor’s safety obligations to City,
it is agreed and understood that each individual Subcontractor will remain controlling
employer responsible for the safety programs and precautions applicable to its own work
and the activities of other’s work in areas designated to be controlled by such Subcontractor
for purposes of workers compensation insurance coverage.
4.6.11
Nothing in this agreement will relieve Contractor of his responsibility to maintain traffic,
structures, etc., as noted on the Plans, Specifications, and Project Specific Conditions.
Contractor is responsible to provide all necessary shoring, bracing and trench support as
is necessary to maintain traffic structures, etc., as stipulated in the Plans, Specifications, and
Special Provisions. If the stability of adjoining building, walls, roadways, etc., is endangered
by Contractor’s excavation, shoring, bracing, or under pinning must be provided as
necessary to ensure project safety. Cost for shoring, bracing, underpinnings, and trench
support will be included in the appropriate items listed in the Contract Price, and no
additional payment will be made for this work.
4.7
MATERIALS QUALITY, SUBSTITUTIONS, AND SHOP DRAWINGS
4.7.1
Quality Control and Quality Assurance Testing.
4.7.1.1
All construction materials to be used or incorporated in the Project are subject to
inspection, Quality Control & Quality Assurance Testing, and approval or rejection by City.
Any material rejected by City must be removed immediately and replaced in an acceptable
manner to City at no additional cost to City. When QC/QA tests indicate noncompliance
with the Contract Documents, retesting must be performed by the same testing laboratory
that performed the tests that indicated noncompliance.
4.7.1.2
The Contractor must establish, provide, and maintain an effective Quality Control Testing
Program (QCTP). The Contractor must develop his own program or procure the services of
a consultant. In either case, the party performing the tests must be currently certified by the
National Bureau of Standards in the National Voluntary Laboratory Accreditation Program
(NVLAP) for construction
services or the AASHTO Accreditation Plan (AAP) for Soils,
Asphalt and Concrete. The Contractor must provide all support necessary to perform QC
and QA testing and sampling (i.e. shoring for testing trench backfill, backhoes, motor
graders, loaders, etc. to facilitate testing and sampling). The City will perform the QA testing.
4.7.1.3
The Contractor must submit a written QCTP to the City as a required submittal. The
Contractor must not begin Work until the Quality Control Program has been reviewed and
General Conditions
Revised: 10/19/2021
GC-20 of 75
accepted by the City. Resumes of all personnel that will be associated directly or indirectly
with the QCTP must be included.
4.7.1.4
The QCTP must include, but not be limited to, on-site/field and laboratory testing of all
material delivered to the Site and any existing materials or conditions pertinent to the
project.
4.7.1.5
All testing must be under the direction of a Professional Engineer registered in the State of
Arizona, knowledgeable in Materials Testing. All “Test Report” forms must be stamped by
said Engineer.
4.7.1.6
The written QCTP will set forth the responsibilities of the engineer, project manager,
supervisory personnel and each technician assigned to this project. Substitutions or
replacement of personnel must require prior written approval by the City. All personnel must
be proficient within their assigned duties and possess certification(s) commensurate with
their position and responsibilities. The minimum certification(s) for each technician must
be NICET Level II, Arizona Technical Testing Institute, American Concrete Institute, or other
nationally recognized program applicable to the project and approved by the City of
Chandler. The written QCTP must include a description of the required field and
construction materials laboratory tests, including required frequencies that meet the
minimums established herein.
4.7.1.7
The Contractor must establish a system to record and report all material test results. The
daily test reports must include, but not be limited to:
a. Test designation;
b. Date of test;
c. Name of tester;
d. Location of test/sample (station and offset);
e. Product suppliers and product codes (as applicable);
f.
Depth/elevation of test/sample;
g. Test result;
h. Control requirement(s);
i.
Cause of rejection (if applicable);
j.
Results of retests (if applicable); and
k. Remedial action (if applicable).
4.7.1.8
The Contractor must submit test results to the designated City representative.
4.7.1.9
The Contractor must also submit a weekly report to the City summarizing the testing
and construction activities completed by emailing the report to the email addresses noted
above. All weekly reports must be submitted simultaneously to the Contractor and the
City of Chandler. The report must include individual summary sheets for each utility line,
structure, and portion of the pavement section. Cores must be numbered sequentially
throughout the Project. Re-cores must reference the original core by number and must
contain the averaged values for thickness and density. Total pavement thickness must be
reported. Vertical location of tests for underground utilities must indicate the depth of the
General Conditions
Revised: 10/19/2021
GC-21 of 75
excavation at the location of the test (i.e., cut to flow line [if applicable], depth to bottom
or top of pipe, etc.). Density tests must be numbered sequentially. If the minimum number
of tests has not been performed per the written QCTP, this must be stated in the weekly
summary report with an explanation of the circumstances.
4.7.1.10
The City will maintain a copy of the Project test results and weekly reports in the Project
file. In cases where quality control activities do not comply with the contract provisions, the
City may:
a. Order the Contractor to replace ineffective or unqualified quality control
personnel.
b. Order the Contractor to stop operations until appropriate corrective action is
taken.
4.7.1.11
Although minimum testing requirements are specified herein, the Contractor bears full
responsibility for the quality of the materials and their installation and may elect to
perform additional testing beyond the requirements set forth herein to ensure compliance.
4.7.1.12
The Quality Control requirements contained in this Section are in addition to and separate
from Quality Assurance Testing, which will be performed by the City of Chandler or its
representative. If the Quality Assurance test results are not in agreement with the Quality
Control test results, the Contractor will have the option to retain a third party consultant for
referee tests. The third party consultant must meet the same requirements as the
consultant performing the Quality Control Testing. The results of the third party will be
binding. All cost incurred by the referee testing will be the Contractor’s expense. If the
Contractor elects not to retain a third party for referee testing, the City of Chandler test
results will prevail.
4.7.1.13
Except as otherwise noted within this Section, Work or materials required by this Section are
non- pay items. Per MAG Section 101, a non-pay item is an item of Work for which no
separate payment will be made, the cost of which is to be included as an incidental cost
for associated item(s) included on the Bid Schedule or Schedule of Values.
4.7.2
Trade Names and Substitutions.
4.7.2.1
Substitutions prior to bid will only be considered if in compliance with Arizona Revised
Statute § 34-104.
4.7.2.2
Contractor, if requested by City, must submit Samples or any additional information that
may be necessary to evaluate the acceptability of the substitution.
4.7.2.3
City will make the final decision and will notify Contractor in writing as to whether the
substitution has been accepted or rejected.
4.7.2.4
If City does not respond within 15 working days, Contractor must continue to perform the
Work in accordance with the Contract Documents and the substitution will be considered
rejected.
4.7.3
Shop Drawings.
4.7.3.1
Contractor must prepare and submit Shop Drawings which show details of all Work to insure
proper installation of the Work using those materials and equipment specified under the
approved Plans and Specifications.
General Conditions
Revised: 10/19/2021
GC-22 of 75
4.7.3.2
Contractor must submit a schedule of Shop Drawing submissions, which avoids bulk
submissions to the extent reasonably possible, with the Project Schedule for City approval.
The schedule of Shop Drawing submissions must include all of the items for which Shop
Drawings are required by the Contract Documents, including the Specifications. Unless
otherwise noted, Shop Drawings will not be required for items specified or detailed in
the Uniform Standard Specifications and Details or the Technical Specifications.
4.7.3.3
Shop Drawings must be numbered consecutively for each Specification section and must
accurately and distinctly present the following:
a. All working and erection dimensions.
b. Arrangements and sectional views.
c. Necessary details, including complete information for making connections
between work under this Contract and work under other Contracts.
d. Kinds of materials and finishes.
e. Parts list and description thereof.
4.7.3.4
Each Drawing or page must include:
a. Project Name, City of Chandler Project Number and descriptions.
b. Submittal date and space for revision dates.
c. Identification of equipment, product or material.
d. Name of Contractor and Subcontractor.
e. Name of Supplier and Manufacturer.
f.
Relation to adjacent structure of material.
g. Physical dimensions clearly identified.
h. ASTM and Federal Specifications references.
i.
Identification of and justification for deviations from the Contract Documents.
j.
Contractor’s stamp, initialed or signed, dated and certifying the review
of submittal, certification of field measurements and compliance with
Contract.
k. Location at which the equipment or materials are to be installed.
4.7.3.5
Location will mean both physical location and location relative to other connected or
attached material. City will return unchecked any submittal, which does not contain
complete data on the Work and full information on related matters.
4.7.3.6
Stock or standard drawings will not be accepted for review unless full identification and
supplementary information is shown thereon in ink or typewritten form.
4.7.3.7
Contractor must schedule, prepare and submit all Shop Drawings in accordance with a time-
table
that will allow its suppliers and manufacturers sufficient time to fabricate,
manufacture, inspect, test and deliver their respective products to the project Site in a
timely manner so as to not delay the complete performance of the Work.
4.7.3.8
If the Shop Drawings show departures from the Contract requirements, Contractor must
General Conditions
Revised: 10/19/2021
GC-23 of 75
make specific mention thereof in the Letter of Transmittal; otherwise review of such
submittals by City will not constitute review of the departure. Review of the Drawings will
constitute review of the specific subject matter for which the Drawings were submitted
and not of any other structure, material, equipment, or apparatus shown on the Drawings.
4.7.3.9
The review of Shop Drawings will be general and will not relieve Contractor of responsibility
for the accuracy of such Drawings, nor for the proper fitting and construction of the Work,
nor for the furnishing of materials or Work required by the Contract. No construction
called for by Shop Drawings will be initiated until such Drawings have been reviewed and
approved by City.
4.7.3.10
The procedure in seeking review of the Shop Drawings will be as follows:
a. Contractor must submit complete sets of Shop Drawings and other
descriptive data as specified in this Section.
b. After Contractor’s submittal or resubmittal of Shop Drawings, if Contractor
has submitted Shop Drawings in accordance with the City-approved
submittal schedule, or upon resubmission, City will be provided with three
(3) calendar weeks for review. Should City require additional review time
above and beyond the three (3) calendar weeks, Contractor may ask for a
time extension or monetary compensation, if they can present valid, factual
evidence that actual damages were incurred by Contractor. City will
determine
the amount of the time extension or the monetary
compensation to be awarded Contractor, if any, in accordance with City’s
Policy Statement for Calculating Delays and Damages, Appendix 1.
4.7.3.11
Contractor will be responsible for all extra costs incurred by City caused by Contractor’s
failure to comply with the procedure outline above.
4.7.4
Long Lead Time Items. Contractor must submit Shop Drawings, as required by the Engineer,
on all long lead items to be furnished and installed as part of the project within 10 Days
after the date of the executed Contract letter issued by City. In addition, Contractor
must order all long lead items to be furnished and installed as part of this Project within 3
Days after receiving approved Shop Drawings. For all long lead times for which Shop
Drawings are not required, Contractor must order said long lead items within 15 Days after
the date of the executed Contract letter issued by City. Within 2 Days after ordering
long lead items, Contractor must supply copies of all purchase orders, along with an
accurate delivery schedule from the supplier.
4.7.5
Construction Water. If Contractor uses water from City’s water system for construction
water, Contractor must obtain a fire hydrant meter from City of Chandler Utility Services
(480-782-2280) and all construction water must be obtained through the hydrant meter.
Contractor must pay all fees related to the hydrant meter and all water bills for construction
water. All cost for meters and construction water will be included in the Contract Price.
4.8
PROJECT RECORD DOCUMENTS
4.8.1
During the construction period, Contractor must maintain at the jobsite a full-size set of
prints of the Construction Document Drawings and Shop Drawings for Project Record
Document purposes.
4.8.2
Contractor must mark these Drawings to indicate the actual installation where the installation
General Conditions
Revised: 10/19/2021
GC-24 of 75
varies from the original Construction Documents. Contractor must give particular attention
to information on elements that will be concealed, which would be difficult to identify or
measure and record later. Items required to be marked include but are not limited to:
a. Dimensional changes to the Drawings.
b. Revisions to details shown on Drawings.
c. Locations and depths of underground utilities.
d. Revisions to routing of piping and conduits.
e. Actual equipment locations.
f.
Changes made by Change Order or Addendum.
g. Details not on original Contract Drawings.
4.8.3
Contractor must mark completely and accurately Project Record Drawing sets of
Construction Documents.
4.8.4
Contractor must mark Project Record Drawings sets with red erasable colored pencil.
4.8.5
Contractor must note Request for Information (RFI) Numbers and Change Order numbers,
etc., as required to identify the source of the change to the Construction Documents.
4.8.6
Contractor must submit Project Record Drawing sets and Shop Drawings to City or its
representative for review and comment.
4.8.7
Upon receipt of the reviewed Project Record Drawings from City, Contractor must correct
any deficiencies and omissions to the Drawings and submit the final original of the Project
Record Drawings to City prior to Final Payment.
4.8.8
Project Manager will review the Project Record Drawings monthly prior to the date
established for the Payment Request and will be the sole judge of acceptance of these
Drawings.
4.9
WARRANTY AND CORRECTION OF DEFECTIVE WORK
4.9.1
Contractor warrants to City that the construction, including all materials and equipment
furnished as part of the Work, will be new unless otherwise specified in the Contract
Documents, of good quality, and free of defects in materials and workmanship. Contractor’s
warranty obligation excludes defects caused by abuse, alterations, or unreasonable failure
to maintain the construction by persons other than Contractor, subcontractors, or others
under Contractor’s control. Nothing in this warranty will limit any manufacturer’s warranty
which provides City with greater warranty rights than set forth herein or in the Contract.
Contractor will provide City with all manufacturers’ warranties and operation and
maintenance manuals upon substantial completion of the Work. Contractor’s warranty
must be for one (1) year, in accordance with MAG Specification § 108.8, and will commence
for all portions of the Work upon Final Acceptance of the entire Work as determined by City
under the Contract. All statutory or other warranties, express or implied, related to latent
defects will remain in force and are not limited by this provision.
4.9.2
City May Stop the Work. If the Work is defective, or Contractor fails to supply sufficient
skilled workmen or suitable materials or equipment, City may order Contractor to stop the
Work without cost to City, or any portion thereof, until the cause for such order has been
General Conditions
Revised: 10/19/2021
GC-25 of 75
eliminated; however, this right of City to stop the Work will not give rise to any duty on the
part of City to exercise this right for the benefit of Contractor or any other party.
4.9.3
Correction or Removal of Defective Work.
4.9.3.1
If required by City, Contractor must promptly, without cost to City and as specified by City,
either correct any defective Work, whether or not fabricated, installed or completed, or, if
the Work has been rejected by City, remove it from the Site and replace it with non-defective
Work. Contractor must correct any Work which may be displaced in correcting, removing or
replacing defective Work. No compensation will be allowed Contractor for such removal,
replacement or remedial Work. Contractor must reimburse City for costs incurred by City
due to such correction or removal including but not limited to additional expenses for
inspection, testing or observation and for repeated reviews by the City or Design
Professional.
4.9.3.2
Upon failure on the part of the Contractor to comply within a reasonably prompt time with
any written order of City to correct or remove defective Work, City has authority to cause
nonconforming materials or rejected Work to be remedied, removed, or replaced at the
Contractor's expense and to deduct the costs from any moneys due or to become due the
Contractor.
4.9.4
City May Correct Defective Work. If Contractor fails within a reasonable time after written
notice of City to proceed to correct defective Work or to remove and replace rejected Work
as required by City or if Contractor fails to perform the Work in accordance with the Contract
Documents (including any requirements of the progress schedule), City may, after 7 Days'
written notice to Contractor, correct and remedy any such deficiency. To the extent
necessary to complete corrective and remedial action, City may exclude Contractor from all
or part of the Work, and suspend Contractor's services related thereto, take possession of
Contractor's tools, appliances, construction equipment and machinery at the Site and
incorporate in the Work all materials and equipment stored at the Site or for which City has
paid Contractor, but which are stored elsewhere. Contractor must allow City, city
representatives, agents and employees such access to the Site as may be necessary to
enable City to exercise City’s rights under this Section. All direct and indirect costs of City in
exercising such rights will be charged against Contractor in an amount verified by City
representative, and a Change Order will be issued incorporating the necessary revisions in
the Contract Documents and a reduction in the Contract Price. Such direct and indirect
costs will include, in particular but without limitation, compensation for additional
professional services required and all costs of repair and replacement of Work or others
destroyed or damaged by correction, removal or replacement of Contractor's defective
Work. Contractor will not be allowed an extension of the Contract Time because of any delay
in Contractor’s performance of the Work attributable to the exercise by City or City's rights
hereunder.
4.9.5
Correction or Removal of Unauthorized Work.
4.9.5.1
Any Work done beyond the lines and grades shown on the Drawings or established by the
Design Professional or any changes in, additions to, or deductions from the Work done
without written authority will be considered as unauthorized and will not be paid for. Work
so done may be ordered remedied, removed, or replaced at the Contractor's expense.
4.9.5.2
Upon failure on the part of the Contractor to comply promptly with any order of the City,
City will have authority to cause unauthorized Work to be remedied, removed, or replaced
General Conditions
Revised: 10/19/2021
GC-26 of 75
at the Contractor's expense and to deduct the costs from any moneys due or to become
due the Contractor.
4.9.6
Correction Period - One Year Guarantee.
4.9.6.1
If, within one year after the date of Final Acceptance, or such longer period of time as may
be prescribed by law or by the terms of any applicable special guarantee required by the
Contract Documents, or by any specific provision of the Contract Documents, any Work is
found to be defective, Contractor must promptly, without cost to City and in accordance
with City's written instructions, either correct such defective Work, or, if it has been rejected
by City, remove it from the Site and replace it with non-defective Work. If Contractor does
not promptly comply with the terms of such instructions, or in an emergency where delay
would cause serious risk of loss or damage, City may have the defective Work corrected or
the rejected Work removed and replaced, and all direct and indirect costs of such removal
and replacement, including compensation for additional professional services, must be paid
by Contractor. Such action by the City will not relieve the Contractor of the guarantees
required by this Section or elsewhere in the Contract Documents.
4.9.6.2
If, in the opinion of the City, defective Work creates a dangerous condition or requires
immediate correction or attention to prevent further loss to the City or to prevent
interruption of operation of the City, the City will attempt to give the notice required by this
Section. If the Contractor cannot be contacted or does not comply with the City's request
for correction within a reasonable time as determined by the City, the City may,
notwithstanding the provisions of this Section, proceed to make such correction or provide
such attention; and the costs of such correction or attention will be charged against the
Contractor. Such action by the City will not relieve the Contractor of the guarantees
required by this Section or elsewhere in the Contract Documents.
4.9.6.3
This Section does not in any way limit the guarantee on any items for which a longer
guarantee is specified or on any items for which a manufacturer or supplier gives a
guarantee for a longer period. The Contractor agrees to act as co-guarantor with such
manufacturer or supplier and must furnish the City all appropriate guarantee or warranty
certificates upon completion of the Project. No guarantee period, whether provided for in
this Section or elsewhere, will in any way limit the liability of Contractor or their sureties or
insurers under the indemnity or insurance provisions of these General Conditions and the
Project Specific Special Conditions.
4.9.7
Acceptance of Defective Work.
4.9.7.1
If, instead of requiring correction or removal and replacement of defective Work, City may
accept Work when in the best interest of the City to do so with appropriate monetary credit
from Contractor. If any such acceptance occurs prior to final payment, a Change Order will
be issued incorporating the necessary revisions in the Contract Documents, including
appropriate reduction in the Contract Price; or, if the acceptance occurs after final payment,
an appropriate amount must be paid by Contractor to City.
4.9.7.2
Alternatively, City may require Contractor to furnish at Contractor's expense, a special
performance guarantee or other surety prior to acceptance of defective work.
4.9.8
The Warranty period begins on the Final Acceptance date noted in the Certificate of
Completion, irrespective of early completion by some Subcontractors of their work.
General Conditions
Revised: 10/19/2021
GC-27 of 75
4.9.9
Contractor’s warranty obligation must be in accordance with MAG Specifications.
4.9.10
Nothing in the warranties contained in the Contract Documents are intended to limit any
manufacturer’s warranty which provides City with greater warranty rights than set forth
in this
Section or the Contract Documents. Contractor must provide City with all
manufacturers’ warranties
prior to Substantial Completion, if applicable, or Final
Acceptance.
4.9.11
Contractor agrees that it will be responsible to manage and administer the correction of any
Work that is not in conformance with the Contract Documents during the warranty periods
set forth in this Section, or during any longer periods to the extent required by the Contract
Documents. A progress payment, or partial or entire use or occupancy of the Project by City,
will not constitute acceptance of Work not in accordance with the Contract Documents.
4.9.12
When notified of a warranty issue, Contractor must respond in writing within 48-hours and
must perform warranty Work as soon as material for said repairs are available (as judged
solely by City), and in any event Contractor must, take immediate steps to commence and
complete correction of nonconforming Work no later than the time period set forth in
City’s written notification in accordance with the Contract Documents. This includes the
correction, removal or replacement of the nonconforming Work and any damage caused
to other parts of the Work affected by the nonconforming Work. If defects develop which
are determined by City to be an emergency, City will notify Contractor, via the most
expeditious means regarding the nature and condition of the defects. In turn, Contractor
must immediately dispatch necessary forces to correct the defect or the emergency
condition in accordance with Contract Documents.
4.9.13
The time periods referenced in this Section apply only to Contractor’s obligation to
correct nonconforming Work and is not intended to constitute a period of limitations for any
other rights or remedies that City may have regarding Contractor’s other obligations under
the Contract Documents.
4.9.14
Without limiting the foregoing or anything in these General Conditions or the Contract
to the contrary, Contractor must obtain and provide to City all warranties for any portion
of the Project offered by the manufacturer, installer or provider thereof. City and the user
of the facility will have the right to the full value and benefit of all such warranties.
Contractor must ensure all such warranties are fully transferrable to facilitate the full value
of this Section.
4.9.15
Contractor’s warranty excludes damages or defects caused by abuse, alterations to the Work
not executed by or through Contractor, improper or insufficient maintenance, improper
operation, or normal wear and tear and normal usage.
4.9.16
In the event of any noncompliance with this entire Section 4, City may require Contractor to
stop or suspend the Work in whole or in part.
SECTION 5 - CITY RESPONSIBILITIES
5.1
CITY PROJECT MANAGER AND INSPECTORS
5.1.1
Project Manager is responsible for providing City-supplied information and approvals in a
timely manner to assist Contractor to fulfill its obligations under the Contract Documents.
General Conditions
Revised: 10/19/2021
GC-28 of 75
5.1.2
Project Manager will also provide Contractor with prompt notice when it observes any
failure on the part of Contractor to fulfill its contractual obligations, including any default
or defect in the Project or non-conformance with the Drawings and Specifications.
5.1.3
City may utilize Field Inspectors to assist Project Manager during construction in
observing performance of Contractor. City’s use of Inspectors is for the purpose of assisting
Project Manager.
5.1.4
The Inspectors are authorized to inspect all Work and materials furnished. Such inspections
may extend to all or part of the Work and to preparation, fabrication or manufacture of the
materials to be used. The Inspectors have the authority to issue instructions contrary to
the Construction Documents if approved and coordinated with the directions of Project
Manager.
5.1.5
The Inspectors have the authority to reject work or materials until any questions at issue can
be decided by Project Manager.
5.1.6
The use of Inspectors by City will not make City responsible for or give City control
over construction means, methods, techniques, sequences or procedures or for safety
precautions or programs or responsibility for Contractor’s failure to perform the Work in
accordance with Contract Documents. The Inspectors are not authorized to direct any of
Contractor’s activities, employees or Subcontractors.
5.2
DESIGN PROFESSIONAL SERVICES
City may contract separately with one or more Design Professionals to provide
construction administration of the Project. The Design Professional’s Contract, as well as
other firms hired by City may be furnished to Contractor. Contractor does not have the right
to limit or restrict or reject any Contract modifications that are mutually acceptable to City
and Design Professional.
5.3
CIT Y ’S SEP AR AT E CONT R ACT ORS
City is responsible for all work performed on the Project or at the Site by separate
contractors retained by City. City will contractually require its separate contractors to
reasonably cooperate with, and reasonably coordinate their activities so as not to interfere
with Contractor in order to enable Contractor to timely complete the Work consistent with
the Contract Documents. Contractor must immediately notify the Project manager, and
address the matter in the next monthly status report, if any activities of such separate
contractors are expected to interfere, or are interfering, with Contractor and such
interference will or could result in any delay in Contractor’s performance of the Work.
5.4
PERMIT REVIEW AND INSPECTIONS
5.4.1
If requested by Contractor, Project Manager will provide assistance and guidance in
obtaining necessary reviews, permits and inspections.
5.4.2
The regulating agencies of City, such as Development and Sustainability, Fire and
Planning Departments, enforce legal requirements. The enforcement activities of City are
independent and separate from this Agreement.
5.5
PLANS AND SPECIFICATIONS TO THE CONTRACTOR.
Contractor will be provided up to five copies of the Contract Documents as are reasonably
necessary for the execution of the Work. Additional copies will be furnished, upon request,
General Conditions
Revised: 10/19/2021
GC-29 of 75
at the cost of reproduction.
SECTION 6 - CONTRACT TIME
6.1
CONTRACT TIME
6.1.1
The Contract Time will start with the Notice to Proceed (“NTP”) and end with Final
Acceptance.
6.1.2
Beginning on the date of the NTP, Contractor must begin to fulfill Contractor’s obligations
under the Contract. Contractor’s obligations include providing City and other agencies
with any submittals required by the Project Specific Special Provisions, including but not
limited to, an approved Project Schedule, Traffic Control Plans, and a Stormwater Pollution
Prevention Plan. Contractor must submit all such required submittals before any physical
construction work commences on the Site. NTP does not authorize construction work
until all contract insurance, bonds, and schedules are submitted to and accepted by the
City.
6.1.3
The Contract Time will be as set forth in the Project Schedule. Contractor agrees that it
will commence performance of the Work and complete the Project through both
Substantial Completion and Final Acceptance within the Contract Time.
6.1.4
Time is of the essence of this Contract, for the Project, for the Work, and for each phase and
designated Milestone thereof.
6.1.5
Failure of Contractor to perform any covenant or condition contained in the Contract
Documents within the time periods specified herein, will constitute a material breach of this
Contract entitling City to terminate the Contract unless Contractor applies for and receives
an extension of time, in accordance with the procedures set forth in the Contract
Documents.
6.1.6
Failure of City to insist upon the performance of any covenant or condition within the time
periods specified herein, will not constitute a waiver of Contractor’s duty to perform every
other covenant or condition within the designated periods, unless a specific waiver is
granted in writing for each such covenant or condition.
6.1.7
City’s agreement to waive a specific time provision or to extend the time for performance
will not constitute a waiver of any other time provisions contained in the Contract
Documents. Failure of Contractor to complete performance promptly within the additional
time authorized in the waiver or extension of time agreement constitutes a material breach
of this Contract entitling City to all the remedies set forth herein or provided by law.
6.2
PROJECT SCHEDULE
6.2.1
The Project Schedule must be in Microsoft Project standard file format, must be updated and
maintained throughout the Contract Time, and must contain the following:
6.2.1.1
Detailed representation of all activities for the project, both on-site construction and major
procurement. All significant activities together with the resource loading requirements for
each and all items appearing on the schedule of values or bid schedule for progress
payments must be shown on the Project Schedule or in attached transmittal letter as
described in Section 6.2.8.
General Conditions
Revised: 10/19/2021
GC-30 of 75
6.2.1.2
Dependencies between activities must be indicated so that it may establish as to the effect
the progress of any one activity would have on other activities and on the Schedule.
6.2.1.3
Activities for submission, review, and approval of all required submittals.
6.2.1.4
An amount of time will be established prior to the final completion date for “punch list and
cleanup”. No other activities will be scheduled during this period. Punch list and cleanup
must be shown on the Project Schedule and must be entirely completed prior to the
expiration of the Contract Time.
6.2.2
Within 10 Days of receipt of City’s comments, Contractor must make all required
corrections, adjustments, and additions to complete the Project Schedule and resubmit to
City for review. City’s review of and response to the Project Schedule is for the purpose of:
(1) City planning and staffing for the Project as may be required from time to time; (2)
ensuring Contractor’s general conformance with the scheduling requirements of the
Contract Documents and completion of the Project within the Contract Time; and (3)
monitoring and evaluating the construction status for purposes of approving monthly
progress payments. Acceptance of a submitted schedule by City should in no way be
construed as an affirmation or admission that the schedule is reasonable or workable by
Contractor. The responsibility for completing the Work on the Project within the Contract
Time remains the obligation of Contractor. City’s review does not relieve Contractor from
compliance with the requirements of the Contract Documents or be construed as
relieving Contractor of its complete and exclusive control over the means, methods,
sequences and techniques for executing the work.
6.2.3
The Project Schedule must show milestones, including milestones for City-furnished
information, and must include activities for City-furnished material and construction by
other contractors when those activities are interrelated with Contractor activities.
6.2.4
The Project Schedule must be revised as required by conditions and progress of the Work,
but such revisions do not relieve Contractor of its obligations to complete the Work
within the Contract Time, as adjusted in accordance with the Contract Documents. No
modification to the Contract Documents or the Contract Time will be effective unless
approved in advance by City.
6.2.5
For all items of materials and equipment that are critical or may require long lead times to
acquire, the Project Schedule must show dates for submission, review and approval of
submittals, ordering, and delivery.
6.2.6
An updated Project Schedule must be submitted monthly to City as part of the Payment
Request. The monthly submittal must include one full size plot of the entire schedule and
one electronic copy containing the schedule in Microsoft Project standard file format. In
addition, Contractor must, upon request by City, provide a copy of all submitted schedule
data in electronic
format which must be clearly labeled with the Project description,
scheduling program name and version number, and schedule print/data date.
6.2.7
Contractor must provide City with a monthly status report with each Project Schedule
detailing the progress of the Work, including: (i) if the Work is proceeding according to
schedule, (ii) any discrepancies, conflicts, or ambiguities found to exist in the Contract
Documents that require resolution, and (iii) other information detailing items that require
resolution so as not to jeopardize the ability to complete the Work in the Contract Time.
General Conditions
Revised: 10/19/2021
GC-31 of 75
6.2.8
With each Project Schedule submittal, Contractor must include a transmittal letter
including the following:
a. Description of problem tasks, referenced to field instructions or requests
for information (RFI’s), as appropriate.
b. Current and anticipated delays including:
(i)
Cause of the delay.
(ii)
Corrective action and schedule adjustments to correct the delay.
(iii)
Known or potential impacts and their delay on other activities,
milestones, and their impact on the Substantial Completion and
Final Acceptance dates.
(iv)
Changes in construction sequence.
c. Pending items and status thereof including but not limited to:
(i) Time Extension requests;
(ii)
Substantial Completion date status;
(iii)
Final Acceptance date status.
d. If ahead of schedule, the number of calendar Days ahead.
e. If behind schedule, the number of calendar Days behind.
f.
Other Project or scheduling concerns.
6.2.9
Critical Path Method (CPM).
6.2.9.1
Unless otherwise specified in the Contract, the Project Schedule must include a Critical
Path
Method (CPM) diagram schedule showing the sequence of activities, the
interdependence of each activity and identifies the Critical Path.
6.2.9.2
The CPM diagram schedule must be in calendar Days and indicate duration, earliest and
latest start and finish dates for all activities, and total Float Times for all activities except
critical activities. The CPM diagram must be presented in a time scaled graphical format for
the Project as a whole.
6.2.9.3
The CPM diagram schedule must indicate all relationships between activities.
6.2.9.4
The activities making the Project Schedule must contain sufficient detail to assure that
adequate planning has been done for proper execution of the Work and such that it provides
an appropriate basis for monitoring and evaluation the progress of the Work. Individual
activities must not exceed 30 Days in length, in most cases.
6.2.9.5
The CPM diagram schedule must be based upon activities, which coincide with the Schedule
of Values.
6.2.9.6
The CPM diagram schedule must show all submittals associated with each work activity and
the review time for each submittal.
6.2.10
Float Time.
6.2.10.1
The total Float Time within the overall schedule is for the exclusive use of City, but City
may approve Contractor’s use of Float as needed to meet contract Milestones and
General Conditions
Revised: 10/19/2021
GC-32 of 75
the Project completion date.
6.2.10.2
Contractor will not be allowed to sequence, hide, or reallocate Float Time through
such strategies, as extending activity duration estimates to consume available Float, using
preferential logic, or using extensive crew/resource sequencing, tec. No time extensions
will be granted nor delay damages paid until a delay occurs which extends the Work beyond
the Contract Time.
6.2.11
City-Caused Delays. City-caused delays on the Project, if any, may be offset by City-caused
time savings (i.e., Critical Path submittals returned in less time than allowed by the Contract,
approval of substitution requests and credit changes which result in savings of time to
Contractor, etc.) In such an event, Contractor will not be entitled to receive a time extension
or delay damages until all City-caused time savings are exceeded and the Contract Time is
also exceeded.
6.2.12
Rain-Related Delays. Contractor is required, in preparing the Project Schedule to take into
account all relevant weather conditions, including normal rainfall and distribution. No
additional compensation will be given for any rain-related delays or impacts on the Work
or the Project Schedule. No time extension will be granted in the Project Schedule unless
the rainfall during the construction of Work is unusually severe, was not reasonably
anticipated, and the total rainfall was significantly in excess of the normal rainfall for the
Project Site location. Normal rainfall for the Project will be determined from the 10-year
average rainfall for the Site as measured by the National Oceanic and Atmospheric
Administration or comparable source of reliable information for rainfall in Chandler,
Arizona. In addition, the excessive rainfall must have actually impacted Work activities on
the Critical Path and caused delay beyond any remaining Float at the time of the rain- caused
delay. The burden of documenting normal rainfall, the excessive rainfall and the impact on
Critical Path activities is on Contractor. All other provisions in the Contract Documents
relating to claims, including without limitation notice requirements, apply to any claim by
Contractor for a rain delay.
6.2.13
City’s “Policy Statement for Calculating Delays and Damages,” Appendix 1 to these
General Conditions, will apply to all claims of delay and delay damages.
6.2.14
Force Majeure. If Contractor is delayed or prevented from the performance of any Work
required under this Contract by reason of acts of God or other causes beyond the control
and without fault of Contractor (financial inability excepted), performance of that Work will
be excused, but only for the period of the delay. The time for performance of the Work will
be extended for a period equivalent to the period of delay. In addition, the parties agree if
Contractor’s delayed or suspended performance directly arises out of or directly results
from the COVID-19 pandemic, Contractor’s delayed or suspended performance may be
excused as set forth in this clause. Provided, however; Contractor must give the City written
notice within 30 days of the occurrence of the event giving rise to COVID-19 pandemic
related delayed or suspended performance. For COVID-19 pandemic related delay or
suspended performance, the parties must agree in writing to the length of the excused
delay or suspended performance. Further, Contractor must obtain the City’s written
approval to use any allowance established as part of the project for delays and costs related
to the COVID-19 pandemic.
6.3
SUBSTANTIAL COMPLETION
6.3.1
When Contractor considers that the Work, phase or a portion thereof, which City agrees in
General Conditions
Revised: 10/19/2021
GC-33 of 75
writing to accept separately, is substantially complete, City will prepare and submit to
Contractor a comprehensive Punch List of items to be completed or corrected prior to Final
Acceptance and Final Payment. Failure to include an item on such Punch List does not alter
the responsibility of Contractor to complete all Work in accordance with the Contract
Documents.
6.3.2
Upon receipt of Contractor’s Punch List, Project Manager will make an inspection to
determine whether the Work or designated portion thereof is substantially complete.
Project Manager may, at Project Manager’s sole option, be assisted in such inspection by
the Design Professional for the Project. If the inspection by the Project Manager discloses
any item, whether or not included on Contractor’s Punch List, which is not sufficiently
completed in accordance with the Contract Documents so that City can occupy or utilize
the Work, phase or designated portion thereof for its intended use, Contractor must,
before issuance of the Certificate of Substantial Completion, complete or correct such
item upon notification by Project Manager. In such case, Contractor must then submit a
request for another inspection by Project Manager to determine Substantial Completion.
6.3.3
Certificate of Substantial Completion.
6.3.3.1
The Project Manager will not issue a Certificate of Substantial Completion unless and until
the Work (or separable units or Phases as provided in the Contract Documents) is
essentially and satisfactorily complete in accordance with the Contract Documents, such
that the Project is ready for use by City for its intended purpose, opening to the general
public, full occupancy or use by City (including, without limitation, all separate units, or
rooms, facilities, access, income-generating areas, and all areas serving the general public,
as applicable, must be ready for full-operation
without material inconvenience or
discomfort), including, to the extent applicable to the Work, the following: all materials,
equipment, systems, controls, features, facilities, accessories and similar elements are
installed in the proper manner and in operating condition, inspected and approved;
surfaces have been painted; masonry and concrete cleaned with any sealer or other finish
applied; utilities and systems connected and functioning; site work complete; permanent
heating,
ventilation, air condition, vertical transportation and other systems properly
operating with proper controls; lighting and electrical systems installed, operable and
controlled; paving completed, signage installed, and other Work as applicable, has
been performed to a similar state of essential and satisfactory completion. A minor
amount of Work, as determined by and at the discretion of the Project Manager, such
as installation of minor accessories or items, a minor amount of painting, minor
replacement of defective work, minor adjustment of controls or sound
systems, or
completion or correction of minor exterior work that cannot be completed as a result of
weather conditions, will not delay determination of Substantial Completion. If prior
written approval is obtained from City for purposes of Substantial Completion, specified
areas of the entire Work or Project may be individually certified as Substantially
Complete. In no event will Substantial Completion be deemed to have occurred unless
and until: (i) a temporary certificate of occupancy has been issued by the appropriate
Governmental Authorities (as applicable) and (ii) all terms and Work required under this
Agreement have been fulfilled by Contractor and same will have also been approved and
accepted by City, subject only to the Punch List items.
6.3.3.2
If requested by City, Contractor must complete and turn-over to City the Project on a phased
basis. Each phase will have a separate inspection by the Project Manager, a Punch List
generated, and then an inspection by City with final approval and acceptance only after the
General Conditions
Revised: 10/19/2021
GC-34 of 75
Project Manager’s Punch List.
6.4
PARTIAL UTILIZATION
6.4.1
City at City’s option may use and occupy any substantially completed parts of the Work
which has specifically been identified in the Contract Documents, or which City, the Design
Professional and Contractor agree constitutes a separately functioning and usable part of
the Work that can be used by City for its intended purpose, without significant interference
with Contractor’s performance of the remainder of the Work, provided, however, if the
portion of the Work to be used or occupied has not been found to be substantially complete,
City must do so in accordance with Section 6.3 prior to such occupancy.
6.4.2
In lieu of the issuance of a Certificate of Substantial Completion as to part of the Work, City
may take over operation of a facility constituting part of the Work whether or not it is
substantially complete if such facility is functionally and separately usable; provided that
prior to any such takeover, City and Contractor agree in writing as to the division of
responsibilities between City and Contractor for security, operation, safety, maintenance,
correction period, heat, utilities and insurance with respect to such facility.
6.4.3
Substantial Completion of or City's beneficial occupancy of a part of the Project will not alter
the fact that the one-year warranty for the whole Project starts at the date of Final
Completion of the whole Project.
6.5
FINAL ACCEPTANCE
6.5.1
Unless otherwise expressly agreed to in writing by City, Final Acceptance must be obtained
by no later than 30 Days (60 Days for federally funded contracts) after the date of Substantial
Completion. Failure to timely obtain Final Acceptance will be a material breach of the
Contract.
6.5.2
Upon receipt of written notice that the Work is ready for final inspection and acceptance, City
and Contractor will jointly inspect to verify that the remaining items of Work have been
completed. There will be no partial acceptance. Final Acceptance will not occur until all
items of Work, including Punch List Items, have been completed to City’s satisfaction as
reflected in the written Final Acceptance.
6.5.3
Final Payment will not be due, owing, or paid by City until Final Acceptance is issued.
6.5.4
Landscape Establishment Period. Unless otherwise expressly agreed to in writing by City, the
Landscape Establishment Period will begin on the date of Final Acceptance of the Project and
will run 90 Calendar Days thereafter. Landscape Establishment Period requirements are
detailed in General Conditions Appendices, attached herein.
6.6
CONTINUATION OF WORK
6.6.1
Permitting Contractor to continue and finish the Work or any part of it after the time fixed
for its completion (whether milestone, phase, Substantial Completion or Final Acceptance)
or after the date to which the time fixed for any completion may have been extended, does
not operate as a waiver by City of any rights under the Contract Documents, law or equity.
6.6.2
Furthermore, the timely completion of the Work being of the utmost importance under
this Contract, notwithstanding the existence of one or more disputes between the parties
concerning the scope of the Work, the Project Schedule, Contract Time, payments or any
General Conditions
Revised: 10/19/2021
GC-35 of 75
other matter, and further notwithstanding a party’s invocation of the Dispute Resolution
provisions specified in Appendix 6 of these General Conditions, unless City suspends
the Contract or Contractor’s performance pursuant to Section 10 of these General
Conditions, Contractor will continue to prosecute the Work, including any Change Order
work or Extra Work Orders, in a diligent and timely manner and not stop, slow down or
impede by action or inaction the progress of the Work, including commencing performance
of and thereafter completing any additional work called out in any Change Order or Extra
Work Order issued by Project Manager with the approval of City, so long as City makes
payment to Contractor in accordance with Section 8 of these General Conditions.
SECTION 7 - CONTRACT PRICE
7.1
UNIT PRICE CONTRACTS
7.1.1
The Contract Price for all Unit Price Contracts will be the amount set forth in the Contract
or Change Order multiplied by the verified quantity provided.
7.1.2
Measurements of quantities to determine the total Contract Price must be in accordance with
MAG Specification §§ 109.1 and 109.2.
7.1.3
The Unit Price may only be changed as set forth in Section 9 below.
7.2
CHANGE ORDERS
7.2.1
Unit Price Change Orders. The Change Order Price for all Unit Price Change Orders will be
the amount set forth in the Change Order multiplied by the verified quantity provided.
7.2.2
Measurements of quantities to determine the total Change Order Price must be in
accordance with MAG Specifications §§ 109.1 and 109.2.
7.2.3
The Unit Price may only be changed as set forth in Section 9 below.
7.2.4
MAG Specification § 109.4.1 is modified as follows: Before § 109.4.1, the following is added:
Any deduction or increase in the Contract Price must be supported by a signed, written
Change Order fully executed by City, and supported by such backup as the Project Manager
may require. No adjustments in any Unit Prices will be allowed. Sections 109.4.1(A) and (B)
and 109.4.2(A) are deleted in their entirety.
7.3
SALES TAX
Contractor is required to pay all applicable sales tax in accordance with the law of the state of
Arizona and this cost must be included in all Contract Prices. When equipment, materials or
supplies generally taxable to Contractor are eligible for a tax exemption due to the nature
of the Project, Contractor must assist City in applying for and obtaining such tax credits and
exemptions which will be paid or credited to City.
SECTION 8 - PAYMENT
8.1
PAYMENT FOR CONSTRUCTION SERVICES
8.1.1
Payment for the Work will be made in accordance with MAG Standard Specification § 109
as amended below.
8.1.2
Contractor must submit to City for review a completed Contractor Payment Request signed
General Conditions
Revised: 10/19/2021
GC-36 of 75
by Contractor, covering the Work completed as of the date of the Request and accompanied
by such supporting documentation as is required by the Contract Documents and also as
City may reasonably require. A Contractor Payment Request will not be considered
complete unless it is accompanied by an updated Project Schedule and a certification that
the on-site, red lined, as built Drawings are up to date. If payment is requested on the basis
of materials and equipment not incorporated in the Work but delivered and suitably,
securely stored at the Site or at another location (such as a bonded warehouse) agreed to
in writing, the Contractor Payment Request must also be accompanied by such data,
satisfactory to City, as will establish City's title to the material and equipment and protect
City's interest therein, including applicable insurance. Each subsequent Contractor Payment
Request must include an affidavit of Contractor stating that all previous progress payments
received on account of the Work have been applied to discharge in full all of Contractor's
obligations reflected in prior Contractor Payment Requests.
8.1.3
Except for Work performed under a JOC contract, the Contracting Agency will retain 10
percent of all estimates as a guarantee for complete performance of the Contract in
accordance with Arizona Revised Statutes Section 34-221 or 34-607. The Contractor may
elect to deposit securities in lieu of retention in accordance with Arizona Revised Statutes
Section 34-221, Paragraph C.5. or 34-607, Paragraph B.5.
8.1.4
The payment process functions as follows: Prior to the payment cycle date, Contractor must
send a draft Contractor Payment Request to Project Manager. The Project Team will review
the Request and agree upon any necessary adjustments. Contractor must certify the final
Request by signing and returning to Project Manager.
8.1.5
When construction of the Project is fifty percent (50%) completed, Contractor may
request payment of one-half of the retention pursuant to A.R.S. § 34-609(B)(3), subject to all
of City’s rights to withhold or offset payments, and other rights of City, under the Contract.
8.1.6
City reserves the right under A.R.S. § 34-609(B)(3) to reinstate the ten percent (10%) retention
if City determines that satisfactory progress is not being made.
8.1.7
Contractor’s Warranty of Title.
8.1.7.1
Contractor warrants and guarantees that title to all Work, materials and equipment covered
by any Contractor Payment Request, whether incorporated in the Project or not, will pass
to City at the time of payment, free and clear of all liens, claims, security interests, and
encumbrances, provided that this will not preclude the Contractor from installing metering
devices or other equipment of utility companies or municipalities, the title of which is
commonly retained by the utility company or municipality.
8.1.7.2
No materials, supplies, or equipment for the Work under this Contract will be purchased
subject to any chattel mortgage or under a conditional sale contract or other agreement by
which an interest therein, or any part thereof, is retained by the seller or supplier.
8.1.7.3
Nothing contained in this Section will defeat or impair the right of such persons furnishing
materials or labor under any bond given by the Contractor for their protection, or any right
under any law permitting such persons to look to funds due the Contractor in the hands of
the City. The provisions of this Section must be inserted in all subcontracts and material
contracts, and notices of its provision must be given to all persons furnishing materials for
the Work when no formal contract is entered into for such materials.
General Conditions
Revised: 10/19/2021
GC-37 of 75
8.2
PAYMENT UPON SUBSTANTIAL COMPLETION
8.2.1
No payment will be made upon Substantial Completion, except for a regularly-scheduled
monthly progress payment, as allowed by Section 8.2.2.
8.2.2
No further payments will be made to Contractor until Final Acceptance.
8.3
FINAL PAYMENT
8.3.1
Subject to all of City’s rights to withhold or offset payment, and other rights under the
Contract, Final Payment including remaining retainage will be paid only after:
a. Work has been fully completed (including completion of all incorrect or
incomplete work items) and the written Final Acceptance has been issued by
City;
b. Necessary operating manuals, any excess materials and supplies necessary
for matching materials and supplies incorporated into the Work,
acceptable sewer video results (if applicable), and complete “as-built”
Drawings (including the Building Information Model, if required by the
Contract Documents) have been delivered to City, as specified in this
Section 8.3;
c. Full and unconditional lien waivers and releases by Contractor and any
person performing labor or supplying material, machinery, fixtures, or tools
for the Work have been delivered to Contractor;
d. All conditions and requirements imposed by City or any financing entity
for the corresponding disbursement have been met; and
e. Contractor delivers to City a Contractor Payment Request requesting Final
Payment.
8.3.2
Contractor must also submit a signed copy of Contractor’s Affidavit Regarding Settlement
of Claims, Appendix 3 to these General Conditions, and Certificate of Completion, Appendix 7
to these General Conditions, prior to Final Payment.
8.3.3
In addition, if required under the Project Specific Special Provisions, Contractor must
compile a complete equipment list and maintenance manual to be submitted to City
as a precondition to Final Payment. The list must include the following items for all
equipment supplied under the Plumbing, Electrical, Air Conditioning, Elevator, and other
Special Equipment Specifications:
a. Name, Model and Manufacturer.
b. Complete parts lists and Drawings.
c. Local source of supply for replacement parts along with suppliers’ telephone
numbers.
d. Local service organizations serving the equipment and their telephone
numbers.
e. All tags, inspection slips, instruction packages, etc., removed from
equipment must be properly identified as to pieces of equipment from
which they were taken.
General Conditions
Revised: 10/19/2021
GC-38 of 75
8.3.4
Contractor must also deliver to City, prior to Final Payment, one (1) digital (in the format
specified by City), and if requested by City, one (1) hard copy, of any applicable
Maintenance manuals. Each manual must include all manufacturer’s operation and
maintenance instructions and “as-built” Drawings with the list herein specified. It must also
include all other diagrams and instructions necessary to properly operate and maintain the
equipment, the name, address and telephone number of Contractor and all Subcontractors
involved.
8.4
CIT Y ’S RIGHT TO WITHHOLD PAYMENT
City may withhold payment to such extent as may be necessary in City’s opinion to protect
City from loss for which Contractor is responsible, including, without limitation, if any of
the following conditions exist:
a. Defective Work not remedied;
b. Third party claims filed or reasonable evidence indicating probable filing of
such claims unless security acceptable to City is provided by Contractor;
c. Failure of Contractor to make payments properly to Subcontractors or for
labor, materials or equipment;
d. Reasonable evidence that the Work cannot be completed for the unpaid
balance of the Contract Price;
e. Damage to City or another Contractor;
f.
Reasonable evidence that the Work will not be completed within the Contract
Time, and that the unpaid balance would not be adequate to cover actual or
liquidated damages for the anticipated delay;
g. Failure to carry out the Work in accordance with the Contract Documents; or
h. Contractor is in default of any of its other obligations under the Contract
Documents.
8.5
JOINT/DIRECT CHECKS
To promote the timely completion and progress of the Work or when appropriate and
necessary, payments to Contractor may be made jointly to Contractor and its employees,
agents, Subcontractors and suppliers, or any of them. For federally funded contracts, see
federal provisions for additional requirements for the joint check process.
8.6
PAYMENT NOT A WAIVER
No payment (nor use or occupancy of the Project by City) will be deemed acceptance or
approval of the Work or as a waiver of any claims, rights, or remedies of City.
8.7
LIENS AND BOND CLAIMS
Contractor must make all payments, in the time required, of all labor and materials
furnished to Contractor in the course of the Work and must promptly furnish evidence of
such payments as City may require. Contractor must pay when due all claims arising out of
performance of the Work covered by this Contract for which a lien may be filed either
against the real estate or leasehold interest of City, or against payments due from City to
Contractor, or for which a claim may be made against any payment or performance bond
or both. To the fullest extent permitted by law, Contractor agrees that no liens or other
claims in the nature of a lien against the real estate, leasehold, or other interest of City,
against payment due from City to Contractor, or against any payment or performance
General Conditions
Revised: 10/19/2021
GC-39 of 75
bond, must be filed or made in connection with the Work by any party who has supplied
professional services, labor, materials, machinery, fixtures, tools, or equipment used in or
in connection with the performance of this Contract, and Contractor agrees to remove or
to cause to be removed any such liens or claims in the nature of a lien or bond claim within
10 Days upon receiving notice or obtaining actual knowledge of the existence of such liens
or claim. In addition, Contractor agrees to defend, indemnify, and hold harmless City
from and against any and all such liens and claims. This paragraph does not apply to claims
and liens of Contractor due to non-payment for work performed.
8.8
FIN AN CI AL R ECORDKE EPI NG AND C IT Y ’S AUD I T RIGHT
8.8.1
Records for all Contracts between City and Contractor must, upon reasonable notice, be
open to inspection and subject to audit, scanning, and reproduction during normal
business working hours. Such audits may be performed by any City’s representative or any
outside representative engaged by City for the purpose of examining such records. City or
its designee may conduct such audits or inspections throughout the term of this Contract
and for a period of five years after Final Payment or longer if required by law. City’s
representatives may (without limitation) conduct verifications such as counting employees
at the Site, witnessing the distribution of payroll, verifying information and amounts through
interviews and written confirmations with Contractor employees, field and agency labor,
Subcontractors, and vendors.
8.8.2
Contractor’s “records” must include any and all information, materials and data of every kind
and
character, including without limitation, records, books, papers, documents,
subscriptions, recordings, agreements, purchase orders, leases, contracts, commitments,
arrangements, notes daily diaries, superintendent reports, drawings, receipts, vouchers and
memoranda, and any and all other agreements, sources of information and matters that
may in City’s judgment have any bearing on or pertain to any matters, rights, duties or
obligations under or covered by any Contract Document. Such records must include (hard
copy, as well as computer readable data if it can be made available), written policies and
procedures; time sheets; payroll registers; payroll records; cancelled payroll checks;
subcontract files (including proposals of successful and unsuccessful bidders, bid recaps,
negotiation notes, etc.); original bid estimates; estimating work sheets; correspondence;
Change Order files (including documentation covering negotiated settlements); back-
charge logs and supporting documentation; invoices and related payment documentation;
general ledger, information detailing cash and trade discounts earned, insurance rebates
and dividends; and any other Contractor records which may have a bearing on matters of
interest to City or the Project in connection with Contractor’s dealings with City or the
Project (all foregoing
hereinafter referred to as “records”) to the extent necessary to
adequately permit evaluation and verification of any or all of the following:
a. Compliance with Contract requirements for deliverables;
b. Compliance with approved Plans and Specifications;
c. Compliance with § 14.9 below;
d. Compliance with Contract provisions regarding the pricing of Change Orders;
e. Accuracy of Contractor representations regarding the pricing of invoices; or
f.
Accuracy of Contractor representations related to claims submitted by
Contractor or any of their employees.
General Conditions
Revised: 10/19/2021
GC-40 of 75
8.8.3
Contractor must require all payees (examples of payees include Subcontractors, Suppliers,
Insurance Carriers, etc.) to comply with the provisions of this Section by including the
requirements hereof in a written Contract Agreement between Contractor and payee.
Contractor will ensure that all payees (including those entering into lump sum contracts)
have the same right to audit provisions contained in this contract included in their contracts
with Contractor.
8.8.4
City’s authorized representative(s) (including, without limitation, Project Manager) must have
reasonable access to Contractor’s facilities, must be allowed to interview all current or former
employees to discuss matters pertinent to the performance of this contract and must be
provided adequate and appropriate work space, in order to conduct audits in compliance
with this Section.
8.8.5
If an audit inspection or examination in accordance with this Section, discloses overpricing
or overcharges to City (of any nature) by Contractor or Contractor’s Subcontractors in excess
of $100,000 in addition to making adjustments for the overcharges, the reasonable actual
cost of City’s audit must be reimbursed to City by Contractor. Any adjustments or payments
which must be made as a result of any such audit or inspection of Contractor’s invoices or
records must be made within a reasonable amount of time (not to exceed 90 Days) from
presentation of City’s findings to Contractor.
8.8.6
In addition to the normal paperwork documentation Contractor typically furnishes to City,
Contractor agrees to furnish, upon written request from City, any of the documentation
necessary for City to exercise its audit rights under this Section 8.8 in computer readable file
formats (Word, Excel, or .pdf), as City may designate.
8.8.7
City, its authorized representative, and the appropriate agency, reserve the right to
audit Contractor’s records in compliance with local, state or federal policies, statutes
or at City’s discretion, within three (3) years of Final Acceptance of the Work.
SECTION 9 - CHANGES TO THE CONTRACT
9.1
FIELD ORDERS
City may authorize minor changes in the Work not involving an adjustment in the Contract
Price or the Contract Times, which are consistent with the overall intent of the Contract
Documents. These may be accomplished by a written Field Order on the standard form
approved and executed by City. Such Field Orders must be binding and Contractor must
perform the change promptly. If Contractor believes that a Field Order justifies an increase
in the Contract Price or Contract Time, Contractor may make a claim therefor as provided
in Section 7.2.
9.2
EXTRA WORK/CHANGES IN THE WORK
9.2.1
City reserves the right to make such changes in the Plans and Specifications for the Work,
as it may deem appropriate and any such change as set forth in a written Change Order
must be deemed a part of this Contract as if originally incorporated herein.
9.2.2
In the event City and Contractor cannot agree on the terms of a Change Order, or
when circumstances otherwise require, the Project Manager has the authority to direct the
Contractor to perform extra work, if the work in question is an item not provided for in the
Contract as awarded. The Project Manager will have the authority to determine, based
upon factual evidence presented by the Contractor, whether the work in question is an
General Conditions
Revised: 10/19/2021
GC-41 of 75
item not provided for in the Contract as awarded. If the Project Manager directs the
Contractor to perform extra work, the Project Manager’s instructions will include a price
that the Contractor cannot exceed in charging the City for the extra work. Upon receipt of
the Project Manager’s directions to perform extra work, the Contractor must promptly
proceed with the extra work and document the actual cost thereof. Contractor’s right to
payment for extra work will be determined under Subsection 9.2.4 below. The Contractor is
responsible to manage the extra work to ensure that the price limits set by the Project
Manager are not exceeded. Contractor must perform the extra work and submit
documentation for the actual cost of the extra work to the City. A Change Order will be
issued to cover this work.
9.2.3
Contractor will not be entitled to payment for extra work unless a written Change Order, in
form and content prescribed by City, has been executed by City. On all requests for Change
Orders, Contractor must specify the increased or decreased costs and whether it
believes any extensions of time will be necessary to complete its Work as modified by the
Change Order. If extra work is performed under Subsection 9.2.2 above, a corresponding
Change Order will be prepared, approved and processed by City before payment can be
made to Contractor.
9.2.4
In general, pricing for Change Orders will include the same mark-up percentages that were
in effect when the Contract was awarded. The cost or credit to the City resulting from a
change in the Work is subject to Appendix 1 (Policy Statement for Calculating Delays and
Damages) and will be determined, based on the type of pricing for the Contract involved, as
follows:
a. By mutual acceptance of a lump sum properly itemized in a form acceptable
to City;
b. By unit prices stated in the Contract Documents;
c. When the City determines that a Unit Price Book Job Order associated with
a Job Order Contract requires a Change Order, by using the same Total Cost
Data and CCI that are in effect when the Change Order is anticipated to be
issued; or
d. By actual cost and a percentage fee covering overhead and profit, as follows:
(i)
Contractor will perform the extra work and be compensated for actual
cost of labor, materials and equipment.
(ii)
Contractor will have the right to add the fee percentage applicable
to the Work under the Contract, or if no such fee has been agreed
to by the parties, not more than five percent (5%) to the
Subcontractor’s prices for authorized extra work performed solely
by Subcontractors. Such percentage will include all of Contractor’s
charges for overhead, profit, administration and supervision.
(iii)
Contractor or Subcontractor will have the right to add the fee
percentage applicable to Work under the Contract for self-performed
extra work, or if no such fee has been agreed to by the parties,
Contractor’s or Subcontractor’s maximum total allowable additions
for overhead, profit, administration and supervision will not exceed
ten percent (10%) of actual verifiable labor, materials and
equipment for such self- performed extra work.
General Conditions
Revised: 10/19/2021
GC-42 of 75
9.2.5
Any agreement which modifies the terms of the Contract (including Change Orders) will
be approved in writing by the Project Manager. Once properly executed by both parties,
these modifications to the Contract will have the same effect as if they had been included in
the original Contract.
9.3
ACCURACY OF CHANGE ORDER PRICING INFORMATION
9.3.1
Subject to Sections 9.3.2 through 9.3.4, signature by the contracting parties constitutes full
accord and satisfaction between City and Contractor for all costs, damages, and expenses
of whatever kind of nature, including delay, impact or acceleration damages, which may be
occasioned by a Change Order of other modification of the Contract agreed to in writing.
9.3.2
Accurate Change Order Pricing Information: Contractor agrees that it is responsible for
submitting accurate cost and pricing data to City to support its Fixed Price, Unit Price, or
Cost Plus Change Order Proposals or other Contract Price adjustments under the
Contract. Contractor further agrees to submit Change Order proposals with cost and
pricing data which is accurate, complete, current, and in accordance with the terms of
the Contract with respect to pricing of change orders. Contractor agrees that any “buy-
out savings” on Change Orders will accrue 100% to Owner. “Buy-out savings” are defined
as any savings negotiated by the Contractor with a Subcontractor or a Material Supplier
after receiving approval of a Change Order amount that was designated to be paid to a
specific Subcontractor or Supplier for the Approved Change Order work.
9.3.3
Right to Verify Change Order Pricing Information: Contractor agrees that City, through
its designated representative, will have the right to examine, copy, and scan the records
of the Contractor, Subcontractor or Sub-Subcontractor’s records (during the Contract
period and up to three years after final payment is made on the Contract) to verify the
accuracy and appropriateness of the pricing data used to price all Change Order
proposals or claims. Contractor agrees that if City determines the cost and pricing data
submitted (whether approved or not) was inaccurate, incomplete, not current, or not in
compliance with the terms of the Contract
regarding pricing of Change Orders, an
appropriate Contract Price adjustment will be made. Such post-approval Contact Price
adjustments will apply to all levels of contractors and Subcontractors and to all types of
Change Order proposals, specifically including Fixed Price, Unit Price, and Cost Plus Change
Orders.
9.3.4
Requirements for Detailed Change Order Pricing Information: Contractor agrees to
provide a detailed breakdown of allowable labor and labor burden cost (i.e., base wage
rate of applicable classifications of workers, payroll taxes, and insurance and benefits
costs). This information will be used to evaluate the potential cost of labor and labor burden
related to Change Order work. It is intended that this information represent an accurate
estimate of the Contractor’s actual labor and labor burden cost components. Information
is not intended to establish fixed billing or Change Order pricing labor rates. However, at the
time Change Orders are priced, the submitted cost data for labor rates may be used to price
Change Order work. The accuracy of any such agreed upon labor rate cost components
used to price Change Orders will be subject to later audit. Approved Change Order
amounts may be adjusted later to correct the impact of inaccurate labor cost
components if the agreed upon labor cost components are determined to be inaccurate.
9.4
EMERGENCIES
In any emergency affecting the safety of persons or property, Contractor will act, at its
General Conditions
Revised: 10/19/2021
GC-43 of 75
discretion, to prevent threatened damage, injury or loss. Any change in the Contract Price or
Contract Time resulting from emergency work will be determined as provided in this Section.
9.5
DIFFERING SITE CONDITIONS
9.5.1
If Differing Site Conditions are encountered at the Project Site, then notice by the observing
party must be given to the other party promptly before conditions are disturbed (to the extent
practicable) and in no event later than 14 Days after first observance of the conditions.
City will promptly investigate such conditions and, if City determines that Differing Site
Conditions exist and they materially cause an increase in the cost of, or time required for,
performance of any part of the Work, Contractor will be entitled to equitable adjustment
in the Contract Price or Construction Schedule (and other time requirements), or both. If it
is determined by City that the conditions at the Project Site are not Differing Site Conditions
and no change is justified, then City will so notify Contractor in writing, stating the reasons.
Claims in opposition to such determination must be made within 14 Days after City has
given notice of its decision. If City and Contractor cannot agree on an adjustment in the
Contract Price or Construction Schedule (and other time requirements), the adjustment
may be submitted to dispute resolution as provided these General Conditions.
9.6
CHANGES IN LAWS, REGULATIONS, OR LEGAL REQUIREMENTS OR TAXES
In the event of a material change in applicable Laws, Regulations, or Legal Requirements, or
taxes subsequent to the date of the Contract by the parties, Contractor may be entitled
to a Change Order, in City’s discretion, to the extent Contractor can document to the
satisfaction of City that such change significantly increases Contractor’s actual cost of
performance of the Work.
SECTION 10 -SUSPENSION AND TERMINATION
10.1
SUSPENSION
City may suspend the Contract and Contractor’s performance in accordance with MAG
Specifications § 105.1 and 108.7.
10.2
TERMINATION BY THE CITY FOR CAUSE
10.2.1
MAG Specifications § 108.11 applies to the Contract.
10.2.2
City may also terminate the Contract if City determines, in its sole discretion that Contractor
has:
a. After prior written notice, refused or failed to supply enough properly skilled
workers or proper materials;
b. After prior written notice, failed to make payment to Subcontractors for
materials or labor in accordance with the respective agreements between
Contractor and the Subcontractors;
c.
After prior written notice, disregards laws, ordinances, or rules, regulations or
orders of a public authority having jurisdiction;
d. After prior written notice, repeatedly failed to comply with written directives
from City;
e. Is adjudged as bankrupt or insolvent;
f.
Made a general assignment for the benefit of creditors;
General Conditions
Revised: 10/19/2021
GC-44 of 75
g. Appointed a trustee or receiver for itself or any of its property;
h. Filed a petition to take advantage of any debtor's act, or to reorganize under
the bankruptcy or similar laws; or
i.
Otherwise breached a provision of the Contract Documents or any other
contract between City and Contractor.
10.2.3
When any of the above reasons exist, City may terminate the Contract, without prejudice to
any other rights or remedies of City, after giving Contractor and Contractors’ surety, if any,
7 Days written notice of City’s intent to terminate the Contract and Contractor’s failure to
cure any such reasons. Upon such termination, City may: (1) take possession of the Site
and of all materials thereon owned by Contractor; or (2) finish the Work by whatever
reasonable method City may deem expedient. When City terminates the Contract for one of
the reasons state above, Contractor will not be entitled to receive further payment until the
Work is finished. If the unpaid balance of the Contract Price existing at the time of such
termination exceeds the costs and expenses of finishing the Work and any other damages
incurred by City, such excess will be paid to Contractor. If such costs, expenses and damages
exceed such unpaid balance, Contractor must pay the difference to City. This obligation
for payment will survive termination of the Contract.
10.3
TERMINATION BY CITY FOR CONVENIENCE
City may also terminate the Contract at any time for its convenience upon 7 Days written
notice to Contractor specifying the termination date. In the event of termination which is
not the fault, in whole or in part, of Contractor, City will pay to Contractor only such
compensation, including reimbursable expenses, due for Work properly performed on
the Project prior to the termination date. Upon any termination of the Contract, no further
payments will be due from City to Contractor.
10.4
A.R.S. § 38-511
The Contract is subject to, and may be terminated by City in accordance with, the provisions
of A.R.S. § 38-511.
SECTION 11 -INSURANCE AND BONDS
11.1
INSURANCE REQUIREMENTS
11.1.1
After Contract award, the Contractor must furnish the City a certificate of insurance on a
standard insurance industry ACORD form. The ACORD form must be issued by an insurance
company authorized to transact business in the State of Arizona possessing a current A.M.
Best, Inc. rating of A-7, or better and legally authorized to do business in the State of Arizona
with policies and forms satisfactory to City. Provided, however, the A.M. Best rating
requirement may not be deemed to apply to required Worker’s Compensation coverage.
11.1.2
The Contractor and any of its Subcontractors must procure and maintain, until all of their
obligations have been discharged, including any warranty periods under this Contract are
satisfied, the insurances set forth below.
11.1.3
The insurance requirements set forth below are minimum requirements for this Contract
and in no way limit the indemnity covenants contained in this Contract.
11.1.4
The City in no way warrants that the minimum insurance limits contained in this Contract
are sufficient to protect Contractor from liabilities that might arise out of the performance
General Conditions
Revised: 10/19/2021
GC-45 of 75
of the Contract services under this Contract by Contractor, its agents, representatives,
employees, or Subcontractors and the Contractor is free to purchase any additional
insurance as may be determined necessary.
11.1.5
Failure to demand evidence of full compliance with the insurance requirements in this
Contract or failure to identify any insurance deficiency will not relieve the Contractor from,
nor will it be considered a waiver of its obligation to maintain the required insurance at all
times during the performance of this Contract.
11.1.6
Use of Subcontractors: If any Work is subcontracted in any way, the Contractor must
execute a written agreement with Subcontractor containing the same Indemnification
Clause and Insurance Requirements as the City requires of the Contractor in this Contract.
The Contractor is responsible for executing the Contract with the Subcontractor and
obtaining Certificates of Insurance and verifying the insurance requirements.
11.2
MINIMUM SCOPE AND LIMITS OF INSURANCE
11.2.1
The Contractor must provide coverage with limits of liability not less than those stated
below.
11.2.1.1
Commercial General Liability-Occurrence Form. Contractor must maintain “occurrence”
form Commercial General Liability insurance with a limit of not less than $2,000,000 for each
occurrence, $4,000,000 aggregate. Said insurance must also include coverage for products
and completed operations, independent contractors, personal injury and advertising injury.
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess
insurance must be “follow form” equal or broader in coverage scope than underlying
insurance.
11.2.1.2
Automobile Liability-Any Automobile or Owned, Hired and Non-Owned Vehicles. Contractor
must maintain Business/Automobile Liability insurance with a limit of $1,000,000 each
accident on Contractor owned, hired, and non-owned vehicles assigned to or used in the
performance under this Contract. If any Excess or Umbrella insurance is utilized to fulfill
the requirements of this paragraph, the Excess or Umbrella insurance must be “follow
form” equal or broader in coverage scope than underlying insurance.
11.2.1.3
Workers Compensation and Employers Liability Insurance. Contractor must maintain
Workers Compensation insurance to cover obligations imposed by federal and state
statutes having jurisdiction of Contractor employees engaged in the performance of Work
under this Contract and must also maintain Employers’ Liability insurance of not less than
$1,000,000 for each accident and $1,000,000 disease for each employee.
11.2.1.4
Builders’ Risk/Installation Floater Insurance. The Contractor bears all responsibility for loss
to all equipment or Work under construction. Unless waived in writing by the City the
Contractor will purchase and maintain in force Builders’ Risk/Installation Floater insurance
on the entire Work until completed and accepted by the City. This insurance will be Special
Causes of Loss policy form, (minimally including perils of fire, flood, lightning, explosion,
windstorm and hail, smoke, aircraft and vehicles, riot and civil commotion, theft, vandalism,
malicious mischief, and collapse), completed value, replacement cost policy form equal to
the contract price and all subsequent modifications. The Contractor’s Builders’
Risk/Installation Floater insurance must be primary and not contributory.
a. Builders’ Risk/Installation Floater insurance must cover the entire Work
General Conditions
Revised: 10/19/2021
GC-46 of 75
including reasonable compensation for architects and engineers’ services
and expenses and other “soft costs” made necessary by an insured loss.
Builders’ Risk/Installation Floater insurance must provide coverage from the
time any covered property comes under the Contractor’s control and or
responsibility, and continue without interruption during course of
construction, renovation and or installation, including any time during which
any Project property or equipment is in transit, off Site, or while on Site for
future use or installation. Insured property must include, but not be limited
to, scaffolding, false work, and temporary buildings at the Site. This
insurance must also cover the cost of removing debris, including demolition
as may be legally required by operation of any law, ordinance, regulation or
code.
b. The Contractor must also purchase and maintain Boiler and Machinery
insurance with the same requirements as Builders’ Risk/Installation Floater
insurance cited above if the Work to be performed involves any exposures
or insurable property normally covered under a Boiler and Machinery
insurance policy or made necessary as required by law or testing
requirements in the performance of this Contract/Agreement. The
Contractor will be responsible for any and all deductibles under these
policies and the Contractor waives all rights of recovery and subrogation
against the City under the Contractor- Builders’ Risk/Installation Floater
insurance described herein.
c. Builders’ Risk/Installation Floater Insurance must be maintained until
whichever of the following first occurs: (i) final payment has been made; or,
(ii) until no person or entity, other than the City, has an insurable interest in
the property required to be covered.
d. The Builders’ Risk/Installation Floater insurance must be endorsed so that
the insurance will not be canceled or lapse because of any partial use or
occupancy by the City.
e. The Builders Risk/Installation Floater insurance must include as named
insureds, the City, the Contractor, and all tiers of Subcontractors and others
with an insurable interest in the Work who will be named as additional
insureds unless they are able to provide the same level of coverage with the
City and Contractor named as additional insureds. Certificates must contain
a provision that the insurance will not be canceled or materially altered
without at least 30 Days advance notice to the City. The City must also be
named as a Loss Payee under the Builders’ Risk/Installation Floater coverage.
f.
The Builders Risk/Installation Floater insurance must be written using the
Special Causes of Loss policy form, replacement cost basis.
g. All rights of subrogation under the Builders Risk/Installation Floater
insurance are, by this Contract/Agreement, waived against the City, its
officers, officials, agents and employees.
h. The Contractor is responsible for payment of all deductibles under the
Builders’ Risk/Installation Floater insurance policy.
11.2.1.5
Pollution Liability Insurance (Including Errors and Omissions). For Job Orders, Pollution
Liability Insurance is only required if applicable and determined on a project specific basis.
General Conditions
Revised: 10/19/2021
GC-47 of 75
Contractor must maintain Pollution Liability Insurance with a limit of not less than
$5,000,000 per loss, $5,000,000 aggregate for losses caused by pollution conditions
including coverage for bodily injury, property damage, defense costs, clean-up costs, and
completed operations that arise from the operations of Contractor as described in this
Contract.
a. The policy must provide for complete professional service coverage,
including coverage for pollution liability that is a result of a breach of
professional duties.
b. The policy must provide for protection again claims for third-party bodily
injury, property damage, or environmental damage caused for pollution
conditions resulting from general contracting activities for which Contractor
is legally liable.
c. The policy must provide for cleanup costs when mandated by governmental
entities, when required by law, or as a result of third-party claims.
d. Completed Operations Coverage must be kept in place for up to the statute
of repose.
e. The policy must be endorsed to include the following additional insured
language: “City, its elected officials, trustees, employees, agents, and
volunteers must be named as additional insureds with respect to liability
arising out of the activities performed by, or on behalf of Contractor”.
f.
If Work under this Contract requires the transportation of any hazardous
material or regulated substances, Contractor must carry Auto Liability with a
CA 9948 endorsement or equivalent.
g. If Work under this Contract requires the disposal of any hazardous materials
from the job site, Contractor must obtain a certificate of insurance for
Pollution Legal Liability from the disposal site operator with a limit of not less
than $5,000,000 per loss, $5,000,000 aggregate.
11.3
ADDITIONAL POLICY PROVISIONS REQUIRED
11.3.1
Self-Insured Retentions or Deductibles. Any self-insured retentions and deductibles must
be declared and approved by the City. If not approved, the City may require that the insurer
reduce or eliminate any deductible or self-insured retentions with respect to the City, its
officers, officials, agents, employees, and volunteers.
11.3.2
The Contractor’s insurance must contain broad form contractual liability coverage.
11.3.3
The Contractor's insurance coverage must be primary insurance with respect to the City, its
officers, officials, agents, and employees. Any insurance or self-insurance maintained by
the City, its officers, officials, agents, and employees will be in excess of the coverage
provided by the Contractor and must not contribute to it.
11.3.4
The Contractor's insurance must apply separately to each insured against whom claim is
made or suit is brought, except with respect to the limits of the insurer's liability.
11.3.5
Coverage provided by the Contractor must not be limited to the liability assumed under the
indemnification provisions of this Contract.
General Conditions
Revised: 10/19/2021
GC-48 of 75
11.3.6
The policies must contain a severability of interest clause and waiver of subrogation against
the City, its officers, officials, agents, and employees, for losses arising from Work
performed by the Contractor for the City.
11.3.7
The Contractor, its successors and or assigns, are required to maintain Commercial General
Liability insurance as specified in this Contract for a minimum period of 3 years following
completion and acceptance of the Work. The Contractor must submit a Certificate of
Insurance evidencing Commercial General Liability insurance during this 3 year period
containing all the Contract insurance requirements, including naming the required
Additional Insureds set forth herein.
11.3.8
If a Certificate of Insurance is submitted as verification of coverage, the City will reasonably
rely upon the Certificate of Insurance as evidence of coverage but this acceptance and
reliance will not waive or alter in any way the insurance requirements or obligations of this
Contract.
11.3.9
Insurance Cancellation During Contract Term.
11.3.9.1
If any of the required policies expire during the life of this Contract, the Contractor must
forward renewal or replacement Certificates to the City within 10 Days after the renewal
date containing all the required insurance provisions.
11.3.9.2
Each insurance policy required by the insurance provisions of this Contract must provide
the required coverage and must not be suspended, voided or canceled except after 30 Days
prior written notice has been given to the City, except when cancellation is for non-payment
of premium, then 10 Days prior notice may be given. Such notice must be sent directly to
Chandler Law-Risk Management Department, Post Office Box 4008, Mailstop 628, Chandler,
Arizona 85225. If any insurance company refuses to provide the require notice, the
Contractor or its insurance broker must notify the City of any cancellation, suspension, non-
renewal of any insurance within 7 Days of receipt of insurers’ notification to that effect.
11.3.10
City as Additional Insured. The above-referenced policies are to contain, or be endorsed to
contain, the following provisions:
11.3.10.1
The Commercial General Liability and Automobile Liability policies are to contain, or be
endorsed to contain, the following provisions: The City, its officers, officials, agents, and
employees are additional insureds with respect to liability arising out of activities performed
by, or on behalf of, the Contractor including the City's general supervision of the Contractor;
Products and Completed Operations of the Contractor; and automobiles owned, leased,
hired, or borrowed by the Contractor.
11.3.10.2
The City, its officers, officials, agents, and employees must be additional insureds to the full
limits of liability purchased by the Contractor even if those limits of liability are in excess of
those required by this Contract.
11.4
BONDS AND OTHER PERFORMANCE SECURITY
11.4.1
After Contract award, Contractor must provide a Performance Bond and a Payment Bond,
each in an amount equal to the full amount of the Contract Price.
11.4.2
Each such bond must be executed by a surety company or companies holding a Certificate
of Authority to transact surety business in the State of Arizona, issued by the Director of the
Arizona Department of Insurance and must be named in the current list of "Companies
General Conditions
Revised: 10/19/2021
GC-49 of 75
Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable
Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff Bureau of
Accounts, U.S. Treasury Department. A copy of the Certificate of Authority must accompany
the bonds. The Certificate must have been issued or updated within two (2) years prior to
the execution of this Agreement. The bonds must be written or countersigned by an
authorized representative of the surety who is either a resident of the state of Arizona or
whose principal office is maintained in this state, as by law required.
11.4.3
The bonds must be made payable and be acceptable to City. The bond forms for the
performance and payment bonds must be in the forms required under A.R.S. § 34-221, et.
Seq., as in Appendices 4 and 5 of these General Conditions.
11.4.4
Upon the request of any person or entity appearing to be a potential beneficiary of bonds
covering payment of obligations arising under the Contract Documents, Contractor must
promptly furnish a copy of the bonds or must permit a copy to be made.
11.4.5
All bonds submitted for this Project must be provided by a company which has been rated AM
Best rating of A- or better for the prior four quarters by the latest edition of the ‘Results
Best’s Key Rating Guide (Property/Casualty)” published by the A.M. Best Company.
11.4.6
Personal or individual bonds are not acceptable.
11.4.7
If the surety on any Bond furnished by Contractor is declared a bankrupt or becomes
insolvent, or Contractor’s right to do business is terminated in any state where any part of
the Project is located, or it ceases to meet the requirements of this Section 11.4, Contractor
must within 5 Days thereafter substitute another Bond and surety, both of which must be
acceptable to City.
SECTION 12 - INDEMNIFICATION
12.1
To the extent permitted by law, the Contractor and its owners, officers, directors, agents,
employees, and subconsultants (collectively "lndemnitor") must indemnify, save, and hold
harmless the City and its officers, officials, agents, and employees (collectively "lndemnitee")
from any and all claims, actions, liabilities, damages, losses, or expenses (including court
costs, attorneys' fees, and costs of claim processing, investigation, and litigation) (collectively
"Claims") caused or alleged to be caused, in whole or in part, by the negligent, reckless,
wrongful, or willful acts, errors, or omissions of Indemnitor in connection with this
Agreement. This indemnity includes any Claim or amount arising out of or recovered under
workers' compensation laws or on account of Indemnitor's failure to conform to any federal,
state, or local law, statute, ordinance, rule, regulation, or court decree. Indemnitor must
indemnify lndemnitee from and against any and all Claims, except those arising solely from
lndemnitee's own negligent, reckless, wrongful, or willful acts, errors, or omissions.
Indemnitor is responsible for primary loss investigation, defense, and judgment costs where
this indemnification applies. In consideration of the award of this Agreement, Indemnitor
agrees to waive all rights of subrogation against lndemnitee for losses arising from or
related to this Agreement. Indemnitor's obligations under this provision survive the
termination or expiration of this Agreement.
SECTION 13 -DISPUTE RESOLUTION
13.1
All disputes arising out of or relating to the Contract, the Work or the Project, other than
termination under Section 10, will be resolved pursuant to the Dispute Resolution
General Conditions
Revised: 10/19/2021
GC-50 of 75
process set forth in Appendix 6 of these General Conditions, and not pursuant to MAG
Specifications § 110.
13.2
Contractor agrees that during any dispute between the parties, Contractor will continue to
perform its obligations under the Contract until such dispute is resolved.
13.3
Notwithstanding any other provision in this Contract, City has the right to immediately file in
court and pursue an action for a temporary restraining order and injunctive relief against
Contractor if City determines that such action is necessary to protect its interests under the
Contract, to obtain specific performance of any provision of the Contract, to advance the
completion of the Project, or to protect health, welfare and safety.
SECTION 14 - MISCELLANEOUS PROVISIONS
14.1
CONTRACT DOCUMENTS
14.1.1
The Contract Documents are intended to permit the parties to complete the Work
and all obligations required by the Contract Documents within the Contract Times for the
Contract Price. The Contract Documents are intended to be complementary and interpreted
in harmony so as to avoid conflict, with words and phrases interpreted in a manner
consistent with construction and design industry standards.
14.1.2
It is the intent of the Contract Documents to describe a functionally complete Project (or
part thereof) to be constructed in accordance with the Contract Documents. Any labor,
documentation, services, materials, or equipment that may reasonably be inferred from the
Contract Documents or from prevailing custom or trade usage as being required to produce
the intended result must be provided by Contractor whether or not specifically called for at
no additional cost to City.
14.1.3
The Contract Documents establish the rights and obligations of the parties and include the
Contract, Addenda (which pertain to the Contract Documents), Contractor's Bid or Proposal
(including documentation accompanying the Bid and any post-Bid documentation
submitted prior to Contract award) when attached as an exhibit to the Contract, the
accepted Project Schedule, the Notice to Proceed, the Performance Bond, the Payment
Bond, Project Design, Engineering and Specifications, these General Conditions, the Project
Specific Special Provisions, Technical Specifications, Contract Drawings, as the same may be
more specifically identified in the Contract, Change Orders, Work Change Directives, Field
Orders and the written interpretations and clarifications of the Design Professional or City
representative and Modifications issued after execution of the Contract. Approved Shop
Drawings and the reports and drawings of subsurface and physical conditions are not
Contract Documents.
14.1.4
In the event of any inconsistency, conflict, or ambiguity between or among the Contract
Documents, the Contract Documents will take precedence as follows from highest to lowest:
Change Orders, Addenda, Contract, Project Specific Special Provisions, General Conditions,
Technical Specifications, Drawings/Plans, Chandler Amendments to MAG Standard
Specifications and Chandler Standard Details, and MAG Uniform Standard Specifications
and Details for Public Works Construction. If applicable to this Contract, Federal Provisions
prevail.
14.1.5
On the Drawings, given dimensions will take precedence over scaled measurements and
General Conditions
Revised: 10/19/2021
GC-51 of 75
large scale drawings over small-scale drawings.
14.1.6
Clarifications and interpretations of the Contract Documents will be issued by the Design
Professional through the City.
14.1.7
The headings used in this Agreement or any other Contract Documents, are for ease of
reference only and must not in any way be construed to limit or alter the meaning of any
provision.
14.1.8
The Contract Documents form the entire agreement between City and Contractor. No
oral representations or other agreements have been made by the parties except as
specifically stated in the Contract Documents.
14.1.9
The Contract Documents may not be changed, altered, or amended in any way except in
writing signed by a duly authorized representative of each party in the form of a Change
Order.
14.1.10
Re-Use of Documents. Neither Contractor nor any Subcontractor, manufacturer, fabricator,
supplier or distributor will have or acquire any title to or ownership rights in any of the
Drawings, Specifications or other documents (or copies of any thereof) prepared by or
bearing the seal of the Design Professional; and they must not re-use any of them on
extensions of the Project or any other project without written consent of City and the Design
Professional and specific written verification or adaptation by the Design Professional.
14.2
REFERENCE STANDARDS
14.2.1
Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific
or by implication, will mean the standard, specification, manual, code, or Laws or
Regulations in effect at the time of opening of Bids (or on the Effective Date of the Contract
if there were no Bids), except as may be otherwise specifically stated in the Contract
Documents.
14.2.2
The provisions of any such standard, specification, manual or code, or any instruction of a
Supplier will not change the duties or responsibilities of City, Contractor, Design
Professional or Project Manager, or any of their Subcontractors, consultants, agents, or
employees from those set forth in the Contract Documents, nor will any such provision or
instruction assign to City, Contractor, Design Professional, or any of their agents, or
employees any duty or authority to supervise or direct the performance of the Work or any
duty or authority to undertake responsibility inconsistent with the provisions of the
Contract Documents.
14.3
COMPLIANCE WITH ARIZONA LAW AND FEDERAL LAW
14.3.1
Compliance with A.R.S. § 41-4401. Pursuant to the provisions of A.R.S. § 41-4401, the
Contractor hereby warrants to the City that the Contractor and each of its subcontractors
(“Subcontractors”) must comply with all Federal Immigration laws and regulations that
relate to the immigration status of their employees and the requirement to use E-Verify set
forth in A.R.S. §23-214(A).
14.3.2
A breach of the Contractor Immigration Warranty constitutes a material breach of this
Contract and subject to penalties up to and including termination of this Contract.
General Conditions
Revised: 10/19/2021
GC-52 of 75
14.3.3
The City retains the legal right to inspect the papers of any Contractor or Subcontractor
employee who works on this Contract to ensure that the Contractor or Subcontractor is
complying with the Contractor Immigration Warranty. The Contractor agrees to assist the
City in the conduct of any such inspections.
14.3.4
The City may, at its sole discretion, conduct random verifications of the employment records
of the Contractor and any Subcontractors to ensure compliance with Contractors
Immigration Warranty. The Contractor agrees to assist the City in performing any such
random verifications.
14.3.5
The provisions of this Article must be included in any contract the Contractor enters into
with any and all of its subcontractors who provide services under this Contract or any
subcontract. “Services” are defined as furnishing labor, time or effort in the State of Arizona
by a contractor or subcontractor. Services include construction or maintenance of any
structure, building or transportation facility or improvement to real property.
14.4
HAZARDOUS ENVIRONMENTAL CONDITIONS
14.4.1
Contractor will not be responsible for any Hazardous Environmental Condition uncovered
or revealed at the Site which was not shown or indicated in Drawings or Specifications or
identified in the Contract Document to be within the scope of the Work. Contractor will be
responsible for a Hazardous Environmental Condition created with any materials brought
to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is
responsible.
14.4.2
If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone
for whom Contractor is responsible creates a Hazardous Environmental Condition.
Contractor must immediately:
a. Secure or otherwise isolate such condition;
b. Stop all Work in connection with such condition and in any area affected
thereby; and
c. Notify City and promptly thereafter confirm such notice in writing.
14.4.3
City will promptly retain a qualified expert to evaluate such condition or take corrective
action, if any.
14.4.4
Contractor will be responsible for any and all civil or criminal penalties, fines, damages, or
other charges imposed by any regulatory agency or court for sewage discharges that are in
violation of applicable statutes and laws and that are a result, direct or indirect, of work
performed under this Contract. Contractor will also be responsible for reimbursement to
City for administration, reporting, and tracking expenses required as a result of any spill
event. In the event the regulatory agency or court imposes a probationary period,
Contractor must post bond for the probationary period to ensure that all such costs are
reimbursed to City. This responsibility will apply whether penalties are imposed directly on
Contractor or any of its Subcontractors, or the City of Chandler. Contractor must defend
and indemnify City against such penalties. Regulatory agencies may include, but are not
limited to, the Arizona Department of Environmental Quality (ADEQ) and the United States
Environmental Protection Agency (USEPA).
14.5
COOPERATION AND FURTHER DOCUMENTATION
General Conditions
Revised: 10/19/2021
GC-53 of 75
Contractor agrees to provide City such other duly executed documents as may be
reasonably requested by City to implement the intent of the Contract Documents.
14.6
ASSIGNMENT
Neither Contractor nor City will, without the written consent of the other assign, transfer or
sublet any portion of this Agreement or part of the Work or the obligations required by
the Contract Documents, any such assignment will be void, will transfer no rights to the
purported assignee, and would be a material breach of the Contract.
14.7
SUCCESSORS
Contractor and City intend that the provisions of the Contract Documents are binding upon
the parties, their employees, agents, heirs, successors and assigns.
14.8
LAWFUL PRESENCE
Pursuant to A.R.S. §§ 1-501 and 1-502, City is prohibited from awarding a contract to any
natural person who cannot establish that such person is lawfully present in the United
States. To establish lawful presence, a person must produce qualifying identification and
sign a City-provided affidavit affirming the identification provided is genuine. This
requirement will be imposed at the time of contract award. This requirement does not
apply to business organizations such as corporations, partnerships, or limited liability
companies.
14.9
NO BOYCOTT OF ISRAEL CERTIFICATION
By Contractor's signature on this Contract, Contractor certifies under A.R.S. § 35-393.01 that
Contractor is not currently engaged in and for the duration of this Contract will not engage
in a boycott of Israel.
14.10
NO THIRD PARTY BENEFICIARY
Nothing under the Contract Documents will be construed to give any rights or benefits in
the Contract Documents to anyone other than City and Contractor, and all duties and
responsibilities undertaken pursuant to the Contract Documents will be for the sole and
exclusive benefit of City and Contractor and not for the benefit of any other party, unless
otherwise expressly set forth in the Contract Documents.
14.11
GOVERNING LAW AND VENUE
The Agreement and all Contract Documents will be deemed to be made under, and will
be construed in accordance with and governed by the laws of the State of Arizona without
regard to the conflicts or choice of law provisions thereof. Any court action to enforce any
provision of the Contract or to obtain any remedy with respect hereto must be brought
in the Superior Court, Maricopa County, Arizona, and for this purpose, each party hereby
expressly and irrevocably consents to the jurisdiction and venue of such Court.
14.12
SEVERABILITY
If any provision of the Contract Documents or the application thereof to any person or
circumstance will be invalid, illegal or unenforceable to any extent, the remainder of the
affected provision, the remainder of the Contract Documents, and the application
thereof will not be affected and will be enforceable to the fullest extent permitted by law.
14.13
LEGAL REQUIREMENTS
At all times relevant to its entry into this Contract and performance of the Services and
the Work, Contractor must fully comply with all Laws, Regulations, or Legal Requirements
applicable to City, the Project, and the Contract, including, without limitation, those set
General Conditions
Revised: 10/19/2021
GC-54 of 75
forth on Exhibit C of the Contract.
14.14
PARTIAL INVALIDITY
If any provision of the Contract is held by a court of competent jurisdiction to be invalid,
void or unenforceable, the remaining provisions will nevertheless continue in full force
without being impaired or invalidated in any way.
14.15
ATTORNEYS' FEES
Should either party to the Contract bring an action to enforce any provision of the Contract,
the prevailing party will be entitled to recover reasonable attorneys' fees and costs in
connection therewith.
14.16
CONFLICT OF INTEREST
14.16.1
Contractor agrees to disclose any financial or economic interest with the Project property,
or any property affected by the Project, existing prior to the execution of the Contract.
Further, Contractor agrees to disclose any financial or economic interest with the Project
property, or any property affected by the Project, if Contractor gains such interest during
the course of this Contract. If Contractor gains financial or economic interest in the Project
during the course of this Contract, this may be grounds for terminating this Contract. Any
decision to terminate the Contract must be at the sole discretion of City.
14.16.2
Contractor will not engage the services on this Contract of any present City employee who
was involved as a decision maker in the selection or approval processes, or who negotiated
or approved billings or Contract Modifications for this Contract.
14.16.3
Contractor agrees that it will not perform services on this Project for a contractor,
subcontractor, or any supplier, not covered under this Contract.
14.17
INDEPENDENT CONTRACTOR
Contractor is and must be an independent contractor. Any provisions in the Contract
Documents that may appear to give City the right to direct Contractor as to the details of
accomplishing the Work or to exercise a measure of control over the Work means that
Contractor must follow the wishes of City as the results of the Work only. These results
must comply with all applicable laws and ordinances.
14.18
NOTICE OF INJURY
Should City or Contractor suffer injury or damage to their person or property because of
any error, omission or act of the other party or of any of the other party's employees or
agents or others for whose acts the other party is legally liable, claim must be made in
writing to the other party within 7 Days of the first observance of such injury or damage.
14.19
CONFIDENTIALITY
Contractor, for the benefit of City, hereby agrees it will not release or cause or permit
to be released to the public any press notices, publicity (oral or written) or advertising
promotion relating to, any statement regarding, or any other public announcement or
disclosure or cause or permit to be publicly announced or disclosed, in any manner
whatsoever, the specific terms and conditions of this Agreement or any comment relating
to the Project or the Site. Notwithstanding the foregoing, Contractor will be entitled to
disclose the terms of the Agreement to the extent required by law or in the course of
enforcing or defending a claim or action hereunder. Contractor must give City reasonably
prompt notice of any disclosure or statement made pursuant to this provision.
General Conditions
Revised: 10/19/2021
GC-55 of 75
14.20
DATA CONFIDENTIALITY
14.20.1
As used in the Contract, “data” means all information, whether written or verbal, including
plans, specifications, renderings, photographs, studies, investigations, audits, analyses,
samples, reports, calculations, internal memos, meeting minutes, data field notes, work
product, proposals, correspondence and any other similar documents or information
prepared by, obtained by, or transmitted to the City in the performance of this Contract.
14.20.2
Contractor agrees that all data, regardless of form, including originals, images, and
reproductions, prepared by, obtained by, or transmitted to City in connection with the
Contractor’s performance of this Contract is confidential and proprietary information
belonging to City.
14.20.3
Except as specifically provided in this Contract, Contractor or its Subcontractors must not
divulge data to any third party without prior written consent of City. Contractor or its
Subcontractors must not use data for any purposes except to perform Work required under
this Contract. These prohibitions will not apply to the following data provided Contractor
has first given the required notice to City:
a. Data which was known to Contractor or its Subcontractors prior to its
performance under this Contract unless such data was acquired in
connection with Work performed for City;
b. Data which was acquired by Contractor or its Subcontractors in its
performance under this Contract and which was disclosed to Contractor or
its Subcontractors by a third party, who to the best of Contractor’s or its
Subcontractor’s knowledge and belief, had the legal right to make such
disclosure and Contractor or its Subcontractors are not otherwise required
to hold such data in confidence; or
c. Data which is required to be disclosed by virtue of law, regulation, or court
order, to which the Contractor or its Subcontractors are subject.
14.20.4
In the event the Contractor or its Subcontractors are required or requested to disclose data
to a third party, or any other information to which the Contractor or its Subcontractors
became privy as a result of any other contract with City, the Contractor must first notify City
as set forth in this Section of the request or demand for the data. The Contractor or its
Subcontractors must give City sufficient facts so that City can be given an opportunity to
first give its consent or take such action that City may deem appropriate to protect such
data or other information from disclosure.
14.20.5
Unless prohibited by law, within 10 Days after completion of services for a third party on
real or personal property owned or leased by City, the Contractor must promptly deliver, as
set forth in this Section, a copy of all data to City. All data will continue to be subject to the
confidentiality agreements of this Contract.
14.20.6
Contractor or its Subcontractors assume all liability for maintaining the confidentiality of
the data in its possession and agree to compensate City if any of the provisions of this
Section are violated by Contractor, its employees, agents, or Subcontractors. Solely for the
purposes of seeking injunctive relief, it is agreed that a breach of this Section will be deemed
to cause irreparable harm that justified injunctive relief in court. Contractor agrees that the
requirements of this Section will be incorporated into all subcontracts entered into by
Contractor. A violation of this Section may result in immediate termination of this Contract
General Conditions
Revised: 10/19/2021
GC-56 of 75
without notice.
14.21
SURVIVAL
All warranties, representations and indemnifications by Contractor must survive the
completion or termination of this Agreement.
14.22
COVENANTS AGAINST CONTINGENT FEES
Contractor warrants that no person has been employed or retained to solicit or secure
this Agreement upon an agreement or understanding for a commission, percentage,
brokerage, or contingent fee, and that no member of City Council, or any employee of
City has any interest, financially, or otherwise, in the firm. For breach or violation of this
warrant, City will have the right to annul the Contract without liability or at its discretion to
deduct from the Contract Price or consideration, the full amount of such commission,
percentage, brokerage, or contingent fee.
14.23
NO WAIVER
The failure of either party to enforce any of the provisions of the Contract Documents or to
require performance of the other party of any of the provisions hereof must not be construed
to be a waiver of such provisions, nor will it affect the validity of the Contract Documents or
any part thereof, or the right of either party to thereafter enforce each and every provision.
14.24
NONEXCLUSIVE REMEDIES
The remedies set forth in this Contract are cumulative and not exclusive, and failure to
exercise any remedy (including, without limitation, any right to terminate) will not preclude
any party from exercising any other right in seeking any other remedy available to it at law
or in equity.
14.25
PROJECT COMMUNICATIONS
14.25.1
All communications concerning the performance of the Work or the Project will be provided
to the designated Project Manager and Contractor’s Representative set forth in Article 1
of the Contract. City may change the designated Project Manager and, subject to Section
4.4.20 of these General Conditions, Contractor may change Contractor Representative, by
written notice to the other.
14.25.2
Project communications may be exchanged by e-mail, but email communications cannot
change the terms of the Contract or the Scope of Work, or effectuate any change that
requires a written Change Order.
14.25.3
When any provisions of the Contract Documents requires Contractor or the Design
Professional to give written notice to City, it will be deemed to have been validly given if
delivered in person or if delivered at or sent by registered or certified mail, postage prepaid,
to the Parties indicated in Contract Article 1, incorporated by reference.
14.25.4
When any provisions of the Contract Documents requires City, Project Manager, or the
Design Professional to give written notice to Contractor, it will be deemed to have been
validly given if delivered in person to the person designated in the Contract Documents as
Contractor’s Resident Superintendent, or if delivered at or sent by registered or certified
mail, postage prepaid, to Contractor at the last address in the Contract Documents or such
substitute address which Contractor designates in writing, or to the business address
known to the giver of notice.
General Conditions
Revised: 10/19/2021
GC-57 of 75
14.26
DRUG FREE WORKPLACE PROGRAM
14.26.1
City has adopted a policy establishing a drug free workplace for itself and as a requirement
for Contractors doing business with City, to ensure the safety and health of employees
working on City projects.
14.26.2
Contractor must require a drug free workplace for all employees working under the
Contract. Specifically, all employees of Contractor who are working under a Contract with
City must be notified, in writing, by Contractor that they are prohibited from the
manufacture, distribution,
dispensation, possession or unlawful use of a controlled
substance in the workplace.
14.27
Failure to require a drug free workplace in accordance with the City’s policy may result
in termination of the Contract and possible debarment form bidding on future City projects.
SECTION 15 - PROVISIONS APPLICABLE SOLELY TO GMP AND COST-BASED CONTRACTS,
CHANGE ORDERS, AND JOB ORDERS
15.1
ADDITIONAL DEFINITIONS
The definitions set forth in Section 2 apply to GMP and Cost-Based Contracts, Change
Orders, and Job Orders, together with the additional definitions set forth below.
Baseline Cost Model –
A breakdown and estimate of the scope of the Project developed by CM@Risk pursuant to Section 17.5
of these General Conditions.
CM@Risk or Construction Manager at Risk –
The person or firm selected by City to provide pre-construction and/or construction services as
detailed in a Construction Manager at Risk Contract with City. In these General Conditions, the term
“Contractor” includes CM@Risk under both Pre-Construction and Construction Services Contracts.
CM@Risk Fee or Contractor’s Fee –
An agreed to percentage in an accepted GMP that represents the Contractor’s fee for performance of
the Work.
Contract Documents –
Where compensation under the Contract is based upon a GMP accepted by City, the term “Contract
Documents” also includes the accepted GMP Proposal.
Contract Price –
Where compensation under the Contract based upon a GMP accepted by City, the term “Contract
Price” refers to the GMP.
Cost-Based Contract, Change Order, or Job Order –
A Contract, Change Order, or Job Order where the Contract Price is based upon the actual cost
of performing the Work, subject to the terms of the Contract Documents, including this Section 15.
These would include those generally referred to as “Cost of the Work plus a Fee with a GMP,”
“Time and Materials,” or “Cost Plus a Fee.”
Cost of the Work –
The direct costs necessarily incurred by Contractor in the proper, timely, and complete performance
on the Work. The Cost of the Work will include only those costs set forth in Section 15.2 of these
General Conditions.
General Conditions
Revised: 10/19/2021
GC-58 of 75
Deliverables –
The work products prepared by Contractor in performing the scope of work described in the Contract.
Some of the major deliverables to be prepared and provided by Contractor during pre-construction
may include but are not limited to: the Baseline Cost Model and Schedule that validate City’s plan and
budget, Construction Management Plan, Detailed Project Schedule, Schedule of Values, alternative
system evaluations, procurement strategies and plans, Detailed Cost Estimates, construction market
surveys, cash flow projections, GMP Proposals, Subcontractor procurement plan, Subcontractor
agreements, Subcontractor bid packages, Supplier agreements, Constructability Review, Cost Control
Log, Traffic control and phasing plans and others as indicated in this Contract or required by the
Project Team.
Pre-Construction Services Contract –
The Contract entered into between City and the CM@Risk for Pre-Construction Services to be provided
by the CM@Risk, including, without limitation, the generation of a GMP Proposal. If the GMP Proposal
is accepted by City and a Construction Contract is entered into between City and CM@Risk, the duties,
obligations and warranties of the CM@Risk under the Pre-Construction Services Contract survive and
are incorporated into the resulting Construction Contract.
Pre-Construction Services –
The services to be provided under the Pre-Construction Services Contract, including Section 17 of
these General Conditions.
Detailed Project Schedule –
The Detailed Project Schedule developed by the CM@Risk for the review and approval of the Project
Manager in accordance with Section 17.3 of these General Conditions, if applicable.
General Conditions Costs –
Those costs set forth in Section 4 of Appendix 9 to these General Conditions.
GMP Plans and Specifications –
The plan and specifications upon which the Guaranteed Maximum price Proposal is based.
GMP Proposal –
The proposal of Contractor submitted pursuant to Section 17.7 of these General Conditions for the
entire Work and/or portion (phases) of the Work.
Guaranteed Maximum Price or GMP –
The Guaranteed Maximum Price set forth in the Contract, Change Order, or Job Order if applicable.
15.2
CONTRACT PRICE
15.2.1
The Contract Price for all Contracts, Change Orders, and Job Orders based upon payment
of the Cost of the Work plus a Fee with a GMP, time and materials, or cost-plus a fee will be
the Cost of the Work incurred plus the Fee agreed to in writing by City, limited to the amount
of the GMP, if agreed to. Unless otherwise expressly provided in the Contract, Change
Order, or Job Order, all Cost Based pricing will be subject to and limited to GMP.
15.2.2
The Contract Price may only be changed as set forth in Section 9 above.
15.2.3
Only costs specifically designated as reimbursable costs are eligible for payment by City or
may be charged against the Contract Price. All other costs will not be paid by City and will
General Conditions
Revised: 10/19/2021
GC-59 of 75
not be chargeable against the Contract Price.
15.2.4
Cost-Based Contracts. For Contracts, Change Orders, or Job Orders, reimbursable costs
must be determined pursuant to Appendix 9 to these General Conditions, Cost of the Work,
and not by MAG Specifications §109.5.
15.3
ALLOWANCES
15.3.1
Contractor must include in the Contract Price all Allowances stated in the Contract
Documents and agreed to in writing by City. Items covered by these Allowances must be
supplied for such amounts and by such persons as City may direct, provided Contractor will
not be required to employ persons against whom Contractor makes a reasonable objection.
Materials, labor, and equipment under an Allowance will be selected by City in accordance
with a schedule to be mutually agreed upon by City, Design Professional and Contractor or
otherwise in reasonably sufficient time to avoid delay in the Work.
15.3.2
Unless otherwise provided in the Contract Documents:
15.3.2.1
These Allowances must cover the cost to Contractor, less any applicable trade discount, of
the materials, labor, and equipment required by the Allowances, delivered at the Site, and
all applicable taxes;
15.3.2.2
Contractor’s costs for unloading and handling on the Site, labor, installation costs, overhead,
profit and other expenses relating to materials, labor, and equipment required by the
Allowance must be included in the Contract Sum and not in the Allowance; and
15.3.2.3
Whenever the cost is more or less than the Allowance, the Contract Sum must be adjusted
accordingly by Change Order, the amount of which will recognize the difference between
actual costs for an Allowance item and the amount of the Allowance item and changes, if
any, in handling costs on the Site, labor, installation costs, overhead, profit and other
expenses.
15.4
CONTINGENCY
An agreed to amount in the GMP that may only be used in accordance with the terms set
forth in these General Conditions and with prior written approval by the City.
15.4.1
Construction Contingency. This GMP includes a dollar amount listed as a Construction
Contingency which will be readily available for increased costs for subcontractors, material,
and equipment subject to prior approval of City, which approval will not be withheld
unreasonably. The Construction Contingency may also be used, at the discretion of City, to
reimburse CM@Risk for unexpected costs due to (a) scope gaps between trade
subcontractors; (b) contract default by trade subcontractors; (c) unforeseen field conditions,
but only as defined in Section 9.5 above; (d) work completed to meet the intent of the
design, but which was not indicated on the plans; (e) costs overruns not covered by
allowances; (f) costs of corrective work not provided for elsewhere; and (g) implementation
of any Recovery Plan. Cost for which CM@Risk desires to be paid from the Construction
Contingency must be documented by CM@Risk on a time and materials basis and are
subject to verification by City. If agreed to by City, a “Use of Contingency” form will be
executed by both parties authorizing the actual cost of the work to be paid and included in
the Work Item Direct Costs. The Construction Contingency is not allocated to any particular
item of the Project but may be used for any portion of the work as determined above. Any
amount not used in the Construction Contingency will belong to City and will reduce the
General Conditions
Revised: 10/19/2021
GC-60 of 75
GMP.
15.4.2
Owner’s Contingency. This GMP also includes a dollar amount listed as an Owner’s
Contingency which may be used only by the City (owner department) for upgrades and
changes in scope or other changes not already included within the intent of the Project
Program. City will provide CM@Risk with a Work Change Directive authorizing CM@Risk to
perform the additional work and to transfer funds from the Owner’s Contingency to the
Work Item Direct Costs category to be paid with such direct costs. These additional costs
will be in an amount mutually agreed upon by CM@Risk and City or will be documented by
CM@Risk on a time and materials basis and are subject to verification by City. Any amount
not used in the Owner’s Contingency will belong to the City and will reduce the GMP.
15.5
REDUCTION IN RETENTION
If the Contract Price is based upon a GMP, in order to receive payment of one-half of the
retention as set forth in Section 8.1.5 above, Contractor must also submit to the Project
Manager a complete accounting of the Actual Reimbursable Cost of the Work to date,
including all such documentation (including, without limitation, invoices, subcontract,
subcontractor change orders, purchase orders, records of payment, etc.) as City may require,
to establish whether the payments made to Contractor equal, exceed, or are less than the
actual reimbursable Cost of the Work to date. Any excess payments by City, as determined
by the Project Manager, will be deducted from the one-half retention payment to be made
to Contractor, and any additional excess amounts paid to Contractor will be refunded by
Contractor to City. The Project Manager’s determinations as to Actual Reimbursable Cost
of the Work will be the basis of payment until final Project Closeout and Final Payment
under the Contract.
15.6
FINAL PAYMENT
If the Contract Price is based upon a GMP, as a further condition precedent to Final Payment
by City, Contractor must submit to the Project Manager a complete final accounting of
the Actual Reimbursable Cost of the Work, including all such documentation (including,
without limitation, invoices, subcontracts, subcontractor change orders, purchase orders,
records of payment, etc.) as City may require, to establish whether the payments made to
Contractor equal, exceed, or are less than the Actual Reimbursable Cost of the Work to
date. Any excess payments by City, as determined by the Project Manager, will be deducted
from the one-half retention payment to be made to Contractor, and any additional excess
amounts paid to Contractor will be refunded by Contractor to City. Disputes relating to the
Final Cost of the Work will be subject to City’s audit rights under Sections 8.8 above and 15.7
below, and the dispute resolution process under Section 13 above.
15.7
OPEN BOOK
On any GMP-based or Cost-Based Contract, Job Order, or Change Order, City may attend
any and all meetings or discussions pertaining to the Project, including bid openings, and
must have access to all books, invoices, accounts, memoranda, correspondence, and
written communications or records of any kind pertaining to the Project, including without
limitation, those stored in electronic format.
15.8
DIFFERING SITE CONDITIONS AND/OR CHANGE IN LAWS
A Change Order for increased costs under Section 9.5 or 9.6 above will only be considered
or granted by City to the extent such actual, documented costs are justified.
SECTION 16 - PROVISIONS APPLICABLE SOLELY TO JOB ORDER CONTRACTS (JOC)
General Conditions
Revised: 10/19/2021
GC-61 of 75
16.1
ADDITIONAL DEFINITIONS
The definitions set forth in Sections 2 and below will apply to all Job Order Contracts and
Job Orders. In addition, the definitions set forth in Section 15.1 above will apply to all Cost-
Based Job Orders.
Contract –
Includes the Job Order Master Agreement and Job Order Project Agreements issued and agreed to by City
and JOC Contractor.
JOC Contractor’s Coefficient –
A numerical factor that represents JOC Contractor total costs (indirect and direct costs, sales tax,
profit, etc.) and other adjustments for market conditions.
Job Order Request for Proposal (RFP) –
The Request for Proposals issued by City for each Job Order Project Agreement relating to a specific
Project.
Job Order Cost Proposal –
The Proposal submitted by JOC Contractor in response to a Job Order Request for Proposal (RFP) issued
by City to develop a Job Order Project Agreement for a specific Project.
Guaranteed Maximum Price (GMP) Job Order –
Job Order under which JOC Contractor is compensated for actual costs incurred.
Job Order Project Agreement (Job Order) –
The agreement for a specific project, as it may be modified by all Change Orders, executed by the
Parties, which incorporates the terms and conditions of the Job Order Master Agreement.
16.2
ORDERING AND PROCESSING PROCEDURES FOR JOB ORDERS
16.2.1
The process for developing and issuing a Job Order for a particular Project consists of three
(3) procedures: (1) issuance of a RFP by City; (2) JOC Contractor’s response to the RFP in the
form of JOC Contractor’s Job Order Cost Proposal; and (3) Issuance of a Job Order by City, as
set for below.
16.2.2
RFP’s For Job Orders
16.2.2.1
City will provide to JOC Contractor RFP with a Scope of Work (SOW) describing the Work to
be performed, which may include special instructions and conditions, material submittal
requirements, and, if applicable, a complete set of sketches, construction drawings and
specifications for the Job Order.
16.2.2.2
Some Job Order RFP’s will be issued by City without detailed sketches, drawing and
specifications and will rely on JOC Contractor to produce them for City review and approval
and is considered to be Pre-Construction and incidental design services included in JOC
Contractor’s overhead for GMP Job Orders. In addition JOC Contractor will not be
reimbursed for any Pre-Job Order costs, including proposal preparation, attendance during
negotiations, or site visits.
16.2.3
JOC Contractor’s Job Order Cost Proposal
16.2.3.1
JOC Contractor must respond within ten (10) calendar days of the RFP date or site visit,
General Conditions
Revised: 10/19/2021
GC-62 of 75
whichever is later or as otherwise indicated on a case-by-case basis, by submitting JOC
Contractor’s Job Order Cost Proposal to the City representative.
16.2.3.2
Unless otherwise required under the terms of the RFP, JOC Contractor’s Job Order Cost
Proposal must include the following.
a. JOC Contractor’s Job Order Cost Proposal in PDF and electronic format;
b. A Project Schedule and schedule of values that reflects the costs of each work
element on the schedule. The schedule must show all milestones (e.g.,
permits, submittals, ordering materials, demolition, work phases, closeout
and completion date); and
c. Necessary documentation will be required to indicate that adequate scoping,
layout, setup and planning to accomplish the Work has been done.
Examples of documentation that might reasonably be expected include
sketches, drawings, calculations, catalog cuts and specifications produced
to a level of detail and skill that could be expected of experienced,
competent Project Managers with five or more periods experience in their
respective trade.
16.2.3.3
JOC Contractor must select Subcontractors based on qualifications alone or on a
combination of qualifications and price and must not select Subcontractors based on
price alone. A qualifications and price selection may be a one-step selection based on
a combination of qualifications and price or two-step selection. In a two-step selection,
the first step must be based on qualifications alone and the second step may be based or
a combination of qualifications and price or on price alone.
16.2.3.4
Upon request, JOC Contractor must provide City with copies of Subcontractor quotes and
the basis for selection of each Subcontractor.
16.2.3.5
If City objects to a selected Subcontractor, City will make the objection and the reasons for
the objection known to the JOC Contractor. JOC Contractor must then present an
acceptable Subcontractor for the applicable discipline. City will not unreasonably object
to or withhold approval of a Subcontractor.
16.2.3.6
For self-performed work, the City retains the right to have the JOC Contractor establish JOC
Contractor’s costs by bidding their costs against at least three (3) other interested trade
Contractors. No self- performed work will be allowed to be performed on a lump sum basis.
16.2.4
Issuance of Job Order
16.2.4.1
City Representative will compare the JOC Contractor’s Job Order Cost Proposal with the City’s
estimate,
schedules and other requirements, and then, if the City Representative
determines it is in the best interest of City, arrange a meeting with JOC Contractor, at which
time the JOC Contractor’s Job Order Cost Proposal will be discussed and negotiated.
16.2.4.2
If the City Representative determines that it is in the best interest of the City, City will then
issue a Job Order to JOC Contractor for execution.
16.2.4.3
Specific Job Orders may vary, but unless agreed to by City in writing otherwise, the content
of Job Orders under the Contract will generally be as follow, all of which will be signed
and/or initialed by JOC Contractor’s designated representative:
General Conditions
Revised: 10/19/2021
GC-63 of 75
a. The description of the Scope of the Work and Project Schedule (attached as
Exhibit A to the Job Order);
b. The address or location of the Work;
c. The Contract Price for Work (Construction) included in the Project (attached
as Exhibit B to the Job Order);
d. The name of the JOC Contractor representative for the Project;
e. The Drawings and Specifications for the Project;
f.
If any shop drawings, project date and/or samples are required for the Job
Order, the date for delivery of each required item (included in the Project
Schedule, Exhibit A to the Job order); and
g. Project Specific Provisions, if any, in Exhibit A to the Job Order,
including, without limitation, whether any of the following are required:
Pre-Construction Conference, weekly progress meetings, field office,
storage enclosure, materials and equipment handling facility, submittals,
shop drawings, product data, equipment list, samples, project manual,
schedule of values, Construction progress schedule, narrative reports,
progress report, progress charts, progress photographs, materials status
report, Construction diagram, Construction status report, operation and
maintenance data, operating maintenance instructions and parts list, and
as-build drawings.
16.2.5
Job Order Intent. Each Job Order will be interpreted to include all items reasonably
necessary to complete the Project under that Job Order as described in the scope of the
Work in that Job Order. All Work must be performed in a professional manner and all
materials used must be new and of the highest quality and of the type best adapted to
their purpose, unless otherwise specified. The Notice to Proceed date, and the award date
established therein, will be deemed an integral part of the Job Order the same as if set forth
therein.
16.3
INCIDENTAL DESIGN SERVICES
16.3.1
This effort includes all “extensions of design” for systems that are typically specified in
a performance oriented manner by consultants and designers. Examples include: fire
sprinkler systems, fire alarm and sprinkler systems, DDC controls, control systems,
prefabricated metal building and similar situations. These designs are normally provided
under submittals as a shop drawing with engineering backup and as appropriate, seals of
registered engineers specializing in the particular system.
16.3.2
Incidental design includes all documents, sketches, schematic diagrams, floor plan
layouts, equipment schedules and other documents produced by the JOC Contractor to
define the work required for projects that the City does not develop formal or abbreviated
designs requiring a seal by a registered engineer. Incidental design does not include
preparation of designs requiring an architect or engineer seal.
16.3.3
JOC Contractor represents, covenants, and agrees, and contractually assumes the
obligation to furnish, all of the required Design Services through properly licensed and
experienced Design Professionals in complete accordance with all of the duties imposed
on a Design Professional under the Contract Documents, Laws, Regulations, or Legal
General Conditions
Revised: 10/19/2021
GC-64 of 75
Requirements, and the common law.
16.3.4
All Design Documents (and all other Project-related documents, models, computer
drawings and other electronic expression, photographs and other expressions CADD, and
BIM files and images included) that JOC Contractor and/or JOC Contractor’s Design
Professional(s) prepare in connection with a Job Order and the copyrights therein
(collectively, the “Instruments of Service”) will be the property of City. JOC Contractor
covenants and agrees to execute any additional document reasonably requested by City
to confirm such assignment without any additional compensation.
16.4
CONSTRUCTION SERVICES
16.4.1
The following subsections of this Section 16.4 set forth requirements beyond those set forth
in Section 4 above which apply to Construction Services performed under a Job Order.
16.4.2
JOC Contractor must perform the Work using only those firms, team members and
individuals designated by JOC Contractor consistent with each Job Order or otherwise
approved by City pursuant to the General Conditions. No other entities or individuals may
be used without the prior written approval of the Project Manager.
16.4.3
Construction Phasing
16.4.3.1
City use of the facilities is anticipated while the Work is being performed. The Work must
be planned and accomplished so that there will be a minimum of interference and
inconvenience to occupants in the building and agencies in the vicinity and to other
craftsmen who may have to do work in the affected facilities. Any blockage of building
exits or driveways must be coordinated in advance.
16.4.3.2
If applicable, furniture, portable office equipment and wall appurtenances not rigidly
fastened to the walls must be moved by JOC Contractor, protected from damage and
replaced to the original position upon completion of the work. If the work required by
the Job Order will not allow furniture and portable office equipment to be replaced to its
original position, new locations will be designated by City. Incidental costs associated with
moving one-piece furnishings up to approximately 150 pounds to perform such tasks as
painting, carpet or tile replacement, etc., are considered a general cost of building
renovation and must be included in the JOC Contractor’s Coefficient. Costs for large scale
or wholesale removal and replacement of large quantities of
desks or modular
workstations, copiers, multiple full file cabinets, etc. to another location or storage outside
the work space, or disassembly and reassembly of modular furniture is not considered
part of the JOC Contractor’s Coefficient and will be priced separately.
16.4.3.3
The work must, so far as practicable, be done in definite sections or divisions and confined
to limited areas which must be completed before work in other sections or divisions are
begun.
16.4.4
Work Site Conflicts. In the event of a conflict between JOC Contractor and others in an
occupied facility or where other Contractors are performing work on the same facility
under other Contracts, City will decide to dispute and that decision will be final.
16.4.5
Ownership of Work Product. Work Product prepared or otherwise created in connection
with the performance of this Contract, including the Work, are to be and remain the
property of City. For purposes of this provision, “Work Product” will include all designs,
General Conditions
Revised: 10/19/2021
GC-65 of 75
drawings, plans, specifications, ideas, renderings and other information or matter, in
whatever form created (e.g., electronic or printed) and in all media now known or
hereinafter created. All Work Product will be considered Work Made for Hire as defined
in the United States Copyright Act 17 U.S.C. §101 (Copyright Act). If for any reason any such
Work is found not to be a work for hire, JOC Contractor hereby transfers and assigns
ownership of the copyright in such Work to City. The rights in this Section are exclusive to
City in perpetuity.
16.5
OPTIONAL LIQUIDATED DAMAGES
16.5.1
Specific Job Orders. City will have the right to assess liquidated damages in relation to
any specific JOC Project Agreement as set forth below.
16.5.2
Substantial Completion Liquidated Damages. JOC Contractor acknowledges and agrees
that if JOC Contractor fails to obtain Substantial Completion of the Work within the Contract
Time, City will sustain extensive damages and serious loss as a result of such failure. The
exact amount of such damages will be extremely difficult to ascertain. Therefore, City and
JOC Contractor agree that if JOC Contractor fails to achieve Substantial Completion of the
Work within the Contract Time, City will
be entitled to retain or recover from JOC
Contractor, as liquidated damages and not as a penalty, the sum per calendar day as
indicated in MAG § 108.9.
16.5.3
Final Acceptance Liquidated Damages. For the same reasons set forth in Section 16.5.2
above, City and JOC Contractor further agree that if JOC Contractor fails to achieve Final
Acceptance of the Work within the Contract Time, City will be entitled to retain or recover
from JOC Contractor, as liquidated damages and not as a penalty, the sum per calendar
day as indicated in MAG § 108.9 commencing from the actual date of Substantial
Completion or Final Acceptance as required under any specific JOC Project Agreement.
16.5.4
MAG Liquidated Damages. Liquidated damages provisions in MAG § 108.9 may apply to any
specific JOC Project Agreement.
16.5.5
City may deduct liquidated damages assessed pursuant to this Section 16.5 from any
unpaid amounts then or thereafter due JOC Contractor under the Contract or any specific
JOC Project Agreement between JOC Contractor and City. Any liquidated damages not so
deducted from any unpaid amounts due JOC Contractor must be payable to City at the
demand of City, together with interest from the date of the demand at the highest lawful
rate of interest payable to JOC Contractor.
16.6
PERFORMANCE MEASUREMENT
16.6.1
Performance Assessment. After the Final Acceptance of Work under each Job Order, City
will complete a written evaluation of the performance of JOC Contractor on the Job Order.
16.6.2
Consideration in Assignment of Work. JOC Contractor’s record of cost, schedule and
quality performance and comparative assessments will be significant considerations in
City’s determination whether to award future Job Orders. JOC Contractor agrees that any
determination by City not to not award future Job Orders or Option periods based on
performance will be at the sole discretion of City.
SECTION 17 - PROVISIONS APPLICABLE SOLELY TO PRE-CONSTRUCTION SERVICES FOR
CONSTRUCTION MANAGER AT RISK
General Conditions
Revised: 10/19/2021
GC-66 of 75
17.1
ADDITIONAL DEFINITIONS
The definitions set forth in Section 2 and 15.1 above will apply to all Pre-Construction
Services Contracts.
17.2
GENERAL
17.2.1
CM@Risk must perform the Services required by, and in accordance with the Contract
Documents and as outlined in Exhibit A of the Contract to the satisfaction of the
Project Manager, exercising the degree of care, skill, diligence and judgment a professional
construction manager experienced in the performance of such services for construction
and/or facilities of similar scope, function, size, quality, complexity and detail to the
Project in urban areas throughout the United States, would exercise at such time, under
similar conditions. CM@Risk must, at all times, perform the required services consistent
with sound and generally accepted engineering principles and construction management
and construction contracting practices.
17.2.2
As a participating member of the Project Team, CM@Risk must provide to City and Design
Professional a written evaluation of City’s Project Program and budget, each in terms of
the other, with recommendations as to the appropriateness of each. CM@Risk must
prepare a Baseline Cost Model that validates City’s budget. The Baseline Cost Model must
include all assumptions and basis of estimates in enough detail so that the Project Team
can compare future detail estimates to the Baseline Cost model for variances. City and
Design Professional will provide all the reasonably required data that is available in
order to reach agreement between the team members that the Baseline Cost Model is an
accurate projection of the costs of the Project.
17.2.3
CM@Risk must attend Project Team meetings, which may include, but are not limited to,
bi- weekly Project management meetings, Project workshops, special Project meetings,
construction document rolling reviews, public meetings and partnering sessions. CM@Risk
attendance at design or other meetings in which CM@Risk is provided the opportunity but
does not actively participate and/or is not properly prepared is not acceptable. Repeated
instances of non-participation and/or lack of preparedness will be grounds for termination
of CM@Risk Contract for default.
17.2.4
CM@Risk must provide Pre-Construction Services, described herein, in a timely manner
and consistent with the intent of the most current Drawings and Specifications. CM@Risk
must promptly notify City in writing whenever CM@Risk determines any Drawings or
Specifications are inappropriate for the Project and/or cause changes in the scope of Work
that deviates more than the allowed contingencies within the Baseline Cost Model or
requires an adjustment in the Baseline Cost Model, Detailed Cost Estimate, Detailed
Project Schedule, GMP Proposals and/or in the Contract Time for the Work, to the extent
such as established.
17.2.5
CM@Risk when requested by City, must attend, make presentations and participate as may
be appropriate in public agency and or community meetings, relevant to the Project.
CM@Risk must provide drawings, schedule diagrams, budget charges and other materials
describing the Project when their use is required or appropriate in any such public agency
meetings.
17.2.6
Ownership of Work Product. All Work Product prepared or otherwise created in connection
with the performance of this Contract, including the Work, are to be and remain the property
General Conditions
Revised: 10/19/2021
GC-67 of 75
of City. For purposes of this provision, “Work Product” will include all designs, drawings,
plans, specifications, ideas, renderings and other information or material, in whatever
form created (e.g., electronic or printed) and in all media now know or hereinafter created.
All Work Product will be considered Work Made for Hire as defined in the United States
Copyright Act 17 U.S.C.
§101 (Copyright Act). If for any reason any such Work is found not to be a work for
hire, Contractor hereby transfers and assigns ownership of the copyright in such Work to
City. The rights in this Section are exclusive to City in perpetuity.
17.2.7
CM@Risk represents to City in completing Pre-Construction Services and providing the
reports
and analysis required thereunder, that Work can be properly and timely
constructed within the GMP Proposal, if accepted. CM@Risk does not assume any design
responsibilities unless specifically called for in the scope of work, but CM@Risk will be
responsible for their errors, omissions or inconsistencies included in the Work.
17.3
DETAILED PROJECT SCHEDULE
17.3.1
The fundamental purpose of the Detailed Project Schedule is to identify, coordinate and
record the tasks and activities to be performed by all of the Project Team members and
then for the Project Team to utilize that Deliverable as a basis for managing and
monitoring all member’s compliance with the schedule requirements of the Project.
Each Project Team member is responsible for its compliance with the Detailed Project
Schedule requirements. CM@Risk must, however, develop and maintain the Detailed
Project Schedule on behalf of and to be used by the Project Team based on input from the
other Project Team members. The Baseline Project Schedule must be developed as part
of the Baseline Cost Model. The Detailed Project Schedule must use the Critical Path
method (“CPM”) technique, unless required otherwise, in writing by City. CM@Risk must
use scheduling software acceptable to City to develop the Detailed Project Schedule.
The Detailed Project Schedule must be presented in graphical and tabular reports as
agreed upon by the Project Team. If Project phasing as described below is required, the
Detailed Project Schedule must indicate milestone dates for the phases once
determined. As part of construction phase, City may require CM@Risk to prepare a
“resource loaded” schedule for all work, including work performed by Subcontractors,
detailing each of the project tasks and the required/anticipated number of personnel per
day for each task. CM@Risk must also indicate on the schedule its ability to meet said
required/anticipated personnel requirements.
17.3.2
CM@Risk must include and integrate in the Detailed Project Schedule the services and
activities required of City, Design Professional and CM@Risk including all construction
phase activities based on the input received from City and the Design Professional.
The Detailed Project Schedule must define activities as determined by City to the extent
required to show: (a) the coordination between preliminary design and various pre-
construction documents, (b) any separate long-lead procurements, (c) any permitting
issues, (d) any land, right-of-way, or easement acquisition, (e) bid packaging strategy and
awards to Subcontractors and Suppliers, (f) major stages of construction, (g) start-up and
commissioning, and (h) occupancy of the completed Work by City. The Detailed Project
Schedule must include by example and not limitation, proposed activity sequences and
durations for design, procurement, construction and testing activities, milestone dates for
actions and decisions by the Project Team, preparation and processing of shop drawings
and samples, delivery of materials or equipment requiring long-lead time procurement (if
any), milestone dates for various construction phases, Total Float for all activities to the
General Conditions
Revised: 10/19/2021
GC-68 of 75
extent authorized by City, relationships between the activities,
City’s occupancy
requirements showing portions of the Project having occupancy priority, and proposed
dates for Final Acceptance.
17.3.3
A Baseline Project Schedule must be initiated with the project Baseline Cost Model and
agreed to by the project team at the same time. CM@Risk must update and maintain a
detailed Project Schedule throughout pre-construction such that it will not require major
changes at the start of the construction phase to incorporate CM@Risk’s plan for the
performance of the construction phase Work. CM@Risk must provide updates and/or
revisions to the Detailed Project Schedule for use by the Project Team, whenever required,
but no less often than at the Project Team meetings. CM@Risk must include with such
submittals a narrative describing its analysis of the progress achieved to-date vs. the
Baseline Project Schedule, including any concerns regarding delays or potential delays, and
any recommendations regarding mitigating actions.
17.3.4
If phased construction is deemed appropriate at the time of developing the Baseline Cost
Model or during the development of the Detailed Project Schedule, and City approves,
CM@Risk must review the design and make recommendations regarding the phased
issuance of Construction Documents to facilitate phased construction of the Work, with
the objective of reducing the Project Schedule and/or Cost of the Work. CM@Risk must take
into consideration such factors as natural and practical lines of work severability,
sequencing effectiveness, access and availability constraints, total time for completion,
construction market conditions, labor and materials availability, and any other factors
pertinent to saving time and cost.
17.3.5
Long Lead Time Items. As part of developing the Detailed Project Schedule, CM@Risk must
identify all long lead time materials, fabrications, equipment, or other items which may
impact the Project Schedule and may require early action on the part of the Project Team.
Dates for selecting and ordering long lead time items will be included and highlighted
in the Detailed Project Schedule
17.3.6
Equipment Plan. Contractor must develop an Equipment Plan that addresses all rental
and owned equipment, regardless of whether such equipment will be provided by
CM@Risk or subcontractor(s), that will be necessary to construct the Project and the cost
of which will be included as a Cost of the Work in the GMP Proposal. The Equipment Plan
will seek to minimize the cost of the equipment to City and maximize the efficient and
coordinated use of the equipment for completion of the Project. The Equipment Plan will
not only include the costs and allowable lease rates for the equipment, but will also include
an equipment schedule that will be incorporated into the Detailed Project Schedule and the
Schedule of Values submitted with the GMP Proposal.
17.4
DESIGN DOCUMENT REVIEWS
17.4.1
CM@Risk must evaluate periodically the availability of labor, materials/equipment, cost-
sensitive aspects of the design; and other factors that may create an unacceptable variance
to the Baseline Cost Model and/or Baseline Project Schedule.
17.4.2
CM@Risk must recommend, in conjunction with the Project Team, those additional surface
and subsurface investigations that, in its professional opinion, are required to provide the
necessary
information for CM@Risk to construct the Project.
These additional
investigations, if agreed to
be necessary by the Project Manager and the Design
Professional, will be acquired by City and copies of the reports will be provided to CM@Risk.
General Conditions
Revised: 10/19/2021
GC-69 of 75
17.4.3
CM@Risk must meet with the Project Team as required to review designs during their
development. CM@Risk must familiarize itself with the evolving documents through
pre-
construction. CM@Risk must proactively advise the Project Team and make
recommendations on factors related to construction costs, and concerns pertaining to the
feasibility and practicality
of any proposed means and methods, selected materials,
equipment and building systems, and, labor and material availability. CM@Risk must
furthermore advise the Project Team on proposed site improvements, excavation and
foundation considerations, as well as, concerns that exist with respect to coordination of
the Drawings and Specifications. CM@Risk must use established value analysis principles
in recommending cost effective alternatives.
17.4.4
CM@Risk must routinely conduct constructability and bid-ability reviews of the Drawings
and Specifications as necessary to satisfy the needs of the Project Team. The reviews must
attempt to identify all discrepancies and inconsistencies in the Construction Documents
especially those related to clarity, consistency, completeness and coordination of Work of
Subcontractors and Suppliers.
17.4.4.1
CM@Risk must evaluate whether: (a) the Drawings and Specifications are configured to
enable efficient construction; (b) design elements are standardized; (c) construction
efficiency
is
properly
considered
in
the
Drawings
and
Specifications;
(d)
module/preassembly design is prepared to facilitate fabrication, transport and installation;
(e) sequences of Work required by or inferable from the Drawings and Specifications are
practicable; (f) the design has taken into consideration efficiency issues concerning access
and entrance to the site, laydown and storage
of materials, staging of site facilities,
construction parking, and other similar pertinent issues; and (g) the design maintains
continued operation of the existing City systems and maintains traffic on adjacent
roadways. CM@Risk must also review the Drawings and Specifications to ensure that what
is depicted therein can be constructed as designed and must promptly inform the Project
Team of any issues.
17.4.4.2
CM@Risk must check cross-reference and complementary Drawings and sections within
the Specifications and in general evaluate whether: (a) the Drawings and Specifications
are sufficiently clear and detailed to minimize ambiguity and to reduce scope interpretation
discrepancies; (b) named materials and equipment are commercially available and are
performing well, or otherwise, in similar installations; (c) Specifications include alternatives
in the event a requirement cannot be met in the field; and (d) in its professional opinion, the
Project is likely to be subject to Differing Site Conditions.
17.4.4.3
The results of the reviews must be provided to Project Team in formal, written reports
clearly
identifying all reviewed documents and the discovered discrepancies and
inconsistencies in the Drawings and Specifications with notations and recommendations
made on the Drawings, Specifications and other documents. CM@Risk must meet with
Project Team to discuss any findings and review reports.
17.4.4.4
CM@Risk’s reviews must be from a Contractor’s perspective, and though it will serve to
eliminate/reduce the number of RFIs) and changes during the construction phase,
responsibility for the Drawings and Specifications will remain with the Design Professional
and not CM@Risk.
17.4.5
It is CM@Risk’s responsibility to assist the Design Professional in ascertaining that, in
CM@Risk’s professional opinion, the Construction Documents are in accordance with
General Conditions
Revised: 10/19/2021
GC-70 of 75
applicable Laws, Regulations, or Legal Requirements, building codes, sound engineering
principle’s rules and regulations. If CM@Risk recognizes that portions of the Construction
Documents are at variance with applicable laws, statutes, ordinances, building codes,
sound engineering principle’s rules and regulations, it must promptly notify the Project Team
in writing, describing the apparent variance of deficiency. However, the Design Professional
is ultimately responsible for the compliance of the Drawings and Specifications with those
laws, statutes, ordinances, building codes, rules and regulations.
17.4.6
The Project Team will routinely identify and evaluate using value analysis principles and
alternate systems, approaches, design changes that have the potential to reduce Project
costs while still delivering a high quality and fully functional Project consistent with
the Project Program. If the Project Team agrees, CM@Risk in cooperation with the Design
Professional, will perform a cost/benefit analysis of the alternatives and submit such in
writing to the Project Team. City, through the Project Manager, will direct which alternatives
will be incorporated into the Project. The Design Professional will have full design
responsibility for the review and incorporation of CM@Risk suggested alternatives into
the Drawings and Specifications. CM@Risk must analyze the costs and schedule impacts of
the alternatives against the Baseline
Cost Model and Schedule and provide a
recommendation for the Project Team’s consideration and City’s approval prior to the
establishment of the GMP.
17.5
BASELINE COSTS MODEL, DETAILED COST ESTIMATES, AND SCHEDULE OF VALUES
17.5.1
At the conclusion of the Master Planning and Programming, if required, CM@Risk will
review all available information regarding the design and scope of the Project using
CM@Risk’s experience in performing similar work, knowledge of similar projects and
current and projected construction costs and, based upon that review, must develop a
Baseline Cost Model for review by the Project Team and approval by City. Once approved
by City, the Baseline Cost Model will be continually referenced as detailed estimates are
created as the design progresses throughout Pre-Construction until the final GMP for the
entire Project is established. A final GMP for the entire Project must be established and
approved by City prior to the start of construction. It is the responsibility of CM@Risk
to ensure City has sufficient information to evaluate and approve a final GMP prior to
the time necessary to start construction so construction can be completed within the
Contract Time. The Project Detailed Cost Estimate will be the best representation from
CM@Risk of what the complete functional Project’s construction costs will be as indicated
by the most current available documents and will be constantly checked against the
Baseline Cost Model. CM@Risk must communicate to the Project Team and assumptions
made in preparing the Baseline Cost Model. The Baseline Cost
Model must support
CM@Risk’s Detailed Cost Estimates and may be broken down initially as dictated by the
available information, as required by City.
17.5.2
After receipt of the Design Professional’s most current documents from certain specified
pre- construction milestones, CM@Risk must provide a draft Detailed Cost Estimate
including a detailed written report detailing any variances to the Baseline Cost Model and
Baseline Project Schedule. The Design Professional and CM@Risk will reconcile any
disagreements on the estimate to arrive at an agreed upon Detailed Cost Estimate for the
construction costs based on the scope of the Project through that specified pre-
construction milestone. Pre-Construction milestones applicable to this paragraph are:
Master Planning and Programming, Schematic Design, 50% Design Development, 100%
Design Development, and 50% Construction Drawings, If no consensus is reached, City will
General Conditions
Revised: 10/19/2021
GC-71 of 75
make the final determination. If the Project Team requires additional updates of the
Detailed Cost Estimate beyond that specified in this paragraph, CM@Risk must provide the
requested information in a timely manner.
17.5.3
If at any point the Detailed Cost Estimate submitted to City exceeds the previously
accepted Baseline Cost Model or previously approved Detailed Cost Estimate agreed to as
set forth in Section 17.5.2 above, CM@Risk must make appropriate recommendations to
project Team on means/methods, materials, and or other design elements that it
believes will reduce the estimated construction costs, such that it is equal to or less than
the established Project Team’s Baseline Cost Model.
17.5.4
Unless other levels of completion are agreed to in writing in the Construction Documents,
at 50% Construction Drawings and included with the associated report, CM@Risk must
also submit to the Project Team for review and approval a Schedule of Values that complies
with the following requirements. The Schedule of Values must be based on City standard
bid schedule and highlight significant variances from any previously submitted Schedule
of Values. The Schedule of Values must be directly related to the breakdowns reflected in
the Detailed Project Schedule and CM@Risk’s Detailed Cost Estimate. In addition, the
Schedule of Values must: (a) detail unit prices and quantity take-offs, (b) detail all other
contingencies and unit price Work shown and specified in the detailed design documents.
17.5.5
CM@Risk is to track, estimate/price and address the Project Team’s overall project cost issues
that arise outside of the Baseline Cost Model and the latest approved Detailed Cost
Estimate such as: City generated changes, Project Team proposed changes, alternate
system analysis, constructability items and value engineering analysis. The system used
to implement this process will be referred to as the Design Evolution Log. This is to be
addressed between the Baseline Cost Model and the Master Planning and Programming
Detailed Cost Estimate, and then (unless other levels of completion are agreed to in writing
in the Construction Documents) between the Detailed Cost Estimates for each of the pre-
construction milestones thereafter, Schematic Design, 50% Design Development, 100%
Design Development, and 50% Construction Documents, and the bid packages for all
Phases.
17.5.6
Upon request by City, CM@Risk must submit to City a cash flow projection for the Project
based on the current updated/revised Detailed Project Schedule and the anticipated level of
payments for CM@Risk during the design and construction phases. In addition, if requested
by City and based on information provided by City, CM@Risk must prepare a cash flow
projection for the entire Project based on historical records for similar types of projects
to assist City in the financing process.
17.5.7
Construction Water. CM@Risk must estimate the quantity of water to be used and include
the cost thereof in each Detailed Cost Estimate and GMP Proposal provided by City.
17.6
SUBCONTRACTOR AND MAJOR SUPPLIER SELECTIONS
17.6.1
There are two ways to select Subcontractors and major Suppliers prior to submission of a
GMP Proposal: (1) qualifications-based selection; or (2) a combination of qualifications
and price. Except as noted below, the selection of Subcontractors/Suppliers is the sole
responsibility of CM@Risk. In any case, CM@Risk is solely responsible for the performance
of the selected Subcontractors/Suppliers, and for compliance with the requirements of
Title 34 of the Arizona Revised Statutes in the selection of a Subcontractors/Suppliers,
to the extent applicable. CM@Risk must comply with its Subcontractor Selection Plan
General Conditions
Revised: 10/19/2021
GC-72 of 75
submitted with its Statement of Qualifications.
17.6.2
City may approve the selection of a Subcontractor(s) or Suppliers(s) based only on their
qualifications when CM@Risk can demonstrate it is in the best interest of the Project. All
Work that is performed, after such a qualifications-based selection, for a price that is
negotiated by CM@Risk will be billed in accordance with the GMP for actual costs and may
be subject to audit by City.
17.6.2.1
Qualifications based selection of a Subcontractor(s)/Supplier(s) should only occur prior to
the submittal of the GMP Proposal.
17.6.2.2
If a Subcontractor/Supplier selection plan was submitted and agreed to by City, CM@Risk
must apply the plan in the evaluation of the qualifications of a Subcontractor(s) or
Supplier(s) and provide City with its review and recommendations.
17.6.2.3
CM@Risk must receive written City approval for each selected Subcontractor(s) and
Supplier(s).
17.6.2.4
CM@Risk must negotiate costs for services/supplies from each Subcontractor/Supplier
selected under this method.
17.6.3
All Work must be competitively bid unless a Subcontractor or Supplier was selected pursuant
to Section 17.6.2 above.
17.6.3.1
CM@Risk must develop Subcontractor and Supplier interest, submit the names of a
minimum of three qualified Subcontractors or Suppliers for each trade in the Project for
approval by City and solicit bids for the various Work categories. If there are not three
qualified Subcontractors/Suppliers available for a specific trade or there are extenuating
circumstances warranting such, CM@Risk may request approval by City to submit less
than three names. Without prior written notice to City, no change in the recommended
Subcontractors/Supplies will be allowed.
17.6.3.2
If City objects to any nominated Subcontractor/Supplier or to any self-performed Work for
good
reason, CM@Risk must nominate a substitute Subcontractor/Supplier that is
acceptable to City.
17.6.3.3
CM@Risk must distribute Drawings and Specifications, and when appropriate, conduct a
Pre- Bid Conference with prospective Subcontractors and Suppliers.
17.6.3.4
If CM@Risk desires to self-perform certain portions of the Work, it must request to be one of
the approved Subcontractor bidders for those specific bid packages. CM@Risk’s bid will
be evaluated in accordance with the process identified below. If events warrant and City
concurs that it is necessary in order to ensure compliance with the Project Schedule
and/or the most recent Detailed Cost Estimate, CM@Risk may be authorized to self-
perform Work without bidding or rebidding the Work. When CM@Risk self-performs work
without bidding, only the actual costs associated with performing the Work in accordance
with the approved GMP will be billed and may be subject to audit by City.
17.6.3.5
CM@Risk must receive, open, record and evaluate the bids; provided, however, that if
CM@Risk or one of its affiliates is bidding to self-perform the Work that is the subject of the
bid, then the bids must be received, opened, recorded and evaluated by Project Manager
instead of CM@Risk. Bids for each category of Work must be opened and recorded at a
pre-determined time. The apparent low bidders must be interviewed to determine the
General Conditions
Revised: 10/19/2021
GC-73 of 75
responsiveness of their proposals. In evaluating the responsiveness of bid proposals
CM@Risk, in addition to bid price, may consider the following factors: past performance
on similar projects, qualifications and
experience of personnel assigned, quality
management plan, approach or understanding of the
Work to be performed, and
performance
schedule
to
complete
the
Work.
The
final
evaluation
of
Subcontractor/Supplier bids must be done with Project Manager in attendance to observe
and witness the process. CM@Risk must resolve any Subcontractor/Supplier bid withdrawal,
protest or disqualification in connection with the award at no increase in the Cost of Work.
17.6.4
CM@Risk will be required to prepare two different reports on the subcontracting process.
17.6.4.1
Within fifteen days after each major Subcontractor/Supplier bid opening process;
CM@Risk must prepare a report for City’s review and approval identifying the
recommended Subcontractors/Supplier for each category of Work. The report must detail:
(a) the name of the recommended Subcontractor/Supplier and the amount of the
Subcontractor/Supplier bid for each sub-agreement; (b) the sum of all recommended
Subcontractor/Supplier bids received; (c) and trade work and its cost that CM@Risk intends
to self-perform, if any.
17.6.4.2
Upon completion of the Subcontractor/Supplier bidding process, CM@Risk must submit
a summary report to City of the entire Subcontractor/Supplier selection process. The report
must indicate, by bid process, all Subcontractors/Suppliers contacted to determine
interest, the Subcontractors/Suppliers solicited, the bids received and costs negotiated,
and the recommended Subcontractors/Suppliers for each category of Work.
17.6.5
The approved Subcontractors/Suppliers will provide a Schedule of Values with their bid
proposals, which will be used to create the overall Project Schedule of Values.
17.6.6
If after receipt of sub-bids or after award to Subcontractors and Suppliers, City objects to
any nominated Subcontractor/Supplier or to any self-performed Work without any
reasonable basis, CM@Risk must nominate a substitute Subcontractor or Supplier,
preferably if such option is still available, from those who submitted Subcontractor bids
for the Work affected. Once such substitute Subcontractors and Suppliers are consented
to by City, CM@Risk’s proposed GMP for the Work or portion thereof must be
correspondingly adjusted to reflect any higher or lower costs form any such substitution.
17.7
GMP PROPOSAL
17.7.1
When a GMP Proposal is submitted for a phase of the Work, the GMP will have a Detailed Cost
Estimate of the Costs of the Work (as set forth in Section 15.2) in each phase of the Work
that is being proposed plus the current estimate for all other Work. City will not approve
the GMP for the phase of work without a total estimate for the complete Project. City may
request a GMP Proposal for all or any portion of the Project and at any time during pre-
construction. Any GMP Proposals submitted by CM@Risk must be based on and consistent
with Baseline Cost Model and the current update/revised Detailed Cost Estimate at the
time of the request and include any clarifications or assumptions upon which the GMP
Proposal(s) are based.
17.7.2
A GMP Proposal for the entire Project will be the sum of the Cost of the Work, CM@Risk Fee,
and General Conditions Cost. CM@Risk guarantees to complete the Project at or less than
the final GMP Proposal amount plus approved Change Orders. CM@Risk will be responsible
for any costs for expenses that would cause the Cost of the Work actually incurred,
General Conditions
Revised: 10/19/2021
GC-74 of 75
including the Construction Fee and General Conditions Costs, to exceed the GMP.
17.7.3
CM@Risk must prepare its GMP Proposal in accordance with City’s request for GMP Proposal
requirements based on the most current completed Drawings and Specifications at that
time, which unless otherwise directed by City in writing, will be at 100% Construction
Drawings. CM@Risk must mark the face of each document of each set upon which its GMP
Proposal is based.
These documents must be identified as the GMP Plans and
Specifications. CM@Risk must send one set of those documents to the Project Manager,
keep one set and return the third set to the Design Professional.
17.7.4
An updated/revised Detailed Project Schedule, Equipment Plan, and Schedule of Values
must be included in any GMP Proposal(s), all of which must reflect the GMP Plans and
Specifications the Detailed Project Schedule must be shown in relationship to the Project
Schedule and identify any variance to the Baseline Project Schedule. Any such Detailed
Project Schedule updates/revisions must continue to comply with the requirements of
Section 17.3.1 through 17.3.5.
17.7.5
GMP Proposals(s) Review and Approval
17.7.5.1
CM@Risk must meet with the Project Team to review the GMP Proposal(s) and the written
statement of its basis. In the event the Project Team discovers inconsistencies or
inaccuracies
in the information presented, CM@Risk must make adjustments as
necessary to the GMP Proposal.
17.7.5.2
If during the review and negotiation of GMP Proposals design changes are required, City
may authorize and cause the Design Professional to revise the GMP Plans and Specifications
to the extent necessary to reflect the agreed-upon assumptions and clarifications contained
in the final approved GMP Proposal. Such revised GMP Plans and Specification will be
furnished to CM@Risk. CM@Risk must promptly notify the Project Team in writing if any
such revised
GMP Plans and Specifications are inconsistent with the agreed upon
assumptions and clarifications.
17.7.6
All portions of or items comprising the GMP Proposal are subject to audit by City, as
deemed appropriate by City, including, without limitation, any based upon unit prices or
Work to be self- performed by CM@Risk, or its affiliates.
17.8
PAYMENT PROCEDURE FOR PRE-CONSTRUCTION SERVICES
17.8.1
Requests for monthly payments by CM@Risk for Pre-Construction Services must be
submitted monthly and must be accompanied by a progress report, detailed invoices
and receipts, if applicable. Any requests for payment must include, as a minimum, a
narrative description of the tasks accomplished during the billing period, a listing of any
Deliverables submitted, and copies of any Subconsultants’ requests for payment, plus
similar narrative and listings of Deliverables associated with their Work. Payment for
services negotiated as a lump sum will be made in accordance with the percentage of work
completed during the preceding month.
17.8.2
In no event will City pay more than seventy-five (75%) of the Contract Price until acceptance
of ALL Pre-Construction Services and award of the final approved Construction Services
Contract for the entire Project by City Council. If CM@Risk does not prepare a GMP
Proposal that is acceptable to City, or the GMP Proposal exceeds the City’s Construction
Budget, then CM@Risk understands and acknowledges that it will forfeit any right to
General Conditions
Revised: 10/19/2021
GC-75 of 75
receive the 25% of the Contract Price being retained by City.
17.8.3
CM@Risk agrees that no charges or claims for costs or damages of any type will be made by
it for any delays or hindrances beyond the reasonable control of City during the progress of
any portion of Pre-Construction Services specified in this Contract. Such delays or
hindrances, if
any, will be solely compensated for by an extension of time for such
reasonable period and may be mutually agreed between the parties. It is understood
and agreed, however, that permitting CM@Risk to proceed to complete any such Services,
in whole or in part after the date to which the time of completion may have been extended,
will in no way act as a waiver on the part of City of any of their respective legal rights herein.
17.8.4
No compensation to CM@Risk will be allowed contrary to Article I, Chapter I, Title 34 of the
Arizona Revised Statutes.
17.8.5
If any service(s) executed by CM@Risk is abandoned or suspended in whole or in part, for
a period of more than 180 days through no fault of CM@Risk, CM@Risk is to be paid for
the services performed prior to the abandonment or suspension.
17.9
SURVIVAL OF THE DESIGN SERVICES CONTRACT, DUTIES, OBLIGATIONS AND
WARRANTIES
If the GMP Proposal is accepted by City and a Construction Contract is entered into
between City and CM@Risk, the duties, obligations and warranties of CM@Risk under the
Pre- Construction Services Contract survive and are incorporated into the resulting
Construction Contract.
App’d 1/7/22
APP-1 of 33
General Conditions Appendices
SECTION 15 – APPENDICES
The following Appendices attached hereto are referenced in the General Conditions and
are incorporated herein.
Appendix 1 – Policy Statement for Calculating Delays and Damages
Appendix 2 – Cost Reduction Incentive Proposals for Design Bid Build Contracts
Appendix 3 – Contractor’s Affidavit Regarding Settlement of Claims
Appendix 4 – Forms of Performance Bond
Appendix 5 – Forms of Payment Bond
Appendix 6 – Dispute Resolution
Appendix 7 – Certificate of Completion
Appendix 8 – Construction Sign Detail
Appendix 9 – Cost of the Work (Applicable solely to Construction Manager at Risk and
Job Order Contracting)
Appendix 10 Landscape Establishment Period
App’d 1/7/22
APP-2 of 33
General Conditions
Appendix 1
CALCULATING DELAYS AND DAMAGES
The purpose of this policy statement is to establish guidelines and procedures for negotiation
between the Contractor and City of Chandler relating to compensation for delays pursuant to
Arizona Revised Statutes (A.R.S.) 34-221(F). This policy statement contains notice requirements in
addition to those set forth in the Contractor Documents, and will be the Contract Provision
contemplated by that statute.
NOTE: As used herein, the term “Engineer” will refer to the City of Chandler City Engineer or
his/her designated representative. Nothing in this Policy Statement will be construed to void any
provision in the Contract which requires timely notice of delays or provides for arbitration or
any other procedure for settlement or provides for liquidated damages.
I.
TYPES OF DELAYS:
For the purposes of this document, there are essentially four types of delays encountered by
City of Chandler Construction Contractors; excusable/compensable, excusable/non-
compensable, non- excusable, and concurrent. Only delays that extend Contract
Completion Time set forth in the Contract Document will be considered for issues
relating to Contract extensions or additional compensation. All other delays are
considered to be activity delays and do not entitle the Contractor to either time
extensions or additional compensation. Contract Completion Time will be defined as the
date set forth in Maricopa Association of Governments (MAG) Uniform Standard Specification
Section 101 and as may be modified by the Contract Documents.
A.
Excusable/Compensable:
These are delays caused solely by the City’s actions or inactions, are unreasonable
under the circumstances, and which were not within the contemplation of the
parties to the Contract at or prior to the time of execution of the Contract.
Since the Contractor presumably has no control over the events causing the delay,
he may be entitled to both contract time extensions and additional compensation for
delay damages. Further, he/she may be entitled to additional compensation from
the impact of that delay on other work. Examples of excusable/compensable (E/C)
delays include: failure to properly locate an underground City-owned utility within
2 feet of the actual location; failure to relocate City-owned utilities far enough in
advance of construction in an area where the Contractor is scheduled to work
that it delays start or completion of the Contractor’s regularly scheduled work;
failure to provide City-furnished equipment or materials in a timely manner if
required by the Contract; failure to acquire necessary Right-of-Way or Public Utility
Easements prior to the Contractor beginning Work in the area; failure to timely return
Shop Drawings or other Contract Submittals in accordance with the Contract;
unreasonable delay by the City in making decisions which affect critical activities;
surveying errors when the City is contractually responsible for providing Project
Surveying. This list is not meant to be all inclusive, but is intended merely as examples
of the type of City action or inaction which can result in a Contractor’s claim for
additional time and compensation.
App’d 1/7/22
APP-3 of 33
General Conditions
Appendix 1
B.
Excusable/Non-compensable:
These are delays over which neither the City nor the Contractor had control. Since
both parties to the Contract have been potentially damaged by the delay, but
neither have caused it, only Time Extensions are warranted. Examples of excusable,
non-compensable (E/N) delays include: unusually severe weather; fire; acts of God;
failure of non-City owned utilities (SRP, CenturyLink, Cable TV, Southern Pacific
Railroad, and Southwest Gas, etc.) to properly or timely locate accurately; failure of
non-City owned utilities to relocate in advance of construction; the voluntary or
involuntary filing for Bankruptcy protection by a Supplier or Subcontractor which
causes the Supplier/Subcontractor to fail to meet a contractual deadline provided
the Contractor can provide documentation that he/she executed the required
Purchase Orders/Subcontract Agreements and received delivery schedules which,
if met, would have eliminated the delay; delays as a result of an incomplete
shutdown of a City or non-City owned utility main (the City does not guarantee a
complete shutdown). This list also is not necessarily all inclusive but merely
indicative of type and class of E/N delays.
C.
Non-excusable/Non-compensable:
These are delays caused by the actions or inactions of Contractor or an officer,
employee, agent, Subcontractor, Supplier or any other party for whom the
Contractor is responsible. Since the Contractor has assumed responsibility for the
risks associated with the events that caused the delay, he/she are not entitled to
either time extensions or monetary delay damages. All non-excusable delays are
also non-compensable. Examples of non- excusable, non-compensable (N/N)
delays include: failure to perform by the Contractor, its Subcontractors and/or
Suppliers (except as noted in section I.B above); failure to provide adequate
labor,
materials,
and/or
equipment
on
the
Project;
failure
to
perform
contractually-required coordination with utilities, agencies and other Contractors;
failure to notify the Engineer, in writing, of delay impacts within two working days,
as required by MAG 104.2.3, or the next work day, as required by MAG 109.8.2;
failure to timely submit Shop Drawings; failure to pothole or otherwise visually locate
utilities sufficiently ahead of the Work to allow the Engineer to direct corrective
action when necessary; delays due to retesting of previously failed work, re-
inspection, and/or restaking resulting from faulty workmanship, poor quality
control, or lack of compliance with Contract Specifications. Again, this list is not
necessarily all inclusive.
D.
Concurrent:
When two or more delays occur simultaneously or overlap, each delay is
analyzed separately to determine its impact on the overall project completion date
based on when that delay started. Once again, only those delays which actually
extend the contract completion time are considered as delays. The concurrent
delay is considered an additional delay only to the extent it prolongs the delay to
the Contract Completion Time beyond the date that the one it is concurrent with
had already delayed that date. For example, if two delays are concurrent, and one
is five days long and the second is seven days long, the second concurrent delay will
App’d 1/7/22
APP-4 of 33
General Conditions
Appendix 1
only extend the Contract Completion Time by two days. The same method of analysis
is used when there are multiple concurrent delays. Only those extending the Project
Completion Date are considered to be delays for the purposes of this policy. The
portion of each concurrent delay that delays the completion of the work is classified
in the same manner as described previously for individual delays and being either
E/C, E/N or N/N.
An example of a concurrent delay is where the City delays furnishing material,
but the Contractor could not have installed it anyway due to unusually severe
weather. The effect of the first delaying activity will extend for the full duration
and will be considered controlling on the Contractor’s schedule. A subsequent,
concurrent delay will thereafter only be considered to effect the project completion
(if at all) once the first delaying activity has ceased to impact the project completion.
In this case, if the unusually severe weather continued and delayed the work after
the material was delivered, the first portion of the delay would be classified E/C
(delay for material) and the second as E/N (delay due to unusually severe weather).
Using the procedure set forth above, the entire concurrent portion would be
considered E/C as shown in the chart which follows.
Example of a Concurrent Delay:
E/C Delay
E/N Delay
City Related Material Delay
Rain Delay
II.
ANALYZING THE DELAY:
The Contractor must provide all documents required or requested by the Engineer to analyze the
delay(s). It is important to understand that, prior to the delay analysis, delays and their impacts are
alleged issues. The information the Contractor provides will be compared with the Inspector’s Daily
Log, Schedules and other available Project information and together they will support or refute that
delays occurred and, if so, how they impact other work and the overall project completion. The
Contractor’s delay in providing these documents will be considered prima facie evidence that either
the delay did not occur or it did not impact the Project Completion Date and any claim for time
extension or damages will be denied.
The Engineer will accept delay analyses in CPM format, as these may demonstrate to his/her
satisfaction whether or not Project Completion has been impacted by a specific event. If the
Contractor chooses not to use CPM scheduling procedures, then the burden will be on the
Contractor to prove to the Engineer’s satisfaction that the Project Completion has been
impacted. The procedures below assume that the Contractor is using CPM scheduling methods.
App’d 1/7/22
APP-5 of 33
General Conditions
Appendix 1
As a minimum the Contractor must provide the following materials to the Engineer:
A.
As-Planned Schedule. The initial construction schedule, required by the Contract
Documents, will be considered the baseline schedule. It is to the Contractor’s
advantage that the As-Planned (baseline) Schedule be as detailed as possible in
order for delays, as they occur, to be incorporated into the schedule in
representative locations. It is also to the Contractor’s advantage to use a computer
software program to generate the schedule since updated schedules are required
monthly by the Contract Documents and since updated schedules are required
to support delays and requests for additional compensation for delays. The As-
Planned (baseline) Schedule must be presented in network format which clearly
shows the interrelationships of the activities. The Contractor must also provide a
printout of the activities showing early start, early finish, late start, late finish,
duration and float. The activity list printout must also indicate predecessor and
successor activities.
B.
As-Built Schedules. The as planned (baseline) schedule must be updated with
complete progress-to-date information (actualized) up to the date of the start of the
alleged delay. Each updated schedule will serve as the as-built schedule for analyzing
the alleged delay and provide a new baseline as-planned schedule for the next delay.
This process must be repeated for each alleged delay as it occurs. In updating the
baseline schedule, the alleged delay must be treated as an activity and inserted into
the schedule as a predecessor to the impacted activity (ies). When an activity that
has already started is impacted, it is preferable to divide this activity into two
parts and show the impact affecting the second part. For schedules which
incorporate a time line (or data date), the delay activity must be inserted at the time
it actually occurred. Some software scheduling programs have a PAUSE-RESUME
feature that can be used to facilitate the requirements. The updated schedule must
also be accompanied by a listing of activities as with the baseline schedule. This
activities list must contain the alleged delay as an activity showing the duration and
the activities which are predecessors and successors to it. When computer
generated schedules are used, the Contractor must provide, in electronic media
format, the complete data files for the updated schedule that included the delay
activity, preferably either in Suretrak or in Microsoft Project. Each electronic media
must contain a label identifying the Project name, Contractor’s name, program
name and version number, data date and project finish date.
C.
Other Documents: In order to determine the amount of the alleged delay and if
it is compensable, the Contractor must provide all backup documentation relevant to
the issue and as required by the Engineer. This documentation must include copies
of such items as: purchase orders; delivery schedules; correspondence; memoranda
of telephone calls; force account daily worksheets (initialed by the Inspector);
payroll data; estimating (bid) worksheets; and any other materials which may be
requested by the Engineer.
D.
Procedure: Only after receipt of sufficient documentation will the Engineer analyze
each alleged delay and determine if it is supported or refuted. If supported, the
Engineer will determine if it is excusable or non-excusable, compensable or non-
compensable. If the Engineer determines that the delay did not affect the Project
Completion, the as-planned schedule, which has been updated to the date of the
alleged delay, must be revised to indicate this. If the Engineer determines the delay
App’d 1/7/22
APP-6 of 33
General Conditions
Appendix 1
did occur but was N/N, then no time extension will be granted. It is imperative that
an actualized schedule be submitted as soon as the occurrence of the alleged delay
is known. In no event will the Contractor submit an actualized updated schedule
later than 60 days after the occurrence of the alleged delay becomes known.
If the Engineer determines the delay did occur and was excusable but, due to a
reason listed in section I.B. is non-compensable, he/she will determine the length
of the E/N delay and prepare a Change Order to add that time to the Contract. The
Engineer’s decision will be final.
If the Engineer determines the delay was excusable and compensable, he/she will
determine the length of the E/C delay and proceed to review the Contractor’s
damage calculations in accordance with Section III. The Engineer will check the
Contractor’s calculations, review the backup documentation provided, and prepare a
Change Order to cover both the additional compensation and the time extension.
The Engineer’s decision on both the time extension and additional compensation for
the delay will be final.
If the issue involves a concurrent delay, the Engineer will analyze available data
to determine the portions which are E/C, E/N, and/or N/N as described above. The
Engineer will proceed to determine the length of E/C delay and verify the Contractor’s
delay damage calculations, if any are provided. Upon completion of this review, the
Engineer will prepare a Change Order for the Contractor’s review and signature.
The Engineer’s decision regarding excusable delay and additional compensation for
the delay is final.
The amount of time the Engineer will require to analyze the alleged delay(s) will
depend upon the Engineer’s workload, the complexity of the delay analysis,
availability of supporting data, extent of cooperation by the Contractor, and other
factors beyond the Engineer’s control. It is entirely possible other delay(s) may
occur while the Engineer is analyzing particular claim for delay(s). The Engineer’s
failure to respond to the Contractor in a set period of time will not be used as the
basis for a further delay claim or as justification for extending and existing delay
claim. The time required for delay analysis by the Engineer will not be counted
against the time allotted for processing Final Payment as required by (MAG Section
109.7(B)) or the release of retention and Final Payment as prescribed by A.R.S.
Arizona Revised Statutes §34-221.
III.
CALCULATING MONETARY DELAY DAMAGES:
Additional compensation for delay, when authorized by the Engineer, will be calculated in accordance
with MAG Section 109.5 ACTUAL COST WORK with the following exceptions:
A.
No additional compensation or other monetary damages will be awarded or paid for
any loss of anticipated profits by the Contractor, Subcontractors or Suppliers.
B.
No additional compensation or other monetary damages will be awarded for home
office overhead or non-project general conditions of the Contractor, Subcontractors
or Suppliers.
C.
Equipment:
App’d 1/7/22
APP-7 of 33
General Conditions
Appendix 1
1.
Contractor-owned equipment rate calculations must be computed in
accordance with Section 109.04(D)(3), Arizona Department of Transportation
“Standard Specifications for Road and Bridge Construction,” 2008 or latest
edition and as modified herein. Year and regional adjustment factors must
be based on the most recent publications of the Rental Rate Blue Book for
Construction
Equipment, published
by
the
Equipment
Guide-Book
Company, San Jose, CA, same as provided by ADOT and in print as of the
date of alleged delay. In no event will the compensation for Contractor-
owned equipment exceed the purchase price, including tax, paid by the
Contractor for the equipment. Compensation will not be allowed for small
tools or equipment that show a daily equipment rental rate of less than $5.00
per day or for unlisted equipment that has a value of less than for
hundred dollars ($400.00).
2.
For leased and rented equipment or equipment not otherwise listed in the
Blue Book, rental contracts, or other supporting data will be used to establish
the hourly rate. No hourly operating expense will be allowed for delay on
standby equipment. In no case will equipment be considered for rental which
exceeds the hourly rate for the first eight hours and the daily rate
divided by eight for all additional hours as compared with similar
equipment listed in the Blue Book. The hourly standby rate must be
computed as the lesser of:
a.
Dividing the monthly invoice or rental value by 176 hours
per month when the equipment is utilized by the Contractor
for more than three weeks;
b.
Dividing the monthly invoice or rental value by 40 hours per
week when the equipment is utilized by the Contractor for
more than three days.
In no event will compensation be paid for delay at more than
8 hours per day or 40 hours per week.
3.
Except for vehicles used by supervisory personnel, all equipment will be paid
at the “standby” rate during the delay period.
4.
Equipment brought solely to mitigate the delay (such as pumps, light plants,
etc.) may be paid in accordance with ADOT section 109.04(D) (3).
5.
The Blue Book regional adjustment will apply in determining rental rates.
D.
Material:
Allowable material charges may include, in addition to material incorporated in the
work material used to mitigate the delay such as barricades, plates, shoring, cold
mix, etc. Except in emergencies the Contractor will not employ such material
without the prior written approval of the Engineer.
E.
Labor:
1.
Except for Supervisory Personnel (Superintendent, Project Engineer, and
Foremen), labor wages will not be paid after the first one-half day of
App’d 1/7/22
APP-8 of 33
General Conditions
Appendix 1
claimed delay or impact. It is expected the Contractor will reassign or
layoff unneeded employees.
2.
For Foreman wages to be included, that Foreman must have been
actively employed on the project prior to the commencement of the delay
and be directly responsible for the activity being delayed.
3.
Labor burden must be actual amounts incurred but must not exceed the
ADOT approved rate.
F.
All costs (equipment, material, and labor) must be substantiated by the City of
Chandler’s Daily Work Reports.
IV.
DOCUMENT REQUIRED FOR CLAIM ANALYSIS:
For purposes of reviewing the Contractor’s request for additional compensation, it will be required
that the Contractor submit the following listed information. Information requested must be prepared
on forms which are substantially similar to the City of Chandler’s Daily Work Report form, a copy of
which is attached as an exhibit.
A.
Labor:
For each employee, laborer, and foreman, for which compensation is requested:
Name, classification, dates of work performed, daily hours worked, total hours worked,
labor rates, labor burden rates, overtime or premium time charges. Further, the
Contractor must make available for inspection and copying to the Engineer the
following listed documentation.
1.
Certified payroll reports for the period of work claimed.
2.
Accounting of Fringe Benefits – certified by a CPA.
3.
Contractor’s and Subcontractor’s daily field reports and daily diaries.
B.
Materials:
For all materials for which compensation is requested, if any, total quantities of
materials, prices, extensions and transportation costs must be provided on a daily
basis. Further, the Contractor must make available for inspection and copying to the
Engineer the following listed documentation.
1.
Invoices for all materials incorporated.
2.
Weigh tickets.
3.
Purchase orders.
4.
Delivery schedules.
5.
Quotes or proposals from manufacturers or supplier.
6.
Freight bills, Bills of Lading, or other documentation to show transportation
costs.
7.
Restocking charges-invoices from vendor.
C.
Equipment:
For all equipment, the Contractor must provide the Engineer with the designation,
dates and hours of usage, dates and hours of standby, if any, daily hours, total hours,
App’d 1/7/22
APP-9 of 33
General Conditions
Appendix 1
rental rates and extension for each unit of equipment and machinery. Rental
rates will be as established in Section III. Further, the Contractor must make
available for inspection and copying to the Engineer the following listed
documentation.
1.
Owned:
a.
Purchase contracts(s).
b.
Depreciation schedule(s).
c.
Invoices for fuel, lube, repairs and other operating costs.
2.
Leased:
a.
Lease agreement with hourly rate, overtime rate, double shift rate, etc.
b.
Invoices or other documentation showing hours worked on a daily
basis.
D.
Subcontractors/Owner-Operators:
In the event the Contractor submits a claim which includes requests for
compensation for Subcontractors of Owner-Operators, the same information
requested of the Contractor must be provided by the Subcontractor/Owner-
Operator. Further, the Contractor must make available for inspection and copying
to the Engineer the following listed documentation.
1.
Bid/Estimate work sheets and/or spreadsheets.
2.
Subcontract Agreements or Agreements with Owner-Operator.
3.
All invoices and billing statements received from the Subcontractor/Owner-
Operator which relates to the amount requested.
E.
Miscellaneous:
Further, the Contractor must make available for inspection and copying to the
Engineer the following listed documentation.
1.
Evidence of payment for bonds and insurance premiums (MAG 109.5.6).
2.
Taxes – unless the Contractor can show otherwise, taxes are reimbursable at
65% of the total cost (less bonds and insurance).
V.
TIME LIMIT ON SUBMISSIONS OF CLAIM FOR DELAY OR IMPACT DAMAGES:
No claims for delay or impact damages will be considered or allowed more than 45 days after the
event or occurrence which the Contractor claims gives rise to the delay or impact. In no event will
a claim for delay or impact damages be considered after submission by the Contractor of the Final
Payment Request.
App’d 1/7/22
APP-10 of 33
General Conditions
Appendix 2
COST REDUCTION INCENTIVE PROPOSALS
FOR DESIGN BID BUILD CONTRACTS
The Contractor may submit to the Engineer proposals for modifying the Plans, Specifications, or
other requirements of the Contract for the sole purpose of reducing the total cost of Project
construction. The proposals must not impair in any manner the essential functions or characteristics
of the project; including but not limited to service life, economy of operations, ease of maintenance,
desired appearance, compatibility with existing or planned equipment, standardization of
systems, or design and safety standards.
It must not be inferred from this Policy that the Engineer is required to consider any proposal
submitted.
Submissions that propose changes in the basic design of a bridge, propose changes in pipe line
size, materials, bedding conditions, pipe specifications; or that propose any change in pavement
design will not be considered.
Proposals submitted pursuant to this Policy will be identified as Cost Reduction Incentive Proposals.
They must be submitted in writing and, at a minimum, contain the following.
1.
Complete the attached or similar cost reduction incentive proposal form.
2.
A description of both the existing Contract Requirements for performing the work
and the proposed changes.
3.
All Engineering Drawings and computations necessary for the thorough and
expeditious evaluation.
4.
An itemization of the existing Contract Requirements that must be changed if the
Proposal is adopted and a recommendation as to the manner in which the change
should be made.
5.
A detailed estimate of the cost of performing the Work under the existing Contract
and under the proposed changes, including the cost of developing and
implementing the changes.
6.
The Contract items affected by the proposed changes and any variations in
quantities resulting from the changes.
7.
An objective estimate of any effects the proposal will have on collateral cost to the
City, costs of related items, and cost of maintenance and operation.
8.
A statement as to the effect that the Proposal will have on the time for the
completion of the Project.
9.
A statement as to the time by which a Change Order adopting the Proposal must
be executed or when the Engineer must have given verbal approval.
Proposals will be processed expeditiously; however, the City will not be liable for any delay in acting
upon any Proposal nor for any failure to accept any Proposal pursuant to this Special Provision.
App’d 1/7/22
APP-11 of 33
General Conditions
Appendix 2
The Engineer will be the sole judge of the acceptability of a Proposal and of the estimated net
savings in construction costs from the adoption of all or any part of the Proposal. The Contractor
will be notified in writing by the Engineer as to whether his/her Proposal has been accepted. The
decision by the Engineer is final.
When the City deems such action to be appropriate, it reserves the right to require the Contractor to
share equally in the cost to the City of investigating, evaluating, and processing the proposal as a
condition for the consideration of such Proposal. Such cost must be shared whether the Proposal is
accepted or rejected. When such a condition is imposed, the City will estimate these costs and the
Contractor must indicate his acceptance thereof in writing. Such acceptance will authorize the City
to deduct the Contractor’s share of the costs from any monies due or that may become due to the
Contractor under the Contract.
If the Contractor’s Proposal is accepted in whole or in part, the necessary Contract Modifications
and Contract Price Adjustments will be affected by the execution of a Change Order which will
specifically state that it is executed pursuant to this Special Provision.
The Contractor must continue to perform the work in accordance with the requirements of the
Contract until a Change Order incorporating the Proposal has been executed or until he/she has
been given verbal approval by the Engineer that his/her Proposal has been accepted. If the
Change Order has not been executed or he/she has not been given verbal approval on or before the
date specified on the attached cost reduction incentive proposal form or on or before such other date
as the Contractor may have subsequently specified in writing, the Proposal may be deemed to be
rejected.
The executed Change Order will incorporate the changes in the Plans, Specifications, or other
requirements of the Contract which are necessary to permit the Proposal, or such part of it which has
been accepted, to be put into effect, and will include any condition – upon which the City’s approval
thereof is based, if such approval is conditional. The executed Change Order may also extend
the time for the completion of the Contract if such an extension has been deemed to be
warranted by the Engineer as a result of his evaluation of the Proposal.
The executed Change Order will also establish the estimated net savings in the cost of performing
the Work attributable to the Proposal effectuated by the Change Order. In determining the net
savings, the right is reserved to the Engineer to disregard the Contract bid prices if, in his/her
judgment, such prices do not represent a fair measure of the value of the Work to be performed or
to be deleted. The net savings will be established by determining the Contractor’s cost of performing
the Work, taking into account his/her cost of developing the Proposal and implementing the
change, and reducing this amount by any ascertainable collateral costs to the City. The executed
Change Order may provide that the Contractor be paid 50 percent of the estimated net savings
amount.
The executed Change Order may also provide for the adjustment in Contract prices. Contract prices
may be adjusted by subtracting the City’s share of the accrued net savings.
The amount specified to be paid to the Contractor in the executed Change Order which effectuates a
Cost Reduction Proposal will constitute full compensation to the Contractor for the Cost Reduction
Proposal and the performance of the work thereof pursuant to the said Change Order.
Upon acceptance of a Cost Reduction Incentive Proposal, any restrictions imposed by the
App’d 1/7/22
APP-12 of 33
General Conditions
Appendix 2
Contractor on its use or on disclosure of the information will become void, and the City thereafter
will have the right to use all or any part of the Proposal without obligation or compensation of any
kind to the Contractor.
App’d 1/7/22
APP-13 of 33
General Conditions
Appendix 2
COST REDUCTION INCENTIVE PROPOSAL FORM
TO:
CIP City Engineer
FROM:
PROJECT NAME:
DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
CITY PROJECT NUMBER:
ST2009.401
DATE:
Summary of Change (Brief description of proposed change including advantages and disadvantages):
ESTIMATED COST SUMMARY (Attached detailed estimate):
A.
Original Cost:
$
B.
Proposed Cost:
$
C.
Construction Savings (A-B):
$
D.
Gross Savings (Included OH
%, Bond
%)
$
E.
Contractor Implementing
$_
F.
City Implementing Cost:
$_
Reduction in Contract Price (C+D-E-F) x 50%:
$
Date by which a Change Order must be issued so as to obtain maximum cost reduction:
App’d 1/7/22
APP-14 of 33
General Conditions
Appendix 3
CITY OF CHANDLER, ARIZONA
PUBLIC WORKS & UTILITIES DEPARTMENT
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS
________________________, Arizona
Date ____________________________
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
City Project No.: ST2009.401
To the City of Chandler, Arizona
Gentlemen:
This is to certify that all lawful claims for materials, rental of equipment and labor used in connection
with the construction of the above project, whether by subcontractor or claimant in person, have been
duly discharged.
The undersigned, for the total compensation of $________________________, as set out in the final pay
application, as full and complete payment under the terms of the contract, hereby waives and
relinquishes any and all further claims or right of lien under, in connection with, or as a result of the
above described project. The undersigned further agrees to indemnify and save harmless the City of
Chandler against any and all liens, claims or liens, suits, actions, damages, charges and expenses
whatsoever, which said City may suffer arising out of the failure of the undersigned to pay for all labor
performances and materials furnished for the performance of said installation.
Signed and dated at ________________, this _________ day of _______________ 20_____.
__________________________________
CONTRACTOR
By _______________________________
STATE OF ARIZONA
)
) SS
COUNTY OF MARICOPA
)
The foregoing instrument was subscribed and sworn to before me this __________ day of
__________________ 20 _________.
___________________________________
Notary Public
___________________________________
My Commission Expires
App’d 1/7/22
APP-18 of 33
General Conditions
Appendix 6
DISPUTE RESOLUTION
A.
INFORMAL DISPUTE RESOLUTION
The parties to the Contract agree that time is of the essence in relation to
performance of the Contract and completion of the Project, therefore any and all
disputes in relation to the Contract will initially be referred to the Project Manager,
the Design Professional Representative and/or the Contractor Representative as
applicable to the dispute, for immediate resolution. If, after good faith efforts to
reach a resolution, none is reached, any party to the dispute may submit the
dispute to the Dispute Resolution Representative (“DRR”) process set forth below,
which is intended to be an expedited process.
B.
DISPUTE RESOLUTION REPRESENTATIVE (“DRR”) PROCESS
1.
The Parties under the Contract agree that all claims and disputes in relation to
the Project which are not resolved in the ordinary course of the Project
(“Claim” or “Claims”) will, as a prerequisite to any mediation, or litigation of
the Claim, first be submitted for resolution between the designated
Dispute Resolution Representatives of the Parties as set forth herein (the
“DRR Process”).
2.
The DRR Process will be initiated through service of a DRR Notice as set
forth below:
a.
For claims by the Contractor or the Design Professional, the DRR
Process will be initiated by the party asserting the claim serving
written notice on the City setting forth in detail: (i) the basis for the
claim; (ii) the effect of the Claim upon the construction of, and/or
Project Schedule for, the Project;
(iii) the specific relief requested, the amount thereof, and how such
was calculated; (iv) the parties involved in the Claim, and how
they are involved; (v) the specific contract provisions in the Contract
Documents (including, if applicable, drawings and specifications)
which apply; and (vi) efforts made to date to resolve the Claim.
b.
For claims by the City, the DRR process will be initiated by the
City providing written notice to the other parties of the basis and
amount of its claim, the parties involved in the Claim, and how they
are involved, the provisions in the Contract Documents that apply,
and the relief requested.
c.
The DRR Notice will be hand-delivered and e-mailed to the other
parties’ designated Dispute Resolution Representatives.
3.
The other parties will respond in writing to the DRR Notice (“DRR
Response”) within ten (10) calendar days of receipt of the DRR Notice, setting
forth those items set forth in the DRR Notice that they agree with, dispute,
and/or have questions concerning. The DRR Response will be hand-delivered
and e-mailed to the other parties’ Dispute Resolution Representatives.
App’d 1/7/22
APP-19 of 33
General Conditions
Appendix 6
4.
The designated Dispute Resolution Representatives for the Parties to the
claim will then meet as soon as possible and in any event within twenty (20)
calendar days of submission of the DRR Notice (regardless of whether a
DRR Response has been submitted by all parties involved in the dispute), at
a mutually agreed upon time and place, to attempt to resolve the Claim
based upon the DRR Notice and DRR Response.
5.
At any time after the first meeting required above, either party may
terminate the DRR Process by written notice to the other party.
6.
The parties may agree, in writing, to extend or modify the time limits or
other provisions of the DRR process in relation to a specific pending Claim.
7.
Unless otherwise designated in a written notice to the other parties, the City
and the representatives of the Contractor and of the Design Professional will
act as the parties’ designated Dispute Resolution Representatives.
8.
If a resolution of the Claim is reached, that resolution must be set forth in
writing and must be signed by the Parties’ designated Dispute Resolution
Representative. If the resolution involves a change in any Contract
Documents, the Contract Price, the Project Schedule, or any other change
requiring a written Change Order or Amendment, the parties must execute
an appropriate written Change Order or Amendment pursuant to the terms
of the Contract Documents.
C.
MEDIATION
1.
Unless extended by written agreement of the parties involved in the dispute,
any Claim not resolved through the DRR process set forth above within
five (5) calendar days after the meeting required under B (4) above, or after
the DRR is terminated pursuant to ¶ B (5) above, whichever is earlier, will be
submitted to mediation as a condition precedent to litigation by either party.
2.
The mediation will be commenced by written demand upon the other party
for mediation. If the parties cannot agree upon a mediator within ten (10)
calendar days of the written demand, either party may make a request to the
Civil Presiding Judge of the Maricopa County Superior Court to appoint a
mediator. The mediation will occur within forth (40) calendar days of the
written demand for mediation, unless the parties agree, in writing, to a
longer period of time.
3.
The qualifications for the mediator will be that he/she be: (a) an
experienced mediator, arbitrator or litigator of construction disputes; and (b)
having engaged a significant portion of his/her time involving and/or
resolving construction disputes for at least the past five (5) years.
4.
Each party will provide to the other party and the mediator all of the
information and documentation required under B(1) and (2) above, together
with any additional information and documentation which the party believes
relevant. In addition, the parties will exchange, and provide to the mediator
such additional memoranda, information and/or documentation, as the
App’d 1/7/22
APP-20 of 33
General Conditions
Appendix 6
mediator may request, and in the form and at such times, as the mediator
may direct.
5.
The parties will share the mediator’s fee and any filing fees equally. The
mediation will be held in Chandler, Arizona, unless another location is
mutually agreed upon. Agreements reached in mediation will be specifically
enforceable in any court having jurisdiction thereof.
D.
LITIGATION
Any claim arising out of or related to the Contract, except Claims relating to aesthetic
effect and except those claims waived as provided for in the Contract
Documents, must be resolved through litigation in the Maricopa County, Arizona
Superior Court.
App’d 1/7/22
APP-21 of 33
General Conditions
Appendix 7
CITY OF CHANDLER, ARIZONA
PUBLIC WORKS & UTILITIES DEPARTMENT
CERTIFICATE OF COMPLETION
PROJECT NAME:
DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
CITY PROJECT NO.:
ST2009.401
If Federally Funded:
FEDERAL NO.:
ADOT NO:
(This section to be completed by Prime)
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER FOR THIS
PROJECT HAVE BEEN DELIVERED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BID
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE CONTRACT HAVE
BEEN COMPLETED AS OF THE COMPLETION DATE LISTED HERE:
FINAL ACCEPTANCE DATE:
PRIME CONTRACTOR:
FIRM NAME:
PRINCIPAL:
TITLE:
SIGNATURE:
DATE:
CERTIFIED BY [INSERT NAME AND TITLE OF PARTY THAT OVERSEES CONSTRUCTION]:
FIRM NAME:
SIGNATURE:
DATE:
PROJECT ACCEPTED BY CITY OF CHANDLER:
NAME:
SIGNATURE:
DATE:
App’d 1/7/22
APP-22 of 33
General Conditions
Appendix 8
CONSTRUCTION SIGN DETAIL
8'
3"
CITY OF CHANDLER
5"
3"
PUTTING YOUR FUNDS TO WORK
5"
3"
PROJECT TITLE:
5"
4'
3"
PROJECT NUMBER:
3"
2"
PROJECT COST:
3"
2"
CONTRACTOR:
3"
2"
MANAGED BY:
PUBLIC WORKS & UTILITIES DEPARTMENT
3"
CAPITAL PROJECTS DIVISION
3"
<--- 4" X 4" POSTS --->
NOTES:
SIGN(S) MUST BE FURNISHED AND ERECTED PRIOR TO COMMENCEMENT OF CONSTRUCTION. POSTS
MUST BE ANCHORED A MINIMUM OF TWO FEET INTO THE GROUND. BOTTOM OF SIGN MUST BE A
MINIMUM OF FOUR FEET ABOVE THE GROUND.
TYPICAL PROJECT IDENTIFICATION SIGN FOR GENERAL PROJECTS MUST BE NON-REFLECTORIZED
GREEN BACKGROUND, AND NON-REFLECTORIZED WHITE LETTERS AND NUMERALS.
ONE SIGN MUST BE ERECTED FOR BUILDINGS AND OTHER LIMITED AREA SINGLE SITES. FOR MULTIPLE
SITES, ONE SIGN MUST BE ERECTED AT EACH SITE.
FOR LINEAR PROJECTS ONE HALF MILE OR LONGER, PLACE ONE SIGN AT EACH END OF THE PROJECT.
App’d 1/7/22
APP-23 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
COST OF THE WORK
(APPLICABLE SOLELY TO CONSTRUCTION MANAGER AT RISK AND JOB ORDER CONTRACTING)
SECTION 1 – COSTS TO BE REIMBURSED
1.1 Cost of the Work
The term Cost of the Work will mean costs necessarily incurred by Contractor in the proper
performance of the Work. Such costs must be at rates not higher than the standard paid at the place
of the Project except with prior consent of City. The Cost of the Work will include only the items set
forth in this Section 1.
1.2 Labor Costs
1.2.1
Wages of construction workers directly employed by the Contractor to perform the
construction of the Work at the site or, with City’s approval, at off-site workshops. Cost to
be reimbursed will be the actual wages paid to the individuals performing the work.
1.2.2
Wages or salaries of the Contractor’s supervisory and administrative personnel when
stationed at the site with City’s approval. No Contractor personnel stationed at the
Contractor’s home or branch offices will be charged to the Cost of the Work. Non-field
office based Contractor management and support personnel are expected to provide
service and advice from time to time throughout the job and his/her time devoted to
Project matters is considered to be covered by the Contractor’s Fee.
1.2.3
Wages and salaries of Contractor’s supervisory or administrative personnel who would
normally be stationed at the field office in accordance with Section 1.2.2 but who become
engaged, at factories,
workshops or on the road, in expediting the production or
transportation of materials or equipment required for the Work, but only for that portion
of his/her time required for the Work. Employee bonuses and/or costs associated with
Employee Stock Ownership Plans (“ESOP”) will not be considered reimbursable labor or
labor burden costs and will be considered non-reimbursable costs considered to be covered
by the Contractor’s Fee.
1.2.4
Costs paid or incurred by Contractor for taxes, insurance, contributions, assessments and
benefits required by law or collective bargaining agreements and, for personnel not
covered by such agreements, customary benefits such as sick leave, medical and health
benefits, holiday, vacations and pensions, provided such costs are based on wages and
salaries included in the Cost of the Work under Subparagraphs 1.2.1 through 1.2.3.
1.2.4.1 Cost of the Work will include the actual net cost to Contractor for worker’s
compensation insurance attributable to the wages chargeable to the Cost of Work per this
Agreement. The actual net cost of worker’s compensation must take into consideration
all cost adjustments due to experience modifiers, premium discounts, policy dividends,
retrospective rating plan premium
adjustments, assigned risk pool rebates, any
applicable weekly maximums, etc. Contractor may charge an estimated amount for
worker’s compensation insurance costs, but will make appropriate cost adjustments to
actual costs within 45 days of receipt of actual cost adjustments from the insurance
carrier.
App’d 1/7/22
APP-24 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
1.2.4.3 Overtime wages paid to salaried personnel (if approved in advance in writing by City)
will be reimbursed at the actual rate of overtime pay paid to the individual. No time
charges for overtime hours worked on the Project will be allowed if the individual is not paid
for the overtime worked.
1.2.4.4 Any overtime premium or shift differential expense to be incurred by Contractor for hourly
workers will require City’s advance written approval before the incremental cost of the
overtime premium or shift differential will be considered a reimbursable cost. If the
Contractor is required to work overtime as a result of an inexcusable delay or other
coordination problems caused by the Contractor or anyone he/she is responsible for,
the overtime premium and/or shift differential expense portion of the payroll expense
and related labor burden costs will be considered as cost not to be reimbursed.
1.2.4.5 Reimbursable labor burden costs will be limited to payroll taxes, worker’s compensation
insurance, the employer’s portion of union benefit costs for union employees working on the
Project, and the actual verifiable fringe benefit costs incurred by Contractor for non-union
individuals working on the Project subject to the following maximum percentages for the
following reimbursable non-union fringe benefit costs. The following maximums (as a
percentage of reimbursable actual wages by individual) will apply for each of the following
types of fringe benefit costs specifically attributable to each of the non-union personnel
working on the Project:
•
Medical Insurance, Dental, Life & AD&D Insurance:
12.00%
•
Holiday, vacation and other paid time not worked:
10.00%
•
Pension Plan Contributions to Vested Employee Account,
Simplified Employee Pension Plans, or 401K matching plans
(Note: ESOP related costs are covered by the Contractor Fee)
10.00%
For non-union personnel, no other fringe benefit costs (other than the three specific
categories listed immediately above, will be considered reimbursable Cost of Work. Any
labor burden costs that are in excess of the amounts considered reimbursable or are
otherwise not considered reimbursable under the terms of this agreement are intended to
be covered by the Contractor Fee.
1.3
Subcontract Costs
1.3.1
Payments made by Contractor to Subcontractors in accordance with the requirements of
the subcontracts.
1.3.2
For Scope of Work Bid Packages typically performed by Subcontractors, Contractor may
“self- perform” such work on an actual cost basis subject to an agreed upon Guaranteed
Maximum Price for the “self-performed work”. The Contractor must, unless agreed to by City
in writing, bid his/her proposed guaranteed Maximum Price for the work to be “self-
performed” against at least three other interested trade Contractors. All savings under
any such Subcontract for “self-performed work” must be applied to reduce the Cost of Work
under the Contract and the Guaranteed Maximum Price. For purposes of defining “self-
performed work” subject to this provision, any division of Contractor, or any separate
Contractor or Subcontractor that is partially owned or wholly owned by the Contractor or
any of his/her employees or employee’s relatives will be considered a related party entity
App’d 1/7/22
APP-25 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
and will be subject to this provision regarding “self-performed work”. No self-performed work
will be allowed to be performed on a Fixed Price basis.
1.3.3
Contractor (with respect to its Suppliers, Subcontractors and all lower tier Subcontractors)
must provide City advance written notice and must obtain City’s approval for any proposed
Subcontract Change Order, Material Purchase Order, or other financial commitment in an
amount in excess of $5,000 prior to placing such order or entering into such agreement
(regardless of whether or not any such commitment will affect the prime contract
Guaranteed Maximum Cost). It is agreed that sums applicable to any Subcontract Change
Order, Purchase Order or other financial commitment entered into in violation of the above
notice and approval requirement will not be included in the amounts owning to Contractor,
Subcontractors or Suppliers whether as Costs of the Work or as reasonable termination
costs in the event of termination.
1.4
Costs of Material and Equipment Incorporated in the Completed Construction
1.4.1
Costs, including transportation and storage, of materials and equipment incorporated or
to be incorporated in the completed construction.
1.4.2
Costs of materials described in the preceding Subparagraph 1.4.1 in excess of those
actually installed to allow for reasonable waste and spoilage. Unused excess materials, in
any, will become City’s property at the completion of the Work or, at City’s option, may be
sold by the Contractor. Any amounts realized from such sales must be credited to City as a
deduction from the Cost of Work.
1.4.3
Proceeds from the sale of recyclable materials, scrap, waste, etc. will be credited to job cost.
1.5
Costs of Other materials and Equipment, Temporary Facilities and Related Items
1.5.1
Costs, including transportation and storage, installation, maintenance, dismantling and
removal of materials, supplies, temporary facilities, machinery, equipment and hand tools
not customarily owned by construction workers, that are provided by the Contractor at the
site and fully consumed in the performance of the Work; and cost (less salvage value) of such
items if not fully consumed, whether sold to others or retained by Contractor. Cost for
items previously used by Contractor will mean fair market value.
1.5.2
Rental charges for temporary facilities, machinery, equipment, and hand tools not
customarily owned by construction workers that are provided by Contractor at the site,
whether rented from Contractor or others, and costs of transportation, installation, minor
repairs and replacements,
dismantling and removal thereof. Rates and quantities of
equipment rented will be subject to City’s prior written approval.
1.5.2.1 The Projected usage for each piece of equipment to be rented for use on the Project and
the estimated total rentals must be considered by Contractor before the piece of
equipment is rented so that an appropriate rent versus buy decision can be made.
Purchased equipment must be considered “job owned”. At the completion of the Project,
Contractor must transfer title and possession of all remaining job-owned equipment to
City, or Contractor may keep any such equipment for an appropriate fair market value
credit to job cost, which will be mutually agreed to by City and Contractor.
App’d 1/7/22
APP-26 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
1.5.2.2 Each piece of equipment to be rented must have hourly, daily, weekly and monthly rates
and the most economical rate available will be reimbursed based on the circumstances of
actual need and usage of the piece of equipment while it is stationed at the jobsite.
When the piece of equipment is no longer needed for the work, no rental charges will be
reimbursed if the piece of equipment remains at the jobsite for the convenience of
Contractor.
1.5.2.3 Equipment Rental Rates
1.5.2.3.1 Compensation for equipment used on the Project will be paid in accordance with the
Equipment Plan submitted by Contractor in the accepted GMP Proposal and no payments
will be made in excess of the rates set forth in the Equipment Plan, or actual
documented costs, whichever is less.
1.5.2.3.2 All equipment rental rates and costs are subject to City’s right to audit when submitted as
part of Equipment Plan and/or at any time during the Project.
1.5.2.4 The aggregate rentals chargeable for each piece of Contractor owned tools or equipment
must not exceed 50% of the fair market value of such equipment at the time of its
commitment to the Work. The original purchase price and date of purchase of the equipment
will be documented with a copy of the purchase invoice for the piece of equipment. Such
aggregate limitations will apply and no further rentals will be charged even if a piece of
equipment is taken off the job and is later replaced by a similar piece of equipment. For
purposes of computing the aggregate rentals applicable to aggregate rental limitations,
rental charges for similar pieces of equipment will be combined if the pieces of equipment
were not used at the same time.
1.5.2.5 Fair market value for used material and equipment as referred to in the Contract Documents
will mean the estimated price a reasonable purchaser would pay to purchase the used
material or equipment at the time it was initially needed for the job. Note: This is usually
lower than the price a reasonable purchaser would pay for similar new construction material
or construction equipment.
1.5.2.6 All losses resulting from lost, damaged or stolen tools and equipment will be the sole
responsibility of Contractor, and not City, and the cost of such losses will not be
reimbursable under the Contract.
1.5.2.7 Contractor will be required to maintain a detailed equipment inventory of all job-owned
equipment (either purchased and charged to job cost or job-owned through aggregate
rentals) and such inventory must be submitted to City each month. For each piece of
equipment, such inventory should contain at a minimum (1) original purchase price or
acquisition cost (2) acquisition date (3) approved Fair Market Value at the time the piece of
equipment was first used on the job and (4) final disposition.
1.5.2.8 All costs incurred for minor maintenance and repairs will be reimbursed at actual cost. Such
costs include routine and preventative maintenance, minor repairs and other incidental
costs. Repairs and/or replacement of a capital nature are considered to be covered by the
rental rates. Major repairs and overhauls are not considered routine and ordinary;
consequently such costs are not reimbursable and are intended to be covered by the rental
App’d 1/7/22
APP-27 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
rates.
1.5.3
Costs of removal of debris from the Site.
1.5.4
Costs of document reproductions, facsimile transmissions and long-distance telephone
calls, postage and parcel delivery charges, telephone service at the site and reasonable
petty cash expenses of the site office.
1.5.5
That portion of the reasonable expenses of Contractor’s personnel incurred while
traveling in discharge of duties connected with the Work.
1.5.5.1 No travel expenses will be reimbursed to Contractor’s representatives unless Project related
travel required them to travel to a destination more than 100 miles from the Project
location. Any travel involving airfare will require advance written approval by an authorized
City’s representative.
1.5.6
Costs of materials and equipment suitably stored off the site at a mutually acceptable
location, if approved in advance by the City.
1.5.7
Reproduction costs will be the actual costs of reproduction subject to a maximum of five
cents ($.05) per square foot for prints and a maximum of five cents ($.05) per 8 ½ by 11-
inch page for offset print or photo copied contract documents, specifications, etc.
Telephone costs will be the actual costs paid to the third party telephone company for the
field office telephone.
1.6
Miscellaneous Costs
1.6.1
That portion of insurance and bond premiums that can be directly attributed to the Contract.
The City will reimburse Contractor for contractually required bond at time of first pay
application for GMP and Cost-Based contracts upon receipt of proof of payment from
the Contractor. If the Contractor completes Work for less than the Contract Price,
Contractor must credit the City a pro- rated amount for the unused portion of the bond
payment
1.6.1.1 Contractor’s actual cost for insurance will be considered to be included within the Maximum
limit for General Conditions Costs. All premiums for any insurance and bonds required for
the Project must reflect the net actual costs to Contractor after taking into consideration cost
adjustments due
to experience modifiers, premium
discounts, policy dividends,
retrospective rating plan premium adjustments, assigned risk pool rebates, refunds, etc.
1.6.1.2 The amount to be reimbursed to Contractor for all contractually required insurance will be
actual costs not to exceed a total of 2% of the Contract Value, unless Contractor
establishes to City’s satisfaction that the actual cost is higher and City agrees to such actual
higher cost in writing. If Contractor’s cost of contractually required insurance is greater
than the amount agreed to be reimbursed per this Contract Provision, the difference will
be considered to be covered by the Contractor’s Fee. The City will reimburse Contractor
for contractually required insurance on a monthly basis for GMP and Cost-Based
contracts. If Contractor can demonstrate substantial savings by paying for all insurance in
advance, the City may agree to reimburse all insurance costs at time of first pay application
App’d 1/7/22
APP-28 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
for GMP and Cost-Based contracts with proof of payment from Contractor.
1.6.2
Sales, use or similar taxes imposed by a governmental authority that are related to the Work.
1.6.3
Fees and assessments for the building permit and for other permits, licenses and
inspections for which Contractor is required by the Contract Documents to pay.
1.6.4
Fees of laboratories for tests required by the Contract Documents, except those related to
defective or nonconforming Work and which do not fall within the scope of ¶ 1.7.3 below.
1.6.5
Royalties and license fees paid for the use of a particular design, process or product
required by
the Contract Documents; the cost of defending suites or claims for
infringement of patent rights arising from such requirement of the Contract Documents; and
payments made in accordance with legal judgments against Contractor resulting from such
suites or claims and payments of settlements made with City’s consent. However, such
costs of legal defenses, judgments and settlements must not be included in the calculation
of the Contractor’s Fee or subject to the Guaranteed Maximum Price.
1.6.6
Data processing costs related to the Work. However, any such data processing costs will be
limited to the cost of personal computer hardware used at the field office in the
normal day to day administration, management and control of the Project. The
aggregate charges for any such hardware must not exceed the Fair Market Value of the
hardware at the time it was brought to the field office. If the total charges for any particular
piece of hardware reach an amount equal to the Fair Market Value, that particular piece of
hardware must be turned over to City whenever it is no longer needed for the Project. If
Contractor elects to keep the particular piece of hardware, the job costs must be credited
with a mutually agreeable amount which will represent the Fair Market Value of the
particular piece of hardware at the time it was no longer needed for the job. Software or
other costs associated with the use of computer programs will not be considered to be a
reimbursable cost and will be considered to be covered by the Contractor’s Fee.
1.6.7
Deposits lost for causes other than Contractor’s negligence or failure to fulfill a specific
responsibility to City as set forth in the Contract Documents.
1.6.8
Legal, mediation and arbitration costs, including attorneys’ fees, other than those arising
from disputes between City and Contractor, reasonably incurred by Contractor in the
performance of the Work and with City’s prior written approval; which approval will not be
unreasonably withheld.
1.6.9
Expenses incurred in accordance with Contractor’s standard personnel policy for relocation
and temporary living allowances of personnel required for the Work, if pre-approved by City
in writing. If City authorizes the reimbursement of relocation costs, the reimbursable
relocation expenses will be limited to a maximum of $50,000 per person. Any relocation
cost incurred by Contractor in excess of the amount reimbursed by City will be considered to
be covered by the Contractor’s Fee.
1.7
Other Costs and Emergencies
1.7.1
Other costs incurred in the performance of the Work if and to the extent approved in
App’d 1/7/22
APP-29 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
advance in writing by City.
1.7.2
Costs due to emergencies incurred in taking action to prevent threatened damage, injury or
loss in case of an emergency affecting the safety of persons and property.
1.7.3
Costs of repairing or correcting damaged or nonconforming Work executed by Contractor,
Subcontractors or Suppliers, provided that such damaged or nonconforming Work was not
caused by negligence or failure to fulfill a specific responsibility of Contractor and only to the
extent that the cost of repair or correction is not recoverable by Contractor from
insurance, sureties, Subcontractors or Suppliers.
1.8
Related Party Transactions
1.8.1
The term “related party” will mean a parent, subsidiary, affiliate or other entity having
common ownership or management with Contractor; any entity in which any stockholder in,
or management employee of, Contractor owns any interest in excess of ten percent in the
aggregate; or any person or entity which has the right to control the business or affairs of
Contractor. The term “related party” includes any member of the immediate family of any
person identified above.
1.8.2
If any of the costs to be reimbursed arise from a transaction between Contractor and a
related party, Contractor must notify City in writing of the specific nature of the
contemplated transaction, including the identity of the related party and the anticipated
cost to be incurred, before any such transaction is consummated or cost incurred. If City,
after such notification, authorizes in writing
the proposed transaction, then the cost
incurred will be included as a cost to be reimbursed, and Contractor must procure the Work,
equipment, goods or service from the related party, as a Subcontractor. If City fails to
authorize the transaction, Contractor must procure the Work, equipment, goods or
service from some person or entity other than a related party.
SECTION 2 – COSTS NOT TO BE REIMBURSED
2.1
The Cost of Work must not include:
2.1.1
Salaries and other compensation of Contractor’s personnel stationed at Contractor’s principal
office or offices other than the site office, except as specifically provided in Subparagraphs
1.2.2 and 1.2.3.
2.1.2
Expenses of Contractors’ principal office and offices other than the site office.
2.1.3
Overhead and general expenses, except as may be expressly included in Section 1.
2.1.3.1 Costs of Contractor’s home office computer services or other outside computer processing
services will be considered overhead and general expense. Accordingly, Contractor should
not plan to perform any such computer related services or alternatives at the field office
when such services or functions can be performed at Contractor’s home or branch offices,
or other outside service locations.
2.1.4
Contractor’s capital expenses, including interest on Contractor’s capital employed for the Work.
App’d 1/7/22
APP-30 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
2.1.5
Rental costs of machinery and equipment, except as specifically provided in subparagraph
1.5.2.
2.1.6
Except as provided in Subparagraph 1.7.3 of the Agreement, costs due to the negligence or
failure to fulfill a specific responsibility of Contractor, Subcontractors and Suppliers or
anyone directly or indirectly employed by any of them or for whose acts of them may be
liable.
2.1.7
Any cost not specifically and expressly described in Section 1.
2.1.8
Costs, other than costs included in Change Orders approved by City that would cause the
GMP to be exceeded.
SECTION 3 – DISCOUNTS, REBATES, REFUNDS AND SAVINGS
3.1
Cash discounts obtained on payments made by Contractor will accrue to City if (1) before
making the payment, Contractor included them in an Application for Payment and
received payment therefore from City, or (2) City has deposited funds with Contractor with
which to make payments; otherwise, cash discounts will accrue to Contractor. Trade
discounts, rebates, refunds and amounts received from sales or surplus materials and
equipment will accrue to City, and Contractor must make provisions so that they can be
secured.
3.1.1
Cost of the Work will be credited with all insurance policy discounts, performance and
payment bond rebates or refunds, refunds or return premiums from any Subcontractor
default insurance, refunds or rebates from any Contractor controlled insurance programs
applicable to the Project, merchandise rebates of any nature, refunds of any nature,
insurance dividends; and a portion of any volume rebates or free material credits earned
with purchase of material or other goods and services charged to the job.
3.1.2
“Cash” discounts which may accrue to Contractor will be limited to a maximum of 1.5% of
invoice cost. Any portion of “Cash” discounts greater than 1.5% will automatically accrue
to City if Contractor is eligible to take advantage of the discounts.
3.2
Amounts that accrue to City in accordance with the provisions of Paragraph 3.1 will be
credited to City as a deduction from the Cost of the Work.
3.3
Any and all savings on the GMP, or any separately guaranteed items comprising the GMP,
will belong to City, subject to any express right in the Contract for Contractor to share in
savings. Savings are subject to City’s right to audit, and may be audited separately.
SECTION 4 – GENERAL CONDITIONS COSTS
4.1
General Conditions Costs may include, but are not limited to, the following types of costs
incurred by Contractor during construction of the Work to the extent they are reimbursable
Costs of the Work as delineated above: payroll costs for Work conducted at the site, payroll
costs for the superintendent and full-time general foremen, payroll costs for management
App’d 1/7/22
APP-31 of 33
General Conditions
Appendix 9 – CM@Risk & JOC
personnel resident and working on the site workers not included as direct labor costs
engaged in support (e.g. loading/unloading, clean-up, etc.), administrative office personnel,
costs of offices and temporary facilities including office materials, office supplies, office
equipment, minor expenses, utilities, fuel, sanitary facilities and telephone services at the
site, costs of liability insurance premiums not included in labor burdens for direct labor
costs, costs of bond premiums, costs of consultants not in the direct employ of Contractor
or Subcontractors, fees for permits and licenses.
4.2
General Conditions Costs may be paid on a percentage of the Contract Price or on a
lump/stipulate sum basis as set forth in the Contract. All costs included in the General
Conditions Costs will not be separately invoiced to or paid by City.
4.3
The total amount of General Conditions Costs for the Work may be divided by the number of
days allowed for performance of the Work, to determine a fixed daily rate for General
Conditions Costs that may be used in computing the General Conditions Costs allocated to
any period of time, or for any adjustments in the General Conditions Costs agreed to in
writing by City.
App’d 1/7/22
APP-32 of 33
General Conditions
Appendix 10
LANDSCAPE ESTABLISHMENT PERIOD
Section 1 – Description and General
Contractor is in direct control of work performed under the Landscape Establishment Period. If work
is subcontracted, a representative of the Contractor will be present at the site of the work for all
hours that the subcontractor works. Subcontracting of Landscape Establishment work will be
permitted for weed eradication with herbicides, because of special licensing. A licensed temporary
service may be used to supply labor to Contractor if Contractor has received approval from City
Representatives. Contractor will submit the required subcontract documentation.
Contractor must provide adequate personnel to accomplish the required maintenance of the plant
materials at intervals acceptable to City Representatives.
If not healthy at the end of the maintenance period, the maintenance must be continued until the
plant material is approved by City.
1.1 Time and Schedule
Unless otherwise expressly agreed to in writing by City, the Landscape Establishment Period will be
per General Conditions Section 6.5.4.
1.2 Planted Stock and Seeding Establishment
1.2.1
Tree planting and staking must be per City of Chandler Standard Detail C-801.
1.2.2
All trees will stand erect on their own without stakes when brought to this site. If the tree
cannot stand on its own when nursery stakes are removed, the tree will be removed and
replaced.
1.3 Pre-Emergent Herbicide and Weed Control
1.3.1
Contractor will provide three applications of an approved pre-emergent herbicide on all
unpaved areas of the project, as directed by City Representatives, to control weed growth in
all areas of the project. The number of applications may be increased as directed by the City
Representative, and at no additional cost to City, if the City Representative deems additional
applications are required to control weed growth.
1.3.2
Application sequence will be approved in advance by City. The first application of pre-
emergent will be completed prior to the application of Decomposed Granite and will be
included with the cost of the Decomposed Granite as specified and part of the Construction
Phase portion of work. The second application of pre-emergent will be completed after
installation of the Decomposed Granit and no later than half-way through the Landscape
Establishment Period. The third and final application of pre-emergent will be applied 15
days prior to completion of the Landscape Establishment portion of the project. The second
and third pre-emergent applications will be included with the cost of Landscape
Establishment. Watering will be completed in accordance with the manufacturer’s
recommendations, as included and as related to each application.
1.3.3
The pre-emergent herbicide will be applied in accordance with the Technical Specifications
and the recommendations of the pre-emergent herbicide manufacturer, as approved by
City Representatives.
App’d 1/7/22
APP-33 of 33
General Conditions
Appendix 10
1.3.4
The control of weeds will be accomplished by the use of herbicides. Manual removal of
weeds will be required, after herbicides have taken affect.
1.3.5
Contractor is responsible for the removal and disposal of all trash and debris that during
the Landscape Establishment Period. Contractor will keep the project in a neat and orderly
manner during the duration of the Landscape Establishment Period.
1.4 Water
The water used during Landscape Establishment to properly maintain the plant material will be
furnished by City, at designated sources from within the project limits, at no charge to Contractor.
Contractor will be responsible for all equipment, materials and labor necessary to load, transport and
unload water for watering purposes.
1.5 Plant Material Replacements
The plant material replacement will be considered as included in the work for Landscape
Establishment, and will be made at no charge to the City.
1.5.1
Shrub and Plant Replacement - During the second half of the Landscaping Establishment
period, Contractor will provide, where required, plant replacements as follows:
Original Size
Replacement Size
1 gallon
5 gallon
5 gallon
15 gallon
15 gallon
24-inch box
36-inch box
48-inch box
1.5.2
Tree Replacement – During the second half of the Landscape Establishment Period,
Contractor will provide plant material replacements for existing plants that die as follows:
Existing Plant Material Sizes
Replacement Size
Trees:
2-inch Caliper
24-inch box
4-inch Caliper
36-inch box
6-inch Caliper and greater
54-inch box
Shrubs:
All Existing Shrubs
15 gallon
1.6 Measurement and Payment
See Technical Specifications for Measurement Payment provisions.
EXHIBIT C
City of Chandler Construction Manager at Risk Construction Services
TS-1
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
TECHNICAL SPECIFICATIONS
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
1
DOBSON ROAD IMPROVEMENTS
INTEL DRIVEWAYS #1 & #4
CITY OF CHANDLER PROJECT NO. ST2009.201
TECHNICAL SPECIFICATIONS
PREPARED FOR:
CITY OF CHANDLER
PUBLIC WORKS & UTILITES
CAPITAL PROJECTS
PREPARED BY:
6437 W. CHANDLER BLVD, SUITE 1
CHANDLER, AZ 85225
DATE: MAY 2021
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
2
This book of specifications and related documents represents the combined
efforts of the following firms:
1. Olsson-Premier
2. Lee Engineering
3. EPG
The professional engineers of each firm has affixed their seals below, which attests that
portions of these Technical Specifications were prepared under their direction
Olsson-Premier
Prime Consultant - Civil Engineer
EPG
Landscape Architect
Lee Engineering
Traffic Engineer
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
3
TABLE OF CONTENTS
PART A: BID ITEMS
6
ITEM NO. 1
CONSTRUCTION SURVEYING AND LAYOUT
6
ITEM NO. 2
TREE PROTECTION FENCE
10
ITEM NO. 3
EROSION CONTROL (SWPPP PREPARATION, INSTALLATION,
MAINTENANCE, AND REMOVAL)
10
ITEM NO. 4
MOBILIZATION/DEMOBILIZATION
11
ITEM NO. 5
CLEARING AND GRUBBING
11
ITEM NO. 6
TREE SALVAGE AND REINSTALLATION
12
ITEM NO. 7
SUBGRADE PREPARATION
12
ITEM NO. 8
AGGREGATE BASE COURSE, 7 IN THICK
13
ITEM NO. 9
AGGREGATE BASE COURSE, 8 IN THICK
13
ITEM NO. 10
ASPHALTIC CONCRETE PAVEMENT (2 IN SURFACE COURSE, A-12.5
EVAC)
14
ITEM NO. 11
ASPHALTIC CONCRETE PAVEMENT (3 IN SURFACE COURSE, R-12.5
EVAC)
14
ITEM NO. 12
ASPHALTIC CONCRETE PAVEMENT (3 IN BASE COURSE, A-19.0 EVAC) 14
ITEM NO. 13
BITUMINOUS TACK COAT SS-1H, DILUTED
15
ITEM NO. 14
CONCRETE LANDSCAPE HEADER
16
ITEM NO. 15
VERTICAL CURB & GUTTER, TYPE A, H=6 IN, MAG DET 220-1
17
ITEM NO. 16
SINGLE CURB, TYPE A, MAG DET 222
17
ITEM NO. 17
END MEDIAN RAMP, COC DET C-225
17
ITEM NO. 18
CONCRETE SIDEWALK, MAG DET 230
17
ITEM NO. 19
CONCRETE CURB RAMP WITH DETECTABLE WARNINGS, COC DET C-258
18
ITEM NO. 20
CONCRETE APRON AND VALLEY GUTTER, MAG DET 240
19
ITEM NO. 21
ADJUST MANHOLE FRAME & COVER, MAG DET 422 & COC DET C-401
19
ITEM NO. 22
ADJUST VALVE BOX & COVER, MAG DET 391-1 AND COC DET C-307
20
ITEM NO. 23
REMOVE CATCH BASIN
20
ITEM NO. 24
REMOVE CONCRETE CURB & GUTTER
21
ITEM NO. 25
REMOVE CONCRETE SINGLE CURB
21
ITEM NO. 26
REMOVE CONCRETE HEADER
21
ITEM NO. 27
REMOVE VALLEY GUTTER
22
ITEM NO. 28
REMOVE CONCRETE SIDEWALK
22
ITEM NO. 29
REMOVE CONCRETE SIDEWALK RAMPS
22
ITEM NO. 30
REMOVE & SALVAGE EXISTING SIGN
22
ITEM NO. 31
REMOVE EXISTING POST & FOUNDATION
22
ITEM NO. 32
REMOVE ASPHALTIC CONCRETE PAVEMENT
23
ITEM NO. 33
MISCELLANEOUS REMOVALS AND OTHER WORK
24
ITEM NO. 34
REMOVE AND REINSTALL SIGN
24
ITEM NO. 35
TRAFFIC CONTROL
25
ITEM NO. 36
LANDSCAPE ESTABLISHMENT
30
ITEM NO. 37
TREE – 24 IN BOX, 1.5 IN CAL MIN
32
ITEM NO. 38
PLANT – 5 GAL
32
ITEM NO. 39
DECOMPOSED GRANITE (TO MATCH EXISTING)
34
ITEM NO. 40
DECOMPOSED GRANITE, REMOVE AND REINSTALL
39
ITEM NO. 41
LANDSCAPE AND IRRIGATION RESTORATION
39
ITEM NO. 42
REMOVE PAINT STRIPE
44
ITEM NO. 43
REMOVE PAINTED SYMBOL (BIKE LANE MARKING SET)
44
ITEM NO. 44
REMOVE THERMOPLASTIC ARROW
44
ITEM NO. 45
REMOVE RAISED PAVEMENT MARKER
44
ITEM NO. 46
4 IN WHITE TRAFFIC PAINT STRIPE
45
ITEM NO. 47
4 IN YELLOW TRAFFIC PAINT STRIPE
45
ITEM NO. 48
PAINT MEDIAN NOSE
45
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
4
ITEM NO. 49
4 IN WHITE THERMOPLASTIC PAVEMENT STRIPE
46
ITEM NO. 50
THERMOPLASTIC SYMBOL (LANE REDUCTION ARROW)
46
ITEM NO. 51
THERMOPLASTIC SYMBOL (LEFT TURN ARROW)
46
ITEM NO. 52
THERMOPLASTIC SYMBOL (RIGHT TURN ARROW)
46
ITEM NO. 53
THERMOPLASTIC SYMBOL (BIKE LANE MARKING SET)
46
ITEM NO. 54
REFLECTORIZED RAISED PAVEMENT MARKER (TYPE D, YELLOW, 2-WAY)
47
ITEM NO. 55
REFLECTORIZED RAISED PAVEMENT MARKER (TYPE G, CLEAR, 1-WAY)
47
ITEM NO. 56
PERFORATED SIGN POST
47
ITEM NO. 57
PERFORATED SIGN POST FOUNDATION
48
ITEM NO. 58
FLAT SHEET ALUMINUM SIGN PANEL, HIGH INTENSITY GRADE
49
ITEM NO. 59
REMOVE AND SALVAGE TRAFFIC SIGNAL
49
ITEM NO. 60
MODIFY TRAFFIC SIGNAL
50
ITEM NO. 61
REMOVE LIGHT POLE FOUNDATIONS AND SALVAGE STREETLIGHT
POLES/EQUIPMENT
51
ITEM NO. 62
SRP LIGHTING PULL BOX (CONTRACTOR SUPPLIED AND INSTALLED)
52
ITEM NO. 63
NO. 7 PULL BOX
52
ITEM NO. 64
NO. 7 PULL BOX WITH EXTENSION
52
ITEM NO. 65
SCH. 40 PVC ELECTRICAL CONDUIT, 1 IN
54
ITEM NO. 66
SCH. 40 PVC ELECTRICAL CONDUIT, 2 IN
54
ITEM NO. 67
SCH. 40 PVC ELECTRICAL CONDUIT, 2 ½ IN (STREETLIGHTING PER SRP
PLANS)
54
ITEM NO. 68
SCH. 40 PVC ELECTRICAL CONDUIT, 3 IN
54
ITEM NO. 69
SCH. 40 PVC ELECTRICAL CONDUIT, 4 IN
54
ITEM NO. 70
POLE FOUNDATION, TYPE A
55
ITEM NO. 71
POLE FOUNDATION, TYPE Q
55
ITEM NO. 72
POLE FOUNDATION, TYPE R
55
ITEM NO. 73
PEDESTRIAN PUSH BUTTON WITH SIGN
55
ITEM NO. 74
VIDEO IMAGE DETECTION SYSTEM, 4 APPROACHES
56
ITEM NO. 75
TYPE A SIGNAL POLE 10 FT
57
ITEM NO. 76
TYPE Q SIGNAL POLE
57
ITEM NO. 77
TYPE R SIGNAL POLE
57
ITEM NO. 78
20 FT MAST ARM (TAPERED)
58
ITEM NO. 79
30 FT MAST ARM (TAPERED)
58
ITEM NO. 80
50 FT MAST ARM (TAPERED)
58
ITEM NO. 81
55 FT MAST ARM (TAPERED)
58
ITEM NO. 82
POLE FOUNDATION FOR SL-1 POLE
59
ITEM NO. 83
STREETLIGHT POLE SL-1 WITH SINGLE DAVIT ARM
59
ITEM NO. 84
METER PEDESTAL CABINET
60
ITEM NO. 85
CONTROLLER CABINET (TYPE IV)
61
ITEM NO. 86
OPTICOM PRE-EMPTION UNIT
61
ITEM NO. 87
TRAFFIC SIGNAL FACE (TYPE F) (LED)
63
ITEM NO. 88
TRAFFIC SIGNAL FACE (PEDESTRIAN) (MAN/HAND) (LED)
63
ITEM NO. 89
SIGNAL MOUNTING ASSEMBY (TYPE II)
67
ITEM NO. 90
SIGNAL MOUNTING ASSEMBLY (TYPE IV)
67
ITEM NO. 91
SIGNAL MOUNTING ASSEMBLY (TYPE V)
67
ITEM NO. 92
SIGNAL MOUNTING ASSEMBLY (TYPE VII)
67
ITEM NO. 93
LED STREETLIGHT LUMINAIRE
68
ITEM NO. 94
CONDUCTORS
69
ITEM NO. 95
CCTV FIELD EQUIPMENT
69
ITEM NO. 96
WIRELESS ACCESS SYSTEM
71
ITEM NO. 97
SIGN ASSEMBLY (IISNS)
72
ITEM NO. 98
CATCH BASIN, MAG DET 533-1, TYPE D, ONE 17 FT WING
72
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
5
ITEM NO. 99
24 IN RGRCP, CLASS IV
73
ITEM NO. 100
STORM DRAIN MANHOLE, MAG DTL 520 & 522
74
ITEM NO. 101
ALLOWANCE: ROADWAY AND CONCRETE FLATWORK
74
ITEM NO. 102
ALLOWANCE: LANDSCAPING
75
ITEM NO. 103
ALLOWANCE: TRAFFIC SIGNAL AND COMMUNICATIONS FACILITIES
75
ITEM NO. 104
ALLOWANCE: SRP ELECTRICAL
76
ITEM NO. 105
ALLOWANCE: FURNISH AND INSTALL TEMPORARY FENCING
77
ITEM NO. 106
ALLOWANCE: WET UTILITIES
77
ITEM NO. 107
ALLOWANCE: DRY UTILITIES
78
ITEM NO. 108
ALLOWANCE: STORM DRAIN
78
ITEM NO. 109
ALLOWANCE: REMOVALS
79
SOILS INFORMATION
80
PERMITS
80
COOPERATION WITH UTILITIES
81
COOPERATION BETWEEN CONTRACTORS AND OTHER AGENCY PROJECTS
83
NOTIFICATION TO PROPERTY OWNERS
83
TRAFFIC CONTROL
84
APPENDIX A – GEOTECHNICAL / SOILS REPORT
APPENDIX B – GIS DATA DICTIONARY
APPENDIX C – PERMITS / AGREEMENTS / THIRD-PARTY REQUIREMENTS, AS
APPLICABLE (SUCH AS RAILROAD PERMIT)
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
6
PART A: BID ITEMS
The following items, though not a comprehensive list, are non-payment items being
considered incidental to the project, the costs of which are to be included within other bid
items:
Saw cutting
Locating (or pothole) of new or existing utilities
Concrete curb and gutter transition, MAG Std. Det. 221
Curb transition, MAG Det. 220-2 and 221
SWPPP preparation and document maintenance
Contractor’s site office or yard.
Roadway sweeping
Any and all permits - preparation costs and permit fees
Protective fencing or plating for open trenches
Photographing and videotaping of the project
Preparation of record drawings
Crown line
Temporary pavement as required for all pipeline and underground work
Removal of existing landscape irrigation pipe, tubing, and equipment
ITEM NO. 1
CONSTRUCTION SURVEYING AND LAYOUT
Description:
The Contractor will furnish all labor, materials, and equipment necessary to perform all
surveying, staking, laying out of control lines, and verifications of the accuracy of all
existing control points that are delineated in the Contract Documents. The work will be
done under the direction of a Registered Land Surveyor (RLS) licensed to practice in the
State of Arizona.
Construction Requirements:
Staking Outline: Prior to beginning any survey operations, the Contractor will furnish to
the Engineer, for approval, a written outline detailing the method of staking, interval of
stakes, marking of stakes, grade control for various courses of materials, referencing,
structure control, and any other procedures and controls necessary for survey completion.
A part of this outline will also be a schedule that will show the sequencing of the survey
and layout work, throughout the course of the contract, listing a percentage of completion
for each month.
Field Books: The Contractor will furnish field books to be used for recording survey data
and field notes. These books will be available for inspection by the City at any time and
will become the property of the City upon completion of the work.
Survey Control Verification: Control Points (horizontal and vertical) -The existence and
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
7
location of all survey monuments, bench marks, and control points will be verified prior to
demolition or construction activity. Immediately notify the City of Chandler Project
Manager when location discrepancies greater than 0.02 foot horizontal or 0.01 foot
vertical are found. All datum will be based upon the City of Chandler datum.
Control Lines: Construction control lines with grade breaks, transition points, horizontal
and vertical curves, etc., will be established and referenced prior to construction.
Temporary Bench Marks: Temporary bench marks will be established prior to
construction, maintained and periodically verified for accuracy throughout the
construction phase.
Pre-Construction Location Survey: All existing features will be located prior to
construction, referenced to survey monuments along control lines by stationing in
accordance with the construction documents and by offset distance from the control lines.
All features will be re-locatable after construction. Distances measured will be within 0.01
foot.
Survey monuments: The land surveyor will follow the requirements of A.R.S. § 33-103
when establishing, replacing or setting Public Land System Survey monuments at Section
or Quarter Section corners and will follow the requirement in Section 9(C) of the Arizona
Boundary Survey Minimum Standards when establishing new or replacement boundary
monuments and witness corner monuments. Finally, land surveyors will also comply with
the requirements of A.R.S. § 104 through 106 when establishing, replacing or setting any
type of boundary monument. Whenever any monuments are established, including those
set to replace missing or damaged monuments of a previous survey, those actions require
the surveyor to create and record a survey drawing documenting the new monumentation
as established.
Water and Sewer Line Appurtenances: Water and sewer line surface appurtenances
such as manholes, valves, and cleanouts that lie within the construction area will be
located and noted on the Contractor's approved construction documents prior to any
demolition or excavation.
Match Points and Removals: Verify the location (horizontal and vertical) of existing
facilities to which the project connects. Immediately notify City Representatives when
location discrepancies of connecting facilities greater than 0.10 foot horizontal or 0.02
foot vertical are found.
Construction Stakes: The Contractor will set construction stakes and marks
establishing lines and grades for road work, curbs, gutters, sidewalks, structures,
buildings, centerlines for utilities and necessary appurtenances, and other work as
indicated in the Contract Documents and will be responsible for their conformance with
the Project Plans and Technical Specifications.
The stakes will be established in accordance with the following guidelines which represent
the minimum standard and the Contractor will provide additional stakes and controls
necessary to perform the work. The Contractor will be held responsible for the
preservation of all stakes and marks and will replace, at no additional cost to the City, any
construction stakes or marks which have been carelessly or willfully destroyed by any
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
8
party.
(a) Roadway: Subgrade stakes will be set to subgrade elevation at 50 foot intervals
on straight sections, 25 foot intervals through vertical curves, on horizontal curves
with radius of 600 feet or less, and/or slopes of less than 0.4%, and the beginning
and end of horizontal and vertical curves and grade breaks. Stakes will be set at
crown lines, at grade break lines, and at edges of pavement which do not abut
concrete curb and gutter or at the edge of pavement abutting vertical curbs or other
structures whose surface grade will not be flush with the finished pavement grade.
Quarter lines will be staked where the distance between the crown line stakes and
the curb and gutter face exceeds 20 feet. ABC stakes will be set to ABC elevation
at 33 foot intervals on straight sections, 25 foot intervals through vertical curves,
on horizontal curves with radius of 600 feet or less, and/or slopes of less than
0.4%, and the beginning and end of horizontal and vertical curves, and grade
breaks. Stakes will be set at crown lines, at grade breaks, and at edges of
pavement which do not abut concrete curb and gutter or at the edge of pavement
abutting vertical curbs or other structures whose surface grade will not be flush
with the finished pavement grade. Quarter lines will be staked where the distance
between the crown line stakes and the curb and gutter face exceeds 20 feet.
(1)
Where the existing pavement will be milled and inlayed, the Contractor will
provide 10-foot grid interval surface control horizontally and vertically.
(2)
Pavement edges will be controlled by utilizing a wire control mechanism or
screeding along a concrete gutter or other structure whose surface grade is
flush with the finished pavement grade. Stakes will be set to finished
elevation at 33 foot intervals on straight sections, 25 foot intervals on curves
with radius of 600 feet or less, and/or slopes of less than 0.4%, and the
beginning and end of horizontal and vertical curves, and grade breaks.
(b) Sidewalk and Bike Paths: Stakes are not required for sidewalks five feet or less
in width which are adjoining existing curb and gutter.
(1)
Sidewalk stakes will be set to grade on an offset and tacked for line at 25
foot intervals at the beginning and end of horizontal and vertical curves and
grade breaks.
(c) Storm Sewer and Drainage: All cuts will be to the invert of the pipe, given to the
nearest 0.01 of a foot.
(1)
Stakes for storm sewer will be driven flush with the existing ground, set on
an offset at 50 foot intervals. Stakes will be marked with the offset and
indicated cut.
(2)
Wyes for laterals will be marked with a line only stake.
(3)
Manholes will be marked with the offset and indicated cut to top of manhole
grade and inverts.
(4)
Stakes for storm water inlets, two per inlet, will be set on a line normal to the
roadway at the center line of the inlet five and ten feet from the face of curb.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
9
The stakes will be marked with the offset to the face of curb and the cut or
fill to the top of curb and inverts.
(5)
Cut sheets will be supplied to the Contractor and City of Chandler Inspector.
(d) Water: All cuts will be to the invert of the pipe, given to the nearest 0.10 of a foot.
(1)
Stakes for water will be driven flush with the existing ground, set on an offset
at 50 foot intervals and specified grade breaks. Stakes will be marked with
the offset and indicated cut.
(2)
Fittings or other critical points such as tees will be marked with a line only
stake.
(3)
Fire hydrants will be located with two stakes per hydrant set parallel with the
roadway five feet from the centerline of the hydrant. The stakes will be
marked with the offset to the hydrant and indicated cut to the top of curb at
the centerline of the hydrant.
(4)
Water meters will be located with two stakes per meter set parallel with the
roadway five feet from the centerline of the meter. The stakes will be marked
with the offset to the meter and indicated cut to the top of curb at the
centerline of the meter.
(5)
Cut sheets will be supplied to the Contractor and City of Chandler Inspector.
(e) Traffic Signing, Striping and Detector Loops: The Contractor will delineate the
procedures and controls to be utilized in the Staking Outline.
(f) Inspection and Acceptance of Work: The City reserves the right to make
inspections and random checks of any portion of the staking and layout work. If, in
the City's opinion, the work is not being performed in a manner that will assure
proper control and accuracy of the work, the City may order any or all of the staking
and layout work redone at no additional cost.
Measurement and Payment:
Construction Surveying and Layout will be measured as a single complete unit of work
and paid at the contract lump sum price, which price will be full compensation for the work
as described herein and required to provide all necessary survey stakes and control. The
approved schedule showing the sequencing and percentage of the survey and layout
work will be the basis on which monthly progress payments will be made. This schedule
will be subject to periodic review, at the request of either party, if the survey and layout
work lags or accelerates. If necessary, the schedule will be revised to reflect changes in
survey and layout progress. When approved, the revised schedule will become the basis
for payment.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
10
ITEM NO. 2
TREE PROTECTION FENCE
Description:
The work under these items will consist of furnishing materials, labor, and equipment
necessary to install protective fencing to existing landscape to remain as indicated, at
locations as specified in the Project Plans.
Construction Requirements:
All work under this item will be completed in conformance with MAG Standard
Specifications Section 107 in its entirety except as modified herein.
All protective fencing shall be in place before earth moving equipment is moved onto the
site and before salvage, clearing or grubbing takes place. The contractor is to schedule
an inspection of construction fence by the Engineer.
A construction fence should be at the canopy edge or beyond to protect as much root
zone as possible for plants that will remain in place and are within the construction
fence/scope of work.
Minimum fence requirement is two (2) strands of gold rope on 6’ T-Bar posts. Posts are
to be placed a maximum of 8 feet on center and at angle points.
Measurement and Payment:
Tree Protection Fence will be measured as a single complete unit of work and paid for at
the contract unit lump sum price, which price will be full compensation for the work,
complete in place.
ITEM NO. 3
EROSION CONTROL (SWPPP PREPARATION, INSTALLATION,
MAINTENANCE, AND REMOVAL)
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to prepare the SWPPP plan, furnish, install, maintain and remove (if
applicable) erosion control best management practices as specified in the Project Plans
and directed by City Representatives.
Materials:
All materials will conform to the requirements of ADOT Standard Specifications. Section
810-2.
Construction Requirements:
All work under this item will be completed in conformance with the Project Plans and all
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
11
applicable City, County, State, and Federal regulations.
Measurement and Payment:
Erosion Control (SWPPP Preparation, Installation, Maintenance, and Removal) will be
measured as a single complete unit of work and paid at the contract lump sum price,
which price will be full compensation for the work described herein and complete in place.
No payment will be made for rejected best management practices, for maintenance after
a storm event, or for damage by the Contractor. No allowance will be made for extra
material used in overlapping at splice joints.
ITEM NO. 4
MOBILIZATION/DEMOBILIZATION
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to conform to MAG Uniform Standard Specifications Section 109.10.
Measurement and Payment:
Mobilization/Demobilization will be measured as a single complete unit of work and paid
at the contact lump sum price, which price will be full compensation for the work, complete
in place.
ITEM NO. 5
CLEARING AND GRUBBING
Description:
The work under this item will consist of furnishing the materials, labor, and equipment
necessary to conform to MAG Uniform Standard Specifications Section 201. The
Contractor should review the landscape plans to identify trees and plants to be protected
in place. The Contractor will clear and grub only the areas required to construct the project
improvements.
Construction Requirements:
All work under this item will be completed in conformance with MAG Uniform Standard
Specifications Section 201 in its entirety except as modified herein.
Burning of trash, debris, plant material, wood, or any other waste material will not be
allowed.
Measurement and Payment:
Clearing and Grubbing will be measured as a single complete unit of work and paid at the
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
12
contact lump sum price, which price will be full compensation for the work, complete in
place. No separate measurement will be made for trees 12 inches or less in diameter at
1-foot above the original ground surface.
ITEM NO. 6
TREE SALVAGE AND REINSTALLATION
Description:
The work under this item will consist of furnishing the labor and equipment necessary for
the salvage, storage and protection, temporary irrigation, and reinstallation of existing
trees, as shown on the Project Plans, in accordance with the requirements of MAG
Standard Specifications Section 201.4 in its entirety except as modified herein.
Construction Requirements:
All tree salvage personnel will have a minimum of one-year experience in tree salvage
and be supervised at all times by a foreman with a minimum of two years’ experience.
Background information on personal associated with this task, along with references that
will verify experience, will be submitted to City Representatives at the pre-construction
meeting.
Salvage, nursery storage and protection, temporary irrigation, and reinstallation of
existing trees.
Cavities resulting from the removal of rootball will be backfilled with material approved by
City Representatives. The material will be compacted to a density of not less than 95
percent of the maximum density as determined in accordance with the requirements of
the applicable test methods of the ADOT Materials Testing Manual and as directed and
approved by City Representatives.
Contractor will coordinate with City Representatives no less than two weeks prior to this
work to tag trees designated for salvage.
Measurement and Payment:
Tree Salvage and Reinstallation will be measured as a unit each for each tree or palm
salvaged as indicated on the plans to be salvaged or as directed by the Engineer, and
will be paid for at the contract unit price each. Price will be full compensation for the work,
complete in place, including excavation and subsequent backfill, compaction, hauling,
obtaining permits, and disposing of the trees/palms.
ITEM NO. 7
SUBGRADE PREPARATION
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
13
necessary for the excavation for the grading and construction of the roadway as specified
in the Project Plans.
Construction Requirements:
Subgrade Preparation will comply with MAG Standard Specifications Section 205 and
301 in its entirety, except as modified herein.
Measurement:
Subgrade Preparation will be measured per square yard including roadway excavation,
borrow excavation, and fill construction.
Payment:
The accepted quantity of Subgrade Preparation, measured as provided above, will be
paid for at the contract unit price per square yard, which price will be full compensation
for the work, complete in place.
ITEM NO. 8
AGGREGATE BASE COURSE, 7 IN THICK
ITEM NO. 9
AGGREGATE BASE COURSE, 8 IN THICK
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for the placement and construction of the aggregate base course as specified
in the Project Plans.
Materials:
Aggregate Base will all comply with MAG Standard Specifications Section 702 in its
entirety, except as modified herein.
The graded aggregate base course will meet City requirements, as shown in the table
below:
Select Aggregate Base Conditions
SIEVE SIZE
(PER ASTM D422-63)
PERCENT PASSING
BY WEIGHT
1 1/4 INCH
100
No. 4
38-65
No. 8
25-60
No. 30
10-40
No. 200
3-12
P.I. MAX
5
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
14
Construction Requirements:
The work under these items will comply with MAG Standard Specifications Section 310
in its entirety, except as modified herein.
Measurement:
Aggregate Base, per thickness as specified in the Project Plans and herein, will be
measured per square yard.
Payment:
The accepted quantities of Aggregate Base, per thickness as specified in the Project
Plans and herein, measured as provided above, will be paid for at the contract unit price
per square yard which price will be full compensation for the work, complete in place.
Payment will include the excavation of in-situ material to reach depths specified on the
Project Plans, percolation tests, and filter fabric.
No additional payment will be made for the excavation of in-situ material to reach depths
as specified in the Project Plans, percolation tests or filter fabric, the cost being
considered incidental to this item
ITEM NO. 10
ASPHALTIC CONCRETE PAVEMENT (2 IN SURFACE COURSE,
A-12.5 EVAC)
ITEM NO. 11
ASPHALTIC CONCRETE PAVEMENT (3 IN SURFACE COURSE,
R-12.5 EVAC)
ITEM NO. 12
ASPHALTIC CONCRETE PAVEMENT (3 IN BASE COURSE, A-19.0
EVAC)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for mixing at a plant, hauling, and placing a mixture of aggregate materials,
mineral admixture and asphalt binder to form a pavement course upon a previously
prepared base or sub base at all locations as specified in the Project Plans.
Materials:
Asphalt Concrete Pavement mix design will conform to current East Valley Asphalt
Committee (EVAC) Hot Mix Approved Asphalt Mixes as follows:
2 in surface course will be A-1/2
3 in surface course will be R-1/2
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
15
3 in base course will be A-3/4
For current EVAC specifications see City of Mesa website located here:
http://www.mesaaz.gov/business/engineering/approve-products-equipment-natural-gas-
line-contractors.
Construction Requirements:
The work under this item will comply with MAG Standard Specifications Section 321 in its
entirety, except as modified herein.
The base prepared by the Contractor, on which the asphalt concrete pavement is to be
placed, will be smooth, firm, and true to grade and cross-section as specified in the Project
Plans, and will be so maintained throughout the period of placing asphalt concrete. If
necessary, in order to obtain the above specified base condition, and if ordered by City
Representatives, a leveling course of asphalt concrete compacted in layers not exceeding
2 inches in thickness or aggregate base will be spread to level irregularities such as dips,
depressions, and sags. All irregularities such as humps or high spots will be removed in
order to provide a smooth base of uniform grade and cross-section, so that subsequent
surfacing will be of uniform thickness. No additional compensation will be allowed for
furnishing and placing these materials and for all work incidental to the correcting of
irregularities will be considered as included in the contract price for asphalt concrete
pavement.
Cold joints between pavement sections will be saw cut.
Measurement and Payment:
Asphaltic Concrete Pavement will be measured per square yard and will be paid for at
the contract unit price per square yard which price will be full compensation for the work,
complete in place.
No additional payment will be paid for saw cutting associated with cold joints.
Measurement and payment for tack coat will be paid for under a separate item
ITEM NO. 13
BITUMINOUS TACK COAT SS-1H, DILUTED
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to apply a bituminous tack coat at all locations as specified in the Project Plans
or as directed by City Representatives.
Materials:
Bituminous Tack Coat will be SS-1h type or approved equal and will conform to MAG
Standard Specification Section 713 in its entirety.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
16
Construction Requirements:
Bituminous Tack Coat will comply with MAG Standard Specifications Section 329 in its
entirety, except as modified herein.
Tack coat will be applied at the rate of no less than 0.08 gallons per square yard or as
directed by City Representatives.
Measurement:
Bituminous Tack Coat will be measured per square yard and will be paid for at the contract
unit price per square yard, which price will be full compensation for the work, complete in
place.
No additional payment will be made for application of Bituminous Tack Coat SS-1H,
Diluted, the cost being considered incidental to this item.
ITEM NO. 14
CONCRETE LANDSCAPE HEADER
Description:
The work under this item will consist of furnishing the all materials, labor, and equipment
necessary to construct concrete header with a medium broom finish at the locations as
specified in the Project Plans and in accordance with the details shown on the Project
Plans, these Technical Specifications, and the requirements of the MAG Standard
Specifications.
Materials:
All materials will conform to MAG Standard Specifications Sections 342 in its entirety.
Construction Requirements:
The Contractor will be responsible for forming the concrete headers per the detail shown
on the Project Plans and COC Detail C-225. Prior to placing the concrete header, the
Contractor will obtain approval from City Representatives for the finish and forming to
ensure it is consistent with the layout as specified in the Project Plans and that the finish
is acceptable prior to proceeding with the work.
All exposed edges will have a 1/4-inch radius.
Measurement and Payment:
Concrete Header (6 in) will be measured by the linear foot and will be paid for at the
contract unit price per linear foot, which price will be full compensation for the work
complete in place.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
17
ITEM NO. 15
VERTICAL CURB & GUTTER, TYPE A, H=6 IN, MAG DET 220-1
ITEM NO. 16
SINGLE CURB, TYPE A, MAG DET 222
ITEM NO. 17
END MEDIAN RAMP, COC DET C-225
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to construct new curb and gutter, single curb, and end median ramp at
locations as specified in the Project Plans.
Materials:
Curb & Gutter and transitions will comply with MAG Details 220-1. Single Curb, Type A &
B will conform to MAG Detail 222. End Median Ramp will comply with COC Detail C-225.
Construction Requirements:
The work under these items will comply with MAG Standard Specifications Section 340
in its entirety, MAG Details 220-1 and 222, and COC Detail C-225.
Measurement:
Vertical Curb & Gutter and Single Curb will be measured per linear foot, including median
nose transitions and curb and gutter transitions. End of Median Ramp will be measured
as a unit for each, including concrete median paving and concrete curbs at the end of
median ramp.
Payment:
Vertical Curb & Gutter and Single Curb, measured as provided above, will be paid for at
the contract unit price per linear foot, which price will be full compensation for the work,
complete in place.
End of Median Ramp, measured as provided above, will be paid for at the contract unit
price each, which price will be full compensation for the work, complete in place, including
concrete median paving and concrete curb at the end of median ramp.
No additional payment will be paid for median nose transitions or curb/curb and gutter
transitions, the cost being considered incidental to this item.
ITEM NO. 18
CONCRETE SIDEWALK, MAG DET 230
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary construct new concrete sidewalk per MAG Detail 230 at all locations as
specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
18
Materials:
All materials will conform to MAG Detail 230 in their entirety, except as modified herein.
Construction Requirements:
Comply with Section 3.12 of City of Chandler Technical Design Manual #4 (2015) and
MAG Detail 230 in their entirety and all City of Chandler supplements, except as modified
herein.
Measurement and Payment:
Concrete Sidewalk will be measured per square foot and will be paid for at the contract
unit price per square foot, which price will be full compensation for the work, complete in
place.
ITEM NO. 19
CONCRETE CURB RAMP WITH DETECTABLE WARNINGS, COC
DET C-258
Description:
The work under this item will consist of furnishing of all materials, labor, and equipment
necessary to construct concrete curb ramps at locations as specified in the Project Plans.
Materials:
All materials will conform to COC Detail C-258 in its entirety, including all City of Chandler
supplements.
Construction Requirements:
Concrete Curb Ramps will comply with COC Detail C-258 in its entirety, including all City
of Chandler supplements.
The work under this item includes construction of the adjacent concrete sidewalk areas
and concrete curb as shown per COC Detail C-258 and as specified in the Project Plans
and all City of Chandler supplements
Measurement:
Concrete Curb Ramps will be measured as a unit for each, including detectable warnings,
additional sidewalk area, and concrete curb as specified in the Project Plans.
Payment:
The accepted quantities of Concrete Curb Ramps, measured as provided above, will be
paid for at the contract unit price each, which price will be full compensation for the item,
complete in place.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
19
No additional payment will be made for additional sidewalk area, concrete curb, or
detectable warnings, the cost being considered incidental to this item.
ITEM NO. 20
CONCRETE APRON AND VALLEY GUTTER, MAG DET 240
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to construct new concrete apron and valley gutters at all locations as specified
in the Project Plans.
Materials:
All materials will conform to MAG Detail 240 in its entirety.
Construction Requirements:
The work under this item will comply with MAG Detail 240 in its entirety, including all City
of Chandler supplements except as modified herein.
Measurement and Payment:
Concrete Apron and Valley Gutter will be measured per square foot and will be paid for
at the contract unit price per square foot, which price will be full compensation for the
work, complete in place.
ITEM NO. 21
ADJUST MANHOLE FRAME & COVER, MAG DET 422 & COC DET
C-401
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to adjust existing manhole frames and covers to match the final surface grade
at all locations as specified in the Project Plans including application of corrosion-
protective coating system on all installed concrete adjustment rings.
Materials:
All materials will conform to MAG Detail 422 and COC Detail C-401.
Corrosion-protective coating system materials will be one of the systems included on the
City of Chandler list of approved products.
Construction Requirements:
The work under this item will comply with MAG Detail 422 and COC Detail C-401 in their
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
20
entirety.
All concrete adjustment rings installed will have a corrosion-protective coating applied
with the application completed in accordance with the manufacturer’s specifications and
City of Chandler’s specifications on file.
Measurement and Payment:
Adjust Manhole Frame & Cover will be measured as a unit for each and will be paid for
at the contract unit price each, which price will be full compensation for the work, complete
in place.
No additional payment will be made for the supply and application of corrosion-protective
coating system on all installed adjustment rings, the cost being considered incidental to
this item.
ITEM NO. 22
ADJUST VALVE BOX & COVER, MAG DET 391-1 AND COC DET
C-307
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to reset frames and covers for existing water and reclaimed water valve boxes
and covers at all locations as specified in the Project Plans.
Materials:
All materials will conform to MAG Details 270, 391-1 and 391-2 and COC Detail C-307.
Construction Requirements:
Comply with, MAG Details 270, 391-1 and 391-2, and COC Details C-307 and C-317, in
their entirety, including all City of Chandler supplements except as modified herein.
Measurement and Payment:
Adjust Valve Box & Cover will be measured as a unit for each and will be paid for at the
contract unit price each, which price will be full compensation for the work, complete in
place.
ITEM NO. 23
REMOVE CATCH BASIN
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
for the removal and disposal of catch basins at locations as specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
21
Construction Requirements:
Removal and disposal of catch basins will comply with MAG Standard Specifications
Section 350 in its entirety, including all except as modified herein. The work includes
removal and disposal of the grates, backfill and compaction of the excavated area.
Measurement and Payment:
Remove Catch Basin will be measured as a unit for each and will be paid for at the
contract unit price each, which price will be full compensation for the work, complete in
place. No additional payment will be made for removal and disposal of the grates, backfill
and compaction of the excavated area, the cost being considered included in this item.
ITEM NO. 24
REMOVE CONCRETE CURB & GUTTER
ITEM NO. 25
REMOVE CONCRETE SINGLE CURB
ITEM NO. 26
REMOVE CONCRETE HEADER
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
for the removal and disposal of existing header curb, concrete single curb, concrete curb
& gutter, and concrete irrigation ditch at locations as specified in the Project Plans.
Construction Requirements:
Removal and disposal of existing header curb, concrete single curb, and concrete curb &
gutter will comply with MAG Standard Specifications Section 350 in its entirety, except as
modified herein.
The Contractor will be responsible for removing the identified concrete improvements in
their entirety. The Contractor will backfill the excavated area per the City’s requirements
for backfilling and compaction.
Measurement and Payment:
Remove Concrete Header, Concrete Single, and Concrete Curb & Gutter will be
measured per linear foot and will be paid for at the contract unit price per linear foot, which
price will be full compensation for the work, including all removals, disposals, backfilling,
and compaction, complete in place.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
22
ITEM NO. 27
REMOVE VALLEY GUTTER
ITEM NO. 28
REMOVE CONCRETE SIDEWALK
ITEM NO. 29
REMOVE CONCRETE SIDEWALK RAMPS
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
for the removal and disposal of existing concrete sidewalks, concrete sidewalk ramps,
and concrete valley gutters and apron at locations as specified in the Project Plans.
Construction Requirements:
The work under these items will comply with MAG Standard Specifications Section 350
in its entirety, except as modified herein.
The Contractor will be responsible for removing and disposal of the identified concrete
improvements in their entirety. The Contractor will backfill the excavated area per the
City’s requirements for backfilling and compaction.
Measurement and Payment:
Remove Concrete Sidewalk and Valley Gutter will be measured per square foot and will
be paid for at the contract unit price per square foot, which price will be full compensation
for the work, including all removals, disposals, backfilling, and compaction, complete in
place.
Remove Concrete Sidewalk Ramps will be measured per each and will be paid for at the
contract unit price per square foot, which price will be full compensation for the work,
including all removals, disposals, backfilling, and compaction, complete in place.
ITEM NO. 30
REMOVE & SALVAGE EXISTING SIGN
ITEM NO. 31
REMOVE EXISTING POST & FOUNDATION
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
required for the excavation, disassembling, removal, and salvage of existing signs,
delineators, object markers, and milepost markers including sign post and foundation, at
locations as specified in the Project Plans.
Construction Requirements:
The Contractor will remove all signs with the sign supports currently in place along the
existing roadway alignments within the project limits at such time as City Representatives
determine the signs are no longer necessary for traffic due to the construction work. The
Contractor will utilize the existing stop signs and other signing items instead of temporary
signing at those locations as much as possible until the existing signing items are no
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
23
longer determined to be necessary.
All items to be removed and which will not be incorporated into the new work will be
removed in a manner which will not produce unnecessary damage or disturbance. The
Contractor will not disturb any other signs, sign posts, foundations, delineators, object
markers, or milepost markers not specifically indicated on the Project Plans or in these
special provisions to be removed unless otherwise directed by City Representatives.
The Contractor shall completely backfill and compact the foundation excavation area in
accordance with City requirements. Salvage and transporting of sign panels, post,
foundation and other sign removal debris shall be the responsibility of the Contractor.
Any items, which are not identified to be removed but which, are damaged, as a result of
the construction will be replaced at the Contractor’s expense. The signs, sign posts,
foundations, delineators, object markers, and milepost markers which are removed will
become the property of the Contractor. They will be disposed of at an acceptable location
off the project limits.
Measurement and Payment:
Remove & Salvage Existing Sign and Remove Existing Post & Foundation will be
measured as a unit for each sign, post and foundation (counted as one unit, inclusive of
post and foundation) and will be paid for at the contract unit price per each, which price
will be full compensation for the item, complete in place.
No additional payment will be made for hauling, removal, and disposal offsite of the signs,
delineators, object markers, and milepost markers sign posts, foundations, hardware,
backfill and compaction, the cost being considered incidental to this item.
ITEM NO. 32
REMOVE ASPHALTIC CONCRETE PAVEMENT
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
for the removal and disposal of existing asphaltic concrete pavement at locations as
specified in the Project Plans.
Construction Requirements:
The work under these items will comply with MAG Standard Specifications Section 350
in its entirety.
Measurement and Payment:
Remove Asphaltic Concrete Pavement will be measured per square yard and will be paid
for at the contract unit price per square yard, which price will be full compensation for the
work, complete in place.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
24
ITEM NO. 33
MISCELLANEOUS REMOVALS AND OTHER WORK
Description:
The work under this item will include furnishing all materials, personnel, and equipment
necessary for the removal and disposal various existing improvements not included in
other Section 350 items described in these technical specifications as directed by the
Engineer and as shown on the project plans.
Existing improvements to be removed under this item shall include non-traffic signs, non-
traffic sign posts, and non-traffic post foundations that are in conflict with proposed
improvements.
Construction Requirements:
Construction will comply with MAG Standard Specifications Section 350 in its entirety with
the addition of miscellaneous post removals.
Backfill and compaction of soil are required in areas as indicated on the Project Plans
and will comply with MAG Standard Specifications Section 211.
Measurement and Payment:
Miscellaneous Removals and Other Work will be measured as a single complete unit of
work and paid for at the contract lump sum price, which price will be full compensation for
the work, complete in place.
ITEM NO. 34
REMOVE AND REINSTALL SIGN
Description:
The work under this item consists of furnishing all equipment, labor, and materials
necessary to remove and reinstall existing signs at locations as specified in the Project
Plans or directed by City Representatives.
Construction Requirements:
The Contractor will be responsible for removing, storing, and reinstalling the identified
existing signs, and reinstalling sign to a different sign post or light pole with new hardware
and appurtenances.
The work under this item will comply with MAG Standard Specifications Section 350 and
City of Chandler Standard Detail C-613.
Prior to the removal of signs, the Contractor will make arrangements for the City
Representative to inspect all signs all signs to be removed. Any signs deemed not
salvageable, as determined by the City Representative, will be disposed of by the
Contractor at his expense. Any signs damaged during removal or storage will be replaced
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
25
at no cost to the City.
Measurement and Payment:
Remove and Reinstall Sign will be measured as a unit for each and will be paid for at the
contract unit price each, which price will be full compensation for the work, complete in
place.
No additional payment will be made for new hardware, appurtenances, sign post,
foundation, backfill, compaction or disposal, the cost being considered incidental to this
item.
ITEM NO. 35
TRAFFIC CONTROL
Description:
The work under this item will consist of furnishing all equipment, labor, and materials
required to install, maintain, move and/or remove barricades, warning signs, lights,
signals, cones, and other traffic control devices required to provide safe and efficient
passage through and/or around the work and to protect workers in or adjacent to the work
zone.
General Requirements:
Traffic control will be provided by the Contractor in accordance with the City of Chandler
Traffic Barricade Design (Technical Design Manual #7), the requirements of Part 6 of the
Manual on Uniform Traffic Control Devices (MUTCD) and MAG Section 401, as directed
by the City, except as modified herein.
The Contractor will submit Traffic Control Plans (TCP) to the City for review and approval.
No work will begin prior to the City’s approval of the proposed TCP(s).
The Contractor’s TCP submittal will be prepared by an individual meeting one of the
following criteria:
(a)
Has successfully completed a recognized traffic control supervisor training
and certification program. The traffic control supervisor training and
certification provided by the American Traffic Safety Services Association
(A.T.S.S.A.) or the International Municipal Signal Association (IMSA) will be
acceptable. Training and certification through other programs must be
approved in advance by the City Representative. The individual’s training
and certification will be current and must be valid throughout the duration of
the project. In order to remain current with the Department, training and
certification will be completed or renewed at least once every four years.
(b)
Be a licensed professional engineer registered in the State of Arizona and
have completed an approved traffic control supervisor training program, as
specified in Subsection 108.03. The training will be current and must be
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
26
valid throughout the duration of the project. In order for the training to remain
current with the Department, it will be completed or renewed every four
years.
The Contractor will submit proof of the proposed individual’s credentials at the
preconstruction conference. The Contractor bears all responsibility for any such
contractor-submitted traffic control plan, whether prepared by its direct employee or other
individual.
The Contractor’s TCP submittal will be submitted early enough to allow at least two weeks
for review and approval before use of the proposed traffic control plan.
Materials:
Temporary Impact Attenuators:
Temporary impact attenuation devices will also meet evaluation criteria for Test Level 3
per NCHRP (National Cooperative Highway Research Program) Report 350, or for Test
Level 3 per MASH (AASHTO Manual for Assessing Safety Hardware). The Contractor
will provide, at the preconstruction conference, a certificate of compliance, certifying that
any temporary impact attenuation devices to be used on the project will meet the above
requirement. The Contractor will include the project number on the submittal.
At the pre-construction conference, the Contractor will provide the City with the name of
the Contractor's employee who is responsible for implementing, monitoring, and altering,
as necessary, the traffic control plan. The Contractor's designee will be available at any
time to respond to calls involving damage or displacement to barricades, lights, signs and
other devices resulting from vandalism, traffic accident or other causes.
Truck Mounted Attenuators:
The Contractor will provide trucks and truck-mounted attenuator at the locations shown
on the Project Plans and/or as directed by the City.
Attenuators will meet either NCHRP Report 350, Test Level 3 criteria, or MASH (Manual
for Assessing Safety Hardware), Test Level 3 criteria, passing both mandatory and
optional tests. The truck and attenuator combination will only be used in the configuration
tested. Either the truck or attenuator will have a sequential arrow display panel or
changeable message board.
Attenuators will have rear-mounted, retroreflective chevron stripes and a standard trailer
lighting system, including brake lights, turn signals, ICC-bar lights, and two yellow rotating
beacons, strobe lights, or LED lights mounted on opposite rear corners of the truck or
attenuator approximately 4-1/2 feet above the bottom of the tires. A Type C arrow panel
or changeable message board will be provided and will be installed in accordance with
the NCHRP 350/ MASH Crashworthiness Certification or FHWA Letter of Acceptance.
There will be a minimum of seven feet from the roadway to the bottom of the panel or
board. Frame work will be an integral part of the truck and be permanently mounted in
such a way as to prevent the unit from separating from the truck in the case of a collision.
For each proposed truck-mounted attenuator, the Contractor will provide a Certificate of
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
27
Compliance, to the City for approval prior to use. The certificate will include the certified
weigh bill for the truck and will state that the attenuator meets the specified criteria, and
will clearly state the roll-ahead distance. A copy of this documentation will be kept in the
truck cab or host vehicle, available for immediate inspection when requested by City
Representatives.
When in use for attenuation, trucks will be used exclusively for attenuators. When in use
for attenuation, such trucks will not be used to carry or store equipment or devices,
secured or unsecured. No modification in configuration or use will be allowed without a
resubmitted certified weigh bill for the City’s approval.
Truck-mounted attenuators used as shadow vehicles per the MUTCD will be positioned
at a distance greater than the roll-ahead distance in advance of the workers or equipment
being protected so that there will be sufficient distance, but not so much that errant
vehicles will travel around the shadow vehicle and strike the protected workers and/or
equipment.
The Contractor will cease operations when a truck-mounted attenuator is damaged. The
Contractor will not resume operations until the attenuator has been repaired or replaced,
unless authorized by the City.
Changeable Message Boards:
Changeable message boards will be furnished and maintained by the contractor at the
locations shown on the plans and as specified by the City. The operations and messages
programmed into the board controller will be as directed by the City. The changeable
message board will be a complete and operational portable unit which will consist of a
wheeled trailer with an adjustable, changeable message board, board message controller
and self-contained power supply.
The power supply for the changeable message board will be a fully independent
self-contained trailer-mounted system. The changeable message board power supply will
be battery operated and rechargeable from a solar panel mounted above the changeable
message board.
The message characters will be delineated by either electromagnetically actuated
reflective dots or optically enhanced light emitting diode pixels (LED) operating under the
control of a digital computer.
The Contractor will submit, at the pre-construction conference, a Certificate of
Compliance that the changeable message board to be used on this project will be as
described herein.
The character formation system and components will conform to the following
requirements:
(1)
The changeable message board will be programmable, and will be capable
of displaying a minimum of three lines of message copy, with a minimum of
eight characters per line, in various alphanumeric combinations.
(2)
The changeable message board matrix configuration will be 35 dots or pixels
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
28
per character in a five horizontal by seven vertical arrangement of the dots or
pixels.
(3)
The dot or pixel size will be a 2.5-inch high by 1.625-inch wide rectangle
(minimum), or equivalent area.
(4)
Each character will be 18 inches in height and 12 inches in width (minimum).
(5)
The horizontal character separation will be three inches or more.
(6)
Dot color will be fluorescent yellow upon activation and flat black when not
activated. The LED pixels will emit amber light upon activation and be dark
when not activated.
(7)
The line separation will be five to 12 inches.
(8)
Changeable message boards will be protected with a clear lexan-type or
equivalent shield that will not interfere with or diminish the visibility of the sign
message.
(9)
The programmable message board will be capable of displaying moving
arrow patterns as one of the operator-selected programs.
(10)
The message board will also be capable of displaying up to two messages in
sequence, with variable timing in a minimum of quarter-second increments.
(11)
The message board will be clearly visible and legible from a distance of 800
feet under both day and night conditions. The dot-matrix board will have an
internal illumination system that will automatically activate under low light
conditions to achieve the visibility requirements. The LED-pixel matrix board
will adjust light output (pulse width modulation) to achieve the visibility
requirements.
(12)
The power supply achieved from the battery and solar panel recharging
system will have sufficient capacity to operate the changeable message
board for a minimum of 20 days without direct sunshine. The solar panel array
will be capable of recharging the batteries such that 2.5 to 3.5 hours of direct
sunshine will provide for a minimum of one 24-hour period of usage.
Additionally, the battery recharging controller will have an ambient
temperature sensing device which will automatically adjust the voltage
supplied from the solar panels to the batteries. The sensing device will ensure
that the batteries are properly charged in hot or cold weather and will provide
the sign with sufficient power to operate the sign as specified.
When in operation, the changeable message board trailer will be offset a minimum of
eight feet from the nearest edge of pavement. If the trailer is located behind temporary
concrete barrier, a minimum offset of six feet will be required. Should the specified
shoulder width not be available, a minimum two-foot offset from the nearest edge of
pavement or temporary concrete barrier will be required. When positioned on the
highway, the changeable message board trailer will be delineated with a minimum of 10
Type II barricades or vertical panels with Type C steady burn lights at a spacing of 10 to
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
29
20 feet, or as shown on the approved traffic control plan.
When not in operation, the changeable message board will be moved away from the edge
of pavement.
The changeable message board trailer will be placed on a level surface and be secured
as recommended by the manufacturer and as directed by the City. The Contractor will
provide any necessary incidental grading and clearing work required to provide a level
surface and clear area for the sign.
Flagging Services:
Flagging services will consist of civilian flaggers only for this item. Local enforcement
officers and their vehicles will conform to the requirements in their perspective bid item.
The Contractor will be responsible to procure civilian flaggers.
The Contractor will furnish verification to the City Representative that all civilian flaggers
have completed a recognized training and certification program. Flaggers certified by the
American Traffic Safety Services Association (A.T.S.S.A.) or by the National Safety
Council will be acceptable. Certification through other programs offering flagger training
must be approved by the City Representative. Flagger certification must be current.
Training and certification will be required at least once every four years.
Construction Requirements:
Signs mounted on posts set in the ground will be removed at the completion of the project,
the post holes filled and compacted, and the immediate area restored to match the
surrounding area.
All Type II Barricades, Type Ill Barricades, and vertical panels will be equipped with steady
burning lights. All orange construction signs will use high reflectivity sheeting. All signs to
be used on the job during periods of darkness will be reflectorized.
Construction Schedule:
The Contractor will provide separate construction progress schedules for each individual
construction activity and the required traffic control for those activities. The schedule will
specify the limits of the work activities and related traffic control plan by station or
milepost, by day, and by time of day.
The schedule and the related traffic control will be developed in such ways that access
or alternative access is maintained at all times to all adjacent residences and businesses.
The schedule should be developed in such a manner that it can be released to the public.
The schedule will be updated as necessary.
Access Requirements for Pedestrians:
Contractor will ensure that all sidewalks on this project remain in compliance with the
Americans with Disabilities Act (ADA) Standards. All open pedestrian walkway areas,
paved or unpaved, will be maintained and safely useable at all times. Such measures as
backfilling or ramping to existing sidewalks, or providing alternate sidewalk areas adjacent
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
30
to existing sidewalks may be used. Contractor will ensure one driveway remains open at
all times per parcel of land.
Guidelines for ADA access requirements will be in accordance with the Manual on
Uniform Traffic Control Devices for Streets and Highways, 2009 edition, and Arizona
Supplement to the 2009 edition, dated January 2012, Public Rights-of-Way Accessibility
Guidelines (PROWAG), Pedestrians Checklist and Considerations for Temporary Traffic
Control Zones (https://www.fhwa.dot.gov/indiv/docs/atssa_pedestrian_checklist.pdf) and
Guidance Sheet – Temporary Traffic Control Zone Pedestrian Access Considerations
(http://www.atssa.com/galleries/default-
file/WZ%20Guidance%20Sheet%20FINAL%20LAYOUT%20TO%20FHWA.pdf).
Measurement and Payment:
Traffic Control will be measured as a single complete unit of work and paid for at the
contract lump sum price, which price will be full compensation for the work complete in
place as described herein and required to provide temporary traffic control.
Twenty five percent of the unit price bid will be paid upon the conclusion of the pre-
construction conference, substantial mobilization to the project and satisfactory initial
installation of temporary traffic control devices. The remaining seventy five percent will
be paid in monthly increments based on the approved lump sum schedule.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by the Engineer as a result of extra work authorized in accordance with City
of Chandler General Conditions Section 9.
The cost of all work described in the Traffic Control section above is not directly measured
nor paid, the costs are considered as included in the cost of the contract bid items.
ITEM NO. 36
LANDSCAPE ESTABLISHMENT
Description:
The Construction Phase of the contract will consist of the items under this contract other
than items covered under the Landscape Establishment item. When the work is
completed under the Construction Phase of the contract and approved by City
Representatives, the six (6) month Landscape Establishment of the contract will begin.
No work or contract time under the Landscape Establishment phase of the project will
begin until the work under the Construction Phase is considered complete by City
Representatives.
The water used during Landscape Establishment to properly maintain the plant material
will be furnished by the City of Chandler, at designated sources from within the project
limits, at no charge to the Contractor. The Contractor will be responsible for the
equipment, materials and labor necessary to load, transport and unload water for
watering purposes.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
31
During the second half of the Landscaping Establishment period, the Contractor will
provide, where required, plant replacements as follows:
Original Size
Replacement Size
1 gallon
5 gallon
5 gallon
15 gallon
15 gallon
24-inch box
36-inch box
48-inch box
During the second half of the Landscape Establishment period, the Contractor will
provide plant material replacements for existing plants that die as follows:
Existing Plant Material Sizes
Replacement Size
Trees:
2-inch Caliper
24-inch box
4-inch Caliper
36-inch box
6-inch Caliper and greater
54-inch box
Shrubs:
All Existing Shrubs
15 Gallon
The plant material replacement will be considered as included in the work for Landscape
Establishment, and will be made at no charge to the City of Chandler.
General:
The Prime Contractor will be in direct control of work performed under Landscape
Establishment. If work is subcontracted, due to labor shortage, a representative of the
Prime Contractor will be present at the site of the work for the hours that the subcontractor
works. Subcontracting of Landscape Establishment work will be permitted for weed
eradication with herbicides, because of special licensing. A licensed temporary service
may be used to supply labor to the prime if the prime has received approval from City
Representatives. The Prime Contractor will submit the required subcontract
documentation.
Planted Stock Establishment:
Materials and labor required for tree guying will be considered as included in the cost paid
for under for the Landscape Establishment item.
All trees will stand erect on their own without stakes when brought to this site. If the tree
cannot stand on its own when nursery stakes are removed, the tree will be removed and
replaced.
The Contractor will provide three applications of an approved pre-emergent herbicide on
the unpaved areas of the project, as directed by City Representatives, to control weed
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
32
growth in the areas of the project. The number of applications may be increased as
directed by the City Representative, and at no additional cost to the City, if the City
Representative deems additional applications are required to control weed growth.
Application sequence will be approved in advance by the City of Chandler. The first
application of pre-emergent will be completed prior to the application of Decomposed
Granite and will be included with the cost of the Decomposed Granite as specified and
part of the Construction Phase portion of work. The second application of pre-emergent
will be completed half-way through the Landscape Establishment period. The third and
final application of pre-emergent will be applied 15 days prior to completion of the
Landscape Establishment portion of the project. The second and third pre-emergent
applications will be included with the cost of Landscape Establishment. Watering will be
completed in accordance with the manufacturer’s recommendations, as included and as
related to each application.
The pre-emergent herbicide will be applied in accordance with the requirements of these
Technical Specifications and the recommendations of the pre-emergent herbicide
manufacturer, as approved by City Representatives.
The control of weeds will be accomplished by the use of herbicides. Manual removal of
weeds will be required, after herbicides have taken affect.
Contractor is responsible for the removal and disposal of the trash and debris during the
Landscape Establishment period. Contractor will keep the project in a neat and orderly
manner during the duration of the Landscape Establishment period.
The Contractor will supply City of Chandler with a minimum of 250 white colored marking
flags for the purpose of conducting the monthly Landscape Establishment inspections per
the acceptance of City Representatives.
Measurement and Payment:
Landscape Establishment will be measured as a single complete unit of work and paid
for at the contract unit lump sum price, which price will be full compensation for the work,
complete in place.
Partial payments may be made for Landscape Establishment. Payment will be based
upon the length of the landscaping establishment period as specified in these technical
specifications, and the contract lump sum price for this item.
ITEM NO. 37
TREE – 24 IN BOX, 1.5 IN CAL MIN
ITEM NO. 38
PLANT – 5 GAL
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to plant trees and plants of the size and type indicated, at all locations as
specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
33
Control stationing, application of rodent repellent by mechanical or chemical means,
removal of excess material(s), and general plant care and maintenance will also be
completed in accordance with the requirements of Section 430 of MAG Standard
Specifications, these Technical Specifications, and as required and approved by City
Representatives.
Materials:
Within 60 calendar days of the Notice of Award, the Contractor will furnish a complete
Plant Availability List of all the plantings needed for this project. The list will include the
confirmed nursery source for the planting stock, assuring the availability of each plant
material and the size specified herein.
The list will include the species name (botanical, common, and varietal), size and quantity
of the plant material, the confirmed source for the plant material as evidenced by an
invoice or contract with the confirmed source and the approximate date the plant material
will be delivered to the jobsite. This Plant Availability List will be submitted in triplicate to
City Representatives.
Approval of the Plant Availability List by City Representatives does not relieve the
Contractor of the responsibility for providing plantings that will pass the inspection
required elsewhere in the ADOT Standard Specifications or these Technical
Specifications.
Prior to planting, the selection of trees will be approved by the City Representatives. The
Contractor will meet with the project Landscape Architect at up to three (3) local nurseries
or wholesale plant providers to select and tag trees for use in the project. Local nurseries
will be defined as those located within the Phoenix Metro Area. Nursery visits will occur
a minimum of three (3) months prior to planting. The selected trees may be purchased
and stored at the nursery, under continued care of the nursery, until time of planting. No
planting will occur during the months of June through September.
To properly plant maintain and care for the plant material, water used during landscape
construction will be furnished by the City of Chandler at the designated water meter
sources from within the project limits, at no cost to the City.
Trees will be maintained in a straight vertical position during both the Construction Phase
and the Landscape Establishment Phase of the project.
The Contractor will be responsible for the care of the trees and damage caused by
improper support of the trees or due to construction activities. If necessary, or if required
by City Representatives, all staking and bracing of trees will be completed as detailed on
the Project Plans.
Construction Requirements:
Immediately after planting, all plants will be irrigated with the irrigation system until the
backfill soil around and below the roots and the root ball itself is brought to 100 percent
water holding capacity.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
34
Plant pits and root balls will not be allowed to be flooded and totally saturated. Water will
not be used to accomplish soil compaction around the root ball.
The soil for back-filling the planting pits will confirm to Section 430 of MAG Standard
Specifications.
All trees will be staked per City of Chandler standard details and are considered incidental
to the tree planting.
The Contractor will layout the planting pits in accordance with the Project Plans and
control stationing along the curb edge using a starting location, methods, and markings
approved by City Representatives. The planting layout will be according to the Project
Plans. Triangular spacing shown are minimums only; actual spacing may vary.
The flagging will remain in the center of the planting pit until planting starts.
The Contractor will pay special attention to the infestation of weeds and grasses. If either
of these items are found in the planting pits, it could result in immediate removal and
disposal of the plant. The planting pit will be excavated and inspected to assure complete
eradication of roots or rhizomes which may have grown into the area. This work and
associated materials will be the responsibility of the Contractor, and will be completed at
no additional cost to the City.
All water used during the planting operation phase of the project will be the responsibility
of the Contractor, and will be provided at no additional cost to the City.
Measurement and Payment:
Trees and plants will be measured as a unit for each item planted and will be paid for at
the contract unit price each, which price will be full compensation for the work, complete
in place.
No payment will be made for trees and plants selected for inspection and not planted or
for the care and protection of trees and plants prior to the beginning of the landscaping
establishment period, the costs being considered as included in the prices paid for trees
accepted and paid for under this bid item.
ITEM NO. 39
DECOMPOSED GRANITE (TO MATCH EXISTING)
Description:
The work under these items consists of the following:
Eradicating existing grasses and weeds with an approved herbicide and by
mechanical methods. Also included will be furnishing and applying herbicide mixed
in water.
Grading surfaces upon which decomposed granite will be placed to ensure proper
drainage.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
35
Furnishing, placing, and compacting decomposed granite, which will include the
excavation and back filling.
Included in the granite work is maintaining these areas free of weeds and
trash/debris during the construction and landscape establishment phases of the
project.
All work under this section will be completed in accordance with the details shown on the
Project Plans, MAG Standard Specifications Section 430 and 795, and the requirements
of these Technical Specifications.
Materials:
Decomposed Granite to be placed at a minimum depth of 2 inches, except in planting
pits. Decomposed granite within planting pits shall be placed at a depth of 1 inch at the
specified in locations shown on the Project Plans. The color to be used on the project will
have the same color range as those listed below, and will be approved by the City of
Chandler representative for color and gradation prior to processing or placement.
Color Table
COLOR
GRANITE NAME
SOURCE
Gold
Desert Gold
AZ Rock Express
Brown
Saddleback Brown
Pioneer
Granite color will be no lighter in coloration than the lightness of the specified colors
above.
Granite will have no more than 10 percent of the lighter color pigments (white and cream
color pigmentations) in the granite mulch mix.
Criteria to be used for approval for project granite color will be based on the following:
Similarity to the granite color sample designated as the desired granite control
color of the project
Conformance to the material samples maintained by the City of Chandler
If referenced similar color granite mulch was used on previous Chandler projects
The material’s appearance after being wet and then dried
Each granite mulch color approved for construction will be acquired from a single source.
Contractor to submit a decomposed granite sample for approval prior to ordering and
installation. Decomposed Granite may vary in size, gradation, and color by location. Each
type, regardless of size, gradation, and color, will be included under this item, and each
type will be submitted and approved prior to ordering and installation.
Gradation requirements for Decomposed Granite ½ Inch Screened, are as follows:
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
36
Decomposed Granite 1/2 Inch Screened
Sieve Size
Percent Passing
3/4”
99
1/2”
67
3/8”
30
1/4"
5
#4
3
#8
2
#10
-
#16
-
#30
1
#40
-
#50
-
#100
-
#200
0.5
Except where granite material has been pulled back for reinstallation, the salvage and
reuse of existing granite material from the project area will not be allowed. All
decomposed granite will be new. Each decomposed granite material will come from a
single source to ensure uniformity of color.
All samples of decomposed granite will be supplied by the Contractor for approval prior
to ordering and installation. The Contractor will receive approval from the City of Chandler
for alternate granite color and/or color changes for decomposed granite prior to
installation.
Construction Requirements:
Decomposed Granite to be used on the project and the granite samples prior to placement
on the job site must meet the following requirements:
Copy of the environmental permit for each granite source pit.
Written acknowledgement from each supplier that they can provide the quantity
of Granite Material required to complete the project.
Written acknowledgement that granite supplier material will be provided within the
contract time frame.
The cost for approved alternate decomposed granite color will be paid for at the
contract bid price.
The Contractor will provide a minimum 1-ton sample for each color required on
the project and each proposed alternate color.
All samples provided will be cleaned and washed and will be leveled and cover
an area of about 10 feet by 10 feet, and will be identified at the jobsite with a sign
measuring 1-foot x 1-1/2 feet, with double staking behind the sign, and placed
securely into the ground adjacent to the granite mulch color(s) samples(s).
Labeling of decomposed granite signs will first list the name of the product, and
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
37
on the second line will appear the name of the supplier. Text for labeling will be
waterproof, clearly legible, printed, and 1-inch capitalized text.
Contractor will utilize one of each of the pre-bid opening colors at the same contract
bid price if an alternate color is not approved.
Alternate granite proposed after bidding acceptance shall require a submittal for
review to be clean and washed, leveled covering an approximate spread area of
10 feet x 20 feet, and signed identifying the product and source.
Alternate granite samples will have been cleared by City Representatives prior to
color(s) submittal and on-site placement for review and approval.
Alternate granite samples submitted after award of contract will be submitted a
minimum of 30 days prior to granite installation for review and approval.
The granite color review and approval process will be coordinated by the Contractor with
City Representatives and requires a 1-week minimum advance notice by the Contractor
through the City Representatives. All granite colors and color alternates are as approved
by City of Chandler. Granite colors are evaluated by comparison to approved color
samples and existing decomposed granite.
The Contractor will remove the non-planted vegetation from the areas designated to
receive decomposed granite (by chemical or mechanical means) and maintain the
designated areas “vegetation-free” for a minimum period of 40 working days prior to
placement of the granite mulch and decomposed granite, or as specified by the City
Representative.
Prior to placement of the decomposed granite, designated areas to receive granite mulch
and decomposed granite will be completely free of grass, weeds, or other miscellaneous
vegetation growth.
When using herbicides, a pre-emergent herbicide (Gallery, Surflan, Barricade or
equivalent) will be applied to the granite material areas in the manner recommended by
the manufacturer to prevent germination of noxious weeds. The Contractor will comply
with the applicable portions of Subsection 803-3.02 of the ADOT Standard Specifications.
The subgrade upon which the decomposed granite is placed, will be graded and
compacted to promote proper drainage, as approved by the City Representative.
The subgrade will be compacted to between 85 to 90 percent of the maximum proctor
density, as determined in accordance with the requirements of Arizona Test Methods 230
or 235, depending on the test method used to determine the compaction density (Sand
Cone or Nuclear Method).
All vehicles used for spreading, grading and raking the decomposed granite will have one
set of wheels with floatation tires having a minimum width of 18 inches to allow equal
compaction of the granite mulch decomposed granite will be placed to a depth as
indicated on the Project Plans and details. After rough spreading and rough grading of
the granite mulch within the designated areas, the granite mulch and decomposed granite
will be raked evenly and thoroughly to blend the different gradation sizes.
The use of conveyor belt type of equipment for placing granite mulch and decomposed
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
38
granite will not relieve the Contractor from the requirements of compacting the granite
mulch and decomposed granite with equipment as described herein.
After placement, the granite mulch and decomposed granite will be saturated with water
to an optimum moisture level as recommended by the supplier. The City Representatives
will approve the amount of water necessary to aid in the compaction of the granite mulch,
prior to application.
During the final spreading and final grading operations, the surfaces within the granite
mulch and decomposed granite areas will be passed over by the spreading and grading
equipment a minimum of two-times.
Equipment operations for spreading, grading, raking, chemical application, water settling,
and other operations will be done in a manner that uniformly maximizes the vehicle‘s
wheel compaction over the surface area.
The pre-emergent herbicide will be applied in the manner recommended by the
manufacturer to prevent germination of noxious weeds.
Pre-emergent herbicide will be applied to the designated granite mulch and decomposed
granite areas as specified in the ADOT Standard Specifications: The City of Chandler
requires three (3) applications of pre-emergent.
After placing, spreading and grading the granite mulch and decomposed granite, the
Contractor will water settle the total thickness of the granite mulch and decomposed
granite, to remove the fine material from the surface. The water settling operation, noted
above, will be completed by applying water at minimum depth of 1/2 inch over the
decomposed granite placed or as approved by the City Representative.
Measurement and Payment:
Decomposed Granite, 1/2-Inch Screened will be measured by the square yard and will
be paid for at the contract unit price per square yard, which price will be full compensation
for the item, complete in place. Payment will include the required or requested samples,
grading, compaction, pre-emergent herbicide, erosion repair work and other related
activities as described and specified herein, and as specified in the Project Plans or as
required by City Representatives.
No additional payment will be made for the erosion repair work or compaction of soil, as
specified herein, the cost being considered incidental to this item.
Contractor will be responsible for erosion repairs on project site that may occur during
decomposed granite mulch color review and approval process at no additional payment
to the Contractor.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
39
ITEM NO. 40
DECOMPOSED GRANITE, REMOVE AND REINSTALL
Description:
The work under this item will consist of furnishing the labor and equipment necessary to
rake away existing decomposed granite to clear the area for construction and re-spread
the material back to the new concrete as indicated, at the locations as specified in the
Project Plans.
Measurement and Payment:
Decomposed Granite, Remove and Reinstall will be measured as a single complete unit
of work and paid for at the contract unit lump sum price, which price will be full
compensation for the work, complete in place.
ITEM NO. 41
LANDSCAPE AND IRRIGATION RESTORATION
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to restore the existing landscape and irrigation in areas that are disturbed by
construction. Work includes the relocation and installation of lateral pipe and drip emitters,
trenching, and backfill for a fully functional irrigation system to ensure effective and
efficient watering of the landscape areas. The decomposed granite installation for these
areas is included in this bid item. Contractor will renew and replace the existing
decomposed granite to match replaced decomposed granite within these restoration
areas.
This work will be as defined in sections 440 of the MAG Standard Specifications as
modified below.
Materials:
Any disturbed existing irrigation system will require that the Contractor re-construct the
irrigation system using the emitters, valves, piping, fittings, controllers, wiring, and other
components, of sizes and types to match existing equipment and as called for in the
contract documents.
All replacement or repair materials will match the existing materials that have been
damaged. Irrigation materials and components will be from the same manufacturer as
originally installed. Emitters will have the same volume output as original. PVC pipe may
be from a different manufacturer but the grade will be as originally installed. All mainline
fittings will be Schedule 80, all lateral fittings will be Schedule 40.
Landscape materials and decomposed granite will be replaced to match existing
conditions. Contractor will walk site with City Representatives to inspect Landscape and
Irrigation Restoration areas prior to construction activities.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
40
Construction Requirements:
Contractor will verify exact limits of disturbance with City Representatives in areas
specified in on the Project Plans as Landscape and Irrigation Restoration Areas. All work
will be in accordance with these Technical Specifications and MAG Standard
Specifications.
Contractor will identify and coordinate limits of disturbance areas where appropriate with
City Representatives prior to beginning of construction activities. Contractor will contact
City Representatives for review and approval of all Landscape and Irrigation Restoration
materials prior to installation.
The work will also consist of reconstructing, rerouting, modifying, or repairing the existing
irrigation system in areas specified in on the Project Plans. The Contractor will be required
to repair and/or replace all disturbed or damaged irrigation components, returning their
operation to 100 percent within 24 hours following initial disturbance of the irrigation
components. The existing irrigation that will be impacted includes the drip irrigation
system for the trees, shrubs and ground covers. The work will include furnishing and
installing the various irrigation sleeves, piping, drip emitters, gate valves, electric control
valves, wiring, and valve boxes, including required excavation and backfill at the specified
in locations shown on the Project Plans or as directed by the City Representatives.
All work will be in accordance with the details shown on the Project Plans, or as directed
by the City Representatives and the requirements of these Technical Specifications. The
existing irrigation components will be protected a45tnd maintained in their current
condition where feasible or repaired, replaced, extended and reconnected in areas
including, but not limited to, those areas that are disturbed during the construction, areas
shown on the Project Plans or as directed by City Representatives. The Contractor will
be required to maintain water to all existing plant materials throughout the duration of the
contract using repairs, reconnections, replacements or rerouting of the system as
approved by City Representatives. The Contractor will ensure that the entire existing and
new irrigation systems within the project limits are operational and functional and will test
and receive approval from City Representatives prior to proceeding with other related
work. The City Representatives will inspect and give approval prior to backfilling.
The system will be constructed to grades and conform to areas and locations as shown
on the drawings.
Protection of Existing Vegetation: The work will include the protection of all existing
plant material. Contractor will take great care to protect in place all existing plant material.
Contractor will replace in like kind and size existing plant material removed, damaged, or
destroyed at no cost to the City and to the satisfaction of City Representatives. The
Contractor will identify and the City Representatives will review existing plant materials
within the disturbance areas. Salvage and relocate or replace all plant material in conflict
with the construction as designated in Landscape and Irrigation Restoration Areas in like
kind and size per the direction of City Representatives.
Identify, protect, and maintain existing vegetation within the protected areas indicated on
the Contract Drawings during the Contract from the Notice-To-Proceed to Final
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
41
Acceptance. Perform the Work of this Section in accordance with the standards of the
Tree Care Industry Association (TCIA). Do not perform work within the protected areas
unless approved by City Representatives. Do not store materials within the protected
areas. Do not permit vehicle parking, foot traffic, or other activity not approved in writing
by City Representatives within the protected areas. Provide labor and new and
undamaged materials that constitute “Best Practice” to meet the letter and intent of this
Contract. Follow the safety requirements of ANSI Z133.1.
Verification of Conditions: Prior to the start of construction, Contractor will conduct
onsite inspections of plants and vegetation with the City of Chandler Representative, and
identify and inventory the plants and vegetation that are to remain in place during this
area tour. Field measure and stake Project improvements as needed for establishing the
location and limits of disturbance.
Construction within Protected Areas:
Demolition and Construction Activities: Contractor will perform demolition and
construction activities within protected areas in a manner that minimizes damage to tree
roots and branches. Use hand tools where necessary. Make minimal use of construction
equipment within the protected areas. Use such equipment within the protected area only
when approved by City Representatives. Tree pruning will be performed by a Certified
Arborist. Notify the City Representatives 72 hours prior to the use of the equipment within
the protected areas.
Provide bridging materials, such as protective planking, in protected areas where
construction equipment operates. When utilities must be installed within protected areas,
bore under the protected areas whenever possible instead of digging open trenches
through them.
Excavating around Trees and Shrubs: Contractor will excavate around trees and
shrubs within protected areas only where indicated on the Project Plans. When work that
may impact protected plants occurs, plan the work to assure minimal disturbance to the
plants, follow good horticultural practices, and direct pruning and wound treatment in
accordance with this Section.
Protecting Root Systems: Contractor will protect root systems from damage due to
runoff or spillage of noxious materials in solution during storage or construction activities.
Protect root systems from flooding or soil erosion. Provide a minimum of two layers of
untreated burlap as a covering over exposed root face areas. Do not disturb or excavate
protected root zone areas unless specifically authorized to do so by City Representatives.
Where trenching for utilities is required within protected areas, excavate under or over
roots by hand digging under the authority of City Representatives. If large roots are
encountered, or if a condition potentially fatal to the plant is observed, notify City
Representatives prior to continuing or commencing work. Do not cut main lateral roots or
taproots, those 2-1/2 inches in diameter or greater; however, smaller roots that interfere
with the installation of new work may be cut. Cut smaller roots with sharp pruning
instruments, but do not break or chop roots. Excavate root systems by hand in areas
where new construction is required within protected areas. Use a narrow-tine spading fork
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
42
to expose roots. Cut exposed roots back from the new construction. Do not permit
exposed roots to dry out before permanent backfills is placed. Provide temporary earth
cover, or pack the roots with peat moss, and wrap the roots with burlap. Water and
maintain the roots in a moist condition, and temporarily support and protect them from
damage until they are permanently relocated and covered with backfill. Provide imported
topsoil backfill to cover exposed roots in soil cuts. Do not overload root zones by placing
backfill above the existing grade.
Protecting, Restoring, or Modifying Irrigation System: The work under this item will
consist of testing, reconstructing, or modifying the existing irrigation systems that are
damaged by the construction or as specified in on the Project Plans for modification. Prior
to construction activities, the Contractor will stake areas that are designated to be
disturbed. The Contractor, along with City Representatives, will meet with the
maintenance representative, owner, owner representative, for each area within the
project that is designated to be disturbed to determine where the existing and functioning
irrigation system is located and how it is operated. The Contractor will be required to
repair and or replace all disturbed or damaged irrigation components to 100 percent
operational. Contractor will ensure that all reconnections (water and power) have been
tested and approved by City Representatives prior to back filling. Prior to final acceptance
and during the maintenance period specified, the contractor and the City Representatives
will meet again with the designated representative to engage each and every irrigation
system that has been disturbed or that is adjacent to this project. The Contractor will
ensure that each system has been returned to a fully operational and functional system
and that all deficiencies have been corrected. All work will comply with these plans and
Technical Specifications.
The underground location of the irrigation facilities is unknown. The Contractor will take
care to minimize disturbance to these areas.
All construction will be coordinated to ensure that the existing irrigation system and its
associated electrical controls are fully functional within 24 hours of modifications. Work
activities that require more than 24 hours of outage will be coordinated with City
Representatives for approval and alternate irrigation methods such as truck watering or
temporary “rain or rent” systems will be required as directed by City Representatives. The
cost of alternate irrigation methods necessary due to extended irrigation system outages
will be at the Contractor’s expense, at no cost to the Department.
All work will be in accordance with the details shown on the Project Plans, or as directed
by City Representatives and the requirements of these Specifications. All work will be
inspected and approved by City Representatives prior to backfilling and will comply with
all the requirements of Section 808 Water Distribution as specified in the most recent
edition of the ADOT Standard Specifications for Road and Bridge Construction.
Repair/Restoration: Contractor will restore all landscape areas and other surface
improvements that were to remain in place, but that have been damaged by the
Contractor’s actions or omissions. Restore landscape areas as nearly as possible to the
original condition.
Repairing Damaged Plants: Where damage to vegetation has occurred, Contractor will
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
43
prune plants in accordance with Tree Care Industry Association (TCIA) standards to
remove branches from the work area, and where needed to maintain the health of the
plant. Remove material in a manner that yields minimal impact and is approved by City
Representatives.
Replacing Damaged Plants: Contractor will remove plants that were identified by City
Representatives to remain in place, but that are damaged during the course of the work
to an extent that they cannot be repaired; and replace the damaged plants with new plants
of the same type and value. Remove and replace damaged plants as directed by the City
Representatives. Base the value of plants that are to be replaced on the criteria found in
the Council of Tree and Landscape Appraisers’ “Guide for Plant Appraisal”, as evaluated
by City Representatives. Contractor will remove and replace damaged plants at no
additional cost to the City. Plants will be replaced at the following sizes or as directed by
City Representatives:
Existing Plant Material Size
Replacement Size
Trees:
2” Caliper
24” Box
4” Caliper
36” Box
6” Caliper
54” Box
All Existing Shrubs
5 Gallon
Clean up the ground areas under plants remaining in place as directed by City
Representatives. Wash off foliage that becomes soiled, or when directed to do so by City
Representatives. Remove materials that fall or flow into protected areas. Provide
protective barriers as needed or as directed by City Representatives to prevent materials
from falling or flowing into protected areas.
Waste Management: Contractor will gather and dispose of spoils and vegetative waste,
including dead and damaged plants and the trimmings accumulated from the operations
to clear and remove existing vegetation. Dispose of spoils and vegetative waste off-site
in conformance with the regulations imposed by the local authorities, and in an area
approved for such disposal by the local authorities.
Maintenance of Vegetation: Contractor will care for and maintain existing vegetation
within protected areas as indicated on the Project Plans. Provide water and labor as
needed for plant health, growth, and for washing down soiled foliage. Provide fertilizer,
deep root fertilization, pesticides, anti-desiccants, and other materials and labor as
needed to maintain the existing plants in a healthy and growing condition. Provide plant
maintenance for the duration of the Contract, until Final Acceptance.
Record Drawings: The Contractor will keep and maintain separate record drawings
(“field redlined record drawings”), corrected shop drawings, or other drawings necessary
for the Engineer to show the landscape and irrigation work as constructed. These field
redlined record drawings will be kept on the worksite and they will be maintained clear,
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
44
accurate and current as changes occur that may differ with the bid set construction
documents and addenda. All landscape and irrigation related elements buried or
backfilled will be recorded in the “field redlined record drawings” prior to burial and
backfilling occurs. The Contractor will submit the updated field redlined record drawings
with monthly pay estimates to City Representatives. Complete field redlined record
drawings that the Contractor maintains will be submitted to City Representatives in a
format that will allow City Representatives to create the formal record drawings. The
Contractor will submit the field redlined record drawings to City Representatives prior to
the end of each construction phase. No extra measurement or direct payment will be
made for this work; the cost being considered included in the price of the contract items.
Measurement and Payment:
Landscape and Irrigation Restoration Areas will be measured as a single complete unit
of work and paid for at the contract lump sum price, which will be full compensation for
the work, complete in place, including all costs, materials, equipment, labor, and
operations necessary for the furnishing and full restoration of all plant materials,
decomposed granite, turf grass, drip and sprinkler irrigation, and other miscellaneous
items to the satisfaction of City Representatives. No additional payment will be made for
site preparations, testing, warranty of work, assemblies and incidentals required to install
a fully functioning irrigation system, the cost being considered included in the item.
ITEM NO. 42
REMOVE PAINT STRIPE
ITEM NO. 43
REMOVE PAINTED SYMBOL (BIKE LANE MARKING SET)
ITEM NO. 44
REMOVE THERMOPLASTIC ARROW
ITEM NO. 45
REMOVE RAISED PAVEMENT MARKER
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to remove existing striping and raised pavement markers at the locations as
specified in the Project Plans.
Construction Requirements:
For obliteration elements, the Contractor will not be allowed to utilize portable grinders
that destroy the surface of the pavement. The Contractor will use water blasting for stripe
removal and will not damage the existing pavement. A sealant approved by the City of
Chandler Street Division shall be applied by the contractor to all areas of pavement
marking obliteration, per project plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
45
Measurement and Payment:
Remove Paint Stripe will be measured per linear foot of 4-inch width equivalent per ADOT
Specifications Section 708-4, and will be paid for at the contract unit price per linear foot,
which price will be full compensation for the item, complete in place.
Remove Painted Symbol (Bike Lane Marking Set) and Remove Thermoplastic Arrow will
be measured per each, and will be paid for at the contract unit price, which price will be
full compensation for the item, complete in place.
Remove Raised Pavement Marker will be measured per each, and will be paid for at the
contract unit, which price will be full compensation for the item, complete in place. No
additional payment will be made for sealant, the cost being considered incidental to this
item.
ITEM NO. 46
4 IN WHITE TRAFFIC PAINT STRIPE
ITEM NO. 47
4 IN YELLOW TRAFFIC PAINT STRIPE
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic paint stripes at the locations as specified in the Project Plans.
Materials:
The work under these items will conform to the current editions of the City of Chandler
Standard Details C-614, C-620 and C-623 and ADOT Standard Specifications Section
708.
Construction Requirements:
The work under these items will conform to the layouts in the Project Plans and COC
Detail C-614, unless otherwise revised by the City Representative.
Measurement:
4 Inch White Traffic Paint Stripe and 4 Inch Yellow Traffic Paint Stripe will be measured
per linear foot of 4-inch width equivalent per ADOT Specifications Section 708-4. No
measurement will be made for the number of linear feet of gaps in dashed lines.
ITEM NO. 48
PAINT MEDIAN NOSE
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to paint median noses at the locations as specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
46
Materials:
The materials under this item will conform to COC Detail C-617.
Construction Requirements:
The work under this item will be completed per COC Detail C-617.
Measurement:
Paint Median Nose will be measured as a unit for each bull nose painted and will be paid
for at the contract unit price each, which price will be full compensation for the work,
complete in place
ITEM NO. 49
4 IN WHITE THERMOPLASTIC PAVEMENT STRIPE
ITEM NO. 50
THERMOPLASTIC SYMBOL (LANE REDUCTION ARROW)
ITEM NO. 51
THERMOPLASTIC SYMBOL (LEFT TURN ARROW)
ITEM NO. 52
THERMOPLASTIC SYMBOL (RIGHT TURN ARROW)
ITEM NO. 53
THERMOPLASTIC SYMBOL (BIKE LANE MARKING SET)
Description:
The work under these items consists of furnishing all materials, labor, and equipment
necessary for the installation of thermoplastic striping and preformed symbols at the
locations as specified in the Project Plans.
Materials:
The work under these items will conform to the current editions of the COC Details C-
614, C-620 and C-623, and ADOT Standard Specifications Section 704.
Construction Requirements:
The work under these items will conform to the layouts in the Project Plans and in
accordance with COC Detail C-614, unless otherwise adjusted by the City
Representative.
Measurement:
4 Inch White Thermoplastic Traffic Stripe will be measured per linear foot of 4-inch width
equivalent per ADOT Specifications Section 708-4. No measurement will be made for
the number of linear feet for gaps in dashed lines.
Thermoplastic Symbols will be measured as a unit for each pavement symbol installed.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
47
Payment:
The accepted quantities of 4 Inch White Thermoplastic Traffic Stripe, measured as
provided above, will be paid for at the contract unit price per linear foot, which price will
be full compensation for the item, complete in place.
The accepted quantities of Thermoplastic Symbol, measured as provided above, will be
paid for at the contract unit price per each, which price will be full compensation for the
item, complete in place.
ITEM NO. 54
REFLECTORIZED RAISED PAVEMENT MARKER (TYPE D,
YELLOW, 2-WAY)
ITEM NO. 55
REFLECTORIZED RAISED PAVEMENT MARKER (TYPE G,
CLEAR, 1-WAY)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install Type D and G reflectorized raised pavement markers at the locations
as specified in the Project Plans.
Materials:
The reflectorized raised pavement markers and adhesives will conform to COC Detail C-
622 and the project plans.
Construction Requirements:
The work under these items will conform to the COC Details C-614, C-620, C-622, C-623,
the City of Chandler “Street Design and Access Control Technical Design Manual #4, and
as specified in the Project Plans.
Measurement and Payment:
Reflectorized Raised Pavement Markers will be measured as a unit for each type of
pavement marker installed and will be paid for at the contract unit price, which price will
be full compensation for the item, complete in place. No additional payment will be made
for adhesive, the cost being considered incidental to this item.
ITEM NO. 56
PERFORATED SIGN POST
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to install perforated sign posts at the locations as specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
48
Materials:
The Perforated Sign Post will conform to COC Detail C-613.
Construction Requirements:
The work under this item will conform to COC Detail C-613.
Measurement and Payment:
Perforated Sign Post will be measured per linear foot of sign post installed and will be
paid for at the contract unit price per linear foot, which price will be full compensation for
the item, complete in place.
ITEM NO. 57
PERFORATED SIGN POST FOUNDATION
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to install concrete perforated sign foundations, including anchor, sleeve, and
associated hardware to attach post to foundation at the locations as specified in the
Project Plans.
Materials:
All materials required to install concrete perforated sign foundations and attachment of
post will conform to COC Detail C-613.
Construction Requirements:
The work under this item will conform to COC Detail C-613 and as specified in the Project
Plans.
Measurement and Payment:
Perforated Sign Foundation will be measured as a unit for each foundation installed and
will be paid for at the contract unit price per each, which price will be full compensation
for the item, complete in place. No additional payment will be made for anchor, sign post
sleeves, and associated hardware to attach post to foundation, the cost be considered
incidental to this item.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
49
ITEM NO. 58
FLAT SHEET ALUMINUM SIGN PANEL, HIGH INTENSITY GRADE
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install the sign panels at locations as specified in the Project Plans.
Materials:
Sign Panels will meet the requirements of the ADOT Specifications Section 608 and will
conform to all applicable current editions of the COC Details.
Construction Requirements:
The Sign Panels will be installed per ADOT Standard Specifications Section 608 and will
conform to all applicable current editions of the COC Details.
Measurement:
Flat Sheet Aluminum Sign Panel, High Intensity Grade will be measured per square foot
for each panel furnished and installed.
Payment:
The accepted quantities of Flat Sheet Aluminum Sign Panel, High Intensity Grade,
measured as provided above, will be paid for at the contract unit price per square foot,
which price will be full compensation for the item, complete in place, including hardware
and appurtenances require to install sign.
ITEM NO. 59
REMOVE AND SALVAGE TRAFFIC SIGNAL
Description:
The work under this item will consist of furnishing of all materials, labor, and equipment
for removing and salvaging traffic signals, including all foundations, poles, luminaires,
mast arms, meter pedestal, controller cabinet and all internal components, vehicular and
pedestrian signal heads, down guys and anchors, span cables, conductors, mounting
assemblies, video detection, and incidental traffic signal equipment.
Construction Requirements:
At least two weeks prior to removals, the Contractor and City Representative will inspect
all equipment to determine which items are salvageable.
Prior to the delivery of any salvaged material or equipment, the Contractor will make
arrangements for the City to inspect all items. Any material or equipment not salvageable,
as determined by the City, will be disposed of by the Contractor at his expense. Any
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
50
items determined to be salvageable prior to removal and then damaged during the
removal will be replaced at no cost to the City.
The Contractor will be responsible for removing all existing streetlight poles, luminaires,
mast arms, bases, and foundations at locations as specified in the Project Plans. All
salvaged poles will be returned to the City of Chandler storage yard at 1800 S. McQueen
Road, Chandler, Arizona. All salvaged materials shall be delivered to the Operations
Yard at 249 E. Chicago Street, Chandler, Arizona.
All foundations will be removed completely. The Contractor will backfill the excavated
area per the City’s requirements for backfilling and compaction.
Measurement and Payment:
Remove and Salvage Traffic Signals will be measured as a single complete unit of work
and paid for at the contract lump sum price, which price will be full compensation for the
work, complete in place, including delivery of salvaged materials and disposal of non-
salvaged items.
ITEM NO. 60
MODIFY TRAFFIC SIGNAL
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to modify the existing traffic signal at South Dobson Road at Intel Driveway #1,
as specified in the Project Plans.
Construction Requirements:
The work under this item shall not occur until the existing crosswalk between the NW and
NE corners is removed and the crossing abandoned for use.
Removed equipment shall be salvaged, transported to the City of Chandler.
Measurement and Payment:
Modify Traffic Signal will be measured as a single complete unit of work and paid for at
the contract lump sum price, which price will be full compensation for the work, complete
in place, including delivery of salvaged materials.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
51
ITEM NO. 61
REMOVE LIGHT POLE FOUNDATIONS AND SALVAGE
STREETLIGHT POLES/EQUIPMENT
Description:
The work under this item will consist of furnishing all materials, labor, and equipment for
removing light pole foundations and salvaging streetlight poles and equipment at
locations as specified in the Project Plans
Construction Requirements:
The Contractor will coordinate all work associated with the streetlight systems (i.e. de-
energizing the system, etc.) with SRP Power.
At least two weeks prior to removals, the Contractor and City Representative will inspect
all streetlight poles and equipment to determine which items are salvageable.
The Contractor will be responsible for removing all existing streetlight poles, luminaires,
mast arms, bases, and foundations at locations as specified in the Project Plans. All
salvaged poles will be returned to the City of Chandler storage yard at 1800 S. McQueen
Road, Chandler, Arizona. All remaining street lighting components, including but not
limited to luminaires, pull boxes, and conductors, are to be salvaged and delivered to the
Operations Yard at 249 E. Chicago Street, Chandler, Arizona.
Existing emptied conduit may be abandoned in place.
Direct-buried poles shall be removed and salvaged, as directed by the City
Representative, and do not involve foundation removal.
Pole foundations for foundation-mounted poles will be removed completely. The
Contractor will backfill the excavated area per the MAG 350 specification.
Prior to the delivery of any material or equipment, the Contractor will make arrangements
for the City to inspect all items. Any material or equipment not salvageable, as determined
by the City, will be disposed of by the Contractor at his expense. Any items determined
to be salvageable prior to removal and then damaged during the removal will be replaced
at no cost to the City.
Measurement and Payment:
Remove Light Pole Foundations and Salvage Streetlight Poles/Equipment will be
measured as a unit each and will be paid for at the contract unit price each, which price
will be full compensation for the item, complete in place. No additional payment will be
made for the delivery of salvaged materials to the City of Chandler Storage yard or the
cost of removing luminaires, mast arms, bases, pull boxes, and foundations, the cost
being considered incidental to this item.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
52
ITEM NO. 62
SRP LIGHTING PULL BOX (CONTRACTOR SUPPLIED AND
INSTALLED)
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary for the installation of SRP approved lighting pull boxes for the streetlight
system in accordance with the details and requirements as specified in the Project Plans.
Materials:
SRP Lighting Pull Boxes are to be furnished by the Contractor. Material specifications will
be per SRP standards and as shown in COC Details SL-14A and SL-14B. This item will
include the ground rod required in each new streetlight pull box and associated conductor
clamps.
Construction Requirements:
The Contractor will furnish and install the lighting pull boxes in accordance with City of
Chandler Details SL-14A and SL-14B in the current Streetlight Design Manual at the
approximate locations as specified in the Project Plans. All pull boxes will be placed
within proximity of the streetlight pole as shown in Detail SL-14A and should be located
in the public utility easement, where available. The pull boxes will be installed at finish
grade.
Measurement:
SRP Lighting Pull Box (Contractor Supplied and Installed) will be measured as unit for
each pull box installed, including pick up, and installation, materials, excavation,
backfilling, conductor clamps, ground rod, fittings, elbows, caps, and solvent.
Payment:
Accepted quantities of SRP Lighting Pull Box (Contractor Supplied and Installed),
measured as provided above, will be paid for at the contract unit price each, which price
will be full compensation for the item, complete in place. No additional payment will be
made for pick up, installation, materials, excavation, backfilling, conductor clamps, ground
rod, fittings, elbows, caps, and solvent, the cost being considered incidental to this item.
ITEM NO. 63
NO. 7 PULL BOX
ITEM NO. 64
NO. 7 PULL BOX WITH EXTENSION
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for the installation of new pull boxes and pull boxes with extensions, including,
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
53
excavation, backfill, compaction, and appurtenances at locations as specified in the
Project Plans.
Materials:
All Pull Boxes, extensions and lids will be polymer concrete material and conform to the
details in the Project Plans. If pull box details are not contained in the Project Plans, the
Contractor will conform the applicable COC Details and ADOT Specifications Section
732. Contractor to coordinate with City Representatives for markings on pull box.
Markings will be clearly defined and uniform in depth and will be placed parallel to the
long side of the lid. Letters will be nominally one inch high.
Pull boxes lids will be rated for traffic loads in locations where subject to vehicular traffic.
Each lid will be furnished with two lock-down bolts.
Concrete Pull Boxes and lids will not be used.
Construction Requirements:
All construction will be performed in accordance with the details in the Project Plans. and
ADOT Specifications Section 732-3.
New Pull Boxes will be located out of sidewalks, but within the City of Chandler right of
way, approximately as shown on the plans. Adjustments in pull box locations are allowed,
but are subject to Inspector approval.
Pull Boxes will be installed at finished grade. The pull box will be backfilled with select
excavated material and thoroughly compacted to within two inches of original grade. The
compaction around the box will not cause the sides to deflect or any part of the box or lid
to crack. The Contractor will replace any cracked, broken, chipped, or damaged pull
boxes or lids at no additional cost to the City.
All pull boxes will be left in clean conditions, free of dirt and debris upon completion of
work.
Measurement:
Pull Box and Pull Box with Extension will be measured as unit for each pull box installed
including pick up, excavation, installation backfill, extension, lid, fittings, elbows, caps,
solvent, and all applicable appurtenances.
Payment:
Accepted quantities of Pull Boxes and Pull Box with Extension, measured as provided
above, will be paid for at the contract unit price each, which price will be full compensation
for the item, complete in place, including pick up, excavation, installation backfill,
extension, lid, fittings, elbows, caps, solvent, all applicable appurtenances, and disposing
of surplus or unsuitable material.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
54
ITEM NO. 65
SCH. 40 PVC ELECTRICAL CONDUIT, 1 IN
ITEM NO. 66
SCH. 40 PVC ELECTRICAL CONDUIT, 2 IN
ITEM NO. 67
SCH. 40 PVC ELECTRICAL CONDUIT, 2 ½ IN (STREETLIGHTING
PER SRP PLANS)
ITEM NO. 68
SCH. 40 PVC ELECTRICAL CONDUIT, 3 IN
ITEM NO. 69
SCH. 40 PVC ELECTRICAL CONDUIT, 4 IN
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for the installation of PVC conduit in accordance with the details shown on the
utility company plans.
Materials:
All conduits will meet the requirements of Section 732-2 of the ADOT Standard
Specifications for Schedule 40 PVC.
The materials for the Sch. 40 PVC Electrical Conduit, 2 1/2” (Street Lighting Per SRP
Plans) item will include 2.5-inch diameter schedule 40 PVC, 2,500 lb. pull tape, trench,
and all other materials incidental to this item of work, conforming to SRP requirements
and specifications.
Construction Requirements:
All construction will be performed in accordance with the Project Plans. Where not
included in these Technical Specifications or other referenced specifications, the work
under this item will be installed per Section 732-3 of the ADOT Standard Specifications.
Conduit to be installed under paved streets and driveways shall be installed by directional
bore, unless otherwise directed by the City Representative.
Measurement:
Electrical Conduit will be measured by the linear foot from center to center of pull boxes
or from end to end of conduit when no pull boxes are used.
Payment:
The accepted quantities for Electrical Conduit, measured as provided above, will be paid
for at the contract unit price per linear foot, which price will be full compensation for the
work, complete in place, including any excavation, directional bore, slurry, fittings, mule
tape, tracer wire, colored innerduct, and all backfill and compaction necessary to
complete the work.
No additional payment will be made for conduit bends or rigid non-metallic conduit bends
at pull boxes, expansion fittings coupling fittings, the cost being considered incidental to
this item.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
55
No additional payment will be made for saw cutting, directional boring, trenching,
pavement removal, disposal and pavement replacement done as part of conduit
installation, the cost being considered incidental to this item.
ITEM NO. 70
POLE FOUNDATION, TYPE A
ITEM NO. 71
POLE FOUNDATION, TYPE Q
ITEM NO. 72
POLE FOUNDATION, TYPE R
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal pole foundations at the locations as specified in the
Project Plans.
Materials:
The work under these items will conform to the current editions of the ADOT “Traffic
Signals & Lighting” Standard Drawings and Section 731-2.02 of the ADOT Standard
Specifications.
Construction Requirements:
The work under these items will conform to Section 731-3.01 of the ADOT Standard
Specifications and City of Chandler “Traffic Signal Design Technical Design Manual #5.”
Measurement:
The pole foundations will be measured as a unit for each foundation furnished and
installed, including excavation and backfill.
Payment:
The accepted quantities of pole foundations, measured as provided above, will be paid
for at the contract unit price each, for the type of foundation designated in the bidding
schedule, which price will be full compensation for the work, complete in place.
No additional payment will be made for all hardware, anchor bolts, wire, excavation,
backfill and incidentals, the cost being considered incidental to this item.
ITEM NO. 73
PEDESTRIAN PUSH BUTTON WITH SIGN
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary for installing pedestrian push buttons at the locations as specified in the Project
Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
56
Materials:
The work under this item will conform to the current editions of the ADOT “Traffic Signals
& Lighting” Standard Drawings and Section 735-2.02 of the ADOT Standard
Specifications.
Construction Requirements:
The work under this item will conform to Section 735-2.02 of the ADOT Standard
Specifications.
Measurement:
The Pedestrian Push Button will be measured as a unit for each pedestrian push button
furnished and installed.
Payment:
The Pedestrian Push Button, measured as provided above, will be paid for at the contract
unit price each, which price will be full compensation for the work complete in place, as
specified herein and on the Project Plans.
ITEM NO. 74
VIDEO IMAGE DETECTION SYSTEM, 4 APPROACHES
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary for installing a camera video detection system at intersections as specified in
the Project Plans.
Materials:
The video detection equipment will be one of the following or approved equivalent:
Video detection equipment will include video detection sensors, interface panels, mini
hubs, cable and any other miscellaneous items required for proper installation resulting
in a fully functional video detection system compatible with the furnished traffic signal
controller and cabinet.
Placement of detection zones will be by means of a notebook computer (PC) operating
the software suite provided under this item. The VGA mode monitor, integral to the
Manufacturer
FLIR TraffiSense2 Dual
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
57
notebook computer (computer screen), will be able to show the detection zones
superimposed on images of traffic scenes.
The video detection system will optimally detect vehicle passage and presence when the
MVP sensor is mounted 30 feet, or higher, above the roadway when the image sensor is
adjacent to the desired coverage area, and when the distance to the farthest detection
zone locations are not greater than 10 times the mounting height of the camera.
Ongoing software support by the supplier will include software updates of the camera
sensor, modular cabinet interface unit and computer applications. These updates will be
provided free of charge during this warranty period.
The supplier will maintain a program for technical support and software updates following
expiration of the warranty period.
Video detection cables will run unspliced from the cameras to the existing controller
cabinet and will be furnished and installed and terminated in the cabinet by the Contractor,
under this item.
Construction Requirements:
A member of the City of Chandler Traffic Signal Group or their representative will
supervise the installation and testing of the video detection system.
The video detection cable will run unspliced from traffic signal control cabinet to video
detection camera.
Measurement:
The Video Image Detection System will be measured as a single complete unit of work
for the complete system furnished and installed, for a 4-approach system.
Payment:
The accepted quantity of Video Image Detection System, measured as provided above,
will be paid for at the contract lump sum price, which will be full compensation for the item
complete in place, including sensors, cabling, mounting brackets, and interface panels as
specified in the Project Plans and described herein.
ITEM NO. 75
TYPE A SIGNAL POLE 10 FT
ITEM NO. 76
TYPE Q SIGNAL POLE
ITEM NO. 77
TYPE R SIGNAL POLE
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal poles at the locations as specified in the Project Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
58
Materials:
The work under these items will conform to the current editions of the ADOT “Traffic
Signals & Lighting” Standard Drawings and Section 731-2.02 of the ADOT Standard
Specifications.
Construction Requirements:
The work under these items will conform to Section 731-3.02 of the ADOT Standard
Specifications and City of Chandler “Traffic Signal Design Technical Design Manual #5.
Measurement:
The traffic signal poles will be measured as a unit for each type of pole furnished and
installed.
Payment:
The accepted quantities of traffic signal poles, measured as provided above, will be paid
for at the contract unit price each, for the type of pole designated in the bidding schedule,
which price will be full compensation for the work complete in place as described and
specified herein and on the Project Plans, including all hardware, wire, and incidentals
necessary to complete the work.
ITEM NO. 78
20 FT MAST ARM (TAPERED)
ITEM NO. 79
30 FT MAST ARM (TAPERED)
ITEM NO. 80
50 FT MAST ARM (TAPERED)
ITEM NO. 81
55 FT MAST ARM (TAPERED)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal mast arms at the locations as specified in the Project
Plans.
Materials:
The work under these items will conform to the current editions of the ADOT “Traffic
Signals & Lighting” Standard Drawings and Section 731-2.02 of the ADOT Standard
Specifications.
Construction Requirements:
The work under these items will conform to Section 731-3.02 of the ADOT Standard
Specifications and City of Chandler “Traffic Signal Design Technical Design Manual #5.”
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
59
Measurement:
The traffic signal mast arms will be measured as a unit for each type of mast arm furnished
and installed.
Payment:
The accepted quantities of traffic signal mast arms, measured as provided above, will be
paid for at the contract unit price each, for the type of mast arm designated in the bidding
schedule, which price will be full compensation for the work complete in place and as
specified herein and on the Project Plans, including all hardware, wire, and incidentals
necessary to complete the work.
ITEM NO. 82
POLE FOUNDATION FOR SL-1 POLE
ITEM NO. 83
STREETLIGHT POLE SL-1 WITH SINGLE DAVIT ARM
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install the street light pole, including signal davit arm, pole foundation, and
appurtenances at the locations as specified in the Project Plans.
Materials:
The street light pole, foundation and single davit arm will conform to the current edition of
the COC Street light Detail SL-1.
Construction Requirements:
The pole will be installed plumb and straight. The base of the pole will be oriented so that
the hand hole is located away from the sidewalk and street.
The Contractor will furnish and install the (2) #12 AWG conductors and (1) #8 AWG
Ground wire from the luminaire to the junction box. The Contractor will install fuse holders
and fuses for all current carrying conductors within the handhole of pole.
The street light pole foundation will be installed as directed in the current edition of the
COC Street light Detail SL-1 and requirements of the current “Streetlight Design”,
Technical Design Manual #6.
Measurement:
Pole Foundation, and SL-1 Pole will be measured as a unit for each foundation and pole
installed.
Payment:
The accepted quantities of Pole Foundation, and SL-1 Pole, measured as provided
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
60
above, will be paid for at the contract unit price per each, which price will be full
compensation for the item, complete in place.
No additional payment will be made for conductors to be installed from the junction box
to the luminaire or fuses/fuse holders, the cost being considered incidental to this item.
ITEM NO. 84
METER PEDESTAL CABINET
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to install meter pedestal cabinet foundation, clearance pad, and electric meter
pedestal at the location shown in the Project Plans.
Materials:
The meter pedestal cabinet will be from the ADOT Approved Products List and will
conform to the current editions of the ADOT Traffic Signals & Lighting Standard Drawings
and ADOT Standard Specifications Section 734.
The meter pedestal foundation will be 3,000 psi Class S concrete and will conform to the
current editions of the ADOT Traffic Signals & Lighting Standard Drawings and ADOT
Standard Specifications Section 734.
Construction Requirements:
The work under these items will conform to ADOT Standard Specifications Section 734-
3.
Measurement:
The Meter Pedestal Cabinet will be measured as a unit for each cabinet furnished and
installed.
Payment:
The accepted quantities Meter Pedestal Cabinet, measured as provided above, will be
paid for at the contract unit price each, which price will be full compensation for the work
complete in place as specified herein and on the Project Plans, including service terminal
boxes, PEC, meter sockets, breaker panels, foundations, conduit, elbows, anchor bolts,
clearance pad, and all other components necessary to provide a complete functional
assembly.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
61
ITEM NO. 85
CONTROLLER CABINET (TYPE IV)
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal control cabinet, controller, and foundation at the location
as specified in the Project Plans.
Materials:
The control cabinet will be a TS2 Type IV cabinet and will conform to the current editions
of the ADOT Traffic Signals & Lighting Standard Drawings and ADOT Standard
Specifications Section 734, and shall include fully functional ARID travel time system and
GPS time source compatible with the furnished controller and operating system.
The traffic signal controller will be a NEMA McCain ATC eX2 NEMA Controller, Type 1,
with Linux operating system wired with “A connector” and systems I/O terminal facilities.
The control cabinet foundation will be 4,000 psi Class S concrete and will conform to the
current editions of the ADOT “Traffic Signals & Lighting” Standard Drawings and Section
734 of the ADOT Standard Specifications.
Construction Requirements:
The work under these items will conform to Section 734-3 of the ADOT Standard
Specifications.
Measurement:
Controller Cabinet (Type IV) will be measured as a unit for each cabinet assembly
furnished and installed.
Payment:
The accepted quantities of Controller Cabinet (Type IV), measured as provided above,
will be paid for at the contract unit price each, which price will be full compensation for the
work, complete in place, as specified herein and on the Project Plans, including controller,
cabinet components, foundation, conduit, elbows, anchor bolts, clearance pad, ARID
system and GPS time source and all other components necessary to provide a complete
functional assembly for controlling the operation and timing of traffic control signals.
ITEM NO. 86
OPTICOM PRE-EMPTION UNIT
Description:
The work under this item will consist of furnishing all labor, materials, and equipment to
install emergency vehicle sensors and phase selector cards as specified in the Project
Plans.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
62
Materials:
The pre-emption equipment will be:
The emergency vehicle pre-emption system sensors and phase selectors will be fully
compatible with the pre-emption system used citywide.
The emergency vehicle pre-emption system sensor devices will have two channels with
two directions.
The phase selector will have four channels of detection.
Construction Requirements:
The emergency vehicle pre-emption system sensors will be mounted on the specified
poles and for specified directions as indicated on the Project Plans. Sensors will be
attached to the mast arm of the specified poles in a rigid and waterproof manner, with
cables routed inside the mast arm and pole shaft.
Sensors will be aimed by the Contractor for maximum distance sensing.
The Contractor is responsible for installing all components, making all connections and
adjusting sensors for the emergency pre-emption system.
Phase selectors will be placed in the appropriate input file slots in the traffic signal
controller cabinet by the Contractor.
Preemption cables will run unspliced from the sensors to the existing controller cabinet
and will be furnished and installed and terminated in the cabinet by the Contractor, under
this item.
Preemption cables will be clearly tagged and marked in the controller cabinet and each
pull box they pass through, designating the direction, phase or corner served. The
Contractor is responsible for insuring the emergency pre-emption system is properly
aimed and ready for activation prior to the date of turn-on. The Contractor will make any
adjustments to sensor aiming or cabling, as requested by City Representatives, and
provide any necessary traffic control and lift trucks, as needed, at the expense of the
contractor.
The pre-emption system will be tested by the Contractor to insure proper operation.
Manufacturer
Opticom – GTT Model 700 Series
Detectors
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
63
Measurement:
Opticom Pre-Emption Unit will be measured as a unit for each pre-emption unit installed
and tested complete in place, including pre-emption sensors for all approaches.
Payment:
Opticom Pre-Emption Unit, measured as above, will be paid for at the contract unit price
per each, which will be in full compensation for the work, complete in place, including pre-
emption sensors for all approaches, phase selector units, cabling and testing as specified
herein and specified in Project Plans.
ITEM NO. 87
TRAFFIC SIGNAL FACE (TYPE F) (LED)
ITEM NO. 88
TRAFFIC SIGNAL FACE (PEDESTRIAN) (MAN/HAND) (LED)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal indications and pedestrian signal indications at the
locations as specified in the Project Plans.
Materials:
The work under these items will conform to the current editions of the ADOT Traffic
Signals & Lighting Standard Drawings and ADOT Standard Specifications Section 733.
All traffic signal indications will be Light Emitting Diode (LED) modules.
Vehicle type LED modules will fit in all standard, incandescent vehicle traffic signal
housings. Each module will be complete, consisting of:
A lens
LED circuit board inclusive of all of the LEDs and required circuit
components
36 inch 16 AWG wire leads with strain relief and quick connect terminals
A rigid housing for protection in shipping, handling and installation
A one-piece neoprene gasket.
Pedestrian Signal Module:
The pedestrian LED traffic signal module will fit the message of a 16 inch by 18 inch
pedestrian signal housing built to the PTCSI Standard. The “HAND” and “MAN” symbol
will be 12 inches in height, and conform to PTCSI Standards.
Pedestrian LED signal modules will be designed so, that when operated over the
specified ambient temperature and voltage range, the signal will attract the attention of,
and be readable to, a viewer (both night and day) at all distances from 9.8 feet to 196.9
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
64
feet (3 meters to 60 meters). The measured chromaticity coordinates of the LED
pedestrian signal module will conform to the chromaticity requirements of Section 5.3 and
Figure C of the PTCSI standard.
The LED pedestrian signal module will be man/hand overlay with fill-in figures for both
the man and the hand. Outline and/or side-by-side modules will not be used.
The LED pedestrian signal module will conform to all other specifications in this
document, where applicable.
The LED signal module will be rated for use in the ambient operating temperature range,
measured at the exposed rear of the module, of -40F to +165F (–40C to +74C).
The LED signal module will be protected against dust and moisture intrusion per the
requirements of NEMA Standard 250-1991, Section 4.7.2.l and 4.7.3.2, for Type 4
enclosures to protect all internal LED, electronic, and electronic components.
The LED signal module lens will be UV stabilized and scratch resistant.
The external lens surface for all vehicle signals will be smooth, with no raised features,
so as to minimize the collection of dirt, diesel smoke, and other particulate contaminates,
and to facilitate periodic cleaning. External lens facets are not allowed. The LED signal
module lens will be UV stabilized and scratch resistant.
The LEDs will be mounted and soldered to a printed circuit board. The LED signal module
will be watertight when properly mounted in an installed traffic signal housing. The LED
signal module will utilize the same mounting hardware used to secure the incandescent
lens and gasket assembly and only require a screwdriver or standard installation tool to
complete the mounting into an existing traffic signal housing built to the VTCSH Standard.
Unit will connect to existing electrical wiring utilizing quick connect terminal.
The LED signal module will be a single, self-contained device, not requiring on-site
assembly for installation into an existing traffic signal housing. The power supply for the
LED signal module will be an integral part of the module. The LED signal module
assembly will weigh less than 5 pounds.
The assembly and manufacturing process for the LED signal module will be designed to
assure all internal LED and electronic components are adequately supported to withstand
mechanical shock and vibration from high winds and other sources.
When necessary, modules will have a prominent and permanent vertical indexing
indicator, i.e., UP ARROW or the word UP or TOP, for correct indexing and orientation
inside signal housing.
Each individual LED signal module will be identified for Warranty purposes and clearly
marked with:
Manufacturer’s name
Date of manufacture.
Unit serial number.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
65
Nominal operating voltage
Power consumption in Watts
Environmental:
The LED signal module will operate over the temperature range of -40F to +165F (–
40C to +74C). The LED signal module will be protected against dust and moisture
intrusion per the requirements of NEMA Standard 250-1991, Section 4.7.2.l and 4.7.3.2,
for Type 4 enclosures to protect all internal LED, electronic, and electronic components.
Electrical – Input:
LED signal modules will operate from a 60 +/- 3 cycle AC line power over a voltage range
from 80 VAC RMS to 135 VAC RMS. The control circuitry will prevent current flow through
the LEDs in the off state to avoid any false indication as may be perceived by the human
eye. The LED traffic signal module will be operationally compatible with NEMA TS - 1 and
NEMA TS - 2 conflict monitoring parameters.
Green LED signals will not illuminate for input voltages below 35 VAC RMS and will
illuminate for all input voltages higher than 45 VAC RMS (voltage will be regulated above
80 VAC RMS). This requirement is so that a green indication will not illuminate due to a
“floating” or high-impedance neutral connection.
All wiring and terminal blocks will meet the requirements of Section 13.02 of the VTCSH
standard. Two secured, color coded, 36 inch (914 mm) long 600 V, 20 AWG minimum,
jacketed wires, conforming to the National Electrical Code, rated for service at +221F
(+105C), are to be provided for electrical connection.
The signal module on-board circuitry will include voltage surge protection to withstand
high-repetition noise transients and low-repetition high-energy transients as stated in
Section 2.1.6, NEMA Standard TS-2, 1992.
The individual LED light sources will be wired so that a catastrophic failure of one LED
light source will result in the loss of not more than 5 percent of the signal module light
output. One LED failure in an LED Signal Module will not affect any other LEDs. In case
of a failure of one LED, only one LED will be lost and not an entire string or module.
Power factor will be 90% or greater, at nominal rated voltage, at 77F (25C), after 60
minutes of operation.
Total harmonic distortion induced into an AC power line by an LED signal module,
operated at nominal operating voltage, with a power consumption equal to or greater than
15 watts at 770F (250C) will not exceed 20 percent. Total harmonic distortion induced
into an AC power line by an LED signal module, operated at nominal operating voltage,
with a power consumption less than 15 watts at 77F’ (259C ) will not exceed 40 percent.
The LED signal and associated on-board circuitry must meet Federal Communications
Commission (FCC) Title 47, subpart B, Section 15 regulations concerning the emission
of electronic noise.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
66
Optical – Output:
The light intensity and distribution from LED signal modules will as a minimum, meet the
current ITE and CAL TRANS standards and measurement criteria for vehicle traffic
control, even after a 30 minute warm up of continuous operation.
Test data to verify the performance as meeting the ITE intensity requirements at +165F
(+74C) will be supplied from either of the following (or another certified independent test
lab):
Lighting Sciences
7630 East Evans Road
Scottsdale, AZ 85260
ETL Testing Laboratories
3933 US Route 11
Cortland, NY 13045-0950
The light output of all LED vehicle signal modules will also meet ITE specifications for
chromaticity.
Fluctuations in line voltage over the range of 80 VAC to l35 VAC will not affect luminous
intensity by more than +/- 10 percent.
LED traffic signals will be temperature compensated so as to maintain intensity at
elevated temperatures. LED traffic signal will be tested and documented by CAL TRANS
as being in compliance with CAL TRANS intensity standards at elevated temperatures.
The LEDs will not exhibit degradation of more than 30% of their initial light intensity
following accelerated life testing (operating at +185F (+85C) and 85% humidity, for 1000
hours). AlGaAs technology is not acceptable.
Warranty:
All LED traffic signal modules supplied will be warranted for five years against
manufacturing defects.
LED traffic signal modules will be performance warranted to be in compliance with ITE
and CAL TRANS minimum intensity standards, at +165F (+74C), after a period of three
years, measured at 117 volts AC.
Failures due to acts of God, abuse, and accidents are excluded from warranty coverage.
The manufacturer expressly warrants that all goods furnished will conform to all
specifications and appropriate standards, will be new, and will be free from defects in
material or workmanship. The manufacturer warrants that all such goods will conform to
any statements made on the containers or labels or advertisements for such goods and
that any goods will be adequately contained, packaged, marked and labeled. The
manufacturer warrants that all goods furnished will be merchantable, and will be safe and
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
67
appropriate for the purpose for which goods of that kind are normally used. If the
manufacturer knows or has reason to know the particular purpose for which the City
intends to use the goods, the manufacturer warrants that such goods will be fit for such
particular purpose. The manufacturer’s warranty will run to the City, its successors, and
assigns. The manufacturer agrees to replace or correct defects of any goods not
conforming to the foregoing warranty promptly, without expense to the City, when notified
of such nonconformity by the City, provided the City elects to provide the manufacturer
with the opportunity to do so. In the event of failure of the manufacturer to correct defects
in or replace nonconforming goods promptly, City, after reasonable notice to the
manufacturer, may make such corrections or replace such goods and charge the
manufacturer for the cost incurred by the City in doing so.
Construction Requirements:
The work under these items will conform to ADOT Standard Specifications Section 733.3.
Measurement:
The traffic signal indications and pedestrian signal indications will be measured as a unit
for each type of signal face furnished and installed.
Payment:
The accepted quantities of traffic signal indications and pedestrian indications, measured
as provided above, will be paid for at the contract unit price each, for the type of signal
face designated in the bidding schedule, complete in place, which price will be full
compensation for the work as specified herein and on the Project Plans, including visors,
backplates, lamps and incidentals necessary to complete the work.
ITEM NO. 89
SIGNAL MOUNTING ASSEMBY (TYPE II)
ITEM NO. 90
SIGNAL MOUNTING ASSEMBLY (TYPE IV)
ITEM NO. 91
SIGNAL MOUNTING ASSEMBLY (TYPE V)
ITEM NO. 92
SIGNAL MOUNTING ASSEMBLY (TYPE VII)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal mounting assemblies at the locations as specified in the
Project Plans.
Materials:
The work under these items shall conform to the current editions of the ADOT “Traffic
Signals & Lighting” Standard Drawings and Section 733 of the ADOT Standard
Specifications.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
68
Construction Requirements:
The work under these items shall conform to Section 733-3 of the ADOT Standard
Specifications.
Measurement:
The traffic signal mounting assemblies will be measured as a unit for each type of
mounting assembly furnished and installed.
Payment:
The accepted quantities of traffic signal mounting assemblies, measured as provided
above, will be paid for at the contract unit price each, for the type of mounting assembly
designated in the bidding schedule, which price shall be full compensation for the work,
complete in place, as specified herein and on the Project Plans, including visors,
backplates, and incidentals necessary to complete the work.
ITEM NO. 93
LED STREETLIGHT LUMINAIRE
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary for installing LED luminaires at locations as specified in the Project Plans, and
in conformance with the current edition of the City of Chandler “Streetlight Design Manual,
Technical Design Manual #6”.
Materials:
Streetlight fixture will be as shown in the Project Plans.
Measurement:
LED Streetlight Luminaire will be measured as a unit for each installed in accordance with
the Project Plans and these Technical Specifications.
Payment:
The Streetlight Luminaire, measured as provided above, will be paid for at the contract
unit price each, which will be full compensation for the work, complete in place, including
storing, transporting, and installing the LED Luminaire on a new pole lighting mast arm.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
69
ITEM NO. 94
CONDUCTORS
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to install traffic signal and lighting conductors in conduits at the locations as
specified in the Project Plans.
Materials:
The material under this item will conform to the current editions of the ADOT Traffic
Signals & Lighting Standard Drawings and ADOT Standard Specification Section 732-
2.01
Construction Requirements:
The work under this item will conform to Section 732-3 of the ADOT Standard
Specifications.
Measurement:
Conductors will be measured as a single complete unit of work. This method of
measurement will be used for signal and lighting conductors shown in the signal
conductor schedule on the Project Plans.
Payment:
Conductors, measured as provided above, will be paid for at the contract lump sum price,
which price will be full compensation for the work, complete in place.
ITEM NO. 95
CCTV FIELD EQUIPMENT
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary for installing and testing CCTV cameras and associated equipment, including
but not limited to, cameras, camera housings, pan/tilt/zoom assemblies, mounting
hardware, power/communications/video cabling and miscellaneous materials required to
provide a complete and operational CCTV system.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
70
Materials:
The CCTV cameras will be:
Manufacturer
Model Number
Axis Communications
Camera:
Power Supply:
Pole Mount:
P5655-E
T8134 60W Midspan PoE
T91L61
All materials provided will be from new un-depreciated stock. Refurbished materials are
not acceptable. All materials provided will be currently supported by the manufacturer and
not scheduled for end-of-life.
The Contractor will furnish mounting arms and required mounting hardware to install the
CCTV assembly on the poles as shown on the Project Plans. The Contractor will supply
all grommets, connectors, cabling, nipples, and incidental hardware required to install the
power and network cabling from the CCTV cabinet to the CCTV Assembly.
The Contractor will coordinate with the City to obtain IP addressing, and program IP and
other communications parameters into the CCTV camera.
Construction Requirements:
The Contractor will mount the CCTV assembly which includes the camera mount, camera
housing, camera, zoom lens, tilt/pan drive, and receiver/driver on traffic signal poles per
the requirements of the CCTV camera supplier.
No wire, cables, or conductors will be exposed from the base of the tilt/pan drive to the
ground. All conductors will be routed inside the support structure.
The surge suppression rack will be installed in the traffic signal cabinet and all surge
suppressors connected per the supplier/manufacturer’s instructions. All surge protector
leads will be as straight and short as possible. The mounting bolts for the chassis and
terminal strips will not protrude from the outside of the enclosure. All cabling, connectors,
and hardware required to interconnect the various CCTV field and fiber optic
communications equipment will be furnished and installed by the Contractor.
(A)
Test Requirements
(1) General:
All CCTV components will be subject to testing and monitoring to determine
conformance with all applicable specifications and to ensure proper
operation of the equipment and system.
(2) Stand-Alone Tests:
The test will exercise all stand-alone (non-network) functional operations
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
71
of the CCTV. The tests will verify the following:
Control of focus, zoom, digital zoom, white balance, iris, tilt/pan, and
power on/off
Response to automatic preset positioning commands
Display of Camera ID information and directional indicators
Video “blacked out” when in a privacy zone
Presence and quality of video signal during bright sunlight and night
conditions
Retention of non-volatile RAM data (i.e., sector text, preset positions)
Measurement:
The CCTV Camera and Field Equipment will be measured as a unit for each item,
furnished and installed, complete in place.
Payment:
The accepted quantity of CCTV Camera and Field Equipment, measured as provided
above, will be paid for at the contract unit price each, complete in place and successfully
tested.
ITEM NO. 96
WIRELESS ACCESS SYSTEM
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to implement a point to pint radio interconnect system between the new traffic
signal at Chaparral Way and Ocotillo Road as specified in the Project Plans.
Materials:
Radios shall be Encom 5.8 Ghz with PoEs and CAT5 cable, with mounting hardware
suitable for mounting to a traffic signal mast arm pole.
Construction Requirements:
Radio cable shall be installed unspliced from radio to controller cabinet. Cable at Ocotillo
Road shall be installed in an existing street crossing conduit between SW and SE corners,
and routed to the existing controller cabinet on the SE corner.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
72
Contractor shall install, set up and test the radio interconnect, resulting in a functional
communications link between the Chaparral Way and Ocotillo Road signal.
Measurement and Payment:
Wireless Access System will be measured as unit for each and will be paid for at the
contract lump sum each, which price will be full compensation for the work, complete in
place, inclusive of setup and testing.
ITEM NO. 97
SIGN ASSEMBLY (IISNS)
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for developing shop drawings and mounting details and installing the Internally
Illuminated Street Name Signs (IISNS) as specified in the Project Plans.
Materials:
The work under this item will conform to the COC Details C-606, C-607 and C-608.
Construction Requirements:
The work under this item will conform to COC Details C-606, C-607, and C-608.
Cabling will run unspliced from the traffic signal control cabinet to the IISNS.
Measurement and Payment:
Sign Assembly (IISNS) will be measured as a unit for each IISNS and will be paid for at
the contract unit price each, for the IISNS designated in the bidding schedule, which price
will be full compensation for the work, complete in place described and specified herein
and on the Project Plans, including IISNS cabling, mounting brackets, and incidentals
necessary to complete the work.
ITEM NO. 98
CATCH BASIN, MAG DET 533-1, TYPE D, ONE 17 FT WING
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for installing catch basins at locations as specified in the Project Plans and in
conformance to MAG Detail 533-1.
Material:
All materials will conform to MAG Detail 533-1, in its entirety.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
73
Construction Requirements:
The work under these items will conform to MAG Detail 533-1, in its entirety.
Each catch basin will include an inlet marker per COC Detail C-508.
Measurement and Payment:
All catch basins will be measured as a unit for each and will be paid for at the contract
unit price each, which price will be full compensation for the work, complete in place. No
additional payment will be made for trash racks, removal of obstructions, excavation,
bedding, backfilling, compacting, inlet markers and joint materials, the cost being
considered incidental to this item.
ITEM NO. 99
24 IN RGRCP, CLASS IV
Description:
The work under these items will consist of furnishing all materials, labor, and equipment
necessary for installing RGRCP as specified in the Project Plans.
Materials:
RGRCP and tees will be in conformance with MAG Uniform Standard Specifications
Section 618.2 and 735.
Construction Requirements:
This work also includes the installation of prefabricated tees for the connection to existing
irrigation systems. All storm drain and reinforced concrete pipe construction will be
constructed in compliance with MAG Standard Specifications Section 618 in its entirety.
Measurement and Payment:
All RGRCP will be measured per linear foot of pipe and will be paid for at the contract unit
price per linear foot, which price will be full compensation for the item, complete in place,
including the pipe, connections to existing facilities/pipelines, removal of obstructions,
excavation, bedding, backfilling, compacting, testing, temporary pavement and joint
materials.
No additional payment will be made for slurry of pipe segments as determined by the City,
the cost being considered incidental to this item.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
74
ITEM NO. 100
STORM DRAIN MANHOLE, MAG DTL 520 & 522
Description:
The work under this item will consist of furnishing all materials, labor, and equipment
necessary to construct storm drain manholes at locations as specified in the Project
Plans.
Materials and Construction Requirements:
Storm Drain Manholes will comply with per MAG Details 520 and 522 in their entirety.
Measurement and Payment:
Storm Drain Manholes will be measured as unit for each and will be paid for at the contract
unit price each, which price will be full compensation for the work, complete in place.
ITEM NO. 101
ALLOWANCE: ROADWAY AND CONCRETE FLATWORK
Description:
The purpose of this allowance is to provide a funding source for any additional roadway
and concrete flatwork work as approved by City Representatives. The Contractor will be
reimbursed for the associated costs of additional roadway work and concrete flatwork.
Any costs, fees, or charges necessary to open asphalt batch plant during off hours (i.e.
weekend or week night) will be reimbursed from this allowance.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional roadway and concrete flatwork work will be completed as approved and
directed by City Representatives.
Measurement and Payment:
Payment for Allowance: Roadway and Concrete Flatwork will be made on an incremental
basis in accordance with the requirements of City of Chandler General Conditions Section
9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
75
ITEM NO. 102
ALLOWANCE: LANDSCAPING
Description:
The purpose of the allowance is to create a funding source for any additional landscaping
work as approved by City Representatives. The Contractor will be reimbursed for the
associated costs of additional landscaping work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional landscaping work will be completed as approved and directed by City
Representatives.
Measurement and Payment:
Payment for Allowance: Landscaping will be made on an incremental basis in accordance
with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 103
ALLOWANCE: TRAFFIC SIGNAL AND COMMUNICATIONS
FACILITIES
Description:
The purpose of this allowance is to provide a funding source for any additional traffic
signal and communication facilities work as approved by City Representatives. The
Contractor will be reimbursed for the associated costs of additional traffic signal and
communications facilities work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional traffic signal and communications facilities work will be completed as approved
and directed by City Representatives.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
76
Measurement and Payment:
Payment for Allowance: Traffic Signal and Communications Facilities will be made on an
incremental basis from allowance in accordance with the requirements of City of Chandler
General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 104
ALLOWANCE: SRP ELECTRICAL
Description:
The purpose of this allowance is to provide a funding source for coordination and paying
all necessary fees for permit and hook up to SRP to install a complete functioning
electrical service to power the irrigation controllers and streetlighting. This item will include
providing all permits, connection fees, foundations, junction boxes, conduit risers, conduit
sweeps, coordination, and required protection when working near overhead lines required
by SRP to provide the electrical connection from the SRP transformer to the proposed
service meter pedestal.
Construction Requirements:
All work will conform to the requirements of SRP. The Contractor will contact the SRP to
coordinate power service and construction requirements.
The Contractor will secure the necessary utility company permits, pay the related fee(s)
for said permit including utility company connection fees, and coordinate the installation
of the required power services.
The meter will be energized and have the account established in the name of the City of
Chandler.
Measurement and Payment:
Payment for Allowance: SRP Electrical will be made on an incremental basis in
accordance with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
77
ITEM NO. 105
ALLOWANCE: FURNISH AND INSTALL TEMPORARY FENCING
Description:
The purpose of this allowance is to provide a funding source for furnishing and installing
any temporary fencing and gates as approved by City Representatives. The Contractor
will be reimbursed for the associated costs of furnishing and installing temporary fencing
and gates.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
See items Fence (Replace In Kind), Remove and Reconstruct Fence, Chain Link Fence
Gate, 24’ Double Swing, MAG DET 160, and Fence Gate (Size Per Plans) of these
technical specifications and comply with MAG Uniform Standard Specifications Section
420 in its entirety, including all City of Chandler supplements except as modified herein,
for construction requirements.
Measurement and Payment:
Payment for Allowance: Furnish and Install Temporary Fencing will be made on an
incremental basis from allowance in accordance with the requirements of City of Chandler
General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 106
ALLOWANCE: WET UTILITIES
Description:
The purpose of the allowance is to create a funding source for any additional wet utility
(water, sanitary sewer, reclaimed water) work as approved by City Representatives. The
Contractor will be reimbursed for the associated costs of additional wet utility work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional wet utility work will be completed as approved and directed by City
Representatives.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
78
Measurement and Payment:
Payment for Allowance: Wet Utilities will be made on an incremental basis from allowance
in accordance with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 107
ALLOWANCE: DRY UTILITIES
Description:
The purpose of the allowance is to create a funding source for any additional dry utility
work as approved by City Representatives. The Contractor will be reimbursed for the
associated costs of additional dry utility work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional dry utility work will be completed as approved and directed by City
Representatives.
Measurement and Payment:
Payment for Allowance: Dry Utilities will be made on an incremental basis from allowance
in accordance with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 108
ALLOWANCE: STORM DRAIN
Description:
The purpose of the allowance is to create a funding source for any additional storm drain
work as approved by City Representatives. The Contractor will be reimbursed for the
associated costs of additional storm drain work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
79
Construction Requirements:
Additional storm drain work will be completed as approved and directed by City
Representatives.
Measurement and Payment:
Payment for Allowance: Storm Drain will be made on an incremental basis from allowance
in accordance with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
ITEM NO. 109
ALLOWANCE: REMOVALS
Description:
The purpose of the allowance is to create a funding source for any additional removal
work as approved by City Representatives. The Contractor will be reimbursed for the
associated costs of additional roadway work.
Contract reimbursement from this allowance (in whole or in part) is not ensured.
Contractor will not anticipate, nor plan, for the amount from this allowance to be included
in the total contract amount as part of this project.
Construction Requirements:
Additional removal work will be completed as approved and directed by City
Representatives.
Measurement and Payment:
Payment for Allowance: Removals will be made on an incremental basis from allowance
in accordance with the requirements of City of Chandler General Conditions Section 9.
No payment in excess of 100% of the contract lump sum price will be made, unless
authorized by City Representatives as a result of extra work authorized in accordance
with City of Chandler General Conditions Section 9.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
80
SOILS INFORMATION
The material boring logs shown in the Geotechnical Report are provided in Appendix A.
It is not intended to imply that the character of materials shown in the logs is
representative throughout the project. The soil borings are indicative of the soil
characteristics only at the locations and to the depths of each of the borings.
Even if not specifically shown on the boring logs, the Contractor may encounter large
cobbles, boulders, caliche, conglomerate, hard rock, sand, perched groundwater, historic
or prehistoric cultural resources, or other differing site conditions on this project. There
will be no additional compensation made for any differing site condition that may be
encountered. It is the Contractor’s responsibility to include the cost of any additional work
items, such as trench boxes, laying back trenches, soil pumping mitigation, etc.,
associated with unforeseen soil conditions in all contract bid items requiring earthwork
and will be considered incidental.
PERMITS
The Contractor will comply with the requirements of MAG Standard Specifications
Sections 107.2 except as modified herein.
The Contractor will obtain all permit(s) required to construct the project, including but not
limited to:
City Water Meter Permit
The Contractor will obtain City permit(s) required for fire hydrant water trucks (Contractor
submits and pays for this permit, no separate payment will be made for this permit; the
cost being considered as included in the price of other contract items) and new landscape
water meters (City pays for the permit but Contractor must sign and pick up the permit).
City Encroachment, Civil and Building Permits
The Contractor will obtain City permit(s) required for encroachment, civil and structures.
The City pays for the permits but Contractor must sign and pick up the permit.
City Administrative Use Permits
The Contractor will pay and obtain City permit(s) required for construction trailer and
temporary facilities. No separate payment will be made for this permit, the cost being
considered as included in the price of other contract items.
Maricopa County Permits
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
81
The Contractor will pay and obtain Maricopa County permit(s) required for traffic control
within their jurisdiction. No separate payment will be made for this permit, the cost being
considered as included in the price of other contract items.
Air Quality Permit
The Contractor will obtain a Maricopa County Air Quality Permit for this project. The
Contractor will be required to prepare a comprehensive fugitive dust control plan, in
accordance with the guidelines established in Rule 310 of Maricopa County Regulation
III, Control of Air Contaminants. The Contractor will complete and submit the control plan
with the permit application and obtain approval from the County prior to any activities
which may produce dust pollutants.
No separate payment will be made for the preparation, implementation of the fugitive dust
control plan, or permit fees, the costs being considered as included in the price of contract
items.
Erosion Control Permit
The Contractor will submit the Arizona Pollutant Discharge Elimination System Notice of
Intent (NOI) and the Notice of Termination (NOT) to the Arizona Department of
Environmental Quality. The Contractor and the City Representatives will jointly review the
Stormwater Pollution Prevention Plan (SWPPP) prior to submission of the NOI and prior
to the start of work. The SWPPP will be maintained throughout the duration of the project
in accordance with the APDES requirements and a current version will be available at all
times at the project site.
No separate payment will be made for the preparation, implementation of the SWPPP, or
permit fees, the costs being considered as included in the price of contract items.
Salt River Project (SRP) Construction License
This project requires the Contractor to remove existing SRP facilities in some locations
and install new SRP facilities in other locations. As such, SRP requires the Contractor
obtain a Construction License for a nominal fee. No separate payment will be made for
the preparation of the construction license or license fees, the costs being considered as
included in the price of contract items.
COOPERATION WITH UTILITIES
Coordination with the pertinent utility companies has been a part of the development of
this project. Construction activities will be coordinated and scheduled to incorporate the
following applicable utility construction activities:
Air Products
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
82
AT&T
CenturyLink
Cox Communications
MCI
Ocotillo Community Association
SRP Electric
SRP Irrigation
Southwest Gas
Zayo Group
The following telephone numbers should put the Contractor in contact with the proper
personnel for coordination:
UTILITY COMPANY
CONTACT
PHONE
Air Products & Chemicals (N2 Gas)
AT&T (Communications)
CenturyLink (Telephone, Fiber Optic)
City of Chandler (Water, Sewer,
Reclaim Water)
City of Chandler (Electric, Traffic)
City of Chandler (Fiber Optic)
COX (Cable, Fiber Optic)
MCI (Communications)
Ocotillo Community Association
(Unknown)
Salt River Project (Electric)
Salt River Project (Irrigation)
Southwest Gas (Natural Gas)
Zayo Group (Communications)
Regardless of the means and methods utilized during the construction of the work, the
Contractor will protect all existing utilities during construction. Any damages to the
existing utilities resulting from the scope of work, will be the repaired and paid for by the
Contractor. The Contractor will follow all AZ811 and state laws regarding the protection
of utilities during construction.
It will be the Contractor’s responsibility to determine the exact location of the utilities prior
to any construction operations and to notify the above-mentioned utility companies at
least two working days prior to commencing any work on the project.
The following utility companies have facilities needing adjustment prior to
construction:
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
83
CenturyLink (Telephone, Fiber Optic)
City of Chandler (Water, Sewer, Reclaim Water)
City of Chandler (Electric, Traffic)
City of Chandler (Fiber Optic)
COX (Cable, Fiber Optic)
Salt River Project (Electric)
Zayo Group (Communications)
The following utility companies have facilities in the area, but are not anticipated
to be in conflict:
Air Products & Chemicals (N2 Gas)
AT&T (Communications)
MCI (Communications)
Ocotillo Community Association (Unknown)
Salt River Project (Irrigation)
Southwest Gas (Natural Gas)
The following utility companies do not have facilities within the project limits:
To be completed after 60% utility conflict review.
COOPERATION BETWEEN CONTRACTORS AND OTHER AGENCY PROJECTS
Contractor will conform to the requirements of MAG Section 105.7 except as modified
herein.
The Contractor is advised that there will be construction activity by others adjacent to the
project site. The Contractor will coordinate the work to accommodate the construction
activities.
The Contractor will contact the City of Chandler, Intel, SRP, and adjacent private
development contractors to verify other nearby projects in the vicinity of this project.
The Contractor is advised to schedule and coordinate all work activities and regional
transit so as not to adversely conflict with this work. The Contractor will be expected to
attend any monthly coordination meetings set up by other agencies or other prime
contractors working on adjacent projects to discuss coordination.
NOTIFICATION TO PROPERTY OWNERS
This project is adjacent to the Intel Ocotillo Campus, the Chandler Public Safety Training
Center, and residential neighborhoods. Contractor, after coordination with City
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
84
Representatives, will provide advance notice to these property owners at least 7 days
prior to the beginning of construction.
No separate payment will be made for providing advance notice, the costs being
considered as included in the price of other contract items. Any claims resulting due to
delay in providing sufficient notice by the Contractor will not be approved.
TRAFFIC CONTROL
Access Requirements for Pedestrians:
The Contractor will maintain ADA accessible passable walkway along Dobson Road and
Chaparral Way at all times during construction.
Traffic-Related Work Restrictions:
No lane restrictions or intersection closures will be allowed during special events or
holiday times as determined by the City.
No trenches will be left open overnight in areas that are not fenced in to prohibit access
to vehicles and pedestrians. All trenches within the roadway will be plated or backfilled
and paved prior to allowing vehicles to travel on the section of roadway.
Traffic Signal Requirements:
The existing traffic signal at the intersection of Driveway #1 and Driveway #4 will remain
operational until the new traffic signal infrastructure has been constructed and ready for
switch over. The traffic signal switch over does not have to be completed at one time and
can be completed in phases as the new traffic signal construction is completed.
Portable temporary signal equipment will not be used under any circumstances.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
APPENDIX A – GEOTECHNICAL / SOILS REPORT
Prepared for:
City of Chandler
Transportation & Development
215 East Buffalo Street
Chandler, Arizona 85225
Prepared by:
6437 W. Chandler Boulevard, Suite 1
Chandler, Arizona 85226
Tel: 480-829-6000
City Project No. ST2009.201
Olsson Premier Project # 021-02916
May 31, 2021
GEOTECHNICAL EVALUATION REPORT
Dobson Road Improvements – Intel Driveways #1 and #4
i
TABLE OF CONTENTS
1.0
INTRODUCTION ....................................................................................................... 1
2.0
PROJECT DESCRIPTION ........................................................................................... 1
3.0
GEOTECHNICAL SCOPE OF SERVICES ....................................................................... 1
4.0
SITE CONDITIONS .................................................................................................... 2
4.1
SURFACE CONDITIONS ................................................................................................ 2
4.2
GEOLOGIC CONDITIONS AND NATURAL HAZARDS ................................................................. 2
4.3
GROUNDWATER ........................................................................................................ 3
4.4
SUBSURFACE EXPLORATIONS ........................................................................................ 3
4.5
LABORATORY TEST RESULTS ........................................................................................ 4
4.6
SUBSURFACE CONDITIONS ........................................................................................... 5
5.0
DESIGN RECOMMENDATIONS ................................................................................... 5
5.1
GENERAL ............................................................................................................... 5
5.2
DESIGN R-VALUE AND SUBGRADE SUPPORTS ..................................................................... 6
5.3
RESILIENT MODULUS .................................................................................................. 6
5.4
DESIGN TRAFFIC ....................................................................................................... 6
5.5
DRAINAGE COEFFICIENT .............................................................................................. 7
5.6
SERVICEABILITY ........................................................................................................ 7
5.7
STANDARD DEVIATION AND RELIABILITY ............................................................................ 7
5.8
STRUCTURAL NUMBER ................................................................................................ 7
5.9
MINIMUM PAVEMENT LAYER THICKNESSES ........................................................................ 7
5.10
ASPHALT CONCRETE MIXES .......................................................................................... 8
5.11
DRAINAGE .............................................................................................................. 8
5.12
CORROSION AND SULFATE ATTACK ................................................................................. 8
6.0
EARTHWORK RECOMMENDATIONS ........................................................................... 9
6.1
GENERAL ............................................................................................................... 9
6.2
SUITABILITY OF FILL MATERIALS AND IMPORTS .................................................................... 9
6.3
SUBGRADE PREPARATION .......................................................................................... 10
6.4
EARTHWORK FACTORS AND GROUND COMPACTION ............................................................ 10
6.5
UTILITY BACKFILLS .................................................................................................. 11
6.6
EXCAVATION AND TRENCHING ..................................................................................... 11
6.7
PLACEMENT AND COMPACTION .................................................................................... 11
6.8
QUALITY CONTROL AND QUALITY ASSURANCE TESTING ....................................................... 12
7.0
DISCLOSURE ........................................................................................................ 12
8.0
REFERENCES ....................................................................................................... 13
APPENDICES
Appendix A: Site Location Map
Appendix B: Soil Classification Method
Appendix C: Boring Locations Plan and Boring Logs
Appendix D: Laboratory Test Results
Appendix E: Site Photos
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
1
1.0
INTRODUCTION
Premier Engineering Corporation, a wholly owned subsidiary of Olsson (Olsson Premier), has completed a
geotechnical evaluation and prepared this geotechnical evaluation report for the proposed Dobson Road
Improvements at Intel Driveway #1 and #4 located at Chaparral Way and north of Ocotillo Road within the
City of Chandler (City), Arizona. The location of the project site is illustrated in the site location map in
Appendix A. The purpose of this geotechnical investigation was to provide information on surface and
subsurface conditions and geotechnical engineering recommendations with regards to the design and
construction of the roadway improvements.
2.0
PROJECT DESCRIPTION
The Dobson Road Improvement project includes the preliminary and final engineering design for
improvements along Dobson Road at two driveway locations serving the Intel Ocotillo Campus. Olsson
Premier is the prime consultant to the City and DCS Contracting will perform the construction.
Driveway #1 is the northernmost Intel campus driveway on Dobson Road and it is located approximately
0.6 mile north of Ocotillo Road. Driveway #1 improvements include evaluating options for adding a second
right turn lane southbound on Dobson Road and the extent of the improvements depend on the results of a
preliminary design analysis. Two options for the proposed improvements at Driveway #1 were analyzed,
both of which would fulfill the ultimate design. Option 1 was to add two new dedicated right-turn lanes on
southbound Dobson Road, narrow the existing raised median, move the west curb south of the intersection,
and relocate the existing pedestrian ramps as needed. Option 2 was to include many of the same features
as Option 1, but keep the existing raised median in place, shift the west curb to add the southbound right-
turn lanes, and relocate traffic signals as needed.
Driveway #4 is the southernmost Intel campus driveway on Dobson Road and it is located at the
intersection of Chaparral Way. Driveway #4 improvements include new ADA ramps on all four corners,
restriping the east leg to provide a left turn lane, ITS conduit and pull boxes for future signal, restriping
crosswalks, and decomposed granite to tie into existing landscaping.
3.0
GEOTECHNICAL SCOPE OF SERVICES
The scope of our work for the geotechnical investigation included completion of a limited geotechnical
exploration to support the proposed Dobson Road improvements. The geotechnical evaluation services
included collection of subsurface information that will be utilized for the design and construction. In detail,
the scope of geotechnical services consisted of a site reconnaissance, boring marking for below ground
utility clearances and blue stake coordination, subsurface field exploration with soil borings, pavement
thickness measurements, soil sampling, field and laboratory testing, engineering analysis, and the
preparation of a geotechnical report with all collected geotechnical information and recommendations for
design and construction.
The field subsurface exploration included five soil borings extending to 5 to 10 feet depths, subsurface
logging, sample collection, and completion of Standard Penetration Tests (SPT) and or California Modified
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
2
Ring samples at five feet depth interval. Laboratory tests for the proposed improvements included
gradation, Atterberg limits, Proctor compaction, moisture content and unit weight, pH, resistivity, sulfate
content, and chloride content tests.
Olsson Premier has prepared this geotechnical evaluation report, as deliverable, with all collected
geotechnical information and developed recommendations for design and construction.
4.0
SITE CONDITIONS
4.1
SURFACE CONDITIONS
Dobson Road is a Major Arterial Road. It is currently paved with asphalt concrete and it includes two
through lanes in both directions (northbound and southbound). At Driveway #1, it includes bike lanes, a
right turn lane and a left turn lane to Intel driveway. At Driveway #4, Dobson Road includes bike lanes, a
left turn lane to Intel driveway and a left turn lane to Chaparral Way.
At both the driveway locations, properties east of Dobson Road are residential and properties west of
Dobson Road are commercial or light industrial. Other features that are present at these driveway
intersections are traffic control structures, light poles, concrete sidewalks, curb, gutters, raised islands,
landscaped areas, and some drainage features.
4.2
GEOLOGIC CONDITIONS AND NATURAL HAZARDS
The project site is located within the Sonoran Desert Section of the Basin and Range Physiographic
Province of the Western United States. The general Phoenix Metro Area is a home for broad alluvial valleys
separated by steep, linear, discontinuous, sub-parallel mountain ranges alternating with wide desert plains.
The Basin and Range Physiographic Province was created 15 to 17 million years ago by a tectonic process
which caused a series of high angle normal faults within this area. The up-thrown parts of the faults were
mountains and the downthrown parts became valleys. Since its creation, the valleys have received massive
amounts of sediment from erosion. The long-term sedimentation process and climatic changes continued
contribution to the weathering of rocks. The regional stream systems also introduced sediment from distant
areas. Therefore, the landforms within the general area consist of mountains and hills, river deposits, and
river valleys.
A brief study of the seismicity and neo-tectonic faults in Arizona was performed to evaluate the seismic
conditions of the current site. There are approximately 400 neo-tectonic faults present in the state of
Arizona. These 400 faults are distributed in 12 zones located within northwestern, southwestern, and
southeastern portions of the state and along the Transition Physiographic Province of Arizona.
The project site is not located near any major river. It is located 12 miles south of the Salt River and at
approximately the same distance northeast of the Gila River. According to the small-scale Geologic map of
Arizona, the materials at the site include Holocene Surficial Deposits. The surface and subsurface materials
in this area generally include unconsolidated deposits associated with modern fluvial systems. This unit
consists primarily of fine-grained well-sorted sediment on alluvial plains, but it also includes gravelly
channel, terrace, and alluvial-fan deposits on middle and upper piedmonts.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
3
This site is located in a relatively stable tectonic region called the Sonoran Zone; located in southwestern
Arizona, southeastern California, southern Nevada, and northern Mexico. It has sparse seismicity and few
Quaternary faults. There are no known active faults underlying the subject site or adjacent areas. The
closest known Quaternary faults to the site is the Carefree Fault zone and the Sugarloaf Fault zone, located
approximately 40 miles to the north and northeast, respectively, of the site and the slip-rate of these faults
is less than 0.2 millimeters per year. Due to the presence of relatively dense subsurface materials, the lack
of near-surface water, and the low ground motion hazard, the likelihood of liquefaction is considered to be
negligible.
Subsidence is a basin wide phenomenon that would result in differential elevation changes over long
distances. Fissure gullies form over subsurface irregularities such as bedrock highs, which cause tensional
stresses and differential subsidence. Where such anomalies are not present, subsidence tends to be
uniform over a wide area. No evidence of earth fissures was observed on the site. The closest known earth
fissures are located in the Chandler Heights area, a few miles from this site. The site is located outside
known areas that have undergone considerable subsidence due to groundwater removal. Areas of
subsidence are known to produce earth fissure, which has affected areas within several miles south of the
site. Based on local experience, subsidence and earth fissures historically have not been a problem in this
area. However, if any cracks, crevasses, or fissures are noted during site excavation, Olsson Premier
should be notified immediately. Olsson Premier representative will then visit the site, assess the feature
and make recommendations regarding restorative measures.
The site is not a candidate for major geologic and other natural hazards including flooding, ground
settlement, liquefaction, ground fissures and subsidence.
According to the United States Department of Agriculture and Natural Resources Conservation Service
Web Soil Survey, the subsurface materials at the project sites include two soil groups including Estrella
Loam (CL) and Trix Clay Loam (CL). Liquid limits of these materials generally vary from 29 to 50 and
plasticity index vary from non-plastic to 12 to 25. Percent fraction passing No. 200 sieve varies from 42 to
90 percent.
4.3
GROUNDWATER
According to Arizona Department of Water Resources (ADWR) online well data, the depth of the regional
groundwater table has been historically measured to be at more than 78 feet below the ground surface.
The groundwater level may not fluctuate much with the seasonal variations in precipitation due to its long
distance from stream flows.
4.4
SUBSURFACE EXPLORATIONS
Subsurface information was gathered by drilling five test borings within the project site, extending to 5 to 10
feet depths at the Dobson Road and project driveway intersections. The drilling was completed utilizing a
truck mounted CME 55 drill rig equipped with eight-inch outside diameter continuous flight hollow-stem
augers. The drilling was monitored and documented by Olsson Premier.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
4
Standard penetration tests (SPT) in conformance with ASTM D 1586 were completed at different depths.
Subsurface materials were classified according to the Unified Soil Classification System (USCS). For
information regarding soil classification, refer to Appendix B. Bulk, split spoon, and relatively undisturbed
ring samples were collected for laboratory tests. Bulk samples were collected at five-foot interval or at
change in material strata. Ring samples were collected at the approximate subgrade level, and the SPT
samples were taken at every five feet. For all boring locations on the existing pavements, the thicknesses
of pavement layers were measured and recorded. At each location, the borehole was backfilled with drill
cuttings and patched with cold-mix asphalt (as needed) at the conclusion of drilling operation for each
location. The locations of all the test borings and detailed descriptions of the subsurface materials
encountered at each boring location are provided in Appendix C.
Neither a groundwater table nor a saturated condition was encountered during the soil exploration at any
boring location.
4.5
LABORATORY TEST RESULTS
Laboratory tests were performed to complement information on the types of subsurface materials
determined at the site. The laboratory tests included gradation, plasticity index, Proctor compaction,
moisture content and unit weight, pH, resistivity, sulfate content, and chloride content tests. Gradation and
Atterberg limits tests were completed to determine classification of the soils and indicate other physical
properties such as strength, compressibility, and potential to change in volume due to exposure to excess
water. pH, resistivity, sulfate content, and chloride content tests were completed to determine chemical and
electrical properties of the soil that can be used to determine corrosion potential for buried
utilities/structures. Laboratory test results are contained in Appendix D.
Olsson Premier completed five particle size distributions (gradation) and five Atterberg limits tests. The test
results are summarized in the following table:
Boring
Number
Sample
Depth
(feet)
Fines
Content
(% Passing
#200 Sieve)
Liquid
Limit
(%)
Plasticity
Index
(%)
Soil Classification (USCS)
Symbol
Name
B-1
0 – 5
38.9
25
7
SC-SM
Silty Clayey SAND with Gravel
B-2
0 – 5
35.8
25
11
SC
Clayey Sand with Gravel
B-3
0 – 5
23.3
21
6
SC-SM
Silty Clayey Sand with Gravel
B-4
0 – 5
15.8
20
4
SC-SM
Silty Clayey Sand with Gravel
B-5
0 – 5
18.7
22
6
SC-SM
Silty Clayey Sand with Gravel
The above test results indicate that the soils at the site are mostly a mixture of sand, silt, clay, and gravel
(SC, SC-SM). The percent fines (passing #200 sieve) vary from 15.8 to 38.9, liquid limit values vary from
20 to 25 and plasticity index values vary from 4 to 11.
Two standard Proctor compaction tests were completed and the test results are summarized in the table
below.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
5
Boring
Number
Sample
Depth
(feet)
Maximum
Dry Density
(pcf)
Optimum
Moisture Content
(%)
B-1 + B-2
0 – 5
122.5
9.1
B-3 + B-4 + & B-5
0 – 5
130.9
7.2
Two sets of chemical and electrical property tests were completed on samples collected from the upper 10
feet. The tests included pH, minimum resistivity, chloride content, and sulfate content tests. The test results
are summarized in the table below.
Boring
Number
Sample
Depth
(feet)
pH
Resistivity
(Ohm-cm)
Sulfate
(ppm)
Chloride
(ppm)
B-1
0 – 10
8.4
1,635
33
27
B-4
0 – 10
8.3
2,526
31
14
The tests values are not indicative of any significant corrosion or chemical attacks.
4.6
SUBSURFACE CONDITIONS
Detailed information regarding the subsurface conditions encountered at each boring location is provided in
the boring logs contained in Appendix C. In a summary, the subsurface materials within the soil borings for
this project mostly consist of loose to medium dense silty clayey sand (SC, SC-SM) with gravel within the
upper ten feet depth. The materials are of low to medium plasticity (PI varies from 4 to 11) with percent
fines ranging from 15.8 to 38.9.
5.0
DESIGN RECOMMENDATIONS
5.1
GENERAL
The recommendations in this report are based on the assumption that the subsurface conditions along the
Dobson Road at/near the two driveway locations are generally similar to those encountered at boring
locations and depths. If variations are noted during construction or changes in the design or materials are
made, Olsson Premier should be notified so that our recommendations can be revised and supplemented,
as necessary. The site conditions and the laboratory test results indicate that the soils at the site will
support the design and construction of the proposed improvements.
The design of pavements for this project was completed utilizing the City of Chandler Plans and
Specifications, Arizona Department of Transportation (ADOT) and American Association of State Highway
and Transportation Officials (AASHTO) Guidelines for Design of Pavement Structures.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
6
5.2
DESIGN R-VALUE AND SUBGRADE SUPPORTS
ADOT guidelines in Pavement Design Manual (PDM) were utilized to determine an equivalent mean R-
value for the subgrade. According to this model, the mean R-value was calculated based on correlated R-
values. The correlated R-values were estimated based on plasticity index and percent passing no. 200
sieve. The following table shows correlated R-values at different exploration locations.
Boring
Location
Depth
(feet)
Fines Content
(%Passing #200 Sieve)
Plasticity Index
Correlated
R-Value
B-1
0 – 5
38.9
7
44
B-2
0 – 5
35.8
11
40
B-3
0 – 5
23.3
6
57
B-4
0 – 5
15.8
4
68
B-5
0 – 5
18.7
6
61
Based on the above correlated R values and their variations, Olsson Premier considered a conservative R-
value of 42 to be used for the flexible pavement design.
5.3
RESILIENT MODULUS
The selected design R-value was utilized to calculate resilient modulus of the subgrade. The procedure
used the AASHTO formula to calculate modulus of resilience MR.
6.0
2
)
(
6.0
40
.2
225
1815
SVF
R
R
M
mean
mean
R
+
+
=
Based on the design R-value of 42 and a seasonal variation factor of 1.0 (PDM Table 2-4), a resilient
modulus MR value of 25,831 pounds per square inch (psi) was calculated using the above equation. This
design MR value is less than ADOT recommended maximum allowable value of 26,000 psi for roadway
subgrade and therefore, 25,831 psi was utilized for the design.
5.4
DESIGN TRAFFIC
Dobson Road is a Major Arterial roadway. Detailed traffic data for Dobson Road was not available.
However, traffic data for Dobson Road was gathered from 2019 Segment and Intersection Traffic Volumes
available online in City’s website for Arterial segments and intersections. Based on the available data,
average weekday traffic for Dobson Road is 19,700 in 2019. Olsson Premier assumed a 20 percent truck
traffic considering the ongoing and potential future construction activities at the Intel site. Considering a 20-
year design period, 50 percent directional distribution, 90 percent lane distribution, 0.21 truck factor (Arterial
street), 20 percent truck traffic, and 4.0 percent annual growth in traffic, a reasonably conservative design
equivalent single axle load (ESAL) was calculated to be 4.55 million.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
7
5.5
DRAINAGE COEFFICIENT
Based on the expected quality of drainage as ‘fair’ and a seasonal variation factor of 1.0, a drainage
coefficient of 1.0 was obtained from Table 2-7 in the PDM.
5.6
SERVICEABILITY
An initial serviceability of 4.2 and a terminal serviceability of 2.8 were used for the design of the pavement
section on Dobson Road (PDM Table 2-2). Therefore, the resulting total serviceability index loss (PSI) is
considered to be 1.4.
5.7
STANDARD DEVIATION AND RELIABILITY
In accordance with ADOT policy, an overall standard deviation of 0.35 was utilized. For a roadway with a
design ADT over 10,000, a reliability of 95 percent was selected from Table 2-1. A standard normal
deviation (ZR) of -1.645 was selected from the same table.
5.8
STRUCTURAL NUMBER
Based on the procedure for flexible pavement design according to AASHTO Guidelines and using the
design parameters mentioned above, Olsson Premier calculated a structural number of 2.84.
5.9
MINIMUM PAVEMENT LAYER THICKNESSES
According to the City of Chandler Standard Details and Specifications Detail No. C-203, the minimum
required thickness for Asphalt Concrete is 5 inches. Detail No. C-239 was used to calculate the minimum
thickness for aggregate base course (depends on plasticity index and passing #200 sieve) and it was
determined to be 8 inches.
With layer coefficient of 0.44 for asphalt concrete and 0.14 for the aggregate base course, Olsson Premier
calculated a minimum asphalt concrete layer thickness of 4 inches over 8-inch thick aggregate base
course. Based on the above estimates utilizing the City of Chandler, ADOT and AASHTO guidelines,
Olsson Premier recommends the following pavement layer thicknesses for Dobson Road section:
Roadway
Asphalt Concrete
(inches)
Aggregate Base Course
(inches)
Dobson Road at Driveways #1 & #4
5.0
8.0
With a similar analysis, it was determined that the Intel Driveway #1 and #4 should include (as minimum) a
3-inch asphalt concrete layer over 7-inch aggregate base layer.
Roadway
Asphalt Concrete
(inches)
Aggregate Base Course
(inches)
Intel Driveway #1
3.0
7.0
Intel Driveway #4
3.0
7.0
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
8
5.10
ASPHALT CONCRETE MIXES
The following mixes are recommended for Miller Road as per Figure 5.10-1 of DSPM.
Roadway
Minimum Depth of
Asphalt Concrete
Asphalt Base
Asphalt Surface
Dobson Road
5-inch
3” A19 or A25 EVAC
2” A12.5 EVAC
Intel Driveways #1 & #4
3-inch
-
3” R-12.5 EVAC
5.11
DRAINAGE
Moisture that infiltrates into roadway subgrade could adversely affect pavement performance. The roadway
design should divert water away from where it could infiltrate into the subgrade. However, the use of
granular base and controlled compaction of subgrade will reduce the potential for adversely affecting the
pavement layers.
It is recommended that positive drainage be provided in the final design by providing adequate slope for a
distance of 5 feet or more away from the pavements. Surface water should not be allowed to pond on
pavement surface. The maintenance of storm water and subsurface drainage systems should be performed
during the entire life of the pavements. Planters and landscaping areas should be placed at sufficient
distance or with appropriate barriers to protect the subgrades from moisture intrusions. Since the root
system of large mature trees can grow under pavements and concrete slabs and cause associated
seepage, it is important to plant any large tree at adequate distances from the roadway. Infiltration of
ground water into excavations is not considered an issue at the site.
5.12
CORROSION AND SULFATE ATTACK
Corrosion is defined as the degradation of a material or its properties due to a reaction with the
environment. It exists in virtually all materials, but is most often associated with metals. Corrosion is a
common physical-biochemical phenomenon that occurs when unprotected materials come in contact with
soils. With some other factors in environment, different metal-soil combinations may cause different amount
of corrosion. Major soil factors that influence corrosion include soil type, moisture content, water table, pH,
resistivity, soluble ions content, oxidation-reduction potential, and the presence of microbes in soil.
The corrosion evaluation is commonly conducted based on the resistance of soil to the flow of electrical
current (resistivity), total acidity, soil drainage, soil texture, and some other properties of soils such as
sulfate/sulfide content, redox potential, chloride content, etc. Soil pH generally varies from 3.5 to 10.0 which
controls the environment for the development of ions, oxygen-reduction potential, and microbial activities in
soils. Soil resistivity indicates the resistance to the flow of electrical current in soil. For unprotected steel
exposed in soil, a soil is generally categorized as corrosive if the soil has a resistivity lower than 2,000
Ohm-cm. However, according to California Department of Transportation (Caltrans) 2018 corrosion criteria,
a project site is classified as corrosive if one or more of the following conditions exist for the representative
soil samples retrieved from the site:
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
9
• Soluble chloride concentration of 500 ppm or greater
• Soluble sulfate concentration of 1,500 ppm or greater
• Electrical resistivity of 1,100 ohm-centimeters or less
• pH of 5.5 or less.
To evaluate the corrosion potential of the site soils for underground metal structures, Olsson Premier
completed a few chemical and electrical tests, including pH, minimum resistivity, moisture content, soluble
sulfate, and soluble chloride tests. Based on the test results, the site soil has low potential for corrosion in
unprotected corrosive metals. Olsson Premier also utilized the Caltrans suggested method to evaluate the
rate of corrosion of metal pipes utilizing the combination of pH and minimum resistivity. This determination
indicates that unprotected ductile iron pipes within the project locations will undergo insignificant loss of
materials. However, although the determined values indicate low corrosion potential, high chemical
concentration in some areas as well as other corrosion factors may cause higher than anticipated amount
of corrosion. Granular pipe zone materials can significantly reduce potential corrosion effects. Type I or II
Portland cement can be used for subsurface concrete structures.
The results of the soluble sulfate content tests indicate low values (<1,000ppm or <0.1%) and therefore, the
materials fall in the exposure category So according to American Concrete Institute (ACI) 318-14 Table
19.3.1.1. Consequently, injurious sulfate attack is generally not a concern at the site.
6.0
EARTHWORK RECOMMENDATIONS
6.1
GENERAL
All disturbed areas created during construction should be proof-rolled to delineate any soft or uncompacted
spots. All backfilling and disturbed areas should be compacted as per compaction and moisture
requirements specified in this report.
The earthwork at the improvement site should be evaluated by a geotechnical engineer or a qualified
representative. The evaluation should include observation and/or testing of site grading, excavation,
subgrade preparation, fill placement and compaction, and other geotechnical conditions exposed during
construction. The prepared fill, subgrades, and utility trenches should not be kept exposed to the
environment for more than 24 hours as this can change the moisture and density conditions.
6.2
SUITABILITY OF FILL MATERIALS AND IMPORTS
On-site native soils removed from excavation and grading or imported non-swelling soils may be utilized
within the subgrades for pavements. Materials to be used as fill shall be clean and free of deleterious
matters including large pieces (larger than three inches).
If import is needed for the construction, the materials should be evaluated by an on-site Olsson Premier
geotechnical representative before the material is brought to the site. The maximum swell potential of the
compacted (95 percent of ASTM D698 maximum dry density) import soil should be 1.5 percent as per
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
10
ASTM D4546 with 100 pounds per square foot (psf) surcharge pressure. The import fill under pavement
layers should be compacted to 95 percent relative compaction at a moisture content within three percent of
optimum moisture content.
6.3
SUBGRADE PREPARATION
The pavement design provided in this report assumes that the upper six (6) inches of sub-base soil
(pavement subgrade) is scarified, moisture conditioned, and recompacted to proper compaction. The
asphalt concrete layers should be constructed of dense-graded mix. Base course and asphalt concrete
materials should conform to MAG or the City of Chandler requirements.
Some preventive maintenance measures should be taken to enhance the short- and long-term
performance of the pavement structures. Base course or pavement materials should not be placed when
the underlying surface is wet. Surface drainage should be provided to keep the storm water away from the
pavement areas and minimize water intrusion into the pavement subgrade. Aggregate base course layers
should not be allowed to extend to planter areas.
Pavement subgrade should be free of organics, debris, oversize materials, and any other deleterious
matters. Subgrade should be firm and clean. If pavement subgrade is found to be disturbed or fill materials
are to be utilized under pavements, the subgrade native soils should be scarified to a minimum eight inches
depth or depth of disturbance, whichever is greater, and then moisture treated and recompacted to 95
percent relative compaction at a moisture content within three percent of the optimum moisture content.
After a rough grade has been achieved for the pavement subgrades and prior to the placement of fill
materials, the exposed subgrade should be checked for the presence of unsuitable materials (debris,
organic matter, oversize particles, etc.). Unsuitable materials should be removed from the subgrades. The
disturbed subgrade should be backfilled and compacted with engineered fill. Engineered fill should be
placed in horizontal lifts with a loose thickness not exceeding eight inches. The upper three feet of fill under
roadway areas should consist of materials free of any pieces of rock or soil particles larger than three
inches.
6.4
EARTHWORK FACTORS AND GROUND COMPACTION
Shrinkage factor is defined as the ratio of fill density to excavation (cut) density. A factor lower than unity
(one) indicates that compaction or placement density is higher than which exists on the borrow site, which
might result in importing additional materials, if the cut volume is equal to or less than the fill volume. Onsite
soil excavated from the upper five feet of subsurface is anticipated to have a shrinkage factor of up to 0.90
(10 percent shrinkage).
The ground compaction factor should be taken into consideration when constructing embankment fill
sections outside the existing roadway prism. Olsson Premier recommends a ground compaction factor of
up to 0.20 feet be used for this project site.
The earthwork factors represent an average of the materials observed with varying consistencies. Potential
bidders should consider this fact in the preparation of estimates and should review the available data to
make their own conclusions regarding excavation conditions.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
11
6.5
UTILITY BACKFILLS
Underground conduits may be installed in this project. Pipe backfill materials can consist of soils obtained
from pipe trench excavations containing no pieces larger than eight inches; alternatively, off-site granular
import materials can be utilized. The compaction of bedding and backfill should be at least 95 percent of its
maximum dry density. However, pipes should not be stressed during compaction of materials over or
around the pipes. Handheld devices such as power tampers should be used to provide careful compaction
of the materials, especially within 12 inches above the pipe. Hard materials larger than three inches in
maximum dimensions should not be placed within six inches of the pipes.
Trench should be excavated to sufficient width and depth to provide working space at both sides of the
trench and around the installed pipes as needed for placing, joining, backfilling and compacting. The trench
bottom should be inspected for loose or deleterious materials. Unstable materials should be removed and
replaced with compacted materials.
6.6
EXCAVATION AND TRENCHING
Based on the subsurface conditions and our understanding of the project construction, Olsson Premier
believes that the construction of the proposed improvements will include grading and excavation/trenching
for the construction of the roadway section and driveways.
Commonly used traditional excavation and trenching equipment can be utilized for the site constructions.
All shallow and temporary excavation slopes in undisturbed soils at the site can be maintained as steep as
1:1 (H:V). A flatter slope such as 1.5:1 may be necessary in disturbed soil and deeper slopes. If the
excavation is expected to stay open for a long time (a few days), it is recommended that the cut slopes be
stabilized with a shotcrete, gunite, or other polymer based spray. Also, if the slope of a deep excavation is
required to be steeper than the recommended slopes, a shoring system should be utilized. All confined
excavations deeper than four (4) feet should conform to the Occupational Safety and Health Administration
(OSHA) regulations.
6.7
PLACEMENT AND COMPACTION
Native and import fill materials should be placed and compacted in horizontal lifts using equipment and
procedures that will produce recommended moisture content and densities.
Recommended compaction and moisture content criteria for engineered fill or recompaction of onsite
materials are as follows.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
12
Material and Location
(On-site or import materials)
Standard Proctor Compaction
(ASTM D 698)
Relative
Compaction
(%)
Moisture Content
Relative to Optimum
Moisture
(%)
Pavement subgrades (native)
95
-3 to +3
Pavement subgrades (import)
95
-3 to +3
Concrete Slabs subgrade
95
-3 to +3
Aggregate base course
100
-3 to +3
The fill surface should be adequately maintained during construction in order to achieve an acceptable
compaction and interlift bonding. The surface should be sloped properly to prevent ponding and provide
drainage of runoff water. If precipitation is anticipated, it is recommended that the fill surface be made
smooth by rolling with a smooth drum roller.
6.8
QUALITY CONTROL AND QUALITY ASSURANCE TESTING
Subgrade preparation, backfill placement, and re-compaction should be observed, tested, and documented
by a qualified representative of the Olsson Premier geotechnical engineer. This representative should, at
least, observe and document the following:
• Subgrade is compacted, firm, and without deleterious objects.
• Compaction and moisture content of backfill soils meet the specifications.
• If import soils are used, the import soils shall have low swell potential. Import soils should be tested
for remolded swell test per batch or one at every 1,000 cubic yard placed, whichever is higher.
• Field density testing should be performed for engineered fill or aggregate base course materials at
a rate of one test every 500 feet per lane for the roadway.
• A quality control test report should be prepared documenting all on-site activities, test results, and
conclusions.
7.0
DISCLOSURE
This report has been prepared as an aid to the designers for the current project only. The comments,
statements, and recommendations set forth reflect the opinions of the author. The opinions are based upon
conditions at the location of the specific observations, as well as tests and data developed to satisfy the
scope of services. However, due to the inherent natural variations of the soil strata and the nature of
geotechnical exploration, it is always possible that the soil conditions between two borings may be different
from those encountered at the boring locations. Also, changes at the site by human activities or changes in
code or standards due to legislative action may affect the conclusions and recommendations. If variations
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road, Chandler, Arizona
Geotechnical Evaluation Report
Olsson Premier Project# 021-02916
13
in materials are encountered or human changes are made, a geotechnical engineer should be contacted to
reevaluate the recommendations provided in this report.
Structural features built on soil and supporting subgrade are subject to risks that cannot be entirely
eliminated. Common detrimental hazards include settlement, localized concentrated drainage, hydro-
compaction, and soil expansion or collapse due to unidentified geologic or man-made conditions. A
geotechnical evaluation with limited boreholes, depths, and laboratory tests may not delineate all the
possible hazards. Therefore, the roles of design professionals and contractors, and maintenance of the site
play a critical role.
This report has been prepared in accordance with generally accepted geotechnical engineering principles
and practices. No warranties are intended or made. It is intended for the exclusive use of our client for
specific application to the current project and is valid for the proposed development at the issuance date of
this report. It should not be used as a bidding document. The contractors must draw their own conclusions
regarding site conditions and specific construction techniques to be used.
8.0
REFERENCES
1. City of Chandler Standard Details and Specifications, July 2015.
2. City of Chandler Street Design and Access Control (TDM#4), January 2014.
3. United States Geological Survey Maps.
4. Pavement Design Manual, Arizona Department of Transportation, September 2017.
5. AASHTO Guide for Design of Pavement Structures, 1993.
6. https://www.chandleraz.gov/residents/transportation/traffic-management/traffic-volumes-and-
calming-measures.
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendices:
Appendix A: Site Location Map
Appendix B: Soil Classification Methods
Appendix C: Boring Locations Plan and Boring Logs
Appendix D: Laboratory Test Results
Appendix E: Site Photos
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendix A
Site Location Map
SITE LOCATION MAP
Dobson Road Improvements
Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Road
Chandler, Arizona
Olsson Premier Project # 021-02916
6437 W. Chandler Boulevard, Suite 1
Chandler, AZ 85226
Ph. (480) 829-6000
Driveway #1
Site Location
Driveway #4
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendix B
Soil Classification Methods
Well graded gravels, gravel sand
GRAVELS
Poorly graded gravels, gravel sand
more than 50%
larger than N0. 4
GW-GM, GW-GC, GP-GM, or GP-GC
sieve size
GM Atterbert limits below
"A" Line or PI < 4
Atterberg limits above "A" Line
GC Atterbert limits above
with PI beween 4 and 7
"A" Line with PI > 7
Well graded sands, gravelly sands,
SANDS
50% or more
Poorly graded sands, gravelly sands,
smaller than N0. 4
sieve size
SW-SM, SW-SC, SP-SM, or SP-SC
SM Atterbert limits below
"A" Line or PI < 4
Atterberg limits above "A" Line
SC Atterbert limits above
with PI beween 4 and 7
"A" Line with PI > 7
Inorganic silt and very fine sands, rock
SILTS
AND
CLAYS
Inorganic clays of low to medium
Liquid limit
plasticity, gravelly clays, sandy clays,
less than
50%
Organic silts and organic silty clays of
SILTS
Inorganic silts, micaceous/diatomaceous
AND
fine sandy or silty soils, elastic silts
CLAYS
Inorganic clays of high plasticity,
Liquid limit
fat clays
50% or more
Organic clays of medium to high plasticity,
organic silts
HIGHLY
ORGANIC
SOILS
Std Penetration
Std Penetration
Consistency
Std Penetration
Relative Firmness
Resistance, N
Resistance, N
Resistance, N
0 - 4
< 2
Very soft
0 - 4
Very soft
5 - 1 0
3 - 4
Soft
5 - 8
Soft
11 - 30
5 - 8
Medium stiff
9 - 15
Moderately firm
31 - 50
9 - 15
Stiff
16 - 30
Firm
> 50
16 - 30
Very stiff
31 - 50
Very firm
> 30
Hard
> 50
Hard
Unified Soil Classification System
< 0.25
0.25 - 0.5
0.50 - 1.00
1.00 - 2.00
Very loose
Loose
Medium dense
Dense
COARSE GRAINED SOILS
SW
little or no fines
SP
> 4.00
Fine Grained Soils
Relative Density, Relative Consistency, and Relative Firmness
2.00 - 4.00
Very dense
GW Cu = D60/D10 > 4 and Cc = D30 / (D10XD60) between 1 and 3
OH
SC
Silty gravels, gravel sand silt mixtures
Cohesionless Uncemented Sand/Gravel
Unconfined Compressive
Strength, qu (tsf)
Clean Sands (less than 5% fines)
OL
flour, silty or clayey fine sands or clayey
Silty sands, sand silt mixtures
Clayey gravels, gravel sand clay mixtures
Clayey sands, sand clay mixtures
FINE GRAINED SOILS
(50% or more passing No. 200 seive)
Partially Saturated and/or Cemented Soils
Gravels with fines (between 5% and 12%)
Gravels with fines (between 5% and 12%)
SOIL CLASSIFICATION, CONSISTENCY, AND PLASTICITY
Relative Density
GW
Clean Gravels (less than 5% fines)
mixtures, little or no fines
(more than 50% larger than No. 200 seive size)
GP
mixtures, little or no fines
GM
GC
GP Not meeting all gradation requirements for GW
GC-GM
SC-SM
SW Cu = D60/D10 > 4 and Cc = D30 / (D10XD60) between 1 and 3
SP Not meeting all gradation requirements for SW
Gravels with fines (more than 12% fines)
PT
Peat and other highly organic soils
ML
silts with slight plasticity
low plasticity
MH
CH
CL
silty clays, lean clays
little or no fines
Sands with fines (more than 12% fines)
SM
0
10
20
30
40
50
60
0
10
20
30
40
50
60
70
80
90
100
CH
CL
CL-ML
ML&OL
Plasticity Index (PI)
Liquid Limil (LL)
PLASTICITY CHART
MH or OH
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendix C
Boring Locations Plan and Boring Logs
B-1: Boring Location 1 (Typical)
BORING LOCATIONS PLAN
Dobson Road Improvements
Intel Driveways #1 and #4
Dobson Road at Chaparral Way and north of Ocotillo Road
Chandler, Arizona
Olsson Premier Project # 021-02916
6437 W. Chandler Boulevard, Suite 1
Chandler, AZ 85226
Ph. (480) 829-6000
B-3
Dobson Road
Driveway #1
B-4
B-5
Jacaranda Parkway
B-1: Boring Location 1 (Typical)
BORING LOCATIONS PLAN
Dobson Road Improvements
Intel Driveways #1 and #4
Dobson Road at Chaparral Way and north of Ocotillo Road
Chandler, Arizona
Olsson Premier Project # 021-02916
6437 W. Chandler Boulevard, Suite 1
Chandler, AZ 85226
Ph. (480) 829-6000
Chapparral Way
B-1
B-2
Dobson Road
Driveway #4
0
3
6
9
12
15
18
21
SC-SM
SC
5.5" Asphalt Concrete
9" Aggregate Base Course
Silty Clayey SAND with Gravel. Small subangular gravel, loose to
medium dense, low plasticity, moist, brown.
Clayey SAND. Medium dense, low to medium plasticity, moist, brown.
Boring terminated at 10 feet depth. Borehole was backfilled with drill
cuttings and patched with cold-mix asphalt.
4 (4-3)
15 (4-6-9)
24 (5-10-14)
BORING LOG
PROJECT: Dobson Rd Improvements - Intel Driveways #1
PROJECT NO.:
021-02916
CLIENT: City of Chandler
DATE:
4/26/2021
BORING NO. B-1
LOCATION: Dobson Rd & Chaparral Way, Chandler,AZ
ELEVATION:
Not dtrmnd
DRILLER: ACS Services, LLC
LOGGED BY:
Marty Verquer
DRILLING METHOD: Truck Mounted CME-55 Drill Rig w/ 8"HSA
File: TralLog
Date Printed: 5/24/2021 DEPTH TO - WATER> INITIAL:
None
AFTER 24 HOURS:
NA
CAVING>
DEPTH
(FEET)
USCS
CLASS
Description
SOIL STRATA
SAMPLE TYPE
Soil Parameters
TEST RESULTS
10
20
30
40
50
N-Value (Blow Counts) -
Water Content -
Plastic Limit
Liquid Limit
Premier Engineering Corporation
Figure
This information pertains only to this boring and should not be interpreted as being indicitive of the site.
PAGE 1 of 1
0
3
6
9
12
15
18
21
SC
5.5" Asphalt Concrete
7" Aggregate Base Course
Clayey SAND with Gravel. Small subangular gravel, loose to medium
dense, low to medium plasticity, moist, brown.
Boring terminated at 5 feet depth. Borehole was backfilled with drill
cuttings and patched with cold-mix asphalt.
11 (4-5-6)
BORING LOG
PROJECT: Dobson Rd Improvements - Intel Driveways #1
PROJECT NO.:
021-02916
CLIENT: City of Chandler
DATE:
4/26/2021
BORING NO. B-2
LOCATION: Dobson Rd & Chaparral Way, Chandler,AZ
ELEVATION:
Not dtrmnd
DRILLER: ACS Services, LLC
LOGGED BY:
Marty Verquer
DRILLING METHOD: Truck Mounted CME-55 Drill Rig w/ 8"HSA
File: TralLog
Date Printed: 5/24/2021 DEPTH TO - WATER> INITIAL:
None
AFTER 24 HOURS:
NA
CAVING>
DEPTH
(FEET)
USCS
CLASS
Description
SOIL STRATA
SAMPLE TYPE
Soil Parameters
TEST RESULTS
10
20
30
40
50
N-Value (Blow Counts) -
Water Content -
Plastic Limit
Liquid Limit
Premier Engineering Corporation
Figure
This information pertains only to this boring and should not be interpreted as being indicitive of the site.
PAGE 1 of 1
0
3
6
9
12
15
18
21
SC-SM
5.5" Asphalt Concrete
7" Aggregate Base Course
Silty Clayey SAND with Gravel. Small subangular gravel, loose to
medium dense, low plasticity, moist, brown.
Boring terminated at 5 feet depth. Borehole was backfilled with drill
cuttings and patched with cold-mix asphalt.
18 (9-6-12)
BORING LOG
PROJECT: Dobson Rd Improvements - Intel Driveways #1
PROJECT NO.:
021-02916
CLIENT: City of Chandler
DATE:
4/26/2021
BORING NO. B-3
LOCATION: Dobson Rd & N. of Ocotillo Rd, Chandler,AZ
ELEVATION:
Not dtrmnd
DRILLER: ACS Services, LLC
LOGGED BY:
Marty Verquer
DRILLING METHOD: Truck Mounted CME-55 Drill Rig w/ 8"HSA
File: TralLog
Date Printed: 5/24/2021 DEPTH TO - WATER> INITIAL:
None
AFTER 24 HOURS:
NA
CAVING>
DEPTH
(FEET)
USCS
CLASS
Description
SOIL STRATA
SAMPLE TYPE
Soil Parameters
TEST RESULTS
10
20
30
40
50
N-Value (Blow Counts) -
Water Content -
Plastic Limit
Liquid Limit
Premier Engineering Corporation
Figure
This information pertains only to this boring and should not be interpreted as being indicitive of the site.
PAGE 1 of 1
0
3
6
9
12
15
18
21
SC-SM
SC
5.5" Asphalt Concrete
7" Aggregate Base Course
Silty Clayey SAND with Gravel. Small subangular gravel, loose to
medium dense, low plasticity, moist, brown.
Clayey SAND. Medium dense, low to medium plasticity, moist, brown.
Boring terminated at 10 feet depth. Borehole was backfilled with drill
cuttings and patched with cold-mix asphalt.
22 (5-29)
6 (4-3-3)
9 (4-5-4)
BORING LOG
PROJECT: Dobson Rd Improvements - Intel Driveways #1
PROJECT NO.:
021-02916
CLIENT: City of Chandler
DATE:
4/26/2021
BORING NO. B-4
LOCATION: Dobson Rd & N. of Ocotillo Rd, Chandler,AZ
ELEVATION:
Not dtrmnd
DRILLER: ACS Services, LLC
LOGGED BY:
Marty Verquer
DRILLING METHOD: Truck Mounted CME-55 Drill Rig w/ 8"HSA
File: TralLog
Date Printed: 5/24/2021 DEPTH TO - WATER> INITIAL:
None
AFTER 24 HOURS:
NA
CAVING>
DEPTH
(FEET)
USCS
CLASS
Description
SOIL STRATA
SAMPLE TYPE
Soil Parameters
TEST RESULTS
10
20
30
40
50
N-Value (Blow Counts) -
Water Content -
Plastic Limit
Liquid Limit
Premier Engineering Corporation
Figure
This information pertains only to this boring and should not be interpreted as being indicitive of the site.
PAGE 1 of 1
0
3
6
9
12
15
18
21
SC-SM
5.5" Asphalt Concrete
6" Aggregate Base Course
Silty Clayey SAND with Gravel. Small subangular gravel, loose to
medium dense, low plasticity, moist, brown.
Boring terminated at 5 feet depth. Borehole was backfilled with drill
cuttings and patched with cold-mix asphalt.
18 (9-9-9)
BORING LOG
PROJECT: Dobson Rd Improvements - Intel Driveways #1
PROJECT NO.:
021-02916
CLIENT: City of Chandler
DATE:
4/26/2021
BORING NO. B-5
LOCATION: Dobson Rd & N. of Ocotillo Rd, Chandler,AZ
ELEVATION:
Not dtrmnd
DRILLER: ACS Services, LLC
LOGGED BY:
Marty Verquer
DRILLING METHOD: Truck Mounted CME-55 Drill Rig w/ 8"HSA
File: TralLog
Date Printed: 5/24/2021 DEPTH TO - WATER> INITIAL:
None
AFTER 24 HOURS:
NA
CAVING>
DEPTH
(FEET)
USCS
CLASS
Description
SOIL STRATA
SAMPLE TYPE
Soil Parameters
TEST RESULTS
10
20
30
40
50
N-Value (Blow Counts) -
Water Content -
Plastic Limit
Liquid Limit
Premier Engineering Corporation
Figure
This information pertains only to this boring and should not be interpreted as being indicitive of the site.
PAGE 1 of 1
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendix D
Laboratory Test Results
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
0.001
0.01
0.1
1
10
100
PI
Cc
18
14
15
16
16
25
25
21
20
22
Cu
LL
PL
7
11
6
4
6
GRAIN SIZE DISTRIBUTION
COBBLES
GRAVEL
38.9
35.8
23.3
15.8
18.7
25
25
25
25
25
SAND
GRAIN SIZE IN MILLIMETERS
coarse
fine
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
CLAYEY SAND with GRAVEL(SC)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
Classification
D100
D60
D30
D10
%Gravel
0.535
0.463
1.095
2.551
3.481
B-01
B-02
B-03
B-04
B-05
coarse
SILT OR CLAY
fine
medium
0-5
0-5
0-5
0-5
0-5
%Sand
%Silt
%Clay
0.15
0.3
0.275
23.0
22.0
24.0
32.0
36.0
38.1
42.2
52.7
52.2
45.3
BOREHOLE
DEPTH
BOREHOLE
DEPTH
3
100
B-01
B-02
B-03
B-04
B-05
2
4
16
30
1
200
6
10
50
1/2
HYDROMETER
U.S. SIEVE OPENING IN INCHES
U.S. SIEVE NUMBERS
140
3
4
20
40
6
60
1.5
8
14
3/4
3/8
0-5
0-5
0-5
0-5
0-5
PERCENT FINER BY WEIGHT
CLIENT
Premier Engineering Corporation
PROJECT NUMBER
20065.00, Premier No. 2020026
PROJECT NAME
Dobson Rd Improvements - Intel Driveway No. 1 & 4
PROJECT LOCATION
Chandler, AZ
GRAIN SIZE - GINT STD US LAB.GDT - 21/5/5 09:17 - U:\GEOTECH GINT DATA\20065.00 DOBSON RD IMP INTEL DRIVEWAY NO. 1 & 4\GINT DATA.GPJ
Quality Testing, LLC
175 S. Hamilton Place, Bldg 6, Suite 114
Gilbert, AZ 85233
Telephone: 480-486-2000
Fax: 480-496-2001
0
10
20
30
40
50
60
0
20
40
60
80
100
B-01
B-02
B-03
B-04
B-05
ML
CL
MH
CH
39
36
23
16
19
CL-ML
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT
Fines Classification
25
25
21
20
22
18
14
15
16
16
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
CLAYEY SAND with GRAVEL(SC)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
SILTY, CLAYEY SAND with GRAVEL(SC-SM)
LL
PL
PI
7
11
6
4
6
ATTERBERG LIMITS' RESULTS
0-5
0-5
0-5
0-5
0-5
BOREHOLE
DEPTH
CLIENT
Premier Engineering Corporation
PROJECT NUMBER
20065.00, Premier No. 2020026
PROJECT NAME
Dobson Rd Improvements - Intel Driveway No. 1 & 4
PROJECT LOCATION
Chandler, AZ
ATTERBERG LIMITS - GINT STD US LAB.GDT - 21/5/5 09:17 - U:\GEOTECH GINT DATA\20065.00 DOBSON RD IMP INTEL DRIVEWAY NO. 1 & 4\GINT DATA.GPJ
Quality Testing, LLC
175 S. Hamilton Place, Bldg 6, Suite 114
Gilbert, AZ 85233
Telephone: 480-486-2000
Fax: 480-496-2001
75
80
85
90
95
100
105
110
115
120
125
130
135
0
10
20
30
40
MOISTURE-DENSITY RELATIONSHIP
Optimum Water Content
Maximum Dry Density
PCF
%
LL
PL
PI
7
TEST RESULTS
Test Method
DRY DENSITY, pcf
WATER CONTENT, %
ATTERBERG LIMITS
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
18
25
Source of Material
Description of Material
122.5
9.1
B-01 (0-5)+B-02 (0-5)
SILTY, CLAYEY SAND with
GRAVEL(SC-SM)
ASTM D698 Method C
CLIENT
Premier Engineering Corporation
PROJECT NUMBER
20065.00, Premier No. 2020026
PROJECT NAME
Dobson Rd Improvements - Intel Driveway No. 1 & 4
PROJECT LOCATION
Chandler, AZ
COMPACTION - GINT STD US LAB.GDT - 21/5/5 09:17 - U:\GEOTECH GINT DATA\20065.00 DOBSON RD IMP INTEL DRIVEWAY NO. 1 & 4\GINT DATA.GPJ
Quality Testing, LLC
175 S. Hamilton Place, Bldg 6, Suite 114
Gilbert, AZ 85233
Telephone: 480-486-2000
Fax: 480-496-2001
75
80
85
90
95
100
105
110
115
120
125
130
135
0
10
20
30
40
MOISTURE-DENSITY RELATIONSHIP
Optimum Water Content
Maximum Dry Density
PCF
%
LL
PL
PI
4
TEST RESULTS
Test Method
DRY DENSITY, pcf
WATER CONTENT, %
ATTERBERG LIMITS
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
16
20
Source of Material
Description of Material
130.9
7.2
B-04 (0-5)+B-5 (0-5)+B-03 (0-5)
SILTY, CLAYEY SAND with
GRAVEL(SC-SM)
ASTM D698 Method C
CLIENT
Premier Engineering Corporation
PROJECT NUMBER
20065.00, Premier No. 2020026
PROJECT NAME
Dobson Rd Improvements - Intel Driveway No. 1 & 4
PROJECT LOCATION
Chandler, AZ
COMPACTION - GINT STD US LAB.GDT - 21/5/5 09:17 - U:\GEOTECH GINT DATA\20065.00 DOBSON RD IMP INTEL DRIVEWAY NO. 1 & 4\GINT DATA.GPJ
Quality Testing, LLC
175 S. Hamilton Place, Bldg 6, Suite 114
Gilbert, AZ 85233
Telephone: 480-486-2000
Fax: 480-496-2001
B-01
0-5
25
18
7
25
39
SC-SM
B-01
2-3
26.2
91.2
B-02
0-5
25
14
11
25
36
SC
B-03
0-5
21
15
6
25
23
SC-SM
B-04
0-5
20
16
4
25
16
SC-SM
B-04
2-3
5.8
114.8
B-05
0-5
22
16
6
25
19
SC-SM
Liquid
Limit
Resistivity
(ohm-cm)
Water
Content
(%)
Dry
Density
(pcf)
Depth
Borehole
SUMMARY OF LABORATORY RESULTS
PAGE 1 OF 1
Plastic
Limit
Plasticity
Index
Maximum
Size
(mm)
%<#200
Sieve
pH
USCS
CLIENT
Premier Engineering Corporation
PROJECT NUMBER
20065.00, Premier No. 2020026
PROJECT NAME
Dobson Rd Improvements - Intel Driveway No. 1 & 4
PROJECT LOCATION
Chandler, AZ
LAB SUMMARY - GINT STD US LAB.GDT - 21/5/5 09:18 - U:\GEOTECH GINT DATA\20065.00 DOBSON RD IMP INTEL DRIVEWAY NO. 1 & 4\GINT DATA.GPJ
Quality Testing, LLC
175 S. Hamilton Place, Bldg 6, Suite 114
Gilbert, AZ 85233
Telephone: 480-486-2000
Fax: 480-496-2001
8.4
1635
8.3
2526
Note: B-01(0-5) & B-01(5-10) samples were combined to run pH & Resistivity tests.
B-04(0-5) & B-04(5-10) samples were combined to run pH & Resistivity tests.
Quality Testing
Marco Solano
175 S. Hamilton Place
Bldg 6, Ste 114
Gilbert, AZ 85233
Date Reported:
5/5/2021
Date Received:
4/29/2021
Project:
20065
Laboratory Analysis Report
PO Number:
531
Lab Number: 936611-1
B-01 (0-5)+B-01 (5-10), S-6899
Test Parameter
Units
Method
Result
Levels
33
ARIZ 733b
ppm
Sulfate
27
ARIZ 736b
ppm
Chloride
Lab Number: 936611-2
B-04 (0-5)+B-04 (5-10), S-6900
Test Parameter
Units
Method
Result
Levels
31
ARIZ 733b
ppm
Sulfate
14
ARIZ 736b
ppm
Chloride
3540 E Corona Ave., Phoenix AZ 85040 602-454-2376 (Phone) 602-454-9243 (Fax)
Page 1 of 1
Dobson Road Improvements – Intel Driveways #1 and #4
Dobson Road at Chaparral Way and North of Ocotillo Rd, Chandler, AZ
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Appendix E
Site Photos
Dobson Road Improvements – Intel Driveways #1 & #4
Dobson Road at Chaparral Way and N. of Ocotillo Rd, Chandler, Arizona
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
SITE PHOTOS
Photo Date: April 26, 2021
Dobson Rd @ Chaparral Way, looking north.
Dobson Rd @ Chaparral Way, looking east.
Dobson Rd @ Chaparral Way, west.
.
SPT Sample from B-1 at 5 feet depth
Dobson Rd @ B-2, looking south.
SPT Sample from B-2 at 5 feet depth.
Dobson Road Improvements – Intel Driveways #1 & #4
Dobson Road at Chaparral Way and N. of Ocotillo Rd, Chandler, Arizona
Olsson Premier Project # 021-02916
Geotechnical Evaluation Report
Dobson Rd @ B-3, looking south.
SPT Sample from B-3 at 5 feet depth.
Dobson Rd @ Driveway#1 (B-4), looking north.
Dobson Rd @ Driveway#1 (B-4), looking south.
SPT Sample from B-4 at 5 feet depth.
SPT Sample from B-5 at 5 feet depth.
City of Chandler
Dobson Road Improvements
Project No. ST2009.201
Intel Driveways #1 & #4
Technical Specifications
APPENDIX B – GIS DATA DICTIONARY
Page 1 of 35
DATA DICTIONARY
FOR
WATER, SEWER, RECLAIM & STORM
Page 2 of 35
DATA DICTIONARY:
WATER
Page 3 of 35
FeatureClassName
FITTING_PNT
DatasetType
FeatureClass
FieldName
FEATUREOWNER
Type
String
Length
20
AliasName
FEATUREOWNER
DomainName
WS_FEATUREOWNER
DefaultValue
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WS_SPATIALSOURCE_STD
GPS
MATERIAL
String
20
MATERIAL
WS_MATERIAL
null
DIAMETER1
String
8
DIAMETER1
null
null
DIAMETER2
String
8
DIAMETER2
null
null
TYPE
String
30
TYPE
WS_FITTING_TYPE
null
BEND
String
20
BEND
WS_FITTING_BEND
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
FeatureClassName
DatasetType
SYSTEM_VALVE_PNT
FeatureClass
FieldName
FEATUREOWNER
Type
String
Length
20
AliasName
FEATURE OWNER
DomainName
WS_FEATUREOWNER
DefaultValue
null
LIFECYCLESTATUS
String
20
LIFECYCLE STATUS
WS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIAL SOURCE
WS_SPATIALSOURCE
GPS
DIAMETER
String
8
Diameter
WS_SYSVAL_DIAM
null
TYPE
String
25
TYPE
WS_SYSVAL_TYPE
null
VALVETYPE
String
10
VALVE TYPE
WS_SYSVAL_VALVETYPE
null
FUNCTION
String
25
FUNCTION
WS_SYSVAL_FUNCTION
null
GROUNDTYPE
String
25
GROUNDTYPE
WS_SYSVAL_GROUNDTYPE
null
WO_CAT_CODE
String
10
WO CAT CODE
null
1310A06
WO_CAT
String
25
WO CAT
null
System Valves
WATERTYPE
String
25
WATERTYPE
null
POTABLE
GPS_DATE
Date
8
GPS DATE
null
null
GPS_COMMENT
String
30
GPS COMMENT
null
null
Page 4 of 35
FeatureClassName
HYDRANT_PNT
DatasetType
FeatureClass
FieldName
HYDRANT_ID
Type
String
Length
25
AliasName
HYDRANT_ID
DomainName
null
DefaultValue
HYD-VERIFY
FEATUREOWNER
String
25
Feature Owner
WS.FEATUREOWNER
null
LIFECYCLESTATUS
String
25
Lifecycle Status
WS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
Spatial Source
WS_SPATIALSOURCE_STD
GPS
BARRELDIAMETER
Double
8
Barrel Diameter
null
6
LARGENOZZLEDIAMETER
Double
8
Large Nozzle Diameter
null
4.5
SMALLNOZZLEDIAMETER
Double
8
Small Nozzle Diameter
null
2.5
OUTLETCONFIGURATION
Double
8
Outlet Configuration
null
3
SEATDIAMETER
Double
8
Seat Diameter
null
6
MANUFACTURER
String
25
Manufacturer
WS_HYD_MANUFACTURER
null
YEARMANUFACTURED
String
25
Manufacture Year
null
null
COLOR
String
25
Color
WS_HYD_COLOR
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
50
GPS_COMMENT
null
null
FeatureClassName
DatasetType
WATER_MANHOLE_PNT
FeatureClass
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
WS_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WS_SPATIALSOURCE_STD
GPS
SUBTYPE
String
25
SUBTYPE
WS_SUBTYPE
null
ACCESSDIAMETER
String
8
ACCESSDIAMETER
WS_ACCESSDIAMETER
32
GROUNDTYPE
String
20
GROUNDTYPE
WS_GROUNDTYPE
null
COVERMATERIAL
String
10
COVERMATERIAL
WS_COVERMATERIAL
null
COVERTYPE
String
8
COVERTYPE
WS_COVERTYPE
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
Page 5 of 35
FeatureClassName
WATER_VAULT_PNT
DatasetType
FeatureClass
FieldName
SUBTYPE
Type
String
Length
20
AliasName
SUBTYPE
DomainName
null
DefaultValue
null
FEATUREOWNER
String
20
FEATUREOWNER
WS_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WS_SPATIALSOURCE_STD
GPS
SUB_TYPE
String
20
SUB_TYPE
WS_VAULT_SUB_TYPE
null
ADDRESS
String
50
ADDRESS
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
50
GPS_COMMENT
null
null
Page 6 of 35
Domain:
WS_FEATUREOWNER
Description: TYPE OF SERVICE
Code
Name
COC
Chandler
GRIC
Gila River Indian Community
COG
Gilbert
GOULD
Gould
INTEL
Intel
COUNTY
Maricopa County
COM
Mesa
MICROCHIP
Microchip
MOTOROLA
Motorola
COP
Phoenix
PRIVATE
Private
SRP
SRP
SRVWUA
SRVWUA
COT
Tempe
UNKNOWN
UNKNOWN
Domain:
WS_SPATIALSOURCE_STD
Description: SPATIAL SOURCE
Code
Name
GPS
GPS
Domain:
WS_FITTING_TYPE
Description: FITTING TYPE
Code
Name
11B
11B
22B
22B
45B
45B
90B
90B
COUPLING
COUPLING
Page 7 of 35
CROSS
CROSS
ENDCAP
ENDCAP
LINESTOP
LINESTOP
OTHER
OTHER
REDUCER
REDUCER
SADDLE
SADDLE
TAPPING SLEEVE
TAPPING SLEEVE
TEE
TEE
UNKNOWN
UNKNOWN
WYE
WYE
Domain:
WS_FITTING_BEND
Description: FITTING BEND
Code
Name
HORIZONTAL
HORIZONTAL
NONE
NONE
VERTICAL
VERTICAL
Domain:
WS_LIFECYCLESTATUS
Description: SYSTEM VALVE LIFECYCLE STATUS
Code
Name
ABANDONED
ABANDONED
ACTIVE
ACTIVE
FUTURE
FUTURE
INACTIVE
INACTIVE
REMOVED
REMOVED
UNKNOWN
UNKNOWN
Domain:
WS_SYSVAL_DIAM
Description: SYSTEM VALVE DIAMETER
Code
Name
2
2
3
3
Page 8 of 35
4
4
6
6
8
8
10
10
12
12
16
16
20
20
24
24
30
30
36
36
42
42
48
48
Domain:
WS_SYSVAL_TYPE
Description: SYSTEM TYPE
Code
Name
ARV
ARV
BLOWOFF
BLOWOFF
STANDARD
STANDARD
Domain:
WS_SYSVAL_VALVETYPE
Description: SYSTEM VALVE TYPE
Code
Name
BALL
BALL
BUTTERFLY
BUTTERFLY
GATE
GATE
INSERTA
INSERTA
PIV
PIV
PLUG
PLUG
UNKNOWN
UNKNOWN
Domain:
WS_SYSVAL_FUNCTION
Description: SYSTEM VALVE FUNCTION
Code
Name
Page 9 of 35
ARV
ARV
BACKFLOW
BACKFLOW
BYPASS
BYPASS
FDC
FDC
FIRELINE
FIRELINE
HYDRANT
HYDRANT
INLINE
INLINE
PUMPOUT
PUMPOUT
PUMPSTATION
PUMPSTATION
SERVICE
SERVICE
STUBOUT
STUBOUT
UNKNOWN
UNKNOWN
VAULT
VAULT
WPF
WPF
ZONE_SPLIT_VALVES
ZONE_SPLIT_VALVES
Domain:
WS_SYSVAL_GROUNDTYPE
Description: SYSTEM VALVE FUNCTION
Code
Name
ASPHALT
ASPHALT
CONCRETE
CONCRETE
LANDSCAPE
LANDSCAPE
UNKNOWN
UNKNOWN
Domain:
WS_HYD_MANUFACTURER
Description: HYDRANT MANUFACTURER
Code
Name
AMERICANDARLING
AMERICANDARLING
AVK
AVK
CLOW
CLOW
DRESSER
DRESSER
GREENBERG
GREENBERG
KENNEDY
KENNEDY
MUELLER
MUELLER
PACIFIC
PACIFIC
UNKNOWN
UNKNOWN
Page 10 of 35
WATEROUS
WATEROUS
Domain:
WS_MATERIAL
Description: MATERIAL
Code
Name
ABS
ABS
ACP
ACP
BRASS
BRASS
CIP
CIP
DIP
DIP
PCPP
PCPP
PE
PE
PVC
PVC
RCP
RCP
RPM
RPM
RTR
RTR
STL
STL
TRUSS
TRUSS
VCP
VCP
Domain:
WS_YES_NO
Description: YES OR NO
Code
Name
YES
YES
NO
NO
Domain:
WS_HYD_COLOR
Description:COLOR OF HYDRANT
Code
Name
BLACK/ALUMINUM
BLACK/ALUMINUM
BLACK/YELLOW
BLACK/YELLOW
Page 11 of 35
GREEN
GREEN
RED
RED
RED/YELLOW
RED/YELLOW
UNKNOWN
UNKNOWN
WHITE
WHITE
YELLOW
YELLOW
Domain:
WS_SUBTYPE
Description: SUBTYPE OF MANHOLE
Code
Name
PUMPOUT STATION
PUMPOUT STATION
UNKNOWN
UNKNOWN
VALVE ACCESS
VALVE ACCESS
Domain:
WS_ACCESSDIAMETER
Description: ACCESS DIAMTER
Code
Name
22
22
24
24
26
26
28
28
30
30
32
32
38
38
Domain:
WS_GROUNDTYPE
Description: GROUND TYPE
Code
Name
ASPHALT
ASPHALT
CONCRETE
CONCRETE
Page 12 of 35
DIRT
DIRT
UNKNOWN
UNKNOWN
Domain:
WS_COVERMATERIAL
Description: COVERMATERIAL
Code
Name
ALUMINUM
ALUMINUM
CASTIRON
CASTIRON
UNKNOWN
UNKNOWN
Domain:
WS_COVERTYPE
Description: COVER TYPE
Code
Name
BOLTED
BOLTED
SEALED
SEALED
UNKNOWN
UNKNOWN
VENTED
VENTED
Domain:
WS_VAULT_SUB_TYPE
Description: SUBTYPE OF VAULT
Code
Name
FIRELINE
FIRELINE
METER
METER
UNKNOWN
UNKNOWN
VALVE
VALVE
Page 13 of 35
DATA DICTIONARY:
SEWER
Page 14 of 35
FeatureClassName
SEWER_MANHOLE_PNT
DatasetType
FeatureClass
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
WW_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WW_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WW_SPATIALSOURCE
GPS
LID
String
20
LID
WW_MANHOLE_LID
null
TYPE
String
20
TYPE
null
null
COVER_MATERIAL
String
20
COVER_MATERIAL
null
null
COVER_HOLE
String
20
COVER_HOLE
null
null
COVER_SIZE
String
20
COVER_SIZE
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
FeatureClassName
DatasetType
SEWER_CLEANOUT_PNT
FeatureClass
FieldName
FEATUREOWNER
LIFECYCLESTATUS
Type Length AliasName
String
20
FEATUREOWNER
String
20
LIFECYCLESTATUS
DomainName
WW_FEATUREOWNER
WW_LIFECYCLESTATUS
DefaultValue
null
null
LOCATIONDESCRIPTION String
100
LOCATIONDESCRIPTION
SPATIALSOURCE
String
20
SPATIALSOURCE
LID
String
20
LID
null
WW_SPATIALSOURCE
WW_SEWER_LID
null
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
FeatureClassName
DatasetType
SEWER_FITTING_PNT
FeatureClass
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
WW_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WW_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WW_SPATIALSOURCE
null
SIZE_
String
20
SIZE_
null
null
MATERIAL
String
20
MATERIAL
WW_MATERIAL
null
TYPE
String
30
TYPE
WW_FITTING_TYPE
null
BEND
String
20
BEND
WW_BEND
null
LOCATIONDESCRIPTION
String
100
LOCATIONDESCRIPTION
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
Page 15 of 35
FeatureClassName
SEWER_CONTROL_VALVE_PNT
DatasetType
FeatureClass
FieldName
Type
Length
AliasName
DomainName
DefaultValue
TYPE
String
25
TYPE
null
null
FEATUREOWNER
String
20
FEATUREOWNER
null
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WW_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WW_SPATIALSOURCE
GPS
LOCATIONDESCRIPTION
String
100
LOCATIONDESCRIPTION
null
null
DIAMETER
String
8
DIAMETER
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
FeatureClassName
DatasetType
SEWER_MISC_STRUCT_PNT
FeatureClass
FieldName
Type
Length
AliasName
DomainName
DefaultValue
TYPE
String
25
TYPE
WW_TYPE
null
FEATUREOWNER
String
20
FEATUREOWNER
WW_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
WW_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
WW_SPATIALSOURCE
GPS
LOCATIONDESCRIPTION
String
100
LOCATIONDESCRIPTION
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
Page 16 of 35
Domain: WW_FEATUREOWNER
Description: WASTEWATER FEATURE OWNER
Code
Name
COC
COC
PRIVATE
PRIVATE
CONTRACTOR
CONTRACTOR
TOG
TOG
UNKNOWN
UNKNOWN
Domain: WW_LIFECYCLESTATUS
Description: WASTEWATER FEATURE LIFECYCLESTATUS
Code
Name
ACTIVE
ACTIVE
FUTURE
FUTURE
PULLED
PULLED
INACTIVE
INACTIVE
UNKNOWN
UNKNOWN
ABANDONED
ABANDONED
Domain: WW_SPATIALSOURCE
Description: WASTEWATER FEATURE SPATIAL SOURCE
Code
Name
GPS
GPS
Domain: WW_TYPE
Description: WASTEWATER TYPE
Code
Name
DIVERSION
DIVERSION
JUNCTION
JUNCTION
Domain: WW_SEWER_LID
Description: WASTEWATER LID
Code
Name
OLD
OLD
NEW
NEW
Page 17 of 35
Domain: WW_BEND
Description: WASTEWATER BEND
Code
Name
HORIZONTAL
HORIZONTAL
VERTICAL
VERTICAL
NONE
NONE
Domain: WW_MATERIAL
Description: WASTEWATER MATERIAL
Code
Name
ACP
ACP
CONCRETE
CONCRETE
DIP
DIP
HDPE
HDPE
MJDIP
MJDIP
PVC
PVC
PVC LINED VCP
PVC LINED VCP
RCP ABS
RCP ABS
STEEL ENCASED VCP
STEEL ENCASED VCP
TLOCKLINE LINE RCP
TLOCKLINE LINE RCP
UNKNOWN
UNKNOWN
VCP
VCP
Domain: WW_FITTING_TYPE
Description: WASTEWATER FITTING_TYPE
Code
Name
ARV
ARV
FLOW METER
FLOW METER
NO_FLOW_POINT
NO_FLOW_POINT
OTHER
OTHER
OWNERSHIP_CHANGE
OWNERSHIP_CHANGE
PLUG
PLUG
REDUCER
REDUCER
UNKNOWN
UNKNOWN
Page 18 of 35
DATA DICTIONARY:
RECLAIM
Page 19 of 35
FeatureClassName REC_FITTING_PNT
DatasetType
FeatureClass
Description
REC_FITTING_PNT
FeatureDataset
null
Tags
null
ShapeType
Point
FeatureType
Simple
AliasName
REC_FITTING_PNT
HasM
false
HasZ
false
SubtypeFieldName
null
DefaultSubtype
null
DSID
39
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
RWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
RWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
RWS_SPATIALSOURCE
null
MATERIAL
String
20
MATERIAL
WS_MATERIAL
null
DIAMETER1
String
8
DIAMETER1
RWS_FITTING_DIAMETER
null
DIAMETER2
String
8
DIAMETER2
RWS_FITTING_DIAMETER
null
TYPE
String
30
TYPE
RWS_FITTING_TYPE
null
BEND
String
20
BEND
WS_FITTING_BEND
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
GPS_DATE
Date
8
GPS_DATE
null
null
Page 20 of 35
FeatureClassName
DatasetType
Description
FeatureDataset
Tags
ShapeType
FeatureType
AliasName
HasM
HasZ
SubtypeFieldName
DefaultSubtype
DSID
REC_SYSTEM_VALVE_PNT
FeatureClass
REC_SYSTEM_VALVE_PNT
null
null
Point
Simple
REC_SYSTEM_VALVE_PNT
false
false
null
null
13
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
Feature Owner
WS_SYSVAL_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
Lifecycle Status
WS_SYSVAL_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
Spatial Source
WS_SYSVAL_SPATIALSOURCE
null
TYPE
String
25
TYPE
WS_SYSVAL_TYPE
null
VALVETYPE
String
10
Valve Type
WS_SYSVAL_VALVETYPE
null
FUNCTION
String
25
FUNCTION
WS_SYSVAL_FUNCTION
null
DIAMETER
String
8
Diameter
WS_SYSVAL_DIAM
null
GROUNDTYPE
String
25
GROUNDTYPE
RWS_GROUNDTYPE
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
WO_CAT_CODE
String
10
WO_CAT_CODE
null
6210A15
WO_CAT
String
25
WO_CAT
null
System Valves
Page 21 of 35
FeatureClassName
DatasetType
Description
FeatureDataset
Tags
ShapeType
REC_RECLAIM_MANHOLE_PNT
FeatureClass
REC_RECLAIM_MANHOLE_PNT
null
null
Point
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
RWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
RWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
RWS_SPATIALSOURCE
null
ACCESSDIAMETER
String
8
ACCESSDIAMETER
RWS_ACCESSDIAMETER
null
GROUNDTYPE
String
20
GROUNDTYPE
RWS_GROUNDTYPE
null
COVERMATERIAL
String
10
COVERMATERIAL
RWS_COVERMATERIAL
null
COVERTYPE
String
8
COVERTYPE
RWS_COVERTYPE
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
30
GPS_COMMENT
null
null
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
FEATUREOWNER
String
20
FEATUREOWNER
RWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
20
LIFECYCLESTATUS
RWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
20
SPATIALSOURCE
RWS_SPATIALSOURCE
null
SUBTYPE
String
20
SUBTYPE
RWS_FITTING_SUBTYPE
null
GPS_DATE
Date
8
GPS_DATE
null
null
GPS_COMMENT
String
50
GPS_COMMENT
null
null
Page 22 of 35
RWS_FEATUREOWNER
Description: Feature owner
Coded Values
Code
Name
COC
COC
COM
COM
INTEL
INTEL
OMG
OMG
PRIVATE
PRIVATE
SRVWUA
SRVWUA
TOG
TOG
UNKNOWN
UNKNOWN
RWS_LIFECYCLESTATUS
Description: Status of feature
Code
Description
ABANDONED
ABANDONED
ACTIVE
ACTIVE
FUTURE
FUTURE
INACTIVE
INACTIVE
PULLED
PULLED
UNKNOWN
UNKNOWN
RWS_SPATIALSOURCE
Description: Spatial Source of feature
Code
Description
ASBUILT
ASBUILT
DESIGN
DESIGN
FIELD
FIELD
GPS
GPS
ORTHOPHOTO
ORTHOPHOTO
UNKNOWN
UNKNOWN
Page 23 of 35
RWS_MAIN_OR_SERVICE_MATERIAL
Description: Material of feature
Code
Description
AC
AC
CC
CC
CI
CI
DI
DI
PVC
PVC
UNKNOWN
UNKNOWN
RWS_SERVICE_MATERIAL
Description: Material of feature
Code
Description
AC
AC
CI
CI
COPPER
COPPER
DI
DI
PVC
PVC
UNKNOWN
UNKNOWN
RWS_MAIN_TYPE
Description: TYPE OF MAIN
Code
Description
DISTRIBUTION
DISTRIBUTION
PURGE LINE
PURGE LINE
RECHARGE WELL
RECHARGE WELL
STUBOUT
STUBOUT
TRANSMISSION
TRANSMISSION
UNKNOWN
UNKNOWN
Page 24 of 35
RWS_FITTING_TYPE
Description: TYPE OF FITTING
Code
Description
11B
11B
22B
22B
45B
45B
90B
90B
COUPLING
COUPLING
CROSS
CROSS
ENDCAP
ENDCAP
LINESTOP
LINESTOP
MECHANICAL JOINT
MECHANICAL JOINT
OTHER
OTHER
RECHARGE WELL
RECHARGE WELL
REDUCER
REDUCER
SADDLE
SADDLE
TAPPING SLEEVE
TAPPING SLEEVE
TEE
TEE
UNKNOWN
UNKNOWN
WYE
WYE
RWS_SERVICE_LATERAL_TYPE
Description: TYPE OF SERVICE
Code
Description
AIR RELEASE
AIR RELEASE
COMMERCIAL
COMMERCIAL
INDUSTRIAL
INDUSTRIAL
LANDSCAPE
LANDSCAPE
MULTIFAMILY
MULTIFAMILY
RESIDENTIAL
RESIDENTIAL
Page 25 of 35
RWS_SERVICE_LATERAL_DIAMETER
Description: TYPE OF SERVICE
Code
Description
0.63
0.63
0.75
0.75
1.0
1.0
1.25
1.25
1.5
1.5
2.0
2.0
2.5
2.5
3.0
3.0
4.0
4.0
6.0
6.0
8.0
8.0
12.0
12.0
UNKNOWN
UNKNOWN
RWS_MAIN_DIAMETER
Description: DIAMETER OF MAIN
Code
Description
4
4
6
6
8
8
10
10
12
12
15
15
16
16
18
18
20
20
24
24
30
30
36
36
42
42
48
48
Page 26 of 35
RWS_FITTING_DIAMETER
Description: DIAMETER OF FITTING
Code
Description
0.63
0.63
0.75
0.75
1
1
1.25
1.25
1.5
1.5
2
2
2.5
2.5
3
3
4
4
6
6
8
8
10
10
12
12
15
15
16
16
18
18
20
20
24
24
30
30
36
36
42
42
48
48
RWS_ACCESSDIAMETER
Description: ACCESS DIAMETER
Code
Description
22
22
24
24
26
26
28
28
30
30
30
30
28
28
Page 27 of 35
RWS_GROUNDTYPE
Description: GROUND TYPE
Code
Description
ASPHALT
ASPHALT
CONCRETE
CONCRETE
DIRT
DIRT
UNKNOWN
UNKNOWN
RWS_COVERMATERIAL
Description: COVER MATERIAL
Code
Description
ALUMINUM
ALUMINUM
CASTIRON
CASTIRON
UNKNOWN
UNKNOWN
RWS_COVERTYPE
Description: COVER TYPE
Code
Description
BOLTED
BOLTED
SEALED
SEALED
UNKNOWN
UNKNOWN
VENTED
VENTED
RWS_COVERTYPE
Description: COVER TYPE
Code
Description
BOLTED
BOLTED
SEALED
SEALED
UNKNOWN
UNKNOWN
VENTED
VENTED
Page 28 of 35
WS_SYSVAL_DIAM
Description: SYSTEM VALVE DIAMETER
Code
Name
2
2
3
3
4
4
6
6
8
8
10
10
12
12
16
16
20
20
24
24
30
30
36
36
42
42
48
48
WS_SYSVAL_VALVETYPE
Description: SYSTEM VALVE TYPE
Code
Name
BALL
BALL
BUTTERFLY
BUTTERFLY
GATE
GATE
INSERTA
INSERTA
PIV
PIV
PLUG
PLUG
UNKNOWN
UNKNOWN
WS_FITTING_BEND
Description: FITTING BEND
Page 29 of 35
Code
Name
HORIZONTAL
HORIZONTAL
NONE
NONE
VERTICAL
VERTICAL
WS_MATERIAL
Description: MATERIAL
Code
Name
ABS
ABS
ACP
ACP
BRASS
BRASS
CIP
CIP
DIP
DIP
PCPP
PCPP
PE
PE
PVC
PVC
RCP
RCP
RPM
RPM
RTR
RTR
STL
STL
TRUSS
TRUSS
VCP
VCP
Page 30 of 35
DATA DICTIONARY:
STORM
Page 31 of 35
FeatureClassName
DatasetType
BUBBLERBOX_PNT
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
BUBBLERBOX_ID
String
20
BUBBLERBOX_ID
null
ST-BB-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
GRATE_OPENINGS_NUM
SmallInteger
2
GRATE_OPENINGS_NUM
SWS_GRATE_OPENINGS
null
GRATE_LENGTH
Double
8
GRATE_LENGTH
SWS_GRATE_LENGTH
null
GRATE_WIDTH
Double
8
GRATE_WIDTH
SWS_GRATE_WIDTH
null
DRYWELL_ASSOC
String
5
DRYWELL_ASSOC
GIS_BOOLEAN_YES_NO
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
FeatureClassName
DatasetType
CATCHBASIN_PNT
FeatureClass
Fields
FieldName
Type
Length AliasName
DomainName
DefaultValue
CATCHBASIN_ID
String
20
CATCHBASIN_ID
null
ST-CB-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
CATCHBASIN_TYPE
String
25
CATCHBASIN_TYPE
SWS_CB_TYPE
null
CITY_EMBLEM
String
5
CITY_EMBLEM
GIS_BOOLEAN_YES_NO
null
ACCESS_OPENING_TYPE
String
25
ACCESS_OPENING_TYPE
SWS_CB_ACCESS_OPENING_TYPE
null
GRATE_LENGTH
Double
8
GRATE_LENGTH
SWS_GRATE_LENGTH
null
GRATE_WIDTH
Double
8
GRATE_WIDTH
SWS_GRATE_WIDTH
null
LID
String
5
LID
GIS_BOOLEAN_YES_NO
null
LID_TYPE
String
25
LID_TYPE
SWS_CB_LID_TYPE
null
DRYWELL_CONN
String
5
DRYWELL_CONN
GIS_BOOLEAN_YES_NO
null
OUTLET_CONN
String
5
OUTLET_CONN
GIS_BOOLEAN_YES_NO
null
BUBBLERBOX_CONN
String
5
BUBBLERBOX_CONN
GIS_BOOLEAN_YES_NO
null
BUBBLERBOX_DRYWELL_ASSOC
String
5
BUBBLERBOX_DRYWELL_ASSOC
GIS_BOOLEAN_YES_NO
null
LAKE_DRAIN
String
5
LAKE_DRAIN
GIS_BOOLEAN_YES_NO
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
Page 32 of 35
FeatureClassName
DatasetType
DRYWELL_PNT
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
DRYWELL_ID
String
20
DRYWELL_ID
null
ST-DW-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
FIELD_LOC
String
100
FIELD_LOC
SWS_DW_LOCATION
null
INSTALLER
String
30
INSTALLER
SWS_DW_INSTALLER
null
CHAMBER_TYPE
String
30
CHAMBER_TYPE
SWS_DW_CHAMBER_TYPE
null
LID_SIZE
SmallInteger
2
LID_SIZE
SWS_DW_LID_SIZE
null
LID_TYPE
String
25
LID_TYPE
SWS_DW_LID_TYPE
null
NUISANCE_LINE_ASSOC
String
5
NUISANCE_LINE_ASSOC
GIS_BOOLEAN_YES_NO
null
CONCRETE_PAD
String
5
CONCRETE_PAD
GIS_BOOLEAN_YES_NO
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
FeatureClassName
DatasetType
INLET_PNT
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
INLET_ID
String
20
INLET_ID
null
ST-IN-VERIFY
CATCHBASIN_TYPE
String
25
CATCHBASIN_TYPE
SWS_CB_TYPE
null
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
FIELD_LOC
String
100
FIELD_LOC
SWS_FIELD_LOC
null
GRATE_ASSOC
String
25
GRATE_ASSOC
GIS_BOOLEAN_YES_NO
null
GRATE_LENGTH
Double
8
GRATE_LENGTH
SWS_GRATE_LENGTH
null
GRATE_WIDTH
Double
8
GRATE_WIDTH
SWS_GRATE_WIDTH
null
INLET_PIPE_DIAM
SmallInteger
2
INLET_PIPE_DIAM
SWS_INLET_PIPE_DIAM
null
INLET_NUMBER
SmallInteger
2
INLET_NUMBER
null
null
TRASHRACK_ASSOC
String
5
TRASHRACK_ASSOC
GIS_BOOLEAN_YES_NO
null
TRASH_LENGTH
Double
8
TRASH_LENGTH
null
null
TRASH_WIDTH
Double
8
TRASH_WIDTH
null
null
NUISANCE_LINE_ASSOC
String
5
NUISANCE_LINE_ASSOC
GIS_BOOLEAN_YES_NO
null
BUBBLER_BOX_DRYWELL_ASSOC
String
5
BUBBLER_BOX_DRYWELL_ASSOC
GIS_BOOLEAN_YES_NO
null
HEADWALLASSOC
String
5
HEADWALLASSOC
GIS_BOOLEAN_YES_NO
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
Page 33 of 35
FeatureClassName
OUTLET_PNT
DatasetType
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
OUTLET_ID
String
20
OUTLET_ID
null
ST-OUT-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
GRATE_ASSOC
String
25
GRATE_ASSOC
GIS_BOOLEAN_YES_NO
null
GRATE_LENGTH
Double
8
GRATE_LENGTH
SWS_GRATE_LENGTH
null
GRATE_WIDTH
Double
8
GRATE_WIDTH
SWS_GRATE_WIDTH
null
INLET_PIPE_DIAM
SmallInteger
2
INLET_PIPE_DIAM
SWS_INLET_PIPE_DIAM
null
INLET_NUMBER
SmallInteger
2
INLET_NUMBER
SWS_INLET_NUMBER
null
TRASHRACK_ASSOC
String
5
TRASHRACK_ASSOC
GIS_BOOLEAN_YES_NO
null
TRASH_LENGTH
Double
8
TRASH_LENGTH
null
null
TRASH_WIDTH
Double
8
TRASH_WIDTH
null
null
NUISANCE_LINE_ASSOC
String
5
NUISANCE_LINE_ASSOC
GIS_BOOLEAN_YES_NO
null
BUBBLER_BOX_DRYWELL_ASSOC
String
5
BUBBLER_BOX_DRYWELL_ASSOC
GIS_BOOLEAN_YES_NO
null
HEADWALLASSOC
String
5
HEADWALLASSOC
GIS_BOOLEAN_YES_NO
null
ADOTOUTFLOW
String
5
ADOTOUTFLOW
GIS_BOOLEAN_YES_NO
NO
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
Page 34 of 35
FeatureClassName
SCUPPER_PNT
DatasetType
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
SCUPPER_ID
String
20
SCUPPER_ID
null
ST-SCP-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
CITY_EMBLEM
String
5
CITY_EMBLEM
GIS_BOOLEAN_YES_NO
null
NUMBER_OPENINGS
SmallInteger
2
NUMBER_OPENINGS
null
null
WIDTH
Double
8
WIDTH
null
null
SPILLWAY_ASSOC
String
25
SPILLWAY_ASSOC
GIS_BOOLEAN_YES_NO
null
HEADWALL_ASSOC
String
5
HEADWALL_ASSOC
GIS_BOOLEAN_YES_NO
null
NUISANCE_LINE_ASSOC
String
5
NUISANCE_LINE_ASSOC
GIS_BOOLEAN_YES_NO
null
BUBBLERBOX_ASSOC
String
5
BUBBLERBOX_ASSOC
GIS_BOOLEAN_YES_NO
null
BUBBLER_BOX_DRYWELL_ASSOC
String
5
BUBBLER_BOX_DRYWELL_ASSOC
GIS_BOOLEAN_YES_NO
null
LAKE_DRAIN
String
5
LAKE_DRAIN
GIS_BOOLEAN_YES_NO
null
RIPRAP
String
25
RIPRAP
GIS_BOOLEAN_YES_NO
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
FeatureClassName
DatasetType
STORM_DRAIN_MANHOLE_PNT
FeatureClass
Fields
FieldName
Type
Length
AliasName
DomainName
DefaultValue
STORMDRAIN_ID
String
20
STORMDRAIN_ID
null
ST-MH-VERIFY
FEATUREOWNER
String
25
FEATUREOWNER
SWS_FEATUREOWNER
null
LIFECYCLESTATUS
String
25
LIFECYCLESTATUS
SWS_LIFECYCLESTATUS
null
SPATIALSOURCE
String
25
SPATIALSOURCE
SWS_SPATIALSOURCE
null
STRUCTURE_TYPE
SmallInteger
2
STRUCTURE_TYPE
SWS_STRUCTURE_TYPE
null
CHANDLER_NAME
String
5
CHANDLER_NAME
GIS_BOOLEAN_YES_NO
null
DIAMETER
SmallInteger
2
DIAMETER
SWS_SDMH_SIZE
null
VENT_HOLE
String
30
VENT_HOLE
GIS_BOOLEAN_YES_NO
null
ACCESS_OPENING_TYPE
String
25
ACCESS_OPENING_TYPE
SWS_SDMH_ACCESS_OPENING_TYPE
null
LID_TYPE
String
30
LID_TYPE
SWS_SDMH_TYPE
null
LID_TEXT
String
30
LID_TEXT
SWS_SDMH_LID_TEXT
null
COMMENTS
String
255
COMMENTS
null
null
COLLECTED_DATE
Date
8
COLLECTED_DATE
null
null
Page 35 of 35
Domain Name
Current Description
GIS_BOOLEAN_YES_NO
GIS Boolean Yes or No
GIS_COLLECTOR_ID
GPS Crew Employee IDs
SWS_DW_CHAMBER_TYPE
Drywell chamber type
SWS_DW_DEPT_RESP
Department responsible for DryWell Maint
SWS_DW_INSTALLER
DryWell installers
SWS_DW_LID_SIZE
Standard size of Drywell lid
SWS_DW_LID_TYPE
Drywell lid type
SWS_DW_LOCATION
Drywell location
SWS_EP_DIAM
Standard sizes of Equalizer Pipe diameters
SWS_EP_MATERIAL
Equalizer Pipe material
SWS_FEATUREOWNER
Storm feature ownership
SWS_GRATE_LENGTH
Denotes the length of a storm water grate
SWS_GRATE_WIDTH
Denotes the width of a storm water grate
SWS_INLET_NUMBER
Number of Inlets
SWS_INLET_PIPE_DIAM
Inlet pipe diameter
SWS_LIFECYCLESTATUS
Denotes the Lifecyclestatus for Storm features
SWS_RB_MAINT_LIST
Retention Basin maintainer
SWS_RB_TYPE
Retention Basin Type
SWS_SDMH_ACCESS_OPENING_TYPE
Storm Drain Manhole Access Opening type
SWS_SDMH_LID_TEXT
Storm Drain Manhole Lid Text
SWS_SDMH_SIZE
Standard size of Storm Drain Manhole
SWS_SDMH_TYPE
Storm Drain Manhole Type
SWS_SEPARATOR_LID_TYPE
Denotes the type of separator lid
SWS_SEPARATOR_TYPE
Denotes the type of separator
SWS_SPATIALSOURCE
Denotes the Spatial Source of Storm features
SWS_SPL_WALL_MATERIAL
Denotes Spillway Wall Material
SWS_STRUCTURE_TYPE
Type of structure for GBA
EXHIBIT D
City of Chandler Construction Manager at Risk Construction Services
GMP-1
Public Works & Utilities Department, Capital Projects Division
Project Name: DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No.: ST2009.401
Rev. 7/16/2021
ACCEPTED GMP/PRICE PROPOSAL
Dobson Rd Improv: DW 1 and 4
Date: 1/21/2022
Dobson Road
ST2009.401
Percentage
Amount
A. Direct Costs
A1 Direct Cost
$183,941.71
$183,941.71
B. General Conditions or Direct Costs only
$183,941.71
C. CM@Risk's Fee on Cost of Work only
11%
$20,233.59
SUBTOTAL 2:
$204,175.30
D. Bonds and Insurance Allowances
D1 Bonds
1.28%
$2,613.44
D2 Insurance
1.05%
$2,143.84
$4,757.28
SUBTOTAL 3:
$208,932.58
E. Sales Tax
E1 Sales Tax (INSERT CURRENT TAX RATE IN CELL F30)
5.07%
$10,592.88
E2 Tax Credits
$10,592.88
G. Approved Allowance
G1 Allowance: Owner's Allowance
$20,000.00
$20,000.00
$239,525.46
Establishment of Values:
a. Direct Costs to be submitted with GMP Proposal.
b. General Conditions Cost (B) to be established in Baseline Cost Model.
c. CM@Risk Fee as set forth in Section 3.7.3 of this Contract
g. Allowances will be calculated with additional costs as needed.
Formulas Used in Calculations
Subtotal 1 = A + B
CM@Risk Fee (C) = C Percentage x Subtotal 1
Subtotal 2 = C + Subtotal 1
Bond & Insurance Allowances ‐ D Percentages x Subtotal 2
Subtotal 3 = D + Subtotal 2
Sales Tax (E1) = (65% of current Chandler Tax Rate) x Subtotal 3
Total GMP Proposal = Subtotal 3 + E + G
CM@RISK 60% COST MODEL SUMMARY
Project Name:
Project Location:
TOTAL DIRECT COSTS:
SUBTOTAL 1 (Cost of the Work):
TOTAL ALLOWANCE:
TOTAL BONDS & INSURANCE ALLOWANCE:
TOTAL SALES TAX:
TOTAL GMP:
City of Chandler Project No.:
ST2009.401
60% Cost Model Dobson Road Improvements: Intel Driveways #1 and #4
60% Cost Model Assumptions and Clarifications
The Total 60% GMP Material Procurement is $ 239,525.46 per the schedule of values.
The 60% Cost Model is based on the following:
o
Dobson Road Improvements Intel Driveways #1 & #4 ST2009.201 Plans Dated 05/31/21 as
prepared by Olson‐Premier Engineering Corporation.
o
Geotechnical Evaluation Dated 05/31/21 prepared by Olson‐Premier.
o
Technical Specifications Dated 05/21 prepared by Olson‐Premier, EPG, & Lee Engineering.
GMP for material procurement allows long lead items as listed in the schedule of values to be ordered
upon approved submittals.
Allowance/Contingency items include the following.
800.00011 Allowance: Material Increases – This allowance is to provide a funding source for any materials
market cost increases during the project. Any material increases from January 20, 2022 to date of material
delivery will be included as a cost billed against this allowance.
ITEM
NO.
BID
ITEM
DESCRIPTION
UNIT
QUANTITY
UNIT
PRICE
AMOUNT
Construction Items
Total
$183,941.71
1
473.73000 Pedestrian Push Button With Sign
EA
6
$300.00
$1,800.00
2
473.80400 Video Image Detection System, 4 Approaches
LS
1
$42,000.00
$42,000.00
3
474.60110 Type A Signal Pole 10 Ft
EA
2
$896.09
$1,792.18
4
474.60500 Type Q Signal Pole
EA
1
$6,549.13
$6,549.13
5
474.60730 Type R Signal Pole
EA
3
$7,916.09
$23,748.27
6
474.70200 20 Ft Mast Arm (Tapered)
EA
4
$1,194.78
$4,779.12
7
474.70300 30 Ft Mast Arm (Tapered)
EA
1
$2,234.35
$2,234.35
8
474.70500 50 Ft Mast Arm (Tapered)
EA
1
$4,160.87
$4,160.87
9
474.70550 55 Ft Mast Arm (Tapered)
EA
2
$5,890.44
$11,780.88
10
474.80001 Streetlight Pole Sl‐1 With Single Davit Arm
EA
1
$2,508.26
$2,508.26
11
475.61400 Meter Pedestal Cabinet
EA
1
$2,277.60
$2,277.60
12
475.62000 Controller Cabinet (Type IV)
EA
1
$32,085.00
$32,085.00
13
475.83010 Opticom Pre‐Emption Unit
EA
1
$7,800.00
$7,800.00
14
476.02010 Traffic Signal Face (Type F) (LED)
EA
12
$361.20
$4,334.40
15
476.12000 Traffic Signal Face (Pedestrian) (Man/Hand) (LED)
EA
6
$270.00
$1,620.00
16
476.63000 Signal Mounting Assembly (Type II)
EA
8
$93.60
$748.80
17
476.63001 Signal Mounting Assembly (Type IV)
EA
2
$402.00
$804.00
18
476.63002 Signal Mounting Assembly (Type V)
EA
4
$360.00
$1,440.00
19
476.63003 Signal Mounting Assembly (Type VII)
EA
2
$410.40
$820.80
20
477.82000 LED Streetlight Luminaire
EA
5
$358.17
$1,790.85
21
483.00011 CCTV Camera And Field Equipment
EA
1
$2,526.00
$2,526.00
22
486.20000 Wireless Access System
LS
1
$2,658.00
$2,658.00
23
487.00000 Sign Assembly (IISNS)
EA
4
$5,920.80
$23,683.20
Allowance Items
Total
$20,000.00
24
800.00011 Allowance: Material Increases
ALLOW
1
$20,000.00
$20,000.00
Total Traffic Signal Cost, Without Allowance Items
$183,941.71
Grand Total, Including Allowance Items
$203,941.71
BID SCHEDULE (60%)
Dobson Road Improvements: Intel Driveway #4
ST2009.401
1/21/2022
4
$5,920.80
6
12
$4,334.40
$1,620.00
EXHIBIT E
Rev.12/1/2020
Construction Manager at Risk Construction Services
SUB-1
DOBSON ROAD IMPROVEMENTS AT INTEL DRIVEWAYS #1 AND #4
Project No. ST2009.401
SUBCONTRACTOR’S LIST FORM
If CM@Risk intends to subcontract any portion of this contract, the CM@Risk must submit the name, address, and contractor’s license number (if
applicable) of each subcontractor, including the work component of such subcontracting. Include the form with the bid submittal documents. CM@Risk
may make multiple copies of this form as needed.
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Percentage of Total
Work Performed:
EXHIBIT F
GIS / GPS DATA DELIVERY REQUIREMENTS
N/A
City of Chandler Construction Manager at Risk Construction Services