£. > CHANDLER
077 \\S arizona
Community of Innovation
CITY OF CHANDLER
JOB ORDER PROJECT AGREEMENT
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No. WW2005.402
This JOB ORDER PROJECT AGREEMENT (“Job Order’) is made this day of 2022 (“Effective
Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City’) and B&F
Contracting, Inc., an Arizona corporation, (“JOC Contractor”) and is entered into pursuant to Job Order
Master Agreement No. JOC1903.401 (“JOC Master Agreement”). City and JOC Contractor may be referred to
individually as “Party” or collectively as “Parties”).
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as follows:
RECITALS
A. On or about March 11, 2020, the Parties entered into the JOC Master Agreement, which terms and
conditions are made a part of and incorporated into this Job Order Project Agreement by this reference.
B. City proposes to engage JOC Contractor to install pipe, including rehabilitation of manholes on Jacaranda
Parkway as more fully described in Exhibit "A", which is attached to and made a part of this Job Order by
this reference.
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for the
compensation and fees set forth and as described in Exhibit “B”, which is attached to and made a part of
this Agreement by this reference.
ARTICLE 1. DESCRIPTION OF WORK
The Parties enter into this Job Order Project Agreement for the JACARANDA PARKWAY SEWER
REHABILITATION, Project Number WW2005.402. The scope of work consists of installing pipe, including
rehabilitation of manholes on Jacaranda Parkway, all as more particularly set forth in Exhibit “A” attached
hereto and incorporated herein by reference.
The JOC Contractor will not accept any change of scope, or change in contract provisions, unless issued in
writing, as a contract amendment or change order and signed by the authorized signatories for each party.
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached hereto
and incorporated herein by reference, will be due prior to execution of each Job Order Project Agreement
in the full amount of each Job Order.
City of Chandler Job Order Project Agreement 1
Public Works & Utilities Department, Capital Projects Division
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No.: WW2005.402
Rev. 9/18/2020
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement of Claims
and Certificate of Completion, as set forth in Exhibit “E" and Exhibit “F” respectively attached hereto and
incorporated herein by reference.
ARTICLE 2. PROJECT PRICE
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master Agreement a fee
not to exceed the Guaranteed Maximum Price of $1.,944,081.66 Dollars determined and payable as set forth
in JOC Master Agreement and Exhibit “B” attached hereto and made a part hereof by reference.
3. TRA E
JOC Contractor agrees to complete all Construction within 120 calendar days from the Notice to Proceed
(NTP) Date.
TICLE 4. PARTI NTS
CITY: Construction Project Manager: Paul Ahlas
Phone: | 480-782-3328
Email: | Paul.ahlas@chandleraz.gov
JOC CONTRACTOR: B&F Contracting, Inc.
11011 N. 23 Ave.
Phoenix, AZ 85029
JOC Contractor Representative: Bruce Balls
Phone: | 623-764-7585
Email: | bruceb@bfcontracting.com
SIGNATURE PAGE TO FOLLOW
City of Chandler Job Order Project Agreement 2
Public Works & Utilities Department, Capital Projects Division
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No.: WW2005.402
Rev. 9/18/2020
IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date.
“cITy”
CITY OF CHANDLER:
“JOC CONTRACTOR”
Contracting, Inc.:
Kile r— hie
MAYOR Date
Recommended By:
fet Date
Bruce W. Balls
lal Name
CED
Andrew Goh, P.E.
CIP City Engineer
APPROVED AS TO FORM:
Title
~ Laies
Secretary [7 I/
City Attorney
By: {Wo
ADDRESS FOR NOTICE
ATTEST:
B&F Contracting, Inc.
11011 N. 234 Ave.
City Clerk SEAL
ADDRESS FOR NOTICE
City of Chandler
P.O. Box 4008, Mail Stop 407
Chandler, AZ 85244-4008
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No.: WW2005.402
Rev. 9/18/2020
Phoenix, AZ 85029
EXHIBIT A
SCOPE OF WORK
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No.: WW2005.402
Rev. 9/18/2020
A-1
EXHIBIT A
WW2005.402 JACARANDA PARKWAY SEWER REHABILITATION
CONSTRUCTION SERVICES
SCOPE OF WORK
Below are the items discussed as the “Construction scope” that are to be implemented upon executing an
agreement. These items include but are not limited to the following,
Mobilization.
Pre-Clean & Video.
Suction & Discharge Manhole Access.
Bypass Pumping.
Prep existing PVC at manholes only.
Point repair of existing pipe.
43531f of 27” CIPP Lining.
13ea Manhole bench repair & coating.
Post cleaning and Panoramic video.
. R&R AC trench pavement.
. Repair disturbed landscaping.
. R&R 48sf of sidewalk.
. R&R 20If of curb & gutter.
. Replace disturbed striping.
. Traffic control.
. Project Management.
$0! 90'S IGS Ur BS: Go
meee ee ee
DAnkRWN— oO
ROC-089744 | BFCONTRACTING.COM | II0I1 N 23rd Ave | Phoenix, AZ 85029
P: 623.582.1170 | F: 623.582.3761
EXHIBIT B
FEE SCHEDULE
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: JACARANDA PARKWAY SEWER REHABILITATION
Project No.: WW2005.402
Rev. 9/18/2020
B-1
EXHIBIT "B"
JOB ORDER COST PROPOSAL
SUMMARY SHEET
Negotiated Prices
Price of Subcontractor(s) $ 1,173,543.98
Price of Subconsultant(s) $ -
General Conditions $ 75,467.04
Preconstruction Labor (if applicable) $ -
Construction Labor (if applicable) $ 281,366.21 |
SUBTOTAL (NEGOTIATED PRICES):| $ 1,530,377.23
Overhead and Profit (Coefficient per Job Order Master Agreement) 8.00% $ 122,430.18
TOTAL (NEGOTIATED PRICES + OVERHEAD & PROFIT):| $ 1,652,807.41
Insurance, Bonds, & Taxes
Sales Tax Percentage (Current Tax Rate) 4.83% $ 79,830.60
General Liability Insurance Percentage (Actual Cost per Job Order) 1.00% $ 16,528.07
Builder's Risk Insurance Percentage (Actual Cost per Job Order) 0.10% $ 1,652.81
Payment Bond (Actual Cost per Job Order) 0.50% $ 8,264.04
Performance Bond (Actual Cost per Job Order) 0.50% $ 8,264.04
SUBTOTAL (INSURANCE, BONDS, & TAXES): $ 114,539.55
COMBINED TOTAL (TOTAL + INSURANCE, BONDS, & TAXES):;| $ 1,767,346.96
City's Allowance @ 10% [$ 176,734.70
TOTAL JOB ORDER:| $ 1,944,081.66
Per the job Order Master Agreement - This Fee Table includes all fees, costs, insurance and bond premiums, allowances, construction
contingency, and taxes of any type necessary to fully, propertly and timely perform and construct the Work. Also per the Job Order
Master Agreement - For any portion of the Work which, either through this Contract, Change Order or otherwise, is performed and
paid for on a cost, or time and materials basis, the costs may be reimbursed to JOC Contractor and chargeable against the Contract
Price will be determined as set forth in MAG 109.5.
“ CONTRACTING INC
Submitted to: City of Chandler
Mail Stop 407, P.O. Box 4008
Chandler, AZ 85244 USA
Attention: Paul Ahlas Phone Number: 4807823310
Item # Item Description
Corporate: 11011 N. 23rd Ave. Phoenix, AZ 85029
Office: 6 23-582-1170|Fax: 623-582-3761
Tucson: 1904 W. Prince Rd. Tucson, AZ 85705
Office: $20-207-8228|Fax: 520-305-3323
Proposal
COST ONLY
AZ Licenses; ROC-089744 A General Contracting
ROC-111282 B-04 General Engineering
Bid Date: 12/21/2021
Bid Number: 4470.003
Project: WW2005.402 Jacaranda PKWY Sewer Rehab
Ocotillo Rd & Jacaranda Pkwy Construction
Chandler, AZ
Estimated Quantity Unit Unit Price Total Price
FACOG CRI ICC aC IE IIa a II a CI A a ICI I a I I 9 IA A ICI A IC A 9 I RC CO OE a I CK
MOBILIZATION
1 Mobilization
GENERAL CONDITIONS
19 Project General Conditions
BYPASS PUMPING
3: Suction Manhole R&R Cone (Ocotillo)
4 Discharge Manhole R&R Cone (Dobson)
5 Bypass Ocotillo
6 Bypass Jacaranda
18 Traffic Control
CIPP LINING
7 Repair Manhole PVC "Flaps" For CIPP Lining
8 Open Benches For CIPP Lining
10 27" CIPP Lining
POINT REPAIR
9 Point Repair
MANHOLE REPAIRS
12 Manhole Bench Coating
PIPE CLEANING AND VIDEO
2 Pre-Clean & Video
11 Post Clean And Video (Pano)
1/20/2022 9:15:56 PM
9,00 TRIP $2,452.73 $22,074.57
Total Price for above MOBILIZATION Items: $22,074.57
1.00 LS $75,467.19 $75,467.19
Total Price for above GENERAL CONDITIONS Items: $75,467.19
2.00 EACH $13,754.07 $27,508.14
1.00 EACH $17,656.17 $17,656.17
1.00 LS $152,562.24 $152,562.24
1.00 LS $231,289.50 $231,289.50
1.00 LS $32,889.16 $32,889.16
Total Price for above BYPASS PUMPING Items: $461,905.21
13.00 EACH $806.40 $10,483.20
7.00 EACH $2,660.64 $18,624.48
4,353.00 LF $159.38 $693,781.14
Total Price for above CIPP LINING Items: $722,888.82
1.00 EACH $43,324.28 $43,324.28
Total Price for above POINT REPAIR Items: $43,324.28
13.00 EACH $6,426.49 $83,544.37
Total Price for above MANHOLE REPAIRS Items: $83,544.37
4,353.00 LF $7.20 $31,341.60
4,353.00 LF $6.71 $29,208.63
B&F Contracting Inc. _bfcontracting.com
Page 1 of 2
Total Price for above PIPE CLEANING AND VIDEO Items: $60,550.23
REMOVE AND REPLACE
13 Remove And Replace AC Pavement 505.00 SF $89.51 $45,202.55
14 Remove And Replace Landscaping 1.00 LS $6,451.29 $6,451.29
15 Remove And Replace Sidewalk 48.00 SF $66.79 $3,205.92
16 Remove And Replace Curb 20.00 LF $163.14 $3,262.80
17 Replace Striping 1.00 LS $2,500.00 $2,500.00
Total Price for above REMOVE AND REPLACE Items: $60,622.56
Total Bid Price: $1,530,377.23
RRKKKAKE RK KKKAKEK EKER KK KKK KK EKKK KAKA KKK KK KKK KKK KAKA AK KE EK KA KAKA KH EK EK AKER EA HEAR EKA E EERE AE EEE EEE
* Terms: Net 30 Days
RRKKKAKEAKKAKAKHK KKK KK EK KKKKHK EK EKEAKEKKEKHKEKKKKK KEKE KE EKER KKK KKK KEK KK KEKE KEE KE EKEKKKKKEKAKEKEKEKKEKEKAKEKERE
* This proposal is based on the following information:
Plans: 100% - 9/22/21 Plans used were: Jacaranda Parkway Sewer Rehabilitation
Prepared by: Dibble Addenda Received: No
HEKKEKKKKKKKKKEEKE: KEKE HK KKK KEE KEKE KK KA HK EEK KKK KA KEKE KK KEKE KEK KEKE KEE KEKE RE KA KE EEK
¢ Exclusions:
*Qdor Control] Scrubbers or Chemical Injection
*Waste disposal generated thru pipe cleaning efforts
*Hazardous or toxic materials
*Section 02148 Item 3.03 D1. As a majority of the newly lined pipe is running on a radius or arc, wrinkles in the liner should be expected.
*Carbon end seals on pipe
KKKKKAKKAKAAKKAKAKAKKA KAKA KKAKKAKKKAKKAKKKKKAEKK KEK EKEKKK EKA KE KA KAKA KKEKKKK KKK EAE KAKA KA KERKAAKEKK AKA KEKE
© Inclusions:
*Testing of the bypass system to check for leaks. If any leaks are found they will be repaired, and the system tested again. Loading and unloading
at the project site for the bypass pipe & pumps.Supply of HDPE Pipe & Fittings, Hoses and Pumps, Installation of sewer plugs as required for the
bypass system Overtime Rates for bypass pumps, Bypass pump periodic service and maintenance costs, Fittings, valves, spill berms, sewer plugs,
and other misc. parts required for the bypass system, Bypass piping at 100% redundancy (2 or more pipes, same size or larger, shall be installed)
Bypass pumps at 100% redundancy for 2 pump operation, Engineer Review and Stamp for bypass submittals Spill kits and full spill response plan.
*Water curing will be utilized
KKK EEK KEKE KEKE KAKA EKA EEE KA KKK KKK EK KKK KAKA AKA KK ERE KKK KA KE KKK KKK KAKKKKKAKAKAKHK KKK KKAKKKKEKAKEKEKEE ERE
© We propose to furnish labor, equipment, and materials - complete in accordance with the plans and specifications supplied to us for the above
mentioned project. All material is guaranteed to be as specified. All work will be completed in a workmanlike manner according to the standard
practices. Any alternations cr deviations from the above specifications involving extra costs, will be executed only upon written orders and will
become an extra charge over the above proposed estimate.
CONFIRMED: ACCEPTED:
B&F Contracting, Inc. (Proposal) The above prices, specifications and conditions are satisfactory
Authorized Signature: and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
Estimator: Bret Thompson :
623-271-2961 bthompson@bfcontracting.com
1/20/2022 9:15:56 PM B&F Contracting Inc. _ bfcontracting.com Page 2 of 2
Proposal
CONTRACTING INC.
“~
Cost Detail By Phase
EXHIBIT C
Corporate: 11011 N. 23rd Ave. Phoenix, AZ 85029
Office: 623-582-1170|Fax: 623-582-3761
Tucson: 1904 W. Prince Rd. Tucson, AZ 85705
Office: 520-207-8228|Fax: 520-305-3323
AZ Licenses: ROC-089744 A General Contracting
ROC-111282 B-04 General Engineering
Project Name: WW2005.402 Jacaranda PKWY Sewer Rehab
Customer: City of Chandler
Job Number: 4470.003 Bid Number: 4470.003 Billing Address: Mail Stop 407, P.O. Box 4008
Bid As: General Contractor Chandler, AZ 85244 USA
Estimator: Bret Thompson Phone: 4807823310
Project Address: Ocotillo Rd & Jacaranda Pkwy Construction, Contact: Paul Ahlas
Chandler, AZ
Completion Date: 6/1/2022
Unit Total
Description Quantity UM Direct Cost Direct Cost
Phase: MOBILIZATION
DY 1 - Mobilization 9.00 TRIP $2,452.73 $22,074.56
@ GC-Mob/Demobilization 9.00 TRIP $830.51 $7,474.56
GC-Mobilization - Forklift/backhoe/Water Truck (2.00 TRIP/DY, 8.00 TRIP $467.16 $3,737.28
4.00 DY)
Transport Truck 32.00 HR $66.55 $2,129.60
Transport Trailer - 48 FT 32.00 HR $14.13 $452.16
Truck Driver 32.00 HR $36.11 $1,155.52
GC-Mobilization - Trackhoe (1.00 TRIP/DY, 4.00 DY) 4.00 TRIP $934.32 $3,737.28
Transport Truck 32.00 HR $66.55 $2,129.60
«}% Transport Trailer - 48 FT 32.00 HR $14.13 $452.16
& Truck Driver 32.00 HR $36.11 $1,155.52
(3) Mobilization CIPP (Insituform Technologies, Inc.) 1.00 EACH $9,000.00 $9,000.00
gS Subcontracted-Mobilization Large Excavator (Stearns) 2.00 TRIP $2,800.00 $5,600.00
Phase: GENERAL CONDITIONS
Bj 19 - Project General Conditions 1.00 LS $75,467.04 $75,467.04
i) JI-Trash Dumpster/Dump Fees 2.00 EACH $350.00 $700.00
JI-Construction Water 100,000.00 GAL $0.03 $3,000.00
JI-Water Meter 2.00 EACH $750.00 $1,500.00
JI-Water & Ice 8.00 WK $50.00 $400.00
JI-Portas/J-Johns 2.00 MO $500.00 $1,000.00
JI-Project Manager 21.00 DY $767.76 $16,122.96
JI-Project Manager Crew (1.00 DY/DY, 21.00 DY) 21.00 DY $767.76 $16,122.96
y Truck - Management 168.00 HR $16.67 $2,800.56
s&s Project Manager 168.00 HR $79.30 $13,322.40
(@) _ Ji-Project Superintendent 42.00 DY $704.80 $29,601.60
JI-Project Superintendent Crew (8.00 HR/DY, 42.00 DY) 336.00 HR $88.10 $29,601.60
: Truck - Management 336.00 HR $16.67 $5,601.12
Z Project Superintendent 336.00 HR $71.43 $24,000.48
1/20/2022 8:59:24 PM
Page 1 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
(Item 19 - Project General Conditions continued)
[D) JI-Project Engineer 21.00 DY $634.88 $13,332.48
it JI-Project Engineer Crew (8.00 HR/DY, 21.00 DY) 168.00 HR $79.36 $13,332.48
4 Truck - Management 168.00 HR $16.67 $2,800.56
& Project Engineer 168.00 HR $62.69 $10,531.92
@ _Ji-Field Communication 1.00 LS $400.00 $400.00
‘B) JI-Small Tools & Supplies (3136 MH X $1.5 MH For Safety 1.00 LS $9,410.00 $9,410.00
Supplies And $1.5MH For Small Tools And Supplies)
Phase: BYPASS PUMPING
D 3 - Suction Manhole R&R Cone (Ocotillo) 2.00 EACH $13,754.04 $27,508.08
RH-Excavation & Backfill Suction Manholes 2.00 EACH $9,928.76 $19,857.52
RH-Excavation & Backfill Suction Pit Crew (0.50 EACH/DY, 2.00 EACH $6,282.40 $12,564.80
4.00 DY)
#@~ Truck - Crew 32.00 HR $26.45 $846.40
§% Dump Truck - 10 Wheel 32.00 HR $62.67 $2,005.44
$2 Water Truck - 2000 Gal 32.00 HR $33.73 $1,079.36
«a Excavator - 20k LB 32.00 HR $63.10 $2,019.20
2 Foreman 32.00 HR $51.86 $1,659.52
& Leadman 32.00 HR $30.91 $989.12
Zz Operator: Large Equipment 32.00 HR $38.27 $1,224.64
2 Laborer 32.00 HR $26.20 $838.40
2 Truck Driver 32.00 HR $29.73 $951.36
2B Water Truck Driver 32.00 HR $29.73 $951.36
e Ready Mix - Slurry ABC Slurry 1/2 Sack 6.00 YARD $115.00 $680.00
# Aggregate - ABC MAG Spec 2.00 TON $14.50 $29.00
48% Shoring [2] 8.00 DY $95.00 $1,520.00
424 Plates (4) 8.00 DY $6.00 $192.00
CP-Sawcutting 100.00 LF $5.84 $584.08
a CP-Sawcutting Crew (200.00 LF/DY, 0.50 DY) 100.00 LF $5.84 $584.08
#83 Truck - Crew 4.00 HR $30.95 $123.80
46% Walk Behind Saw - 57 HP 4.00 HR $40.47 $161.88
& Operator: Small Equipment [2] 4.00 HR $37.30 $298.40
CP-Asphalt Patchback 16.00 SY $257.98 $4,127.64
at CP-Asphalt Replace Crew (16.00 SY/DY, 1.00 DY) 16.00 SY $220.79 $3,532.64
484 Truck - Crew 8.00 HR $30.95 $247.60
4 Asphalt Roller - 35in-50in 8.00 HR $33.11 $264.88
48% Backhoe - Light 8.00 HR $43.71 $349.68
4 Skid Steer 8.00 HR $33.03 $264.24
483. Dump Truck - 6 Wheel (Bobtail) 8.00 HR $41.21 $329.68
& Foreman 8.00 HR $53.44 $427.52
zZ Operator: Small Equipment (2] 8.00 HR $37.30 $596.80
2 Pipelayer 8.00 HR $35.14 $281.12
2 Laborer [3] 8.00 HR $32.13 $771.12
@ Asphalt - Asphalt 7.00 TON $85.00 $595.00
3£ Dump Fee 1.00 LOAD $150.00 $150.00
( RH-Remove & Replace Manhole Cone 2.00 EACH $3,825.28 $7,650.56
RH-Cone Removal & Replace 2.00 EACH $1,173.32 $2,346.64
R RH-Cone Removal Crew (2.00 EACH/DY, 1.00 DY) 2.00 EACH $1,123.32 $2,246.64
1/20/2022 8:59:24 PM
WW2005.402 Jacaranda PKWY Sewer Rehab
Page 2 of 10
1/20/2022 8:59:24 PM
WW2005.402 Jacaranda PKWY Sewer Rehab
Unit Total
Description Quantity UM Direct Cost Direct Cost
(Item 3 - Suction Manhole R&R Cone (Ocotillo) continued)
28 Truck - Crew 8.00 HR $30.95 $247.60
4Q Excavator - 20k LB 8.00 HR $63.10 $504.80
#4 Air Compressor - 185CFM 8.00 HR $22.20 $177.60
4% Jack Hammer - 90 Lb. 8.00 HR $7.00 $56.00
2 Foreman 8.00 HR $53.44 $427.52
2 Operator: Large Equipment 8.00 HR $39.88 $319.04
& Laborer (2) 8.00 HR $32.13 $514.08
@# Manhole - Concrete Collar 2.00 EACH $50.00 $100.00
RH-Manhole Frame & Cover Adjustment ' 2.00 EACH $1,151.96 $2,303.92
nt R-Frame & Cover Adjustment Crew (2.00 EACH/DY, 1.00 2.00 EACH $851.96 $1,703.92
43 Truck - Crew 8.00 HR $30.95 $247.60
4a Air Compressor - 185CFM 8.00 HR $22.20 $177.60
48% Jack Hammer - 90 Lb. 8.00 HR $7.00 $56.00
& Foreman 8.00 HR $53.44 $427.52
& Pipelayer 8.00 HR $35.14 $281.12
& Laborer [2] 8.00 HR $32.13 $514.08
@@ Ready Mix Concrete - MAG AA 4000 4.00 YARD $150.00 $600.00
&__ Subcontracted-Manhole Coating Repair (Joseph Painting 2.00 EACH $1,500.00 $3,000.00
Company Inc)
[] 4 - Discharge Manhole R&R Cone (Dobson) 1.00 EACH $17,656.13 $17,656.13
@® __RH-Excavation & Backfill Suction Manholes 1.00 EACH $13,880.85 $13,880.85
FR RH-Excavation & Backfill Suction Pit Crew (0.50 EACH/DY, 1.00 EACH $6,282.40 $6,282.40
2.00 DY)
4g Truck - Crew 16.00 HR $26.45 $423.20
48 Dump Truck - 10 Wheel 16.00 HR $62.67 $1,002.72
«Water Truck - 2000 Gal 16.00 HR $33.73 $539.68
2 Excavator - 20k LB 16.00 HR $63.10 $1,009.60
& Foreman 16.00 HR $51.86 $829.76
2 Leadman 16.00 HR $30.91 $494.56
£2 Operator: Large Equipment 16.00 HR $38.27 $612.32
& aborer 16.00 HR $26.20 $419.20
& Truck Driver 16.00 HR $29.73 $475.68
ZB Water Truck Driver 16.00 HR $29.73 $475.68
@ Ready Mix - Slurry ABC Slurry 1/2 Sack 3.00 YARD $115.00 $345.00
@# Aggregate - ABC MAG Spec 1.00 TON $14.50 $14.50
#2 Shoring 42.00 DY $95.00 $3,990.00
4 Plates [2] 42.00 DY $6.00 $504.00
CP-Sawcutting: 40.00 LF $5.84 $233.63
JR CP-Sawcutting Crew (200.00 LF/DY, 0.20 DY) 40.00 LF $5.84 $233.63
48% Truck - Crew 1.60 HR $30.95 $49.52
48% Walk Behind Saw - 57 HP 1.60 HR $40.47 $64.75
a2 Operator: Small Equipment [2] 1.60 HR $37.30 $119.36
@ cp-Asphalt patchback 8.00 SY $295.17 $2,361.32
JR CP-Asphalt Replace Crew (16.00 SY/DY, 0.50 DY) 8.00 SY $220.79 $1,766.32
42 Truck - Crew 4.00 HR $30.95 $123.80
484 Asphalt Roller - 35in-50in 4.00 HR $33.11 $132.44
Page 3 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
(item 4 - Discharge Manhole R&R Cone (Dobson) continued)
484 Backhoe - Light 4.00 HR $43.71 $174.84
484 Skid Steer 4.00 HR $33.03 $132.12
463 Dump Truck - 6 Wheel (Bobtail) 4.00 HR $41.21 $164.84
& Foreman 4.00 HR $53.44 $213.76
2 Operator: Small Equipment [2] 4.00 HR $37.30 $298.40
2&2 Pipelayer 4.00 HR $35.14 $140.56
& Laborer [3] 4.00 HR $32.13 $385.56
@ Asphalt - Asphalt 7.00 TON $85.00 $595.00
3% Dump Fee 1.00 LOAD $150.00 $150.00
RH-Remove & Replace Manhole Cone 1.00 EACH $3,775.28 $3,775.28
RH-Cone Removal & Replace 1.00 EACH $1,173.32 $1,173.32
it RH-Cone Removal Crew (2.00 EACH/DY, 0.50 DY) 1.00 EACH $1,123.32 $1,123.32
48 Truck - Crew 4.00 HR $30.95 $123.80
+ Excavator - 20k LB 4.00 HR $63.10 $252.40
4 Air Compressor - 185CFM 4.00 HR $22.20 $88.80
44 Jack Hammer - 90 Lb. 4.00 HR $7.00 $28.00
& Foreman 4.00 HR $53.44 $213.76
& Operator: Large Equipment 4.00 HR $39.88 $159.52
Zz Laborer [2] 4.00 HR $32.13 $257.04
ge Manhole - Concrete Collar 1.00 EACH $50.00 $50.00
RH-Manhole Frame & Cover Adjustment 1.00 EACH $1,101.96 $1,101.96
tt heii & Cover Adjustment Crew (2.00 EACH/DY, 0.50 1.00 EACH $851.96 $851.96
D
43 Truck - Crew 4.00 HR $30.95 $123.80
464 Air Compressor - 185CFM 4.00 HR $22.20 $88.80
«Jack Hammer - 90 Lb. 4.00 HR $7.00 $28.00
s Foreman 4.00 HR $53.44 $213.76
2 Pipelayer 4.00 HR $35.14 $140.56
& Laborer [2] 4.00 HR $32.13 $257.04
eP Ready Mix Concrete - MAG AA 4000 2.00 YARD $125.00 $250.00
3] Subcontracted-Manhole Coating Repair (Joseph Painting 1.00 EACH $1,500.00 $1,500.00
Company Inc)
5 - Bypass Ocotillo 1.00 LS $152,561.94 $152,561.94
8 Subcontracted-Bypass Pumping (B&F Pumping Solutions) 1.00 LS $152,561.94 $152,561.94
1D 6 - Bypass Jacaranda 1.00 LS $231,289.04 $231,289.04
(Si Subcontracted-Bypass Pumping (B&F Pumping Solutions) 1.00 LS $231,289.04 $231,289.04
18 - Traffic Control 1.00 LS $32,889.10 $32,889.10
Traffic Control - Jacaranda 1.00 LS $24,863.30 $24,863.30
A GC-Traffic Control Support Crew (0.03 LS/DY, 35.00 DY) 1.00 LS $11,325.30 $11,325.30
4 Truck - Crew 70.00 HR $28.95 $2,026.50
& Foreman 70.00 HR $48.44 $3,390.80
£ Pipelayer 70.00 HR $30.14 $2,109.80
2 Laborer [2] 70.00 HR $27.13 $3,798.20
468 Barricades 40.00 DY $207.00 $8,280.00
(Si) Barricade Setup 1.00 LS $5,118.00 $5,118.00
@ Traffic Control Plan 4.00 EACH $35.00 $140.00
1/20/2022 8:59:24 PM WW2005.402 Jacaranda PKWY Sewer Rehab Page 4 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
(item 18 - Traffic Control continued)
® Traffic Control - Ocotillo 1.00 LS $8,025.80 $8,025.80
wt GC-Traffic Control Support Crew (0.10 LS/DY, 10.00 DY) 1.00 LS $3,235.80 $3,235.80
4 Truck - Crew 20.00 HR $28.95 $579.00
& Foreman 20.00 HR $48.44 $968.80
2 Pipelayer 20.00 HR $30.14 $602.80
2 Laborer [2] 20.00 HR $27.13 $1,085.20
48% Barricades 10.00 DY $180.00 $1,800.00
(Si) Barricade Setup (Aguilar Traffic) 1.00 LS $2,890.00 $2,890.00
8 Traffic Control Plan (Aguilar Traffic) 2.00 EACH $50.00 $100.00
Phase: CIPP LINING
7 - Repair Manhole PVC "Flaps" For CIPP Lining 13.00 EACH $806.40 $10,483.20
GC-Confined Space Pipe Cleaning 13.00 EACH $806.40 $10,483.20
> RH-Confined Space Cleaning Crew (2.17 EACH/DY, 6.00 DY) 13.00 EACH $806.40 $10,483.20
46 Truck - Crew 48.00 HR $30.95 $1,485.60
«63 Blower 24in - Trailer Mounted 48.00 HR $37.00 $1,776.00
48% Confined Space Equipment 6.00 DY $102.00 $612.00
28% Small Tools - Saws, Cutters, Grinders [2] 48.00 HR $10.00 $960.00
2 Foreman 48.00 HR $53.44 $2,565.12
& Laborer [2] 48.00 HR $32.13 $3,084.48
iD} 8 - Open Benches For CIPP Lining 7.00 EACH $2,660.63 $18,624.41
® Bench Cut Out 7.00 EACH $2,660.63 $18,624.41
Rt RH-Confined Space Cleaning Crew (1.00 EACH/DY, 7.00 DY) 7.00 EACH $2,660.63 $18,624.41
«@ Truck - Crew 56.00 HR $30.95 $1,733.20
48% Blower 24in - Trailer Mounted 56.00 HR $37.00 $2,072.00
484 Confined Space Equipment 7.00 DY $102.00 $714.00
#88 Small Tools - Saws, Cutters, Grinders [2] $6.00 HR $10.00 $1,120.00
44% Air Compressor - 185CFM 56.00 HR $19.92 $1,115.52
48% Jack Hammer - 90 Lb. 56.00 HR $10.00 $560.00
2 Foreman 70.00 HR $57.28 $4,009.88
& Laborer [2] 70.00 HR $33.84 $4,738.02
£ Pipelayer 70.00 HR $36.60 $2,561.79
iD 10 - 27" CIPP Lining 4,353.00 LF $159.38 $693,772.24
CIPP Lining Support 28.00 DY $836.08 $23,410.24
R RH-CIPP Lining Support Crew (1.00 DY/DY, 28.00 DY) 28.00 DY $836.08 $23,410.24
48 Truck - Crew 224.00 HR $26.45 $5,924.80
& Foreman 224.00 HR $51.86 $11,616.64
2 Laborer 224.00 HR + $26.20 $5,868.80
8 Subcontracted- CIPP Lining (Insituform Technologies, Inc.) 4,353.00 LF $154.00 $670,362.00
Phase: POINT REPAIR
B 9 - Point Repair 1.00 EACH $43,324.20 $43,324.20
® RH-Excavation & Backfill 1.00 EACH $38,038.76 $38,038.76
RH-Excavation & Backfill Suction Pit Crew (0.33 EACH/DY, 1.00 EACH $19,691.76 $19,691.76
3.00 DY)
#8 Truck - Crew 24.00 HR $26.45 $634.80
48% Excavator - 100k LB 24.00 HR $224.68 $5,392.32
1/20/2022 8:59:24 PM 'WW2005.402 Jacaranda PKWY Sewer Rehab Page 5 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
(Item 9 - Point Repair continued)
«4 Backhoe - Heavy 24.00 HR $76.73 $1,841.52
4 Telescoping Forklift - 10k LB 24.00 HR $63.86 $1,532.64
48 Dump Truck - 10 Wheel [2] 24.00 HR $62.67 $3,008.16
48% Water Truck - 2000 Gal 24.00 HR $33.73 $809.52
& Foreman 24.00 HR $51.86 $1,244.64
&, Leadman 24.00 HR $30.91 $741.84
& Operator: Large Equipment 24.00 HR $38.27 $918.48
£ Laborer 24.00 HR $26.20 $628.80
2 Truck Driver [2] 24.00 HR $29.73 $1,427.04
2 Water Truck Driver 24.00 HR $29.73 $713.52
& Operator: Small Equipment 24.00 HR $33.27 $798.48
Ze Ready Mix - Slurry ABC Slurry 1/2 Sack 21.00 YARD $115.00 $2,415.00
ge Aggregate - ABC MAG Spec 132.00 TON $14.50 $1,914.00
#8 Shoring [4] 5.00 DY $125.00 $2,500.00
@ CP-Sawcutting 80.00 LF $5.84 $467.26
tt CP-Sawcutting Crew (200.00 LF/DY, 0.40 DY) 80.00 LF $5.84 $467.26
«4% Truck - Crew 3.20 HR $30.95 $99.04
4$2 Walk Behind Saw - 57 HP 3.20 HR $40.47 $129.50
£ Operator: Small Equipment [2] 3.20 HR $37.30 $238.72
) CP-Asphalt Patchback 34.00 SY $280.90 $9,550.73
a CP-Asphalt Replace Crew (16.75 SY/DY, 2.03 DY) 34.00 SY $210.90 $7,170.73
46% Truck - Crew 16.24 HR $30.95 $502.59
4 Asphalt Roller - 35in-50in 16.24 HR $33.11 $537.67
48% Backhoe - Light 16.24 HR $43.71 $709.80
4 Skid Steer 16.24 HR $33.03 $536.37
48 Dump Truck - 6 Wheel (Bobtail) 16.24 HR $41.21 $669.20
2 Foreman 16.24 HR $53.44 $867.80
2 Operator: Small Equipment [2] 16.24 HR $37.30 $1,211.41
S&. Pipelayer 16.24 HR $35.14 $570.63
S& Laborer [3] 16.24 HR $32.13 $1,565.26
@ Asphalt - Asphalt 28.00 TON $85.00 $2,380.00
3& Dump Fee 10.00 LOAD $150.00 $1,500.00
RH-Remove & Replace Pipe Section 1.00 EACH $5,285.44 $5,285.44
RH-Pipe Removal & Replace 1.00 EACH $5,285.44 $5,285.44
wt RH-Removal Crew (1.00 EACH/DY, 1.00 DY) 1.00 EACH $3,805.44 $3,805.44
483 Truck - Crew 8.00 HR $30.95 $247.60
#6 Excavator - 100k LB 8.00 HR $224.68 $1,797.44
#63 Air Compressor - 185CFM : 8.00 HR $22.20 - $177.60
48% Jack Hammer - 90 Lb. 8.00 HR $7.00 $56.00
2 Foreman 8.00 HR $53.44 $427.52
2 Operator: Large Equipment 8.00 HR $39.88 $319.04
S& taborer (2) 8.00 HR $32.13 $514.08
& Pipelayer 8.00 HR $33.27 $266.16
F Ready Mix Collar - MAG A 3000 8.00 YARD $125.00 $1,000.00
P Pipe - RGRCP Pipe Class V 27in 8.00 LF $60.00 $480.00
Phase: MANHOLE REPAIRS
1/20/2022 8:59:24 PM 'WW2005.402 Jacaranda PKWY Sewer Rehab Page 6 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
& 12 - Manhole Bench Coating 13.00 EACH $6,426.48 $83,544.24
f RH-Manhole Bench Coating 13.00 EACH $6,426.48 $83,544.24
at RH-Manhole Bench Coating Support Crew (1.00 EACH/DY, 13.00 EACH $626.48 $8,144.24
13.00 DY)
#3 Truck - Crew 104.00 HR $26.45 $2,750.80
2 Foreman 104.00 HR $51.86 $5,393.44
8 Subcontracted-Manhole Bench Coating (Joseph Painting 13.00 EACH $5,800.00 $75,400.00
Company Inc)
Phase: PIPE CLEANING AND VIDEO
2- Pre-Clean & Video 4,353.00 LF $7.20 $31,339.80
Pre-Video CCTV 4,353.00 LF $4.37 $19,008.00
aR GC-CCTV Crew (725.50 LF/DY, 6.00 DY) 4,353.00 LF $1.55 $6,727.68
48 CCTV Truck 48.00 HR $85.00 $4,080.00
& CCTV Technician 60.00 HR $44.13 $2,647.68
Rk GC-Hydro Vactor Combo Truck Crew (725.50 LF/DY, 6.00 DY) 4,353.00 LF $2.82 $12,280.32
«6% Combo Truck 48.00 HR $187.00 $8,976.00
2 Combo Truck Operator 72.00 HR $45.89 $3,304.32
GC-Confined Space Pipe Cleaning 4,353.00 LF $2.83 $12,331.80
# RH-Confined Space Support Crew (725.50 LF/DY, 6.00 DY) 4,353.00 LF $2.83 $12,331.80
2 Truck - Crew 48.00 HR $30.95 $1,485.60
3 Blower 24in - Trailer Mounted 48.00 HR $37.00 $1,776.00
«@& Confined Space Equipment 6.00 DY $102.00 $612.00
«€% Small Tools - Saws, Cutters, Grinders [2] 48.00 HR $10.00 $960.00
& Foreman 60.00 HR $57.28 $3,437.04
& Laborer [2] 60.00 HR $33.84 $4,061.16
11 - Post Clean And Video (Pano) 4,353.00 LF $6.71 $29,224.00
6} Panorama CCTV 4,353.00 LF $6.12 $26,624.00
ey Pano CCTV Crew (544.13 LF/DY, 8.00 DY) 4,353.00 LF $2.35 $10,250.24
482 Pano Truck 64.00 HR $105.00 $6,720.00
& cctv Technician 80.00 HR $44.13 $3,530.24
a GC-Hydro Vactor Combo Truck Crew (544.13 LF/DY, 8.00 DY) 4,353.00 LF $3.76 $16,373.76
4s8 Combo Truck 64.00 HR $187.00 $11,968.00
2 Combo Truck Operator 96.00 HR $45.89 $4,405.76
S Post Pano On MH 13.00 EACH $200.00 $2,600.00
Phase: REMOVE AND REPLACE
Dy 13 - Remove And Replace AC Pavement 505.00 SF $89.51 $45,200.84
RH-Bypass Pipe Trench 253.00 LF $154.30 $39,037.84
0) CP-Sawcutting . $50.00 LF $2.92 $1,606.22
A CP-Sawcutting Crew (400.00 LF/DY, 1.38 DY) 550.00 LF $2.92 $1,606.22
4 Truck - Crew 11.00 HR $30.95 $340.45
4 Walk Behind Saw - 57 HP 11.00 HR $40.47 $445.17
& Operator: Small Equipment [2] 11.00 HR $37.30 $820.60
RH-Bypass Pipe Trench 253.00 LF $76.93 $19,464.50
At RH-Bypass Pipe Trench Crew (80.00 LF/DY, 3.16 DY) 253.00 LF $69.83 $17,667.50
#6 Truck - Crew [2] 25.30 HR $30.95 $1,566.07
«Backhoe - Light [2] 25.30 HR $43.71 $2,211.73
4g Air Compressor - 185CFM 25.30 HR $22.20 $561.66
1/20/2022 8:59:24 PM WW2005.402 Jacaranda PKWY Sewer Rehab Page 7 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
(item 13 - Remove And Replace AC Pavement continued)
423 Jack Hammer - 80 Lb. 25.30 HR $7.00 $177.10
483 Dump Truck - 10 Wheel [2] 25.30 HR $67.55 $3,418.03
2% Water Truck - 2000 Gal 25.30 HR $40.19 $1,016.81
23 Small Tools 25.30 HR $10.00 $253.00
& Foreman 25.30 HR $53.44 $1,352.03
2 Operator: Large Equipment [2] 25.30 HR $39.88 $2,017.93
& Laborer (3] 25.30 HR $32.13 $2,438.67
& Truck Driver [2] 25.30 HR $36.11 $1,827.17
Water Truck Driver 25.30 HR $32.70 $827.31
482 Skid Steer with Cold Planer 20.00 HR $59.85 $1,197.00
@ _ Subcontracted-Trucking & Hauloff 4.00 TRIP $150.00 $600.00
RH-Slurry Prep Crew 253.00 LF $9.70 $2,454.91
A RH-Slurry Prep Crew (200.00 LF/DY, 1.27 DY) 253.00 LF $9.70 $2,454.91
283 Truck - Crew 10.12 HR $30.95 $313.21
4 Backhoe - Light 10.12 HR $43.71 $442.35
4% Flatbed Trailer 10.12 HR $7.33 $74.18
2 Foreman 10.12 HR $53.44 $540.81
2 Operator: Large Equipment 10.12 HR $39.88 $403.59
2S Pipelayer 10.12 HR $35.14 $355.62
& taborer 10.12 HR $32.13 $325.16
1] RH-Slurry Backfill 253.00 LF $31.27 $7,912.22
a RH-Slurry Backfill Crew (200.00 LF/DY, 1.27 DY) 253.00 LF $9.14 $2,312.22
48 Truck - Crew 10.12 HR $30.95 $313.21
2 Foreman 10.12 HR $53.44 $540.81
2 Pipelayer 10.12 HR $35.14 $355.62
& Laborer 10.12 HR $32.13 $325.16
«4 Backhoe - Light 10.12 HR $43.71 $442.35
«@&% Asphalt Roller - 35in-5Gin 10.12 HR $33.11 $335.07
eZ Ready Mix - Slurry ABC Slurry 1/2 Sack 40.00 YARD $105.00 $4,200.00
Fa Asphalt - Cold Patch TN 10.00 TON $140.00 $1,400.00
4® Plates [20] 28.00 DY $10.00 $5,600.00
(S}] GC-Plate Delivery & Retum 4.00 TRIP $500.00 $2,000.00
8 Subcontracted-Asphalt Paving (Calvary Paving) 67.00 SY $69.00 $4,623.00
7 Aggregate - ABC MAG Spec 70.00 TON $14.50 $1,015.00
Miscellaneous-Dump Fees 7.00 LOAD $75.00 $525.00
Dy 14 - Remove And Replace Landscaping 1.00 LS $6,451.28 $6,451.28
'D) GC-Landscaping (LS) 1.00 LS $6,451.28 $6,451.28
it GC-Landscaping Crew (LS) (0.33 LS/DY, 3.00 DY) 1.00 LS $5,801.28 $5,801.28
«i Truck - Crew 24.00 HR $26.45 $634.80
484 Skip Loader - 1.3 CY 24.00 HR $40.48 $971.52
48 Water Truck - 2000 Gal 24.00 HR $33.73 $809.52
& Foreman 24.00 HR $51.86 $1,244.64
2. Operator: Small Equipment 24.00 HR $33.27 $798.48
2 Laborer 24.00 HR $26.20 $628.80
& Water Truck Driver 24.00 HR $29.73 $713.52
a Sod - Midiron 100.00 SF $6.50 $650.00
1/20/2022 8:59:24 PM
'WW2005.402 Jacaranda PKWY Sewer Rehab
Page 8 of 10
Unit Total
Description Quantity UM Direct Cost Direct Cost
iD" 15 - Remove And Replace Sidewalk 48.00 SF $66.79 $3,205.90
iD) CP-Restore Concrete Sidewalk, Driveways & Valley Gutter 48.00 SF $66.50 $3,191.98
at CP-Concrete Sidewalk Removal Crew (192.00 SF/DY, 0.25 DY) 48.00 SF $14.52 $696.98
4) Truck - Crew 2.00 HR $30.95 $61.90
48 Backhoe - Light 2.00 HR $43.71 $87.42
28 Air Compressor - 185CFM 2.00 HR $22.20 $44.40
#8 Jack Hammer - 90 Lb. 2.00 HR $7.00 $14.00
+8 Dump Truck - 6 Wheel (Bobtail) 2.00 HR $41.21 $82.42
4 Water Trailer - 500 Gal 2.00 HR $11.74 $23.48
2 Foreman 2.00 HR $53.44 $106.88
& Operator: Small Equipment 2.00 HR $37.30 $74.60
& laborer 2.00 HR $32.13 $64.26
B Water Truck Driver 2.00 HR $32.70 $65.40
& Truck Driver 2.00 HR $36.11 $72.22
@ _ Subcontracted-Concrete Flatwork 48.00 SF $25.00 $1,200.00
Subcontractor - Mobilization 1.00 EACH $1,250.00 $1,250.00
3 Dump Fee 1.00 LOAD $45.00 $45.00
eP Aggregate - ABC MAG Spec 1.00 TON $13.92 $13.92
D' 16 - Remove And Replace Curb 20.00 LF $163.14 $3,262.88
CP-Concrete Curb & Gutter 20.00 LF $162.45 $3,248.96
tt ye Curb & Gutter Removal Crew (40.00 LF/DY, 0.50 20.00 LF $69.70 $1,393.96
48 Truck - Crew 4.00 HR $30.95 $123.80
48% Backhoe - Light 4.00 HR $43.71 $174.84
46% Air Compressor - 185CFM 4.00 HR $22.20 $88.80
4 Jack Hammer - 90 Lb. 4.00 HR $7.00 $28.00
48% Dump Truck - 6 Wheel (Bobtail) 4.00 HR $41.21 $164.84
42 Water Trailer - 500 Gal 4.00 HR $11.74 $46.96
& Foreman 4.00 HR $53.44 $213.76
£ Operator: Small Equipment 4.00 HR $37.30 $149.20
& Laborer 4.00 HR $32.13 $128.52
£ Water Truck Driver 4.00 HR $32.70 $130.80
£ Truck Driver 4.00 HR $36.11 $144.44
8 Subcontracted-Concrete Curb & Gutter 20.00 LF $28.00 $560.00
8 Subcontractor - Mobilization 1.00 EACH $1,250.00 $1,250.00
3% Dump Fee 1.00 LOAD $45.00 $45.00
@ Aggregate - ABC MAG Spec 1.00 TON $13.92 $13.92
[Bj 17 - Replace Striping 1.00 LS $2,500.00 $2,500.00
(S] Subcontracted-Striping 1.00 LS $2,500.00 $2,500.00
1/20/2022 8:59:24 PM
‘WW2005.402 Jacaranda PKWY Sewer Rehab
Page 9 of 10
Direct Cost Totals
Amount Birect Cost
Labor: $169,644.46 11.09%
Equipment Owned: $125,229.11 8.18%
Equipment Rented: $25,386.00 1.66%
Materials Owned: $0.00 0.00%
Materials Purchased: $18,750.34 1.23%
Subcontracted: $1,173,543.98 76.68%
Trucking Owned: $0.00 0.00%
Trucking Hired: $0.00 0.00%
Miscellaneous: $8,015.00 0.52%
Plug: $9,810.00 0.64%
Direct Cost: $1,530,378.88
Percent of
Amount Bid Price
Total Direct Cost: $1,530,378.88 100.00%
Total DC Adds/Cuts: $0.00 0.00%
Total Indirect Cost: $0.00 0.00%
Total Bond: $0.00 0.00%
Total Overall Cost: $1,530,378.88 100.00%
Total Overhead: $0.00 0.00%
Total Profit: ($1.65) -0.00%
Total Margin: ($1.65) -0.00%
Total Bid Price: $1,530,377.23
1/20/2022 8:59:24 PM
'WW2005.402 Jacaranda PKWY Sewer Rehab
Page 10 of 10
L 4 20. ! a i nn on) 4 RPS oe DO. nto. i AM. Ans. a “a La SOB. Sa. _
Wer toe HRA Ths SPR ‘WW 2005 402 - JACARANDA SEWER REHABILITATION os
van 1
= Preconstruction Wdeys — Two /1f2Z_ Mon 4/4/22 Preconstruction ‘
r aa ‘
. Subettas Ydays Tue 3/1/22 Mon 3/14/22 Submittals
3/1 emmemme, 3/14
TR = ue day Mon 3/21/22 Mon 3/21/22 NTP
ates V2
vp oe Materta! Procurement ISdin, Tue 18/22 Mon 4/4j2z ‘Mugertal Procurement a
ans a
“e - ‘Mobilization / Bypans Set-up. 10d Tue 3722/22 Mon 4/4/22 Mobilization / Bypass Set-up :
va ENERO,
Tyo Trathe Control Saas Wed 8/9/22 Ton 6/7/22 Tratfie Control :
MF
- Taff Control Pes Yoda Wed 3/9/22 Tue 3/22/22 ‘Traffic Control Permit
i
of (Message Boards MAdays Wed 3/16/22 Mon 5/16/22 i
® =< Tea Conttot SAdone = Th 3/24/22 Te6/7/22
32 gemea REET
i ” 27" RGRCP Lining 2adaye = Tue fSf22 Thu 5/22/22 27” RGRCP Us
as — 4 5/12
7 Mobilization tay Tue a/SR2 Tue 4/5722 Mobifzation :
4S Ea, 4/5
a ” Point Repair Sdays Wed 4/6/22 Tue 4/12/22
- ‘Clean Pipe CCTV Pre testa! 2d Wed aft3/22 Thu a/14pa2
-” CPP ining today HayiS2 Wed S/11/22
wl os Post CCTV Iday Thu sS/t22z ThuS/i2722
7 -™ Manhole Rahabitation Arden F142 Mons/23/22 spa
= Mobieation Ady Faanena Faapene
o1S os ‘Sand-blast Manholes Bdaye—MonS/2/22 Wed 5/18/22 sn Sand-blast Manhole: se '
ee eee
” ‘CleanyPrep Manholes Bay Tue S322 Thu 5/19/22 d Clean/Prep Manholes
ERENCES -5/19 |
raison Coat Manhotes Wades Wed $1422 FSNO/Z ¢ Cost Manholes sro
Ren Test Manholes Bay ‘Thu S/S/22_ Mon $/23/22 ‘Test Manholes <1
- Remove Bypass System Today, = Tue 8/24/22 Mon 6/6/22 sree Remove Bypass System I,
Fy = Restoration wea TueS/24/22 Mon 6/6/22 sae Restoration |,
7 Chose
=“ Ponchtst / oteout 2d = Wed (R/T THUEHNZ nails | Cees
Tat SXESEONIM Summary TT actin ttettone uronenty TARAIIRE strony c Aetrmalidesone Manual Progeit
Pree wuanst2ncanndanas | wineries tpcheny Ft names 8 tena ig ee tray co
Mtestone ° race Tsk Manual Tae AERA Manual suman tater tats Progees eee
Page