City Clerk Document No.  
 
 
 
 
Public Housing Authority Commission Meeting Date: February 7, 2022 
 
CITY OF CHANDLER SERVICES AGREEMENT 
PUBLIC HOUSING KITCHEN AND BATH CABINET REPLACEMENTS 
CITY OF CHANDLER AGREEMENT NO. HO2-910-4443 
 
THIS AGREEMENT (Agreement) is made and entered into by and between the City of Chandler, an 
Arizona municipal corporation (City), and Boyjin Development, LLC, (Contractor), (City and 
Contractor may individually be referred to as Party and collectively referred to as Parties) and made 
 
 
 
 , 2022 (Effective Date). 
 
RECITALS 
 
A. City proposes to contract for kitchen and bath cabinet replacements as more fully described in 
Exhibit A, which is attached to and made a part of this Agreement by this reference. 
 
B. Contractor is ready, willing, and able to provide the services described in Exhibit A for the 
compensation and fees set forth and as described in Exhibit B, which is attached to and made a part 
of this Agreement by this reference. 
 
C. City desires to contract with the Contractor to provide these services under the terms and 
conditions set forth in this Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and the mutual promises contained in this 
Agreement, City and Contractor agree as follows: 
 
SECTION I: DEFINITIONS 
 
For purposes of this Agreement, the following definitions apply: 
Agreement means the legal agreement executed between the City and the Contractor  
City means the City of Chandler, Arizona 
Contractor means the individual, partnership, or corporation named in the Agreement 
Days means calendar days 
May, Should means something that is not mandatory but permissible 
Shall, Will, Must means a mandatory requirement 
 
SECTION II: CONTRACTOR’S SERVICES 
 
Contractor must perform the services described in Exhibit A to the City’s satisfaction within the 
terms and conditions of this Agreement and within the care and skill that a person who provides 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 2 of 96 
 
similar services in Chandler, Arizona exercises under similar conditions. All work or services 
furnished by Contractor under this Agreement must be performed in a skilled and workmanlike 
manner. Unless authorized by the City in writing, all fixtures, furnishings, and equipment furnished 
by Contractor as part of the work or services under this Agreement must be new, or the latest 
model, and of the most suitable grade and quality for the intended purpose of the work or service.  
 
SECTION III: PERIOD OF SERVICE 
 
Contractor must perform the services described in Exhibit A for the term of this Agreement.  
 
Following execution of this Agreement by City, the Contractor will immediately commence work and 
will complete all services described within 90 calendar days from the date the Contractor is notified 
to proceed. 
 
SECTION lV: PAYMENT OF COMPENSATION AND FEES 
 
Unless amended in writing by the Parties, Contractor's compensation and fees as more fully 
described in Exhibit B for performance of the services approved and accepted by the City under this 
Agreement must not exceed $259,507. Contractor must submit requests for payment for services 
approved and accepted during the previous billing period and must include, as applicable, detailed 
invoices and receipts, a narrative description of the tasks accomplished during the billing period, a 
list of any deliverables submitted, and any subcontractor’s or supplier’s actual requests for payment 
plus similar narrative and listing of their work. Payment for those services negotiated as a lump sum 
will be made in accordance with the percentage of the work completed during the preceding billing 
period. Services negotiated as a not-to-exceed fee will be paid in accordance with the work 
completed on the service during the preceding month. All requests for payment must be submitted 
to the City for review and approval. The City will make payment for approved and accepted services 
within 30 days of the City’s receipt of the request for payment. Contractor bears all responsibility 
and liability for any and all tax obligations that result from Contractor’s performance under this 
Agreement.  
 
SECTION V: GENERAL CONDITIONS 
 
5.1 Records/Audit. Records of the Contractor's direct personnel payroll, reimbursable expenses 
pertaining to this Agreement and records of accounts between the City and Contractor must be 
kept on the basis of generally accepted accounting principles and must be made available to the 
City and its auditors for up to three years following the City’s final acceptance of the services under 
this Agreement. The City, its authorized representative, or any federal agency, reserves the right to 
audit Contractor's records to verify the accuracy and appropriateness of all cost and pricing data, 
including data used to negotiate this Agreement and any amendments. The City reserves the right 
to decrease the total amount of Agreement price or payments made under this Agreement or 
request reimbursement from the Contractor following final contract payment on this Agreement if, 
upon audit of the Contractor's records, the audit discloses the Contractor has provided false, 
misleading, or inaccurate cost and pricing data. The Contractor will include a similar provision in all 
of its contracts with subcontractors providing services under the Agreement Documents to ensure 
that the City, its authorized representative, or the appropriate federal agency, has access to the 
subcontractors’ records to verify the accuracy of all cost and pricing data. The City reserves the right 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 3 of 96 
 
to decrease Contract price or payments made on this Agreement or request reimbursement from 
the Contractor following final payment on this Agreement if the above provision is not included in 
subcontractor agreements, and one or more subcontractors refuse to allow the City to audit their 
records to verify the accuracy and appropriateness of all cost and pricing data. If, following an audit 
of this Agreement, the audit discloses the Contractor has provided false, misleading, or inaccurate 
cost and pricing data, and the cost discrepancies exceed 1% of the total Agreement billings, the 
Contractor will be liable for reimbursement of the reasonable, actual cost of the audit. 
 
5.2 Alteration in Character of Work. Whenever an alteration in the character of work results in a 
substantial change in this Agreement, thereby materially increasing or decreasing the scope of 
services, cost of performance, or Project schedule, the work will be performed as directed by the 
City. However, before any modified work is started, a written amendment must be approved and 
executed by the City and the Contractor. Such amendment must not be effective until approved by 
the City. Additions to, modifications, or deletions from this Agreement as provided herein may be 
made, and the compensation to be paid to the Contractor may accordingly be adjusted by mutual 
agreement of the Parties. It is distinctly understood and agreed that no claim for extra work done 
or materials furnished by the Contractor will be allowed by the City except as provided herein, nor 
must the Contractor do any work or furnish any materials not covered by this Agreement unless 
such work is first authorized in writing. Any such work or materials furnished by the Contractor 
without prior written authorization will be at Contractor's own risk, cost, and expense, and 
Contractor hereby agrees that without written authorization Contractor will make no claim for 
compensation for such work or materials furnished. 
 
5.3 Termination for Convenience. The City and the Contractor hereby agree to the full 
performance of the covenants contained herein, except that the City reserves the right, at its 
discretion and without cause, to terminate or abandon any service provided for in this 
Agreement, or abandon any portion of the Project for which services have been performed by 
the Contractor. In the event the City abandons or suspends the services, or any part of the 
services as provided in this Agreement, the City will notify the Contractor in writing and 
immediately after receiving such notice, the Contractor must discontinue advancing the work 
specified under this Agreement. Upon such termination, abandonment, or suspension, the 
Contractor must deliver to the City all drawings, plans, specifications, special provisions, 
estimates and other work entirely or partially completed, together with all unused materials 
supplied by the City. The Contractor must appraise the work Contractor has completed and 
submit Contractor's appraisal to the City for evaluation. The City may inspect the Contractor's 
work to appraise the work completed. The Contractor will receive compensation in full for 
services performed to the date of such termination. The fee shall be paid in accordance with 
Section IV of this Agreement, and as mutually agreed upon by the Contractor and the City. If 
there is no mutual agreement on payment, the final determination will be made in accordance 
with the Disputes provision in this Agreement. However, in no event may the payment exceed 
the payment set forth in this Agreement nor as amended in accordance with Alteration in 
Character of Work. The City will make the final payment within 60 days after the Contractor has 
delivered the last of the partially completed items and the Parties agree on the final payment. 
If the City is found to have improperly terminated the Agreement for cause or default, the 
termination will be converted to a termination for convenience in accordance with the 
provisions of this Agreement. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 4 of 96 
 
5.4 Termination for Cause. The City may terminate this Agreement for Cause upon the occurrence 
of any one or more of the following events: in the event that (a) the Contractor fails to perform 
pursuant to the terms of this Agreement, (b) the Contractor is adjudged a bankrupt or insolvent, (c) 
the Contractor makes a general assignment for the benefit of creditors, (d) a trustee or receiver is 
appointed for Contractor or for any of Contractor’s property (e) the Contractor files a petition to 
take advantage of any debtor's act, or to reorganize under the bankruptcy or similar laws, (f) the 
Contractor disregards laws, ordinances, rules, regulations or orders of any public body having 
jurisdiction, or (g) the Contractor fails to cure default within the time requested. Where Agreement 
has been so terminated by City, the termination will not affect any rights of City against Contractor 
then existing or which may thereafter accrue. 
 
5.5 Indemnification. The Contractor (lndemnitor) must indemnify, defend, save and hold 
harmless the City and its officers, officials, agents and employees (lndemnitee) from any and 
all claims, actions, liabilities, damages, losses or expenses (including court costs, attorneys' fees 
and costs of claim processing, investigation and litigation) (Claims) caused or alleged to be 
caused, in whole or in part, by the wrongful, negligent or willful acts, or errors or omissions of 
the Contractor or any of its owners, officers, directors, agents, employees, or subcontractors in 
connection with this Agreement. This indemnity includes any claim or amount arising out of or 
recovered under workers' compensation law or on account of the failure of the Contractor to 
conform to any federal, state or local law, statute, ordinance, rule, regulation or court decree. 
The Contractor must indemnify lndemnitee from and against any and all Claims, except those 
arising solely from lndemnitee's own negligent or willful acts or omissions. The Contractor is 
responsible for primary loss investigation, defense and judgment costs where this 
indemnification applies. In consideration of the award of this Agreement, the Contractor agrees 
to waive all rights of subrogation against lndemnitee for losses arising from or related to this 
Agreement. The obligations of the Contractor under this provision survive the termination or 
expiration of this Agreement. 
 
5.6 Insurance Requirements. Contractor must procure insurance under the terms and 
conditions and for the amounts of coverage set forth in Exhibit C against claims that may arise 
from or relate to performance of the work under this Agreement by Contractor and its agents, 
representatives, employees, and subcontractors. Contractor and any subcontractors must 
maintain this insurance until all of their obligations have been discharged, including any 
warranty periods under this Agreement. These insurance requirements are minimum 
requirements for this Agreement and in no way limit the indemnity covenants contained in this 
Agreement. The City in no way warrants that the minimum limits stated in Exhibit C are 
sufficient to protect the Contractor from liabilities that might arise out of the performance of 
the work under this Agreement by the Contractor, the Contractor’s agents, representatives, 
employees, or subcontractors. Contractor is free to purchase such additional insurance as may 
be determined necessary. 
 
5.7 Cooperation and Further Documentation. The Contractor agrees to provide the City such 
other duly executed documents as may be reasonably requested by the City to implement the 
intent of this Agreement. 
 
5.8 Notices. Unless otherwise provided, notice under this Agreement must be in writing and 
will be deemed to have been duly given and received either (a) on the date of service if 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 5 of 96 
 
personally served on the party to whom notice is to be given, or (b) on the date notice is sent if 
by electronic mail, or (c) on the third day after the date of the postmark of deposit by first class 
United States mail, registered or certified, postage prepaid and properly addressed as follows: 
 
For the City 
For the Contractor 
Name:  Larry Mickel                                                  Name: Lance Boyajian                                                 
Title: Housing Project Coordinator                        Title:  President/Office Manager                                
Address:  235 S, Arizona Ave.                                  Address:  P.O. Box 1496                                              
Chandler, AZ 85225                                                  Glendale, AZ 85311                                                      
Phone:  480-782-3220                                              Phone: 602-278-0211                                                  
Email: larry.mickel@chandleraz.gov                      Email:  office@absolutecomfortcooling.com           
 
5.9 Successors and Assigns. City and Contractor each bind itself, its partners, successors, 
assigns, and legal representatives to the other party to this Agreement and to the partners, 
successors, assigns, and legal representatives of such other party in respect to all covenants of 
this Agreement. Neither the City nor the Contractor may assign, sublet, or transfer its interest 
in this Agreement without the written consent of the other party. In no event may any 
contractual relation be created between any third party and the City. 
 
5.10 Disputes. In any dispute arising out of an interpretation of this Agreement or the duties 
required not disposed of by agreement between the Contractor and the City, the final 
determination at the administrative level will be made by the City Purchasing and Materials 
Manager. 
 
5.11 Completeness and Accuracy of Contractor's Work. The Contractor must be responsible for 
the completeness and accuracy of Contractor's services, data, and other work prepared or 
compiled under Contractor's obligation under this Agreement and must correct, at Contractor's 
expense, all willful or negligent errors, omissions, or acts that may be discovered. The fact that 
the City has accepted or approved the Contractor's work will in no way relieve the Contractor 
of any of Contractor's responsibilities. 
 
5.12 Withholding Payment. The City reserves the right to withhold funds from the Contractor's 
payments up to the amount equal to the claims the City may have against the Contractor until 
such time that a settlement on those claims has been reached. 
 
5.13 City's Right of Cancellation. The Parties acknowledge that this Agreement is subject to 
cancellation by the City under the provisions of Section 38-511, Arizona Revised Statutes 
(A.R.S.). 
 
5.14 Independent Contractor. For this Agreement the Contractor constitutes an independent 
contractor. Any provisions in this Agreement that may appear to give the City the right to direct 
the Contractor as to the details of accomplishing the work or to exercise a measure of control 
over the work means that the Contractor must follow the wishes of the City as to the results of 
the work only. These results must comply with all applicable laws and ordinances. 
 
5.15 Project Staffing. Prior to the start of any work under this Agreement, the Contractor must 
assign to the City the key personnel that will be involved in performing services prescribed in 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 6 of 96 
 
the Agreement. The City may acknowledge its acceptance of such personnel to perform 
services under this Agreement. At any time hereafter that the Contractor desires to change key 
personnel while performing under the Agreement, the Contractor must submit the 
qualifications of the new personnel to the City for prior approval. The Contractor will maintain 
an adequate and competent staff of qualified persons, as may be determined by the City, 
throughout the performance of this Agreement to ensure acceptable and timely completion of 
the Scope of Services. If the City objects, with reasonable cause, to any of the Contractor's staff, 
the Contractor must take prompt corrective action acceptable to the City and, if required, 
remove such personnel from the Project and replace with new personnel agreed to by the City. 
 
5.16 Subcontractors. Prior to beginning the work, the Contractor must furnish the City for 
approval the names of subcontractors to be used under this Agreement. Any subsequent 
changes are subject to the City’s written prior approval. 
 
5.17 Force Majeure. If either party is delayed or prevented from the performance of any act 
required under this Agreement by reason of acts of God or other cause beyond the control and 
without fault of the Party (financial inability excepted), performance of that act may be excused, 
but only for the period of the delay, if the Party provides written notice to the other Party within 
ten days of such act. The time for performance of the act may be extended for a period 
equivalent to the period of delay from the date written notice is received by the other Party. 
 
5.18 Compliance with Laws. Contractor understands, acknowledges, and agrees to comply with 
the Americans with Disabilities Act, the Immigration Reform and Control Act of 1986 and the 
Drug Free Workplace Act of 1989. All services performed by Contractor must also comply with 
all applicable City of Chandler codes, ordinances, and requirements. Contractor agrees to 
permit the City to verify Contractor’s compliance. 
 
5.19 No Israel Boycott. By entering into this Agreement, Contractor certifies that Contractor is 
not currently engaged in, and agrees for the duration of the Agreement, not to engage in a 
boycott of Israel as defined by state statute. 
 
5.20 Legal Worker Requirements. A.R.S. § 41-4401 prohibits the City from awarding a contract 
to any contractor who fails, or whose subcontractors fail, to comply with A.R.S. § 23-214(A). 
Therefore, Contractor agrees Contractor and each subcontractor it uses warrants their 
compliance with all federal immigration laws and regulations that relate to their employees 
and their compliance with§ 23-214, subsection A. A breach of this warranty will be deemed a 
material breach of the Agreement and may be subject to penalties up to and including 
termination of the Agreement. City retains the legal right to inspect the papers of any 
Contractor’s or subcontractor’s employee who provides services under this Agreement to 
ensure that the Contractor and subcontractors comply with the warranty under this provision. 
 
5.21 Lawful Presence Requirement. A.R.S. §§ 1-501 and 1-502 prohibit the City from awarding 
a contract to any natural person who cannot establish that such person is lawfully present in 
the United States. To establish lawful presence, a person must produce qualifying identification 
and sign a City-provided affidavit affirming that the identification provided is genuine. This 
requirement will be imposed at the time of contract award. This requirement does not apply 
to business organizations such as corporations, partnerships, or limited liability companies. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 7 of 96 
 
 
5.22 Covenant Against Contingent Fees. Contractor warrants that no person has been 
employed or retained to solicit or secure this Agreement upon an agreement or understanding 
for a commission, percentage, brokerage, or contingent fee, and that no member of the 
Chandler City Council, or any City employee has any interest, financially, or otherwise, in 
Contractor’s firm. For breach or violation of this warrant, the City may annul this Agreement 
without liability or, at its discretion, to deduct from the Agreement price or consideration, the 
full amount of such commission, percentage, brokerage, or contingent fee. 
 
5.23 Non-Waiver Provision. The failure of either Party to enforce any of the provisions of this 
Agreement or to require performance of the other Party of any of the provisions hereof must 
not be construed to be a waiver of such provisions, nor must it affect the validity of this 
Agreement or any part thereof, or the right of either Party to thereafter enforce each and every 
provision. 
 
5.24 Disclosure of Information Adverse to the City’s Interests. To evaluate and avoid potential 
conflicts of interest, the Contractor must provide written notice to the City, as set forth in this 
Section, of any work or services performed by the Contractor for third parties that may involve 
or be associated with any real property or personal property owned or leased by the City. Such 
notice must be given seven business days prior to commencement of the services by the 
Contractor for a third party, or seven business days prior to an adverse action as defined below. 
Written notice and disclosure must be sent to the City’s Purchasing and Materials Manager. An 
adverse action under this Agreement includes, but is not limited to: (a) using data as defined in 
the Agreement acquired in connection with this Agreement to assist a third party in pursuing 
administrative or judicial action against the City; or (b) testifying or providing evidence on behalf 
of any person in connection with an administrative or judicial action against the City; or (c) using 
data to produce income for the Contractor or its employees independently of performing the 
services under this Agreement, without the prior written consent of the City. Contractor 
represents that except for those persons, entities, and projects identified to the City, the 
services performed by the Contractor under this Agreement are not expected to create an 
interest with any person, entity, or third party project that is or may be adverse to the City’s 
interests. Contractor's failure to provide a written notice and disclosure of the information as 
set forth in this Section constitute a material breach of this Agreement. 
 
5.25 Data Confidentiality and Data Security. As used in the Agreement, data means all 
information, whether written or verbal, including plans, photographs, studies, investigations, audits, 
analyses, samples, reports, calculations, internal memos, meeting minutes, data field notes, work 
product, proposals, correspondence and any other similar documents or information prepared by, 
obtained by, or transmitted to the Contractor or its subcontractors in the performance of this 
Agreement. The Parties agree that all data, regardless of form, including originals, images, and 
reproductions, prepared by, obtained by, or transmitted to the Contractor or its subcontractors in 
connection with the Contractor's or its subcontractor’s performance of this Agreement is 
confidential and proprietary information belonging to the City. Except as specifically provided in this 
Agreement, Contractor or its subcontractors must not divulge data to any third party without the 
City’s prior written consent. Contractor or its subcontractors must not use the data for any purposes 
except to perform the services required under this Agreement. These prohibitions do not apply to 
the following data provided to the Contractor or its subcontractors have first given the required 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 8 of 96 
 
notice to the City: (a) data which was known to the Contractor or its subcontractors prior to its 
performance under this Agreement unless such data was acquired in connection with work 
performed for the City; or (b) data which was acquired by the Contractor or its subcontractors in its 
performance under this Agreement and which was disclosed to the Contractor or its subcontractors 
by a third party, who to the best of the Contractor's or its subcontractors knowledge and belief, had 
the legal right to make such disclosure and the Contractor or its subcontractors are not otherwise 
required to hold such data in confidence; or (c) data which is required to be disclosed by virtue of 
law, regulation, or court order, to which the Contractor or its subcontractors are subject. In the event 
the Contractor or its subcontractors are required or requested to disclose data to a third party, or 
any other information to which the Contractor or its subcontractors became privy as a result of any 
other contract with the City, the Contractor must first notify the City as set forth in this Section of 
the request or demand for the data. The Contractor or its subcontractors must give the City 
sufficient facts so that the City can be given an opportunity to first give its consent or take such 
action that the City may deem appropriate to protect such data or other information from 
disclosure. Unless prohibited by law, within ten calendar days after completion or termination of 
services under this Agreement, the Contractor or its subcontractors must promptly deliver, as set 
forth in this Section, a copy of all data to the City. All data must continue to be subject to the 
confidentiality agreements of this Agreement. Contractor or its subcontractors assume all liability 
to maintain the confidentiality of the data in its possession and agrees to compensate the City if any 
of the provisions of this Section are violated by the Contractor, its employees, agents or 
subcontractors. Solely for the purposes of seeking injunctive relief, it is agreed that a breach of this 
Section must be deemed to cause irreparable harm that justifies injunctive relief in court. Contractor 
agrees that the requirements of this Section must be incorporated into all subcontracts entered 
into by Contractor. A violation of this Section may result in immediate termination of this Agreement 
without notice. 
 
5.26 Personal Identifying Information-Data Security. Personal identifying information, financial 
account information, or restricted City information, whether electronic format or hard copy, 
must be secured and protected at all times by Contractor and any of its subcontractors. At a 
minimum, Contractor must encrypt or password-protect electronic files. This includes data 
saved to laptop computers, computerized devices, or removable storage devices. When 
personal identifying information, financial account information, or restricted City information, 
regardless of its format, is no longer necessary, the information must be redacted or destroyed 
through appropriate and secure methods that ensure the information cannot be viewed, 
accessed, or reconstructed. In the event that data collected or obtained by Contractor or its 
subcontractors in connection with this Agreement is believed to have been compromised, 
Contractor or its subcontractors must immediately notify the City contact. Contractor agrees 
to reimburse the City for any costs incurred by the City to investigate potential breaches of this 
data and, where applicable, the cost of notifying individuals who may be impacted by the 
breach. Contractor agrees that the requirements of this Section must be incorporated into all 
subcontracts entered into by Contractor. It is further agreed that a violation of this Section must 
be deemed to cause irreparable harm that justifies injunctive relief in court. A violation of this 
Section may result in immediate termination of this Agreement without notice. The obligations 
of Contractor or its subcontractors under this Section must survive the termination of this 
Agreement. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 9 of 96 
 
5.27 Jurisdiction and Venue. This Agreement is made under, and must be construed in 
accordance with and governed by the laws of the State of Arizona without regard to the 
conflicts or choice of law provisions thereof. Any action to enforce any provision of this 
Agreement or to obtain any remedy with respect hereto must be brought in the courts located 
in Maricopa County, Arizona, and for this purpose, each Party hereby expressly and irrevocably 
consents to the jurisdiction and venue of such court. 
 
5.28 Survival. All warranties, representations, and indemnifications by the Contractor must 
survive the completion or termination of this Agreement. 
 
5.29 Modification. Except as expressly provided herein to the contrary, no supplement, 
modification, or amendment of any term of this Agreement will be deemed binding or effective 
unless in writing and signed by the Parties.  
 
5.30 Severability. If any provision of this Agreement or the application to any person or 
circumstance may be invalid, illegal or unenforceable to any extent, the remainder of this 
Agreement and the application will not be affected and will be enforceable to the fullest extent 
permitted by law. 
 
5.31 Integration. This Agreement contains the full agreement of the Parties. Any prior or 
contemporaneous written or oral agreement between the Parties regarding the subject matter 
is merged and superseded. 
 
5.32 Time is of the Essence. Time of each of the terms, covenants, and conditions of this 
Agreement is hereby expressly made of the essence. 
 
5.33 Date of Performance. If the date of performance of any obligation or the last day of any 
time period provided for should fall on a Saturday, Sunday, or holiday for the City, the 
obligation will be due and owing, and the time period will expire, on the first day after which is 
not a Saturday, Sunday or legal City holiday. Except as may otherwise be set forth in this 
Agreement, any performance provided for herein will be timely made if completed no later 
than 5:00 p.m. (Chandler time) on the day of performance. 
 
5.34 Delivery.  All prices are F.O.B. Destination and include all delivery and unloading at the 
specified destinations.  The Contractor will retain title and control of all goods until they are 
delivered and accepted by the City.  All risk of transportation and all related charges will be the 
responsibility of the Contractor.  All claims for visible or concealed damage will be filed by the 
Contractor.  The City will notify the Contractor promptly of any damaged goods and will assist 
the Contractor in arranging for inspection. 
 
5.35 Third Party Beneficiary. Nothing under this Agreement will be construed to give any rights 
or benefits in the Agreement to anyone other than the City and the Contractor, and all duties 
and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive 
benefit of City and the Contractor and not for the benefit of any other party. 
 
5.36 Conflict in Language. All work performed must conform to all applicable City of Chandler 
codes, ordinances, and requirements as outlined in this Agreement. If there is a conflict in 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 10 of 96 
 
interpretation between provisions in this Agreement and those in the Exhibits, the provisions 
in this Agreement prevail. 
 
5.37 Document/Information Release. Documents and materials released to the Contractor, 
which are identified by the City as sensitive and confidential, are the City’s property. The 
document/material must be issued by and returned to the City upon completion of the services 
under this Agreement. Contractor’s secondary distribution, disclosure, copying, or duplication 
in any manner is prohibited without the City’s prior written approval. The document/material 
must be kept secure at all times. This directive applies to all City documents, whether in 
photographic, printed, or electronic data format.  
 
5.38 Exhibits. The following exhibits are made a part of this Agreement and are incorporated 
by reference: 
 
Exhibit A - Scope of Services 
 
Exhibit E – Wage Decision 
Exhibit B – Price Sheet 
 
 
Exhibit F – Cabinet Specifications 
Exhibit C - Insurance Requirements 
Exhibit G1-G2 – Bond Forms 
Exhibit D - Special Conditions  
 
Exhibit H – HUD Forms 
 
5.39 Special Conditions. As part of the services Contractor provides under this Agreement, 
Contractor agrees to comply with and fully perform the special terms and conditions set forth 
in Exhibit D, which is attached to and made a part of this Agreement. 
 
5.40 Cooperative Use of Agreement.  In addition to the City of Chandler and with approval of 
the Contractor, this Agreement may be extended for use by other municipalities, school 
districts and government agencies of the State.  Any such usage by other entities must be in 
accordance with the ordinance, charter and/or procurement rules and regulations of the 
respective political entity. 
 
If required to provide services on a school district property at least five times during a month, 
the Contractor will submit a full set of fingerprints to the school of each person or employee 
who may provide such service.  The District will conduct a fingerprint check in accordance with 
A.R.S. 41-1750 and Public Law 92-544 of all Contractors, subcontractors or vendors and their 
employees for which fingerprints are submitted to the District. Additionally, the Contractor will 
comply with the governing body fingerprinting policies of each individual school district/public 
entity.  The Contractor, sub-contractors, vendors and their employees will not provide services 
on school district properties until authorized by the District. 
 
Orders placed by other agencies and payment thereof will be the sole responsibility of that 
agency.  The City will not be responsible for any disputes arising out of transactions made by 
other agencies who utilize this Agreement. 
 
5.41 Non-Discrimination and Anti-Harassment Laws. Contractor must comply with all 
applicable City, state, and federal non-discrimination and anti-harassment laws, rules, and 
regulations. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 11 of 96 
 
5.42 Licenses and Permits. Beginning with the Effective Date and for the full term of this 
Agreement, Contractor must maintain all applicable City, state, and federal licenses and 
permits required to fully perform Contractor’s services under this Agreement. 
 
5.43 Warranties. Contractor must furnish a one-year warranty on all work and services 
performed under this Agreement. Contractor must furnish, or cause to be furnished, a two-
year warranty on all fixtures, furnishings, and equipment furnished by Contractor, 
subcontractors, or suppliers under this Agreement. Any defects in design, workmanship, or 
materials that do not comply with this Agreement must be corrected by Contractor (including, 
but not limited to, all parts and labor) at Contractor’s sole cost and expense. All written 
warranties and redlines for as-built conditions must be delivered to the City on or before the 
City’s final acceptance of Contractor’s services under this Agreement.  
 
5.44 Emergency Purchases.  City reserves the rights to purchase from other sources those 
items, which are required on an emergency basis and cannot be supplied immediately by the 
Contractor. 
 
5.45 Non-Exclusive Agreement. This agreement is for the sole convenience of the City of 
Chandler. The City reserves the right to obtain like goods or services from another source when 
necessary. 
5.46 Performance and Payment Bonds. At the time City issues Notice of Contract Award, Contractor 
must provide a Performance Bond and a Payment Bond, each in an amount equal to the full amount 
of the Contract Price. 
Each such bond must be executed by a surety company or companies holding a Certificate of 
Authority to transact surety business in the State of Arizona, issued by the Director of the Arizona 
Department of Insurance and must be named in the current list of "Companies Holding Certificates 
of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as 
published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury 
Department. A copy of the Certificate of Authority must accompany the bonds. The Certificate must 
have been issued or updated within two (2) years prior to the execution of this Agreement. The 
bonds must be written or countersigned by an authorized representative of the surety who is either 
a resident of the state of Arizona or whose principal office is maintained in this state, as by law 
required. 
The bonds must be made payable and be acceptable to City. The bond forms for the performance 
and payment bonds must be in the forms required under A.R.S. § 34-221, et. Seq., as in Appendices 
4 and 5 of these General Conditions. 
Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering 
payment of obligations arising under the Contract Documents, Contractor must promptly furnish a 
copy of the bonds or must permit a copy to be made. 
All bonds submitted for this Project must be provided by a company which has been rated AM Best 
rating of A- or better for the prior four quarters by the latest edition of the ‘Results Best’s Key Rating 
Guide (Property/Casualty)” published by the A.M. Best Company. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 12 of 96 
 
5.47 Budget Approval Into Next Fiscal Year.  This Agreement will commence on the Effective Date 
and continue in full force and effect until it is terminated or expires in accordance with the 
provisions of this Agreement.  The Parties recognize that the continuation of this Agreement after 
the close of the City's fiscal year, which ends on June 30 of each year, is subject to the City Council's 
approval of a budget that includes an appropriation for this item as expenditure.  The City does not 
represent that this budget item will be actually adopted. This determination is solely made by the 
City Council at the time Council adopts the budget. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 13 of 96 
 
This Agreement shall be in full force and effect only when it has been approved and executed 
by the duly authorized City officials. 
 
 
FOR THE CITY 
FOR THE CONTRACTOR 
 
By: _________________________________________ 
 
By: _________________________________________ 
 
Its: ____________Mayor_______________________ 
 
Its: _________________________________________ 
 
 
 
 
APPROVED AS TO FORM: 
 
 
By: _________________________________________ 
 
City Attorney  
 
 
ATTEST: 
 
 
By: _________________________________________ 
 
City Clerk 
 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D
President

Page 14 of 96 
 
EXHIBIT A TO AGREEMENT 
SCOPE OF SERVICES 
PUBLIC HOUSING KITCHEN AND BATH CABINET REPLACEMENT  
 
INTRODUCTION 
Contractor shall replace kitchen cabinets and bath vanities and countertops at 15 public housing 
homes.  The Contractor shall supply all materials, equipment, labor, services, and transportation 
required to perform the work in a complete and professional manner. Selected Contractor shall comply 
with the HUD special requirements as noted in the HUD documents attached to and included herein. 
 
The cabinets shall be all plywood construction in the mocha color.   There shall be no engineered 
wood, particleboard, flake board, fiberboard, or hardboard in the construction of the cabinets.  
Cabinets shall bear the KCMA Certification Seal and additional label indicating conformance to Federal 
Severe Use specifications. 
      
This project is funded by the Department of Housing & Urban Development (HUD).  The Contractor 
shall comply with the HUD requirements as noted in the HUD documents included as part of this bid 
packet.  This is a Labor Standards Act, Davis-Bacon and Related Acts (DBRA) wage rate project.  Workers 
shall be paid the minimum wage rate and fringe benefits for the work classification being performed. 
 
1 SCOPE OF WORK:  The work under this contract will be performed on 15 Public Housing homes 
buildings listed in the Pricing Sheet (Exhibit B).     
 
The work under this contract shall include the removal and replacement of all existing 
cabinets/vanity, countertops, sinks, faucets, shut-off valves, pipe, escutcheons, supply lines, sink 
drain/traps, range hoods, plumbing fittings, trim, and other misc. items required to complete this 
project.  The cabinets shall be all plywood construction.  
 
Contractor is responsible for the proper disposal of all demolished material from this project.  The 
replacements of cabinets/vanity, countertops, and trim materials shall be with new materials as 
specified in these documents.  
 
All demolition and replacement work shall be performed in accordance with applicable rules, 
regulations, codes, and ordinances of local, State and Federal authorities.   
 
1.1 DEMOLITION : 
 
1.1.1 Contractor will remove and properly dispose of all existing cabinets, countertops, and 
trim materials. 
1.1.2 Contractor will remove all damaged or deteriorated (i.e. water, mold) drywall from 
behind cabinets. 
1.1.3 Contractor will remove and dispose of all old supply valves, supply lines, traps and 
other old plumbing fittings. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 15 of 96 
RFP Revised 07_16 
 
1.1.4 Contractor will inspect, and where required, snake all sink drains to the point where 
they enter the main sewer line.  
 
1.2 WALL CABINETS: 
 
1.2.1 Color: Mocha 
1.2.2 Cabinets are to be centered within the designated opening, and installed plumb and 
level.   
1.2.3 There will be no spaces between cabinets.   
1.2.4 There are to be enough screws, of sufficient length and diameter to support each 
cabinet under heavy load.   
1.2.5 All screws will have a beveled chrome or gold washer installed under the head.  All 
unused screw holes will be filled with matching color wood filler.   
1.2.6 All cabinets will be trimmed out so that no space exists between cabinet and wall, 
ceiling or soffit.  
1.2.7 All trim and filler material will match new cabinets, and be sufficiently nailed to 
prevent movement.  Trim material will be cut and fitted so as to provide tight, square 
fit.   
1.2.8 All doors are to be adjusted to close evenly, and have equal reveal.   
1.2.9 All cabinet doors and drawers will have factory installed rubber bumpers to cushion 
and quite door and drawer operation.   
1.2.10 Cabinets are not to be modified in any way. 
1.2.11 On houses where there is no existing soffit, the contractor will construct soffit as 
required as part of his/her bid. 
1.2.12 Contractor will seal all cracks or other openings around cabinets, countertops, ducts, 
floors, pipes, drains, etc. to prevent the entrance of insects.   
1.2.13 All caulking will be mildew proof, and installed in a neat and professional manor.   
1.2.14 Caulking will not exceed in width the manufacturer’s specifications. 
 
1.3 BASE CABINETS: 
 
1.3.1 Color: Mocha 
1.3.2 Cabinets are to be centered within the designated opening, and installed plumb and 
level.   
1.3.3 There will be no spaces between cabinets.   
1.3.4 There are to be enough screws, of sufficient length to support the cabinet at top and 
bottom, and hold cabinet firmly against the wall.   
1.3.5 All screws will have a beveled chrome or gold washer installed under the head.   
1.3.6 All unused screw holes will be filled with matching color wood filler.   
1.3.7 All cabinets will be trimmed out so that no space exists between cabinet and end 
walls.   
1.3.8 All trim and filler material will match new cabinets, and be sufficiently nailed to 
prevent movement.  Trim material will be cut and fitted so as to provide tight, square 
fit.   
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 16 of 96 
RFP Revised 07_16 
 
1.3.9 All doors and drawers are to be adjusted to close evenly, and have equal reveal.  
1.3.10 All openings in cabinet backs will be cut with an opening just large enough for 
plumbing and/or electrical box to enter.   
1.3.11 All openings will be sealed with a mildew proof clear caulk prior to installing 
escutcheons or covers.  Cabinets are not to be modified in any way. 
1.3.12 Contractor will be responsible for drilling or cutting properly sized openings in cabinet 
backs to allow for drains, supply lines, and clean-outs.   
1.3.13 Contractor will supply and install properly sized escutcheons around all drains, supply 
lines, and cleanouts. 
1.3.14 All peninsulas and islands (uppers & lowers) will have finished backs.   
1.3.15 Material will match cabinets is color and grain. 
1.3.16 All wood that will come into contact with the floor will be treated lumber.   
1.3.17 Contractor will install (if not existing) VCT under all base cabinets before installation.   
1.3.18 Contractor will match existing VCT in size and color.   
1.3.19 If existing VCT is no longer available, the Project Manager will make the final 
determination. 
1.3.20 Contractor will seal all cracks or other openings around cabinets, countertops, ducts, 
floors, pipes, drains, etc. to prevent the entrance of insects.   
1.3.21 All caulking will be mildew proof, and installed in a neat and professional manor.   
1.3.22 Caulking will not exceed in width the manufacturer’s specifications. 
1.3.23 New cabinets will cover no existing clean-outs.   
1.3.24 All clean-outs will be extended (where necessary) so as to extend inside the new 
cabinet, leaving enough room for a cap or plug, and escutcheons to be installed. 
1.3.25 Contractor will properly close and seal any wall openings located behind cabinets 
before installing new cabinets. 
 
1.4 Kitchen Countertops 
 
1.4.1 Color: Milano Quartz or a color pattern that closely matches. 
1.4.2 Type: Post Formed with integral backsplashes, Radius Corners, Continuous Laminate, 
Flat Roll Front Edge, ¾” Plywood.    
1.4.3 No particleboard, pressed board, fiberboard, etc. 
1.4.4 Countertops are to be installed level, both side to side and front to back.   
1.4.5 Corners (45 deg.) will be glued and screwed tightly together so as to provide an 
apparent invisible seam.   
1.4.6 Wall scoring will be kept to a minimum.   
1.4.7 Space between countertop and wall will not exceed ¼” and will be filled with a mildew 
proof, paintable caulk (color to match countertop).   
1.4.8 All other areas between countertop and walls will be sealed with a mildew proof, 
paintable caulk (color to match countertop). 
 
 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 17 of 96 
RFP Revised 07_16 
 
1.5 FLOORS 
 
1.5.1 In the event the new cabinets do not overlap the existing floor tile, they will match the 
existing floor tile as close as possible to cover all exposed concrete.   
1.5.2 Old tile will be removed back to first seem.    
1.5.3 Contractor will match existing VCT in size and color.   
1.5.4 If existing VCT is no longer available, the Project Manager will make the final 
determination as to color. 
1.5.5 Armstrong – Imperial Tile, 1/8 inch, 12” x 12”; Color: match existing.  VCT adhesive will 
not contain any asbestos. 
1.5.6 Floor will be free of any material that could result in an uneven finish on new tile. 
 
1.6 WALLS 
 
1.6.1 In the event the new cabinets and/or countertops do not cover the same area as the 
old cabinets or countertops, the contractor (as part of this project, and at no 
additional cost to the City) will clean, repair, texture (to match existing), and repaint all 
such areas so as to blend in and match the finished walls.  Contractor will supply 
paint.   
1.6.2 All painting will be from corner to corner or edge to edge. 
1.6.3 Contractor will supply, replace, prime & paint any missing or damaged wood 
baseboard located within the kitchen. 
 
1.7 PLUMBING & FIXTURES 
  
1.7.1 Contractor will supply and install new stainless steel sinks, three-hole, 8-inch depth, 
18 Ga. kitchen sink in each unit. 
1.7.2 Contractor will supply and install new Moen “or equal” double handle kitchen faucet.  
1.7.3 Sink rims are to be caulked prior to installation, using a mildew proof caulk. 
1.7.4 Contractor will supply and install new bathroom sink.   
1.7.5 The new bathroom sink will be oval in shape and an integral part of the countertop.  
1.7.6 The contractor will install a new Moen “or equal” double handle bathroom faucet.  
1.7.7 Any plumbing moves, adjustments, special fittings, upgrades, etc., required to provide 
a complete and professional cabinet and sink install will be the responsibility of the 
contractor, and included in the contractor’s bid. 
1.7.8 If none exist, the contractor will install a clean-out in the sink base cabinet. 
1.7.9 During this project, the contractor will replace all the following: 
1.7.9.1 New ¼ turn angle stops, brass/chrome.  No plastic valves will be used. 
1.7.9.2 New flexible braided stainless steel supply lines. 
1.7.9.3 New 17 Ga. chrome plated traps & drain from sink to wall. 
1.7.9.4 New baskets and strainers. 
1.7.9.5 New chrome escutcheons on supply and drain lines. 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 18 of 96 
RFP Revised 07_16 
 
1.8 RANGE HOODS 
 
1.8.1 Contractor shall install a new Broan “or equal” 30 inch, 7 inch round duct, light and 2-
speed fan, white, in each unit. 
1.8.2 Contractor will supply and install new range hoods mounted no less than 30 inches 
from the stove cooking top.   
1.8.3 A preformed flange will be installed around the ductwork where it enters or exits the 
wall cabinet to cover and seal opening.  
 
1.9 ELECTRICAL 
 
1.9.1 New cabinets or countertop will cover no existing electrical outlet, junction box or 
switch.  Contractor will move or remove any such device for the proper installation of 
cabinets.  
1.9.2 No live wiring will be permitted except in an approved junction box with cover and is 
located in an accessible area. 
 
2 HUD CABINET STANDARDS 
 
2.1.1 Comply with the following Reference Standards: 
2.1.1.1 1. Cabinets: 
a. HUD Minimum Property standards for Housing. 
b. ANSI/KCMA A161.1 - Recommended Performance and Construction 
Standards for 
2.1.1.2 Kitchen and Vanity Cabinets. 
A. Plywood: 
a. ANSI/HPMA HP - Hardwood and Decorative Plywood 
b. US Product Standard PS 1 - Softwood Plywood, Construction and 
Industrial 
B.   Pressure Treating Lumber: AWPA Standard C2 - Lumber, Timbers, Bridge 
Ties and Mine Ties - Preservative Treatment by Pressure Process. 
2.1.1.3 Cabinet Hardware: ANSI/BHMA A156.9 Cabinet Hardware. 
2.1.1.4 Plastic Laminate Countertops: ANSI 161.2 - Performance Standards for 
Fabricated High-pressure Decorative Laminate Countertops. 
a. Plastic Laminate: NEMA Standards Publication No. LD 3 - High-Pressure 
Decorative Laminates. 
2.1.1.5 Joint Sealant: 
a. Federal Specification (FS) TT-S-001543A - Sealing Compound: Silicone 
Rubber Base (For Calking, Sealing, and Glazing in Buildings and other 
Structures). 
b. ASTM C920 - Elastomeric Joint Sealants. 
2.1.1.6 Certification: 
a. 
ANSI Z34.1 - Certification, Third party Certification Program. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 19 of 96 
RFP Revised 07_16 
 
2.1.2 Performance Requirements: 
2.1.2.1 Comply with test procedures and required performances of ANSI/KCMA 
A161.1. 
a. Perform tests on standard 30-inch wall and base cabinets. 
2.1.2.2 Drawers and Drawer Hardware for Federal Severe Use: Apply 75-pound point 
load to exterior edge of drawer extended 6-inches from its closed position 
for a period of 15 minutes.  
a. Successful Test: No failure in any part of drawer assembly or operating 
system, and drawer remains operable with no mechanical interference with 
any part of cabinet assembly. 
 
2 PROJECT LOCATION:   
 
2.1 This contract provides for the immediate replacement of kitchen & bath cabinets and 
countertops at 15 housing units.   All buildings are located within the City of Chandler.  
 
3 PERMITS & LICENSING:   
 
3.1 The scope or work as described in these contract documents do not require a building 
permit from the City of Chandler.  The selected Contractor is responsible for any other 
permitting and licensing required by Federal, State and Local agencies associated with this 
project and roofing services.     
 
4 WORK SCHEDULE: 
 
4.1 Contractor will only be allowed to work Monday through Friday between the hours of 7:00 
AM to 4:00 PM, excluding City holidays.  Exceptions would be for work deemed by the Project 
Manager as an emergency or requiring immediate attention. 
4.2 These are occupied units with children; the Contractor will be required to remove all 
equipment, materials, and debris from the site on a daily basis. 
4.3  Work will need to be scheduled and coordinated in a timely manner so no home is left 
overnight or weekends without water and electric. 
4.4 The Contractor must supply a sufficient number of skilled workers in order to maintain 
quality of work, and stay on schedule. 
 
5 RESIDENT NOTIFICATION:  
 
5.1 Prior to starting any work, the Contractor must re-notify each resident, in writing, a minimum 
of 72 hours in advance, prior to entering his or her property.   This will be accomplished with 
either a 3-part door hanger (in both English & Spanish) to be left on each door accessible 
from the front of the property, or a mailed letter (in both English & Spanish).  If mailed letter 
is used, the Contractor must allow for sufficient transit time.  Door hanger or letter will 
include the following (minimum) information: Reference Type Work (cabinet replacement) 
Being Done (for The City of Chandler), Notice Date, Project Address, Project Start Date, 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 20 of 96 
RFP Revised 07_16 
 
Project Completion Date, Work Hours, Special Instructions , Name / Address / Phone Number 
of Company, Contact Person, and 24 Hour Emergency Phone Number.  Door Hanger or 
Letter must be pre-approved by the Project Manager prior to being used.  A copy of each 
door hanger or letter will be provided to the Project Manager. 
5.2 In the event that the Contractor is unable to start a previously notified unit (i.e. rain, labor 
dispute, material shortage, schedule change, lack of manpower, etc.), the contractor will be 
required to re-notify that resident with another 72-hour door hanger or letter.  
 
6 CONTRACTOR QUALIFICATIONS:   
 
6.1 The Contractor or Subcontractor performing the work shall have an Arizona Registrar of 
CR60 Contractors license. 
6.2 The Contractor or Subcontractor performing the work shall have a minimum of five (5) years 
of experience as a licensed Arizona Contractor. 
6.3 Proof of the above-mentioned Contractor qualifications must be included with the bid 
submittal.  
 
7 POST AWARD SUBMITTALS: 
 
7.1 Before ordering cabinets Contractor will be required to submit the Contract Administrator 
for approval one complete base cabinet (see cabinet specification section) with at least one 
door and one drawer, and one complete wall cabinet, in the specified finish & color, a section 
of countertop, along with documentation that this sample and all cabinets and countertops 
that follow are HUD Approved Severe-Use. 
7.2 Contractor will be required to submit shop drawings of each kitchen layout showing size, 
type, and location of cabinets, countertops, and range hoods.  
7.3 Design/layout of each kitchen shall be consistent with current layout where specifications 
permit. The Project Manager must approve all design changes. 
7.4 Contractor will submit cut sheets for sinks, faucets, and stove exhaust fan for approval 
7.5 Bidder / contractor shall be responsible for quantities of cabinets and countertop and all 
conditions based on inspection prior to bid due date. 
7.6 All required HUD documentation indicated in these Contract documents must be read, 
properly completed, signed, and returned. 
7.7 Certified Payroll Reports are due weekly.  
7.8 Section 3 forms are due with each pay application.  Other HUD forms as directed by the 
Housing Project Coordinator 
7.9 
Manufacturer’s warranty on cabinet’s materials after final acceptance. 
7.10 Contractor will provide in writing a full warranty on installed work, agreeing to repair or replace 
defective workmanship or related materials, at no additional cost to the Owner.     
7.11 Tenant notification sample letter or door hanger in English and Spanish for Project 
Coordinator approval. 
7.12 Contractor shall provide a safety action plan for review and approval by the City.  
7.13 Contractor will provide a written record of all work completed, locations, measurements, 
sizes, and detailed drawings    
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 21 of 96 
RFP Revised 07_16 
 
8 QUALITY CONTROL 
 
8.1 
Source limitations for cabinets: Obtain cabinets through one source from a single 
manufacturer. 
8.2 
Certifications: 
8.2.1 Cabinets: Continuously tested, certified and displaying label or seal of Kitchen 
Cabinet Manufacturers Association (KCMA)  
8.2.2 Federal Severe Use Cabinets: Bear KCMA Certification Seal and additional label 
indicating conformance to Federal Severe Use specifications. 
8.3 
All material shall be new and of the specified quality. 
8.4 
Contractor will install all material per manufactures recommendations, specifications, and 
code requirements. 
8.5 
Contractor will verify finish and color match before installing any cabinets.  All new cabinets 
will match in color and grain.  This will include cabinet fronts (stiles), doors, and drawer 
fronts.   
8.6 
Finished cabinets and countertops will be free of nicks, scratches or other blemishes (see 
cabinet specifications section).   
8.7 
The project manager reserves the right to reject any cabinet(s) that does not match in color 
or grain.  It will be the contractor’s responsibility to remove and replace rejected cabinets at 
the contractor’s expense.  
8.8 
The project manager will have the right to reject all cabinets that do not match or meet 
construction specifications. 
8.9 
Contractor will correct or replace at no additional expense to the City. 
8.10 The Contractor must supply a sufficient number of skilled workers in order to maintain 
quality of work, and stay on schedule. 
8.11 The Contractor must have on site at all times a project manager, foreman, or lead worker 
who is capable and authorized to make decisions on behalf of the contractor. 
8.12  All material shall be new free of material defects, and of the specified quality.  
8.13 
Where not more specifically described in any of the contract documents, workmanship 
shall  
conform to all of the methods and operations of best standards and accepted 
practices of the  
trade or trades involved, and shall include all items of fabrication, 
construction, or installation  
regularly furnished or required for completion of the services.  
All work shall be executed by  
personnel skilled in their respective lines of work. 
 
9 SAFETY AND SITE PROTECTION  
 
9.1 
This project occurs on occupied Public Housing sites and the protection of the residents is 
essential.  The dwelling units will be occupied during construction.  It is the responsibility of 
the Contractor to secure and make safe each unit during construction. 
9.2 
Contractor shall be responsible for cleaning, repairing, or replacement of any damage to the 
City’s and/or resident’s property caused by the Contractor or Subcontractor(s) during the 
removal or installation of the items associated with this project. 
9.3 
The Contractor will be responsible for immediately notifying the Housing Project 
Coordinator of any damage caused by the Contractor during contract activities. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 22 of 96 
RFP Revised 07_16 
 
 
10 SPECIAL CONSIDERATIONS AND CONTRACTOR RESPONSIBILITIES:  
  
10.1 
Coordinate work so each unit has a functioning kitchen sink and/or bathroom sink by the 
end of the day. 
10.2 
Contractor will be responsible for removing and reinstalling the range and refrigerator 
during construction.  Refrigerator shall be located so it can be plugged in and used by the 
resident during construction. 
10.3 
Contractor will have to provide his/her own storage facilities.  There will be no on site 
storage available on this project. 
 
11 CLEANUP 
 
11.1 
All debris will be removed from the site on a daily basis.  City dumpsters and/or resident 
trash containers will not be used for the disposal of any construction related material.   
11.2 
It is the contractor’s responsibility to dispose of all material in an approved and lawful 
method. 
11.3 
Contractor will not sell or give any new or used materials to the residents. 
11.4 
Contractor will be responsible for cleaning, repairing, or replacement of any resident 
property damaged during this project. 
11.5 
Protect existing carpet and tile during construction from damage, dirt, water, etc.  
Contractor will be responsible for cleaning, repair, or replacement of any damaged carpet 
or tile. 
 
12 CONTRACTOR’S USE OF PREMISES 
 
12.1 
The Contractor’s employees shall be identified by company shirt and identification badge.  
12.2 
The Contractor shall provide his/her own storage facilities.  There will be no on site storage 
on this project.   
12.3 
The Contractor shall furnish restroom facilities for employees, or make other 
arrangements with workers as where to report for restroom facilities.  Resident and on site 
public restrooms are not to be used.  
12.4 
The Contractor shall provide his/her own power for equipment and tools.  Residents pay 
for their own electricity therefore the use of onsite electricity/outlets is not permitted.   
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 23 of 96 
 
 
 
EXHIBIT B TO AGREEMENT 
PRICING 
 
ADDRESS 
KITCHEN 
 
COUNTER 
TOP 
VANITY 
1 
VANITY 
2 
KITCHEN 
SINK 
VANITY 
SINK(S) 
PLUMBING 
ACCESSORIES 
95 S. 132nd St. 
$4,569.00  
$2,741.00  
$1,654.00  
$1,621.00  
$1,846.00  
$1,846.00  
$1,846.00  
714 E. Laredo St. 
$4,853.00  
$3,185.00  
$1,874.00  
NA 
$1,779.00  
$1,854.00  
$1,846.00  
2617 E. Commonwealth Cir. 
$5,339.00  
$3,032.00  
$1,671.00  
$1,671.00  
$1,621.00  
$1,846.00  
$1,846.00  
1940 N. Illinois St. 
$6,625.00  
$2,984.00  
$1,686.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
1319 N. Dakota St. 
$4,762.00  
$2,832.00  
$1,671.00  
NA 
$1,846.00  
$1,846.00  
$1,671.00  
725 W. Gail Dr. 
$5,167.00  
$3,388.00  
$1,686.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
784 N. Alma School Rd. 
$6,024.00  
$3,608.00  
$1,671.00  
$1,671.00  
$1,621.00  
$1,846.00  
$1,846.00  
857 N. Evergreen St. 
$5,848.00  
$3,388.00  
$1,686.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
98 W. Oakland St. 
$4,902.00  
$2,606.00  
$1,844.00  
NA 
$1,779.00  
$1,646.00  
$1,846.00  
298 N. Nebraska St. 
$6,052.00  
$3,242.00  
$1,671.00  
NA 
$1,621.00  
$1,846.00  
$1,846.00  
2104 W. Detroit St. 
$5,163.00  
$3,073.00  
$2,011.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
2226 W. Monroe St. 
$5,233.00  
$3,087.00  
$1,686.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
2305 W. Stottler Drive 
$4,407.00  
$3,385.00  
$1,836.00  
$1,726.00  
$1,621.00  
$1,846.00  
$1,846.00  
1750 W. Mariposa Ct. 
$3,750.00  
$3,008.00  
$1,686.00  
$1,686.00  
$1,621.00  
$1,846.00  
$1,846.00  
1218 W. Erie St. 
$4,493.00  
$3,732.00  
$1,786.00  
$2,011.00  
$1,621.00  
$1,846.00  
$1,846.00  
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 24 of 96 
 
EXHIBIT C TO AGREEMENT 
INSURANCE 
INSURANCE  
 
General. 
 
A. 
At the same time as execution of this Agreement, the Contractor shall furnish the City a 
certificate of insurance on a standard insurance industry ACORD form.  The ACORD form 
must be issued by an insurance company authorized to transact business in the State of 
Arizona possessing a current A.M. Best, Inc. rating of A-7, or better and legally authorized to 
do business in the State of Arizona with policies and forms satisfactory to City.  Provided, 
however, the A.M. Best rating requirement shall not be deemed to apply to required Workers’ 
Compensation coverage.  
 
B. 
The Contractor and any of its subcontractors shall procure and maintain, until all of their 
obligations have been discharged, including any warranty periods under this Agreement are 
satisfied, the insurances set forth below. 
 
C. 
The insurance requirements set forth below are minimum requirements for this Agreement 
and in no way limit the indemnity covenants contained in this Agreement. 
 
D. 
The City in no way warrants that the minimum insurance limits contained in this Agreement 
are sufficient to protect Contractor from liabilities that might arise out of the performance 
of the Agreement services under this Agreement by Contractor, its agents, representatives, 
employees, subcontractors, and the Contractor is free to purchase any additional insurance 
as may be determined necessary. 
 
E. 
Failure to demand evidence of full compliance with the insurance requirements in this 
Agreement or failure to identify any insurance deficiency will not relieve the Contractor from, 
nor will it be considered a waiver of its obligation to maintain the required insurance at all 
times during the performance of this Agreement. 
 
F. 
Use of Subcontractors:  If any work is subcontracted in any way, the Contractor shall execute 
a written contract with Subcontractor containing the same Indemnification Clause and 
Insurance Requirements as the City requires of the Contractor in this Agreement. The 
Contractor is responsible for executing the Agreement with the Subcontractor and obtaining 
Certificates of Insurance and verifying the insurance requirements. 
 
Minimum Scope and Limits of Insurance.  The Contractor shall provide coverage with limits of liability not 
less than those stated below. 
 
A. 
Commercial General Liability-Occurrence Form.  Contractor must maintain “occurrence” form 
Commercial General Liability insurance with a limit of not less than $2,000,000 for each 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 25 of 96 
RFP Revised 07_16 
 
occurrence, $4,000,000 aggregate.  Said insurance must also include coverage for products 
and completed operations, independent contractors, personal injury and advertising injury. 
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess 
insurance must be “follow form” equal or broader in coverage scope than underlying 
insurance. 
 
B. 
Automobile Liability-Any Auto or Owned, Hired and Non-Owned Vehicles 
Vehicle Liability:  Contractor must maintain Business/Automobile Liability insurance with a 
limit of $1,000,000 each accident on Contractor owned, hired, and non-owned vehicles 
assigned to or used in the performance of the Contractor’s work or services under this 
Agreement.  If any Excess or Umbrella insurance is utilized to fulfill the requirements of this 
paragraph, the Excess or Umbrella insurance must be “follow form” equal or broader in 
coverage scope than underlying insurance. 
 
 
C. 
Workers Compensation and Employers Liability Insurance:  Contractor must maintain Workers 
Compensation insurance to cover obligations imposed by federal and state statutes having 
jurisdiction of Contractor employees engaged in the performance of work or services under 
this Agreement and must also maintain Employers’ Liability insurance of not less than 
$1,000,000 for each accident and $1,000,000 disease for each employee. 
 
 
D. 
Builders’ Risk/Installation Floater Insurance.  The Contractor bears all responsibility for loss to 
all equipment or Work under construction.  Unless waived in writing by the City the 
Contractor will purchase and maintain in force Builders’ Risk/Installation Floater insurance 
on the entire Work until completed and accepted by the City.  This insurance will be Special 
Causes of Loss policy form, (minimally including perils of fire, flood, lightning, explosion, 
windstorm and hail, smoke, aircraft and vehicles, riot and civil commotion, theft, vandalism, 
malicious mischief, and collapse), completed value, replacement cost policy form equal to 
the contract price and all subsequent modifications.  The Contractor’s Builders’ 
Risk/Installation Floater insurance must be primary and not contributory. 
1. Builders’ Risk/Installation Floater insurance must cover the entire Work including 
reasonable compensation for architects and Contractors’ services and expenses and 
other “soft costs” made necessary by an insured loss.  Builders’ Risk/Installation Floater 
insurance must provide coverage from the time any covered property comes under the 
Contractor’s control and or responsibility, and continue without interruption during 
course of construction, renovation and or installation, including any time during which 
any project property or equipment is in transit, off site, or while on site for future use or 
installation.  Insured property must include, but not be limited to, scaffolding, false work, 
and temporary buildings at the site.  This insurance must also cover the cost of removing 
debris, including demolition as may be legally required by operation of any law, 
ordinance, regulation or code. 
2. The Contractor must also purchase and maintain Boiler and Machinery insurance with 
the same requirements as Builders’ Risk/Installation Floater insurance cited above if the 
Work to be performed involves any exposures or insurable property normally covered 
under a Boiler and Machinery insurance policy or made necessary as required by law or 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 26 of 96 
RFP Revised 07_16 
 
testing requirements in the performance of this Contract/Agreement.  The Contractor will 
be responsible for any and all deductibles under these policies and the Contractor waives 
all rights of recovery and subrogation against the City under the Contractor’s Builders’ 
Risk/Installation Floater insurance described herein. 
3. Builders’ Risk/Installation Floater Insurance must be maintained until whichever of the 
following first occurs: (i) final payment has been made; or, (ii) until no person or entity, 
other than the City, has an insurable interest in the property required to be covered. 
a. The Builders’ Risk/Installation Floater insurance must be endorsed so that the 
insurance will not be canceled or lapse because of any partial use or occupancy by 
the City. 
b. The Builders Risk/Installation Floater insurance must include as named insureds, the 
City, the Contractor, and all tiers of subcontractors and others with an insurable 
interest in the Work who will be named as additional insureds unless they are able to 
provide the same level of coverage with the City and Contractor named as additional 
insureds. Certificates must contain a provision that the insurance will not be canceled 
or materially altered without at least 30 days advance notice to the City.  The City must 
also be named as a Loss Payee under the Builders’ Risk/Installation Floater coverage. 
c. The Builders Risk/Installation Floater insurance must be written using the Special 
Causes of Loss policy form, replacement cost basis. 
d. All rights of subrogation under the Builders Risk/Installation Floater insurance are, by 
this Contract/Agreement, waived against the City, its officers, officials, agents and 
employees. 
e. The Contractor is responsible for payment of all deductibles under the Builders’ 
Risk/Installation Floater insurance policy. 
 
Additional Policy Provisions Required. 
 
A. Self-Insured Retentions or Deductibles.  Any self-insured retentions and deductibles must be 
declared and approved by the City.  If not approved, the City may require that the insurer reduce 
or eliminate any deductible or self-insured retentions with respect to the City, its officers, 
officials, agents, employees, and volunteers. 
 
1.  The Contractor’s insurance must contain broad form contractual liability coverage. 
 
2.  The Contractor's insurance coverage must be primary insurance with respect to the City, 
its officers, officials, agents, and employees.  Any insurance or self-insurance maintained 
by the City, its officers, officials, agents, and employees shall be in excess of the coverage 
provided by the Contractor and must not contribute to it. 
 
3.  The Contractor's insurance must apply separately to each insured against whom claim is 
made or suit is brought, except with respect to the limits of the insurer's liability. 
 
4.  Coverage provided by the Contractor must not be limited to the liability assumed under 
the indemnification provisions of this Agreement. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 27 of 96 
RFP Revised 07_16 
 
 
5. The policies must contain a severability of interest clause and waiver of subrogation 
against the City, its officers, officials, agents, and employees, for losses arising from Work 
performed by the Contractor for the City. 
 
6.  The Contractor, its successors and or assigns, are required to maintain Commercial 
General Liability insurance as specified in this Agreement for a minimum period of three 
years following completion and acceptance of the Work.  The Contractor must submit a 
Certificate of Insurance evidencing Commercial General Liability insurance during this 
three year period containing all the Agreement insurance requirements, including 
naming the City of Chandler, its agents, representatives, officers, directors, officials and 
employees as Additional Insured as required. 
 
7. If a Certificate of Insurance is submitted as verification of coverage, the City will 
reasonably rely upon the Certificate of Insurance as evidence of coverage but this 
acceptance and reliance will not waive or alter in any way the insurance requirements or 
obligations of this Agreement.   
 
B.  
Insurance Cancellation During Term of Contract/Agreement.  
1. If any of the required policies expire during the life of this Contract/Agreement, the 
Contractor must forward renewal or replacement Certificates to the City within ten days 
after the renewal date containing all the required insurance provisions. 
2.  Each insurance policy required by the insurance provisions of this Contract/Agreement 
shall provide the required coverage and shall not be suspended, voided or canceled 
except after 30 days prior written notice has been given to the City, except when 
cancellation is for non-payment of premium, then ten days prior notice may be given.  
Such notice shall be sent directly to Chandler Law-Risk Management Department, Post 
Office Box 4008, Mailstop 628, Chandler, Arizona 85225. If any insurance company 
refuses to provide the required notice, the Contractor or its insurance broker shall notify 
the City of any cancellation, suspension, non-renewal of any insurance within seven days 
of receipt of insurers’ notification to that effect.  
 
A. 
City as Additional Insured.  The policies are to contain, or be endorsed to contain, the 
following provisions: 
 
1. The Commercial General Liability and Automobile Liability policies are to contain, or be 
endorsed to contain, the following provisions:  The City, its officers, officials, agents, and 
employees are additional insureds with respect to liability arising out of activities 
performed by, or on behalf of, the Contractor including the City's general supervision of 
the Contractor; Products and Completed operations of the Contractor; and automobiles 
owned, leased, hired, or borrowed by the Contractor. 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 28 of 96 
RFP Revised 07_16 
 
2.  The City, its officers, officials, agents, and employees must be additional insureds to the 
full limits of liability purchased by the Contractor even if those limits of liability are in 
excess of those required by this Agreement. 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 29 of 96 
RFP Revised 07_16 
 
EXHIBIT D TO AGREEMENT 
SPECIAL CONDITIONS 
 
ACCESS TO SECURED FACILITIES 
 
Contract Worker Access Controls, Badge and Key Access Requirements. A Contract Worker shall not be 
allowed to begin work in any City facility without: (A) The prior completion and the City's acceptance of the 
required background screening; and (B) when required, the Contract Worker's receipt of a City issued 
badge. A badge will be issued to a Contract Worker solely for access to the City facility(s) to which the 
Contract Worker is assigned. Each Contract Worker who enters a City facility must use the badge issued to 
the Contract Worker. Any and all fees associated with security badging will be assessed in compliance with 
Chandler City Code §4-22. 
 
Key Access Procedures. If the Contract Worker's services require keyed access to enter a City facility(s), a 
separate key issue/return form must be completed and submitted by Contractor for each key issued. 
 
Stolen or Lost Badges or Keys. Contractor shall report lost or stolen badges or keys to the City immediately. 
A new badge application or key issue form shall be completed and submitted along with payment of the 
applicable fees prior to issuance of a new badge or key. 
 
Return of Badges or Keys. All badges and keys are the property of the City and must be returned to the City 
within one business day of when the Contract Worker's access to a City facility is no longer required to 
furnish the services under this Agreement. Contractor shall collect a Contract Worker's badge and key(s) 
upon the termination of the Contract Worker's employment; when the Contract Worker's services are no 
longer required at the particular City facility(s); or upon termination, cancellation or expiration of this 
Agreement. 
 
Contractor's default under this Section shall include, but is not limited to the following: (1) Contract Worker 
gains access to a City facility(s) without the proper badge or key; (2) Contract Worker uses a badge or key 
of another to gain access to a City facility; (3) Contract Worker commences services under this Agreement 
without the proper badge, key or Background Screening; (4) Contract Worker or Contractor submits false 
information or negligently submits wrong information to the City to obtain a badge, key or applicable 
Background Screening; or (5) Contractor fails to collect and timely return Contract Worker's badge or key 
upon termination of Contract Worker's employment, reassignment of Contract Worker to another City 
facility or upon the expiration, cancellation or termination of this Agreement. Contractor acknowledges 
and agrees that the access control, badge and key requirements in this Section are necessary to preserve 
and protect public health, safety and welfare. Accordingly, Contractor agrees to properly cure any default 
under this Section within three business days from the date notice of default is sent by the City. The parties 
agree that Contractor's failure to properly cure any default under this Section shall constitute a breach of 
this Section. In addition to any other remedy available to the City at law or in equity, Contractor shall be 
liable for and shall pay to the City the sum of $1,000.00 for each breach by Contractor of this Section. The 
parties further agree that the sum fixed above is reasonable and approximates the actual or anticipated 
loss to the City at the time and making of this Agreement in the event that Contractor breaches this Section. 
Further, the parties expressly acknowledge and agree to the fixed sum set forth above because of the 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 30 of 96 
RFP Revised 07_16 
 
difficulty of proving the City's actual damages in the event that Contractor breaches this Section. The parties 
further agree that three breaches by Contractor of this Section arising out of any default within a 
consecutive period of three months or three breaches by Contractor of this Section arising out of the same 
default within a period of 12 consecutive months shall constitute a material breach of this Agreement by 
Contractor and the City expressly reserves all of its rights, remedies and interests under this Agreement, 
at law and in equity including, but not limited to, termination of this Agreement. 
 
1. Contractor and Subcontractor Worker Background Screening. Contractor agrees that all 
contract workers and subcontractors (collectively "Contract Worker(s)") that Contractor furnishes 
to City under this Agreement will be subject to background and security checks and screening as 
set forth in this Section (collectively "Background Screening") at Contractor’s sole cost and expense. 
As part of the Background Screening, Contractor must provide to a person designated by the City 
the name(s), address(es), and phone number(s) of all Contract Workers who will provide any 
services under this Agreement. All Contract Workers must comply with these Background 
Screening requirements. All Contract Workers must be able to provide proof of the legal right to 
work in the United States. The Background Screening provided by Contractor must comply with all 
applicable laws, rules, and regulations. Contractor further agrees that the Background Screening 
required in this Section is necessary to preserve and protect public health, safety, and welfare. The 
Background Screening requirements set forth in this Section are the minimum requirements for 
this Agreement. City in no way warrants that these minimum requirements are sufficient to protect 
Contractor from any liabilities that may arise out of Contractor’s services under this Agreement or 
Contractor’s failure to comply with this Section. Therefore, in addition to the specific measures set 
forth below, Contractor and its Contract Workers must take such other reasonable, prudent, and 
necessary measures to further preserve and protect public health, safety, and welfare when 
providing services under this Agreement. 
 
2. Background Screening Requirements and Criteria. Before offering or scheduling any services 
under this Agreement, Contractor agrees that all Contract Workers, including the Contractor, if the 
Contractor is an individual or sole proprietorship, must have successfully passed a Background 
Screening in accordance with this Section. Contractor warrants that no person will be permitted 
to substitute for a Contract Worker who has satisfied the Background Screening requirements until 
the proposed substitute has also satisfied the Background Screening requirements in this Section. 
For review and approval, Contractor must submit to a person designated by the City proof of a 
completed Background Screening for each Contract Worker over the age of 18 performing services 
under this Agreement no fewer than two (2) weeks before the proposed start date of such Contract 
Worker’s services. The Background Screening must have been completed within the 12-month 
period preceding the Contract Worker’s start date under this Agreement and must include the 
results of a national criminal databased check with source verification, and a sex offender 
database search.  
 
 
3. Additional City Rights Regarding Security Inquiries. In addition to the foregoing, City reserves 
the rights but not the obligations to: (1) have a Contract Worker be required to provide fingerprints 
and execute such other documentation as may be necessary to obtain criminal justice information 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 31 of 96 
RFP Revised 07_16 
 
pursuant to A.R.S. § 41-1750(G)(4); (2) act on newly acquired information whether or not such 
information should have been previously discovered; (3) unilaterally change its standards and 
criteria relative to the acceptability of Contract Workers; and (4) object, at any time and for any 
reason, to a Contract Worker performing work (including supervision and oversight) under this 
Agreement. 
 
4. Contractor Certification. By executing this Agreement, Contractor certifies that Contractor has 
read and understands the Background Screening requirements and criteria in this Section and will 
fully comply with such requirements. Contractor further certifies that any Background Screening 
information to be furnished to City related to Contractor or its Contract Workers will be complete, 
current, and accurate. A Contract Worker rejected for work under this Agreement will not be 
proposed to perform work under other City contracts or engagements without City's prior written 
approval. 
 
5. Terms of This Section Applicable to all of Contractor’s Contracts and Subcontracts. 
Contractor must include the terms of this Section for Contract Worker Background Screening in all 
contracts and subcontracts for services furnished under this Agreement including, but not limited 
to, supervision and oversight services. 
 
6. Materiality of Background Screening Requirements: Indemnity. The Background Screening 
requirements of this Section are material to City's entry into this Agreement and any breach of this 
Section by Contractor will be deemed a material breach of this Agreement. In addition to the 
indemnity provisions set forth in this Agreement, Contractor must defend, indemnify, and hold 
harmless City for any and all Claims arising out of this Background Screening Section including, 
but not limited to, the disqualification of a Contract Worker by Contractor or City for failure to 
satisfy this Section. 
 
7. Continuing Duty, Audit. Contractor’s obligations and requirements that Contract Workers satisfy 
this Background Screening Section will continue throughout the entire term of this Agreement. 
Contractor must notify City immediately of any change to a Background Screening of a Contract 
Worker previously accepted by City. Contractor must maintain all records and documents related 
to all Background Screenings and City reserves the right to audit Contractor’s compliance with this 
Section under the terms of this Agreement. 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 32 of 96 
RFP Revised 07_16 
 
EXHIBIT E 
WAGE DECISION 
 
"General Decision Number: AZ20210001 10/08/2021 
 
Superseded General Decision Number: AZ20200001 
 
State: Arizona 
 
Construction Type: Residential 
 
County: Maricopa County in Arizona. 
 
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family 
homes and apartments up to and including 4 stories). 
 
Note: Under Executive Order (EO) 13658, an hourly minimum wage 
of $10.95 for calendar year 2021 applies to all contracts 
subject to the Davis-Bacon Act for which the contract is 
awarded (and any solicitation was issued) on or after January 
1, 2015.  If this contract is covered by the EO, the contractor 
must pay all workers in any classification listed on this wage 
determination at least $10.95 per hour (or the applicable wage 
rate listed on this wage determination, if it is higher) for 
all hours spent performing on the contract in calendar year 
2021.  If this contract is covered by the EO and a 
classification considered necessary for performance of work on 
the contract does not appear on this wage determination, the 
contractor must pay workers in that classification at least the 
wage rate determined through the conformance process set forth 
in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is 
higher than the conformed wage rate).  The EO minimum wage rate 
will be adjusted annually.  Please note that this EO applies to 
the above-mentioned types of contracts entered into by the 
federal government that are subject to the Davis-Bacon Act 
itself, but it does not apply to contracts subject only to the 
Davis-Bacon Related Acts, including those set forth at 29 CFR 
5.1(a)(2)-(60). Additional information on contractor 
requirements and worker protections under the EO is available 
at www.dol.gov/whd/govcontracts. 
 
 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 33 of 96 
RFP Revised 07_16 
 
Modification Number     Publication Date 
          0              01/01/2021 
          1              07/23/2021 
          2              09/03/2021 
          3              09/10/2021 
          4              10/08/2021 
 
 BRAZ0003-007 07/01/2021 
 
                                  Rates          Fringes 
 
BRICKLAYER.......................$ 31.68             8.90 
 
ZONE PAY:  
 
  (Radius miles from the intersection of Central Ave. and 
  Washington St., Phoenix, AZ) 
 
Zone A: 0-60 miles- Base Rate 
Zone B: 61-75 miles- Base Rate plus $2.00 per hour 
Zone C: 75-100 miles- Base Rate plus $3.00 per hour 
Zone D: 101-200 miles- Base Rate plus $3.50 per hour 
Zone E: Over 200 miles- Base Rate plus $6.50 per hour 
 
---------------------------------------------------------------- 
 ENGI0428-005 06/01/2021 
 
                                  Rates          Fringes 
 
POWER EQUIPMENT OPERATOR    
(Grader/Blade)...................$ 32.94            12.12 
---------------------------------------------------------------- 
* IRON0075-008 04/01/2021 
 
                                  Rates          Fringes 
 
IRONWORKER, STRUCTURAL...........$ 28.80            19.35 
---------------------------------------------------------------- 
 PLAS0394-006 07/01/2019 
 
                                  Rates          Fringes 
 
CEMENT MASON/CONCRETE FINISHER...$ 25.08             8.57 
---------------------------------------------------------------- 
  SUAZ2011-001 07/28/2011 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 34 of 96 
RFP Revised 07_16 
 
 
                                  Rates          Fringes 
 
ALARM INSTALLER, Includes    
Wiring and Installation..........$ 13.91             0.00 
   
CARPENTER, Excludes Drywall    
Hanging, and Form Work...........$ 18.16             0.00 
   
DRYWALL HANGER...................$ 15.00             0.58 
   
ELECTRICIAN, Excludes Low    
Voltage Wiring and    
Installation of Alarms...........$ 15.45             0.01 
   
FORM WORKER......................$ 14.37             0.00 
   
GLAZIER..........................$ 13.45             0.00 
   
HVAC MECHANIC (Installation    
of HVAC Duct)....................$ 15.36             0.00 
   
LABORER:  Common or General......$ 10.18             0.00 
   
LABORER:  Grade Checker..........$ 16.83             0.45 
   
LABORER:  Mason Tender - Brick...$ 12.77             0.00 
   
LABORER:  Mason Tender -    
Cement/Concrete/Stone............$ 11.00             0.00 
   
LABORER:  Pipelayer..............$ 13.00             0.00 
   
OPERATOR:  Backhoe...............$ 18.29             0.00 
   
OPERATOR:  Excavator.............$ 24.67             0.00 
   
OPERATOR:  Forklift..............$ 16.17             0.00 
   
OPERATOR:  Loader (Front End)....$ 15.00             0.00 
   
OPERATOR:  Paver  (Asphalt,    
Aggregate, and Concrete).........$ 20.75             0.00 
   
OPERATOR:  Roller................$ 16.24             1.42 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 35 of 96 
RFP Revised 07_16 
 
   
OPERATOR:  Scraper...............$ 19.20             1.52 
   
OPERATOR:  Tractor...............$ 22.63             0.00 
   
PAINTER:  Brush, Roller and    
Spray, Excludes Drywall    
Finishing/Taping.................$ 12.89             0.00 
   
PLUMBER..........................$ 20.14             4.08 
   
ROOFER...........................$ 13.67             0.00 
   
SPRINKLER FITTER (Fire    
Sprinklers)......................$ 17.73             0.00 
   
TRUCK DRIVER:  Dump Truck........$ 17.02             0.00 
   
TRUCK DRIVER:  Water Truck.......$ 14.50             0.00 
---------------------------------------------------------------- 
 
WELDERS - Receive rate prescribed for craft performing 
operation to which welding is incidental. 
 
================================================================ 
  
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave 
for Federal Contractors applies to all contracts subject to the 
Davis-Bacon Act for which the contract is awarded (and any 
solicitation was issued) on or after January 1, 2017.  If this 
contract is covered by the EO, the contractor must provide 
employees with 1 hour of paid sick leave for every 30 hours 
they work, up to 56 hours of paid sick leave each year. 
Employees must be permitted to use paid sick leave for their 
own illness, injury or other health-related needs, including 
preventive care; to assist a family member (or person who is 
like family to the employee) who is ill, injured, or has other 
health-related needs, including preventive care; or for reasons 
resulting from, or to assist a family member (or person who is 
like family to the employee) who is a victim of, domestic 
violence, sexual assault, or stalking.  Additional information 
on contractor requirements and worker protections under the EO 
is available at www.dol.gov/whd/govcontracts. 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 36 of 96 
RFP Revised 07_16 
 
Unlisted classifications needed for work not included within 
the scope of the classifications listed may be added after 
award only as provided in the labor standards contract clauses 
(29CFR 5.5 (a) (1) (ii)). 
---------------------------------------------------------------- 
The body of each wage determination lists the classification 
and wage rates that have been found to be prevailing for the 
cited type(s) of construction in the area covered by the wage 
determination. The classifications are listed in alphabetical 
order of ""identifiers"" that indicate whether the particular 
rate is a union rate (current union negotiated rate for local), 
a survey rate (weighted average rate) or a union average rate 
(weighted union average rate). 
 
Union Rate Identifiers 
 
A four letter classification abbreviation identifier enclosed 
in dotted lines beginning with characters other than ""SU"" or 
""UAVG"" denotes that the union classification and rate were 
prevailing for that classification in the survey. Example: 
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of 
the union which prevailed in the survey for this 
classification, which in this example would be Plumbers. 0198 
indicates the local union number or district council number 
where applicable, i.e., Plumbers Local 0198. The next number, 
005 in the example, is an internal number used in processing 
the wage determination. 07/01/2014 is the effective date of the 
most current negotiated rate, which in this example is July 1, 
2014. 
 
Union prevailing wage rates are updated to reflect all rate 
changes in the collective bargaining agreement (CBA) governing 
this classification and rate. 
 
Survey Rate Identifiers 
 
Classifications listed under the ""SU"" identifier indicate that 
no one rate prevailed for this classification in the survey and 
the published rate is derived by computing a weighted average 
rate based on all the rates reported in the survey for that 
classification.  As this weighted average rate includes all 
rates reported in the survey, it may include both union and 
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates 
the rates are survey rates based on a weighted average 
calculation of rates and are not majority rates. LA indicates 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 37 of 96 
RFP Revised 07_16 
 
the State of Louisiana. 2012 is the year of survey on which 
these classifications and rates are based. The next number, 007 
in the example, is an internal number used in producing the 
wage determination. 5/13/2014 indicates the survey completion 
date for the classifications and rates under that identifier. 
 
Survey wage rates are not updated and remain in effect until a 
new survey is conducted. 
 
Union Average Rate Identifiers 
 
Classification(s) listed under the UAVG identifier indicate 
that no single majority rate prevailed for those 
classifications; however, 100% of the data reported for the 
classifications was union data. EXAMPLE: UAVG-OH-0010 
08/29/2014. UAVG indicates that the rate is a weighted union 
average rate. OH indicates the state. The next number, 0010 in 
the example, is an internal number used in producing the wage 
determination. 08/29/2014 indicates the survey completion date 
for the classifications and rates under that identifier. 
 
A UAVG rate will be updated once a year, usually in January of 
each year, to reflect a weighted average of the current 
negotiated/CBA rate of the union locals from which the rate is 
based. 
---------------------------------------------------------------- 
 
                   WAGE DETERMINATION APPEALS PROCESS 
 
1.) Has there been an initial decision in the matter? This can 
be: 
 
*  an existing published wage determination 
*  a survey underlying a wage determination 
*  a Wage and Hour Division letter setting forth a position on 
   a wage determination matter 
*  a conformance (additional classification and rate) ruling 
 
On survey related matters, initial contact, including requests 
for summaries of surveys, should be with the Wage and Hour 
Regional Office for the area in which the survey was conducted 
because those Regional Offices have responsibility for the 
Davis-Bacon survey program. If the response from this initial 
contact is not satisfactory, then the process described in 2.) 
and 3.) should be followed. 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 38 of 96 
RFP Revised 07_16 
 
 
With regard to any other matter not yet ripe for the formal 
process described here, initial contact should be with the 
Branch of Construction Wage Determinations.  Write to: 
 
            Branch of Construction Wage Determinations 
            Wage and Hour Division 
            U.S. Department of Labor 
            200 Constitution Avenue, N.W. 
            Washington, DC 20210 
 
2.) If the answer to the question in 1.) is yes, then an 
interested party (those affected by the action) can request 
review and reconsideration from the Wage and Hour Administrator 
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: 
 
            Wage and Hour Administrator 
            U.S. Department of Labor 
            200 Constitution Avenue, N.W. 
            Washington, DC 20210 
 
The request should be accompanied by a full statement of the 
interested party's position and by any information (wage 
payment data, project description, area practice material, 
etc.) that the requestor considers relevant to the issue. 
 
3.) If the decision of the Administrator is not favorable, an 
interested party may appeal directly to the Administrative 
Review Board (formerly the Wage Appeals Board).  Write to: 
 
            Administrative Review Board 
            U.S. Department of Labor 
            200 Constitution Avenue, N.W. 
            Washington, DC 20210 
 
4.) All decisions by the Administrative Review Board are final. 
 
================================================================ 
 
          END OF GENERAL DECISION" 
 
 
 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 39 of 96 
RFP Revised 07_16 
 
EXHIBIT F 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 40 of 96 
RFP Revised 07_16 
 
EXHIBIT G1 
PERFORMANCE BOND 
 
 
STATUTORY PERFORMANCE BOND PURSUANT TO 
TITLE 34, CHAPTER 2, ARTICLE 2, 
OF THE ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Bond amount) 
 
KNOW ALL MEN BY THESE PRESENTS: That,   
 
 
 
 
 (hereinafter called the Principal), 
as Principal, and  
 
 
 
 
 a corporation organized and existing under the law of the State of  
 
 
 with its principal office in the City of  
 
 
 
, (hereinafter called the Surety), as Surety, 
are held and firmly bound unto the City of Chandler, County of Maricopa, State of Arizona, in the amount of   
 
 
 
 
 
Dollars    ($ 
 
 
), for the payment whereof, the said Principal and Surety 
bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severely, firmly by these 
presents. 
 
 
WHEREAS, the Principal has entered into a certain written Contract with the City of Chandler, Dated the ________ day 
of  
 
 
, _______, for PUBLIC HOUSING KITCHEN AND BATH CABINET REPLACEMENT, HO2-
910-4443, which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copies at length 
herein. 
 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully 
perform and fulfill all the undertakings, covenants terms, conditions, and agreements of said contract during the original term of 
said Contract and any extensions thereof, with or without notice to the Surety, and during the life of any warranty required under 
the contract, and shall also perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all 
duly authorized modifications of conditions of said Contract that may hereafter be made, notice of which modifications to the 
Surety being hereby waived; then the above obligations shall be void, otherwise to remain in full force and effect. 
 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2 of the 
Arizona Revised Statutes, and all liabilities on this bond shall be determined in accordance with the provisions of said Title, 
Chapter and Article, to the extent as if it were copied at length herein. 
 
The prevailing party in a suit on this bond shall be entitled to such reasonable attorney's fees as may be fixed by a judge of 
the Court. 
 
 
Witness our hands this ____ day of  
 
 
, 20___. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PRINCIPAL 
 
SEAL 
 
  
 
 
 
 
 
 
AGENT OF RECORD 
 
 
 
 
 
BY  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SURETY 
 
SEAL 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AGENT ADDRESS 
 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Page 41 of 96 
RFP Revised 07_16 
 
EXHIBIT G2 
PAYMENT BOND 
 
 
ARIZONA STATUTORY PAYMENT BOND 
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES 
(Penalty of this Bond must be 100% of the Contract amount) 
 
KNOW ALL MEN BY THESE PRESENTS:  
 
THAT:   
 
 
 
 
(hereinafter “Principal”), as Principal, and  
 
 
 
 
 (hereinafter “Surety”), a corporation organized and existing under the laws of the State of  
 
 
 with its principal office in the City of   
 
, holding a certificate of authority to transact 
surety business in Arizona issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 
2, Article 1, as Surety, are held and firmly bound unto the City of Chandler, (hereinafter “Obligee”) County of 
Maricopa, State of Arizona, in the amount of  
 
 
 
 
 
 
 
 
 
Dollars  ($ 
 
 
), for the payment whereof, the said Principal and Surety bind themselves, and 
their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Contract with the City of Chandler, dated the  
 
 
 day of  
 
 
 
 , 20 
, for PUBLIC HOUSING KITCHEN AND BATH 
CABINET REPLACEMENT, HO2-910-4443, which Contract is hereby referred to and made a part hereof as fully 
and to the same extent as if copies at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLICATION IS SUCH, that if the Principal promptly 
pays all moneys due to all persons supplying labor or materials to the Principal or the Principal’s subcontractors 
in the prosecution of the work provided for in said contract, this obligation is void.  Otherwise it remains in full 
force and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, 
Article 2 Arizona Revised Statutes, and all liabilities on this bond shall be determined in accordance with the 
provisions, conditions and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same 
extent as if it were copied at length in this agreement. 
 
The prevailing party in a suit on this bond shall recover as part of the judgment reasonable attorney fees 
that may be fixed by a judge of the court. 
 
Witness our hands this ______ day of __________________, 20_______. 
 
_______________________________    
_______________________________ 
Principal 
 
 
 
 
SEAL  
SURETY 
 
By:  ________________________ 
 
By: ____________________________ 
 
Attorney-in-Fact 
 
  SEAL 
 
Its: _________________________ 
 
_______________________________ 
 
 
 
 
 
 
AGENCY OF RECORD 
 
 
 
 
 
 
 
 
 
 
_______________________________ 
 
 
 
 
 
 
AGENCY ADDRESS 
 
 
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Applicability 
The Project or Program to which the construction work 
covered by this contract pertains is being assisted by the 
United States of America and the following Federal Labor 
Standards 
Provisions 
are 
included 
in 
this 
Contract 
pursuant to the provisions applicable to such Federal 
assistance. 
A.
1.  (i)  Minimum Wages.  All laborers and mechanics
employed or working upon the site of the work, will be paid
unconditionally and not less often than once a week, and
without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by
regulations issued by the Secretary of Labor under the
Copeland Act (29 CFR Part 3), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof)
due at time of payment computed at rates not less than
those 
contained 
in 
the 
wage 
determination 
of 
the
Secretary of Labor which is attached hereto and made a
part hereof, regardless of any contractual relationship
which may be alleged to exist between the contractor and
such laborers and mechanics.  Contributions made or
costs reasonably anticipated for bona fide fringe benefits
under Section l(b)(2) of the Davis-Bacon Act on behalf of
laborers or mechanics are considered wages paid to such
laborers or mechanics, subject to the provisions of 29 CFR
5.5(a)(1)(iv); also, regular contributions made or costs
incurred for more than a weekly period (but not less often
than quarterly) under plans, funds, or programs, which
cover the particular weekly period, are deemed to be
constructively made or incurred during such weekly period.
Such laborers and mechanics shall be paid the appropriate 
wage rate and fringe benefits on the wage determination 
for the classification of work actually performed, without 
regard to skill, except as provided in 29 CFR 5.5(a)(4). 
Laborers or mechanics performing work in more than one 
classification may be compensated at the rate specified for 
each classification for the time actually worked therein: 
Provided, That the employer’s payroll records accurately 
set forth the time spent in each classification in which 
work is performed.  The wage determination (including any 
additional classification and wage rates conformed under 
29 CFR 5.5(a)(1)(ii) and the Davis-Bacon poster (WH-
1321) shall be posted at all times by the contractor and its 
subcontractors at the site of the work in a prominent and 
accessible, place where it can be easily seen by the 
workers. 
(ii)
(a) Any class of laborers or mechanics which is not
listed in the wage determination and which is to be
employed 
under the contract shall be classified 
in
conformance with the wage determination.  HUD shall
approve an additional classification and wage rate and
fringe benefits therefor only when the following criteria
have been met:
(1)
The work to be performed by the classification
requested is not performed by a classification in the wage
determination; and
(2)
The classification is utilized in the area by the
construction industry; and
(3)
The proposed wage rate, including any bona fide
fringe benefits, bears a reasonable relationship to the
wage rates contained in the wage determination.
(b)
If the contractor and the laborers and mechanics to be
employed 
in 
the 
classification 
(if 
known), 
or 
their
representatives, and HUD or its designee agree on the
classification 
and 
wage 
rate 
(including 
the 
amount
designated for fringe benefits where appropriate), a report
of the action taken shall be sent by HUD or its designee to
the 
Administrator 
of 
the 
Wage 
and 
Hour 
Division,
Employment Standards Administration, U.S. Department of
Labor, Washington, D.C. 20210.  The Administrator, or an
authorized 
representative, 
will 
approve, 
modify, 
or
disapprove every additional classification action within 30
days of receipt and so advise HUD or its designee or will
notify HUD or its designee within the 30-day period that
additional time is necessary. (Approved by the Office of
Management and Budget under OMB control number 1215-
0140.)
(c)
In the event the contractor, the laborers or mechanics
to 
be 
employed 
in 
the 
classification 
or 
their
representatives, and HUD or its designee do not agree on
the proposed classification and wage rate (including the
amount designated for fringe benefits, where appropriate),
HUD or its designee shall refer the questions, including
the views of all interested parties and the recommendation
of 
HUD 
or 
its 
designee, 
to 
the 
Administrator 
for
determination.  The Administrator, or an authorized
representative, will issue a determination within 30 days of
receipt and so advise HUD or its designee or will notify
HUD or its designee within the 30-day period that
additional time is necessary. (Approved by the Office of
Management and Budget under OMB Control Number
1215-0140.)
(d)
The wage rate (including fringe benefits where
appropriate) 
determined 
pursuant 
to 
subparagraphs
(1)(ii)(b) or (c) of this paragraph, shall be paid to all
workers performing work in the classification under this
contract from the first day on which work is performed in
the classification.
(iii)
Whenever the minimum wage rate prescribed in the
contract for a class of laborers or mechanics includes a
fringe benefit which is not expressed as an hourly rate, the
contractor shall either pay the benefit as stated in the
wage determination or shall pay another bona fide fringe
benefit or an hourly cash equivalent thereof.
(iv)
If the contractor does not make payments to a trustee
or other third person, the contractor may consider as part
Page 42 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

of the wages of any laborer or mechanic the amount of any 
costs reasonably anticipated in providing bona fide fringe 
benefits under a plan or program, Provided, That the 
Secretary of Labor has found, upon the written request of 
the contractor, that the applicable standards of the Davis-
Bacon Act have been met.  The Secretary of Labor may 
require the contractor to set aside in a separate account 
assets for the meeting of obligations under the plan or 
program. (Approved by the Office of Management and 
Budget under OMB Control Number 1215-0140.) 
2.  Withholding.  HUD or its designee shall upon its own 
action 
or 
upon 
written 
request 
of 
an 
authorized 
representative of the Department of Labor withhold or 
cause to be withheld from the contractor under this 
contract or any other Federal contract with the same prime 
contractor, 
or 
any 
other 
Federally-assisted 
contract 
subject to Davis-Bacon prevailing wage requirements, 
which is held by the same prime contractor so much of the 
accrued payments or advances as may be considered 
necessary to pay laborers and mechanics, including 
apprentices, trainees and helpers, employed by the 
contractor or any subcontractor the full amount of wages 
required by the contract In the event of failure to pay any 
laborer or mechanic, including any apprentice, trainee or 
helper, employed or working on the site of the work, all or 
part of the wages required by the contract, HUD or its 
designee may, after written notice to the contractor, 
sponsor, applicant, or owner, take such action as may be 
necessary 
to 
cause 
the 
suspension 
of 
any 
further 
payment, advance, or guarantee of funds until such 
violations have ceased.  HUD or its designee may, after 
written notice to the contractor, disburse such amounts 
withheld 
for 
and 
on 
account 
of 
the 
contractor 
or 
subcontractor to the respective employees to whom they 
are due.  The Comptroller General shall make such 
disbursements in the case of direct Davis-Bacon Act 
contracts. 
3.  (i)  Payrolls and basic records.  Payrolls and basic 
records relating thereto shall be maintained by the 
contractor during the course of the work preserved for a 
period of three years thereafter for all laborers and 
mechanics working at the site of the work.  Such records 
shall contain the name, address, and social security 
number 
of 
each 
such 
worker, 
his 
or 
her 
correct 
classification, hourly rates of wages paid (including rates 
of contributions or costs anticipated for bona fide fringe 
benefits or cash equivalents thereof of the types described 
in Section l(b)(2)(B) of the Davis-bacon Act), daily and 
weekly number of hours worked, deductions made and 
actual wages paid.  Whenever the Secretary of Labor has 
found under 29 CFR 5.5 (a)(1)(iv) that the wages of any 
laborer or mechanic include the amount of any costs 
reasonably anticipated in providing benefits under a plan 
or program described in Section l(b)(2)(B) of the Davis-
Bacon Act, the contractor shall maintain records which 
show that the commitment to provide such benefits is 
enforceable, that the plan or program is financially 
responsible, and that the plan or program has been 
communicated in writing to the laborers or mechanics 
affected, and records which show the costs anticipated or 
the actual cost incurred in providing such benefits.  
Contractors employing apprentices or trainees under 
approved programs shall maintain written evidence of the 
registration of apprenticeship programs and certification of 
trainee programs, the registration of the apprentices and 
trainees, and the ratios and wage rates prescribed in the 
applicable 
programs. 
(Approved 
by 
the 
Office 
of 
Management and Budget under OMB Control Numbers 
1215-0140 and 1215-0017.) 
(ii)  (a)  The contractor shall submit weekly for each week 
in which any contract work is performed a copy of all 
payrolls to HUD or its designee if the agency is a party to 
the contract, but if the agency is not such a party, the 
contractor will submit the payrolls to the applicant 
sponsor, or owner, as the case may be, for transmission to 
HUD or its designee.  The payrolls submitted shall set out 
accurately and completely all of the information required 
to be maintained under 29 CFR 5.5(a)(3)(i) except that full 
social security numbers and home addresses shall not be 
included on weekly transmittals.  Instead the payrolls shall 
only need to include an individually identifying number for 
each employee (e.g., the last four digits of the employee’s 
social security number).  The required weekly payroll 
information may be submitted in any form desired. 
Optional Form WH-347 is available for this purpose from 
the 
Wage 
and 
Hour 
Division 
Web 
site 
at 
http://www.dol.gov/esa/whd/forms/wh347instr.htm 
or 
its 
successor site.  The prime contractor is responsible for 
the submission of copies of payrolls by all subcontractors.  
Contractors and subcontractors shall maintain the full 
social security number and current address of each 
covered worker, and shall provide them upon request to 
HUD or its designee if the agency is a party to the 
contract, but if the agency is not such a party, the 
contractor will submit the payrolls to the applicant 
sponsor, or owner, as the case may be, for transmission to 
HUD or its designee, the contractor, or the Wage and Hour 
Division of the Department of Labor for purposes of an 
investigation or audit of compliance with prevailing wage 
requirements.  It is not a violation of this subparagraph for 
a prime contractor to require a subcontractor to provide 
addresses and social security numbers to the prime 
contractor for its own records, without weekly submission 
to HUD or its designee.  (Approved by the Office of 
Management and Budget under OMB Control Number 
1215-0149.)   
(b)  Each payroll submitted shall be accompanied by a 
“Statement of Compliance,” signed by the contractor or 
subcontractor or his or her agent who pays or supervises 
the payment of the persons employed under the contract 
and shall certify the following: 
(1)  That the payroll for the payroll period contains the 
information required to be provided under 29 CFR 5.5 
(a)(3)(ii), the appropriate information is being maintained 
under 29 CFR 5.5(a)(3)(i), and that such information is 
correct and complete; 
Page 43 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(2)  That each laborer or mechanic (including each helper, 
apprentice, and trainee) employed on the contract during 
the payroll period has been paid the full weekly wages 
earned, without rebate, either directly or indirectly, and 
that no deductions have been made either directly or 
indirectly 
from 
the 
full 
wages 
earned, 
other 
than 
permissible deductions as set forth in 29 CFR Part 3; 
(3)  That each laborer or mechanic has been paid not less 
than the applicable wage rates and fringe benefits or cash 
equivalents for the classification of work performed, as 
specified 
in 
the 
applicable 
wage 
determination 
incorporated into the contract. 
(c)  The weekly submission of a properly executed 
certification set forth on the reverse side of Optional Form 
WH-347 shall satisfy the requirement for submission of the 
“Statement of Compliance” required by subparagraph 
A.3.(ii)(b). 
(d)  The falsification of any of the above certifications may 
subject the contractor or subcontractor to civil or criminal 
prosecution under Section 1001 of Title 18 and Section 
231 of Title 31 of the United States Code. 
(iii)  The contractor or subcontractor shall make the 
records required under subparagraph A.3.(i) available for 
inspection, 
copying, 
or 
transcription 
by 
authorized 
representatives of HUD or its designee or the Department 
of Labor, and shall permit such representatives to 
interview employees during working hours on the job.  If 
the contractor or subcontractor fails to submit the required 
records or to make them available, HUD or its designee 
may, after written notice to the contractor, sponsor, 
applicant or owner, take such action as may be necessary 
to cause the suspension of any further payment, advance, 
or guarantee of funds.  Furthermore, failure to submit the 
required records upon request or to make such records 
available may be grounds for debarment action pursuant to 
29 CFR 5.12. 
4.  Apprentices and Trainees.   
(i)  Apprentices.  Apprentices will be permitted to work at 
less than the predetermined rate for the work they 
performed when they are employed pursuant to and 
individually registered in a bona fide apprenticeship 
program registered with the U.S. Department of Labor, 
Employment 
and 
Training 
Administration, 
Office 
of 
Apprenticeship Training, Employer and Labor Services, or 
with a State Apprenticeship Agency recognized by the 
Office, or if a person is employed in his or her first 90 
days of probationary employment as an apprentice in such 
an 
apprenticeship 
program, 
who 
is 
not 
individually 
registered in the program, but who has been certified by 
the Office of Apprenticeship Training, Employer and Labor 
Services 
or 
a 
State 
Apprenticeship 
Agency 
(where 
appropriate) to be eligible for probationary employment as 
an apprentice.  The allowable ratio of apprentices to 
journeymen on the job site in any craft classification shall 
not be greater than the ratio permitted to the contractor as 
to the entire work force under the registered program.  Any 
worker listed on a payroll at an apprentice wage rate, who 
is not registered or otherwise employed as stated above, 
shall be paid not less than the applicable wage rate on the 
wage determination for the classification of work actually 
performed.  In addition, any apprentice performing work on 
the job site in excess of the ratio permitted under the 
registered program shall be paid not less than the 
applicable wage rate on the wage determination for the 
work actually performed.  Where a contractor is performing 
construction on a project in a locality other than that in 
which its program is registered, the ratios and wage rates 
(expressed in percentages of the journeyman’s hourly 
rate) specified in the contractor’s or subcontractor’s 
registered program shall be observed.  Every apprentice 
must be paid at not less than the rate specified in the 
registered program for the apprentice’s level of progress, 
expressed as a percentage of the journeymen hourly rate 
specified 
in 
the 
applicable 
wage 
determination.  
Apprentices shall be paid fringe benefits in accordance 
with the provisions of the apprenticeship program.  If the 
apprenticeship program does not specify fringe benefits, 
apprentices must be paid the full amount of fringe benefits 
listed on the wage determination for the applicable 
classification.  If the Administrator determines that a 
different practice prevails for the applicable apprentice 
classification, fringes shall be paid in accordance with that 
determination.  In the event the Office of Apprenticeship 
Training, Employer and Labor Services, or a State 
Apprenticeship 
Agency 
recognized 
by 
the 
Office, 
withdraws approval of an apprenticeship program, the 
contractor 
will 
no 
longer 
be 
permitted 
to 
utilize 
apprentices at less than the applicable predetermined rate 
for the work performed until an acceptable program is 
approved. 
(ii)  Trainees.  Except as provided in 29 CFR 5.16, 
trainees will not be permitted to work at less than the 
predetermined rate for the work performed unless they are 
employed pursuant ‘,to and individually registered in a 
program which has received prior approval, evidenced by 
formal certification by the U.S. Department of Labor, 
Employment and Training Administration.  The ratio of 
trainees to journeymen on the job site shall not be greater 
than 
permitted 
under 
the 
plan 
approved 
by 
the 
Employment and Training Administration.  Every trainee 
must be paid at not less than the rate specified in the 
approved program for the trainee’s level of progress, 
expressed as a percentage of the journeyman hourly rate 
specified in the applicable wage determination.  Trainees 
shall be paid fringe benefits in accordance with the 
provisions of the trainee program.  If the trainee program 
does not mention fringe benefits, trainees shall be paid 
the full amount of fringe benefits listed on the wage 
determination unless the Administrator of the Wage and 
Hour Division determines that there is an apprenticeship 
program associated with the corresponding journeyman 
wage rate on the wage determination which provides for 
less than full fringe benefits for apprentices.  Any 
employee listed on the payroll at a trainee rate who is not 
registered and participating in a training plan approved by 
Page 44 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

the Employment and Training Administration shall be paid 
not less than the applicable wage rate on the wage 
determination for the work actually performed.  In addition, 
any trainee performing work on the job site in excess of 
the ratio permitted under the registered program shall be 
paid not less than the applicable wage rate on the wage 
determination for the work actually performed.  In the 
event 
the 
Employment 
and 
Training 
Administration 
withdraws approval of a training program, the contractor 
will no longer be permitted to utilize trainees at less than 
the applicable predetermined rate for the work performed 
until an acceptable program is approved. 
(iii)  Equal employment opportunity.  The utilization of 
apprentices, trainees and journeymen under 29 CFR Part 5 
shall 
be 
in 
conformity 
with 
the 
equal 
employment 
opportunity requirements of Executive Order 11246, as 
amended, and 29 CFR Part 30. 
5.  Compliance with Copeland Act requirements.  The 
contractor shall comply with the requirements of 29 CFR 
Part 3 which are incorporated by reference in this contract 
6.  Subcontracts.  The contractor or subcontractor will 
insert in any subcontracts the clauses contained in 
subparagraphs 1 through 11 in this paragraph A and such 
other clauses as HUD or its designee may by appropriate 
instructions 
require, 
and 
a 
copy 
of 
the 
applicable 
prevailing wage decision, and also a clause requiring the 
subcontractors to include these clauses in any lower tier 
subcontracts.  The prime contractor shall be responsible 
for the compliance by any subcontractor or lower tier 
subcontractor 
with 
all 
the 
contract 
clauses 
in 
this 
paragraph. 
7.  Contract termination; debarment.  A breach of the 
contract clauses in 29 CFR 5.5 may be grounds for 
termination of the contract and for debarment 
 as 
a 
contractor and a subcontractor as provided in 29 CFR 
5.12. 
8.  Compliance with Davis-Bacon and Related Act Requirements.  
All rulings and interpretations of the Davis-Bacon and 
Related Acts contained in 29 CFR Parts 1, 3, and 5 are 
herein incorporated by reference in this contract 
9.  Disputes concerning labor standards.  Disputes 
arising out of the labor standards provisions of this 
contract shall not be subject to the general disputes 
clause of this contract.  Such disputes shall be resolved in 
accordance with the procedures of the Department of 
Labor set forth in 29 CFR Parts 5, 6, and 7. Disputes 
within the meaning of this clause include disputes between 
the contractor (or any of its subcontractors) and HUD or 
its designee, the U.S. Department of Labor, or the 
employees or their representatives. 
10.  (i)  Certification of Eligibility.  By entering into this 
contract the contractor certifies that neither it (nor he or 
she) nor any person or firm who has an interest in the 
contractor’s firm is a person or firm ineligible to be 
awarded Government contracts by virtue of Section 3(a) of 
the Davis-Bacon Act or 29 CFR 5.12(a)(1) or to be 
awarded HUD contracts or participate in HUD programs 
pursuant to 24 CFR Part 24. 
(ii)  No part of this contract shall be subcontracted to any 
person or firm ineligible for award of a Government 
contract by virtue of Section 3(a) of the Davis-Bacon Act 
or 29 CFR 5.12(a)(1) or to be awarded HUD contracts or 
participate in HUD programs pursuant to 24 CFR Part 24. 
(iii)  The penalty for making false statements is prescribed 
in the U.S. Criminal Code, 18 U.S.C. 1001.  Additionally, 
U.S. Criminal Code, Section 1 01 0, Title 18, U.S.C., 
“Federal Housing Administration transactions”, provides in 
part: “Whoever, for the purpose of . . . influencing in any 
way the action of such Administration..... makes, utters or 
publishes any statement knowing the same to be false..... 
shall be fined not more than $5,000 or imprisoned not 
more than two years, or both.” 
11. 
 
Complaints, 
Proceedings, 
or 
Testimony 
by 
Employees.  No laborer or mechanic to whom the wage, 
salary, or other labor standards provisions of this Contract 
are applicable shall be discharged or in any other manner 
discriminated 
against 
by 
the 
Contractor 
or 
any 
subcontractor because such employee has filed any 
complaint or instituted or caused to be instituted any 
proceeding or has testified or is about to testify in any 
proceeding under or relating to the labor standards 
applicable under this Contract to his employer. 
B.  Contract Work Hours and Safety Standards Act.  The 
provisions of this paragraph B are applicable where the amount of the 
prime contract exceeds $100,000.  As used in this paragraph, the 
terms “laborers” and “mechanics” include watchmen and guards. 
(1)  Overtime requirements.  No contractor or subcontractor 
contracting for any part of the contract work which may require or 
involve the employment of laborers or mechanics shall require or 
permit any such laborer or mechanic in any workweek in which the 
individual is employed on such work to work in excess of 40 hours in 
such 
workweek 
unless 
such 
laborer 
or 
mechanic 
receives 
compensation at a rate not less than one and one-half times the basic 
rate of pay for all hours worked in excess of 40 hours in such 
workweek. 
(2)  Violation; liability for unpaid wages; liquidated 
damages.  In the event of any violation of the clause set 
forth in subparagraph (1) of this paragraph, the contractor 
and any subcontractor responsible therefor shall be liable 
for the unpaid wages.  In addition, such contractor and 
subcontractor shall be liable to the United States (in the 
case of work done under contract for the District of 
Columbia or a territory, to such District or to such 
territory), 
for 
liquidated 
damages. 
 
Such 
liquidated 
damages shall be computed with respect to each individual 
laborer or mechanic, including watchmen and guards, 
employed 
in 
violation 
of 
the 
clause 
set 
forth 
in 
subparagraph (1) of this paragraph, in the sum of $10 for each 
calendar day on which such individual was required or permitted to 
work in excess of the standard workweek of 40 hours without payment 
of the overtime wages required by the clause set forth in sub 
paragraph (1) of this paragraph. 
Page 45 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(3)  Withholding for unpaid wages and liquidated 
damages.  HUD or its designee shall upon its own action 
or upon written request of an authorized representative of 
the Department of Labor withhold or cause to be withheld, 
from any moneys payable on account of work performed by 
the contractor or subcontractor under any such contract or 
any other Federal contract with the same prime contract, 
or any other Federally-assisted contract subject to the 
Contract Work Hours and Safety Standards Act which is 
held by the same prime contractor such sums as may be 
determined to be necessary to satisfy any liabilities of 
such contractor or subcontractor for unpaid wages and 
liquidated damages as provided in the clause set forth in 
subparagraph (2) of this paragraph. 
(4)  Subcontracts.  The contractor or subcontractor shall 
insert in any subcontracts the clauses set forth in 
subparagraph (1) through (4) of this paragraph and also a 
clause requiring the subcontractors to include these 
clauses in any lower tier subcontracts.  The prime 
contractor shall be responsible for compliance by any 
subcontractor or lower tier subcontractor with the clauses 
set forth in subparagraphs (1) through (4) of this 
paragraph. 
C.  Health and Safety.  The provisions of this paragraph C  are 
applicable where the amount of the prime contract exceeds $100,000. 
(1)  No laborer or mechanic shall be required to work in 
surroundings or under working conditions which are 
unsanitary, hazardous, or dangerous to his health and 
safety as determined under construction safety and health 
standards promulgated by the Secretary of Labor by 
regulation. 
(2)  The Contractor shall comply with all regulations 
issued by the Secretary of Labor pursuant to Title 29 Part 
1926 and failure to comply may result in imposition of 
sanctions pursuant to the Contract Work Hours and Safety 
Standards Act, (Public Law 91-54, 83 Stat 96).  40 USC 
3701 et seq. 
(3)  The contractor shall include the provisions of this 
paragraph in every subcontract so that such provisions will 
be binding on each subcontractor.  The contractor shall 
take such action with respect to any subcontractor as the 
Secretary of Housing and Urban Development or the 
Secretary of Labor shall direct as a means of enforcing 
such provisions. 
 
Page 46 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Previous edition is obsolete
form HUD-5369 (10/2002)
Instructions to Bidders for Contracts
Public and Indian Housing Programs
U.S. Department of Housing and
Urban Development
Office of Public and Indian Housing
Page 47 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Previous edition is obsolete
form HUD-5369 (10/2002)
Instructions to Bidders for Contracts
Public and Indian Housing Programs
Table of Contents
Clause
Page
1.
Bid Preparation and Submission
1
2.
Explanations and Interpretations to Prospective Bidders 1
3.
Amendments to Invitations for Bids
1
4.
Responsibility of Prospective Contractor
1
5.
Late Submissions, Modifications, and Withdrawal of Bids 1
6.
Bid Opening
2
7.
Service of Protest
2
8.
Contract Award
2
9.
Bid Guarantee
3
10. Assurance of Completion
3
11. Preconstruction Conference
3
12. Indian Preference Requirements
3
1.
Bid Preparation and Submission
(a) Bidders are expected to examine the specifications, drawings,
all instructions, and, if applicable, the construction site (see also the
contract clause entitled Site Investigation and Conditions Affect-
ing the Work  of the General Conditions of the Contract for Construc-
tion). Failure to do so will be at the bidders’ risk.
(b) All bids must be submitted on the forms provided by the Public
Housing Agency/Indian Housing Authority (PHA/IHA). Bidders shall
furnish all the information required by the solicitation.  Bids must be
signed and the bidder’s name typed or printed on the bid sheet and
each continuation sheet which requires the entry of information by
the bidder. Erasures or other changes must be initialed by the person
signing the bid.  Bids signed by an agent shall be accompanied by
evidence of that agent’s authority.  (Bidders should retain a copy of
their bid for their records.)
(c)
Bidders must submit as part of their bid a completed form HUD-
5369-A, “Representations, Certifications, and Other Statements of
Bidders.”
(d) All bid documents shall be sealed in an envelope which shall be
clearly marked with the words “Bid Documents,” the Invitation for
Bids (IFB) number, any project or other identifying number, the
bidder’s name, and the date and time for receipt of bids.
(e) If this solicitation requires bidding on all items, failure to do so will
disqualify the bid.  If bidding on all items is not required, bidders
should insert the words “No Bid” in the space provided for any item
on which no price is submitted.
(f)
Unless expressly authorized elsewhere in this solicitation, alter-
nate bids will not be considered.
(g) Unless expressly authorized elsewhere in this solicitation, bids
submitted by telegraph or facsimile (fax) machines will not be
considered.
(h) If the proposed contract is for a Mutual Help project (as de-
scribed in 24 CFR Part 905, Subpart E) that involves Mutual Help
contributions of work, material, or equipment, supplemental informa-
tion regarding the bid advertisement is provided as an attachment to
this solicitation.
2.
Explanations and Interpretations to Prospective
Bidders
(a) Any prospective bidder desiring an explanation or interpretation
of the solicitation, specifications, drawings, etc., must request it at
least 7 days before the scheduled time for bid opening.  Requests
may be oral or written.  Oral requests must be confirmed in writing.
The only oral clarifications that will be provided will be those clearly
related to solicitation procedures, i.e., not substantive technical
information.  No other oral explanation or interpretation will be
provided.  Any information given a prospective bidder concerning
this solicitation will be furnished promptly to all other prospective
bidders as a written amendment to the solicitation, if that information
is necessary in submitting bids, or if the lack of it would be prejudicial
to other prospective bidders.
(b) Any information obtained by, or provided to, a bidder other than
by formal amendment to the solicitation shall not constitute a change
to the solicitation.
3.
Amendments to Invitations for Bids
(a) If this solicitation is amended, then all terms and conditions
which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this
solicitation (1) by signing and returning the amendment, (2) by
identifying the amendment number and date on the bid form, or (3)
by letter, telegram, or facsimile, if those methods are authorized in
the solicitation.  The PHA/IHA must receive acknowledgement by the
time and at the place specified for receipt of bids.  Bids which fail to
acknowledge the bidder’s receipt of any amendment will result in the
rejection of the bid if the amendment(s) contained information which
substantively changed the PHA’s/IHA’s requirements.
(c)
Amendments will be on file in the offices of the PHA/IHA and the
Architect at least 7 days before bid opening.
4.
Responsibility of Prospective Contractor
(a) The PHA/IHA will award contracts only to responsible prospec-
tive contractors who have the ability to perform successfully under
the terms and conditions of the proposed contract.  In determining
the responsibility of a bidder, the PHA/IHA will consider such matters
as the bidder’s:
(1) Integrity;
(2) Compliance with public policy;
(3) Record of past performance; and
(4) Financial and technical resources (including construction
and technical equipment).
(b) Before a bid is considered for award, the bidder may be re-
quested by the PHA/IHA to submit a statement or other documenta-
tion regarding any of the items in paragraph (a) above.  Failure by the
bidder to provide such additional information shall render the bidder
nonresponsible and ineligible for award.
Page 1 of 4
Page 48 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Previous edition is obsolete
form HUD-5369 (10/2002)
5.
Late Submissions, Modifications, and Withdrawal of Bids
(a) Any bid received at the place designated in the solicitation after
the exact time specified for receipt will not be considered unless it is
received before award is made and it:
(1) Was sent by registered or certified mail not later than the
fifth calendar day before the date specified for receipt of offers (e.g.,
an offer submitted in response to a solicitation requiring receipt of
offers by the 20th of the month must have been mailed by the 15th);
(2) Was sent by mail, or if authorized by the solicitation, was
sent by telegram or via facsimile, and it is determined by the PHA/IHA
that the late receipt was due solely to mishandling by the PHA/IHA
after receipt at the PHA/IHA; or
(3) Was sent by U.S. Postal Service Express Mail Next Day
Service - Post Office to Addressee, not later than 5:00 p.m. at the
place of mailing two working days prior to the date specified for
receipt of proposals.  The term “working days” excludes weekends
and observed holidays.
(b) Any modification or withdrawal of a bid is subject to the same
conditions as in paragraph (a) of this provision.
(c)
The only acceptable evidence to establish the date of mailing of
a late bid, modification, or withdrawal sent either by registered or
certified mail is the U.S. or Canadian Postal Service postmark both
on the envelope or wrapper and on the original receipt from the U.S.
or Canadian Postal Service. Both postmarks must show a legible
date or the bid, modification, or withdrawal shall be processed as if
mailed late.  “Postmark” means a printed, stamped, or otherwise
placed impression (exclusive of a postage meter machine impres-
sion) that is readily identifiable without further action as having been
supplied and affixed by employees of the U.S. or Canadian Postal
Service on the date of mailing.  Therefore, bidders should request the
postal clerk to place a hand cancellation bull’s-eye postmark on both
the receipt and the envelope or wrapper.
(d)
The only acceptable evidence to establish the time of receipt at the
PHA/IHA is the time/date stamp of PHA/IHA on the proposal wrapper or
other documentary evidence of receipt maintained by the PHA/IHA.
(e) The only acceptable evidence to establish the date of mailing of
a late bid, modification, or withdrawal sent by Express Mail Next Day
Service-Post Office to Addressee is the date entered by the post
office receiving clerk on the “Express Mail Next Day Service-Post
Office to Addressee” label and the postmark on both the envelope or
wrapper and on the original receipt from the U.S. Postal Service.
“Postmark” has the same meaning as defined in paragraph (c) of this
provision, excluding postmarks of the Canadian Postal Service.
Therefore, bidders should request the postal clerk to place a legible
hand cancellation bull’s eye postmark on both the receipt and Failure
by a bidder to acknowledge receipt of the envelope or wrapper.
(f)
Notwithstanding paragraph (a) of this provision, a late modifica-
tion of an otherwise successful bid that makes its terms more
favorable to the PHA/IHA will be considered at any time it is received
and may be accepted.
(g) Bids may be withdrawn by written notice, or if authorized by this
solicitation, by telegram (including mailgram) or facsimile machine
transmission received at any time before the exact time set for
opening of bids; provided that written confirmation of telegraphic or
facsimile withdrawals over the signature of the bidder is mailed and
postmarked prior to the specified bid opening time.  A bid may be
withdrawn in person by a bidder or its authorized representative if,
before the exact time set for opening of bids, the identity of the person
requesting withdrawal is established and the person signs a receipt
for the bid.
6.
Bid Opening
All bids received by the date and time of receipt specified in the
solicitation will be publicly opened and read.  The time and place of
opening will be as specified in the solicitation.  Bidders and other
interested persons may be present.
7.
Service of Protest
(a) Definitions.  As used in this provision:
“Interested party” means an actual or prospective bidder whose
direct economic interest would be affected by the award of the
contract.
“Protest” means a written objection by an interested party to this
solicitation or to a proposed or actual award of a contract pursuant
to this solicitation.
(b) Protests shall be served on the Contracting Officer by obtaining
written and dated acknowledgement from —
[Contracting Officer designate the official or location where a protest
may be served on the Contracting Officer]
(c)
All protests shall be resolved in accordance with the PHA’s/
IHA’s protest policy and procedures, copies of which are maintained
at the PHA/IHA.
8.
Contract Award
(a) The PHA/IHA will evaluate bids in response to this solicitation
without discussions and will award a contract to the responsible
bidder whose bid, conforming to the solicitation, will be most advan-
tageous to the PHA/IHA considering only price and any price-related
factors specified in the solicitation.
(b) If the apparent low bid received in response to this solicitation
exceeds the PHA’s/IHA’s available funding for the proposed contract
work, the PHA/IHA may either accept separately priced items (see
8(e) below) or use the following procedure to determine contract
award.  The PHA/IHA shall apply in turn to each bid (proceeding in
order from the apparent low bid to the high bid) each of the separately
priced bid deductible items, if any, in their priority order set forth in
this solicitation.  If upon the application of the first deductible item to
all initial bids, a new low bid is within the PHA’s/IHA’s available
funding, then award shall be made to that bidder.  If no bid is within
the available funding amount, then the PHA/IHA shall apply the
second deductible item. The PHA/IHA shall continue this process
until an evaluated low bid, if any, is within the PHA’s/IHA’s available
funding. If upon the application of all deductibles, no bid is within the
PHA’s/IHA’s available funding, or if the solicitation does not request
separately priced deductibles, the PHA/IHA shall follow its written
policy and procedures in making any award under this solicitation.
(c)
In the case of tie low bids, award shall be made in accordance
with the PHA’s/IHA’s written policy and procedures.
(d) The PHA/IHA may reject any and all bids, accept other than the
lowest bid (e.g., the apparent low bid is unreasonably low), and waive
informalities or minor irregularities in bids received, in accordance
with the PHA’s/IHA’s written policy and procedures.
Page 2 of 4
Page 49 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Previous edition is obsolete
form HUD-5369 (10/2002)
(e) Unless precluded elsewhere in the solicitation, the PHA/IHA
may accept any item or combination of items bid.
(f)
The PHA/IHA may reject any bid as nonresponsive if it is
materially unbalanced as to the prices for the various items of work
to be performed.  A bid is materially unbalanced when it is based on
prices significantly less than cost for some work and prices which are
significantly overstated for other work.
(g) A written award shall be furnished to the successful bidder within
the period for acceptance specified in the bid and shall result in a
binding contract without further action by either party.
9.
Bid Guarantee (applicable to construction and equip-
ment contracts exceeding $25,000)
All bids must be accompanied by a negotiable bid guarantee which
shall not be less than five percent (5%) of the amount of the bid.  The
bid guarantee may be a certified check, bank draft, U.S. Government
Bonds at par value, or a bid bond secured by a surety company
acceptable to the U.S. Government and authorized to do business in
the state where the work is to be performed.  In the case where the
work under the contract will be performed on an Indian reservation
area, the bid guarantee may also be an irrevocable Letter of Credit
(see provision 10, Assurance of Completion, below).  Certified
checks and bank drafts must be made payable to the order of the
PHA/IHA.  The bid guarantee shall insure the execution of the
contract and the furnishing of a method of assurance of completion
by the successful bidder as required by the solicitation.  Failure to
submit a bid guarantee with the bid shall result in the rejection of the
bid. Bid guarantees submitted by unsuccessful bidders will be
returned as soon as practicable after bid opening.
10. Assurance of Completion
(a) Unless otherwise provided in State law, the successful bidder
shall furnish an assurance of completion prior to the execution of any
contract under this solicitation.  This assurance may be [Contracting
Officer check applicable items] —
[  ]
(1) a performance and payment bond in a penal sum of 100
percent of the contract price; or, as may be required or permitted by
State law;
[  ]
(2) separate performance and payment bonds, each for 50
percent or more of the contract price;
[  ]
(3) a 20 percent cash escrow;
[  ]
(4) a 25 percent irrevocable letter of credit; or,
[  ]
(5) an irrevocable letter of credit for 10 percent of the total
contract price with a monitoring and disbursements agreement with
the IHA (applicable only to contracts awarded by an IHA under the
Indian Housing Program).
(b) Bonds must be obtained from guarantee or surety companies
acceptable to the U.S. Government and authorized to do business in
the state where the work is to be performed.  Individual sureties will
not be considered.  U.S. Treasury Circular Number 570, published
annually in the Federal Register, lists companies approved to act as
sureties on bonds securing Government contracts, the maximum
underwriting limits on each contract bonded, and the States in which
the company is licensed to do business.  Use of companies listed in
this circular is mandatory.  Copies of the circular may be downloaded
on the U.S. Department of Treasury website http://
www.fms.treas.gov/c570/index.html, or ordered for a minimum fee
by contacting the Government Printing Office at (202) 512-2168.
(c)
Each bond shall clearly state the rate of premium and the total
amount of premium charged.  The current power of attorney for the
person who signs for the surety company must be attached to the
bond.  The effective date of the power of attorney shall not precede
the date of the bond. The effective date of the bond shall be on or after
the execution date of the contract.
(d) Failure by the successful bidder to obtain the required assur-
ance of completion within the time specified, or within such extended
period as the PHA/IHA may grant based upon reasons determined
adequate by the  PHA/IHA, shall render the bidder ineligible for
award.  The PHA/IHA may then either award the contract to the next
lowest responsible bidder or solicit new bids.  The PHA/IHA may
retain the ineligible bidder’s bid guarantee.
11. Preconstruction Conference (applicable to construction
contracts)
After award of a contract under this solicitation and prior to the start
of work, the successful bidder will be required to attend a
preconstruction conference with representatives of the PHA/IHA and
its architect/engineer, and other interested parties convened by the
PHA/IHA.  The conference will serve to acquaint the participants with
the general plan of the construction operation and all other require-
ments of the contract (e.g., Equal Employment Opportunity, Labor
Standards).  The PHA/IHA will provide the successful bidder with the
date, time, and place of the conference.
12. Indian Preference Requirements (applicable only if
this solicitation is for a contract to be performed on a
project for an Indian Housing Authority)
(a) HUD has determined that the contract awarded under this
solicitation is subject to the requirements of section 7(b) of the Indian
Self-Determination and Education Assistance Act (25 U.S.C. 450e(b)).
Section 7(b) requires that any contract or subcontract entered into for
the benefit of Indians shall require that, to the greatest extent feasible
(1) Preferences and opportunities for training and employment
(other than core crew positions; see paragraph (h) below) in connec-
tion with the administration of such contracts or subcontracts be
given to qualified “Indians.” The Act defines “Indians” to mean
persons who are members of an Indian tribe and defines “Indian
tribe” to mean any Indian tribe, band, nation, or other organized
group or community, including any Alaska Native village or regional
or village corporation as defined in or established pursuant to the
Alaska Native Claims Settlement Act, which is recognized as eligible
for the special programs and services provided by the United States
to Indians because of their status as Indians; and,
(2) Preference in the award of contracts or subcontracts in
connection with the administration of contracts be given to Indian
organizations and to Indian-owned economic enterprises, as de-
fined in section 3 of the Indian Financing Act of 1974 (25 U.S.C.
1452).  That Act defines “economic enterprise” to mean any Indian-
owned commercial, industrial, or business activity established or
organized for the purpose of profit, except that the Indian ownership
must constitute not less than 51 percent of the enterprise; “Indian
organization” to mean the governing body of any Indian tribe or entity
established or recognized by such governing body; “Indian” to mean
any person who is a member of any tribe, band, group, pueblo, or
community which is recognized by the Federal Government as
eligible for services from the Bureau of Indian Affairs and any
“Native” as defined in the Alaska Native Claims Settlement Act; and
Indian “tribe” to mean any Indian tribe, band, group, pueblo, or
community including Native villages and Native groups (including
Page 3 of 4
Page 50 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Previous edition is obsolete
form HUD-5369 (10/2002)
corporations organized by Kenai, Juneau, Sitka, and Kodiak) as
defined in the Alaska Native Claims Settlement Act, which is recog-
nized by the Federal Government as eligible for services from the
Bureau of Indian Affairs.
(b) (1) The successful Contractor under this solicitation shall com-
ply with the requirements of this provision in awarding all subcon-
tracts under the contract and in providing training and employment
opportunities.
(2) A finding by the IHA that the contractor, either (i) awarded
a subcontract without using the procedure required by the IHA, (ii)
falsely represented that subcontracts would be awarded to Indian
enterprises or organizations; or, (iii) failed to comply with the
contractor’s employment and training preference bid statement shall
be grounds for termination of the contract or for the assessment of
penalties or other remedies.
(c)
If specified elsewhere in this solicitation, the IHA may restrict the
solicitation to qualified Indian-owned enterprises and Indian organi-
zations.  If two or more (or a greater number as specified elsewhere
in the solicitation) qualified Indian-owned enterprises or organiza-
tions submit responsive bids, award shall be made to the qualified
enterprise or organization with the lowest responsive bid.  If fewer
than the minimum required number of qualified Indian-owned enter-
prises or organizations submit responsive bids, the IHA shall reject
all bids and readvertise the solicitation in accordance with paragraph
(d) below.
(d) If the IHA prefers not to restrict the solicitation as described in
paragraph (c) above, or if after having restricted a solicitation an
insufficient number of qualified Indian enterprises or organizations
submit bids, the IHA may advertise for bids from non-Indian as well
as Indian-owned enterprises and Indian organizations.  Award shall
be made to the qualified Indian enterprise or organization with the
lowest responsive bid if that bid is -
(1) Within the maximum HUD-approved budget amount estab-
lished for the specific project or activity for which bids are being
solicited; and
(2) No more than the percentage specified in 24 CFR 905.175(c)
higher than the total bid price of the lowest responsive bid from any
qualified bidder.  If no responsive bid by a qualified Indian-owned
economic enterprise or organization is within the stated range of the
total bid price of the lowest responsive bid from any qualified
enterprise, award shall be made to the bidder with the lowest bid.
(e) Bidders seeking to qualify for preference in contracting or
subcontracting shall submit proof of Indian ownership with their bids.
Proof of Indian ownership shall include but not be limited to:
(1) Certification by a tribe or other evidence that the bidder is
an Indian.  The IHA shall accept the certification of a tribe that an
individual is a member.
(2) Evidence such as stock ownership, structure, manage-
ment, control, financing and salary or profit sharing arrangements of
the enterprise.
(f)
(1) All bidders must submit with their bids a statement describ-
ing how they will provide Indian preference in the award  of subcon-
tracts.  The specific requirements of that statement and the factors
to used by the IHA in determining the statement’s adequacy are
included as an attachment to this solicitation.  Any bid that fails to
include the required statement shall be rejected as nonresponsive.
The IHA may require that comparable statements be provided by
subcontractors to the successful Contractor, and may require the
Contractor to reject any bid or proposal by a subcontractor that fails
to include the statement.
(2) Bidders and prospective subcontractors shall submit a
certification (supported by credible evidence) to the IHA in any
instance where the bidder or subcontractor believes it is infeasible to
provide Indian preference in subcontracting.  The acceptance or
rejection by the IHA of the certification shall be final.  Rejection shall
disqualify the bid from further consideration.
(g) All bidders must submit with their bids a statement detailing their
employment and training opportunities and their plans to provide
preference to Indians in implementing the contract; and the number
or percentage of Indians anticipated to be employed and trained.
Comparable statements from all proposed subcontractors must be
submitted.  The criteria to be used by the IHA in determining the
statement(s)’s adequacy are included as an attachment to this
solicitation.  Any bid that fails to include the required statement(s), or
that includes a statement that does not meet minimum standards
required by the IHA shall be rejected as nonresponsive.
(h) Core crew employees.  A core crew employee is an individual
who is a bona fide employee of the contractor at the time the bid is
submitted; or an individual who was not employed by the bidder at the
time the bid was submitted, but who is regularly employed by the
bidder in a supervisory or other key skilled position when work is
available.  Bidders shall submit with their bids a list of all core crew
employees.
(i)
Preference in contracting, subcontracting, employment, and
training shall apply not only on-site, on the reservation, or within the
IHA’s jurisdiction, but also to contracts with firms that operate outside
these areas (e.g., employment in modular or manufactured housing
construction facilities).
(j)
Bidders should contact the IHA to determine if any additional
local preference requirements are applicable to this solicitation.
(k)
The IHA  [  ] does  [  ] does not [Contracting Officer check
applicable box] maintain lists of Indian-owned economic enterprises
and Indian organizations by specialty (e.g., plumbing, electrical,
foundations), which are available to bidders to assist them in meeting
their responsibility to provide preference in connection with the
administration of contracts and subcontracts.
Page 4 of 4
Page 51 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

form HUD-5369-A (11/92)
Previous edition is obsolete
Representations, Certifications,
and Other Statements of Bidders
Public and Indian Housing Programs
U.S. Department of Housing
and Urban Development
Office of Public and Indian Housing
Page 52 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

form HUD-5369-A (11/92)
Previous edition is obsolete
Representations, Certifications,
and Other Statements of Bidders
Public and Indian Housing Programs
Table of Contents
Clause
Page
1.
Certificate of Independent Price Determination
1
2.
Contingent Fee Representation and Agreement
1
3.
Certification and Disclosure Regarding Payments
to Influence Certain Federal Transactions
1
4.
Organizational Conflicts of Interest Certification
2
5.
Bidder's Certification of Eligibility
2
6.
Minimum Bid Acceptance Period
2
7.
Small, Minority, Women-Owned Business Concern
 Representation
2
8.
Indian-Owned Economic Enterprise and Indian
Organization Representation
2
9.
Certification of Eligibility Under the Davis-Bacon Act
3
10. Certification of Nonsegregated Facilities
3
11. Clean Air and Water Certification
3
12. Previous Participation Certificate
3
13. Bidder's Signature
3
1.
Certificate of Independent Price Determination
(a) The bidder certifies that--
(1) The prices in this bid have been arrived at independently,
without, for the purpose of restricting competition, any consultation,
communication, or agreement with any other bidder or competitor
relating to (i) those prices, (ii) the intention to submit a bid, or (iii) the
methods or factors used to calculate the prices offered;
(2) The prices in this bid have not been and will not be
knowingly disclosed by the bidder, directly or indirectly, to any other
bidder or competitor before bid opening (in the case of a sealed bid
solicitation) or contract award (in the case of a competitive proposal
solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the bidder to
induce any other concern to submit or not to submit a bid for the
purpose of restricting competition.
(b) Each signature on the bid is considered to be a certification by
the signatory that the signatory--
(1) Is the person in the bidder's organization responsible for
determining the prices being offered in this bid or proposal, and that
the signatory has not participated and will not participate in any
action contrary to subparagraphs (a)(l) through (a)(3) above; or
(2) (i)
Has been authorized, in writing, to act as agent for the
following principals in certifying that those principals have not
participated, and will not participate in any action contrary to
subparagraphs (a)(l) through (a)(3) above.
_______________________________________________ [insert
full name of person(s) in the bidder's organization responsible for
determining the prices offered in this bid or proposal, and the title of
his or her position in the bidder's organization];
(ii)
As an authorized agent, does certify that the principals
named in subdivision (b)(2)(i) above have not participated, and will
not participate, in any action contrary to subparagraphs (a)(1)
through (a)(3) above; and
(iii) As an agent, has not personally participated, and will
not participate in any action contrary to subparagraphs (a)(1)
through (a)(3) above.
(c) If the bidder deletes or modifies subparagraph (a)2 above, the
bidder must furnish with its bid a signed statement setting forth in
detail the circumstances of the disclosure.
[  ] [Contracting Officer check if following paragraph is applicable]
(d) Non-collusive affidavit. (applicable to contracts for construction
and equipment exceeding $50,000)
(1) Each bidder shall execute, in the form provided by the PHA/
IHA, an affidavit to the effect that he/she has not colluded with any
other person, firm or corporation in regard to any bid submitted in
response to this solicitation.  If the successful bidder did not submit
the affidavit with his/her bid, he/she must submit it within three (3)
working days of bid opening.  Failure to submit the affidavit by that
date may render the bid nonresponsive.  No contract award will be
made without a properly executed affidavit.
(2) A fully executed "Non-collusive Affidavit"   [  ] is,  [  ] is not
included with the bid.
2.
Contingent Fee Representation and Agreement
(a) Definitions.  As used in this provision:
"Bona fide employee" means a person, employed by a bidder
and subject to the bidder's supervision and control as to time, place,
and manner of performance, who neither exerts, nor proposes to
exert improper influence to solicit or obtain contracts nor holds out
as being able to obtain any contract(s) through improper influence.
"Improper influence" means any influence that induces or tends
to induce a PHA/IHA employee or officer to give consideration or to
act regarding a PHA/IHA contract on any basis other than the merits
of the matter.
(b) The bidder represents and certifies as part of its bid that, except
for full-time bona fide employees working solely for the bidder, the
bidder:
(1) [  ] has,  [  ] has not  employed or retained any person or
company to solicit or obtain this contract; and
(2) [  ] has,  [  ] has not  paid or agreed to pay to any person or
company employed or retained to solicit or obtain this contract any
commission, percentage, brokerage, or other fee contingent upon or
resulting from the award of this contract.
(c) If the answer to either (a)(1) or (a)(2) above is affirmative, the
bidder shall make an immediate and full written disclosure to the
PHA/IHA Contracting Officer.
(d) Any misrepresentation by the bidder shall give the PHA/IHA the
right to (1) terminate the contract; (2) at its discretion, deduct from
contract payments the amount of any commission, percentage,
brokerage, or other contingent fee; or (3) take other remedy
pursuant to the contract.
3.
Certification and Disclosure Regarding Payments to
Influence Certain Federal Transactions (applicable to
contracts exceeding $100,000)
(a) The definitions and prohibitions contained in Section 1352 of
title 31, United States Code, are hereby incorporated by reference
in paragraph (b) of this certification.
Page1 of 3
Page 53 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

form HUD-5369-A (11/92)
Previous edition is obsolete
6.
Minimum Bid Acceptance Period
(a) "Acceptance period," as used in this provision, means the
number of calendar days available to the PHA/IHA for awarding a
contract from the date specified in this solicitation for receipt of bids.
(b) This provision supersedes any language pertaining to the
acceptance period that may appear elsewhere in this solicitation.
(c) The PHA/IHA requires a minimum acceptance period of
[Contracting Officer insert time period] calendar days.
(d) In the space provided immediately below, bidders may specify
a longer acceptance period than the PHA's/IHA's minimum require-
ment.  The bidder allows the following acceptance period:
calendar days.
(e) A bid allowing less than the PHA's/IHA's minimum acceptance
period will be rejected.
(f)
The bidder agrees to execute all that it has undertaken to do, in
compliance with its bid, if that bid is accepted in writing within (1) the
acceptance period stated in paragraph (c) above or (2) any longer
acceptance period stated in paragraph (d) above.
7.
Small, Minority, Women-Owned Business Concern
Representation
The bidder represents and certifies as part of its bid/ offer that it --
(a) [  ] is,  [  ] is not  a small business concern.  "Small business
concern," as used in this provision, means a concern, including its
affiliates, that is independently owned and operated, not dominant
in the field of operation in which it is bidding, and qualified as a small
business under the criteria and size standards in 13 CFR 121.
(b) [    ] is,  [    ] is not  a women-owned business enterprise.  "Women-
owned business enterprise," as used in this provision, means a
business that is at least 51 percent owned by a woman or women
who are U.S. citizens and who also control and operate the business.
(c) [    ] is,  [    ] is not  a minority business enterprise. "Minority
business enterprise," as used in this provision, means a business
which is at least 51 percent owned or controlled by one or more
minority group members or, in the case of a publicly owned business,
at least 51 percent of its voting stock is owned by one or more
minority group members, and whose management and daily opera-
tions are controlled by one or more such individuals. For the purpose
of this definition, minority group members are:
(Check the block applicable to you)
[  ]  Black Americans
[  ]  Asian Pacific Americans
[  ]  Hispanic Americans
[  ]  Asian Indian Americans
[  ]  Native Americans
[  ]  Hasidic Jewish Americans
8.
Indian-Owned Economic Enterprise and Indian
Organization  Representation (applicable only if this
solicitation is for a contract to be performed on a project for an
Indian Housing Authority)
The bidder represents and certifies that it:
(a) [    ] is,  [    ] is not  an Indian-owned economic enterprise.
"Economic enterprise," as used in this provision, means any com-
mercial, industrial, or business activity established or organized for
the purpose of profit, which is at least 51 percent Indian owned.
"Indian," as used in this provision, means any person who is a
member of any tribe, band, group, pueblo, or community which is
recognized by the Federal Government as eligible for services from
the Bureau of Indian Affairs and any "Native" as defined in the Alaska
Native Claims Settlement Act.
(b) [   ] is,  [   ] is not  an Indian organization. "Indian organization,"
as used in this provision, means the governing body of any Indian
tribe or entity established or recognized by such governing body.
Indian "tribe" means any Indian tribe, band, group, pueblo, or
(b) The bidder, by signing its bid, hereby certifies to the best of his
or her knowledge and belief as of December 23, 1989 that:
(1) No Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an
officer or employee of any agency, a Member of Congress, an officer
or employee of Congress, or an employee of a Member of Congress
on his or her behalf in connection with the awarding of a contract
resulting from this solicitation;
(2) If any funds other than Federal appropriated funds (includ-
ing profit or fee received under a covered Federal transaction) have
been paid, or will be paid, to any person for influencing or attempting
to influence an officer or employee of any agency, a Member of
Congress, an officer or employee of Congress, or an employee of a
Member of Congress on his or her behalf in connection with this
solicitation, the bidder shall complete and submit, with its bid, OMB
standard form LLL, "Disclosure of Lobbying Activities;" and
(3) He or she will include the language of this certification in all
subcontracts at any tier and require that all recipients of subcontract
awards in excess of $100,000 shall certify and disclose accordingly.
(c) Submission of this certification and disclosure is a prerequisite
for making or entering into this contract imposed by section 1352,
title 31, United States Code. Any person who makes an expenditure
prohibited under this provision or who fails to file or amend the
disclosure form to be filed or amended by this provision, shall be
subject to a civil penalty of not less than $10,000, and not more than
$100,000, for each such failure.
(d) Indian tribes (except those chartered by States) and Indian
organizations as defined in section 4 of the Indian Self-Determina-
tion and Education Assistance Act (25 U.S.C. 450B) are exempt
from the requirements of this provision.
4.
Organizational Conflicts of Interest Certification
The bidder certifies that to the best of its knowledge and belief and
except as otherwise disclosed, he or she does not have any
organizational conflict of interest which is defined as a situation in
which the nature of work to be performed under this proposed
contract and the bidder's organizational, financial, contractual, or
other interests may, without some restriction on future activities:
(a) Result in an unfair competitive advantage to the bidder; or,
(b) Impair the bidder's objectivity in performing the contract work.
[  ]
In the absence of any actual or apparent conflict, I hereby  certify
that to the best of my knowledge and belief, no actual or apparent
conflict of interest exists with regard to my possible performance of
this procurement.
5.
Bidder's Certification of Eligibility
(a) By the submission of this bid, the bidder certifies that to the best
of its knowledge and belief, neither it, nor any person or firm which
has an interest in the bidder's firm, nor any of the bidder's subcon-
tractors,  is ineligible to:
(1) Be awarded contracts by any agency of the United States
Government, HUD, or the State in which this contract is to be
performed; or,
(2) Participate in HUD programs pursuant to 24 CFR Part 24.
(b) The certification in paragraph (a) above is a material represen-
tation of fact upon which reliance was placed when making award.
If it is later determined that the bidder knowingly rendered an
erroneous certification, the contract may be terminated for default,
and the bidder may be debarred or suspended from participation in
HUD programs and other Federal contract programs.
Page 2 of 3
Page 54 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

form HUD-5369-A (11/92)
Previous edition is obsolete
community including Native villages and Native groups (including
corporations organized by Kenai, Juneau, Sitka, and Kodiak) as
defined in the Alaska Native Claims Settlement Act, which is
recognized by the Federal Government as eligible for services from
the Bureau of Indian Affairs.
9.
Certification of Eligibility Under the Davis-Bacon
Act (applicable to construction contracts exceeding $2,000)
(a) By the submission of this bid, the bidder certifies that neither it
nor any person or firm who has an interest in the bidder's firm is a
person or firm ineligible to be awarded contracts by the United States
Government by virtue of section 3(a) of the Davis-Bacon Act or 29
CFR 5.12(a)(1).
(b) No part of the contract resulting from this solicitation shall be
subcontracted to any person or firm ineligible to be awarded
contracts by the United States Government by virtue of section 3(a)
of the Davis-Bacon Act or 29 CFR 5.12(a)(1).
(c) The penalty for making false statements is prescribed in the U.
S. Criminal Code, 18 U.S.C. 1001.
10.
Certification of Nonsegregated Facilities (applicable
to contracts exceeding $10,000)
(a) The bidder's attention is called to the clause entitled Equal
Employment Opportunity  of the General Conditions of the Con-
tract for Construction.
(b) "Segregated facilities," as used in this provision, means any
waiting rooms, work areas, rest rooms and wash rooms, restaurants
and other eating areas, time clocks, locker rooms and other storage
or dressing areas, parking lots, drinking fountains, recreation or
entertainment areas, transportation, and housing facilities provided
for employees, that are segregated by explicit directive or are in fact
segregated on the basis of race, color, religion, or national origin
because of habit, local custom, or otherwise.
(c) By the submission of this bid, the bidder certifies that it does not
and will not maintain or provide for its employees any segregated
facilities at any of its establishments, and that it does not and will not
permit its employees to perform their services at any location under
its control where segregated facilities are maintained.  The bidder
agrees that a breach of this certification is a violation of the Equal
Employment Opportunity clause in the contract.
(d) The bidder further agrees that (except where it has obtained
identical certifications from proposed subcontractors for specific
time periods) prior to entering into subcontracts which exceed
$10,000 and are not exempt from the requirements of the Equal
Employment Opportunity clause, it will:
(1) Obtain identical certifications from the proposed subcon-
tractors;
(2) Retain the certifications in its files; and
(3) Forward the following notice to the proposed subcontrac-
tors (except if the proposed subcontractors have submitted identical
certifications for specific time periods):
Notice to Prospective Subcontractors of Requirement for
Certifications of Nonsegregated Facilities
A Certification of Nonsegregated Facilities must be submitted before
the award of a subcontract exceeding $10,000 which is not exempt
from the provisions of the Equal Employment Opportunity clause of
the prime contract.  The certification may be submitted either for
each subcontract or for all subcontracts during a period (i.e.,
quarterly, semiannually, or annually).
Note:  The penalty for making false statements in bids is prescribed
in 18 U.S.C. 1001.
11.
Clean Air and Water Certification (applicable to con-
tracts exceeding $100,000)
The bidder certifies that:
(a) Any facility to be used in the performance of this contract  [    ]
is,   [   ] is not  listed on the Environmental Protection Agency List of
Violating Facilities:
(b) The bidder will immediately notify the PHA/IHA Contracting
Officer, before award, of the receipt of any communication from the
Administrator, or a designee, of the Environmental Protection
Agency, indicating that any facility that the bidder proposes to use
for the performance of the contract is under consideration to be
listed on the EPA List of Violating Facilities; and,
(c) The bidder will include a certification substantially the same as
this certification, including this paragraph (c), in every nonexempt
subcontract.
12.
Previous Participation Certificate (applicable to
construction and equipment contracts exceeding $50,000)
(a) The bidder shall complete and submit with his/her bid the Form
HUD-2530, "Previous Participation Certificate."  If the successful
bidder does not submit the certificate with his/her bid, he/she must
submit it within three (3) working days of bid opening.  Failure to
submit the certificate by that date may render the bid nonresponsive.
No contract award will be made without a properly executed certifi-
cate.
(b) A fully executed "Previous Participation Certificate"
[   ] is,  [   ] is not  included with the bid.
13.
Bidder's Signature
The bidder hereby certifies that the information contained in these
certifications and representations is accurate, complete, and
current.
__________________________________________________________________
(Signature and Date)
__________________________________________________________________
(Typed or Printed Name)
__________________________________________________________________
(Title)
__________________________________________________________________
(Company Name)
(Company Address)
Page 3 of 3
Page 55 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

General Conditions for Construction 
Public Housing Programs
U.S. Department of Housing and Urban 
Contracts
Development 
-
Office of Public and Indian Housing 
OMB Approval No. 2577-0157 (exp. 1/31/2017) 
Applicability. This form is applicable to any
construction/development contract greater than $100,000.
This form includes those clauses required by OMB's common rule on grantee procurement, implemented at HUD in 24 CFR 85.36, and 
those requirements set forth in Section 3 of the Housing and Urban Development Act of 1968 and its amendment by the Housing and 
Community Development Act of 1992, implemented by HUD at 24 CFR Part 135. The form is required for construction contracts 
awarded by Public Housing Agencies (PHAs). 
The form is used by Housing Authorities in solicitations to provide necessary contract clauses. If the form were not used, HAs would be 
unable to enforce their contracts. 
Public reporting burden for this collection of information is estimated to average 1.0 hours per response, including the time for reviewing 
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection 
of information. Responses to the collection of information are required to obtain a benefit or to retain a benefit. 
The information requested does not lend itself to confidentiality. 
HUD may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently
valid OMB number. 
Table of Contents
Clause
Page 
Clause
Page 
1. 
Definitions 
2
Administrative Requirements
Construction Requirements
Contract Modifications 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 1 of 19 
form HUD-5370 (8/2016)  
Temporary Buildings and Transportation Materials
Clean Air and Water
2.
Contractor’s Responsibility for Work
2
25.
Contract Period
9
3. 
Architect’s Duties, Responsibilities and Authority
2 
26. 
Order of Precedence
9 
4.
Other Contracts
3
27.
Payments
9
5.
Preconstruction Conference and Notice to Proceed
3
29.
Changes
10
6.
Construction Progress Schedule
3
30.
Suspension of Work
11
7. 
Site Investigation and Conditions Affecting the Work
3 
31. 
Disputes
11 
8. 
Differing Site Conditions
4 
32. 
Default
11 
9. 
Specifications and Drawings for Construction
4 
33. 
Liquidated 
12 
10. 
As-Built Drawings
5 
34. 
Termination of Convenience
12 
11.
Material and Workmanship
5
35.
Assignment of Contract
12
12. 
Permits and Codes
5 
36. 
Insurance
12 
13.
Health, Safety, and Accident Prevention
6
37.
Subcontracts
13
Subcontracting with Small and Minority Firms, Women’s 
Business Enterprise, and Labor Surplus Area Firms 
15.
Availability and Use of Utility Services
6
39.
Equal Employment Opportunity
13
Protection of Existing Vegetation, Structures, 
Equipment, Utilities, and Improvements 
6 
Employment, Training, and Contracting Opportunities 
for Low-Income Persons, Section 3 of the Housing and 
Urban Development Act of 1968 
17.
Temporary Buildings and Transportation Materials
7
41.
Interest of Members of Congress
15
Interest of Members, Officers, or Employees and Former 
Members, Officers, or Employees 
19.
Energy Efficiency
7
43.
Limitations on Payments Made to Influence
15
20.
Inspection and Acceptance of Construction
7
44.
Royalties and Patents
15
21. 
Use and Possession Prior to 
8 
45. 
Examination and Retention of Contractor’s Records
15 
22. 
Warranty of Title
8 
46. 
Labor Standards-Davis-Bacon and Related Acts
15 
23. 
Warranty of 
8 
47. 
Non-Federal Prevailing Wage Rates
19 
24. 
Prohibition Against 
9 
48. 
Procurement of Recovered 
19 
42.
7
14
15
13
40.
38.
6
18.
14.
16.
28.
10
Page 56 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

1. Definitions 
(a) The Contractor shall furnish all necessary labor, 
(a) “Architect” means the person or other entity engaged by 
the PHA to perform architectural, engineering, design, 
and other services related to the work as provided for in 
the contract. When a PHA uses an engineer to act in this 
capacity, the terms “architect” and “engineer” shall be 
synonymous. The Architect shall serve as a technical 
representative of the Contracting Officer. The Architect’s 
materials, tools, equipment, and transportation necessary 
for performance of the work. The Contractor shall also 
furnish all necessary water, heat, light, and power not 
made available to the Contractor by the PHA pursuant to 
the clause entitled Availability and Use of Utility Services 
herein. 
(b) The Contractor shall perform on the site, and with its own 
authority is as set forth elsewhere in this contract. 
organization, work equivalent to at least [ 
] (12 percent
unless otherwise indicated) of the total amount of work to 
be performed under the order. This percentage may be 
reduced by a supplemental agreement to this order if, 
during performing the work, the Contractor requests a 
reduction and the Contracting Officer determines that the
(b) “Contract” means the contract entered into between the 
PHA and the Contractor. It includes the forms of Bid, the 
Bid Bond, the Performance and Payment Bond or Bonds 
or other assurance of completion, the Certifications, 
Representations, and Other Statements of Bidders (form 
HUD-5370), these General Conditions of the Contract for 
Construction (form HUD-5370), the applicable wage rate 
determinations from the U.S. Department of Labor, any 
special conditions included elsewhere in the contract, the 
specifications, and drawings. It includes all formal 
changes to any of those documents by addendum, 
reduction would be to the advantage of the PHA. 
(c) At all times during performance of this contract and until 
the work is completed and accepted, the Contractor shall 
directly superintend the work or assign and have on the 
work site a competent superintendent who is satisfactory 
to the Contracting Officer and has authority to act for the 
Contractor. 
change order, or other modification. 
(d) The Contractor shall be responsible for all damages to 
(c) “Contracting Officer” means the person delegated the au- 
persons or property that occur as a result of the 
Contractor’s fault or negligence, and shall take proper
thority by the PHA to enter into, administer, and/or 
terminate this contract and designated as such in writing 
to the Contractor. The term includes any successor 
safety and health precautions to protect the work, the 
workers, the public, and the property of others. The 
Contractor shall hold and save the PHA, its officers and 
agents, free and harmless from liability of any nature 
occasioned by the Contractor’s performance. The 
Contractor shall also be responsible for all materials 
delivered and work performed until completion and 
acceptance of the entire work, except for any completed 
unit of work which may have been accepted under the 
Contracting Officer and any duly authorized 
representative of the Contracting Officer also designated 
in writing. The Contracting Officer shall be deemed the 
authorized agent of the PHA in all dealings with the 
Contractor. 
(d) “Contractor” means the person or other entity entering 
into the contract with the PHA to perform all of the work 
required under the contract. 
contract. 
(e) “Drawings” means the drawings enumerated in the 
(e) The Contractor shall lay out the work from base lines and 
schedule of drawings contained in the Specifications and
as described in the contract clause entitled Specifications
bench marks indicated on the drawings and be 
responsible for all lines, levels, and measurements of all 
work executed under the contract. The Contractor shall 
verify the figures before laying out the work and will be 
held responsible for any error resulting from its failure to 
and Drawings for Construction herein. 
(f) “HUD” means the United States of America acting through 
the Department of Housing and Urban Development 
including the Secretary, or any other person designated to 
act on its behalf. HUD has agreed, subject to the 
provisions of an Annual Contributions Contract (ACC), to 
provide financial assistance to the PHA, which includes 
assistance in financing the work to be performed under 
this contract. As defined elsewhere in these General 
Conditions or the contract documents, the determination 
of HUD may be required to authorize changes in the work 
or for release of funds to the PHA for payment to the 
Contractor. Notwithstanding HUD’s role, nothing in this 
contract shall be construed to create any contractual 
do so. 
(f) The Contractor shall confine all operations (including 
storage of materials) on PHA premises to areas 
authorized or approved by the Contracting Officer. 
(g) The Contractor shall at all times keep the work area, 
relationship between the Contractor and HUD. 
including storage areas, free from accumulations of 
waste materials. After completing the work and before 
final inspection, the Contractor shall (1) remove from the 
premises all scaffolding, equipment, tools, and materials 
(including rejected materials) that are not the property of 
the PHA and all rubbish caused by its work; (2) leave the 
work area in a clean, neat, and orderly condition 
satisfactory to the Contracting Officer; (3) perform all 
specified tests; and, (4) deliver the installation in 
(g) “Project” means the entire project, whether construction 
or rehabilitation, the work for which is provided for in 
whole or in part under this contract.
complete and operating condition. 
(h) “PHA” means the Public Housing Agency organized 
under applicable state laws which is a party to this 
(h) The Contractor’s responsibility will terminate when all 
contract. 
work has been completed, the final inspection made, and 
the work accepted by the Contracting Officer. The 
Contractor will then be released from further obligation 
except as required by the warranties specified elsewhere 
in the contract. 
(j) “Specifications” means the written description of the 
technical requirements for construction and includes the
criteria and tests for determining whether the 
requirements are met. 
(l) “Work” means materials, workmanship, and manufacture 
and fabrication of components. 
3. Architect’s Duties, Responsibilities, and Authority 
2. Contractor’s Responsibility for Work 
(a) The Architect for this contract, and any successor, shall 
be designated in writing by the Contracting Officer. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 2 of 19 
form HUD-5370 (8/2016)  
Page 57 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(b) The Architect shall serve as the Contracting Officer’s 
technical representative with respect to architectural, 
engineering, and design matters related to the work 
performed under the contract. The Architect may provide 
direction on contract performance. Such direction shall be 
within the scope of the contract and may not be of a 
nature which: (1) institutes additional work outside the 
scope of the contract; (2) constitutes a change as defined 
in the Changes clause herein; (3) causes an increase or 
decrease in the cost of the contract; (4) alters the 
Construction Progress Schedule; or (5) changes any of 
the other express terms or conditions of the contract. 
6. Construction Progress Schedule 
(a) The Contractor shall, within five days after the work 
(c) The Architect’s duties and responsibilities may include but 
commences on the contract or another period of time 
determined by the Contracting Officer, prepare and 
submit to the Contracting Officer for approval three copies 
of a practicable schedule showing the order in which the 
Contractor proposes to perform the work, and the dates 
on which the Contractor contemplates starting and 
completing the several salient features of the work 
(including acquiring labor, materials, and equipment). The 
schedule shall be in the form of a progress chart of 
suitable scale to indicate appropriately the percentage of 
work scheduled for completion by any given date during 
the period. If the Contractor fails to submit a schedule 
within the time prescribed, the Contracting Officer may 
withhold approval of progress payments or take other 
remedies under the contract until the Contractor submits 
shall not be limited to: 
(1) Making periodic visits to the work site, and on the 
basis of his/her on-site inspections, issuing written 
reports to the PHA which shall include all observed 
deficiencies. The Architect shall file a copy of the 
report with the Contractor’s designated representative
at the site; 
the required schedule. 
(2) Making modifications in drawings and technical 
(b) The Contractor shall enter the actual progress on the 
chart as required by the Contracting Officer, and 
immediately deliver three copies of the annotated 
schedule to the Contracting Officer. If the Contracting 
Officer determines, upon the basis of inspection 
conducted pursuant to the clause entitled Inspection and 
Acceptance of Construction, herein that the Contractor is 
not meeting the approved schedule, the Contractor shall 
take steps necessary to improve its progress, including 
those that may be required by the Contracting Officer, 
without additional cost to the PHA. In this circumstance, 
the Contracting Officer may require the Contractor to 
increase the number of shifts, overtime operations, days 
of work, and/or the amount of construction plant, and to 
submit for approval any supplementary schedule or 
schedules in chart form as the Contracting Officer deems 
necessary to demonstrate how the approved rate of 
specifications and assisting the Contracting Officer in
the preparation of change orders and other contract 
modifications for issuance by the Contracting Officer; 
(3) Reviewing and making recommendations with respect 
to - (i) the Contractor’s construction progress 
schedules; (ii) the Contractor’s shop and detailed 
drawings; (iii) the machinery, mechanical and other 
equipment and materials or other articles proposed 
for use by the Contractor; and, (iv) the Contractor’s 
price breakdown and progress payment estimates; 
and, 
(4) Assisting in inspections, signing Certificates of 
Completion, and making recommendations with 
respect to acceptance of work completed under the 
contract. 
4. Other Contracts 
progress will be regained. 
The PHA may undertake or award other contracts for 
additional work at or near the site of the work under this 
contract. The Contractor shall fully cooperate with the 
other contractors and with PHA employees and shall 
carefully adapt scheduling and performing the work under 
this contract to accommodate the additional work, heeding 
any direction that may be provided by the Contracting 
Officer. The Contractor shall not commit or permit any act 
that will interfere with the performance of work by any 
other contractor or by PHA employees 
(c) Failure of the Contractor to comply with the requirements 
of the Contracting Officer under this clause shall be 
grounds for a determination by the Contracting Officer that 
the Contractor is not prosecuting the work with sufficient 
diligence to ensure completion within the time 
specified in the Contract. Upon making this 
determination, the Contracting Officer may terminate the 
Contractor’s right to proceed with the work, or any 
separable part of it, in accordance with the Default clause 
of this contract. 
7. Site Investigation and Conditions Affecting the Work 
Construction Requirements 
5. Pre-construction Conference and Notice to Proceed 
(a) The Contractor acknowledges that it has taken steps 
reasonably necessary to ascertain the nature and location 
of the work, and that it has investigated and satisfied itself 
as to the general and local conditions which can affect the 
work or its cost, including but not limited to, (1) conditions 
bearing upon transportation, disposal, handling, and 
storage of materials; (2) the availability of labor, water, 
electric power, and roads;(3) uncertainties of weather, 
river stages, tides, or similar physical conditions at the 
site; (4) the conformation and conditions of the ground; 
and (5) the character of equipment and facilities needed 
preliminary to and during work performance. The 
Contractor also acknowledges that it has satisfied itself as 
to the character, quality, and quantity of surface and 
subsurface materials or obstacles to be encountered 
insofar as this information is 
(a) Within ten calendar days of contract execution, and prior 
to the commencement of work, the Contractor shall 
attend a preconstruction conference with representatives 
of the PHA, its Architect, and other interested parties 
convened by the PHA. The conference will serve to 
acquaint the participants with the general plan of the 
construction operation and all other requirements of the 
contract. The PHA will provide the Contractor with the 
date, time, and place of the conference. 
(b) The contractor shall begin work upon receipt of a written 
Notice to Proceed from the Contracting Officer or 
designee. The Contractor shall not begin work prior to 
receiving such notice. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 3 of 19 
form HUD-5370 (8/2016)  
Page 58 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

reasonably ascertainable from an inspection of the site, 
including all exploratory work done by the PHA, as well 
as from the drawings and specifications made a part of 
this contract. Any failure of the Contractor to take the 
actions described and acknowledged in this paragraph 
will not relieve the Contractor from responsibility for 
estimating properly the difficulty and cost of successfully 
performing the work, or for proceeding to successfully 
promptly submitted to the Contracting Officer, who shall 
promptly make a determination in writing. Any adjustment 
by the Contractor without such a determination shall be at 
its own risk and expense. The Contracting Officer shall 
furnish from time to time such detailed drawings and other 
information as considered necessary, unless 
otherwise provided. 
perform the work without additional expense to the PHA. 
(b) Wherever in the specifications or upon the drawings the 
words “directed”, “required”, “ordered”, “designated”, 
“prescribed”, or words of like import are used, it shall be
(b) The PHA assumes no responsibility for any conclusions 
or interpretations made by the Contractor based on the 
information made available by the PHA. Nor does the 
PHA assume responsibility for any understanding 
reached or representation made concerning conditions 
which can affect the work by any of its officers or agents 
before the execution of this contract, unless that 
understanding or representation is expressly stated in 
this contract. 
understood that the “direction”, “requirement”, “order”, 
“designation”, or “prescription”, of the Contracting Officer 
is intended and similarly the words “approved”, 
“acceptable”, “satisfactory”, or words of like import shall
mean “approved by”, or “acceptable to”, or “satisfactory 
to” the Contracting Officer, unless otherwise expressly 
stated. 
(c) Where “   shown” “ indicated”, as detailed”, or words 
as
,as
8. Differing Site Conditions 
of similar import are used, it shall be understood that the 
reference is made to the drawings accompanying this 
contract unless stated otherwise. The word “provided” as 
used herein shall be understood to mean “provide 
complete in place” that is “furnished and installed”. 
(a) The Contractor shall promptly, and before the conditions 
are disturbed, give a written notice to the Contracting 
Officer of (1) subsurface or latent physical conditions at 
the site which differ materially from those indicated in this 
contract, or (2) unknown physical conditions at the 
site(s), of an unusual nature, which differ materially from 
those ordinarily encountered and generally recognized as 
inhering in work of the character provided for in the 
(d) “Shop drawings” means drawings, submitted to the PHA 
contract. 
by the Contractor, subcontractor, or any lower tier 
subcontractor, showing in detail (1) the proposed 
fabrication and assembly of structural elements and (2) 
the installation (i.e., form, fit, and attachment details) of 
materials of equipment. It includes drawings, diagrams, 
layouts, schematics, descriptive literature, illustrations, 
schedules, performance and test data, and similar 
materials furnished by the Contractor to explain in detail 
specific portions of the work required by the contract. The 
PHA may duplicate, use, and disclose in any manner and 
for any purpose shop drawings delivered under this 
(b) The Contracting Officer shall investigate the site 
conditions promptly after receiving the notice. Work shall 
not proceed at the affected site, except at the 
Contractor’s risk, until the Contracting Officer has 
provided written instructions to the Contractor. If the 
conditions do materially so differ and cause an increase 
or decrease in the Contractor’s cost of, or the time 
required for, performing any part of the work under this 
contract, whether or not changed as a result of the 
conditions, the Contractor shall file a claim in writing to 
the PHA within ten days after receipt of such instructions 
and, in any event, before proceeding with the work. An 
equitable adjustment in the contract price, the delivery 
schedule, or both shall be made under this clause and 
contract. 
(e) If this contract requires shop drawings, the Contractor 
the contract modified in writing accordingly. 
shall coordinate all such drawings, and review them for 
accuracy, completeness, and compliance with other 
contract requirements and shall indicate its approval 
thereon as evidence of such coordination and review. 
Shop drawings submitted to the Contracting Officer 
without evidence of the Contractor’s approval may be 
returned for resubmission. The Contracting Officer will 
indicate an approval or disapproval of the shop drawings 
and if not approved as submitted shall indicate the PHA’s 
reasons therefore. Any work done before such approval 
shall be at the Contractor’s risk. Approval by the 
Contracting Officer shall not relieve the Contractor from 
responsibility for any errors or omissions in such 
drawings, nor from responsibility for complying with the 
requirements of this contract, except with respect to 
variations described and approved in accordance with (f)
(c) No request by the Contractor for an equitable adjustment 
to the contract under this clause shall be allowed, unless 
the Contractor has given the written notice required; 
provided, that the time prescribed in (a) above for giving 
written notice may be extended by the Contracting
Officer. 
(d) No request by the Contractor for an equitable adjustment 
to the contract for differing site conditions shall be 
allowed if made after final payment under this contract.
below. 
9. Specifications and Drawings for Construction 
(f) If shop drawings show variations from the contract 
requirements, the Contractor shall describe such 
variations in writing, separate from the drawings, at the 
time of submission. If the Architect approves any such 
variation and the Contracting Officer concurs, the 
(a) The Contractor shall keep on the work site a copy of the 
drawings and specifications and shall at all times give the 
Contracting Officer access thereto. Anything mentioned 
in the specifications and not shown on the drawings, or 
shown on the drawings and not mentioned in the 
specifications, shall be of like effect as if shown or 
mentioned in both. In case of difference between 
drawings and specifications, the specifications shall 
govern. In case of discrepancy in the figures, in the 
drawings, or in the specifications, the matter shall be 
Contracting Officer shall issue an appropriate 
modification to the contract, except that, if the variation is 
minor or does not involve a change in price or in time of 
performance, a modification need not be issued. 
(g) It shall be the responsibility of the Contractor to make
timely requests of the PHA for such large scale and full 
size drawings, color schemes, and other additional 
information, not already in his possession, which shall be 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 4 of 19 
form HUD-5370 (8/2016)  
Page 59 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

required in the planning and production of the work. Such 
requests may be submitted as the need arises, but each 
such request shall be filed in ample time to permit 
appropriate action to be taken by all parties involved so 
machinery and mechanical and other equipment. 
When required by this contract or by the Contracting 
Officer, the Contractor shall also obtain the 
Contracting Officer’s approval of the material or 
articles which the Contractor contemplates 
incorporating into the work. When requesting 
approval, the Contractor shall provide full information 
concerning the material or articles. Machinery, 
equipment, material, and articles that do not have the 
required approval shall be installed or used at the risk 
as to avoid delay. 
(h) The Contractor shall submit to the Contracting Officer for 
approval four copies (unless otherwise indicated) of all 
shop drawings as called for under the various headings 
of these specifications. Three sets (unless otherwise 
indicated) of all shop drawings, will be retained by the 
PHA and one set will be returned to the Contractor. As 
required by the Contracting Officer, the Contractor, upon 
completing the work under this contract, shall furnish a 
complete set of all shop drawings as finally approved. 
These drawings shall show all changes and revisions 
of subsequent rejection. 
(2) When required by the specifications or the 
Contracting Officer, the Contractor shall submit 
appropriately marked samples (and certificates
related to them) for approval at the Contractor’s
made up to the time the work is completed and accepted. 
expense, with all shipping charges prepaid. The 
Contractor shall label, or otherwise properly mark on 
the container, the material or product represented, its 
place of origin, the name of the producer, the 
Contractor’s name, and the identification of the 
construction project for which the material or product
(i) This clause shall be included in all subcontracts at any tier.
It shall be the responsibility of the Contractor to ensure 
that all shop drawings prepared by subcontractors are 
submitted to the Contracting Officer. 
10. As-Built Drawings 
is intended to be used. 
(a) “As-built drawings,” as used in this clause, means 
(3) Certificates shall be submitted in triplicate, describing 
each sample submitted for approval and certifying 
that the material, equipment or accessory complies 
with contract requirements. The certificates shall 
include the name and brand of the product, name of 
manufacturer, and the location where produced. 
drawings submitted by the Contractor or subcontractor at 
any tier to show the construction of a particular structure 
or work as actually completed under the contract. “As-built
drawings” shall be synonymous with “Record 
drawings.” 
(4) Approval of a sample shall not constitute a waiver of 
(b) As required by the Contracting Officer, the Contractor 
the PHA right to demand full compliance with contract 
requirements. Materials, equipment and accessories 
may be rejected for cause even though samples have
shall provide the Contracting Officer accurate information 
to be used in the preparation of permanent as-built 
drawings. For this purpose, the Contractor shall record on 
one set of contract drawings all changes from the 
installations originally indicated, and record final locations 
of underground lines by depth from finish grade and by 
accurate horizontal offset distances to permanent surface 
improvements such as buildings, curbs, or edges of 
been approved. 
walks.
(5) Wherever materials are required to comply with 
recognized standards or specifications, such 
specifications shall be accepted as establishing the 
technical qualities and testing methods, but shall not 
govern the number of tests required to be made nor 
modify other contract requirements. The Contracting 
Officer may require laboratory test reports on items 
submitted for approval or may approve materials on 
the basis of data submitted in certificates with 
samples. Check tests will be made on materials 
delivered for use only as frequently as the Contracting 
Officer determines necessary to insure compliance of 
materials with the specifications. The Contractor will 
assume all costs of retesting materials which fail to 
meet contract requirements and/or testing materials 
offered in substitution for those found deficient. 
(c) This clause shall be included in all subcontracts at any 
tier. It shall be the responsibility of the Contractor to 
ensure that all as-built drawings prepared by 
subcontractors are submitted to the Contracting Officer. 
11. Material and Workmanship 
(a) All equipment, material, and articles furnished under this 
contract shall be new and of the most suitable grade for 
the purpose intended, unless otherwise specifically 
provided in this contract. References in the contract to 
equipment, material, articles, or patented processes by 
trade name, make, or catalog number, shall be regarded 
as establishing a standard of quality and shall not be 
construed as limiting competition. The Contractor may, at 
its option, use any equipment, material, article, or 
process that, in the judgment of, and as approved by the 
Contracting Officer, is equal to that named in the 
specifications, unless otherwise specifically provided in 
(6) After approval, samples will be kept in the Project 
office until completion of work. They may be built into 
the work after a substantial quantity of the materials 
they represent has been built in and accepted. 
(c) Requirements concerning lead-based paint. The 
Contractor shall comply with the requirements concerning 
lead-based paint contained in the Lead-Based Paint 
Poisoning Prevention Act (42 U.S.C. 4821-4846) as 
implemented by 24 CFR Part 35. 
this contract. 
(b) Approval of equipment and materials. 
12. Permits and Codes 
(1) The Contractor shall obtain the Contracting Officer’s 
approval of the machinery and mechanical and other 
equipment to be incorporated into the work. When 
requesting approval, the Contractor shall furnish to the 
Contracting Officer the name of the manufacturer, the 
model number, and other information concerning the 
performance, capacity, nature, and rating of the 
(a) The Contractor shall give all notices and comply with all 
applicable laws, ordinances, codes, rules and regulations. 
Notwithstanding the requirement of the Contractor to 
comply with the drawings and specifications in the 
contract, all work installed shall comply with all applicable 
codes and regulations as amended by any 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 5 of 19 
form HUD-5370 (8/2016)  
Page 60 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

waivers. Before installing the work, the Contractor shall 
examine the drawings and the specifications for 
compliance with applicable codes and regulations 
bearing on the work and shall immediately report any 
discrepancy it may discover to the Contracting Officer. 
14. Temporary Heating 
Where the requirements of the drawings and 
The Contractor shall provide and pay for temporary 
heating, covering, and enclosures necessary to properly 
protect all work and materials against damage by 
dampness and cold, to dry out the work, and to facilitate 
the completion of the work. Any permanent heating 
equipment used shall be turned over to the PHA in the 
condition and at the time required by the specifications. 
specifications fail to comply with the applicable code or 
regulation, the Contracting Officer shall modify the 
contract by change order pursuant to the clause entitled 
Changes herein to conform to the code or regulation. 
(b) The Contractor shall secure and pay for all permits, fees, 
and licenses necessary for the proper execution and 
completion of the work. Where the PHA can arrange for 
the issuance of all or part of these permits, fees and 
licenses, without cost to the Contractor, the contract 
amount shall be reduced accordingly. 
15. Availability and Use of Utility Services 
(a) The PHA shall make all reasonably required amounts of 
13. Health, Safety, and Accident Prevention 
utilities available to the Contractor from existing outlets 
and supplies, as specified in the contract. Unless 
otherwise provided in the contract, the amount of each 
utility service consumed shall be charged to or paid for by 
the Contractor at prevailing rates charged to the PHA or, 
where the utility is produced by the PHA, at reasonable 
rates determined by the Contracting Officer. The 
Contractor shall carefully conserve any utilities furnished 
(a) In performing this contract, the Contractor shall: 
(1) Ensure that no laborer or mechanic shall be required 
to work in surroundings or under working conditions 
which are unsanitary, hazardous, or dangerous to 
his/her health and/or safety as determined under 
construction safety and health standards promulgated
without charge.
(b) The Contractor, at its expense and in a manner 
by the Secretary of Labor by regulation; 
satisfactory to the Contracting Officer, shall install and 
maintain all necessary temporary connections and 
distribution lines, and all meters required to measure the 
amount of each utility used for the purpose of 
determining charges. Before final acceptance of the work 
by the PHA, the Contractor shall remove all the 
temporary connections, distribution lines, meters, and 
associated paraphernalia. 
(2) Protect the lives, health, and safety of other persons; 
(3) Prevent damage to property, materials, supplies, and 
equipment; and, 
(4) Avoid work interruptions. 
(b) For these purposes, the Contractor shall: 
(1) Comply with regulations and standards issued by the 
Secretary of Labor at 29 CFR Part 1926. Failure to 
comply may result in imposition of sanctions pursuant 
to the Contract Work Hours and Safety Standards Act 
(Public Law 91-54, 83 Stat. 96), 40 U.S.C. 3701 et 
16. Protection of Existing Vegetation, Structures, 
Equipment, Utilities, and Improvements 
seq.; and 
(a) The Contractor shall preserve and protect all structures, 
(2) Include the terms of this clause in every subcontract 
equipment, and vegetation (such as trees, shrubs, and 
grass) on or adjacent to the work site, which are not to be 
removed under this contract, and which do not 
unreasonably interfere with the work required under this 
so that such terms will be binding on each 
subcontractor. 
(c) The Contractor shall maintain an accurate record of 
exposure data on all accidents incident to work performed 
under this contract resulting in death, traumatic injury, 
occupational disease, or damage to property, materials, 
supplies, or equipment, and shall report this data in the 
manner prescribed by 29 CFR Part 
contract. 
(b) The Contractor shall only remove trees when specifically 
1904. 
authorized to do so, and shall avoid damaging vegetation 
that will remain in place. If any limbs or branches of trees 
are broken during performance of this contract, or by the 
careless operation of equipment, or by workmen, the 
Contractor shall trim those limbs or branches with a clean 
cut and paint the cut with a tree-pruning compound as 
(d) The Contracting Officer shall notify the Contractor of any 
noncompliance with these requirements and of the 
corrective action required. This notice, when delivered to 
the Contractor or the Contractor’s representative at the 
site of the work, shall be deemed sufficient notice of the 
noncompliance and corrective action required. After 
receiving the notice, the Contractor shall immediately 
take corrective action. If the Contractor fails or refuses to 
take corrective action promptly, the Contracting Officer 
may issue an order stopping all or part of the work until 
satisfactory corrective action has been taken. The 
Contractor shall not base any claim or request for 
equitable adjustment for additional time or money on any
directed by the Contracting Officer. 
(c) The Contractor shall protect from damage all existing 
improvements and utilities (1) at or near the work site and 
(2) on adjacent property of a third party, the locations of 
which are made known to or should be known by the 
Contractor. Prior to disturbing the ground at the 
construction site, the Contractor shall ensure that all 
underground utility lines are clearly marked. 
(d) The Contractor shall shore up, brace, underpin, secure, 
stop order issued under these circumstances. 
and protect as necessary all foundations and other parts 
of existing structures adjacent to, adjoining, and in the 
vicinity of the site, which may be affected by the 
excavations or other operations connected with the 
(e) The Contractor shall be responsible for its subcontractors’ 
compliance with the provisions of this clause. The 
Contractor shall take such action with respect to any 
subcontract as the PHA, the Secretary of Housing and 
Urban Development, or the Secretary of Labor shall 
direct as a means of enforcing such provisions. 
construction of the project. 
(e) Any equipment temporarily removed as a result of work 
under this contract shall be protected, cleaned, and 
replaced in the same condition as at the time of award of 
this contract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 6 of 19 
form HUD-5370 (8/2016)  
Page 61 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(f) New work which connects to existing work shall 
The contactor shall comply with the Clean Air Act, as 
amended, 42 USC 7401 et seq., the Federal Water 
Pollution Control Water Act, as amended, 33 U.S.C. 1251 
et seq., and standards issued pursuant thereto in the 
facilities in which this contract is to be performed. 
correspond in all respects with that to which it connects
and/or be similar to existing work unless otherwise 
required by the specifications. 
(g) No structural members shall be altered or in any way 
weakened without the written authorization of the 
Contracting Officer, unless such work is clearly specified
19. Energy Efficiency 
in the plans or specifications. 
(h) If the removal of the existing work exposes discolored or 
unfinished surfaces, or work out of alignment, such 
surfaces shall be refinished, or the material replaced as 
necessary to make the continuous work uniform and 
harmonious. This, however, shall not be construed to 
require the refinishing or reconstruction of dissimilar 
finishes previously exposed, or finished surfaces in good 
condition, but in different planes or on different levels 
when brought together by the removal of intervening 
work, unless such refinishing or reconstruction is 
The Contractor shall comply with mandatory standards 
and policies relating to energy efficiency which are 
contained in the energy conservation plan issued in 
compliance with the Energy Policy and Conservation Act 
(Pub.L. 94-163) for the State in which the work under the 
contract is performed. 
20. Inspection and Acceptance of Construction 
(a) Definitions. As used in this clause - 
specified in the plans or specifications. 
(1) “Acceptance” means the act of an authorized 
representative of the PHA by which the PHA approves 
and assumes ownership of the work performed under this 
contract. Acceptance may be partial or complete. 
(2) “Inspection” means examining and testing the work 
(i) The Contractor shall give all required notices to any 
adjoining or adjacent property owner or other party before 
the commencement of any work. 
(j) The Contractor shall indemnify and save harmless the 
PHA from any damages on account of settlement or the 
loss of lateral support of adjoining property, any damages 
from changes in topography affecting drainage, and from 
all loss or expense and all damages for which the PHA 
may become liable in consequence of such injury or 
damage to adjoining and adjacent structures and their 
performed under the contract (including, when 
appropriate, raw materials, equipment, components, and
intermediate assemblies) to determine whether it 
conforms to contract requirements. 
premises. 
(3) “Testing” means that element of inspection that 
determines the properties or elements, including 
functional operation of materials, equipment, or their 
components, by the application of established scientific 
(k) The Contractor shall repair any damage to vegetation, 
structures, equipment, utilities, or improvements, 
including those that are the property of a third party, 
resulting from failure to comply with the requirements of 
this contract or failure to exercise reasonable care in 
performing the work. If the Contractor fails or refuses to 
repair the damage promptly, the Contracting Officer may 
have the necessary work performed and charge the cost 
to the Contractor. 
principles and procedures. 
(b) The Contractor shall maintain an adequate inspection 
system and perform such inspections as will ensure that 
the work performed under the contract conforms to 
contract requirements. All work is subject to PHA 
inspection and test at all places and at all reasonable 
times before acceptance to ensure strict compliance with
the terms of the contract. 
(c) PHA inspections and tests are for the sole benefit of the 
17. Temporary Buildings and Transportation of Materials 
PHA and do not: (1) relieve the Contractor of 
responsibility for providing adequate quality control 
measures; (2) relieve the Contractor of responsibility for 
loss or damage of the material before acceptance; (3) 
constitute or imply acceptance; or, (4) affect the 
continuing rights of the PHA after acceptance of the 
(a) Temporary buildings (e.g., storage sheds, shops, offices, 
sanitary facilities) and utilities may be erected by the 
Contractor only with the approval of the Contracting 
Officer and shall be built with labor and materials 
furnished by the Contractor without expense to the PHA. 
The temporary buildings and utilities shall remain the 
property of the Contractor and shall be removed by the 
Contractor at its expense upon completion of the work. 
With the written consent of the Contracting Officer, the 
buildings and utilities may be abandoned and need not 
completed work under paragraph (j) below. 
(d) The presence or absence of the PHA inspector does not 
relieve the Contractor from any contract requirement, nor 
is the inspector authorized to change any term or 
condition of the specifications without the Contracting 
Officer’s written authorization. All instructions and 
be removed. 
approvals with respect to the work shall be given to the 
(b) The Contractor shall, as directed by the Contracting 
Contractor by the Contracting Officer. 
Officer, use only established roadways, or use temporary 
roadways constructed by the Contractor when and as 
authorized by the Contracting Officer. When materials are 
transported in prosecuting the work, vehicles shall not be 
loaded beyond the loading capacity recommended by the 
manufacturer of the vehicle or prescribed by any federal, 
state, or local law or regulation. When it is necessary to 
cross curbs or sidewalks, the Contractor shall protect them 
from damage. The Contractor shall repair or pay for the 
repair of any damaged curbs, sidewalks, or roads. 
(e) The Contractor shall promptly furnish, without additional 
charge, all facilities, labor, and material reasonably 
needed for performing such safe and convenient 
inspections and tests as may be required by the 
Contracting Officer. The PHA may charge to the 
Contractor any additional cost of inspection or test when 
work is not ready at the time specified by the Contractor 
for inspection or test, or when prior rejection makes 
reinspection or retest necessary. The PHA shall perform 
all inspections and tests in a manner that will not 
unnecessarily delay the work. Special, full size, and 
performance tests shall be performed as described in the 
contract. 
18. Clean Air and Water 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 7 of 19 
form HUD-5370 (8/2016)  
Page 62 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(f) The PHA may conduct routine inspections of the 
occupied without proper remuneration therefore. If prior 
possession or use by the PHA delays the progress of the 
work or causes additional expense to the Contractor, an 
equitable adjustment shall be made in the contract price 
or the time of completion, and the contract shall be 
modified in writing accordingly. 
construction site on a daily basis. 
(g) The Contractor shall, without charge, replace or correct 
work found by the PHA not to conform to contract 
requirements, unless the PHA decides that it is in its 
interest to accept the work with an appropriate 
adjustment in contract price. The Contractor shall 
promptly segregate and remove rejected material from
22. Warranty of Title 
the premises. 
(h) If the Contractor does not promptly replace or correct 
The Contractor warrants good title to all materials, 
supplies, and equipment incorporated in the work and 
agrees to deliver the premises together with all 
improvements thereon free from any claims, liens or 
charges, and agrees further that neither it nor any other 
person, firm or corporation shall have any right to a lien 
upon the premises or anything appurtenant thereto. 
rejected work, the PHA may (1) by contract or otherwise, 
replace or correct the work and charge the cost to the 
Contractor, or (2) terminate for default the Contractor’s 
right to proceed. 
(i) If any work requiring inspection is covered up without ap- 
proval of the PHA, it must, if requested by the Contracting 
Officer, be uncovered at the expense of the Contractor. If 
at any time before final acceptance of the entire work, the 
PHA considers it necessary or advisable, to examine 
work already completed by removing or tearing it out, the 
Contractor, shall on request, promptly furnish all 
necessary facilities, labor, and material. If such work is 
found to be defective or nonconforming in any material 
respect due to the fault of the Contractor or its 
subcontractors, the Contractor shall defray all the 
expenses of the examination and of satisfactory 
reconstruction. If, however, such work is found to meet 
the requirements of the contract, the Contracting Officer 
shall make an equitable adjustment to cover the cost of 
the examination and reconstruction, including, if 
completion of the work was thereby delayed, an 
23. Warranty of Construction 
(a) In addition to any other warranties in this contract, the 
Contractor warrants, except as provided in paragraph (j) 
of this clause, that work performed under this contract 
conforms to the contract requirements and is free of any 
defect in equipment, material, or workmanship performed
by the Contractor or any subcontractor or supplier at any 
tier. This warranty shall continue for a period of 
(one year unless otherwise indicated) from the date of final 
acceptance of the work. If the PHA takes possession of 
any part of the work before final acceptance, this warranty 
shall continue for a period of (one year unless otherwise 
indicated) from the date that the PHA takes 
extension of time. 
possession. 
(j) The Contractor shall notify the Contracting Officer, in 
(b) The Contractor shall remedy, at the Contractor’s 
writing, as to the date when in its opinion all or a 
designated portion of the work will be substantially 
completed and ready for inspection. If the Architect 
determines that the state of preparedness is as 
represented, the PHA will promptly arrange for the 
inspection. Unless otherwise specified in the contract, the 
PHA shall accept, as soon as practicable after completion 
and inspection, all work required by the contract or that 
portion of the work the Contracting Officer determines and 
designates can be accepted separately. Acceptance shall 
be final and conclusive except for latent defects, fraud, 
gross mistakes amounting to fraud, or the PHA’s right 
under any warranty or guarantee. 
expense, any failure to conform, or any defect. In 
addition, the Contractor shall remedy, at the Contractor’s 
expense, any damage to PHA-owned or controlled real or 
personal property when the damage is the result of— 
(1) The Contractor’s failure to conform to contract require- 
ments; or 
(2) Any defects of equipment, material, workmanship or 
design furnished by the Contractor. 
(c) The Contractor shall restore any work damaged in 
fulfilling the terms and conditions of this clause. The 
Contractor’s warranty with respect to work repaired or 
replaced will run for (one year unless otherwise indicated) 
from the date of repair or replacement. 
(d) The Contracting Officer shall notify the Contractor, in 
21. Use and Possession Prior to Completion 
writing, within a reasonable time after the discovery of 
any failure, defect or damage. 
(a) The PHA shall have the right to take possession of or use 
any completed or partially completed part of the work. 
Before taking possession of or using any work, the 
Contracting Officer shall furnish the Contractor a list of 
items of work remaining to be performed or corrected on 
those portions of the work that the PHA intends to take 
possession of or use. However, failure of the Contracting 
Officer to list any item of work shall not relieve the 
Contractor of responsibility for complying with the terms of 
the contract. The PHA’s possession or use shall not be 
(e) If the Contractor fails to remedy any failure, defect, or 
damage within a reasonable time after receipt of notice, 
the PHA shall have the right to replace, repair or 
otherwise remedy the failure, defect, or damage at the 
Contractor’s expense. 
(f) With respect to all warranties, express or implied, from 
subcontractors, manufacturers, or suppliers for work 
performed and materials furnished under this contract,
the Contractor shall: 
(1) Obtain all warranties that would be given in normal 
deemed an acceptance of any work under the contract. 
commercial practice; 
(b) While the PHA has such possession or use, the 
(2) Require all warranties to be executed in writing, for the 
Contractor shall be relieved of the responsibility for (1) the 
loss of or damage to the work resulting from the PHA’s 
possession or use, notwithstanding the terms of the 
clause entitled Permits and Codes herein; (2) all 
maintenance costs on the areas occupied; and, (3) 
furnishing heat, light, power, and water used in the areas 
benefit of the PHA; and, 
(3) Enforce all warranties for the benefit of the PHA. 
(g) In the event the Contractor’s warranty under paragraph 
(a) of this clause has expired, the PHA may bring suit at 
its own expense to enforce a subcontractor’s, 
manufacturer’s or supplier’s warranty. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 8 of 19 
form HUD-5370 (8/2016)  
Page 63 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(h) Unless a defect is caused by the negligence of the 
basis for determining progress payments. The breakdown 
shall be approved by the Contracting Officer and must be
acceptable to HUD. If the contract covers more than one 
Contractor or subcontractor or supplier at any tier, the 
Contractor shall not be liable for the repair of any defect of 
material or design furnished by the PHA nor for the repair 
of any damage that results from any defect in PHA 
project, the Contractor shall furnish a separate 
furnished material or design. 
breakdown for each. The values and quantities employed
in making up this breakdown are for determining the
amount of progress payments and shall not be construed
as a basis for additions to or deductions from the contract
price. The Contractor shall prorate its overhead and profit
(i) Notwithstanding any provisions herein to the contrary, the 
establishment of the time periods in paragraphs (a) and 
(c) above relate only to the specific obligation of the 
Contractor to correct the work, and have no relationship 
to the time within which its obligation to comply with the 
contract may be sought to be enforced, nor to the time 
within which proceedings may be commenced to 
establish the Contractor’s liability with respect to its 
obligation other than specifically to correct the work. 
over the construction period of the contract. 
(d) The Contractor shall submit, on forms provided by the 
PHA, periodic estimates showing the value of the work 
performed during each period based upon the approved
submitted not later than 
days in advance of 
(j) This warranty shall not limit the PHA’s rights under the 
the date set for payment and are subject to correction and 
revision as required. The estimates must be approved by 
the Contracting Officer with the concurrence of the 
Architect prior to payment. If the contract covers more 
than one project, the Contractor shall furnish a 
Inspection and Acceptance of Construction clause of this
contract with respect to latent defects, gross mistakes or
fraud. 
24. Prohibition Against Liens 
separate progress payment estimate for each. 
The Contractor is prohibited from placing a lien on the 
PHA’s property. This prohibition shall apply to all 
subcontractors at any tier and all materials suppliers. 
(e) Along with each request for progress payments and the 
required estimates, the Contractor shall furnish the 
following certification, or payment shall not be made: I 
hereby certify, to the best of my knowledge and belief, 
that: 
Administrative Requirements
(1) The amounts requested are only for performance in 
accordance with the specifications, terms, and 
25. Contract Period 
conditions of the contract; 
(2) Payments to subcontractors and suppliers have been 
made from previous payments received under the 
contract, and timely payments will be made from the 
proceeds of the payment covered by this certification, 
in accordance with subcontract agreements; and, 
this contract within 
calendar days of the 
effective date of the contract, or within the time schedule 
established in the notice to proceed issued by the 
Contracting Officer. 
(3) This request for progress payments does not include 
26. Order of Provisions 
any amounts which the prime contractor intends to 
withhold or retain from a subcontractor or supplier in 
accordance with the terms and conditions of the 
subcontract. 
In the event of a conflict between these General 
Conditions and the Specifications, the General 
Conditions shall prevail. In the event of a conflict between 
the contract and any applicable state or local law or 
regulation, the state or local law or regulation shall 
prevail; provided that such state or local law or regulation 
does not conflict with, or is less restrictive than applicable 
federal law, regulation, or Executive Order. In the event of 
such a conflict, applicable federal law, regulation, and 
Executive Order shall prevail. 
Name: 
Title: 
Date: 
27. Payments 
(f) Except as otherwise provided in State law, the PHA shall 
(a) The PHA shall pay the Contractor the price as provided in 
retain ten (10) percent of the amount of progress 
payments until completion and acceptance of all work 
under the contract; except, that if upon completion of 50 
percent of the work, the Contracting Officer, after 
consulting with the Architect, determines that the 
Contractor’s performance and progress are satisfactory,
this contract. 
(b) The PHA shall make progress payments approximately 
every 30 days as the work proceeds, on estimates of 
work accomplished which meets the standards of quality 
established under the contract, as approved by the 
Contracting Officer. The PHA may, subject to written 
determination and approval of the Contracting Officer, 
make more frequent payments to contractors which are 
the PHA may make the remaining payments in full for the 
work subsequently completed. If the Contracting Officer 
subsequently determines that the Contractor’s 
performance and progress are unsatisfactory, the PHA 
shall reinstate the ten (10) percent (or other percentage 
as provided in State law) retainage until such time as the 
Contracting Officer determines that performance and 
qualified small businesses. 
(c) Before the first progress payment under this contract, the 
Contractor shall furnish, in such detail as requested by 
the Contracting Officer, a breakdown of the total contract 
price showing the amount included therein for each 
principal category of the work, which shall substantiate 
the payment amount requested in order to provide a 
progress are satisfactory. 
(g) The Contracting Officer may authorize material delivered 
on the site and preparatory work done to be taken into 
consideration when computing progress payments. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 9 of 19 
form HUD-5370 (8/2016)  
Page 64 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Material delivered to the Contractor at locations other than 
the site may also be taken into consideration if the 
Contractor furnishes satisfactory evidence that (1) it has 
acquired title to such material; (2) the material is properly 
stored in a bonded warehouse, storage yard, or similar 
suitable place as may be approved by the Contracting 
Officer; (3) the material is insured to cover its full value; 
and (4) the material will be used to perform this contract. 
Before any progress payment which includes delivered 
material is made, the Contractor shall furnish such 
documentation as the Contracting Officer may require to 
assure the protection of the PHA’s interest in such 
materials. The Contractor shall remain responsible for 
such stored material notwithstanding the transfer of title 
responsibilities of the parties (e.g., change in the PHA 
address). All other contract modifications shall be in the 
form of supplemental agreements signed by the 
Contractor and the Contracting Officer. 
(c) When a proposed modification requires the approval of 
HUD prior to its issuance (e.g., a change order that 
exceeds the PHA’s approved threshold), such 
modification shall not be effective until the required 
approval is received by the PHA. 
29. Changes 
(a) The Contracting Officer may, at any time, without notice 
to the PHA. 
to the sureties, by written order designated or indicated 
to be a change order, make changes in the work within 
the general scope of the contract including changes: 
(1) In the specifications (including drawings and designs); 
(2) In the method or manner of performance of the work; 
(h) All material and work covered by progress payments 
made shall, at the time of payment become the sole 
property of the PHA, but this shall not be construed as (1) 
relieving the Contractor from the sole responsibility for all 
material and work upon which payments have been made 
or the restoration of any damaged work; or, (2) waiving the 
right of the PHA to require the fulfillment of all of the terms 
of the contract. In the event the work of the Contractor has 
been damaged by other contractors or persons other than 
employees of the PHA in the course of their employment, 
the Contractor shall restore such damaged work without 
cost to the PHA and to seek redress for its damage only 
from those who directly 
(3) PHA-furnished facilities, equipment, materials, 
services, or site; or, 
(4) Directing the acceleration in the performance of the 
caused it. 
work. 
(b) Any other written order or oral order (which, as used in 
this paragraph (b), includes direction, instruction, 
interpretation, or determination) from the Contracting 
Officer that causes a change shall be treated as a 
change order under this clause; provided, that the 
Contractor gives the Contracting Officer written notice 
stating (1) the date, circumstances and source of the 
order and (2) that the Contractor regards the order as a
(i) The PHA shall make the final payment due the Contractor 
under this contract after (1) completion and final 
acceptance of all work; and (2) presentation of release of 
all claims against the PHA arising by virtue of this contract, 
other than claims, in stated amounts, that the Contractor 
has specifically excepted from the operation of the release. 
Each such exception shall embrace no more than one 
claim, the basis and scope of which shall be clearly 
defined. The amounts for such excepted claims shall not 
be included in the request for final payment. A release may 
also be required of the assignee if the Contractor’s claim to 
amounts payable under this contract 
change order. 
(c) Except as provided in this clause, no order, statement or 
conduct of the Contracting Officer shall be treated as a 
change under this clause or entitle the Contractor to an 
equitable adjustment. 
(d) If any change under this clause causes an increase or 
has been assigned. 
decrease in the Contractor’s cost of, or the time required 
for the performance of any part of the work under this 
contract, whether or not changed by any such order, the 
Contracting Officer shall make an equitable adjustment 
and modify the contract in writing. However, except for a 
adjustment based on defective specifications, no proposal 
for any change under paragraph (b) above shall be 
allowed for any costs incurred more than 20 days (5 days 
for oral orders) before the Contractor gives written notice 
as required. In the case of defective specifications for 
which the PHA is responsible, the equitable adjustment 
shall include any increased cost reasonably incurred by 
the Contractor in attempting to comply with 
(j) Prior to making any payment, the Contracting Officer may 
require the Contractor to furnish receipts or other 
evidence of payment from all persons performing work 
and supplying material to the Contractor, if the 
Contracting Officer determines such evidence is 
necessary to substantiate claimed costs. 
(k) The PHA shall not; (1) determine or adjust any claims for 
payment or disputes arising there under between the 
Contractor and its subcontractors or material suppliers; 
or, (2) withhold any moneys for the protection of the 
subcontractors or material suppliers. The failure or 
refusal of the PHA to withhold moneys from the 
Contractor shall in nowise impair the obligations of any 
surety or sureties under any bonds furnished under this 
contract. 
the defective specifications. 
(e) The Contractor must assert its right to an adjustment 
28. Contract Modifications 
under this clause within 30 days after (1) receipt of a 
written change order under paragraph (a) of this clause, 
or (2) the furnishing of a written notice under paragraph 
(b) of this clause, by submitting a written statement 
describing the general nature and the amount of the 
proposal. If the facts justify it, the Contracting Officer may 
extend the period for submission. The proposal may be 
included in the notice required under paragraph (b) 
above. No proposal by the Contractor for an equitable 
adjustment shall be allowed if asserted after final 
(a) Only the Contracting Officer has authority to modify any 
term or condition of this contract. Any contract 
payment under this contract. 
modification shall be authorized in writing. 
(f) The Contractor’s written proposal for equitable 
adjustment shall be submitted in the form of a lump sum 
proposal supported with an itemized breakdown of all 
increases and decreases in the contract in at least the 
following details: 
(b) The Contracting Officer may modify the contract 
unilaterally (1) pursuant to a specific authorization stated 
in a contract clause (e.g., Changes); or (2) for 
administrative matters which do not change the rights or 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 10 of 19 
form HUD-5370 (8/2016)  
Page 65 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(1) Direct Costs. Materials (list individual items, the 
been so suspended, delayed, or interrupted by any other 
cause, including the fault or negligence of the Contractor 
or for which any equitable adjustment is provided for or 
excluded under any other provision of this contract. 
quantity and unit cost of each, and the aggregate 
cost); Transportation and delivery costs associated 
with materials; Labor breakdowns by hours or unit 
costs (identified with specific work to be performed); 
Construction equipment exclusively necessary for the 
change; Costs of preparation and/ or revision to shop 
drawings resulting from the change; Worker’s 
Compensation and Public Liability Insurance; 
Employment taxes under FICA and FUTA; and, Bond 
Costs when size of change warrants revision. 
(2) Indirect Costs. Indirect costs may include overhead, 
general and administrative expenses, and fringe 
benefits not normally treated as direct costs. 
(3) Profit. The amount of profit shall be negotiated and 
may vary according to the nature, extent, and 
complexity of the work required by the change. The 
allowability of the direct and indirect costs shall be 
determined in accordance with the Contract Cost 
Principles and Procedures for Commercial Firms in Part 
31 of the Federal Acquisition Regulation (48 CFR 1-31), 
as implemented by HUD Handbook 2210.18, in effect on 
the date of this contract. The Contractor shall not be 
(c) A claim under this clause shall not be allowed (1) for any 
costs incurred more than 20 days before the Contractor 
shall have notified the Contracting Officer in writing of 
the act or failure to act involved (but this requirement 
shall not apply as to a claim resulting from a suspension 
order); and, (2) unless the claim, in an amount stated, is 
asserted in writing as soon as practicable after the 
termination of the suspension, delay, or interruption, but 
not later than the date of final payment under the 
contract. 
31. Disputes 
allowed a profit on the profit received by any 
(a) “Claim,” as used in this clause, means a written demand 
or written assertion by one of the contracting parties 
seeking, as a matter of right, the payment of money in a 
sum certain, the adjustment or interpretation of contract 
terms, or other relief arising under or relating to the 
contract. A claim arising under the contract, unlike a 
claim relating to the contract, is a claim that can be 
resolved under a contract clause that provides for the 
relief sought by the claimant. A voucher, invoice, or other 
routine request for payment that is not in dispute when 
submitted is not a claim. The submission may be 
converted to a claim by complying with the requirements 
of this clause, if it is disputed either as to liability or 
amount or is not acted upon in a reasonable time. 
subcontractor. Equitable adjustments for deleted work 
shall include a credit for profit and may include a credit for 
indirect costs. On proposals covering both increases and 
decreases in the amount of the contract, the application of 
indirect costs and profit shall be on the net-change in 
direct costs for the Contractor or subcontractor 
performing the work. 
(g) The Contractor shall include in the proposal its request 
for time extension (if any), and shall include sufficient 
information and dates to demonstrate whether and to 
what extent the change will delay the completion of the
(b) Except for disputes arising under the clauses entitled 
contract in its entirety. 
Labor Standards - Davis Bacon and Related Acts, herein, 
all disputes arising under or relating to this contract, 
including any claims for damages for the alleged breach 
thereof which are not disposed of by agreement, shall be 
(h) The Contracting Officer shall act on proposals within 30 
days after their receipt, or notify the Contractor of the 
resolved under this clause. 
(c) All claims by the Contractor shall be made in writing and 
date when such action will be taken. 
submitted to the Contracting Officer for a written decision. 
A claim by the PHA against the Contractor shall be 
subject to a written decision by the Contracting Officer. 
(d) The Contracting Officer shall, within 60 (unless otherwise 
indicated) days after receipt of the request, decide the 
claim or notify the Contractor of the date by which the 
(i) Failure to reach an agreement on any proposal shall be a 
dispute under the clause entitled Disputes herein.
Nothing in this clause, however, shall excuse the 
Contractor from proceeding with the contract as changed. 
(j) Except in an emergency endangering life or property, no 
change shall be made by the Contractor without a prior
order from the Contracting Officer. 
decision will be made. 
(e) The Contracting Officer’s decision shall be final unless 
30. Suspension of Work 
the Contractor (1) appeals in writing to a higher level in 
the PHA in accordance with the PHA’s policy and 
procedures, (2) refers the appeal to an independent 
mediator or arbitrator, or (3) files suit in a court of 
competent jurisdiction. Such appeal must be made within 
(30 unless otherwise indicated) days after receipt of the 
(a) The Contracting Officer may order the Contractor in 
writing to suspend, delay, or interrupt all or any part of the 
work of this contract for the period of time that the 
Contracting Officer determines appropriate for the 
Contracting Officer’s decision. 
convenience of the PHA. 
(f) The Contractor shall proceed diligently with performance 
(b) If the performance of all or any part of the work is, for an 
unreasonable period of time, suspended, delayed, or 
interrupted (1) by an act of the Contracting Officer in the 
administration of this contract, or (2) by the Contracting 
Officer’s failure to act within the time specified (or within a 
reasonable time if not specified) in this contract an 
adjustment shall be made for any increase in the cost of 
performance of the contract (excluding profit) necessarily 
caused by such unreasonable suspension, delay, or 
interruption and the contract modified in writing 
accordingly. However, no adjustment shall be made 
under this clause for any suspension, delay, or 
interruption to the extent that performance would have 
of this contract, pending final resolution of any request for 
relief, claim, appeal, or action arising under or relating to 
the contract, and comply with any decision of the 
Contracting Officer. 
32. Default 
(a) If the Contractor refuses or fails to prosecute the work, or 
any separable part thereof, with the diligence that will 
insure its completion within the time specified in this 
contract, or any extension thereof, or fails to complete 
said work within this time, the Contracting Officer may, by 
written notice to the Contractor, terminate the right to 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 11 of 19 
form HUD-5370 (8/2016)  
Page 66 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

proceed with the work (or separable part of the work) that 
has been delayed. In this event, the PHA may take over 
the work and complete it, by contract or otherwise, and 
may take possession of and use any materials, 
equipment, and plant on the work site necessary for 
completing the work. The Contractor and its sureties shall 
be liable for any damage to the PHA resulting from the 
Contractor’s refusal or failure to complete the work within 
completion of the work together with any increased costs 
occasioned the PHA in completing the work. 
(c) If the PHA does not terminate the Contractor’s right to 
proceed, the resulting damage will consist of liquidated
damages until the work is completed or accepted. 
34. Termination for Convenience 
the specified time, whether or not the Contractor’s right to
proceed with the work is terminated. This liability includes
any increased costs incurred by the PHA in completing 
(a) The Contracting Officer may terminate this contract in 
whole, or in part, whenever the Contracting Officer 
determines that such termination is in the best interest of 
the PHA. Any such termination shall be effected by 
delivery to the Contractor of a Notice of Termination 
specifying the extent to which the performance of the 
work under the contract is terminated, and the date upon
the work. 
(b) The Contractor’s right to proceed shall not be terminated 
or the Contractor charged with damages under this 
clause if— 
(1) The delay in completing the work arises from 
which such termination becomes effective. 
unforeseeable causes beyond the control and without 
the fault or negligence of the Contractor. Examples of 
such causes include (i) acts of God, or of the public 
enemy, (ii) acts of the PHA or other governmental 
entity in either its sovereign or contractual capacity, 
(iii) acts of another contractor in the performance of a 
contract with the PHA, (iv) fires, (v) floods, (vi) 
epidemics, (vii) quarantine restrictions, (viii) strikes, 
(ix) freight embargoes, (x) unusually severe weather, 
or (xi) delays of subcontractors or suppliers at any tier 
arising from unforeseeable causes beyond the control 
and without the fault or negligence of both the 
Contractor and the subcontractors or suppliers; and 
(2) The Contractor, within days (10 days unless otherwise 
indicated) from the beginning of such delay (unless 
extended by the Contracting Officer) notifies the 
Contracting Officer in writing of the causes of delay. 
The Contracting Officer shall ascertain the facts and 
the extent of the delay. If, in the judgment of the 
Contracting Officer, the findings of fact warrant such 
action, time for completing the work shall be extended 
by written modification to the contract. The findings of 
the Contracting Officer shall be reduced to a written 
decision which shall be subject to the provisions of 
(b) If the performance of the work is terminated, either in 
whole or in part, the PHA shall be liable to the Contractor 
for reasonable and proper costs resulting from such 
termination upon the receipt by the PHA of a properly 
presented claim setting out in detail: (1) the total cost of 
the work performed to date of termination less the total 
amount of contract payments made to the Contractor; (2) 
the cost (including reasonable profit) of settling and 
paying claims under subcontracts and material orders for 
work performed and materials and supplies delivered to 
the site, payment for which has not been made by the 
PHA to the Contractor or by the Contractor to the 
subcontractor or supplier; (3) the cost of preserving and 
protecting the work already performed until the PHA or 
assignee takes possession thereof or assumes 
responsibility therefore; (4) the actual or estimated cost of 
legal and accounting services reasonably necessary to 
prepare and present the termination claim to the PHA; 
and (5) an amount constituting a reasonable profit on the
value of the work performed by the Contractor. 
(c) The Contracting Officer will act on the Contractor’s claim 
within days (60 days unless otherwise indicated) of 
receipt of the Contractor’s claim. 
(d) Any disputes with regard to this clause are expressly 
the Disputes clause of this contract. 
made subject to the provisions of the Disputes clause of
this contract. 
(c) If, after termination of the Contractor’s right to proceed, it 
is determined that the Contractor was not in default, or 
that the delay was excusable, the rights and obligations 
of the parties will be the same as if the termination had 
been for convenience of the PHA. 
35. Assignment of Contract 
33. Liquidated Damages 
The Contractor shall not assign or transfer any interest in 
this contract; except that claims for monies due or to 
become due from the PHA under the contract may be 
assigned to a bank, trust company, or other financial 
institution. Such assignments of claims shall only be 
made with the written concurrence of the Contracting 
Officer. If the Contractor is a partnership, this contract 
shall inure to the benefit of the surviving or remaining 
member(s) of such partnership as approved by the 
Contracting Officer. 
(a) If the Contractor fails to complete the work within the time 
specified in the contract, or any extension, as specified in
the clause entitled Default of this contract, the Contractor 
shall pay to the PHA as liquidated damages, the sum of 
Contracting Officer insert amount] for 
$
each day of delay. If different completion dates are 
specified in the contract for separate parts or stages of the 
work, the amount of liquidated damages shall be 
assessed on those parts or stages which are delayed. To 
the extent that the Contractor’s delay or nonperformance 
is excused under another clause in this contract, 
liquidated damages shall not be due the PHA. The 
Contractor remains liable for damages caused other than 
36. Insurance 
(a) Before commencing work, the Contractor and each 
subcontractor shall furnish the PHA with certificates of 
insurance showing the following insurance is in force and
will insure all operations under the Contract:
by delay. 
(1) Workers’ Compensation, in accordance with state or 
(b) If the PHA terminates the Contractor’s right to proceed, 
Territorial Workers’ Compensation laws. 
the resulting damage will consist of liquidated damages
until such reasonable time as may be required for final 
(2) Commercial General Liability with a combined single 
than $ 
limit for bodily injury and property damage of not less 
[Contracting Officer insert amount] 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 12 of 19 
form HUD-5370 (8/2016)  
Page 67 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

per occurrence to protect the Contractor and each 
subcontractor against claims for bodily injury or death 
and damage to the property of others. This shall cover 
the use of all equipment, hoists, and vehicles 
(2) “Subcontractor” means any supplier, vendor, or firm 
that furnishes supplies, materials, equipment, or 
services to or for the Contractor or another 
subcontractor. 
on the site(s) not covered by Automobile Liability 
(b) The Contractor shall not enter into any subcontract with 
any subcontractor who has been temporarily denied 
participation in a HUD program or who has been 
suspended or debarred from participating in contracting
under (3) below. If the Contractor has a             made” 
policy, then the following additional requirements 
apply: the policy must provide a “retroactive date” 
which must be on or before the
“claims- 
programs by any agency of the United States 
execution date of the Contract; and the extended
reporting period may not be less than five years 
Government or of the state in which the work under this 
contract is to be performed. 
following the completion date of the Contract. 
(c) The Contractor shall be as fully responsible for the acts or 
omissions of its subcontractors, and of persons either 
directly or indirectly employed by them as for the acts or 
omissions of persons directly employed by the 
(3) Automobile Liability on owned and non -owned motor 
vehicles used on the site(s) or in connection therewith
for a combined single limit for bodily injury and 
property damage of not less than $ 
Contractor. 
[Contracting Officer insert amount] per occurrence. 
(d) The Contractor shall insert appropriate clauses in all 
(b) Before commencing work, the Contractor shall furnish the 
subcontracts to bind subcontractors to the terms and 
conditions of this contract insofar as they are applicable
PHA with a certificate of insurance evidencing that 
Builder’s Risk (fire and extended coverage) Insurance on 
all work in place and/or materials stored at the building 
site(s), including foundations and building equipment, is 
in force. The Builder’s Risk Insurance shall be for the 
benefit of the Contractor and the PHA as their interests 
may appear and each shall be named in the policy or 
policies as an insured. The Contractor in installing 
equipment supplied by the PHA shall carry insurance on 
such equipment from the time the Contractor takes 
possession thereof until the Contract work is accepted by 
the PHA. The Builder’s Risk Insurance need not be 
carried on excavations, piers, footings, or foundations 
until such time as work on the superstructure is started. It 
need not be carried on landscape work. Policies shall 
furnish coverage at all times for the full cash value of all 
completed construction, as well as materials in place 
and/or stored at the site(s), whether or not partial 
payment has been made by the PHA. The Contractor 
may terminate this insurance on buildings as of the date 
taken over for occupancy by the PHA. The Contractor is 
not required to carry Builder’s Risk Insurance for 
modernization work which does not involve structural 
alterations or additions and where the PHA’s existing fire 
and extended coverage policy can be endorsed to 
to the work of subcontractors. 
(e) Nothing contained in this contract shall create any 
contractual relationship between any subcontractor and 
the PHA or between the subcontractor and HUD. 
38. Subcontracting with Small and Minority Firms, 
Women’s Business Enterprise, and Labor Surplus
Area Firms 
The Contractor shall take the following steps to ensure 
that, whenever possible, subcontracts are awarded to 
small business firms, minority firms, women’s business
enterprises, and labor surplus area firms: 
(a) Placing qualified small and minority businesses and 
women’s business enterprises on solicitation lists;
(b) Ensuring that small and minority businesses and 
women’s business enterprises are solicited whenever
they are potential sources; 
(c) Dividing total requirements, when economically feasible, 
into smaller tasks or quantities to permit maximum 
participation by small and minority businesses and 
women’s business enterprises;
(d) Establishing delivery schedules, where the requirements 
include such work. 
of the contract permit, which encourage participation by
small and minority businesses and women’s business 
(c) All insurance shall be carried with companies which are 
enterprises; and 
financially responsible and admitted to do business in the 
State in which the project is located. If any such 
insurance is due to expire during the construction period, 
the Contractor (including subcontractors, as applicable) 
shall not permit the coverage to lapse and shall furnish 
evidence of coverage to the Contracting Officer. All 
certificates of insurance, as evidence of coverage, shall 
provide that no coverage may be canceled or non-
renewed by the insurance company until at least 30 days 
prior written notice has been given to the Contracting 
Officer. 
(e) Using the services and assistance of the U.S. Small 
Business Administration, the Minority Business 
Development Agency of the U.S. Department of 
Commerce, and State and local governmental small 
business agencies. 
39. Equal Employment Opportunity 
During the performance of this contract, the Contractor 
agrees as follows: 
(a) The Contractor shall not discriminate against any 
employee or applicant for employment because of race, 
37. Subcontracts 
color, religion, sex, national origin, or handicap. 
(b) The Contractor shall take affirmative action to ensure that 
(a) Definitions. As used in this contract - 
applicants are employed, and that employees are treated 
during employment without regard to their race, color, 
religion, sex, national origin, or handicap. Such action 
shall include, but not be limited to, (1) employment, (2) 
upgrading, (3) demotion, (4) transfer, (5) recruitment or 
recruitment advertising, (6) layoff or termination, (7) rates 
of pay or other forms of compensation, and (8) selection 
for training, including apprenticeship. 
(1) “Subcontract” means any contract, purchase order, or 
other purchase agreement, including modifications 
and change orders to the foregoing, entered into by a 
subcontractor to furnish supplies, materials, 
equipment, and services for the performance of the 
prime contract or a subcontract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 13 of 19 
form HUD-5370 (8/2016)  
Page 68 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(c) The Contractor shall post in conspicuous places available 
(a) The work to be performed under this contract is subject to 
the requirements of section 3 of the Housing and Urban 
Development Act of 1968, as amended, 12 U.S.C. 1701u 
(section 3). The purpose of section 3 is to ensure that 
employment and other economic opportunities generated 
by HUD assistance or HUD-assisted projects covered by 
section 3, shall, to the greatest extent feasible, be directed 
to low- and very low-income persons, particularly persons 
who are recipients of HUD assistance for 
to employees and applicants for employment the notices
to be provided by the Contracting Officer that explain this 
clause. 
(d) The Contractor shall, in all solicitations or 
advertisements for employees placed by or on behalf of 
the Contractor, state that all qualified applicants will 
receive consideration for employment without regard to 
race, color, religion, sex, national origin, or handicap. 
(e) The Contractor shall send, to each labor union or 
housing. 
representative of workers with which it has a collective 
bargaining agreement or other contract or understanding, 
the notice to be provided by the Contracting Officer 
advising the labor union or workers’ representative of the 
Contractor’s commitments under this clause, and post 
copies of the notice in conspicuous places available to 
(b) The parties to this contract agree to comply with HUD's 
regulations in 24 CFR Part 135, which implement section 
3. As evidenced by their execution of this contract, the 
parties to this contract certify that they are under no 
contractual or other impediment that would prevent them 
from complying with the Part 135 regulations. 
employees and applicants for employment. 
(c) The contractor agrees to send to each labor organization 
or representative of workers with which the contractor has 
a collective bargaining agreement or other understanding, 
if any, a notice advising the labor organization or workers' 
representative of the contractor's commitments under this 
section 3 clause, and will post copies of the notice in 
conspicuous places at the work site where both 
employees and applicants for training and employment 
positions can see the notice. The notice shall describe the 
section 3 preference, shall set forth minimum number and 
job titles subject to hire, availability of apprenticeship and 
training positions, the qualifications for each; and the 
name and location of the person(s) taking applications for 
each of the positions; and the 
(f) The Contractor shall comply with Executive Order 11246, 
as amended, and the rules, regulations, and orders of the 
Secretary of Labor. 
(g) The Contractor shall furnish all information and reports
required by Executive Order 11246, as amended, Section 
503 of the Rehabilitation Act of 1973, as amended, and 
by rules, regulations, and orders of the Secretary of 
Labor, or pursuant thereto. The Contractor shall permit 
access to its books, records, and accounts by the 
Secretary of Labor for purposes of investigation to 
ascertain compliance with such rules, regulations, and 
orders. 
(h) In the event of a determination that the Contractor is not 
in compliance with this clause or any rule, regulation, or 
order of the Secretary of Labor, this contract may be 
canceled, terminated, or suspended in whole or in part, 
and the Contractor may be declared ineligible for further 
Government contracts, or Federally assisted construction 
contracts under the procedures authorized in Executive 
Order 11246, as amended. In addition, sanctions may be 
imposed and remedies invoked against the Contractor as 
provided in Executive Order 11246, as amended, the 
rules, regulations, and orders of the Secretary of Labor, 
anticipated date the work shall begin. 
(d) The contractor agrees to include this section 3 clause in 
every subcontract subject to compliance with regulations 
in 24 CFR Part 135, and agrees to take appropriate 
action, as provided in an applicable provision of the 
subcontract or in this section 3 clause, upon a finding that 
the subcontractor is in violation of the regulations in 24 
CFR Part 135. The contractor will not subcontract with 
any subcontractor where the contractor has notice or 
knowledge that the subcontractor has been found in 
or as otherwise provided by law. 
violation of the regulations in 24 CFR Part 135. 
(i) The Contractor shall include the terms and conditions of 
(e) The contractor will certify that any vacant employment 
this clause in every subcontract or purchase order unless 
exempted by the rules, regulations, or orders of the 
Secretary of Labor issued under Executive Order 11246, 
as amended, so that these terms and conditions will be 
binding upon each subcontractor or vendor. The 
Contractor shall take such action with respect to any 
subcontract or purchase order as the Secretary of 
Housing and Urban Development or the Secretary of 
Labor may direct as a means of enforcing such 
provisions, including sanctions for noncompliance; 
provided that if the Contractor becomes involved in, or is 
threatened with, litigation with a subcontractor or vendor 
as a result of such direction, the Contractor may request 
the United States to enter into the litigation to protect the 
positions, including training positions, that are filled (1) 
after the contractor is selected but before the contract is 
executed, and (2) with persons other than those to whom 
the regulations of 24 CFR Part 135 require employment 
opportunities to be directed, were not filled to circumvent 
the contractor's obligations under 24 CFR Part 135. 
(f) Noncompliance with HUD's regulations in 24 CFR Part
135 may result in sanctions, termination of this contract
for default, and debarment or suspension from future 
HUD assisted contracts. 
interests of the United States. 
(g) With respect to work performed in connection with section 
3 covered Indian housing assistance, section 7(b) of the 
Indian Self-Determination and Education Assistance Act 
(25 U.S.C. 450e) also applies to the work to be 
performed under this contract. Section 7(b) requires that 
to the greatest extent feasible (i) preference and 
opportunities for training and employment shall be given 
to Indians, and (ii) preference in the award of contracts 
and subcontracts shall be given to Indian organizations 
and Indian-owned Economic Enterprises. Parties to this 
contract that are subject to the provisions of section 3 
and section 7(b)agree to comply with section 3 to the 
maximum extent feasible, but not in derogation of 
compliance with section 7(b). 
(j) Compliance with the requirements of this clause shall be 
to the maximum extent consistent with, but not in 
derogation of, compliance with section 7(b) of the Indian 
Self-Determination and Education Assistance Act and the 
Indian Preference clause of this contract. 
40. Employment, Training, and Contracting 
Opportunities for Low-Income Persons, Section 3 of
the Housing and Urban Development Act of 1968. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 14 of 19 
form HUD-5370 (8/2016)  
Page 69 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

41. Interest of Members of Congress 
(a) The PHA, HUD, or Comptroller General of the United 
No member of or delegate to the Congress of the United
States of America shall be admitted to any share or part of
this contract or to any benefit that may arise therefrom. 
States, or any of their duly authorized representatives 
shall, until 3 years after final payment under this contract, 
have access to and the right to examine any of the 
Contractor’s directly pertinent books, documents, papers, 
or other records involving transactions related to this 
contract for the purpose of making audit, examination, 
42. Interest of Members, Officers, or Employees and 
Former Members, Officers, or Employees 
excerpts, and transcriptions. 
No member, officer, or employee of the PHA, no member 
of the governing body of the locality in which the project 
is situated, no member of the governing body of the 
locality in which the PHA was activated, and no other 
public official of such locality or localities who exercises 
any functions or responsibilities with respect to the 
project, shall, during his or her tenure, or for one year 
thereafter, have any interest, direct or indirect, in this 
contract or the proceeds thereof. 
(b) The Contractor agrees to include in first-tier subcontracts 
under this contract a clause substantially the same as 
paragraph (a) above. “Subcontract,” as used in this 
clause, excludes purchase orders not exceeding 
$10,000. 
43. Limitations on Payments made to Influence Certain 
Federal Financial Transactions 
(c) The periods of access and examination in paragraphs (a) 
and (b) above for records relating to (1) appeals under the 
Disputes clause of this contract, (2) litigation or settlement 
of claims arising from the performance of this contract, or 
(3) costs and expenses of this contract to which the PHA, 
HUD, or Comptroller General or any of their duly 
authorized representatives has taken exception shall 
continue until disposition of such appeals, litigation, 
claims, or exceptions. 
(a) The Contractor agrees to comply with Section 1352 of 
Title 31, United States Code which prohibits the use of 
Federal appropriated funds to pay any person for 
influencing or attempting to influence an officer or 
employee of any agency, a Member of Congress, and 
officer or employee of Congress, or an employee of a 
Member of Congress in connection with any of the 
following covered Federal actions: the awarding of any 
Federal contract; the making of any Federal grant; the 
making of any Federal loan; the entering into of any 
cooperative agreement; or the modification of any 
46. Labor Standards - Davis-Bacon and Related Acts 
If the total amount of this contract exceeds $2,000, the 
Federal labor standards set forth in the clause below shall 
apply to the development or construction work to be 
performed under the contract. 
(a) Minimum Wages. 
Federal contract, grant, loan, or cooperative agreement. 
(1) All laborers and mechanics employed under this 
contract in the development or construction of the 
project(s) involved will be paid unconditionally and not 
less often than once a week, and without subsequent 
deduction or rebate on any account (except such payroll 
deductions as are permitted by regulations issued by the 
Secretary of Labor under the Copeland Act (29 CFR Part 
3)), the full amount of wages and bona fide fringe benefits 
(or cash equivalents thereof) due at time of payment 
computed at rates not less than those contained in the 
wage determination of the Secretary of Labor which is 
attached hereto and made a part hereof, regardless of 
any contractual relationship which may be alleged to exist 
between the Contractor and such laborers and 
mechanics. Contributions made or costs reasonably 
anticipated for bona fide fringe benefits under Section 
1(b)(2) of the Davis-Bacon Act on behalf of laborers or 
mechanics are considered wages paid to such laborers or 
mechanics, subject to the provisions of 29 CFR 
5.5(a)(1)(iv); also, regular contributions made or costs 
incurred for more than a weekly period (but not less often 
than quarterly) under plans, funds, or programs which 
cover the regular weekly period, are deemed to be 
constructively made or incurred during such weekly 
period. Such laborers and mechanics shall be paid the 
appropriate wage rate and fringe benefits in the wage 
determination for the classification of work actually 
performed, without regard to skill, except as provided in 
29 CFR 5.5(a)(4). Laborers or mechanics performing 
(b) The Contractor further agrees to comply with the 
requirement of the Act to furnish a disclosure (OMB 
Standard Form LLL, Disclosure of Lobbying Activities) if 
any funds other than Federal appropriated funds 
(including profit or fee received under a covered Federal 
transaction) have been paid, or will be paid, to any person 
for influencing or attempting to influence an officer or 
employee of any agency, a Member of Congress, an 
officer or employee of Congress, or an employee of a 
Member of Congress in connection with a Federal 
contract, grant, loan, or cooperative agreement. 
44. Royalties and Patents 
The Contractor shall pay all royalties and license fees. It 
shall defend all suits or claims for infringement of any 
patent rights and shall save the PHA harmless from loss 
on account thereof; except that the PHA shall be 
responsible for all such loss when a particular design, 
process or the product of a particular manufacturer or 
manufacturers is specified and the Contractor has no 
reason to believe that the specified design, process, or 
product is an infringement. If, however, the Contractor 
has reason to believe that any design, process or product 
specified is an infringement of a patent, the Contractor 
shall promptly notify the Contracting Officer. Failure to 
give such notice shall make the Contractor responsible 
for resultant loss. 
work in more than one classification may be 
45. Examination and Retention of Contractor’s Records 
compensated at the rate specified for each classification 
for the time actually worked therein; provided, that the 
employer’s payroll records accurately set forth the time 
spent in each classification in which work is performed. 
The wage determination (including any additional 
classification and wage rates conformed under 29 CFR 
5.5(a)(1)(ii) and the Davis-Bacon poster (WH-1321) shall
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 15 of 19 
form HUD-5370 (8/2016)  
Page 70 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

be posted at all times by the Contractor and its 
subcontractors at the site of the work in a prominent and 
accessible place where it can be easily seen by the 
amount of any costs reasonably anticipated in 
providing bona fide fringe benefits under a plan or 
program; provided, that the Secretary of Labor has 
found, upon the written request of the Contractor, that 
the applicable standards of the Davis-Bacon Act have 
been met. The Secretary of Labor may require the 
Contractor to set aside in a separate account assets 
for the meeting of obligations under the plan or 
workers.
(2) (i) Any class of laborers or mechanics, including 
helpers, which is not listed in the wage 
determination and which is to be employed under 
the contract shall be classified in conformance with 
the wage determination. HUD shall approve an 
additional classification and wage rate and fringe 
benefits therefor only when all the following criteria 
have been met: (A) The work to be performed by 
the classification requested is not performed by a 
classification in the wage determination; and (B) 
The classification is utilized in the area by the 
construction industry; and (C) The proposed wage 
rate, including any bona fide fringe benefits, bears 
a reasonable relationship to the wage rates 
contained in the wage 
program. 
determination. 
(b) Withholding of funds. HUD or its designee shall, upon its 
own action or upon written request of an authorized 
representative of the Department of Labor, withhold or 
cause to be withheld from the Contractor under this 
contract or any other Federal contract with the same 
prime Contractor, or any other Federally-assisted 
contract subject to Davis-Bacon prevailing wage 
requirements, which is held by the same prime 
Contractor, so much of the accrued payments or 
advances as may be considered necessary to pay 
laborers and mechanics, including apprentices, trainees, 
and helpers, employed by the Contractor or any 
subcontractor the full amount of wages required by the 
contract. In the event of failure to pay any laborer or 
mechanic, including any apprentice, trainee, or helper, 
employed or working in the construction or development 
of the project, all or part of the wages required by the 
contract, HUD or its designee may, after written notice to 
the Contractor, take such action as may be necessary to 
cause the suspension of any further payment, advance, 
or guarantee of funds until such violations have ceased. 
HUD or its designee may, after written notice to the 
Contractor, disburse such amounts withheld for and on 
account of the Contractor or subcontractor to the 
(ii) If the Contractor and the laborers and mechanics 
to be employed in the classification (if known), or 
their representatives, and HUD or its designee 
agree on the classification and wage rate 
(including the amount designated for fringe 
benefits where appropriate), a report of the action 
taken shall be sent by HUD or its designee to the 
Administrator of the Wage and Hour Division, 
Employee Standards Administration, U.S. 
Department of Labor, Washington, DC 20210. 
The Administrator, or an authorized 
representative, will approve, modify, or disapprove 
every additional classification action within 30 days 
of receipt and so advise HUD or its designee or will 
notify HUD or its designee within the 30-day period 
that additional time is necessary. 
respective employees to whom they are due. 
(c) Payrolls and basic records. 
(1) Payrolls and basic records relating thereto shall be 
(iii) In the event the Contractor, the laborers or 
maintained by the Contractor during the course of the 
work and preserved for a period of three years 
thereafter for all laborers and mechanics working in 
the construction or development of the project. Such 
records shall contain the name, address, and social 
security number of each such worker, his or her 
correct classification, hourly rates of wages paid 
(including rates of contributions or costs anticipated 
for bona fide fringe benefits or cash equivalents 
thereof of the types described in section 1(b)(2)(B) of 
the Davis-Bacon Act), daily and weekly number of 
hours worked, deductions made, and actual wages 
paid. Whenever the Secretary of Labor has found, 
under 29 CFR 5.5(a)(1)(iv), that the wages of any 
laborer or mechanic include the amount of costs 
reasonably anticipated in providing benefits under a 
plan or program described in section 1(b)(2)(B) of the 
Davis-Bacon Act, the Contractor shall maintain 
records which show that the commitment to provide 
such benefits is enforceable, that the plan or program 
is financially responsible, and that the plan or 
program has been communicated in writing to the 
laborers or mechanics affected, and records which 
show the costs anticipated or the actual cost incurred 
in providing such benefits. Contractors employing 
apprentices or trainees under approved programs 
shall maintain written evidence of the registration of 
apprenticeship programs and certification of trainee 
programs, the registration of the apprentices and 
trainees, and the ratios and wage rates prescribed in 
the applicable programs. 
mechanics to be employed in the classification or 
their representatives, and HUD or its designee do 
not agree on the proposed classification and wage 
rate (including the amount designated for fringe 
benefits, where appropriate), HUD or its designee 
shall refer the questions, including the views of all 
interested parties and the recommendation of HUD 
or its designee, to the Administrator of the Wage 
and Hour Division for determination. The 
Administrator, or an authorized representative, will 
issue a determination within 30 days of receipt and 
so advise HUD or its designee or will notify HUD or 
its designee within the 30-day period that 
additional time is necessary. 
(iv) The wage rate (including fringe benefits where 
appropriate) determined pursuant to 
subparagraphs (a)(2)(ii) or (iii) of this clause shall 
be paid to all workers performing work in the 
classification under this contract from the first day
on which work is performed in classification. 
(3) Whenever the minimum wage rate prescribed in the 
contract for a class of laborers or mechanics includes 
a fringe benefit which is not expressed as an hourly 
rate, the Contractor shall either pay the benefit as 
stated in the wage determination or shall pay another 
bona fide fringe benefit or an hourly cash equivalent 
thereof. 
(4) If the Contractor does not make payments to a trustee 
or other third person, the Contractor may consider as
part of the wages of any laborer or mechanic the 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 16 of 19 
form HUD-5370 (8/2016)  
Page 71 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(2) (i) The Contractor shall submit weekly for each week 
make such records available may be grounds for
debarment action pursuant to 29 CFR 5.12. 
in which any contract work is performed a copy of 
all payrolls to the Contracting Officer for 
(d) (1) Apprentices. Apprentices will be permitted to work at 
transmission to HUD or its designee. The payrolls 
submitted shall set out accurately and completely 
all of the information required to be maintained 
under subparagraph (c)(1) of this clause. This 
information may be submitted in any form desired. 
Optional Form WH-347 (Federal Stock Number 
029-005-00014-1) is available for this purpose and 
may be purchased from the Superintendent of 
Documents, U.S. Government Printing Office, 
Washington, D.C. 20402. The Contractor is 
responsible for the submission of copies of 
payrolls by all subcontractors. (Approved by the 
Office of Management and Budget under OMB 
less than the predetermined rate for the work they 
performed when they are employed pursuant to and 
individually registered in a bona fide apprenticeship 
program registered with the U.S. Department of 
Labor, Employment and Training Administration, 
Office of Apprenticeship and Training, Employer and
Labor Services (OATELS), or with a State 
Apprenticeship Agency recognized by OATELS, or if a 
person is employed in his or her first 90 days of 
probationary employment as an apprentice in such an 
apprenticeship program, who is not individually 
registered in the program, but who has been certified 
by OATELS or a State Apprenticeship Agency (where
Control Number 1214-0149.) 
appropriate) to be eligible for probationary
(ii) Each payroll submitted shall be accompanied by a 
employment as an apprentice. The allowable ratio of 
apprentices to journeymen on the job site in any craft 
classification shall not be greater than the ratio 
permitted to the Contractor as to the entire work force 
under the registered program. Any worker listed on a 
payroll at an apprentice wage rate, who is not 
registered or otherwise employed as stated in this 
paragraph, shall be paid not less than the applicable 
wage rate on the wage determination for the 
classification of work actually performed. In addition, 
any apprentice performing work on the job site in 
excess of the ratio permitted under the registered 
program shall be paid not less than the applicable 
wage rate on the wage determination for the work 
actually performed. Where a contractor is performing 
construction on a project in a locality other than that in 
which its program is registered, the ratios and wage 
rates (expressed in percentages of the journeyman’s 
“Statement of Compliance,” signed by the 
Contractor or subcontractor or his or her agent 
who pays or supervises the payment of the 
persons employed under the contract and shall
certify the following: 
(A) That the payroll for the payroll period contains 
the information required to be maintained 
under paragraph (c) (1) of this clause and that 
such information is correct and complete; 
(B) That each laborer or mechanic (including each 
helper, apprentice, and trainee) employed on 
the contract during the payroll period has been 
paid the full weekly wages earned, without 
rebate, either directly or indirectly, and that no 
deductions have been made either directly or 
indirectly from the full wages earned, other 
than permissible deductions as set forth in 29 
CFR Part 3; and 
hourly rate) specified in the Contractor’s or 
(C) That each laborer or mechanic has been paid 
not less than the applicable wage rates and 
fringe benefits or cash equivalents for the 
classification of work performed, as specified 
in the applicable wage determination 
subcontractor’s registered program shall be observed. 
Every apprentice must be paid at not less than the rate 
specified in the registered program for the apprentice’s 
level of progress, expressed as a percentage of the 
journeyman hourly rate specified in the applicable 
wage determination. Apprentices shall be paid fringe 
benefits in accordance with the provisions of the 
apprenticeship program. If the apprenticeship program 
does not specify fringe benefits, apprentices must be 
paid the full amount of fringe benefits listed on the 
wage determination for the applicable classification. If 
the Administrator of the Wage and Hour Division 
determines that a different practice prevails for the 
applicable apprentice classification, fringes shall be 
paid in accordance with that determination. In the 
event OATELS, or a State Apprenticeship Agency 
recognized by OATELS, withdraws approval of an 
apprenticeship program, the Contractor will no longer 
be permitted to utilize apprentices at less than the 
applicable predetermined rate for the work performed 
until an acceptable 
incorporated into the contract. 
(iii) The weekly submission of a properly executed 
certification set forth on the reverse side of 
Optional Form WH-347 shall satisfy the 
requirements for submission of the “Statement of
Compliance” required by subparagraph (c)(2)(ii) of
this clause. 
(iv) The falsification of any of the above certifications 
may subject the Contractor or subcontractor to civil 
or criminal prosecution under Section 1001 of Title 
18 and Section 3729 of Title 31 of the United 
States Code. 
(3) The Contractor or subcontractor shall make the 
records required under subparagraph (c)(1) available 
for inspection, copying, or transcription by authorized 
representatives of HUD or its designee, the 
Contracting Officer, or the Department of Labor and 
shall permit such representatives to interview 
employees during working hours on the job. If the 
Contractor or subcontractor fails to submit the 
required records or to make them available, HUD or 
program is approved. 
(2) Trainees. Except as provided in 29 CFR 5.16, 
its designee may, after written notice to the 
trainees will not be permitted to work at less than the 
predetermined rate for the work performed unless they 
are employed pursuant to and individually registered in 
a program which has received prior approval, 
evidenced by formal certification by the U.S. 
Department of Labor, Employment and Training 
Administration. The ratio of trainees to journeymen on 
the job site shall not be greater than permitted under 
Contractor, take such action as may be necessary to 
cause the suspension of any further payment, 
advance, or guarantee of funds. Furthermore, failure 
to submit the required records upon request or to 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 17 of 19 
form HUD-5370 (8/2016)  
Page 72 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

the plan approved by the Employment and Training 
Administration. Every trainee must be paid at not less 
than the rate specified in the approved program for the 
trainee’s level of progress, expressed as a percentage 
of the journeyman hourly rate specified in the 
applicable wage determination. Trainees shall be paid 
fringe benefits in accordance with the provisions of the 
trainee program. If the trainee program does not 
mention fringe benefits, trainees shall be paid the full 
amount of fringe benefits listed in the wage 
determination unless the Administrator of the Wage 
and Hour Division determines that there is an 
apprenticeship program associated with the 
corresponding journeyman wage rate in the wage 
determination which provides for less than full fringe 
benefits for apprentices. Any employee listed on the 
payroll at a trainee rate who is not registered and 
participating in a training plan approved by the 
Employment and Training Administration shall be paid 
not less than the applicable wage rate in the wage 
determination for the classification of work actually 
performed. In addition, any trainee performing work on 
the job site in excess of the ratio permitted under the 
registered program shall be paid not less than the 
applicable wage rate in the wage determination for the 
work actually performed. In the event the Employment 
and Training Administration withdraws approval of a 
training program, the Contractor will no longer be 
permitted to utilize trainees at less than the applicable 
predetermined rate for the work performed 
(2) No part of this contract shall be subcontracted to any 
person or firm ineligible for award of a United States
Government contract by virtue of section 3(a) of the
Davis-Bacon Act or 29 CFR 5.12(a)(1). 
(3) The penalty for making false statements is prescribed 
in the U. S. Criminal Code, 18 U.S.C. 1001. 
(j) Contract Work Hours and Safety Standards Act. As used 
in this paragraph, the terms “laborers” and “mechanics” 
include watchmen and guards. 
(1) Overtime requirements. No contractor or 
subcontractor contracting for any part of the contract 
work which may require or involve the employment of 
laborers or mechanics, including watchmen and 
guards, shall require or permit any such laborer or 
mechanic in any workweek in which the individual is 
employed on such work to work in excess of 40 hours 
in such workweek unless such laborer or mechanic 
receives compensation at a rate not less than one and 
one-half times the basic rate of pay for all hours 
worked in excess of 40 hours in such workweek. 
(2) Violation; liability for unpaid wages; liquidated 
damages. In the event of any violation of the 
provisions set forth in subparagraph (j)(1) of this 
clause, the Contractor and any subcontractor 
responsible therefor shall be liable for the unpaid
wages. In addition, such Contractor and
until an acceptable program is approved. 
subcontractor shall be liable to the United States (in 
the case of work done under contract for the District 
of Columbia or a territory, to such District or to such 
territory), for liquidated damages. Such liquidated 
damages shall be computed with respect to each 
individual laborer or mechanic (including watchmen 
and guards) employed in violation of the provisions 
set forth in subparagraph (j)(1) of this clause, in the 
sum of $10 for each calendar day on which such 
individual was required or permitted to work in excess 
of the standard workweek of 40 hours without 
payment of the overtime wages required by 
provisions set forth in subparagraph (j)(1) of this 
(3) Equal employment opportunity. The utilization of 
apprentices, trainees, and journeymen under this 
clause shall be in conformity with the equal 
employment opportunity requirements of Executive
Order 11246, as amended, and 29 CFR Part 30. 
(e) Compliance with Copeland Act requirements. The 
Contractor shall comply with the requirements of 29 CFR
Part 3, which are hereby incorporated by reference in this
contract. 
clause. 
(f) Contract termination; debarment. A breach of this contract 
clause may be grounds for termination of the contract and 
for debarment as a Contractor and a subcontractor as 
provided in 29 CFR 5.12. 
(3) Withholding for unpaid wages and liquidated 
(g) Compliance with Davis-Bacon and related Act 
requirements. All rulings and interpretations of the Davis-
damages. HUD or its designee shall upon its own 
action or upon written request of an authorized 
representative of the Department of Labor withhold or 
cause to be withheld, from any moneys payable on 
account of work performed by the Contractor or 
subcontractor under any such contract or any Federal 
contract with the same prime Contractor, or any other 
Federally-assisted contract subject to the Contract 
Work Hours and Safety Standards Act, which is held 
by the same prime Contractor, such sums as may be 
determined to be necessary to satisfy any liabilities of 
such Contractor or subcontractor for unpaid wages 
and liquidated damages as provided in the provisions 
set forth in subparagraph (j)(2) of this clause. 
(k) Subcontracts. The Contractor or subcontractor shall insert 
in any subcontracts all the provisions contained in this 
clause, and such other clauses as HUD or its designee 
may by appropriate instructions require, and also a 
clause requiring the subcontractors to include these 
provisions in any lower tier subcontracts. The prime 
Contractor shall be responsible for the compliance by any 
subcontractor or lower tier subcontractor with all these 
provisions. 
Bacon and related Acts contained in 29 CFR Parts 1, 3, 
and 5 are herein incorporated by reference in this 
contract. 
(h) Disputes concerning labor standards. Disputes arising out 
of the labor standards provisions of this clause shall not 
be subject to the general disputes clause of this contract. 
Such disputes shall be resolved in accordance with the 
procedures of the Department of Labor set forth in 29 
CFR Parts 5, 6, and 7. Disputes within the meaning of 
this clause include disputes between the Contractor (or 
any of its subcontractors) and the PHA, HUD, the U.S. 
Department of Labor, or the employees or their 
representatives. 
(i) Certification of eligibility. 
(1) By entering into this contract, the Contractor certifies 
that neither it (nor he or she) nor any person or firm 
who has an interest in the Contractor’s firm is a 
person or firm ineligible to be awarded contracts by 
the United States Government by virtue of section 
3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 18 of 19 
form HUD-5370 (8/2016)  
Page 73 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

47. Non-Federal Prevailing Wage Rates 
(a) Any prevailing wage rate (including basic hourly rate and 
any fringe benefits), determined under State or tribal law 
to be prevailing, with respect to any employee in any 
trade or position employed under the contract, is 
inapplicable to the contract and shall not be enforced 
against the Contractor or any subcontractor, with respect 
to employees engaged under the contract whenever 
such non-Federal prevailing wage rate exceeds: 
(1) The applicable wage rate determined by the Secretary 
of Labor pursuant to the Davis-Bacon Act (40 U.S.C. 
3141 et seq.) to be prevailing in the locality with 
respect to such trade; 
(b) An applicable apprentice wage rate based thereon 
specified in an apprenticeship program registered with
the U.S. Department of Labor (DOL) or a DOL- 
recognized State Apprenticeship Agency; or 
(c) An applicable trainee wage rate based thereon specified 
in a DOL-certified trainee program. 
48. Procurement of Recovered Materials. 
(a) In accordance with Section 6002 of the Solid Waste 
Disposal Act, as amended by the Resource Conservation 
and Recovery Act, the Contractor shall procure items 
designated in guidelines of the Environmental Protection 
Agency (EPA) at 40 CFR Part 247 that contain the highest 
percentage of recovered materials practicable, consistent 
with maintaining a satisfactory level of competition. The 
Contractor shall procure items designated in the EPA 
guidelines that contain the highest percentage of 
recovered materials practicable unless the Contractor 
determines that such items: (1) are not reasonably 
available in a reasonable period of time; (2) fail to meet 
reasonable performance standards, which shall be 
determined on the basis of the guidelines of the National 
Institute of Standards and Technology, if applicable to the 
item; or (3) are only available at an 
unreasonable price. 
(b) Paragraph (a) of this clause shall apply to items 
purchased under this contract where: (1) the 
Contractor purchases in excess of $10,000 of the item 
under this contract; or (2) during the preceding 
Federal fiscal year, the Contractor: (i) purchased any 
amount of the items for use under a contract that was 
funded with Federal appropriations and was with a 
Federal agency or a State agency or agency of a 
political subdivision of a State; and (ii) purchased a 
total of in excess of $10,000 of the item both under 
and outside that contract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 19 of 19 
form HUD-5370 (8/2016)  
Page 74 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

General Conditions for Construction 
Public Housing Programs
U.S. Department of Housing and Urban 
Contracts
Development 
-
Office of Public and Indian Housing 
OMB Approval No. 2577-0157 (exp. 3/31/2020) 
Applicability. This form is applicable to any
construction/development contract greater than $150,000.
This form includes those clauses required by OMB's common rule on grantee procurement, implemented at HUD in 2 CFR 200, and 
those requirements set forth in Section 3 of the Housing and Urban Development Act of 1968 and its amendment by the Housing and 
Community Development Act of 1992, implemented by HUD at 24 CFR Part 135. The form is required for construction contracts 
awarded by Public Housing Agencies (PHAs). 
The form is used by Housing Authorities in solicitations to provide necessary contract clauses. If the form were not used, HAs would be 
unable to enforce their contracts. 
Public reporting burden for this collection of information is estimated to average 1.0 hours per response, including the time for reviewing 
instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection 
of information. Responses to the collection of information are required to obtain a benefit or to retain a benefit. 
The information requested does not lend itself to confidentiality. 
HUD may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently
valid OMB number. 
Table of Contents
Clause
Page 
Clause
Page 
1. 
Definitions 
2
Administrative Requirements
Construction Requirements
28. 
Contract Modifications 
10 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 1 of 19 
form HUD-5370 (1/2014)  
14.
Temporary Buildings and Transportation Materials
6
38.
13
16.
40.
14
18.
Clean Air and Water
7
42.
15
2.
Contractor’s Responsibility for Work
2
25.
Contract Period
9
3. 
Architect’s Duties, Responsibilities and Authority
2 
26. 
Order of Precedence
9 
4.
Other Contracts
3
27.
Payments
9
5.
Preconstruction Conference and Notice to Proceed
3
29.
Changes
10
6.
Construction Progress Schedule
3
30.
Suspension of Work
11
7. 
Site Investigation and Conditions Affecting the Work
3 
31. 
Disputes
11 
8. 
Differing Site Conditions
4 
32. 
Default
11 
9. 
Specifications and Drawings for Construction
4 
33. 
Liquidated 
12 
10. 
As-Built Drawings
5 
34. 
Termination of Convenience
12 
11.
Material and Workmanship
5
35.
Assignment of Contract
12
12. 
Permits and Codes
5 
36. 
Insurance
12 
13.
Health, Safety, and Accident Prevention
6
37.
Subcontracts
13
Subcontracting with Small and Minority Firms, Women’s 
Business Enterprise, and Labor Surplus Area Firms 
15.
Availability and Use of Utility Services
6
39.
Equal Employment Opportunity
13
Protection of Existing Vegetation, Structures, 
Equipment, Utilities, and Improvements 
6 
Employment, Training, and Contracting Opportunities 
for Low-Income Persons, Section 3 of the Housing and 
Urban Development Act of 1968 
17.
Temporary Buildings and Transportation Materials
7
41.
Interest of Members of Congress
15
Interest of Members, Officers, or Employees and 
Former Members, Officers, or Employees 
19.
Energy Efficiency
7
43.
Limitations on Payments Made to Influence
15
20.
Inspection and Acceptance of Construction
7
44.
Royalties and Patents
15
21. 
Use and Possession Prior to 
8 
45. 
Examination and Retention of Contractor’s Records
15 
22. 
Warranty of Title
8 
46. 
Labor Standards-Davis-Bacon and Related Acts
15 
23. 
Warranty of 
8 
47. 
Non-Federal Prevailing Wage Rates
19 
24. 
Prohibition Against 
9 
48. 
Procurement of Recovered 
19 
Page 75 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

1. Definitions 
(a) The Contractor shall furnish all necessary labor, 
(a) “Architect” means the person or other entity engaged by 
the PHA to perform architectural, engineering, design, 
and other services related to the work as provided for in 
the contract. When a PHA uses an engineer to act in this 
capacity, the terms “architect” and “engineer” shall be 
synonymous. The Architect shall serve as a technical 
representative of the Contracting Officer. The Architect’s 
materials, tools, equipment, and transportation necessary 
for performance of the work. The Contractor shall also 
furnish all necessary water, heat, light, and power not 
made available to the Contractor by the PHA pursuant to 
the clause entitled Availability and Use of Utility Services 
herein. 
(b) The Contractor shall perform on the site, and with its own 
authority is as set forth elsewhere in this contract. 
organization, work equivalent to at least [ 
] (12 percent
unless otherwise indicated) of the total amount of work to 
be performed under the order. This percentage may be 
reduced by a supplemental agreement to this order if, 
during performing the work, the Contractor requests a 
reduction and the Contracting Officer determines that the
(b) “Contract” means the contract entered into between the 
PHA and the Contractor. It includes the forms of Bid, the 
Bid Bond, the Performance and Payment Bond or Bonds 
or other assurance of completion, the Certifications, 
Representations, and Other Statements of Bidders (form 
HUD-5370), these General Conditions of the Contract for 
Construction (form HUD-5370), the applicable wage rate 
determinations from the U.S. Department of Labor, any 
special conditions included elsewhere in the contract, the 
specifications, and drawings. It includes all formal 
changes to any of those documents by addendum, 
reduction would be to the advantage of the PHA. 
(c) At all times during performance of this contract and until 
the work is completed and accepted, the Contractor shall 
directly superintend the work or assign and have on the 
work site a competent superintendent who is satisfactory 
to the Contracting Officer and has authority to act for the 
Contractor. 
change order, or other modification. 
(d) The Contractor shall be responsible for all damages to 
(c) “Contracting Officer” means the person delegated the au- 
persons or property that occur as a result of the 
Contractor’s fault or negligence, and shall take proper
thority by the PHA to enter into, administer, and/or 
terminate this contract and designated as such in writing 
to the Contractor. The term includes any successor 
safety and health precautions to protect the work, the 
workers, the public, and the property of others. The 
Contractor shall hold and save the PHA, its officers and 
agents, free and harmless from liability of any nature 
occasioned by the Contractor’s performance. The 
Contractor shall also be responsible for all materials 
delivered and work performed until completion and 
acceptance of the entire work, except for any completed 
unit of work which may have been accepted under the 
Contracting Officer and any duly authorized 
representative of the Contracting Officer also designated 
in writing. The Contracting Officer shall be deemed the 
authorized agent of the PHA in all dealings with the 
Contractor. 
(d) “Contractor” means the person or other entity entering 
into the contract with the PHA to perform all of the work 
required under the contract. 
contract. 
(e) “Drawings” means the drawings enumerated in the 
(e) The Contractor shall lay out the work from base lines and 
schedule of drawings contained in the Specifications and
as described in the contract clause entitled Specifications
bench marks indicated on the drawings and be 
responsible for all lines, levels, and measurements of all 
work executed under the contract. The Contractor shall 
verify the figures before laying out the work and will be 
held responsible for any error resulting from its failure to 
and Drawings for Construction herein. 
(f) “HUD” means the United States of America acting through 
the Department of Housing and Urban Development 
including the Secretary, or any other person designated to 
act on its behalf. HUD has agreed, subject to the 
provisions of an Annual Contributions Contract (ACC), to 
provide financial assistance to the PHA, which includes 
assistance in financing the work to be performed under 
this contract. As defined elsewhere in these General 
Conditions or the contract documents, the determination 
of HUD may be required to authorize changes in the work 
or for release of funds to the PHA for payment to the 
Contractor. Notwithstanding HUD’s role, nothing in this 
contract shall be construed to create any contractual 
do so. 
(f) The Contractor shall confine all operations (including 
storage of materials) on PHA premises to areas 
authorized or approved by the Contracting Officer. 
(g) The Contractor shall at all times keep the work area, 
relationship between the Contractor and HUD. 
including storage areas, free from accumulations of 
waste materials. After completing the work and before 
final inspection, the Contractor shall (1) remove from the 
premises all scaffolding, equipment, tools, and materials 
(including rejected materials) that are not the property of 
the PHA and all rubbish caused by its work; (2) leave the 
work area in a clean, neat, and orderly condition 
satisfactory to the Contracting Officer; (3) perform all 
specified tests; and, (4) deliver the installation in 
(g) “Project” means the entire project, whether construction 
or rehabilitation, the work for which is provided for in 
whole or in part under this contract.
complete and operating condition. 
(h) “PHA” means the Public Housing Agency organized 
under applicable state laws which is a party to this 
(h) The Contractor’s responsibility will terminate when all 
contract. 
work has been completed, the final inspection made, and 
the work accepted by the Contracting Officer. The 
Contractor will then be released from further obligation 
except as required by the warranties specified elsewhere 
in the contract. 
(j) “Specifications” means the written description of the 
technical requirements for construction and includes the
criteria and tests for determining whether the 
requirements are met. 
(l) “Work” means materials, workmanship, and manufacture 
and fabrication of components. 
3. Architect’s Duties, Responsibilities, and Authority 
2. Contractor’s Responsibility for Work 
(a) The Architect for this contract, and any successor, shall 
be designated in writing by the Contracting Officer. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 2 of 19 
form HUD-5370 (1/2014)  
Page 76 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(b) The Architect shall serve as the Contracting Officer’s 
technical representative with respect to architectural, 
engineering, and design matters related to the work 
performed under the contract. The Architect may provide 
direction on contract performance. Such direction shall be 
within the scope of the contract and may not be of a 
nature which: (1) institutes additional work outside the 
scope of the contract; (2) constitutes a change as defined 
in the Changes clause herein; (3) causes an increase or 
decrease in the cost of the contract; (4) alters the 
Construction Progress Schedule; or (5) changes any of 
the other express terms or conditions of the contract. 
6. Construction Progress Schedule 
(a) The Contractor shall, within five days after the work 
(c) The Architect’s duties and responsibilities may include but 
commences on the contract or another period of time 
determined by the Contracting Officer, prepare and 
submit to the Contracting Officer for approval three copies 
of a practicable schedule showing the order in which the 
Contractor proposes to perform the work, and the dates 
on which the Contractor contemplates starting and 
completing the several salient features of the work 
(including acquiring labor, materials, and equipment). The 
schedule shall be in the form of a progress chart of 
suitable scale to indicate appropriately the percentage of 
work scheduled for completion by any given date during 
the period. If the Contractor fails to submit a schedule 
within the time prescribed, the Contracting Officer may 
withhold approval of progress payments or take other 
remedies under the contract until the Contractor submits 
shall not be limited to: 
(1) Making periodic visits to the work site, and on the 
basis of his/her on-site inspections, issuing written 
reports to the PHA which shall include all observed 
deficiencies. The Architect shall file a copy of the 
report with the Contractor’s designated representative
at the site; 
the required schedule. 
(2) Making modifications in drawings and technical 
(b) The Contractor shall enter the actual progress on the 
chart as required by the Contracting Officer, and 
immediately deliver three copies of the annotated 
schedule to the Contracting Officer. If the Contracting 
Officer determines, upon the basis of inspection 
conducted pursuant to the clause entitled Inspection and 
Acceptance of Construction, herein that the Contractor is 
not meeting the approved schedule, the Contractor shall 
take steps necessary to improve its progress, including 
those that may be required by the Contracting Officer, 
without additional cost to the PHA. In this circumstance, 
the Contracting Officer may require the Contractor to 
increase the number of shifts, overtime operations, days 
of work, and/or the amount of construction plant, and to 
submit for approval any supplementary schedule or 
schedules in chart form as the Contracting Officer deems 
necessary to demonstrate how the approved rate of 
specifications and assisting the Contracting Officer in
the preparation of change orders and other contract 
modifications for issuance by the Contracting Officer; 
(3) Reviewing and making recommendations with respect 
to - (i) the Contractor’s construction progress 
schedules; (ii) the Contractor’s shop and detailed 
drawings; (iii) the machinery, mechanical and other 
equipment and materials or other articles proposed 
for use by the Contractor; and, (iv) the Contractor’s 
price breakdown and progress payment estimates; 
and, 
(4) Assisting in inspections, signing Certificates of 
Completion, and making recommendations with 
respect to acceptance of work completed under the 
contract. 
4. Other Contracts 
progress will be regained. 
The PHA may undertake or award other contracts for 
additional work at or near the site of the work under this 
contract. The Contractor shall fully cooperate with the 
other contractors and with PHA employees and shall 
carefully adapt scheduling and performing the work under 
this contract to accommodate the additional work, heeding 
any direction that may be provided by the Contracting 
Officer. The Contractor shall not commit or permit any act 
that will interfere with the performance of work by any 
other contractor or by PHA employees 
(c) Failure of the Contractor to comply with the requirements 
of the Contracting Officer under this clause shall be 
grounds for a determination by the Contracting Officer that 
the Contractor is not prosecuting the work with sufficient 
diligence to ensure completion within the time 
specified in the Contract. Upon making this 
determination, the Contracting Officer may terminate the 
Contractor’s right to proceed with the work, or any 
separable part of it, in accordance with the Default clause 
of this contract. 
7. Site Investigation and Conditions Affecting the Work 
Construction Requirements 
5. Pre-construction Conference and Notice to Proceed 
(a) The Contractor acknowledges that it has taken steps 
reasonably necessary to ascertain the nature and location 
of the work, and that it has investigated and satisfied itself 
as to the general and local conditions which can affect the 
work or its cost, including but not limited to, (1) conditions 
bearing upon transportation, disposal, handling, and 
storage of materials; (2) the availability of labor, water, 
electric power, and roads;(3) uncertainties of weather, 
river stages, tides, or similar physical conditions at the 
site; (4) the conformation and conditions of the ground; 
and (5) the character of equipment and facilities needed 
preliminary to and during work performance. The 
Contractor also acknowledges that it has satisfied itself as 
to the character, quality, and quantity of surface and 
subsurface materials or obstacles to be encountered 
insofar as this information is 
(a) Within ten calendar days of contract execution, and prior 
to the commencement of work, the Contractor shall 
attend a preconstruction conference with representatives 
of the PHA, its Architect, and other interested parties 
convened by the PHA. The conference will serve to 
acquaint the participants with the general plan of the 
construction operation and all other requirements of the 
contract. The PHA will provide the Contractor with the 
date, time, and place of the conference. 
(b) The contractor shall begin work upon receipt of a written 
Notice to Proceed from the Contracting Officer or 
designee. The Contractor shall not begin work prior to 
receiving such notice. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 3 of 19 
form HUD-5370 (1/2014)  
Page 77 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

reasonably ascertainable from an inspection of the site, 
including all exploratory work done by the PHA, as well 
as from the drawings and specifications made a part of 
this contract. Any failure of the Contractor to take the 
actions described and acknowledged in this paragraph 
will not relieve the Contractor from responsibility for 
estimating properly the difficulty and cost of successfully 
performing the work, or for proceeding to successfully 
promptly submitted to the Contracting Officer, who shall 
promptly make a determination in writing. Any adjustment 
by the Contractor without such a determination shall be at 
its own risk and expense. The Contracting Officer shall 
furnish from time to time such detailed drawings and other 
information as considered necessary, unless 
otherwise provided. 
perform the work without additional expense to the PHA. 
(b) Wherever in the specifications or upon the drawings the 
words “directed”, “required”, “ordered”, “designated”, 
“prescribed”, or words of like import are used, it shall be
(b) The PHA assumes no responsibility for any conclusions 
or interpretations made by the Contractor based on the 
information made available by the PHA. Nor does the 
PHA assume responsibility for any understanding 
reached or representation made concerning conditions 
which can affect the work by any of its officers or agents 
before the execution of this contract, unless that 
understanding or representation is expressly stated in 
this contract. 
understood that the “direction”, “requirement”, “order”, 
“designation”, or “prescription”, of the Contracting Officer 
is intended and similarly the words “approved”, 
“acceptable”, “satisfactory”, or words of like import shall
mean “approved by”, or “acceptable to”, or “satisfactory 
to” the Contracting Officer, unless otherwise expressly 
stated. 
(c) Where “as shown” “as indicated”, “as detailed”, or 
8. Differing Site Conditions 
of similar import are used, it shall be understood that the 
reference is made to the drawings accompanying this 
contract unless stated otherwise. The word “provided” as 
used herein shall be understood to mean “provide 
complete in place” that is “furnished and installed”. 
(a) The Contractor shall promptly, and before the conditions 
are disturbed, give a written notice to the Contracting 
Officer of (1) subsurface or latent physical conditions at 
the site which differ materially from those indicated in this 
contract, or (2) unknown physical conditions at the 
site(s), of an unusual nature, which differ materially from 
those ordinarily encountered and generally recognized as 
inhering in work of the character provided for in the 
(d) “Shop drawings” means drawings, submitted to the PHA 
contract. 
by the Contractor, subcontractor, or any lower tier 
subcontractor, showing in detail (1) the proposed 
fabrication and assembly of structural elements and (2) 
the installation (i.e., form, fit, and attachment details) of 
materials of equipment. It includes drawings, diagrams, 
layouts, schematics, descriptive literature, illustrations, 
schedules, performance and test data, and similar 
materials furnished by the Contractor to explain in detail 
specific portions of the work required by the contract. The 
PHA may duplicate, use, and disclose in any manner and 
for any purpose shop drawings delivered under this 
(b) The Contracting Officer shall investigate the site 
conditions promptly after receiving the notice. Work shall 
not proceed at the affected site, except at the 
Contractor’s risk, until the Contracting Officer has 
provided written instructions to the Contractor. If the 
conditions do materially so differ and cause an increase 
or decrease in the Contractor’s cost of, or the time 
required for, performing any part of the work under this 
contract, whether or not changed as a result of the 
conditions, the Contractor shall file a claim in writing to 
the PHA within ten days after receipt of such instructions 
and, in any event, before proceeding with the work. An 
equitable adjustment in the contract price, the delivery 
schedule, or both shall be made under this clause and 
contract. 
(e) If this contract requires shop drawings, the Contractor 
the contract modified in writing accordingly. 
shall coordinate all such drawings, and review them for 
accuracy, completeness, and compliance with other 
contract requirements and shall indicate its approval 
thereon as evidence of such coordination and review. 
Shop drawings submitted to the Contracting Officer 
without evidence of the Contractor’s approval may be 
returned for resubmission. The Contracting Officer will 
indicate an approval or disapproval of the shop drawings 
and if not approved as submitted shall indicate the PHA’s 
reasons therefore. Any work done before such approval 
shall be at the Contractor’s risk. Approval by the 
Contracting Officer shall not relieve the Contractor from 
responsibility for any errors or omissions in such 
drawings, nor from responsibility for complying with the 
requirements of this contract, except with respect to 
variations described and approved in accordance with (f)
(c) No request by the Contractor for an equitable adjustment 
to the contract under this clause shall be allowed, unless 
the Contractor has given the written notice required; 
provided, that the time prescribed in (a) above for giving 
written notice may be extended by the Contracting
Officer. 
(d) No request by the Contractor for an equitable adjustment 
to the contract for differing site conditions shall be 
allowed if made after final payment under this contract.
below. 
9. Specifications and Drawings for Construction 
(f) If shop drawings show variations from the contract 
requirements, the Contractor shall describe such 
variations in writing, separate from the drawings, at the 
time of submission. If the Architect approves any such 
variation and the Contracting Officer concurs, the 
(a) The Contractor shall keep on the work site a copy of the 
drawings and specifications and shall at all times give the 
Contracting Officer access thereto. Anything mentioned 
in the specifications and not shown on the drawings, or 
shown on the drawings and not mentioned in the 
specifications, shall be of like effect as if shown or 
mentioned in both. In case of difference between 
drawings and specifications, the specifications shall 
govern. In case of discrepancy in the figures, in the 
drawings, or in the specifications, the matter shall be 
Contracting Officer shall issue an appropriate 
modification to the contract, except that, if the variation is 
minor or does not involve a change in price or in time of 
performance, a modification need not be issued. 
(g) It shall be the responsibility of the Contractor to make
timely requests of the PHA for such large scale and full 
size drawings, color schemes, and other additional 
information, not already in his possession, which shall be 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 4 of 19 
form HUD-5370 (1/2014)  
Page 78 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

required in the planning and production of the work. Such 
requests may be submitted as the need arises, but each 
such request shall be filed in ample time to permit 
appropriate action to be taken by all parties involved so 
machinery and mechanical and other equipment. 
When required by this contract or by the Contracting 
Officer, the Contractor shall also obtain the 
Contracting Officer’s approval of the material or 
articles which the Contractor contemplates 
incorporating into the work. When requesting 
approval, the Contractor shall provide full information 
concerning the material or articles. Machinery, 
equipment, material, and articles that do not have the 
required approval shall be installed or used at the risk 
as to avoid delay. 
(h) The Contractor shall submit to the Contracting Officer for 
approval four copies (unless otherwise indicated) of all 
shop drawings as called for under the various headings 
of these specifications. Three sets (unless otherwise 
indicated) of all shop drawings, will be retained by the 
PHA and one set will be returned to the Contractor. As 
required by the Contracting Officer, the Contractor, upon 
completing the work under this contract, shall furnish a 
complete set of all shop drawings as finally approved. 
These drawings shall show all changes and revisions 
of subsequent rejection. 
(2) When required by the specifications or the 
Contracting Officer, the Contractor shall submit
appropriately marked samples (and certificates
related to them) for approval at the Contractor’s
made up to the time the work is completed and accepted. 
expense, with all shipping charges prepaid. The 
Contractor shall label, or otherwise properly mark on 
the container, the material or product represented, its 
place of origin, the name of the producer, the 
Contractor’s name, and the identification of the 
construction project for which the material or product
(i) This clause shall be included in all subcontracts at any tier. 
It shall be the responsibility of the Contractor to ensure 
that all shop drawings prepared by subcontractors are 
submitted to the Contracting Officer. 
10. As-Built Drawings 
is intended to be used. 
(a) “As-built drawings,” as used in this clause, means 
(3) Certificates shall be submitted in triplicate, describing 
each sample submitted for approval and certifying 
that the material, equipment or accessory complies 
with contract requirements. The certificates shall 
include the name and brand of the product, name of 
manufacturer, and the location where produced. 
drawings submitted by the Contractor or subcontractor at 
any tier to show the construction of a particular structure 
or work as actually completed under the contract. “As-built
drawings” shall be synonymous with “Record 
drawings.” 
(4) Approval of a sample shall not constitute a waiver of 
(b) As required by the Contracting Officer, the Contractor 
the PHA right to demand full compliance with contract 
requirements. Materials, equipment and accessories 
may be rejected for cause even though samples have
shall provide the Contracting Officer accurate information 
to be used in the preparation of permanent as-built 
drawings. For this purpose, the Contractor shall record on 
one set of contract drawings all changes from the 
installations originally indicated, and record final locations 
of underground lines by depth from finish grade and by 
accurate horizontal offset distances to permanent surface 
improvements such as buildings, curbs, or edges of 
been approved. 
walks.
(5) Wherever materials are required to comply with 
recognized standards or specifications, such 
specifications shall be accepted as establishing the 
technical qualities and testing methods, but shall not 
govern the number of tests required to be made nor 
modify other contract requirements. The Contracting 
Officer may require laboratory test reports on items 
submitted for approval or may approve materials on 
the basis of data submitted in certificates with 
samples. Check tests will be made on materials 
delivered for use only as frequently as the Contracting 
Officer determines necessary to insure compliance of 
materials with the specifications. The Contractor will 
assume all costs of retesting materials which fail to 
meet contract requirements and/or testing materials 
offered in substitution for those found deficient. 
(c) This clause shall be included in all subcontracts at any 
tier. It shall be the responsibility of the Contractor to 
ensure that all as-built drawings prepared by 
subcontractors are submitted to the Contracting Officer. 
11. Material and Workmanship 
(a) All equipment, material, and articles furnished under this 
contract shall be new and of the most suitable grade for 
the purpose intended, unless otherwise specifically 
provided in this contract. References in the contract to 
equipment, material, articles, or patented processes by 
trade name, make, or catalog number, shall be regarded 
as establishing a standard of quality and shall not be 
construed as limiting competition. The Contractor may, at 
its option, use any equipment, material, article, or 
process that, in the judgment of, and as approved by the 
Contracting Officer, is equal to that named in the 
specifications, unless otherwise specifically provided in 
(6) After approval, samples will be kept in the Project 
office until completion of work. They may be built into 
the work after a substantial quantity of the materials 
they represent has been built in and accepted. 
(c) Requirements concerning lead-based paint. The 
Contractor shall comply with the requirements concerning 
lead-based paint contained in the Lead-Based Paint 
Poisoning Prevention Act (42 U.S.C. 4821-4846) as 
implemented by 24 CFR Part 35. 
this contract. 
(b) Approval of equipment and materials. 
12. Permits and Codes 
(1) The Contractor shall obtain the Contracting Officer’s 
approval of the machinery and mechanical and other 
equipment to be incorporated into the work. When 
requesting approval, the Contractor shall furnish to the 
Contracting Officer the name of the manufacturer, the 
model number, and other information concerning the 
performance, capacity, nature, and rating of the 
(a) The Contractor shall give all notices and comply with all 
applicable laws, ordinances, codes, rules and regulations. 
Notwithstanding the requirement of the Contractor to 
comply with the drawings and specifications in the 
contract, all work installed shall comply with all applicable 
codes and regulations as amended by any 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 5 of 19 
form HUD-5370 (1/2014)  
Page 79 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

waivers. Before installing the work, the Contractor shall 
examine the drawings and the specifications for 
compliance with applicable codes and regulations 
bearing on the work and shall immediately report any 
discrepancy it may discover to the Contracting Officer. 
14. Temporary Heating 
Where the requirements of the drawings and 
The Contractor shall provide and pay for temporary 
heating, covering, and enclosures necessary to properly 
protect all work and materials against damage by 
dampness and cold, to dry out the work, and to facilitate 
the completion of the work. Any permanent heating 
equipment used shall be turned over to the PHA in the 
condition and at the time required by the specifications. 
specifications fail to comply with the applicable code or 
regulation, the Contracting Officer shall modify the 
contract by change order pursuant to the clause entitled 
Changes herein to conform to the code or regulation. 
(b) The Contractor shall secure and pay for all permits, fees, 
and licenses necessary for the proper execution and 
completion of the work. Where the PHA can arrange for 
the issuance of all or part of these permits, fees and 
licenses, without cost to the Contractor, the contract 
amount shall be reduced accordingly. 
15. Availability and Use of Utility Services 
(a) The PHA shall make all reasonably required amounts of 
13. Health, Safety, and Accident Prevention 
utilities available to the Contractor from existing outlets 
and supplies, as specified in the contract. Unless 
otherwise provided in the contract, the amount of each 
utility service consumed shall be charged to or paid for by 
the Contractor at prevailing rates charged to the PHA or, 
where the utility is produced by the PHA, at reasonable 
rates determined by the Contracting Officer. The 
Contractor shall carefully conserve any utilities furnished 
(a) In performing this contract, the Contractor shall: 
(1) Ensure that no laborer or mechanic shall be required 
to work in surroundings or under working conditions 
which are unsanitary, hazardous, or dangerous to 
his/her health and/or safety as determined under 
construction safety and health standards promulgated
without charge.
(b) The Contractor, at its expense and in a manner 
by the Secretary of Labor by regulation; 
satisfactory to the Contracting Officer, shall install and 
maintain all necessary temporary connections and 
distribution lines, and all meters required to measure the 
amount of each utility used for the purpose of 
determining charges. Before final acceptance of the work 
by the PHA, the Contractor shall remove all the 
temporary connections, distribution lines, meters, and 
associated paraphernalia. 
(2) Protect the lives, health, and safety of other persons; 
(3) Prevent damage to property, materials, supplies, and 
equipment; and, 
(4) Avoid work interruptions. 
(b) For these purposes, the Contractor shall: 
(1) Comply with regulations and standards issued by the 
Secretary of Labor at 29 CFR Part 1926. Failure to 
comply may result in imposition of sanctions pursuant 
to the Contract Work Hours and Safety Standards Act 
(Public Law 91-54, 83 Stat. 96), 40 U.S.C. 3701 et 
16. Protection of Existing Vegetation, Structures, 
Equipment, Utilities, and Improvements 
seq.; and 
(a) The Contractor shall preserve and protect all structures, 
(2) Include the terms of this clause in every subcontract 
equipment, and vegetation (such as trees, shrubs, and 
grass) on or adjacent to the work site, which are not to be 
removed under this contract, and which do not 
unreasonably interfere with the work required under this 
so that such terms will be binding on each 
subcontractor. 
(c) The Contractor shall maintain an accurate record of 
exposure data on all accidents incident to work performed
under this contract resulting in death, traumatic injury, 
occupational disease, or damage to property, materials, 
supplies, or equipment, and shall report this data in the 
manner prescribed by 29 CFR Part 
contract. 
(b) The Contractor shall only remove trees when specifically 
1904. 
authorized to do so, and shall avoid damaging vegetation 
that will remain in place. If any limbs or branches of trees 
are broken during performance of this contract, or by the 
careless operation of equipment, or by workmen, the 
Contractor shall trim those limbs or branches with a clean 
cut and paint the cut with a tree-pruning compound as 
(d) The Contracting Officer shall notify the Contractor of any 
noncompliance with these requirements and of the 
corrective action required. This notice, when delivered to 
the Contractor or the Contractor’s representative at the 
site of the work, shall be deemed sufficient notice of the 
noncompliance and corrective action required. After 
receiving the notice, the Contractor shall immediately 
take corrective action. If the Contractor fails or refuses to 
take corrective action promptly, the Contracting Officer 
may issue an order stopping all or part of the work until 
satisfactory corrective action has been taken. The 
Contractor shall not base any claim or request for 
equitable adjustment for additional time or money on any
directed by the Contracting Officer. 
(c) The Contractor shall protect from damage all existing 
improvements and utilities (1) at or near the work site and 
(2) on adjacent property of a third party, the locations of 
which are made known to or should be known by the 
Contractor. Prior to disturbing the ground at the 
construction site, the Contractor shall ensure that all 
underground utility lines are clearly marked. 
(d) The Contractor shall shore up, brace, underpin, secure, 
stop order issued under these circumstances. 
and protect as necessary all foundations and other parts 
of existing structures adjacent to, adjoining, and in the 
vicinity of the site, which may be affected by the 
excavations or other operations connected with the 
(e) The Contractor shall be responsible for its subcontractors’ 
compliance with the provisions of this clause. The 
Contractor shall take such action with respect to any 
subcontract as the PHA, the Secretary of Housing and 
Urban Development, or the Secretary of Labor shall 
direct as a means of enforcing such provisions. 
construction of the project. 
(e) Any equipment temporarily removed as a result of work 
under this contract shall be protected, cleaned, and 
replaced in the same condition as at the time of award of 
this contract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 6 of 19 
form HUD-5370 (1/2014)  
Page 80 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(f) New work which connects to existing work shall 
The contactor shall comply with the Clean Air Act, as 
amended, 42 USC 7401 et seq., the Federal Water 
Pollution Control Water Act, as amended, 33 U.S.C. 1251 
et seq., and standards issued pursuant thereto in the 
facilities in which this contract is to be performed. 
correspond in all respects with that to which it connects
and/or be similar to existing work unless otherwise 
required by the specifications. 
(g) No structural members shall be altered or in any way 
weakened without the written authorization of the 
Contracting Officer, unless such work is clearly specified
19. Energy Efficiency 
in the plans or specifications. 
(h) If the removal of the existing work exposes discolored or 
unfinished surfaces, or work out of alignment, such 
surfaces shall be refinished, or the material replaced as 
necessary to make the continuous work uniform and 
harmonious. This, however, shall not be construed to 
require the refinishing or reconstruction of dissimilar 
finishes previously exposed, or finished surfaces in good 
condition, but in different planes or on different levels 
when brought together by the removal of intervening 
work, unless such refinishing or reconstruction is 
The Contractor shall comply with mandatory standards 
and policies relating to energy efficiency which are 
contained in the energy conservation plan issued in 
compliance with the Energy Policy and Conservation Act 
(Pub.L. 94-163) for the State in which the work under the 
contract is performed. 
20. Inspection and Acceptance of Construction 
(a) Definitions. As used in this clause - 
specified in the plans or specifications. 
(1) “Acceptance” means the act of an authorized 
representative of the PHA by which the PHA approves 
and assumes ownership of the work performed under this 
contract. Acceptance may be partial or complete. 
(2) “Inspection” means examining and testing the work 
(i) The Contractor shall give all required notices to any 
adjoining or adjacent property owner or other party before 
the commencement of any work. 
(j) The Contractor shall indemnify and save harmless the 
PHA from any damages on account of settlement or the 
loss of lateral support of adjoining property, any damages 
from changes in topography affecting drainage, and from 
all loss or expense and all damages for which the PHA 
may become liable in consequence of such injury or 
damage to adjoining and adjacent structures and their 
performed under the contract (including, when 
appropriate, raw materials, equipment, components, and
intermediate assemblies) to determine whether it 
conforms to contract requirements. 
premises. 
(3) “Testing” means that element of inspection that 
determines the properties or elements, including 
functional operation of materials, equipment, or their 
components, by the application of established scientific 
(k) The Contractor shall repair any damage to vegetation, 
structures, equipment, utilities, or improvements, 
including those that are the property of a third party, 
resulting from failure to comply with the requirements of 
this contract or failure to exercise reasonable care in 
performing the work. If the Contractor fails or refuses to 
repair the damage promptly, the Contracting Officer may 
have the necessary work performed and charge the cost 
to the Contractor. 
principles and procedures. 
(b) The Contractor shall maintain an adequate inspection 
system and perform such inspections as will ensure that 
the work performed under the contract conforms to 
contract requirements. All work is subject to PHA 
inspection and test at all places and at all reasonable 
times before acceptance to ensure strict compliance with
the terms of the contract. 
(c) PHA inspections and tests are for the sole benefit of the 
17. Temporary Buildings and Transportation of Materials 
PHA and do not: (1) relieve the Contractor of 
responsibility for providing adequate quality control 
measures; (2) relieve the Contractor of responsibility for 
loss or damage of the material before acceptance; (3) 
constitute or imply acceptance; or, (4) affect the 
continuing rights of the PHA after acceptance of the 
(a) Temporary buildings (e.g., storage sheds, shops, offices, 
sanitary facilities) and utilities may be erected by the 
Contractor only with the approval of the Contracting 
Officer and shall be built with labor and materials 
furnished by the Contractor without expense to the PHA. 
The temporary buildings and utilities shall remain the 
property of the Contractor and shall be removed by the 
Contractor at its expense upon completion of the work. 
With the written consent of the Contracting Officer, the 
buildings and utilities may be abandoned and need not 
completed work under paragraph (j) below. 
(d) The presence or absence of the PHA inspector does not 
relieve the Contractor from any contract requirement, nor 
is the inspector authorized to change any term or 
condition of the specifications without the Contracting 
Officer’s written authorization. All instructions and 
be removed. 
approvals with respect to the work shall be given to the 
(b) The Contractor shall, as directed by the Contracting 
Contractor by the Contracting Officer. 
Officer, use only established roadways, or use temporary 
roadways constructed by the Contractor when and as 
authorized by the Contracting Officer. When materials are 
transported in prosecuting the work, vehicles shall not be 
loaded beyond the loading capacity recommended by the 
manufacturer of the vehicle or prescribed by any federal, 
state, or local law or regulation. When it is necessary to 
cross curbs or sidewalks, the Contractor shall protect them 
from damage. The Contractor shall repair or pay for the 
repair of any damaged curbs, sidewalks, or roads. 
(e) The Contractor shall promptly furnish, without additional 
charge, all facilities, labor, and material reasonably 
needed for performing such safe and convenient 
inspections and tests as may be required by the 
Contracting Officer. The PHA may charge to the 
Contractor any additional cost of inspection or test when 
work is not ready at the time specified by the Contractor 
for inspection or test, or when prior rejection makes 
reinspection or retest necessary. The PHA shall perform 
all inspections and tests in a manner that will not 
unnecessarily delay the work. Special, full size, and 
performance tests shall be performed as described in the 
contract. 
18. Clean Air and Water 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 7 of 19 
form HUD-5370 (1/2014)  
Page 81 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(f) The PHA may conduct routine inspections of the 
occupied without proper remuneration therefore. If prior 
possession or use by the PHA delays the progress of the 
work or causes additional expense to the Contractor, an 
equitable adjustment shall be made in the contract price 
or the time of completion, and the contract shall be 
modified in writing accordingly. 
construction site on a daily basis. 
(g) The Contractor shall, without charge, replace or correct 
work found by the PHA not to conform to contract 
requirements, unless the PHA decides that it is in its 
interest to accept the work with an appropriate 
adjustment in contract price. The Contractor shall 
promptly segregate and remove rejected material from
22. Warranty of Title 
the premises. 
(h) If the Contractor does not promptly replace or correct 
The Contractor warrants good title to all materials, 
supplies, and equipment incorporated in the work and 
agrees to deliver the premises together with all 
improvements thereon free from any claims, liens or 
charges, and agrees further that neither it nor any other 
person, firm or corporation shall have any right to a lien 
upon the premises or anything appurtenant thereto. 
rejected work, the PHA may (1) by contract or otherwise, 
replace or correct the work and charge the cost to the 
Contractor, or (2) terminate for default the Contractor’s 
right to proceed. 
(i) If any work requiring inspection is covered up without ap- 
proval of the PHA, it must, if requested by the Contracting 
Officer, be uncovered at the expense of the Contractor. If 
at any time before final acceptance of the entire work, the 
PHA considers it necessary or advisable, to examine 
work already completed by removing or tearing it out, the 
Contractor, shall on request, promptly furnish all 
necessary facilities, labor, and material. If such work is 
found to be defective or nonconforming in any material 
respect due to the fault of the Contractor or its 
subcontractors, the Contractor shall defray all the 
expenses of the examination and of satisfactory 
reconstruction. If, however, such work is found to meet 
the requirements of the contract, the Contracting Officer 
shall make an equitable adjustment to cover the cost of 
the examination and reconstruction, including, if 
completion of the work was thereby delayed, an 
23. Warranty of Construction 
(a) In addition to any other warranties in this contract, the 
Contractor warrants, except as provided in paragraph (j) 
of this clause, that work performed under this contract 
conforms to the contract requirements and is free of any 
defect in equipment, material, or workmanship performed
by the Contractor or any subcontractor or supplier at any 
tier. This warranty shall continue for a period of 
(one year unless otherwise indicated) from the date of final 
acceptance of the work. If the PHA takes possession of 
any part of the work before final acceptance, this warranty 
shall continue for a period of (one year unless otherwise 
indicated) from the date that the PHA takes 
extension of time. 
possession. 
(j) The Contractor shall notify the Contracting Officer, in 
(b) The Contractor shall remedy, at the Contractor’s 
writing, as to the date when in its opinion all or a 
designated portion of the work will be substantially 
completed and ready for inspection. If the Architect 
determines that the state of preparedness is as 
represented, the PHA will promptly arrange for the 
inspection. Unless otherwise specified in the contract, the 
PHA shall accept, as soon as practicable after completion 
and inspection, all work required by the contract or that 
portion of the work the Contracting Officer determines and 
designates can be accepted separately. Acceptance shall 
be final and conclusive except for latent defects, fraud, 
gross mistakes amounting to fraud, or the PHA’s right 
under any warranty or guarantee. 
expense, any failure to conform, or any defect. In 
addition, the Contractor shall remedy, at the Contractor’s 
expense, any damage to PHA-owned or controlled real or 
personal property when the damage is the result of— 
(1) The Contractor’s failure to conform to contract require- 
ments; or 
(2) Any defects of equipment, material, workmanship or 
design furnished by the Contractor. 
(c) The Contractor shall restore any work damaged in 
fulfilling the terms and conditions of this clause. The 
Contractor’s warranty with respect to work repaired or 
replaced will run for (one year unless otherwise indicated) 
from the date of repair or replacement. 
(d) The Contracting Officer shall notify the Contractor, in 
21. Use and Possession Prior to Completion 
writing, within a reasonable time after the discovery of
any failure, defect or damage. 
(a) The PHA shall have the right to take possession of or use 
any completed or partially completed part of the work. 
Before taking possession of or using any work, the 
Contracting Officer shall furnish the Contractor a list of 
items of work remaining to be performed or corrected on 
those portions of the work that the PHA intends to take 
possession of or use. However, failure of the Contracting 
Officer to list any item of work shall not relieve the 
Contractor of responsibility for complying with the terms of 
the contract. The PHA’s possession or use shall not be 
(e) If the Contractor fails to remedy any failure, defect, or 
damage within a reasonable time after receipt of notice, 
the PHA shall have the right to replace, repair or 
otherwise remedy the failure, defect, or damage at the 
Contractor’s expense. 
(f) With respect to all warranties, express or implied, from 
subcontractors, manufacturers, or suppliers for work 
performed and materials furnished under this contract,
the Contractor shall: 
(1) Obtain all warranties that would be given in normal 
deemed an acceptance of any work under the contract. 
commercial practice; 
(b) While the PHA has such possession or use, the 
(2) Require all warranties to be executed in writing, for the 
Contractor shall be relieved of the responsibility for (1) the 
loss of or damage to the work resulting from the PHA’s 
possession or use, notwithstanding the terms of the 
clause entitled Permits and Codes herein; (2) all 
maintenance costs on the areas occupied; and, (3) 
furnishing heat, light, power, and water used in the areas 
benefit of the PHA; and, 
(3) Enforce all warranties for the benefit of the PHA. 
(g) In the event the Contractor’s warranty under paragraph
(a) of this clause has expired, the PHA may bring suit at 
its own expense to enforce a subcontractor’s, 
manufacturer’s or supplier’s warranty. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 8 of 19 
form HUD-5370 (1/2014)  
Page 82 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(h) Unless a defect is caused by the negligence of the 
basis for determining progress payments. The breakdown
shall be approved by the Contracting Officer and must be
acceptable to HUD. If the contract covers more than one 
Contractor or subcontractor or supplier at any tier, the 
Contractor shall not be liable for the repair of any defect of 
material or design furnished by the PHA nor for the repair 
of any damage that results from any defect in PHA 
project, the Contractor shall furnish a separate 
furnished material or design. 
breakdown for each. The values and quantities employed
in making up this breakdown are for determining the
amount of progress payments and shall not be construed
as a basis for additions to or deductions from the contract
price. The Contractor shall prorate its overhead and profit
(i) Notwithstanding any provisions herein to the contrary, the 
establishment of the time periods in paragraphs (a) and 
(c) above relate only to the specific obligation of the 
Contractor to correct the work, and have no relationship 
to the time within which its obligation to comply with the 
contract may be sought to be enforced, nor to the time 
within which proceedings may be commenced to 
establish the Contractor’s liability with respect to its 
obligation other than specifically to correct the work. 
over the construction period of the contract. 
(d) The Contractor shall submit, on forms provided by the 
PHA, periodic estimates showing the value of the work 
performed during each period based upon the approved
submitted not later than 
days in advance of 
(j) This warranty shall not limit the PHA’s rights under the 
the date set for payment and are subject to correction and 
revision as required. The estimates must be approved by 
the Contracting Officer with the concurrence of the 
Architect prior to payment. If the contract covers more 
than one project, the Contractor shall furnish a 
Inspection and Acceptance of Construction clause of this
contract with respect to latent defects, gross mistakes or
fraud. 
24. Prohibition Against Liens 
separate progress payment estimate for each. 
The Contractor is prohibited from placing a lien on the 
PHA’s property. This prohibition shall apply to all 
subcontractors at any tier and all materials suppliers. 
(e) Along with each request for progress payments and the 
required estimates, the Contractor shall furnish the 
following certification, or payment shall not be made: I 
hereby certify, to the best of my knowledge and belief, 
that: 
Administrative Requirements 
(1) The amounts requested are only for performance in 
accordance with the specifications, terms, and 
25. Contract Period 
conditions of the contract; 
(2) Payments to subcontractors and suppliers have been 
made from previous payments received under the 
contract, and timely payments will be made from the 
proceeds of the payment covered by this certification, 
in accordance with subcontract agreements; and, 
this contract within 
calendar days of the 
effective date of the contract, or within the time schedule 
established in the notice to proceed issued by the 
Contracting Officer. 
(3) This request for progress payments does not include 
26. Order of Provisions 
any amounts which the prime contractor intends to 
withhold or retain from a subcontractor or supplier in 
accordance with the terms and conditions of the 
subcontract. 
In the event of a conflict between these General 
Conditions and the Specifications, the General 
Conditions shall prevail. In the event of a conflict between 
the contract and any applicable state or local law or 
regulation, the state or local law or regulation shall 
prevail; provided that such state or local law or regulation 
does not conflict with, or is less restrictive than applicable 
federal law, regulation, or Executive Order. In the event of 
such a conflict, applicable federal law, regulation, and 
Executive Order shall prevail. 
Name: 
Title: 
Date: 
27. Payments 
(f) Except as otherwise provided in State law, the PHA shall 
(a) The PHA shall pay the Contractor the price as provided in 
retain ten (10) percent of the amount of progress 
payments until completion and acceptance of all work 
under the contract; except, that if upon completion of 50 
percent of the work, the Contracting Officer, after 
consulting with the Architect, determines that the 
Contractor’s performance and progress are satisfactory,
this contract. 
(b) The PHA shall make progress payments approximately 
every 30 days as the work proceeds, on estimates of 
work accomplished which meets the standards of quality 
established under the contract, as approved by the 
Contracting Officer. The PHA may, subject to written 
determination and approval of the Contracting Officer, 
make more frequent payments to contractors which are 
the PHA may make the remaining payments in full for the 
work subsequently completed. If the Contracting Officer 
subsequently determines that the Contractor’s 
performance and progress are unsatisfactory, the PHA 
shall reinstate the ten (10) percent (or other percentage 
as provided in State law) retainage until such time as the 
Contracting Officer determines that performance and 
qualified small businesses. 
(c) Before the first progress payment under this contract, the 
Contractor shall furnish, in such detail as requested by 
the Contracting Officer, a breakdown of the total contract 
price showing the amount included therein for each 
principal category of the work, which shall substantiate 
the payment amount requested in order to provide a 
progress are satisfactory. 
(g) The Contracting Officer may authorize material delivered 
on the site and preparatory work done to be taken into 
consideration when computing progress payments. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 9 of 19 
form HUD-5370 (1/2014)  
Page 83 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

Material delivered to the Contractor at locations other than 
the site may also be taken into consideration if the 
Contractor furnishes satisfactory evidence that (1) it has 
acquired title to such material; (2) the material is properly 
stored in a bonded warehouse, storage yard, or similar 
suitable place as may be approved by the Contracting 
Officer; (3) the material is insured to cover its full value; 
and (4) the material will be used to perform this contract. 
Before any progress payment which includes delivered 
material is made, the Contractor shall furnish such 
documentation as the Contracting Officer may require to 
assure the protection of the PHA’s interest in such 
materials. The Contractor shall remain responsible for 
such stored material notwithstanding the transfer of title 
responsibilities of the parties (e.g., change in the PHA 
address). All other contract modifications shall be in the 
form of supplemental agreements signed by the 
Contractor and the Contracting Officer. 
(c) When a proposed modification requires the approval of 
HUD prior to its issuance (e.g., a change order that 
exceeds the PHA’s approved threshold), such 
modification shall not be effective until the required 
approval is received by the PHA. 
29. Changes 
(a) The Contracting Officer may, at any time, without notice 
to the PHA. 
to the sureties, by written order designated or indicated 
to be a change order, make changes in the work within 
the general scope of the contract including changes: 
(1) In the specifications (including drawings and designs); 
(2) In the method or manner of performance of the work; 
(h) All material and work covered by progress payments 
made shall, at the time of payment become the sole 
property of the PHA, but this shall not be construed as (1) 
relieving the Contractor from the sole responsibility for all 
material and work upon which payments have been made 
or the restoration of any damaged work; or, (2) waiving the 
right of the PHA to require the fulfillment of all of the terms 
of the contract. In the event the work of the Contractor has 
been damaged by other contractors or persons other than 
employees of the PHA in the course of their employment, 
the Contractor shall restore such damaged work without 
cost to the PHA and to seek redress for its damage only 
from those who directly 
(3) PHA-furnished facilities, equipment, materials, 
services, or site; or, 
(4) Directing the acceleration in the performance of the 
caused it. 
work. 
(b) Any other written order or oral order (which, as used in 
this paragraph (b), includes direction, instruction, 
interpretation, or determination) from the Contracting 
Officer that causes a change shall be treated as a 
change order under this clause; provided, that the 
Contractor gives the Contracting Officer written notice 
stating (1) the date, circumstances and source of the 
order and (2) that the Contractor regards the order as a
(i) The PHA shall make the final payment due the Contractor 
under this contract after (1) completion and final 
acceptance of all work; and (2) presentation of release of 
all claims against the PHA arising by virtue of this contract, 
other than claims, in stated amounts, that the Contractor 
has specifically excepted from the operation of the release. 
Each such exception shall embrace no more than one 
claim, the basis and scope of which shall be clearly 
defined. The amounts for such excepted claims shall not 
be included in the request for final payment. A release may 
also be required of the assignee if the Contractor’s claim to 
amounts payable under this contract 
change order. 
(c) Except as provided in this clause, no order, statement or 
conduct of the Contracting Officer shall be treated as a 
change under this clause or entitle the Contractor to an 
equitable adjustment. 
(d) If any change under this clause causes an increase or 
has been assigned. 
decrease in the Contractor’s cost of, or the time required 
for the performance of any part of the work under this 
contract, whether or not changed by any such order, the 
Contracting Officer shall make an equitable adjustment 
and modify the contract in writing. However, except for a 
adjustment based on defective specifications, no proposal 
for any change under paragraph (b) above shall be 
allowed for any costs incurred more than 20 days (5 days 
for oral orders) before the Contractor gives written notice 
as required. In the case of defective specifications for 
which the PHA is responsible, the equitable adjustment 
shall include any increased cost reasonably incurred by 
the Contractor in attempting to comply with 
(j) Prior to making any payment, the Contracting Officer may 
require the Contractor to furnish receipts or other 
evidence of payment from all persons performing work 
and supplying material to the Contractor, if the 
Contracting Officer determines such evidence is 
necessary to substantiate claimed costs. 
(k) The PHA shall not; (1) determine or adjust any claims for 
payment or disputes arising there under between the 
Contractor and its subcontractors or material suppliers; 
or, (2) withhold any moneys for the protection of the 
subcontractors or material suppliers. The failure or 
refusal of the PHA to withhold moneys from the 
Contractor shall in nowise impair the obligations of any 
surety or sureties under any bonds furnished under this 
contract. 
the defective specifications. 
(e) The Contractor must assert its right to an adjustment 
28. Contract Modifications 
under this clause within 30 days after (1) receipt of a 
written change order under paragraph (a) of this clause, 
or (2) the furnishing of a written notice under paragraph 
(b) of this clause, by submitting a written statement 
describing the general nature and the amount of the 
proposal. If the facts justify it, the Contracting Officer may 
extend the period for submission. The proposal may be 
included in the notice required under paragraph (b) 
above. No proposal by the Contractor for an equitable 
adjustment shall be allowed if asserted after final 
(a) Only the Contracting Officer has authority to modify any 
term or condition of this contract. Any contract 
payment under this contract. 
modification shall be authorized in writing. 
(f) The Contractor’s written proposal for equitable 
adjustment shall be submitted in the form of a lump sum 
proposal supported with an itemized breakdown of all 
increases and decreases in the contract in at least the 
following details: 
(b) The Contracting Officer may modify the contract 
unilaterally (1) pursuant to a specific authorization stated 
in a contract clause (e.g., Changes); or (2) for 
administrative matters which do not change the rights or 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 10 of 19 
form HUD-5370 (1/2014)  
Page 84 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(1) Direct Costs. Materials (list individual items, the 
been so suspended, delayed, or interrupted by any other 
cause, including the fault or negligence of the Contractor 
or for which any equitable adjustment is provided for or 
excluded under any other provision of this contract. 
quantity and unit cost of each, and the aggregate 
cost); Transportation and delivery costs associated 
with materials; Labor breakdowns by hours or unit 
costs (identified with specific work to be performed); 
Construction equipment exclusively necessary for the 
change; Costs of preparation and/ or revision to shop 
drawings resulting from the change; Worker’s 
Compensation and Public Liability Insurance; 
Employment taxes under FICA and FUTA; and, Bond 
Costs when size of change warrants revision. 
(2) Indirect Costs. Indirect costs may include overhead, 
general and administrative expenses, and fringe 
benefits not normally treated as direct costs. 
(3) Profit. The amount of profit shall be negotiated and 
may vary according to the nature, extent, and 
complexity of the work required by the change. The 
allowability of the direct and indirect costs shall be 
determined in accordance with the Contract Cost 
Principles and Procedures for Commercial Firms in Part 
31 of the Federal Acquisition Regulation (48 CFR 1-31), 
as implemented by HUD Handbook 2210.18, in effect on 
the date of this contract. The Contractor shall not be 
(c) A claim under this clause shall not be allowed (1) for any 
costs incurred more than 20 days before the Contractor 
shall have notified the Contracting Officer in writing of 
the act or failure to act involved (but this requirement 
shall not apply as to a claim resulting from a suspension 
order); and, (2) unless the claim, in an amount stated, is 
asserted in writing as soon as practicable after the 
termination of the suspension, delay, or interruption, but 
not later than the date of final payment under the 
contract. 
31. Disputes 
allowed a profit on the profit received by any 
(a) “Claim,” as used in this clause, means a written demand 
or written assertion by one of the contracting parties 
seeking, as a matter of right, the payment of money in a 
sum certain, the adjustment or interpretation of contract 
terms, or other relief arising under or relating to the 
contract. A claim arising under the contract, unlike a 
claim relating to the contract, is a claim that can be 
resolved under a contract clause that provides for the 
relief sought by the claimant. A voucher, invoice, or other 
routine request for payment that is not in dispute when 
submitted is not a claim. The submission may be 
converted to a claim by complying with the requirements 
of this clause, if it is disputed either as to liability or 
amount or is not acted upon in a reasonable time. 
subcontractor. Equitable adjustments for deleted work 
shall include a credit for profit and may include a credit for 
indirect costs. On proposals covering both increases and 
decreases in the amount of the contract, the application of 
indirect costs and profit shall be on the net-change in 
direct costs for the Contractor or subcontractor 
performing the work. 
(g) The Contractor shall include in the proposal its request 
for time extension (if any), and shall include sufficient 
information and dates to demonstrate whether and to 
what extent the change will delay the completion of the
(b) Except for disputes arising under the clauses entitled 
contract in its entirety. 
Labor Standards - Davis Bacon and Related Acts, herein, 
all disputes arising under or relating to this contract, 
including any claims for damages for the alleged breach 
thereof which are not disposed of by agreement, shall be 
(h) The Contracting Officer shall act on proposals within 30 
days after their receipt, or notify the Contractor of the 
resolved under this clause. 
(c) All claims by the Contractor shall be made in writing and 
date when such action will be taken. 
submitted to the Contracting Officer for a written decision. 
A claim by the PHA against the Contractor shall be 
subject to a written decision by the Contracting Officer. 
(d) The Contracting Officer shall, within 60 (unless otherwise 
indicated) days after receipt of the request, decide the 
claim or notify the Contractor of the date by which the 
(i) Failure to reach an agreement on any proposal shall be a 
dispute under the clause entitled Disputes herein.
Nothing in this clause, however, shall excuse the 
Contractor from proceeding with the contract as changed. 
(j) Except in an emergency endangering life or property, no 
change shall be made by the Contractor without a prior
order from the Contracting Officer. 
decision will be made. 
(e) The Contracting Officer’s decision shall be final unless 
30. Suspension of Work 
the Contractor (1) appeals in writing to a higher level in 
the PHA in accordance with the PHA’s policy and 
procedures, (2) refers the appeal to an independent 
mediator or arbitrator, or (3) files suit in a court of 
competent jurisdiction. Such appeal must be made within 
(30 unless otherwise indicated) days after receipt of the 
(a) The Contracting Officer may order the Contractor in 
writing to suspend, delay, or interrupt all or any part of the 
work of this contract for the period of time that the 
Contracting Officer determines appropriate for the 
Contracting Officer’s decision. 
convenience of the PHA. 
(f) The Contractor shall proceed diligently with performance 
(b) If the performance of all or any part of the work is, for an 
unreasonable period of time, suspended, delayed, or 
interrupted (1) by an act of the Contracting Officer in the 
administration of this contract, or (2) by the Contracting 
Officer’s failure to act within the time specified (or within a 
reasonable time if not specified) in this contract an 
adjustment shall be made for any increase in the cost of 
performance of the contract (excluding profit) necessarily 
caused by such unreasonable suspension, delay, or 
interruption and the contract modified in writing 
accordingly. However, no adjustment shall be made 
under this clause for any suspension, delay, or 
interruption to the extent that performance would have 
of this contract, pending final resolution of any request for 
relief, claim, appeal, or action arising under or relating to 
the contract, and comply with any decision of the 
Contracting Officer. 
32. Default 
(a) If the Contractor refuses or fails to prosecute the work, or 
any separable part thereof, with the diligence that will 
insure its completion within the time specified in this 
contract, or any extension thereof, or fails to complete 
said work within this time, the Contracting Officer may, by 
written notice to the Contractor, terminate the right to 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 11 of 19 
form HUD-5370 (1/2014)  
Page 85 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

proceed with the work (or separable part of the work) that 
has been delayed. In this event, the PHA may take over 
the work and complete it, by contract or otherwise, and 
may take possession of and use any materials, 
equipment, and plant on the work site necessary for 
completing the work. The Contractor and its sureties shall 
be liable for any damage to the PHA resulting from the 
Contractor’s refusal or failure to complete the work within 
completion of the work together with any increased costs 
occasioned the PHA in completing the work. 
(c) If the PHA does not terminate the Contractor’s right to 
proceed, the resulting damage will consist of liquidated
damages until the work is completed or accepted. 
34. Termination for Convenience 
the specified time, whether or not the Contractor’s right to
proceed with the work is terminated. This liability includes
any increased costs incurred by the PHA in completing 
(a) The Contracting Officer may terminate this contract in 
whole, or in part, whenever the Contracting Officer 
determines that such termination is in the best interest of 
the PHA. Any such termination shall be effected by 
delivery to the Contractor of a Notice of Termination 
specifying the extent to which the performance of the 
work under the contract is terminated, and the date upon
the work. 
(b) The Contractor’s right to proceed shall not be terminated 
or the Contractor charged with damages under this 
clause if— 
(1) The delay in completing the work arises from 
which such termination becomes effective.
unforeseeable causes beyond the control and without 
the fault or negligence of the Contractor. Examples of 
such causes include (i) acts of God, or of the public 
enemy, (ii) acts of the PHA or other governmental 
entity in either its sovereign or contractual capacity, 
(iii) acts of another contractor in the performance of a 
contract with the PHA, (iv) fires, (v) floods, (vi) 
epidemics, (vii) quarantine restrictions, (viii) strikes, 
(ix) freight embargoes, (x) unusually severe weather, 
or (xi) delays of subcontractors or suppliers at any tier 
arising from unforeseeable causes beyond the control 
and without the fault or negligence of both the 
Contractor and the subcontractors or suppliers; and 
(2) The Contractor, within days (10 days unless otherwise 
indicated) from the beginning of such delay (unless 
extended by the Contracting Officer) notifies the 
Contracting Officer in writing of the causes of delay. 
The Contracting Officer shall ascertain the facts and 
the extent of the delay. If, in the judgment of the 
Contracting Officer, the findings of fact warrant such 
action, time for completing the work shall be extended 
by written modification to the contract. The findings of 
the Contracting Officer shall be reduced to a written 
decision which shall be subject to the provisions of 
(b) If the performance of the work is terminated, either in 
whole or in part, the PHA shall be liable to the Contractor 
for reasonable and proper costs resulting from such 
termination upon the receipt by the PHA of a properly 
presented claim setting out in detail: (1) the total cost of 
the work performed to date of termination less the total 
amount of contract payments made to the Contractor; (2) 
the cost (including reasonable profit) of settling and 
paying claims under subcontracts and material orders for 
work performed and materials and supplies delivered to 
the site, payment for which has not been made by the 
PHA to the Contractor or by the Contractor to the 
subcontractor or supplier; (3) the cost of preserving and 
protecting the work already performed until the PHA or 
assignee takes possession thereof or assumes 
responsibility therefore; (4) the actual or estimated cost of 
legal and accounting services reasonably necessary to 
prepare and present the termination claim to the PHA; 
and (5) an amount constituting a reasonable profit on the
value of the work performed by the Contractor. 
(c) The Contracting Officer will act on the Contractor’s claim 
within days (60 days unless otherwise indicated) of 
receipt of the Contractor’s claim. 
(d) Any disputes with regard to this clause are expressly 
the Disputes clause of this contract. 
made subject to the provisions of the Disputes clause of
this contract. 
(c) If, after termination of the Contractor’s right to proceed, it 
is determined that the Contractor was not in default, or 
that the delay was excusable, the rights and obligations 
of the parties will be the same as if the termination had 
been for convenience of the PHA. 
35. Assignment of Contract 
33. Liquidated Damages 
The Contractor shall not assign or transfer any interest in 
this contract; except that claims for monies due or to 
become due from the PHA under the contract may be 
assigned to a bank, trust company, or other financial 
institution. Such assignments of claims shall only be 
made with the written concurrence of the Contracting 
Officer. If the Contractor is a partnership, this contract 
shall inure to the benefit of the surviving or remaining 
member(s) of such partnership as approved by the 
Contracting Officer. 
(a) If the Contractor fails to complete the work within the time 
specified in the contract, or any extension, as specified in 
the clause entitled Default of this contract, the Contractor 
shall pay to the PHA as liquidated damages, the sum of 
Contracting Officer insert amount] for 
$
each day of delay. If different completion dates are 
specified in the contract for separate parts or stages of the 
work, the amount of liquidated damages shall be 
assessed on those parts or stages which are delayed. To 
the extent that the Contractor’s delay or nonperformance 
is excused under another clause in this contract, 
liquidated damages shall not be due the PHA. The 
Contractor remains liable for damages caused other than 
36. Insurance 
(a) Before commencing work, the Contractor and each 
subcontractor shall furnish the PHA with certificates of 
insurance showing the following insurance is in force and
will insure all operations under the Contract:
by delay. 
(1) Workers’ Compensation, in accordance with state or 
(b) If the PHA terminates the Contractor’s right to proceed, 
Territorial Workers’ Compensation laws. 
the resulting damage will consist of liquidated damages
until such reasonable time as may be required for final 
(2) Commercial General Liability with a combined single 
than $ 
limit for bodily injury and property damage of not less 
[Contracting Officer insert amount] 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 12 of 19 
form HUD-5370 (1/2014)  
Page 86 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

per occurrence to protect the Contractor and each 
subcontractor against claims for bodily injury or death 
and damage to the property of others. This shall cover 
the use of all equipment, hoists, and vehicles 
(2) “Subcontractor” means any supplier, vendor, or firm 
that furnishes supplies, materials, equipment, or 
services to or for the Contractor or another 
subcontractor. 
on the site(s) not covered by Automobile Liability 
(b) The Contractor shall not enter into any subcontract with 
any subcontractor who has been temporarily denied 
participation in a HUD program or who has been 
suspended or debarred from participating in contracting
under (3) below. If the Contractor has a "claims made” 
policy, then the following additional requirements 
apply: the policy must provide a “retroactive date” 
which must be on or before the
programs by any agency of the United States 
execution date of the Contract; and the extended
reporting period may not be less than five years 
Government or of the state in which the work under this 
contract is to be performed. 
following the completion date of the Contract. 
(c) The Contractor shall be as fully responsible for the acts or 
omissions of its subcontractors, and of persons either 
directly or indirectly employed by them as for the acts or 
omissions of persons directly employed by the 
(3) Automobile Liability on owned and non -owned motor 
vehicles used on the site(s) or in connection therewith
for a combined single limit for bodily injury and 
property damage of not less than $ 
Contractor. 
[Contracting Officer insert amount] per occurrence. 
(d) The Contractor shall insert appropriate clauses in all 
(b) Before commencing work, the Contractor shall furnish the 
subcontracts to bind subcontractors to the terms and 
conditions of this contract insofar as they are applicable
PHA with a certificate of insurance evidencing that 
Builder’s Risk (fire and extended coverage) Insurance on 
all work in place and/or materials stored at the building 
site(s), including foundations and building equipment, is 
in force. The Builder’s Risk Insurance shall be for the 
benefit of the Contractor and the PHA as their interests 
may appear and each shall be named in the policy or 
policies as an insured. The Contractor in installing 
equipment supplied by the PHA shall carry insurance on 
such equipment from the time the Contractor takes 
possession thereof until the Contract work is accepted by 
the PHA. The Builder’s Risk Insurance need not be 
carried on excavations, piers, footings, or foundations 
until such time as work on the superstructure is started. It 
need not be carried on landscape work. Policies shall 
furnish coverage at all times for the full cash value of all 
completed construction, as well as materials in place 
and/or stored at the site(s), whether or not partial 
payment has been made by the PHA. The Contractor 
may terminate this insurance on buildings as of the date 
taken over for occupancy by the PHA. The Contractor is 
not required to carry Builder’s Risk Insurance for 
modernization work which does not involve structural 
alterations or additions and where the PHA’s existing fire 
and extended coverage policy can be endorsed to 
to the work of subcontractors. 
(e) Nothing contained in this contract shall create any 
contractual relationship between any subcontractor and 
the PHA or between the subcontractor and HUD. 
38. Subcontracting with Small and Minority Firms, 
Women’s Business Enterprise, and Labor Surplus
Area Firms 
The Contractor shall take the following steps to ensure 
that, whenever possible, subcontracts are awarded to 
small business firms, minority firms, women’s business
enterprises, and labor surplus area firms: 
(a) Placing qualified small and minority businesses and 
women’s business enterprises on solicitation lists;
(b) Ensuring that small and minority businesses and 
women’s business enterprises are solicited whenever
they are potential sources; 
(c) Dividing total requirements, when economically feasible, 
into smaller tasks or quantities to permit maximum 
participation by small and minority businesses and 
women’s business enterprises;
(d) Establishing delivery schedules, where the requirements 
include such work. 
of the contract permit, which encourage participation by
small and minority businesses and women’s business 
(c) All insurance shall be carried with companies which are 
enterprises; and 
financially responsible and admitted to do business in the 
State in which the project is located. If any such 
insurance is due to expire during the construction period, 
the Contractor (including subcontractors, as applicable) 
shall not permit the coverage to lapse and shall furnish 
evidence of coverage to the Contracting Officer. All 
certificates of insurance, as evidence of coverage, shall 
provide that no coverage may be canceled or non-
renewed by the insurance company until at least 30 days 
prior written notice has been given to the Contracting 
Officer. 
(e) Using the services and assistance of the U.S. Small 
Business Administration, the Minority Business 
Development Agency of the U.S. Department of 
Commerce, and State and local governmental small 
business agencies. 
39. Equal Employment Opportunity 
During the performance of this contract, the Contractor 
agrees as follows: 
(a) The Contractor shall not discriminate against any 
employee or applicant for employment because of race, 
37. Subcontracts 
color, religion, sex, national origin, or handicap. 
(b) The Contractor shall take affirmative action to ensure that 
(a) Definitions. As used in this contract - 
applicants are employed, and that employees are treated 
during employment without regard to their race, color, 
religion, sex, national origin, or handicap. Such action 
shall include, but not be limited to, (1) employment, (2) 
upgrading, (3) demotion, (4) transfer, (5) recruitment or 
recruitment advertising, (6) layoff or termination, (7) rates 
of pay or other forms of compensation, and (8) selection 
for training, including apprenticeship. 
(1) “Subcontract” means any contract, purchase order, or 
other purchase agreement, including modifications 
and change orders to the foregoing, entered into by a 
subcontractor to furnish supplies, materials, 
equipment, and services for the performance of the 
prime contract or a subcontract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 13 of 19 
form HUD-5370 (1/2014)  
Page 87 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(c) The Contractor shall post in conspicuous places available 
(a) The work to be performed under this contract is subject to 
the requirements of section 3 of the Housing and Urban 
Development Act of 1968, as amended, 12 U.S.C. 1701u 
(section 3). The purpose of section 3 is to ensure that 
employment and other economic opportunities generated 
by HUD assistance or HUD-assisted projects covered by 
section 3, shall, to the greatest extent feasible, be directed 
to low- and very low-income persons, particularly persons 
who are recipients of HUD assistance for 
to employees and applicants for employment the notices
to be provided by the Contracting Officer that explain this 
clause. 
(d) The Contractor shall, in all solicitations or 
advertisements for employees placed by or on behalf of 
the Contractor, state that all qualified applicants will 
receive consideration for employment without regard to 
race, color, religion, sex, national origin, or handicap. 
(e) The Contractor shall send, to each labor union or 
housing. 
representative of workers with which it has a collective 
bargaining agreement or other contract or understanding, 
the notice to be provided by the Contracting Officer 
advising the labor union or workers’ representative of the 
Contractor’s commitments under this clause, and post 
copies of the notice in conspicuous places available to 
(b) The parties to this contract agree to comply with HUD's 
regulations in 24 CFR Part 135, which implement section 
3. As evidenced by their execution of this contract, the 
parties to this contract certify that they are under no 
contractual or other impediment that would prevent them 
from complying with the Part 135 regulations. 
employees and applicants for employment. 
(c) The contractor agrees to send to each labor organization 
or representative of workers with which the contractor has 
a collective bargaining agreement or other understanding,
if any, a notice advising the labor organization or workers' 
representative of the contractor's commitments under this 
section 3 clause, and will post copies of the notice in 
conspicuous places at the work site where both 
employees and applicants for training and employment 
positions can see the notice. The notice shall describe the 
section 3 preference, shall set forth minimum number and 
job titles subject to hire, availability of apprenticeship and 
training positions, the qualifications for each; and the 
name and location of the person(s) taking applications for 
each of the positions; and the 
(f) The Contractor shall comply with Executive Order 11246, 
as amended, and the rules, regulations, and orders of the 
Secretary of Labor. 
(g) The Contractor shall furnish all information and reports
required by Executive Order 11246, as amended, Section 
503 of the Rehabilitation Act of 1973, as amended, and 
by rules, regulations, and orders of the Secretary of 
Labor, or pursuant thereto. The Contractor shall permit 
access to its books, records, and accounts by the 
Secretary of Labor for purposes of investigation to 
ascertain compliance with such rules, regulations, and 
orders. 
(h) In the event of a determination that the Contractor is not 
in compliance with this clause or any rule, regulation, or 
order of the Secretary of Labor, this contract may be 
canceled, terminated, or suspended in whole or in part, 
and the Contractor may be declared ineligible for further 
Government contracts, or Federally assisted construction 
contracts under the procedures authorized in Executive 
Order 11246, as amended. In addition, sanctions may be 
imposed and remedies invoked against the Contractor as 
provided in Executive Order 11246, as amended, the 
rules, regulations, and orders of the Secretary of Labor, 
anticipated date the work shall begin. 
(d) The contractor agrees to include this section 3 clause in 
every subcontract subject to compliance with regulations 
in 24 CFR Part 135, and agrees to take appropriate 
action, as provided in an applicable provision of the 
subcontract or in this section 3 clause, upon a finding that 
the subcontractor is in violation of the regulations in 24 
CFR Part 135. The contractor will not subcontract with 
any subcontractor where the contractor has notice or 
knowledge that the subcontractor has been found in 
or as otherwise provided by law. 
violation of the regulations in 24 CFR Part 135. 
(i) The Contractor shall include the terms and conditions of 
(e) The contractor will certify that any vacant employment 
this clause in every subcontract or purchase order unless 
exempted by the rules, regulations, or orders of the 
Secretary of Labor issued under Executive Order 11246, 
as amended, so that these terms and conditions will be 
binding upon each subcontractor or vendor. The 
Contractor shall take such action with respect to any 
subcontract or purchase order as the Secretary of 
Housing and Urban Development or the Secretary of 
Labor may direct as a means of enforcing such 
provisions, including sanctions for noncompliance; 
provided that if the Contractor becomes involved in, or is 
threatened with, litigation with a subcontractor or vendor 
as a result of such direction, the Contractor may request 
the United States to enter into the litigation to protect the 
positions, including training positions, that are filled (1) 
after the contractor is selected but before the contract is 
executed, and (2) with persons other than those to whom 
the regulations of 24 CFR Part 135 require employment 
opportunities to be directed, were not filled to circumvent 
the contractor's obligations under 24 CFR Part 135. 
(f) Noncompliance with HUD's regulations in 24 CFR Part 
135 may result in sanctions, termination of this contract
for default, and debarment or suspension from future 
HUD assisted contracts. 
interests of the United States. 
(g) With respect to work performed in connection with section 
3 covered Indian housing assistance, section 7(b) of the 
Indian Self-Determination and Education Assistance Act 
(25 U.S.C. 450e) also applies to the work to be 
performed under this contract. Section 7(b) requires that 
to the greatest extent feasible (i) preference and 
opportunities for training and employment shall be given 
to Indians, and (ii) preference in the award of contracts 
and subcontracts shall be given to Indian organizations 
and Indian-owned Economic Enterprises. Parties to this 
contract that are subject to the provisions of section 3 
and section 7(b)agree to comply with section 3 to the 
maximum extent feasible, but not in derogation of 
compliance with section 7(b). 
(j) Compliance with the requirements of this clause shall be 
to the maximum extent consistent with, but not in 
derogation of, compliance with section 7(b) of the Indian 
Self-Determination and Education Assistance Act and the 
Indian Preference clause of this contract. 
40. Employment, Training, and Contracting 
Opportunities for Low-Income Persons, Section 3 of
the Housing and Urban Development Act of 1968. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 14 of 19 
form HUD-5370 (1/2014)  
Page 88 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

41. Interest of Members of Congress 
(a) The PHA, HUD, or Comptroller General of the United 
No member of or delegate to the Congress of the United
States of America shall be admitted to any share or part of
this contract or to any benefit that may arise therefrom. 
States, or any of their duly authorized representatives 
shall, until 3 years after final payment under this contract, 
have access to and the right to examine any of the 
Contractor’s directly pertinent books, documents, papers, 
or other records involving transactions related to this 
contract for the purpose of making audit, examination, 
42. Interest of Members, Officers, or Employees and 
Former Members, Officers, or Employees 
excerpts, and transcriptions. 
No member, officer, or employee of the PHA, no member 
of the governing body of the locality in which the project 
is situated, no member of the governing body of the 
locality in which the PHA was activated, and no other 
public official of such locality or localities who exercises 
any functions or responsibilities with respect to the 
project, shall, during his or her tenure, or for one year 
thereafter, have any interest, direct or indirect, in this 
contract or the proceeds thereof. 
(b) The Contractor agrees to include in first-tier subcontracts 
under this contract a clause substantially the same as 
paragraph (a) above. “Subcontract,” as used in this 
clause, excludes purchase orders not exceeding 
$10,000. 
43. Limitations on Payments made to Influence Certain 
Federal Financial Transactions 
(c) The periods of access and examination in paragraphs (a) 
and (b) above for records relating to (1) appeals under the 
Disputes clause of this contract, (2) litigation or settlement 
of claims arising from the performance of this contract, or 
(3) costs and expenses of this contract to which the PHA, 
HUD, or Comptroller General or any of their duly 
authorized representatives has taken exception shall 
continue until disposition of such appeals, litigation, 
claims, or exceptions. 
(a) The Contractor agrees to comply with Section 1352 of 
Title 31, United States Code which prohibits the use of 
Federal appropriated funds to pay any person for 
influencing or attempting to influence an officer or 
employee of any agency, a Member of Congress, and 
officer or employee of Congress, or an employee of a 
Member of Congress in connection with any of the 
following covered Federal actions: the awarding of any 
Federal contract; the making of any Federal grant; the 
making of any Federal loan; the entering into of any 
cooperative agreement; or the modification of any 
46. Labor Standards - Davis-Bacon and Related Acts 
If the total amount of this contract exceeds $2,000, the 
Federal labor standards set forth in the clause below shall 
apply to the development or construction work to be 
performed under the contract. 
(a) Minimum Wages. 
Federal contract, grant, loan, or cooperative agreement. 
(1) All laborers and mechanics employed under this 
contract in the development or construction of the 
project(s) involved will be paid unconditionally and not 
less often than once a week, and without subsequent 
deduction or rebate on any account (except such payroll 
deductions as are permitted by regulations issued by the 
Secretary of Labor under the Copeland Act (29 CFR Part 
3)), the full amount of wages and bona fide fringe benefits 
(or cash equivalents thereof) due at time of payment 
computed at rates not less than those contained in the 
wage determination of the Secretary of Labor which is 
attached hereto and made a part hereof, regardless of 
any contractual relationship which may be alleged to exist 
between the Contractor and such laborers and 
mechanics. Contributions made or costs reasonably 
anticipated for bona fide fringe benefits under Section 
1(b)(2) of the Davis-Bacon Act on behalf of laborers or 
mechanics are considered wages paid to such laborers or 
mechanics, subject to the provisions of 29 CFR 
5.5(a)(1)(iv); also, regular contributions made or costs 
incurred for more than a weekly period (but not less often 
than quarterly) under plans, funds, or programs which 
cover the regular weekly period, are deemed to be 
constructively made or incurred during such weekly 
period. Such laborers and mechanics shall be paid the 
appropriate wage rate and fringe benefits in the wage 
determination for the classification of work actually 
performed, without regard to skill, except as provided in 
29 CFR 5.5(a)(4). Laborers or mechanics performing 
(b) The Contractor further agrees to comply with the 
requirement of the Act to furnish a disclosure (OMB 
Standard Form LLL, Disclosure of Lobbying Activities) if 
any funds other than Federal appropriated funds 
(including profit or fee received under a covered Federal 
transaction) have been paid, or will be paid, to any person 
for influencing or attempting to influence an officer or 
employee of any agency, a Member of Congress, an 
officer or employee of Congress, or an employee of a 
Member of Congress in connection with a Federal 
contract, grant, loan, or cooperative agreement. 
44. Royalties and Patents 
The Contractor shall pay all royalties and license fees. It 
shall defend all suits or claims for infringement of any 
patent rights and shall save the PHA harmless from loss 
on account thereof; except that the PHA shall be 
responsible for all such loss when a particular design, 
process or the product of a particular manufacturer or 
manufacturers is specified and the Contractor has no 
reason to believe that the specified design, process, or 
product is an infringement. If, however, the Contractor 
has reason to believe that any design, process or product 
specified is an infringement of a patent, the Contractor 
shall promptly notify the Contracting Officer. Failure to 
give such notice shall make the Contractor responsible 
for resultant loss. 
work in more than one classification may be
45. Examination and Retention of Contractor’s Records 
compensated at the rate specified for each classification 
for the time actually worked therein; provided, that the 
employer’s payroll records accurately set forth the time 
spent in each classification in which work is performed. 
The wage determination (including any additional 
classification and wage rates conformed under 29 CFR 
5.5(a)(1)(ii) and the Davis-Bacon poster (WH-1321) shall
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 15 of 19 
form HUD-5370 (1/2014)  
Page 89 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

be posted at all times by the Contractor and its 
subcontractors at the site of the work in a prominent and 
accessible place where it can be easily seen by the 
amount of any costs reasonably anticipated in 
providing bona fide fringe benefits under a plan or 
program; provided, that the Secretary of Labor has 
found, upon the written request of the Contractor, that 
the applicable standards of the Davis-Bacon Act have 
been met. The Secretary of Labor may require the 
Contractor to set aside in a separate account assets 
for the meeting of obligations under the plan or 
workers.
(2) (i) Any class of laborers or mechanics, including 
helpers, which is not listed in the wage 
determination and which is to be employed under 
the contract shall be classified in conformance with 
the wage determination. HUD shall approve an 
additional classification and wage rate and fringe 
benefits therefor only when all the following criteria 
have been met: (A) The work to be performed by 
the classification requested is not performed by a 
classification in the wage determination; and (B) 
The classification is utilized in the area by the 
construction industry; and (C) The proposed wage 
rate, including any bona fide fringe benefits, bears 
a reasonable relationship to the wage rates 
contained in the wage 
program. 
determination. 
(b) Withholding of funds. HUD or its designee shall, upon its 
own action or upon written request of an authorized 
representative of the Department of Labor, withhold or 
cause to be withheld from the Contractor under this 
contract or any other Federal contract with the same 
prime Contractor, or any other Federally-assisted 
contract subject to Davis-Bacon prevailing wage 
requirements, which is held by the same prime 
Contractor, so much of the accrued payments or 
advances as may be considered necessary to pay 
laborers and mechanics, including apprentices, trainees, 
and helpers, employed by the Contractor or any 
subcontractor the full amount of wages required by the 
contract. In the event of failure to pay any laborer or 
mechanic, including any apprentice, trainee, or helper, 
employed or working in the construction or development 
of the project, all or part of the wages required by the 
contract, HUD or its designee may, after written notice to 
the Contractor, take such action as may be necessary to 
cause the suspension of any further payment, advance, 
or guarantee of funds until such violations have ceased. 
HUD or its designee may, after written notice to the 
Contractor, disburse such amounts withheld for and on 
account of the Contractor or subcontractor to the 
(ii) If the Contractor and the laborers and mechanics 
to be employed in the classification (if known), or 
their representatives, and HUD or its designee 
agree on the classification and wage rate 
(including the amount designated for fringe 
benefits where appropriate), a report of the action 
taken shall be sent by HUD or its designee to the 
Administrator of the Wage and Hour Division, 
Employee Standards Administration, U.S. 
Department of Labor, Washington, DC 20210. 
The Administrator, or an authorized 
representative, will approve, modify, or disapprove 
every additional classification action within 30 days 
of receipt and so advise HUD or its designee or will 
notify HUD or its designee within the 30-day period 
that additional time is necessary. 
respective employees to whom they are due. 
(c) Payrolls and basic records. 
(1) Payrolls and basic records relating thereto shall be 
(iii) In the event the Contractor, the laborers or 
maintained by the Contractor during the course of the 
work and preserved for a period of three years 
thereafter for all laborers and mechanics working in 
the construction or development of the project. Such 
records shall contain the name, address, and social 
security number of each such worker, his or her 
correct classification, hourly rates of wages paid 
(including rates of contributions or costs anticipated 
for bona fide fringe benefits or cash equivalents 
thereof of the types described in section 1(b)(2)(B) of 
the Davis-Bacon Act), daily and weekly number of 
hours worked, deductions made, and actual wages 
paid. Whenever the Secretary of Labor has found, 
under 29 CFR 5.5(a)(1)(iv), that the wages of any 
laborer or mechanic include the amount of costs 
reasonably anticipated in providing benefits under a 
plan or program described in section 1(b)(2)(B) of the 
Davis-Bacon Act, the Contractor shall maintain 
records which show that the commitment to provide 
such benefits is enforceable, that the plan or program 
is financially responsible, and that the plan or 
program has been communicated in writing to the 
laborers or mechanics affected, and records which 
show the costs anticipated or the actual cost incurred 
in providing such benefits. Contractors employing 
apprentices or trainees under approved programs 
shall maintain written evidence of the registration of 
apprenticeship programs and certification of trainee 
programs, the registration of the apprentices and 
trainees, and the ratios and wage rates prescribed in 
the applicable programs. 
mechanics to be employed in the classification or 
their representatives, and HUD or its designee do 
not agree on the proposed classification and wage 
rate (including the amount designated for fringe 
benefits, where appropriate), HUD or its designee 
shall refer the questions, including the views of all 
interested parties and the recommendation of HUD 
or its designee, to the Administrator of the Wage 
and Hour Division for determination. The 
Administrator, or an authorized representative, will 
issue a determination within 30 days of receipt and 
so advise HUD or its designee or will notify HUD or 
its designee within the 30-day period that 
additional time is necessary. 
(iv) The wage rate (including fringe benefits where 
appropriate) determined pursuant to 
subparagraphs (a)(2)(ii) or (iii) of this clause shall 
be paid to all workers performing work in the 
classification under this contract from the first day
on which work is performed in classification. 
(3) Whenever the minimum wage rate prescribed in the 
contract for a class of laborers or mechanics includes 
a fringe benefit which is not expressed as an hourly 
rate, the Contractor shall either pay the benefit as 
stated in the wage determination or shall pay another 
bona fide fringe benefit or an hourly cash equivalent 
thereof. 
(4) If the Contractor does not make payments to a trustee 
or other third person, the Contractor may consider as
part of the wages of any laborer or mechanic the 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 16 of 19 
form HUD-5370 (1/2014)  
Page 90 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

(2) (i) The Contractor shall submit weekly for each week 
make such records available may be grounds for
debarment action pursuant to 29 CFR 5.12. 
in which any contract work is performed a copy of 
all payrolls to the Contracting Officer for 
(d) (1) Apprentices. Apprentices will be permitted to work at 
transmission to HUD or its designee. The payrolls 
submitted shall set out accurately and completely 
all of the information required to be maintained 
under subparagraph (c)(1) of this clause. This 
information may be submitted in any form desired. 
Optional Form WH-347 (Federal Stock Number 
029-005-00014-1) is available for this purpose and 
may be purchased from the Superintendent of 
Documents, U.S. Government Printing Office, 
Washington, D.C. 20402. The Contractor is 
responsible for the submission of copies of 
payrolls by all subcontractors. (Approved by the 
Office of Management and Budget under OMB 
less than the predetermined rate for the work they 
performed when they are employed pursuant to and 
individually registered in a bona fide apprenticeship 
program registered with the U.S. Department of 
Labor, Employment and Training Administration, 
Office of Apprenticeship and Training, Employer and
Labor Services (OATELS), or with a State 
Apprenticeship Agency recognized by OATELS, or if a 
person is employed in his or her first 90 days of 
probationary employment as an apprentice in such an 
apprenticeship program, who is not individually 
registered in the program, but who has been certified 
by OATELS or a State Apprenticeship Agency (where
Control Number 1214-0149.) 
appropriate) to be eligible for probationary 
(ii) Each payroll submitted shall be accompanied by a 
employment as an apprentice. The allowable ratio of 
apprentices to journeymen on the job site in any craft 
classification shall not be greater than the ratio 
permitted to the Contractor as to the entire work force 
under the registered program. Any worker listed on a 
payroll at an apprentice wage rate, who is not 
registered or otherwise employed as stated in this 
paragraph, shall be paid not less than the applicable 
wage rate on the wage determination for the 
classification of work actually performed. In addition, 
any apprentice performing work on the job site in 
excess of the ratio permitted under the registered 
program shall be paid not less than the applicable 
wage rate on the wage determination for the work 
actually performed. Where a contractor is performing 
construction on a project in a locality other than that in 
which its program is registered, the ratios and wage 
rates (expressed in percentages of the journeyman’s 
“Statement of Compliance,” signed by the 
Contractor or subcontractor or his or her agent 
who pays or supervises the payment of the 
persons employed under the contract and shall
certify the following: 
(A) That the payroll for the payroll period contains 
the information required to be maintained 
under paragraph (c) (1) of this clause and that 
such information is correct and complete; 
(B) That each laborer or mechanic (including each 
helper, apprentice, and trainee) employed on 
the contract during the payroll period has been 
paid the full weekly wages earned, without 
rebate, either directly or indirectly, and that no 
deductions have been made either directly or 
indirectly from the full wages earned, other 
than permissible deductions as set forth in 29 
CFR Part 3; and 
hourly rate) specified in the Contractor’s or 
(C) That each laborer or mechanic has been paid 
not less than the applicable wage rates and 
fringe benefits or cash equivalents for the 
classification of work performed, as specified 
in the applicable wage determination 
subcontractor’s registered program shall be observed. 
Every apprentice must be paid at not less than the rate 
specified in the registered program for the apprentice’s 
level of progress, expressed as a percentage of the 
journeyman hourly rate specified in the applicable 
wage determination. Apprentices shall be paid fringe 
benefits in accordance with the provisions of the 
apprenticeship program. If the apprenticeship program 
does not specify fringe benefits, apprentices must be 
paid the full amount of fringe benefits listed on the 
wage determination for the applicable classification. If 
the Administrator of the Wage and Hour Division 
determines that a different practice prevails for the 
applicable apprentice classification, fringes shall be 
paid in accordance with that determination. In the 
event OATELS, or a State Apprenticeship Agency 
recognized by OATELS, withdraws approval of an 
apprenticeship program, the Contractor will no longer 
be permitted to utilize apprentices at less than the 
applicable predetermined rate for the work performed 
until an acceptable 
incorporated into the contract. 
(iii) The weekly submission of a properly executed 
certification set forth on the reverse side of 
Optional Form WH-347 shall satisfy the 
requirements for submission of the “Statement of
Compliance” required by subparagraph (c)(2)(ii) of
this clause. 
(iv) The falsification of any of the above certifications 
may subject the Contractor or subcontractor to civil 
or criminal prosecution under Section 1001 of Title 
18 and Section 3729 of Title 31 of the United 
States Code. 
(3) The Contractor or subcontractor shall make the 
records required under subparagraph (c)(1) available 
for inspection, copying, or transcription by authorized 
representatives of HUD or its designee, the 
Contracting Officer, or the Department of Labor and 
shall permit such representatives to interview 
employees during working hours on the job. If the 
Contractor or subcontractor fails to submit the 
required records or to make them available, HUD or 
program is approved. 
(2) Trainees. Except as provided in 29 CFR 5.16, 
its designee may, after written notice to the 
trainees will not be permitted to work at less than the 
predetermined rate for the work performed unless they 
are employed pursuant to and individually registered in 
a program which has received prior approval, 
evidenced by formal certification by the U.S. 
Department of Labor, Employment and Training 
Administration. The ratio of trainees to journeymen on 
the job site shall not be greater than permitted under 
Contractor, take such action as may be necessary to 
cause the suspension of any further payment, 
advance, or guarantee of funds. Furthermore, failure 
to submit the required records upon request or to 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 17 of 19 
form HUD-5370 (1/2014)  
Page 91 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

the plan approved by the Employment and Training 
Administration. Every trainee must be paid at not less 
than the rate specified in the approved program for the 
trainee’s level of progress, expressed as a percentage 
of the journeyman hourly rate specified in the 
applicable wage determination. Trainees shall be paid 
fringe benefits in accordance with the provisions of the 
trainee program. If the trainee program does not 
mention fringe benefits, trainees shall be paid the full 
amount of fringe benefits listed in the wage 
determination unless the Administrator of the Wage 
and Hour Division determines that there is an 
apprenticeship program associated with the 
corresponding journeyman wage rate in the wage 
determination which provides for less than full fringe 
benefits for apprentices. Any employee listed on the 
payroll at a trainee rate who is not registered and 
participating in a training plan approved by the 
Employment and Training Administration shall be paid 
not less than the applicable wage rate in the wage 
determination for the classification of work actually 
performed. In addition, any trainee performing work on 
the job site in excess of the ratio permitted under the 
registered program shall be paid not less than the 
applicable wage rate in the wage determination for the 
work actually performed. In the event the Employment 
and Training Administration withdraws approval of a 
training program, the Contractor will no longer be 
permitted to utilize trainees at less than the applicable 
predetermined rate for the work performed 
(2) No part of this contract shall be subcontracted to any 
person or firm ineligible for award of a United States
Government contract by virtue of section 3(a) of the
Davis-Bacon Act or 29 CFR 5.12(a)(1). 
(3) The penalty for making false statements is prescribed 
in the U. S. Criminal Code, 18 U.S.C. 1001. 
(j) Contract Work Hours and Safety Standards Act. As used 
in this paragraph, the terms “laborers” and “mechanics” 
include watchmen and guards. 
(1) Overtime requirements. No contractor or 
subcontractor contracting for any part of the contract 
work which may require or involve the employment of 
laborers or mechanics, including watchmen and 
guards, shall require or permit any such laborer or 
mechanic in any workweek in which the individual is 
employed on such work to work in excess of 40 hours 
in such workweek unless such laborer or mechanic 
receives compensation at a rate not less than one and 
one-half times the basic rate of pay for all hours 
worked in excess of 40 hours in such workweek. 
(2) Violation; liability for unpaid wages; liquidated 
damages. In the event of any violation of the 
provisions set forth in subparagraph (j)(1) of this 
clause, the Contractor and any subcontractor 
responsible therefor shall be liable for the unpaid
wages. In addition, such Contractor and
until an acceptable program is approved. 
subcontractor shall be liable to the United States (in 
the case of work done under contract for the District 
of Columbia or a territory, to such District or to such 
territory), for liquidated damages. Such liquidated 
damages shall be computed with respect to each 
individual laborer or mechanic (including watchmen 
and guards) employed in violation of the provisions 
set forth in subparagraph (j)(1) of this clause, in the 
sum of $10 for each calendar day on which such 
individual was required or permitted to work in excess 
of the standard workweek of 40 hours without 
payment of the overtime wages required by 
provisions set forth in subparagraph (j)(1) of this 
(3) Equal employment opportunity. The utilization of 
apprentices, trainees, and journeymen under this 
clause shall be in conformity with the equal 
employment opportunity requirements of Executive
Order 11246, as amended, and 29 CFR Part 30. 
(e) Compliance with Copeland Act requirements. The 
Contractor shall comply with the requirements of 29 CFR
Part 3, which are hereby incorporated by reference in this
contract. 
clause. 
(f) Contract termination; debarment. A breach of this contract 
clause may be grounds for termination of the contract and 
for debarment as a Contractor and a subcontractor as 
provided in 29 CFR 5.12. 
(3) Withholding for unpaid wages and liquidated 
(g) Compliance with Davis-Bacon and related Act 
requirements. All rulings and interpretations of the Davis-
damages. HUD or its designee shall upon its own 
action or upon written request of an authorized 
representative of the Department of Labor withhold or 
cause to be withheld, from any moneys payable on 
account of work performed by the Contractor or 
subcontractor under any such contract or any Federal 
contract with the same prime Contractor, or any other 
Federally-assisted contract subject to the Contract 
Work Hours and Safety Standards Act, which is held 
by the same prime Contractor, such sums as may be 
determined to be necessary to satisfy any liabilities of 
such Contractor or subcontractor for unpaid wages 
and liquidated damages as provided in the provisions 
set forth in subparagraph (j)(2) of this clause. 
(k) Subcontracts. The Contractor or subcontractor shall insert 
in any subcontracts all the provisions contained in this 
clause, and such other clauses as HUD or its designee 
may by appropriate instructions require, and also a 
clause requiring the subcontractors to include these 
provisions in any lower tier subcontracts. The prime 
Contractor shall be responsible for the compliance by any 
subcontractor or lower tier subcontractor with all these 
provisions. 
Bacon and related Acts contained in 29 CFR Parts 1, 3, 
and 5 are herein incorporated by reference in this 
contract. 
(h) Disputes concerning labor standards. Disputes arising out 
of the labor standards provisions of this clause shall not 
be subject to the general disputes clause of this contract. 
Such disputes shall be resolved in accordance with the 
procedures of the Department of Labor set forth in 29 
CFR Parts 5, 6, and 7. Disputes within the meaning of 
this clause include disputes between the Contractor (or 
any of its subcontractors) and the PHA, HUD, the U.S. 
Department of Labor, or the employees or their 
representatives. 
(i) Certification of eligibility. 
(1) By entering into this contract, the Contractor certifies 
that neither it (nor he or she) nor any person or firm 
who has an interest in the Contractor’s firm is a 
person or firm ineligible to be awarded contracts by 
the United States Government by virtue of section 
3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 18 of 19 
form HUD-5370 (1/2014)  
Page 92 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

47. Non-Federal Prevailing Wage Rates 
(a) Any prevailing wage rate (including basic hourly rate and 
any fringe benefits), determined under State or tribal law 
to be prevailing, with respect to any employee in any 
trade or position employed under the contract, is 
inapplicable to the contract and shall not be enforced 
against the Contractor or any subcontractor, with respect 
to employees engaged under the contract whenever 
such non-Federal prevailing wage rate exceeds: 
(1) The applicable wage rate determined by the Secretary 
of Labor pursuant to the Davis-Bacon Act (40 U.S.C. 
3141 et seq.) to be prevailing in the locality with 
respect to such trade; 
(b) An applicable apprentice wage rate based thereon 
specified in an apprenticeship program registered with
the U.S. Department of Labor (DOL) or a DOL- 
recognized State Apprenticeship Agency; or 
(c) An applicable trainee wage rate based thereon specified 
in a DOL-certified trainee program. 
48. Procurement of Recovered Materials. 
(a) In accordance with Section 6002 of the Solid Waste 
Disposal Act, as amended by the Resource Conservation 
and Recovery Act, the Contractor shall procure items 
designated in guidelines of the Environmental Protection 
Agency (EPA) at 40 CFR Part 247 that contain the highest 
percentage of recovered materials practicable, consistent 
with maintaining a satisfactory level of competition. The 
Contractor shall procure items designated in the EPA 
guidelines that contain the highest percentage of 
recovered materials practicable unless the Contractor 
determines that such items: (1) are not reasonably 
available in a reasonable period of time; (2) fail to meet 
reasonable performance standards, which shall be 
determined on the basis of the guidelines of the National 
Institute of Standards and Technology, if applicable to the 
item; or (3) are only available at an 
unreasonable price. 
(b) Paragraph (a) of this clause shall apply to items 
purchased under this contract where: (1) the 
Contractor purchases in excess of $10,000 of the item 
under this contract; or (2) during the preceding 
Federal fiscal year, the Contractor: (i) purchased any 
amount of the items for use under a contract that was 
funded with Federal appropriations and was with a 
Federal agency or a State agency or agency of a 
political subdivision of a State; and (ii) purchased a 
total of in excess of $10,000 of the item both under 
and outside that contract. 
Previous editions are obsolete 
Replaces form HUD-5370-A 
Page 19 of 19 
form HUD-5370 (1/2014)  
Page 93 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

SECTION 3 BUSINESS CONCERN (24 CFR §75) 
Certification Form 
EMPLOYER AND PROJECT INFORMATION (to be completed by the employer) 
Employer Name: 
Contact Person: 
Address: 
Phone Number: 
Email: 
Type of Trade: 
Minority Owned Business: ܆ Yes ܆ No 
܆New Construction
܆Substantial Rehab.
܆Repair
܆Service
܆Project Mangt.
܆Professional
܆Tenant Services
܆Education/Training
܆Arch./Engrg. Appraisal
܆Other
܆White Americans
܆Black Americans
܆Native Americans
܆Hispanic Americans
܆Asian/Pacific Americans
܆Hasidic Jews
Federal EIN: 
Women Owned Business:   
܆Yes ܆ No
1. Does your business qualify as a Section 3 Business based on definition in 24 CFR Part 75.5?    ܆ Yes  ܆ No
܆
At least 51 percent owned and controlled by low- or very low-income persons; or
܆
More than 75 percent of the labor hours performed for the business over the previous 3-month period are performed by
Section 3 workers; or
܆
At least 51 percent owned and controlled by current residents of public housing or
Section 8-assisted housing.
2. Is your business registered in HUD’s Section 3 Business Registry?
܆Yes  ܆ No
Additional Information on how to register can be found at https://www.hud.gov/section3
 By signing below, I hereby certify and declare under penalty of perjury under the laws of the United States and the State of Arizona 
that, based upon Company’s payroll records and personnel file, the information provided above is true and correct, and that I am 
authorized on behalf of the Company to make this certification. 
Signature: 
Date: 
Printed Name & Title: 
Phone: 
Email: 
Page 94 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

SECTION 3 PROJECT WEEKLY BENCHMARK FORM (24 CFR §75) 
For Certified Payroll Projects 
SECTION 3 PROJECT BENCHMARK CALCULATIONS (for projects requiring certified payroll) 
Project Name: 
Project Number: 
Project Location/Address: 
Contract Number: 
Employer Name: ܆ General Contractor or ܆ Subcontractor 
Instructions: This information must match weekly certified payroll form WH-347. 
1. Complete the Section 3 Worker Certification form for all employees working on the project.
2. On the WH-374 form, indicated in the “Name and Individual Identifying Number” section for each employee with a “S3W”
for a Section 3 Worker or “TS3W” for Targeted Section 3 Worker.
3. Using the same payroll number and week ending information on the WH-347, fill out section A and B.
3. Add up the total number of hours worked by all workers on the project, enter them below in section C.
4. Add up the total number of hours worked on the project by Section 3 Workers, enter in section D.
5. Add up the total number of hours worked on the project by Targeted Section 3 Workers, enter in section E.
6. Submit this form and any new Section 3 Worker Certification forms with the weekly certified payroll forms.
Summarized Project Benchmark Calculations 
A. Certified Payroll No:
B. For Week Ending:
C. Total Number of Hours Worked
by All Workers
D. Hours Worked by Section 3
Workers
E. Hours Worked by Targeted
Section 3 Workers
Overall Project Benchmark Calculations (Add up all of the weekly “Summarized Project Benchmark Calculations” over 
the course of the entire project including the hours on this submittal.) 
F. Total Number of Hours Worked
by All Workers
G. Hours Worked by Section 3
Workers
H. Hours Worked by Targeted
Section 3 Workers
Page 95 of 96
DocuSign Envelope ID: 967AB005-65D4-4F46-9DB8-A7832336B56D

SECTION 3 WORKER CERTIFICATION FORM (24 CFR §75)
܆Employee Self-Certification; or ܆ Employer’s Certification of Worker
PART I: PROJECT INFORMATION 
Project Name: 
Project Number: 
Project Location/Address: 
Contract Number: 
Employer Name: ܆ General Contractor or ܆ Subcontractor 
Project Funding Types: ܆Housing & Community Development Financial Assistance (CDBG, HOME, ESG, NSP) 
܆Public Housing Financial Assistance
PART II: EMPLOYEE INFORMATION 
Name: 
Address: 
Phone Number: 
Position/Job Title: 
܆Full Time or ܆ Part Time
܆Permanent or ܆ Temporary
܆Exempt (Salary) or ܆Non-Exempt (Hourly)
Hire Date: 
Last 4 digits of SSN: 
Enrolled in any training or apprenticeship programs:     ܆ Yes   ܆ No 
SECTION 3 WORKER & TARGETED SECTION 3 WORKER INFORMATION 
1. Based on the below definition, do you qualify as a Section 3 Worker? 
 
܆ Yes  ܆ No
Section 3 Worker means any worker who currently fits, or when hired within the past five years but no later than November 30,
2020 fits, at least one of the following categories, as documented:
܆
The worker’s income for the previous or annualized calendar year is below the income limit established by HUD
(maximum of $44,250 per worker in 2021. See https://www.huduser.gov/portal/datasets/il.html for more information).
܆
The worker is employed by a Section 3 business concern.
܆
The worker is a YouthBuild participant. YouthBuild is a community-based pre-apprenticeship program administered by the U.S.
Department of Labor that provides job training and educational opportunities for at-risk youth ages 16-24 who have previously
dropped out of high school.
2. Based on the below definition, do you qualify as a Targeted Section 3 Worker?
܆Yes  ܆ No
A Targeted Section 3 worker is a Section 3 worker who is:
܆
A worker employed by a Section 3 business concern; or
܆
A worker who currently fits, or when hired fit at least one of the following categories, as documented within the past five
years but not later than November 30, 2020:
܆
i. Living within the service area or the neighborhood of the project as defined in 24 CFR Part 75.5 as “an area within one
mile of the Section 3 project or, if fewer than 5,000 people live within one mile of a Section 3 project, within a circle centered on the 
Section 3 project that is sufficient to encompass a population of 5,000 people according to the most recent U.S. Census.” ; or
܆
ii. A YouthBuild participant.
܆
iii. A resident of public housing or Section 8-assisted housing. (Only qualifies if public housing financial assistance is provided).
܆
iv. A resident of other public housing projects or Section 8-assisted housing managed by the PHA that is providing
assistance. (Only qualifies if public housing financial assistance is provided).
By signing below, I hereby certify and declare under penalty of perjury under the laws of the United States and the State of Arizona that the 
above information is true and correct, and further agree to provide the Housing Authority of the City of Glendale or the City of Glendale with 
documentation verifying the above-mentioned employee’s Section 3 eligibility upon request. 
܆I am the Employee; or ܆ I am the Employer completing the above form
Signature: 
Date: 
Printed Name & Title: 
Page 96 of 96