Extracted text (via pymupdf)
41737 characters
KERRY’S AUTO NOISE STUDY – CHANDLER, AZ DECEMBER 6, 2021 PREPARED FOR: SIMONCRE CSH, LLC PREPARED BY: ACOUSTICS GROUP, INC. CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION A G i ACOUSTICS GROUP, INC. DECEMBER 6, 2021 I CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 Kerry’s Auto Noise Study – Chandler, AZ Prepared for: Alex Pitrofsky SIMONCRE CSH, LLC 6900 E 2nd Street Scottsdale, AZ 85251 Prepared by: ROBERT WOO – Principal Acoustical Consultant, INCE ACOUSTICS GROUP, INC. CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 ACOUSTICS GROUP, INC. DECEMBER 6, 2021 II CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................. 1 INTRODUCTION ............................................................................................................. 2 NOISE ............................................................................................................................. 3 NOISE STANDARDS ...................................................................................................... 4 EXISTING NOISE LEVELS ............................................................................................. 4 NOISE ANALYSIS........................................................................................................... 5 IMPACT ASSESSMENT ................................................................................................. 8 NOISE CONTROL MEASURES ..................................................................................... 9 CONCLUSION ................................................................................................................ 9 REFERENCES .............................................................................................................. 11 APPENDIX .................................................................................................................... 12 Figures Figure 1. Location of the Project Site & Vicinity Map ....................................................... 2 Figure 2. Typical A-weighted Noise Levels ..................................................................... 3 Figure 3. Noise Measurement Locations ......................................................................... 4 Figure 4. Noise Contour Map of Projected Kerry’s Auto Operational Noise Levels ......... 7 Tables Table 1. Summary of Ambient Noise Measurements ...................................................... 5 Table 2. Kerry’s Auto Typical Equipment and Operational Noise Sources ...................... 6 Table 3. Projected Operational Noise Levels at Nearest Boundaries .............................. 7 Table 4. Summary of Operational Noise Levels and Noise Impact Assessment ............. 8 Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 1 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 EXECUTIVE SUMMARY Acoustics Group, Inc., (AGI) has conducted a noise study of the Kerry’s Auto Project in Chandler, AZ. The Kerry’s Auto’s Site Plan has been reviewed, noise measurements conducted, noise levels analyzed, and an impact assessment performed to determine compliance with the City of Chandler Noise Ordinance. Kerry’s Auto’s future operations were analyzed based on the updated northern site plan that is located further away from residences at the southern property boundary. The northern facing roll up door will direct operations noise to the northern direction towards the existing commercial development and away from the southern and western residential developments. The overall benefit of the northern site configuration is a reduced noise exposure to the residents to the south compared to locating the building at the southern minimum setback of the originally approved PDP. Noise from future equipment operations would be as high as 52 dBA at the office boundary to the east (NM1), 46.2 dBA at the residential boundary to the south (NM2), 36 dBA at the residential boundary to the west (NM3), 41.3 dBA at the residential boundary to the north (NM4) and 53.8 dBA at the commercial boundary to the north (NM5), respectively. When combined with the ambient background noise, the increase in noise level above the ambient baseline will be 0.8 dB at NM1, 0.1 dB at NM2, 0.0 dB at NM3, 0.1 dB at NM4 and 0.1 dB at NM5. The increase in noise level attributed to the future operational noise levels will be less than significant and will not result in significant noise impacts at any of the nearby boundary locations. Noise from pneumatic tools, tire dismounting/mounting, air compressors and general operations has the potential to be audible at the nearest residences, commercial and office boundaries when there are lulls in the ambient background noise. However, during periods of less intense activity or when the ambient background noise is higher such as during the midday or afternoon, noise from the repair shop would be less noticeable. Noise control measures are identified to minimize the potential for annoyance on the nearest receivers. This report has been organized into multiple sections for ease of reference. Section 1 introduces the Project and provides a general discussion on the Project Components. Section 2 discusses Noise Fundamentals, and Section 3 presents the Noise Standards. Section 4 discusses the Existing Noise Environment; Section 5 discusses the Noise Analysis and Section 6 discusses the Impact Assessment. Section 7 presents the Noise Control Measures. Section 8 discusses the Conclusion. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 2 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 INTRODUCTION Kerry’s Auto proposes a new auto service center at 1071 S. Cooper Rd. in Chandler, AZ. The future facility will operate from 7:00 AM to 7:00 PM Monday through Friday, 7:00 AM to 5:00 PM Saturday, and closed on Sunday. Refer to Figure 1 for the general location of the Site and a Vicinity Map. Land uses immediately surrounding the site are commercial and residential. Approximately 6-ft high noise barrier walls protect the residential land uses to the south, west, and north of the project site. The main noise concern is future automotive repair operations affecting the neighboring residential and office properties. Refer to the Appendix for the Project Drawings. Figure 1. Location of the Project Site & Vicinity Map Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 3 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 NOISE The magnitude by which noise affects its surrounding environment is measured on a logarithmic scale in decibels (dB). Because the human ear is limited to hearing a specific range of frequencies, the A-weighted filter system is used to form relevant results. A- weighted sound levels are represented as dBA. Figure 2 shows typical A-weighted exterior and interior noise levels that occur in human environments. Several noise metrics have been developed to evaluate noise. Leq is the energy average noise level and corresponds to a steady-state sound level that has the same acoustical energy as the sum of all the time varying noise events. Lmax is the maximum noise level measured during a sampling period, and Lxx are the statistical noise levels that are exceeded xx-% of the time of the measurement. L50 is the average noise level that is exceeded 50% of the time, 30 minutes in a 60 minute period. Figure 2. Typical A-weighted Noise Levels Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 4 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 NOISE STANDARDS The City of Chandler and the County of Maricopa Noise Ordinances do not adopt a specific noise standard limit. However, the Noise Ordinances state that no person shall disturb the peace, quiet and comfort of the surrounding neighborhood (Section 11-10 and P-23). Per each code, noise produced in the normal conduct of business is excluded from the ordinance provisions. EXISTING NOISE LEVELS AGI conducted a site visit on December 6, 2021 to observe the project site and conduct a short term noise survey. Ambient noise measurements were conducted at the project site (NM1) and at the residential neighborhoods to the south (NM2), west (NM3) and north (NM5). A noise measurement was also conducted at the commercial boundary located to the north (NM4). Figure 3 shows the location of the noise measurement locations. Figure 3. Noise Measurement Locations Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 5 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 The short-term Leq measured at location NM1 was 59.1 dBA. The noise sources contributing to the ambient measurement data at NM1 were from vehicular traffic, distant car exhaust, small aircraft, and cars at gas station parking lot. The short-term Leq measured at receiver NM2 was 62.2 dBA with contributing noise sources from vehicular traffic, distant car exhaust, loud motorcycle exhaust, music and small aircraft. At receiver NM3, the short-term Leq was 73.6 dBA and was primarily due to vehicular traffic, car exhaust and car music and to a lesser extent distant gardeners and small aircraft. The short-term Leq at receiver NM4 was 60.6 dBA and was attributed to vehicular traffic, parking lot and small aircraft. The short-term Leq was 68.5 dBA at location NM5 and was due to vehicular traffic, loud motorcycle and car exhausts, distant gardeners, and small aircraft. Table 1 summarizes the noise measurement data from the survey. Refer to the Appendix for the measurement data sheets. Table 1. Summary of Ambient Noise Measurements Receiver Location Date Time A-weighted Sound Level, dBA Contributing Noise Sources Lmax Lmin Leq NM1 East Property Line – Office Boundary 11-19-21 5:22 PM – 5:37 PM 72.1 49.5 59.1 Vehicular traffic, distant car exhaust, small aircraft, and cars at gas station parking lot. NM2 South Property Line - Residential Boundary 11-19-21 5:04 PM – 5:19 PM 78.2 49.6 62.2 Vehicular traffic, distant car exhaust, loud motorcycle exhaust, music and small aircraft NM3 West Residential Boundary 11-19-21 4:20 PM – 4:35 PM 84.6 55.2 73.6 Vehicular traffic, distant gardeners, loud car exhaust, car music, small aircraft NM4 North Residential Boundary 11-19-21 5:41 PM – 5:56 PM 74.4 53.2 60.6 Vehicular traffic, car in parking lot, small aircraft NM5 North Commercial Boundary 11-19-21 4:42 PM – 4:57 PM 85.7 52.4 68.5 Vehicular Traffic, car music, loud motorcycle and car exhaust, distant gardeners, small aircraft NOISE ANALYSIS The future noise generated from Kerry’s Auto operations has the potential to impact nearby properties. The methodology used to analyze and predict operations noise from the project involved the use of the CadnaA computer noise model. CadnaA can simulate the physical environment by factoring in x, y, and z geometrics of a particular site to simulate the buildings, obstacles, and typography. The model uses industry recognized algorithms (ISO 9613) to perform acoustical analyses. The noise generated by future Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 6 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 operations was calculated by inputting acoustical sources at the project site. AGI’s industry acoustical database was used for the modeling inputs. Kerry’s Auto’s future operations were analyzed based on the updated northern site plan that is located further away from residences at the southern property boundary. The northern facing roll up door will direct operations noise to the northern direction towards the existing commercial development and away from the southern and western residential developments. The overall benefit of the northern site configuration is a reduced noise exposure to the residents to the south compared to locating the building at the southern minimum setback of the originally approved PDP. Operational noise sources were modeled for peak hour activity where all the service bays are all operating simultaneously. The future facility will include 8 lifts, an alignment rack, air compressor and a standard array of pneumatic, electric and hand tools. The operator is forecasting as much as 905 vehicles per month or 30 vehicles per day for service1. Typical noise sources from the facility will include the compressor, brake rotor lathe, loudspeaker public address, tire balance machine, releasing air from tires, impact wrench, tire dismount and remount, lifts, air ratchet, lift air valve, alignment rack, hammering, cars starting and car door slam. Table 2 lists the typical equipment and operational noise levels from the future facility. Table 2. Kerry’s Auto Typical Equipment and Operational Noise Sources Source Equipment Noise Level at 3 feet, dBA Compressor 85.7 Brake Rotor Lathe 77.5 Loudspeaker 86.1 Tire Balance 69.6 Releasing Air from Tire 89.5 Impact Wrench Lugnut Removal 95.9 Tire Dismount & Remount 96.6 Impact Wrench Lugnut Install 100.2 Lowering Car 78.0 Air Ratchet 107.1 Lift Air valve 100.3 Alignment Rack Raising 74.7 Alignment Rack Lowering 67.0 Alignment Rack Hammering 85.2 Source: AGI Acoustical Database, 2021. 1 Projected operational data for Kerry’s Auto provided by SimonCRE, email received November 15, 2021. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 7 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 The hourly Leq from future facility operations is estimated to be 52 dBA at the office boundary to the east (NM1), 46.2 dBA at the residential boundary to the south (NM2), 40 dBA at the residential boundary to the west (NM3), 41.3 dBA at the residential boundary to the north (NM4) and 53.8 dBA at the commercial boundary to the north (NM5), respectively. Table 3 summarizes the projected operational noise levels at the nearest boundaries. Refer to Figure 4 for a noise contour map of Kerry’s Auto’s Projected Operational Noise Levels. Refer to the Appendix for the projected individual equipment noise levels at each receiver location. Table 3. Projected Operational Noise Levels at Nearest Boundaries Figure 4. Noise Contour Map of Projected Kerry’s Auto Operational Noise Levels Receiver Location Future Operations Peak Hour Leq, dBA NM1 East Property Line – Office Boundary 52.0 NM2 South Property Line - Residential Boundary 46.2 NM3 West Residential Boundary 40.0 NM4 North Residential Boundary 41.3 NM5 North Commercial Boundary 53.8 Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 8 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 IMPACT ASSESSMENT The hourly Leq from future facility operations is estimated to be 52 dBA at receiver NM1, 46.2 dBA at receiver NM2, 40 dBA at receiver NM3, 41.3 dBA at receiver NM4 and 53.8 dBA at receiver NM5, respectively. When combined with the ambient background noise, the increase in noise level above the ambient baseline will be 0.8 dB at NM1, 0.1 dB at NM2, 0.0 dB at NM3, 0.1 dB at NM4 and 0.1 dB at NM5. The increase in noise level attributed to the future operational noise levels will be less than significant and will not result in significant noise impacts at any of the nearby boundary locations2. Because the noise from air lifts, air ratchet, air drill, and impact wrenches are distinctive, the operational noise levels from the future Kerry’s Auto could be occasionally audible to the nearest receivers when there are lulls in the background traffic noise. Noise control measures are identified to reduce operational noise levels to lessen annoyance. Refer to Table 4 for a summary of the future Kerry’s Auto operational noise levels and impact assessment. Table 4. Summary of Operational Noise Levels and Noise Impact Assessment Receiver Location Future Operations Peak Hour Leq, dBA Ambient Background Noise Level, dBA Operations Noise plus Ambient Background Noise Level, dBA Increase Above Ambient, dBA Assessment NM1 East Property Line – Office Boundary 52.0 59.1 59.9 0.8 No Impact NM2 South Property Line - Residential Boundary 46.2 62.2 62.3 0.1 No Impact NM3 West Residential Boundary 40.0 73.6 73.6 0.0 No Impact NM4 North Residential Boundary 41.3 60.6 60.7 0.1 No Impact NM5 North Commercial Boundary 53.8 68.5 68.6 0.1 No Impact 2 A significant noise impact would occur if the project would result in a greater than 3 dB noise increase above the existing ambient background noise level. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 9 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 NOISE CONTROL MEASURES The following noise control measures should be implemented to minimize noise at the nearest residential properties: 1. Low noise power tools such as electric or low noise equivalent, should be used. 2. Rotary electric lifts should be used in lieu of pneumatic lifts. 3. Noisy equipment such as the brake lathe should be located within the service area and shielded from line of site to the nearest homes to the north. 4. The air compressor should be shielded with a minimum 6-ft high concrete masonry unit (CMU) walled enclosure with a solid rooftop constructed from minimum 5/8” thick tongue and groove plywood with built-up roofing. The access door should be a solid core wood or metal panel door to form a continuous barrier to prevent sound transmission. 5. The metal roll up door should be kept closed during the early morning and evening hours to the extent feasible. CONCLUSION AGI has conducted a noise study of the Kerry’s Auto Project in Chandler, AZ. The Kerry’s Auto’s Site Plan has been reviewed, noise measurements conducted, noise levels analyzed, and an impact assessment performed to determine compliance with the City of Chandler Noise Ordinance. Kerry’s Auto’s future operations were analyzed based on the updated northern site plan that is located further away from residences at the southern property boundary. The northern facing roll up door will direct operations noise to the northern direction towards the existing commercial development and away from the southern and western residential developments. The overall benefit of the northern site configuration is a reduced noise exposure to the residents to the south compared to locating the building at the southern minimum setback of the originally approved PDP. Noise from future equipment operations would be as high as 52 dBA at the office boundary to the east (NM1), 46.2 dBA at the residential boundary to the south (NM2), 36 dBA at the residential boundary to the west (NM3), 41.3 dBA at the residential boundary to the north (NM4) and 53.8 dBA at the commercial boundary to the north (NM5), respectively. When combined with the ambient background noise, the increase in noise level above the ambient baseline will be 0.8 dB at NM1, 0.1 dB at NM2, 0.0 dB at NM3, 0.1 dB at NM4 and 0.1 dB at NM5. The increase in noise level attributed to the future operational noise levels will be less than significant and will not result in significant noise impacts at any of the nearby boundary locations. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 10 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 Noise from pneumatic tools, tire dismounting/mounting, air compressors and general operations has the potential to be audible at the nearest residences, commercial and office boundaries when there are lulls in the ambient background noise. However, during periods of less intense activity or when the ambient background noise is higher such as during the midday or afternoon, noise from the repair shop would be less noticeable. Noise control measures are identified to minimize the potential for annoyance on the nearest receivers. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 11 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 REFERENCES 1. Caltrans Technical Noise Supplement, 1998. 2. Project Drawings dated October 8, 2021. 3. City of Chandler, AZ Noise Standards. Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. DECEMBER 6, 2021 12 CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 APPENDIX CITY OF CHANDLER EXTERIOR NOISE STANDARDS MODELING INPUT & OUTPUT SITE PLAN Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 CITY OF CHANDLER NOISE STANDARDS ORDINANCE NO. 4153 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CHANDLER, ARIZONA, AMENDING THE CHANDLER CITY CODE BY REPEALING CHAPTER 30, SECTION 30-11; BY RENUMBERING CHAPTER 30, SECTION 30-12 AS SECTION 30-11; AND BY ADOPTING A NEW CHAPTER 11, SUBSECTION 11-10, DISTURBING THE PEACE PROHIBITED; AND PROVIDING PENALTIES FOR THE VIOLATION OF THIS ORDINANCE. BE IT ORDAINED by the City Council of the City of Chandler, Arizona, as follows: SECTION 1. AMENDMENT OF CHANDLER CITY CODE. The Chandler City Code is amended as follows: (a) Section 30-11 of Chapter 30 is hereby repealed; (b) Section 30-12 of Chapter 30 is hereby renumbered as Section 30-11 of Chapter 30; and (c) a new Subsection 11-10 of Chapter 11 is hereby adopted to read as follows: 11-10. Disturbing the peace prohibited. No person shall disturb the peace, quiet and comfort of any neighborhood by creating therein any disturbing or unreasonably loud noise. 11-10.1 Disturbing noises designated. A. It is the intent of this chapter to prohibit all noises that are disturbing or unreasonably loud. The types of noises set out in subsection B. shall not be deemed or construed as in any way exclusive, but merely illustrative. B. The following types of noises are declared to be disturbing to the peace, quiet and comfort of the neighborhood in which they are heard, and persons creating such noises are in violation of section 11-10: 1. Operating any vehicle at such a speed on a curve or turn, or accelerating or decelerating such vehicle in such a manner as to create loud and unnecessary noise through the squealing of tires upon the pavement, or to cause damage to the roadway; 2. The sounding of any horn, signal or noise device on any automobile, motorcycle, bus, truck or other vehicle, in any other manner or for any other purpose than allowed by the Arizona Vehicle Code or other laws of the State; 3. The noise from an exhaust system of any vehicle that is not equipped or constructed so as to prevent any disturbing or unreasonably loud noise; 4. The revving of the engine of any motor vehicle while such vehicle is not in motion, except when done in the course of repairing, adjusting or testing it during reasonable hours; 5. Keeping, harboring or having custody within the City any dog which barks, howls or makes noises by day or night which disturbs the peace and quiet of any person or family in the neighborhood; 6. For any person who sells food and drink, at or adjacent to any conveyance, to ring bells, play chimes or an amplified musical system or to make other noise in any residential area of the City for advertising purposes between the hours of 8:00 p.m. and 9:00 a.m. and between the hours of 1:00 p.m. and 3:00 p.m., and no such noise shall be made when the vehicle is parked; a. For the purposes of this section, an "amplified musical system" is defined as mechanical or electrical musical instrument, or music producing device, equipped with an electrical amplifier or loudspeaker. b. No bells, chimes, or amplified musical system, as defined herein shall make noise or music which disturbs the peace or quiet of any neighborhood or which causes discomfort or annoyance to any reasonable person of normal sensitiveness residing or working in the area. 7. Disturbing or unreasonably loud shouting or crying of peddlers, hawkers, vendors or newspaper carriers; 8. The playing or operating of any radio, phonograph, orchestra or other musical device or instrument in a manner that is disturbing or unreasonably loud to a reasonable person outside the facility or unit from which the noise emanates; and 9. Disturbing or unreasonably loud shouting, screaming, wailing or other vocalization that is disturbing or unreasonably loud to a reasonable person outside the facility or unit from which the noise emanates. C. Nothing herein shall be construed so as to prohibit noises produced by emergency vehicles, operations or procedures of any kind or at any time, or to prohibit noise produced in the normal conduct of business or commerce, provided that such noise production occurs within the normal and customary hours for the conduct of such business or commerce and the operation is being legally conducted within the scope of all ordinances, laws and statutes of the City of Chandler, Maricopa County and the State of Arizona. 11-10.2 Construction Noise A. It shall be unlawful for any person to pour concrete or perform construction work in the city, except within the time periods specified herein. As used in this section, “construction work” shall include (1) operating construction-related equipment; (2) performing outside construction work; (3) performing outside repair work on buildings, structures or projects; and, (4) operating a pile driver, power shovel, pneumatic hammer, derrick, power hoist or other construction-type device. B. Concrete may not be poured and concrete-mixing trucks may not be idled between the hours of 10:00 PM and 5:00 AM each day. C. Construction work occurring within 500 feet of a residential property may not begin prior to 5:00 AM and may not continue beyond 10:00 PM on weekdays. Notwithstanding the foregoing, construction work shall not begin prior to 7:00 AM and must stop by 7:00 PM on any Saturday, Sunday or holiday. For the purposes of this section, a “residential property” is defined as a lot, parcel or tract of land containing one or more dwelling units, and distance is measured from lot lines with any intervening public right-of-way being included in the measurement. D. Notwithstanding the foregoing, pouring concrete or performing construction work in a public place or right-of-way located within 500 feet of a residential property may begin prior to 5:00 AM and may continue beyond 10:00 PM provided that an encroachment permit allowing such an extended time period is obtained. Said encroachment permit shall be kept on the work site and shown to city officials on request. For the purposes of this section, a “public place” is defined as any real property owned, maintained or controlled by the City. E. Nothing herein shall be construed to prohibit emergency construction work that is necessary to provide essential services such as water, sewer, electricity, data/communications, or gas to any property or to remedy an immediate threat to the public safety or the safety of the inhabitants of any given property. F. The Public Works Director or designee may revoke any encroachment permit granted hereunder upon complaint based upon substantial evidence that the construction activity caused unreasonable disturbance in the vicinity of the work site. To deny or revoke a permit, the Public Works Director or designee shall deliver or mail by certified mail to the business address shown on the permit application, a written notice that said permit is revoked and which lists the grounds therefore, and which may order the immediate stoppage of the work being performed under the permit pending any hearing on the revocation. A revoked permit shall be surrendered to the Public Works Director or designee on demand. 1. The permittee may request an informal hearing on such revocation by submitting a written request within ten (10) days after the notice of revocation is given and shall set forth specifically the grounds for the hearing. If a hearing is not requested within ten (10) days of the date of notice, the revocation shall take effect on the eleventh day after the date of the notice. If a hearing is requested, no revocation shall take effect until after the hearing and date of notice of the Public Works Director or designee's final decision. An appeal of the Public Works Director's decision to the City Manager, may not be made prior to the date of notice of Public Works Director's final decision. 2. The permittee may appeal the final decision of the Public Works Director/designee within ten (10) days of the date of notice of such decision by submitting to the City Clerk a written notice of the permittee's intention to appeal to the City Manager/designee. A timely appeal shall result in a stay of any decision of the Director/designee, except that a work stoppage order may remain in effect. The appeal will be heard in accordance with the provisions set forth in Chapter 1. Failure to appeal in writing within the prescribed time constitutes a waiver of the right to appeal. The decision of the City Manager/designee shall be final. 11-10.3. Disruptive parties. A. Prohibition of parties that disturb the peace. No person shall knowingly congregate because of, or participate in, any party or gathering of two (2) or more people from which noise emanates of sufficient volume or of such nature to reasonably disturb the peace, quiet, or repose of other persons. B. Authority to disperse noisy party. A Police Officer may order all persons present other than the owners or tenants of the building or place to immediately disperse. It shall be unlawful for any person to refuse to leave after being ordered to do so by a Police Officer. C. Owner or other tenant responsibility in abatement of disturbance. It shall be unlawful for any owner or tenant of the building or place who has knowledge of the disturbance to fail or refuse to immediately abate said disturbance. 11-10.4 Penalties for disturbing the peace. Any person who violates a provision of Section 11-10, including any subsection thereof, shall be guilty of a misdemeanor and shall be subject to the penalties provided in Chapter 1 of this Code. SECTION 2: EFFECT OF REPEAL OF CHAPTER 30, SECTION 30-11. The repeal by this Ordinance No. 4153 of existing Chapter 30, Section 30-11, Disturbing the Peace Prohibited, shall not affect any punishment, penalty or civil infraction incurred before the repeal took effect, nor any suit, prosecution or proceeding pending at the time of the repeal, for an offense committed under said existing Chapter 30, Section 30-11. SECTION 3: PENALTY CLAUSE. A person who violates a provision of new Section 11-10 of Chapter 11 of the Chandler City Code as enacted by this Ordinance No. 4153 is guilty of a Class 1 misdemeanor, which is punishable by a fine not exceeding $2,500.00, by imprisonment for a term not exceeding 6 months, by probation for a term not exceeding 3 years, or by any combination thereof. The sentence to pay a fine that is imposed on an enterprise convicted of a Class 1 misdemeanor shall be an amount not more than $20,000.00 INTRODUCED AND TENTATIVELY APPROVED by the City Council this 14th day of Jannuary 2010. ATTEST: _S/Marla Paddock________________ _S/Boyd W. Dunn_________________ CITY CLERK MAYOR PASSED AND ADOPTED by the City Council this 28th day of January 2010. ATTEST: _S/Marla Paddock________________ _S/Boyd W. Dunn_________________ CITY CLERK MAYOR APPROVED AS TO FORM: _S/Mary Wade_________ CITY ATTORNEY Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 MODELING INPUT & OUTPUT * KERRY'S AUTO INPUT OUTPUT RECEIVERS Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) NE Commercial 52 ‐88 0 0 Total 1.5 r 382.02 144.01 1.5 North across E Pecos 41.3 ‐88 0 0 x Total 1.5 r 383.36 298.02 1.5 W across S Cooper 36 ‐88 0 0 x Total 1.5 r 258.02 165.34 1.5 S PL 46.2 ‐88 0 0 x Total 1.5 r 358.69 78 1.5 N PL 53.8 ‐88 0 0 x Total 1.5 r 356.48 166.79 1.5 SOURCES Name M. ID Result. PWL Lw / Li Operating Height Coordinates Day Evening Night Type Value Day X Y Z (dBA) (dBA) (dBA) (min) (m) (m) (m) (m) Lift 1 86.2 86.2 86.2 Lw GY15 2 2 r 364.88 121.11 2 Lift 2 86.2 86.2 86.2 Lw GY15 2 2 r 364.79 116.45 2 Lift 3 86.2 86.2 86.2 Lw GY15 2 2 r 364.63 111.3 2 Lift 4 86.2 86.2 86.2 Lw GY15 2 2 r 364.46 106.4 2 Air Rachet 118.2 118.2 118.2 Lw GY12 30 1 r 354.57 106.24 1 Impact Wrench 107 107 107 Lw GY3 15 0.5 r 354.16 112.05 0.5 Impact Wrench 107 107 107 Lw GY3 15 0.5 r 354.49 116.7 0.5 Air Impact Wrench 107 107 107 Lw GY3 15 0.5 r 353.66 122.1 0.5 Compressor 96.7 96.7 96.7 Lw GY1 30 1.5 r 344.19 107.07 1.5 Alignment Rack 85.8 85.8 85.8 Lw GY8 2 1 r 359.14 104.74 1 Tire Balance 1 80.6 80.6 80.6 Lw GY5 30 1 r 349.51 118.78 1 Tire air release 1 100.5 100.5 100.5 Lw GY2 30 1 r 349.34 117.62 1 Tire Balance 2 80.6 80.6 80.6 Lw GY5 30 1 r 349.34 112.72 1 Tire air release 2 100.5 100.5 100.5 Lw GY2 30 1 r 349.17 111.64 1 Lift 8 86.2 86.2 86.2 Lw GY15 2 2 r 352.83 122.44 2 Lift 7 86.2 86.2 86.2 Lw GY15 2 2 r 353.58 116.87 2 Lift 6 86.2 86.2 86.2 Lw GY15 2 2 r 353.16 112.22 2 Lift 5 86.2 86.2 86.2 Lw GY15 2 2 r 353.74 106.57 2 Alignment Rack 78.1 78.1 78.1 Lw GY9 2 1 r 359.64 104.74 1 rachet 118.2 118.2 118.2 Lw GY12 15 2 r 364.96 105.9 2 rachet 118.2 118.2 118.2 Lw GY12 15 2 r 365.29 111.14 2 Rachet 92.1 92.1 92.1 Lw GY12 15 2 r 365.46 116.37 2 Rachet 118.2 118.2 118.2 Lw GY12 15 2 r 365.46 120.94 2 Alignment Rack 96.3 96.3 96.3 Lw GY10 2 1 r 358.73 104.74 1 Alignment Rack 107 107 107 Lw GY3 2 1 r 358.27 104.78 1 Impact Wrench 111.3 111.3 111.3 Lw GY6 15 0.5 r 354.03 116.49 0.5 Impact Wrench 111.3 111.3 111.3 Lw GY6 15 0.5 r 353.78 111.79 0.5 Tire Mount 1 107.7 107.7 107.7 Lw GY4 30 1 r 349.42 117.03 1 Tire Mount 2 107.7 107.7 107.7 Lw GY4 30 1 r 349.17 111.05 1 Car Start 8 86.2 86.2 86.2 Lw GY15 1 1 r 352.68 121.78 1 Car Door Slam 8 86 86 86 Lw GY16 30 1 r 353.59 121.45 1 Car Start 7 86.2 86.2 86.2 Lw GY15 1 1 r 353.51 116.3 1 Car Door Slam 7 86 86 86 Lw GY16 1 1 r 354.09 115.97 1 Tire Mount 2 107.7 107.7 107.7 Lw GY4 30 1 r 353.18 111.56 1 Tire Mount 2 107.7 107.7 107.7 Lw GY4 30 1 r 353.93 111.23 1 Car Start 6 86.2 86.2 86.2 Lw GY15 1 1 r 353.68 105.91 1 Car Door Slam 6 86 86 86 Lw GY16 1 1 r 354.42 105.66 1 Car Start at alignment 86.2 86.2 86.2 Lw GY15 1 1 r 358.41 106.16 1 Car Door Slam at alignm 86 86 86 Lw GY16 1 1 r 359.16 106.08 1 Car Start 4 86.2 86.2 86.2 Lw GY15 1 1 r 364.06 105.66 1 Car Door Slam 4 86 86 86 Lw GY16 1 1 r 364.73 105.25 1 Car Start 3 86.2 86.2 86.2 Lw GY15 1 1 r 364.39 110.56 1 Car Door Slam 3 86 86 86 Lw GY16 1 1 r 365.14 110.32 1 Car Start 2 86.2 86.2 86.2 Lw GY15 1 1 r 364.56 115.88 1 Car Door Slam 2 86 86 86 Lw GY16 1 1 r 365.22 115.63 1 Car Start 1 86.2 86.2 86.2 Lw GY15 1 1 r 364.56 120.37 1 Car door slam 1 86 86 86 Lw GY16 1 1 r 365.06 120.12 1 BARRIERS Name Height Begin End (m) (m) Building 19 g 19 g S property wall 2 r 2 r S property side wall 2 r 2 r W Property Wall 2 r 2 r W property wall 2 2 r 2 r W property wall 2 2 r 2 r Receiver Lr w/o Noise Control Name ID Day dB(A) NE Commercial 52 North across E Pecos 41.3 W across S Cooper 36 S PL 46.2 N PL 53.8 Source Partial Level Day Name M. ID NM1 NM4 NM3 NM2 NM5 Lift 1 1.7 ‐13.3 ‐1.1 ‐3.2 2.7 Lift 2 0.4 ‐12.7 ‐9.4 ‐2.3 6.6 Lift 3 ‐1 ‐12.5 ‐11.4 ‐1.1 13.2 Lift 4 ‐2.1 ‐12.5 ‐12.1 0.2 12.4 Air Rachet 38 38.6 26 42.1 48.6 Impact Wrench 29.5 28.2 16.6 27.6 34.7 Impact Wrench 36.2 28.5 16.8 26.5 35.8 Air Impact Wrench 45.9 17.7 17.3 25.3 29.8 Compressor 12.6 0.3 6.6 31.8 11.4 Alignment Rack ‐2.9 ‐0.5 ‐12.9 0.5 11.3 Tire Balance 1 21.1 ‐9 ‐5.2 3.1 3.5 Tire air release 1 42.1 10 13.6 22.6 22.4 Tire Balance 2 14.8 ‐7.6 ‐5.5 4.4 3.4 Tire air release 2 33.5 11.6 13.3 24 22.3 Lift 8 17.3 ‐11.9 ‐10.8 ‐3.5 0.4 Lift 7 11.2 ‐3.7 ‐11.3 ‐2.4 4.2 Lift 6 3.3 1 ‐11.7 ‐1.4 3.7 Lift 5 ‐0.7 0.7 ‐12 0.2 5.9 Alignment Rack ‐11.1 ‐9 ‐21.3 ‐7.5 3.4 rachet 35.2 19.4 22.3 39.1 50.3 rachet 36.6 19.3 22.9 37.3 44.5 Rachet 15.4 1.1 5.3 12.7 18.5 Rachet 39.5 18.9 34.2 34.5 36.9 Alignment Rack 7.2 9.9 ‐2.7 10.8 21.6 Alignment Rack 17.2 19.4 7.1 21.2 31.7 Impact Wrench 40.5 31.7 20 30.2 37 Impact Wrench 33.2 31.4 19.7 31.5 36.7 Tire Mount 1 47.2 12.8 17.4 28.2 27.1 Tire Mount 2 35.9 14.2 17.1 29.8 26.6 Car Start 8 13.8 ‐15.1 ‐14 ‐6.5 ‐3 Car Door Slam 8 28.1 3.1 1.3 8.6 14.3 Car Start 7 6.4 ‐7.3 ‐14.4 ‐5.3 0.5 Car Door Slam 7 4.3 ‐2.9 ‐14 ‐5.1 2.7 Tire Mount 2 31.3 29 16.8 29.9 32.4 Tire Mount 2 30.6 29 16.7 30.1 35.4 Car Start 6 ‐4.3 ‐2.9 ‐15.1 ‐2.6 2.2 Car Door Slam 6 ‐4.2 ‐3.4 ‐14.7 ‐2.5 3.4 Car Start at alignment ‐5.1 ‐2.9 ‐15.2 ‐2.6 9 Car Door Slam at alignm ‐4.8 ‐3.4 ‐14.8 ‐2.5 8.3 Car Start 4 ‐5.4 ‐15.6 ‐15.3 ‐2.6 8.8 Car Door Slam 4 ‐5.2 ‐15.6 ‐14.8 ‐2.4 8 Car Start 3 ‐4.3 ‐15.7 ‐14.7 ‐4 9.6 Car Door Slam 3 ‐4.1 ‐15.8 ‐14.1 ‐3.9 4 Car Start 2 ‐2.9 ‐15.8 ‐13.1 ‐5.3 4.5 Car Door Slam 2 ‐2.8 ‐15.9 ‐12.5 ‐5.1 1.8 Car Start 1 ‐1.6 ‐16.1 ‐7.8 ‐6.2 0.9 Car door slam 1 ‐1.5 ‐16 ‐7.6 ‐6 ‐0.4 Kerry’s Auto Noise Study – Chandler, AZ ACOUSTICS GROUP, INC. CONSULTANTS IN ACOUSTICS, NOISE & VIBRATION (877) 595-9988 PROJECT DRAWINGS PROPOSED AUTO SERVICE +/- 8,409 SF ADJACENT USE: COMMERCIAL OFFICE ADJACENT USE: COMMERCIAL OFFICE ADJACENT USE: SINGLE FAMILY RESIDENTIAL 6 6 8 8 19'-0" 9'-0" 25'-0" 65'-6 5/8" 11'-9" PARKING SETBACK 25'-0" BLDG SETBACK 20'-0" BLDG SETBACK 52'-5 1/2" 116'-2 1/2" 116'-5 1/2" 11'-0" 8'-0" 11'-0" 19'-0" 25'-1" 35'-0 3/4" 39'-8" EXISTING INGRESS/EGRESS TO REMAIN 105'-8" 88'-0" 19'-0" 9'-0" SES/FIRE RISER BICYCLE PARKING FUTURE EV PARKING 5'-0" 12'-0" 6'-0" 6'-0" TRUCK TURNING RADIUS 5'-0" 5'-0" TRASH ENCLOSURE CMU SCREEN WALL NEW 5'-0" SIDEWALK TO ATTACH TO EXISTING CMU SCREEN WALL GEOLINER 678 FORWARDLIFT DP10 14K SCISSOR 14K SCISSOR FORWARDLIFT DP10 FORWARDLIFT DP10 FORWARDLIFT DP10 FORWARDLIFT DP10 FORWARDLIFT DP10 2'-10" 7'-4 1/2" 5'-4" 5'-0" 20'-8" 5'-2" 9'-1" 23'-2 1/2" 9'-9" 45° 5'-0" 5'-0" 5'-0" 5'-0" TOOL/DIAGNOSTIC/PARTS WASHER/WORK BENCH AREA GEOLINER 678 SEE LINE ATCH SEE LINE 30'-0" BLDG SETBACK VARIES ELEC ESMT 65'-0" R.O.W. 32'-0" PECOS ROADWAY IMPROVEMENTS R.O.W. 5'-0" 8'-0" TELE ESMT 15'-0" WATER ESMT EXISTING PAVING TO REMAIN REMOVE CURB 8'-3" A R C H I T E C S T , I N C SEC PECOS & COOPER 1071 S COOPER RD, CHANDLER AZ KERRY'S AUTO DATE: 10-08-2021 (PRELIMINARY) NORTH SCALE: SITE PLAN 1" = 20'-0" RKAA# 21237.00 SP-1 2 0 2 1 R K A A ARCHITECTS, INC. ALL RIGHTS R ES ER VED. THIS DRAWING IS AN I N S T R U M E N T O F SERVICE. IT IS THE PROPERTY OF RKAA ARCHITECTS, INC. AND M A Y N O T B E DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN PERMISSION OF THE ARCHITECT. © 20' 40' 10' 0' THIS SITE PLAN HAS BEEN PREPARED WITHOUT THE AID OF A SURVEY. ALL PROPERTY BOUNDARIES ARE ROUGH APPROXIMATIONS. THIS DRAWING IS TO BE USED FOR CONCEPTUAL PURPOSES ONLY AND IT IS NOT TO BE THE BASIS FOR ANY LEGALLY BINDING DOCUMENTATION. site VICINITY MAP SCALE: N.T.S. NORTH E FLINTLOCK WAY E PECOS RD S COTTONWOOD ST S COOPER RD PROJECT DIRECTORY APPLICANT: SIMONCRE 6900 E 2ND ST SCOTTSDALE, AZ 85251 CONTACT: ALEX PITROFSKY PHONE: 480-566-8955 E-MAIL: alex.pitrofsky@simoncre.com PROJECT DESCRIPTION NEW GROUND UP BUILDING FOR FUTURE AUTO SERVICE USE. WORK INCLUDES MAJOR UTILITIES INCLUDING ELECTRICAL, MECHANICAL, AND PLUMBING. SITE WORK INLCLUDES NEW GRADING AND DRAINAGE, NEW PARKING STALLS, DRIVE-THRU, HARDSCAPE, AND LANDSCAPE AREAS. ARCHITECT: RKAA ARCHITECTS, INC. 2233 E. THOMAS ROAD PHOENIX, AZ 85016 CONTACT: NEIL FEASER PHONE: (602) 955-3900 FAX: (602) 955-0496 E-MAIL: nfeaser@rkaa.com SITE DATA ASSESSOR PARCEL NO: 303-30-006S GROSS SITE AREA: 1.53 ACRES (66,470 S.F.) NET SITE AREA: 1.05 ACRES (45,588 S.F.) PROPERTY TYPE: COMMERCIAL COMMUNITY AUTOMOBILE EXISTING ZONING: PAD PROPOSED ZONING: (UNCHANGED) PROPOSED FLOOR RATIO: 8,409 / 45,588 = 18.4% TOTAL PARKING REQUIRED: 28 SPACES 3.5 SPACES PER BAY (8 BAYS) TOTAL PARKING PROVIDED: 28 SPACES ACCESSIBLE SPACES REQUIRED: 2 SPACES ACCESSIBLE SPACES PROVIDED (VAN ACCESSIBLE): 2 SPACES BICYCLE SPACES PROVIDED: 2 SPACES PARKING DATA NOTE: SUBJECT PARCELS ARE PART OF LARGER PROPERTY OWNED BY A SINGLE OWNER.