JOB ORDER PROJECT AGREEMENT
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No. PD2208.401
This JOB ORDER PROJECT AGREEMENT ("Job Order’) is made this day of 2022
(‘Effective Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”)
and FC! Constructors, Inc., a Colorado corporation, (‘JOC Contractor") and is entered into
pursuant to Job Order Master Agreement No. JOC1911.401 (“JOC Master Agreement”). City and
JOC Contractor may be referred to individually as “Party” or collectively as “Parties”).
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as
follows:
RECITALS
A. On or about January 23, 2020, the Parties entered into the JOC Master Agreement, which terms
and conditions are made a part of and incorporated into this Job Order Project Agreement by this
reference.
B. City proposes to engage JOC Contractor to design and construct a shade structure in the
Chandler Heights precinct courtyard, as more fully described in Exhibit "A", which is attached to
and made a part of this Job Order by this reference.
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for
the compensation and fees set forth and as described in Exhibit “B", which is attached to and
made a part of this Agreement by this reference.
ARTICLE 1. DESCRIPTION OF WORK
The Parties enter into this Job Order Project Agreement for the CHANDLER HEIGHTS POLICE
SUBSTATION COURTYARD COVER, Project Number PD2208.401. The scope of work consists of
design and construction of a shade structure in the Chandler Heights precinct courtyard, all as
more particularly set forth in Exhibit “A” attached hereto and incorporated herein by reference.
City of Chandler Job Order Project Agreement 4
Public Works & Utilities Department, Capital Projects Division
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No.: PD2208.401
Rev. 3/4/22
The JOC Contractor will not accept any change of scope, or change in contract provisions, unless
issued in writing, as a contract amendment or change order and signed by the authorized
signatories for each party.
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached
hereto and incorporated herein by reference, will be due prior to execution of each Job Order
Project Agreement in the full amount of each Job Order.
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement
of Claims and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F" respectively
attached hereto and incorporated herein by reference.
ARTICLE 2. PROJECT PRICE
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master
Agreement a fee not to exceed the Guaranteed Maximum Price of $125,321 Dollars determined
and payable as set forth in JOC Master Agreement and Exhibit “B” attached hereto and made a
part hereof by reference.
ARTICLE 3. CONTRACT TIME & SCHEDULE
JOC Contractor agrees to complete all Construction within 203 calendar days from the Notice to
Proceed (NTP) Date.
ARTICLE 4, PARTICIPANTS
CITY: Construction Project Manager: Jason Garcia
Phone: | 480-782-3453
Email: | Jason.garcia@chandleraz.gov
JOC CONTRACTOR: FCI Constructors, inc.
10922 W. Glenn Dr.
Glendale, AZ_ 85307
JOC Contractor Representative: Drew Wenger
Phone: | 623-772-7400
Email: | dwenger@fciol.com
SIGNATURE PAGE TO FOLLOW
City of Chandler Job Order Project Agreement 2
Public Works & Utilities Department, Capital Projects Division
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No.: PD2208.401
Rev. 3/4//22
IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date.
“CITY”
CITY OF CHANDLER:
MAYOR Date “Signature 7 Date
Woeew Weoee—
Recommended By: Print Name
TRO Cele nAl MAN ALEC
TEM lwgr L Title
Kimberly Moon, P.E.
Acting CIP City Engineer ATTEST: If Corporation
APPROVED AS TO FORM:
City Attorney Ww?
By
ATTEST:
Secretary
ADDRESS FOR NOTICE
FCI Constructors, Inc.
10922 W. Glenn Dr.
City Clerk SEAL
Glendale, AZ_ 85307
ADDRESS FOR NOTICE
City of Chandler
P.O. Box 4008, Mail Stop 407
Chandler, AZ 85244-4008
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No.: PD2208.401
Rev. 3/4/22
EXHIBITA
SCOPE OF WORK
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No.: PD2208.401
Rev. 3/41/22
Ae
-IFCI
Constructors, Inc.
March 14, 2022
REVO3
Ivan Magana, PE
Project Manager
City of Chandler
RE: Canopy at Heights Police Substations
Dear Mr. Magana,
It is our pleasure to submit the following proposal for the Fitness Canopy at Chandler Heights Police
Substation. Based on the site walk held on December 2", our understanding of the scope of work is as
follows:
- Provide a steel canopy that covers the majority of the artificial turf area.
- Paint the underside of the canopy so that it reflects light, as we will not be providing
additional lighting under the canopy.
Our Pricing is based off the site walk held on December 2"™ along with the following assumptions.
- Project material testing & special inspection fees are included as an allowance.
- Builder’s Risk and General Liability Insurance is included in the estimate.
- Payment and Performance Bond is included, with a one-year warranty period included.
- We have included a full-time on-site Superintendent during normal working hours.
- A jobsite trailer is not included, we will work out of our Superintendent’s truck.
- Estimates include all state and city sales taxes through point of sale (MRRA).
- The cost of stamped engineering and calcs are included in the pricing for permitting.
- We have included the cost for building permit and a soils report.
- The footings for the canopy is quoted as drilled footings. Should for some reason spread
footings be required to solve any unforeseen situation, we have included the allowance
for a 5’x9’x2’ thick spread footings.
- Pricing includes a powder coat finish on the columns & beams.
- The proposal is based on a 35-foot by 75-foot, double cantilevered steel canopy with 3-
column.
- The as-builts that were provided show a sanitary sewer line running through the yard
area (see attached).
- Since there is no new lighting being provided under the canopy, the canopy has a
clearance height of 12’ to allow exiting lighting to be utilized. The clearance height is
the lowest point of the canopy.
- In addition to the 12’ clearance height, the underside of the deck is white to reflect the
light.
- There is an allowance included in our proposal for any landscape and turf repair.
- We have included turf and sidewalk protection.
- The removal of the footing spoils, along with any other construction waste is included.
License No. ROC 072062 B-01 10922 West Glenn Dr., Glendale, AZ 85307 (623) 772-7400 (623) 877-3300 Fax www.fciol.com
FCI
Constructors, Inc.
- Drawing and specs are to be submitted to owner for review prior to submittal for plan
review.
The scope of work within this estimate is planned to begin after all the long lead material is procured and
received. Please see the included schedule for anticipated durations. Due to industry material price volatility,
our estimate is valid for 90 days from February 25, 2022.
If you have any questions or need additional information, please let us know. Thank you for the opportunity
to price this work, FCI is looking forward to working together with you on this project.
Best Regards,
Chris Reina
Estimator
License No. ROC 072062 B-01 10922 West Glenn Dr., Glendale, AZ 85307 (623) 772-7400 (623) 877-3300 Fax www.fciol.com
-/FCI
Constructors, Inc.
. |
Anticipated Schedule - |
Heights Police Substation Parking Canopies |
Design/Construction Documents 3-4 Weeks
Owner Construction Documents Review 2 Weeks (confirm with City)
Comment Resolution 2 Weeks
Permitting 4 Weeks (confirm with City)
Pre-Construction 2 Weeks
Procurement & Fabrication of Long Lead Items 6-7 Weeks
Construction 4 Weeks
License No. ROC 072062 B-01 10922 West Glenn Dr., Glendale, AZ 85307 (623) 772-7400 (623) 877-3300 Fax www.fciol.com
SPEDE
AND ASSOQaTes
Geotechnical + Environmentat ¢ Materlals Engineers
Revised: February 17, 2021
Chris Reina
FCI Constructors, Inc.
10922 West Glenn Drive
Glendale, AZ 85307
RE: Proposal for Geotechnical Investigation
Chandler Height Substation Canopy
4040 East Chandler Heights Road
Chandler, AZ
Proposal No. 79267 S
Mr. Reina:
We are pleased to provide our cost estimate to conduct a soil investigation at the above referenced site
that will satisfy site development and foundation design requirements. All work on this project will be
carried out under the overall supervision of a registered Professional Engineer in the state of Arizona.
We understand that construction will consist of a steel shade canopy on the southwest side of the existing
substation. The proposed canopy will be steel frame construction. Structural loads are expected to be light
to moderate and no special considerations regarding settlement tolerances are known at this time.
Adjacent areas will remain unchanged.
We will drill and sample sufficient test borings to adequately determine subsoil conditions and provide
samples for laboratory testing. Sufficient laboratory tests will be conducted to properly classify the soils
encountered and provide data for engineering design. We presently anticipate drilling one (1) structural
borings to a depth of 25 feet below existing ground surface, or refusal, whichever comes first. Access to
the site by conventional truck-mounted drilling equipment is assumed to be free and unencumbered.
We will mark the proposed boring locations in the field with the locations to be approved by the client
and owner. Speedie & Associates will take reasonable precautions to avoid damage to subterranean
structures, pipelines and utilities including calling AZ811 (Blue Stake) and subcontracting a private utility
locator to locate privately owned traceable underground utilities and reviewing all as-built utility plans
provided by the client. The client (and owner) agree Speedie & Associates is not responsible for any
damages to underground structures, pipelines and utilities that are not traceable, not called to our
attention and/or correctly shown on the plans furnished to Speedie & Associates.
We will analyze the data obtained from field and laboratory testing and prepare a report presenting all data
obtained, together with our conclusions and recommendations regarding:
1. Design data, allowable bearing pressure and depth, for shallow spread footings.
2. Alternate foundation systems and design data, if indicated by soil conditions.
3331 East Wood Street = Phoenix, AZ 85040 = Phone 602-997-6391 m Fax 602-943-5508 m www.spsedie.net
PHOENIX TUCSON FLAGSTAFF
SPEEDie
AND ASSOCIATES
Geotechnical + Environmental « Materials Engineers
Settlement estimate for each foundation system considered.
Lateral pressures on temporary and permanent retaining and foundation walls.
Seismic Site Classification based on borings and published ground motion data.
Groundwater conditions, if any, to the depths which will influence design and/or construction
of the proposed development.
7. Swell potential of in-situ and compacted soils and recommendations for control if highly
expansive.
8. Suitability of site soils for use as compacted fill and preferred earthwork methods, including
clearing, stripping, excavation and construction of engineered fill.
9. Local excavation and trenching conditions and stability considerations.
ON Gy Bi
We propose to provide the design services set forth herein for the following lump sum amounts, which
includes all testing, engineering, reimbursable expenses, one hard copy of the report and an electronic
PDF format file to be emailed upon completion. Should we be informed that additional hard copies of
the report are needed after it has been finalized, there will be an additional charge of $25.00 per report.
Geotechnical Investigation with Report $3,500.00 Pricing is valid for 90 days from proposal date.
We have the staff available to begin work immediately upon notice to proceed. Once we finalize the boring
location plan, about 12 working days are required to mark, obtain utility clearances and begin auger
borings. Fieldwork for auger borings should take one day (weather & access permitting) and lab testing
about 5 weeks. The complete report will be issued within 7 days of lab testing completion. As always, we
stand ready to make reasonable adjustments to this schedule to meet our clients' needs.
We appreciate the opportunity to submit this proposal for your consideration. If the terms set forth are
satisfactory, please sign the attached copy and return it for our records.
Respectfully submitted, APPROVED AND ACCEPTED
SPEEDIE & ASSOCIATES, INC. For: FCI Constructors, Inc.
c —
« By:
Kenneth M. Euge II (Printed Name & Position)
Project Coordinator
(Signature)
(Date)
FCI Constructors, Inc. Proposal No. 79267 S2
Chandler Heights Substation Canopy Revised: February 17, 2022 - Page 2
11:56 AM.
10F
3
Proposal CP21-1204-R1 FC! Construction, Chander Police Department 4040
L lone Steel Ive
4
631 West Commerce Avenue? Gilbert, Arizona 85233
480-926-0122 +EAX 480-926-9178
License: AZ 85457, CA 790298, NM 102676,NV 71416
PROPOSAL/CONTRACT BID # CP21-1204-R1, SHADE CARPORT STRUCTURE
(This must be with the Contract Di for this quote to be valid.)
JOB NAME: CHANDLER POLICE DEPARTMENT DATE: Thursday, January 20, 2022
JOB ADDRESS: AOdO EB CHANDLER HEIGHTS ROAD! DATE SENT: Thursday, January 20, 2022
CITY, STATE, ZIP: CHANDLER POLICE DEPARTMENT, AZ EXPIRES; _=Thustaytamary27-2022~ Price valid for 90 days
REFERENCE
STRAIGHT BEAM DOUBLE CANTILEVERED _ from 2/23/2022
DOUBLE POST & BEAM
CONTACTS: CHRIS REINA.
DIRECT EMAIL: creina@fciol.com
CUSTOMER: FCT-CONSTRUCTION ING: WEB SITE: www.feiolcom
ADDRESS: DIRECT: (623) 772-7400
CITY, STATE, ZIP: CELL: (480)-215-3449
EST: Rex Castafieda
PROPOSAL: Rex Castafieda
CHECKED By: Rick Dancer
WAGE'S: Standard
IND IG) Tun 1 [G2 [ro p=
OPT. #1-1.2 Base Price For Fabrication & Install (STRAIGHT BEAM DOUBLE CANTILEVERED )
Total Base Price
Sales Tax on Material Only.. &1.250,00.... Base Bid
Total Base Price Including Tax...
ice For Fabrication & Install (DOUBLE POST & BEAM )
Total Base Price
Sales Tax on Material
eluding Tax...
IN 1.3 OPTIONS SEE ADDER CLARIFICATION OF ADDED COST
ADD TO BASE PRICE FOR (29 ga. White on White Retro-Rib)... Included 910 LF
ADD TO BASE PRICE FOR (29 ga. 2" x 2-1/2" Painted to Match Canopy.)... Included 220 LF
included
eas: Ja ds 28-8... . RACOLS, & 3 BEAMS
Sore Ft 8 nn RAMRED le COLS & 3 BEAMS
6.COLS & 3 BEAMS
ADD TO BASE PRICE FOR Spolh Removal)...
Series ae aNiae Edie outing 6HSS-Cole& 2S Beams $2 646.60, 6.COLS. & 3 BEAMS
11:56 AM.
20F
3
a es ALL
i—4
8 ADD TO BASE PRICE FOR (Low Profile Exposed Piers in Landscape or Dirt). $250 / Each if Required
9 PERMITS... NOT INCLUDED
10 PRIVATE LOCATE.. NOT INCLUDED
IN 1.3A SPREAD FOOTINGS OPTIONS SEE ADDER CLARIFICATION OF ADDED COST
SPECIAL NOTE: Spread Footing Prices Below are theoretical and subject to change based on PERMIT
engineered footing designs specific to the character of the project site.
1 opr#1-ADD TO BASE PRICE FOR (First Two Spread Footing, 5' Wide x 9" Long x 2 Thick)... .. $3,600 / Each For First Two Spread Footings NCL, 2F
2 oPpT#1- ADD TO BASE PRICE FOR (Any Additional Spread Footing, 5' Wide x 9" Long x 2 Thick). $3,240 / Any Additonal Spread FootingsINCL 1EA
3 —OPTH2-ADD TO BASE PRICE FOR First Two Spremt Footing} Witte bomg x 2-Phivky = $2,700-/ Each For First Two Spread Feotings-
Pease cence (Any-Additional Spread Footing 4" Wider ?-Longx2-Fhiels $2,430 / Any Additonal Spread Footings
STRAIGHT BE.
DOUBLE, 2625 SQIFT
CANTILEVERED.
16 CPUs 7 LINES 3 COLUMNS & BEAMS 12x30 x 20" 12x26 x 35"
DOUBLE POST & HSS4x4x.3125x1] HSS4x4x.3125x1
2 OPT #2 2625 SQ/FT 16 CPUs 6 COLUMNS & BEAMS
BEAM 4.83 x 20' 4.83 x35"
1.2A BASE PRICE FABRICATE AND INSTALL
# of Drilled Footings: (3 OR 6 COLUMNS) 24 IN DIAMETER at required depth drilled footings is equal to the Number of Columns and Beams.
OPT #1 or OPT #2 Purlin LF: (536) LF 8 X 3-1/2 x 12ga., Black, Purlin Support.
Included Stamped AZ Engineering and Cales.
Paint: One coat Red or Gray Rust Inhibitive Primer, or the customer has the option to choose a color. The Price may be
increased due to the choice in color or the amount of coats necessary for color to apply. Anything greater that 2-3
mils in thickness of paint will be considered an increased in the numbers of coatings.
' THE ABOVE INCLUDES: all materials for, 16 spaces, 3 columns, beams, and footings, 1 independent structures to be preformed in ONE phase/mobilization,
ADD: $2,000.00 for cach extra phase mobilization.All carport footings to be installed after asphalt, in asphalt area of parking lot a minimum of 3 days after asphalt
is complete. Also includes freight, engineering for structure (acceptable for issuance of permits), fabrication, erection, excavated material removed to on-site
location (additional fee for off-site removal), site broom swept clean. All structural members to receive one coat of flat,tinted, oil-based primer field applied to
structure before decking to serve function as rust inhibitive coating protecting steel from outdoor elements, color to be PER BUYER. Roofing to be WHITE OR
TAN 29-gauge RETRO RIB.Proposal reflects 9 wide, 18 deep by 12'-0" CLEAR clear approximate spaces/stalls. Price for field installation is per OSHA Subpart
"R", if OSHA Subpart "M" is required and does not include Subpart "R" add a minimum $500.00 or $30 per space to meet this requirement.
? THE ABOVE DOES NOT INCLUDE: bonds, prevailing wages, sales tax, additional insurance, specific insurance requirements above general liability,
PROFESSIONAL LIABILITY INSURANCE, permits, site plan amendments, special inspections, soil fees, sono tube, gutters, down spouts, reglets, flashing, seal
tape to roof deck to weather-proof or water-tight roof system (carport intent is to provide sun protection, shade and shelter), fascia, gloss or semi-gloss finish paint,
shop applied primer, painting after hours (i.e. night time, Saturday, Sunday or holiday) available at extra charge, barricades or warning devices to segregate work
areas for clear access, electrical lighting, asphalt cutting or patching of caisson footings. An additional $40/footing will be charged for asphalt cutting or patching
with a $250 minimum. An additional $50/footing for drilling behind (landscape side) of curb or before asphalt with a $250 minimum. SPECIFICALLY
EXCLUDES POWER WASHING OR SWEEPING OF ASPHALT.
COURTYARD DESIGN a ee moons
Write a description for your map ; : ¥ 4040 E Chandler Heights Rd
= ~ 9 Chandler Police Department - Chandler?
12'-0" CLEAR MINIMUM
26GA. DECK
DRAIN
Staple (Sted, Ine. a | if | Luk
| 7 a WW. Contre Aas. Saber, Aoiewes B29
36’ STRAIGHT BEAM DOUBLE CANTLLEVERED faz, mers
SECTION A |
i.
2. PURLING
oe
4. SOunNS
&, POLE PRenNG
& TRE (OPTIONAL!
EXHIBIT B
FEE SCHEDULE
City of Chandler Job Order Project Agreement
Public Works & Utilities Department, Capital Projects Division
Project Name: CHANDLER HEIGHTS POLICE SUBSTATION COURTYARD COVER
Project No.: PD2208.401
Rev. 3/4/22
B-1
FCI
Constructors, Inc.
Chandler Heights Police Substation Fitness Yard Canopy
14-Mar-22
REV03
Base Project
Description Labor % Quantity Unit Unit Price Total Price
1 Office/Project Manager 25% 4 WKS $4,200 $4,200
2 Project Superintendent 100% 4 WKS $3,800 $15,200
3 Project Engineer 25% 4 WKS $2,800 $2,800
4 Project Estimator (Estimate Prep & Design Coordination) 100% ‘] WKS $4,200 $4,200
5 Administration Support 15% 0 WKS $2,200 $0
6 Project Vehicle Project Manager 25% 4 WKS $64 $256
6 Project Vehicle Superintendent 100% 4 WKS $256 $1,025
8 Vehicle Fuel and Maintenance Project Manager 25% 4 WKS $25 $100
9 Vehicle Fuel and Maintenance Superintendent 100% 4 WKS $100 $400
10 Cell Phone Project Manager 25% 4 WKS $4 $18
1 Cell Phone Superintendent 100% 4 WKS $28 $110
12 Internet/IT Rental - PM 25% 4 WKS $15 $61
13 Internet/IT Rental -Super 100% 4 WKS $61 $245
14 Project Safety 1 Ls $50 $50
15 Property Protection 1 LS $125 $125
16 Temporary Fencing/Barriers 4 WKS $125 $500
17 Temporary Toilets 4 WKS $175 $700
18 Dumpsters/Waste Removal 4 WKS $125 $500
19 Equipment Rental 0 WKS $500 $0
20 Documentation Reproduction/Office Supplies 0 WKS $50 $0
21 Continuous Clean of Building/Site 1 WKS $250 $250
22 Final Clean of Building/Site 0 WKS $250 $0
General Conditions $30,740.00]
Description Quantity Unit Unit Price Total Price
1 Fitness Canopy (3 columns option) - Skyline Steel 1 Ls $42,475 $42,475
2 Construction Permit / Testing & Special Inspection 1 Ls $5,905 $5,905
3 Soils Report 1 Ls $3,500 $3,500
4 Landscaping / Turf Repair (Allowance) 1 LS $2,500 $2,500
5 Private Locating 1 Ls $1,750 $1,750
6 Turf/Sidewalk Protection 1 Ls $2,490 $2,490
7 Powder Coat Finish to Columns & Beams 1 LS $3,548 $3,548
Vendor Subtotal $62,167.23}
TOTAL HARD COST $92,907.23
Overhaed & Profit 8.00% $7,432.58
SUBTOTAL $100,339.81
Insurance 1.00% $1,003.40
Bond 1.00% $1,003.40
Sales Tax (Point of Sale) 0.00% $0
Total Base Bid $102,346.61]
City's Allowance 10.00% $10,235
5'x9'x2'T Spread Footing Allowance $12,740
Total Base Bid with Allowances $125,321
Page 1
Bond No. 30156236 EXHIBIT C
PERFORMANCE BOND
ARIZONA STATUTORY PERFORMANCE BOND
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract amount)
KNOW ALL MEN BY THESE PRESENTS THAT:__/C! Constructors, Inc.
(hereinafter “Principal"), and Western Surety Company (hereinafter "Surety"), a
corporation organized and existing under the laws of the State of __ SD with its principal office in the City of
Sioux Falls holding a certificate of authority to transact surety business in Arizona issued by the
Director of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto
City of Chandler (hereinafter "Obligee") in the amount of Sne Hundred Twenty Five Thousand Three Hundred Twenty One and 00/100
(Dollars) ($125,321.00), for the payment whereof, Principal and Surety bind themselves, and their heirs, administrators,
executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated
the __ 18th day of __ March 2022 for construction of | CHANDLER HEIGHTS POLICE
CANOPY PO# PD2208.401, which contract is hereby referred to and made a part
hereof as fully and to the same extent as if copies at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal faithfully performs and
fulfills all the undertakings, covenants, terms, conditions and agreements of the contract during the original term of the
contract and any extension of the contract, with or without notice of the Surety, and during the life of any guaranty
required under the contract, and also performs and fulfills all the undertakings, covenants, terms, conditions, and
agreements of all duly authorized modifications of the contract that may hereafter be made, notice of which
modifications to the Surety being hereby waived, the above obligation is void. Otherwise it remains in full force and
effect.
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2,
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions of Title 34,
Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length in this Contract.
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that
may be fixed by a judge of the court.
Witness our hands this___23rd day of March 2022
FCI Constructors, Inc.
. PRINCIPAL
USI Insurance Services, LLC
AGENT OF RECORD
SURETY",
A
B%,
6501 South Fiddlers Green Circle, Suite 100
Greenwood Village, CO 80111
AGENT ADDRESS
Fig pend
a Vig <
eo,
“™
City of Chandler Job Order Project Agreement C-1
Public Works & Utilities Department, Capital Projects Division
Project Name: POLICE DEPARTMENT AIR CONDITIONER PROPERTY AND EVIDENCE 911 TRAINING ROOM
Project No.: BF2108.402
Rev. 9/18/2020
Bond No. 30156236 EXHIBIT D
PAYMENT BOND
ARIZONA STATUTORY PAYMENT BOND
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES
(Penalty of this Bond must be 100% of the Contract amount)
KNOW ALL MEN BY THESE PRESENTS THAT:_FCI Constructors, Inc.
(hereinafter "Principal"), as Principal, and Western Surety Company (hereinafter "Surety"), a corporation
organized and existing under the laws of the State of SD with its principal office in the City of
Sioux Falls, holding a certificate of authority to transact surety business in Arizona issued by the Director of the
Department of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto
City of Chandler (hereinafter "Obligee") in the amount of One Hundred Twenty Five Thousand Three Hundred Twenty One and 00/100
(Dollars) ($125,321.00), for the payment whereof, the Principal and Surety bind themselves, and their heirs,
administrators, executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 18th day of
—WMarch __, 2022 for construction of CHANDLER HEIGHTS POLICE CANOPY
PO# PD2208.401. which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal promptly pays all moneys
due to all persons supplying labor or materials to the Principal or the Principal's subcontractors in the prosecution of
the work provided for in said contract, this obligation is void. Otherwise it remains in full force and effect.
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions, conditions
and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length
in this Contract.
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney
may be fixed by a judge of the court. a
Witness our hands this _ 23rd day of March 2022
FCI Constructors, Inc.
PRINCIPAL SEAL
USI Insurance Services, LLC
AGENT OF RECORD
6501 South Fiddlers Green Circle, Suite 100
Greenwood Village, CO 80111
AGENT ADDRESS
City of Chandler Job Order Project Agreement D-1
Public Works & Utilities Department, Capital Projects Division
Project Name: POLICE DEPARTMENT AIR CONDITIONER PROPERTY AND EVIDENCE 911 TRAINING ROOM
Project No.: BF2108.402
Rev. 9/18/2020
Wester Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly erganized and oxisting corporation
having its principal office in the Clty of Sioux Falls, and State of South ‘Dakots, and that it does by virtue of the signature and seal herein affixed hereby
make, constitute and appoint
Kristin L, Salazar, Individually
of, Greenwood Village, CO, its tue and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and
on its behalf bonds, undertakings and other obligatory instamments of similar nature
~In Unlimited Amounts -
Surety BondNoz 30156236
Principals FC! Constructors, Inc.
Obligee: City of Chandler
and to bind it thereby as futly and to the same extent as if such instraments were signed by a duly authorized officer of the corporation and all the acts of said
Altomey, pursuant to the authority hereby given, are hereby ratified and confirmed.
‘This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adopicd, as indicated, by
the shareholders of the corporation.
In Witaess Whercof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate scat ta be
hereto affixed on this H6th day of June, 2021.
WESTERN SURETY COMPANY
‘aul T. Braftat, View President
State of South Dakota 5
County of Minnehaha
Qn this 16d: day of June, 2021, before me personally came Paul T. Bruflat, ta me known, who, being by me duly sworn, did depose and say: that he
resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which executed
the above instrument; that he knows the scai of said cozporation; that the seal affixed to the said instrament is such comporate seal; that it was sp affixed
pursuant to authorily given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges
same to be the act and deed of said corporation.
M ca . sername g
ly commission expires 4. BENT
OLTTARY PENI
March 2, 2026
M, Bent, Notary Public
CERTIFICATE
1, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that ihe Power of Attomey hereinabove set dorth is still in
force, and further certify that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I hove hereunto subscribed
my name and affixed the seal of the said corporation this 23rd day of March, 2022.
See WESTERN SURETY COMPANY
me
eS
"
Nh
Serax,
,
Fonn F4280-7-2012 7 “Se L, Nelson, Assistant Secretary
Go to www.cnasurety.com > Owner / Obligee Services > Valldate Bond Coverage, if you want to verify bond authenticity.
Authorizing By-Law
ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY
‘This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders
of the Company.
Section 7. Ak bonds, policies, undertakings, Powers of Aitorney, or other obligations of ihe corporation shatl ‘be executed in the
corporate name of the Company by the President, Secretary, and Assistant Seerelary, Treasurer, ox any Vice President, or by such other
officers. as fhe Board of Dixectors may authorize. The President, any Vice President, Secretacy, any Assistant Secretauy, or the Treasurer
may appoint Atomeys ts Fact or agents who shall have authosity to issue bonds, policies, or undertakings In the name of the Company.
The corporate seal is not mecessary for the validity of any bonds, policies, undertakings, Powers of Attormey or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile.
STATE
OF
ARIZONA
DEPARTMENT OF INSURANCE
THIS IS TO CERTIFY, THAT THIS
INSTRUMENT IS A FULL, TRUE AND
CORRECT COPY OF THE ORIGINAL ON
FILE WITH THE DEPARTMENT OF
INSURANCE OF THE STATE OF ARIZONA
AND CONSISTS OF 1 PAGE(S)